CYMA Theka Rate
CYMA Theka Rate
CYMA Theka Rate
Page 4 Page 1
MIZORAM CHHUNG ATANA THEKA RATE MIZORAM CHHUNG ATANA THEKA RATE
Sl. Sl.
Item of Works Unit Rate Item of Works Unit Rate
No. No.
1 Plinth Area (Brick leh Plaster telin) 10 Floor Tile
a) Slab / Floor 3 chin Sq.ft Rs.200 a) 2' x 2' size Sq.ft Rs.20
b) Slab / Floor 3 aia tam Sq.ft Rs.250 b) 1' x 1' size Sq.ft Rs.25
2 Plinth Area (RCC Works chauh) c) Bath room (Floor leh wall tiles) Sq.ft Rs.30
a) Slab / Floor 3 chin Sq.ft Rs.150 11 Marble leh Granite
b) Slab / Floor 3 aia tam Sq.ft Rs.200 a) Steps Sq.ft Rs.120
3 PCC Works (Rod telloa cement chhun) Cu.ft Rs.45 b) Floor Sq.ft Rs.80
4 RCC Works (Rod tela cement chhun) Cu.ft Rs.145 12 Stone Works (Lung rem) Cu.ft Rs.30
5 Brick Works
13 Ceiling Works (Material telin)
a) Brick bawk a rem (Half brick) Sq.ft Rs.22
a) Gypsum Board ceiling Sq.ft Rs.85
b) Brick chhawng a rem (Brick on edge) Sq.ft Rs.15
b) Hilux / Syntex ceiling Sq.ft Rs.105
6 Plaster Works
c) Cornice R/ft Rs.80
a) Chhung lam Sq.ft Rs.16
Mild Steel Pipes (Truss and Railing Works,
b) Pawn lam Sq.ft Rs.22 14 Kg Rs.120
Material telin)
c) Ceiling Sq.ft Rs.15
15 Inchung chih man (Material tel lovin)
7 AAC Works
Pre-coated steel roofing chih man
a) AAC rem man Sq.ft Rs.12 a) Sq.ft Rs.8
(Dyna, Tata, Shathyam, etc)
b) Chhung lam plaster Sq.ft Rs.14 b) CGI sheet roof (Rangva pangngai) Sq.ft Rs.5
c) Pawn lam plaster Sq.ft Rs.16 16 Plumbing Works (PVC/uPVC Pipes)
8 Wall Putty Sq.ft Rs.5 a) Surface (Phum bo lohvin) Point Rs.280
9 Painting b) Concealed (Phum bovin) Point Rs.350
a) Cement Paint (Chhung lam) Sq.ft Rs.4 17 Electrical Works
b) Cement Paint (Pawn lam) Sq.ft Rs.5 Surface / Casing Capping (Phum bo
a) Point Rs.250
c) Enamel Paint (Chhung lam) Sq.ft Rs.6 lohvin)
d) Enamel Paint (Pawn lam) Sq.ft Rs.7 b) Concealed (Phum bovin) Point Rs.400
Page 2 Page 3