Barangay Road Gravelling (Crispin Dela Cruz)
Barangay Road Gravelling (Crispin Dela Cruz)
SUMMARY
A. DIRECT COST
A.1 Material Requirements Php 45,000.00
A.2 Labor Requirements Php 5,960.00
A.3 Equipment Rental Php 45,000.00
A.4 Contingencies Php 4,040.00
TOTAL ESTIMATED PROJECT COST PHP 100,000.00
A. DIRECT COST
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Total Estimated Direct Cost Err:509 Err:509
B. INDIRECT COST
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Total Estimated Indirect Cost Err:509 Err:509
Total Estimated Project Cost (EPC) Err:509 Err:509
Prepared by: VICENT JOHN A. PAREDES Checked by: OSCAR JAN M. MASILLONES, CE
Draftsman Engineering Assistant
Amount
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Amount
Err:509
Err:509
Err:509
Err:509
Err:509 2,563,145.68
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
, CE