Location

Submitted
SN NO. Trade RFI NO. (Building Date
/ Zone)

1 S KAIG3-RFI-CO-S-8415-00 2R 1-Aug-22

2 S KAIG3-RFI-EC-S-8422-00 5A 2-Aug-22

3 S KAIG3-RFI-CO-S-8475-00 2D 2-Aug-22

4 S KAIG3-RFI-PC-S-8462-00 4 4-Aug-22

5 S KAIG3-RFI-EC-S-8487-00 5A 6-Aug-22

6 A KAIG3-RFI-PA-A-0390-00 K 8-Aug-22

7 A KAIG3-RFI-CO-A-0990-00 1B 8-Aug-22

8 C KAIG3-RFI-SW-C-5075-01 6B 9-Aug-22

9 C KAIG3-RFI-SW-C-5073-01 6B 9-Aug-22

10 S KAIG3-RFI-PG-S-8525-00 4D 9-Aug-22

11 C KAIG3-RFI-SW-C-3010-01 6A 11-Aug-22

12 S KAIG3-RFI-EC-S-8568-00 5A 11-Aug-22
13 S KAIG3-RFI-WG-S-8542-00 4 13-Aug-22

14 A KAIG3-RFI-CO-A-1000-00 1C 14-Aug-22

15 E KAIG3-RFI-TG-E-0404-01 1N 14-Aug-22

16 LC KAIG3-RFI-SM-LC-0752-00 1G 14-Aug-22

17 LC KAIG3-RFI-SM-LC-0753-00 1G 14-Aug-22

18 C KAIG3-RFI-SW-C-6834-00 6B 15-Aug-22

19 C KAIG3-RFI-SW-C-6848-00 DE2 8-Aug-22

20 C KAIG3-RFI-SW-C-6940-00 6 15-Aug-22

21 C KAIG3-RFI-DG-C-6949-00 6A 16-Aug-22

22 C KAIG3-RFI-DG-C-6948-00 DE2 16-Aug-22

23 C KAIG3-RFI-DG-C-6947-00 H6 16-Aug-22

24 LC KAIG3-RFI-MB-LC-0677-00 4B 16-Aug-22

25 E KAIG3-RFI-SW-E-0542-00 2B 17-Aug-22
26 C KAIG3-RFI-PG-C-7003-00 4D 18-Aug-22

27 C KAIG3-RFI-PG-C-7004-00 4D 18-Aug-22

28 E KAIG3-RFI-SW-E-0543-00 2B 18-Aug-22

29 A KAIG3-RFI-AG-A-1004-00 2B 20-Aug-22

30 A KAIG3-RFI-AG-A-1005-00 2Q 20-Aug-22

31 S KAIG3-RFI-CO-S-8689-00 2E 20-Aug-22

32 S KAIG3-RFI-EC-S-8667-00 5A 20-Aug-22

33 S KAIG3-RFI-EC-S-8746-00 5A 20-Aug-22

34 S KAIG3-RFI-EC-S-8747-00 5A 20-Aug-22

35 E KAIG3-RFI-SW-E-0551-00 2B 21-Aug-22

36 C KAIG3-RFI-SW-C-6982-00 G 22-Aug-22

37 E KAIG3-RFI-SW-E-0554-00 3A 22-Aug-22

38 LC KAIG3-RFI-SW-LC-0769-00 4C 22-Aug-22
39 LC KAIG3-RFI-SW-LC-0770-00 4C 22-Aug-22

40 S KAIG3-RFI-CO-S-8754-00 2M 22-Aug-22

41 C KAIG3-RFI-SW-C-7080-00 G 23-Aug-22

42 C KAIG3-RFI-SW-C-7120-00 G&K 23-Aug-22

43 C KAIG3-RFI-SW-C-7130-00 G 23-Aug-22

44 C KAIG3-RFI-SW-C-7133-00 B 23-Aug-22

45 P KAIG3-RFI-PC-P-0284-00 2C 23-Aug-22

46 C KAIG3-RFI-SW-C-7077-00 L5 24-Aug-22

47 S KAIG3-RFI-CO-S-8757-00 2H 24-Aug-22

48 E KAIG3-RFI-MB-E-0555-00 4B 25-Aug-22

49 SU KAIG3-RFI-CO-SU-2906-00 1A 25-Aug-22

50 S KAIG3-RFI-CO-S-8561-00 2M 27-Aug-22

51 S KAIG3-RFI-CO-S-8856-00 2E 28-Aug-22
52 S KAIG3-RFI-CO-S-8865-00 2R 28-Aug-22

53 A KAIG3-RFI-CO-A-1021-00 2M 31-Aug-22

54 A KAIG3-RFI-CO-A-1020-00 2M 31-Aug-22

55 C KAIG3-RFI-RD-C-7290-00 F&K 30-Aug-22

56 C KAIG3-RFI-SW-C-7287-00 F&G 30-Aug-22

57 C KAIG3-RFI-SW-C-7270-00 G4 30-Aug-22

58 C KAIG3-RFI-SW-C-7260-00 F 30-Aug-22

59 M KAIG3-RFI-SW-M-0291-00 G 31-Aug-22

60 M KAIG3-RFI-SW-M-0290-00 G 31-Aug-22

61 S KAIG3-RFI-CO-S-8880-00 2N 29-Aug-22

62 SU KAIG3-RFI-CO-SU-2910-00 2N 29-Aug-22

63 C KAIG3-RFI-SW-C-7228-00 E 30-Aug-22

64 C KAIG3-RFI-SW-C-7227-00 E 30-Aug-22
65 C KAIG3-RFI-SW-C-6980-00 E&D 30-Aug-22

66 C KAIG3-RFI-SW-C-6980-01 E&D 30-Aug-22

67 S KAIG3-RFI-CO-S-8843-00 2H 29-Aug-22

68 S KAIG3-RFI-CO-S-8844-00 2H 29-Aug-22

69 C KAIG3-RFI-RG-C-7229-00 2D & 2E 30-Aug-22

70 S KAIG3-RFI-CO-S-8813-00 6 29-Aug-22
Action Taken

Steel Reinforcements for internal columns and


wall of NORTH ADMINSTRATION axis 02/BC,
02/1-02/2 to 02/AZ, 02/1-02/2 (as highlighted)
Zone 2R (LEVEL as highlighted)
Concrete Pouring & Shuttering for Columns
(above the level +872.35) of Boundary Wall @
Grid (R/18-22), at Energy Center 2, as highlighted
area in attached drawing's.
Steel Reeinforcements for RC concrete ETFE
PUMP ROOM S.O.G.. zone 2D axis 02-J inner line
(as highlighted) at CRESCENT ,KAIG3-SCR-CO-S-
0193-00

Concreting for central bridge abutment grid


01/M zone 4 (as highlighted)

Concrete Pouring & Shuttering for Columns of


Boundary Wall @ Grid (A/6-12B), at Energy
Center 2, as highlighted area in attached
drawing's.
Inspection for application of Cementitious water
Proofing (3rd Coat) at Prayer Area Zone-K
(outside) - as Highlighted

Base Seal and Extrusion Aluminum Installation


between Axis 01/D - 01/E.

Base Seal and Extrusion Aluminum Installation


between Axis 01/D - 01/E.

"INSPECTION FOR INSTALLATION OF ALL RINGS


(RISER) AND SLAB FOR FW-A-3-7.1 (As
Highlighted) "

Concrete Pouring for Blinding under Fountain 1,


At Inner Side of Plant room, Inside Physic
Garden, as highlighted in attached drawing's.

INSPECTION OF INSTALLATION OF ALL RINGS


(RAISER) AND SLAB FOR FW-A-07 (AS ATTACHED)

Surface Preparation prior to Waterpoofing for


Footings & Garde Beams @ Grid (1-3/C-I), Inside
Energy Center 2, as highlighted area in attached
drawing's.
Surface Preparation prior to Waterpoofing for
Beams of Jetty 1 & Jetty 2 at Boat Garden inside
Water Garden , as highlighted area in the
attached drawings

Base Seal and Extrusion Aluminum Installation


between Axis 01/I-01/J.

Installation of PVC Conduit Sleeves Passing the


Concrete (3x75mm) for Low Voltage (Power
System) at Butterfly Garden and as highlighted in
the drawing.
Installation of straight PVC conduit (dia.25mm)
and Box for Voice and DATA (WIFI & CAM) at
Crescent - 01 Infill Wall (axis in between 01/1P &
01/1Q) as per attached highlighted drawing.
Installation of straight PVC conduit (dia.25mm)
and Box for Security (CAM) at Crescent - 01 Infill
Wall (axis in between 01/1P & 01/1Q) as per
attached highlighted drawing.
"INSPECTION FOR INSTALLATION OF ALL RINGS
(RISER) AND SLAB FOR FW-A-3-14 (As
Highlighted) "

Inspection of Excavation for MV Line from


D/MV/18 to E/MV/09 and D/MV/19 to E/MV/08
including all Pit - at Zone-D&E - as highlighted
Inspection of Excavation for Heating and Chilled
Water Line at Zone-G&K including Pit K/DC/02,
K/DC/01, G/DC/16, G/DC/08, G/DC/15 - As
highlighted ,
Inspection & Compaction tests of Single Layer
(Sub-Base) Backfilling on Irrigation Sub-Main Line
Distribution Network (50,90 mm line) at
Discovery Garden, as highlighted in attached
drawings.(SP 140)
Inspection & Compaction tests of Single Layer
(Sub-Base) Backfilling on Low Current Lines of
Telecom and Fire Alarm & Security Lines, Inside
Discovery Garden at highlighted area in attached
Drawing's.
Inspection & (SPCompaction
140) tests of Single Layer
(Sub-Base) Backfilling on Electrical Lines of Low
voltage Lines & Emergency Lines, Inside
Discovery Garden at highlighted area in attached
Drawing's.
Installation(SP
of 140)
EMT Conduit (Dia. 3/4) and Box
for Voice Data (CAM, WIFI & Telephone) at
Management and Maintenance Bldg. (GF 5000D
Passage, GF 5000 Reception) as per attached
Installation
highlighted of straight UPVC Conduit (Dia.
drawing.
160mm) Medium Voltage Ductbank no. DD/D-
MV/29 (from Manhole no. D/MV/17 to
D/MV/33) and (from Manhole no. D/MV/33 to
D/MV/03) at the Site Work as per attached
highlighted drawings.
Excavation & Bed Preparation for Electrical Lines
of Low Voltage (MH/PG/LV/09-12) and
Emergency (MH/PG/EM/10-13), Inside Physic
Garden as highlighted in attached drawing's.
Excavation & Bed Preparation for Low Current
Lines (MH/PG/LC/13-17) and Fire Alarm &
Security lines (MH/PG/FA/09-12), Inside Physic
Garden as highlighted
Installation of straight in attached
UPVC drawing's.
Conduit (Dia.
160mm) Medium Voltage Ductbank no. DD/D-
MV/12 (from Manhole no. D/MV/08 to
D/MV/31) and (from Manhole no. D/MV/31 to
D/MV/19) at the Site Work as per attached
highlighted
Mockup for drawings.
Stone Cladding on Boundary wall
(Outer Side) of Aviary Garden, Installed Location
at Grid (12-14/Left Side) at Aviary Garden, as
Highlighted area in Attached Drawings & Photos.
Mockup for Stone Cladding for Crescent
between Axis 02AY-02AZ & 02AW-02AX as
highligted (Zone 2Q).

Concreting for Infill wall inner at Crescent at axis


02O & 02P buttress BII BIV 77 & 78 (As
highlighted) ZONE 2E
Concrete Pouring & Shuttering for Columns (2nd
lift, above the level +872.35) of Boundary Wall @
Grid (M/17-22), at Energy Center 2, as
highlighted area in attached drawing's.
Surface preparation prior to waterproofing for
footings (inner Side) of Boundary wall @ grid
(01-C1), inside energy center 2, as highlighted
area in attached drawing's
Base Primer Coating prior to damp proofing for
Footings (Inner Side) of Boundary Wall @ Grid
(0-1/C-I), Inside Energy Center 2, as highlighted
area in attached
Installation drawing's.
of straight UPVC Conduit (Dia.
160mm) Medium Voltage Ductbank no. DD/D-
MV/15 (from Manhole no. D/MV/17 to
D/MV/02) & DD/D-MV/08 (from Manhole no.
D/MV/02 to D/MV/01) at the Site Work as per
attached
Inspectionhighlighted drawings.
and Compaction Test for backfilling
Sub-grade 5th Layer (5 of 6) around MV Line Pit
G/MV/28 at Zone-G - As Highlighted (Stock Pile#
133 A-1-B)
Installation of straight UPVC Conduit (Dia.
160mm) Medium Voltage Ductbank no. CC/D-
MV/03 (from Manhole no. C/MV/03 to
C/MV/30) at the Site Work as per attached
highlighted
Installation ofdrawings.
UPVC conduit (2x110mm dia.) Low
Current (Fire and Security) Ductbank no.GG/D-
FS/01 in between Hanhole (G/RC-FS/02 to G/RC-
FS/45) at the South Side Nursery (SW) as per
attached highlighted drawing.
Installation of UPVC conduit (4x110mm dia.) Low
Current (TELECOM) Ductbank no.GG/D-TL/01 in
between Handhole (G/TL/03 to G/TL/01) at the
South Side Nursery (SW) as per attached
highlighted drawing.
Antitermite for ETFE PUMP ROOM under mass
concrete zone 2M (as highlighted) at CRESCENT

Inspection of Blinding Concrete under Heating &


Chilled Water Line Isolation Pit for G/DH/04,
G/DH/05 and G/DC/06 at Zone-G - as highlighted

Inspection of Blinding Concrete under Heating &


Chilled Water Line Isolation Pit for G/DC/15,
G/DC/08, G/DC/16, K/DC/01, K/DC/02 at Zone-
G&K - as highlighted
Inspection of Excavation for Heating and Chilled
Water Line at Zone-G including Pit F/DH/04,
F/DC/05, G/DC/01, G/DH/02 - As highlighted

Inspection of Excavation for Heating and Chilled


Water Line at Zone-B including Pit G/DC/20,
G/DH/21, G/DC/22 - As highlighted
Pipe Sleeves Installation of Outer infill Wall
Mechanical CHW (S&R) From Axis (02/2G to
02/H ) At Crescent 2; (UPVC Pipe Class 4 dia 400
mm); As per High lighted Attached Approved
Shop Drawing.
"Inspection of Excavation for MV Line Pulling Pit
- L/MV/16, L/MV/05, L/MV/01 - as highlighted "

Steel Reinforcements for Tunnel 1 wall & slab


part-C (as Highlighted) Zone 2H 875.00
Installation of EMT Conduit (Dia. 3/4, 1 inch.)
and Box (Ceiling Mounted) for Lighting (E1,E1/CE
& Presence Detector ) at Management and
Maintenance Bldg. (GF 5000 C Passage & GF
5000 Lobby ) as per attached highlighted
drawing.
Level and Location for Strip Footing blinding
between PC 5-7 Zone 1A (as highlighted)

Concreting for plain concrete at DEVONIAN


GARDEN zone 2M BETWEEN axis 02-AN & 02-AL
(as highlighted)

Concreting for Infill wall Beam at axis 02P - 02Q


Zone 2E (as highlighted)
Surface preparation & Base primer coating for
Infill wall bw BOI 126_127 BII 128_127_126 zone
2R up S. O. G level 870.40 at CRESCENT (as
highlighted)
CHB laying for Pump Room upto lintel beam at
Zone 2M axis 02AN (as highlighted) using 20cm
CHB

1st Layer of CHB laying for Pump Room at Zone


2M axis 02AN (as highlighted) using 20cm CHB

Excavation and Soil Preparation prior to start


backfilling Layers for Roads, Starting from
ST.0+000 to 0+300 at Zone F&K - as highlighted

Inspection of Blinding Concrete under Heating &


Chilled Water Line Isolation Pit for F/DH/04,
F/DC/01, F/DC/05 at Zone-F&G - as highlighted

Inspection of Blinding Concrete under Heating &


Chilled Water Line Isolation Pit for G/DH/02,
G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22
at Zone-B&G - as highlighted
Inspection of Excavation for Heating and Chilled
Water Line at Zone-F including Pit F/DC/01 &
F/DC/02 - As Chiled
Pre insulated highlighted
Water Pipes (S&R)
200mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:647483.48 N:2713871.373) to
(E:647576.326 N:2713932.524). Pre insulated
Heat Water Pipes (S&R)
150mmØ( laying
Pre insulated ,Aligment
Heat ,Leveling
Water Pipes (S&R)and fit up)
From point (E
150mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:647473.054 N:2713846.088) to
(E:647499.164 N:2713788.554). At zone G. As
per highlighted Area in the attached Dwg.
Concreting for Diaphragm Wall axis 02AQ (1st
stage toc 874.00) (2nd part) (as highlighted)
Zone 2N

Level and Location for Diaphragm Wall axis 02AQ


(1st stage toc 874.00) (2nd part) (as highlighted)
Zone 2N

Inspection of Concrete Pouring for Wall of MV


Line Pit - E/MV/02, E/MV/05, E/MV/01 and
E/MV/03 at Zone-E (As Highlighted)

Inspection of Formwork for Wall of MV Line Pit -


E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at
Zone-E (As Highlighted)
Inspection of Formwork for footing of MV Line
Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32
and D/MV/03 at Zone-E&D (As Highlighted)

Inspection of Formwork for footing of MV Line


Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32
and D/MV/03 at Zone-E&D (As Highlighted)

Two layer of 4mm thick modified bituminous


waterproofing membrane for TUNNEL 1 wall
(outer) Zone 2H PART C (as highlihgted)

Protection layer of 4mm thick bituminous


protection board for TUNNEL 1 wall (outer) Zone
2H PART C (as highlihgted)
"Inspection and compaction test for 1st layer
under lower EPDM for cretaceous garden zone
2D,2E (as highlighted), KAIG3-SCR-GN-C-0027-
00 "
Concreting for Retaining wall (FOUNDATION)
Between Axis 02M-02L (as highlighted) Zone 6
Location
Submitted
SN NO. Trade RFI NO. (Building Date
/ Zone)

1 s KAIG3-RFI-CO-S-8331-01 2D 9/10/22

2 s KAIG3-RFI-CO-S-8582-00 2Q 9/11/22

3 s KAIG3-RFI-CO-S-8928-00 1A 9/5/22

4 s KAIG3-RFI-CO-S-9027-00 2F 9/20/22

5 s KAIG3-RFI-CO-S-9028-00 2R 9/1/22

6 s KAIG3-RFI-LM-S-9042-00 1G 9/1/22

7 s KAIG3-RFI-LM-S-9043-00 1G 9/1/22

8 s KAIG3-RFI-CO-S-9083-00 1P 9/6/22
9 s KAIG3-RFI-CO-S-9093-00 2R 9/4/22

10 s KAIG3-RFI-CO-S-9094-00 2R 9/4/22

11 s KAIG3-RFI-CO-S-9095-00 2R 9/4/22

12 s KAIG3-RFI-CO-S-9162-00 2R 9/7/22

13 s KAIG3-RFI-CO-S-9171-00 2E 9/7/22

14 s KAIG3-RFI-CO-S-9172-00 2E 9/7/22

15 s KAIG3-RFI-CO-S-9173-00 2E 9/8/22

16 s KAIG3-RFI-LM-S-9178-00 1G 9/7/22
17 s KAIG3-RFI-LM-S-9180-00 1G 9/7/22

18 s KAIG3-RFI-CO-S-9228-00 2Q 9/11/22

19 s KAIG3-RFI-WG-S-9272-00 4A 9/13/22

20 s KAIG3-RFI-WG-S-9273-00 4A 9/13/22

21 s KAIG3-RFI-WG-S-9273-01 4A 9/20/22

22 s KAIG3-RFI-CO-S-9318-00 2H 9/17/22

23 s KAIG3-RFI-LM-S-9330-00 1G 9/18/22

24 s KAIG3-RFI-LM-S-9331-00 1G 9/20/22

25 s KAIG3-RFI-VG-S-9381-00 2M 9/21/22
26 s KAIG3-RFI-LM-S-9400-00 1G 9/25/22

27 A KAIG3-RFI-CO-A-1025-00 2N 9/4/22

28 A KAIG3-RFI-CO-A-1034-00 1C 9/8/22

29 A KAIG3-RFI-CO-A-1061-00 2M 9/19/22

30 A KAIG3-RFI-CO-A-1062-00 2M 9/19/22

31 A KAIG3-RFI-CO-A-1063-00 2M 9/19/22

32 A KAIG3-RFI-CO-A-1064-00 2M 9/19/22

33 A KAIG3-RFI-CO-A-1069-00 2J 9/20/22

34 A KAIG3-RFI-EC-A-1070-00 5A 9/20/22

35 C KAIG3-RFI-RD-C-7290-01 FK45 9/18/22


36 C KAIG3-RFI-SW-C-7373-00 BG35 9/1/22

37 C KAIG3-RFI-SW-C-7420-00 G5 9/3/22

38 C KAIG3-RFI-SW-C-7441-00 B4 9/4/22

39 C KAIG3-RFI-SW-C-7443-00 G4 9/4/22

40 C KAIG3-RFI-SW-C-7458-00 G4 9/5/22

41 C KAIG3-RFI-JG-C-7491-00 2G 2H 9/6/22

42 C KAIG3-RFI-NA-C-7546-00 2R 9/8/22
43 C KAIG3-RFI-WG-C-7643-00 7 9/12/22

44 C KAIG3-RFI-WG-C-7644-00 4A 9/12/22

45 C KAIG3-RFI-SW-C-7645-00 4A 9/12/22

46 C KAIG3-RFI-WG-C-7702-00 4A 9/14/22

47 C KAIG3-RFI-WG-C-7703-00 4A 9/14/22

48 C KAIG3-RFI-SW-C-7721-00 6A 9/15/22
49 C KAIG3-RFI-SW-C-7734-00 H6 9/17/22

50 C KAIG3-RFI-SW-C-7740-00 C3 9/17/22

51 C KAIG3-RFI-SW-C-7769-00 H6 9/19/22

52 C KAIG3-RFI-SW-C-7789-00 DE2 9/19/22

53 C KAIG3-RFI-SW-C-7824-00 L5 9/21/22

54 SU KAIG3-RFI-CO-SU-2944-00 2R 9/1/22

55 SU KAIG3-RFI-LM-SU-2945-00 1G 9/1/22

56 SU KAIG3-RFI-CO-SU-2962-00 1A 9/5/22
57 SU KAIG3-RFI-LM-SU-3059-00 1G 9/27/22

58 E KAIG3-RFI-TT-E-0559-00 4D 9/25/22

59 E KAIG3-RFI-TT-E-0560-00 4D 9/25/22

60 E KAIG3-RFI-PC-E-0573-00 2D 9/1/22

61 E KAIG3-RFI-TT-E-0575-00 4D 9/7/22

62 E KAIG3-RFI-PC-E-0577-00 2A 9/8/22

63 E KAIG3-RFI-TG-E-0599-00 4C 9/27/22
64 P KAIG3-RFI-SW-M-0290-01 G 9/18/22

65 P KAIG3-RFI-SW-M-0291-01 G 9/18/22

66 P KAIG3-RFI-CC-M-0304-00 H5 9/14/22

67 P KAIG3-RFI-SW-M-0309-00 B 9/20/22

68 SS KAIG3-RFI-AG-SS-0426 4B 9/1/22
Action Taken

Concreting for Infill wall for 2 infill walls


Buttress 71 axis ( 02/J ) & Butterss 72 axis
( 02/K ) (as highlighted) Zone 2D

Concreting for Infill inner wall at Crescent


between (02-AY & 02-AX) (As highlighted)
ZONE 2Q

Concreting for Kicker of Infill wall for Zone 1A


between Axis 01A-01B-01C-01D (PC 1-3-5, 2-4-
6-8) (as highlighted)

Concreting for outer infill wall with counter fort


at Axis 02S-02T (as highlighted) Zone 2F
(KAIG3-SCR-CO-A-0204-00 with attachments)

Shuttering for internal buliding foundation for


stair between axis (02-BB & 02-BA) (as
highlighted) Zone 2R (as highlighted)

Steel Reinforcements for STAIR at Large


Mosque, Axis E-F, 1-1.1 zone 1G (as
highlighted)

Shuttering for STAIR at Large Mosque, Axis E-


F, 1-1.1 zone 1G (as highlighted)

Concreting for Buttress Head at BOI, BOV, BII,


BIV 57, 58 (as highlighted) at Zone 1P (KAIG3-
SCR-CO-S-198-00)
Surface preparation & Base primer coating for
Stair for Internal Building Foundation ZONE 2R
at AXIS 02BA TO 02BB up to level 870.40 at
CRESCENT (as highlighted)

Two coat of bituminous damp proofing coating


for Stair for Internal Building Foundation ZONE
2R at AXIS 02BA TO 02BB up to level 870.40
at CRESCENT (as highlighted)

Protection layer of 4mm thick bituminous


protection board for Stair for Internal Building
Foundation ZONE 2R at AXIS 02BA TO 02BB
up to level 870.40 at CRESCENT (as
highlighted)

Concreting for internal buliding foundation for


stair between axis (02-BB & 02-BA) (as
highlighted) Zone 2R (as highlighted)

Antitermite for ETFE PUMP ROOM for Mass


Concrete under SOG at Zone 2E axis 02Q (as
highlighted) (KAIG3-SCR-CO-S-0193-00)

Shuttering for ETFE PUMP ROOM for Mass


Concrete under SOG at Zone 2E axis 02Q (as
highlighted) (KAIG3-SCR-CO-S-0193-00)

Concreting for ETFE PUMP ROOM for Mass


Concrete under SOG at Zone 2E axis 02Q (as
highlighted) (KAIG3-SCR-CO-S-0193-00)

Steel reinforcements for Large Mosque Lower


1st floor suspended slab and Beams at Axis 5-6,
C-F (as highlighted) Zone 1G
Concreting for Large Mosque Lower 1st floor
suspended slab and Beams at Axis 5-6, C-F (as
highlighted) Zone 1G

Concreting Infill wall on BOI 122 Axis 02AX (as


highlighted) Zone 2Q

Surface Preparation prior to Repair by


Nitomortar TC2000 Epoxy, for All Inner Surface
of tank Wet Well E, Inside Water Garden as
highlighted area in attached drawing's.

Inspection for Repair by Nitomortar TC2000


Epoxy, for Inner Surfaces of tank of Wet Well F,
Inside Water Garden as highlighted area in
attached drawing's.

Inspection for Repair by Nitomortar TC2000


Epoxy, for Inner Surfaces of tank of Wet Well F,
Inside Water Garden as highlighted area in
attached drawing's.

Steel Reinforcement for Infill wall (inner) at


Zone 2H Axis 02AA-02AB TOC 876.00 (as
highlighted)

Shuttering for Large Mosque for Upper First


Floor for columns (C3A,C4,C5 ) Walls (W1),
Axis C-F, 1-2 Zone 1G (as highlighted)

Concreting for Large Mosque for Upper First


Floor for columns (C3A,C4,C5 ) Walls (W1),
Axis C-F, 1-2 Zone 1G (as highlighted)

Shuttering for Devonian Garden Wall (1st) at


zone 2M axis 02M (as highlighted) TOC 874.80
Concreting for Stairs at Large Mosque Zone 1G
Axis 5.1-6, E-F from 871.10 to 874.60 (as
highlihgted)

Aluminum Cap Installation between Axis 02/AR


- 02/AS.

CHB laying and Stifiner (ST-02) for Pump Room


at Zone 1C axis 01I (as highlighted) using 20cm
CHB upto 876.00

Aluminum Cap Installation between Axis 02/AO


- 02/AP.

Aluminum Cap Installation between Axis 02/AN


- 02/AO.

Aluminum Cap Installation between Axis 02/AM


- 02/AN.

Aluminum Cap Installation between Axis 02/AL


- 02/AN.

Installed Base Extrusion and Base Seal between


Axis 02/AB - 02/AC.

1st Layer of Block Work layout for Energy


Center outer Wall axis 17-29, R (as highlighted)

Excavation and Soil Preparation prior to start


backfilling Layers for Roads, Starting from
ST.0+000 to 0+300 at Zone F&K - as highlighted
Inspection of Blinding Concrete under Heating &
Chilled Water Line Isolation Pit for B/DC/02,
B/DC/06, G/DC/13 at Zone-B&G - as
highlighted

Inspection of Excavation for Heating and Chilled


Water Line Pit G/DH/19, G/DC/18 at Zone-G -
As highlighted

Inspection and Compaction test for backfilling


Sub-grade 1st Layer (1 of 6) for Non potable
water line pit POC-6 at zone B - As Highlighted
(Stock Pile# 131 A-1-B)

Inspection of Excavation for Heating and Chilled


Water Line at Zone-G - As highlighted

Inspection of Sand bediing under pipe for


Heating and Chilled Water Line at Zone-G - As
highlighted (Stock Pile# 132)

Level and Location for Foundation of strip


footing between PC 23 & PC 25 zone 1D at
CRESCENT AXIS 01-M TO 01-L (as
highlighted) TOC 866.00 - 867.00

Installation of Soak Away Base (SA-03) at north


administration building Zone 2R
Inspection for Installed Electrical Handholes of
Low Voltage (MH/WG/LV/22, 27 & 28) and
Emergency (MH/WG/EM/14), inside water play
Garden, at Water Garden, as highlighted in
attached drawing's.

Inspection for Installed Low Current Handholes


(MH/WG/LC/05, 06, 07 & 09) and Fire Alarm &
Security (MH/WG/FA/07, 08, 09, 10, 11, 12, 13,
16 & 32), Inside water play Garden, at Water
Garden, as highlighted in attached drawing's.

'Bedding of Gravel 3/8" and Geotextile


Surrounding Foul Water Line for (160&110mmØ
- UPVC- Class 4) from (FW-A-13-6). At
CRECENT Zone 7 ( Cenozoic Garden). As per
highlighted Area in the attached Dwg.

Inspection for Installed Electrical Handholes of


Low Voltage (MH/WG/LV/01, 02, 03, 04, 05,
06, 07, 08, 09 & 10), Inside Mist Garden, at
water Garden, as highlighted area in attached
drawing's.

Inspection for Installed Low Current Handholes


of Fire Alarm & Security (MH/WG/FA/01,02 &
03), Inside Mist Garden, at water Garden, as
highlighted area in attached drawing's.

Inspection and Compaction test for backfilling


Sub-grade 1st Layer (1 of 6) above gravel For
Manhole FW-A-9 - As Highlighted (SP#136 A-
1-B)
Inspection for Installation of Heating and Chilled
Water Line Pit for H/DH/26, H/DH/25,
H/DH/29, H/DH/30, H/DH/35, H/DH/36,
H/DC/24, H/DC/23, H/DC/27, H/DC/17,
H/DC/33, H/DC/34 at Zone-H - As highlighted

Surface Preparation prior to start backfilling for


the Duct Bank of MV Line from C/MV/12 to
C/MV/20 at Zone- C (As Highlighted)

Inspection for Blinding Concrete under MV Line


Pulling Pit H/MV/30 - as highlighted

Inspection of Sand Covering Layer for Protection


of MV Line from D/MV/35 to E/MV/05 &
D/MV/34 to E-MV/02 at Zone-D&E as
highlighted in the attached drawing (Stock Pile #
132)

Inspection of Excavation for Heating and Chilled


Water Line at Zone-L - As highlighted

Level and Location for internal buliding


foundation for stair between axis (02-BB & 02-
BA) (as highlighted) Zone 2R (as highlighted)

Level and location for STAIR at Large Mosque,


Axis E-F, 1-1.1 zone 1G (as highlighted)

Level and Location for Kicker of outer Infill wall


for Zone 1A between Axis 01A-01B-01C (PC 1-
3-5) (as highlighted)
Level and Location for Large Mosque for Upper
First Floor for Columns & Walls
(C5,C4,C3A,C2A,C2C,W5) , Axis C-E, 5-6
Zone 1G (as highlighted)

Installation of straight PVC Conduit (Dia. 25mm)


& Boxes for Power System (Socket Outlet) at
First Floor Site Tower No. 2 as per attached
highlighted drawing.

Installation of straight PVC Conduit (Dia. 25mm)


& Boxes for Lighting System (LED W5, LED
W5/E) at First Floor Site Tower No. 2 as per
attached highlighted drawing.

Installation of PVC Conduit (Dia. 25mm) for


Lighting (EXIT Sign) at the Crescent-02 at the
Infill Wall (between Axis 02/1AD & 02/1AE) as
per attached highlighted drawing.

Installation of straight PVC Conduit (Dia. 25mm)


& Boxes for Power System (Socket Outlet, Fused
Connection &Three Phase Isolator) at Site Tower
No. 2 as per attached highlighted drawing.

Installation of straight UPVC Conduit (Dia.


160mm) Low Voltage Ducts (Submain Cables) at
Crescent-02 beside the Cafeteria (between Axis
02/2A & 02/2B) as per attached highlighted
drawings.

Installation of UPVC conduit (dia. 50mm


&75mm) passing through the Wall for Low
Voltage Ductbank (Power & Lighting) at the
Butterfly Garden as per attached highlighted
drawing.
Pre insulated Heat Water Pipes (S&R) 150mmØ(
laying ,Aligment ,Leveling and fit up) From
point (E:647473.054 N:2713846.088) to
(E:647499.164 N:2713788.554). At zone G. As
per highlighted Area in the attached Dwg.

Pre insulated Chiled Water Pipes (S&R)


200mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:647483.48 N:2713871.373) to
(E:647576.326 N:2713932.524). Pre insulated
Heat Water Pipes (S&R)
150mmØ( laying ,Aligment ,Leveling and fit up)
From point (E

Pre insulated Chiled Water Pipes (S&R)


150mmØ &
100mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:648100.9898 N:2714189.5670) to
(E:648080.8758 N:2714226.973). At zone H. As
per highlighted Area in the attached Dwg.

Pre insulated chilled Water Pipes (S&R)


65mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:647552.974 N:2714089.840) to
(E:647553.171 N:2714061.144) &
200mmØ( laying ,Aligment ,Leveling and fit up)
From point (E:647553.171 N:2714061.144) to
(E:64

Final Inspection for the Ivory Garden from Grid


lines 01 to 23
SN NO. Trade RFI NO.

35 C KAIG3-RFI-SW-C-8346-00

39 M KAIG3-RFI-SW-M-0334-01
Location (Building /
Description Submitted Date
Zone)
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above
Pipes). As per highlighted Area in the attached Dwg. F5 19-Oct-22

Pre insulated chilled Water Pipes (S&R)


200mmØ( laying ,Aligment ,Leveling and fit up) From point
(E:647442.829 N:2713735.292) to (E:647340.156 N:2713743.732) & GF 19-Oct-22
150mmØ From point (E:647340.156 N:2713743.732) to
(E:647341.892 N:2713756.442). At zone F.
Action Taken

24-Oct-22

26-Oct-22