Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

A14JE Hydraulic Principle And Parameter

LINGONG HEAVY MACHINERY CO.,LTD.


CONTENTS

Part 1 : Hydraulic Control Principle And Parameters

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Hydraulic Symbols Instruction

Name Symbol Name Symbol Name Symbol


Constant  Pressure reducing
Flow line displacement pump valve

Variable
Drain line displacement pump
Flow control valve

Constant 
Connected displacement motor
Flow divider valve

Variable 2-position 2-way


Non-connected displacement motor reversing valve

3-position 4-way
Flow direction Safety valve reversing valve
One-way restrictive
Throttle valve Unloading valve valve
Single-acting
cylinder
Sequence valve Oil tank

Double-acting
cylinder
Check valve Oil filter

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1: Auxiliary Pump



(A14JE/A14JE-Li)
Auxiliary Pump
① Auxiliary Pump
② Auxiliary Pump Inlet(To Tank)
③ Auxiliary Pump outlet(To P1)
④ Outlet (To T1)
Displacement 1.3cc
System Pressure 22Mpa
Port Size M/P/A1/T=1/4''
Control Valve Check Valve/Relief Valve
LINGONG HEAVY MACHINERY CO.,LTD.
Part 1:Manifold Valve(A14JE)

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Manifold Valve
Installation
NO. Part Name And Function Qty. Max Pressure(Bar) Flow(L/min) Pilot Ratio
Toque
Check valve stcv08-0-000a, for controlling inlet flow direction
1 2 420 50 - 40-45
of 2-speed motor
2 Relief valve strv08-g-240a, limiting floating pressure 1 350 30 - 40-45
3 Relief valve strv08-b-120a 2 350 30 - 40-45
4 Check valve stcv08-0-004a 1 420 50 - 40-45
5 M6 damper, for controlling speed and stabilizing flow 1 - - - 3
6 Damper, for controlling speed and stabilizing flow 1 - - - 3
7 Solenoid valve, for switching between left turn and right turn 1 207 11 - 27.1
8 Solenoid valve sv08-30-0-n-0 2 207 15 - 27.1
9 Relief valve, for controlling platform swing speed 1 241 1.5 - 27.1
10 Solenoid valve sv08-47d-0-n-0 5 207 11 - 27.1
11 Flow valve, for controlling leveling speed 1 241 2.3 - 27.1
12 Balance valve, for controlling leveling and locking load 2 350 30 3:1 40-45
13 Plug 4bn-04wd 5 - - - 35-40
14 Plug 4bn-02wd 26 - - - 22-26
15 Coil, for controlling spool 14 - - - 5
LINGONG HEAVY MACHINERY CO.,LTD.
Part 1:Manifold Valve(A14JE)

Setting pressure(bar) 0-5L/min 235


Valve
2 Adjust range(bar) 120-350
Item Parameter
Setting pressure(bar) 0-5L/min 138
Rated pressure 240bar Valv
e3 Adjust range(bar) 50-220
Rated flow 10L/min
Setting pressure(bar) 0-5L/min 250
Control valve Check Valve/Relief Valve Valv
Adjust range(bar) 140-350
Connector DT04-2P 12V±15% e12
Pilot Ratio 3:1
Coil mounting torque 4
T G1/2
Coil voltage 20VDC±15%
P、T1 G3/8
Working temperature -30℃-110℃ Port
SEC1 M14*1.5 ISO-6149

Others G1/4

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Manifold Valve(A14JE)

Steering right Platform level down Rotating right Jib down Main boom down Tower boom descent Main boom retract

Relief valve2

Relief valve3-1 Relief valve3-1

Test Steering left Platform level up Rotating left Jib up Main boom descent Tower boom up Main boom extend

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Manifold Valve(A14JE)

Balance valve12-1 Balance valve12-2

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Manifold Valve(A14JE)
Installation
NO. Part Name And Function Qty. Max Pressure(Bar) Flow(L/min) Pilot Ratio
Toque
Check valve stcv08-0-000a, for controlling inlet flow direction
1 2 420 50 - 40-45
of 2-speed motor
2 Relief valve strv08-g-240a, limiting floating pressure 1 350 30 - 40-45
3 Relief valve strv08-b-120a 2 350 30 - 40-45
4 Check valve stcv08-0-004a 1 420 50 - 40-45
5 M6 damper, for controlling speed and stabilizing flow 1 - - - 3
6 Damper, for controlling speed and stabilizing flow 1 - - - 3
7 Solenoid valve, for switching between left turn and right turn 1 207 11 - 27.1
8 Solenoid valve sv08-30-0-n-0 2 207 15 - 27.1
9 Relief valve, for controlling platform swing speed 1 241 1.5 - 27.1
10 Solenoid valve sv08-47d-0-n-0 5 207 11 - 27.1
11 Flow valve, for controlling leveling speed 1 241 2.3 - 27.1
12 Balance valve, for controlling leveling and locking load 2 350 30 3:1 40-45
13 Plug 4bn-04wd 5 - - - 35-40
14 Plug 4bn-02wd 26 - - - 22-26
15 Coil, for controlling spool 14 - - - 5
LINGONG HEAVY MACHINERY CO.,LTD.
Part 1: Swing Cylinder

Swing cylinder

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1: Swing Cylinder
Swing cylinder
1 Swing angle 160°
2 Displacement 103ml/r
3 Rated pressure 210bar
Shaft
4 Setting pressure 21Mpa

Splined hub 5 Pilot Ratio 4:1


6 Maximum axial load 5000N
Shell 7 Maximum radial load 14000N
8 Gear clearance ±1°

Working principle of swing cylinder:


These three parts are in relative motion, forming two pairs of helix meshing. When the shell is fixed, the oil inlet from one oil port pushes the
spline sleeve side to rotate and move in the direction of the other oil port, so as to drive the rotation of the shaft and rotate the output flange; When
the output flange is fixed, the principle is the same. The oil inlet from one oil port drives the spline sleeve side to rotate and move in the direction
of the other oil port, which can realize the rotation of the shell and drive the swing of the structural parts connected with the four feet.

LINGONG HEAVY MACHINERY CO.,LTD.


Part 1:Rotaty Motor
Balance valve
Balance valve
Motor
1 Pilot Ratio 4.25:1

Port A 2 Setting pressure 25Mpa


Port B
3 Valve core number 2
Rotating motor
Brake 4 Displacement 475ml/r
5 Max pressure 17.5Mpa
6 Max rotating speed 10r/min
7 Maximum mounting torque 820N.m
8 Maximum flow 4.5L/min
Brake
9 Static braking torque 1640N.m
10 Brake release pressure 2.5-3Mpa
Rotating motor Brake 11 Max brake pressure 24.5Mpa

Direction of rotation: Seen from the shaft end of the motor, the motor rotates clockwise when A enters oil and B returns oil.
LINGONG HEAVY MACHINERY CO.,LTD.
3.Hydraulic system— Steering

Steering left Steering right

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system— Swing

swing left swing right

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system—Tower Boom

Tower boom lift Tower boom down

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system—Main Boom

Main boom lift Main boom down

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system—Main Boom

Main boom extend Main boom retract

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system—Jib

Jib Up Jib Down

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system—Platform

Left Right

LINGONG HEAVY MACHINERY CO.,LTD.


3.Hydraulic system— Platform

LINGONG HEAVY MACHINERY CO.,LTD.


Thank You

LINGONG HEAVY MACHINERY CO.,LTD.

You might also like