PatimOne Consul FoRM -04
PACKAGE 5 CONTRACT
CAR TERMINAL CONSTRUCTION
REQUEST FOR INSPECTION (RFI)
Reference No._[TWWHAPTBPS-RFL-OV-23/004 Date Fe
‘Speceation/ Seetion 1.11.2 Coordination of Works | Pay item No n
Spectiaton/ leanen 1. Ct Works: 2 Oo ey Na
Location IcA1~A 31CA02, 1604, 3605 (Patimban - Subang, West Java - Indonesia)
Date & Time for Inspection/ Measurement (5 Fb 2023 a 09:00 a
(QUALITY REPORT,
Wo con Dac. [ef ZO Fama, [=
1. [Existing Benchmark Verieation TWA PPS HS GEO =
‘Attachment 1: Schedule of Inspection =
J. attachment 2 Location Drawing fr BM Verfieation 3
le. Atachment 3 : Equpment Uist 5
[Attachment 4 : Equipment Speciation 2
fe. Attachment 5 Cathicate of Caltatin a
| QUANTITY REPORT
Dialed Descrinion/Secon/Location Desion. | Acual
Me ‘ofthe Activity tobe Inspected Unit | ouantty | Quantity | éference
1 \Verfcation of Bisting Bencturark (as attached) Nes, 4
TOTAL
[CONTRACTOR'S NOTES:
frUnWiA Contact Person: Teaar 7
(Chet Surveyor TOA Corp Sr, Surveyor TOA Corp
Package 5, Patinban Project Pacage 5, Fimban Project
(052215035200) osisza0658)
ENGINEER'S REVIEW /COMMENTS
‘The above work(s) were inspected/surveyed withthe folowing resi
ape 8
| Accepted, subject to comments (pease see below comments) 8
Wi, ejected (Pease see betow comments Fay) —=~SCSCSCS~*~S~SS
[BASED OW THE ABOVE RESULTS, THE NEXT STAGE WAY ] WAY NOT PROCEED
‘The Contractor ‘The Enainesr
loate:03~62~1003 ate: 3 Feb 2023 ste: 3re6 3 loate: loot: