LAST PLANNER

LOOK AHEAD
(HORIZONTE 4 SEMANAS)

Metrado Metrado
Metrado SEMANA 22 SEMANA 23 SEMANA 24
PROG PROG Metrado Rend. Meta Total
PARTIDAS DE CONTROL SEM 22-25
INIC FIN
Und Total Ejecutado
SALDO (und/día) Programa L M M J V S D L M M J V S D L M M J V S D
PLANILLA Acum.
do 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
MOVIMIENTO DE TIERRAS Y PAVIMENTOS - ING. JUAN HUAMÁN
SECTOR 1 25+000 35+000
Base - Adicional N°4
MOTONIVELADORA N° 01, NELSON - SB 27+930 28+810 m3 250 1,100 250.0 250.0 250.0 350.0
MOTONIVELADORA N° 01, NELSON - BG 29+210 29+350 m3 250 210 210.0
MOTONIVELADORA CAT 02, ENRIQUE - BG 29+630 29+975 m3 250 518 250.0 267.5
MOTONIVELADORA CAT 03, MAYCOL 32+320 32+660 m3 250 510 250.0 260.0
MOTONIVELADORA CAT 04, PAULINO 34+500 34+950 m3 250 675 250.0 250.0 175.0
Imprimación 25+000 26+000 m2 100,227 - 100,227 5,000 2,966 2,966
26+000 27+000 m2 5,932
27+000 28+000 m2 2,966

SECTOR 2 35+000 41+000


Conformación de terraplenes - Sub Rasante 35+000 40+100 m3 14,761 - 14,761 320 2,000 500.0 750.0 750.0
PLAN SEMANAL
SEMANA 45
DEL 07 DE NOVIEMBRE AL 13 DE NOVIEMBRE DEL 2022

NOVIEMBRE - SEMANA 45
ITEM DESCRIPCION UND METRADO 06 07 08 09 10 11 12 OBSERVACIONES
L M M J V S D
100 OBRAS PRELIMINARES Y PROVISIONALES
102.A TRAZO Y REPLANTEO
km 16+000 - km 70+000 km 12.00 2.00 2.00 2.00 2.00 2.00 2.00
km 70+000 - km 95+400 km 12.00 2.00 2.00 2.00 2.00 2.00 2.00
CONFORMACIÓN DE DME (EN USO)
km 13+200 m3 5,000.00 2,500.00 2,500.00 CAPACIDAD DE 32,000 m3
km 86+200 m3 15,000.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
km 87+100 m3 15,000.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
200 MOVIMIENTO DE TIERRAS
201.B DESBROCE Y LIMPIEZA DE ZONAS NO BOSCOSAS
km 23+410 - km 23+790 ha 0.18 0.03 0.03 0.03 0.03 0.03 0.03
205.C EXCAVACIÓN EN EXP. DE MAT. COMÚN Y ROCA SUELTA
TD km 21+990 - km 22+440 (DME 13) m3 6,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 TURNO DÍA
TN km 21+990 - km 22+440 (DME 13) m4 3,600.00 600.00 600.00 600.00 600.00 600.00 600.00 TURNO NOCHE
TN km 22+520 - km 22+700 (DME 42) m3 1,800.00 300.00 300.00 300.00 300.00 300.00 300.00 TURNO NOCHE
km 91+942 m3 1,600.00 400.00 400.00 400.00 400.00 DESVÍO
210.A CONFORMACIÓN DE TERRAPLENES
km 21+250 - km 21+480 m3 2,100.00 350.00 350.00 350.00 350.00 350.00 350.00 TERRAPLEN
km 23+190 - km 23+220 m3 1,050.00 350.00 350.00 350.00
km 86+380 - km 86+930 m3 4,800.00 800.00 800.00 800.00 800.00 800.00 800.00 TERRAPLEN
km 91+000 - km 92+000 m3 3,000.00 500.00 500.00 500.00 500.00 500.00 500.00 SUB RASANTE
km 91+000 - km 95+400 m3 7,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 TERRAPLEN
km 93+650 m3 2,700.00 450.00 450.00 450.00 450.00 450.00 450.00 DESVÍO
300 BASES Y SUBBASES
303.A SUB BASE GRANULAR
km 36+900 - km 37+270 m3 640.00 320.00 320.00
km 85+000 - km 86+000 m3 2,700.00 450.00 450.00 450.00 450.00 450.00 450.00
400 PAVIMENTO ASFÁLTICO
410.A3 MAC con polimeros
Km 25+000 - Km 30+000 m3 2,700.00 450.00 450.00 450.00 450.00 450.00 450.00 SEGUNDA CAPA - PAO N°7
500 OBRAS COMPLEMENTARIAS
501 MURO DE CONCRETO ARMADO
610.A EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
km 21+160 m3 630.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
610.I CONCRETO CLASE I (f'c 100 kg/cm2)
km 21+160 m3 21.60 2.40 2.40 2.40 2.40 4.80 4.80 2.40 Concreto Clase I (f'c 100 kg/cm2)
605.A RELLENO PARA ESTRUCTURAS
km 93+185 - km 93+250 m3 355.00 20.00 30.00 45.00 60.00 80.00 120.00
612.A ENCOFRADO Y DESENCOFRADO
km 21+160 m2 140.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
610.D CONCRETO CLASE D 20.6 MPa (210 Kg/cm2)
km 21+160 m3 180.00 18.00 18.00 18.00 18.00 36.00 54.00 18.00
615.A ACERO DE REFUERZO
km 21+160 kg 7,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00
LOSA RÍGIDA
615.A ACERO DE REFUERZO
km 16+000 - km 16+350 kg 11,200.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00
612.A ENCOFRADO Y DESENCOFRADO
km 16+000 - km 16+350 m2 112.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
610.I CONCRETO CLASE I (f'c 100 kg/cm2)
km 16+000 - km 16+350 m3 42.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 Concreto Clase I (f'c 100 kg/cm2)
610.D CONCRETO CLASE D 20.6 MPa (210 Kg/cm2)
km 16+000 - km 16+350 m3 11.20 1.60 1.60 1.60 1.60 1.60 1.60 1.60 Concreto f´c = 210kg/cm2
610.C CONCRETO CLASE D 20.6 MPa (280 Kg/cm2)
km 16+000 - km 16+350 m3 100.80 14.40 14.40 14.40 14.40 14.40 14.40 14.40 Concreto f´c = 280kg/cm2
600 OBRAS DE ARTE
ALCANTARILLA TMC
610.A EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
TMC 94+847.00 und 1.00 0.50 0.50
622.B TUBERIA CORRUGADA ACERO GALVANIZADO CIRCULAR D = 0.90 m.
TMC 93+042.50 und 0.50 0.50
TMC 94+847.00 1.00
605.A RELLENO PARA ESTRUCTURAS
TMC 93+042.50 und 0.50 0.25 0.25
612.A ENCOFRADO Y DESENCOFRADO
TMC 93+042.50 m2 30.40 6.40 10.00 14.00
TMC 94+847.00 m2 37.50 9.50 14.00 14.00
610.E CONCRETO CLASE E 17.2 MPa (175 Kg/cm2)
TMC 93+042.50 m3 7.00 2.50 4.50
TMC 93+828.00 m3 10.30 5.00 5.30
640.B EMBOQUILLADO
km 88+126 - km 88+638 m2 107.00 14.00 15.00 27.00 11.00 27.00 13.00 Concreto f´c = 175kg/cm2
SUBDRENES
625.B SUBDREN PROFUNDO
km 36+798 - km 36+900 ml 90.00 30.00 30.00 30.00
km 90+690 - km 90+810 ml 119.00 30.00 30.00 30.00 29.00
km 90+910 - km 90+955 ml 45.00 10.00 20.00 15.00
km 91+015 - km 91+110 ml 40.00 20.00 20.00
CUNETAS DE VIAS
636.C BORDILLOS
Km 60+000 - km 70+000 ml 210.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Concreto f´c = 175kg/cm2
Km 76+220 - km 76+380 ml 160.00 15.00 30.00 30.00 30.00 30.00 25.00 Concreto f´c = 175kg/cm2
636.C ZANJA DE DRENAJE
Km 59+000 – km 63+000 ml 350.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Km 80+570 ml 67.00 15.00 25.00 27.00
PEDRAPLEN
601.A EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS
km 93+710 - km 94+750 m3 4,800.00 800.00 800.00 800.00 800.00 800.00 800.00
680.A PEDRAPLENES
km 93+710 - km 94+750 m3 1,200.00 200.00 200.00 200.00 200.00 200.00 200.00 BASE
PONTONES
601.A EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS
km 22+945 PONTÓN CULLHUAY m3 1,367.00 348.00 200.00 200.00 200.00 200.00 219.00 EXCAVACIÓN EN SECO Y BAJO AGUA
FALSO PUENTE
km 24+350 PONTÓN CUSHPA m3 10.00 3.00 3.00 4.00 EXCAVACIÓN EN SECO Y BAJO AGUA
612.A ENCOFRADO Y DESENCOFRADO
km 24+350 m2 110.00 110.00
610.C CONCRETO CLASE D 20.6 MPa (280 Kg/cm2)
km 24+350 m3 65.00 65.00 Elevación y Ménsula LD
615.A ACERO DE REFUERZO
km 24+350 kg 12,000.00 3,000.00 3,000.00 3,000.00 3,000.00
PINTURA BITUMINOSA
km 24+350 m2 225.00 225.00
605.A RELLENO PARA ESTRUCTURAS
km 24+350 und 1,050.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
TUBO PVC SAP
km 24+350 und 8.00 8.00
800 SEÑALIZACION
860.A BARRERAS DE SEGURIDAD DE BORDE LATERAL
Km 39+000 - km 58+000 m 720.00 120.00 120.00 120.00 120.00 120.00 120.00 Lado derecho y lado izquierdo
805.A POSTES DELINEADORES
km 49+000 - 59+000 und 180.00 20.00 20.00 20.00 40.00 40.00 40.00 PINTADO
km 49+000 - 59+000 und 120.00 20.00 20.00 20.00 20.00 20.00 20.00 LIJADO Y LAMINADO
VOLADURA
CANTERA 83+700 m3 0.00
CANTERA KM 24+750
Material integral m3 1,800.00 300.00 300.00 300.00 300.00 300.00 300.00
Material relleno para terraplen m3 1,800.00 300.00 300.00 300.00 300.00 300.00 300.00
CANTERA KM 37+500
ZARANDEO DE MATERIAL
Producción de filtro m3 300.00 50.00 50.00 50.00 50.00 50.00 50.00
Produccion de corona m3 450.00 75.00 75.00 75.00 75.00 75.00 75.00
CANTERA KM 77+000
Transporte de material granular para terraplé m3 900.00 300.00 300.00 300.00 TURNO DÍA Y NOCHE
CANTERA KM 83+700
Producción de transicion m3 300.00 50.00 50.00 50.00 50.00 50.00 50.00 TURNO DÍA Y NOCHE
Producción Corona m3 480.00 80.00 80.00 80.00 80.00 80.00 80.00 TURNO DÍA Y NOCHE
Producción Integral m3 1,200.00 200.00 200.00 200.00 200.00 200.00 200.00 TURNO DÍA Y NOCHE
Transporte Material de Roca - Pedraplen m3 3,000.00 500.00 500.00 500.00 500.00 500.00 500.00 TURNO DÍA Y NOCHE
CHANCADORA KM 29+700
CHANCADO Y ZARANDEO DE MATERIAL
Arena N°4 terciaria para asfalto m3 450.00 75.00 75.00 75.00 75.00 75.00 75.00
CHANCADORA KM 80+150
CHANCADO Y ZARANDEO DE MATERIAL
Producción filtro m3 420.00 70.00 70.00 70.00 70.00 70.00 70.00 TURNO DÍA Y NOCHE
Producción de relleno de terraplen m3 330.00 55.00 55.00 55.00 55.00 55.00 55.00 TURNO DÍA Y NOCHE
Producción de subbase m3 660.00 110.00 110.00 110.00 110.00 110.00 110.00 TURNO DÍA Y NOCHE
Producción de base m3 4,320.00 720.00 720.00 720.00 720.00 720.00 720.00 TURNO DÍA Y NOCHE
700 TRANSPORTES
TRANSPORTE DE MATERIALES GRANULARES
700.A ENTRE CIENTO VEINTE METROS (120 m.) Y MIL
METROS (1000 m.)
MATERIAL DE SBG, BG, RELLENO m3/km 21,045.74 3,540.90 3,541.12 3,262.72 3,567.00 3,567.00 3,567.00 -
TRANSPORTE DE MATERIALES GRANULARES
700.B PARA DISTANCIAS MAYORES DE MIL METROS
(1000 m.)
MATERIAL DE SBG, BG, RELLENO m3/km 101,958.95 16,137.00 16,138.22 16,138.22 17,848.50 17,848.50 17,848.50 -

TRANSPORTE DE DESECHOS Y EXCEDENTES A


700.F DME ENTRE CIENTO VEINTE METROS (120 m.)
Y MIL METROS (1000 m.)
MATERIAL DE EXCAVACION NO CLASIFICADA m3/km 15,486.87 2,697.00 2,697.00 2,697.00 2,697.44 2,349.44 2,349.00 -
TRANSPORTE DE DESECHOS Y EXCEDENTES A
700.G DME PARA DISTANCIAS MAYORES DE MIL
METROS (1000 m.)
MATERIAL DE EXCAVACION NO CLASIFICADA m3/km 87,046.89 15,159.00 15,159.00 15,159.00 15,161.45 13,205.45 13,203.00 -
700.G TRANSPORTE DE ROCA PARA DISTANCIAS
ENTRE 120 M Y 1000 M.
MATERIAL DE CANTERA 83+700 PARA PEDRAP m3/km 0.00 - - - - - - -
MATERIAL DE VOLADURA DEL 37+500 AL 29+7 m3/km 585.00 97.50 97.50 97.50 97.50 97.50 97.50 -
700.H TRANSPORTE DE ROCA PARA DISTANCIAS
MAYORES DE MIL METROS (1000 m).
MATERIAL DE CANTERA 83+700 PARA PEDRAP m3/km 4,890.00 978.00 - 978.00 978.00 978.00 978.00 -
MATERIAL DE VOLADURA DEL 37+500 AL 29+7 m3/km 3,667.50 611.25 611.25 611.25 611.25 611.25 611.25 -
M
e
t
r
a
d
o PROGRAMADA SEMANA 46 EJECUTADO SEMANA 46 ANÁLISIS DE CUMPLIMIENTO
DESCRIPCIÓN DE LA PROG. PROG. UND
TOTAL TOTAL
ACTIVIDAD INICIAL FINAL A L M W J V S D PROG. L M W J V S D EJEC.
v SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
a 13 14 15 16 17 18 19 13 14 15 16 17 18 19
n
SEÑALIZACIÓN Y SEGURIDAD VIAL - ING. JAMES ESCURRA z
a
Barreras de seguridad de borde 50+000 55+000 m d 120.0 120.0 120.0 120.0 480 184 192 168 128 672 1 - Restricciones: Terminales
lateral - INGETRAFFIC o

Postes delineadores 49+000 54+000 und

Postes pintados 49+000 54+000 und 40.0 40.0 40.0 120 20 35 35 35 125 1 -

Postes laminados 49+000 54+000 und 20.0 20.0 20.0 20.0 80 25 25 25 75 - 1 PROG No se presentó reporte del domingo

MOVIMIENTO DE TIERRAS Y PAVIMENTOS - ING. JUAN HUAMÁN


SECTOR 1 00+000 35+000

Desbroce y limpieza de zonas no bo 23+410 23+790 ha 0.1 0.1 0.1 0.1 0.42 375 375 1 -

Excavación en Mat. Común y Roca su 21+850 21+900 m3 500.0 500.0 500.0 500.0 2,000.0 1,312 700 2,012 1 - Km 21+990@22+240 está a - 30 de la SR

23+330 23+780 m3 500.0 500.0 500.0 500.0 2,000.0 500 500 500 500 2,000 1 -

Banqueta 22+130 22+200 m3 30.0 30.0 150 300 208 658 1 -

22+240 22+290 m3 50.0 50.0 100.0 45 165 128 338 1 -

Terraplén 23+330 23+780 m3 350.0 350.0 350.0 350.0 1,400.0 350 350 700 - 1 PROG Avance al 50%

Base 16+220 16+350 m3 250.0 250.0 251 251 1 - Refine y acabado

17+400 17+440 m3 100.0 100.0 - - 1 CPP

Carpeta Asfáltica 25+000 27+920 m3 450 450 450 450 1,800 610 513 368 584 368 2,443 1 -

Conformación de DME 13+200 m3 2,500.0 2,500.0 2,500.0 2,500.0 10,000.0 2,500 2,500 2,500 2,500 10,000 1 -

SECTOR 2 35+000 41+000

Terraplén 36+800 37+780 m3 350.0 250.0 600.0 300 300 600 1 -

Base 37+560 37+760 m3 280.0 170.0 450.0 280 171 451 1 - En conformación

37+270 37+580 m3 720 720 Colocación de material


Partida 700.A TRANSPORTE DE MATERIALES GRANULARES ENTRE CIENTO VEINTE METROS (120 m) Y MIL METROS (1,000 m)
Partida 700.B TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE MIL METROS (1,000 m)

Cantera Km 37+500 Cantera Km 77+000


Ubicación (Km) 37+500 Ubicación (Km) 77+000
Acceso (Km) Acceso (Km) 2.331
Distancia de Momento de Distancia de Momento de
Progresiva Progresiva Transporte de Material Transporte de Material
Volumen Material Material
Inicio Final C.G Transporte (%) Transporte Granular (m3-Km) Transporte (%) Transporte Granular (m3-Km)
(Km) (Km) (m3) (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km
Sector 1
27+930 28+810 28+370 0.00 9.13 100% 0.00 0.00 0.00 0.00
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Sector 2
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509
Sector 3
0.00 0.00 0.00 0.00 79.33 0% 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sector 4
70+690 70+800 70+745 0.00 33.25 0.00 0.00 0.00 0.00 8.59 100% 0.00 0.00 0.00 0.00
59+000 66+000 62+500 2,450.00 25.00 0.00 0.00 0.00 0.00 16.83 100% 2,450.00 40,941.95 2,156.00 38,785.95
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sector 5
Err:509 Err:509 Err:509 Err:509 Err:509 0% Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509

71+250 71+290 71+270 0.00 33.77 8.06 100% 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Transporte de Material
Volumen
Granular (m3-Km)
(m3) D <= 1 Km D > 1 Km
Cantera Km 37+500 Err:509 Err:509 Err:509
Cantera Km 77+000 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

Emboq
Planta Trituradora Distancia de Concreto Emboquill. Piedra Volumen Volumen Volumen
Progresiva Progresiva uill.
CG Ejecutado e= Transportad 700.A 700.B
Inicial Final Ubicación acceso Transporte f'c 280 f'c 210 f'c 175 f'c 100 e = 0.35m Asentada Concreto Agregado
0.20m o
(Km) (Km) (Km) (Km) (m) (m) (Km) (m3) (m3) (m3) (m3) (m2) (m2) (m3) (m3) (m3) (m3) (Km) (m3 - Km) (Km) (m3 - Km)
Sector 1
84+818 0+000 42+409 29+700.000 122.00 1.00 12.83 1.00 1.00 1.00 1.00 0.88 0.88 11.83 11.83
25+000 35+000 30+000 29+700.000 122.00 0.00 0.42 - - - 0.30 - - -
24+920 35+000 29+960 29+700.000 122.00 0.00 0.38 - 0.26 - - -
Sector 2

Sector 3
54+000 59+000 56+500 29+700.000 122.00 0.00 26.92 - - - 0.88 - 25.92 -

Sector 4
70+674 70+910 70+792 83,700.00 498.00 0.00 13.41 - - - 0.88 - 12.41 -

Sector 5
82+695 82+725 82+710 83+700.000 498.00 0.00 1.49 0.00 0.00 - - 0.88 - 0.49 -
82+695 82+725 82+710 83+700.000 498.00 0.00 1.49 0.00 0.00 - - 0.88 - 0.49 -
Err:509 Err:509 Err:509 83+700.000 498.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509

Partida 700.E TRANSPORTE DE DESECHOS Y EXCEDENTES A DME ENTRE CIENTO VEINTE METROS (120 m) Y MIL METROS (1,000 m)
Partida 700.F TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA DISTANCIAS MAYORES A MIL METROS (1,000 m)

DME Km 42+000 DME Km 57+120 DME Km 65+500 DME Km 85+560 DME Km 86+200 DME Km 87+100
Ubicación (Km) 42+000 Ubicación (Km) 57+120 Ubicación (Km) 65+495 Ubicación (Km) 85+560 Ubicación (Km) 86+200 Ubicación (Km) 87+100
Acceso (Km) 0.210 Acceso (Km) 0.115 Acceso (Km) 0.066 Acceso (Km) 0.073 Acceso (Km) 0.368 Acceso (Km) 0.538

Progresiva C.G. Volumen Distancia de Momento de Transporte de Desechos y Distancia de Momento de Transporte de Desechos y Distancia de Momento de Transporte de Desechos y Distancia de Momento de Distancia de Momento de Distancia de Momento de Transporte de Material Granular
Transporte de Material Transporte de Material
Material Materiales Excedentes (m3- Material Materiales Excedentes (m3- Material Materiales Excedentes (m3- Material Material Material
Granular (m3-Km) Granular (m3-Km) (m3-Km)
Km) Km) Km)
Inicio Final Transporte (%) Transporte Transporte (%) Transporte Transporte (%) Transporte Transporte (%) Transporte Transporte (%) Transporte Transporte (%) Transporte
(Km) (Km) (m) (m3) (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km
Sector 1
Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Sector 2

Sector 3

Sector 4
0+000 0+000 0+000 0.00 42.21 0% 0.00 0.00 0.00 0.00 57.23 0.00 0.00 0.00 0.00 65.56 100% 0.00 0.00 0.00 0.00 85.63 0.00 0.00 0.00 0.00 86.57 0.00 0.00 0.00 0.00 87.64 0.00 0.00 0.00 0.00
71+000 85+000 78+000 3,250.00 36.21 0% 0.00 0.00 0.00 0.00 20.99 0.00 0.00 0.00 0.00 12.57 0% 0.00 0.00 0.00 0.00 7.63 100% 3,250.00 24,417.25 2,860.00 21,557.25 8.57 0.00 0.00 0.00 0.00 9.64 0.00 0.00 0.00 0.00
Sector 5
82+695 82+725 82+710 0.00 40.92 0% 0.00 0.00 0.00 0.00 25.70 0.00 0.00 0.00 0.00 17.28 0.00 0.00 0.00 0.00 2.92 100% 0.00 0.00 0.00 0.00 3.86 0.00 0.00 0.00 0.00 4.93 0.00 0.00 0.00 0.00
17+475 17+475 17+475 0.00 24.74 0% 0.00 0.00 0.00 0.00 39.76 0.00 0.00 0.00 0.00 48.09 100% 0.00 0.00 0.00 0.00 68.16 0% 0.00 0.00 0.00 0.00 69.09 0.00 0.00 0.00 0.00 70.16 0.00 0.00 0.00 0.00
TOTAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Transporte de Desechos y
Descripción Material
Materiales Excedentes (m3-Km)
DME Km 86+200 Err:509 Err:509 Err:509
DME Km 87+100 Err:509 Err:509 Err:509
Err:509 Err:509
Partida 700.G TRANSPORTE DE ROCA ENTRE CIENTO VEINTE METROS (120 m) Y MIL METROS (1,000 m)
Partida 700.H TRANSPORTE DE ROCA PARA DISTANCIAS MAYORES DE MIL METROS (1,000 m)

Cantera Km 67+300 Cantera Km 83+700


Ubicación (Km) 67+300 Ubicación (Km) 83+700
Acceso (Km) 0.350 Acceso (Km) 0.333
Progresiva Progresiva Material Distancia de Momento de Transporte de Roca (m3- Distancia de Momento de Transporte de Roca (m3-
Material Material
Inicio Final C.G Pedraplen Transporte (%) Transporte Km) Transporte (%) Transporte Km)
(Km) (Km) (m3) (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km (Km) (m3) (m3-Km) D <= 1 Km D > 1 Km
Sector 1
0.00 37.50 0.00 0.00 84.03 0.00 0.00
0.00 37.50 0.00 0.00 84.03 0.00 0.00
Sector 2
0.00 37.50 0.00 0.00 84.03 0.00 0.00
0.00 37.50 0.00 0.00 84.03 0.00 0.00
Sector 3
0.00 37.50 0.00 0.00 84.03 0.00 0.00
0.00 37.50 0.00 0.00 84.03 0.00 0.00
Sector 4
0.00 37.50 0.00 0.00 84.03 0.00 0.00
0.00 37.50 0.00 0.00 84.03 0.00 0.00
Sector 5
84+370 84+520 84+445 2,500.00 46.95 0.00 0.00 1.08 100% 2,500.00 2,395.00 2,200.00 195.00
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100% Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
CI
80%

71%
70%

62%
60%
54%

50%

40% 39%

32%
30%

21%
20% 19%

11% 11%
10%
7%
5% 5%
4%
2% 2% 1% 1%
1% 1%
0%
PROG LOG EQ QA/QC TOP

CI ACUMULADO - OBRA GEN


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 5 2 7 0 0 0
SEM 15 6 2 4 3 0 2
SEM 16 15 1 3 0 0 3
SEM 17 14 3 5 0 0 4
SEM 18 6 0 8 1 0 2
SEM 19 12 0 12 0 0 8
SEM 20 10 0 5 0 0 12
SEM 21 19 0 2 0 0 5
SEM 22 7 1 1 0 0 0
SEM 23 13 4 4 0 0 5
SEM 24 18 8 9 0 0 3
SEM 25 9 2 15 0 0 6
SEM 26 18 0 6 0 0 7
SEM 27 15 0 7 0 0 7
SEM 28 5 0 4 0 0 2
SEM 29 13 0 12 0 0 2
SEM 30 21 0 13 0 0 1
SEM 31 9 0 2 0 0 5
SEM 32 4 0 4 0 0 0
SEM 33 7 0 3 0 0 0
SEM 34 16 0 6 0 0 1
SEM 35 6 0 6 0 0 0
SEM 36 11 0 7 0 0 0
SEM 37 16 0 10 0 0 9
SEM 38 5 0 6 0 0 4
SEM 39 17 0 5 0 0 2
SEM 40 13 0 5 0 0 2
SEM 41 13 0 5 0 0 2
SEM 42 16 0 5 0 0 0
SEM 43 12 1 4 0 0 4
SEM 44 10 1 2 0 0 0
SEM 45 0 0 0 0 0 0
SEM 46 0 0 0 0 0 0
SEM 47 0 0 0 0 0 0
Total 361 25 187 4 0 98
% 41% 3% 21% 0% 11%

CI ACUMULADO - MOVIMIENTO DE TIERRAS Y P


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 0 0 0 0 0 0
SEM 15 1 0 0 2 0 0
SEM 16 3 0 0 0 0 0
SEM 17 0 0 0 0 0 0
SEM 18 4 0 0 0 0 0
SEM 19 6 0 2 0 0 1
SEM 20 5 0 0 0 0 0
SEM 21 7 0 0 0 0 0
SEM 22 0 0 0 0 0 0
SEM 23 1 1 0 0 0 0
SEM 24 1 0 1 0 0 0
SEM 25 0 0 2 0 0 0
SEM 26 2 0 1 0 0 0
SEM 27 3 0 0 0 0 0
SEM 28 0 0 0 0 0 0
SEM 29 2 0 2 0 0 0
SEM 30 2 0 1 0 0 0
SEM 31 2 0 0 0 0 0
SEM 32 1 0 1 0 0 0
SEM 33 0 0 0 0 0 0
SEM 34 2 0 0 0 0 0
SEM 35 1 0 0 0 0 0
SEM 36 0 0 0 0 0 0
SEM 37 4 0 1 0 0 0
SEM 38 2 0 1 0 0 0
SEM 39 4 0 0 0 0 0
SEM 40 4 0 0 0 0 0
SEM 41 4 0 0 0 0 0
SEM 42 13 0 0 0 0 0
SEM 43 4 1 0 0 0 0
SEM 44 1 0 0 0 0 0
SEM 45
SEM 46
SEM 47
Total 79 2 12 2 0 1
% 71% 2% 11% 2% 1%

CI ACUMULADO - MOVIMIENTO DE TIERRAS Y P


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 1 0 0 0 0 0
SEM 15 2 0 0 0 0 0
SEM 16 3 0 0 0 0 0
SEM 17 0 0 1 0 0 2
SEM 18 0 0 2 1 0 0
SEM 19 1 0 3 0 0 2
SEM 20 1 0 0 0 0 5
SEM 21 0 0 0 0 4 2
SEM 22 0 0 0 0 0 0
SEM 23 5 0 0 0 0 1
SEM 24 6 0 1 0 1 0
SEM 25 0 0 2 0 0 0
SEM 26 8 0 2 0 0 0
SEM 27 2 0 3 0 0 1
SEM 28 1 0 0 0 0 0
SEM 29 4 0 3 0 0 2
SEM 30 8 0 1 0 0 1
SEM 31 1 0 1 0 0 2
SEM 32 1 0 1 0 2 0
SEM 33 2 0 1 0 0 0
SEM 34 2 0 3 0 0 0
SEM 35 1 0 1 0 2 0
SEM 36 2 0 1 0 0 0
SEM 37 1 0 0 0 0 0
SEM 38 0 0 1 0 0 3
SEM 39 0 0 2 0 0 2
SEM 40 0 0 2 0 0 2
SEM 41 1 0 1 0 0 0
SEM 42 0 0 0 0 0 0
SEM 43 1 0 0 0 0 0
SEM 44 0 0 0 0 0 0
SEM 45
SEM 46
SEM 47
Total 54 0 32 1 9 25
% 32% 19% 1% 5% 15%

CI ACUMULADO - ESTRUCTURAS, OBRAS DE ART


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 0 0 0 0 0 0
SEM 15 0 0 0 0 0 0
SEM 16 0 0 0 0 0 0
SEM 17 0 0 0 0 0 1
SEM 18 1 0 1 0 0 0
SEM 19 2 0 0 0 0 0
SEM 20 0 0 0 0 0 0
SEM 21 3 0 0 0 0 0
SEM 22 3 0 0 0 0 0
SEM 23 4 0 1 0 0 0
SEM 24 5 0 0 0 0 1
SEM 25 2 0 3 0 0 0
SEM 26 2 0 1 0 1 0
SEM 27 4 0 0 0 0 0
SEM 28 1 0 1 0 0 0
SEM 29 2 0 0 0 0 0
SEM 30 2 0 0 0 0 0
SEM 31 1 0 0 0 0 0
SEM 32 0 0 0 0 0 0
SEM 33 3 0 1 0 0 0
SEM 34 5 0 0 0 0 1
SEM 35 1 0 2 0 0 0
SEM 36 3 0 1 0 0
SEM 37 4 0 1 0 0 0
SEM 38 3 0 0 0 0 0
SEM 39 8 0 0 0 0 0
SEM 40 4 0 0 0 0 0
SEM 41 2 0 2 0 0 0
SEM 42 3 0 1 0 0 0
SEM 43 4 0 0 0 0 4
SEM 44 4 0 0 0 0 0
SEM 45
SEM 46
SEM 47
Total 76 0 15 0 1 7
% 54% 11% 1% 5%

CI ACUMULADO - ESTRUCTURAS, OBRAS DE ART


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 0 0 1 0 0 0
SEM 15 1 2 1 0 0 2
SEM 16 3 0 0 0 0 0
SEM 17 13 3 0 0 0 1
SEM 18 0 0 0 0 0 2
SEM 19 3 0 4 0 0 3
SEM 20 4 0 0 0 0 7
SEM 21 9 0 0 0 0 3
SEM 22 1 1 0 0 0 0
SEM 23 3 3 0 0 0 4
SEM 24 2 4 0 0 2 2
SEM 25 7 2 0 0 0 6
SEM 26 5 0 0 0 0 7
SEM 27 3 0 0 0 0 6
SEM 28 1 0 0 0 0 2
SEM 29 4 0 0 0 0 0
SEM 30 9 0 2 0 0 0
SEM 31 5 0 0 0 0 3
SEM 32 2 0 0 0 0 0
SEM 33 0 0 0 0 0 0
SEM 34 7 0 0 0 0 0
SEM 35 3 0 1 0 0 0
SEM 36 6 0 0 0 0 0
SEM 37 7 0 1 0 0 8
SEM 38 0 0 2 0 0 1
SEM 39 5 0 0 0 0 0
SEM 40 5 0 0 0 0 0
SEM 41 5 0 2 0 0 0
SEM 42 0 0 4 0 0 0
SEM 43 1 0 2 0 0 0
SEM 44 1 1 0 0 0 0
SEM 45
SEM 46
SEM 47
Total 115 16 20 0 2 57
% 39% 5% 7% 1% 19%

CI ACUMULADO - PRODUCCIÓN DE AGREGA


SEM/CI PROG LOG EQ QA/QC TOP EXT
SEM 14 4 2 6 0 0 0
SEM 15 2 0 3 1 0 0
SEM 16 6 1 3 0 0 3
SEM 17 1 0 4 0 0 0
SEM 18 1 0 5 0 0 0
SEM 19 0 0 3 0 0 2
SEM 20 0 0 5 0 0 0
SEM 21 0 0 2 0 0 0
SEM 22 3 0 1 0 0 0
SEM 23 0 0 3 0 0 0
SEM 24 4 4 7 0 0 0
SEM 25 0 0 8 0 0 0
SEM 26 1 0 2 0 0 0
SEM 27 3 0 4 0 0 0
SEM 28 2 0 3 0 0 0
SEM 29 1 0 7 0 0 0
SEM 30 0 0 9 0 0 0
SEM 31 0 0 1 0 0 0
SEM 32 0 0 2 0 0 0
SEM 33 2 0 1 0 0 0
SEM 34 0 0 3 0 0 0
SEM 35 0 0 2 0 0 0
SEM 36 0 0 5 0 0 0
SEM 37 0 0 7 0 0 1
SEM 38 0 0 2 0 0 0
SEM 39 0 0 3 0 0 0
SEM 40 0 0 3 0 0 0
SEM 41 1 0 0 0 0 2
SEM 42 0 0 0 0 0 0
SEM 43 2 0 2 0 0 0
SEM 44 4 0 2 0 0 0
SEM 45
SEM 46
SEM 47
Total 37 7 108 1 0 8
% 21% 4% 62% 1% 5%
ANÁLISIS DE CAUSAS DE INCUMPLIMIENTO (CI) ACUMULADO
(POR FRENTES Y GENERAL)

CI ACUMULADO POR FRENTES

20%
19% 19%20%
15%

5% 5% 5% 6%
5% 5% 4% 3% 3% 4%
2%
1% 1% 1% 1%

A/QC TOP EXT CPP ING SUP/PERM EJEC

ACUMULADO - OBRA GENERAL


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 14
0 0 0 0 0 0 17
0 0 0 0 0 0 22
0 6 0 1 0 0 33
0 4 0 4 2 0 27
2 6 0 1 0 0 41
0 0 5 0 4 2 38
5 0 0 0 1 0 32
4 0 0 0 1 0 14
1 0 0 1 2 0 30
8 0 0 2 1 0 49
6 0 0 0 6 0 44
16 0 0 0 1 0 48
11 0 0 0 0 0 40
4 0 0 0 0 0 15
10 0 0 0 0 0 37
0 0 0 0 0 0 35
4 0 0 0 1 0 21
4 0 0 0 0 0 12
7 2 0 0 2 0 21
9 0 0 0 0 0 32
1 0 0 0 1 0 14
6 3 0 0 0 0 27
1 0 0 0 2 0 38
2 0 0 0 2 0 19
4 0 0 1 0 0 29
4 0 0 1 0 0 25
3 0 0 3 0 0 26
15 0 0 0 0 0 36
1 0 0 0 0 0 22
5 0 0 0 0 0 18
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
133 21 5 14 26 2 876
15% 2% 1% 2% 3% 0% 100%

VIMIENTO DE TIERRAS Y PAVIMENTOS TRAMO 2A


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 0
0 0 0 0 0 0 3
0 0 0 0 0 0 3
0 0 0 1 0 0 1
0 0 0 1 0 0 5
0 0 0 1 0 0 10
0 0 0 0 1 0 6
0 0 0 0 1 0 8
0 0 0 0 1 0 1
0 0 0 0 1 0 3
0 0 0 0 0 0 2
1 0 0 0 2 0 5
0 0 0 0 0 0 3
1 0 0 0 0 0 4
0 0 0 0 0 0 0
0 0 0 0 0 0 4
0 0 0 0 0 0 3
0 0 0 0 0 0 2
0 0 0 0 0 0 2
0 0 0 0 0 0 0
0 0 0 0 0 0 2
0 0 0 0 0 0 1
0 0 0 0 0 0 0
0 0 0 0 0 0 5
0 0 0 0 0 0 3
0 0 0 0 0 0 4
0 0 0 0 0 0 4
2 0 0 0 0 0 6
1 0 0 0 0 0 14
0 0 0 0 0 0 5
1 0 0 0 0 0 2
0
0
0
6 0 0 3 6 0 111
5% 3% 5% 100%

VIMIENTO DE TIERRAS Y PAVIMENTOS TRAMO 2B


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 1
0 0 0 0 0 0 2
0 0 0 0 0 0 3
0 0 0 0 0 0 3
0 0 0 3 1 0 7
1 0 0 0 0 0 7
0 0 0 0 0 0 6
2 0 0 0 0 0 8
0 0 0 0 0 0 0
0 0 0 0 0 0 6
2 0 0 0 1 0 11
5 0 0 0 3 0 10
7 0 0 0 1 0 18
5 0 0 0 0 0 11
1 0 0 0 0 0 2
1 0 0 0 0 0 10
0 0 0 0 0 0 10
1 0 0 0 0 0 5
1 0 0 0 0 0 5
2 0 0 0 0 0 5
3 0 0 0 0 0 8
0 0 0 0 0 0 4
0 0 0 0 0 0 3
1 0 0 0 2 0 4
0 0 0 0 0 0 4
1 0 0 1 0 0 6
1 0 0 1 0 0 6
0 0 0 0 0 0 2
0 0 0 0 0 0 0
0 0 0 0 0 0 1
0 0 0 0 0 0 0

34 0 0 5 8 0 168
20% 3% 5% 100%

RUCTURAS, OBRAS DE ARTE Y DRENAJE TRAMO 2A


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 1
0 0 0 0 0 0 2
1 0 0 0 0 0 3
0 0 5 0 0 0 5
3 0 0 0 0 0 6
3 0 0 0 0 0 6
0 0 0 0 0 0 5
0 0 0 2 0 0 8
0 0 0 0 0 0 5
3 0 0 0 0 0 7
0 0 0 0 0 0 4
1 0 0 0 0 0 3
0 0 0 0 0 0 2
0 0 0 0 0 0 2
1 0 0 0 0 0 2
0 0 0 0 0 0 0
1 0 0 0 0 0 5
1 0 0 0 0 0 7
0 0 0 0 0 0 3
1 3 0 0 0 0 8
0 0 0 0 0 0 5
0 0 0 0 2 0 5
1 0 0 0 0 0 9
1 0 0 0 0 0 5
1 0 0 3 0 0 8
5 0 0 0 0 0 9
0 0 0 0 0 0 8
3 0 0 0 0 0 7
26 3 5 5 2 0 140
19% 2% 4% 4% 1% 100%

RUCTURAS, OBRAS DE ARTE Y DRENAJE TRAMO 2B


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 1
0 0 0 0 0 0 6
0 0 0 0 0 0 3
0 6 0 0 0 0 23
0 4 0 0 0 0 6
0 6 0 0 0 0 16
0 0 0 0 3 2 16
0 0 0 0 0 0 12
1 0 0 0 0 0 3
0 0 0 1 1 0 12
6 0 0 0 0 0 16
0 0 0 0 0 0 15
1 0 0 0 0 0 13
5 0 0 0 0 0 14
2 0 0 0 0 0 5
9 0 0 0 0 0 13
0 0 0 0 0 0 11
2 0 0 0 0 0 10
3 0 0 0 0 0 5
3 2 0 0 2 0 7
5 0 0 0 0 0 12
1 0 0 0 0 0 5
4 0 0 0 0 0 10
0 0 0 0 0 0 16
1 0 0 0 0 0 4
2 0 0 0 0 0 7
2 0 0 0 0 0 7
0 0 0 0 0 0 7
9 0 0 0 0 0 13
1 0 0 0 0 0 4
1 0 0 0 0 0 3

58 18 0 1 6 2 295
20% 6% 0% 2% 1% 100%

PRODUCCIÓN DE AGREGADOS TRAMO 2A Y 2B


CPP ING SUP/PERM EJEC ADM/RRHH SC SUMA
0 0 0 0 0 0 12
0 0 0 0 0 0 6
0 0 0 0 0 0 13
0 0 0 0 0 0 5
0 0 0 0 1 0 7
0 0 0 0 0 0 5
0 0 0 0 0 0 5
0 0 0 0 0 0 2
0 0 0 0 0 0 4
1 0 0 0 0 0 4
0 0 0 0 0 0 15
0 0 0 0 1 0 9
5 0 0 0 0 0 8
0 0 0 0 0 0 7
0 0 0 0 0 0 5
0 0 0 0 0 0 8
0 0 0 0 0 0 9
0 0 0 0 1 0 2
0 0 0 0 0 0 2
1 0 0 0 0 0 4
0 0 0 0 0 0 3
0 0 0 0 1 0 3
1 0 0 0 0 0 6
0 0 0 0 0 0 8
1 0 0 0 0 0 3
0 0 0 0 0 0 3
0 0 0 0 0 0 3
0 0 0 0 0 0 3
0 0 0 0 0 0 0
0 0 0 0 0 0 4
0 0 0 0 0 0 6

9 0 0 0 4 0 174
5% 2% 100%
O (CI) ACUMULADO

Mov. Tierras y Pav - 2A

Mov. Tierras y Pav - 2B

Estruct. OA y Dren - 2A

Estruct. OA y Dren - 2B

Producción de Agregados

5% 5%
4% 3% 3% 4%
0% 1% 2% 2% 1%

SUP/PERM EJEC ADM/RRHH SC

CI ACUMULADO - OBRA GENERAL

SUP/PERM
1% EJEC
2% ADM/RRHH SC
ING 3% 0%
2% PROG

LOG

CPP
15% EQ

PRO QA/QC
1% EJEC
2% ADM/RRHH SC
ING 3% 0%
2% PROG

LOG

CPP
15% EQ

PRO QA/QC
G
41%
TOP

EXT

CPP

EXT ING
11%
SUP/PERM

QA/ EJEC
QC
0%
ADM/RRHH

LOG SC
EQ 3%
21%

CI ACUMULADO - MOV DE TIERRAS Y PAVIMENTOS 2A

ADM/RRHH
EJE
C 5% PROG
CP 3%
P
5% LOG
QAEX
/ T
QC1% EQ
2%
QA/QC

EQ TOP
11
%
EXT

CPP

ING
LO
G SUP/
2% PERM
EQ TOP
11
%
EXT

CPP

ING
LO
G SUP/
2% PERM

EJEC

PR ADM/
OG RRHH
71
%
SC

CI ACUMULADO - MOV TIERRAS Y PAVIMENTOS 2B

ADM/RRHH
EJEC 5%
3%
PROG
PR
O LOG
G
CP 32
P EQ
%
20
% QA/QC

TOP

EXT

CPP

ING

SUP/
PERM

EJEC
EX
T ADM/
15 RRHH
%
EQ
19 SC
TOP %
5% QA/QC
1%
EJEC
EX
T ADM/
15 RRHH
%
EQ
19 SC
TOP %
5% QA/QC
1%

CI ACUMULADO - ESTRUCTURAS, OA Y DREN 2A

PROG
SUP
/
PER EJEC ADM/RRHH
M 4% 1% LOG

ING 4%
2% EQ

QA/QC

CPP TOP
19%

EXT

CPP

PRO
G
ING
54%

EXT
SUP/PERM
5%
TOP
1%
EJEC

EQ
11% ADM/RRHH

SC
CI ACUMULADO - ESTRUCTURAS, OA Y DREN 2B

ADM/RRHH
EJEC SC
ING 2% 0% 1%
6% PROG

LOG

EQ
PR
CPP OG
20 39 QA/QC
% %
TOP

EXT

CPP

ING

SUP/PERM

EJEC

EXT ADM/RRHH
19
% LO
SC
G
TOP EQ 5%
1% 7%

CI ACUMULADO - PRODUCCIÓN DE AGREGADOS 2A Y 2B


CI ACUMULADO - PRODUCCIÓN DE AGREGADOS 2A Y 2B

ADM/RRHH
CPP 2% PR
EX 5% O
QA T G PROG
/ 5% 21
QC %
1% LOG

EQ

QA/QC

LO TOP
G
4%
EXT

CPP

ING

SUP/PERM

EJEC

ADM/RRHH

SC
EQ
62
%
ORDEN DE MÉRITO POR PROMEDIO HISTÓRICO DE PPC
FRENTE RESPONSABLE
PRODUCCIÓN DE AGREGADOS Y CANTERAS JIMMY SALVATIERRA
ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE CRISPIN MAMANI
MOVIMIENTO DE TIERRAS Y PAVIMENTOS YURI AROTOMA

ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE JAVIER CÁRDENAS


SEÑALIZACIÓN Y SEGURIDAD VIAL JAMS ESCURRA
MOVIMIENTO DE TIERRAS Y PAVIMENTOS JUAN HUAMÁN
OBRA GENERAL - TRAMO 2A Y 2B
CONFIABILIDAD META DE PLANIFICACIÓN (PPC META)

PPC META VS. PPC EJECUTADO - OBRA GENERAL


100%

90%

80% 75% 74%


70% 7
70% 68%
64% 63%
61% 61% 62%
58% 59%
60% 56% 56% 54% 55%
53%
50% 50% 51% 50% 52% 49%
51%
50%
43%
40%

30%

20%

10%

0%
SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM S
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

SEMANAL ACUMULADO META

OBRA GENERAL

TAREAS PROGRAMADAS TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO SEMANAL
SEM 14 28 28 14 14 50%
SEM 15 43 71 24 38 56%
SEM 16 50 121 28 66 56%
SEM 17 67 188 41 107 61%
SEM 18 70 258 43 150 61%
SEM 19 88 346 44 194 50%
SEM 20 81 427 43 237 53%
SEM 21 92 519 57 294 62%
SEM 22 105 624 45 339 42.9%
SEM 23 101 725 65 404 64.4%
SEM 24 93 818 47 451 50.5%
SEM 25 84 902 42 493 50.0%
SEM 26 82 984 43 536 52.4%
SEM 27 89 1073 48 584 53.9%
SEM 28 113 1186 65 649 57.5%
SEM 29 80 1266 44 693 55.0%
SEM 30 72 1338 35 728 48.6%
SEM 31 70 1408 49 777 70.0%
SEM 32 64 1472 48 825 75.0%
SEM 33 71 1543 48 873 67.6%
SEM 34 78 1621 46 919 59.0%
SEM 35 58 1679 43 962 74.1%
SEM 36 75 1754 47 1009 62.7%
SEM 37 74 1828 38 1047 51.4%
SEM 38 74 1902 53 1100 71.6%
SEM 39 72 1974 36 1136 50.0%
SEM 40 72 2046 36 1172 50.0%
SEM 41 65 2111 38 1210 58.5%
SEM 42 92 2203 53 1263 57.6%
SEM 43 66 2269 44 1307 66.7%
SEM 44 63 2332 41 1348 65.1%
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52

PROM 58%
EDIO HISTÓRICO DE PPC
TRAMO PPC PRINCIPAL CI
2A Y 2B 67% EQ Y PROG
2B 61% PROG Y EXT
2B 60% PROG Y EQ

2A 52% PROG Y CPP


2A Y 2B 50% SC
2A 47% PROG Y EQ
58% PROG Y EQ
75%

TADO - OBRA GENERAL PPC META VS. PPC EJECUTA


100%
100%
90%

75% 80% 75% 75%


74%
70% 72%
68% 67% 65% 70% 67%
63%
59% 58% 58% 60%
55%
51% 50% 50%
49% 50% 44% 44%
40% 33%
30% 25%25% 27% 2
20% 17%

10%
0%
0%
SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM 14 15 1 6 17 1 8 1 9 20 2 1 22 2 3 2 4 25
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 M M M M M M M M M M M M M
SE SE SE SE SE SE SE SE SE SE SE SE SE
UMULADO META SEMANAL

MOVIMIENTO DE T

PPC TAREAS PROGRAMADAS


ACUMULADO META SEMANAL ACUMULADO

50% 80.0% SEM 14 2 2


54% 80.0% SEM 15 4 6
55% 80.0% SEM 16 4 10
57% 80.0% SEM 17 4 14
58% 80.0% SEM 18 9 23
56% 80.0% SEM 19 12 35
56% 80.0% SEM 20 9 44
57% 80.0% SEM 21 11 55
54% 80.0% SEM 22 6 61
56% 80.0% SEM 23 6 67
55% 80.0% SEM 24 8 75
55% 80.0% SEM 25 9 84
54% 80.0% SEM 26 4 88
54% 80.0% SEM 27 5 93
55% 80.0% SEM 28 5 98
55% 80.0% SEM 29 4 102
54% 80.0% SEM 30 5 107
55% 80.0% SEM 31 4 111
56% 80.0% SEM 32 3 114
57% 80.0% SEM 33 5 119
57% 80.0% SEM 34 6 125
57% 80.0% SEM 35 2 127
58% 80.0% SEM 36 3 130
57% 80.0% SEM 37 5 135
58% 80.0% SEM 38 8 143
58% 80.0% SEM 39 6 149
57% 80.0% SEM 40 6 155
57% 80.0% SEM 41 11 166
57% 80.0% SEM 42 26 192
58% 80.0% SEM 43 12 204
58% 80.0% SEM 44 12 216
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52
PPC HISTÓRICO POR FREN

META VS. PPC EJECUTADO - MOV. DE TIERRAS Y PAVIMENTOS 2A PPC


100% 100% 100%
100%
90%
75% 80%
67% 67% 67% 70% 67%
63%
58% 60%
60% 57% 56%
50% 50% 50%
44% 45% 46% 50%
40%
33% 33% 33%33% 40%
27% 27%
25% 30%
20%
% 20%
10%
0% 0% 0%
0%
20 2 1 22 2 3 2 4 25 2 6 27 28 2 9 30 3 1 32 3 3 3 4 35 3 6 37 38 3 9 40 41 4 2 43 44 14 15 1 6 1 7 1 8 1 9
E SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM
M
EM EM EM EM EM EM EM
S S S S S S S

SEMANAL ACUMULADO META

MOVIMIENTO DE TIERRAS Y PAVIMENTOS - TRAMO 2A

TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO META

2 2 100% 100.0% 80.0% SEM 14


1 3 25% 50.0% 80.0% SEM 15
1 4 25% 40.0% 80.0% SEM 16
3 7 75% 50.0% 80.0% SEM 17
4 11 44% 47.8% 80.0% SEM 18
2 13 17% 37.1% 80.0% SEM 19
3 16 33% 36.4% 80.0% SEM 20
3 19 27% 34.5% 80.0% SEM 21
4 23 67% 37.7% 80.0% SEM 22
0 23 0% 34.3% 80.0% SEM 23
6 29 75% 38.7% 80.0% SEM 24
4 33 44% 39.3% 80.0% SEM 25
1 34 25% 38.6% 80.0% SEM 26
1 35 20% 37.6% 80.0% SEM 27
5 40 100% 40.8% 80.0% SEM 28
0 40 0% 39.2% 80.0% SEM 29
2 42 40% 39.3% 80.0% SEM 30
2 44 50% 39.6% 80.0% SEM 31
1 45 33% 39.5% 80.0% SEM 32
5 50 100% 42.0% 80.0% SEM 33
4 54 67% 43.2% 80.0% SEM 34
1 55 50% 43.3% 80.0% SEM 35
3 58 100% 44.6% 80.0% SEM 36
0 58 0% 43.0% 80.0% SEM 37
5 63 63% 44.1% 80.0% SEM 38
2 65 33% 43.6% 80.0% SEM 39
2 67 33% 43.2% 80.0% SEM 40
5 72 45% 43.4% 80.0% SEM 41
12 84 46% 43.8% 80.0% SEM 42
7 91 58% 44.6% 80.0% SEM 43
8 99 67% 45.8% 80.0% SEM 44
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52

PROM 47%
POR FRENTES

PPC META VS. PPC EJECUTADO - MOV. DE TIERRAS Y PAVIMENTOS 2B


100% 100%
92%

80%
77%
70% 71% 73%
67% 65% 67% 64% 67%
63%
60%
57% 56% 56% 55% 55%
54% 53% 54%54%
50%
47%45%
40%

27% 29%
19%

14 15 1 6 1 7 1 8 1 9 2 0 21 2 2 23 2 4 25 26 27 28 2 9 30 31 32 33 34 35 3 6 37 3 8 39 4 0 4 1 4 2 43 4 4
M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M
SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE

SEMANAL ACUMULADO META

MOVIMIENTO DE TIERRAS Y PAVIMENTOS - TRAMO 2B

TAREAS PROGRAMADAS TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO SEMANAL ACUMULADO META

3 3 2 2 67% 66.7% 80.0%


5 8 3 5 60% 62.5% 80.0%
7 15 4 9 57% 60.0% 80.0%
11 26 3 12 27% 46.2% 80.0%
14 40 7 19 50% 47.5% 80.0%
18 58 10 29 56% 50.0% 80.0%
17 75 11 40 65% 53.3% 80.0%
18 93 10 50 56% 53.8% 80.0%
32 125 6 56 19% 44.8% 80.0%
27 152 19 75 70% 49.3% 80.0%
24 176 13 88 54% 50.0% 80.0%
10 186 4 92 40% 49.5% 80.0%
15 201 7 99 47% 49.3% 80.0%
22 223 10 109 45% 48.9% 80.0%
30 253 19 128 63% 50.6% 80.0%
22 275 12 140 55% 50.9% 80.0%
17 292 5 145 29% 49.7% 80.0%
15 307 10 155 67% 50.5% 80.0%
17 324 12 167 71% 51.5% 80.0%
14 338 9 176 64% 52.1% 80.0%
15 353 8 184 53% 52.1% 80.0%
11 364 8 192 73% 52.7% 80.0%
13 377 10 202 77% 53.6% 80.0%
11 388 6 208 55% 53.6% 80.0%
12 400 8 216 67% 54.0% 80.0%
13 413 7 223 54% 54.0% 80.0%
13 426 7 230 54% 54.0% 80.0%
10 436 8 238 80% 54.6% 80.0%
12 448 12 250 100% 55.8% 80.0%
12 460 11 261 92% 56.7% 80.0%
9 469 9 270 100% 57.6% 80.0%

PROM 60%
PPC META VS. PPC EJECUTADO - ESTRUCTURAS, OBRAS DE ARTE Y
100% 100% 2A
92% 100% 100% 100%
100%

80% 90% 83%


80%
73%
70% 67% 67% 67% 67%
62
54%54% 60% 53%
50% 50% 50%
50% 44% 44% 44% 47%
40% 38%
40%
29%
30%
22% 22%
20% 17% 14%
10%
0%
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3
39 4 0 4 1 4 2 43 4 4 E M E M E M E M E M E M E M EM E M E M E M E M E M E M E M E M E M E M E M E M E M E M E M E M E M
M M M M M S S S S S S S S S S S S S S S S S S S S S S S S S
SE SE SE SE SE

SEMANAL ACUMULADO META

ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE -2A

TAREAS PROGRAMADAS TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO SEMANAL
SEM 14 1 1 1 1 100%
SEM 15 3 4 2 3 67%
SEM 16 4 8 4 7 100%
SEM 17 3 11 2 9 67%
SEM 18 4 15 2 11 50%
SEM 19 5 20 2 13 40%
SEM 20 7 27 2 15 29%
SEM 21 6 33 1 16 17%
SEM 22 9 42 2 18 22%
SEM 23 9 51 4 22 44%
SEM 24 7 58 1 23 14%
SEM 25 9 67 4 27 44%
SEM 26 9 76 2 29 22%
SEM 27 12 88 8 37 67%
SEM 28 13 101 5 42 38%
SEM 29 6 107 5 47 83%
SEM 30 4 111 2 49 50%
SEM 31 6 117 4 53 67%
SEM 32 4 121 4 57 100%
SEM 33 9 130 4 61 44%
SEM 34 14 144 7 68 50%
SEM 35 11 155 8 76 73%
SEM 36 15 170 7 83 47%
SEM 37 15 185 8 91 53%
SEM 38 13 198 8 99 62%
SEM 39 21 219 10 109 48%
SEM 40 21 240 10 119 48%
SEM 41 12 252 4 123 33%
SEM 42 14 266 5 128 36%
SEM 43 14 280 6 134 43%
SEM 44 17 297 9 143 53%
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52

PROM 52%
OBRAS DE ARTE Y DRENAJE PPC META VS. PPC EJECUTADO - ESTRUCTURAS,
00% 100%

90%
81%
80%
73% 73%
70% 67% 67% 68% 68% 66% 65% 66
62% 61% 61%
60% 57%
53% 53% 54% 54%
50% 50% 52% 52%
47% 48% 48%
44% 43% 50%
40%
33% 36% 40%

30%

20%

10%
32 33 34 35 36 37 38 39 40 41 42 43 44 0%
M M M M M M M M M M M M SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SE
SE SE S E SE SE SE SE SE SE SE SE SE
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3

META SEMANAL ACUMULADO

Y DRENAJE -2A ESTRUCTURAS, OBRAS DE

PPC TAREAS PROGRAMADAS


ACUMULADO META SEMANAL ACUMULADO

100.0% 80.0% SEM 14 3 3


75.0% 80.0% SEM 15 15 18
87.5% 80.0% SEM 16 16 34
81.8% 80.0% SEM 17 34 68
73.3% 80.0% SEM 18 22 90
65.0% 80.0% SEM 19 32 122
55.6% 80.0% SEM 20 35 157
48.5% 80.0% SEM 21 37 194
42.9% 80.0% SEM 22 38 232
43.1% 80.0% SEM 23 38 270
39.7% 80.0% SEM 24 33 303
40.3% 80.0% SEM 25 35 338
38.2% 80.0% SEM 26 33 371
42.0% 80.0% SEM 27 29 400
41.6% 80.0% SEM 28 45 445
43.9% 80.0% SEM 29 28 473
44.1% 80.0% SEM 30 31 504
45.3% 80.0% SEM 31 29 533
47.1% 80.0% SEM 32 25 558
46.9% 80.0% SEM 33 26 584
47.2% 80.0% SEM 34 26 610
49.0% 80.0% SEM 35 16 626
48.8% 80.0% SEM 36 24 650
49.2% 80.0% SEM 37 26 676
50.0% 80.0% SEM 38 22 698
49.8% 80.0% SEM 39 15 713
49.6% 80.0% SEM 40 15 728
48.8% 80.0% SEM 41 17 745
48.1% 80.0% SEM 42 21 766
47.9% 80.0% SEM 43 10 776
48.1% 80.0% SEM 44 7 783
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52
JECUTADO - ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE 2B PPC META
100%

90%
80% 82%
80%
69% 69%
66% 65% 66% 70% 67% 67% 67%
% 61% 58% 59% 60%
57% 57% 60%
52% 52% 54% 54% 53% 53%
50%
46% 50%
40% 38% 40% 37%
32%
30%

20%

10%

0%
M SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM
2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 14 15 16 17 18 19

SEMANAL ACUMULADO META

ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE - 2B

TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO META

2 2 67% 66.7% 80.0%


10 12 67% 66.7% 80.0%
13 25 81% 73.5% 80.0%
23 48 68% 70.6% 80.0%
16 64 73% 71.1% 80.0%
16 80 50% 65.6% 80.0%
19 99 54% 63.1% 80.0%
25 124 68% 63.9% 80.0%
23 147 61% 63.4% 80.0%
25 172 66% 63.7% 80.0%
17 189 52% 62.4% 80.0%
20 209 57% 61.8% 80.0%
20 229 61% 61.7% 80.0%
15 244 52% 61.0% 80.0%
18 262 40% 58.9% 80.0%
15 277 54% 58.6% 80.0%
20 297 65% 58.9% 80.0%
19 316 66% 59.3% 80.0%
20 336 80% 60.2% 80.0%
18 354 69% 60.6% 80.0%
14 368 54% 60.3% 80.0%
11 379 69% 60.5% 80.0%
14 393 58% 60.5% 80.0%
12 405 46% 59.9% 80.0%
18 423 82% 60.6% 80.0%
8 431 53% 60.4% 80.0%
8 439 53% 60.3% 80.0%
10 449 59% 60.3% 80.0%
8 457 38% 59.7% 80.0%
6 463 60% 59.7% 80.0%
4 467 57% 59.6% 80.0%

PROM 61%
PPC META VS. PPC EJECUTADO - PRODUCCIÓN DE AGREGADOS Y CANTERAS
100%
100%
90% 90%
90% 88%
85%
81% 80% 82% 81%
80% 77%
73% 73%
70% 67% 67% 67% 67% 67% 67%
62% 62% 60% 60% 60% 6
60%
50% 50%
50% 48% 48%
40%
40% 37%
32%
30%

20%

10%

0%
SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM SEM S
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 4

SEMANAL ACUMULADO META

PRODUCCIÓN DE AGREGADOS Y CANTERAS

TAREAS PROGRAMADAS TAREAS REALIZADAS PPC


SEMANAL ACUMULADO SEMANAL ACUMULADO SEMANAL ACUMULADO
SEM 14 19 19 7 7 37% 36.8%
SEM 15 16 35 8 15 50% 42.9%
SEM 16 19 54 6 21 32% 38.9%
SEM 17 15 69 10 31 67% 44.9%
SEM 18 21 90 14 45 67% 50.0%
SEM 19 21 111 14 59 67% 53.2%
SEM 20 13 124 8 67 62% 54.0%
SEM 21 20 144 18 85 90% 59.0%
SEM 22 20 164 10 95 50% 57.9%
SEM 23 21 185 17 112 81% 60.5%
SEM 24 21 206 10 122 48% 59.2%
SEM 25 21 227 10 132 48% 58.1%
SEM 26 21 248 13 145 62% 58.5%
SEM 27 21 269 14 159 67% 59.1%
SEM 28 20 289 18 177 90% 61.2%
SEM 29 20 309 12 189 60% 61.2%
SEM 30 15 324 6 195 40% 60.2%
SEM 31 16 340 14 209 88% 61.5%
SEM 32 13 353 11 220 85% 62.3%
SEM 33 15 368 11 231 73% 62.8%
SEM 34 15 383 12 243 80% 63.4%
SEM 35 17 400 14 257 82% 64.3%
SEM 36 18 418 12 269 67% 64.4%
SEM 37 18 436 12 281 67% 64.4%
SEM 38 16 452 13 294 81% 65.0%
SEM 39 15 467 9 303 60% 64.9%
SEM 40 15 482 9 312 60% 64.7%
SEM 41 13 495 10 322 77% 65.1%
SEM 42 14 509 14 336 100% 66.0%
SEM 43 15 524 11 347 73% 66.2%
SEM 44 15 539 9 356 60% 66.0%
SEM 45
SEM 46
SEM 47
SEM 48
SEM 49
SEM 50
SEM 51
SEM 52

PROM 67%
OS Y CANTERAS
100%

81%
77%
73%
67% 67%
60% 60% 60%

SEM SEM SEM SEM SEM SEM SEM SEM SEM


36 37 38 39 40 41 42 43 44

PPC
META

80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
80.0%
0
0
0
0
0
0
0
0
ANÁLISIS DE RESTRICCIONES

DESCRIPCIÓN DE ACTIVIDADES RESTRICCIÓN AREA/FRENTE


FECHA DE FECHA REQ.
RESPONSAB
ITEM INICIO DEL LEVANTAMIE DUEÑO DE LA
HORIZONTE 4 SEMANAS LE DESCRIPCIÓN UND CANT.
LOOKAHEAD NTO RESTRICCION
RESTRICCIÓN
1 ESTRUCTURAS, OBRAS DE ARTE Y DRENAJE
SOLICITA CAMBIO DE TUBERÍA PVC A HDPE km
TUBERÍA DE CONDUCCIÓN DE AGUA
21+960@22+740

2 MOVIMIENTO DE TIERRAS Y PAVIMENTOS

VOLADURA DE ROCA PARA PEDRAPLÉN SE REQUIERE AMPLIACIÓN DE CANTERA 83+700

TUBERÍA DE AGUA HUAYLLAY SE REQUIERE ADECUACIÓN EN PLANOS

CONFORMACIÓN DE DME SE REQUIERE TRACTOR ORUGA UND 2

3 PRODUCCIÓN DE CANTERAS

Cantera 37+500

Produccion de agregados Compra de materiales para reforzar estructura y mallas und 1 pendiente Logistica

Explotacion de Canteras Material para voladura según requerimiento und 1 pendiente Logistica

transporte de material (roca) al Km 29+700 Retraso en el ciclo de volquetes por trabajos en el tramo Km37-29 und 1 pendiente Ing. Huaman

transporte de material (roca) al Km 51+160 Retraso en el ciclo de volquetes por trabajos en el tramo Km37-51 und 1 pendiente Ing. Huaman

Produccion de agregados Mantenimientos de los equipos de linea amarilla und 6 pendiente Equipo mecanico
CONSOLIDADO DE PPC - VARIANTE UCHUMAYO 2017

FRENTE TOTAL OBRA


DRENAJE,
SEMANA DATOS EXPLANACIONES MUROS PUENTES SEMANAL ACUMULADO
CANALES Y TEL
Act. Cumplidas 10 0 1 17
Act. Incumplidas 0 0 0 6
SEM 20 - 2017 82.35% 68.61%
PPC Semanal 100.0% 0.0% 100.0% 73.9%
PPC Acumulado 67.7% 0.0% 71.4% 71.4%
Act. Cumplidas 14 0 4 14
Act. Incumplidas 13 0 0 3
SEM 21 - 2017 66.67% 68.45%
PPC Semanal 51.9% 0.0% 100.0% 82.4%
PPC Acumulado 66.2% 0.0% 73.9% 72.3%
Act. Cumplidas 12 0 2 10
Act. Incumplidas 9 0 1 8
SEM 22 - 2017 57.14% 67.68%
PPC Semanal 57.1% 0.0% 66.7% 55.6%
PPC Acumulado 65.6% 0.0% 73.5% 71.0%
Act. Cumplidas 10 0 3 12
Act. Incumplidas 1 0 2 6
SEM 23 - 2017 73.53% 67.99%
PPC Semanal 90.9% 0.0% 60.0% 66.7%
PPC Acumulado 66.5% 0.0% 72.2% 70.7%
Act. Cumplidas 13 0 1 15
Act. Incumplidas 7 0 3 5
SEM 24 - 2017 65.91% 67.86%
PPC Semanal 65.0% 0.0% 25.0% 75.0%
PPC Acumulado 66.4% 0.0% 69.0% 71.0%
Act. Cumplidas 8 10 5 11
Act. Incumplidas 2 2 3 5
SEM 25 - 2017 73.91% 68.23%
PPC Semanal 80.0% 83.3% 62.5% 68.8%
PPC Acumulado 66.8% 83.3% 68.2% 70.9%
Act. Cumplidas 8 10 5 7
Act. Incumplidas 3 10 6 5
SEM 26 - 2017 55.56% 67.38%
PPC Semanal 72.7% 50.0% 45.5% 58.3%
PPC Acumulado 66.9% 62.5% 64.9% 70.4%
Act. Cumplidas 11 12 5 8
Act. Incumplidas 4 7 2 9
SEM 27 - 2017 62.07% 67.02%
PPC Semanal 73.3% 63.2% 71.4% 47.1%
PPC Acumulado 67.2% 62.7% 65.5% 69.1%
Act. Cumplidas 10 20 2 7
Act. Incumplidas 2 9 1 9
SEM 28 - 2017 65.00% 66.88%
PPC Semanal 83.3% 69.0% 66.7% 43.8%
PPC Acumulado 67.7% 65.0% 65.5% 67.9%
Act. Cumplidas 5 15 1 7
Act. Incumplidas 1 17 1 7
SEM 29 - 2017 51.85% 66.05%
PPC Semanal 83.3% 46.9% 50.0% 50.0%
PPC Acumulado 67.9% 59.8% 65.2% 67.2%
Act. Cumplidas 12 11 4 8
Act. Incumplidas 4 11 0 2
SEM 30 - 2017 67.31% 66.11%
PPC Semanal 75.0% 50.0% 100.0% 80.0%
PPC Acumulado 68.2% 58.2% 66.7% 67.5%
Act. Cumplidas 13 19 3 4
Act. Incumplidas 3 8 2 1
SEM 31 - 2017 73.58% 66.48%
PPC Semanal 81.3% 70.4% 60.0% 80.0%
PPC Acumulado 68.7% 60.2% 66.3% 67.7%
Act. Cumplidas 11 15 2 9
Act. Incumplidas 0 5 1 3
SEM 32 - 2017 80.43% 67.05%
PPC Semanal 100.0% 75.0% 66.7% 75.0%
PPC Acumulado 69.5% 61.9% 66.3% 67.9%
Act. Cumplidas 9 18 2 7
Act. Incumplidas 1 1 4 4
SEM 33 - 2017 78.26% 67.49%
PPC Semanal 90.0% 94.7% 33.3% 63.6%
PPC Acumulado 70.0% 65.0% 64.5% 67.8%
Act. Cumplidas 3 20 2 5
Act. Incumplidas 4 1 3 3
SEM 34 - 2017 73.17% 67.69%
PPC Semanal 42.9% 95.2% 40.0% 62.5%
PPC Acumulado 69.5% 67.9% 63.4% 67.7%
Act. Cumplidas 4 24 4 4
Act. Incumplidas 0 7 2 3
SEM 35 - 2017 75.00% 67.97%
PPC Semanal 100.0% 77.4% 66.7% 57.1%
PPC Acumulado 69.8% 69.0% 63.6% 67.5%
Act. Cumplidas 10 23 4 6
Act. Incumplidas 10 10 2 3
SEM 36 - 2017 63.24% 67.72%
PPC Semanal 50.0% 69.7% 66.7% 66.7%
PPC Acumulado 69.0% 69.1% 63.7% 67.5%
Act. Cumplidas 9 24 4 8
Act. Incumplidas 0 9 2 4
SEM 37 - 2017 75.00% 68.04%
PPC Semanal 100.0% 72.7% 66.7% 66.7%
PPC Acumulado 69.5% 69.5% 63.8% 67.5%
Act. Cumplidas 21 32 3 5
Act. Incumplidas 0 11 3 4
SEM 38 - 2017 77.22% 68.53%
PPC Semanal 100.0% 74.4% 50.0% 55.6%
PPC Acumulado 70.8% 70.1% 63.2% 67.2%
Act. Cumplidas 9 26 6 3
Act. Incumplidas 0 4 0 9
SEM 39 - 2017 77.19% 68.86%
PPC Semanal 100.0% 86.7% 100.0% 25.0%
PPC Acumulado 71.3% 71.4% 64.8% 66.1%
Act. Cumplidas 0 0 0 0
Act. Incumplidas 0 0 0 0
SEM 40 - 2017 0.00% 68.86%
PPC Semanal 0.0% 0.0% 0.0% 0.0%
PPC Acumulado 0.0% 0.0% 0.0% 0.0%
Act. Cumplidas 0 0 0 0
Act. Incumplidas 0 0 0 0
SEM 41 - 2017 0.00% 68.86%
PPC Semanal 0.0% 0.0% 0.0% 0.0%
PPC Acumulado 0.0% 0.0% 0.0% 0.0%