Sl No CRMS No Area Function/Equipment

1 100002283808 AREA#4(COCO AREA) WB#4


2 100002283810  AREA#4(COCO AREA) WB#5
3 100002283811 AREA#4(COCO AREA) WB#6
4 100002283812 AREA#4(COCO AREA) COCO hyd room
5 100002283813 AREA#4(COCO AREA) WB#5
6 100002283814 AREA#4(COCO AREA) TT#2
7 100002283816 AREA#4(COCO AREA) WB#5
8 100002283817 WATER SYSTEM WB#6
9  100002283818 WATER SYSTEM Major Shutdown Plan for Civil jobs
10 100002283819 WATER SYSTEM WB#4 Part#1
11 100002283820  WATER SYSTEM MST
12 100002283822  WATER SYSTEM MSP
13 100002283823 WATER SYSTEM Cooling Tower 01
14  100002283824 WATER SYSTEM Cooling tower#4
15 100002283825 WATER SYSTEM P-15 Group PUMP house
16  100002283826 WATER SYSTEM P-18 Group PUMP house
17 100002283827 WATER SYSTEM CT#1 to 5
18 100002283828  WATER SYSTEM ACID TANK STORAGE AREA
19 100002283829  WATER SYSTEM CT #1 to 4
20  100002283833 WATER SYSTEM P-09,P10 & P11
21  100002283834 WATER SYSTEM Coldwell-1
22 100002283835 WATER SYSTEM Cold well #1,2,3,5
23 100002283836 WATER SYSTEM P-17 group & P-20 group
24 100002283838  WATER SYSTEM cold well 5
25  100002283839 WATER SYSTEM hot well
26 100002283840 AREA#4(COCO AREA) Walking beam 1
27 100002283841 AREA#4(COCO AREA) walking beam 2,TT#1
28 100002283842 AREA#4(COCO AREA) walking beam 3
29  100002283843 AREA#4(COCO AREA) walking beam 4, TT#2
30  100002283844 AREA#4(COCO AREA) walking beam 5
31 100002283845 AREA#4(COCO AREA) walking beam 6
32 100002283846 AREA#4(COCO AREA) coil conveyor
33 100002283847 AREA#4(COCO AREA) L car#2
34 100002283849 AREA#4(COCO AREA) Stationary coil deposit 1 & 2
35 100002283850 AREA#4(COCO AREA) IRT
36  100002283851 AREA#4(COCO AREA) Scrap car
37  100002283852  AREA#4(COCO AREA) coil conveyor
38 100002283864 AREA#2(FURNACE AREA) Line A and B wet roll  D/s
39 100002283865 AREA#2(FURNACE AREA) Line A and B drip pot
40 100002283866 AREA#2(FURNACE AREA) Line A and B drip pot
41 100002283867 AREA#2(FURNACE AREA) Line A and B piping
42 100002283868 AREA#2(FURNACE AREA) Line A rail 2 and 3
43 100002283875 AREA#2(FURNACE AREA) Line B rotating seal
44 100002283876 AREA#2(FURNACE AREA) Line A and B pivot
45 100002283877 AREA#2(FURNACE AREA) Line A and B Swivel
46 100002283878 AREA#2(FURNACE AREA) Line A and B water line
47 100002283879 AREA#2(FURNACE AREA) Line B rail 5
48 100002283880 AREA#2(FURNACE AREA) AREA#2(FURNACE AREA)
49 100002125409 Mill Mechanical TSCR Mech
50 100002284968 Mill Mechanical TSCR Mech
51 100002284970 Mill Mechanical TSCR Mech
52 100002091673 Mill Mechanical TSCR Mech
53 100002284971 Mill Mechanical TSCR Mech
54 100002284972 Mill Mechanical TSCR Mech
55 100002284973 Mill Mechanical TSCR Mech
56 100000961376 IEM TSCR IEM
57 100000961377 IEM TSCR IEM
58 100000961378 IEM TSCR IEM
59 100000961379 IEM TSCR IEM
60 100000961381 IEM TSCR IEM
61 100000961385 IEM TSCR IEM
62 100000994124 IEM TSCR IEM
63 100000995015 IEM TSCR IEM
64 100000995018 IEM TSCR IEM
65 100000995020 IEM TSCR IEM
66 100000995021 IEM TSCR IEM
67 100000995025 IEM TSCR IEM
68 100000995029 IEM TSCR IEM
69 100001010011 IEM TSCR IEM
70 100001010016 IEM TSCR IEM
71 100001030467 IEM TSCR IEM
72 100001117580 IEM TSCR IEM
73 100001126787 IEM TSCR IEM
74 100001126796 IEM TSCR IEM
75 100001134154 IEM TSCR IEM
76 100001151013 IEM TSCR IEM
77 100001165272 IEM TSCR IEM
78 100001166371 IEM TSCR IEM
79 100001166375 IEM TSCR IEM
80 100001195306 IEM TSCR IEM
81 100001195309 IEM TSCR IEM
82 100001195346 IEM TSCR IEM
83 100001195347 IEM TSCR IEM
84 100001195353 IEM TSCR IEM
85 100001195355 IEM TSCR IEM
86 100001195358 IEM TSCR IEM
87 100001195360 IEM TSCR IEM
88 100001195362 IEM TSCR IEM
89 100001195365 IEM TSCR IEM
90 100001195367 IEM TSCR IEM
91 100001195370 IEM TSCR IEM
92 100001212731 IEM TSCR IEM
93 100001230758 IEM TSCR IEM
94 100001265721 IEM TSCR IEM
95 100001291357 IEM TSCR IEM
96 100001301940 IEM TSCR IEM
97 100001301943 IEM TSCR IEM
98 100001318757 IEM TSCR IEM
99 100001322236 IEM TSCR IEM
100 100001336539 IEM TSCR IEM
101 100001336543 IEM TSCR IEM
102 100001336569 IEM TSCR IEM
103 100001342062 IEM TSCR IEM
104 100001360072 IEM TSCR IEM
105 100001367786 IEM TSCR IEM
106 100001410973 IEM TSCR IEM
107 100001411009 IEM TSCR IEM
108 100001419301 IEM TSCR IEM
109 100001419302 IEM TSCR IEM
110 100001419304 IEM TSCR IEM
111 100001419305 IEM TSCR IEM
112 100001419319 IEM TSCR IEM
113 100001419321 IEM TSCR IEM
114 100001419323 IEM TSCR IEM
115 100001419330 IEM TSCR IEM
116 100001419331 IEM TSCR IEM
117 100001419332 IEM TSCR IEM
118 100001426107 IEM TSCR IEM
119 100001439888 IEM TSCR IEM
120 100001445023 IEM TSCR IEM
121 100001471726 IEM TSCR IEM
122 100001471728 IEM TSCR IEM
123 100001471729 IEM TSCR IEM
124 100001471730 IEM TSCR IEM
125 100001471731 IEM TSCR IEM
126 100001471732 IEM TSCR IEM
127 100001471733 IEM TSCR IEM
128 100001471734 IEM TSCR IEM
129 100001505172 IEM TSCR IEM
130 100001538567 IEM TSCR IEM
131 100001551024 IEM TSCR IEM
132 100001570741 IEM TSCR IEM
133 100001579888 IEM TSCR IEM
134 100001579891 IEM TSCR IEM
135 100001583978 IEM TSCR IEM
136 100001589170 IEM TSCR IEM
137 100001613154 IEM TSCR IEM
138 100001624102 IEM TSCR IEM
139 100001624809 IEM TSCR IEM
140 100001645822 IEM TSCR IEM
141 100001651776 IEM TSCR IEM
142 100001652451 IEM TSCR IEM
143 100001656820 IEM TSCR IEM
144 100001667789 IEM TSCR IEM
145 100001667790 IEM TSCR IEM
146 100001681443 IEM TSCR IEM
147 100001682200 IEM TSCR IEM
148 100001724412 IEM TSCR IEM
149 100001741162 IEM TSCR IEM
150 100001758974 IEM TSCR IEM
151 100001759343 IEM TSCR IEM
152 100001759345 IEM TSCR IEM
153 100001759346 IEM TSCR IEM
154 100001759348 IEM TSCR IEM
155 100001759349 IEM TSCR IEM
156 100001802403 IEM TSCR IEM
157 100001806668 IEM TSCR IEM
158 100001806671 IEM TSCR IEM
159 100001806676 IEM TSCR IEM
160 100001806679 IEM TSCR IEM
161 100001809698 IEM TSCR IEM
162 100001809748 IEM TSCR IEM
163 100001809749 IEM TSCR IEM
164 100001818059 IEM TSCR IEM
165 100001828196 IEM TSCR IEM
166 100001828198 IEM TSCR IEM
167 100001828321 IEM TSCR IEM
168 100001828322 IEM TSCR IEM
169 100001828324 IEM TSCR IEM
170 100001831375 IEM TSCR IEM
171 100001831390 IEM TSCR IEM
172 100001837375 IEM TSCR IEM
173 100001839993 IEM TSCR IEM
174 100001842570 IEM TSCR IEM
175 100001842571 IEM TSCR IEM
176 100001844938 IEM TSCR IEM
177 100001856202 IEM TSCR IEM
178 100001856203 IEM TSCR IEM
179 100001856204 IEM TSCR IEM
180 100001856205 IEM TSCR IEM
181 100001856206 IEM TSCR IEM
182 100001900297 IEM TSCR IEM
183 100001943724 IEM TSCR IEM
184 100001943726 IEM TSCR IEM
185 100001943728 IEM TSCR IEM
186 100001943729 IEM TSCR IEM
187 100001943741 IEM TSCR IEM
188 100001943742 IEM TSCR IEM
189 100001949430 IEM TSCR IEM
190 100001957571 IEM TSCR IEM
191 100001974228 IEM TSCR IEM
192 100002001969 IEM TSCR IEM
193 100002006490 IEM TSCR IEM
194 100002006496 IEM TSCR IEM
195 100002013040 IEM TSCR IEM
196 100002019652 IEM TSCR IEM
197 100002027526 IEM TSCR IEM
198 100002028148 IEM TSCR IEM
199 100002044297 IEM TSCR IEM
200 100002044300 IEM TSCR IEM
201 100002044302 IEM TSCR IEM
202 100002051247 IEM TSCR IEM
203 100002051249 IEM TSCR IEM
204 100002059955 IEM TSCR IEM
205 100002060006 IEM TSCR IEM
206 100002069351 IEM TSCR IEM
207 100002089007 IEM TSCR IEM
208 100002089009 IEM TSCR IEM
209 100002089026 IEM TSCR IEM
210 100002089027 IEM TSCR IEM
211 100002089085 IEM TSCR IEM
212 100002089089 IEM TSCR IEM
213 100002089090 IEM TSCR IEM
214 100002089096 IEM TSCR IEM
215 100002089097 IEM TSCR IEM
216 100002089098 IEM TSCR IEM
217 100002089099 IEM TSCR IEM
218 100002089100 IEM TSCR IEM

219 100002089101 IEM TSCR IEM

220 100002089102 IEM TSCR IEM


221 100002095019 IEM TSCR IEM

222 100002095024 IEM TSCR IEM

223 100002095047 IEM TSCR IEM


224 100002095049 IEM TSCR IEM

225 100002095052 IEM TSCR IEM

226 100002095066 IEM TSCR IEM


227 100002095067 IEM TSCR IEM
228 100002095069 IEM TSCR IEM
229 100002095070 IEM TSCR IEM
230 100002099916 IEM TSCR IEM
231 100002105494 IEM TSCR IEM
232 100002120315 IEM TSCR IEM
233 100002133926 IEM TSCR IEM
234 100002140051 IEM TSCR IEM
235 100002163937 IEM TSCR IEM
236 100002163939 IEM TSCR IEM
237 100002163941 IEM TSCR IEM
238 100002163943 IEM TSCR IEM
239 100002163945 IEM TSCR IEM
240 100002163948 IEM TSCR IEM
241 100002163971 IEM TSCR IEM
242 100002173295 IEM TSCR IEM
243 100002182970 IEM TSCR IEM
244 100002182972 IEM TSCR IEM
245 100002182976 IEM TSCR IEM
246 100002182980 IEM TSCR IEM
247 100002186475 IEM TSCR IEM
248 100002186477 IEM TSCR IEM
249 100002187332 IEM TSCR IEM
250 100002190381 IEM TSCR IEM
251 100002195402 IEM TSCR IEM
252 100002199890 IEM TSCR IEM
253 100002246587 IEM TSCR IEM
254 100002247346 IEM TSCR IEM
255 100002250349 IEM TSCR IEM
256 100002261059 IEM TSCR IEM
257 100002261061 IEM TSCR IEM
258 100002261062 IEM TSCR IEM
259 100002263272 IEM TSCR IEM
260 100002264505 IEM TSCR IEM
261 100002264507 IEM TSCR IEM
262 100002264511 IEM TSCR IEM
263 100002264553 IEM TSCR IEM
264 100002264554 IEM TSCR IEM
265 100002264555 IEM TSCR IEM
266 100002264557 IEM TSCR IEM
267 100002270600 IEM TSCR IEM
268 100002270602 IEM TSCR IEM
269 100002275430 IEM TSCR IEM
270 100002276330 IEM TSCR IEM
271 100002277063 IEM TSCR IEM
272 100002280187 IEM TSCR IEM
273 100002280521 IEM TSCR IEM
274 100002281039 IEM TSCR IEM
275 100002286088 AREA 1(CASTER AREA) TSCR CASTER
276 100002286089 AREA 1(CASTER AREA) TSCR CASTER
277 100002286091 AREA 1(CASTER AREA) TSCR CASTER
278 100002286092 AREA 1(CASTER AREA) TSCR CASTER
279 100002286093 AREA 1(CASTER AREA) TSCR CASTER
280 100002286094 AREA 1(CASTER AREA) TSCR CASTER
281 100002286096 AREA 1(CASTER AREA) TSCR CASTER
282 100002286097 AREA 1(CASTER AREA) TSCR CASTER
283 100002193005 AREA 1(CASTER AREA) TSCR CASTER
284 100002286098 AREA 1(CASTER AREA) TSCR CASTER
285 100002286100 AREA 1(CASTER AREA) TSCR CASTER

286 100002286311 AREA 1(CASTER AREA) TSCR CASTER

287 100002286312 Mill OPERATION TSCR MILL


288 100002286080 FURNACE OPERATION TSCR FURNACE
289 100002286082 FURNACE OPERATION TSCR FURNACE
290 100002286084 FURNACE OPERATION TSCR FURNACE
291 100002286086 FURNACE OPERATION TSCR FURNACE
292 CASTER OPERATION TSCR CASTER
293 CASTER OPERATION TSCR CASTER
294 CASTER OPERATION TSCR CASTER
295 AREA 1(CASTER AREA) TSCR CASTER
Job Description Agency
for Increase size of Pipe Trench of Coil conveyor of WB#4 CIVIL
for Increase size of Pipe Trench of Coil conveyor of WB#5 CIVIL
for Increase size of Pipe Trench of Coil conveyor of WB#6 CIVIL
For increase height of drains which is located at COCO hyd room CIVIL
For increase height of Pipe Trench which is located near Wb#5 CIVIL
For flooring of TT#2 area CIVIL
For flooring of wb#5 area near travelling cylinder CIVIL
for nozzles grouting at wall near WB#5 staircase CIVIL
for filling up of Pit near WB#4 Part#1 CIVIL
for make a civil drain ways for water flowing from pathways to Pit near WB#4 Part#1 CIVIL
Wall to be extended to a height about 1 m between MST 301 & MST 302 towards P 20 Suction PIT CIVIL
Mill Scale Pit Vent room Flooring job & Rectification of Pit for Mounting of SUMP PUMP CIVIL
Cooling tower 1 Fan stack entrance door civil Maint . Job. CIVIL
Cooling Tower#4 Fan stack entrance door civil Maint . Job. CIVIL
P-15 Group Pump house (CSPPH)flooring job for prevention of water accumulation at floor CIVIL
P-18 Group Pump house(MSPPH) flooring job for prevention of water accumulation at floor CIVIL
CT 1 to 5 all door civil repairing job CIVIL
DYKE Repairing of Chemical ACID Tank storage area CIVIL
Special coating of Cooling tower fan cell outer wall (CT 1 to 4 Total -14 nos cell) PAINTING
Pipelines coating of P9 Grp (Supply & return) P10 Grp & P11 Grp supply line at Mill tunnel area PAINTING
Special coating of Coldwell-1 inside suction wall. PAINTING
Cold well #1,2,3,5 inside pipe line & structures special coating job PAINTING
P-17 group & P-20 group suction pit pipe line & structures painting job PAINTING
cold well 5 straircase special coating job PAINTING
hot well straircase special coating job PAINTING
Painting of all structures of walking beam 1 PAINTING
Painting of all structures of walking beam 2,TT#1 PAINTING
Painting of all structures of walking beam 3 PAINTING
Painting of all structures of walking beam 4, TT#2 PAINTING
Painting of all structures of walking beam 5 PAINTING
Painting of all structures of walking beam 6 PAINTING
Painting of all hyd. Pipe lines of coil conveyor PAINTING
Painting of L car#2 PAINTING
Painting of Stationary coil deposit 1 & 2 PAINTING
Painting of IRT structures PAINTING
Painting of Scrap car area PAINTING
Painting of all handrailing & Platform PAINTING
wet roll base civil grouting and strengthening in msd 2022 CIVIL
Drip pot tank repair in MSD CIVIL
Drip pot tank for line A and B gas header CIVIL
Gas line column civil repair and strengthening CIVIL
line A rail 2 and 3 grouting and hilti making CIVIL
Line B rotating seal painting PAINTING
Line A and B pivot area civil Grouting CIVIL
Line A and B swivel trench pipe graphene painting PAINTING
Line A and B water line graphene painting( common sec exit,line A and B entry) PAINTING
Line B rail 5 insitu repair grouting and hilti making CIVIL
Spare DN 800 and 600 pipe graphene painting PAINTING
Descaler Arco Plate Inspection and remaining area to be covered. CIVIL
ROT SIS trench cleaning BY SUPERSUCKER PHES
Down coiler structure painting to be done. Paint Application
Downcoiler pit cleaning to be done BY SUPERSUCKER PHES
MOS,ZOS MILL,ZOS DC other pipe painting to be done. Paint Application
Celler pipe tunnel pipe painting to be done. Paint Application
Pipe tunnel damaged pipe to be repaired and painting to be done. Paint Application
ROOF TREATMENT CIVIL
WATER PROOFING OF SIDE WALL CIVIL
PROVIDING DOWN COMER AT STPH CIVIL
WALL TREATMENT OF STPH CONTROL DESK ROOM CIVIL
ROOF TREATMENT OF RCPH ABOVE MCC-3 CIVIL
RCPH ECR EMERGENCY EXIT DOOR STAIR CASE TOP ROOF WALL MAKING TO AVOID RAIN WATER CIVIL
DOOR WITH FRAME TO BE SET RIGHT CIVIL
MILL ECR2,10MTS CRP ROOM DOOR REPAIR CIVIL
TSCR IEM ROOM'S DOOR LOCK & DOOR CLOSER APPROX. 40 NOS REPAIRING CIVIL
7 NOS SHUTTR OF ECHILLER PLANT REPAIRING CIVIL
DOOR PAINTING OF TSCR IEM WATER & OTHER SYSTEMS CIVIL
RUSTED HINGE CHANGING AT MCC-6 & CABLE VAULT EMERGENCY EXIT DOOR OF WATER SYSTEM CIVIL
4 NOS TRESTLE PAINTING PAINTING
STPH HT CONTROL DESK WATER SEPAGE FROM THE AHU DUCTS CIVIL
CHILLER CABLE VAULT VENTILLATION OUTER SIDE STEEL MESH FRAME CHANGING CIVIL
WATER SYSTEM LCPH ECR INSIDE FOR NEW DRIVE INSTALLATION CIVIL
Roll Shop TSCR CIVIL
RCPH BATTERY ROOM WASH BASIN DRAINAGE SYSTEM TO BE SET RIGHT CIVIL
RCPH BATTERY ROOM WASH BASIN DRAINAGE PROVISION CIVIL
WATER SYSTEM ALL ECR ROOF SIDE PORTION CONCRETE REPAIRING CIVIL
LCPH ECR ROOM FALSE CEILING TO BE REPAIRED CIVIL
WATER SYSTEM MCC#6 STAIR PAINTING PAINTING
WATER SYSTEM MCC6 STAIR PAINTING PAINTING
P18 PUMP ROOM SHED SHEET CHANGING CIVIL
STRUCTURAL SHED REQUIRED IN EXIT DOOR CIVIL
AHU1&4 ROOM DOOR AND DRAINAGE PROBLEM CIVIL
RCPH MCC ROOM DOOR STRUCTURAL SHED TO BE ERRECTED CIVIL
RCPH ECR ROOF STRUCTURAL SHED TO BE ERRECTED CIVIL
RCPH CABLE VAULT NEAR LIFT ROOF TREATMENT TO PREVENT WATER INGRESS CIVIL
MCC-6 ECR ROOF TREATMENT TO PREVENT WATER INGRESS CIVIL
STPH STAIR CASE NEAR LIFT L TYPE WALL CONSTUCTION CIVIL
MCC-6 EMERGENCY EXIT DOOR & MCC ROOF TREATMENT TO PREVENT WATER INGRESS CIVIL
RIO-9 MOPLY ROOF TREATMENT TO PREVENT WATER INGRESS CIVIL
LCPH HT BOARD ROOF MOPLY TREATMENT TO PREVENT WATER INGRESS CIVIL
P-18 STPH PUMP HOUSE WATER LEAKAGE FROM SHEED.NEED TO REPLACE THEM . CIVIL
RCPH CABLE VAULT EXHAUST FAN BRICK WORK TO PREVENT WATER INGRESS CIVIL
TSCR WATER SYSTEM RCPH BUILDING TOP ROOF SIDE WALL DAMAGED CAUSING MATERIAL FALLING CIVIL
TSCR TESTLE (4 NOS ) CONCRETE ENCORING SLOPING TOP TO BE PROVIDED CIVIL
RIO ROOM DOORS ARE JAM AND NOT OPENING/CLOSING PROPERLY CIVIL
ROLL SHOP WOBBE GAS ANALYSER INLET GAS VALVE APPROACH STAIR CASE FABRICATION & ERRECTION CIVIL
ROOF TREATMENT OF ECR 3A & 3B CIVIL
ROOF TREATMENT OF STPH CONTROL DESK ROOM CIVIL
INSTRUMENT LAB FRONT ROOM BESIDE IEM STORE . CIVIL
ROLL MAINTENANCE SHOP CABLE TUNNEL SIDE WALL 3 ' HEIGHT X 6' LENGTH WALL MAKING CIVIL
SMALL BRICK WALL MAKING NEAR EARTH PIT # 138 CIVIL
TOILET CLEANING CIVIL
STPH ROAD SIDE BESIDE P-17 EARTH STRIP TO COVERED WITH CONCRETE ABOUT 1 MT AREA CIVIL
LCPH ECR ROOM 3 NOS DRIVE , 5 NOS O/P ISOLATOR INCOMING & OUT GOING 6.6KV MAIN AS WELL AS CIVIL
rcph,lcph,mcc-6,stph area CIVIL
HILTI BOLTING AT LCPH ECR CABLE VAULT ( 6 NOS CHANEL FIXING TOP ROOF & BOTTOM FLOOR ) CIVIL
LCPH ECR EPOXY DAMAGED FLOOR TOBE REPAIRED WITH EPOXY CIVIL
WATER SYSTEM LCPH ECR DAMAGED EPOXY FLOOR TO BE RE PAINTED CIVIL
STPH HT CONTROL DESK WATER LEAKAGE TO BE SET RIGHT CIVIL
WATER SYSTEM RIO & OTHER AREA DAMAGED METALLIC DOOR REPAIRING CIVIL
WATER SYSTEM IEM AREAS BROKEN GLASS REPLACEMENT CIVIL
WATER SYSTEM LCPH HT ECR ROOM FALSE CEILING REFIXING TO BE DONE CIVIL
WATER SYSTEM RCPH BUILDING PCC CONCRETE (PLASTER) DAMAGED .TO BE REPAIRED CIVIL
WATER SYSTEM RCPH BUILDING SIDE WALL PEEPAL TREE CUTTING CIVIL
WATER SYSTEM MCC-6 STAIR,ALL ECR SHUTTER,CABLE TRESTLE PATHWAY PAINTING CIVIL
WATER SYSTEM ECR EYE SHOWERS WATER DRAINAGE PATH TO BE GIVEN CIVIL
WATER SYSTEM ECR EYE SHOWER WATER PRESSURE LOW .NEED TO INCREASE IT CIVIL
ECR TO ROLL MAITENANCE SHOP,ECR TO CHILLER CABLE TUNNEL ETC.CIVIL GROUTING JOB CIVIL
Water system LCPH ECR P-12A HT drive bypass isolator front side flooring CIVIL
LCPH ECR P-12A BYPASS PANEL FRONT SIDE FLOORING CIVIL
a low protective wall along the edge of LCPH ECR a roof at Water system CIVIL
RCPH EXIT DOOR CHHAJJA SHEETING CIVIL
WATER LOGGING IN AHU1 & 4 CIVIL
RAIN WATER ENTERING AT RCPH ECR THROUGH WALL CIVIL
RAIN WATER ENTERING FROM RCPH ECR ROOF STAIR CIVIL
RAIN WATER ENTERING AT RCPH CABLE VAULT THROUGH CABLE TRAY CIVIL
RAIN WATER ENTERING INMCC-6 THROUGH WALL,ROOF& DOOR CIVIL
RAIN WATER ENTERING IN STPH ECR, BATTERY ROOM THROUGH WALL CIVIL
RAIN WATER ENTERING INSIDE STPH STAIR NEAR LIFT THROUGH DOOR CIVIL
MILL ECR1 ENTRANCE DOOR NEAR LIFT BOTTOM PORTION SLOPPING TO BE DONE CIVIL
LCPH ECR ONE SHUTTER TO BE CLOSED WITH BRICK WALL & ONE DOOR TO BE PROVIDED THERE CIVIL
WHITE WASHING OF LCPH ECR WALL CIVIL
RCPH TOILET BACK SIDE SEWAGE SYSTEM DAMAGED PVC PIPE (DUE TO TREE) CHANGING CIVIL
ECR1 ,10M DIGITIZATION ROOM EPOXY PAINTING PAINTING
CHILLER ECR HT ROOM FLOOR EPOXY PAINTING PAINTING
4 NOS.CAMERA JB FIX UP IN LINE-A & LINE-B TUNNEL FURNACE AREA CIVIL
ECR1 10M TOILET TILES ,PAN & WASH BASIN CHANGING CIVIL
17 mts mill motor house air washer unit water leakage & duct chilled air leakage arresting CIVIL
FLOORING OF AIR WASHER ROOM 17M ECR CIVIL
TSCR ALL SAFETY EYE WASH SHOWER PIPE LINE TO BE SET RIGHT CIVIL
ECR 10M LADIES TOILET ENTRANCE AREA DOOR FIXING CIVIL
MILL ECR STRUCTURAL BIM ,CHANNEL& ANGLE RUSTED CAUSING WEAK STRUCTURAL STRENGTH CIVIL
TSCR MAIN ECR BUILDING CABLE VAULT BIM STRUCTURE MAINTENANCE CIVIL
Water leakage from top roof of Roll shop 5 nos ECR .Tarpoline to be pasted over the roofs CIVIL
PLC ROOM & ECR ROOM SURROUNDING DRAINCLEANING TO AVOID WATER SEEPAGE CIVIL
FURNACE CABLE TUNNEL ROOF & FLOOR WATER LEAKAGE TO BE GROUTED CIVIL
WATER SYSTEM RCPH TOP TOILET BACK SIDE PIPE NEED CHANGE DUE TO GROWN UP OF TREE ON IT CIVIL
2 NOS EYE WASH SHOWER ( RCIL +FURNACE ) WATER CONNECTION CIVIL
WATER SEPAGE IN ALL ECR OF TUNNEL FURNACE CIVIL
FURNACE LINEB ECR 3B,24 NOS HILTI BOLT FIXING IN NEW SWIVEL DRIVE BASE CIVIL
12 NOS HILTI FIXING AT MILL ECR#2 ' 0 ' METER AREA CIVIL
WATER SEEPAGE FROM THE ECR1 ROOF EXPANSION JOINT CIVIL
WATER SYSTEM RCPH PLC FLOOR CRACK CIVIL
ECR2 & AHU DOOR REPAIRING CIVIL
WATER SEEPAGE IN CASTER MOTOR STORAGE AREA CIVIL
CHAJJA TO BE PROVIDED INTHE EXIT DOOR OF RCPH TOP FLOOR TOWARDS TOILET CIVIL
WATER SYSTEM LCPH ECR WALL& CHHAJJA REPAIR CIVIL
TUNNEL FURNACE 6 NOS ECR DOOR LOCKING ARRANGEMENT FIXING CIVIL
ECR 3A WINDOW WITH SLIDING GLASS MAKING CIVIL
FURNACE PLC ROOM LEAKAGE DRINKINGPIPE LINE CHANGING CIVIL
FURNACE PLC ROOM TOILET BROKEN FLUSH CHANGING CIVIL
TSCR ALL ECR BUILDING PAINTING PAINTING
RCIL ECR BUILDING PAINTING PAINTING
FURNACE ECR BUILDING PAINTING PAINTING
TUNNEL FURNACE PLC ROOM DOOR BROKEN GLASS CHANGING CIVIL
MILL ECR TOP ROOF CHAJJA REPAIRING AS CONCRETE FALLING FROM IT CIVIL
RCPH MAIN BULDING CHAJJA REPAIR AS CONCRETE FALLING FROM ITS TOP ROOF CIVIL
RCPH AREA ROAD DAMAGED NEAR DRAIN OF RCPH PUMP ROOM CIVIL
STPH P-18 ROAD 90DEG TURN BUT MIRROR NOT PROVIDED CIVIL
STPH P-20 PUMP ROOM AREA ROAD HAVING 90DEG TURN BUT MIRROR NOT PROVIDED CIVIL
TSCR MOTOR HOUSE AREA RAIN WATER FALLING FROM TOP ROOF CIVIL
TSCR MOTOR HOUSE TOP ROOF SHEETS TO BE CHANGED AS WATER IS FALLING THROUGH IT CIVIL
MOTOR HOUSE BACKSIDE AREA DRAIN AND FLOOR REPAIRING CIVIL
water system connecting road path way and zebra crossing to be marked CIVIL
MAIN ECR IEM STORE BACK SIDE WASH BASIN DRAIN PIPE DAMAGED CIVIL
10M IEM STORE BACK SIDE WASH BASIN DRAIN PIPE GOT DAMAGED NEED TO CHANGE CIVIL
HILTI BOLT 8 NOS FIXING CIVIL
CASTER ENTRANCE GATE LD3 SIGNAL WINDOW OF TUNNEL BROKEN WCICH GRILL TO BE PROVIDED CIVIL
ECR-1 , 0-MT GENTS TOILET WINDOW GRILL PROVISION & DOOR LOCK REPAIRING CIVIL
AHU ROOM LATCH LOCK & WINDOW GRILL TO BE PROVIDED CIVIL
ECR1&2 BOTTOM TUNNEL GATE DOOR LOCKING ARRANGEMENT PROVISION CIVIL
MILL AREA EMERGENCY GATE WAY TO MOTOR HOUSE DOOR LOCKING ARRANGEMENT CIVIL
ECR STORES BESIDE ROOM PARTITION SHIFTING AND NEW CABIN 12 NOS. PARTITION MAKING CIVIL
RAIN WATER ENTER THROUGH RCPH EMERGENCY EXIT DOOR AND LIFT SIDE CABLE TUNNEL DOOR CIVIL
WATER SYSTEM AREA MCC 6 WALL WATER SEEPAGE CIVIL
RAIN WATER ENTER IN SIDE STPH ECR AND CONTROL ROOM THROUGH WALL CIVIL
RAIN WATER ENTER THROUGH WALL AND CEILING ON HT MOTOR OF STPH AREA P 18 GROUP CIVIL
RCPH AREA RIO-9 & 2ND FLOOR NEAR LIFT WALL WATER SEEPAGE CIVIL
EARTH PIT#217,219 & 229 BROKEN WALL /FLOOR REPAIRING CIVIL
MILL ECR CHHAJJA BROKEN.CONCRETE MATERIAL FALLING.TO BE REPAIRED. CIVIL
hilti bolt 10mm dia , 60mm length fixing at furnace ECR CIVIL
ROLL SHOP SHEAR BLADE ECR WINDOW GLASS CHANGING CIVIL
line B SECTION 2 Air control valve T joint area hilti provision for canopy fixing CIVIL
FM PULPIT LEVEL1 & FURNACE ECR STAIR HAND RAIL REPLACEMENT WITH STEEL STRUCTURE CIVIL
FM PULPIT WOODEN BLOCK RE SHEETING CIVIL
WATER LOGGING AT 10M,ECR2 FLOOR IN FRONT OF HT ROOM CIVIL
FALSE CELLING FIXING AT ROLL SHOP CONTROL ROOM CIVIL
SPLIT AC 3 NOS.UNIT FIXING AT COMMAND CENTRE ROLL SHOP AREA CIVIL
TSCR ROLL SHOP AREA COMMAND CENTER OUTER BOTTOM AREA TILES FIXING CIVIL
DG ROOM BATTERY STAND MAKING CIVIL
CASTER ECR BATTERY STAND MAKING CIVIL
CHILLER ECR NEW BATTERY STAND MAKING CIVIL
WATER LOGGING IN BETWEEN CHILLER MCC 1 & 2 WHICH IS FALLING FROM TOP ROOF CIVIL
FALSE CELLING INSIDE CHILLER ECR ROOM TO BE SET RIGHT .MAY FALL ANY TIME . CIVIL
WATER SYSTEM AREA CABLE TRUSSEL PATHWAY,HAND RAILS MONO RAIL,DOORS PAINTING CIVIL
TSCR MILL ECR1 10M STORE TOILET COMMODE , ITS TOP COVER & FLASHING UNIT CHANGING CIVIL
NEW AC INSTALLATION IN REFURBISHMENT DRIVE ROOM CIVIL
TSCR, WATER SYSTEM ,LCPH ECR, ENTRANCE EYE SHOWER PIPE LINE TO BE RE ROUTED TO AVOIDE SLIP CIVIL
P13 PUMP ROOM ENTRANCE EARTH STRIP FALLS ON PATHWAY NEED TO HIDE TO AVOID STF CIVIL
TSCR,WATER SYSTEM FILTRATION PLANT Earthing Strip on pathway . To be set right CIVIL
TSCR WATER SYSTEM FILTRATION PLANT ENTRANCE AREA UNEVEN SURFACE .TO BE SET RIGHT CIVIL
TSCR ,WATER SYSTEM, CASTER SCALE PIT AREA UNEVEN SURFACE .TO BE SET RIGHT CIVIL
TSCR, MILL ECR NEAR AJANTA ELECTRICAL SHED ROAD PARTIALLY DAMAGED .TO BE REPAIRED CIVIL
ROAD NEAR TSCR MILL MAIN TRANSFORMER SHELL GOT PARTIAL DAMAGED. CIVIL
TSCR MILL ECR DRAIN SURROUNDING TREE TRIMMING CIVIL
MOTOR HOUSE BACK SIDE DRAIN JAM. IT IS TO BE CLEANED CIVIL
TSCR WATER SYSTEM FILTRATION PLANT PATH WAY UNEVEN SURFACE CIVIL
TSCR WATER SYSTEM GAP BETWEEN RIO-10 ENTRANCE AND PATHWAY .NEED TO SET RIGHT CIVIL
TSCR,WATER SYSTEM P-20 PUMP ROOM ENTRANCE AREA UNEVEN FLOOR CIVIL

TSCR WATER SYSTEM P-20 PUMP ROOM EARTH STRIP ON P-20 PATHWAY WHICH CAUSE STF. NEED TO SET CIVIL

TSCR WATER SYSTEM THICKNEER PATHWAY HAVING EARTH STRIP .TO BE SET RIGHT TO AVOID STF CIVIL
TSCR_TUNNEL FURNACE ECR-3A WALL CUTOUT FILL UP WITH BRICK AND CONCRETE MATERIAL CIVIL

TSCR TUNNEL FURNACE ECR-2B ROOF SLOPPING OPPOSITE OF FURNACE SIDE FOR RAIN WATER DROPPING CIVIL

TSCR LINE-A SWIVEL CABLE TRENCH WATER SEEPAGE .NEED TO RECTIFY BY CHEMICAL TREATMENT CIVIL
TSCR ROLL SHOP ALL CABLE TUNNEL WATER SEEPAGE CIVIL

TSCR FURNACE PLC ROOM CABLE VAULT ,CABLE TUNNEL AND IN BETWEEN CABLE TUNNEL WATER SEEPAGE CIVIL

TSCR FURNACE LINE A AIR CONTROL VALVE 1,2,3,6,7,8 OVER HEAD SHHETING TO AVOID RAIN WATER CIVIL
TSCR FURNACE LINE B AIR CONTROL VALVE 1,2,3,5,6,TOP AREA SHEETING TO AVOID RAIN WATER CIVIL
TSCR FURNACE PLC ROOM TOP FLOOR NEED PIPING FOR CHILLED WATER LINE CIVIL
TSCR FURNACE PLC ROOM TOP FLOOR NEED TOILET CIVIL
TSCR-MILL ,ECR-1,10M EMERGENCY DOOR BESIDE CONFERENCE ROOM GLASS OPENED FROM ONE SIDE CIVIL
TSCR MILL ROT CABLE TRAY ROOF WATER SEEPAGE CAUSING TRAY DAMAGE CIVIL
MILL ECR2 10M DRINKING WATER WASH BASHIN CHANGING AND TILES FIXING ON THE SAME WALL CIVIL
LD3-45 ,AC SHIFTING FROM ECR-1A & FIXING TO FCE PLC STORE CIVIL
TSCR TUNNEL FURNACE PLC ROOM DOOR BROKEN GLASS TO BE CHANGED CIVIL
WATER SEEPAGE FROM rm shop cable tunnel CIVIL
ROLL SHOP CABLE TUNNEL WATER SEEPAGE CIVIL
WATER SEEPAGE FROM MILL ECR TO RCIL LCSS ROOM CABLE TUNNEL CIVIL
RCIL LCSS TO RCIL PLC ROOM CABLE TUNNEL WATER SEEPAGE CIVIL
TUNNEL FURNACE IN BETWEEN FURNACE TUNNEL WATER SEEPAGE CIVIL
MILL ECR1,10M, HEAD IEM ,ROOM AC INSTALLATION CIVIL
TSCR MILL,FURNACE AND WATER SYSTEM ECR BUILDING PAINTING PAINTING
MILL ECR FRONT SIDE PLANTATION CIVIL
TSCR MILL ECR TOWALL AND FOUNTAIN MAKING CIVIL
TSCR MILL ECR GARDEN DEVLOPMENT CIVIL
TSCR MILL ECR GARDEN AUTO IRRIGATION SYSTEM INSTALLATION CIVIL
TSCR MILL ECR GARDEN WATER PIPING CIVIL
TSCR ROLL SHOP COMMAND CENTER URINAL TILES REPAIRING CIVIL
TSCR MILL ECR LADIES REST ROOM AC FIXING CIVIL
TSCR MILL ECR , 5 NOS. OFFIFE FLOOR TILES FIXING CIVIL
MILL ECR1 ,10M, AHU ROOM DAMAGE FLOOR REPAIRING CIVIL
MILL ECR ENTRANCE AREA TWHO NOS. CAR PARKING SHED MAKING FOR HEAD IEM CIVIL
TSCR ROLL SHOP CABLE TUNNEL TWO NOS PIT MAKING FOR SUMP PUMP CIVIL
TSCR ROLL SHOP ALL ECR INSIDE FLOOR WATER SEEPAGE CIVIL
WATER SYSTEM EARTH PIT (11 NOS.) PERIPHERAL CIVIL STRUCTURAL BRICK WALL REPAIR CIVIL
MILL ECR2 DC DRIVE ABOVE FALSE CEILING REFIXING CIVIL
TSCR WS RCPR ROOF WATER SEEPAGE .NEED TO REPAIR ROOF TO AVOID RAIN WATER SEEPAGE CIVIL
TSCR ROLL SHOP ECR FLOOR WATER SEPAGE CIVIL
TSCR ROLL SHOP CABLE TUNNEL OVER HEAD ENTRY POINT WATERSEEPAGE CIVIL
TSCR ROLL SHOP SHIFT ROOM ONE AC SHIFTING TO SHARE BLADE GRINDER ROOM CIVIL
MILL ECR DRIVE ROOM WATER SEEPAGE CIVIL
TUNNEL FURNACE ECR-3A WATER SEEPAGE FROM ROOF CIVIL
MILL ECR1 , 0-MT CRP ROOM WATER SEEPAGE CIVIL
TSCR RCIL CABLE TUNNEL WATER LOGGING CIVIL
TSCR CABLE TUNNEL MILL TO RCIL WATER LOGGING CIVIL
TSCR ROLL SHOP CABLE TUNNEL PATHWAY WATER LOGGING CIVIL
TSCR TUNNEL FURNACE CABLE TUNNEL PATHWAY WATER LOGGING CIVIL
TSCR MILL ECR 1 & 2 ,10MT RAIN WATER SEEPAGE INCLUDING LIFT MCC ROOM CIVIL
TSCR ROLL SHOP ALL ECR GETTING RAIN WATER SEEPAGE CIVIL
MILL ECR HEAD IEM ROOM INSIDE HILTI FIXING FOR MONITOR BASE PLATE CIVIL
TSCR FURNACE PLC ROOM ENTRY DAMAGE PATHWAY NEED REPAIRING CIVIL
TSCR STPH ECR BUILDING TOILET NOT IN OK CONDITION . IT IS TO BE SET RIGHT. CIVIL
TSCR MILL ECR CONFERENCE ROOM EXIT EMERGENCY DOOR MAKING CIVIL
TSCR RCIL CABLE TUNNEL PATHWAY DEMAGED CIVIL
FP CENTER LIFT SHAFT WALL CRACKED .NEED TO REPAIR CIVIL
C#1 Crop Car area idler base strengthening by concreting. CIVIL
C#2 Crop Car area idler base strengthening by concreting. CIVIL
C#1 Civil flooring and anti-skid tiles provision at DBPR Gear Box area. CIVIL
C#2 Civil flooring and anti-skid tiles provision at DBPR Gear Box area. CIVIL
C#1 Civil flooring and anti-skid tiles provision at Hydraulic room. CIVIL
C#2 Civil flooring and anti-skid tiles provision at Hydraulic room. CIVIL
C#1 MCW Surge tank booster pump base strengthening CIVIL
C#2 MCW Surge tank booster pump base strengthening CIVIL
Provide chilled drinking water at WDR#2 basin CIVIL
C#1 0mtr hatch cover border base concreting (3nos) CIVIL
C#2 0mtr hatch cover border base concreting (3nos) CIVIL
1-C#1 CBC power pack area drain line both side concrete base height to increase and slope towards outside
for rain water free flow CIVIL
2-Secodary containment provisioning near C#1 CBC power pack
EQUIPMENT PAINTING PAINTING
Tunnel Fce Stack inspection CIVIL
Tunnel Fce and its structural painting PAINTING
Tunnel Fce Stack Painting PAINTING
Tunnel fce Cellar painting PAINTING
Repalcement of Flooring and side wall at Caster Pulpit CIVIL
Painting application of equipment PAINTING
Painting application of structural parts PAINTING
Epoxy coating of Steam Exhaust Unit at Caster PAINTING
Pre MSD(Y/N) End Date
(To be filled by Duration(Hrs) Start Date (To be filled
Dept (To be filled by (To be filled by by Dept
Contact Person Section Convener) Engg services) Dept Convener) Convener)
SUKHWINDAR KOUR Coil conveyor Y DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor Y DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor Y DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor Y DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor Y DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor N DAY-2 DAY-6
SUKHWINDAR KOUR Coil conveyor N DAY-2 DAY-6
ABHISHEK CHATTERJEE Coil conveyor Y DAY-2 DAY-6
ABHISHEK CHATTERJEE Coil conveyor Y DAY-2 DAY-6
ABHISHEK CHATTERJEE Coil conveyor N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-3 DAY-4
ABHISHEK CHATTERJEE RCPH N DAY-3 DAY-4
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-6
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-4
ABHISHEK CHATTERJEE RCPH N DAY-2 DAY-5
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SUKHWINDAR KOUR COCO N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR FURNACE N DAY-2 DAY-6
SANTOSH KUMAR PAINTING Y
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
Rohit Shrivastava Mill N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6


R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6


R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6

R R MAHATO IEM N DAY- 2 DAY-6


R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
R R MAHATO IEM N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
NIRMAL KUMAR CASTER N DAY- 2 DAY-6

NIRMAL KUMAR CASTER N DAY- 2 DAY-6

MANISH KUMAR MILL OPRN N DAY- 2 DAY-6


D S PANDEY FURNACE OPRN N DAY- 2 DAY-6
D S PANDEY FURNACE OPRN N DAY- 2 DAY-6
D S PANDEY FURNACE OPRN N DAY- 2 DAY-6
D S PANDEY FURNACE OPRN N DAY- 2 DAY-6
P.N.SHIVANGI CASTER N DAY-2 DAY-6
P.N.SHIVANGI CASTER N
P.N.SHIVANGI CASTER N
NIRMAL KUMAR CASTER N DAY- 2 DAY-6
Engg services
Engg Services contact contact no
name(filled by Engg (filled by Engg
services) services)
RCPH
S.N
Section Area Equipment
o
1 RCPH RCPH ICW Caster & Mill Cold well
2 RCPH RCPH ICW Caster & Mill Cold Basin
3 RCPH RCPH ICW Furnace Cold Well
4 RCPH RCPH ICW Furnace Cold Basin
5 RCPH RCPH DCW Caster Cold well
6 RCPH RCPH DCW Caster Cold Basin
7 RCPH RCPH DCW Mill Cold Well
8 RCPH RCPH DCW Mill Cold Basin

9 RCPH LCPH LCW Cold Basin

10 RCPH STPH CASTER DCW Caster

11 RCPH STPH MILL DCW Mill


12 RCPH STPH Soft Water Storage Tank (LD#3 TSCR)
13 RCPH WWTP Thickener tank & Launder cleaning.
14 RCPH WWTP Sludge Storage Tank-01 & 02.
15 RCPH WWTP WWTP Leakage & Drainage Pit.
16 RCPH STPH MILL Mill Settling Tank Cleaning 301,302 & 303
17 RCPH WWTP Backwash Pit Cleaning
18 RCPH LCW Cold well LCW Cold well cleaning job
19 RCPH Laminar tunnel Laminar tunnel cleaning job
20 RCPH Hot well Suction Pit Hot well Suction Pit cleaning job
21 RCPH Service water Tank Service water Tank cleaning job
22 RCPH RCPH ALL DRAIN CLEANING JOB FROM CT 1 TO CASTER ENTRANCE AREA
23 LD3 TSCR LD3 TSCR Cleaning of WSD and crop bucket
RCPH
SOURCES OF Last date TBM due date resource Status
Days Task Description
JOB name
3rd Day Cold well # 1 Cleaning TBM MSD -21 MSD -22 Super Sucker
Cold Basin # 1 A, B, C & D
3rd & 4th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
2nd Day Cold well # 2 Cleaning TBM MSD -21 MSD -22 Super Sucker
3rd Day Cold Basin #2 A & B Cleaning TBM MSD -21 MSD -22 Super Sucker
2nd Day Cold well # 3 Cleaning TBM MSD -21 MSD -22 Super Sucker
2nd & 3rd Day Cold Basin #3 A,B & C Cleaning TBM MSD -21 MSD -22 Super Sucker
3rd day Cold well # 4 Cleaning TBM MSD -21 MSD -22 Super Sucker
Cold Basin #4 A,B,C,D & E
3rd & 4th day TBM MSD -21 MSD -22 Super Sucker
Cleaning
Cold Basin # 5 A,B,C & D
1st & 2nd Day Cleaning TBM MSD -21 MSD -22 Super Sucker

P17 suction pit and sludge and


3rd & 4th day scale cleaning. TBM MSD -21 MSD -22 Super Sucker

4th & 5th Day P20 suction pit and sludge and TBM MSD -21 MSD -22 Super Sucker
scale cleaning.
1st Day Cleaning of SWST TBM MSD -21 MSD -22 Super sucker
5th & 6th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
6th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
6th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
5th & 6th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
2nd to 6th Cleaning TBM MSD -21 MSD -22 Super Sucker
4th & 5th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
5th & 6th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
4th & 5th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
5th Day Cleaning TBM MSD -21 MSD -22 Super Sucker
BEFORE MSD Cleaning TBM PRE MSD-21 PRE MSD-22 Super Sucker
1st & 2nd Day Cleaning TBM PRE MSD-21 PRE MSD-22 Super Sucker
Remarks