1.0 Introduction
MICRENCH GLOBAL RESOURCES is a 100% wholly owned Nigerian indigenous company with
its head office and operations base at 106 Old Aba Road, Port Harcourt. The company is
engaged in Facility Maintenance, Dredging, Well sweeping, Construction, Offshore and
Onshore Installation and oilfield-related activities and we are committed by virtue of the
guiding philosophy and as such we fully understand and appreciate the importance of Nigerian
indigenous capacity building and developmental efforts of the Government and as such the
issue of Local Content is given the due attention it deserves in all our contracting obligations.
The implementation of Nigerian Content is therefore monitored at the highest level of the
management of our organization to ensure the desired dividend and objective is achieved.
Our measurement of Local Content shall be based on a combination of parameters that take
into consideration the Turn Over resulting from our Maintenance activities, our manpower/
human resource spread (local community/Nigerian vs. foreign nationals), the amount of
involvement and local commerce generated as a direct consequence of our activities, the
result of which shall be made manifest via the degree of social stability induced in our
environment as a direct outcome of our activities.
In the project implementation, MICRENCH GLOBAL will utilize the existing fabrication
facilities, onshore equipment, offices and fleet of marine barges and vessels owned and
operated MICRENCH GLOBAL RESOURCES.
Our organisation currently has well experienced personnel in its employment with over 98%
Nigerians and has indeed made substantial investment and commitment required to enable a
Nigerian indigenous owned company to successfully compete for and execute major projects
utilizing its own resources.
Based on our past experience(which was acquired from Trans-Coastal Group and Seaweld
Engineering (Nigeria) Limited), and recognizing the importance of indigenous development,
our organization have made substantial investment towards building up of infrastructures and
construction resources with over US$800 million dollars in assets within Nigeria as part of our
developmental process.
All aspect of this project (engineering, procurement, fabrication etc.) shall be carried out in
Nigeria
1 90
Management 12 1 13
%
2 100
Engineering 4 0 4
%
3
Site Activies 3 1 3 100%
4 100
Machine Shop 5 0 5
%
5 100
Administration 11 0 11
%
6 100
Corporate Affairs 2 0 2
%
7 100
Accounts 3 0 3
%
8 100
Contracts 3 0 3
%
9 100
Safety 4 0 4
%
10
Transport Officers 5 0 5 100
11 100
Operations 6 0 6
%
12 100
Electrical Maintenance 3 0 3
%
13 100
Maintenance 4 0 4
%
14 100
Fabrication Shop 6 0 6
%
15 100
Warehouse 2 0 2
%
16 100
Security 11 0 11
%
Total Workforce= 86
Total Nigerian Workforce=84
Percentage Nigerian Workforce= 98%
Engineering 90%
Construction 80
%
70%
Procurement
Installation 80
%
Logistics 95
%
Material Procurement 90
%
Third Party Services 100
%
Maintenance 90
%
Commissioning 95
%
I. Training
It is the policy of MICRENCH GLOBAL RESOURCES to maintain the availability of trained staff.
We have training facility located at our Head Office at 106 OLD ABA ROAD, Port Harcourt, and
Rivers State, Nigeria.
The training facilities consist of a lecture room with 25 seats furnished with air-conditioning
units, slide projectors, video / TV screen.
The skills and qualification of inspection personnel are further upgraded by sending the
inspectors to inspection course and subsequent examination scheme given by Authorized
Certifying bodies such as; ASNT, CSWIP, ASME,NACE,SSPC,API and AWS.
MICRENCH GLOBAL in line with the Nigerian Content Requirement is having an Agreement
with OGTAN Trainer who will be responsible for coordination of the training activities during
execution of the DREDGING WORKS IN THE NIGER DELTA (CAPITAL AND
MAINTENANCE DREDGING) CONTRACT
The experienced Training Coordinator will be engaged to coordinate the program and be
responsible for its planning and execution. The Training Coordinator will deal directly
with COMPANY in all aspects of the program including reviews, approvals and performance
reporting. Main responsibilities include:
The Project Management Team (PMT) Office shall be located in Nigeria at MICRENCH GLOBAL
NIG building located at 106 OLD ABA ROAD, Port Harcourt Industrial Layout, Port Harcourt,
and Rivers State.
All Project Management activities shall be carried out in this location. Nigerian Nationals shall
be actively invloved in the management of this project.
Health, Safety and Environment issues are at the centre of all MICRENCH GLOBAL work.
MICRENCH GLOBAL is also committed to the implementation of Quality Assurance and Quality
Managemet in all aspects of project execution.
Contracts undertaken by MICRENCH GLOBAL are managed on a project oriented basis. The
main features of the company’s management approach are as follows:
2. The Project Manager has the responsibility and authority to undertake all actions
necessary to ensure that the stated objectives are met.
3. The resources to undertake the project are provided by the various Divisional
Managers. The Project Manager notifies his requirements (for personnel,
equipment, production capacity, etc) to the Divisional Managers, who have the
directive to satisfy project requirements.
4. Once the resources have been provided, they are under the full control of the
project manager, and may not be released from the project without his permission.
Should these resources not be provided from within the company, the Project
Manager is empowered to source them externally
a. Procurement
MICRENCH GLOBAL will carry out the procurement and material controls in line with of
this Contract MICRENCH GLOBAL will engage Company elected vendors to procure and
supply all materials for the project except Company provided items.
MICRENCH GLOBAL shall receive the free-Issued materials from the company after
due inspectionand will ensure they are properly handled, stored and preserved in
accordance with the manufacturer’s instructions and company specifications.
MICRENCH GLOBAL shall ensure that the schedule for procurement as per the contract
scope is developed in line with the project schedule. MICRENCH GLOBAL shall also
ensure that all free issued materials supplied by Company conform to specification and
project schedule to enhance smooth project execution.
MICRENCH GLOBAL shall procure consumable materials and equipment for the
installation to the correct specification, quantity, quality and price and timely delivery
to work site. It places demand on skill and expertise of all procurement activities.
The detailed materials procurement procedure for the project describes the activities
and requirement for the procurement of materials, equipment and services. It covers
the procedure for controlling requisitions, selection and evaluation of vendor /
subcontractors, and expediting activities.
MICRENCH GLOBAL recognises that early procurement of goods is a crucial element to
the overall success of the project.
The content and compilation of all enquiry requisitions shall be the responsibility of
the requisitioner, either the procurement officer or Discipline Engineer. The enquiry
packages shall be analyzed and a bidder list compiled and approved based on
technical, commercial, delivery and QA previous performance, as available. The list
must be endorsed by the Project Manager.
Materials take off for bulk items shall be prepared by the appropriate engineering
discipline. All materials and equipment shall be subjected to a criticality assessment
and a criticality rating index shall be produced, which determines the degree of quality
surveillance to be applied to a specific scope of supply.
A quality questionnaire shall be included within all enquiry packages issued to new
supplier to assess the maturity of the supplier’s quality system. All bids shall be
assessed commercially and technically against requirements specified and completed
quality questionnaires, short listed bidders may be invited for bid clarification meeting.
b. Materials Management.
The following describes the plan for materials management from receiving, inspection,
storage of Materials.
i. Receiving Inspection.
The P.O./ item No. shall be indicated in the Material Receiving Report (MRR) to enable
traceability to manufacturers test certificates, vendor documents and to the vendor/
supplier. The receiving inspection performed on incoming materials will confirm the
traceability of the identification markings on the material (such as P.O./item No, heat
number, batch number) to materials test certificates or to vendor documents.
ii. Storage.
The accepted materials shall bear “acceptance tags or stickers” or marked “accepted”
directly on the materials. The accepted materials shall be marked with MRR No. and
P.O./ item No. The rejected materials shall be segregated in delimited area and
positively identified to avoid inadvertent use for Dredging. The “rejected materials”
shall be painted with red stripe, marked with Non-Conformance Report (NCR) Number
and with P.O/ item No. The materials shall be stored in a manner that will prevent
corrosion and deterioration.
of facility.
MICRENCH GLOBAL has targeted that 90% of the total work scope will be conducted by
Nigerian Personnel.
The percentage of total work scope breakdown that will be involved for this project is
stated below:
1. Transportation 100
2. Project Management 98
3. Dredging Services 98
4. QA/QC/Inspection Services 98
7. Safety 100
It is the policy of MICRENCH GLOBAL RESOURCES to maintain the availability of trained staff. We have
training facility located at our Head Office at 106 OLD ABA ROAD,, Port Harcourt, Rivers State, Nigeria.
Below are details of training and development plans for Engineering, Procurement and Project Management staff etc.
No of
Durati
e Title
Locati
Hours
Hours
ency/
SN
Traini
Frequ
Cours
Cours
Cours
Categ
hours
Provi
Total
Staff
Staff
Man
Man
Man
Per
der
ory
ng
on
of
e
A MANAGEMENT
COURSES
Contemporary Project Mgt 2days Quarterly 1,028
-Project Manager . Systems and methods. 8h x 8dx2y
-QA/QC Manager =128hrs
-Procurement Mgr. Interface Management and Quarterly
-Safety Manager. Team work. 2days 8h x 8d x 2y 1,028
-Interface Manager 8 =128hrs Tom
- Engineering Mgr. Management Planning: the Associates
-Community Relations bridge between Strategic Quarterly PH Nig.
Manager Direction and Project 3days 8h x 12d x2y 1,536
- Construction Mgr. implementation =192hrs
B
ENGINEERING
Design & Maintenance of Twice Yearly
-Project Engineer Piping Systems. 5days 8h x 10d x2y 13,760
-Lead Mech. Engr. =160hrs
-Lead Structural
Engr Process/Fluid analysis and Quarterly
-Lead Safety Engr. Design against seismic 3days 8h x 12d x2y 16,512
-Lead lifting/weight loading. =192hrs
Control Engineer.
-lead Pipe Engr 86 Heavy Module Design Twice Yearly
-Design Engr Engineering & Piping 5days 8h x 10d x2y 13,760 PH Nigerian
- NDT. Coord. Operations =160hrs & Society of
- NDT Inspectors LOS Engineers
-Hookup Supervisor Pipe Engineering:- 3days Twice Yearly
Reliability and integrity 8h x 6d x 2y 8,256
inspection =96hrs
Twice Yearly
3days 8h x 6d x 2y 8,256
Survey planning & =96hrs
Geotechnical
Seabed Sampling. Twice Yearly
3days 8h x 6d x 2y 8,256 68,800
Corrosion & corrosion =96hrs
management.
C PROCUREMENT
D LOGISTICS
-Logistics Coordinator.. Dangerous Goods 3days Twice Yearly
-Lead Material Movement and Safety 8h x 6d x 2y 8,640
Controller Adviser Course. =96hrs
-Store Coordinator.
-Store Personnel. 90 Marine and Supply Base Twice Yearly Internation
- Hands involved in the Operations for Offshore 3days 8h x 6d x 2y PH al
Involved in the Support. =96hrs 8,640 Training
logistics Fund.
& Transport of Project Heavy duty Materials
Materials. Handling/ Movement 3days Same
Operation. for Onshore & 8,640 25,920mhs
offshore Operations
E QA/QC
-Lead QA/QC Engr. Project and Quality 2days Twice yearly 1,792
-Lead Certification inspection 8h x 4d x 2y
Engineers =64hrs
-Quality Team Heads Advanced Process Control PH Standards
-Quality inspectors 28 (APC). 3days Twice Yearly Organizati
-NDT Inspectors 8h x 6d x 2y 2,688 on of Nig.
Quality Control =96hrs
Mechanisms and
Certification. 3days Same 2,688
Twice yearly
-All Supervisors. Safety Monitoring 2days 8h x 4d x 2y 1,664
-All Team leaders/. Strategies. =64hrs
Foremen. Nigerian
-Safety Personnel. 26 Emergency Response & 2days Same 1,664 PH Institute of
Crisis Safety
Management. Profession
als
Zero Injury Technique. 2days Same 1,664
Disaster / Hazards
Control 2days Same 1,664
Twice yearly
Fire Prevention & 2days 8h x 4d x 1,664
Fighting. 2y
=64hrs
2days 1,664
PPE And Survival at Sea. Same
2days 1,664
Basic and Advanced First Same
Aid.
CONTRUCTION/
G INSTALLATION
-Design Engineers. Twice
- Structural Engineers. Strategic Construction 3days Yearly 21,504
-Construction and Design Workshops 8h x 6d x
Supervisors. 2y
-Construction 224 Piping Systems &Hookup =96hrs PH Nigerian
Technicians. Strategies for offshore 2days 14,336 Society of
-Wielding Supervisor. Projects. Twice yearly Engineers
-Wielding Technicians 8h x 4d x
-Hookup Supervisor Basic & Advanced 2y
-Hookup Technicians. Fabrication Techniques. 2days =64hrs 14,336
-Crane Operators..
Twice yearly
8h x 4d x
2y
=64hrs
Twice Yearly
Error /Fault indicators and 3days 8h x 6d x 2y 21,504 86,116mhs
Equipment Monitoring =96hrs
H PLANNING/SCHEDULIN
G
-Project Manager Project Capacity Planning Yearly
-Project Engineer. work Stations and Service 8h x 3d x2y 576
-All lead Team Heads. Layouts. 3days =48hrs
-Lead Compliance 12
Operatives Project Planning and works Yearly PH Nigerian
measurement, Design & 3days 8h x 3d x2y 576 Society of
Controls. =48hrs Engineers
Yearly
Implementation Plan & 2days 8h x 2d x2y 384 2,112mhs
Timing =32hrs
ITT FOR LOCATION PREPARATION AND ACCESS TENDER No:
ROAD CALL-OF CONTRACT FOR SEPLAT SEPLAT/LAG/ITT/2
WESTERN ASSET FOR OML 3, 38 AND 41 (CALL 021/ENG/139598
OFF CONTRACT)
TECHNICAL
TENDER
I HOOK-UP/
COMMISSIONING
TECHNICAL TENDER
ITT FOR LOCATION PREPARATION AND ACCESS TENDER No:
ROAD CALL-OF CONTRACT FOR SEPLAT SEPLAT/LAG/ITT/2
WESTERN ASSET FOR OML 3, 38 AND 41 (CALL 021/ENG/139598
OFF CONTRACT)
TECHNICAL
TENDER
The Project Management Team (PMT) and Procurement Centers shall be located in Nigeria
at MICRENCH GLOBAL RESOURCES building located on 106 OLD ABA ROAD,, Port Harcourt.
Portions of the Work to be performed at this Work Site include:
The company has an active training and development plan to train quality skilled
personnel and youths from our host community in welding, fitting, machine operations
and other skilled crafts.
Given the brief outline of the nature of the Project, the following goods, materials and
consumables are envisaged to be procured from Nigeria:
Oil Tools.
Machinery & Parts.
Vehicle Spare Parts.
Painting & Blasting Equipment & Accessories.
Consumables.
Safety Items.
Communication Items.
Stationery.
Household Items.
Petroleum Products.
Printing.
Pest Control & Fumigation Services.
Lubricants.
Drugs/Pharmaceuticals.
MICRENCH GLOBAL shall also ensure the utilisation of Nigerian resources (including
materials and Labour) to the best possible extent.
development and execution of the Project, within the context of the internationally
competitive environment.
MICRENCH GLOBAL Plans to offer 100% Nigerian Constructionin her Fabrication Yards
at Plot 100 Rumuagholu Rupkoku Airport Road. Additionally we will utilize an
indigenous sub-contractor as a clearing agents.
MICRENCH GLOBAL would be utilizing her marine resources available in Nigeria i.e.Lay
barge, Cargo barges, Supply boats & tugs which are already captured in the NOGIC
JQS Potral of Nigerian Content Development Management Board (NCDMB) and other
logistic support with a view to increasing the Nigerian participation in the development
of this Project.MICRENCH GLOBAL will also respect MOA between the COMPANY and
the host community. We are going to identify and consider NAOC local communities
contractors to perform supplies for this project.
Please see NOGIC JQS registration notification account creation attached
N. Nigerian Content Equipment Certificate