MUSTIKA PETROTECH INDONESIA PERTAMINA EP

MORNING REPORT
REPORT NO 43 Mudlogging Unit No: A4 CO.MAN R Danil, M Rafian, Arde G
DATE 10 January 2023 GEOLOGIST Budi BEP
TIME 03:30 MLU ARRIVED 20 Nopember 2022
WELL LBK-INF-5/LBK-019 CUSTOMER PERTAMINA EP Soni Y
FIELD LEMBAK AREA LEMBAK, SUMSEL MLU Meyer A
REGION SUMATERA CONTRACTOR PDSI TEAM Meulana F.V
WELL TYPE DEVELOPMENT RIG NO 05.2/OW760-M Andreas T
WELL CLASS EKSPLOITASI SPUD DATE 28 Nov 2022 @ 17:00 WIB Sigit Widodo

A C T IV IT Y Masuk 7" Casing (N-80 (R3/R2), N-80 (R2), #26 ppf, BTC)
PRESENT DEPTH (M) : 1701.00 mMD PREVIOUS DEPTH (M) : 1701.00 mMD
: 1638.70 mTVD 24:00 : 1638.70 mT V D 0:00
PROGRESS (M) : 0.00 m MIDNIGHT DEPTH (M) : 1701.00 MD
PRESENT BIT
D BIT NO/Manfc 5/2 RR 8.5" PDC, NOV JET SIZE Open Nozzle Flow Rate (gpm) 580 - 600
R TYPE SKFX519S TFA 0.839 SPP (psi) 2100 - 2230
I S/N E263299 LAST 24 HRS 0.51 WOB (klbs) 2-6
L IADC 519 TOT BIT HRS 10.01 RPM Motor 177 - 187
L ROP MAX 1.93 @ 1608 m AVG ROP #DIV/0! min/m Torque(ft-lb) 8000 - 10000
I (min/m) MIN 5.50 @ 1699 m LAST ROP 2.53 min/m RPM Surface 47 - 53
N
DULL GRADE 1-2-CT-G-X-1/16-NO-TD
G
DEPTH IN 1512.00 DEPTH OUT 1701.00 METERAGE 189 AVG ROP 3.18 min/mtr
PREVIOUS BIT
P BIT NO/Manfc 5/2 NB 8.5" PDC, NOV JET SIZE 1x18,2x12,1x16,1x15 GPM 580 - 650
A TYPE SKFX519S TFA 0.839 SPP (psi) 1100 - 1300
R
S/N E263299 LAST 24 HRS 0.00 WOB (klb) 1 - 19
A
IADC 519 TOT BIT HRS 10.01 RPM Motor
M
ROP MAX 1.93 @ 1608 m AVG ROP 4.20 min/m Torque (lb-ft) 4500 - 10000
E
(mtr/hr) MIN 5.50 @ 1699 m LAST ROP 11.93 min/m RPM Surface 50 - 90
T
E Reason Pulled TD Casing Point 1723 mMD DULL GRADE 1-1-WT-A-X-1/16-PN-TD
R DEPTH IN 1274 DEPTH OUT 1723 METERAGE 449 AVG ROP 2.90 min/mtr
P PUMP NO TYPE LINER L. STROKE EFF (%) BBL/STRK SPM MAX. PRESS. (psi)
U I National 6.25 9.25 93% 0.0816 61
M II National 6.25 9.25 90% 0.0790 61 2,450
P III National 6.25 9.25 93% 0.0816 58 2,450

C OD (INCH) ID (INCH) POUNDER (LB/FT) TOP (M) SHOE (M)


A 30 29.000 309 0 47.00
S 20 19.124 94 0 460.00
I 13-3/8 12.615 54.5 0 1345.92
N 9-5/8 8.835 40 0 1507.40
G 7.00 6.276 26 1229.45 1721.40
DEPTH (M) MAX GAS (UNIT) BACKGROUND GAS (UNIT) CONN GAS (UNIT) TRIP GAS (UNIT)
G
A
S

M MW(SG) ECD VIS PV/YP pH Filtrate Gel Str Sand Cont Solid K+/Cl-
U 1.14 1.19 63 21/33 10 5.0 10/18 0.12 7 34K/48K
D

Bit PDC 8.5" 0.27 0.27


6-3/4" Mud Motor 8.37 8.64
6-3/4'' Float Sub 0.54 9.18
8" IB Stabilizer 2.33 11.51
6-3/4" Muleshoe Sub 0.62 12.13
6-3/4" NMDC MWD 9.36 21.49
6-3/4" NMDC 9.39 30.88
B
15 x 5" HWDP 140.54 171.42
H
A 6-1/2" Jar 5.94 177.36
5x 5" HWDP 46.14 223.50
223.50
223.50
223.50
T otal BH A 2 2 3 .5 0 m

TOTAL DP (JTS) 165 LENGTH 1637.95 m BHA LENGTH + DP 1861.45 m


REMARK
Pump Hi-vis 10 bbls @ 282 mMD
PT. MUSTIKA PETROTECH INDONESIA PERTAMINA EP

LITHOLOGY GAS PEAKS


DEPTH CLST SH SLST SST LST COAL Tuff DEPTH TG BG C1 C2 C3 IC4 NC4 IC5 NC5
O/S LITHO
(m MD) (%) (%) (%) (%) (%) (%) (%) ( m MD ) ( unit ) ( unit ) ( ppm ) ( ppm ) ( ppm ) ( ppm ) ( ppm ) ( ppm ) ( ppm )

DATA SURVEY
Survey Depth (m) INCL (deg) AZIM (deg) TVD (m) C-C plan C-C MH
1669.36 19.43 313.00 1608.39 2.77

INTERVAL SLIDING
SLIDING (m) SLIDING (m) SLIDING (m) SLIDING (m)

ACTIVITY
9 January 2023
- Repeat pass: 1600-1690 mMD.
00.00 - 05.30 OH logging Run#4 : (FMI-DSI)
- Cabut wireline logging tool run#4 dan L/D.
- R/D wireline logging unit.
05:30 - 12:30 M/U dan masuk rangkaian Pahat 8-1/2" PDC + BHA Rotary (Trip BHA) dari permukaan sampai 1701 mMD (bottom). No Fill
- Break sirkulasi @ 509 Mmd, 1429 mMD, GPM/SPP: 166/257 psi
- (08:50-09:30) Break sirkulasi @ 883 mMD, sambil memperbaiki Line Air pendingin Drawwork, GPM/SPP: 167-307/257-423 psi
- SPR @ 1429 mMD, MW: 1.14 SG, MP#1: 49 spm/167 gpm/257 psi, MP#2: 64 spm/213 gpm/347 psi, MP#3: 53 spm/183 gpm/273 psi
- Ambil parameter @ 1429 mMD. P/U: 144 klbs, S/O: 115 klbs, RW: 127 klbs/10-30 rpm/3600-4500 ft-lb, GPM/SPP: 184/283 psi
- Wash down last stand, GPM/SPP: 620/1350 psi. Trip Gas 2451 Unit
12.30 - 13.30 Sirkulasi bersih sambil WOP, GPM/SPP/RPM/TQ : 610/1310 psi/23/3900-4500 ft-lb
- Sweep 30 bbls Hivis. Lag check dengan Hivis, Average Hole Size : 8.99"
- Spot 30 bbls Hivis & Displace
13:30 - 19:00 Cabut normal rangkaian Pahat 8-1/2" PDC + BHA Rotary (Trip BHA) dari 1701 mMD sampai permukaan
- Flow check 5 menit, well static
- L/D Bit, 6-1/2" B/S & 2 x X/O
19:00 - 20:30 Persiapan masuk rangkaian Casing liner 7"
- Install link & elevator
- R/U Casing Power tong 7"
20:30 - 24:00 PJSM. Masuk 7" Casing (N-80 (R3/R2), N-80 (R2), #26 ppf, BTC) dari permukaan sampai kedalaman 229 mMD
- Tes alir Reamer Shoe dan Landing Collar di permukaan, baik.
- Joint tack welded (4 titik) Reamer Shoe, 2 jts Shoe track, Landing collar.
- Fill up casing tiap joint.
- Break circulate @ 371 mMD (197 GPM/100 psi).
10 January 2023
- Total 7" casing masuk 34 jts.
00:00 - 00:30 Lanjut Masuk 7" Casing (N-80 (R3/R2), N-80 (R2), #26 ppf, BTC) dari 229 sampai kedalaman 253 mMD
- Fill up casing tiap joint.
- Total 7" casing masuk 21 jts.
00:30 - 02:00 M/U Liner Hanger (Hydraulic Rotatable) + RT Assy.
- check pre-run running tool + LH assy, Cek ID running tool pastikan bersih, OK.
- Ganti elevator ke 5" DP.
- Cek Shear Pin LWP : 3/8" (4 pcs x 300\101.34psi) = 1205.33 psi.
- Cek shear Pin liner Hanger : 1/4" (2 x 345.85 psi) + 3/8" (1 x 673.3 psi) = 1365 psi.
- Cek Shear Pin liner packer : 3/8" (6 pcs x 2897.7 lbs) = 17390lbs.
- RPOB Test surface (GPM/SPP: 255/180 psi), tidak ada kebocoran diantara setting tool & liner, OK.
- Cek PU/SO 7" csg + LH assy = 43 klbs/43 klbs (pump on), 43 klbs/43 klbs (pump off), berat casing = 43-25(block) = 18 klbs.
- Take parameter putar pump on, PU/SO/RPM/TQ = 43 klbs/43 klbs/10-30/500-1500ft-lbs.
02:00 - 03:30 Lanjut masuk 7" casing + hydraulic rotateable liner hanger 7" x 9-5/8" (N-80, 26 ppf, BTC) assy + 5" HWDP+DP penghantar dari 253
mMD spi kedalaman 544 mMD. (RS @1801 mMD, FC@1778 mMD, TOL@1424 mMD)
- Sablon 5" HWDP + DP penghantar.