Consultant : DAR

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

kaig-qcals 1
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

57 KAIG3-RFI-BO-A-0053-00 0 Inspection for Mock-up of Boundary Wall - Stone Cladding Architectural Boundary Wall 04.11.19 09.11.19 Approved as noted

Surface preparation for concrete Boundary Wall outer face, prior to install
60 KAIG3-RFI-BO-A-0056-00 0 Architectural Boundary Wall 06.11.19 09.11.19 Approved as noted
Riyadh Stone Cladding.
Surface preparation for concrete Boundary Wall outer face, prior to install
61 KAIG3-RFI-BO-A-0057-00 0 Architectural Boundary Wall 10.11.19 13.11.19 Approved as noted
Riyadh Stone Cladding; span 9 - 16.

KAIG3-RFI-BO-A-0070-02 2 Architectural Boundary Wall 07.12.19 09.12.19 Approved as noted

Surface preparation of concrete Boundary Wall outer face, prior to install


KAIG3-RFI-BO-A-0071-00 0 Architectural Boundary Wall 16.11.19 18.11.19 Approved as noted
Riyadh Stone Cladding, column 1-18.

KAIG3-RFI-BO-A-0089-00 0 Boundary Wall 28.11.19 01.12.19 Rejected


Installation of Stone Cladding for Concrete Boundary Wall outer face, wall
span #18.
KAIG3-RFI-BO-A-0089-01 1 Architectural Boundary Wall 17.12.19 19.12.19 Approved as noted

KAIG3-RFI-BO-S-0093-00 0 Opening of Control Joints for Boundary Wall at Span #4, 6 & 8. Structural Boundary Wall 01.12.19 05.12.19 Approved as noted

Inspection for "Mockup of Copping" on Boundary Wall as per KAIG3-RFI-


KAIG3-RFI-BO-A-0094-00 0 Architectural Boundary Wall 01.12.19 05.12.19 Approved as noted
BO-A-0053-00, comments #4.
Visual inspection for Boundary Wall reinforcement (done by 2nd Stage
KAIG3-RFI-BO-S-0114-00 0 Structural Boundary Wall 11.12.19 12.12.19 Rejected
Contractor) prior to proceed for Formworks.
Surface preparation of concrete Boundary Wall outer face, prior to install
KAIG3-RFI-BO-A-0127-00 0 Architectural Boundary Wall 15.12.19 15.12.19 Approved as noted
Riyadh Stone Cladding, Span 42-48..
Installation of Stone Cladding for Concrete Boundary Wall outer face
KAIG3-RFI-BO-A-0134-00 0 Architectural Boundary Wall 17.12.19 19.12.19 Approved as noted
(except column), wall span #14 - 17.
Installation of Stone Cladding for Concrete Boundary Wall outer face
KAIG3-RFI-BO-A-0136-01 1 Architectural Boundary Wall 08.01.20 11.01.20 Approved as noted
(except column), wall span #10 - 13.
Installation of Stone Cladding for Concrete Boundary Wall outer face
KAIG3-RFI-BO-A-0139-01 1 Architectural Boundary Wall 14.01.20 18.01.20 Approved as noted
(except column), wall span #5-#9.
Surface preparation of Concrete Boundary Wall inner face (including
KAIG3-RFI-BO-A-0141-00 0 Architectural Boundary Wall 16.01.20 19.01.20 Approved as noted
column), prior to install Riyadh Stone Cladding at Span 1-17
Rebar Planting for Column and Corebel Extension (for Column 10, 12 to
KAIG3-RFI-BO-S-0239-00 0 Structural Boundary Wall 20.01.20 25.01.20 Approved as noted
15) as per attached SCR-BO-S-0010-00.
Shuttering for Column - Corebel Extension (for Column 10, 12 to 15 and 1,
KAIG3-RFI-BO-S-0248-00 0 Structural Boundary Wall 23.01.20 26.01.20 Approved as noted
4 to 9), as per attached SCR-BO-S-0010-00.
Rebar Planting for Column - Corebel Extension (for Column 1, 4 to 9) as
KAIG3-RFI-BO-S-0249-00 0 Structural Boundary Wall 22.01.20 26.01.20 Approved as noted
per attached SCR-BO-S-0010-00.

kaig-qcals 2
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-BO-A-0143-01 1 Architectural Boundary Wall 10.02.20 15.02.20 Approved as noted
(except column), wall span #2 to 4.

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-BO-A-0144-02 2 Architectural Boundary Wall 18.02.20 20.02.20 Approved as noted
(except column), wall span #43 & 44.

Rebar Planting for Column - Corebel Extension (Col. 16, 17 and 42 to 48)
KAIG3-RFI-BO-S-0254-00 0 Structural Boundary Wall 25.01.20 26.01.20 Approved as noted
as per attached SCR-BO-S-0010-00.
Shuttering for Column - Corebel Extension (Col. 16, 17 and 42 to 48) as
KAIG3-RFI-BO-S-0255-00 0 Structural Boundary Wall 25.01.20 26.01.20 Approved as noted
per attached SCR-BO-S-0010-00.
Concrete Pouring for Column - Corebel Extension (Col. 1, 4 to 10, 12 to 17
KAIG3-RFI-BO-S-0256-01 1 Structural Boundary Wall 01.02.20 11.02.20 Approved as noted
and 42 to 48) as per attached SCR-BO-S-0010-00.

Surface preparation of Concrete Boundary Wall inner face including


KAIG3-RFI-BO-A-0146-00 0 Architectural Boundary Wall 27.01.20 30.01.20 Approved as noted
column, prior to install Riyadh Stone Cladding at span 42 - 47.

7 Additional Probing and Grouting Works at Zone-2N, as per Comment in


KAIG3-RFI-CO-S-0273-00 0 Structural Crescent 28.01.20 03.02.20 Approved as noted
RFI-CO-S-0165-00.
4 Additional Probing and Grouting Works at Zone-RW, as per Comment in
KAIG3-RFI-CO-S-0274-00 0 Structural Crescent 28.01.20 03.02.20 Approved as noted
RFI-CO-S-0153-00.
1 Additional Probing and Grouting Works at Zone-1C, as per Comment in
KAIG3-RFI-CO-S-0275-00 0 Structural Crescent 28.01.20 03.02.20 Approved as noted
RFI-CO-S-0197-00.
2 Additional Probing and Grouting Works at Zone-2M, as per Comment in
KAIG3-RFI-CO-S-0276-00 0 Structural Crescent 28.01.20 03.02.20 Approved as noted
RFI-CO-S-0167-00.

2 Additional Probing and Grouting Works at Zone-1F, as per Comment in


KAIG3-RFI-CO-S-0278-00 Structural Crescent 28.01.20 03.02.20 Approved as noted
RFI-CO-S-0158-00.
Highlighted drawing showing External Cosmetic and Structure repairing
KAIG3-RFI-TT-S-0279-00 0 area prior to proceed with repairing works, (Cosmetic=238 sqm and Structural Site Tower 29.01.20 05.02.20 Approved as noted
Structural=90.34 sqm), Site tower #1.

Filling of tie rod holes by using HS Extra for External elevation of Tower-1,
KAIG3-RFI-TT-S-0280-00 0 Structural Site Tower 29.01.20 03.02.20 Approved as noted
Zone-2B (Done by 2nd Stage Contractor).

kaig-qcals 3
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing at Zone-1A, 112
KAIG3-RFI-CO-SU-0219-00 0 Surveying Crescent 29.01.20 30.01.20 Approved as noted
points

Plastering Accessories and Rough Coat prior to proceed with Render


KAIG3-RFI-BO-A-0147-00 0 Architectural Public Toilet 29.01.20 01.02.20 Approved as noted
Sample (2m x 1,50m), at Toilet #1 Zone-4A.

KAIG3-RFI-GN-LS-0003-00 0 29.01.20 02.02.20 Rejected

KAIG3-RFI-GN-LS-0003-01 1 Rock and Stone Boulder Placement No. 1 done by 2nd Stage Contractor. Landscape General 04.02.20 09.02.20 Rejected

Inspection for coordinates prior to start Cavity Probing at Zone-2A, South


KAIG3-RFI-CO-SU-0220-00 0 Surveying Crescent 30.01.20 01.02.20 Approved as noted
Water tower and Bridge, 73 points
Inspection for coordinates prior to start Cavity Probing at Zone-1A, 14
KAIG3-RFI-CO-SU-0221-00 0 Surveying Crescent 30.01.20 01.02.20 Approved as noted
points
Installation and Alignment of Formwork Assembly for Wall, Ticketing Boot
KAIG3-RFI-TB-SU-0222-00 0 Surveying Ticketing Booth 30.01.20 05.02.20 Approved as noted
#2.
Rebar Planting for Retaining Wall - Corebel Extension (for Span 2-7) as
KAIG3-RFI-BO-S-0281-00 0 per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 10.02.20 15.02.20 Approved as noted
Contractor".
Shuttering for Retaining Wall - Corebel Extension (for Span 2-7) as per
KAIG3-RFI-BO-S-0282-00 0 attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 10.02.20 15.02.20 Approved as noted
Contractor".

Notification to proceed for Excavation as per attached plan for


KAIG3-RFI-BO-S-0283-00 0 Structural Boundary Wall 01.02.20 03.02.20 Approved as noted
Waterproofing of existing Boundary Wall.

KAIG3-RFI-BO-A-0148-00 0 01.02.20 02.02.20 Rejected

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-BO-A-0148-01 1 Architectural Boundary Wall 18.02.20 20.02.20 Approved as noted
(except column) span #42.

KAIG3-RFI-BO-A-0149-00 0 01.02.20 08.02.20 Rejected

Surface preparation on Concrete Boundary Wall outer face (except


KAIG3-RFI-BO-A-0149-01 1 Architectural Boundary Wall 12.02.20 16.02.20 Rejected
column), prior to install Riyadh Stone Cladding at Span 76-90.

kaig-qcals 4
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing at Zone-2A, 84
KAIG3-RFI-CO-SU-0223-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2B, 29
KAIG3-RFI-CO-SU-0224-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2C, 27
KAIG3-RFI-CO-SU-0225-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2B, 42
KAIG3-RFI-CO-SU-0226-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2A, 29
KAIG3-RFI-CO-SU-0227-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2C, 32
KAIG3-RFI-CO-SU-0228-00 0 Surveying Crescent 01.02.20 03.02.20 Approved as noted
points
After excavation to level -0.50 from inspected rock level surface at Zone-1
KAIG3-RFI-CO-SU-0229-00 0 Surveying Crescent 01.02.20 05.02.20 Approved as noted
(Survey Inspection).
Inspection for coordinates prior to start Cavity Probing at Zone-2F, 86
KAIG3-RFI-CO-SU-0230-00 0 Surveying Crescent 02.02.20 03.02.20 Approved as noted
points

Notification to proceed for concrete repair of external elevation of Security Fire Control
KAIG3-RFI-FC-S-0284-00 0 Structural 02.02.20 08.02.20 Approved as noted
Fire Control Center. Center

Notification prior to proceed for concrete repair of external elevation of Management


KAIG3-RFI-MB-S-0285-00 0 Structural 02.02.20 09.02.20 Rejected
Management & Maintenance Building. Building

Rebar Planting for Retaining Wall - Corebel Extension (for Span 1 to 5, 16


KAIG3-RFI-BO-S-0286-00 0 Structural Boundary Wall 02.02.20 05.02.20 Approved as noted
& 17) as per SCR-BO-S-0012-00.
Chipping to make rough surface and removing Bitumen Paint to extend
KAIG3-RFI-BO-S-0287-00 0 Kicker of Retaining Wall (for Span 1 to 5, 16 & 17) as per SCR-BO-S-0012- Structural Boundary Wall 02.02.20 03.02.20 Approved as noted
00.

KAIG3-RFI-GN-LS-0004-00 0 Rock and Stone Boulder Placement No. 2 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0005-00 0 Rock and Stone Boulder Placement No. 3 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0006-00 0 Rock and Stone Boulder Placement No. 4 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0007-00 0 Rock and Stone Boulder Placement No. 5 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

kaig-qcals 5
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-GN-LS-0008-00 0 Rock and Stone Boulder Placement No. 6 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0009-00 0 Rock and Stone Boulder Placement No. 7 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0010-00 0 Rock and Stone Boulder Placement No. 8 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0011-00 0 Rock and Stone Boulder Placement No. 9 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

KAIG3-RFI-GN-LS-0012-00 0 Rock and Stone Boulder Placement No. 10 done by 2nd Stage Contractor. Landscape General 02.02.20 08.02.20 Rejected

Inspection for coordinates prior to start Cavity Probing at Zone-2D, 62


KAIG3-RFI-CO-SU-0231-00 0 Surveying Crescent 03.02.20 03.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-1G, 145
KAIG3-RFI-CO-SU-0232-00 0 Surveying Crescent 03.02.20 05.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing for Front Canopies ,
KAIG3-RFI-CO-SU-0233-00 0 Surveying Crescent 03.02.20 05.02.20 Approved as noted
34 points

Inspection for Plastering Guide lines at Security and Fire Control Center Fire Control
KAIG3-RFI-FC-A-0150-00 0 Architectural 03.02.20 08.02.20 Approved as noted
(Elev. 4 only). Center

Inspection for Plastering Guide lines at Security and Fire Control Center Fire Control
KAIG3-RFI-FC-A-0151-00 0 Architectural 03.02.20 08.02.20 Approved as noted
(Elev. 1,2 & 3 only). Center

Highlighted drawing showing External Cosmetic repairing area prior to


KAIG3-RFI-PT-S-0288-00 0 proceed with repairing works, Public Toilet #2 (Cosmetic=182 sq.m), Zone- Structural Public Toilet 03.02.20 09.02.20 Approved as noted
4D.
Shuttering for Retaining Wall - Corebel Extension, inner face (Span 16 &
KAIG3-RFI-BO-S-0289-00 0 17) as per attached SCR-BO-S-0012-00; "Boundary Wall done by 2nd Structural Boundary Wall 03.02.20 05.02.20 Approved as noted
Stage Contractor".

Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span
KAIG3-RFI-BO-S-0290-00 0 16 & 17) as per attached SCR-BO-S-0012-00; Concrete Mix Design Structural Boundary Wall 03.02.20 05.02.20 Approved as noted
C32/40 - Very Severe. "Boundary Wall done by 2nd Stage Contractor".

Notification prior to start Compaction for Slab on Grade preparation at


KAIG3-RFI-TT-S-0291-00 0 Structural Sie Tower 11.02.20 13.02.20 Approved as noted
Tower-1, "done by 2nd Stage Contractor".

kaig-qcals 6
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

Application of Termite prior to blinding concrete at PC-89, 90, 87, 85, 83,
KAIG3-RFI-CO-S-0292-00 0 Structural Crescent 04.02.20 08.02.20 Approved as noted
81, 79, 77, 88, 86, 84, 82, 80 and 78.

Blinding Concrete at PC-89, 90, 87, 85, 83, 81, 79, 77, 88, 86, 84, 82, 80
KAIG3-RFI-CO-S-0293-00 0 Structural Crescent 04.02.20 08.02.20 Approved as noted
and 78.

KAIG3-RFI-PT-S-0294-00 0 Notification to start Compaction for Slab on Grade preparation at Toilet-1. Structural Public Toilet 15.02.20 18.02.20 Approved as noted

Inspection for Blinding level for shear key PC-89, 90, 87, 85, 83, 81, 79,
KAIG3-RFI-CO-SU-0234-00 0 Surveying Crescent 04.02.20 09.02.20 Approved as noted
77, 88, 86, 84, 82, 80 and 78.
Inspection for coordinates prior to start Cavity Probing at Zone-2F , 65
KAIG3-RFI-CO-SU-0235-00 0 Surveying Crescent 04.02.20 05.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-2F , 47
KAIG3-RFI-CO-SU-0236-00 0 Surveying Crescent 04.02.20 05.02.20 Approved as noted
points
Check Formation level prior to casting mass concrete - blinding level (VIP
KAIG3-RFI-CO-SU-0237-00 0 Surveying Crescent 04.02.20 08.02.20 Approved as noted
Auditorium).
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0238-00 0 Surveying Crescent 04.02.20 08.02.20 Approved as noted
Mosque, 27 points
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0239-00 0 Surveying Crescent 04.02.20 08.02.20 Approved as noted
Mosque, 91 points
Rebar Planting for Retaining Wall - Corebel Extension (for Span 1, 12-15)
KAIG3-RFI-BO-S-0295-00 0 as per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 05.02.20 08.02.20 Approved as noted
Contractor".
Shuttering for Retaining Wall - Corebel Extension (for Span 1, 12-15) as
KAIG3-RFI-BO-S-0296-00 0 per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 05.02.20 08.02.20 Approved as noted
Contractor".
Concrete Pouring for Retaining Wall - Corebel Extension (for Span 1, 12-
KAIG3-RFI-BO-S-0297-00 0 15) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 - Structural Boundary Wall 05.02.20 09.02.20 Approved as noted
Very Severe. "Boundary Wall done by 2nd Stage Contractor".
Highlighted drawing showing External Elevation for Cosmetic and
Fire Control
KAIG3-RFI-FC-S-0298-00 0 Structural repairing area prior to proceed for repairing works at Fire Control Structural 06.02.20 11.02.20 Approved as noted
Center
Building; "Fire ontrol Building done by 2nd Stage Contractor".
Inspection for coordinates prior to start Cavity Probing at Zone-2F, 97
KAIG3-RFI-CO-SU-0240-00 0 Surveying Crescent 06.02.20 08.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0241-00 0 Surveying Crescent 06.02.20 08.02.20 Approved as noted
Mosque, 80 points

kaig-qcals 7
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0242-00 0 Surveying Crescent 06.02.20 08.02.20 Approved as noted
Mosque, 42 points
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0243-00 0 Surveying Crescent 06.02.20 08.02.20 Approved as noted
Mosque, 74 points
Rebar Planting for Retaining Wall - Corebel Extension (for Span 2,3 & 8-
KAIG3-RFI-BO-S-0299-00 0 11) as per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Structural Boundary Wall 08.02.20 09.02.20 Approved as noted
Stage Contractor".
Shuttering for Retaining Wall - Corebel Extension (for Span 2,3 & 8-11) as
KAIG3-RFI-BO-S-0300-00 0 per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 08.02.20 11.02.20 Approved as noted
Contractor".

Installation of Steel Reinforcement for Walls of Ticketing Booth #2, prior to


KAIG3-RFI-TB-S-0301-00 0 Structural Ticketing Booth 08.02.20 12.02.20 Approved as noted
close shuttering; (Highlighted Portion Only)

Notification prior to proceed for Block Works beside Grade Beam of


Management
KAIG3-RFI-MB-S-0302-00 0 Management & Maintenance Building as per SCR-MB-S-0015-01. Structural 08.02.20 11.02.20 Approved as noted
Building
"Management Bldg. done by 2nd Stage Contractor".

Excavation and Compaction of soil beside Grade Beam of Management &


Management
KAIG3-RFI-MB-S-0303-00 0 Maintenance Building as per SCR-MB-S-0015-01. "Management Bldg. Structural 08.02.20 13.02.20 Rejected
Building
done by 2nd Stage Contractor".

Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span
KAIG3-RFI-BO-S-0304-00 0 8 & 11) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 Structural Boundary Wall 09.02.20 11.02.20 Approved as noted
- Very Severe. "Boundary Wall done by 2nd Stage Contractor".

Rebar Planting for Retaining Wall - Corebel Extension (for Span 2-7) as
KAIG3-RFI-BO-S-0305-00 0 per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 10.02.20 16.02.20 Approved as noted
Contractor".

KAIG3-RFI-MB-S-0306-00 0 09.02.20 13.02.20 Rejected

Application for Anti-Termite prior to cast Blind Concrete for Blockworks Management
KAIG3-RFI-MB-S-0306-01 1 Structural 16.02.20 19.02.20 Approved as noted
beside Grade Beam, (done by 2nd Stage Contractor). Building

Installation and Alignment of Shuttering prior to concrete pouring for Walls


KAIG3-RFI-TB-S-0307-00 0 Structural Ticketing Booth 09.02.20 17.02.20 Approved as noted
of Ticketing Booth #2.

Inspection for existing Asphalt Boundaries at Zone-1 to 4, done by 2nd


KAIG3-RFI-CO-SU-0244-00 0 Surveying Roads 15.02.20 19.02.20 Approved
Stage Contractor.
Inspection for coordinates prior to start Cavity Probing at Zone-3 Large
KAIG3-RFI-CO-SU-0245-00 0 Surveying Crescent 08.02.20 09.02.20 Approved as noted
Mosque, 16 points

kaig-qcals 8
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing at Zone-1B ,29
KAIG3-RFI-CO-SU-0246-00 0 Surveying Crescent 09.02.20 11.02.20 Approved as noted
points
Inspection for coordinates prior to start Cavity Probing for Front Canopies
KAIG3-RFI-CO-SU-0247-00 0 Surveying Crescent 09.02.20 11.02.20 Approved as noted
Zone-6 14 points
Inspection for coordinates prior to start Cavity Probing at Zone-2N Child
KAIG3-RFI-CO-SU-0248-00 0 Surveying Crescent 10.02.20 12.02.20 Approved as noted
Care, 78 points
Inspection for Roof - Bottom Slab level (880.11) prior to install reiforcement
KAIG3-RFI-TB-SU-0249-00 0 Surveying Ticketing Booth 20.02.20 29.02.20 Approved as noted
and Shuttering of Roof Slab - ticketing Booth #2.
Inspection for formation of rock level for Pile Cap and Strip Footing (PC-
KAIG3-RFI-CO-SU-0250-00 0 Surveying Crescent 10.02.20 12.02.20 Approved as noted
187 to 200.

KAIG3-RFI-CO-SU-0251-00 0 Blinding level prior to concrete for PC- 187 to 200 (Shear Key) Surveying Crescent 10.02.20 12.02.20 Approved as noted

KAIG3-RFI-CO-SU-0252-00 0 Level prior to casting concrete under minipiles PC-88 (Mock-up) Surveying Crescent 10.02.20 12.02.20 Approved as noted

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0253-00 0 Surveying Crescent 10.02.20 12.02.20 Approved as noted
foundation Zone-2M, 88 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0254-00 0 Surveying Crescent 10.02.20 12.02.20 Approved as noted
foundation Zone-2M, 45 points

KAIG3-RFI-GN-LS-0013-00 0 Rock and Stone Boulder Placement No. 11 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0014-00 0 Rock and Stone Boulder Placement No. 12 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0015-00 0 Rock and Stone Boulder Placement No. 13 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0016-00 0 Rock and Stone Boulder Placement No. 14 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0017-00 0 Rock and Stone Boulder Placement No. 15 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0018-00 0 Rock and Stone Boulder Placement No. 16 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0019-00 0 Rock and Stone Boulder Placement No. 17 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0020-00 0 Rock and Stone Boulder Placement No. 18 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

kaig-qcals 9
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-GN-LS-0021-00 0 Rock and Stone Boulder Placement No. 19 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

KAIG3-RFI-GN-LS-0022-00 0 Rock and Stone Boulder Placement No. 20 done by 2nd Stage Contractor. Landscape General 10.02.20 15.02.20 Rejected

mmm mm

Application of Anti termite prior to blinding concrete at PC-187 to 200


KAIG3-RFI-CO-S-0309-00 0 Structural Crescent 10.02.20 12.02.20 Approved as noted
(Shear Key)

KAIG3-RFI-CO-S-0310-00 0 Blinding concrete at PC-187 to 200 (Shear Key) Structural Crescent 10.02.20 12.02.20 Approved as noted

KAIG3-RFI-CO-S-0311-00 0 Anti termite for mockup for casting concrete under minipiles (PC-88) Structural Crescent 10.02.20 12.02.20 Approved as noted

KAIG3-RFI-CO-S-0312-00 0 Mockup for casting concrete under minipiles (PC-88) Structural Crescent 10.02.20 13.02.20 Approved as noted

Surface preparation, cleaning and removing of tierod pipe and steel, prioe
Fire Control
KAIG3-RFI-FC-S-0313-00 0 to start Cosmetic repair at Fire Control Building. "done by 2nd Stage Structural 10.02.20 12.02.20 Approved as noted
Building
Contractor".

Cosmetic repair for exterior elevation as per highlighted area in RFI (KAIG-
KAIG3-RFI-PT-S-0314-00 0 Structural Public Toilet 10.02.20 13.02.20 Approved as noted
RFI-PT-S-0264-00); done by 2nd Stage Contractor.

KAIG3-RFI-FC-S-0315-00 0 Inspection of formworks to cast concrete under pile cap PC-88 (Mockup). Structural Crescent 11.02.20 13.02.20 Approved as noted

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0255-00 0 Surveying Crescent 11.02.20 12.02.20 Approved as noted
foundation Zone-2M, 56 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0256-00 0 Surveying Crescent 11.02.20 12.02.20 Approved as noted
foundation Zone-2M, 88 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0257-00 0 Surveying Crescent 11.02.20 12.02.20 Approved as noted
foundation Zone-2M, 36 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0258-00 0 Surveying Crescent 11.02.20 12.02.20 Approved as noted
foundation Zone-2M, 82 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0259-00 0 Surveying Crescent 12.02.20 13.02.20 Approved as noted
foundation Zone-2H, 67 points

kaig-qcals 10
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0260-00 0 Surveying Crescent 12.02.20 13.02.20 Approved as noted
foundation Zone-2H, 54 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0261-00 0 Surveying Crescent 12.02.20 13.02.20 Approved as noted
foundation Zone-2M, 33 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0262-00 0 Surveying Crescent 12.02.20 13.02.20 Approved as noted
foundation Zone-2K, 54 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0263-00 0 Surveying Crescent 13.02.20 17.02.20 Approved as noted
foundation Zone-2K, 91 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0264-00 0 Surveying Crescent 13.02.20 17.02.20 Approved as noted
foundation Zone-2K, 65 points

Concrete Pouring for Walls of Ticketing Booth #2; Mix Design - 32/40
KAIG3-RFI-TB-S-0316-00 0 Structural Ticketing Booth 13.02.20 17.02.20 Approved as noted
(Severe Exposed)

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0265-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2J, 34 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0266-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2J, 81 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0267-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2J, 52 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0268-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2J, 49 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0269-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2K, 74 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0270-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2K, 32 points
Inspection of location and level prior to casting concrete under pile caps
KAIG3-RFI-CO-SU-0271-00 0 Surveying Crescent 15.02.20 20.02.20 Approved as noted
(86 & 87) Axis 01-AQ, 01-AR
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0272-00 0 Surveying Crescent 15.02.20 17.02.20 Approved as noted
foundation Zone-2J, 46 points

Inspection for applying anti termite prior to casting concrete under pile
KAIG3-RFI-CO-S-0317-00 0 Structural Crescent 15.02.20 17.02.20 Approved as noted
caps (86, 87)

KAIG3-RFI-CO-S-0318-00 0 Inspection of formwork to cast concrete under pile caps (86, 87) Structural Crescent 15.02.20 20.02.20 Approved as noted

kaig-qcals 11
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-CO-S-0319-00 0 Concreting under pile caps 86, 87 (Casting) Structural Crescent 15.02.20 20.02.20 Approved as noted

Filling of tie rod holes by using HS Extra for External elevation at Security Fire Control
KAIG3-RFI-FC-S-0320-00 0 Structural 15.02.20 19.02.20 Approved as noted
and Fire Control Building, Zone-3B. Building

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-PT-A-0152-00 0 Architectural Boundary Wall 18.02.20 22.02.20 Approved as noted
(except column), wall span #45-46.

KAIG3-RFI-PT-A-0153-00 0 Render finish with 3 types of texture as per attached plan; Toilet #1. Architectural Public Toilet 15.02.20 17.02.20 Approved as noted

Setting out of Grooves for Exterior Elevation as per attached drawing prior
KAIG3-RFI-PT-A-0154-00 0 Architectural Public Toilet 16.02.20 17.02.20 Approved as noted
to install all Grooves for Toilet #1.

KAIG3-RFI-TB-S-0321-00 0 Application of Curing Compund for Walls of Ticketing Booth #2. Structural Ticketing Booth 16.02.20 17.02.20 Approved as noted

KAIG3-RFI-TB-S-0322-00 0 16.02.20 17.02.20 Rejected

KAIG3-RFI-TB-S-0322-01 1 02.03.19 04.03.19 Rejected

Notification for Demolition of Ticketing Booth #1, done by 2nd Stage


KAIG3-RFI-TB-S-0322-02 2 Structural Ticketing Booth 04.03.19 05.03.19 Approved as noted
Contractor.

Inspection of Anti Termite prior to blinding concreting for shear key PC-1 to
KAIG3-RFI-CO-S-0323-00 0 Structural Crescent 16.02.20 17.02.20 Approved as noted
12.

KAIG3-RFI-CO-S-0324-00 0 Blinding concreting for shear key PC-1 to 12. Structural Crescent 16.02.20 19.02.20 Approved as noted

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0273-00 0 Surveying Crescent 17.02.20 17.02.20 Approved as noted
foundation Zone-2H, 61 points
Inspection of formation level prior to casting blinding for shear key PC-1 to
KAIG3-RFI-CO-SU-0274-00 0 Surveying Crescent 16.02.20 19.02.20 Approved as noted
12 (at bottom of footing design level or higher).
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0275-00 0 Surveying Crescent 16.02.20 17.02.20 Approved as noted
foundation Zone-2K, 39 points

kaig-qcals 12
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0276-00 0 Surveying Crescent 16.02.20 17.02.20 Approved as noted
foundation Zone-2J, 85 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0277-00 0 Surveying Crescent 17.02.20 17.02.20 Approved as noted
foundation Zone-2G, 78 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0278-00 0 Surveying Crescent 17.02.20 18.02.20 Approved as noted
foundation Zone-2G, 64 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0279-00 0 Surveying Crescent 17.02.20 18.02.20 Approved as noted
foundation Zone-2G, 77 points

KAIG3-RFI-CO-SU-0280-00 0 Inspection for coordinates prior to start Cavity Probing at Zone-1E, 6 points Surveying Crescent 17.02.20 18.02.20 Approved as noted

Casting of Blinding Concrete for Blockworks beside Grade Beam of


Management
KAIG3-RFI-MB-S-0325-00 0 Management Building (as per SCR-MB-S-0325-01); done by 2nd Stage Structural 17.02.20 22.02.20 Approved as noted
Building
Contractor)
Inspection for existing Curbstone Boundaries at Zone-1, 2, 3 & 4; done by
KAIG3-RFI-RD-SU-0281-00 0 Surveying Roads 18.02.20 20.02.20 Approved as noted
2nd Stage Contractor.
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0282-00 0 Surveying Crescent 18.02.20 20.02.20 Approved
foundation Zone-2H, 85 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0283-00 0 Surveying Crescent 18.02.20 20.02.20 Approved
foundation Zone-2G, 52 points

KAIG3-RFI-BO-A-0155-00 0 18.02.20 22.02.20 Rejected

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-BO-A-0155-01 1 Architectural Boundary Wall 18.02.20 29.02.20 Approved as noted
(except column), wall span #47-48.

Notification prior to proceed for "Demolition of Existing Raft / Existing RC


KAIG3-RFI-GN-S-0326-00 0 Structural General 18.02.20 20.02.20 Approved
Platform" as per attached SKETCH.

KAIG3-RFI-GN-LS-0023-00 0 Rock and Stone Boulder Placement No. 21 done by 2nd Stage Contractor. Landscape General 19.02.20 22.02.20 Rejected

KAIG3-RFI-GN-LS-0024-00 0 Rock and Stone Boulder Placement No. 22 done by 2nd Stage Contractor. Landscape General 19.02.20 22.02.20 Rejected

KAIG3-RFI-GN-LS-0025-00 0 Rock and Stone Boulder Placement No. 23 done by 2nd Stage Contractor. Landscape General 19.02.20 22.02.20 Rejected

KAIG3-RFI-GN-LS-0026-00 0 Rock and Stone Boulder Placement No. 24 done by 2nd Stage Contractor. Landscape General 19.02.20 22.02.20 Rejected

kaig-qcals 13
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-GN-LS-0027-00 0 Rock and Stone Boulder Placement No. 25 done by 2nd Stage Contractor. Landscape General 19.02.20 22.02.20 Rejected

Excavated area prior to proceed for Waterproofing as attached Notification


KAIG3-RFI-BO-S-0327-00 0 Structural Boundary Wall 19.02.20 25.02.20 Approved as noted
for Excavation (RFI-BO-S-0283-00).

Application for Anti-Termite prior to cast Blind Concrete for Blockworks


Management
KAIG3-RFI-MB-S-0328-00 0 beside Grade Beam as per SCR-MB-0015-01 - highlighted in attached Structural 19.02.20 22.02.20 Approved as noted
Building
drawing, (done by 2nd Stage Contractor).

Surface preparation and primer prior to application of waterproofing


KAIG3-RFI-CO-S-0329-00 0 Structural Crescent 19.02.20 24.02.20 Rejected
(Mockup).

Rebar Planting for Retaining Wall - Corebel Extension (for Span 42-44) as
KAIG3-RFI-BO-S-0330-00 0 per attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 19.02.20 24.02.20 Approved as noted
Contractor".

Shuttering for Retaining Wall - Corebel Extension (for Span 42-44) as per
KAIG3-RFI-BO-S-0331-00 0 attached SCR-BO-S-0012-00. "Boundary Wall done by 2nd Stage Structural Boundary Wall 19.02.20 24.02.20 Approved as noted
Contractor".

Concrete Pouring for Retaining Wall - Corebel Extension (for Span 42-44)
KAIG3-RFI-BO-S-0332-00 0 as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 - Very Structural Boundary Wall 19.02.20 25.02.20 Approved as noted
Severe. "Boundary Wall done by 2nd Stage Contractor".

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0284-00 0 Surveying Crescent 19.02.20 20.02.20 Approved
foundation Zone-2E, 94 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0285-00 0 Surveying Crescent 19.02.20 20.02.20 Approved
foundation Zone-2G, 57 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0286-00 0 Surveying Crescent 19.02.20 20.02.20 Approved
foundation Zone-2H, 29 points
Inspection for location and level and formwork prior to casting concrete
KAIG3-RFI-CO-SU-0287-00 0 Surveying Crescent 20.02.20 24.02.20 Approved as noted
under pile caps (89, 90, 85)
Formation level prior of casting mass concrete blinding level for pile cap,
KAIG3-RFI-CO-SU-0288-00 0 strip footing at grid 01/A to 01/F at the bottom of footing design level or Surveying Crescent 20.02.20 25.02.20 Approved as noted
higher

Installation of Stone Cladding for Concrete Boundary Wall outer face


KAIG3-RFI-BO-A-0156-00 0 Architectural Boundary Wall 20.02.20 25.02.20 Approved as noted
(except column), wall span #89-90.

KAIG3-RFI-BO-S-0333-00 0 Concreteing under pile caps (89, 90, 85) Structural Boundary Wall 20.02.20 25.02.20 Approved as noted

kaig-qcals 14
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-BO-S-0334-00 0 Anti termite prior to casting concrete under pile caps (89, 90, 85) Structural Boundary Wall 20.02.20 22.02.20 Approved as noted

Casting of blinding concrete for Blockworks beside Grade Beam of


Management
KAIG3-RFI-MB-S-0335-00 0 Management Building (as per SCR-MB-S-0015-01); done by 2nd Stage Structural 20.02.20 24.02.20 Approved as noted
Building
Contractor. Mix Design - C16/20 (SRC)

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0289-00 0 Surveying Crescent 22.02.20 24.02.20 Approved
foundation Zone-2E, 96 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0290-00 0 Surveying Crescent 22.02.20 24.02.20 Approved
foundation Zone-2E, 71 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0291-00 0 Surveying Crescent 22.02.20 24.02.20 Approved
foundation Zone-2E, 39 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0292-00 0 Surveying Crescent 22.02.20 24.02.20 Approved
foundation Zone-2E, 93 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0293-00 0 Surveying Crescent 22.02.20 24.02.20 Approved
foundation Zone-2E, 39 points
Inspection for location and level and formwork prior to casting concrete
KAIG3-RFI-CO-SU-0294-00 0 Surveying Crescent 22.02.20 25.02.20 Approved as noted
under pile caps (83, 84)
Inspection for rock surface level for north administration building prior to
KAIG3-RFI-CO-SU-0295-00 0 Surveying Crescent 22.02.20 25.02.20 Approved as noted
start backfilling to the level under interior footing.

Inspection of Shuttering for Roof Slab as per attached drawing for


KAIG3-RFI-TB-S-0336-00 0 Structural Ticketing Booth 23.02.20 29.02.20 Approved as noted
Ticketing Slab #2.

KAIG3-RFI-CO-S-0337-00 0 Inspection for anti termite prior to casting concrete under pile caps (83, 84) Structural Crescent 22.02.20 25.02.20 Approved as noted

KAIG3-RFI-CO-S-0338-00 0 Inspection of Concreting (C16-20) under pile caps (83, 84) Structural Crescent 22.02.20 25.02.20 Approved as noted

Inspection for Application of anti termite for PC-195, 196 and 198 (Mass
KAIG3-RFI-CO-S-0339-00 0 Structural Crescent 22.02.20 25.02.20 Approved as noted
concrete)

Inspection for blinding concreting of PC-195, 196 and 198 (Design 16/20)
KAIG3-RFI-CO-S-0340-00 0 Structural Crescent 23.02.20 25.02.20 Approved as noted
Mass concrete).

kaig-qcals 15
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

Application of cosmetic and structure repair as per attached drawing for all Fire Control
KAIG3-RFI-FC-S-0341-00 0 Structural 23.02.20 26.02.20 Approved as noted
elevations. Building

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0296-00 0 Surveying Crescent 23.02.20 25.02.20 Approved
foundation Zone-2J, 3 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0297-00 0 Surveying Crescent 23.02.20 25.02.20 Approved
foundation Zone-2H, 3 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0298-00 0 Surveying Crescent 23.02.20 25.02.20 Approved
foundation Zone-2D, 67 points
Inspection for location and level and formwork prior to casting concrete
KAIG3-RFI-CO-SU-0299-00 0 Surveying Crescent 22.02.20 25.02.20 Approved as noted
under pile caps 195-196 and 198.
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0300-00 0 Surveying Crescent 24.02.20 25.02.20 Approved
foundation Zone-2E, 91 points
Inspection for coordinates prior to start Cavity Probing fat small Mosque,
KAIG3-RFI-CO-SU-0301-00 0 Surveying Crescent 24.02.20 25.02.20 Approved
60 points.
Inspection for coordinates prior to start Cavity Probing fat small Mosque,
KAIG3-RFI-CO-SU-0302-00 0 Surveying Crescent 24.02.20 25.02.20 Approved
50 points.
Inspection for layout coordination, level and formwork for PC 197 under
KAIG3-RFI-CO-SU-0303-00 0 Surveying Crescent 24.02.20 29.02.20 Approved as noted
pile cap prior to mass concrete.
Inspection for layout coordination, level and formwork for PC 193, 194, 199
KAIG3-RFI-CO-SU-0304-00 0 Surveying Crescent 24.02.20 29.02.20 Approved as noted
& 200 prior to mass concrete.

Inspection for reinforcement of Roof Slab as per attached drawing for


KAIG3-RFI-TB-S-0342-00 0 Structural Ticketing Booth 24.02.20 29.02.20 Approved as noted
Ticketing Booth #2.

KAIG3-RFI-CO-S-0343-00 0 Inspection for application of Anti termite for PC-197 prior to mass concrete. Structural Crescent 24.02.20 26.02.20 Approved as noted

KAIG3-RFI-CO-S-0344-00 0 Concreting for PC-197 mass concrete (16/20) Structural Crescent 24.02.20 26.02.20 Approved as noted

Inspection for application of Anti termite for PC-193, 194, 199 & 200 prior
KAIG3-RFI-CO-S-0345-00 0 Structural Crescent 24.02.20 26.02.20 Approved as noted
to concrete.

kaig-qcals 16
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-CO-S-0346-00 0 Concreting for PC-193, 194, 199 & 200 mass concrete (16/20) Structural Crescent 24.02.20 26.02.20 Approved as noted

Cosmetic repair for exterior elevations as per highlighted area in RFI


KAIG3-RFI-PT-S-0347-00 0 Structural Public Toilet 25.02.20 29.02.20 Approved as noted
(KAIG3-RFI-PT-S-0265-00) Toilet #2, "done by 2nd Stage Contractor".

Cosmetic repair for exterior elevations as per highlighted area in RFI


KAIG3-RFI-TT-S-0348-00 0 Structural Site Tower 25.02.20 29.02.20 Approved as noted
(KAIG3-RFI-TT-S-0279-00) Tower #1, "done by 2nd Stage Contractor".

CMU laying (first layer) beside Grade Beam of Management Building (as
Management
KAIG3-RFI-MB-S-0349-00 0 per SCR-MB-S-0015-01), highlighted in attached drawing; done by 2nd Structural 25.02.20 29.02.20 Rejected
Building
Stage Contractor.

Inspection for coordinates prior to start Cavity Probing for MCPE


KAIG3-RFI-CO-SU-0305-00 0 Surveying Crescent 25.02.20 26.02.20 Approved
foundation Zone-2D, 29 points
Inspection for coordinates prior to start Cavity Probing for MCPE
KAIG3-RFI-CO-SU-0306-00 0 Surveying Crescent 26.02.20 29.02.20 Approved
foundation Zone-2M, 51 points

Concrete pouring for Roof Slab of Ticketing Booth #2; Mix Design - C32/40
KAIG3-RFI-TB-S-0350-00 0 Structural Ticketing Booth 27.02.20 02.03.20 Approved as noted
(Very Severe).

Rebar Planting for Retaining Wall - Corebel Extension (for span 45-48) as
KAIG3-RFI-BO-S-0351-00 0 per attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 26.02.20 29.02.20 Approved as noted
Contractor.
Shuttering for Retaining Wall - Corebel Extension (for span 45-48) as per
KAIG3-RFI-BO-S-0352-00 0 attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 26.02.20 29.02.20 Approved as noted
Contractor.
Concrete Pouring for Retaining Wall - Corebel Extension (for span 45-48)
KAIG3-RFI-BO-S-0353-00 0 as per attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 26.02.20 29.02.20 Approved as noted
Contractor.
Notification prior to proceed for Concrete Repair of External Elevation of
KAIG3-RFI-TT-S-0354-00 0 Structural Site Tower 27.02.20 02.03.20 Approved as noted
Site Tower - 2.
Application for Anti-Termite prior to cast Blind Concrete for Blockworks
Management
KAIG3-RFI-MB-S-0355-00 0 beside Grade Beam as per SCR-MB-0015-01 - highlighted in attached Structural 27.02.20 02.03.20 Approved as noted
Building
drawing, (done by 2nd Stage Contractor).

KAIG3-RFI-CO-S-0356-00 0 Inspection for application of waterproofing for Mock-up. Structural Crescent 27.02.20 02.03.20 Rejected

kaig-qcals 17
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

Inspection for Anti termite prior to casting concrete under shear keys for
KAIG3-RFI-CO-S-0357-00 0 Structural Crescent 27.02.20 02.03.20 Approved as noted
PC (91 to 98).

Inspection of blinding concrete (C 16/20) under shear keys design level for
KAIG3-RFI-CO-S-0358-00 0 Structural Crescent 27.02.20 02.03.20 Approved as noted
PC (91 to 98).

Inspection for location, level and formwork prior to casting blinding


KAIG3-RFI-CO-SU-0308-00 0 Surveying Crescent 27.02.20 02.03.20 Approved as noted
concrete (C16/20) for shear keys in PC 91 to 98.
Inspection for layout coordinates, level, plumbness and formworks for
KAIG3-RFI-CO-SU-0309-00 0 Surveying Crescent 29.02.20 02.03.20 Rejected
blinding under footing pad at VIP Auditorium at grid A/8, A/7 & A/5.
Inspection to check formation level prioe to casting concrete - blinding level
KAIG3-RFI-CO-SU-0310-00 0 at the bottom of footing design level at Zone- 2A Axis 02/A - 02/D, (Rock Surveying Crescent 29.02.20 02.03.20 Approved as noted
Excavation).

Inspection for Anti termite prior to casting blinding concrete under pad
KAIG3-RFI-CO-S-0359-00 0 Structural Crescent 29.02.20 02.03.20 Rejected
footing at VIP Auditorium at grid A/8. A/7 & A/5.

Blinding concrete under pad footing at VIP Auditorium at grid A/8. A/7 &
KAIG3-RFI-CO-S-0360-00 0 Structural Crescent 29.02.20 02.03.20 Rejected
A/5.
Casting of Blinding concrete for blockworks beside Grade Beam of
Management
KAIG3-RFI-MB-S-0361-00 0 Management Building (as per SCR-MB-S-0015-01); done by 2nd Stage Structural 29.02.20 02.03.20 Approved as noted
Building
Contractor. Mix Design - C 16/20 (SRC).
Rebar Planting for Retaining Wall - Corebel Extension (for span 76-90) as
KAIG3-RFI-BO-S-0362-00 0 per attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 02.03.20 04.03.20 Approved as noted
Contractor.
Shuttering for Retaining Wall - Corebel Extension (for span 76-90) as per
KAIG3-RFI-BO-S-0363-00 0 attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 02.03.20 07.03.20 Approved as noted
Contractor.
Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90)
KAIG3-RFI-BO-S-0364-00 0 as per attached SCR-BO-S-0012-00. Boundary Wall done by 2nd Stage Structural Boundary Wall 02.03.20
Contractor.
Notification prior to proceed for Concrete Repair of External Elevation of
KAIG3-RFI-PT-S-0365-00 0 Structural Site Toilet 01.03.20 07.03.20 Rejected
Site Toilet-4.
Notification prior to proceed for Concrete Repair of External Elevation of
KAIG3-RFI-PT-S-0366-00 0 Structural Site Toilet 01.03.20 04.03.20 Approved as noted
Site Toilet-3.

kaig-qcals 18
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

Render Finish Sample with 2 types of texture as per attached plan; Toilet
KAIG3-RFI-PT-A-0157-00 0 Architectural Site Toilet 01.03.20 04.03.20 Approved as noted
#1.

Surface preparation on Concrete Boundary Wall outer face (except


KAIG3-RFI-BO-A-0158-00 0 Architectural Boundary Wall 01.03.20
column), prior to install Riyadh Stone Cladding at span 76, 78 to 88.

Inspection for layout coordinates and level prior to concreting of blinding


KAIG3-RFI-CO-SU-0311-00 0 Surveying Crescent 02.03.20 04.03.20 Approved as noted
mass concrete at PC 91-93.

Inspection of application of Anti termite prior to blinding concreting under


KAIG3-RFI-CO-S-0367-00 0 Structural Crescent 02.03.20 04.03.20 Approved as noted
pile cap at PC 91 - 93

KAIG3-RFI-CO-S-0368-00 0 Concreting of Blinding / Mass concrete for PC 91-93. Structural Crescent 02.03.20 04.03.20 Approved as noted

Reinforcement Steel Bars of Columns for Boundary Wall and 3-sides


KAIG3-RFI-BO-S-0369-00 0 Shuutering prior to close shuttering, Column #76-80. "Done by 2nd Stage Structural Boundary Wall 02.03.20 07.03.20 Approved as noted
Contracotr".
Blinding Concrete for Slab on Grade of Tower-1; "Done by 2nd Stage
KAIG3-RFI-TT-S-0370-00 0 Structural Site Tower 02.03.20 04.03.20 Approved as noted
Contractor". Mix Design - C 16/20 (SRC).
Structural repair for Exterior Elevation as highlighted area in RFI (KAIG3-
KAIG3-RFI-TT-S-0371-00 0 Structural Site Toilet 02.03.20 04.03.20 Approved as noted
RFI-PT-S-0265-00), Toilet-2.
Application for Anti-Termite prior to cast Blind Concrete for Slab on Grade
KAIG3-RFI-TT-S-0372-00 0 Structural Site Tower 02.03.20 04.03.20 Approved
of Tower-1; (done by 2nd Stage Contractor).
Inspection Anti termite prior to casting concrete under pile cap at PC 81,
KAIG3-RFI-CO-S-0373-00 0 Structural Crescent 03.03.20 04.03.20 Approved as noted
79 & 77.

KAIG3-RFI-CO-S-0374-00 0 Inspection Blinding Concrete (C16/20) under pile cap at PC 81, 79 & 77. Structural Crescent 03.03.20

Inspection for location, level and formwork prior to casting Blinding


KAIG3-RFI-CO-SU-0312-00 0 Surveying Crescent 03.03.20
Concrete (C16/20) under pile cap at PC 81, 79 & 77.

Inspection for Coordinates prior to start Probing works at Zone-2H Tunnel-


KAIG3-RFI-CO-SU-0313-00 0 Surveying Crescent 03.03.20 04.03.20 Approved
1, 68 points.
Inspection for Coordinates prior to start Probing works at Zone-2H Tunnel-
KAIG3-RFI-CO-SU-0314-00 0 Surveying Crescent 04.03.20
1, 94 points.
Inspection for Coordinates prior to start Probing works at Zone-2H Tunnel-
KAIG3-RFI-CO-SU-0315-00 0 Surveying Crescent 04.03.20
1, 60 points.

kaig-qcals 19
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted

KAIG3-RFI-BO-S-0375-00 0 Closing of Shuttering for Columns of Boundary Wall, Column #76 - 80. Structural Boundary Wall 04.03.20 07.03.20 Approved as noted

Notification prior to proceed for Waterproofing Work of Existing Water


KAIG3-RFI-WT-S-0376-00 0 Structural Water Tank 04.03.20
Tank.
Rock and Stone Boulder Placement No. 109 done by 2nd Stage
KAIG3-RFI-GN-LS-0028-00 0 Landscape General 04.03.20 07.03.20 Rejected
Contractor.
Rock and Stone Boulder Placement No. 110 done by 2nd Stage
KAIG3-RFI-GN-LS-0029-00 0 Landscape General 04.03.20 07.03.20 Rejected
Contractor.
Rock and Stone Boulder Placement No. 111 done by 2nd Stage
KAIG3-RFI-GN-LS-0030-00 0 Landscape General 04.03.20 07.03.20 Rejected
Contractor.
Rock and Stone Boulder Placement No. 112 done by 2nd Stage
KAIG3-RFI-GN-LS-0031-00 0 Landscape General 04.03.20 07.03.20 Rejected
Contractor.
Rock and Stone Boulder Placement No. 113 done by 2nd Stage
KAIG3-RFI-GN-LS-0032-00 0 Landscape General 04.03.20 07.03.20 Rejected
Contractor.

KAIG3-RFI-CO-S-0377-00 0 Inspection of Anti Termite prior to casting concrete at PC (181-186) Structural Crescent 05.03.20 07.03.20 Approved as noted

KAIG3-RFI-CO-S-0378-00 0 Inspection of Blinding Concrete casting C(16-20) at PC (181-186) Structural Crescent 05.03.20

KAIG3-RFI-CO-S-0379-00 0 Inspection of Anti Termite prior to casting concrete under PC (94-98) Structural Crescent 05.03.20 07.03.20 Approved as noted

KAIG3-RFI-CO-S-0380-00 0 Inspection of Blinding Concrete casting C(16-20) at PC (94-98) Structural Crescent 05.03.20 08.03.20 Approved as noted

Concrete Pouring for Columns of Boundary, Column # 76-80. Conc Mix


KAIG3-RFI-BO-S-0381-00 0 Structural Boundary Wall 05.03.20
Design C32/40 - Very Severe
Notification to start Water Gardens Boundary Wall for Cavity Probing
KAIG3-RFI-WG-S-0382-00 0 Structural Water Garden 05.03.20
Platform as per highlighted in attached drawng.
Inspection for location, level and formwork prior to casting blinding
KAIG3-RFI-CO-SU-0316-00 0 Surveying Crescent 05.03.20 07.03.20 Approved as noted
concrete for shear keys in PC (181-186)
Inspection for location, level and formwork prior to casting blinding
KAIG3-RFI-CO-SU-0317-00 0 Surveying Crescent 05.03.20 07.03.20 Approved as noted
concrete SRC C(16-20) under pile caps
Inspection for location, level and formwork prior to casting blinding
KAIG3-RFI-CO-SU-0318-00 0 Surveying Crescent 07.03.20 08.03.20 Approved as noted
concrete under pile caps PC(78, 80 & 82)
Inspection for Coordinates prior to Probing works at Zone 2H Tunnel-1, 74
KAIG3-RFI-CO-SU-0319-00 0 Surveying Crescent 07.03.20 07.03.20 Approved
Probes.

kaig-qcals 20
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection for Coordinates prior to Probing works at Zone 2G MCPE, 15
KAIG3-RFI-CO-SU-0320-00 0 Surveying Crescent 08.03.20 08.03.20 Approved
Probes.
Inspection for level and verticality of Concrete Column for Boundary Wall
KAIG3-RFI-BO-SU-0321-00 0 Surveying Boundary Wall 07.03.20 08.03.20 Approved
(Col. 76-80).
After Demolition of existing Raft Foundation as per approved otification
KAIG3-RFI-GN-S-0383-00 0 Structural General 07.03.20
(KAIG3-RFI-GN-S-0326-00).

Application for Anti-Termite prior to cast Blind Concrete for Blockworks


Management
KAIG3-RFI-MB-S-0384-00 0 beside Grade Beam as per SCR-MB-0015-01 - highlighted in attached Structural 07.03.20
Building
drawing, (done by 2nd Stage Contractor).

Casting of Blinding concrete for blockworks beside Grade Beam of


Management
KAIG3-RFI-MB-S-0385-00 0 Management Building (as per SCR-MB-S-0015-01); done by 2nd Stage Structural 07.03.20
Building
Contractor. Mix Design - C 16/20 (SRC).
Notification to proceed with concrete testing for existing water tank as per
KAIG3-RFI-WT-S-0386-00 0 Structural Water Tank 07.03.20
letter DAR-ZHG-KAIG-GEN-422.

KAIG3-RFI-CO-S-0387-00 0 Inspection of Anti termite prior to casting concrete under PC (82, 80 & 78) Structural Crescent 07.03.20 08.03.20 Approved as noted

KAIG3-RFI-CO-S-0388-00 0 Inspection of concrete casting SRC, C(16-20) under PC (82,80 & 78). Structural Crescent 07.03.20

KAIG3-RFI-TB-S-0389-00 0 Inspection of reinforcement for DOME - Ticketing Booth #2. Structural Ticketing Booth 07.03.20

Solid Block wall beside Grade Beam of Management Building (as per Management
KAIG3-RFI-MB-S-0390-00 0 Structural 07.03.20
SCR-MB-G-0031-00); done by 2nd Stage Contractor. Building
Steel reinforcement for Post beside existing Column of Management Management
KAIG3-RFI-MB-S-0391-00 0 Structural 07.03.20
Building (as per SCR-MB-G-0031-00); done by 2nd Stage Contractor. Building
Structural repair for exterior elevation as highlighted area in RFI (KAIG3- Management
KAIG3-RFI-TT-S-0392-00 0 Structural 07.03.20
RFI-TT-S-0279-00), Tower-1. Building
Shuttering for Post beside existing Column of Management Building (as Management
KAIG3-RFI-MB-S-0393-00 0 Structural 08.03.20
per SCR-MB-G-0031-00); done by 2nd Stage Contractor. Building
Concrete Pouring for Post beside existing Column of Management Building Management
KAIG3-RFI-MB-S-0394-00 0 Structural 08.03.20
(as per SCR-MB-G-0031-00); done by 2nd Stage Contractor. Building

KAIG3-RFI-CO-S-0395-00 0 Inspection of Anti termite prior to casting concrete under PC (188-192) Structural Crescent 08.03.20

KAIG3-RFI-CO-S-0396-00 0 Inspection of concrete casting SRC, C(16-20) under PC (188-192) Structural Crescent 08.03.20

kaig-qcals 21
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection of anti-termite prior to casting concrete under shear keys in PC
KAIG3-RFI-CO-S-0397-00 0 Structural Crescent 08.03.20
(65, 67, 69, 71, 73 & 75).
Inspection of concrete casting C (16-20) under shear keys in PC (65, 67,
KAIG3-RFI-CO-S-0398-00 0 Structural Crescent 08.03.20
69, 71, 73 & 75).

KAIG3-RFI-CO-S-0399-00 0 Reinfocement for Slab on Grade of Tower-1. Structural Site Tower 08.03.20

KAIG3-RFI-CO-SU-0322-00 0 Inspection for Coordinates prior to Probing works at Zone 2G, 3 Probes. Surveying Crescent 08.03.20 08.03.20 Approved

Inspection for location, level and formwork prior to casting blinding


KAIG3-RFI-CO-SU-0323-00 0 Surveying Crescent 08.03.20
concrete under pile caps PC(188-192)

KAIG3-RFI-PG-SU-0324-00 0 Coordinates and Level for Wall - Centerline of Physic Gaden. Surveying Physic Garden 08.03.20

Inspection for location, level and formwork prior to casting blinding


KAIG3-RFI-CO-SU-0325-00 0 Surveying Crescent 08.03.20
concrete for shear keys in PC (65, 67, 69, 71, 73 & 75).
Inspection for Coordinates prior to Probing works at Zone-5, Bridges and
KAIG3-RFI-CO-SU-0326-00 0 Surveying Crescent 08.03.20
Jurassic Garden; 56 Probes.

Inspection for Plastering Guide lines at Site Tower-2; done by 2nd Stage
KAIG3-RFI-TT-A-0159-00 0 Architectural SiteTower 08.03.20
Contractor

Inspection for Plastering Guide lines at Site Toilet-3; done by 2nd Stage
KAIG3-RFI-PT-A-0160-00 0 Architectural Public Toilet 08.03.20
Contractor

Stting out of Grooves for Exterior Elevation as per attached drawing prior Fire Control
KAIG3-RFI-FC-A-0161-00 0 Architectural 08.03.20
to install Grooves for Fire Control Building. Building

Inspection for Coordinates prior to Probing works for Tunnels in


KAIG3-RFI-CO-SU-0327-00 0 Surveying Crescent 09.03.20
Carboniferous Garden; 35 Probes.
Inspection for location, level and formwork prior to casting blinding
KAIG3-RFI-CO-SU-0328-00 0 Surveying Crescent 09.03.20
concrete under pile caps PC (181, 183, 185 & 187).
Inspection to check formation level prior to casting mass concrete at zone-
KAIG3-RFI-CO-SU-0329-00 0 Surveying Crescent 09.03.20
2 up bottom of footing design level or higher.
Inspection for location, level and formwork prior to casting blinding
KAIG3-RFI-CO-SU-0330-00 0 Surveying Crescent 09.03.20
concrete for shear keys in PC (66, 68, 70, 72, 74 & 76).

KAIG3-RFI-PG-SU-0331-00 0 Coordinates for Wall - Centerline of Physic Garden. Surveying Crescent 09.03.20

kaig-qcals 22
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

Approved as
OPEN Approved Rejected
Noted
0 29 340 61

REQUEST FOR INSPECTION LOGSHEET


Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Approved as
Submitted Replied Approved Rejected
Noted
Inspection of Anti termite prior to casting concrete under PC (181, 183, 185
KAIG3-RFI-CO-S-0400-00 0 Structural Crescent 09.03.20
& 187)
Inspection of concrete casting SRC, C(16-20) under PC (181, 183, 185 &
KAIG3-RFI-CO-S-0401-00 0 Structural Crescent 09.03.20
187)
Inspection of Anti termite prior to casting concrete under shear keys at PC
KAIG3-RFI-CO-S-0402-00 0 Structural Crescent 09.03.20
(66, 68, 70, 72, 74 & 76)
Inspection of concrete casting SRC, C(16-20) under shear key at PC (66,
KAIG3-RFI-CO-S-0403-00 0 Structural Crescent 09.03.20
68, 70, 72, 74 & 76)
Installation of Reinforcement and Shuttering for Kicker of Ticketing Booth
KAIG3-RFI-TB-S-0404-00 0 Structural Ticketing Booth 09.03.20
#1, (H=100mm).

kaig-qcals 23
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 24
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

Original copy pulled


out by DAR

kaig-qcals 25
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 26
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 27
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 28
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 29
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 30
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 31
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 32
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 33
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 34
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 35
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 36
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 37
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 38
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 39
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 40
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 41
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 42
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 43
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 44
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 45
As of 5 Mar. 2020

TOTAL
430

UEST FOR INSPECTION LOGSHEET

Remarks

kaig-qcals 46
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

CANCELLED OPEN Approved Approved as Noted Rejected


2 0 1 6 4

REQUEST FOR INSPECTION LOGSHEET


CIVIL
Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Submitted Replied Approved Approved as Noted Rejected
Inspection for Shuttering, Reinforcement and Concrete Pouring (33-units
1 KAIG-FIR-ZHBG-GN-C-02-00 0 Civil Site Precast Yard 31.07.19 31.07.19 Approved as noted
Foundation only - Precast) for Traverse Control Point.
Inspection for Shuttering, Reinforcement, Anchor Bolts and Concrete Pouring for
2 KAIG-FIR-ZHBG-GN-C-03-00 0 Project Signboard 01.08.19 Cancelled
Raft Foundation of Project Signboard

3 KAIG3-RFI-GN-C-0005-00 0 Inspection for Shuttering and Reinforcement for Project Signboard. Civil Project Signboard 06.08.19 08.08.19 Approved as noted

4 KAIG3-RFI-GN-C-0008-00 0 25.08.19 28.08.19 Rejected


Installation of 33-units Traverse Control Point (Main Traverse point) with
identification plate
5 KAIG3-RFI-GN-C-0008-01 1 Civil Project Site 29.08.19 31.08.19 Approved as noted

Inspection for coordinates and level of foundation for "Visitor's Center" -


6 KAIG3-RFI-GN-C-0014-00 0 Surveying Visitor's Center 27.08.19 28.08.19 Approved as noted
Electrical Room.
Inspection for existing level of Zone-1 (Backfill Area), prior to start
7 KAIG-FIR-ZHBG-CO-C-15-00 0 Zone-1 28.08.19 Cancelled
backfilling.
Inspection for surface preparation of Zone-1 (Backfill Area), prior to start
8 KAIG3-RFI-CO-C-0018-00 0 Civil Crescent 29.08.19 01.09.01 Rejected
backfilling.

9 KAIG3-RFI-CO-C-0019-00 0 01.09.19 04.09.19 Rejected


Inspection of soil sample collection for "Soil Classification Test" in Zone-1
(Backfill Area / Crescent Area), prior to start backfilling.
10 KAIG3-RFI-CO-C-0019-01 1 Civil Crescent 07.09.19 11.09.19 Approved

Inspection for Reinforcement of Grade Beam at Visitor's Center - Electrical


11 KAIG3-RFI-GN-C-0023-00 0 Civil Visitor's Center 01.09.19 07.09.19 Approved as noted
Room.

12 KAIG3-RFI-CO-C-0096-00 0 Concrete pouring for Blinding of "Crescent Traverse Point" Civil Crescent 02.12.19 05.12.19 Approved as noted

13 KAIG3-RFI-GN-C-0113-00 0 Inspection for Stock Filling Materials at Site (by Jawdat) - 12 Stockpiles Civil General 11.12.19 17.12.19 Rejected

kaig-qcals 47
Consultant : DAR
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Main Contractor: ZHBG
As of 5 Mar. 2020

CANCELLED OPEN Approved Approved as Noted Rejected


2 0 1 6 4

REQUEST FOR INSPECTION LOGSHEET


CIVIL
Date STATUS
Location / Building
Sl No. IR NUMBER REV. DESCRIPTION DISCIPLINE
Name Submitted Replied Approved Approved as Noted Rejected

kaig-qcals 48
As of 5 Mar. 2020

TOTAL
13

T FOR INSPECTION LOGSHEET


CIVIL
Remarks

Cancelled

Cancelled

Original copy pulled


out by DAR

Original copy pulled


out by DAR

kaig-qcals 49
As of 5 Mar. 2020

TOTAL
13

T FOR INSPECTION LOGSHEET


CIVIL
Remarks

kaig-qcals 50
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

kaig-qcals 51
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

4 4 KAIG3-RFI-PC-SU-2463 01 Level and Location for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (3rd stage) Survey Promenade Bridge 10/11/22 10/13/22 Approved as noted

7 6 KAIG3-RFI-PC-SU-2474 01 Level and Location for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlighted) Survey Bridge to South Tower 10/11/22 10/13/22 Approved as noted

1N 1P 6 KAIG3-RFI-CO-SU-2480 01 Level and Location for 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highlighted) Survey Crescent 10/11/22 10/13/22 Approved as noted

2D 6 KAIG3-RFI-CO-SU-2601 01 Level and Location for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZONE 2D Survey Crescent 10/11/22 10/15/22 Approved as noted

1A 6 KAIG3-RFI-CO-SU-2962 01 Level and Location for Kicker of outer Infill wall for Zone 1A between Axis 01A-01B-01C (PC 1-3-5) (as highlighted) Survey Crescent 10/22/22 10/23/22 Approved as noted

Level and Location for Large Mosque for Upper First Floor for Columns & Walls (C5,C4,C3A,C2A,C2C,W5) , Axis C-E, 5-6
1G 6 KAIG3-RFI-LM-SU-3059 01 Survey Large Mosque 10/3/22 10/5/22 Approved as noted
Zone 1G (as highlighted)

1E 6 KAIG3-RFI-CO-SU-3084 00 Level and location for Excavation of Diaphragm wall foundation at zone 1E Axis 01M (as highlighted) Survey Crescent 10/1/22 10/4/22 Approved as noted

Level and Location for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlighted) (4
1E 6 KAIG3-RFI-CO-SU-3085 00 Survey Crescent 10/1/22 10/3/22 Approved as noted
footing & 3 strip)

2H 6 KAIG3-RFI-MC-SU-3086 00 Level and Location for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as highlighted) from 871.00 to 875.55 Survey MCPE 2 10/1/22 10/3/22 Approved as noted

1D 6 KAIG3-RFI-CO-SU-3087 00 Level and Location for Strip footing (RC) at Zone 1D Between PC 19-21(as highlighted) Survey Crescent 10/4/22 10/3/22 Approved as noted

Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02A-02B (as highlighted) TOC
2A 6 KAIG3-RFI-CF-SU-3088 00 Survey Cefeteria 10/2/22 10/4/22 Approved as noted
863.450

1A 6 KAIG3-RFI-CO-SU-3090 00 Level and Location for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A Survey Crescent 10/2/22 10/4/22 Approved as noted

2B 2 KAIG3-RFI-TB-SU-3091 00 Check Top Levels of Slab (+2950) for New Ticketing Booth # 5A As per Attached Highlighted Drawing's. Survey New Ticketing Booth 10/2/22 10/3/22 Approved as noted

Level and Location of Plain concrete under Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO-AP (as
2M 6 KAIG3-RFI-VG-SU-3092 00 Survey Crescent 10/5/22 10/6/22 Approved as noted
highlighted)

1E 6 KAIG3-RFI-CO-SU-3093 00 Level and location for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlighted) (1 strip) Survey Crescent 10/9/22 10/10/22 Approved as noted

2M 6 KAIG3-RFI-VG-SU-3094 00 Level and Loction of Blinding under S.O.G of Devonion Garden in Zone 2M Axis 02AM-AP (as highlighted) Survey Crescent 10/5/22 10/6/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3095 00 Level and Location for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as highlighted) Level 875.50 Survey Energy Center 2 10/2/22 10/3/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3096 00 Level and Location for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as highlighted) level 877.00 Survey Energy Center 2 10/2/22 10/3/22 Approved as noted

2N 6 KAIG3-RFI-CC-SU-3097 00 Level and Location for Child Care Grade Beam at Zone 2N (as highlighted) Survey Child Care 10/2/22 10/4/22 Approved as noted

Level and Location for Front Canopy Foundation at Zone 1 Axis 01AD, 01AE, 01AF, 01AG, 01AH, 01AI (as highlighted) TOC
1 6 KAIG3-RFI-CO-SU-3098 00 Survey Crescent 10/3/22 10/4/22 Approved as noted
865.060

1L 6 KAIG3-RFI-CO-SU-3099 00 Level and Location for Mass Concrete of strip Footing ( Inner ) Between (PC 66-68-70-72) (As highlighted) Zone1L Survey Crescent 10/3/22 10/5/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3100 00 Level and Location for Columns neck (INT) for Energy Center,Grid 13-14,D-H (as highlighted) Survey Energy Center 2 10/3/22 10/4/22 Approved as noted

2M 2N 6 KAIG3-RFI-MC-SU-3101 00 Level and Location for MCPE 1 Suspended Slab of Duct Tunnel,at Zone 2M&2N , Axis 03T ( As Highlighted )TOC 874.80 Survey MCPE 1 10/3/22 10/5/22 Approved as noted

KAIG3-RFI-CF-SU-3102 00 Level and Location for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As highlighted) Survey Crescent 10/3/22 10/4/22 Approved as noted

kaig-qcals 52
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

1E 6 KAIG3-RFI-CO-SU-3103 00 Level and Location for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (As highlighted) Survey Crescent 10/4/22 10/5/22 Approved as noted

2B 2 KAIG3-RFI-SM-SU-3104 00 Level and Location for South Small Mosque Second Floor Suspended slab (as highlighted) Survey South Small Mosque 10/4/22 10/5/22 Approved as noted

Level and Location for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 Foudations) up to Expansion joint
1E 6 KAIG3-RFI-CO-SU-3105 00 Survey Crescent 10/4/22 10/6/22 Approved as noted
(as highlighted)

2M 2N 6 KAIG3-RFI-MC-SU-3106 00 Level and Location for Top Slab of Duct Tunnel for MCPE 1,at Zone 2M&2N , Axis 03S ( As Highlighted )TOC 874.80 Survey MCPE 1 10/4/22 10/5/22 Approved as noted

4A 4 KAIG3-RFI-WG-SU-3107 00 Coordinates & Levels of Wall for Fountain of Geyser Garden, inside water Garden, as highlighted area in attached drawing's. Survey Water Play/Geyser Garden 10/4/22 10/6/22 Approved as noted

1A 6 KAIG3-RFI-CO-SU-3108 00 Level and Location for Strip footing (RC) Between PC 5-7 at Zone 1A (as highlighted) Survey Crescent 10/4/22 10/5/22 Approved as noted

2B 2 KAIG3-RFI-TB-SU-3109 00 Check Top Levels of Slab (+2950) for New Ticketing Booth # 6A As per Attached Highlighted Drawing's. Survey New Ticketing Booth 10/4/22 10/6/22 Approved as noted

Level and Location for blinding of retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-GN-S-0147-
2C 6 KAIG3-RFI-SA-SU-3110 00 Survey South Admin Bldg. 10/5/22 10/6/22 Approved as noted
00)

5A 5 KAIG3-RFI-EC-SU-3111 00 Level and Location for Energy Center (7nos) columns (ext) at Grid 2-4, A upto Level 874.85 (as highlighted) Survey Energy Center 10/5/22 10/5/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3112 00 Level and Location for Columns neck (int.) of Energy Center 2,Axis 4-6, C-H (as highlighted). Survey Energy Center 10/5/22 10/5/22 Approved as noted

1E 6 KAIG3-RFI-CO-SU-3114 00 Level and location for Excavation of Diaphragm wall foundation and Strip Footing at zone 1E Axis 01P (As Highlighted) Survey Crescent 10/6/22 10/11/22 Approved as noted

1E 6 KAIG3-RFI-CO-SU-3115 00 Level and Location of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E Axis 01P (As Highlighted) Survey Crescent 10/6/22 10/8/22 Approved as noted

2G 6 KAIG3-RFI-MC-SU-3116 00 Level and Location for Duct Tunnel Wall of MCPE 2,Axis 03E, 03F Level upto 874.50 (as highlighted) Zone 2G Survey MCPE 2 10/6/22 10/8/22 Approved as noted

2G 6 KAIG3-RFI-MC-SU-3117 00 Level and Location of Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G Level at 874.50 Survey MCPE 2 10/8/22 10/12/22 Approved as noted

1N 1P 6 KAIG3-RFI-CO-SU-3118 00 Level and Location for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as highlighted) TOC 869.10 Survey Crescent 10/8/22 10/9/22 Approved as noted

2K 6 KAIG3-RFI-CO-SU-3119 00 Level and Location for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted) Survey Crescent 10/8/22 10/9/22 Approved as noted

Level and Location of 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings and Strip
1E 6 KAIG3-RFI-CO-SU-3120 00 Survey Crescent 10/8/22 10/9/22 Approved as noted
Footing) (As Highlighted)

5A 5 KAIG3-RFI-EC-SU-3121 00 Level and location for Rock level inside energy center at grid 15-30, M-R (Mechanical Building) (as Highlighted) Survey Energy Center 10/8/22 10/10/22 Approved as noted

4D 4 KAIG3-RFI-PG-SU-3122 00 Coordinates & Levels of Blinding under Fountain 2 (4 nos) Inside Physic Garden as highlighted area in attached drawing's. Survey Physic Garden 10/8/22 10/8/22 Approved as noted

1 6 KAIG3-RFI-CO-SU-3123 00 Level and Location for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as highlighted) TOC 865.060 Survey Crescent 10/9/22 10/10/22 Approved as noted

Level and Location for Large Mosque for Upper First Floor for Columns & Walls (W1) , Axis E-F, 5-6 Zone 1G (as
1G 6 KAIG3-RFI-LM-SU-3124 00 Survey Large Mosque 10/9/22 10/10/22 Approved as noted
highlighted)

2R 6 KAIG3-RFI-CO-SU-3125 00 Level and Location for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ - 02BC (as highlighted) Survey Crescent 10/9/22 10/11/22 Approved as noted

2A 6 KAIG3-RFI-CF-SU-3126 00 Level and Location for Cafeteria undercroft AHU pad (4 nos.) , Axis 02C zone 2A (As highlighted) Survey Cafeteria 10/9/22 10/10/22 Approved as noted

kaig-qcals 53
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

5A 5 KAIG3-RFI-EC-SU-3127 00 Level and Location for Column Neck of Energy Center, Grid 7-11, B & 4-13, K (As Highlighted) Survey Energy Center 10/10/22 10/12/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3128 00 Level and Location for center Columns of Energy Center, Grid 7-11, A upto 881.00 (As Highlighted) Survey Energy Center 10/10/22 10/12/22 Approved as noted

67 6 KAIG3-RFI-CO-SU-3129 00 Level and Location of Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted) Survey Crescent 10/10/22 10/11/22 Approved as noted

2M 6 KAIG3-RFI-VG-SU-3130 00 Level and Location of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted) Level upto 874.80 ( 2nd Part ) Survey Devonian Garden 10/10/22 10/12/22 Approved as noted

2C 6 KAIG3-RFI-SA-SU-3131 00 Level and Location for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-GN-S-0147-00) Survey South Admin Bldg. 10/10/22 10/12/22 Approved as noted

Level and Location for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 & 70-72) (As highlighted)
1L 6 KAIG3-RFI-CO-SU-3132 00 Survey Crescent 10/10/22 10/11/22 Approved as noted
Zone1L

Level and Location for slab, Beams, Stairs ( fom Lower 1st to Upper 1st ) & Landings for Upper 1st Floor for Large Mosque,
1G 6 KAIG3-RFI-LM-SU-3133 00 Survey Large Mosque 10/11/22 10/13/22 Approved as noted
Axis C-E / 1.1-5.1 Zone 1G (As Highlighted)

2A 6 KAIG3-RFI-CF-SU-3134 00 Level and Location for Cafeteria undercroft AHU pad ( 1no ),Axis 02B zone 2A (As highlighted) Survey Cafeteria 10/11/22 10/12/22 Approved as noted

Level and Location for Large Mosque for Upper First Floor for ( 2 Columns ) C1B upto 876.50,Axis E / 3&4 Zone 1G (As
1G 6 KAIG3-RFI-LM-SU-3135 00 Survey Large Mosque 10/11/22 10/13/22 Approved as noted
Highlighted)

1L 6 KAIG3-RFI-CO-SU-3136 00 Level and Location for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As highlighted) Survey Crescent 10/11/22 10/13/22 Approved as noted

4 6 KAIG3-RFI-CO-SU-3137 00 Level and Location for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as highlighted) Zone 4 Survey Crescent 10/11/22 10/13/22 Approved as noted

Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02B (as highlighted) TOC
2A 6 KAIG3-RFI-CF-SU-3138 00 Survey Cafeteria 10/13/22 10/15/22 Approved as noted
863.450

5A 5 KAIG3-RFI-EC-SU-3139 00 Level and Location for Energy Center (27nos) columns at Grid 0-7 / I-L,upto Level 878.00 (As Highlighted) Survey Energy Center 10/12/22 10/15/22 Approved as noted

2B 2 KAIG3-RFI-TB-SU-3140 00 Inspection of Levels for Dome of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's. Survey New Ticket Booth 10/12/22 10/15/22 Approved as noted

Coordinates & Levels for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 3, Inside Physic Garden as highlighted area
4D 4 KAIG3-RFI-PG-SU-3141 00 Survey Physic Garden 10/12/22 10/15/22 Approved as noted
in attached drawing's.

5A 5 KAIG3-RFI-EC-SU-3142 00 Level and Location for Columns of Energy Center at Grid 27-30/R (10 nos) upto Level 878.00 (As Highlighted) Survey Energy Center 10/12/22 10/15/22 Approved as noted

Level and Location for Cafeteria (undercroft) Wall (W19) as highlighted, upto 869.100 zone 2A (KAIG3-SCR-CF-S-0194-00
2A 6 KAIG3-RFI-CF-SU-3143 00 Survey Cafeteria 10/12/22 10/18/22 Approved as noted
with attachments)

1E 6 KAIG3-RFI-CO-SU-3144 00 Level and Location for Diaphragm wall (Foundation) at zone 1E Axis 01P (as highlighted) TOC 866.00 & 866.50 Survey Crescent 10/12/22 10/13/22 Approved as noted

Level and Location for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, from 863.45 upto 868.60 zone 2A
2A 6 KAIG3-RFI-CF-SU-3145 00 Survey Cafeteria 10/17/22 10/18/22 Approved as noted
(KAIG3-SCR-CF-S-0194-00 with attachments)

1N 6 KAIG3-RFI-CO-SU-3146 00 Level and Location for Diaphragm wall (Foundation & Strip Footing ) at zone 1N Axis 01AM (as highlighted) Level 866.50 Survey Crescent 10/15/22 10/17/22 Approved as noted

1L 6 KAIG3-RFI-CO-SU-3147 00 Level and Location for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at Zone 1L (As Highlighted) Survey Crescent 10/15/22 10/18/22 Approved as noted

4D 4 KAIG3-RFI-PG-SU-3148 00 Coordinates & Levels for Wall of Fountain (3), inside Physic Garden as highlighted area in attached drawing's. Survey Physic Garden 10/15/22 10/17/22 Approved as noted

4D 4 KAIG3-RFI-PG-SU-3149 00 Coordinates & Levels for Fountain 2 (Inner) (4 nos), Inside Physic Garden as highlighted area in attached drawing's. Survey Physic Garden 10/15/22 10/17/22 Approved as noted

kaig-qcals 54
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

1E 6 KAIG3-RFI-CO-SU-3150 00 Level and Location for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( Level 868.50 ) Survey Crescent 10/15/22 10/18/22 Approved as noted

1E 6 KAIG3-RFI-CO-SU-3151 00 Level and Location for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E Axis 01M (As Highlighted) Survey Crescent 10/15/22 10/18/22 Approved as noted

Level and Location for South Small Mosque Staircase (Step ,Riser ,Landing ) from ground to 1st Floor, zone 2B at Axis F-G &
2B 6 KAIG3-RFI-SM-SU-3152 00 Survey South Small Mosque 10/15/22 10/18/22 Approved as noted
1-3 ,from 869.25 to 873.150 ( KAIG3-SCR-SM-S-0205-00 ),(As Highlighted

2B 6 KAIG3-RFI-SM-SU-3153 00 Level and Location for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B (as highlighted) TOC- 877.80 Survey South Small Mosque 10/15/22 10/18/22 Approved as noted

Level and Location for South Small Mosque Second Floor Columns at Axis A-D & 4-5 , Zone 2B from 876.650 to 878.550 (as
2B 6 KAIG3-RFI-SM-SU-3154 00 Survey South Small Mosque 10/16/22 10/26/22 Approved as noted
Highlighted)

5A 5 KAIG3-RFI-EC-SU-3155 00 Level and Location for Columns of Energy Center at Grid17-22M (16 nos) (As Highlighted) 868.00 Survey Energy Center 10/15/22 10/17/22 Approved as noted

Level and Location for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to Movement Joint ) (as
1G 6 KAIG3-RFI-CO-SU-3156 00 Survey Crescent 10/15/22 10/18/22 Approved as noted
highlighted) Zone 1G

2N 6 KAIG3-RFI-CC-SU-3157 00 Level and Location for COLUMNS C2 at Zone 2N Child Care (as highlighted) (C2 -5 nos) Upto bottom of Slab. Survey Child Care 10/17/22 10/18/22 Approved as noted

3 6 KAIG3-RFI-CO-SU-3158 00 Level and location for Excavation for Retaining wall Foundation at Zone 3 at axis 01S - 01P (As Highlighted) Survey Crescent 10/17/22 10/22/22 Approved as noted

1 6 KAIG3-RFI-NT-SU-3159 00 Level and Location for Blinding under Foundation for North Watch Tower in zone 1 (as highlighted) Survey North Watch Tower 10/17/22 10/20/22 Approved as noted

1D 6 KAIG3-RFI-CO-SU-3160 00 Level and Location for Infill Wall ( inner ) (1st stage ) at Zone 1D Axis 01J-01K ( As Highlighted) Survey Crescent 10/19/22 10/20/22 Approved as noted

2A 6 KAIG3-RFI-CO-SU-3161 00 Level and Location for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 ( As Highlighted ) Survey Crescent 10/19/22 10/20/22 Approved as noted

2K 6 KAIG3-RFI-MC-SU-3162 00 Level and Location for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (as highlighted) TOC 875.974 & 875.850 Survey MCPE 2 10/18/22 10/20/22 Approved as noted

Level and Location for COLUMNS C2 & C3 at Zone 2N Child Care ( As Highlighted) (C2 -4 nos) (C3 -1 no) Upto bottom of
2N 6 KAIG3-RFI-CC-SU-3163 00 Survey Child Care 10/19/22 10/20/22 Approved as noted
Slab

Level and Location for 3rd Layer Mass Concrete Under Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings and Strip
1E 6 KAIG3-RFI-CO-SU-3164 00 Survey Crescent 10/18/22 10/20/22 Approved as noted
Footing) (As Highlighted)

23 6 KAIG3-RFI-CO-SU-3165 00 Level and Location for Foundation of Retaining wall at Axis 01U-01W (as highlighted) Zone 2 & 3 Survey Crescent 10/19/22 10/20/22 Approved as noted

2C 6 KAIG3-RFI-CO-SU-3166 00 Level and location for Excavation of Diaphragm wall at zone 2C , Axis 02J (as highlighted) Survey Crescent 10/19/22 10/22/22 Approved as noted

5 5 KAIG3-RFI-CO-SU-3167 00 Level and location for Excavation for Retaining wall Foundation at Zone 5 at axis 01G - (after) 01E (As Highlighted) Survey Crescent 10/20/22 10/24/22 Approved as noted

5 5 KAIG3-RFI-CO-SU-3168 00 Level and Location for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E (as highligted) Survey Crescent 10/20/22 10/23/22 Approved as noted

1A 6 KAIG3-RFI-CO-SU-3169 00 Level and Location for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted) 869.10 Survey Crescent 10/20/22 10/22/22 Approved as noted

6 6 KAIG3-RFI-CO-SU-3170 00 Level and Location for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as highlighted) TOC 865.060 Survey Crescent 10/20/22 10/22/22 Approved as noted

1E 6 KAIG3-RFI-CO-SU-3171 00 Level and Location for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As Highlighted) 865.00, 864.50 Survey Crescent 10/20/22 10/25/22 Approved as noted

Level and Location For Columns at North Administration Building First Floor Zone 2R As Highlighted Axis 02BB TO 02AZ
2R 6 KAIG3-RFI-NA-SU-3172 00 From 873.725 TO 876.80 (C75, C59, 28 C15, C14, C27, C58, C74, C11, C10, C26, C25, C57, C71, C56, C70,) and 873.725 TO Survey Crescent 10/22/22 10/25/22 Approved as noted
875.80 (C38, C37, C3

kaig-qcals 55
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

Coordinates & Levels for Blinding under Foundation of Mechanical Room, at Grid (F-H/10-11), at Management and
4B 4 KAIG3-RFI-MB-SU-3173 00 Survey Management Building 10/23/22 10/25/22 Approved as noted
Maintenance Building, As Highlighted in attached Drawings.

5A 5 KAIG3-RFI-EC-SU-3174 00 Level and Location for Energy Center Internal Column (neck) at Axis 7/D-G , 8-10/D-H , 11-12/ D (as highlighted) Survey Energy Center 10/20/22 10/22/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3175 00 Level and Location for Energy Center Beam Grid 18-30/R (As Highlighted) at Level 878.50 Survey Energy Center 10/20/22 10/22/22 Approved as noted

Level and location for Excavation for Strip footing Between PC (71-73-75-77- ) and PC ( 72-74-76-78 ) at Zone 1M (As
1M 6 KAIG3-RFI-CO-SU-3176 00 Survey Crescent 10/20/22 10/22/22 Approved as noted
Highlighted)

Level and Location for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As Highlighted) Level from 863.55 -
2A 6 KAIG3-RFI-CO-SU-3177 00 Survey Crescent 10/22/22 10/23/22 Approved as noted
869.10

Level and Location for Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (as highlighted) TOC
1M 6 KAIG3-RFI-CO-SU-3178 00 Survey Crescent 10/22/22 10/23/22 Approved as noted
865.430

Level and Location for Columns of Energy Center, Grid 22-27/M ( 21 nos ) & Grid 28-30/R-N ( 27 nos ) upto Level 878.00 (As
5A 5 KAIG3-RFI-EC-SU-3179 00 Survey Energy Center 10/22/22 10/23/22 Approved as noted
Highlighted)

Level and Location for Large Mosque for Upper First Floor for Columns ( C4,C5,C1B ) & Walls ( W5 ) , Axis C-E, 2-5 Zone
1G 6 KAIG3-RFI-LM-SU-3180 00 Survey Large Mosque 10/22/22 10/23/22 Approved as noted
2G (as highlighted)

1E 6 KAIG3-RFI-CO-SU-3181 00 Level and Location for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P (As Highlighted) Survey Crescent 10/22/22 10/23/22 Approved as noted

2G 6 KAIG3-RFI-MC-SU-3182 00 Level and Location for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G (As Highlighted ) Survey MCPE 2 10/22/22 10/23/22 Approved as noted

3 6 KAIG3-RFI-CO-SU-3183 00 Level and Location for blinding of retaining wall foundation zone 3 from axis 01P-01S (as highligted) Survey Crescent 10/22/22 10/25/22 Approved as noted

Level and Location for Large Mosque for Upper First Floor for Columns & Walls ( C1 ) , Axis C-E, 2-5 Zone 1G (as
2G 6 KAIG3-RFI-LM-SU-3184 00 Survey Large Mosque 10/24/22 10/25/22 Approved as noted
highlighted)

5A 5 KAIG3-RFI-CO-SU-3185 00 Level and Location for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As Highlighted) Survey Energy Center 10/23/22 10/25/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3186 00 Level and Location for Energy Center, Beam at level 875.35 Grid 0-4/C-A (As Highlighted) Survey Energy Center 10/23/22 10/25/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3187 00 Level and Location for Columns of Energy Center at Grid 0-1/C (1 no ) Level 874.85 (As Highlighted) Survey Energy Center 10/23/22 10/25/22 Approved as noted

1E 6 KAIG3-RFI-CO-SU-3188 00 Level and Location for Diaphragm wall ( 2nd Span ) Vertical Wall at zone 1E Axis 01P (As Highlighted) upto Level 868.50 Survey Crescent 10/23/22 10/24/22 Approved as noted

2N 6 KAIG3-RFI-CC-SU-3189 00 Level and Location for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as highlighted) Upto bottom of Slab Survey Child Care 10/23/22 10/25/22 Approved as noted

Coordinates and Levels of Blinding under Decant Sump-D1 at Boat garden, inside Water Garden as highlighted area in attached
4B 4 KAIG3-RFI-WG-SU-3190 00 Survey Water Play Garden 10/23/22 10/26/22 Approved as noted
drawing's.

2F 6 KAIG3-RFI-CO-SU-3191 00 Level and Location for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted) Survey Crescent 10/24/22 10/25/22 Approved as noted

Level and Location for Mass concrete under Strip footing ( INNER ) (1st Layer )at Zone 1M Between PC 72-74 &PC 76-78 (as
1M 6 KAIG3-RFI-CO-SU-3192 00 Survey Crescent 10/24/22 10/25/22 Approved as noted
highlighted)

1E 6 KAIG3-RFI-CO-SU-3194 00 Level and Location for ( 1st span ) Beam of Diaphragm wall at zone 1E , Axis 01P (As Highlighted) upto Level 869.00 Survey Crescent 10/25/22 10/30/22 Approved as noted

1A 6 KAIG3-RFI-CO-SU-3195 00 Level and Location for first floor TIP Zone 1A Axis 01A (as highlighted) Level 873.05 Survey Crescent 10/25/22 10/30/22 Approved as noted

2G 6 KAIG3-RFI-MC-SU-3196 00 Level and Location for MCPE 2 Duct tunnel Suspened Slab at Axis 03E and 03F, Zone 2G (As Highlighted ) Level 874.80 Survey MCPE 2 10/26/22 10/30/22 Approved as noted

kaig-qcals 56
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

1L 6 KAIG3-RFI-CO-SU-3197 00 Level and Location for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and 01AI to 01AJ (As Highlighted) Survey Crescent 10/26/22 10/30/22 Approved as noted

Level and Location for Large Mosque for (upper first floor) for Beams (B119, B120, B131, B132, B133, B127, B128) Zone 1G
1G 6 KAIG3-RFI-LM-SU-3198 00 Survey Large Mosque 10/26/22 10/30/22 Approved as noted
as highlighted upto Level 878.03.

6&7 6 KAIG3-RFI-CO-SU-3199 00 Level and Location for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted) Survey Crescent 10/26/22 10/30/22 Approved as noted

1A 6 KAIG3-RFI-CO-SU-3200 00 Level and Location for Ring Beam (Inner) at Zone 1A, Axis 01B-01D (as highlighted), Level at 877.500 Survey Crescent 10/8/22 10/30/22 Approved as noted

2K 6 KAIG3-RFI-CO-SU-3201 00 Level and Location for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF ( As Highlighted) Survey Crescent 10/26/22 10/30/22 Approved as noted

1D 6 KAIG3-RFI-CO-SU-3202 00 Level and Location for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) ( As Highlighted) Survey Crescent 10/26/22 10/30/22 Approved as noted

4 6 KAIG3-RFI-CO-SU-3203 00 Level and Location for Front Canopy Foundation (3nos) at Zone 4 Axis 01J, 01I, 01H (As Highlighted) TOC 865.05 Survey Crescent 10/27/22 10/30/22 Approved as noted

Level and Location For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB , Walls ( W18 , W17 ,W5 , W6 ,
2R 6 KAIG3-RFI-NA-SU-3204 00 Survey North Admin Building 10/27/22 10/30/22 Approved as noted
W16 , W4 , W15 , W3 ) first Floor upto 876.80 (As Highlighted ) upto 876.80

Level and Location for Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-22/N , 12-19/O-P , 21-22/O-P
5A 5 KAIG3-RFI-EC-SU-3205 00 Survey Energy Center 10/27/22 10/29/22 Approved as noted
(as highlighted)

5A 5 KAIG3-RFI-EC-SU-3206 00 Level and Location for Energy Center,Beam at Grid 7-11/A at level 881.50 (As Highlighted) Survey Energy Center 10/27/22 10/29/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-3207 00 Level and Location for Energy Center, columns at Grid 28-30/M-N ( 20 nos ) at level 878.00 (As Highlighted) Survey Energy Center 10/27/22 10/29/22 Approved as noted

Coordinates & Levels of Blinding under Fountain 2 (Inner) (2 nos) Inside Physic Garden as highlighted area in attached
4D 4 KAIG3-RFI-PG-SU-3208 00 Survey Physic Garden 10/27/22 10/29/22 Approved as noted
drawing's.

Coordinates and Levels of Blinding under Decant Sump-D2 at Geyser Garden, inside Water Garden as highlighted area in
4A 4 KAIG3-RFI-WG-SU-3209 00 Survey Water Play Garden 10/27/22 10/29/22 Approved as noted
attached drawing's & KAIG3-SCR-WG-S-0212-00-Reply.

Coordinates & Levels for Foundation & Kicker of Decant Sump-D4 Inside Water Play garden, at Water Garden as highlighted
4A 4 KAIG3-RFI-WG-SU-3210 00 Survey Water Play Garden 10/27/22 10/29/22 Approved as noted
area in attached drawing's.

Coordinates and Levels of Blinding under Decant Sump-D3 at Mist Garden, inside Water Garden as highlighted area in attached
4A 4 KAIG3-RFI-WG-SU-3211 00 Survey Water Play Garden 10/27/22 10/30/22 Approved as noted
drawing's & KAIG3-SCR-WG-S-0212-00-Reply.

2H 6 KAIG3-RFI-MC-SU-3213 00 Level and Location for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as highlighted) 874.80 Zone 2H Survey MCPE 2 10/29/22 10/30/22 Approved as noted

2J 6 KAIG3-RFI-MC-SU-3214 00 Level and Location for MCPE 2 Inner wall and Counter fort at Axis 03K to 02AD (as highlighted) 875.55 Zone 2J Survey MCPE 2 10/29/22 10/30/22 Approved as noted

Level and Location for Mass concrete (2nd layer) under Strip footing (inner) at Zone 1M Between PC 72-74 & 76-78 (as
1M 6 KAIG3-RFI-CO-SU-3215 00 Survey Crescent 10/29/22 10/30/22 Approved as noted
highlighted) TOC 865.430, 865.930

Level and location for Excavation for Retaining wall Foundation Between axis before 01Z to after 01Y at Zone 2 & 3 (As
2&3 3 KAIG3-RFI-CO-SU-3216 00 Survey Crescent 10/30/22 10/31/22 Approved as noted
Highlighted)

2&3 3 KAIG3-RFI-CO-SU-3217 00 Level and Location for Retaining wall (Blinding) Between axis before 01Z to after 01Y at Zone 2 & 3 (As Highlighted) Survey Crescent 10/30/22 10/31/22 Approved as noted

Level and Location for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns (C3 (1 no.) at Zone 2N Child
2N 6 KAIG3-RFI-CC-SU-3218 00 Survey Child Care 10/30/22 10/31/22 Approved as noted
Care (As Highlighted) Upto Bottom Level of Suspended Slab

Coordinates & Levels for Wall of Fountain 1 (1 no's) at Right side of Outer Canopy 3, Inside Physic Garden as highlighted area
4D 4 KAIG3-RFI-PG-SU-3221 00 Survey Physic Garden 10/30/22 10/31/22 Approved as noted
in attached drawing's.

kaig-qcals 57
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

5A 5 KAIG3-RFI-EC-SU-03271 00 Level and Location for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highlighted) Survey Energy Center 11/10/22 11/12/22 Approved as noted

Level and Location for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25, O-Q , 26, O-Q , 27-28, O-Q , 29,
5A 5 KAIG3-RFI-EC-SU-03272 00 Survey Energy Center 11/10/22 11/12/22 Approved as noted
N-O (As Highlighted)

2M 6 KAIG3-RFI-VG-SU-03273 00 Level and Location for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 864.50 Survey Devonian Garden 11/10/22 11/13/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-03274 00 Level and Location for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level 877.00 to 882.30 (As Highlighted) Survey Energy Center 11/10/22 11/12/22 Approved as noted

2C 6 KAIG3-RFI-CO-SU-03275 00 Level and Location for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted) 868.50 Survey Crescent 11/10/22 11/12/22 Approved as noted

1M 6 KAIG3-RFI-CO-SU-03276 00 Level and Location for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted) Survey Crescent 11/12/22 11/14/22 Approved as noted

Level and Location for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Highlighted ) Toc 877.05
2R 6 KAIG3-RFI-NA-SU-03277 00 Survey North Admin Building 11/12/22 Open

2B 6 KAIG3-RFI-CO-SU-03278 00 Level and Location for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted) Survey Crescent 11/12/22 11/13/22 Approved as noted

Level and Location for Lower Second Slab Upstand (UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F ) (As Highlighted)
1G 6 KAIG3-RFI-LM-SU-03279 00 Survey Large Mosque 11/12/22 11/14/22 Approved as noted
Level from 878.10 to 879.25

67 6 KAIG3-RFI-CO-SU-03280 00 Level and Location for Blinding under Foundation of Retaining wall at axis 02C Zone 6 & 7 (as highlighted) Survey Crescent 11/12/22 11/15/22 Approved as noted

2H 6 KAIG3-RFI-MC-SU-03281 00 Level and Location for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted) Survey MCPE 2 11/12/22 11/14/22 Approved as noted

Coordinates & Levels of Blinding under Foundation of Water Feature Pump Room, at Butterfly Garden, as highlighted area in
4C 4 KAIG3-RFI-TG-SU-3282 00 Survey Butterfly Garden 11/12/22 11/13/22 Approved as noted
attached drawing's.

Coordinates & Levels of Blinding under Foundations of Internal Garden, Inside Aviary Garden, As per Highlighted in attached
4B 4 KAIG3-RFI-AG-SU-3284 00 Survey Aviary Garden 11/13/22 11/14/22 Approved as noted
Drawing's.

2K 6 KAIG3-RFI-MC-SU-03285 00 Level and Location for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone 2K (as highlighted) Survey MCPE 2 11/13/22 11/15/22 Approved as noted

5A 5 KAIG3-RFI-EC-SU-03286 00 Level and Location for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 878.50 Survey Energy Center 11/13/22 Open

Level and Location for strip foundation of retaining block wall strip footing Zone 2R North Admin building (KAIG3-SCR-GN-
2R 6 KAIG3-RFI-NA-SU-03287 00 Survey North Admin Building 11/13/22 11/14/22 Approved as noted
S-0147-00)

1E 6 KAIG3-RFI-CO-SU-03288 00 Level and Location for Diaphragm wall ( Inclined ) at Zone 1E Axis 01P (As Highlighted) Level 868.50 Survey Crescent 11/14/22 Open

2&3 6 KAIG3-RFI-CO-SU-03289 00 Level and Location for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as highlighted) Survey Crescent 11/14/22 Open

1N 6 KAIG3-RFI-CO-SU-03295 00 Level and Location for Diaphragm wall , Columns and Walls at zone 1N , Axis 01AM (As Highlighted) upto 872.50 Survey Crescent 11/16/22 Open

Level and Location for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , Level from 864.866-868.75 (As
6&7 6 KAIG3-RFI-CF-SU-03296 00 Survey Crescent 11/16/22 Open
Highlighted )

KAIG3-RFI-CO-SU-03297 00 Level and Location or Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted)

2M 6 KAIG3-RFI-VG-SU-03298 00 Level and Location for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80 Survey Devonian Garden 11/17/22 Open

Level and Location for Large Mosque for ( Lower Second Floor ) Beams ( B206 & B 207 ) Zone 1G , Level fromm 878.10 to
1G 6 KAIG3-RFI-LM-SU-03299 00 Survey Crescent 11/17/22 Open
878.45 (As Highlighted)

2N 6 KAIG3-RFI-CC-SU-03300 00 Level and Location for Child Care ,Grade Beam at Zone 2N , (As Highlighted) Survey Child Care 11/17/22 Open

Level and Location for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , TOC : 866.83-867-33
1K 6 KAIG3-RFI-CO-SU-03301 00 Survey Crescent 11/17/22 Open
( As higlighted )

KAIG3-RFI-CO-SU-03302 00 Level and Location for Infill wall (upper part) outer Zone 1A between axis 01A-01B (as highlighted) TOC 877.500

kaig-qcals 58
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
0 169 37 12 743 2323 49 3333
SURVEY
SUB Date STATUS Remarks
SI No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

kaig-qcals 59
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 60
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

2R 6 KAIG3-RFI-CO-S-8340 1 Anti termite for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (as highlighted) at CRESCENT Structural Crescent 10/17/22 10/18/22 Code C (not resubmit)

Steel reinforcements for Cafeteria (undercroft) Wall (W18 & 19) as highlighted, upto 869.100 zone 2A (KAIG3-SCR-CF-S-0194-00
2A 6 KAIG3-RFI-CF-S-9527 00 Structural Cafeteria 10/2/22 10/5/22 Code C (resubmit)
with attachments)

Solvent Base Primer Coating prior to Membrane Water proofing on Blinding of Decant Sump-D4 Inside Water Play garden, at Water
4A 4 KAIG3-RFI-WG-S-9565 00 Structural Water Play Garden 10/4/22 10/6/22 Code C (resubmit)
Garden as highlighted area in attached drawing's.

Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Decant Sump-D4 Inside Water Play garden, at
4A 4 KAIG3-RFI-WG-S-9566 00 Structural Water Play Garden 10/4/22 10/6/22 Code C (resubmit)
Water Garden as highlighted area in attached drawing's.

2A 6 KAIG3-RFI-CO-S-9762 00 Concreting for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 (As Highlighted) Structural Crescent 10/25/22 10/27/22 Code C (not resubmit)

Inspection for 2nd Coat Epoxy (Nitocote EP405), for Inner Surfaces of tank of Wet Well F, Inside Water Garden as highlighted area in
4A 4 KAIG3-RFI-WG-S-9764 00 Structural Water Play Garden 10/18/22 10/24/22 Code C (not resubmit)
attached drawing's.

1A 6 KAIG3-RFI-CO-S-9796 00 Concreting for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted) 869.10 Structural Crescent 10/20/22 10/27/22 Code C (not resubmit)

1M 6 KAIG3-RFI-CO-S-9811 00 Concreting for Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (as highlighted) TOC 865.430 Structural Crescent 10/24/22 10/26/22 Code C (not resubmit)

1M 6 KAIG3-RFI-CO-S-9869 00 Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC 72-74 & PC 76-78(as highlighted) Structural Crescent 10/25/22 10/27/22 Code C (not resubmit)

Inspection for 2nd Coat Epoxy (Nitocote EP405), for All Inner Surfaces of tank Wet Well E, Inside Water Garden as highlighted area Water Play Garden/Wet
4A 4 KAIG3-RFI-WG-S-9884 00 Structural 10/25/22 10/27/22 Code C (not resubmit)
in attached drawing's. Well

Concreting for Mass concrete (2nd layer) under Strip footing (inner) at Zone 1M Between PC 72-74 & 76-78 (as highlighted) TOC
1M 6 KAIG3-RFI-CO-S-9950 00 Structural Crescent 10/29/22 10/31/22 Code C (not resubmit)
865.430, 865.930

Steel reinforcements for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Level from 863.55-868.75 ,
2A 6 KAIG3-RFI-CF-S-10055 00 Structural Cafeteria 11/5/22 11/6/22 Approved as noted
KAIG3-SCR-CO-S-0194-01

Concrete Pouring & Shuttering for Ring Beams at Entrance of Back of House @ Grid (17-21/Left Side) or 30 to 32, on Boundary wall
4B 4 KAIG3-RFI-AG-S-10056 00 Structural Aviary Garden 11/5/22 Open
at Aviary Garden, As per Highlighted in attached Drawing's.

4D 4 KAIG3-RFI-PG-S-10057 00 Concrete Pouring & Shuttering for Fountain 2 (Outer) (4 nos) Inside Physic Garden as highlighted area in attached drawing's. Structural Physic Garden 11/7/22 Open

1E 6 KAIG3-RFI-CO-S-10058 00 Steel Reinfocements for Diaphragm wall ( Inclined ) ( 1st Span) at zone 1E Axis 01P (As Highlighted) Structural Crescent 11/6/22 11/10/22 Approved as noted

1M 6 KAIG3-RFI-CO-S-10059 00 Steel Reinforcement for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted) Structural Crescent 11/6/22 Open

1M 6 KAIG3-RFI-CO-S-10060 00 Shuttering for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted) Structural Crescent 11/6/22 Open

1M 6 KAIG3-RFI-CO-S-10061 00 Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted) Structural Crescent 11/8/22 11/10/22 Approved as noted

1G 6 KAIG3-RFI-LM-S-10064 00 Steel Reinforcment for Large Mosque for ( Lower Second Floor ) for Slab &Beams Zone 1G (As Highlighted) Upto Level 878.10 Structural Large Mosque 11/6/22 11/6/22 Approved as noted

1G 6 KAIG3-RFI-LM-S-10065 00 Shuttering for Large Mosque for ( Lower Second Floor ) for Slab & Beams Zone 1G (As Highlighted) Upto Level 878.10 Structural Large Mosque 11/6/22 11/8/22 Approved as noted

Shuttering for Large Mosque for ( Upper second Floor ) for Two Columns and Wall ,Column ( C 1A ) Wall ( W5 ), Zone 1G (As
1G 6 KAIG3-RFI-LM-S-10067 00 Structural Large Mosque 11/6/22 Open
Highlighted) Level upto 880.30 & 879.90
Concreting for Large Mosque for ( Upper second Floor ) for Two Columns and Wall ,Column ( C 1A ) Wall ( W5 ), Zone 1G (As
1G 6 KAIG3-RFI-LM-S-10068 00 Structural Large Mosque 11/12/22 Open
Highlighted) Level upto 880.30 & 879.90

1G 6 KAIG3-RFI-LM-S-10069 00 Steel Reinforcement for Large Mosque Parapet for Zone 1G Axis ( 5-6 / C-F ) (As Highlighted) Upto Level 879.25 Structural Large Mosque 11/6/22 11/8/22 Approved as noted

4A 4 KAIG3-RFI-WG-S-10070 00 Leak Test for Tank of Wet Well E, Inside Water Garden as highlighted area in attached drawing's. Structural Water Play Garden 11/6/22 Open

4D 4 KAIG3-RFI-PG-S-10071 00 Steel Reinforcement for Fountain 2 (Inner) (2 nos), Inside Physic Garden as highlighted area in attached drawing's. Structural Physic Garden 11/6/22 Open

1D 6 KAIG3-RFI-CO-S-10072 00 Steel Reinforcements for Infill wall (inner) ( Stage 2 ) at Zone 1D at Axis 01K-01J (as highlighted) Structural Crescent 11/6/22 Open

5A 5 KAIG3-RFI-EC-S-10073 00 Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P , 21-24/P , 23-24/Q, (As Highlighted) Structural Energy Center 11/6/22 Open

5A 5 KAIG3-RFI-EC-S-10074 00 Concreting of Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P , 21-24/P , 23-24/Q, (As Highlighted) Structural Energy Center 11/6/22 Open

5A 5 KAIG3-RFI-EC-S-10075 00 Antitermite under Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/Q (As Highlighted) Structural Energy Center 11/6/22 Open

5A 5 KAIG3-RFI-EC-S-10076 00 Shuttering for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/Q (As Highlighted) Structural Energy Center 11/6/22 Open

5A 5 KAIG3-RFI-EC-S-10077 00 Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/O (As Highlighted) Structural Energy Center 11/6/22 Open

2 6 KAIG3-RFI-CO-S-10078 00 Steel Reinforcements for Kicker and wall of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted) Structural Crescent 11/6/22 11/8/22 Approved as noted

1N 6 KAIG3-RFI-CO-S-10082 00 Steel Reinforcements for Diaphragm wall , Columns and Walls ( Right Span ) at zone 1N , Axis 01AM (As Highlighted) upto 874.50 Structural Crescent 11/7/22 11/8/22 Approved as noted

Surface Preparation and primer Coating for Foundation of Devonian Garden , Zone 2M , Between Axis 02AM-02AO ( As
2M 6 KAIG3-RFI-VG-S-10083 00 Structural Devonian Garden 11/7/22 11/10/22 Approved as noted
Highlighted)
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane for Foundation of Devonian Garden , Zone 2M ,
2M 6 KAIG3-RFI-VG-S-10084 00 Structural Devonian Garden 11/7/22 11/10/22 Approved as noted
Between Axis 02AM-02AO ( As Highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for Foundation of Devonian Garden , Zone 2M , Between Axis 02AM-
2M 6 KAIG3-RFI-VG-S-10085 00 Structural Devonian Garden 11/7/22 11/10/22 Approved as noted
02AO ( As Highlighted)

2M 6 KAIG3-RFI-VG-S-10086 00 Shuttering for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 Structural Devonian Garden 11/7/22 Open

2M 6 KAIG3-RFI-VG-S-10087 00 Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 Structural Devonian Garden 11/8/22 11/12/22 Approved as noted

Shuttering for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Level to 868.75 , KAIG3-SCR-CO-S-
2A 6 KAIG3-RFI-CF-S-10088 00 Structural Cafeteria 11/7/22 11/10/22 Approved as noted
0194-01

Concreting for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Level to 868.75 , KAIG3-SCR-CO-S-
2A 6 KAIG3-RFI-CF-S-10089 00 Structural Cafeteria 11/8/22 11/10/22 Approved as noted
0194-01

2A 6 KAIG3-RFI-CF-S-10090 00 Shuttering for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As Highlighted ) Level Upto 864.866 Structural Cafeteria 11/7/22 11/10/22 Approved as noted

Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As Highlighted ) Level Upto 864.866 ( KAIG3-
2A 6 KAIG3-RFI-CF-S-10091 00 Structural Cafeteria 11/7/22 11/10/22 Approved as noted
SCR-CO-S-0196-00 )

2A 6 KAIG3-RFI-CF-S-10092 00 Shuttering for wall (W4) at cafeteria undercroft, Zone 2A (as highlighted) Structural Cafeteria 11/7/22 11/10/22 Approved as noted

2A 6 KAIG3-RFI-CF-S-10093 00 Concreting for wall (W4) at cafeteria undercroft, Zone 2A (as highlighted) Structural Cafeteria 11/7/22 11/10/22 Approved as noted

Shuttering for Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level upto 867.92 , KAIG3-SCR-CO-
2A 6 KAIG3-RFI-CF-S-10094 00 Structural Cafeteria 11/7/22 11/10/22 Approved as noted
S-0196-00

kaig-qcals 61
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D
Concreting for Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level upto 867.92 , KAIG3-SCR-CO-
2A 6 KAIG3-RFI-CF-S-10095 00 Structural Cafeteria 11/8/22 11/10/22 Approved as noted
S-0196-00

2J 6 KAIG3-RFI-MC-S-10096 00 Steel Reinforcement for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As Highlighted ) Level 875.85 Structural MCPE 2 11/7/22 Open

Surface Preparation and Primer Coating on Blinding under Foundation of Retaining wall,From Axis 02E-02C, Zone 6&7 (As
6&7 6 KAIG3-RFI-CO-S-10097 00 Structural Crescent 11/8/22 11/10/22 Approved as noted
Highlighted)
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane on Blinding under Foundation of Retaining wall,From
6&7 6 KAIG3-RFI-CO-S-10098 00 Structural Crescent 11/8/22 11/12/22 Approved as noted
Axis 02E-02C, Zone 6&7 (As Highlighted)
Protection Layer of 4mm thick Bituminous Protection Board on Blinding under Foundation of Retaining wall From Axis 02E-02C,
6&7 6 KAIG3-RFI-CO-S-10099 00 Structural Crescent 11/8/22 11/12/22 Approved as noted
Zone 6&7 (As Highlighted)

6&7 6 KAIG3-RFI-CO-S-10100 00 Cementitious waterproofing on Blinding under Foundation of Retaining wall, From Axis 02E-02C, Zone 6&7 (As Highlighted) Structural Crescent 11/8/22 11/10/22 Approved as noted

2B 6 KAIG3-RFI-CO-S-10101 00 Steel Reinforcements for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted) Structural Crescent 11/8/22 11/10/22 Approved as noted

Protection Layer of 4mm thick Bituminous Protection Board for (1st) AHU top of Foundation and Wall upto level 869.65 for
2M 6 KAIG3-RFI-VG-S-10102 00 Structural Devonian Garden 11/8/22 11/12/22 Approved as noted
Devonian Garden Zone 2M (as highlighted)

5A 5 KAIG3-RFI-EC-S-10103 00 Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 24/N-O , 25/N (As Highlighted) Structural Energy Center 11/8/22 11/12/22 Approved as noted

2A 6 KAIG3-RFI-CO-S-10105 00 Shuttering for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55 to 869.10 Structural Crescent 11/8/22 11/10/22 Approved as noted

2A 6 KAIG3-RFI-CO-S-10106 00 Concreting for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55 to 869.10 Structural Crescent 11/14/22 Open

Surface Preparation and Primer Coating for Central Bridge Abutment Rc Footing ( Top and Inner Side ), zone 4 , Axis 02AG-02AH
4 4 KAIG3-RFI-PC-S-10107 00 Structural Central Bridge 11/8/22 11/14/22 Approved as noted
(As Highlighted) Level upto 864.60

Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Central Bridge Abutment Rc Footing ( Top and Inner
4 4 KAIG3-RFI-PC-S-10108 00 Structural Central Bridge 11/8/22 11/12/22 Approved as noted
Side ), zone 4 , Axis 02AG-02AH (As Highlighted) Level upto 864.60

4 4 KAIG3-RFI-CO-S-10109 00 Surface Preparation and primer coating for RC footing ( Top and Side ) of diaphragm wall at Zone 4 , Axis 01P (As Highlighted) Structural Crescent 11/8/22 11/10/22 Approved as noted

Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for RC footing ( Top and Side ) of diaphragm wall at
4 4 KAIG3-RFI-CO-S-10110 00 Structural Crescent 11/8/22 11/12/22 Approved as noted
Zone 4 , Axis 01P (As Highlighted)

4 4 KAIG3-RFI-CO-S-10111 00 Surface Preparation and primer coating for diaphragm wall ( Vertical Wall Only ) at Zone 4 , Axis 01P (As Highlighted) upto 868.50 Structural Crescent 11/8/22 11/12/22 Approved as noted

Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for for diaphragm wall ( Vertical Wall Only ) at Zone 4 ,
4 4 KAIG3-RFI-CO-S-10112 00 Structural Crescent 11/8/22 11/12/22 Approved as noted
Axis 01P (As Highlighted) upto 868.50
Steel Reinforcement for Large Mosque Lower Second Floor ( Slab and UB3 ) for, Zone 1G Axis ( 1-2 / D-F ) (As Highlighted) Upto
1G 6 KAIG3-RFI-LM-S-10113 00 Structural Large Mosque 11/9/22 11/13/22 Approved as noted
Level 878.1

1E 6 KAIG3-RFI-CO-S-10114 00 Steel Reinforcements for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted) Structural Crescent 11/9/22 11/13/22 Approved as noted

2&3 6 KAIG3-RFI-CO-S-10115 00 Shuttering for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted) Structural Structural 11/9/22 11/12/22 Approved as noted

2&3 6 KAIG3-RFI-CO-S-10116 00 Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted) Structural Structural 11/9/22 11/12/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10117 00 Steel Reinforcements for Columns of Energy Center at Grid 7-14/L (24 nos) (As Highlighted) Level upto 881.00 Structural Energy Center 11/9/22 11/12/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10118 00 Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R Highlighted) Structural Energy Center 11/9/22 11/10/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10119 00 Steel Reinforcements for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 878.50 Structural Energy Center 11/9/22 11/12/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10120 00 Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As Highlighted) Structural Energy Center 11/9/22 11/10/22 Approved as noted

2&3 6 KAIG3-RFI-CO-S-10121 00 Shuttering for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted) Structural Crescent 11/9/22 11/13/22 Approved as noted

2&3 6 KAIG3-RFI-CO-S-10122 00 Concreting for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted) Structural Crescent 11/9/22 11/13/22 Approved as noted

1G 6 KAIG3-RFI-LM-S-10123 00 Shuttering for Large Mosque Lower Second Floor Slab for Zone 1G Axis ( 1-2 / D-F ) (As Highlighted) Upto Level 878.1 Structural Large Mosque 11/9/22 11/12/22 Approved as noted

2C 6 KAIG3-RFI-CO-S-10125 00 Steel Reinforcements for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted) Structural Crescent 11/10/22 11/13/22 Approved as noted

2M 6 KAIG3-RFI-CO-S-10126 00 Shuttering for Infill wall at Zone 2M at Axis 02AO (as highlighted) Structural Crescent 11/9/22 11/12/22 Approved as noted

2M 6 KAIG3-RFI-CO-S-10127 00 Concreting for Infill wall at Zone 2M at Axis 02AO (as highlighted) Structural Crescent 11/9/22 11/13/22 Approved as noted

2K 6 KAIG3-RFI-MC-S-10128 00 Shuttering for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to 02AG zone 2K (as highlighted) Structural MCPE 2 11/9/22 11/13/22 Approved as noted

2K 6 KAIG3-RFI-MC-S-10129 00 Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to 02AG zone 2K (as highlighted) Structural MCPE 2 11/9/22 11/13/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10132 00 Antitermite under Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highlighted) Structural Energy Center 11/10/22 11/13/22 Approved as noted

5A 5 KAIG3-RFI-EC-S-10133 00 Shuttering for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20 , N-Q (As Highlighted) Structural Energy Center 11/10/22 Open

5A 5 KAIG3-RFI-EC-S-10134 00 Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highlighted) Structural Energy Center 11/10/22 Open

Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25/O-Q , 26/O-Q , 27-28/O-Q , 29/N-O (As
5A 5 KAIG3-RFI-EC-S-10135 00 Structural Energy Center 11/10/22 Open
Highlighted)

Concreting for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25 , O-Q , 26 , O-Q , 27-28 , O-Q , 29 , N-O (As
5A 5 KAIG3-RFI-EC-S-10136 00 Structural Energy Center 11/10/22 Open
Highlighted)

2M 6 KAIG3-RFI-VG-S-10137 00 Shuttering for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 864.50 Structural Devonian Garden 11/10/22 Open

2M 6 KAIG3-RFI-VG-S-10138 00 Concreting for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 874.50 Structural Devonian Garden 11/12/22 Open

5A 5 KAIG3-RFI-EC-S-10139 00 Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level 877.00 to 882.30 (As Highlighted) Structural Energy Center 11/10/22 Open

Surface Preparation and Repair (with Nitobond AR and HS extra) for Footing of Boundary Wall at Span 49 from Inner side of Water
4B 4 KAIG3-RFI-WG-S-10140 00
Garden, as highlighted area in attached drawing's and to Close the NCR no. KAIG3-NCR-GN-S-0008-00
Structural Water Play Garden 11/10/22 11/14/22 Approved as noted

Surface Preparation prior to Water proofing for External Surfaces of Wet Well E (All Sides), Inside Water Garden as highlighted area
4A 4 KAIG3-RFI-WG-S-10141 00 Structural Water Play Garden 11/10/22 Open
in attached drawing's.

2C 6 KAIG3-RFI-CO-S-10142 00 Shuttering for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted) 868.50 Structural Crescent 11/10/22 Open

2C 6 KAIG3-RFI-CO-S-10143 00 Concreting for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted) 868.50 Structural Crescent 11/10/22 Open

1M 6 KAIG3-RFI-CO-S-10145 00 Steel Reinforcements for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted) Structural Crescent 11/12/22 11/15/22 Approved as noted

kaig-qcals 62
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

1M 6 KAIG3-RFI-CO-S-10146 00 Shuttering for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted) Structural Crescent 11/12/22 Open

1M 6 KAIG3-RFI-CO-S-10147 00 Concreting for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted) Structural Crescent 11/12/22 11/14/22 Approved as noted

Surface Preparation and Solvent Base Primer Coating Waterproofing for Footing of Boundary Wall at Span 49 from Inner side of
4B 4 KAIG3-RFI-WG-S-10148 00
Water Garden, as highlighted area in attached drawing's and to Close the NCR no. KAIG3-NCR-GN-S-0008-00
Structural Water Play Garden 11/12/22 11/14/22 Approved as noted

Single layer 4mm thick modified bituminous waterproofing membrane and Protection layer for Footing of Boundary Wall at Span 49
4B 4 KAIG3-RFI-WG-S-10149 00 Structural Water Play Garden 11/12/22 Open
from Inner side of Water Garden, as highlighted area in attached drawing's and to Close the NCR no. KAIG3-NCR-GN-S-0008-00

2R 6 KAIG3-RFI-NA-S-10150 00 Steel reinforcements for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Highlighted ) Toc 877.05 Structural North Admin Building 11/12/22 11/14/22 Approved as noted

2R 6 KAIG3-RFI-NA-S-10151 00 Shuttering for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Highlighted ) Toc 877.05 Structural North Admin Building 11/12/22 11/15/22 Approved as noted

2R 6 KAIG3-RFI-NA-S-10152 00 Concreting for roof slab of north administration building, Zone 2R, axis 02BC-02AZ (as highlighted) TOC 877.05 Structural North Admin Building 11/17/22 Open

2B 6 KAIG3-RFI-CO-S-10153 00 Shuttering for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted) Structural Crescent 11/12/22 Open

2B 6 KAIG3-RFI-CO-S-10154 00 Concreting for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted) Structural Crescent 11/12/22 11/15/22 Approved as noted

Shuttering for Lower Second Slab Upstand (UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F ) (As Highlighted) Level from
1G 6 KAIG3-RFI-LM-S-10155 00 Structural Large Mosque 11/12/22 11/14/22 Approved as noted
878.10 to 879.25

Concreting for Lower Second Slab Upstand ( UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F ) (As Highlighted) Level from
1G 6 KAIG3-RFI-LM-S-10156 00 Structural Large Mosque 11/17/22 Open
878.10 to 879.25

2M 6 KAIG3-RFI-VG-S-10157 00 Steel reinforcements for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80 Structural Devonian Garden 11/12/22 11/15/22 Approved as noted

2M 6 KAIG3-RFI-VG-S-10158 00 Steel reinforcements for Devonian garden AHU RC foundation (near 2nd) at zone 2M axis 02AM-02AL (as highlighted) Structural Devonian Garden 11/12/22 11/15/22 Approved as noted

2H 6 KAIG3-RFI-MC-S-10159 00 Steel reinforcements for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted) Structural MCPE 2 11/12/22 Open

2H 6 KAIG3-RFI-MC-S-10160 00 Shuttering for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted) Structural MCPE 2 11/12/22 11/14/22 Approved as noted

2H 6 KAIG3-RFI-MC-S-10161 00 Concrteting for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted) Structural MCPE 2 11/12/22 11/14/22 Approved as noted

Cooncrete Pouring for Blinding under Foundation of Water Feature Pump Room, at Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-S-10162 00 Structural Butterfly Garden 11/12/22 11/14/22 Approved as noted
drawing's.

Surface Preparation and Primer Coating for retaining Wall Foundation and Wall ,From Axis 02E-02F, Zone 6&7 (As Highlighted)
6&7 6 KAIG3-RFI-CO-S-10174 00 Structural Crescent 11/13/22 Open
Level upto 866.45

Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Retaining Wall Foundation and Wall ,From Axis 02E-
6&7 6 KAIG3-RFI-CO-S-10175 00 Structural Crescent 11/13/22 Open
02F, Zone 6&7 (As Highlighted) Level upto 866.45

Protection Layer of 4mm thick Bituminous Protection Board for Retaining Wall Foundation and Wall ,From Axis 02E-02F, Zone 6&7
6&7 6 KAIG3-RFI-CO-S-10176 00 Structural Crescent 11/13/22 Open
(As Highlighted) Level upto 866.45

Protection Layer of Geotextile and screed for Retaining Wall Foundation and Wall ,From Axis 02E-02F, Zone 6&7 (As Highlighted)
6&7 6 KAIG3-RFI-CO-S-10177 00 Structural Crescent 11/13/22 Open
Level upto 866.45

Steel Reinforcement for Walls of Cabin Room, ETFE Pump Room & Remaining Boundary wall, at Butterfly Garden, as highlighted
4C 4 KAIG3-RFI-TG-S-10178 00 Structural Butterfly Garden 11/13/22 Open
area in attached drawing's.

2H 6 KAIG3-RFI-MC-S-10179 00 Steel reinforcements for MCPE 2 wall and counter fort at zone 2H Between axis 02AA to 02AB TOC 875.85 (as highlighted) Structural MCPE 2 11/13/22 Open

2K 6 KAIG3-RFI-MC-S-10180 00 Shuttering for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone 2K (as highlighted) Structural MCPE 2 11/13/22 Open

2K 6 KAIG3-RFI-MC-S-10181 00 Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone 2K (as highlighted) Structural MCPE 2 11/13/22 Open

5A 5 KAIG3-RFI-EC-S-10182 00 Shuttering and Concreting for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 878.50 Structural Energy Center 11/13/22 Open

Steel Reinforcements for Stiffner of Buttress BII-9 ( Inner ( 1no ) ) and BOV- 9 & BOV-10 ( Outer ( 2 no ) ) , at Zone 1C Axis 01G
1C 6 KAIG3-RFI-CO-S-10183 00 Structural Crescent 11/13/22 Open
& 01H ( As Highlihted )

1C 6 KAIG3-RFI-CO-S-10184 00 Steel Reinforcements for Stiffner of Buttress BII-112 ( Inner ( 1no ) ), at Zone 1C Axis 01J ( As Highlihted ) Structural Crescent 11/13/22 Open

Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well F (All Sides) (upto 2m ht above
4A 4 KAIG3-RFI-WG-S-10185 00 Structural Water Play Garden 11/13/22 Open
T.O.F), Inside Water Garden as highlighted area in attached drawing's.

Single layer 4mm thick modified bituminous waterproofing membrane for External Surfaces of Wet Well F (All Sides) (upto 2m ht
4A 4 KAIG3-RFI-WG-S-10186 00 Structural Water Play Garden 11/13/22 Open
above T.O.F), Inside Water Garden as highlighted area in attached drawing's.

Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well E (All Sides) (upto 2m ht above
4A 4 KAIG3-RFI-WG-S-10187 00 Structural Water Play Garden 11/13/22 Open
T.O.F), Inside Water Garden as highlighted area in attached drawing's.

Single layer 4mm thick modified bituminous waterproofing membrane for External Surfaces of Wet Well E (All Sides) (upto 2m ht
4A 4 KAIG3-RFI-WG-S-10188 00 Structural Water Play Garden 11/13/22 Open
above T.O.F), Inside Water Garden as highlighted area in attached drawing's.

Surface Preparation and primer coating for diaphragm wall ( Vertical Wall ) at zone 4 , Axis 01P (As Highlighted) Level Upto
4 6 KAIG3-RFI-CO-S-10189 00 Structural Crescent 11/13/22 Open
868.50

Single Layer of 4mm thick Modified Bituminous Water Proofing Membrane for diaphragm wall Rc footing( Top & Side ) at Zone 4 ,
4 6 KAIG3-RFI-CO-S-10190 00 Structural Crescent 11/13/22 Open
Axis 01P (As Highlighted)

4 6 KAIG3-RFI-CO-S-10191 00 Surface Preparation and Primer Coating for diaphragm wall Rc footing( Top & Side ) at Zone 4 , Axis 01P (As Highlighted) Structural Crescent 11/13/22 Open

Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for diaphragm wall ( Vertical Wall ) at zone 4 , Axis 01P
4 6 KAIG3-RFI-CO-S-10192 00 Structural Crescent 11/13/22 Open
(As Highlighted) Level Upto 868.50

kaig-qcals 63
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D
Surface Preparation and primer coating for diaphragm wall for Foundations and wall at zone 2M axis 02AQ (As Highlighted) Level
2M 6 KAIG3-RFI-CO-S-10196 00 Structural Crescent 11/14/22 Open
Upto 870.80

Single Layer of 4 mm thick Modified Bituminous WaterProofing Membrane for diaphragm wall for Foundations and wall at zone 2M
2M 6 KAIG3-RFI-CO-S-10197 00 Structural Crescent 11/14/22 Open
axis 02AQ (As Highlighted) Level Upto 870.80

Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall for Foundations and wall at Zone 2M , Axis 02AQ
2M 6 KAIG3-RFI-CO-S-10198 00 Structural Crescent 11/14/22 Open
(As Highlighted) Level Upto 870.80

1E 6 KAIG3-RFI-CO-S-10201 00 Shuttering for Diaphragm wall ( Inclined ) at Zone 1E Axis 01P (As Highlighted) Level 868.50 Structural Crescent 11/14/22 Open

1E 6 KAIG3-RFI-CO-S-10202 00 Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level 868.75 Structural Crescent 11/16/22 Open

4B 4 KAIG3-RFI-AG-S-10203 00 Concrete Pouring for Blinding under Foundations of Internal Garden, Inside Aviary Garden, As per Highlighted in attached Drawing's. Structural Crescent 11/14/22 Open

2N 6 KAIG3-RFI-CC-S-10205 00 Steel reinforcements for Child Care Wall ( W2 ) at Zone 2N (As Highlighted) Structural Child Care 11/14/22 Open

2&3 6 KAIG3-RFI-CO-S-10106 00 Concreting for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55 to 869.10 Structural Crescent 11/14/22 Open

2&3 6 KAIG3-RFI-CO-S-10207 00 Concreting for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as highlighted) Structural Crescent 11/14/22 Open

1H 6 KAIG3-RFI-CO-S-10211 00 Shuttering for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone 1H ,at Level 865.0 & 865.50 (as highlighted) Structural Crescent 11/14/22 Open

1H 6 KAIG3-RFI-CO-S-10212 00 Concreting for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone 1H ,at Level 865.0 & 865.50 (as highlighted) Structural Crescent 11/14/22 Open

2B 2 KAIG3-RFI-TB-S-10217 00 Steel Reinforcement for Dome of New Ticketing Booth # 4A, As per Attached Highlighted Drawing's. Structural New Ticketing Booth 11/14/22 Open

2A 6 KAIG3-RFI-CO-S-10225 00 Surface Preparation and Primer Coating forStrip Foorting, at Zone 2A , Axis 02C-02D (As Highlighted) Structural Crescent 11/16/22 Open

Single Layer of 4mm thick Modified Bitumionus Water Proofing Membrane forStrip Foorting, at Zone 2A , Axis 02C-02D (As
2A 6 KAIG3-RFI-CO-S-10226 00 Structural Crescent 11/16/22 Open
Highlighted)

2M 6 KAIG3-RFI-VG-S-10227 00 Shuttering for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80 Structural Devonian Garden 11/17/22 Open

2M 6 KAIG3-RFI-VG-S-10228 00 Concreting for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80 Structural Devonian Garden 11/17/22 Open

Surface Preparation and Primer Coating for Devonian garden foundation (near 2nd) at Zone 2M , Axis 02AM-02AO, Level from
2M 6 KAIG3-RFI-VG-S-10237 00 Structural Devonian Garden 11/16/22 Open
870.4 to 871.0 (as highlighted)

Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Devonian garden foundation (near 2nd) at Zone 2M ,
2M 6 KAIG3-RFI-VG-S-10238 00 Structural Devonian Garden 11/16/22 Open
Axis 02AM-02AO, Level from 870.4 to 871.0 (as highlighted)

Protection Layer of 4mm thick Bituminous Protection Board for Devonian garden foundation (near 2nd) at Zone 2M , Axis 02AM-
2M 6 KAIG3-RFI-VG-S-10239 00 Structural Devonian Garden 11/16/22 Open
02AO, Level from 870.4 to 871.0 (as highlighted)

2A 6 KAIG3-RFI-CO-S-10240 00 Surface Preparation and Primer Coating for Infill wall ( outer Part ) , at Zone 2A , Axis 02C-02D (As Highlighted) Structural Crescent 11/16/22 Open

Single Layer of 4mm thick Modified Bituminous water Proofing Membrane for Infill wall ( outer Part ) , at Zone 2A , Axis 02C-
2A 6 KAIG3-RFI-CO-S-10241 00 Structural Crescent 11/16/22 Open
02D , from 863.00 TO 865.00 (As Highlighted)

2A 6 KAIG3-RFI-CO-S-10242 00 Steel Reinforcements for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As Highlighted) Structural Crescent 11/16/22 Open

1N 6 KAIG3-RFI-CO-S-10243 00 Shuttering for Diaphragm wall , Columns and Walls at zone 1N , Axis 01AM (As Highlighted) upto 872.50 Structural Crescent 11/16/22 Open

1N 6 KAIG3-RFI-CO-S-10244 00 Concreting for Diaphragm wall , Columns and Walls at zone 1N , Axis 01AM (As Highlighted) upto 872.50 Structural Crescent 11/16/22 Open

kaig-qcals 64
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

2A 6 KAIG3-RFI-CO-S-10245 00 Steel Reinforcements for Infill wall ( Outer ) at Zone 2A at Axis 02C-02D from 863.55 to 869.15(as highlighted) Structural Crescent 11/16/22 Open

2A 6 KAIG3-RFI-CF-S-10246 00 Shuttering for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , Level from 864.866-868.75 (As Highlighted ) Structural Cafeteria 11/16/22 Open

2A 6 KAIG3-RFI-CF-S-10247 00 Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , Level from 864.866-868.75 (As Highlighted ) Structural Cafeteria 11/16/22 Open

6&7 6 KAIG3-RFI-CO-S-10248 00 Shuttering for Retaining wall (wall) at Axis 02F to 02G Zone 6 & 7 (as highlighted) Structural Crescent 11/16/22 Open

6&7 6 KAIG3-RFI-CO-S-10249 00 Concreting for Retaining Wall at Axis 02F to 02G, Zone 6 & 7 as highlighted. Structural Crescent 11/16/22 Open

Shuttering for Large Mosque for ( Lower Second Floor ) Beams ( B206 & B 207 ) Zone 1G , Level fromm 878.10 to 878.45 (As
1G 6 KAIG3-RFI-LM-S-10250 00 Structural Large Mosque 11/17/22 Open
Highlighted)

2N 6 KAIG3-RFI-CC-S-10251 00 Steel reinforcements for Child Care Grade Beam at Zone 2N Child Care (As Highlighted) Structural Child Care 11/17/22 Open

2M 6 KAIG3-RFI-VG-S-10252 00 Steel reinforcements for Devonian garden wall , Zone 2M Axis 02AN-02AO (as highlighted) Structural Devonian Garden 11/17/22 Open

Antetermite for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , TOC : 866.83-867-33 ( As
1K 6 KAIG3-RFI-CO-S-10253 00 Structural Crescent 11/17/22 Open
higlighted )

2 6 KAIG3-RFI-CO-S-10260 00 Steel Reinforcements for Kicker and wall for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (as highlighted) Structural Crescent 11/17/22 Open

Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall for Foundations and wall at , Zone 4 , Axis01P(As
4 6 KAIG3-RFI-CO-S-10261 00 Structural Crescent 11/17/22 Open
Highlighted)

kaig-qcals 65
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 66
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 67
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 68
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 69
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

0 833 194 116 249 9230 119 10741

STRUCTURAL
SUB LOCATION DATE STATUS
No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE BUILDING Submitted Replied Approved Approved as noted Code C/Code D

kaig-qcals 70
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
1 153 6 19 14 1081 26 1299

ARCHITECTURAL
SUB Date STATUS Remarks
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

kaig-qcals 71
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
1 153 6 19 14 1081 26 1299

ARCHITECTURAL
SUB Date STATUS Remarks
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

2B 6 KAIG3-RFI-CO-A-1084 00 Installed Aluminum Caps between Axis 02/D - 02/E. Architectural Crescent 2 10/1/22 10/3/22 Code C (resubmit)

2C 6 KAIG3-RFI-CO-A-1088 00 Installed Aluminum Caps between Axis 02/H - 02/I. Architectural Crescent 2 10/1/22 10/3/22 Code C (resubmit)

1C 6 KAIG3-RFI-CO-A-1106 00 Installed ETFE Cushions (without aluminum caps) between axis 01-I/01-J. Architectural Crescent 2 10/2/22 10/4/22 Code C (resubmit)
Inspection of Plaster Guide Point and Plaster Accessories for Pump Room 6089 at Zone 1C axis 01I (as highlighted) upto 876.00
1C 6 KAIG3-RFI-CO-A-1136 00 Architectural Crescent 10/9/22 10/11/22 Code C (resubmit)

1st Layer of Block Work for First Floor at South small mosque , at Zone 2B , Axis D-E/2 , 2-4/D , 5-7/D , D-E/7 , 7-8/D , D-G/8
2B 6 KAIG3-RFI-SM-A-1244 00 Architectural South Small Mosque 11/2/22 11/3/22 Approved as noted
(As Highlighted)

Inspection of Plaster Guide Point and Plaster Accessories & Rush coat ( Spatter Dash ) of ( Inner ) for ETFE Pump Room 6113at
2G 6 KAIG3-RFI-CO-A-01245 00 Architectural Crescent 11/5/22 11/6/22 Approved as noted
Zone 2G, Axis 02W (as highlighted) Level 869.2 to 876.0

Inspection of Plaster Guide Point and Plaster Accessories of ( Outer Side ) for ETFE Pump Room 6113 at Zone 2G, Axis 02W
2G 6 KAIG3-RFI-CO-A-01246 00 Architectural Crescent 11/5/22 11/6/22 Approved as noted
(as highlighted) Level 869.2 to 876.0

Inspection of First Layer Block Layout for Walls of Toilets & Meeting Room, at Grid (1-4/A-B & 4-5/B-C), at Security & Fire
3B 3 KAIG3-RFI-FC-A-1247 00 Architectural Fire Control Building 11/5/22 11/7/22 Approved as noted
Control Building, As Highlighted in attached Drawings.
Grouting for Stone Cladding of Boundary walls (Both faces) @ Span 74 and 75 and Columns C74, C75 and C76 (All Sides), as
2B 2 KAIG3-RFI-SW-A-01248 00 Architectural Site Works/Boundary Wall 11/6/22 11/7/22 Code C (not resubmit)
Attached Highlighted Drawing's.
Inspection of Block work upto Lintel Height (9 Layers) for Walls of Toilets & Meeting Room, at Grid (1-4/A-B & 4-5/B-C), at
3B 3 KAIG3-RFI-FC-A-1249 00 Architectural Fire Control Building 11/14/22 11/14/22 Approved as noted
Security & Fire Control Building, As Highlighted in attached Drawings.
Block Work Laying for ETFE pump room No # 6046 from Lintel Beam to Bottom of Ring Beam at zone 2N axis 02AR (As
2N 6 KAIG3-RFI-CO-A-01251 00 Architectural Crescent 11/7/22 11/9/22 Approved as noted
Highlighted)
2G 6 KAIG3-RFI-CO-A-01252 00 Installed ETFE Cushions in Zone 2G between axis 02-V/02-W without Aluminum Caps. Architectural Crescent 2 11/7/22 11/8/22 Approved as noted

2G 6 KAIG3-RFI-CO-A-01253 00 Installed ETFE Cushions in Zone 2G between axis 02-W/02-X without Aluminum Caps. Architectural Crescent 2 11/7/22 11/9/22 Approved as noted

2G 6 KAIG3-RFI-CO-A-01254 00 Installed ETFE Cushions in Zone 2G between axis 02-X/02-Y without Aluminum Caps. Architectural Crescent 2 11/7/22 11/9/22 Approved as noted

2G 6 KAIG3-RFI-CO-A-01255 00 Installed Aluminum Extrusion and Base Seal between Axis 02/Y - 02/Z. Architectural Crescent 2 11/7/22 11/8/22 Approved as noted

2H 6 KAIG3-RFI-CO-A-01256 00 Installed Aluminum Extrusion and Base Seal between Axis 02/Z - 02/AA. Architectural Crescent 2 11/7/22 11/8/22 Approved as noted

2H 6 KAIG3-RFI-CO-A-01257 00 Installed Aluminum Extrusion and Base Seal between Axis 02/AA - 02/AB. Architectural Crescent 2 11/7/22 11/8/22 Approved as noted

2K 6 KAIG3-RFI-CO-A-1258 00 Installed Base Extrusion and Base Seal between Axis 02/AG - 02/AH. Architectural Crescent 2 11/8/22 11/10/22 Approved as noted

2F 6 KAIG3-RFI-CO-A-1259 00 Installed Aluminum Caps between Axis 02/R - 02/S. Architectural Crescent 2 11/10/22 11/12/22 Approved as noted

2F 6 KAIG3-RFI-CO-A-1260 00 Installed Aluminum Caps between Axis 02/S - 02/T. Architectural Crescent 2 11/10/22 11/12/22 Approved as noted

2F 6 KAIG3-RFI-CO-A-1261 00 Installed Aluminum Caps between Axis 02/T - 02/U. Architectural Crescent 2 11/10/22 11/12/22 Approved as noted

2F 6 KAIG3-RFI-CO-A-1262 00 Installed Aluminum Caps between Axis 02/U - 02/V. Architectural Crescent 2 11/10/22 11/12/22 Approved as noted

Inspection of Plastering Work ( inner side ) for ETFE Pump Room no # 6113 ( Ground Floor ) at Zone 2G, Axis 02W (as
2G 6 KAIG3-RFI-CO-A-01263 00 Architectural Crescent 11/12/22 11/13/22 Approved as noted
highlighted) Level 869.2 to 876.0

4D 4 KAIG3-RFI-TT-A-1264 00 Plastering for all walls (All sides), at 1st & 2nd Floors Inside Site Tower 2, as per the highlighted attached Drawings. Architectural Site Tower 2 11/13/22 11/14/22 Approved as noted

Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of Boundary wall @ Grid (12-
4B 4 KAIG3-RFI-AG-A-1265 00 Architectural Aviary Garden 11/13/22 11/14/22 Approved as noted
21/Right Side), at Aviary Garden, As per Highlighted in attached Drawing's.
1st Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (12-23/Right Side), at Aviary Garden, As
4B 4 KAIG3-RFI-AG-A-1266 00 Architectural Aviary Garden 11/13/22 11/14/22 Approved as noted
per Highlighted in attached Drawing's.
2nd Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (12-23/Right Side), at Aviary Garden, As
4B 4 KAIG3-RFI-AG-A-1267 00 Architectural Aviary Garden 11/13/22 11/14/22 Approved as noted
per Highlighted in attached Drawing's.

1G 6 KAIG3-RFI-LM-A-01268 00 Block Works Laying for Large Mosque,Ground Floor Axis 5-6/C-F at Zone 1G Upto Bottom of Lintel Beam (as highlighted) Architectural Large Mosque 11/14/22 Open

1G 6 KAIG3-RFI-LM-A-01269 00 1st Layer of Block Work for Large Mosque ,Ground Floor at axis 5-6/D-F at Zone 1G (as highlighted) Architectural Large Mosque 11/14/22 Open
Block Works Laying for Large Mosque,Ground Floor Axis 1-2/C-F at Zone 1G Upto Bottom of Lintel Beam (as highlighted)
1G 6 KAIG3-RFI-LM-A-01270 00 Architectural Large Mosque 11/14/22 Open
KAIG3-SCR-LM-A-0173-00
2G 6 KAIG3-RFI-CO-A-1271 00 Installed Aluminum Caps between Axis 02/V - 02/W. Architectural Crescent 11/14/22 Open

2G 6 KAIG3-RFI-CO-A-1272 00 Installed Aluminum Caps between Axis 02/W - 02/X. Architectural Crescent 11/14/22 Open

2G 6 KAIG3-RFI-CO-A-1273 00 Installed Aluminum Caps between Axis 02/X - 02/Y. Architectural Crescent 11/14/22 Open

kaig-qcals 72
AS OF: February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved
1 153 6 19 14 1081 26 1299

ARCHITECTURAL
SUB Date STATUS Remarks
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Location / Building Name
ZONE Submitted Replied Approved Approved as Noted Code C/Code D

4D 4 KAIG3-RFI-TT-A-1274 00 Inspection of Plastering for wall (Both sides) at Grid 1, Inside Site Tower 2, as per the highlighted attached Drawings. Architectural Site Tower 2 11/14/22 Open

Steel Reinforcement & Shuttering for Lintels and Stiffener Columns of Block work & Doors for Walls of Toilets & Meeting Security Fire & Command
3B 3 KAIG3-RFI-FC-A-1275 00 Architectural 11/14/22 Open
Room, at Grid (1-4/A-B & 4-5/B-C), at Security & Fire Command Center, As Highlighted in attached Drawings. Center
2nd coat of Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & ring beams ,Outer part of
2Q 6 KAIG3-RFI-CO-A-01276 00 Architectural Crescent 11/16/22 Open
Axis 02/AW ,02/AX , 02/AY ,02/AZ , Level 870.79 ,871.00 , 871.22 , 871.27 (As Highlighted )
2nd Coat Cementitous water proof coating prior Stone Cladding for ZONE 2R buttress, Infill wall & ring beams ,Outer part of
2R 6 KAIG3-RFI-CO-A-01277 00 Architectural Crescent 11/16/22 Open
Axis 02BC-02BB-02BA-02AZ , Level 870.36 , 870.57 , 870.79 upto 877.50(As Highlighted )
1F 6 KAIG3-RFI-CO-A-1278 00 Installed Base Extrusion and Base Seal between Axis 01/P - 01/Q. Architectural Crescent 1 11/16/22 Open

1F 6 KAIG3-RFI-CO-A-1279 00 Installed Base Extrusion and Base Seal between Axis 01/Q - 01/R. Architectural Crescent 1 11/16/22 Open

1F 6 KAIG3-RFI-CO-A-1280 00 Installed Base Extrusion and Base Seal between Axis 01/R - 01/S. Architectural Crescent 1 11/16/22 Open

1G 6 KAIG3-RFI-CO-A-1281 00 Installed Base Extrusion and Base Seal between Axis 01/S - 01/T. Architectural Crescent 1 11/16/22 Open

1G 6 KAIG3-RFI-CO-A-1282 00 Installed Base Extrusion and Base Seal between Axis 01/T - 01/U. Architectural Crescent 1 11/16/22 Open

2B 2 KAIG3-RFI-SW-A-1283 00 Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 17 & 18, As per Attached Highlighted Drawing's. Architectural Site Works/Boundary Wall 11/17/22 Open

2B 2 KAIG3-RFI-SW-A-1284 00 Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 15 & 16, As per Attached Highlighted Drawing's. Architectural Site Works/Boundary Wall 11/17/22 Open

kaig-qcals 73
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

kaig-qcals 74
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

G 5 KAIG3-RFI-PA-LS-1618 00 "Mock up inspection of Copping for Seating Area (1) at Zone-G (SA-11) - As Highlighted" Landscape Picnic Area 10/2/22 10/3/22 Code C (resubmit)

Mockup for Stone Coping on Seat walls for all External Gardens Installed Inside Butterfly Garden at highlighted area in
4C 4 KAIG3-RFI-TG-LS-1629 00 Landscape Butterfly Garden 10/5/22 10/11/22 Code C (not resubmit)
attached Drawing's.at Butterfly Garden, as highlighted in attached drawing's & Photos.

Excavation & Surface preparation for Planting area Inside Outer Canopy 2, at Physic garden, as highlighted area in attached
4D 4 KAIG3-RFI-PG-LS-1649 00 Landscape Physic Garden 10/11/22 10/18/22 Code C (resubmit)
drawing's.

Excavation & Surface preparation for Planting area Inside Outer Canopy 3, at Physic garden, as highlighted area in attached
4D 4 KAIG3-RFI-PG-LS-1650 00 Landscape Physic Garden 10/11/22 10/24/22 Code C (resubmit)
drawing's.

Inspection Of Pipe Installation For Irrigation ROW Sub-Mainline (110&63&50mmØ- UPVC-Claas-5 ); As per High
4A 4 KAIG3-RFI-WG-LS-1680 00 Landscape Water Play Garden 10/22/22 10/24/22 Approved as noted
lighted Attached Approved Shop Drawing.

BC 3 KAIG3-RFI-SW-LS-1681 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-083 for All Layers" Landscape Site Works 10/22/22 10/26/22 Approved as noted

C3 3 KAIG3-RFI-SW-LS-1682 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-079 for All Layers" Landscape Site Works 10/22/22 10/26/22 Approved as noted

C3 3 KAIG3-RFI-SW-LS-1683 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-080 for All Layers" Landscape Site Works 10/22/22 10/26/22 Approved as noted

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (33 no's), inside Butterfly Garden, as
4C 4 KAIG3-RFI-TG-LS-1684 00 Landscape Butterfly Garden 10/22/22 10/24/22 Approved as noted
highlighted area in attached drawing's. (SP 143)

6 6 KAIG3-RFI-SW-LS-1685 00 Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-27 for All Layers Landscape Site Works 10/23/22 10/26/22 Approved as noted

K5 5 KAIG3-RFI-PA-LS-1686 00 Inspection of Excavation for Tree Pit (39No's) as Details D-38-1- as highlighted Landscape Picnic Area 10/23/22 10/25/22 Approved as noted

Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (63&50 mmØ- UPVC-Claas-5 ) ; As per
6A 6 KAIG3-RFI-PC-LS-1687 00 Landscape Picnic Area 10/23/22 10/24/22 Approved as noted
High lighted Attached Approved Shop Drawing.

Inspection Of Pipe Installation For Irrigation ROW Mainline (90mmØ- UPVC-Claas-5 ); As per High lighted Attached
6A 6 KAIG3-RFI-SW-LS-1688 00 Landscape Site Works 10/23/22 10/24/22 Approved as noted
Approved Shop Drawing.

'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (63&90mmØ-
4D 4 KAIG3-RFI-PG-LS-1689 00 Landscape Physic Garden 10/24/22 10/25/22 Approved as noted
UPVC-Claas-5 ); As per High lighted Attached Approved Shop Drawing.

4C 4 KAIG3-RFI-TG-LS-1690 00 Inspection for Installed Gabions inside Tunnel of Butterfly Garden , as Highlighted area in attached Drawings. Landscape Butterfly Garden 10/24/22 11/1/22 Code C (not resubmit)

Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (59No's) as Details D-38-1- as highlighted
K5 5 KAIG3-RFI-PA-LS-1691 00 Landscape Picnic Area 10/24/22 10/25/22 Approved as noted
(Stock Pile# 143)

G4 4 KAIG3-RFI-SW-LS-1692 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-237 for All Layers" Landscape Site Works 10/24/22 10/26/22 Approved as noted

G4 4 KAIG3-RFI-SW-LS-1693 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-248 for All Layers" Landscape Site Works 10/24/22 10/26/22 Approved as noted

G4 4 KAIG3-RFI-SW-LS-1694 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-249 for All Layers" Landscape Site Works 10/24/22 10/26/22 Approved as noted

G4 4 KAIG3-RFI-SW-LS-1695 00 "Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-250 for All Layers" Landscape Site Works 10/24/22 10/26/22 Approved as noted

Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree Pit's (98No's) -
GK45 5 KAIG3-RFI-PA-LS-1696 00 Landscape Picnic Area 10/25/22 10/26/22 Approved as noted
as highlighted

K5 5 KAIG3-RFI-PA-LS-1697 00 Inspection of Excavation for Tree Pit (22No's) as Details D-38-1- as highlighted Landscape Picnic Area 10/25/22 10/26/22 Approved as noted

Excavation & Surface Preparation for Planting area's Between Tunnel and Boundary wall, inside Butterfly Garden, as
4C 4 KAIG3-RFI-TG-LS-1698 00 Landscape Butterfly Garden 10/25/22 10/26/22 Approved as noted
highlighted area in attached drawing's.

kaig-qcals 75
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area's Between Tunnel and Boundary wall,
4C 4 KAIG3-RFI-TG-LS-1699 00 Landscape Butterfly Garden 10/25/22 10/26/22 Approved as noted
inside Butterfly Garden, as highlighted area in attached drawing's.

Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (22No's) as Details D-38-1- as highlighted
K5 5 KAIG3-RFI-PA-LS-1700 00 Landscape Picnic Area 10/26/22 10/30/22 Approved as noted
(Stock Pile# 143)

Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree Pit's (22No's) -
K5 5 KAIG3-RFI-PA-LS-1701 00 Landscape Picnic Area 10/26/22 10/30/22 Approved as noted
as highlighted

G4 4 KAIG3-RFI-SW-LS-1702 00 Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 10 at Zone-G (As Highlighted) Landscape Site Works 10/26/22 10/30/22 Approved as noted

Excavation & Surface Preparation for Planting area insdie Tunnel at Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-LS-1703 00 Landscape Butterfly Garden 10/25/22 10/30/22 Approved as noted
drawing's.

Marking & Check for coordinates of Tree Pits (19 no's) Between Geyser Garden and Aviary Garden, At Water Garden, at
4A 4 KAIG3-RFI-WG-LS-1704 00 Landscape Water Play Garden 10/30/22 10/31/22 Approved as noted
highlighted area in attached drawings.

Excavation for Tree Pits (42 no's) Between Geyser Garden and Aviary Garden and Water Play Garden, at highlighted area
4A 4 KAIG3-RFI-WG-LS-1705 00 Landscape Water Play Garden 10/30/22 10/31/22 Approved as noted
in attached drawings.

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (42 no's) Between Geyser Garden and
4A 4 KAIG3-RFI-WG-LS-1706 00 Landscape Water Play Garden 10/30/22 10/31/22 Approved as noted
Aviary Garden and Water Play Garden, at highlighted area in attached drawings.

3 3 KAIG3-RFI-SW-LS-1707 00 Inspection of Headwall and Stone Boulder for Outfall-G - As Highlighted Landscape Site Works 10/30/22 11/1/22 Approved as noted

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area insdie Tunnel at Butterfly Garden, as
4C 4 KAIG3-RFI-TG-LS-1708 00 Landscape Butterfly Garden 10/30/22 10/31/22 Approved as noted
highlighted area in attached drawing's.

Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC Class 4 ) at
4A 4 KAIG3-RFI-WG-LS-1709 00 Landscape Water Play Garden 10/31/22 11/3/22 Approved as noted
Water Gardns. As per High lighted Attached Approved Shop Drawing.

H6 6 KAIG3-RFI-SW-LS-01710 00 Installation of Rock and Boulder No. WRB-56 - 1st layer (1 of 6) Landscape Site Works 11/1/22 11/8/22 Approved as noted

Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (40&63&50&75&110 mmØ- UPVC-Claas-5
6A 6 KAIG3-RFI-PC-LS-1711 00 Landscape Promenade & Canopies 11/2/22 11/3/22 Approved as noted
) ; As per High lighted Attached Approved Shop Drawing.

Inspection Of Pipe Installation For Irrigation ROW Mainline (90&160mmØ- UPVC-Claas-5 ); As per High lighted
6A 6 KAIG3-RFI-SW-LS-1712 00 Landscape Site Works 11/2/22 11/3/22 Approved as noted
Attached Approved Shop Drawing.

H6 6 KAIG3-RFI-SW-LS-01713 00 Installation of Rock and Boulder No. WRB-56 - 2nd layer (2 of 6) Landscape Site Works 11/3/22 11/8/22 Approved as noted

Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC Class 4 ) at
4A 4 KAIG3-RFI-WG-LS-1714 00 Landscape Water Play Garden 11/3/22 11/7/22 Approved as noted
Water Gardns. As per High lighted Attached Approved Shop Drawing.

Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC Class 4 ) at
4A 4 KAIG3-RFI-WG-LS-1715 00 Landscape Water Play Garden 11/3/22 11/7/22 Approved as noted
Water Gardns. As per High lighted Attached Approved Shop Drawing.

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (07 no's) along 1st line of Boulders (Right
4A 4 KAIG3-RFI-WG-LS-1716 00 Landscape Water Play Garden 11/3/22 11/6/22 Approved as noted
side) at Geyser Garden, inside Water Garden, at highlighted area in attached drawings. (SP 143)

K5 5 KAIG3-RFI-SW-LS-01717 00 Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 16 at Zone-K (As Highlighted) Landscape Site Works 11/6/22 11/8/22 Approved as noted

L5 5 KAIG3-RFI-SW-LS-01718 00 Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 15 at Zone-L (As Highlighted) Landscape Site Works 11/6/22 11/8/22 Approved as noted

3 3 KAIG3-RFI-SW-LS-01719 00 Inspection of Copping and Stone Boulder Installation at existing culvert in Wadi-1 and Wadi-2 - As Highlighted Landscape Site Works 11/6/22 11/8/22 Approved as noted

'Inspection of Warning Tape for ROW Sub-Mainline (110, 63 & 50mm Ø - uPVC Class 5) as per attached highlighted
4A 4 KAIG3-RFI-WG-LS-01720 00 Landscape Water Play Garden 11/6/22 11/7/22 Approved
approved shop drawing.

Excavation & Surface Preparation for Planting area's at Center, inside Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-LS-1721 00 Landscape Butterfly Garden 11/6/22 11/7/22 Approved as noted
drawing's.

kaig-qcals 76
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area's at Center, inside Butterfly Garden, as
4C 4 KAIG3-RFI-TG-LS-1722 00 Landscape Butterfly Garden 11/6/22 11/7/22 Approved as noted
highlighted area in attached drawing's. (SP 143)

Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC Class 4 ) at
4A 4 KAIG3-RFI-WG-LS-01723 00 Landscape Water Play Garden 11/6/22 11/8/22 Approved as noted
Water Gardns. As per High lighted Attached Approved Shop Drawing.

Surface Preparation prior to Waterproofing for Fountain 1 (6 no's), inside Physic Garden as highlighted area in attached
4D 4 KAIG3-RFI-PG-LS-01724 00 Landscape Physic Garden 11/7/22 Open
drawing's.

Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ, ) at Butterfly Garden . As
4C 4 KAIG3-RFI-TG-LS-1725 00 Landscape Butterfly Garden 11/9/22 11/12/22 Approved as noted
per High lighted Attached Approved Shop Drawing.

Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC Class 4 ) at
A&F 4 KAIG3-RFI-WG-LS-1726 00 Landscape Water Play Garden 11/10/22 11/14/22 Approved as noted
Water Gardns. As per High lighted Attached Approved Shop Drawing.

Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per High
5D 5 KAIG3-RFI-SW-LS-1727 00 Landscape Site Works 11/12/22 11/13/22 Approved as noted
lighted Attached Approved Shop Drawing.

Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per High
3A 3 KAIG3-RFI-SW-LS-1728 00 Landscape Site Works 11/12/22 11/15/22 Approved as noted
lighted Attached Approved Shop Drawing.

Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per High
5D 5 KAIG3-RFI-SW-LS-1729 00 Landscape Site Works 11/12/22 11/15/22 Approved as noted
lighted Attached Approved Shop Drawing.

G4 4 KAIG3-RFI-SW-LS-1730 00 Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 19 at Zone G as highlighted. Landscape Site Works 11/12/22 11/13/22 Approved as noted

BC3 3 KAIG3-RFI-SW-LS-1731 00 Inspection of Excavation for Tree Pit (125No's) as Details D-38-1 at Car Parking-J - as highlighted Landscape Site Works 11/13/22 11/14/22 Approved as noted

Stack Boulders Installed Layers at levels +874.40, 874.80, 875.20, 875.60, 876.00, 876.40, 876.80, 877.20 & 879.00, along
4B 4 KAIG3-RFI-WG-LS-1732 00 Open Channel (Boundary wall Side near SBC 08), at Wadi # 2, Inside Water Garden, At Highlighted area in attached Landscape Water Play Garden 11/14/22 Open
Drawings.

Stack Boulders Installed Layers at levels +874.40, 874.80, 875.20, 875.60, 876.00 & 876.40, along Open Channel (Aviary
4B 4 KAIG3-RFI-WG-LS-1733 00 Landscape Water Play Garden 11/14/22 Open
Garden Side near SBC 08), at Wadi # 2, Inside Water Garden, At Highlighted area in attached Drawings.

G4 4 KAIG3-RFI-SW-LS-1734 00 Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 20 at Zone-G (As Highlighted) Landscape Site Works 11/14/22 Open

H6 6 KAIG3-RFI-SW-LS-1738 00 Installation of Rock and Boulder No. WRB-56 - 3rd layer (3 of 6) Landscape Site Works 11/16/22 Open

Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (17 no's) Inside Boat Garden, At Water
4B 4 KAIG3-RFI-WG-LS-1739 00 Landscape Water Play Garden 11/16/22 Open
Garden, at highlighted area in attached KAIG3-SCR-WG-LS-0077-00-Reply & drawings.

kaig-qcals 77
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

kaig-qcals 78
February 28, 2023
Consultant : DAR
Code C already
Code D Cancelled Open Approved Approved as noted Code C (not resubmit) TOTAL
Main Contractor: ZHBG resubmit/approved

9 176 24 8 29 1591 61 1889


LANDSCAPE
SUB Location / Building Date
Sl No. ZONE IR NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C (not resubmit)

kaig-qcals 79
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Installation of pipes for Storm Water line out fall B; 315mm Ø UPVC class 4(G-B-7 to MH-B-02); as per
KAIG3-RFI-SW-C-0125 00 Plumbing/Civil Site Works 2/13/21 2/14/21 Approved as noted
high lighted in dwg.
Excavation for foul line for ( FW11 to FW12-2) prior to gravel bedding. At highlighted area in the attached
KAIG3-RFI-SW-C-0126 00 Plumbing/Civil Site Works 2/14/21 2/16/21 Approved
Drawing's.
Excavation for foul line for ( FW1-1 to FW1-2) prior to gravel bedding. At highlighted area in the attached
KAIG3-RFI-SW-C-0127 00 Plumbing/Civil Site Works 2/14/21 2/16/21 Approved
Drawing's.
Excavation for foul line for ( FW5 to FW6) prior to gravel bedding. At highlighted area in the attached
KAIG3-RFI-SW-C-0128 00 Plumbing/Civil Site Works 2/14/21 2/17/21 Approved as noted
Drawing's.
Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (250mm Ø) for Foul Water Line (FW9
KAIG3-RFI-SW-C-0129 00 Plumbing/Civil Site Works 2/14/21 2/16/21 Approved as noted
to FW8). At highlighted area in the attached Drawing's.

KAIG3-RFI-SW-C-0130 00 Installation of pipes for Foul Water line ; 250mm Øupvc class 4(FW8 to FW9); as per high lighted in dwg. Plumbing/Civil Site Works 2/14/21 2/16/21 Approved as noted

Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line (FW1-
KAIG3-RFI-SW-C-0131 00 Plumbing/Civil Site Works 2/15/21 2/16/21 Approved as Noted
3.1 to FW1-3). At highlighted area in the attached Drawing's.
Installation of pipes for Foul Water line ; 160mm Øupvc class 4(FW1-3 to FW1-3.1); as per high lighted in
KAIG3-RFI-SW-C-0132 00 Plumbing/Civil Site Works 2/15/21 2/18/21 Approved as noted
dwg.
Excavation for foul line for ( FW1-3.1 to FW1-3.2) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0133 00 Plumbing/Civil Site Works 2/16/21 2/18/21 Approved as noted
attached Drawing's.
Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line (FW11
KAIG3-RFI-SW-C-0134 00 Plumbing/Civil Site Works 2/17/21 2/18/21 Approved as noted
to FW12-2). At highlighted area in the attached Drawing's.
Installation of pipes for Foul Water line ; 160mm Øupvc class 4(FW11 to FW12-2); as per high lighted in
KAIG3-RFI-SW-C-0135 00 Plumbing/Civil Site Works 2/17/21 2/22/21 Approved as Noted
dwg.
Excavation for foul line for ( FW6 to FW6-1) prior to gravel bedding. At highlighted area in the attached
KAIG3-RFI-SW-C-0136 00 Plumbing/Civil Site Works 2/18/21 2/22/21 Approved as Noted
Drawing's.
Excavation & Bed preparation for Sub Surface Main Line (250mm, 200mm & 160mm Part 2) and (110mm-
KAIG3-RFI-PG-C-0137 00 Civil Physic Garden 2/21/21 2/18/21 Approved
160mm Part 2) at Physic Garden at highlighted area in attached drawing's.
Excavation & Bed Preparation for Sub-Surface Drain Pipes (315mm, 160mm & 110mm Dia) Near Zone 2, 3
4B KAIG3-RFI-DG-C-0138 00 Civil Discovery Garden 2/21/21 2/23/21 Approved as Noted
& 10, at Discovery Garden at highlighted area in the attached drawing's.
Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line (FW1-
KAIG3-RFI-SW-C-0139 00 Civil Site Works 2/21/21 2/22/21 Approved as Noted
3.1 to FW1-3.2) at highlighted area in the attached drawings.
Installation of pipes for Foul Water line; 160mm Ø UPVC class 4 (FW1-3.1 to FW1-3.2); as per highlighted
KAIG3-RFI-SW-C-0140 00 Civil Site Works 2/21/21 2/23/21 Approved as Noted
in dwg.
Excavation for foul water line for ( FW1-3 to FW1-4) prior to gravel bedding at highlighted area in the
KAIG3-RFI-SW-C-0141 00 Civil Site Works 2/21/21 2/23/21 Approved as Noted
attached drawing's.

KAIG3-RFI-PG-C-0142 00 Installation of sub surface main line drainage upvc pipes class 4 (160 & 110mmØ) as per high lighted in dwg. Civil Physic Garden 2/21/21 2/23/21 Approved as Noted

Excavation & Surface Preparation for foundation of boundary wall @ span 35 & 36 @ Water Garden at
4B KAIG3-RFI-WG-C-0143 00 Civil Water Play Garden 2/17/21 2/21/21 Code C (resubmit)
highlighted area in attached Drawing's.
Excavation & Surface Preparation for foundation of boundary wall @ span 35 & 36 @ Water Garden at
4B KAIG3-RFI-WG-C-0143 01 Civil Water Play Garden 3/3/21 3/7/21 Approved
highlighted area in attached Drawing's.
Excavation & Surface Preparation for foundation of boundary wall @ span 37 & 38 @ Water Garden at
4B KAIG3-RFI-WG-C-0144 00 Civil Water Play Garden 2/17/21 2/21/21 Code C (not resubmit)
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) @ Zone 7 to 4 to 9, at Butterfly
KAIG3-RFI-TG-C-0145 00 Civil Butterfly Garden 2/22/21 2/24/21 Approved
Garden, At highlighted area in the attached Drawing's.
Backfilling of gravel 38/" (300mm thck) above upvc pipes class 4 (160mm Ø) for Foul Water Line (FW11 to
KAIG3-RFI-SW-C-0146 00 Civil Site Works 2/22/21 2/24/21 Approved as Noted
FW12-2). At highlighted area in the attached Drawing's.
Backfilling of gravel 38/" (300mm Thck.) above upvc pipes class 4 (160mm Ø) for Foul Water Line (FW1-3
KAIG3-RFI-SW-C-0147 00 Civil Site Works 2/22/21 2/24/21 Approved as Noted
to FW1-3.1). At highlighted area in the attached Drawing's.
KAIG3-RFI-SW-C-0148 00 Soil Preparation under Boulder No. RB-326A. Civil Site Works 2/22/21 3/18/21 Code C (resubmit)
KAIG3-RFI-SW-C-0148 01 Soil Preparation under Boulder No. RB-326A. Civil Site Works 3/17/21 3/18/21 Approved as Noted
Surface Preperation prior to start backfilling at Road Constrution From ST 2+140 to ST 1+840 as per the
KAIG3-RFI-SW-C-0149 00 Civil Site Works 2/22/21 2/24/21 Approved as Noted
attached drawing.
Excavation for foul line for ( FW9-1 to Management Bldg.) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0150 00 Civil Site Works 2/22/21 2/24/21 Approved as Noted
attached Drawing's.
KAIG3-RFI-SW-C-0151 00 Soil Preparation under Boulder No.RB- 112 Civil Site Works 2/23/21 2/24/21 Approved as Noted
KAIG3-RFI-SW-C-0152 00 Inspection for the Excavation of Storm Box Culvert - SBC-09 (As Highlighted) Civil Site Works 2/25/21 2/25/21 Approved as Noted
Excavation for foul line for ( FW1-2 to FW1-2.2) prior to gravel bedding at highlighted area in the attached
KAIG3-RFI-SW-C-0153 00 Civil Site Works 2/23/21 2/28/21 Approved as Noted
Drawing's.
Putting of WARNING TAPE for Storm Water line put fall B for (MH-B-01 to MH-B-02) at highlighted area
KAIG3-RFI-SW-C-0154 00 Civil Site Works 2/23/21 2/24/21 Approved as Noted
in the attached Drawing's.
Excavation for foul line for ( FW1 to FW1-1) prior to gravel bedding. At highlighted area in the attached
KAIG3-RFI-SW-C-0155 00 Civil Site Works 2/25/21 2/28/21 Approved as Noted
Drawing's.

kaig-qcals 80
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation for foul line for ( FW1-2.2 to FW1-2.3) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0156 00 Civil Site Works 2/25/21 3/1/21 Approved as Noted
attached Drawing's.
Excavation for foul line for ( FW1-4 to Butterflygarden) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0157 00 Civil Site Works 2/25/21 2/28/21 Approved as Noted
attached Drawing's.
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (315mm, 160mm & 110mm Dia)
4B KAIG3-RFI-DG-C-0158 00 Civil Discovery Garden 2/27/21 3/1/21 Approved as Noted
Near Zone 2, 3 & 10, at Discovery Garden, At highlighted area in the attached Drawing's.

Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Zone 7 to 4 to 9, at
KAIG3-RFI-TG-C-0159 00 Civil Butterfly Garden 2/27/21 3/1/21 Approved as Noted
Butterfly Garden, At highlighted area in the attached Drawing's.
Excavation & Surface Preparation for foundation of boundary wall @ span 37, 38 & 39 @ Water Garden at
4B KAIG3-RFI-WG-C-0160 00 Civil Water Play Garden 2/27/21 3/1/21 Approved as Noted
highlighted area in attached Drawing's.
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (160 & 110mm Ø)
4B KAIG3-RFI-DG-C-0161 00 Civil Discovery Garden 2/27/21 3/1/21 Approved as Noted
(110mm Ø); as per high lighted in dwg.
Installation of SUB surface upvc pipes class 4 perforated branches pipes (110mm Ø); as per high lighted in
KAIG3-RFI-TG-C-0162 00 Civil Butterfly Garden 2/27/21 3/1/21 Approved as Noted
dwg.
KAIG3-RFI-SW-C-0163 00 Soil Preperation prior to start backfilling Wall Outside for SBC 1&2 - As Highlighted Civil Site Works 2/27/21 2/28/21 Approved as Noted
BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 160 mm Ø) in (FW6 to FW6-1). At
KAIG3-RFI-SW-C-0164 00 Civil Site Works 2/27/21 3/1/21 Approved as Noted
highlighted area in the attached Drawing's.
BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 250 mm Ø) in (FW6 to FW8). At highlighted
KAIG3-RFI-SW-C-0165 00 Civil Site Works 2/27/21 3/1/21 Approved as Noted
area in the attached Drawing's.

KAIG3-RFI-SW-C-0166 00 Installation of Foul Water Line of 160mmØ upvc pipes class 4 (FW6 to FW6-1)as per high lighted in dwg. Civil Site Works 2/27/21 3/1/21 Approved as Noted

Installation of Foul Water Line of 250mmØ upvc pipes class 4 (FW5 to FW6)as per high lighted in dwg.
KAIG3-RFI-SW-C-0167 00 Civil Site Works 2/27/21 3/1/21 Approved as Noted
(L=26.40m)
Installation of Foul Water Line of 250mmØ upvc pipes class 4 (FW6 to FW8)as per high lighted in dwg.
KAIG3-RFI-SW-C-0168 00 Civil Site Works 2/27/21 3/1/21 Approved as Noted
(L=26M)
Excavation & Bed preparation for Sub Surface Main Line (250mm Part 2) at Physic Garden at highlighted
KAIG3-RFI-PG-C-0169 00 Civil Site Works 2/27/21 3/2/21 Approved as noted
area in attached Drawing's.

Soil Preparation prior to backfilling along the Boundary Wall (Inner Face) @ Grid (EXC4-11/12 to 27/28 &
KAIG3-RFI-PG-C-0170 00 Civil Physic Garden 2/28/21 3/1/21 Approved as noted
EXC4-29/30 to 41/42) at Physic Garden, at Highlighted area in Attached Drawings.

Excavation for foul line for ( FW1-2 to Butterflygarden) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0171 00 Civil Site Works 2/28/21 3/3/21 Approved as Noted
attached Drawing's.
Excavation for foul water line from (FW6-1 to FW6-3) prior to gravel bedding. At highlighted area in the
KAIG3-RFI-SW-C-0172 00 Civil Site Works 3/2/21 3/7/21 Approved
attached Drawing's.( Near Admin BLDG.)
BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 160mmØ) in (FW9 to Management BLDG.).
KAIG3-RFI-SW-C-0173 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
At highlighted area in the attached Drawing's.
Backfilling of gravel 38/" (300mm Thck) above of Foul Water Line (160mmØ) upvc pipes class 4 in (FW6 to
KAIG3-RFI-SW-C-0174 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
FW6-1). At highlighted area in the attached Drawing's.
Backfilling of gravel 38/" (300mm Thck) above of Foul Water Line (250mmØ) upvc pipes class 4 in (FW6 to
KAIG3-RFI-SW-C-0175 00 Civil Site Works 3/3/21 3/3/21 Approved as Noted
FW8). At highlighted area in the attached Drawing's.
BEDDING of gravel 38/" and Geotextile for Foul Water Line (160 & 110mmØ) in (FW1-3 to FW1-4). At
KAIG3-RFI-SW-C-0176 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
highlighted area in the attached Drawing's.
WARNING TAPE installation for FOUL Water line at (FW1-3.1 to FW1-3.2). At highlighted area in the
KAIG3-RFI-SW-C-0177 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
attached Drawing's.
Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW1-3 to Butterfly Garden)as per
KAIG3-RFI-SW-C-0178 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
high lighted in dwg. (L=43.50M & 31.0M).
Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW9 to FW9-1 & Management
KAIG3-RFI-SW-C-0179 00 Civil Site Works 3/2/21 3/3/21 Approved as Noted
Bldg.)as per high lighted in dwg.
Excavation & Surface Preparation for foundation of boundary wall @ span 30, 32 & 33 @ Water Garden at
4B KAIG3-RFI-WG-C-0180 00 Civil Water Play Garden 3/3/21 3/7/21 Approved
highlighted area in attached Drawing's.
Excavation & Bed preparation for Sub Surface Main Line Drain Pipe (250mm Part 2) at Physic Garden at
KAIG3-RFI-PG-C-0181 00 Civil Physic Garden 3/4/21 3/8/21 Approved as Noted
highlighted area in attached drawings.

KAIG3-RFI-PG-C-0182 00 Installation of sub surface main line drainage upvc pipes class 4 (250mmØ) as per high lighted in dwg. Civil Physic Garden 3/4/21 3/7/21 Approved as Noted

Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line (250mm Part 2) at Physic Garden at
KAIG3-RFI-PG-C-0183 00 Civil Physic Garden 3/4/21 3/7/21 Approved as Noted
highlighted area in attached drawings.
BEDDING of gravel 38/" and Geotextile for Foul Water Line (160mmØ) in (FW1-2 to FW1-2.2). At
KAIG3-RFI-SW-C-0184 00 Civil Site Works 3/6/21 3/8/21 Approved as Noted
highlighted area in the attached Drawing's.

Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW9 to Management BLDG.). Site Works/Near
KAIG3-RFI-SW-C-0185 00 Civil 3/6/21 3/8/21 Approved as Noted
At highlighted area in the attached Drawing's. Management Buuilding

kaig-qcals 81
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (110 &160mmØ) in (FW1-3 to FW1-4 & Site Works/Near Butterfly
KAIG3-RFI-SW-C-0186 00 Civil 3/6/21 3/8/21 Approved as Noted
Butterfly Garden). At highlighted area in the attached Drawing's. Garden
Excavation & Bed preparation for Sub Surface Drain Pipe (110mm & 160mm Part 2) at Physic Garden at
KAIG3-RFI-PG-C-0187 00 Civil Physic Garden 3/6/21 3/8/21 Approved as Noted
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Sub-Surface Drain Pipes (250mm & 200mm dia Pipes @ North-west Side
KAIG3-RFI-ZG-C-0188 00 and 110mm dia Pipes at planted bed East side & South-east side). @ Maze Garden, At highlighted area in the Civil Maze Garden 3/6/21 3/8/21 Approved as Noted
attached Drawing's.

Soil Preparation prior to Backfilling along the Boundary Wall (Outer Face) @ Grid (EXC4-11/12 to 27/28 &
KAIG3-RFI-PG-C-0189 00 Civil Physic Garden 3/6/21 3/8/21 Approved as Noted
EXC4-29/30 to 41/42) at Physic Garden, at Highlighted area in Attached Drawings.

WARNING TAPE Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW9 to FW9-1 &
KAIG3-RFI-SW-C-0190 00 Civil Management Building 3/6/21 3/13/21 Approved as Noted
Management Bldg.)as per high lighted in dwg.
WARNING TAPE Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW1-3 to FW1-4 Site Works/Near Butterfly
KAIG3-RFI-SW-C-0191 00 Civil 3/6/21 3/8/21 Approved as Noted
& Butterfly Garden)as per high lighted in dwg. Garden
Excavation for foul water line from (FW12 to FW14) prior to gravel bedding. At highlighted area in the Site Works/Near Aviary
KAIG3-RFI-SW-C-0192 00 Civil 3/6/21 3/9/21 Approved as Noted
attached Drawing's.( Near AVAIRY GARDEN) Garden
Installation of FOUL WATER LINE upvc pipes class 4 (160mmØ) (FW1-2 to FW1-2.3) as per high lighted
KAIG3-RFI-SW-C-0193 00 Civil Site Works/Near Nursery 3/7/21 3/9/21 Approved as Noted
in dwg.
Gravel 3/8" and Geotextile for Foul Water Line sorrounding of upvc pipes calss 4 (110mmØ) in (FW1-2 to Site Works/Near
KAIG3-RFI-SW-C-0194 00 Civil 3/7/21 3/8/21 Approved as Noted
Warehouse). highlighted area in the attached Drawing's. Warehouse
Soil Preparation prior to Backfilling along the Boundary Wall (Inner Side) of Span 22, 23, 24 & 25 at Water
4B KAIG3-RFI-WG-C-0195 00 Civil Water Play Garden 3/7/21 3/9/21 Approved as Noted
Garden, at Highlighted area in Attached Drawings.
Gravel 3/8" and Geotextile for Foul Water Line sorrounding of upvc pipes calss 4 (160mmØ) in (FW6-1 to Site Works near Water
KAIG3-RFI-SW-C-0196 00 Civil 3/7/21 3/8/21 Approved as Noted
FW6-3). At highlighted area in the attached Drawing's. Tank
BEDDING Gravel 3/8" and Geotextile for Foul Water Line for upvc pipes calss 4 (160mmØ) in (FW11 to
4B KAIG3-RFI-SW-C-0197 00 Civil water Play Garden 3/8/21 3/9/21 Approved as Noted
FW16). At highlighted area in the attached Drawing's.
BEDDING Gravel 3/8" and Geotextile for Foul Water Line for upvc pipes calss 4 (400mmØ) in (FW1 to Site Works/STP & Pro
KAIG3-RFI-SW-C-0198 00 Civil 3/8/21 3/9/21 Approved as Noted
FW1-1.1). At highlighted area in the attached Drawing's. Plant
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW1-2 to FW1-2.3). At Site Works/Near Butterfly
KAIG3-RFI-SW-C-0199 00 Civil 3/8/21 3/9/21 Approved as Noted
highlighted area in the attached Drawing's. Garden
Installation for Foul Water Line of upvc pipes calss 4 (110mmØ) at (FW1-2 to Warehouse). highlighted area Site Works/Near
KAIG3-RFI-SW-C-0200 00 Civil 3/8/21 3/9/21 Approved as Noted
in the attached Drawing's. Warehouse
Installation for Foul Water Line of upvc pipes calss 4 (160mmØ) at (FW6-1 to FW6-3). highlighted area in Site Works/Near Mgt.
KAIG3-RFI-SW-C-0201 00 Civil 3/9/21 3/9/21 Approved as Noted
the attached Drawing's. Building
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (110mm & 160mm Part 2) at Physic
KAIG3-RFI-PG-C-0202 00 Civil Physic Garden 3/9/21 3/10/21 Approved as noted
Garden at highlighted area in attached Drawing's.
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (250mm & 200mm dia Pipes @
KAIG3-RFI-ZG-C-0203 00 North-west Side and 110mm dia Pipes at planted bed East side & South-east side). @ Maze Garden, At Civil Maze Garden 3/9/21 3/10/21 Approved as noted
highlighted area in the attached Drawing's.
Installation of sub surface main line drainage UPVC pipes class 4 (110, 160, & 250 mmØ) as per highlighted
KAIG3-RFI-PG-C-0204 00 Civil Physic Garden 3/9/21 3/11/21 Approved as noted
in dwg.
Installation of sub surface main line drainage and branches perforated upvc pipes class 4 (110, 160, &200,
KAIG3-RFI-ZG-C-0205 00 Civil Maze Garden 3/10/21 3/14/21 Approved as Noted
250mmØ) & (110mm Ø); as per high lighted in dwg.
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW6-1 to FW6-3). At Site Works/Near Admin
KAIG3-RFI-SW-C-0206 00 Civil 3/10/21 3/14/21 Approved as noted
highlighted area in the attached Drawing's. Building
Installation of FOUL WATER LINE upvc pipes (160mm Ø)class 4 (FW12 to FW14) ; as per high lighted in Site Works/Near Aviary
KAIG3-RFI-SW-C-0207 00 Civil 3/10/21 3/13/21 Approved as noted
dwg. Garden
Excavation, soil preparation of the bottom of manhole prior to concrete blinding (FW5 TO FW8) as per Site Works near Mgt.
KAIG3-RFI-SW-C-0208 00 Civil 3/10/21 3/14/21 Approved as noted
highlighted. Building
WARNING TAPE Installation for Foul Water Line of 250mmØ upvc pipes class 4 (FW6 to FW8)as per high Site Works/Near Butterfly
KAIG3-RFI-SW-C-0209 00 Civil 3/11/21 3/13/21 Approved as noted
lighted in dwg. Garden
WARNING TAPE Installation for Foul Water Line of 250mmØ upvc pipes class 4 (FW5 to FW6)as per high Site Works/Near Butterfly
KAIG3-RFI-SW-C-0210 00 Civil 3/11/21 3/13/21 Approved as noted
lighted in dwg. Garden
Soil Preparation for foundation of Boundary wall (C, D, E, F & I) & All Light walls at Sound & Light
KAIG3-RFI-SG-C-0211 00 Civil Sound & Light Garden 3/11/21 3/16/21 Approved as Noted
Garden, At highlighted area in attached Drawing's.
Excavation & Surface Preparation for foundation of boundary wall (A, B, G & H) at Sound & Light Garden,
KAIG3-RFI-SG-C-0212 00 Civil Sound & Light Garden 3/11/21 3/15/21 Approved as noted
At highlighted area in attached Drawing's.
WARNING TAPE Installation for Foul Water Line of 160mmØ upvc pipes class 4 (FW6 to FW6-1)as per Site Works/Near Butterfly
KAIG3-RFI-SW-C-0213 00 Civil 3/11/21 3/13/21 Approved as noted
high lighted in dwg. Garden
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW12 to FW14). At Site Works/Near Aviary
KAIG3-RFI-SW-C-0214 00 Civil 3/11/21 3/13/21 Approved as noted
highlighted area in the attached Drawing's. Garden
KAIG3-RFI-SW-C-0215 00 Soil Preparation under Boulder No.RB- 295 Civil Site Works 3/13/21 3/16/21 Approved as Noted

kaig-qcals 82
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Site Works/Near Butterfly
KAIG3-RFI-SW-C-0216 00 300 mm Gravel Back Filling Above Foul Water Line (110 mmØ - UPVC - Class 4 (FW1-2 to Ware House). Civil 3/14/21 3/15/21 Approved as noted
Garden
Excavation of Storm Water Line From (Outfall-X to MH-X-01) Prior Gravel Bedding Includes Manhole Site Works near Mgt.
KAIG3-RFI-SW-C-0217 00 Civil 3/14/21 3/16/21 Approved as Noted
(MH-X-01). Building
KAIG3-RFI-SW-C-0218 00 Pipe Installation of FOUL WATER Line (400 mmØ - UPVC - Class 4) at (FW1 to FW1-1). Civil Site Works/Near Nursery 3/15/21 3/16/21 Approved as Noted
Site Works near Mgt.
KAIG3-RFI-SW-C-0219 00 Excavation & Blinding Concrete for Foul Water Manholes (FW6-2 & FW6-3). Civil 3/15/21 3/16/21 Approved as noted
Building
Excavation of Storm Water Line from (Concrete Encasment Point to MH-A-13) Prior Gravel Bedding Site Works near Water
KAIG3-RFI-SW-C-0220 00 Civil 3/15/21 3/17/21 Approved as noted
Includes MH-A-11, MH-A-12 & MH-A-13. Tank
KAIG3-RFI-SW-C-0221 00 Soil Preparation under Boulder No.RB- 115a Civil Site Works 3/15/21 3/17/21 Approved as Noted
KAIG3-RFI-SW-C-0222 00 Soil Preparation under Boulder No.RB- 115 Civil Site Works 3/15/21 3/17/21 Approved as Noted
Excavation of Storm Water Line (Outfall - B Tranch) (450 mmØ - UPVC - Class 4) from (G-B-10 to Site Works/Near Aviary
KAIG3-RFI-SW-C-0223 00 Civil 3/20/21 3/21/21 Approved as Noted
Culvert). Garden
Soil Preparation prior to Start Backfilling for Base of Boundary Wall Span 26, 27, 28 & 29 at Water Garden,
4B KAIG3-RFI-WG-C-0224 00 Civil Water Play Garden 3/17/21 3/21/21 Approved as Noted
at Highlighted area in Attached Drawings.
300 mm Gravel Back Filling Above Foul Water Line (400mmØ - UPVC - Class 4) from (FW1 to FW1-1) Site Works near
KAIG3-RFI-SW-C-0225 00 Civil 3/17/21 3/18/21 Approved as Noted
NEAR WAREHOUSE. Warehouse
Excavation & Surface Preparation for foundation of boundary wall (C, D, E, F & I) at Sound & Light
KAIG3-RFI-SG-C-0226 00 Civil Sound & Light Garden 3/18/21 3/21/21 Approved as Noted
Garden, At highlighted area in attached Drawing's.
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW6-1 to FW6-3). Site Works near Mgt.
KAIG3-RFI-SW-C-0227 00 Civil 3/21/21 3/22/21 Approved as Noted
As per high lighted in dwg. Building
Excavation of Storm Water Line from (Concrete Encasment Point to MH-A-10) Prior Gravel Bedding Site Works near
KAIG3-RFI-SW-C-0228 00 Civil 3/21/21 3/23/21 Approved
Includes MH-A-10. Warehouse
Site Works near Water
KAIG3-RFI-SW-C-0229 00 Excavation of Storm Water Line from (MH-A-13 to MH-A-14) Prior Gravel Bedding Includes MH-A-14. Civil 3/21/21 3/23/21 Approved
Tank
Site Works near Mgt.
KAIG3-RFI-SW-C-0230 00 Excavation of Storm Water Line from (MH-X-01 to MH-X-01-1) Prior Gravel Bedding Includes MH-X-1-1. Civil 3/21/21 3/22/21 Approved as Noted
Building
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC-CLASS Site Works near Mgt.
KAIG3-RFI-SW-C-0231 00 Civil 3/21/21 3/25/21 Approved as Noted
4) from (MH-X-01 to Outfall X). At highlighted Area in the attached Dwg. Building
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW12 to FW14). As Site Works/Near Aviary
KAIG3-RFI-SW-C-0232 00 Civil 3/21/21 3/23/21 Approved as Noted
per high lighted in dwg. Garden
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW1-2 to FW1-2.3).
KAIG3-RFI-SW-C-0233 00 Civil Site Works/Near Nursery 3/21/21 3/22/21 Approved as Noted
As per high lighted in dwg.
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC-CLASS Site Works near Water
KAIG3-RFI-SW-C-0234 00 Civil 3/21/21 3/22/21 Approved as Noted
4) from (MH-A-12 to MH-A-13). At highlighted Area in the attached Dwg. Tank
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (1) (SA-13) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0236 00 Civil Picnic Area 3/22/21 3/30/21 Approved as Noted
Highlighted
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of Span 1, 3, 4, 5 & 6 at Water
4B KAIG3-RFI-WG-C-0237 00 Civil Water Play Garden 3/22/21 3/27/21 Approved as Noted
Garden, at Highlighted area in Attached Drawings.
KAIG3-RFI-SW-C-0238 00 Soil Preparation under Boulder No.RB- 296. Civil Site Works 3/23/21 3/27/21 Code C (resubmit)
KAIG3-RFI-SW-C-0238 01 Soil Preparation under Boulder No.RB- 296. Civil Site Works 3/28/21 3/30/21 Approved as Noted
Excavation & Surface Preparation for foundation of boundary wall @ span 26, 27, 28 & 29 @ Water Garden
4B KAIG3-RFI-WG-C-0239 00 Civil Water Play Garden 3/23/21 3/27/21 Approved as noted
at highlighted area in attached Drawing's.
KAIG3-RFI-SW-C-0240 00 Soil Preparation under Boulder No. RB-154. Civil Site Works 3/24/21 3/27/21 Code C (resubmit)
KAIG3-RFI-SW-C-0240 01 Soil Preparation under Boulder No. RB-154. Civil Site Works 7/8/21 7/14/21 Approved as Noted

Site Work near


KAIG3-RFI-SW-C-0241 00 Excavation of Storm Water Line from (MH-X-01 to MH-X-02) Prior Gravel Bedding. Civil 3/25/21 3/30/21 Approved as noted
Management Building

Site Work near


KAIG3-RFI-SW-C-0242 00 Excavation of Storm Water Line from (FW6 to FCO) Prior Gravel Bedding. Civil 3/25/21 3/29/21 Code C (not resubmit)
Management Building

GRAVEL BEDDING and Geotextile Surronding Foul Water Line for (160mmØ-UPVC-CLASS 4) from Site Works near Water
KAIG3-RFI-SW-C-0243 00 Civil 3/25/21 3/27/21 Approved as noted
(FW1-2 to FW1-3) at highlighted area in the attached drawing. Tank
PIPE INSTALLATION of Foul Water Line for (160mmØ-UPVC-CLASS 4) from (FW1-2 to FW1-3) at Site Works near Water
KAIG3-RFI-SW-C-0244 00 Civil 3/25/21 3/31/21 Approved as noted
highlighted Area in the attached drawing. Tank
Pipe installation of STORM Water Line- OutFall - A for (600mmØ-PP Corrugated Pipe ) from (MH-A-11 to Site Works near Water
KAIG3-RFI-SW-C-0245 00 Civil 3/25/21 3/29/21 Approved as noted
MH-A-12 ) at highlighted area in the attached drawing. Tank
Excavation & Surface Preparation for foundation of Seat walls & Light walls at Sound & Light Garden, At
KAIG3-RFI-SG-C-0246 00 Civil Sound & Light Garden 3/27/21 3/30/21 Approved as noted
highlighted area in attached Drawing's.
Soil preparation for foundation at Bottom of Blinding of Light walls at Sound & Light Garden, At highlighted
KAIG3-RFI-SG-C-0247 00 Civil Sound & Light Garden 3/27/21 cancelled
area in attached Drawing's.
Soil preparation prior to Backfilling for column foundation at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) @ Jetty #
4B KAIG3-RFI-WG-C-0248 00 Civil Water Play Garden 3/27/21 3/29/21 Approved as noted
1 at Boat Garden at highlighted area in attached Drawing's.
Soil preparation prior to Backfilling for column foundation at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C, D & E)
4B KAIG3-RFI-WG-C-0249 00 Civil Water Play Garden 3/27/21 3/29/21 Approved as noted
@ Jetty # 2 at Boat Garden at highlighted area in attached Drawing's.

kaig-qcals 83
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (800mmØ-PP- Site Works near Water
KAIG3-RFI-SW-C-0250 00 Civil 3/28/21 3/29/21 Approved as noted
Corrugated) from (MH-A-10 to MH-A-11) at highlighted Area in the attached Dwg. Tank
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC- Class Site Works near Water
KAIG3-RFI-SW-C-0251 00 Civil 3/28/21 3/29/21 Approved as noted
4) from (MH-A-12 to MH-A-13) at highlighted Area in the attached Dwg. Tank
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC- Class Site Works near Water
KAIG3-RFI-SW-C-0252 00 Civil 3/29/21 3/30/21 Approved as noted
4) from (MH-A-13 to MH-A-14). At highlighted Area in the attached Dwg. Tank
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) Site Works/Near Aviary
KAIG3-RFI-SW-C-0253 00 Civil 3/29/21 3/30/21 Approved as noted
from (MH-B-01 to G-B-10). At highlighted Area in the attached Dwg. Garden
Pipe Installation of STORM WATER Line-OutFall-B for (450mmØ-UPVC- Class 4 ) for 36 m Length &
Site Works/Near Aviary
KAIG3-RFI-SW-C-0254 00 (315mmØ-UPVC- Class 4 ) for 3 m Length from (MH-B-01 to G-B-10 ). At highlighted Area in the attached Civil 3/29/21 3/31/21 Approved as noted
Garden
Dwg.

Site Work near Aviary


GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC- Class
KAIG3-RFI-SW-C-0255 00 Civil Garden & Management 3/28/21 3/29/21 Approved as noted
4) from (Outfall X to MH-X-01) at highlighted Area in the attached Dwg.
Building

Site Work near Aviary


Pipe Installation of STORM WATER Line - Outfall X for (450mmØ-UPVC- Class 4) from (Outfall X to
KAIG3-RFI-SW-C-0256 00 Civil Garden & Management 3/29/21 3/30/21 Approved as noted
MH-X-01). At highlighted Area in the attached Dwg.
Building

GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (400mmØ-UPVC- Class Site Work near Water
KAIG3-RFI-SW-C-0257 00 Civil 3/28/21 3/29/21 Approved as noted
4) from (MH-X-01 to MH-X-01-1) at highlighted Area in the attached Dwg. Tank & Warehouse.
Site Works near
Pipe Installation of STORM WATER Line - Outfall X for (400mmØ-UPVC- Class 4) 40 m Length from
KAIG3-RFI-SW-C-0258 00 Civil Management and 3/31/21 4/1/21 Approved as noted
(MH-X-01 to MH-X-01-1) at highlighted Area in the attached Dwg.
Maitenance Building
WARNING TAPE Installation for Foul Water Line (110mmØ-UPVC-CLASS 4) from (FW1-2 to Site Work near Water
KAIG3-RFI-SW-C-0259 00 Civil 3/28/21 3/29/21 Approved as noted
Warehouse) as per highlighted in dwg. Tank & Warehouse.
cancelled DAR
Excavation & Surface Preparation Prior to Backfill for foundation of boundary wall @ span 40, 41 & 42 @
4B KAIG3-RFI-WG-C-0260 00 Civil Water Play Garden 3/29/21 cancelled Engr. And Engr.
Water Garden at highlighted area in attached Drawing's.
Ali Makawi
SURFACE PREPARATION Prior to Start Backfilling Under Pipe for Storm Water Line from (MH-A-15 to Site Works near Green
KAIG3-RFI-SW-C-0261 00 Civil 3/29/21 4/1/21 Approved as noted
G-A-01) NEAR GREEN HOUSE. (SP #92). House
Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) from (MH-A-10 to MH-A- Site Work near Water
KAIG3-RFI-SW-C-0262 00 Civil 3/29/21 3/30/21 Approved as noted
11). At highlighted Area in the attached Dwg. Tank & Warehouse.
Pipe Installation of STORM WATER Line-OutFall-A for (450mmØ-UPVC- Class 4 ) for 28 m Length &
Site Works near Water
KAIG3-RFI-SW-C-0263 00 (315mmØ-UPVC-Class 4) for 5m length from (MH-A-12 to MH-A-13) at highlighted area in the attached Civil 3/30/21 3/31/21 Approved as noted
Tank Green House
dwg.

Site Work near Nursery


KAIG3-RFI-SW-C-0264 00 Excavation of Storm Water Line from (MH-A-10 to MH-A-02) Prior Gravel Bedding Includes MH-A-02. Civil 3/30/21 4/3/21 Approved as noted
Garden & Warehouse.

Excavation & Surface Preparation after the Backfilling upto Bottom of blinding of boundary wall at span 40,
4B KAIG3-RFI-WG-C-0265 00 Civil Water Play Garden 3/30/21 4/5/21 Approved as noted
41 & 42 @ Water Garden at highlighted area in attached Drawing's.

Pipe Installation of STORM WATER Line-OutFall-A for (450mmØ-UPVC- Class 4 ) for 29 m Length &
Site Works near Water
KAIG3-RFI-SW-C-0266 00 (315mmØ-UPVC- Class 4 ) for 16.5 m Length from (MH-A-13 to MH-A-14 ). At highlighted Area in the Civil 3/31/21 4/1/21 Approved as noted
Tank Green House
attached Dwg.
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (1) (SA-10) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0267 00 Civil Picnic Area 3/31/21 4/1/21 Approved as noted
Highlighted
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-22) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0268 00 Civil Picnic Area 3/31/21 4/3/21 Approved as noted
Highlighted
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-28) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0269 00 Civil Picnic Area 3/31/21 4/1/21 Approved as noted
Highlighted
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of Span 3, 4, 5 & 6 at Water Garden
4B KAIG3-RFI-WG-C-0270 00 Civil Water Play Garden 3/31/21 4/1/21 Approved as noted
at highlighted area in attached drawings.
Site Works near
KAIG3-RFI-SW-C-0271 00 Excavation for Foul Water Line from (FW6 to FCO) Prior Gravel Bedding. Civil Management and 4/1/21 4/6/21 Code C (not resubmit)
Maitenance Building
Site Works near
KAIG3-RFI-SW-C-0272 00 Excavation for Storm Water Line from (MH-A-14 to MH-A-15) Prior Gravel Bedding Includes (MH-A-15). Civil Management and 3/31/21 4/3/21 Approved as noted
Maitenance Building
Excavation for Storm Water Line from (MH-A-7 to MH-A-8) Prior Gravel Bedding Includes (MH-A-7 & Site Work near Water
KAIG3-RFI-SW-C-0273 00 Civil 3/31/21 4/3/21 Approved as noted
MH-A-8). Tank & Parking

kaig-qcals 84
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-SW-C-0274 00 Notification to start Cutting and Removing of The Highlight area in Drawing up to Level Finishing. Civil Site Works 4/1/21 4/4/21 Approved as noted
300 mm GRAVEL Backfilling above Foul Water Line for (160mmØ-UPVC- Class 4) 88m Length from Site Works near Water
KAIG3-RFI-SW-C-0276 00 Civil 4/11/21 4/12/21 Approved as noted
(FW1-2 to FW1-3). At highlighted Area in the attached Dwg. Tank
Site Works near
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC- Class
KAIG3-RFI-SW-C-0277 00 Civil Management and 4/1/21 4/4/21 Approved as noted
4) 60 Length from (MH-X-01 to MH-X-02). At highlighted Area in the attached Dwg.
Maitenance Building
Site Work near Water
KAIG3-RFI-SW-C-0278 00 Excavation for Storm Water Line from (MH-A-8 to MH-A-9) Prior Gravel Bedding Includes (MH-A-9). Civil 4/3/21 4/5/21 Approved as noted
Tank & Parking
Site Work near Water
KAIG3-RFI-SW-C-0279 00 Excavation for Storm Water Line from (MH-A-2 to MH-A-3) Prior Gravel Bedding Includes (MH-A-3). Civil 4/3/21 4/5/21 Approved as noted
Tank & Parking
Excavation & Surface Preparation prior to blinding of Light walls (G & F) at Sound & Light Garden, At
KAIG3-RFI-SG-C-0280 00 Civil Sound & Light Garden 4/4/21 4/6/21 Approved as noted
highlighted area in attached Drawing's.
KAIG3-RFI-SW-C-0281 00 Inspection for Excavation and Bedding Prepration at Plaza area as per highlighted. Civil Site Works 4/4/21 4/6/21 Approved as noted
KAIG3-RFI-SW-C-0282 00 Inspection for Excavation and Bedding Prepration at Plaza area as per highlighted. Civil Site Works 4/4/21 4/6/21 Approved as noted
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class Site Work near Water
KAIG3-RFI-SW-C-0283 00 Civil 4/4/21 4/5/21 Approved as noted
4) from (MH-A-7 to MH-A-8). At highlighted Area in the attached Dwg. Tank & Parking
Site Works near
Pipe Installation of STORM WATER Line-OutFall-A for (400mmØ-UPVC- Class 4 ) for 30 m Length from
KAIG3-RFI-SW-C-0284 00 Civil Management and 4/4/21 4/5/21 Approved as noted
(MH-A-7 to MH-A-8 ). At highlighted Area in the attached Dwg.
Maitenance Building
Site Works near
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class
KAIG3-RFI-SW-C-0285 00 Civil Management and 4/4/21 4/5/21 Approved as noted
4) from (MH-A-14 to MH-A-15) at highlighted area in the attached drawing.
Maitenance Building
Pipe Installation of STORM WATER Line-OutFall-A for (400mmØ-UPVC- Class 4 ) for 58 m Length & Site Works near
KAIG3-RFI-SW-C-0286 00 (315mmØ-UPVC- Class 4 ) for 10 m Length from (MH-A-14 to MH-A-15 ). At highlighted Area in the Civil Management and 4/4/21 4/5/21 Approved as noted
attached Dwg. Maitenance Building
Inspection After Removal of old crescents monument Beside Boundary wall Span 38, Near Entrance Gate at
KAIG3-RFI-SW-C-0287 00 highlighted area in attached Sketch Drawing & Photos of removal, as per Document No.DAR-KAIG-GEN- Civil Site Works 4/5/21 4/6/21 Approved as noted
0892
Excavation & Bed preparation for Sub Surface Main Drain Pipe (250mm, 200mm & 160mm Part 2) @
KAIG3-RFI-PG-C-0288 00 Civil Physic Garden 4/5/21 4/7/21 Approved as noted
Planting beds at Physic Garden at highlighted area in attached Drawing's.

Excavation & Bed preparation for Sub Surface Branch Drain Pipe (110mm & 160mm Part 2) Inside Planting
KAIG3-RFI-PG-C-0289 00 Civil Physic Garden 4/5/21 4/7/21 Approved as noted
beds room at Physic Garden at highlighted area in attached Drawing's.

Site Works near


KAIG3-RFI-SW-C-0290 00 Excavation for Storm Water Line from (G-X-7 to MH-X-01-1) Prior Gravel Bedding Includes (G-X-7). Civil Management and 4/6/21 4/8/21 Approved as noted
Maitenance Building
Excavation for FOUL WATER Line from (FW14 to FW16) Prior Gravel Bedding Includes the manhole Site Works near Aviary
KAIG3-RFI-SW-C-0291 00 Civil 4/6/21 4/8/21 Approved as noted
(FW15 & FW16). Garden
Site Works near
Backfilling of Gravel 3/8"( 300mm thk)above the pipes (400mm dia. Upvc class 4) for STORM WATER
KAIG3-RFI-SW-C-0292 00 Civil Management and 4/6/21 4/7/21 Approved as noted
Line- OUT FALL (MH-X-01 to MH-X-01-1) 40M Length.
Maitenance Building
Site Works near Admin
KAIG3-RFI-SW-C-0293 00 WARNING TAPE Installation for STORM WATER Line- OUT FALL (MH-X-01 to MH-X-01-1). Civil 4/6/21 4/7/21 Approved as noted
Building
Pipe installation for STORM WATER LINE-OUT FALL (450mmØ- upvc. Class 4) 60M length as per Site Works near Admin
KAIG3-RFI-SW-C-0294 00 Civil 4/6/21 4/8/21 Approved as noted
highlighted. Building

Bedding of Gravel 3/8" and Geotextile surrounding in pipes 800mm Ø) for STORM WATER LINE-OUT Site Work near Nursery
KAIG3-RFI-SW-C-0295 00 Civil 4/6/21 4/7/21 Approved as noted
FALL (MH-A-02 to MH-A-10); 26M length as per highlighted. Garden & Warehouse.

Pipe installation for STORM WATER LINE-OUT FALL ( 800mmØ- CORRUGATED pipe upvc. Class 4) Site Work near Nursery
KAIG3-RFI-SW-C-0296 00 Civil 4/6/21 4/8/21 Approved as noted
26M length as per highlighted. Garden & Warehouse.

KAIG3-RFI-SW-C-0297 00 Soil Preperation prior to start backfilling around Manhol NO # (B-2,-3,-4 ) at Zone 1 - as highlighted. Civil Site Works 4/6/21 4/8/21 Approved as noted

Excavation & Soil Preparation Prior to Backfilling for foundation of boundary wall @ span 43, 44, 45 & 46
4B KAIG3-RFI-WG-C-0298 00 Civil Water Play Garden 4/7/21 4/11/21 Approved as noted
@ Water Garden at highlighted area in attached Drawing's.
Inspection of Geotextile & Gravel 3/8 Backfilling around Storm Water Line Manhol ( MH-B-04,MH-B-
KAIG3-RFI-SW-C-0299 00 Civil Site Works 4/8/21 4/11/21 Approved as noted
03,MH-B2 ) From 1st to 2nd Layer at Zone-1 (as highlighted) (SP# 94).
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-25) (Inside + outside Area) as
KAIG3-RFI-PA-C-0300 00 Civil Picnic Area 4/10/21 4/12/21 Approved as noted
highlighted.

kaig-qcals 85
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-29) (Inside + outside Area) as
KAIG3-RFI-PA-C-0301 00 Civil Picnic Area 4/10/21 4/12/21 Approved as noted
highlighted.
Excavation for STORM WATER LINE from (MH-A-01 to OUT FALL )prior start gravel bedding as per Site Works near Nursery
KAIG3-RFI-SW-C-0302 00 Civil 4/10/21 4/12/21 Approved as noted
highlighted. Garden
Excavation for STORM WATER LINE from (MH-A-01 to MH-A-02) include MH-A-01 prior start gravel Site Works near Nursery
KAIG3-RFI-SW-C-0303 00 Civil 4/10/21 4/12/21 Approved as noted
bedding as per highlighted. Garden
Excavation & Surface Preparation Prior to Cast Blinding of boundary wall @ span 43 & 44 @ Water Garden
4B KAIG3-RFI-WG-C-0304 00 Civil Water Play Garden 4/10/21 4/12/21 Approved as noted
at highlighted area in attached drawings.

Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (110mm & 160mm Part 2) Inside
KAIG3-RFI-PG-C-0305 00 Civil Physic Garden 4/10/21 4/11/21 Approved as noted
Planting beds room at Physic Garden at highlighted area in attached drawings.

Rock top level after Removing of Soil material at the base of boundary wall @ span 43, 44, 45 & 46 @ Water
4B KAIG3-RFI-WG-C-0306 00 Civil Water Play Garden 4/10/21 4/13/21 Approved as noted
Garden at highlighted area in attached drawings.
Rock top level after Removing of Soil material at the base of boundary wall @ span 47, 48 & 49 @ Water
4B KAIG3-RFI-WG-C-0307 00 Civil Water Play Garden 4/10/21 4/13/21 Approved as noted
Garden at highlighted area in attached drawings.
Pipe installation for sub-suface drainage main line(160mmØ upvc class 4) & (110 CORRUGATED pipe
KAIG3-RFI-PG-C-0308 00 Civil Physic Garden 4/10/21 4/12/21 Approved as noted
upvc. Class 4); as per highlighted.

GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class Site Works near Water
KAIG3-RFI-SW-C-0309 00 Civil 4/11/21 4/12/21 Approved as noted
4) 38 Length from (MH-A-08 to MH-A-09). At highlighted Area in the attached Dwg. Tank

Pipe installation of Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38m Length & (315mmØ- Site Works near Water
KAIG3-RFI-SW-C-0310 00 Civil 4/11/21 4/12/21 Approved as noted
UPVC- Class 4) 2m Length from (MH-A-08 to MH-A-09) at highlighted area in the attached drawing. Tank

300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4) 29m Site Works near Water
KAIG3-RFI-SW-C-0311 00 Civil 4/11/21 4/12/21 Approved as noted
Length from (MH-A-13 to MH-A-14) at highlighted area in the attached drawing. Tank and Green House

300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4) 28m Site Works near Water
KAIG3-RFI-SW-C-0312 00 Civil 4/11/21 4/12/21 Approved as noted
Length from (MH-A-12 to MH-A-13). At highlighted Area in the attached Dwg. Tank and Green House

300 mm GRAVEL Backfilling above Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 36m Site Works near Aviary
KAIG3-RFI-SW-C-0313 00 Civil 4/11/21 4/13/21 Code C (resubmit)
Length from (MH-B-01 to G-B-10) at highlighted Area in the attached Dwg. Garden

300 mm GRAVEL Backfilling above Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 36m Site Works near Aviary
KAIG3-RFI-SW-C-0313 01 Civil 8/14/21 8/15/21 Approved as noted
Length from (MH-B-01 to G-B-10) at highlighted Area in the attached Dwg. Garden
Site Works near
300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 58m
KAIG3-RFI-SW-C-0314 00 Civil Management Building & 4/11/21 4/12/21 Approved as noted
Length from (MH-A-14 to MH-A-15) at highlighted Area in the attached Dwg.
Green House
300 mm GRAVEL Backfilling above Storm Water Line-Outfall A for (400mmØ-UPVC- Class 4) 30m Site Works near Water
KAIG3-RFI-SW-C-0315 00 Civil 4/11/21 4/13/21 Approved as noted
Length from (MH-A-07 to MH-A-08) at highlighted area in the attached Dwg. Tank
300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38 Length Site Works near Water
KAIG3-RFI-SW-C-0316 00 Civil 4/11/21 4/13/21 Approved as noted
from (MH-A-08 to MH-A-09) at highlighted Area in the attached Dwg. Tank

Site Works near


Excavation for STORM WATER LINE from (MH-A-15 to G-A-01) After Final Layer of Backfilling as per
KAIG3-RFI-SW-C-0317 00 Civil Management Building & 4/11/21 4/20/21 Code C (resubmit)
highlighted.
Green House

Site Works near


Excavation for STORM WATER LINE from (MH-A-15 to G-A-01) After Final Layer of Backfilling as per
KAIG3-RFI-SW-C-0317 01 Civil Management Building & 4/22/21 4/24/21 Approved as noted
highlighted.
Green House

Surface Preparation Prior to start Backfilling for Around Collonades Zone 2P (as highlighted) Axis 02-AT
KAIG3-RFI-CO-C-0318 00 Civil Crescent 4/11/21 4/14/21 Approved as noted
and 02-AW
duplicate, span 45
Excavation & Surface Preparation Prior to Cast Blinding of boundary wall @ span 45 & 46 @ Water Garden & 46 include
4B KAIG3-RFI-WG-C-0319 00 Civil Water Play Garden 4/12/21 cancelled
at highlighted area in attached drawings. already in RFI no.
C-0298

Gravel Bedding and Geotextile Surronding Storm Water Line-Outfall A for (600mmØ-PP-Corrugated) 78m Site Work near
KAIG3-RFI-SW-C-0320 00 Civil 4/13/21 4/14/21 Approved as noted
Length from (MH-A-02 to MH-A-03) at highlighted area in the attached drawing. Warehouse.

Pipe Installation of Storm Water Line-Outfall A for (600mmØ-PP-Corrugated) 78m Length from (MH-A-02 Site Work near
KAIG3-RFI-SW-C-0321 00 Civil 4/13/21 4/18/21 Approved as noted
to MH-A-03) at highlighted area in the attached drawing. Warehouse.

kaig-qcals 86
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

300 mm GRAVEL Backfilling above Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Site Work near
KAIG3-RFI-SW-C-0322 00 Civil 4/22/21 4/24/21 Code C (resubmit)
Length from (MH-A-02 to MH-A-03) at highlighted area in the attached drawing. Warehouse.

300 mm GRAVEL Backfilling above Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Site Work near
KAIG3-RFI-SW-C-0322 01 Civil 6/24/21 6/29/21 Approved as noted
Length from (MH-A-02 to MH-A-03) at highlighted area in the attached drawing. Warehouse.

Site Works near Aviary


KAIG3-RFI-SW-C-0323 00 Excavation of STORM WATER Line for Catch Basin (G-B-07 & G-B-08) as per highlighted. Civil 4/13/21 4/17/21 Approved as noted
Garden
Casting of Blinding Concrete of STORM WATER Line for Catch Basin (G-B-07 & G-B-08) as per Site Works near Aviary
KAIG3-RFI-SW-C-0324 00 Civil 4/13/21 4/18/21 Approved as noted
highlighted. Garden
Warning Tape Installation of Foul Water Line (400mmØ - UPVC - Class 4) from (FW1 to FW1-1) NEAR Site Work near
KAIG3-RFI-SW-C-0325 00 Civil 4/14/21 4/18/21 Approved as noted
WAREHOUSE. Warehouse.
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-23) (Inside + outside Area) as
KAIG3-RFI-PA-C-0326 00 Civil Picnic Area 4/14/21 4/17/21 Approved as noted
highlighted.
Gravel Bedding and Geotextile Surronding Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from Site Works near Aviary
KAIG3-RFI-SW-C-0327 00 Civil 4/14/21 4/17/21 Approved as noted
(FW14 to FW16) at highlighted area in the attached drawing. Garden
Pipe Installation of Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from (FW14 to FW16). At Site Works near Aviary
KAIG3-RFI-SW-C-0328 00 Civil 4/17/21 4/20/21 Approved as noted
highlighted Area in the attached Dwg. Garden

Site Works near Aviary


300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m
KAIG3-RFI-SW-C-0329 00 Civil Garden & Management 4/14/21 4/17/21 Code C (resubmit)
Length from (MH-X-01 to Outfall X) at highlighted area in the attached drawing.
Building

Site Works near Aviary


300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m
KAIG3-RFI-SW-C-0329 01 Civil Garden & Management 4/22/21 4/24/21 Code C (resubmit)
Length from (MH-X-01 to Outfall X) at highlighted area in the attached drawing.
Building

Site Works near Aviary


300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m
KAIG3-RFI-SW-C-0329 02 Civil Garden & Management 6/24/21 6/29/21 Approved as noted
Length from (MH-X-01 to Outfall X) at highlighted area in the attached drawing.
Building

Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 7, 8, 9, 10 & 11 of Water
4B KAIG3-RFI-WG-C-0330 00 Civil Water Play Garden 4/17/21 4/19/21 Approved as noted
Garden, as per highlighted area in attached drawings.

Site Works near Aviary


Gravel Bedding and Geotextile Surronding Foul Water Line for (160mmØ-UPVC- Class 4) 69m Length from
KAIG3-RFI-SW-C-0331 00 Civil Garden & Management 4/17/21 4/18/21 Approved as noted
(FW1-1 to FW1-2). At highlighted Area in the attached Dwg.
Building

Gravel Bedding and Geotextile Surronding Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) Site Works near Nursery
KAIG3-RFI-SW-C-0332 00 Civil 4/17/21 4/19/21 Approved as noted
121m Length from (MH-A-02 to Outfall A). At highlighted Area in the attached Dwg. Garden

Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 121m Length (2 - 4m Depth) Site Works near Nursery
KAIG3-RFI-SW-C-0333 00 Civil 4/17/21 4/20/21 Approved as noted
from (MH-A-02 to Outfall A). At highlighted Area in the attached Dwg. Garden

Pipe Installation of Foul Water Line (160mmØ-UPVC-Class 4) 69m Length ( 4m - 6m Average Depth ) from Site Works near Nursery
KAIG3-RFI-SW-C-0334 00 Civil 4/17/21 4/20/21 Approved as noted
(FW1-1 to FW1-2). At highlighted Area in the attached Dwg. Garden
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Main line 110mm & 160mm)(250mm,
KAIG3-RFI-PG-C-0335 00 200mm & 160mm Part 2)(110mm & 160mm Part 2) at Physic Garden at highlighted area in attached Civil Physic Garden 4/18/21 4/19/21 Approved as noted
drawings.
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2)(SA-30) (Inside+outside area) as
KAIG3-RFI-PA-C-0336 00 Civil Picnic Area 4/18/21 4/20/21 Approved as noted
highlighted.
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-31) (Inside+outside Area) as
KAIG3-RFI-PA-C-0337 00 Civil Picnic Area 4/18/21 4/20/21 Approved as noted
highlighted.
Site Works near Aviary
KAIG3-RFI-SW-C-0338 00 Casting of Blinding Concrete of Storm Water Line for Catch Basin (G-B-01,02,03 and 04) as per highlighted. Civil 4/18/21 4/20/21 Approved as noted
Garden
Excavation & Bed Preparation of Storm Water Line for Catch Basin (G-B-01,02,03 and 04). as per Site Works near Aviary
KAIG3-RFI-SW-C-0339 00 Civil 4/18/21 4/20/21 Approved as noted
highlighted Garden

Excavation of Storm Water Line for Catch Basin (G-B-05,06 & 09) Prior Blinding Concrete. as per Site Works near Water
KAIG3-RFI-SW-C-0340 00 Civil 4/20/21 4/22/21 Approved as noted
highlighted. Play & Aviary Garden

Site Works near Water


KAIG3-RFI-SW-C-0341 00 Casting of Blinding Concrete of Storm Water Line for Catch Basin (G-B-05, 06 & 09) as per highlighted. Civil 4/20/21 4/22/21 Approved as noted
Play & Aviary Garden

KAIG3-RFI-SW-C-0342 00 Surface Preperation prior to start backfilling behind the boundary wall at Zone-D (as highlighted). Civil Site Works 4/20/21 4/22/21 Approved as noted

kaig-qcals 87
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
300 mm GRAVEL Backfilling above Foul Water Line for (160mmØ-UPVC-Class 4) 33m Length from Site Works near Aviary
KAIG3-RFI-SW-C-0343 00 Civil 4/20/21 4/21/21 Approved as noted
(FW14 to FW16) at highlighted area in the attached drawing. Garden
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of Span 14, 15, 16, 17, 18, 19 & 20 at
4B KAIG3-RFI-WG-C-0344 00 Civil Water Play Garden 4/20/21 4/22/21 Approved as noted
Water Garden at highlighted area in attached drawings.
Site Works near Aviary
KAIG3-RFI-SW-C-0345 00 Excavation for Foul Water Manholes (FW15 & FW16) at highlighted area in the attached Dwg. Civil 4/21/21 4/22/21 Approved as noted
Garden
Site Works near
KAIG3-RFI-SW-C-0346 00 Excavation for Storm Water Line inside Management Building as per highlighted. Civil 4/22/21 4/25/21 Code C (resubmit)
Management Building
Site Works near
KAIG3-RFI-SW-C-0346 01 Excavation for Storm Water Line inside Management Building as per highlighted. Civil 4/26/21 4/29/21 Approved as noted
Management Building
KAIG3-RFI-SW-C-0347 00 Soil Preperation prior to start backfilling Wall Outside for SBC 4 - as highlighted. Civil Site Works 4/21/21 4/24/21 Approved as noted

300 mm GRAVEL Backfilling above Foul Water Line (160mmØ-UPVC-Class 4) 69m Length from (FW1-1 Site Works near Nursery
KAIG3-RFI-SW-C-0348 00 Civil 4/22/21 4/24/21 Approved as noted
to FW1-2) at highlighted area in the attached drawing. Garden and Warehouse

300 mm GRAVEL Backfilling above Storm Water Line- OutFall - A for (800mmØ-PP-Corrugated ) 90m Site Work near Water
KAIG3-RFI-SW-C-0349 00 Civil 4/22/21 4/24/21 Approved as noted
Length from (MH-A-10 to MH-A-11 ) at highlighted area in the attached drawing. Tank & Warehouse.

WARNING TAPE Installation for Storm Water Line-Outfall A for (450mmØ-UPVC-Class4) 29m Length Site Work near Water
KAIG3-RFI-SW-C-0350 00 Civil 4/22/21 4/24/21 Approved as noted
from (MH-A-13 to MH-A-14). Tank & Green House
WARNING TAPE Installation for Storm Water Line-Outfall A for (450mmØ-UPVC-Class4) 28m length Site Work near Water
KAIG3-RFI-SW-C-0351 00 Civil 4/22/21 4/24/21 Approved as noted
from (MH-A-12 to MH-A-13). Tank & Green House
300 mm GRAVEL Backfilling above Storm Water Line- OutFall - A for (450mmØ-UPVC-Class4 ) 34.5m Site Work near Water
KAIG3-RFI-SW-C-0352 00 Civil 4/22/21 4/24/21 Approved as noted
Length from (MH-A-11 to MH-A-12 ) at highlighted area in the attached Dwg. Tank
Gravel & Geotextile for Sub Surface Branch Drain Pipe (Main line 110mm & 160mm)(250mm, 200mm &
KAIG3-RFI-PG-C-0353 00 Civil Physic Garden 4/22/21 4/24/21 Approved as noted
160mm Part 2)(110mm & 160mm Part 2) at Physic Garden at highlighted area in attached drawings. Site Works near Green
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 58m Length from
KAIG3-RFI-SW-C-0354 00 Civil House & Management 4/22/21 4/24/21 Approved as noted
(MH-A-14 to MH-A-15) at highlighted area in the attached Dwg.
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 30m Length from Building
Site Work near Water
KAIG3-RFI-SW-C-0355 00 Civil 4/22/21 4/24/21 Approved as noted
(MH-A-07 to MH-A-08). At highlighted Area in the attached Dwg. Tank & Parking
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38 Length from Site Work near Water
KAIG3-RFI-SW-C-0356 00 Civil 4/22/21 4/24/21 Approved as noted
(MH-A-08 to MH-A-09) at highlighted area in the attached Dwg. Tank & Parking
Casting of Blinding Concrete for Foul Water Manholes (FW15 & FW16) at highlighted Area in the attached Site Works near Aviary
KAIG3-RFI-SW-C-0357 00 Civil 4/22/21 4/25/21 Approved as noted
Dwg. Garden
Site Works near Water
Casting of Blinding Concrete for Storm Water Manholes (MH-A-07, MH-A-08, MH-A-09, MH-A-13, MH-
KAIG3-RFI-SW-C-0358 00 Civil Tank & Management 4/22/21 4/24/21 Approved as noted
A-14, MH-A-15 & MH-X-01, MH-X-02, MH-X-01-1) at highlighted in the attached Dwg.
Pipe Installation of Subsurface Drainage(Main Line) for (160mmØ-UPVC- Class 4) 12m Length & Building
Site Works near Physic
KAIG3-RFI-SW-C-0359 00 Civil 4/22/21 4/25/21 Approved as noted
(110mmØ-UPVC-Class 4) 36m Length as highlighted area in the attached Dwg. Garden
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0360 00 Civil Site Works 4/24/21 4/25/21 Approved as noted
CONCRETE
INSPECTIONFOR FORSHORT
MANHOLE PIECEBASE
- MH-B-04 (As Highlighted)
INSTALLATION, UPVC PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0361 00 CONCRETE FOR SHORT PIECE ( FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1, FW12-2, FW13, FW14) Civil Site Works 4/24/21 4/25/21 Approved as noted
(As Highlighted).
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-17) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0362 00 Civil Picnic Area 4/25/21 4/26/21 Approved as noted
Highlighted.
Surface Preparation Prior to start Backfilling for Around Pilecaps 173, 171, 169, 167 (as Highlighted) Zone
KAIG3-RFI-CO-C-0363 00 Civil Crescent 4/25/21 4/26/21 Approved as noted
2M Site Works between Green
Gravel 3/8'' Bedding and Geotextile Surronding Storm Water Line- Outfall-A for (315mmØ-UPVC- Class 4)
KAIG3-RFI-SW-C-0364 00 Civil House and Management 4/25/21 4/26/21 Approved as noted
48m Length from (MH-A-15 to G-A-01). At highlighted Area in the attached Dwg. Site Works between Green
Pipe Installation of Storm Water Line- Outfall-A for (315mmØ-UPVC- Class 4) 48m Length from (MH-A-15 Building
KAIG3-RFI-SW-C-0365 00 Civil House and Management 4/25/21 4/27/21 Approved as noted
to G-A-01). At highlighted Area in the attached Dwg.
Gravel 3/8'' Bedding and Geotextile Surronding Storm Water Line- Outfall-X for (315mmØ-UPVC- Class 4) Site Building
Works bnear
KAIG3-RFI-SW-C-0366 00 Civil 4/25/21 4/26/21 Approved as noted
20m Length from (MH-X-01-1 to G-X-07). At highlighted Area in the attached Dwg. Management Building
Pipe Installation of Storm Water Line- Outfall-X for (315mmØ-UPVC- Class 4) 20m Length from (MH-X- Site Works bnear
KAIG3-RFI-SW-C-0367 00 Civil 4/25/21 4/27/21 Approved as noted
01-1 to G-X-07). At highlighted Area in the attached Dwg. Management Building
300 mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line -Outfull-A for ( 800mmØ - PP- Site Works near Nursery
KAIG3-RFI-SW-C-0368 00 Civil 4/25/21 4/26/21 Approved as noted
Corrugated) 26m Length from (MH-A-02 to MH-A-10). As per high lighted.(SP# 94) Garden
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW6-
KAIG3-RFI-SW-C-0369 00 Civil Site Works 4/28/21 5/4/21 Approved as noted
2, FW6-3) (as highlighted).
Pipe Installation of Storm Water Line-Outfall A for (800mmØ-PP- Corrugated) 44m Length from (MH-A-01 Site Works near Nursery
KAIG3-RFI-SW-C-0370 00 Civil 4/28/21 5/1/21 Code C (resubmit)
to Outfall A) at highlighted area in the attached Dwg. Garden
Pipe Installation of Storm Water Line-Outfall A for (800mmØ-PP- Corrugated) 44m Length from (MH-A-01 Site Works near Nursery
KAIG3-RFI-SW-C-0370 01 Civil 5/3/21 5/5/21 Approved as noted
to Outfall A). At highlighted Area in the attached Dwg. Garden
300mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line Outfall A for (800mmØ-PP - Site Works near Nursery
KAIG3-RFI-SW-C-0371 00 Civil 4/29/21 4/29/21 Approved as noted
Corrugated) 77m length from (MH-A-01 to MH-A-02) at highlighted area in the attached drawing. Garden
300mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line Outfall A for (450mmØ-UPVC - Site Works near Nursery
KAIG3-RFI-SW-C-0372 00 Civil 4/29/21 4/29/21 Approved as noted
Class 4) 60m length from (MH-X-01 to MH-X-02) at highlighted area in the attached drawing. Garden
INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT (FW1-2.1, FW1-2.2,
KAIG3-RFI-SW-C-0373 00 Civil Site Works 4/28/21 5/3/21 Approved as noted
FW1-4, FW12, FW12-1, FW12-2, FW13, FW14) (As Highlighted)
INSPECTION FOR APPLICATION OF PRIMER (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1, FW12-2,
KAIG3-RFI-SW-C-0374 00 Civil Site Works 4/28/21 5/3/21 Approved as noted
FW13, FW14) (As Highlighted).
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1,
KAIG3-RFI-SW-C-0375 00 Civil Site Works 5/1/21 5/4/21 Approved as noted
FW1-3.1) (As Highlighted).
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 18, 19, 20, 21, 22, 23, 24 &
4B KAIG3-RFI-WG-C-0376 00 Civil Water Play Garden 5/2/21 5/4/21 Approved as noted
25 of Water Garden, as per highlighted area in attached drawings.
INSPECTION FOR APPLICATION OF PRIMER 2nd Coat (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1,
KAIG3-RFI-SW-C-0377 00 Civil Site Works 5/3/21 5/4/21 Approved as noted
FW12-2, FW13, FW14) (As Highlighted).
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1-
KAIG3-RFI-SW-C-0378 00 Civil Site Works 5/3/21 5/4/21 Approved as noted
3.2, FW7) (as highlighted).
KAIG3-RFI-CO-C-0379 00 Surface Preparation Prior to start Backfilling for Internal Building (as Highlighted) Zone 2C Civil Crescent 5/3/21 5/4/21 Approved as noted

kaig-qcals 88
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Bedding of Gravel 3/8" and Geotextile surround in Storm Water Line- Outfall X for (315mmØ-UPVC- Class Site Works near
KAIG3-RFI-SW-C-0380 00 Civil 5/3/21 5/5/21 Approved as noted
4) BETWEEN IN 2 BLDG. OF MANAGEMENT. At highlighted Area in the attached Dwg. Management Building
Pipe Installation of Storm Water Line- Outfall X for (315mmØ-upvc class 4) . BETWEEN IN 2 BLDG. OF Site Works near
KAIG3-RFI-SW-M-0381 00 Civil 5/3/21 5/5/21 Approved as noted
MANAGEMENT. At highlighted Area in the attached Dwg. Management Building
INSPECTION FOR APPLICATION OF PRIMER 3rd Coat (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1,
KAIG3-RFI-SW-C-0382 00 Civil Site Works 5/3/21 5/5/21 Approved as noted
FW12-2, FW13, FW14) (As Highlighted).
Warning Tape Installation of Storm Water Line -Outfull-A for ( 800mmØ - PP- Corrugated) 26m Length Site Works near Nursery
KAIG3-RFI-SW-C-0383 00 Civil 5/3/21 5/6/21 Approved as noted
from (MH-A-02 to MH-A-10) as per highlighted. Garden
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from (FW14 to Site Works near Aviary
KAIG3-RFI-SW-C-0384 00 Civil 5/3/21 5/6/21 Approved as noted
FW16). At highlighted Area in the attached Dwg. Garden
Site Works between
Warning Tape Installation for Foul Water Line (160mmØ-UPVC-Class 4) 69m Length from (FW1-1 to FW1-
KAIG3-RFI-SW-C-0385 00 Civil Nursery Garden & 5/3/21 5/6/21 Approved as noted
2). At highlighted Area in the attached Dwg.
Warehouse
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW5,
4A 4B KAIG3-RFI-SW-C-0389 00 Civil Site Works 5/5/21 5/6/21 Code C (resubmit)
FW6, FW8, FW9-1) (as highlighted).
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW5,
4A 4B KAIG3-RFI-SW-C-0389 01 Civil Site Works 8/31/21 9/8/21 Approved as noted
FW6, FW8, FW9-1) (as highlighted).
Soil Preparation prior to backfill along the Boundary Wall (Outer Side) of Span 30 & 33 of Water Garden as
4B KAIG3-RFI-WG-C-0390 00 Civil Water Play Garden 5/5/21 5/8/21 Approved as noted
per highlighted area in attached drawing.
Soil Preperation prior to start backfilling around the Manholes for FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-
KAIG3-RFI-SW-C-0391 00 Civil Site Works 5/6/21 5/9/21 Approved as noted
1, FW12-2, FW13, FW14 (As Highlighted).
Bedding of Gravel 3/8" and Geotextile surround in Foul Water Line-for (110mmØ-UPVC-Class 4) between Site Works near
KAIG3-RFI-SW-C-0392 00 Civil 5/8/21 5/9/21 Approved as noted
in 2 Bldg. of Management at highlighted area in the attached drawing. Management Building
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-2.1, FW1-
KAIG3-RFI-SW-C-0393 00 Civil Site Works 5/9/21 5/11/21 Approved as noted
2.2, FW1-4, FW12, FW12-1, FW12-2, FW13, FW14 (As Highlighted) STOCK PILE # 106
INSPECTION FOR PUNCHING OF MANHOLES FOR - FW1-2.1, FW1-2.2, FW1-3.1, FW1-3.2, FW1-4,
KAIG3-RFI-SW-C-0394 00 Civil Site Works 5/9/21 5/10/21 Code C (not resubmit)
FW6-2, FW6-3, FW9-1, FW13 (As Highlighted)

withdrawn by the
KAIG3-RFI-CO-C-0395 00 Surface Preparation Prior to start Backfilling for Tunnel 1 (as Highlighted) Zone 2H. Civil Crescent 5/9/21 cancelled
Engr. Yaseen

Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of span 21 of Water Garden, as per
4B KAIG3-RFI-WG-C-0396 00 Civil Water Play Garden 5/9/21 5/11/21 Approved as noted
highlighted area in attached drawings.
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-14) (Inside+outside Area) as
KAIG3-RFI-PA-C-0397 00 Civil Picnic Area 5/17/21 5/18/21 Approved as noted
highlighted.
INSPECTION OF SURFACE PREPARATION FOR CONCRETE ENCASEMENT OF (FW1-2.3, FW1-3.1,
KAIG3-RFI-SW-C-0398 00 Civil Site Works 5/17/21 5/19/21 Approved as noted
FW1-3.2, FW5, FW6, FW7, FW8) PRIOR TO START WATERPROOFING (as highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-1
KAIG3-RFI-SW-C-0399 00 Civil Site Works 5/17/21 5/20/21 Approved as noted
(As Highlighted).
INSPECTION FOR APPLICATION OF PRIMER 1st Coat FOR (FW1-2.3, FW1-3.1, FW1-3.2, FW5, FW6,
KAIG3-RFI-SW-C-0400 00 Civil Site Works 5/17/21 5/19/21 Approved as noted
FW7, FW8) (as highlighted).
Notification to Start Removal of Disposal Materials between the 2 Retaining walls as per the Highlighted
KAIG3-RFI-SW-C-0401 00 Civil Site Works 5/17/21 5/20/21 Approved as noted
Area & Attached Survey Report.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-
KAIG3-RFI-SW-C-0402 00 2.1, FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4, FW7, FW6-2, FW6-3, FW12, FW12-1, FW12.2, FW13, Civil Site Works 5/17/21 5/18/21 Code C (resubmit)
FW14) as highlighted.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-
KAIG3-RFI-SW-C-0402 01 2.1, FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4, FW7, FW6-2, FW6-3, FW12, FW12-1, FW12.2, FW13, Civil Site Works 5/20/21 5/22/21 Code C (resubmit)
FW14) as highlighted.

INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR (G-A-01, G-A-
KAIG3-RFI-SW-C-0403 00 Civil Site Works 5/17/21 5/18/21 Code C (resubmit)
02, G-A-03, G-A-04, G-A-05, G-A-06, G-A-07, G-A-08, G-A-09) (as highlighted).

INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR (G-A-01, G-A-
KAIG3-RFI-SW-C-0403 01 Civil Site Works 5/30/21 6/5/21 Approved as noted
02, G-A-03, G-A-04, G-A-05, G-A-06, G-A-07, G-A-08, G-A-09) (as highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0404 00 Civil Site Works 5/17/21 5/19/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE - MH-A-13, MH-A-15 (As Highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0404 01 Civil Site Works 5/20/21 5/22/21 Approved as noted
CONCRETE FOR SHORT PIECE - MH-A-13, MH-A-15 (As Highlighted).
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4,
KAIG3-RFI-SW-C-0405 00 Civil Site Works 5/17/21 5/18/21 Code C (resubmit)
FW6-2, FW6-3, FW12, FW12-1, FW12.2, FW13, FW14) - As Highlighted

kaig-qcals 89
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
300 mm Gravel 3/8" Backfilling and Geotextile Above Foul Water Line for (110mmØ-UPVC- Class 4) from Site Works near
KAIG3-RFI-SW-C-0406 00 Civil 5/18/21 5/20/21 Approved as noted
(MB to FW6). At highlighted Area in the attached Dwg. (SP# 94) Management Building
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) from (MB to FW6). At Site Works near
KAIG3-RFI-SW-M-0407 00 Civil 5/19/21 5/20/21 Approved as noted
highlighted Area in the attached Dwg. Management Building

300 mm Gravel 3/8" Backfilling Above Storm Water Line- Outfall -X for (315mmØ-UPVC- Class 4) Inside Site Works near
KAIG3-RFI-SW-C-0408 00 Civil 5/18/21 5/20/21 Approved as noted
Management Building. At highlighted Area in the attached Dwg. (SP# 94) Management Building

Warning Tape Installation for Storm Water Line- Outfall -X for (315mmØ-UPVC- Class 4) Inside Site Works near
KAIG3-RFI-SW-M-0409 00 Civil 5/19/21 5/20/21 Approved as noted
Management Building at highlighted area in the attached dwg. Management Building

INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING


KAIG3-RFI-SW-C-0410 00 Civil Site Works 5/17/21 5/19/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE - MH-X-01, MH-X-02, MH-X-01-1 (as highlighted).

INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING


KAIG3-RFI-SW-C-0410 01 Civil Site Works 5/20/21 5/22/21 Approved as noted
CONCRETE FOR SHORT PIECE - MH-X-01, MH-X-02, MH-X-01-1 (as highlighted).

INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) as


KAIG3-RFI-SW-C-0411 00 Civil Site Works 5/17/21 5/18/21 Code C (resubmit)
highlighted.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) as
KAIG3-RFI-SW-C-0411 01 Civil Site Works 5/20/21 5/22/21 Code C (resubmit)
highlighted.
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0412 00 Civil Site Works 5/17/21 5/19/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE - MH-A-07, MH-A-08, MH-A-09 (as highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0412 01 Civil Site Works 5/20/21 5/22/21 Approved as noted
CONCRETE FOR SHORT PIECE - MH-A-07, MH-A-08, MH-A-09 (as highlighted).
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-A-07, MH-A-
KAIG3-RFI-SW-C-0413 00 Civil Site Works 5/17/21 5/18/21 Code C (resubmit)
08, MH-A-09) as highlighted.
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-
KAIG3-RFI-SW-C-0414 00 Civil Site Works 5/17/21 5/20/21 Code C (resubmit)
2.3 (As Highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-
4C KAIG3-RFI-SW-C-0414 01 Civil Site Works 9/20/21 9/25/21 Approved as noted
2.3 (As Highlighted).
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 34 & 35 of Water Garden, as
4B KAIG3-RFI-WG-C-0415 00 Civil Water Play Garden 5/18/21 5/19/21 Approved as noted
per highlighted area in attached drawings.
INSPECTION FOR APPLICATION OF PRIMER 2nd & 3rd Coat FOR (FW1-2.3, FW1-3.1, FW1-3.2,
KAIG3-RFI-SW-C-0416 00 Civil Site Works 5/18/21 5/20/21 Approved as noted
FW5, FW6, FW7, FW8) (as highlighted).
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-19) (Inside+outside Area) as
KAIG3-RFI-PA-C-0417 00 Civil Picnic Area 5/18/21 5/19/21 Approved as noted
highlighted.

KAIG3-RFI-CO-C-0418 00 Surface Preparation Prior to start Backfilling for Around Pilecaps 159, 161, 163 (as Highlighted) Zone 2L. Civil Crescent 5/18/21 5/19/21 Approved as noted

KAIG3-RFI-CO-C-0419 00 Surface Preparation Prior to start Backfilling for Internal Building (as Highlighted) Zone 2C (2nd part). Civil Crescent 5/18/21 5/20/21 Approved as noted

Excavation and Surface Preperation For Catch Basin (G-A-01, G-A-03, G-A-06, G-A-07, G-A-08, G-A-09,
KAIG3-RFI-SW-C-0420 00 Civil Site Works 5/18/21 5/23/21 Approved as noted
G-A-10, G-A-11, G-X-07 (as Highlighted).
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-01, G-A-03, G-A-06, G-A-07, G-
KAIG3-RFI-SW-C-0421 00 Civil Site Works 5/18/21 5/20/21 Approved as noted
A-08, G-A-09, G-A-10, G-A-11, G-X-07 (as highlighted)

KAIG3-RFI-SW-C-0422 00 Excavation and Surface Preperation For Manhole (MH-X-03) as highlighted. Civil Site Works 5/18/21 5/22/21 Approved as noted

KAIG3-RFI-SW-C-0423 00 Inspection for Casting the Blinding Concrete under the Manhole (MH-X-03) (as Highlighted). Civil Site Works 5/18/21 5/20/21 Approved as noted

Excavation & Surface Preparation for foundation of Whisper Cave 1 & 2, at Sound & Light Garden, At
KAIG3-RFI-SG-C-0424 00 Civil Sound & Light Garden 5/19/21 5/20/21 Code C (resubmit)
highlighted area in attached Drawing's
Excavation & Surface Preparation for foundation of Whisper Cave 1 & 2, at Sound & Light Garden, At
KAIG3-RFI-SG-C-0424 01 Civil Sound & Light Garden 5/31/21 6/2/21 Approved as noted
highlighted area in attached Drawing's
Excavation & Surface Preparation for foundation of Manhole (MH-C-3-2) prior to blinding @ East Side in
KAIG3-RFI-AG-C-0425 00 Civil Aviary Garden 5/19/21 5/23/21 Approved as noted
Aviary garden at highlighted in the attached drawings.
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-27) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0426 00 Civil Picnic Area 5/19/21 5/23/21 Approved as noted
Highlighted
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-40) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0427 00 Civil Picnic Area 5/19/21 5/23/21 Approved as noted
Highlighted
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-2.3, FW1-
KAIG3-RFI-SW-C-0428 00 Civil Site Works 5/20/21 5/26/21 Approved as noted
3.1, FW1-3.2, FW5, FW6, FW7, FW8 (As Highlighted) STOCK PILE # 106.
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-16) (Inside+outside Area) as
KAIG3-RFI-PA-C-0429 00 Civil Picnic Area 5/20/21 5/23/21 Approved as noted
highlighted.

kaig-qcals 90
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-CO-C-0430 00 Surface Preparation Prior to start Backfilling for TIP 1P (as Highlighted) Zone 1P. Civil Crescent 5/22/21 5/24/21 Approved

Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 36 of Water Garden, as per
4B KAIG3-RFI-WG-C-0431 00 Civil Water Play Garden 5/22/21 5/24/21 Approved
highlighted area in attached drawings.

KAIG3-RFI-SW-C-0432 00 Excavation for Storm Water Line from G-A-10 to G-A-11 prior to start Gravel Bedding (as Highlighted). Civil Site Works 5/22/21 5/25/21 Approved as noted

KAIG3-RFI-SW-C-0433 00 Excavation for Storm Water Line inside Management Building prior to start Gravel Bedding (as Highlighted). Civil Site Works 5/22/21 5/23/21 Approved as noted

Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-30) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0434 00 Civil Picnic Area 5/22/21 5/26/21 Approved as noted
Highlighted
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0435 00 Civil Picnic Area 5/22/21 5/26/21 Approved as noted
(SA-34) - As Highlighted.
Soil Preperation after removing the Disposal Material between the 2 retaining walls as per the highlighted
KAIG3-RFI-SW-C-0436 00 Civil Site Works 5/23/21 5/26/21 Approved as noted
area & attached Survey report.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-40) as
KAIG3-RFI-PA-C-0437 00 Civil Picnic Area 5/23/21 5/26/21 Approved as noted
highlighted.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-30) as
KAIG3-RFI-PA-C-0438 00 Civil Picnic Area 5/23/21 5/26/21 Approved as noted
highlighted
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 37 of Water Garden, as per
4B KAIG3-RFI-WG-C-0439 00 Civil Water Play Garden 5/23/21 5/24/21 Approved
highlighted area in attached drawings.

KAIG3-RFI-SW-C-0440 00 Excavation for Foul Water Line from FW-A-25 to FW-A-22 prior to start Gravel Bedding (as Highlighted) Civil Site Works 5/24/21 5/26/21 Code C (resubmit)

KAIG3-RFI-SW-C-0440 01 Excavation for Foul Water Line from FW-A-25 to FW-A-22 prior to start Gravel Bedding (as Highlighted) Civil Site Works 5/31/21 6/2/21 Approved as noted

Inspection for casing the Concrete Encasement for the Storm Water Line As per the Highlighted area in the
KAIG3-RFI-SW-C-0441 00 Civil Site Works 5/24/21 5/26/21 Approved as noted
attached Drawings.
Inspection for cutting and removal of the disposal material upto the finish level near the New Ticketing area
KAIG3-RFI-SW-C-0442 00 Civil Site Works 5/24/21 5/26/21 Approved as noted
as highlighted.
Surface Preperation prior to start backfilling behind the boundary wall at Zone-3B (Span#23 to Span # 38) as
KAIG3-RFI-SW-C-0443 00 Civil Site Works 5/24/21 5/26/21 Approved as noted
highlighted.
Notification to Start Road Cutting and Layers Construction for Main Access and VIP Bus Parking at Zone-3A
KAIG3-RFI-SW-C-0444 00 Civil Site Works 5/24/21 5/26/21 Approved as noted
& 3B (as highlighted).
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0445 00 Civil Picnic Area 5/24/21 5/26/21 Approved as noted
(SA-27) as highlighted.
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
KAIG3-RFI-PA-C-0446 00 Civil Picnic Area 5/24/21 5/26/21 Approved as noted
(SA-40) as highlighted.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-27) as
KAIG3-RFI-PA-C-0447 00 Civil Picnic Area 5/24/21 5/29/21 Approved as noted
highlighted.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-35) as
KAIG3-RFI-PA-C-0448 00 Civil Picnic Area 5/24/21 5/26/21 Approved as noted
highlighted.
Excavation and Surface Preparation Prior to start Backfilling For Telecommunication & (Fire & Scurity) at
KAIG3-RFI-SW-C-0449 00 Civil Site Works 5/24/21 5/26/21 Code C (not resubmit)
Zone L (as highlighted)
Installation of Manhole (MH-C-3-2) with Backdrop Connection's as per SCR @ Aviary garden, at highlighted
KAIG3-RFI-AG-C-0450 00 Civil Aviary Garden 5/25/21 5/29/21 Approved as noted
area in the attached drawing's.
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
4C KAIG3-RFI-SW-C-0451 00 Civil Site Works 5/25/21 5/26/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE FOR (FW1-2) - as highlighted.
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
4C KAIG3-RFI-SW-C-0451 01 Civil Site Works 8/31/21 9/1/21 Approved as noted
CONCRETE FOR SHORT PIECE FOR (FW1-2) - as highlighted.
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0452 00 Civil Site Works 5/25/21 5/27/21 Approved as noted
CONCRETE FOR SHORT PIECE - MH-X-03, MH-A-14 (as highlighted)
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-36) (Inside+outside Area) - As
KAIG3-RFI-PA-C-0453 00 Civil Picnic Area 5/26/21 5/29/21 Approved as noted
Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-30) As
KAIG3-RFI-PA-C-0454 00 Civil Picnic Area 5/26/21 5/31/21 Code C (resubmit)
Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-30) As
KAIG3-RFI-PA-C-0454 01 Civil Picnic Area 6/1/21 06/02/21 Approved as noted
Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-35) As
KAIG3-RFI-PA-C-0455 00 Civil Picnic Area 5/26/21 5/31/21 Approved as noted
Highlighted.
INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As
KAIG3-RFI-SW-C-0456 00 Civil Site Works 5/26/21 5/31/21 Approved as noted
Highlighted).
INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR -G-A-03, G-A-
KAIG3-RFI-SW-C-0457 00 Civil Site Works 5/26/21 5/29/21 Code C (resubmit)
06, G-A-07, G-A-08, G-A10, G-A-11 (As Highlighted).

kaig-qcals 91
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-CO-C-0458 00 Surface Preparation Prior to start Backfilling for Around PC 155 & 157 (as Highlighted) Zone 2K. Civil Crescent 5/27/21 5/31/21 Approved as noted

INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (FW1-1, FW1-1,


KAIG3-RFI-SW-C-0459 00 Civil Site Works 5/27/21 5/31/21 Approved as noted
FW6-1, FW6-2, FW9-1) PRIOR TO START WATERPROOFING (as highlighted).
INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (MH-A-07, MH-A-
KAIG3-RFI-SW-C-0460 00 08, MH-A-09, MH-A-13, MH-A-15, MH-X-1, MH-X-1-1) PRIOR TO START WATERPROOFING (as Civil Site Works 5/27/21 5/29/21 Approved as noted
highlighted).
INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - G-B-03, G-B-04, G-B-05, G-B-06 (as
KAIG3-RFI-SW-C-0461 00 Civil Site Works 5/27/21 5/31/21 Approved as noted
highlighted).
Excavation and Surface Preperation For Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-08,
KAIG3-RFI-SW-C-0462 00 Civil Site Works 5/27/21 5/29/21 Approved as noted
G-X-09) - as Highlighted.
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-
KAIG3-RFI-SW-C-0463 00 Civil Site Works 5/27/21 5/29/21 Approved as noted
A-26, G-X-8, G-X-9 (as Highlighted).
Surface Preperation prior to start backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-B-
KAIG3-RFI-SW-C-0464 00 Civil Site Works 5/27/21 5/31/21 Approved as noted
07, G-B-08, G-B-09 ) - as Highlighted.

Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-B-07, G-B-08, G-B-09
KAIG3-RFI-SW-C-0465 00 Civil Site Works 5/27/21 5/31/21 Approved as noted
) - as Highlighted

KAIG3-RFI-SW-C-0466 00 Inspection for Application of Primer (1st Coat) for Manhole (FW6-1, FW6-2) As Highlighted. Civil Site Works 5/27/21 5/29/21 Approved as noted

Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0467 00 Civil Picnic Area 5/27/21 5/31/21 Approved as noted
(SA-38) - As Highlighted.
Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 15.5 m Length, from (G-B-07 to
KAIG3-RFI-SW-C-0468 00 Civil Site Works 5/27/21 5/29/21 Approved as noted
G-B-09). NEAR AVIARY GARDEN. At highlighted Area in the attached Dwg.
Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length, from (MH-B-04 to Site Works near Butterfly
KAIG3-RFI-SW-C-0469 00 Civil 5/27/21 5/29/21 Code C (resubmit)
G-B-01). NEAR WATER PLAY GARDEN. At highlighted Area in the attached drawing. Garden
Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length, from (MH-B-04 to Site Works near Butterfly
KAIG3-RFI-SW-C-0469 01 Civil 6/21/21 6/23/21 Approved as noted
G-B-01). NEAR WATER PLAY GARDEN. At highlighted Area in the attached drawing. Garden

KAIG3-RFI-SW-C-0470 00 Inspection for Application of Primer (2nd Coat) for Manhole (FW6-2, FW6-3) As Highlighted. Civil Site Works 5/30/21 6/1/21 Approved as noted

KAIG3-RFI-SW-C-0471 00 Inspection for Application of Primer (3rd Coat) for Manhole (FW6-2, FW6-3) As Highlighted. Civil Site Works 5/30/21 6/1/21 Approved as noted

Inspection for the Installation of Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-07, G-X-08,
KAIG3-RFI-SW-C-0472 00 Civil Site Works 5/30/21 5/31/21 Code C (resubmit)
G-X-09 (as Highlighted)

Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As
KAIG3-RFI-SW-C-0473 00 Civil Site Works 5/30/21 06/02/21 Approved as noted
Highlighted.

Excavation and Surface Preperation for Foul Water Line from FW-A-22 to FW-A-18 prior to start Gravel
KAIG3-RFI-SW-C-0474 00 Civil Site Works 5/30/21 6/2/21 Approved as noted
Bedding (as Highlighted).

Surface preparation prior to Water proofing for Concrete Encasement of Backdrop & Short piece of Manhole
KAIG3-RFI-AG-C-0475 00 Civil Aviary Garden 5/30/21 6/1/21 Approved as noted
(MH-C-3-2) @ Aviary garden at highlighted in the attached drawing's.
Primer Coat prior to Water proofing for Concrete Encasement of Backdrop & Short piece of Manhole (MH-
KAIG3-RFI-AG-C-0476 00 Civil Aviary Garden 5/30/21 6/2/21 Approved as noted
C-3-2) @ Aviary garden at highlighted in the attached drawing's.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-K (SA-16) as
KAIG3-RFI-PA-C-0477 00 Civil Picnic Area 5/30/21 6/2/21 Approved as noted
highlighted.

KAIG3-RFI-SW-C-0478 00 Inspection for Application of Primer (1st Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted). Civil Site Works 5/30/21 6/1/21 Approved as noted

Inspection for Application of Primer 1st Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-
KAIG3-RFI-SW-C-0479 00 Civil Site Works 5/31/21 6/1/21 Approved as noted
X-1, MH-X-1-1) (as highlighted).

KAIG3-RFI-SW-C-0480 00 Inspection for Application of Primer (2nd Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted). Civil Site Works 5/31/21 6/1/21 Approved as noted

Inspection for Application of Primer 2nd Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-
KAIG3-RFI-SW-C-0481 00 Civil Site Works 5/31/21 6/1/21 Approved as noted
X-1, MH-X-1-1) (As Highlighted).

KAIG3-RFI-SW-C-0482 00 Soil Preperation Prior to Start Backfill Gravel for Manhole FW6-2 and FW6-3 - as Highlighted Civil Site Works 5/31/21 6/2/21 Approved as noted

KAIG3-RFI-SW-C-0483 00 Inspection for Application of Primer (3rd Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted). Civil Site Works 5/31/21 6/1/21 Approved as noted

Inspection for Application of Primer 3rd Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-
KAIG3-RFI-SW-C-0484 00 Civil Site Works 5/31/21 6/1/21 Approved as noted
X-1, MH-X-1-1) (As Highlighted).

kaig-qcals 92
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-8) As
KAIG3-RFI-PA-C-0486 00 Civil Picnic Area 5/31/21 cancelled
Highlighted (Note: This work has been completed on March 01, 2021).
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-9) As
KAIG3-RFI-PA-C-0487 00 Civil Picnic Area 5/31/21 cancelled
Highlighted (Note: This work has been completed on March 01, 2021).
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-10) As
KAIG3-RFI-PA-C-0488 00 Civil Picnic Area 5/31/21 cancelled
Highlighted (Note: This work has been completed on March 01, 2021)
Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-8) As Highlighted (Note: This
KAIG3-RFI-PA-C-0489 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021).
Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-9) As Highlighted (Note: This
KAIG3-RFI-PA-C-0490 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021).
Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-10) As Highlighted (Note:
KAIG3-RFI-PA-C-0491 00 Civil Picnic Area 5/31/21 cancelled
This work has been completed on March 01, 2021).
Inspection of Formwork for the Wall of Seating Area (2) at Zone-N (SA-13) As Highlighted (Note: This
KAIG3-RFI-PA-C-0492 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021).
Inspection of Formwork for the Wall of Seating Area (2) at Zone-N (SA-14) As Highlighted (Note: This
KAIG3-RFI-PA-C-0493 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021).
Inspection of Formwork for the Wall of Seating Area (2) at Zone-N (SA-06) As Highlighted (Note: This
KAIG3-RFI-PA-C-0494 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021)"
Inspection of Formwork for the Wall of Seating Area (2) at Zone-N (SA-07) As Highlighted (Note: This
KAIG3-RFI-PA-C-0495 00 Civil Picnic Area 5/31/21 cancelled
work has been completed on March 01, 2021).

KAIG3-RFI-CO-C-0496 00 Surface Preparation Prior to start Backfilling for Around PC 153 (as Highlighted) Zone 2K. Civil Crescent 6/1/21 6/2/21 Approved as noted

KAIG3-RFI-SW-C-0497 00 Excavation and Surface Preperation For Catch Basin (G-A-02, G-X-06) - as Highlighted" Civil Site Works 5/31/21 6/2/21 Approved as noted

KAIG3-RFI-SW-C-0498 00 Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-02, G-X-6 (as Highlighted). Civil Site Works 5/31/21 6/1/21 Approved as noted

Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-10 to G-A-11 As
KAIG3-RFI-SW-C-0499 00 Civil Site Works 5/31/21 6/2/21 Approved as noted
Highlighted.

KAIG3-RFI-PA-C-0500 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-30) As Highlighted" Civil Picnic Area 5/31/21 6/2/21 Approved as noted

Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0501 00 Civil Picnic Area 5/31/21 6/3/21 Approved as noted
(SA-36) - As Highlighted.
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0502 00 Civil Picnic Area 5/31/21 6/2/21 Approved as noted
(SA-26) - As Highlighted

300 mm Gravel 3/8" Backfilling Above Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 44m
KAIG3-RFI-SW-C-0503 00 Civil Site near Nursery Garden 6/1/21 6/5/21 Approved as noted
Length from (MH-A-01 to Outfall A). At highlighted Area in the attached Dwg.

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4) from Site Works near
KAIG3-RFI-SW-C-0504 00 Civil 6/1/21 6/5/21 Approved as noted
(MB to FW6-2) at highlighted area in the attached drawing. Management Building
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 28 & 29 of Water Garden, as
4B KAIG3-RFI-WG-C-0505 00 Civil Water Play Garden 6/1/21 6/2/21 Approved as noted
per highlighted area in attached drawings.
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 38 & 39 of Water Garden, as
4B KAIG3-RFI-WG-C-0506 00 Civil Water Play Garden 6/1/21 6/2/21 Approved as noted
per highlighted area in attached drawings.
Inspection of Concrete Pouring for the Wall of Play area (2) at Zone-I As Highlighted (Note: This work has
KAIG3-RFI-PA-C-0507 00 Civil Picnic Area 6/1/21 cancelled
been completed on March 01, 2021)

KAIG3-RFI-SW-C-0508 00 Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-A-1 and G-X-7 - as highlighted. Civil Site Works 6/1/21 6/2/21 Approved as noted

Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-A-01, G-X-07) - as
KAIG3-RFI-SW-C-0509 00 Civil Site Works 6/1/21 6/5/21 Approved as noted
Highlighted (STOCK PILE # 106).

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW6-2, FW6-3
KAIG3-RFI-SW-C-0510 00 Civil Site Works 6/1/21 6/5/21 Approved as noted
(As Highlighted) STOCK PILE # 106.

1st Coat Damp proofing for Concrete Encasement of Backdrop & Short piece of Manhole (MH-C-3-2) @
KAIG3-RFI-AG-C-0511 00 Civil Aviary Garden 6/1/21 6/2/21 Approved as noted
Aviary garden, At Highlighted in the attached drawing's.
2nd Coat Damp proofing for Concrete Encasement of Backdrop & Short piece of Manhole (MH-C-3-2) @
KAIG3-RFI-AG-C-0512 00 Civil Aviary Garden 6/1/21 6/2/21 Approved as noted
Aviary garden, At Highlighted in the attached drawing's.
Pipe Installation of Storm Water Line- Outfall A for (315mmØ-upvc class 4) 36 m Length, from (MH-A-12 Site Work between Water
KAIG3-RFI-SW-C-0513 00 Civil 6/1/21 6/5/21 Approved as noted
to G-A-11). Between Water Tank & Butterfly Garden. At highlighted Area in the attached Dwg. Tank & Butterfly Garden

KAIG3-RFI-PA-C-0514 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-30) as highlighted. Civil Picnic Area 6/2/21 6/5/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-40) as
KAIG3-RFI-PA-C-0515 00 Civil Picnic Area 6/2/21 6/5/21 Approved as noted
highlighted.

kaig-qcals 93
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0516 00 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted. Civil Picnic Area 6/2/21 6/5/21 Approved as noted

Excavation and Surface Preperation for Foul Water Line from FW-A-18 to FW-A-16 prior to start Gravel
KAIG3-RFI-SW-C-0517 00 Civil Site Works 6/2/21 6/5/21 Approved as noted
Bedding (as Highlighted).

KAIG3-RFI-SW-C-0518 00 Excavation and Surface Preperation prior to Start Blinding For Manhole (MH-A-06) - as Highlighted. Civil Site Works 6/2/21 6/5/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As
KAIG3-RFI-PA-C-0519 00 Civil Picnic Area 6/2/21 6/8/21 Code C (resubmit)
Highlighted

Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As
KAIG3-RFI-PA-C-0519 01 Civil Picnic Area 6/10/21 6/17/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0520 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted. Civil Picnic Area 6/2/21 6/5/21 Approved as noted

KAIG3-RFI-PA-C-0521 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted. Civil Picnic Area 6/2/21 6/5/21 Approved as noted

Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-06 to Main Line (As
KAIG3-RFI-SW-C-0522 00 Civil Site Works 6/2/21 6/5/21 Approved as noted
Highlighted).

KAIG3-RFI-SW-C-0523 00 Inspection for Casting the Blinding Concrete under the Manhole (MH-A-06) (as Highlighted). Civil Site Works 6/2/21 6/5/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-26) As
KAIG3-RFI-PA-C-0524 00 Civil Picnic Area 6/2/21 6/7/21 Approved as noted
Highlighted.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-L (SA-38) As
KAIG3-RFI-PA-C-0525 00 Civil Picnic Area 6/2/21 6/7/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0526 00 Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted. Civil Picnic Area 6/3/21 6/5/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-27) As
KAIG3-RFI-PA-C-0527 00 Civil Picnic Area 6/3/21 6/5/21 Approved as noted
Highlighted.
Soil preparation prior to Backfill Surround for Manhole (MH-C-3-2) @ Aviary garden, At Highlighted in the
KAIG3-RFI-AG-C-0528 00 Civil Aviary Garden 6/3/21 6/7/21 Approved as noted
attached drawing's.

KAIG3-RFI-SW-C-0529 00 Inspection for the Installation of Catch Basin (G-A-02, G-X-06) (as Highlighted). Civil Site Works 6/3/21 6/7/21 Code C (not resubmit)

Notification to Start Cut and Removal of Disposal Materials upto -75CM from Top of Asphalt - as per the
KAIG3-RFI-SW-C-0530 00 Civil Site Works 6/3/21 6/6/21 Approved as noted
attached Highlighted Drawing.

KAIG3-RFI-PA-C-0531 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-27) As Highlighted. Civil Picnic Area 6/3/21 6/5/21 Approved as noted

KAIG3-RFI-PA-C-0532 00 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted. Civil Picnic Area 6/3/21 6/5/21 Approved as noted

KAIG3-RFI-CO-C-0533 00 Surface Preparation Prior to start Backfilling for Around Collonades Zone 2P (as Highlighted) 02-AW. Civil Crescent 6/5/21 6/7/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-34) As
KAIG3-RFI-PA-C-0534 00 Civil Picnic Area 6/5/21 6/7/21 Approved as noted
Highlighted

KAIG3-RFI-SW-C-0535 00 Soil Preperation Prior to Start Backfill Gravel for Manhole FW1, FW1-1, FW1-2, FW9-1 -as Highlighted Civil Site Works 6/5/21 6/7/21 Approved as noted

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1, FW1-1,
KAIG3-RFI-SW-C-0536 00 Civil Site Works 6/5/21 6/7/21 Approved as noted
FW1-2, FW9-1 (As Highlighted) STOCK PILE # 106
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 94 M Site Works near Sound &
KAIG3-RFI-SW-C-0537 00 Civil 6/6/21 6/8/21 Approved as noted
Length (FW-A-18 to FW-A-21). Near sound & light garden, as per highlighted Area in the attached Dwg. Light Garden
Pipe Installation of Foul Water Line- (315mmØ-upvc class 4) 94 m Length, from (FW-A-18 to FW-A-21). Site Works near Sound &
KAIG3-RFI-SW-C-0538 00 Civil 6/6/21 6/8/21 Approved as noted
Near SOUND & LIGHT GARDEN At highlighted Area in the attached Dwg. Light Garden

KAIG3-RFI-PA-C-0539 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-34) As Highlighted Civil Picnic Area 6/5/21 6/9/21 Approved as noted

Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-A-6, G-A-10, MH-A-07, MH-A-08, MH-A-
KAIG3-RFI-SW-C-0540 00 Civil Site Works 6/5/21 6/7/21 Approved as noted
09, MH-A-15 (As Highlighted)
Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-A-06, G-A-10, MH-
KAIG3-RFI-SW-C-0541 00 Civil Site Works 6/5/21 6/5/21 Approved as noted
A-07, MH-A-08, MH-A-09, MH-A-15) - as Highlighted (STOCK PILE # 106)

KAIG3-RFI-SW-C-0542 00 Excavation and Surface Preperation prior to start Blinding For Manhole (FW6-1) As Highlighted. Civil Site Works 6/6/21 6/8/21 Approved as noted

KAIG3-RFI-SW-C-0543 00 Inspection for Casting the Blinding Concrete under the Manhole (FW6-1) - (As Highlighted). Civil Site Works 6/6/21 6/9/21 Approved as noted

kaig-qcals 94
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0544 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-34) As Highlighted. Civil Picnic Area 6/6/21 6/9/21 Approved as noted

KAIG3-RFI-PA-C-0545 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-27) As Highlighted Civil Picnic Area 6/6/21 6/7/21 Approved as noted

Excavation for Storm Water Line from G-A-23 to MH-A-08, G-A-24 to Main Line and G-A-26 to MH-A-09
KAIG3-RFI-SW-C-0546 00 Civil Site Works 6/6/21 6/8/21 Approved as noted
(as Highlighted).

KAIG3-RFI-SW-C-0547 00 Excavation for Foul Water Line from FW12-1 and FW12-2 to Aviary Garden (As Highlighted) Civil Site Works 6/7/21 6/9/21 Approved as noted

Inspection for casting the Concrete Encasement for the Storm Water Line from G-B-07 to MH-B-02 as per
KAIG3-RFI-SW-C-0548 00 Civil Site Works 6/6/21 6/8/21 Approved as noted
the Highlighted area in the attached Drawing
Soil Preparation prior to Backfill along all the Boundary Wall (Inner Side) of Maze Garden, as per
KAIG3-RFI-ZG-C-0549 00 Civil Maze Garden 6/6/21 6/8/21 Approved as noted
highlighted area in attached drawing's.
INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-B-1 to MH-B-04,
G-B-2 to Main Line, G-B-3 to Main Line, G-B-4 to Main Line, G-B-5, G-B-6 to Main Line, G-B-7 to G-B-9,
KAIG3-RFI-SW-C-0550 00 Civil Site Works 6/6/21 6/8/21 Approved as noted
G-A-01 to MH-A-15, G-X-7 to MH-X-01-1, G-A-06 TO Main Line, G-A-10 to G-A-11) prior to start
Inspection for Application
Waterproofing of Primer (1st Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2 to
as highlighted.
KAIG3-RFI-SW-C-0551 00 Main Line, G-B-3 to Main Line, G-B-4 to Main Line, G-B-5, G-B-6 to Main Line, G-B-7 to G-B-9, G-A-01 Civil Site Works 6/6/21 6/8/21 Approved as noted
to MH-A-15, G-X-7 to MH-X-01-1, G-A-06 TO Main Line, G-A-10 to G-A-11 as highlighted.
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 111 m Site Works near Sound &
KAIG3-RFI-SW-C-0552 00 Civil 6/6/21 6/8/21 Approved as noted
Length (FW-A-21 to FW-A-24). Near sound & light garden, as per highlighted Area in the attached Dwg. Light Garden
Pipe Installation of Foul Water Line- (315mmØ-upvc class 4) 111 m Length, from (FW-A-21 to FW-A-24). Site Works near Sound &
KAIG3-RFI-SW-C-0553 00 Civil 6/6/21 6/8/21 Approved as noted
Near SOUND & LIGHT GARDEN At highlighted Area in the attached Dwg. Light Garden
Excavation for Storm Water Line from MH-A-06 to MH-A-07, prior to start Gravel Bedding (as
KAIG3-RFI-SW-C-0554 00 Civil Site Works 6/7/21 6/8/21 Code C (resubmit)
Highlighted).
Excavation for Storm Water Line from MH-A-06 to MH-A-07, prior to start Gravel Bedding (as
KAIG3-RFI-SW-C-0554 01 Civil Site Works 6/10/21 6/13/21 Approved as noted
Highlighted).

Inspection for Application of Primer (2nd Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2 to
KAIG3-RFI-SW-C-0555 00 Main Line, G-B-3 to Main Line, G-B-4 to Main Line, G-B-5, G-B-6 to Main Line, G-B-7 to G-B-9, G-A-01 Civil Site Works 6/7/21 6/9/21 Approved as noted
to MH-A-15, G-X-7 to MH-X-01-1, G-A-06 TO Main Line, G-A-10 to G-A-11 as highlighted.

Inspection for Application of Primer (3rd Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2 to
KAIG3-RFI-SW-C-0556 00 Main Line, G-B-3 to Main Line, G-B-4 to Main Line, G-B-5, G-B-6 to Main Line, G-B-7 to G-B-9, G-A-01 Civil Site Works 6/7/21 6/9/21 Approved as noted
to MH-A-15, G-X-7 to MH-X-01-1, G-A-06 TO Main Line, G-A-10 to G-A-11 aas highlighted.

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-16) As
KAIG3-RFI-PA-C-0557 00 Civil Picnic Area 6/7/21 6/9/21 Approved as noted
Highlighted

Soil Preparation prior to Backfill Between Boat Garden and the Boundary Wall span 3 to 11 of Water Garden,
4B KAIG3-RFI-WG-C-0558 00 Civil Water Play Garden 6/8/21 6/10/21 Approved as noted
as per highlighted area in attached drawings.

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-L (SA-38) As
KAIG3-RFI-PA-C-0559 00 Civil Picnic Area 6/8/21 6/10/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0560 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted. Civil Picnic Area 6/8/21 6/14/21 Approved as noted

KAIG3-RFI-PA-C-0561 00 Inspection of Formwork for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted Civil Picnic Area 6/8/21 6/14/21 Approved as noted

KAIG3-RFI-PA-C-0562 00 Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-32) - As Highlighted Civil Picnic Area 6/8/21 6/9/21 Approved as noted

KAIG3-RFI-PA-C-0563 00 Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-33) - As Highlighted Civil Picnic Area 6/8/21 6/9/21 Approved as noted

KAIG3-RFI-CO-C-0564 00 Surface Preparation Prior to start Backfilling for Foundation of ETFE Mock-up Civil Crescent 6/8/21 6/9/21 Approved as noted

Excavation for Foul Water Line from FW-A-3-6.9 to FW-A-3-6.12 including the Manhole FW-A-3-6.9, FW-
KAIG3-RFI-SW-C-0565 00 Civil Site Works 6/8/21 6/9/21 Approved as noted
A-3-6.10, FW-A-3-6.11, FW-A-3-6.12 prior to start Gravel Bedding (as Highlighted).
Excavation and Surface Preperation prior to start Blinding for Manhole FW-A-25, FW-A-24, FW-A-23, FW-
KAIG3-RFI-SW-C-0566 00 Civil Site Works 6/8/21 6/10/21 Approved as noted
A-22, FW-A-21, FW-A-20, FW-A-19, FW-A-18, FW-A-17, FW-A-16 (as Highlighte
Soil Preperation prior to start backfilling Sub-Grade for Play Area 1-3 (Inside+outside Area) - As
KAIG3-RFI-PA-C-0567 00 Civil Picnic Area 6/9/21 6/10/21 Approved as noted
Highlighted.
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
KAIG3-RFI-PA-C-0568 00 Civil Picnic Area 6/10/21 6/14/21 Approved as noted
(SA-31) - As Highlighted

kaig-qcals 95
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0569 00 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted Civil Picnic Area 6/9/21 6/10/21 Approved as noted

KAIG3-RFI-PA-C-0570 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted Civil Picnic Area 6/9/21 6/10/21 Approved as noted

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class 4) 58 m Site Works near Site
KAIG3-RFI-SW-C-0571 00 Civil 6/9/21 6/10/21 Approved as noted
Length (FW-A-24 to FW-A-25). NEAR SITE TOILET #2. As per highlighted Area in the attached Dwg. Toilet 2

Pipe Installation of Foul Water Line for (160mmØ-UPVC- Class 4) 58 m Length (FW-A-24 to FW-A-25). Site Works near Site
KAIG3-RFI-SW-C-0572 00 Civil 6/9/21 6/12/21 Approved as noted
NEAR SITE TOILET #2. As per highlighted Area in the attached Dwg. Toilet 2

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 58 m Site Works near Energy
KAIG3-RFI-SW-C-0573 00 Civil 6/9/21 6/12/21 Approved as noted
Length (FW-A-17 to FW-A-18). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2
Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 58 m Length (FW-A-17 to FW-A-18). Site Works near Energy
KAIG3-RFI-SW-C-0574 00 Civil 6/9/21 6/12/21 Approved as noted
Near Energy Center # 2 . As per highlighted Area in the attached Dwg Center 2
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-26) As
KAIG3-RFI-PA-C-0575 00 Civil Picnic Area 6/9/21 6/14/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0576 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted. Civil Picnic Area 6/9/21 6/14/21 Approved as noted

300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4)
Site Works near Sound &
KAIG3-RFI-SW-C-0577 00 94 m Length (FW-A-18 to FW-A-21). Near sound & light garden, as per highlighted Area in the attached Civil 6/10/21 6/12/21 Approved as noted
Light Garden
Dwg.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32) As
KAIG3-RFI-PA-C-0578 00 Civil Picnic Area 6/10/21 6/19/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0579 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted Civil Picnic Area 6/10/21 6/14/21 Approved as noted

KAIG3-RFI-PA-C-0580 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted Civil Picnic Area 6/10/21 6/14/21 Approved as noted

Excavation for Foul Water Line from FW-A-16 to FW-A-15 including the Manhole FW-A-16, FW-A-15
KAIG3-RFI-SW-C-0581 00 Civil Site Works 6/10/21 6/13/21 Approved as noted
prior to start Gravel Bedding (as Highlighted)
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-A for (400mmØ-UPVC- Class
Site Works near Refuse
KAIG3-RFI-SW-C-0582 00 4) 35 m Length (MH-A-06 to MH-A-07). NEAR REFUSE GARBAGE. As per highlighted Area in the Civil 6/10/21 6/12/21 Approved as noted
Garbage
attached Dwg.
Pipe Installation of Storm Water Line Outfall-A for (400mmØ-UPVC- Class 4) 35 m Length (MH-A-06 to Site Works near Refuse
KAIG3-RFI-SW-C-0583 00 Civil 6/10/21 6/12/21 Approved as noted
MH-A-07). NEAR REFUSE GARBAGE. As per highlighted Area in the attached Dwg. Garbage

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 77 m Site Works near Energy
KAIG3-RFI-SW-C-0584 00 Civil 6/10/21 6/12/21 Approved as noted
Length (FW-A-16 to FW-A-17). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2
Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 77 m Length (FW-A-16 to FW-A-17). Site Works near Energy
KAIG3-RFI-SW-C-0585 00 Civil 6/10/21 6/12/21 Approved as noted
Near Energy
Bedding Center3/8"
of Gravel # 2 and
. AsGeotextile
per highlighted Area inFoul
surrounding the attached Dwg.
Water Line for (110mmØ-UPVC- Class 4) 12m Center 2
Site Works near Aviary
KAIG3-RFI-SW-C-0586 00 Length (AVIARY GARDEN to FW12-1 & 12-2). NEXT TO AVIARY GARDEN. As per highlighted Area Civil 6/10/21 6/12/21 Approved as noted
Garden
in the attached Dwg.
Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) 12m Length (AVIARY GARDEN to Site Works near Aviary
KAIG3-RFI-SW-C-0587 00 Civil 6/10/21 6/12/21 Approved as noted
FW12-1 & 12-2). NEXT TO AVIARY GARDEN. As per highlighted Area in the attached Dwg. Garden

KAIG3-RFI-PA-C-0588 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted. Civil Picnic Area 6/12/21 6/14/21 Approved as noted

Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-08 to G-X-09 as per the
KAIG3-RFI-SW-C-0589 00 Civil Site Works 6/12/21 6/14/21 Approved as noted
Highlighted area in the attached Drawing.

Inspection for Casting the Concrete Encasement for the Storm Water Line from Management Building to
KAIG3-RFI-SW-C-0590 00 Civil Site Works 6/12/21 6/14/21 Approved as noted
Main Line as per the Highlighted area in the attached Drawing

Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of span 37, 38 & 39 of Water Garden,
4B KAIG3-RFI-WG-C-0591 00 Civil Water Play Garden 6/13/21 6/14/21 Approved as noted
as per highlighted area in attached drawings.

Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 27 of Water Garden, as per
4B KAIG3-RFI-WG-C-0592 00 Civil Water Play Garden 6/13/21 6/14/21 Approved as noted
highlighted area in attached drawings.

4B KAIG3-RFI-SW-C-0593 00 Soil Preparation under Boulder No.RB- 308 prior to start cutting. Civil Water Play Garden 6/13/21 6/13/21 Code C (resubmit)

4B KAIG3-RFI-SW-C-0593 01 Soil Preparation under Boulder No.RB- 308 prior to start cutting. Civil Water Play Garden 7/25/21 7/26/21 Approved as noted

kaig-qcals 96
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-G (SA-31) As
KAIG3-RFI-PA-C-0594 00 Civil Picnic Area 6/13/21 6/19/21 Approved as noted
Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-02 to Main Line and G-
KAIG3-RFI-SW-C-0595 00 Civil Site Works 6/13/21 6/14/21 Approved as noted
A-03 to Main Line as Highlighted
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0596 00 Civil Site Works 6/13/21 6/14/21 Approved as noted
FW6-1 (As Highlighted)
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 94 m Length (FW-A-18 to FW-A- Site Works near Sound &
KAIG3-RFI-SW-C-0597 00 Civil 6/14/21 6/15/21 Approved as noted
21). Near sound & light garden, as per highlighted Area in the attached Dwg. Light Garden
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Storm Water Line Outfall-A for (400mmØ-
Site Works near Refuse
KAIG3-RFI-SW-C-0598 00 UPVC- Class 4) 35 m Length (MH-A-06 to MH-A-07). NEAR REFUSE GARBAGE. As per highlighted Civil 6/14/21 6/15/21 Approved as noted
Garbage
Areamm
300 in the attached
Gravel 3/8" Dwg.
Backfilling and Geotextile surrounding Foul Water Line- (315mmØ-upvc class 4) 111 m
Site Works near Sound &
KAIG3-RFI-SW-C-0599 00 Length, from (FW-A-21 to FW-A-24). Near SOUND & LIGHT GARDEN At highlighted Area in the Civil 6/14/21 6/15/21 Approved as noted
Light Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-A for (400mmØ-UPVC- Class 4) 35 m Length (MH- Site Works near Refuse
KAIG3-RFI-SW-C-0600 00 Civil 6/14/21 6/15/21 Approved as noted
A-06 to MH-A-07). NEAR REFUSE GARBAGE. As per highlighted Area in the attached Dwg. Garbage
Warning Tape Installation for Foul Water Line- (315mmØ-upvc class 4) 111 m Length, from (FW-A-21 to Site Works near Sound &
KAIG3-RFI-SW-C-0601 00 Civil 6/14/21 6/15/21 Approved as noted
FW-A-24). Near SOUND & LIGHT GARDEN At highlighted Area in the attached Dwg. Light Garden
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class 4) Site Works near Site
KAIG3-RFI-SW-C-0602 00 Civil 6/15/21 6/19/21 Approved as noted
58 m Length (FW-A-24 to FW-A-25). NEAR SITE TOILET #2. As per highlighted Area in the attached Dwg Toilet 2

Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 58 m Length (FW-A-24 to Site Works near Site
KAIG3-RFI-SW-C-0603 00 Civil 6/15/21 6/19/21 Approved as noted
FW-A-25). NEAR SITE TOILET #2. As per highlighted Area in the attached Dwg Toilet 2

KAIG3-RFI-PA-C-0604 00 Soil Preperation prior to start Excavation for Seating Area (1) (SA-15) - As Highlighted Civil Picnic Area 6/14/21 6/16/21 Approved as noted

KAIG3-RFI-PA-C-0605 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted Civil Picnic Area 6/14/21 6/19/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-32) As
KAIG3-RFI-PA-C-0606 00 Civil Picnic Area 6/16/21 6/19/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0607 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted Civil Picnic Area 6/16/21 6/21/21 Approved as noted

300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) Site Works near Energy
KAIG3-RFI-SW-C-0608 00 Civil 6/14/21 6/15/21 Approved as noted
58 m Length (FW-A-17 to FW-A-18). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2

Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 58 m Length (FW-A-17 to Site Works near Energy
KAIG3-RFI-SW-C-0609 00 Civil 6/14/21 6/15/21 Approved as noted
FW-A-18). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4)
Site Works near Aviary
KAIG3-RFI-SW-C-0610 00 12m Length (AVIARY GARDEN to FW12-1 & 12-2). NEXT TO AVIARY GARDEN. As per highlighted Civil 6/14/21 6/21/21 Approved as noted
Garden
Area in the attached Dwg.
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) 12m Length (AVIARY
Site Works near Aviary
KAIG3-RFI-SW-C-0611 00 GARDEN to FW12-1 & 12-2). NEXT TO AVIARY GARDEN. As per highlighted Area in the attached Civil 6/14/21 6/15/21 Approved as noted
Garden
Dwg.
Inspection for Casting the Concrete Encasement for the Storm Water Line Manhole MH-A-06 and MH-A-07
KAIG3-RFI-SW-C-0612 00 Civil Site Works 6/14/21 6/15/21 Approved as noted
- as Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-07 to Main Line (as
KAIG3-RFI-SW-C-0613 00 Civil Site Works 6/15/21 6/19/21 Approved as noted
Highlighted)

SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW6-1, MH-A-06, MH-A-07) PRIOR
KAIG3-RFI-SW-C-0614 00 Civil Site Works 6/15/21 6/19/21 Approved as noted
TO START WATERPROOFING (As Highlighted

Notification to Start Cut and Removal of Disposal Materials upto -20CM to match the Grading level - as per
KAIG3-RFI-SW-C-0615 00 Civil Site Works 6/15/21 6/16/21 Approved as noted
the attached Highlighted Drawing .

Inspection for Application of Primer (1st Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07) (As
KAIG3-RFI-SW-C-0616 00 Civil Site Works 6/15/21 6/19/21 Approved as noted
Highlighted)

Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07) (as
KAIG3-RFI-SW-C-0617 00 Civil Site Works 6/15/21 6/19/21 Approved as noted
highlighted)

Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07) (as
KAIG3-RFI-SW-C-0618 00 Civil Site Works 6/15/21 6/19/21 Approved as noted
highlighted)

KAIG3-RFI-PA-C-0619 00 Soil Preperation prior to start backfilling Sub-Grade for Seating Area (2) (SA-33) - As Highlighted Civil Picnic Area 6/15/21 6/17/21 Approved as noted

kaig-qcals 97
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-33) As
KAIG3-RFI-PA-C-0620 00 Civil Picnic Area 6/15/21 6/19/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0621 00 Soil Preperation prior to start Excavation for Seating Area (2) (SA-31) - As Highlighted Civil Picnic Area 6/15/21 6/17/21 Approved as noted

300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) Site Works near Energy
KAIG3-RFI-SW-C-0622 00 Civil 6/15/21 6/19/21 Approved as noted
77 m Length (FW-A-16 to FW-A-17). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 77 m Length (FW-A-16 to Site Works near Energy
KAIG3-RFI-SW-C-0623 00 Civil 6/15/21 6/19/21 Approved as noted
FW-A-17). Near Energy Center # 2 . As per highlighted Area in the attached Dwg. Center 2

KAIG3-RFI-PA-C-0624 00 Soil Preperation after Excavation prior to start Backfilling for Seating Area (2) (SA-31) - As Highlighted Civil Picnic Area 6/16/21 6/21/21 Approved as noted

Surface Preparation Prior to start Backfilling for Zone 1B beside strip footing between PC 8-10-12-14 (as
KAIG3-RFI-CO-C-0625 00 Civil Crescent 6/16/21 6/16/21 Approved as noted
Highlighted)
KAIG3-RFI-PA-C-0626 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted. Civil Picnic Area 6/16/21 6/19/21 Approved as noted
KAIG3-RFI-PA-C-0627 00 Inspection of Formwork for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted Civil Picnic Area 6/16/21 6/23/21 Approved as noted

KAIG3-RFI-SW-C-0628 00 Soil Preperation Prior to Start Backfill Gravel for Manhole FW6-1 - as Highlighted Civil Site Works 6/16/21 6/19/21 Approved as noted

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLE FOR - FW6-1 (As
KAIG3-RFI-SW-C-0629 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
Highlighted) STOCK PILE # 106
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (G-X-8 AND G-X-9) PRIOR TO
KAIG3-RFI-SW-C-0630 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
START WATERPROOFING (As Highlighted)
Inspection for Application of Primer (1st Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As
KAIG3-RFI-SW-C-0631 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
Highlighted)
Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As
KAIG3-RFI-SW-C-0632 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
Highlighted
Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As
KAIG3-RFI-SW-C-0633 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-23 to Main Line and
KAIG3-RFI-SW-C-0634 00 Civil Site Works 6/16/21 6/19/21 Approved as noted
from G-A-24 to Main Line (as Highlighted)

KAIG3-RFI-PA-C-0635 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted Civil Picnic Area 6/17/21 6/21/21 Approved as noted
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class 4) 27 m
Site Works near Crescent
KAIG3-RFI-SW-C-0636 00 Length & (250mmØ-UPVC- Class 4) 29 m Length from (FW-A-3-6.10 to FW-A-3-6.12). BESIDE Civil 6/17/21 6/21/21 Approved as noted
Zone 1N, 1M, 1L.
CRECENT
Pipe ZONE;
Installation 1N, 1M
of Foul & 1L
Water . As
Line forper highlighted AreaClass
(160mmØ-UPVC- in the4)attached drawing.
27 m Length & (250mmØ-UPVC- Class
Site Works near Crescent
KAIG3-RFI-SW-C-0637 00 4) 29 m Length from (FW-A-3-6.10 to FW-A-3-6.12). BESIDE CRECENT ZONE; 1N, 1M & 1L . As per Civil 6/17/21 6/21/21 Approved as noted
Zone 1N, 1M, 1L.
highlighted Area in3/8"
Bedding of Gravel the attached Dwg. surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 82 m
and Geotextile
Site Works near Crescent
KAIG3-RFI-SW-C-0638 00 Length from (FW15 to FW16). BETWEEN CRECENT #2 & ENERGY CENTER #2. As per highlighted Civil 6/17/21 6/21/21 Approved as noted
2 & Energy Center 2
Area in the attached Dwg.
Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 82 m Length from (FW15 to FW16). Site Works near Crescent
KAIG3-RFI-SW-C-0639 00 Civil 6/17/21 6/21/21 Approved as noted
BETWEEN CRECENT #2 & ENERGY CENTER #2. As per highlighted Area in the attached Dwg. 2 & Energy Center 2
Soil Preparation for Foundation Base of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area in
KAIG3-RFI-PG-C-0640 00 Civil Physic Garden 6/17/21 6/21/21 Code C (resubmit)
attached drawings.
Soil Preparation for Foundation Base of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area in
KAIG3-RFI-PG-C-0640 01 Civil Physic Garden 6/28/21 7/1/21 Approved as noted
attached drawings.

KAIG3-RFI-PA-C-0641 00 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted Civil Picnic Area 6/19/21 6/23/21 Approved as noted

INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0642 00 Civil Site Works 6/19/21 6/21/21 Approved as noted
FW9, FW10, FW11, FW12-1, FW12-2 (As Highlighted)
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 26 of Water Garden, as per
4B KAIG3-RFI-WG-C-0643 00 Civil Water Play Garden 6/19/21 6/21/21 Approved as noted
highlighted area in attached drawings.
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-31) As
KAIG3-RFI-PA-C-0644 00 Civil Picnic Area 6/19/21 6/21/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0645 00 Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted Civil Picnic Area 6/20/21 6/23/21 Approved as noted

Excavation for Storm Water Line inside Management Building prior to start Gravel Bedding (as Highlighted)
KAIG3-RFI-SW-C-0646 00 Civil Site Works 6/20/21 6/21/21 Approved as noted
Site Works between Green
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall-A for (315mmØ-UPVC- Class
KAIG3-RFI-SW-C-0647 00 Civil House and Management 6/20/21 6/21/21 Approved as noted
4) 48m Length from (MH-A-15 to G-A-01). At highlighted Area in the attached Dwg.
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall B for (315mmØ-upvc class 4) Building
Site Works near Aviary
KAIG3-RFI-SW-C-0648 00 15.5 m Length, from (G-B-07 to G-B-09). NEAR AVIARY GARDEN. At highlighted Area in the attached Civil 6/20/21 6/21/21 Approved as noted
Garden
Dwg. Site Works between Green
Warning Tape Installation for Storm Water Line- Outfall-A for (315mmØ-UPVC- Class 4) 48m Length from
KAIG3-RFI-SW-C-0649 00 Civil House and Management 6/20/21 6/21/21 Approved as noted
(MH-A-15 to G-A-01). At highlighted Area in the attached Dwg.
Building
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ-upvc class 4) 15.5 m Length, from Site Works near Aviary
KAIG3-RFI-SW-C-0650 00 Civil 6/20/21 6/21/21 Approved as noted
(G-B-07 to G-B-09). NEAR AVIARY GARDEN. At highlighted Area in the attached Dwg. Garden

kaig-qcals 98
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Site Works near
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall-X for (315mmØ-UPVC- Class
KAIG3-RFI-SW-C-0651 00 Civil Management Building and 6/20/21 6/21/21 Approved as noted
4) 20m Length from (MH-X-01-1 to G-X-07). At highlighted Area in the attached Dwg.
Maintenance
Site WorksBuilding
near
Warning Tape Installation for Storm Water Line- Outfall-X for (315mmØ-UPVC- Class 4) 20m Length from
KAIG3-RFI-SW-C-0652 00 Civil Management Building and 6/20/21 6/21/21 Approved as noted
(MH-X-01-1 to G-X-07). At highlighted Area in the attached Dwg.
Maintenance Building
Warning Tape Installation for Storm Water Line- OutFall - A for (450mmØ-UPVC-Class4 ) 34.5m Length Site Works near Water
KAIG3-RFI-SW-C-0653 00 Civil 6/20/21 6/21/21 Approved as noted
from (MH-A-11 to MH-A-12 ). At highlighted Area in the attached Dwg. Tank
Warning Tape Installation for Storm Water Line- OutFall - A for (800mmØ-PP-Corrugated ) 90m Length Site Works near Water
KAIG3-RFI-SW-C-0654 00 Civil 6/20/21 6/21/21 Approved as noted
from (MH-A-10 to MH-A-11 ). At highlighted Area in the attached Dwg. Tank & Warehouse
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 88m Length from (FW1-2 to Site Works near Water
KAIG3-RFI-SW-C-0655 00 Civil 6/20/21 6/21/21 Approved as noted
FW1-3). At highlighted Area in the attached Dwg. Tank
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall A for (800mmØ-PP- Site Works near Nursery
KAIG3-RFI-SW-C-0656 00 Civil 6/20/21 6/21/21 Approved as noted
Corrugated) 121m Length from (MH-A-02 to Outfall A). At highlighted Area in the attached Dwg. Garden
Warning Tape Installation for Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 121m Length Site Works near Nursery
KAIG3-RFI-SW-C-0657 00 Civil 6/20/21 6/21/21 Approved as noted
from (MH-A-02 to Outfall A). At highlighted Area in the attached Dwg. Garden
Site Works near
Warning Tape Installation for Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length from
KAIG3-RFI-SW-C-0658 00 Civil Management Building and 6/20/21 6/21/21 Approved as noted
(MH-X-01 to MH-X-02). At highlighted Area in the attached Dwg.
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (160mmØ-UPVC- Class 4) 27 m Maintenance
Site Works Building
beside
KAIG3-RFI-SW-C-0659 00 Length & (250mmØ-UPVC- Class 4) 29 m Length from (FW-A-3-6.10 to FW-A-3-6.12). BESIDE Civil Crescent Zone 1N, 1M & 6/20/21 6/21/21 Approved as noted
CRECENT ZONE;
Warning Tape 1N, 1Mfor
Installation &Foul
1L . Water
As perLine
highlighted Area in the attached
for (160mmØ-UPVC- ClassDwg
4) 27 m Length & (250mmØ- 1L. beside
Site Works
KAIG3-RFI-SW-C-0660 00 UPVC- Class 4) 29 m Length from (FW-A-3-6.10 to FW-A-3-6.12). BESIDE CRECENT ZONE; 1N, 1M & Civil Crescent Zone 1N, 1M & 6/20/21 6/21/21 Approved as noted
1L . mm
300 As per highlighted
Gravel Area in the
3/8" Backfilling andattached Dwg.
Geotextile of Foul Water Line for (315mmØ-UPVC- Class 4) 82 m 1L.between
Site Works
KAIG3-RFI-SW-C-0661 00 Length from (FW15 to FW16). BETWEEN CRECENT #2 & ENERGY CENTER #2. As per highlighted Civil Crescent 2 & Energy 6/20/21 6/21/21 Approved as noted
Area in the attached Dwg. Centerbetween
Site Works 2
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 82 m Length from (FW15 to
KAIG3-RFI-SW-C-0662 00 Civil Crescent 2 & Energy 6/20/21 6/21/21 Approved as noted
FW16). BETWEEN CRECENT #2 & ENERGY CENTER #2. As per highlighted Area in the attached Dwg.
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall A for (315mmØ-upvc class 4) Center 2
Site Works near Water
KAIG3-RFI-SW-C-0663 00 36 m Length, from (MH-A-12 to G-A-11). Between Water Tank & Butterfly Garden. At highlighted Area in Civil 6/21/21 cancelled
Tank & Butterfly Garden
the attached Dwg.
Warning Tape Installation for Storm Water Line- Outfall A for (315mmØ-UPVC class 4) 36 m Length, from Site Works near Water
KAIG3-RFI-SW-C-0664 00 Civil 6/21/21 6/23/21 Approved as noted
(MH-A-12 to G-A-11). Between Water Tank & Butterfly Garden. At highlighted Area in the attached Dwg. Tank & Butterfly Garden
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length, from Site Works near Water
KAIG3-RFI-SW-C-0665 00 Civil 6/21/21 6/23/21 Approved as noted
(MH-B-04 to G-B-01). NEAR WATER PLAY GARDEN. At highlighted Area in the attached Dwg. Play Garden
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-33) As
KAIG3-RFI-PA-C-0666 00 Civil Picnic Area 6/21/21 6/28/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0667 00 Soil Preperation after Excavation prior to start Backfilling for Seating Area (1) (SA-15) - As Highlighted Civil Picnic Area 6/21/21 6/23/21 Approved as noted

SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR MANHOLE (FW9, FW10, FW11)
KAIG3-RFI-SW-C-0668 00 Civil Site Works 6/21/21 6/23/21 Approved as noted
PRIOR TO START WATERPROOFING (As Highlighted)

KAIG3-RFI-PA-C-0669 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted Civil Picnic Area 6/21/21 6/28/21 Approved as noted

Surface Preparation Prior to start Backfilling for Zone 2N beside strip footing between PC 177 - 179 - 181 (as
KAIG3-RFI-CO-C-0670 00 Civil Crescent 6/21/21 6/23/21 Approved as noted
Highlighted)
INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE OF MH-A-09 AND CONCRETE
KAIG3-RFI-SW-C-0671 00 Civil Site Works 6/21/21 6/23/21 Approved as noted
ENCASEMENT FOR G-A-29 TO MH-A-09 (As Highlighted)

KAIG3-RFI-PA-C-0674 00 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted Civil Picnic Area 6/22/21 6/23/21 Approved as noted

KAIG3-RFI-PA-C-0675 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted Civil Picnic Area 6/22/21 6/24/21 Approved as noted

Inspection for Application of Primer (1st Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As
KAIG3-RFI-SW-C-0676 00 Civil Site Works 6/22/21 6/23/21 Approved as noted
Highlighted
Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As
KAIG3-RFI-SW-C-0677 00 Civil Site Works 6/22/21 6/23/21 Approved as noted
Highlighted
Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As
KAIG3-RFI-SW-C-0678 00 Civil Site Works 6/22/21 6/23/21 Approved as noted
Highlighted
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0679 00 Civil Site Works 6/22/21 6/23/21 Approved as noted
FW1-3 (As Highlighted)

KAIG3-RFI-PA-C-0680 00 Soil Preparation prior to start backfilling for Seating Area (2) (SA-39) - As Highlighted Civil Picnic Area 6/22/21 6/23/21 Code C (resubmit)

KAIG3-RFI-PA-C-0680 01 Soil Preparation prior to start backfilling for Seating Area (2) (SA-39) - As Highlighted Civil Picnic Area 6/26/21 6/28/21 Approved as noted
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm) along Boundary
KAIG3-RFI-PG-C-0681 00 wall inner side at Grid (EXC4 11/12 to 27/28 and EXC4-29/30 to 41/42) at Physic Garden at highlighted area Civil Physic Garden 6/22/21 6/24/21 Approved as noted
in attached Drawing's.
KAIG3-RFI-CO-C-0682 00 Surface Preparation Prior to start Backfilling for Zone 2P Collonades and PC at axis 02-AW as highlighted Civil Crescent 6/22/21 6/26/21 Approved as noted

KAIG3-RFI-PA-C-0683 00 Soil Preparation prior to start backfilling for Seating Area (2) (SA-39A) - As Highlighted Civil Picnic Area 6/22/21 6/23/21 Code C (not resubmit)

kaig-qcals 99
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0684 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-30) As Highlighted Civil Picnic Area 6/23/21 6/28/21 Approved as noted

KAIG3-RFI-PA-C-0685 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-30) As Highlighted Civil Picnic Area 6/23/21 6/28/21 Approved as noted

KAIG3-RFI-SW-C-0686 00 Soil Preperation Prior to Start Backfill Gravel for Manhole FW9, FW10, FW11 -as Highlighted Civil Site Works 6/23/21 6/24/21 Approved as noted

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW9, FW10,
KAIG3-RFI-SW-C-0687 00 Civil Site Works 6/23/21 6/24/21 Approved as noted
FW11 (As Highlighted) STOCK PILE # 106

KAIG3-RFI-CO-C-0688 00 Surface Preparation Prior to start Backfilling for TUNNEL 1 (near axis 02-1) as highlighted Civil Crescent 6/23/21 6/26/21 Approved as noted

KAIG3-RFI-CO-C-0689 00 Surface Preparation Prior to start Backfilling for TIP ZONE 1A as highlighted Civil Crescent 6/23/21 6/26/21 Approved as noted

KAIG3-RFI-SW-C-0690 00 Soil Preperation Prior to Start Backfill Gravel for Manhole MH-A-06 and MH-A-07 (As Highlighted) Civil Site Works 6/24/21 6/28/21 Approved as noted

Inspection for backfilling 3/8 Gravel around the Manhole for (MH-A-06, MH-A-09) - as Highlighted
KAIG3-RFI-SW-C-0691 00 Civil Site Works 6/24/21 6/28/21 Approved as noted
(STOCK PILE # 106)

KAIG3-RFI-PA-C-0692 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted Civil Picnic Area 6/24/21 6/28/21 Approved as noted

KAIG3-RFI-PA-C-0693 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted Civil Picnic Area 6/24/21 6/28/21 Approved as noted

Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-12) As
KAIG3-RFI-PA-C-0694 00 Civil Picnic Area 6/24/21 6/28/21 Approved as noted
Highlighted
Warning Tape Installation for Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Length from Site Works near
KAIG3-RFI-SW-C-0695 00 Civil 6/24/21 6/29/21 Approved as noted
(MH-A-02 to MH-A-03). At highlighted Area in the attached Dwg. Warehouse
Site Works near Aviary
Warning Tape Installation for Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length from
KAIG3-RFI-SW-C-0696 00 Civil Garden & Management 6/24/21 6/29/21 Approved as noted
(MH-X-01 to Outfall X). At highlighted Area in the attached Dwg.
Warning Tape Installation for Foul Water Line for (250mmØ-UPVC- Class 4) 69 m Length from (FW8 to Building
Site Works near Aviary
KAIG3-RFI-SW-C-0697 00 FW9). BESIDE MANAGEMENT-MAINTENANCE BUILDING. As per highlighted Area in the attached Civil Garden & Maintenace 6/24/21 6/29/21 Approved as noted
Dwg. Building
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 63 m Length from (FW11 to Site Works near Aviary
KAIG3-RFI-SW-C-0698 00 Civil 6/24/21 6/29/21 Approved as noted
FW12-2). BESIDE AVIARY GARDEN. As per highlighted Area in the attached Dwg. Garden
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 42 m Length from (FW1-3 to Site Works near Water
KAIG3-RFI-SW-C-0699 00 Civil 6/24/21 6/29/21 Approved as noted
FW1-3.1). NEAR WATER TANK. As per highlighted Area in the attached Dwg. Tank
Site Works near Aviary
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m
KAIG3-RFI-MB-C-0700 00 Civil Garden & Management 6/24/21 cancelled
Length. INSIDE MANAGEMENT BLDG. At highlighted Area in the attached Dwg
Building
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-20, FW-A-21, FW-A-22, FW-A-
KAIG3-RFI-SW-C-0701 00 Civil Site Works 6/24/21 6/26/21 Approved as noted
23, FW-A-24, FW-A-25 (as Highlighted

KAIG3-RFI-SW-C-0702 00 Excavation and Surface Preparation prior to Start Blinding For Manhole (MH-B-01) - as Highlighted Civil Site Works 6/24/21 6/26/21 Approved as noted

KAIG3-RFI-SW-C-0703 00 Inspection for Casting the Blinding Concrete under the Manhole (MH-B-01) (as Highlighted) Civil Site Works 6/24/21 6/26/21 Approved as noted

INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0704 00 Civil Site Works 6/24/21 6/29/21 Approved as noted
FW1-3 (As Highlighted)
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m
KAIG3-RFI-MB-C-0705 00 Civil Management Building 6/24/21 cancelled
Length. INSIDE MANAGEMENT BLDG. at highlighted Area in the attached Dwg
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0706 00 Civil Site Works 6/26/21 6/29/21 Approved as noted
FW15 & FW16 (As Highlighted)
Gravel & Geotextile for Sub Surface Branch Drain Pipe (Branch pipes 110mm) along Boundary wall inner
KAIG3-RFI-PG-C-0707 00 side at Grid (EXC4 11/12 to 27/28 and EXC4-29/30 to 41/42) at Physic Garden at highlighted area in Civil Physic Garden 6/27/21 6/29/21 Approved as noted
attached Drawing's.
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-36) As
KAIG3-RFI-PA-C-0708 00 Civil Physic Garden 6/27/21 6/29/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0709 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted Civil Picnic Area 6/27/21 6/29/21 Approved as noted

KAIG3-RFI-PA-C-0710 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted Civil Picnic Area 6/27/21 6/29/21 Approved as noted

Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-13) As
KAIG3-RFI-PA-C-0711 00 Civil Picnic Area 6/27/21 7/1/21 Approved as noted
Highlighted
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-L (SA-15) As
KAIG3-RFI-PA-C-0712 00 Civil Picnic Area 6/27/21 6/29/21 Approved as noted
Highlighted
Pipe installation of perforated upvc pipes 110mm dia for sub surface drainage system in PHYSIC GARDEN
KAIG3-RFI-PG-C-0713 00 Civil Physic Garden 6/27/21 6/29/21 Approved as noted
as per high lighted in dwg.
Excavation & Soil preparation for Plant Encloser room at Discovery Garden at highlighted area in attached
4B KAIG3-RFI-DG-C-0714 00 Civil Discovery Garden 6/27/21 6/30/21 Code C (resubmit)
Drawing's.
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-33) As
KAIG3-RFI-PA-C-0715 00 Civil Picnic Area 6/27/21 6/29/21 Approved as noted
Highlighted

kaig-qcals 100
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0716 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-33) As Highlighted Civil Picnic Area 6/27/21 6/29/21 Approved as noted

KAIG3-RFI-PA-C-0717 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-33) As Highlighted Civil Picnic Area 6/27/21 6/29/21 Approved as noted

KAIG3-RFI-SW-C-0718 00 Inspection for Casting the Blinding Concrete under the Manhole (G-B-10 & G-B-11) (as Highlighted) Civil Site Works 6/27/21 7/1/21 Approved as noted

Soil Preperation prior to start backfilling under the Catch Basin to reach the pipe level for (G-B-05) - as
KAIG3-RFI-SW-C-0719 00 Civil Site Works 6/28/21 cancelled
Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-31) As
KAIG3-RFI-PA-C-0720 00 Civil Picnic Area 6/29/21 7/1/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0721 00 Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted Civil Picnic Area 6/29/21 7/7/21 Approved as noted

KAIG3-RFI-PA-C-0722 00 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted Civil Picnic Area 6/29/21 7/4/21 Code C (resubmit)

KAIG3-RFI-PA-C-0722 01 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted Civil Picnic Area 7/29/21 8/1/21 Approved as noted

Soil Preperation prior to start backfilling sub-base under beam of Seating Area (2) at Zone-L (SA-37) - As
KAIG3-RFI-PA-C-0723 00 Civil Picnic Area 6/30/21 7/4/21 Approved as noted
Highlighted
Soil Preperation prior to start backfilling sub-base under beam of Seating Area (3) at Zone-K (SA-28) - As
KAIG3-RFI-PA-C-0724 00 Civil Picnic Area 6/30/21 7/4/21 Approved as noted
Highlighted

KAIG3-RFI-SW-C-0725 00 Excavation for Storm Water Line from G-A-05 to Main Line prior to start Gravel Bedding (as Highlighted) Civil Site Works 6/29/21 7/1/21 Approved as noted

Excavation for Foul Water Line from FW-A-13-5 to FW-A-13-4 prior to start Gravel Bedding (as
KAIG3-RFI-SW-C-0726 00 Civil Site Works 6/29/21 7/1/21 Approved as noted
Highlighted)
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-G (SA-39) As
KAIG3-RFI-PA-C-0727 00 Civil Picnic Area 6/29/21 7/4/21 Approved as noted
Highlighted
Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-10) As
KAIG3-RFI-PA-C-0728 00 Civil Picnic Area 6/30/21 7/4/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0729 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted Civil Picnic Area 6/30/21 7/4/21 Approved as noted

KAIG3-RFI-PA-C-0730 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted Civil Picnic Area 6/30/21 7/1/21 Approved as noted

KAIG3-RFI-SW-C-0731 00 Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-05) (as Highlighted) Civil Site Works 6/30/21 7/1/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-31) As
KAIG3-RFI-PA-C-0732 00 Civil Picnic Area 6/30/21 7/1/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0733 00 Inspection of Formwork for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted Civil Picnic Area 6/30/21 7/4/21 Approved as noted

Zone G KAIG3-RFI-PA-C-0734 00 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted Civil Picnic Area 6/30/21 7/4/21 Code C (resubmit)

Zone G KAIG3-RFI-PA-C-0734 01 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted Civil Picnic Area 8/2/21 8/5/21 Approved as noted

Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 38 & 39 of Water Garden, as
4B KAIG3-RFI-WG-C-0735 00 Civil Water Play Garden 7/3/21 7/4/21 Approved as noted
per highlighted area in attached drawings.
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-
KAIG3-RFI-SW-C-0736 00 Civil Site Works 7/1/21 7/12/21 Code C (resubmit)
3, FW6-1, FW9, FW10, FW11, FW15, FW16 (as highlighted).
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-
4A 4B 4C KAIG3-RFI-SW-C-0736 01 Civil Site Works 9/20/21 9/25/21 Approved as noted
3, FW6-1, FW9, FW10, FW11, FW15, FW16 (as highlighted).
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-15, FW-A-16, FW-A-17, FW-A-
KAIG3-RFI-SW-C-0737 00 Civil Site Works 7/1/21 7/4/21 Approved as noted
18, FW-A-19 (as Highlighted)
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (As
KAIG3-RFI-SW-C-0738 00 Civil Site Works 7/1/21 7/4/21 Code C (resubmit)
Highlighted)
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (As
KAIG3-RFI-SW-C-0738 01 Civil Site Works 10/11/21 10/13/21 Code C (resubmit)
Highlighted)
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (As
KAIG3-RFI-SW-C-0738 02 Civil Site Works 10/17/21 10/19/21 Approved as noted
Highlighted)

KAIG3-RFI-PA-C-0739 00 Soil Preparation prior to start backfilling for Seating Area (2) at Zone-K (SA-42) - As Highlighted Civil Picnic Area 7/1/21 7/4/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND PIPE CONNECTION FOR MANHOLE -
KAIG3-RFI-SW-C-0740 00 Civil Site Works 7/1/21 7/12/21 Code C (resubmit)
MH-A-06 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND PIPE CONNECTION FOR MANHOLE -
KAIG3-RFI-SW-C-0740 01 Civil Site Works 9/16/21 9/20/21 Code C (not resubmit)
MH-A-06 (As Highlighted)

KAIG3-RFI-PA-C-0741 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted Civil Picnic Area 7/3/21 7/5/21 Approved as noted

kaig-qcals 101
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0742 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted Civil Picnic Area 7/3/21 7/5/21 Approved as noted

SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW15 & FW16) PRIOR TO START
KAIG3-RFI-SW-C-0743 00 Civil Site Works 7/4/21 7/7/21 Approved as noted
WATERPROOFING (As Highlighted)
Inspection for Application of Primer (1st Coat) for Concrete Short Piece of FW-15 & FW-16 (As
KAIG3-RFI-SW-C-0744 00 Civil Site Works 7/4/21 7/7/21 Approved as noted
Highlighted)
Inspection for Application of Primer (2nd Coat) for Concrete Short Piece of FW-15 & FW-16 (As
KAIG3-RFI-SW-C-0745 00 Civil Site Works 7/4/21 7/7/21 Approved as noted
Highlighted)
Inspection for Application of Primer (3rd Coat) for Concrete Short Piece of FW-15 & FW-16 (As
KAIG3-RFI-SW-C-0746 00 Civil Site Works 7/4/21 7/7/21 Approved as noted
Highlighted)

KAIG3-RFI-SW-C-0747 00 Inspection for Casting the Blinding Concrete under the Manhole (G-B-12) (as Highlighted) Civil Site Works 7/4/21 7/6/21 Approved as noted

Excavation for Storm Water Line from MH-X-02 to MH-X-03, prior to start Gravel Bedding (as Highlighted)
KAIG3-RFI-SW-C-0748 00 Civil Site Works 7/4/21 7/5/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING


KAIG3-RFI-SW-C-0749 00 Civil Site Works 7/4/21 7/12/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE - MH-B-01 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING
4A KAIG3-RFI-SW-C-0749 01 Civil Site Works 9/20/21 9/25/21 Approved as noted
CONCRETE FOR SHORT PIECE - MH-B-01 (As Highlighted)
Excavation & Soil Preparation for Foundation Base of Outer Canopy 2 at Physic Garden, as per highlighted
KAIG3-RFI-PG-C-0750 00 Civil Physic Garden 7/5/21 7/7/21 Approved as noted
area in attached drawings.
Soil Preparation prior to Backfill along the Boundary Wall (Outer & Inner Sides) of span 48 & 49 of Water
4B KAIG3-RFI-WG-C-0751 00 Civil Water Play Garden 7/4/21 7/6/21 Approved as noted
Garden, as per highlighted area in attached drawings.
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line ( FW-9 to FW-11) 250mmØ pipe as per Site Works near Aviary
KAIG3-RFI-SW-C-0752 00 Civil 7/4/21 7/6/21 Approved as noted
high lighted in dwg. Garden
Site Works near Aviary
KAIG3-RFI-SW-C-0753 00 Warning Tape Installation for Foul Water Line ( FW-9 to FW-11) 250mmØ pipe as per high lighted in dwg. Civil 7/4/21 7/6/21 Approved as noted
Garden
Bedding of Gravel 3/8" and Geotextile surrounding for Foul Water Line for (225mmØ-UPVC- Class 4) 24 m
Site Woks near Crescent
KAIG3-RFI-SW-C-0754 00 Length from (FW-A-13-4 to FW-A-13-5). BETWEEN CRECENTS ZONE; 1D, 1C & 2J, 2H as per Civil 7/4/21 7/6/21 Approved as noted
zone 1D, 1C, 2J & 2H.
highlighted area in the attached Dwg.
Pipe installation of Foul Water Line for (225mmØ-UPVC- Class 4) 24 m Length from (FW-A-13-4 to FW-A- Site Woks near Crescent
KAIG3-RFI-SW-C-0755 00 Civil 7/4/21 7/6/21 Approved as noted
13-5). BETWEEN CRECENTS ZONE; 1D, 1C & 2J, 2H. . As per highlighted Area in the attached Dwg. zone 1D, 1C, 2J & 2H.
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (225mmØ-UPVC- Class 4) 24 m
Site Woks near Crescent
KAIG3-RFI-SW-C-0756 00 Length from (FW-A-13-4 to FW-A-13-5). BETWEEN CRECENTS ZONE; 1D, 1C & 2J, 2H. . As per Civil 7/7/21 7/10/21 Approved as noted
zone 1D, 1C, 2J & 2H.
highlighted
Warning Area
Tape in the attached
Installation Dwg.
for Foul Water Line for (225mmØ-UPVC- Class 4) 24 m Length from (FW-A-13-
Site Woks near Crescent
KAIG3-RFI-SW-C-0757 00 4 to FW-A-13-5). BETWEEN CRECENTS ZONE; 1D, 1C & 2J, 2H. . As per highlighted Area in the Civil 7/7/21 7/10/21 Approved as noted
zone 1D, 1C, 2J & 2H.
attached Dwg. Site
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m Length. INSIDE
4B KAIG3-RFI-MB-C-0758 00 Civil Management/Maintenance 8/5/21 8/7/21 Approved as noted
MANAGEMENT BLDG. At highlighted Area in the attached Dwg.
Building
Site
Warning Tape Installation for Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length. INSIDE
4B KAIG3-RFI-MB-C-0759 00 Civil Management/Maintenance 8/5/21 8/7/21 Approved as noted
MANAGEMENT BLDG. At highlighted Area in the attached Dwg.
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 23m Length Building
Site Works beside
KAIG3-RFI-SW-C-0760 00 from (FW-A-3-6.9 to FW-A-3-6.10). BESIDE CRECENT ZONE-1 as per highlighted Area in the attached Civil 7/7/21 7/10/21 Approved as noted
Crescent zone 1
Dwg.
KAIG3-RFI-PA-C-0761 00 Inspection of Formwork for the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted Civil Picnic Area 7/5/21 7/8/21 Approved as noted

KAIG3-RFI-PA-C-0762 00 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted Civil Picnic Area 7/5/21 7/14/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-42) As
KAIG3-RFI-PA-C-0763 00 Civil Picnic Area 7/5/21 7/8/21 Approved as noted
Highlighted
Excavation for Storm Water Line from MH-X-03 TO G-X-01 including catch basin G-X-01, prior to start
KAIG3-RFI-SW-C-0764 00 Civil Site Works 7/5/21 7/6/21 Approved as noted
Gravel Bedding (as Highlighted)
Inspection for Casting the Concrete Encasement for theStorm Water Line Catch Basin G-A-04 (As
KAIG3-RFI-SW-C-0765 00 Civil Site Works 7/5/21 7/7/21 Approved as noted
Highlighted)
(‫ )حسبتــــوجـيهـ صــاحباــلصالحية ازاــلة اعماـلاــلمرحـلة اـــلثانية‬Notification to Start Cut and Removal of Disposal Materials
KAIG3-RFI-SW-C-0766 00 Civil Site Works 7/6/21 7/12/21 Approved as noted
upto -75CM from existing Asphalt Layers at Parking area - as Highlighted in the Drawing.
Soil Preparation prior to Backfill along the Boundary Wall (Outer & Inner Sides) of span 40, 41 & 42 of
4B KAIG3-RFI-WG-C-0767 00 Civil Water Play Garden 7/6/21 7/8/21 Approved as noted
Water Garden, as per highlighted area in attached drawings.
Soil Preparation prior to Backfill along the Boundary Wall (Inner Sides) of span 26 at Water Garden, as per
4B KAIG3-RFI-WG-C-0768 00 Civil Water Play Garden 7/6/21 7/8/21 Approved as noted
highlighted area in attached drawings.

KAIG3-RFI-PA-C-0769 00 Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted Civil Picnic Area 7/6/21 7/7/21 Approved as noted

KAIG3-RFI-PA-C-0770 00 Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted Civil Picnic Area 7/6/21 7/8/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-L (SA-15) As
KAIG3-RFI-PA-C-0771 00 Civil Picnic Area 7/6/21 7/7/21 Approved as noted
Highlighted

KAIG3-RFI-SW-C-0772 00 Inspection for Casting the Blinding Concrete under the Catch Basin (G-X-01) (as Highlighted) Civil Site Works 7/6/21 7/7/21 Approved as noted

kaig-qcals 102
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Excavation for Foul Water Line from FW-A-3-6.7 to FW-A-3-6.9 including the Manhole FW-A-3-6.7, FW-
KAIG3-RFI-SW-C-0773 00 Civil Site Works 7/6/21 7/8/21 Approved as noted
A-3-6.8, FW-A-3-6.9 prior to start Gravel Bedding (as Highlighted)

KAIG3-RFI-PA-C-0774 00 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted Civil Picnic Area 7/7/21 7/14/21 Code C (resubmit)

KAIG3-RFI-PA-C-0774 01 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted Civil Picnic Area 7/24/21 7/29/21 Approved as noted

Inspection for Casting the Blinding Concrete under Beam of Seating Area (2) at Zone-L (SA-37) As
KAIG3-RFI-PA-C-0775 00 Civil Picnic Area 7/7/21 7/12/21 Approved as noted
Highlighted
Inspection for Casting the Blinding Concrete under Beam of Seating Area (3) at Zone-K (SA-28) As
KAIG3-RFI-PA-C-0776 00 Civil Picnic Area 7/7/21 7/12/21 Approved as noted
Highlighted
Soil Preperation prior to start backfilling sub-base under beam of Seating Area (3) at Zone-K (SA-24) - As
KAIG3-RFI-PA-C-0777 00 Civil Picnic Area 7/7/21 7/11/21 Approved as noted
Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-05 to Main Line (as
KAIG3-RFI-SW-C-0778 00 Civil Site Works 7/7/21 7/11/21 Approved as noted
Highlighted)
"(‫ )حسبتــــوجيهـ صــاحـباـــلصالحـية ازاــلة اعماــلاـــلمرحلة اــلثانـية‬Notification to Start Excavation and Removal of Existing
KAIG3-RFI-SW-C-0779 00 Manholes and Pipe Networks related to Phase-2 - as per the attached drawing survey schedule for Manholes" Civil Site Works 7/7/21 7/12/21 Approved as noted

Pipe installation of Foul Water Line (315mmØ-UPVC- Class 4) 23m Length from (FW-A-3-6.9 to FW-A-3- Site Works beside
KAIG3-RFI-SW-C-0780 00 Civil 7/7/21 7/10/21 Approved as noted
6.10). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Dwg. Crescent Zone 1

KAIG3-RFI-PA-C-0781 00 Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-31) As Highlighted Civil Picnic Area 7/8/21 7/11/21 Approved as noted

KAIG3-RFI-PA-C-0782 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-31) as highlighted Civil Picnic Area 7/8/21 7/11/21 Approved as noted

KAIG3-RFI-PA-C-0783 00 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-31) As highlighted Civil Picnic Area 7/8/21 7/14/21 Approved as noted

KAIG3-RFI-PA-C-0784 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-31) As highlighted Civil Picnic Area 7/8/21 7/14/21 Approved as noted

KAIG3-RFI-SW-C-0785 00 Soil Preparation under Boulder No.RB-307 Civil Site Works 7/8/21 7/14/21 Approved as noted

KAIG3-RFI-SW-C-0786 00 Soil Preparation under Boulder No.RB-308a Civil Site Works 7/8/21 7/14/21 Approved as noted

KAIG3-RFI-SW-C-0787 00 Soil Preparation Prior to Start Backfill Gravel for Manhole FW15 and FW16 - as Highlighted Civil Site Works 7/8/21 7/14/21 Approved as noted

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW15 and FW16
KAIG3-RFI-SW-C-0788 00 Civil Site Works 7/8/21 7/11/21 Approved as noted
(as highlighted) STOCK PILE # 106
Excavation for Storm Water Line Catch Basin G-X-2, G-X-3, G-X-4 prior to start blinding concrete (as
KAIG3-RFI-SW-C-0789 00 Civil Site Works 7/8/21 7/14/21 Approved as noted
highlighted)

KAIG3-RFI-SW-C-0790 00 Inspection for Casting Blinding Concrete under the Catch Basin (G-X-2, G-X-3 and G-X-4) as highlighted Civil Site Works 7/8/21 7/13/21 Approved as noted

KAIG3-RFI-SW-C-0791 00 Soil Preparation under Boulder No. RB- 307a Civil Site Works 7/10/21 7/14/21 Approved as noted

KAIG3-RFI-SW-C-0792 00 Soil Preparation under Boulder No. RB- 319 Civil Site Works 7/10/21 7/12/21 Code C (not resubmit)

INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW6 and FW9) - As
KAIG3-RFI-SW-C-0793 00 Civil Site Works 7/10/21 7/14/21 Code C (resubmit)
Highlighted.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-B-01) - As
KAIG3-RFI-SW-C-0794 00 Civil Site Works 7/10/21 7/14/21 Code C (resubmit)
Highlighted
INSPECTION OF UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT PIECE OF
KAIG3-RFI-SW-C-0795 00 Civil Site Works 7/10/21 7/11/21 Approved as noted
MANHOLE - FW1-2 AND FW6 (As Highlighted)
Excavation for Storm Water Line from MH-D-08 to MH-D-09, including Manhole MH-D- 08 (as
KAIG3-RFI-SW-C-0796 00 Civil Site Works 7/11/21 7/13/21 Approved as noted
Highlighted)
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 23m Length
Site Works beside
KAIG3-RFI-SW-C-0797 00 from (FW-A-3-6.9 to FW-A-3-6.10). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Civil 7/11/21 7/13/21 Approved as noted
Crescent zone 1
Dwg.
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 23m Length from (FW-A-3-6.9 to Site Works beside
KAIG3-RFI-SW-C-0798 00 Civil 7/11/21 7/13/21 Approved as noted
FW-A-3-6.10). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Dwg. Crescent zone 1
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-X for (400mmØ-UPVC- Class
Site Works beside
KAIG3-RFI-SW-C-0799 00 4) 63m Length from (MH-X-02 to MH-X-03). BESIDE MANAGEMENT- MAINTENANCE BUILDING . Civil 7/11/21 7/13/21 Approved as noted
Management Building
As per highlighted
Bedding of Gravel Area in the
3/8" and attachedsurrounding
Geotextile Dwg. Foul Water Line (315mmØ-UPVC- Class 4) 65m Length
Site Works beside
KAIG3-RFI-SW-C-0800 00 from (FW-A-3-6.7 to FW-A-3-6.9). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Civil 7/11/21 7/13/21 Approved as noted
Crescent zone 1
Dwg.
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE -
KAIG3-RFI-SW-C-0801 00 Civil Site Works 7/11/21 7/14/21 Approved as noted
FW1-, FW1-2.3 (As Highlighted)
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-1 to MH-X-03 (as
KAIG3-RFI-SW-C-0802 00 Civil Site Works 7/11/21 7/14/21 Approved as noted
Highlighted)

KAIG3-RFI-PA-C-0803 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted Civil Picnic Area 7/12/21 7/14/21 Code C (resubmit)

kaig-qcals 103
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0803 01 Inspection of Formwork for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted Civil Picnic Area 7/24/21 7/26/21 Approved as noted

KAIG3-RFI-PA-C-0804 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted Civil Picnic Area 7/12/21 7/14/21 Code C (resubmit)

KAIG3-RFI-PA-C-0804 01 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted Civil Picnic Area 7/24/21 7/27/21 Approved as noted

Excavation for Storm Water Line from MH-D-07 to MH-D-08, including Manhole MH-D- 07 (as
KAIG3-RFI-SW-C-0805 00 Civil Site Works 7/12/21 7/14/21 Approved as noted
Highlighted)
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.7, FW-A-3-6.8,FW-A-3-6.9,
KAIG3-RFI-SW-C-0806 00 Civil Site Works 7/12/21 7/13/21 Approved as noted
FW-A-3-6.10, FW-A-3-6.11, FW-A-3-6.12 (as Highlighted)
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW1-2, FW1-3, FW1-3.1) PRIOR TO
KAIG3-RFI-SW-C-0807 00 Civil Site Works 7/13/21 7/15/21 Approved as noted
START WATERPROOFING (As Highlighted)
Inspection for Application of Primer (1st Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
KAIG3-RFI-SW-C-0808 00 Civil Site Works 7/13/21 7/15/21 Approved as noted
Highlighted)
Inspection for Application of Primer (2nd Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
KAIG3-RFI-SW-C-0809 00 Civil Site Works 7/13/21 7/15/21 Approved as noted
Highlighted)
Pipe Installation for Storm Water Line Outfall-X for (400mmØ-UPVC- Class 4) 63m Length from (MH-X-02
Site Works beside
KAIG3-RFI-SW-C-0810 00 to MH-X-03). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As per highlighted Area in the Civil 7/11/21 7/13/21 Approved as noted
Management Building
attached Dwg.
Inspection for Application of Primer (3rd Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
KAIG3-RFI-SW-C-0811 00 Civil Site Works 7/13/21 7/15/21 Approved as noted
Highlighted)

KAIG3-RFI-CO-C-0812 00 Surface Preparation Prior to start Backfilling around pilecap 181 & 183 as highlighted Civil Crescent 7/12/21 7/14/21 Approved as noted

Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 65m Length from (FW-A-3-6.7 to FW-A-3- Site Works beside
KAIG3-RFI-SW-C-0813 00 Civil 7/12/21 7/14/21 Approved as noted
6.9). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Dwg. Crescent zone 1

KAIG3-RFI-SW-C-0814 00 Soil Preparation Prior to Start Backfill Gravel for Manhole FW1-3 - as Highlighted Civil Site Works 7/13/21 7/15/21 Approved as noted

INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-3 (As
KAIG3-RFI-SW-C-0815 00 Civil Site Works 7/13/21 7/15/21 Approved as noted
Highlighted) STOCK PILE # 106
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1-2, FW1-3,
KAIG3-RFI-SW-C-0816 00 Civil Site Works 7/13/21 7/15/21 Code C (resubmit)
FW1-3.2, FW5, FW8, FW9-1, FW10, FW11) - As Highlighted
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2, FW1-2.1, FW1-3, FW5, FW6, FW7, FW8,
KAIG3-RFI-SW-C-0817 00 Civil Site Works 7/13/21 7/15/21 Code C (resubmit)
FW9, FW9-1, FW10, FW11) - As Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-10 and G-B-11
KAIG3-RFI-SW-C-0818 00 Civil Site Works 7/14/21 7/15/21 Approved as noted
(as Highlighted)
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR STORM WATER LINE, MANHOLE
KAIG3-RFI-SW-C-0819 00 Civil Site Works 7/14/21 7/15/21 Approved as noted
- MH-X-03 (As Highlighted)
Inspection for Casting the Blinding Concrete under the Manhole (FW7, FW8, FW9-1, FW13, FW14) - As
KAIG3-RFI-SW-C-0820 00 Civil Site Works 7/14/21 7/15/21 Approved as noted
Highlighted
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-X for (400mmØ-UPVC- Class
Site Works beside
KAIG3-RFI-SW-C-0821 00 4) 63m Length from (MH-X-02 to MH-X-03). BESIDE MANAGEMENT- MAINTENANCE BUILDING . Civil 7/15/21 7/17/21 Approved as noted
Management Building
As per highlighted
Warning Area in for
Tape Installation theStorm
attached Dwg.
Water Line Outfall-X for (400mmØ-UPVC- Class 4) 63m Length from
Site Works beside
KAIG3-RFI-SW-C-0822 00 (MH-X-02 to MH-X-03). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As per highlighted Civil 7/15/21 7/17/21 Approved as noted
Management Building
Areamm
300 in the attached
Gravel 3/8" Dwg.
Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 65m Length
Site Works beside
KAIG3-RFI-SW-C-0823 00 from (FW-A-3-6.7 to FW-A-3-6.9). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Civil 7/15/21 7/17/21 Approved as noted
Crescent 1
Dwg.
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 65m Length from (FW-A-3-6.7 to Site Works beside
KAIG3-RFI-SW-C-0824 00 Civil 7/15/21 7/17/21 Approved as noted
FW-A-3-6.9). BESIDE CRECENT ZONE-1 . As per highlighted Area in the attached Dwg. Crescent 1
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-G (SA-31) As
KAIG3-RFI-PA-C-0825 00 Civil Picnic Area 7/15/21 7/17/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-32) As
KAIG3-RFI-PA-C-0826 00 Civil Picnic Area 7/15/21 7/17/21 Approved as noted
Highlighted

KAIG3-RFI-SW-C-0827 00 Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-308a Civil Site Works 7/15/21 7/18/21 Code C (resubmit)

KAIG3-RFI-SW-C-0827 01 Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-308a Civil Site Works 7/25/21 7/29/21 Approved as noted

KAIG3-RFI-SW-C-0828 00 Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-308a Civil Site Works 7/15/21 7/18/21 Code C (resubmit)

KAIG3-RFI-SW-C-0828 01 Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-308a Civil Site Works 7/25/21 7/29/21 Approved as noted

Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-12 (as
KAIG3-RFI-SW-C-0829 00 Civil Site Works 7/15/21 7/17/21 Approved as noted
Highlighted)
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-G (SA-39) As
KAIG3-RFI-PA-C-0830 00 Civil Picnic Area 7/15/21 cancelled
Highlighted

KAIG3-RFI-PA-C-0831 00 Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted" Civil Picnic Area 7/15/21 7/18/21 Code C (resubmit)

kaig-qcals 104
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-PA-C-0831 01 Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted" Civil Picnic Area 7/27/21 7/28/21 Approved as noted
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-X for (450mmØ-UPVC- Class
Site Works beside
KAIG3-RFI-SW-C-0832 00 4) 19m Length from (MH-X-01 to G-X-5). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As Civil 7/15/21 7/17/21 Approved as noted
Management Building
per highlighted
Bedding Area
of Gravel in the
3/8" andattached Dwg.
Geotextile surrounding Storm Water Line Outfall-X for (315mmØ-UPVC- Class
Site Works beside
KAIG3-RFI-SW-C-0833 00 4) 16m Length from (MH-X-03 to G-X-1). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As Civil 7/15/21 7/17/21 Approved as noted
Management Building
per highlighted
Pipe InstallationArea in theWater
of Storm attached
LineDwg.
Outfall-X for (315mmØ-UPVC- Class 4) 26m Length ( 8 m Concrete
Site Works beside
KAIG3-RFI-SW-C-0834 00 Incasement ) from (MH-X-03 to G-X-1). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As per Civil 7/15/21 7/17/21 Approved as noted
Management Building
highlighted Area3/8"
300 mm Gravel in the attached Dwg.
Backfilling and Geotextile for Storm Water Line Outfall-X for (315mmØ-UPVC- Class
Site Works beside
KAIG3-RFI-SW-C-0835 00 4) 16m Length from (MH-X-03 to G-X-1). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As Civil 7/15/21 7/17/21 Approved as noted
Management Building
per highlighted
Warning Area in thefor
Tape Installation attached
StormDwg.
Water Line Outfall-X for (315mmØ-UPVC- Class 4) 26m Length ( 8 m
Site Works beside
KAIG3-RFI-SW-C-0836 00 Concrete Incasement ) from (MH-X-03 to G-X-1). BESIDE MANAGEMENT- MAINTENANCE Civil 7/15/21 7/17/21 Approved as noted
Management Building
BUILDING . As per
Bedding of Gravel highlighted
3/8" Area in
and Geotextile the attachedStorm
surrounding Dwg.Water Line Outfall-D for (315mmØ-UPVC- Class Site Works between
KAIG3-RFI-SW-C-0837 00 4) 65m Length from (MH-D-08 to MH-D-09). BETWEEN DISCOVARY & BUTTERFLY GARDEN. As Civil Discovery & Butterfly 7/15/21 7/17/21 Approved as noted
per highlighted
Pipe InstallationArea in theWater
of Storm attached
LineDwg.
Outfall-D for (315mmØ-UPVC- Class 4) 65m Length from (MH-D-08 Garden
Site Works between
KAIG3-RFI-SW-C-0838 00 to MH-D-09). BETWEEN DISCOVARY & BUTTERFLY GARDEN. As per highlighted Area in the Civil Discovery & Butterfly 7/15/21 7/17/21 Approved as noted
attached Dwg. Garden
Excavation & Surface Preparation for Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as
KAIG3-RFI-ZG-C-0839 00 Civil Maze Garden 7/17/21 7/18/21 Approved as noted
per highlighted area in attached drawing's.
Surface Preparation of Concrete Short Piece for (MH-B-01, G-B-10, G-B-11, G-B-12, MH-X-03, G-A-04)
KAIG3-RFI-SW-C-0840 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
prior to start Waterproofing as highlighted.
Excavation for Foul Water Line from FW-A-3-6.6 to FW-A-3-6.7 including Manhole FW-A-3-6.6 prior to
KAIG3-RFI-SW-C-0841 00 Civil Site Works 7/24/21 7/26/21 Approved as noted
start Gravel Bedding as highlighted.

KAIG3-RFI-PA-C-0842 00 Inspection of Formworks for the Wall of Seatig Area1 at Zone-L (SA-15) as highlighted. Civil Picnic Area 7/24/21 7/26/21 Approved as noted

KAIG3-RFI-PA-C-0843 00 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-15) as highlighted Civil Picnic Area 7/24/21 7/28/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Manhole (MH-B-02, MH-B-03, MH-B-04) as
KAIG3-RFI-SW-C-0844 00 Civil Site Works 7/24/21 7/25/21 Code C (resubmit)
highlighted.

Inspection for Casting the Blinding Concrete under the Manhole (MH-B-02, MH-B-03, MH-B-04) as
KAIG3-RFI-SW-C-0844 01 Civil Site Works 7/27/21 7/28/21 Approved as noted
highlighted.

Insection for Manhole base Installation, Pipe connection and Casting Concrete for Short Piece G-B-10, G-B-
KAIG3-RFI-SW-C-0845 00 Civil Site Works 7/24/21 7/29/21 Approved as noted
11, G-B-12 as highlighted.

INSPECTION FOR GULLIES INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR
KAIG3-RFI-SW-C-0846 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
SHORT PIECE - G-B-10, G-B-11, G-B-12 (As Highlighted)

Inspection for Application of Primer (1st Coat) for Concrete Encasement ( G-B-10, G-B-11, G-B-12) (as
KAIG3-RFI-SW-C-0847 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
highlighted).

Inspection for Application of Primer (2nd Coat) for Concrete Encasement ( G-B-10, G-B-11, G-B-12) (as
KAIG3-RFI-SW-C-0848 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
highlighted).
Inspection for Application of Primer (3rd Coat) for Concrete Encasement ( G-B-10, G-B-11, G-B-12) (as
KAIG3-RFI-SW-C-0849 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
highlighted).
Soil Preparation prior to start Backfill Gravel for Catch Basin G-B-1, G-B-2, G-B-3, G-B-4, G-B-5, G-B-6 as
KAIG3-RFI-SW-C-0850 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
highlighted.
Inspection for Backfilling 3/8 Gravel around the Catch Basin and under the Pipe for G-B-1, G-B-2, G-B-3, G-
KAIG3-RFI-SW-C-0851 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
B-4, G-B-5, G-B-6 as highlighted. Stock Pile 106.

KAIG3-RFI-PA-C-0852 00 Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted Civil Site Works 7/24/21 7/26/21 Approved as noted

KAIG3-RFI-PA-C-0853 00 Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted Civil Site Works 7/24/21 7/28/21 Approved as noted

KAIG3-RFI-PA-C-0854 00 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted Civil Site Works 7/24/21 7/28/21 Approved as noted

Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-33) As
KAIG3-RFI-PA-C-0855 00 Civil Site Works 7/24/21 7/28/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (2) at Zone-K (SA-31) As
KAIG3-RFI-PA-C-0856 00 Civil Site Works 7/24/21 7/27/21 Approved as noted
Highlighted

KAIG3-RFI-CO-C-0857 00 Surface Preparation Prior to start Backfilling around pilecap 121, 123, 125 as highlighted Zone 2E Civil Site Works 7/24/21 7/26/21 Approved as noted

Excavation for Storm Water Line from MH-D-08 to MH-D-08-01, including Manhole MH-D-08-01 (as
KAIG3-RFI-SW-C-0858 00 Civil Site Works 7/24/21 7/28/21 Approved as noted
Highlighted)
kaig-qcals 105
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation for Foul Water Line from FW-A-3-6.4 to FW-A-3-6.6 including the Manhole FW-A-3-6.4 & FW-
KAIG3-RFI-SW-C-0859 00 Civil Site Works 7/25/21 7/26/21 Approved as noted
A-3-6.5 prior to start Gravel Bedding (as Highlighted)
INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-1, G-X-6,
KAIG3-RFI-SW-C-0860 00 MH-X-02, MH-X-03, G-A-02, G-A-03, G-A-04, G-A-05, G-A-07, G-A-08, G-A-09, G-A-23, G-A-24, G-A- Civil Site Works 7/25/21 7/27/21 Approved as noted
25, G-A-26,forMH-B-01,
Inspection MH-B-02,
Application MH-B-03
of Primer ) PRIOR
(1st Coat) TO START
for Concrete WATERPROOFING
Encasement - (G-X-1, G-X-6, MH-X-02, MH-
KAIG3-RFI-SW-C-0861 00 X-03, G-A-02, G-A-03, G-A-04, G-A-05, G-A-07, G-A-08, G-A-09, G-A-23, G-A-24, G-A-25, G-A-26, Civil Site Works 7/25/21 7/27/21 Approved as noted
MH-B-01, for
Inspection MH-B-02, MH-B-03)
Application (As(2nd
of Primer Highlighted
Coat) for Concrete Encasement - (G-X-1, G-X-6, MH-X-02, MH-
KAIG3-RFI-SW-C-0862 00 X-03, G-A-02, G-A-03, G-A-04, G-A-05, G-A-07, G-A-08, G-A-09, G-A-23, G-A-24, G-A-25, G-A-26, Civil Site Works 7/25/21 7/27/21 Approved as noted
MH-B-01, MH-B-02,
Inspection for MH-B-03)
Application (As(3rd
of Primer Highlighted
Coat) for Concrete Encasement - (G-X-1, G-X-6, MH-X-02, MH-
KAIG3-RFI-SW-C-0863 00 X-03, G-A-02, G-A-03, G-A-04, G-A-05, G-A-07, G-A-08, G-A-09, G-A-23, G-A-24, G-A-25, G-A-26, Civil Site Works 7/25/21 7/27/21 Approved as noted
MH-B-01, MH-B-02, MH-B-03) (As Highlighted)
Surface Preparation Prior to start Backfilling beside strip footing as highlighted Zone 1A, 1B, 1C (as
KAIG3-RFI-CO-C-0864 00 Civil Crescent 7/25/21 7/26/21 Approved as noted
highlighte
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-26) As
KAIG3-RFI-PA-C-0865 00 Civil Picnic Area 7/25/21 7/27/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-27) As
KAIG3-RFI-PA-C-0866 00 Civil Picnic Area 7/25/21 7/27/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-34) As
KAIG3-RFI-PA-C-0867 00 Civil Picnic Area 7/25/21 7/27/21 Approved as noted
Highlighted
Inspection for Catch basin Installation, Backdrop, Pipe Connection and Casting Concrete for Short Piece - G-
4B KAIG3-RFI-SW-C-0868 00 Civil Site Works 7/25/21 7/26/21 Code C (submitted)
X-6 (As Highlighted)
Inspection for Catch basin Installation, Backdrop, Pipe Connection and Casting Concrete for Short Piece - G-
4B KAIG3-RFI-SW-C-0868 01 Civil Site Works 8/1/21 8/5/21 Approved as noted
X-6 (As Highlighted)
Inspection for Catch basin Installation, Pipe Connection and Casting Concrete for Short Piece - G-X-2 , G-X-
4B KAIG3-RFI-SW-C-0869 00 Civil Site Works 7/25/21 7/26/21 Code C (submitted)
3, G-X-4 (As Highlighted)
Inspection for Catch basin Installation, Pipe Connection and Casting Concrete for Short Piece - G-X-2 , G-X-
4B KAIG3-RFI-SW-C-0869 01 Civil Site Works 8/1/21 8/2/21 Approved as noted
3, G-X-4 (As Highlighted)

KAIG3-RFI-SW-C-0870 00 Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-307 (under 2nd lift Civil Site Works 7/26/21 7/27/21 Approved as noted

Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-307
KAIG3-RFI-SW-C-0871 00 Civil Site Works 7/26/21 7/29/21 Approved as noted
(under second lift)
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm 10no's) along Linear
KAIG3-RFI-PG-C-0872 00 Civil Physic Garden 7/26/21 7/29/21 Code C (submitted)
Channel Drain (inner side) at Physic Garden at highlighted area in attached Drawing's.
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm 10no's) along Linear
KAIG3-RFI-PG-C-0872 01 Civil Physic Garden 8/4/21 8/5/21 Approved as noted
Channel Drain (inner side) at Physic Garden at highlighted area in attached Drawing's.

KAIG3-RFI-SW-C-0874 00 Soil Preparation under Boulder No.RB- 308 after cutting. Civil Site Works 7/27/21 7/29/21 Approved as noted

Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-307a (under 2nd layer of
KAIG3-RFI-SW-C-0875 00 Civil Site Works 7/27/21 7/29/21 Approved as noted
rock)
Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-307a
KAIG3-RFI-SW-C-0876 00 Civil Site Works 7/27/21 7/29/21 Approved as noted
(under second layer of rock)

KAIG3-RFI-SW-C-0877 00 Inspection for Backfilling Sub-base under Boulder no. RB-308 Civil Site Works 7/27/21 7/29/21 Approved as noted

KAIG3-RFI-PA-C-0878 00 Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-36) As Highlighted Civil Picnic Area 7/27/21 7/28/21 Approved as noted

KAIG3-RFI-PA-C-0879 00 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-36) As Highlighted Civil Picnic Area 7/27/21 7/28/21 Approved as noted

KAIG3-RFI-PA-C-0880 00 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted Civil Picnic Area 7/27/21 7/28/21 Approved as noted

INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-2, G-X-3, G-


KAIG3-RFI-SW-C-0881 00 Civil Site Works 7/27/21 7/29/21 Approved as noted
X-4) PRIOR TO START WATERPROOFING (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0882 00 Civil Site Works 7/27/21 7/29/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
KAIG3-RFI-SW-C-0882 01 Civil Site Works 10/21/21 10/27/21 Approved as noted
CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-
KAIG3-RFI-SW-C-0883 00 Civil Site Works 7/27/21 7/29/21 Code C (resubmit)
A-3-6.12) - As Highlighted
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-
KAIG3-RFI-SW-C-0883 01 Civil Site Works 10/21/21 10/28/21 Code C (resubmit)
A-3-6.12) - As Highlighted
Excavation & Surface Preparation at Both Sides of Stone Boulders at Layer 2 of (Part 1 & 2) at Geyser Water Play
4B KAIG3-RFI-WG-C-0884 00 Civil 7/27/21 8/4/21 Approved as noted
Garden in Water Garden, At Highlighted area in attached Drawings. Garden/Geyser Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class Site Works between
KAIG3-RFI-SW-C-0885 00 4) 65m Length from (MH-D-08 to MH-D-09). BETWEEN DISCOVARY & BUTTERFLY GARDEN. As Civil Discovery & Butterfly 7/27/21 7/28/21 Approved as noted
per highlighted
Warning Area in thefor
Tape Installation attached
StormDwg.
Water Line Outfall-D for (315mmØ-UPVC- Class 4) 65m Length from Garden
Site Works between
KAIG3-RFI-SW-C-0886 00 (MH-D-08 to MH-D-09). BETWEEN DISCOVARY & BUTTERFLY GARDEN. As per highlighted Area in Civil Discovery & Butterfly 7/27/21 7/28/21 Approved as noted
the attached Dwg. Garden

kaig-qcals 106
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Pipe Installation of Storm Water Line Outfall-X for (450mmØ-UPVC- Class 4) 19m Length from (MH-X-01 Site Works between
KAIG3-RFI-SW-C-0887 00 to G-X-5). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As per highlighted Area in the Civil Management & 7/27/21 7/28/21 Approved as noted
attached
300 Dwg. 3/8" Backfilling and Geotextile for Storm Water Line Outfall-X for (450mmØ-UPVC- Class
mm Gravel Maintenance Building
Site Works between
KAIG3-RFI-SW-C-0888 00 4) 19m Length from (MH-X-01 to G-X-5). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As Civil Management & 7/27/21 7/29/21 Approved as noted
per highlighted Area in the attached Dwg. Maintenance Building
KAIG3-RFI-SW-C-0889 00 Soil Preparation under Boulder No.RB- 329 prior to start cutting. Civil Site Works 7/28/21 7/31/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.4, FW-A-3-6.5, FW-A-3-6.6
KAIG3-RFI-SW-C-0890 00 Civil Site Works 7/28/21 7/29/21 Approved as noted
(as Highlighted
Excavation for Storm Water Line from MH-D-08-01 to MH-D-08-02, including Manhole MH-D-08-02 (as
KAIG3-RFI-SW-C-0891 00 Civil Site Works 7/29/21 8/1/21 Approved as noted
Highlighted)

KAIG3-RFI-SW-C-0892 00 Soil Preparation under Boulder No.RB- 329 after cutting. Civil Site Works 7/29/21 7/31/21 Approved as noted

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-42) As
KAIG3-RFI-PA-C-0893 00 Civil Picnic Area 7/29/21 8/1/21 Approved as noted
Highlighted

KAIG3-RFI-PA-C-0894 00 Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted Civil Picnic Area 7/29/21 8/1/21 Approved as noted

KAIG3-RFI-PA-C-0895 00 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted Civil Picnic Area 7/29/21 8/1/21 Approved as noted

Excavation & Blinding levels for Manholes (Inside 6 no's) & (Outside 2 no's) of Maze garden, as per
KAIG3-RFI-ZG-C-0896 00 Civil Maze Garden 7/29/21 8/1/21 Approved as noted
highlighted area in attached drawing's.
Excavation for Storm Water Line from MH-D-06 to MH-D-07, including Manhole MH-D- 06 (as
KAIG3-RFI-SW-C-0897 00 Civil Site Works 7/29/21 8/1/21 Approved as noted
Highlighted)
Warning Tape Installation for Storm Water Line Outfall-X for (450mmØ-UPVC- Class 4) 19m Length from Site Works between
4B KAIG3-RFI-SW-C-0898 00 (MH-X-01 to G-X-5). BESIDE MANAGEMENT- MAINTENANCE BUILDING . As per highlighted Area Civil Management & 7/31/21 8/1/21 Approved as noted
in the attached
Bedding Dwg.
of Gravel 3/8" and Geotextile surrounding Storm Water Line - Out Fall A for (Ø 315mm - UPVC - Maintenance Building
Site Works between
4B 4C KAIG3-RFI-SW-C-0899 00 Class 4 ) - 16 m Length from ( G-A-5 to Main Line ). BETWEEN MANAGEMENT- MAINTENANCE Civil Management & 7/31/21 8/1/21 Approved as noted
BUILDING & WATER
Pipe Installation of StormTANK
Water.Line
As per highlighted
- Out Fall A forArea in the attached
(Ø 315mm - UPVCdrawing.
- Class 4 ) -16 m Length + 5 m Maintenance Building
Site Works between
4B 4C KAIG3-RFI-SW-C-0900 00 length( With Concrete Incasment) from ( G-A-5 to Main Line ). BETWEEN MANAGEMENT- Civil Management & 7/31/21 8/1/21 Approved as noted
MAINTENANCE
Bedding of Gravel BUILDING & WATER
3/8" and Geotextile TANK .Foul
surrounding As per highlighted
Water Area in the atta Class 4) 48m Length
Line (315mmØ-UPVC- Maintenance Building
Site Works beside
6B KAIG3-RFI-SW-C-0901 00 from (FW-A-3-6.4 to FW-A-3-6.7). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the Civil 8/1/21 8/2/21 Approved as noted
Crescent Zone 1 & 2
attached Dwg.
Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 48m Length from (FW-A-3-6.4 to FW-A-3- Site Works beside
6B KAIG3-RFI-SW-C-0902 00 Civil 8/1/21 8/4/21 Approved as noted
6.7). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (160mmØ-UPVC- Class
Site Works beside
4B KAIG3-RFI-SW-C-0903 00 4) 50m Length from (MH-D-08 to MH-D-08-01). BSIDE BUTTERFLY GARDEN. As per highlighted Area Civil 8/1/21 8/2/21 Approved as noted
Butterfly Garden
in the attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 50m Length from (MH-D-08 Site Works beside
4B KAIG3-RFI-SW-C-0904 00 Civil 8/1/21 8/2/21 Approved as noted
to MH-D-08-01). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Dwg. Butterfly Garden
Inspection for Casting the Blinding Concrete under Foundation of Seating Area (3) at Zone-K (SA-34) As
Zone K KAIG3-RFI-PA-C-0905 00 Civil Picnic Area 8/9/21 8/15/21 Approved as noted
Highlighted

Zone G KAIG3-RFI-PA-C-0906 00 Inspection of Formwork for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted Civil Picnic Area 8/1/21 8/5/21 Approved as noted

Zone G KAIG3-RFI-PA-C-0907 00 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted Civil Picnic Area 8/1/21 8/4/21 Approved as noted

5B - L KAIG3-RFI-SW-C-0908 00 Inspection for Backfilling Sub-base under Boulder no. RB-329 Civil Site Works 8/1/21 8/2/21 Approved as noted

Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-30) As
Zone K KAIG3-RFI-PA-C-0909 00 Civil Picnic Area 8/1/21 8/4/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-35) As
Zone K KAIG3-RFI-PA-C-0910 00 Civil Picnic Area 8/1/21 8/4/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (2) at Zone-K (SA-40) As
Zone K KAIG3-RFI-PA-C-0911 00 Civil Picnic Area 8/1/21 8/4/21 Approved as noted
Highlighted
Excavation for Storm Water Line from MH-D-04 to MH-D-05, including Manhole MH-D-04, MH-D-05 (as
4D KAIG3-RFI-SW-C-0912 00 Civil Site Works 8/1/21 8/3/21 Approved as noted
Highlighted)

4B KAIG3-RFI-SW-C-0913 00 Inspection for Casting the Blinding Concrete under the Gully (G-X-05) (as Highlighted) Civil Site Works 8/1/21 8/2/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
6B KAIG3-RFI-SW-C-0914 00 Civil Site Works 8/2/21 8/3/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.9, FW-A-3-6.10 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
6B KAIG3-RFI-SW-C-0914 01 Civil Site Works 8/29/21 9/1/21 Code C (resubmit)
CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.9, FW-A-3-6.10 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
6B KAIG3-RFI-SW-C-0914 02 Civil Site Works 9/14/21 9/15/21 Approved as noted
CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.9, FW-A-3-6.10 (As Highlighted)
Surface Preparation Prior to start Backfilling South tower bridge foundation as highlighted Zone 2A (as
2A KAIG3-RFI-CO-C-0915 00 Civil Crescent 8/2/21 8/3/21 Approved as noted
highlighted)
Surface Preparation Prior to start Backfilling around Pilecap 135, 137 as highlighted Zone 2G (as highlighted)
2G KAIG3-RFI-CO-C-0916 00 Civil Crescent 8/2/21 8/3/21 Approved as noted

kaig-qcals 107
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation and Removal of Disposal Materials ( -75cm ) from Raods and Parking Area - as per the attached
Zone B & C KAIG3-RFI-SW-C-0917 00 Civil Site Works 8/2/21 8/3/21 Approved as noted
Drawing and Survey Report

4B KAIG3-RFI-SW-C-0918 00 Inspection for Gullies Installation and Pipe Connection for - G-X-5 , G-A-1, G-A-5 (As Highlighted) Civil Site Works 8/3/21 8/8/21 Approved as noted

Excavation for Storm Water Line from G-H-3 to Outfall H, including Manhole and Gullies Highlighted in the
3A KAIG3-RFI-SW-C-0919 00 Civil Site Works 8/3/21 8/5/21 Approved as noted
attched Drawing
Excavation & Surface Preparation for Foundation of Circular Walls (6, 7, 8, 9 & 10) inside Maze garden, as
5A KAIG3-RFI-ZG-C-0920 00 Civil Maze Garden 8/2/21 8/3/21 Approved as noted
per highlighted area in attached drawing's.
Surface Preparation Prior to start Backfilling around Pilecap 117, 119, 120, 122, 124, 126 as highlighted
2E KAIG3-RFI-CO-C-0921 00 Civil Crescent 8/3/21 8/4/21 Approved as noted
Zone 2E (as highlighted)

4A 4B KAIG3-RFI-SW-C-0922 00 Soil Preparation under Boulder No. RB- 109 Civil Site Works 8/3/21 8/4/21 Code C (resubmit)

4A 4B KAIG3-RFI-SW-C-0922 01 Soil Preparation under Boulder No. RB- 109 Civil Site Works 8/25/21 8/29/21 Approved as noted

Inspection of Gully Installation, Pipe Connection and Casting Concrete for Short Piece for Gully - G-X-5 (As
4B KAIG3-RFI-SW-C-0923 00 Civil Site Works 8/4/21 8/5/21 Approved as noted
Highlighted)
Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water
4B KAIG3-RFI-SW-C-0924 00 Civil Site Works 8/4/21 8/5/21 Code C (resubmit)
Line Manhole - FW-A-22, FW-A-23, FW-A-24 (As Highlighted)
Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water
4B KAIG3-RFI-SW-C-0924 01 Civil Site Works 9/9/21 9/13/21 Approved as noted
Line Manhole - FW-A-22, FW-A-23, FW-A-24 (As Highlighted)

4D KAIG3-RFI-SW-C-0925 00 Excavation for Storm Water Line from MH-D-02 to MH-D-04 (As Highlighted) Civil Site Works 8/4/21 8/7/21 Approved as noted
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (160mmØ-UPVC- Class
Site Works beside
4D KAIG3-RFI-SW-C-0926 00 4) 30m Length from (MH-D-08-01 to MH-D-08-02). BSIDE BUTTERFLY GARDEN. As per highlighted Civil 11/4/21 11/8/21 Approved as noted
Butterfly Garden
Area in the
Bedding of attached Dwg.
Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC- Class Site Works beside
4D 4C KAIG3-RFI-SW-C-0927 00 4) 84m Length from (MH-D-06 to MH-D-07). BSIDE BUTTERFLY GARDEN & PHYSIC GARDEN. As Civil Butterfly Garden & Physic 8/4/21 8/5/21 Approved as noted
per Site Works between
300highlighted
mm Gravel Area in the attached
3/8" Backfilling andDwg.
Geotextile for Storm Water Line - Out Fall A for (Ø 315mm - UPVC - Garden
Management &
4B 4C KAIG3-RFI-SW-C-0928 00 Class 4 ) - 16 m Length from ( G-A-5 to Main Line ). BETWEEN MANAGEMENT- MAINTENANCE Civil 8/5/21 8/7/21 Approved as noted
Maintenance
Site Works between &
Building
BUILDING
Warning Tape& Installation
WATER TANK . As Water
for Storm per highlighted Area
Line - Out FallinAthe
forattached
(Ø 315mm-UPVC- Class 4 ) 21 m Length Water Tank&
Management
4B 4C KAIG3-RFI-SW-C-0929 00 from ( G-A-5 to Main Line ). BETWEEN MANAGEMENT- MAINTENANCE BUILDING & WATER Civil 8/5/21 8/7/21 Approved as noted
Maintenance Building &
TANK . As per highlighted Area in the attached Dwg.
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (North Water Tank
Zone D KAIG3-RFI-SW-C-0930 00 Civil Site Works 8/5/21 8/9/21 Approved as noted
Open Channel Slope & Berm)

Zone D KAIG3-RFI-SW-C-0931 00 Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-04) Civil Site Works 8/5/21 8/9/21 Approved as noted

Zone E KAIG3-RFI-SW-C-0932 00 Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-E (Area-1) Civil Site Works 8/5/21 8/9/21 Approved as noted

Zone D KAIG3-RFI-SW-C-0933 00 Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-02) Civil Site Works 8/5/21 8/9/21 Approved as noted

Zone D KAIG3-RFI-SW-C-0934 00 Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-01) Civil Site Works 8/5/21 8/9/21 Approved as noted

5A - K KAIG3-RFI-SW-C-0935 00 Soil Preparation under Boulder No.RB- 298 prior to start Sub-base Civil Site Works 8/5/21 8/9/21 Approved as noted

5A - K KAIG3-RFI-SW-C-0936 00 Inspection for Backfilling Sub-base under Boulder no. RB-298 Civil Site Works 8/5/21 8/9/21 Approved as noted

6A - K KAIG3-RFI-SW-C-0937 00 Inspection for Backfilling Sub-base under Boulder no. RB-149 Civil Site Works 8/5/21 8/9/21 Approved as noted

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water
Zone C KAIG3-RFI-SW-C-0938 00 Civil Site Works 8/7/21 8/8/21 Approved as noted
Line Manhole - FW-A-20, FW-A-21, (as highlighted)

4D KAIG3-RFI-SW-C-0939 00 Excavation for Storm Water Line from MH-D-01 to MH-D-02 (As Highlighted) Civil Site Works 8/8/21 8/12/21 Approved as noted

300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (160mmØ-UPVC- Class
Site Works beside
4B KAIG3-RFI-SW-C-0940 00 4) 50m Length from (MH-D-08 to MH-D-08-01). BSIDE BUTTERFLY GARDEN. As per highlighted Area Civil 8/5/21 8/7/21 Approved as noted
Butterfly Garden
in the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 50m Length from Site Works beside
4B KAIG3-RFI-SW-C-0941 00 Civil 8/5/21 8/7/21 Approved as noted
(MH-D-08 to MH-D-08-01). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Dwg. Butterfly Garden
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 84m Length from (MH-D-06 Site Works beside
4C 4D KAIG3-RFI-SW-C-0942 00 to MH-D-07). BSIDE BUTTERFLY GARDEN & PHYSIC GARDEN. As per highlighted Area in the Civil Butterfly Garden & Physic 8/5/21 8/7/21 Approved as noted
attached Dwg. Garden
Pipe Installation of Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 30m Length from (MH-D-08- Site Works beside
4D KAIG3-RFI-SW-C-0943 00 Civil 8/5/21 8/7/21 Approved as noted
01 to MH-D-08-02). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Dwg. Butterfly Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 48m Length
Site Works beside
6B KAIG3-RFI-SW-C-0944 00 from (FW-A-3-6.4 to FW-A-3-6.7). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the Civil 8/5/21 8/7/21 Approved as noted
Crescent Zone 1 & 2
attached Dwg.
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 48m Length from (FW-A-3-6.4 to Site Works beside
6B KAIG3-RFI-SW-C-0945 00 Civil 8/5/21 8/7/21 Approved as noted
FW-A-3-6.7). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Behind
Zone C KAIG3-RFI-SW-C-0946 00 Civil Site Works 8/7/21 8/17/21 Approved as noted
Boundary Wall Span# 40, 41)
kaig-qcals 108
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Behind
Zone C KAIG3-RFI-SW-C-0947 00 Civil Site Works 8/8/21 8/11/21 Approved as noted
Boundary Wall Span# 42,43,44,45)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Behind
Zone C KAIG3-RFI-SW-C-0948 00 Civil Site Works 8/8/21 8/11/21 Approved as noted
Boundary Wall Span# 46, 47, 48)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B&C
Zone B C KAIG3-RFI-SW-C-0949 00 Civil Site Works 8/7/21 8/7/21 Approved as noted
(Behind Boundary Wall Span# 23 to Span# 38)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C&D
Zone C D KAIG3-RFI-SW-C-0950 00 Civil Site Works 8/7/21 8/7/21 Approved as noted
(Behind Boundary Wall Span# 56 to Span# 67B)
Excavation & Blinding levels for Manholes (14 no's) Inside Maze garden, as per highlighted area in attached
4D KAIG3-RFI-PG-C-0951 00 Civil Physic Garden 8/7/21 8/9/21 Approved as noted
drawing's.
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Behind
Zone C KAIG3-RFI-SW-C-0952 00 Civil Site Works 8/7/21 8/7/21 Approved as noted
Boundary Wall Span# 49A, 49B, 50A)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (Behind
Zone D KAIG3-RFI-SW-C-0953 00 Civil Site Works 8/7/21 8/7/21 Approved as noted
Boundary Wall Span# 68A to Span# 73)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-E (Behind
Zone E KAIG3-RFI-SW-C-0954 00 Civil Site Works 8/7/21 8/7/21 Approved as noted
Boundary Wall Span# 75 to Span# 88)
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 14, 15 & 16 at
4A 4B KAIG3-RFI-WG-C-0955 00 Civil Water Play Garden 8/9/21 8/9/21 Approved as noted
Water Garden, at highlighted area in attached drawings & as per attached RFT's .
Excavation & Soil preparation for Remaining Boundary wall at Discovery Garden at highlighted area in
4B KAIG3-RFI-DG-C-0956 00 Civil Discovery Garden 8/8/21 8/11/21 Approved as noted
attached Drawing's.
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (160mmØ-UPVC- Class
Site Work beside Butterfly
4D KAIG3-RFI-SW-C-0957 00 4) 30m Length from (MH-D-08-01 to MH-D-08-02). BSIDE BUTTERFLY GARDEN. As per highlighted Civil 8/9/21 8/11/21 Approved as noted
Garden
Area in the
Warning attached
Tape Dwg. for Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 30m Length from
Installation
Site Work beside Butterfly
4D KAIG3-RFI-SW-C-0958 00 (MH-D-08-01 to MH-D-08-02). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Civil 8/9/21 8/11/21 Approved as noted
Garden
Dwg.mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC- Class
300
Site Work beside Butterfly
4D 4C KAIG3-RFI-SW-C-0959 00 4) 84m Length from (MH-D-06 to MH-D-07). BSIDE BUTTERFLY GARDEN & PHYSIC GARDEN. As Civil 8/9/21 8/11/21 Approved as noted
Garden &Physic Garden
per highlighted
Warning Area in thefor
Tape Installation attached
StormDwg.
Water Line Outfall-D for (400mmØ-UPVC- Class 4) 84m Length from
Site Work beside Butterfly
4D 4C KAIG3-RFI-SW-C-0960 00 (MH-D-06 to MH-D-07). BSIDE BUTTERFLY GARDEN & PHYSIC GARDEN. As per highlighted Area Civil 8/9/21 8/11/21 Approved as noted
Garden &Physic Garden
in the attached
Bedding Dwg.
of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Work beside Butterfly
4D 4C KAIG3-RFI-SW-C-0961 00 4) 41m Length from (MH-D-07 to MH-D-08). BSIDE BUTTERFLY GARDEN. As per highlighted Area in Civil 8/9/21 8/11/21 Approved as noted
Garden
the attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 41m Length from (MH-D-07 Site Work beside Butterfly
4D 4C KAIG3-RFI-SW-C-0962 00 Civil 8/9/21 8/11/21 Approved as noted
to MH-D-08). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (450mmØ-UPVC- Class
Site Work beside Physic
4D KAIG3-RFI-SW-C-0963 00 4) 95 m Length from (MH-D-02 to MH-D-04). BSIDE PHYSIC GARDEN. As per highlighted Area in the Civil 8/9/21 8/11/21 Approved as noted
Garden
attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 95 m Length from (MH-D-02 Site Work beside Physic
4D KAIG3-RFI-SW-C-0964 00 Civil 8/9/21 8/11/21 Approved as noted
to MH-D-04). BSIDE PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC- Class
Site Work beside Physic
4D KAIG3-RFI-SW-C-0965 00 4) 25 m Length from (MH-D-04 to MH-D-05). BSIDE PHYSIC GARDEN. As per highlighted Area in the Civil 8/9/21 8/11/21 Approved as noted
Garden
attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 25 m Length from (MH-D-04 Site Work beside Physic
4D KAIG3-RFI-SW-C-0966 00 Civil 8/9/21 8/11/21 Approved as noted
to MH-D-05). BSIDE PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (450mmØ-UPVC- Class
Site Work beside Parking
3A KAIG3-RFI-SW-C-0967 00 4) 54 m Length from (MH-H-02 to MH-H-03). BSIDE PARKING AREA. As per highlighted Area in the Civil 8/10/21 8/11/21 Approved as noted
Area
attached Dwg.
Pipe Installation of Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) 54 m Length from (MH-H-02 Site Work beside Parking
3A KAIG3-RFI-SW-C-0968 00 Civil 8/10/21 8/11/21 Approved as noted
to MH-H-03). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (600mmØ-PP-
Site Work beside Parking
3A KAIG3-RFI-SW-C-0969 00 CORRUGATED) 54 m Length from (MH-H-01 to OUTFULL-H). BSIDE PARKING AREA. As per Civil 8/15/21 8/16/21 Approved as noted
Area
highlighted Area in the attached Dwg.
Pipe Installation of Storm Water Line Outfall-H for (600mmØ-PP- CORRUGATED) 54 m Length from Site Work beside Parking
3A KAIG3-RFI-SW-C-0970 00 Civil 8/15/21 8/17/21 Approved as noted
(MH-H-01 to OUTFULL-H). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 3, 4, 5 & 6 at Water
4B KAIG3-RFI-WG-C-0971 00 Civil Water Play Garden 8/10/21 8/23/21 Code C (not resubmit)
Garden, at highlighted area in attached drawings & as per attached RFT's (2 no's).

Zone K KAIG3-RFI-PA-C-0972 00 Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-42) as highlighted Civil Picnic Area 8/9/21 8/11/21 Approved as noted

Zone K KAIG3-RFI-PA-C-0973 00 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-42) As Highlighted Civil Picnic Area 8/9/21 8/15/21 Approved as noted

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water
5A 6A KAIG3-RFI-SW-C-0974 00 Civil Site Works 8/9/21 8/11/21 Approved as noted
Line Manhole - FW-A-15, FW-A-16, FW-A-17 (As Highlighted

4D KAIG3-RFI-SW-C-0975 00 Excavation for Storm Water Line from MH-D-01 to MH-D-01-A1 (As Highlighted) Civil Site Works 8/9/21 8/12/21 Approved as noted

4D KAIG3-RFI-SW-C-0976 00 Excavation for Storm Water Line from MH-D-05 to MH-D-06 (As Highlighted) Civil Site Works 8/9/21 8/12/21 Approved as noted

INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-5) PRIOR TO


4B KAIG3-RFI-SW-C-0977 00 Civil Site Works 8/9/21 8/14/21 Approved as noted
START WATERPROOFING (As Highlighted
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Road ST
Zone M KAIG3-RFI-SW-C-0978 00 Civil Site Works 8/10/21 8/21/21 Approved as noted
2-140 to ST 1+860)

kaig-qcals 109
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B (Plaza
Zone B KAIG3-RFI-SW-C-0979 00 Civil Site Works 8/10/21 8/23/21 Code C (not resubmit)
Area)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating
Zone N KAIG3-RFI-SW-C-0980 00 Civil Site Works 8/10/21 8/24/21 Approved as noted
Area-1) SA-1
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 7, 8, 9, 10 & 11 at
4B KAIG3-RFI-WG-C-0981 00 Civil Water Play Garden 8/10/21 8/19/21 Code C (not resubmit)
Water Garden, at highlighted area in attached drawings & as per attached RFT's (4 no's).
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 19, 20, 21, 22, 23,
4A KAIG3-RFI-WG-C-0982 00 Civil Water Play Garden 8/10/21 8/19/21 Approved as noted
24 & 25 at Water Garden, at highlighted area in attached drawings & as per attached RFT's (4 no's).
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 26, 27 & 28 at
4A KAIG3-RFI-WG-C-0983 00 Civil Water Play Garden 8/10/21 8/19/21 Approved as noted
Water Garden, at highlighted area in attached drawings & as per attached RFT's (9no's).
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 29 at Water Garden,
4A KAIG3-RFI-WG-C-0984 00 Civil Water Play Garden 8/10/21 8/19/21 Approved as noted
at highlighted area in attached drawings & as per attached RFT's (4no's).
Inspection for Completion of Backfilling along the Boundary Wall (Inner Sides) of span 37, 38 & 39 at Water
4A KAIG3-RFI-WG-C-0985 00 Civil Water Play Garden 8/10/21 8/19/21 Approved as noted
Garden, at highlighted area in attached drawings & as per attached RFT's (4no's).
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating
Zone N KAIG3-RFI-SW-C-0986 00 Civil Site Works 8/10/21 8/24/21 Approved as noted
Area-1) SA-2
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating
Zone M KAIG3-RFI-SW-C-0987 00 Civil Site Works 8/10/21 8/23/21 Code C (not resubmit)
Area-1) SA-4
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating
Zone N KAIG3-RFI-SW-C-0988 00 Civil Site Works 8/10/21 8/23/21 Approved as noted
Area-1) SA-5
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-26) As
Zone K KAIG3-RFI-PA-C-0989 00 Civil Picnic Area 8/10/21 8/14/21 Approved as noted
Highlighted
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (1) at Zone-K (SA-16) As
Zone K KAIG3-RFI-PA-C-0990 00 Civil Picnic Area 8/10/21 8/14/21 Approved as noted
Highlighted
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating
Zone J KAIG3-RFI-SW-C-0991 00 Civil Site Works 8/10/21 8/23/21 Approved as noted
Area-1) SA-7
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating
Zone J KAIG3-RFI-SW-C-0992 00 Civil Site Works 8/10/21 8/23/21 Approved as noted
Area-1) SA-8
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating
Zone J KAIG3-RFI-SW-C-0993 00 Civil Site Works 8/10/21 8/23/21 Approved as noted
Area-1) SA-9
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Zone G KAIG3-RFI-SW-C-0994 00 Civil Site Works 8/10/21 8/14/21 Code C (not resubmit)
Area-1) SA-10
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Zone G KAIG3-RFI-SW-C-0995 00 Civil Site Works 8/10/21 8/14/21 Code C (not resubmit)
Area-1) SA-11
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Zone G KAIG3-RFI-SW-C-0996 00 Civil Site Works 8/10/21 8/14/21 Code C (not resubmit)
Area-1) SA-12
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Zone G KAIG3-RFI-SW-C-0997 00 Civil Site Works 8/10/21 8/14/21 Code C (not resubmit)
Area-1) SA-13
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
Zone K KAIG3-RFI-SW-C-0998 00 Civil Site Works 8/10/21 8/24/21 Code C (not resubmit)
Area-1) SA-14
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K & L
Zone K & L KAIG3-RFI-SW-C-0999 00 Civil Site Works 8/11/21 8/24/21 Approved as noted
(Seating Area-1) SA-15
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
Zone K KAIG3-RFI-SW-C-1000 00 Civil Site Works 8/11/21 8/24/21 Code C (not resubmit)
Area-1) SA-16
Surface Preparation Prior to start Backfilling along Strip footing and Pilecap 1-3-5 and tip as highlighted
2A KAIG3-RFI-CO-C-1001 00 Civil Crescent 8/10/21 8/15/21 Approved as noted
Zone 2A (as highlighted)

2N KAIG3-RFI-CO-C-1002 00 Surface Preparation Prior to start Backfilling around Pilecap 175 as highlighted Zone 2N (as highlighted) Civil Crescent 8/10/21 8/14/21 Approved as noted

Check for Completion of Backfilling under the Boundary Wall of span 1, 2, 3 & 4 at Water Garden, at
4B KAIG3-RFI-WG-C-1003 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (7 no's).
Check for Completion of Backfilling under the Boundary Wall of span 5, 6 & 7 at Water Garden, at
4B KAIG3-RFI-WG-C-1004 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (5 no's).
Check for Completion of Backfilling under the Boundary Wall of span 26, 27, 28 & 29 at Water Garden, at
4A KAIG3-RFI-WG-C-1005 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (4 no's).
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
Zone K KAIG3-RFI-SW-C-1006 00 Civil Site Works 8/11/21 8/24/21 Code C (not resubmit)
Area-1) SA-17
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Near Site
Zone L KAIG3-RFI-SW-C-1007 00 Civil Site Works 8/11/21 8/23/21 Approved as noted
Tower)
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING
6B KAIG3-RFI-SW-C-1009 00 CONCRETE FOR SHORT PIECE FOR - FW-A-3-6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8 (As Civil Site Works 8/11/21 8/14/21 Approved as noted
Highlighted)
Excavation for Storm Water Line from MH-D-01 to MH-D-01-B1 Including Manhole MH-D-01 and MH-D-
4D KAIG3-RFI-SW-C-1010 00 Civil Site Works 8/11/21 8/16/21 Approved as noted
01-B1 (As Highlighted)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Area - 07)
Zone L KAIG3-RFI-SW-C-1011 00 Civil Site Works 8/11/21 8/23/21 Code C (not resubmit)

kaig-qcals 110
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Near Site
Zone M KAIG3-RFI-SW-C-1012 00 Civil Site Works 8/12/21 8/14/21 Code C (not resubmit)
Tower)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B (Area -
Zone B KAIG3-RFI-SW-C-1013 00 Civil Site Works 8/11/21 8/21/21 Code C (not resubmit)
01)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Prayer
Zone G KAIG3-RFI-SW-C-1014 00 Civil Site Works 8/11/21 8/23/21 Approved as noted
Area)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating
Zone N KAIG3-RFI-SW-C-1015 00 Civil Site Works 8/11/21 8/24/21 Approved as noted
Area-3) SA-1
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating
Zone J KAIG3-RFI-SW-C-1016 00 Civil Site Works 8/11/21 8/23/21 Code C (not resubmit)
Area-3) SA-2

Check for Completion of Backfilling under the Boundary Wall of span 30 & 32 at Water Garden, at
4A KAIG3-RFI-WG-C-1016 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (6 no's).

Check for Completion of Backfilling under the Boundary Wall of span 33, 34 & 35 at Water Garden, at
4A KAIG3-RFI-WG-C-1017 00 Civil Water Play Garden 8/11/21 8/17/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (8 no's).

Check for Completion of Backfilling under the Boundary Wall of span 36, 37 & 39 at Water Garden, at
4A KAIG3-RFI-WG-C-1018 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (3 no's).
Check for Completion of Backfilling under the Column's along the Abutement Wall of Jetty 1, at Boat
4B KAIG3-RFI-WG-C-1019 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (2 no's).
Check for Completion of Backfilling under the Column's along the Abutement Wall of Jetty 2, at Boat
4B KAIG3-RFI-WG-C-1020 00 Civil Water Play Garden 8/11/21 8/19/21 Approved as noted
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (2 no's).

Check for Completion of Backfilling Under the Boundary Wall of span 17 & 18 at Water Garden, at
4A KAIG3-RFI-WG-C-1021 00 Civil Water Play Garden 8/12/21 8/14/21 Code C (not resubmit)
highlighted area in attached drawings & as per attached Approved RFT's (6 no's)

Check for Completion of Backfilling Under the Blinding of Outer Canopy 1, 2 & 3 at Physic Garden, at
4D KAIG3-RFI-PG-C-1022 00 Civil Physic Garden 8/12/21 8/17/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (2 no's)
Check for Completion of Backfilling along the Boundary wall Bothside at grid EXC4-29/30 to 41/42 and
4D KAIG3-RFI-PG-C-1023 00 Inner side of wall at Grid EXC4-12 to 28 at Physic Garden, at highlighted area in attached drawings & as per Civil Physic Garden 8/12/21 8/17/21 Code C (not resubmit)
attached Approved RFT's (5 no's)
Check for Completion of Backfilling Under the Blinding of Water Fountain of Geyser Garden inside Water
4A KAIG3-RFI-WG-C-1024 00 Civil Water Play Garden 8/12/21 8/17/21 Approved as noted
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (2 no's)
Check for Completion of Backfilling of Sub-base Under the Boulders (1, 2 & 3 lines) Beside Planted Bed of
4B KAIG3-RFI-WG-C-1025 00 Boat Garden inside Water Garden, at highlighted area in attached drawings & as per attached Approved Civil Water Play Garden 8/12/21 8/14/21 Code C (not resubmit)
RFT's (3 no's)
Check for Completion of Backfilling of Sub-base Under the Planted Bed inside Boat Garden at Water
4B KAIG3-RFI-WG-C-1026 00 Civil Water Play Garden 8/12/21 8/14/21 Code C (not resubmit)
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (1 no's)q
Excavation for Foul Water Line from FW-A-3-6.1 to FW-A-3-6.4 including the Manhole FW-A-3-6.1, FW-
6B KAIG3-RFI-SW-C-1027 00 Civil Site Works 8/12/21 8/14/21 Approved as noted
A-3-6.2, FW-A-3-6.3, FW-A-3-6.4 prior to start Gravel Bedding (as Highlighted)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1028 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-3
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1029 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-5
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1030 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-6

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1031 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-4

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1032 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-12

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1033 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
3) SA-13

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1034 00 Civil Picnic Area 8/15/21 9/1/21 Approved as noted
3) SA-7

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1035 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
3) SA-8

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1036 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
3) SA-9

kaig-qcals 111
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1037 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
3) SA-10

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-3)
Zone J KAIG3-RFI-PA-C-1038 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
SA-15

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-I (Seating Area-3)
Zone I KAIG3-RFI-PA-C-1039 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
SA-18

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1040 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
3) SA-11
Check for Completion of Backfilling of Sub-base Under the Planted Bed 1, inside Water play Garden, at
4A KAIG3-RFI-WG-C-1041 00 Civil Water Play Garden 8/12/21 8/14/21 Code C (not resubmit)
highlighted area in attached drawings & as per attached Approved RFT's (1 no's)
Check for Completion of Backfilling of Sub-base Under the Planted Bed 2 & 3, inside Water play Garden, at
4A KAIG3-RFI-WG-C-1042 00 Civil Water Play Garden 8/12/21 8/24/21 Code C (not resubmit)
highlighted area in attached drawings & as per attached Approved RFT's (1 no's)
Check for Completion of Backfilling of Sub-base Under the Stack Boulders 1st lines of Geyser Garden inside
4A KAIG3-RFI-WG-C-1043 00 Civil Water Play Garden 8/12/21 8/14/21 Code C (not resubmit)
Water Garden, at highlighted area in attached drawings & as per attached Approved RFT's (1 no's)
Inspection & Compaction tests of Backfilling 4th Layer along the Boundary wall (Outer side) at grid EXC4-
4D KAIG3-RFI-PG-C-1044 00 Civil Physic Garden 8/25/21 8/30/21 Approved as noted
29/30 to 41/42 at Physic Garden, at highlighted area in attached drawings, (Stock Pile # 78).
Inspection & Compaction tests of Backfilling 5th (Final) Layer along the Boundary wall (Outer side) at grid
4D KAIG3-RFI-PG-C-1045 00 Civil Physic Garden 8/25/21 8/30/21 Approved as noted
EXC4-29/30 to 41/42 at Physic Garden, at highlighted area in attached drawings, (Stock Pile # 78).
Check for Executed Backfilling for Subsurface Drain pipe crossing the Boundary Wall (D) at Sound & Light
5A KAIG3-RFI-SG-C-1046 00 Civil Sound & Light Garden 8/14/21 8/23/21 Code C (not resubmit)
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (7 no's)
Check for Executed Backfilling for Under the Boundary Wall (C, D, E, F & I) at Sound & Light Garden, at
5A KAIG3-RFI-SG-C-1047 00 Civil Sound & Light Garden 8/14/21 8/24/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (2 no's)
Check for Executed Backfilling for Under the foundation of Whispering Cave 1, at Sound & Light Garden, at
5A KAIG3-RFI-SG-C-1048 00 Civil Sound & Light Garden 8/14/21 8/24/21 Approved as noted
highlighted area in attached drawings & as per attached Approved RFT's (1 no's)
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 14, 15, 16, 17, 18, 19,
4A KAIG3-RFI-WG-C-1049 00 Civil Water Play Garden 8/15/21 8/28/21 Code C (not resubmit)
20 & 21 at Water Garden, at highlighted area in attached drawings & as per attached Approved RFT's (4 no's)
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 22, 23, 24 & 25 at
4A KAIG3-RFI-WG-C-1050 00 Civil Water Play Garden 8/15/21 8/28/21 Code C (not resubmit)
Water Garden, at highlighted area in attached drawings & as per attached Approved RFT's (4 no's)
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 3, 4, 5 & 6 at Water
4A KAIG3-RFI-WG-C-1051 00 Civil Water Play Garden 8/15/21 8/28/21 Code C (not resubmit)
Garden, at highlighted area in attached drawings & as per attached Approved RFT's (2 no's)
Check for Partially Executed Backfilling along the Boundary Wall (Outer Side) of span 30, 33, 34, 35, 36 &
4A KAIG3-RFI-WG-C-1052 00 Civil Water Play Garden 8/15/21 8/28/21 Code C (not resubmit)
37 at Water Garden, at highlighted area in attached drawings & as per attached Approved RFT's (9 no's)
Check for Executed Backfilling Under the Boundary Wall at Grid (19-23/Right side) and (9-23/Left side) of
4B KAIG3-RFI-AG-C-1053 00 Civil Aviary Garden 8/17/21 8/21/21 Approved as noted
Aviary Garden, at highlighted area in attached drawings & as per attached Approved RFT's (4 no's)
Check for Executed Backfilling Under the Boundary Wall at Grid (1-19/Right side) and (1-8/Left side) of
4B KAIG3-RFI-AG-C-1054 00 Civil Aviary Garden 8/17/21 8/28/21 Code C (not resubmit)
Aviary Garden, at highlighted area in attached drawings & as per attached Approved RFT's (5 no's)
Excavation & Blinding levels for Manholes (4 no's) Inside Sound & Light garden, as per highlighted area in
5A KAIG3-RFI-SG-C-1055 00 Civil Sound & Light Garden 8/19/21 8/23/21 Approved as noted
attached drawing's.
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 1P (TIP)
1P KAIG3-RFI-CO-C-1056 00 Civil Crescent 8/15/21 8/19/21 Code C (not resubmit)
Crescent
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2A (TIP)
2A KAIG3-RFI-CO-C-1057 00 Civil Crescent 8/24/21 8/26/21 Approved as noted
Crescent
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2R (TIP)
2R KAIG3-RFI-CO-C-1058 00 Civil Crescent 8/24/21 8/28/21 Code C (not resubmit)
Crescent
Check theExecuted Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 1A (TIP)
1A KAIG3-RFI-CO-C-1059 00 Civil Crescent 8/15/21 cancelled
Crescent
Inspection and Compaction Test 2nd Layer for Backfilling at Zone 2H PC 139, 141, 143 as highighted (PC 2
2H KAIG3-RFI-CO-C-1060 00 Civil Crescent 8/23/21 8/26/21 Approved as noted
of 4 up to TOC and PC only) SP 119
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC- Class
Site Works beside Physic
4D KAIG3-RFI-SW-C-1062 00 4) 25 m Length from (MH-D-04 to MH-D-05). BSIDE PHYSIC GARDEN. As per highlighted Area in the Civil 8/12/21 8/15/21 Approved as noted
Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 25 m Length from Site Works beside Physic
4D KAIG3-RFI-SW-C-1063 00 Civil 8/12/21 8/15/21 Approved as noted
(MH-D-04 to MH-D-05). BSIDE PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works beside
4C 4D KAIG3-RFI-SW-C-1064 00 4) 41m Length from (MH-D-07 to MH-D-08). BSIDE BUTTERFLY GARDEN. As per highlighted Area in Civil 8/12/21 8/15/21 Approved as noted
Butterfly Garden
the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 41m Length from Site Works beside
4C 4D KAIG3-RFI-SW-C-1065 00 Civil 8/12/21 8/15/21 Approved as noted
(MH-D-07 to MH-D-08). BSIDE BUTTERFLY GARDEN. As per highlighted Area in the attached Dwg. Butterfly Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (450mmØ-UPVC- Class
Site Work beside Parking
3A KAIG3-RFI-SW-C-1066 00 4) 54 m Length from (MH-H-02 to MH-H-03). BSIDE PARKING AREA. As per highlighted Area in the Civil 8/12/21 8/15/21 Approved as noted
Area
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) 54 m Length from Site Work beside Parking
3A KAIG3-RFI-SW-C-1067 00 Civil 8/12/21 8/15/21 Approved as noted
(MH-H-02 to MH-H-03). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (400mmØ- UPVC-
Site Works near Water
4A KAIG3-RFI-SW-C-1068 00 CLASS 4) from (MH-B-03 to MH-B-04). NEAR WATER PLAY GARDEN. At highlighted Area in the Civil 8/12/21 8/14/21 Approved as noted
Play Garden
attached Dwg.

kaig-qcals 112
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Warning Tape Installation for Storm Water Line- Outfall B for (400mmØ- UPVC- CLASS 4) from (MH-B- Site Works near Water
4A KAIG3-RFI-SW-C-1069 00 Civil 8/12/21 8/14/21 Approved as noted
03 to MH-B-04). NEAR WATER PLAY GARDEN. At highlighted Area in the attached Dwg. Play Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (400mmØ- UPVC-
Site Works near Water
4A KAIG3-RFI-SW-C-1070 00 CLASS 4) from (MH-B-02 to MH-B-03). NEAR WATER PLAY GARDEN. At highlighted Area in the Civil 8/12/21 8/14/21 Approved as noted
Play Garden
attached Dwg.
Warning Tape Installation for Storm Water Line- Outfall B for (400mmØ- UPVC- CLASS 4) from (MH-B- Site Works near Water
4A KAIG3-RFI-SW-C-1071 00 Civil 8/12/21 8/14/21 Approved as noted
02 to MH-B-03). NEAR WATER PLAY GARDEN. At highlighted Area in the attached Dwg. Play Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (315mmØ- UPVC-
Site Works near Water
4A KAIG3-RFI-SW-C-1072 00 CLASS 4) from (MH-B-02 to G-B-07). NEAR WATER PLAY GARDEN. At highlighted Area in the Civil 8/12/21 8/14/21 Approved as noted
Play Garden
attached Dwg.
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ- UPVC- CLASS 4) from (MH-B- Site Works near Water
4A KAIG3-RFI-SW-C-1073 00 Civil 8/12/21 8/14/21 Approved as noted
02 to G-B-07). NEAR WATER PLAY GARDEN. At highlighted Area in the attached Dwg. Play Garden
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-3)
Zone J KAIG3-RFI-PA-C-1074 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
SA-14
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-3)
Zone J KAIG3-RFI-PA-C-1075 00 Civil Picnic Area 8/15/21 8/31/21 Approved as noted
SA-16

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-3)
Zone J KAIG3-RFI-PA-C-1076 00 Civil Picnic Area 8/15/21 8/30/21 Approved as noted
SA-17

Excavation for Storm Water Line from MH-D-01 to MH-D-01-A2 & MH-D-01-A1 to MH-D-01-A1-01 &
5A KAIG3-RFI-SW-C-1077 00 Civil Site Works 8/15/21 8/18/21 Approved as noted
MH-D-01-B1 to MH-D-01-B2 Including Manhole Highlighted in tha attached Drawing.

Excavation and Removal of Disposal Materials ( -75cm ) from Parking Area at Zone-G as per the attached
Zone G KAIG3-RFI-SW-C-1078 00 Civil Site Works 8/15/21 8/17/21 Approved as noted
highlighted Drawing and Survey Report

4D - K KAIG3-RFI-SW-C-1079 00 Soil Preparation under Boulder No.RB- 331 prior to start cutting. Civil Site Works 8/15/21 8/18/21 Approved as noted

4D - G KAIG3-RFI-SW-C-1080 00 Soil Preparation under Boulder No.RB- 330 prior to start cutting. Civil Site Works 8/15/21 8/18/21 Approved as noted

4D - K KAIG3-RFI-SW-C-1081 00 Soil Preparation under Boulder No.RB- 334 prior to start backfilling Civil Site Works 8/15/21 8/18/21 Approved as noted

Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-6.1 including the Manhole FW-A-3-6 & FW-A-
6B KAIG3-RFI-SW-C-1082 00 Civil Site Works 8/15/21 8/18/21 Approved as noted
3-6.1 prior to start Gravel Bedding (as Highlighted)
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.1, FW-A-3-6.2, FW-A-3-6.3
6B KAIG3-RFI-SW-C-1083 00 Civil Site Works 8/15/21 8/18/21 Approved as noted
(as Highlighted)

4D - K KAIG3-RFI-SW-C-1084 00 Soil Preparation under Boulder No.RB- 331 after cutting. Civil Site Works 8/15/21 8/18/21 Approved as noted

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1085 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-19
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1086 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-20
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1087 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-22
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1088 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-21
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1089 00 Civil Picnic Area 8/14/21 8/24/21 Approved as noted
3) SA-24
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1090 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-23
300 mm Gravel 3/8" Backfilling and Geotextile for STORM WATER Line-OutFall-B for (450mmØ-UPVC- Site Work near Aviary
4A 4B KAIG3-RFI-SW-C-1091 00 Civil 8/14/21 8/15/21 Approved as noted
Class 4 ) for 36 m Length from (MH-B-02 to G-B-10 ). At highlighted Area in the attached Dwg. Garden
Warning Tape Installation for Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 32m Length from Site Work near Aviary
4A 4B KAIG3-RFI-SW-C-1092 00 Civil 8/14/21 8/15/21 Approved as noted
(MH-B-01 to G-B-10). At highlighted Area in the attached Dwg. Garden
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1093 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-25
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1094 00 Civil Picnic Area 8/14/21 8/24/21 Approved as noted
3) SA-26
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1095 00 Civil Picnic Area 8/14/21 8/28/21 Approved as noted
3) SA-27
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1096 00 Civil Picnic Area 8/14/21 8/25/21 Approved as noted
3) SA-28
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1097 00 Civil Picnic Area 8/14/21 8/26/21 Code C (not resubmit)
3) SA-30
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1098 00 Civil Picnic Area 8/14/21 8/28/21 Approved as noted
3) SA-31
kaig-qcals 113
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1099 00 Civil Picnic Area 8/14/21 8/24/21 Code C (resubmit)
3) SA-32
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1099 01 Civil Picnic Area 8/29/21 cancelled
3) SA-32
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1100 00 Civil Picnic Area 8/14/21 8/24/21 Approved as noted
3) SA-33
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1101 00 Civil Picnic Area 8/14/21 8/26/21 Code C (not resubmit)
3) SA-34
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1102 00 Civil Picnic Area 8/14/21 8/24/21 Code C (not resubmit)
3) SA-35
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1103 00 Civil Picnic Area 8/14/21 8/26/21 Approved as noted
3) SA-36
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1104 00 Civil Picnic Area 8/14/21 8/26/21 Approved as noted
3) SA-38
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1105 00 Civil Picnic Area 8/14/21 8/26/21 Approved as noted
SA-1
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone N KAIG3-RFI-PA-C-1106 00 Civil Picnic Area 8/14/21 8/26/21 Approved as noted
SA-3

4D G KAIG3-RFI-SW-C-1107 00 Soil Preparation under Boulder No.RB- 330 after cutting. Civil Site Works 8/15/21 8/18/21 Approved as noted

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1108 00 Civil Picnic Area 8/16/21 9/6/21 Approved as noted
2) SA-4
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1109 00 Civil Picnic Area 8/16/21 9/6/21 Approved as noted
2) SA-5
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1110 00 Civil Picnic Area 8/16/21 9/6/21 Approved as noted
2) SA-6

2Q KAIG3-RFI-CO-C-1111 00 Surface Preparation Prior to start Backfilling around Pilecap 187 as highlighted Zone 2Q (as highlighted) Civil Crescent 8/15/21 8/18/21 Approved as noted

Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Crescent
2Q KAIG3-RFI-CO-C-1112 00 Civil Crescent 8/15/21 cancelled
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (450mmØ-UPVC- Class
Site Works near Maze
4D KAIG3-RFI-SW-C-1113 00 4) 43 m Length from (MH-D-01 to MH-D-02). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/15/21 8/16/21 Approved as noted
Garden
attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 43 m Length from (MH-D-01 Site Works near Maze
4D KAIG3-RFI-SW-C-1114 00 Civil 8/15/21 8/17/21 Approved as noted
to MH-D-02). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC- Class
Site Works near Physic
4D KAIG3-RFI-SW-C-1115 00 4) 28 m Length from (MH-D-05 to MH-D-06). NEAR PHYSIC GARDEN. As per highlighted Area in the Civil 8/15/21 8/16/21 Approved as noted
Garden
attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 28 m Length from (MH-D-05 Site Works near Physic
4D KAIG3-RFI-SW-C-1116 00 Civil 8/15/21 8/17/21 Approved as noted
to MH-D-06). NEAR PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (450mmØ-UPVC- Class
Site Works near Physic
4D KAIG3-RFI-SW-C-1117 00 4) 95 m Length from (MH-D-02 to MH-D-04). BSIDE PHYSIC GARDEN. As per highlighted Area in the Civil 8/15/21 8/18/21 Approved as noted
Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 95 m Length from Site Works near Physic
4D KAIG3-RFI-SW-C-1118 00 Civil 8/15/21 8/16/21 Approved as noted
(MH-D-02 to MH-D-04). BSIDE PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 50m Length
Site Works beside
6B KAIG3-RFI-SW-C-1119 00 from (FW-A-3-6.1 to FW-A-3-6.4). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the Civil 8/15/21 8/16/21 Approved as noted
Crescent Zone 1 & 2
attached Dwg.
Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 50m Length from (FW-A-3-6.1 to FW-A-3- Site Works beside
6B KAIG3-RFI-SW-C-1120 00 Civil 8/15/21 8/17/21 Approved as noted
6.4). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1121 00 Civil Picnic Area 8/16/21 9/7/21 Approved as noted
2) SA-7
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1122 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-8
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1123 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-9
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1124 00 Civil Picnic Area 8/16/21 9/6/21 Approved as noted
2) SA-10
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1125 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-11

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1126 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-12

kaig-qcals 114
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1127 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-13

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone M KAIG3-RFI-PA-C-1128 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-14
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Area-
Zone M KAIG3-RFI-PA-C-1129 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
2) SA-15
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1130 00 Civil Picnic Area 8/16/21 9/4/21 Approved as noted
SA-19
Excavation for Storm Water Line from G-E-01 to Outfall E, including all the Line, Manhole and Gullies
4A 3B KAIG3-RFI-SW-C-1131 00 Civil Site Works 8/16/21 8/18/21 Approved as noted
Highlighted in the attched Drawing
Excavation for Storm Water Line Manhole MH-D-08, MH-D-08-01, MH-D-08-02, MH-D-07, MH-D-06,
4B 4C 4D 5A KAIG3-RFI-SW-C-1132 00 MH-D-05, MH-D-4, MH-D-03, MH-D-03-01, MH-D-02, MH-D-01, MH-D-01-A1, MH-D-01-A2, MH-D- Civil Site Works 8/16/21 8/18/21 Approved as noted
01-A1-01, MH-D-01-B1, MH-D-01-B2 as Highlighted
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
4D 5A KAIG3-RFI-SW-C-1133 00 4) 38 m Length from (MH-D-01 to MH-D-01-A1). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/16/21 8/17/21 Approved as noted
Garden
attached Dwg.
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 38 m Length from (MH-D-01 Site Works near Maze
4D 5A KAIG3-RFI-SW-C-1134 00 Civil 8/16/21 8/17/21 Approved as noted
to MH-D-01-A1). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1135 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
2) SA-30
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1136 00 Civil Picnic Area 8/17/21 8/26/21 Code C (not resubmit)
2) SA-29
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Area-
Zone N KAIG3-RFI-PA-C-1137 00 Civil Picnic Area 8/17/21 8/26/21 Code C (not resubmit)
2) SA-17
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Seating Area-
Zone L KAIG3-RFI-PA-C-1138 00 Civil Picnic Area 8/17/21 8/26/21 Code C (not resubmit)
2) SA-28
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1139 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
SA-26
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1140 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
SA-25
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1141 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
SA-22
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1142 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
SA-21
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Area-2)
Zone J KAIG3-RFI-PA-C-1143 00 Civil Picnic Area 8/17/21 9/6/21 Approved as noted
SA-31
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1144 00 Civil Picnic Area 8/17/21 9/8/21 Approved as noted
2) SA-31
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1145 00 Civil Picnic Area 8/17/21 8/28/21 Approved as noted
2) SA-32
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1146 00 Civil Picnic Area 8/17/21 8/28/21 Approved as noted
2) SA-33
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Seating Area-
Zone L KAIG3-RFI-PA-C-1147 00 Civil Picnic Area 8/17/21 8/28/21 Approved as noted
2) SA-37
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1148 00 Civil Picnic Area 8/17/21 8/28/21 Code C (not resubmit)
2) SA-40
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1149 00 Civil Picnic Area 8/17/21 8/28/21 Approved as noted
2) SA-39
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
Zone K KAIG3-RFI-PA-C-1150 00 Civil Picnic Area 8/17/21 8/28/21 Approved as noted
2) SA-42
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (600mmØ-PP-
Site Work beside Parking
3A KAIG3-RFI-SW-C-1151 00 CORRUGATED) 54 m Length from (MH-H-01 to OUTFULL-H). BSIDE PARKING AREA. As per Civil 8/17/21 8/18/21 Approved as noted
Area
highlighted Area in the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-H for (600mmØ-PP- CORRUGATED) 54 m Length Site Work beside Parking
3A KAIG3-RFI-SW-C-1152 00 Civil 8/17/21 8/18/21 Approved as noted
from (MH-H-01 to OUTFULL-H). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (450mmØ-UPVC- Class
Site Works near Maze
4D KAIG3-RFI-SW-C-1153 00 4) 43 m Length from (MH-D-01 to MH-D-02). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/17/21 8/18/21 Approved as noted
Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 43 m Length from Site Works near Maze
4D KAIG3-RFI-SW-C-1154 00 Civil 8/17/21 8/18/21 Approved as noted
(MH-D-01 to MH-D-02). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

kaig-qcals 115
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC- Class
Site Works near Physic
4D KAIG3-RFI-SW-C-1155 00 4) 28 m Length from (MH-D-05 to MH-D-06). NEAR PHYSIC GARDEN. As per highlighted Area in the Civil 8/17/21 8/18/21 Approved as noted
Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 28 m Length from Site Works near Physic
4D KAIG3-RFI-SW-C-1156 00 Civil 8/17/21 8/18/21 Approved as noted
(MH-D-05 to MH-D-06). NEAR PHYSIC GARDEN. As per highlighted Area in the attached Dwg. Garden
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 1B Crescent
1B KAIG3-RFI-CO-C-1157 00 Civil Crescent 8/18/21 cancelled

2E KAIG3-RFI-CO-C-1158 00 Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2E Crescent Civil Crescent 8/18/21 cancelled

Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2G, 2K, 2L,
2G 2K 2L 2K KAIG3-RFI-CO-C-1159 00 Civil Crescent 8/18/21 cancelled
2M Crescent

2G 2K 2L 2K KAIG3-RFI-CO-C-1160 00 Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2P Crescent Civil Crescent 8/18/21 cancelled

4D - K KAIG3-RFI-SW-C-1161 00 Soil Preparation under Boulder No.RB- 332 Civil Site Works 8/18/21 8/22/21 Approved as noted

4D - K KAIG3-RFI-SW-C-1162 00 Soil Preparation under Boulder No.RB- 333 Civil Site Works 8/18/21 8/22/21 Approved as noted

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water
5A KAIG3-RFI-SW-C-1163 00 Civil Site Works 8/18/21 8/21/21 Approved as noted
Line Manhole - FW-A-18 (One Side), FW-A-19 (As Highlighted
Surface Preparation Prior to start Backfilling around Pilecap and Strip footing at PC 120-122-124-126 as
2E KAIG3-RFI-CO-C-1164 00 Civil Crescent 8/19/21 8/24/21 Approved as noted
highlighted Zone 2E (as highlighted)
Surface Preparation Prior to start Backfilling around Pilecap 139, 141 as highlighted Zone 2H (as
2H KAIG3-RFI-CO-C-1165 00 Civil Crescent 8/19/21 8/24/21 Approved as noted
highlighted)
Excavation and Removal of Disposal Materials ( -75cm ) from Asphalt Level and Bed Preperation prior to
4B KAIG3-RFI-SW-C-1166 00 Civil Site Works 8/19/21 cancelled
start backfill at Zone-4B as per the attached Drawing and Survey Report (From ST.0+220 to ST.0+390)

4B KAIG3-RFI-SW-C-1167 00 Excavation for Storm Water Line from MH-D-01 to Outfall-D (As Highlighted) Civil Site Works 8/19/21 8/22/21 Code C (resubmit)

4B KAIG3-RFI-SW-C-1167 01 Excavation for Storm Water Line from MH-D-01 to Outfall-D (As Highlighted) Civil Site Works 9/5/21 9/6/21 Approved as noted

Excavation for Storm Water Line from MH-D-03 to MH-D-03-01 & MH-D-04 to MH-D-04-01 (As
4D KAIG3-RFI-SW-C-1168 00 Civil Site Works 8/19/21 8/26/21 Approved as noted
Highlighted)
Inspection for Casting the Blinding Concrete under the Manhole (MH-D-06, MH-D-07, MH-D-08, MH-D-
4C 4D KAIG3-RFI-SW-C-1169 00 Civil Site Works 8/19/21 8/23/21 Approved as noted
08-01, MH-D-08-02) (as Highlighted)
Excavation & Bed Preparation for Sub Surface Drainage Main Line (400, 315 & 250mm) between Geysere
4A KAIG3-RFI-WG-C-1170 00 Civil Water Play Garden 8/21/21 8/24/21 Approved as noted
Garden and the Boundary Wall inside Water Garden at highlighted area in attached drawing.
Excavation and Removal of Disposal Materials upto (-20cm ) from Finishing Level near Water Garden area at
4A 3B KAIG3-RFI-SW-C-1171 00 Civil Site Works 8/21/21 8/22/21 Code C (resubmit)
Zone 4A and 3B, as per the attached Drawing and Survey Report.
Excavation and Removal of Disposal Materials upto (-20cm ) from Finishing Level near Water Garden area at
4A 3B KAIG3-RFI-SW-C-1171 01 Civil Site Works 8/26/21 8/29/21 Approved as noted
Zone 4A and 3B, as per the attached Drawing and Survey Report.

1A 1B KAIG3-RFI-CO-C-1172 00 Inspection and compaction test 1st layer for backfilling at Zone 1A Outer (as Highlighted) Civil Crescent 8/21/21 8/24/21 Approved as noted
Inspection and compaction test 1st layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
2E KAIG3-RFI-CO-C-1173 00 126 (as Highlighted) (strip footing 1 of 3 layers, only upto TOC of Mass concrete) (PC 1 of 4 upto TOC od Civil Crescent 8/22/21 8/24/21 Approved as noted
PC only) SP#119
Inspection and compaction test 1st layer for backfilling at Zone 2H PC-139, 141, 143 (as Highlighted) (PC 1
2H KAIG3-RFI-CO-C-1174 00 Civil Crescent 8/22/21 8/24/21 Approved as noted
of 4 upto TOC od PC only) SP#119
Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01, MH-D-02, MH-D-03, MH-D-
4D KAIG3-RFI-SW-C-1175 00 Civil Site Works 8/22/21 8/26/21 Approved as noted
04, MH-D-05) (as Highlighted)
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
4D 5A KAIG3-RFI-SW-C-1176 00 4) 38 m Length from (MH-D-01 to MH-D-01-A1). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/22/21 8/26/21 Approved as noted
Garden
attached Dwg.

Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 38 m Length from Site Works near Maze
4D 5A KAIG3-RFI-SW-C-1177 00 Civil 8/22/21 8/26/21 Approved as noted
(MH-D-01 to MH-D-01-A1). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (250mmØ-UPVC- Class
4) 53m Length from (MH-D-01-A1 to MH-D-01-A1-01 ). NEAR MAZE GARDEN. As per highlighted Area Site Works near Maze
5A KAIG3-RFI-SW-C-1178 00 Civil 8/23/21 8/26/21 Approved as noted
in the attached Dwg. Garden

Pipe Installation of Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) 53m Length from (MH-D-01- Site Works near Maze
5A KAIG3-RFI-SW-C-1179 00 Civil 8/23/21 8/26/21 Approved as noted
A1 to MH-D-01-A1-01 ). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

kaig-qcals 116
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
5A KAIG3-RFI-SW-C-1180 00 4) 76m Length from (MH-D-01-A1 to MH-D-01-A2 ). NEAR MAZE GARDEN. As per highlighted Area in Civil 8/23/21 8/26/21 Approved as noted
Garden
the attached Dwg.

Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 76m Length from (MH-D-01- Site Works near Maze
5A KAIG3-RFI-SW-C-1181 00 Civil 8/23/21 8/26/21 Approved as noted
A1 to MH-D-01-A2 ). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1182 00 CLASS 4) 102 m Length from (MH-E-02 to MH-E-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As Civil Circular Pathway Junction 8/23/21 8/26/21 Approved as noted
per highlighted Area in the attached Dwg. 8
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) 102 m Length from (MH- Site Works beside
3A 3B KAIG3-RFI-SW-C-1183 00 E-02 to MH-E-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 8/23/21 8/26/21 Approved as noted
Dwg. 8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
5A KAIG3-RFI-SW-C-1184 00 4) 98m Length from (MH-D-01 to MH-D-01-B1). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/23/21 8/26/21 Approved as noted
Garden
attached Dwg.

Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 98m Length from (MH-D-01 Site Works near Maze
5A KAIG3-RFI-SW-C-1185 00 Civil 8/23/21 8/26/21 Approved as noted
to MH-D-01-B1). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 50m Length
Site Works beside
6B KAIG3-RFI-SW-C-1186 00 from (FW-A-3-6.1 to FW-A-3-6.4). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the Civil 8/26/21 8/30/21 Approved as noted
Crescent Zone 1 & 2
attached Dwg.

Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 50m Length from (FW-A-3-6.1 to Site Works beside
6B KAIG3-RFI-SW-C-1187 00 Civil 8/26/21 8/30/21 Approved as noted
FW-A-3-6.4). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2

Notification to Start Grading as highlighted in the attached drawing, including Cut and Removal of Disposal
4D 5A 6A 6B KAIG3-RFI-SW-C-1188 00 Civil Site Works 8/23/21 8/24/21 Code C (resubmit)
Material and Backfilling upto (-20cm) from the FGL Level

Notification to Start Grading as highlighted in the attached drawing, including Cut and Removal of Disposal
4D 5A 6A 6B KAIG3-RFI-SW-C-1188 01 Civil Site Works 8/26/21 8/26/21 Approved as noted
Material and Backfilling upto (-20cm) from the FGL Level

Excavation for Storm Water Line from MH-F-01 to MH-F-04 Including Manhole MH-F-01, MH-F-02, MH-
3A KAIG3-RFI-SW-C-1189 00 Civil Site Works 8/22/21 8/24/21 Approved as noted
F-03, MH-F-04 as Highlighted in the attached Drawing.

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08 to MH-D-
4B 4C KAIG3-RFI-SW-C-1190 00 Civil Site Works 8/22/21 8/24/21 Approved as noted
09 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-08 to MH-D-
4C KAIG3-RFI-SW-C-1191 00 Civil Site Works 8/22/21 8/24/21 Approved as noted
08-01 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Zone K KAIG3-RFI-SW-C-1192 00 Inspection and Compaction Test for Sub-base under Bouder No. RB-332 (Stock Pile # 109 A-1-A) Civil Site Works 8/22/21 8/24/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-333 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1193 00 Civil Site Works 8/22/21 8/24/21 Approved
105 A-1-B)

Zone L KAIG3-RFI-PA-C-1194 00 Inspection of Steel Reinforcement for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted Civil Picnic Area 8/23/21 8/26/21 Approved as noted

Zone L KAIG3-RFI-PA-C-1195 00 "Inspection of formwork for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted" Civil Picnic Area 8/23/21 8/26/21 Approved as noted

Zone L KAIG3-RFI-PA-C-1196 00 Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted Civil Picnic Area 8/22/21 8/26/21 Code C (resubmit)

Zone L KAIG3-RFI-PA-C-1196 01 Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted Civil Picnic Area 10/4/21 10/7/21 Approved as noted

Zone K KAIG3-RFI-SW-C-1197 00 Inspection and Compaction Test for Sub-base under Bouder No. RB-333 (Stock Pile # 109 A-1-A Civil Site Works 8/23/21 8/28/21 Approved as noted

Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1198 00 Civil Site Works 8/23/21 8/28/21 Approved as noted
02 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test 2nd Layer for Backfilling at Zone 1A Outer (2nd of 4th layer) As
1A 1B KAIG3-RFI-CO-C-1199 00 Civil Crescent 8/23/21 8/26/21 Approved as noted
Highlighted

kaig-qcals 117
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 2nd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
2E KAIG3-RFI-CO-C-1200 00 126 (as Highlighted) (strip footing 2 of 3 layers, only upto TOC of Mass concrete) (PC 2 of 4 upto TOC od Civil Crescent 8/23/21 8/26/21 Approved as noted
PC only) SP#119

Inspection and Compaction Test for 4th Layer Subgrade backfill in Zone 1B Strip footing between PC 8-10-
1B KAIG3-RFI-CO-C-1201 00 Civil Crescent 8/24/21 8/26/21 Code C (not resubmit)
12-14 as Highlighted (SP#99) A-1-B (4th of 4th layer)

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08 to MH-D-
4B 4C KAIG3-RFI-SW-C-1202 00 Civil Site Works 8/24/21 8/26/21 Approved as noted
09 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08 to MH-D-
4C KAIG3-RFI-SW-C-1203 00 Civil Site Works 8/24/21 8/26/21 Approved as noted
08-01 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1204 00 Civil Site Works 8/24/21 8/26/21 Approved as noted
03 - as Highlighted (upto bottom of road - Total 7 Layers) (Stock Pile # 105 A-1-B)
Excavation for Storm Water Line from MH-F-01-1 to MH-F-01-4 Including Manhole MH-F-01-1, MH-F-01-
3A KAIG3-RFI-SW-C-1205 00 Civil Site Works 8/25/21 8/30/21 Approved as noted
2, MH-F-01-3, MH-F-0-14 as Highlighted in the attached Drawing.
Inspection and compaction test 3rd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
2E KAIG3-RFI-CO-C-1206 00 126 (as Highlighted) (strip footing 2 of 3 layers, only upto TOC of Mass concrete) (PC 3 of 4 upto TOC od Civil Crescent 8/25/21 8/26/21 Code C (resubmit)
PC only) SP#121
Inspection and compaction test 3rd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
2E KAIG3-RFI-CO-C-1206 01 126 (as Highlighted) (strip footing 2 of 3 layers, only upto TOC of Mass concrete) (PC 3 of 4 upto TOC od Civil Crescent 8/31/21 9/2/21 Approved as noted
PC only) SP#121
Inspection and compaction test 3rd layer for backfilling at Zone 2H PC-139, 141 (as Highlighted) (PC 3 of 4
2H KAIG3-RFI-CO-C-1207 00 Civil Crescent 8/25/21 8/28/21 Approved as noted
upto TOC od PC only) SP#121

Inspection and Compaction Test 3rd Layer for Backfilling at Zone 1A Outer (3rd of 4th layer) As Highlighted
1A 1B KAIG3-RFI-CO-C-1208 00 Civil Crescent 8/25/21 8/28/21 Code C (resubmit)

Inspection and Compaction Test 3rd Layer for Backfilling at Zone 1A Outer (3rd of 4th layer) As Highlighted
1A 1B KAIG3-RFI-CO-C-1208 01 Civil Crescent 8/30/21 8/31/21 Approved as noted

Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1209 00 Civil Site Works 8/25/21 8/29/21 Approved as noted
01-A1 - as Highlighted (upto bottom of road - Total 5 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1210 00 Civil Site Works 8/25/21 8/28/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-04 to MH-D-
4D KAIG3-RFI-SW-C-1211 00 Civil Site Works 8/25/21 8/29/21 Approved as noted
05 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

Excavation for Storm Water Line Gullies G-E-01, G-E-02, G-E-03, G-E-04, G-E-05, G-E-06, G-E-07, G-E-
4A 4B KAIG3-RFI-SW-C-1212 00 Civil Site Works 8/25/21 8/31/21 Approved as noted
08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13, G-E-14, G-E-15, G-E-16, G-E-17 as Highlighted
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1213 00 Civil Site Works 8/26/21 8/29/21 Approved as noted
03 - as Highlighted (upto bottom of road - Total 7 Layers) (Stock Pile # 105 A-1-B
Surface Preparation & Levels prior to Backfilling along the Boundary walls (Inner Side) @ Elevation A, G &
5A KAIG3-RFI-SG-C-1214 00 H and along Light Walls (A, B, C, D, E, F, G & H) all Sides at Sound & Light garden, as per highlighted area Civil Sound & Light Garden 8/25/21 8/26/21 Approved as noted
in attached drawing's & Survey Data.

Excavation of Tree pits (2 no's) beside the Entrance walls and Marking of remaining Tree pits (3no's) inside
5A KAIG3-RFI-ZG-C-1215 00 Civil Maze Garden 8/26/21 8/28/21 Code C (not resubmit)
Maze garden, as per highlighted area in attached drawing's.

Excavation & Bed Preparation for Sub surface Drainage Main line (400 & 315mm) & (MH-C-7 & MH-C-8)
4A KAIG3-RFI-WG-C-1216 00 Civil Water Play Garden 8/26/21 8/28/21 Approved as noted
from Geyser to Mist Garden Inside Water Garden, at highlighted area in attached drawings.

Notification & Check for coordinates of Tree Pits (21 no's) Prior to Excavation at along the Geyser Garden Geyser & Water Play
4A KAIG3-RFI-WG-C-1217 00 Civil 8/26/21 8/26/21 Code C (not resubmit)
Inside Water Garden, at highlighted area in attached drawings. Garden

Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1218 00 CLASS 4) from (MH-E-01 to MH-E-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
highlighted Area in the attached Dwg. 8
Site Works beside
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01 to MH-E-
3A 3B KAIG3-RFI-SW-C-1219 00 Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
02 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Dwg.
8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1220 00 CLASS 4) from (MH-E-01-1 to MH-E-01-2 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
highlighted Area in the attached Dwg. 8
Site Works beside
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01-1 to MH-
3A 3B KAIG3-RFI-SW-C-1221 00 Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
E-01-2 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Dwg.
8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1222 00 CLASS 4) from (MH-E-01 to MH-E-01-1 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
highlighted Area in the attached Dwg. 8

kaig-qcals 118
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Site Works beside
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01 to MH-E-
3A 3B KAIG3-RFI-SW-C-1223 00 Civil Circular Pathway Junction 8/26/21 8/30/21 Approved as noted
01-1 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Dwg.
8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC- Class Site Work between Sound
5A KAIG3-RFI-SW-C-1224 00 4) from (MH-D-01-B1 to MH-D-01-B2). BETWEEN SOUND LIGHT GARDEN & MAZE GARDEN. As Civil & Light Garden & Maze 8/26/21 8/30/21 Approved as noted
per highlighted Area in the attached Dwg. Garden
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) from (MH-D-01-B1 to MH- Site Work between Sound
5A KAIG3-RFI-SW-C-1225 00 D-01-B2). BETWEEN SOUND LIGHT GARDEN & MAZE GARDEN. As per highlighted Area in the Civil & Light Garden & Maze 8/26/21 8/30/21 Approved as noted
attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (250mmØ-UPVC- Class
Site Works near Maze
5A KAIG3-RFI-SW-C-1226 00 4) 53m Length from (MH-D-01-A1 to MH-D-01-A1-01 ). NEAR MAZE GARDEN. As per highlighted Area Civil 9/1/21 9/1/21 Approved as noted
Garden
in the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) 53m Length from Site Works near Maze
5A KAIG3-RFI-SW-C-1227 00 Civil 9/1/21 9/1/21 Approved as noted
(MH-D-01-A1 to MH-D-01-A1-01 ). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
5A KAIG3-RFI-SW-C-1228 00 4) 76m Length from (MH-D-01-A1 to MH-D-01-A2 ). NEAR MAZE GARDEN. As per highlighted Area in Civil 9/1/21 9/1/21 Approved as noted
Garden
the attached Dwg.

Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 76m Length from Site Works near Maze
5A KAIG3-RFI-SW-C-1229 00 Civil 9/1/21 9/1/21 Approved as noted
(MH-D-01-A1 to MH-D-01-A2 ). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1230 00 CLASS 4) 102 m Length from (MH-E-02 to MH-E-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As Civil Circular Pathway Junction 9/1/21 9/1/21 Approved as noted
per highlighted Area in the attached Dwg. 8

Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1231 00 Civil Site Works 8/26/21 8/30/21 Approved as noted
D-08-02 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1232 00 Civil Site Works 8/26/21 8/30/21 Approved as noted
105 A-1-B)

4A - B KAIG3-RFI-SW-C-1233 00 Soil Preparation under Boulder No. RB- 108 Civil Site Works 8/28/21 8/30/21 Approved as noted

Surface Preparation Prior to start Backfilling around Pilecap & Strip footing (109-111-113-115 as
2D KAIG3-RFI-CO-C-1234 00 Civil Crescent 8/26/21 8/30/21 Approved as noted
highlighted Zone 2D (for 4 Lifts)

Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (400, 315 & 250mm) Between Geyse
4A KAIG3-RFI-WG-C-1235 00 Civil Water Play Garden 8/26/21 8/30/21 Approved as noted
Garden and the Boundary Wall, Inside Water Garden, at highlighted area in attached drawings.

Inspection and compaction test 4th layer for backfilling at Zone 2H PC-139, 141 (as Highlighted) (PC 4 of 4
2H KAIG3-RFI-CO-C-1235 00 Civil Crescent 8/28/21 8/31/21 Approved as noted
upto TOC od PC only) SP#121

Zone 1 KAIG3-RFI-CO-C-1236 00 Inspection and Compaction Test 4th Layer for Backfilling at Zone 1A Outer (4th of 4th layer) As Highlighted Civil Crescent 9/2/21 9/6/21 Approved as noted

Excavation & Surface Preparation Prior to Blinding under Innerside Tunnel foundation @ Butterfly Garden,
4C KAIG3-RFI-TG-C-1237 00 Civil Butterfly Garden 8/28/21 8/29/21 Code C (resubmit)
at highlighted area in attached drawings.

Excavation & Surface Preparation Prior to Blinding under Innerside Tunnel foundation @ Butterfly Garden,
4C KAIG3-RFI-TG-C-1237 01 Civil Butterfly Garden 9/1/21 9/2/21 Approved as noted
at highlighted area in attached drawings.

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
4B 4C KAIG3-RFI-SW-C-1238 00 Civil Site Works 8/28/21 8/30/21 Code C (resubmit)
09 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
4B 4C KAIG3-RFI-SW-C-1238 01 Civil Site Works 9/2/21 9/8/21 Approved as noted
09 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08 to MH-D-
4B 4C KAIG3-RFI-SW-C-1239 00 Civil Site Works 8/28/21 8/30/21 Approved as noted
08-01 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-06 to MH-D-
4D KAIG3-RFI-SW-C-1240 00 Civil Site Works 8/28/21 8/30/21 Approved as noted
07 - as Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B

kaig-qcals 119
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1241 00 Civil Site Works 8/28/21 8/30/21 Approved as noted
105 A-1-B)

Check the Executed Backfilling for the highlighted area Around PC 190 as per the attached RFT's, RFI's at
2Q KAIG3-RFI-CO-C-1242 00 Civil Crescent 8/31/21 8/31/21 Code C (not resubmit)
Zone 2Q Crescent
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Crescent
2Q KAIG3-RFI-CO-C-1243 00 Civil Crescent 8/31/21 8/31/21 Code C (not resubmit)
(2nd Part)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Crescent
2Q KAIG3-RFI-CO-C-1244 00 Civil Crescent 8/31/21 8/31/21 Approved as noted
(3rd Part)

Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Crescent
2Q KAIG3-RFI-CO-C-1246 00 Civil Crescent 8/31/21 8/31/21 Approved as noted
(MEP works redsand)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Crescent
2C KAIG3-RFI-CO-C-1247 00 Civil Crescent 8/31/21 8/31/21 Code C (not resubmit)
(Internal Buildings)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Crescent
2C KAIG3-RFI-CO-C-1248 00 Civil Crescent 8/31/21 8/31/21 Code C (not resubmit)
(Mech'l. Trench)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Crescent
2C KAIG3-RFI-CO-C-1249 00 Civil Crescent 8/31/21 8/31/21 Code C (not resubmit)
(6 footings)

5B - K KAIG3-RFI-SW-C-1254 00 Soil Preparation under Boulder No. RB- 297 Civil Site Works 8/29/21 8/30/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1255 00 Civil Site Works 8/29/21 8/31/21 Code C (resubmit)
105 A-1-B)
Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1255 01 Civil Site Works 9/1/21 9/2/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-108 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1256 00 Civil Site Works 8/29/21 9/1/21 Approved as noted
105 A-1-B)
Excavation for Storm Water Line Gullies, G-H-1, G-H-2, G-H-3, G-H-4, G-H-5, G-H-6, G-H-7, G-H-8, G-
3A KAIG3-RFI-SW-C-1257 00 H-9, G-H-10, G-H-11, G-H-12, G-H-13, G-H-14, G-H-15, G-H-16, G-H-17, G-H-18, G-H-19, G-H-20, G- Civil Site Works 8/29/21 8/30/21 Approved as noted
H-21 as Highlighted
Excavation for Foul Water Line from FW-A-13 to FW-A-15 including the Manhole FW-A-13, FW-A-14,
6A KAIG3-RFI-SW-C-1258 00 Civil Site Works 8/31/21 8/31/21 Approved as noted
FW-A-15 prior to start Gravel Bedding (as Highlighted
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1259 00 Civil Site Works 8/29/21 8/31/21 Approved as noted
03 - as Highlighted (upto bottom of road - Total 7 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1260 00 Civil Site Works 8/29/21 8/31/21 Approved as noted
01-A1 - as Highlighted (upto bottom of road - Total 5 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1261 00 Civil Site Works 8/29/21 8/31/21 Approved as noted
02 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1262 00 Civil Site Works 8/29/21 8/31/21 Approved as noted
08 - as Highlighted (upto bottom of road - Total 12 Layers) (Stock Pile # 105 A-1-B

4A - B KAIG3-RFI-SW-C-1263 00 Soil Preparation under Boulder No. RB- 108 after Excavation Civil Site Works 8/29/21 8/30/21 Approved as noted

Excavation and Removal of Disposal Materials ( -75cm ) from Asphalt Level at Zone-4B as per the attached
4B KAIG3-RFI-SW-C-1264 00 Civil Site Works 8/29/21 9/1/21 Code C (resubmit)
Drawing and Survey Report (From ST.0+320 to ST.0+390)
Excavation and Removal of Disposal Materials ( -75cm ) from Asphalt Level at Zone-4B as per the attached
4B KAIG3-RFI-SW-C-1264 01 Civil Site Works 9/8/21 9/11/21 Approved as noted
Drawing and Survey Report (From ST.0+320 to ST.0+390)
Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-7 including the Manhole FW-A-3-6 and FW-A-
6B KAIG3-RFI-SW-C-1265 00 Civil Site Works 8/31/21 8/31/21 Approved as noted
3-7 prior to start Gravel Bedding (as Highlighted
Excavation for Storm Water Line Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-
5A 3A KAIG3-RFI-SW-C-1266 00 08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14, G-F-42-43, G-F-44-45 & OUTFALL-F including all Civil Site Works 8/31/21 9/1/21 Approved as noted
the Branch Lines as highlighted
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-108 (Stock Pile #
Zone B KAIG3-RFI-SW-C-1267 00 Civil Site Works 8/31/21 9/1/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 4) Backfilling under Bouder No. RB-297 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1268 00 Civil Site Works 8/31/21 9/1/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-06 to MH-D-
4D KAIG3-RFI-SW-C-1269 00 Civil Site Works 9/1/21 9/1/21 Approved as noted
07 - as Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1270 00 Civil Site Works 9/1/21 9/2/21 Approved as noted
D-01-A2 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1271 00 Civil Site Works 8/31/21 9/1/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

kaig-qcals 120
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1272 00 Civil Site Works 9/1/21 9/2/21 Approved as noted
03 - as Highlighted (upto bottom of road - Total 7 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
4C KAIG3-RFI-SW-C-1273 00 Civil Site Works 9/5/21 9/2/21 Code C (resubmit)
08-01 - as Highlighted (upto -20cm from FGL - Total 11 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
4C KAIG3-RFI-SW-C-1273 01 Civil Site Works 9/14/21 9/21/21 Approved as noted
08-01 - as Highlighted (upto -20cm from FGL - Total 11 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1274 00 Civil Site Works 9/1/21 9/2/21 Approved as noted
D-08-02 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

6B - C - H KAIG3-RFI-SW-C-1275 00 Soil Preparation at Zone - 6B prior to start Excavation (-20 cm) from FGL - as highlighted Civil Site Works 8/31/21 9/1/21 Code C (resubmit)

6B - C - H KAIG3-RFI-SW-C-1275 01 Soil Preparation at Zone - 6B prior to start Excavation (-20 cm) from FGL - as highlighted Civil Site Works 9/6/21 9/13/21 Approved as noted

Excavation & Surface preparation for Footings (6 no's) Inside Physic Garden, at highlighted area in attached
4D KAIG3-RFI-PG-C-1276 00 Civil Physic Garden 8/31/21 9/2/21 Approved as noted
drawings.

Excavation & Soil preparation prior to Backfilling Under the Foundation of Plant Room at Physic Garden, at
4D KAIG3-RFI-PG-C-1277 00 Civil Physic Garden 8/31/21 9/4/21 Code C (resubmit)
highlighted area in attached drawings.
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) 102 m Length Site Works beside
3A 3B KAIG3-RFI-SW-C-1278 00 from (MH-E-02 to MH-E-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
the attached Dwg. 8
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class
Site Works near Maze
5A KAIG3-RFI-SW-C-1279 00 4) 98m Length from (MH-D-01 to MH-D-01-B1). NEAR MAZE GARDEN. As per highlighted Area in the Civil 8/31/21 9/1/21 Approved as noted
Garden
attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 98m Length from Site Works near Maze
5A KAIG3-RFI-SW-C-1280 00 Civil 8/31/21 9/1/21 Approved as noted
(MH-D-01 to MH-D-01-B1). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC- Class Site Work between Sound
5A KAIG3-RFI-SW-C-1281 00 4) from (MH-D-01-B1 to MH-D-01-B2). BETWEEN SOUND LIGHT GARDEN & MAZE GARDEN. As Civil & Light Garden & Maze 8/31/21 9/1/21 Approved as noted
per highlighted Area in the attached Dwg. Garden
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) from (MH-D-01- Site Work between Sound
5A KAIG3-RFI-SW-C-1282 00 B1 to MH-D-01-B2). BETWEEN SOUND LIGHT GARDEN & MAZE GARDEN. As per highlighted Area Civil & Light Garden & Maze 8/31/21 9/1/21 Approved as noted
in the attached Dwg. Garden
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1283 00 CLASS 4) from (MH-E-01 to MH-E-01-1 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
highlighted Area in the attached Dwg. 8
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01 Site Works beside
3A 3B KAIG3-RFI-SW-C-1284 00 to MH-E-01-1 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
Dwg. 8
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1285 00 CLASS 4) from (MH-E-01 to MH-E-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
highlighted Area in the attached Dwg. 8
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01
3A 3B KAIG3-RFI-SW-C-1286 00 Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
to MH-E-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Dwg.
8
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC- Site Works beside
3A 3B KAIG3-RFI-SW-C-1287 00 CLASS 4) from (MH-E-01-1 to MH-E-01-2 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
highlighted Area in the attached Dwg. 8
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01- Site Works beside
3A 3B KAIG3-RFI-SW-C-1288 00 1 to MH-E-01-2 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 8/31/21 9/1/21 Approved as noted
Dwg. 8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (600mmØ-PP-
Site Works near Maze
5A KAIG3-RFI-SW-C-1289 00 CORRUGATED) from (MH-D-01 to OUTFULL-D). NEAR MAZE GARDEN. As per highlighted Area in Civil 8/31/21 9/6/21 Approved as noted
Garden
the attached Dwg.
Pipe Installation for Storm Water Line Outfall-D for (600mmØ-PP- CORRUGATED) from (MH-D-01 to Site Works near Maze
5A KAIG3-RFI-SW-C-1290 00 Civil 8/31/21 9/6/21 Approved as noted
OUTFULL-D). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (250mmØ-UPVC- Class
Site Works near Physic
4D KAIG3-RFI-SW-C-1291 00 4) from (MH-D-03 to MH-D-03-01 &MH-D-04 to MH-D-04-01 ). BSIDE PHYSIC GARDEN. As per Civil 9/6/21 9/8/21 Approved as noted
Garden
highlighted Area in the attached Dwg.
Pipe Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) from (MH-D-03 to MH-D-
Site Works near Physic
4D KAIG3-RFI-SW-C-1292 00 03-01 &MH-D-04 to MH-D-04-01 ). BSIDE PHYSIC GARDEN. As per highlighted Area in the attached Civil 9/6/21 9/8/21 Approved as noted
Garden
Dwg.

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (250mmØ-UPVC- Class 4) from (FW- Site Works beside
Zone 1 & 2 KAIG3-RFI-SW-C-1293 00 Civil 9/6/21 9/8/21 Approved as noted
A-3-6 to FW-A-3-7). BESIDE CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2

Pipe Installation for Foul Water Line (250mmØ-UPVC- Class 4) from (FW-A-3-6 to FW-A-3-7). BESIDE Site Works beside
Zone 1 & 2 KAIG3-RFI-SW-C-1294 00 Civil 9/6/21 9/8/21 Approved as noted
CRECENT ZONE-1 & 2 . As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2

Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) from Site Works beside
Zone 2 & 6 KAIG3-RFI-SW-C-1295 00 Civil 9/6/21 9/8/21 Approved as noted
(FW-A-13 to FW-A-15). BESIDE CRECENT #2 ZONE-6 . As per highlighted Area in the attached Dwg. Crescent 2 Zone 6

kaig-qcals 121
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Pipe Installation for Foul Water Line for (315mmØ-UPVC- Class 4) from (FW-A-13 to FW-A-15). BESIDE Site Works beside
Zone 6 KAIG3-RFI-SW-C-1296 00 Civil 9/6/21 9/8/21 Approved as noted
CRECENT #2 ZONE-6 . As per highlighted Area in the attached Dwg. Crescent 2 Zone 6

300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (250mmØ-UPVC- CLASS 4) from (FW- Site Works beside
6B KAIG3-RFI-SW-C-1297 00 Civil 9/12/21 9/14/21 Approved as noted
A-3-6 to FW-A-3-7). BSIDE CRESCENT ZONE 1 & 2 As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2

Warning Tape Installation for Foul Water Line (250mmØ-UPVC- CLASS 4) from (FW-A-3-6 to FW-A-3-7). Site Works beside
6B KAIG3-RFI-SW-C-1298 00 Civil 9/12/21 9/14/21 Approved as noted
BSIDE CRESCENT ZONE 1 & 2 As per highlighted Area in the attached Dwg. Crescent Zone 1 & 2

300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- CLASS 4) from (FW- Site Works beside
6A KAIG3-RFI-SW-C-1299 00 Civil 9/12/21 9/14/21 Approved as noted
A-13 to FW-A-15). BSIDE CRESCENT ZONE 2 & 6 As per highlighted Area in the attached Dwg. Crescent 2 Zone 6

Warning Tape Installation for Foul Water Line (315mmØ-UPVC- CLASS 4) from (FW-A-13 to FW-A-15). Site Works beside
6A KAIG3-RFI-SW-C-1300 00 Civil 9/12/21 9/14/21 Approved as noted
BSIDE CRESCENT ZONE 2 & 6 As per highlighted Area in the attached Dwg. Crescent 2 Zone 6

Inspection and compaction test 1st layer for backfilling at Zone 2D around PC and strip footing -109-111-
KAIG3-RFI-CO-C-1301 00 Civil Crescent 8/31/21 9/2/21 Approved as noted
113-115 (as Highlighted) (PC 1 of 6 upto TOC of PC only) SP#121

Inspection and Compaction Test for 2nd Layer (2 of 4) Backfilling under Bouder No. RB-297 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1302 00 Civil Site Works 8/31/21 9/2/21 Approved as noted
105 A-1-B)

Soil Preparation at Zone - 6A prior to start Cut and removal of disposal material and backfilling upto (-20cm)
6B - C - H KAIG3-RFI-SW-C-1303 00 Civil Site Works 8/31/21 9/1/21 Code C (resubmit)
from FGL Level - as highlighted

Soil Preparation at Zone - 6A prior to start Cut and removal of disposal material and backfilling upto (-20cm)
5A KAIG3-RFI-SW-C-1303 01 Civil Site Works 9/12/21 9/14/21 Approved as noted
from FGL Level - as highlighted (excluding RB-152 & RB-153).

Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01-A1, MH-D-01-A1-01, MH-D-
KAIG3-RFI-SW-C-1304 00 Civil Site Works 8/31/21 9/1/21 Approved as noted
01-A2, MH-D-01-B1, MH-D-01-B2) (as Highlighted)

Zone B KAIG3-RFI-SW-C-1305 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No.RB-109 (Stock Pile # 109 A-1-A) Civil Site Works 8/31/21 9/2/21 Approved as noted

Excavation & Surface Preparation for Foundation of 2 Walls at the Entrance Boundary wall inside Maze
5A KAIG3-RFI-ZG-C-1306 00 Civil Maze Garden 9/1/21 9/4/21 Approved as noted
garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests after Excavation for Foundation of 2 Walls at the Entrance Boundary wall
5A KAIG3-RFI-ZG-C-1307 00 Civil Maze Garden 9/1/21 9/4/21 Approved as noted
inside Maze garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests of Backfilling (1 layer out of 1) Under the Foundation of Plant Room at
4D KAIG3-RFI-PG-C-1308 00 Civil Physic Garden 9/1/21 9/4/21 Code C (resubmit)
Physic Garden, at highlighted area in attached drawings. (Stock Pile # 117).

Inspection and Compaction Test for 3rd Layer (3 of 5) Backfilling under Bouder No. RB-297 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1309 00 Civil Site Works 9/1/21 9/4/21 Approved as noted
105 A-1-B)

Zone B KAIG3-RFI-SW-C-1310 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No.RB-108 (Stock Pile # 109 A-1-A) Civil Site Works 9/2/21 9/6/21 Approved as noted

Inspection and Compaction Test for 4th Layer (4 of 4) Backfilling under Bouder No. RB-297 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1311 00 Civil Site Works 9/2/21 9/8/21 Approved as noted
105 A-1-B)

4A B KAIG3-RFI-SW-C-1312 00 Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under 2nd lift of Rock Boulder no. RB-109 Civil Site Works 9/2/21 9/6/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under 2nd lift of Rock Boulder no. RB-
4A B KAIG3-RFI-SW-C-1313 00 Civil Site Works 9/2/21 9/6/21 Approved as noted
109
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1314 00 Civil Site Works 9/2/21 9/6/21 Approved as noted
D-01-A1-01 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-A1 to
5A KAIG3-RFI-SW-C-1315 00 Civil Site Works 9/2/21 9/6/21 Approved as noted
MH-D-01-A2 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1316 00 Civil Site Works 9/2/21 9/6/21 Approved as noted
08 - as Highlighted (upto bottom of road - Total 12 Layers) (Stock Pile # 105 A-1-B
kaig-qcals 122
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-06 to MH-D-
4D KAIG3-RFI-SW-C-1317 00 Civil Site Works 9/2/21 9/6/21 Approved as noted
07 - as Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B)

Zone G KAIG3-RFI-PA-C-1318 00 Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted Civil Picnic Area 9/2/21 9/4/21 Approved as noted

Zone G KAIG3-RFI-PA-C-1319 00 Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted Civil Picnic Area 9/2/21 9/4/21 Approved as noted

Inspection and compaction test 2nd layer for backfilling at Zone 2D around PC and strip footing -109-111-
2H KAIG3-RFI-CO-C-1320 00 Civil Crescent 9/2/21 9/4/21 Approved as noted
113-115 (as Highlighted) (PC 2 of 6 upto TOC of PC only) SP#121

2G KAIG3-RFI-CO-C-1321 00 Surface Preparation prior to start Backfilling for PC and Stripfooting PC 134-136-138-140 Zone 2G Civil Crescent 9/2/21 9/4/21 Approved as noted

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-06 to MH-D-
4B KAIG3-RFI-WG-C-1322 00 Civil Water Play Garden 9/2/21 9/6/21 Approved as noted
07 - as Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B

Zone G KAIG3-RFI-PA-C-1323 00 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted Civil Picnic Area 9/2/21 9/6/21 Approved as noted
Inspection for Casting the Blinding Concrete under the Gullies (G-E-01, G-E-02, G-E-03, G-E-04, G-E-05,
3B KAIG3-RFI-SW-C-1324 00 G-E-06, G-E-07, G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13, G-E-14, G-E-15, G-E-16, G-E-17) (as Civil Site Works 9/2/21 9/6/21 Approved as noted
Highlighted)
"Excavation for Storm Water Line Gullies G-F-04, G-F-15, G-F-16, G-F-17, G-F-18, G-F-19, G-F-20, G-F-
5A 3A KAIG3-RFI-SW-C-1325 00 21, G-F-22, G-F-23, G-F-24, G-F-25, G-F-26, G-F-27, G-F-28, G-F-29, G-F-30, G-F-31, G-F-32, G-F-33, G- Civil Site Works 9/2/21 9/6/21 Approved as noted
F-34, G-F-35, G-F-36, G-F-37, G-F-38, G-F-39, G-F-
Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1326 00 Civil Site Works 9/4/21 9/6/21 Approved as noted
03 - as Highlighted (upto bottom of road - Total 7 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1327 00 Civil Site Works 9/4/21 9/6/21 Approved as noted
02 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1328 00 Civil Site Works 9/4/21 9/6/21 Approved as noted
01-A1 - as Highlighted (upto bottom of road - Total 5 Layers) (Stock Pile # 105 A-1-B)

5B K KAIG3-RFI-SW-C-1329 00 Soil Preparation under Boulder No. RB- 304 Civil Site Works 9/4/21 9/6/21 Approved as noted

Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-297 (Stock Pile # 109 A-1-A)
Zone K KAIG3-RFI-SW-C-1330 00 Civil Site Works 9/4/21 9/6/21 Approved as noted

INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR STORM WATER LINE, MANHOLE
4B 4C KAIG3-RFI-SW-C-1331 00 Civil Site Works 9/5/21 9/8/21 Approved as noted
- G-X-7, G-A-08,09 & G-A25,26 (As Highlighted)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1332 00 Civil Site Works 9/5/21 9/8/21 Approved as noted
D-01-A2 - as Highlighted (upto -20cm from FGL - Total 6 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-A1 to
5A KAIG3-RFI-SW-C-1333 00 Civil Site Works 9/5/21 9/8/21 Approved as noted
MH-D-01-A1-01 - as Highlighted (upto -20cm from FGL - Total 6 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-02 to MH-D-
4D KAIG3-RFI-SW-C-1334 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
03 - as Highlighted (upto -20cm from FGL - Total 8 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-304 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1335 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 3rd lift of Rock Boulder no. RB-109
4A B KAIG3-RFI-SW-C-1336 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
(Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Sub-Base (1 of 1) under 3rd lift of Rock Boulder no. RB-109 (Stock Pile
4A B KAIG3-RFI-SW-C-1337 00 Civil Site Works 9/5/21 9/8/21 Approved as noted
# 109 A-1-A)

6B KAIG3-RFI-SW-C-1338 00 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-6, FW-A-3-7 (as Highlighted Civil Site Works 9/5/21 9/8/21 Approved as noted

Inspection for Completion of Benching for Manholes (FW1, FW1-1, FW1-2, FW1-2.1, FW1-2.2, FW1-2.3,
KAIG3-RFI-SW-C-1339 00 FW1-3, FW1-3.1, FW1-3.2, FW1-4, FW5, FW6, FW6-2, FW6-3, FW7, FW8, FW9, FW9-1, FW10, FW11, Civil Site Works 9/6/21 cancelled
FW12, FW12-1, FW12-2, FW13, FW14, FW15, FW16) - As Highlighted

4D G KAIG3-RFI-SW-C-1340 00 Soil Preparation under Boulder No. RB- 335 Civil Site Works 9/7/21 9/11/21 Approved as noted

Inspection and compaction test 3rd layer for backfilling at Zone 2D around PC and strip footing -109-111-
2D KAIG3-RFI-CO-C-1341 00 Civil Crescent 9/6/21 9/8/21 Approved as noted
113-115 (as Highlighted) (PC 3 of 6 upto TOC of PC only) SP#121
Inspection and compaction test 1st layer for backfilling of PC and strip footing -134-136-138-140 at Zone 2G
2G KAIG3-RFI-CO-C-1342 00 Civil Crescent 9/6/21 9/9/21 Approved as noted
(as Highlighted) (1 of 4 layers)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-304 (Stock Pile #
Zone K KAIG3-RFI-SW-C-1343 00 Civil Site Works 9/6/21 9/9/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 2nd lift of Rock Boulder no. RB-108
4A B KAIG3-RFI-SW-C-1344 00 Civil Site Works 9/6/21 9/9/21 Approved as noted
(Stock Pile # 105 A-1-B)

kaig-qcals 123
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 4th layer for backfilling at Zone 2D around PC and strip footing -109-111-
2D KAIG3-RFI-CO-C-1345 00 Civil Crescent 9/6/21 9/9/21 Approved as noted
113-115 (as Highlighted) (4 of 6 upto TOC of PC only) SP#121
Inspection and Compaction Test for Sub-Base (1 of 1) under 2nd lift of Rock Boulder no. RB-108 (Stock Pile
4A B KAIG3-RFI-SW-C-1346 00 Civil Site Works 9/6/21 9/9/21 Approved as noted
# 109 A-1-A)

4B KAIG3-RFI-SW-C-1347 00 Inspection for the Excavation of Storm Box Culvert - SBC-06 (As Highlighted) Civil Site Works 9/6/21 9/8/21 Approved as noted

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1348 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
01-A1 - as Highlighted (upto -20cm from FGL - Total 5 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1349 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
4C 4D KAIG3-RFI-SW-C-1350 00 Civil Site Works 9/6/21 9/8/21 Approved as noted
D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-05, MH-D-07, MH-D-08-01 (As Highlighted)

4B KAIG3-RFI-SW-C-1351 00 Inspection for Casting the Blinding Concrete under the Manhole (MH-D-03-01) as Highlighted Civil Site Works 9/14/21 9/21/21 Approved as noted

Zone K KAIG3-RFI-SW-C-1352 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-304 (Stock Pile # 109 A-1-A) Civil Site Works 9/7/21 9/11/21 Approved as noted

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1353 00 Civil Site Works 9/7/21 9/11/21 Approved as noted
D-01-A2 - as Highlighted (upto -20cm from FGL - Total 6 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1354 00 Civil Site Works 9/7/21 9/11/21 Approved as noted
D-01-A1-01 - as Highlighted (upto -20cm from FGL - Total 6 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1355 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
02 - as Highlighted (upto bottom of road - Total 6 Layers) (Stock Pile # 105 A-1-B)

6A KAIG3-RFI-SW-C-1356 00 "Inspection for Casting the Blinding Concrete under the Manhole FW-A-13, FW-A-14 (as Highlighted)" Civil Site Works 9/7/21 9/8/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Manhole (MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-
4A KAIG3-RFI-SW-C-1357 00 Civil Site Works 9/7/21 9/11/21 Approved as noted
02, MH-E-03, MH-D-04) as Highlighted
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
4C KAIG3-RFI-SW-C-1358 00 Civil Site Works 9/7/21 9/9/21 Code C (resubmit)
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-07, MH-D-08-01 (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 3rd lift of Rock Boulder no. RB-108
4A B KAIG3-RFI-SW-C-1359 00 Civil Site Works 9/7/21 9/11/21 Approved as noted
(Stock Pile # 105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 4th lift of Rock Boulder no. RB-109
4A B KAIG3-RFI-SW-C-1360 00 Civil Site Works 9/7/21 9/11/21 Approved as noted
(Stock Pile # 105 A-1-B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-B-
4C 4D KAIG3-RFI-SW-C-1361 00 Civil Site Works 9/7/21 9/8/21 Approved as noted
02, MH-B-03 (As Highlighted)
Inspection and compaction test 4th layer for backfilling at Zone 2Q around PC 190 (as Highlighted) (4 of 4
2Q KAIG3-RFI-CO-C-1362 00 Civil Crescent 9/7/21 9/11/21 Approved as noted
upto TOC of PC only) SP#115
Inspection and compaction test 5th layer for backfilling at Zone 2D around PC and strip footing -109-111-
2D KAIG3-RFI-CO-C-1363 00 Civil Crescent 9/7/21 9/11/21 Approved as noted
113-115 (as Highlighted) (5 of 6 upto TOC of PC only) SP#121

Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone
2G KAIG3-RFI-CO-C-1364 00 Civil Crescent 9/7/21 9/11/21 Approved as noted
2G (as highlighted) (2 of 4 layers) SP#121

2L KAIG3-RFI-CO-C-1365 00 Surface Preparation Prior to start Backfilling around Pilecap 162 as highlighted Zone 2L (for 4 Lifts) Civil Crescent 9/8/21 9/11/21 Approved as noted

Excavation ( -75cm ) from Asphalt Level at Parking Area at Zone-3B as per the attached Drawing and Survey
3B KAIG3-RFI-SW-C-1366 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
Report
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B KAIG3-RFI-SW-C-1367 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
3-6.2, FW-A-3-6.3, FW-A-3-6.4 (As Highlighted)

Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-08 to MH-D-
4C KAIG3-RFI-SW-C-1368 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
08-01 - as Highlighted (upto -20cm from FGL - Total 11 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1369 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
D-08-02 - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1370 00 Civil Site Works 9/8/21 9/11/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B

kaig-qcals 124
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone G KAIG3-RFI-SW-C-1371 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-335 (Stock Pile # 109 A-1-A) Civil Site Works 9/8/21 9/11/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
5A KAIG3-RFI-SW-C-1372 00 Civil Site Works 9/8/21 9/13/21 Approved as noted
18, FW-A-19 (As Highlighted)

not used

Inspection and Compaction Test for Sub-base (1 of 1) under 3rd lift of Rock Boulder no. RB-108 (Stock Pile
4A B KAIG3-RFI-SW-C-1374 00 Civil Site Works 9/9/21 9/13/21 Approved as noted
# 109 A-1-A)

Inspection and Compaction Test for Sub-Base (1 of 1) under 4th lift of Rock Boulder no. RB-109 (Stock Pile
4A B KAIG3-RFI-SW-C-1375 00 Civil Site Works 9/9/21 9/13/21 Approved as noted
# 109 A-1-A)

4B KAIG3-RFI-SW-C-1376 00 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) Civil Site Works 9/9/21 9/11/21 Approved as noted

Inspection and compaction test 1st layer for backfilling (5th Layer) for Storm Water Line from MH-D-01-A1
5A KAIG3-RFI-SW-C-1377 00 Civil Site Works 9/12/21 9/14/21 Approved as noted
to MH-D-01-A2 as highlighted up to -20cm from FGL - (4 layers) SP#105 A-1-B.
Inspection and compaction test 1st layer for backfilling (4th Layer) for Storm Water Line from MH-D-01-A1
5A KAIG3-RFI-SW-C-1378 00 Civil Site Works 9/12/21 9/14/21 Approved as noted
to MH-D-01-A1-01 as highlighted up to -20cm from FGL - (6 layers) SP#105 A-1-B.
Inspection and compaction test 2nd layer for backfilling for Storm Water Line from MH-D-01 to MH-D-01-
5A KAIG3-RFI-SW-C-1379 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
B2 as highlighted up to -20cm from FGL - (10 layers) SP#105 A-1-B.
Inspection and compaction test 2nd layer for backfilling for Storm Water Line from MH-D-01 to MH-D-01-
5A KAIG3-RFI-SW-C-1379 01 Civil Site Works 9/16/21 9/21/21 Approved as noted
B2 as highlighted up to -20cm from FGL - (10 layers) SP#105 A-1-B.
Inspection and compaction test 1st layer for backfilling (5th Layer) for Storm Water Line from MH-D-01-A1
4D KAIG3-RFI-SW-C-1380 00 Civil Site Works 9/12/21 9/14/21 Approved as noted
to MH-D-02 as highlighted up to buttom of the road - (6 layers) SP#105 A-1-B.
Excavation & Surface Preparation upto Bottom of Blinding level under Tunnel foundation at Grid (A-1-21)
4C KAIG3-RFI-TG-C-1381 00 Civil Butterfly Garden 9/9/21 9/11/21 Code C (resubmit)
@ Butterfly Garden, at highlighted area in attached drawings.
Excavation & Surface Preparation upto Bottom of Blinding level under Tunnel foundation at Grid (A-1-21)
4C KAIG3-RFI-TG-C-1381 01 Civil Butterfly Garden 9/15/21 9/18/21 Approved as noted
@ Butterfly Garden, at highlighted area in attached drawings.
Inspection and compaction test 1st layer for backfilling around PC 162 Zone 2L (as highlighted) (1 of 4
2L KAIG3-RFI-CO-C-1382 00 Civil Crescent 9/11/21 9/13/21 Code C (resubmit)
layers) SP#121
Inspection and compaction test 1st layer for backfilling around PC 162 Zone 2L (as highlighted) (1 of 4
2L KAIG3-RFI-CO-C-1382 01 Civil Crescent 9/15/21 cancelled
layers) SP#121
Inspection and compaction test 6th layer for backfilling at Zone 2D around PC and strip footing -109-111-
2D KAIG3-RFI-CO-C-1383 00 Civil Crescent 9/11/21 9/13/21 Approved as noted
113-115 (as Highlighted) (6 of 6 upto TOC of PC only) SP#121
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 110, 112, 114,
2D KAIG3-RFI-CO-C-1384 00 Civil Crescent 9/11/21 9/14/21 Code C (resubmit)
116, 118 as highlighted Zone 2D
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 110, 112, 114,
2D KAIG3-RFI-CO-C-1384 01 Civil Crescent 9/16/21 9/19/21 Approved as noted
116, 118 as highlighted Zone 2D
Excavation & Bed Preparation for Sub surface Sleeves 03 no's (110mm) at Bottom Side of Planted bed 1,
4B KAIG3-RFI-WG-C-1385 00 Civil Water Play Garden 9/12/21 9/14/21 Approved as noted
Inside Water Play Garden, at highlighted area in attached drawings.
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-
3B KAIG3-RFI-SW-C-1386 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
01-1 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-
3B KAIG3-RFI-SW-C-1386 01 Civil Site Works 9/16/21 9/18/21 Approved as noted
01-1 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01-1 to MH-E-
3B KAIG3-RFI-SW-C-1387 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
01-2 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01-1 to MH-E-
3B KAIG3-RFI-SW-C-1387 01 Civil Site Works 9/16/21 9/18/21 Approved as noted
01-2 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-
3B KAIG3-RFI-SW-C-1388 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
02 - as Highlighted (upto -20cm from FGL - Total 5 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-
3B KAIG3-RFI-SW-C-1388 01 Civil Site Works 9/16/21 9/18/21 Approved as noted
02 - as Highlighted (upto -20cm from FGL - Total 5 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-02 to MH-E-
3B KAIG3-RFI-SW-C-1389 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
03 - as Highlighted (upto -20cm from FGL - Total 5 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-02 to MH-E-
3B KAIG3-RFI-SW-C-1389 01 Civil Site Works 9/16/21 9/18/21 Approved as noted
03 - as Highlighted (upto -20cm from FGL - Total 5 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-03 to MH-E-
3B KAIG3-RFI-SW-C-1390 00 Civil Site Works 9/12/21 9/14/21 Code C (resubmit)
04 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B)
kaig-qcals 125
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-03 to MH-E-
3B KAIG3-RFI-SW-C-1390 01 Civil Site Works 9/16/21 9/18/21 Approved as noted
04 - as Highlighted (upto -20cm from FGL - Total 4 Layers) (Stock Pile # 105 A-1-B)

5B KAIG3-RFI-SW-C-1391 00 Soil Preparation under Boulder No. RB- 309 Civil Site Works 9/12/21 9/14/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
4D KAIG3-RFI-SW-C-1392 00 Civil Site Works 9/12/21 9/15/21 Approved as noted
D-06 (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 5th lift of Rock Boulder no. RB-109
4A B KAIG3-RFI-SW-C-1393 00 Civil Site Works 9/13/21 9/18/21 Approved as noted
(Stock Pile # 105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 4th lift of Rock Boulder no. RB-108
4A B KAIG3-RFI-SW-C-1394 00 Civil Site Works 9/13/21 9/18/21 Approved as noted
(Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Sub-Base (1 of 1) under 5th lift of Rock Boulder no. RB-109 (Stock Pile
4A B KAIG3-RFI-SW-C-1395 00 Civil Site Works 9/13/21 9/18/21 Approved as noted
# 109 A-1-A)
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (250mmØ-UPVC- Class
Site Works beside Physic
4D KAIG3-RFI-SW-C-1396 00 4) from (MH-D-03 to MH-D-03-01 &MH-D-04 to MH-D-04-01 ). BSIDE PHYSIC GARDEN. As per Civil 9/12/21 9/14/21 Approved as noted
Garden
highlighted Area in the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) from (MH-D-03 to
Site Works beside Physic
4D KAIG3-RFI-SW-C-1397 00 MH-D-03-01 &MH-D-04 to MH-D-04-01 ). BSIDE PHYSIC GARDEN. As per highlighted Area in the Civil 9/12/21 9/14/21 Approved as noted
Garden
attached Dwg.
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (600mmØ-PP-
Site Works beside Maze
5A KAIG3-RFI-SW-C-1398 00 CORRUGATED) from (MH-D-01 to OUTFULL-D). NEAR MAZE GARDEN. As per highlighted Area in Civil 9/12/21 9/14/21 Approved as noted
Garden
the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-D for (600mmØ-PP- CORRUGATED) from (MH- Site Works beside Maze
5A KAIG3-RFI-SW-C-1399 00 Civil 9/12/21 9/14/21 Approved as noted
D-01 to OUTFULL-D). NEAR MAZE GARDEN. As per highlighted Area in the attached Dwg. Garden

Zone B KAIG3-RFI-SW-C-1400 00 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/13/21 9/15/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1400 01 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/29/21 10/2/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1400 02 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 10/10/21 10/16/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-309 (Stock Pile #
Zone L KAIG3-RFI-SW-C-1401 00 Civil Site Works 9/14/21 9/16/21 Approved as noted
105 A-1-B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
5A KAIG3-RFI-SW-C-1402 00 Civil Site Works 9/14/21 9/18/21 Approved as noted
D-01-A1, MH-D-01-A2, MH-D-01-A1-01, MH-D-01-B1, MH-D-01-B2 (As Highlighted)
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 103 - 105 as
2C KAIG3-RFI-CO-C-1403 00 Civil Crescent 9/13/21 9/16/21 Approved as noted
highlighted Zone 2C
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (600mmØ-PP- Site Works beside
3A 3B KAIG3-RFI-SW-C-1404 00 CORRUGATED) from (MH-E-01 to OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As Civil Circular Pathway Junction 9/13/21 9/20/21 Code C (resubmit)
per highlighted Area in the attached Dwg. 8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (600mmØ-PP- Site Works beside
3A 3B KAIG3-RFI-SW-C-1404 01 CORRUGATED) from (MH-E-01 to OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As Civil Circular Pathway Junction 9/28/21 9/30/21 Approved as noted
per highlighted Area in the attached Dwg. 8
Pipe Installation for Storm Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-E-01 to Site Works beside
3A 3B KAIG3-RFI-SW-C-1405 00 OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 9/13/21 9/14/21 Code C (resubmit)
Dwg. 8
Pipe Installation for Storm Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-E-01 to Site Works beside
3A 3B KAIG3-RFI-SW-C-1405 01 OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 9/28/21 9/30/21 Approved as noted
Dwg. 8
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (400mmØ-UPVC- Class Site Works beside
3A 3B KAIG3-RFI-SW-C-1406 00 4) from (MH-F-02 to MH-F-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 9/13/21 9/14/21 Approved as noted
in the attached Dwg. 9
Site Works beside
Pipe Installation for Storm Water Line Outfall-F for (400mmØ-UPVC- Class 4) from (MH-F-02 to MH-F-
3A 3B KAIG3-RFI-SW-C-1407 00 Civil Circular Pathway Junction 9/21/21 9/25/21 Approved as noted
04 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Dwg.
9
Pipe Installation for sub surface drainage (main line) (size: 450, 400, 315, 250 mm Ø) and (160 & 110
4B KAIG3-RFI-WG-P-1408 00 Civil Water Play Garden 9/18/21 9/19/21 Code C (resubmit)
mm ).in water garden. As per highlighted Area in the attached Dwg.

Pipe Installation for sub surface drainage (main line) (size: 450, 400, 315, 250 mm Ø) and (160 & 110
4B KAIG3-RFI-WG-P-1408 01 Civil Water Play Garden 9/22/21 9/27/21 Approved as noted
mm ).in water garden. As per highlighted Area in the attached Dwg.

Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat)
4B KAIG3-RFI-SW-C-1408 00 Civil Site Works 9/14/21 9/21/21 Approved as noted
for FW-A-3-6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8 (As Highlighted

4D F & G KAIG3-RFI-SW-C-1409 00 Soil Preparation under Boulder No. RB- 244 Civil Site Works 9/14/21 9/16/21 Approved as noted

Inspection and Compaction Test for Sub-Base (1 of 1) under 4th lift of Rock Boulder no. RB-108 (Stock Pile
4A B KAIG3-RFI-SW-C-1410 00 Civil Site Works 9/14/21 9/16/21 Approved as noted
# 109 A-1-A)

kaig-qcals 126
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-309 (Stock Pile #
Zone L KAIG3-RFI-SW-C-1411 00 Civil Site Works 9/14/21 9/16/21 Approved as noted
105 A-1-B)

Zone B KAIG3-RFI-SW-C-1412 00 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/14/21 9/18/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1412 01 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/29/21 10/2/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1412 02 Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 10/10/21 10/21/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Manhole (MH-A-01, MH-A-02, MH-A-03, MH-A-
4C KAIG3-RFI-SW-C-1413 00 Civil Site Works 9/14/21 9/18/21 Approved as noted
10, MH-A-11, MH-A-12) as Highlighted

Excavation for Storm Water Line from G-E-01 to Outfall E, including Manhole and Outfall E as Highlighted
3B KAIG3-RFI-SW-C-1414 00 Civil Site Works 9/14/21 9/16/21 Approved as noted
in the attched Drawing

Inspection and compaction test 1st layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1415 00 Civil Crescent 9/14/21 9/16/21 Approved as noted
highlighted) Zone 2D SP#121 (1 of 13)

Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-309 (Stock Pile #
Zone L KAIG3-RFI-SW-C-1416 00 Civil Site Works 9/15/21 9/18/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-309 (Stock Pile # 109 A-1-A)
Zone L KAIG3-RFI-SW-C-1417 00 Civil Site Works 9/15/21 9/18/21 Approved as noted

4D F & G KAIG3-RFI-SW-C-1418 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-244 (Stock Pile # 109 A-1-A) Civil Site Works 9/15/21 9/19/21 Approved as noted

4A B KAIG3-RFI-SW-C-1419 00 Soil Preparation under Boulder No. RB- 169 Civil Site Works 9/15/21 9/18/21 Approved as noted

Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (315 400 & 450mm) From Geyser to
4A KAIG3-RFI-WG-C-1420 00 Mist Garden (MH-C-4 to MH-C-5 to MH-C-6 to MH-C-7 to MH-C-8) and Sleeves 3 no's (110mm) at Bottom Civil Water Play Garden 9/16/21 9/19/21 Approved as noted
Side of Planted Bed 1, Inside Water Garden, at highlighteD DRAWING.
Inspection for Installation of Rings (Riser) upto bottom of slab for (MH-A-06, MH-A-13, MH-A-15) - As
4B KAIG3-RFI-SW-C-1421 00 Civil Site Works 9/16/21 9/21/21 Code C (not resubmit)
Highlighted
INSPECTION FOR CASTING CONRETE FOR SHORT PIECE OF MANHOLE - FW-A-18, FW-A-19
5A KAIG3-RFI-SW-C-1422 00 Civil Site Works 9/16/21 9/19/21 Approved as noted
(As Highlighted)

4B B KAIG3-RFI-SW-C-1423 00 Soil Preparation under Boulder No. RB- 169b Civil Site Works 9/16/21 9/19/21 Approved as noted
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
4D KAIG3-RFI-SW-C-1424 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, Civil Site Works 9/16/21 9/25/21 Approved as noted
MH-D-05, MH-D-06 (As Highlighted)
Zone L KAIG3-RFI-SW-C-1425 00 Soil Preparation under Boulder No. RB- 311 Civil Site Works 9/16/21 9/19/21 Approved as noted

Excavation (as per instruction of DAR) for the loose Exsisting NGL in between PC 162 - 164 at Zone 2L (as
2L KAIG3-RFI-CO-C-1426 00 Civil Site Works 9/16/21 9/19/21 Approved as noted
highlighted)

2D 2E KAIG3-RFI-CO-C-1427 00 Surface Preparation Prior to start Backfilling around Strip footing & Pilecap 117 as highlighted Zone 2D 2E Civil Crescent 9/16/21 9/19/21 Approved as noted

Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1428 00 Civil Crescent 9/16/21 9/19/21 Approved as noted
highlighted) Zone 2D SP#121 (2 of 13)
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 103 - 105 (as
2D KAIG3-RFI-CO-C-1429 00 Civil Crescent 9/16/21 9/19/21 Approved as noted
highlighted) Zone 2C SP#121 (1 of 6)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6A KAIG3-RFI-SW-C-1430 00 Civil Site Works 9/16/21 9/19/21 Approved as noted
13, FW-A-14, FW-A-25 (As Highlighted)
Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat)
5A 6A KAIG3-RFI-SW-C-1431 00 Civil Site Works 9/16/21 9/25/21 Approved as noted
for FW-A-15, FW-A-16, FW-A-17, FW-A-20, FW-A-21, FW-A-22, FW-A-23, FW-A-24 (As Highlighted)

Zone B KAIG3-RFI-SW-C-1432 00 Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/19/21 9/20/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1432 01 Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 9/29/21 10/2/21 Code C (resubmit)

kaig-qcals 127
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone B KAIG3-RFI-SW-C-1432 02 Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing Civil Site Works 10/10/21 10/16/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 6th lift of Rock Boulder no. RB-109
4A B KAIG3-RFI-SW-C-1433 00 Civil Site Works 9/18/21 9/19/21 Approved as noted
(Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Sub-Base (1 of 1) under 6th lift of Rock Boulder no. RB-109 (Stock Pile
4A B KAIG3-RFI-SW-C-1434 00 Civil Site Works 9/18/21 9/20/21 Approved as noted
# 109 A-1-A)

Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 5th lift of Rock Boulder no. RB-108
4A B KAIG3-RFI-SW-C-1435 00 Civil Site Works 9/18/21 9/20/21 Approved as noted
(Stock Pile # 105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Bouder No. RB-311 (Stock Pile #
Zone L KAIG3-RFI-SW-C-1436 00 Civil Site Works 9/18/21 9/19/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-169 (Stock Pile #
Zone A KAIG3-RFI-SW-C-1437 00 Civil Site Works 9/18/21 9/19/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
Zone B KAIG3-RFI-SW-C-1438 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-169 (Stock Pile #
Zone A KAIG3-RFI-SW-C-1439 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for Sub-Base (1 of 1) under 5th lift of Rock Boulder no. RB-108 (Stock Pile
4A B KAIG3-RFI-SW-C-1440 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
# 109 A-1-A)
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-311 (Stock Pile # 109 A-1-A)
Zone L KAIG3-RFI-SW-C-1441 00 Civil Site Works 9/19/21 9/21/21 Approved as noted

Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1442 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1443 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1444 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1445 00 Civil Site Works 9/20/21 9/25/21 Code C (not resubmit)
D-01-A1-01 - as Highlighted (upto -20cm from FGL - Total 8 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01-A1 to MH-
5A KAIG3-RFI-SW-C-1446 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
D-01-A2 - as Highlighted (upto -20cm from FGL - Total 8 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-B1 to
5A KAIG3-RFI-SW-C-1447 00 Civil Site Works 9/19/21 9/21/21 Code C (resubmit)
MH-D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-B1 to
5A KAIG3-RFI-SW-C-1447 01 Civil Site Works 9/28/21 9/30/21 Approved as noted
MH-D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-
5A KAIG3-RFI-SW-C-1448 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to MH-D-
4D KAIG3-RFI-SW-C-1449 00 Civil Site Works 9/19/21 9/21/21 Approved as noted
02 - as Highlighted (upto bottom of road - Total 8 Layers) (Stock Pile # 105 A-1-B)
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attached
Zone B KAIG3-RFI-SW-C-1450 00 Civil Site Works 9/19/21 9/20/21 Code C (resubmit)
drawing
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attached
Zone B KAIG3-RFI-SW-C-1450 01 Civil Site Works 9/29/21 10/4/21 Code C (resubmit)
drawing
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attached
Zone B KAIG3-RFI-SW-C-1450 02 Civil Site Works 10/17/21 10/21/21 Approved as noted
drawing
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1451 00 Civil Site Works 9/19/21 9/20/21 Code C (resubmit)
attached drawing
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1451 01 Civil Site Works 9/29/21 10/4/21 Code C (resubmit)
attached drawing
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1451 02 Civil Site Works 10/12/21 10/14/21 Approved as noted
attached drawing
Excavation & Bed Preparation for Sub surface Drainage Main line Pipes (800mm from MH-C-1 to MH-C-2
4A KAIG3-RFI-WG-C-1452 00 to MH-C-3, 600mm from MH-C-3 to MH-C-4 and 400mm from MH-C-3 to MH-C-3-1) (Part 2) Inside Water Civil Water Play Garden 9/19/21 9/21/21 Code C (not resubmit)
Garden, at highlighted area in attached drawings.
Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (250mm drop to 160mm
4A KAIG3-RFI-WG-C-1453 00 Drop to 110mm from MH-C-1 to End, 110mm from MH-C-3-1 to End and Sleeves 6 no's 110mm Along) Civil Water Play Garden 9/19/21 9/21/21 Code C (not resubmit)
(2no's Pipes 110mm) (Part 5) Inside Water Garden, at highlighted area in attached drawings.
kaig-qcals 128
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (250mm drop to 160mm
4A KAIG3-RFI-WG-C-1454 00 Drop to 110mm and Sleeves 6 no's 110mm Along) from beside Planted Bed 2 to 3, Inside Water Garden, at Civil Water Play Garden 9/19/21 9/21/21 Code C (not resubmit)
highlighted area in attached drawings.
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 117 (as highlighted)
2D 2E KAIG3-RFI-CO-C-1455 00 Civil Crescent 9/19/21 9/21/21 Approved as noted
Zone 2D 2E SP#121 (1 of 4)

Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 103 - 105 (as
2C KAIG3-RFI-CO-C-1456 00 Civil Crescent 9/19/21 9/21/21 Approved as noted
highlighted) Zone 2C SP#121 (2 of 6)

Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1457 00 Civil Crescent 9/19/21 9/21/21 Approved as noted
highlighted) Zone 2D SP#121 (3 of 13)

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
5A KAIG3-RFI-SW-C-1458 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-01-A1, MH-D-01-A2, MH-D-01-A1-01, Civil Site Works 9/20/21 9/20/21 Approved as noted
MH-D-01-B1, MH-D-01-B2 (As Highlighted

Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
Zone B KAIG3-RFI-SW-C-1459 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-169 (Stock Pile #
Zone A KAIG3-RFI-SW-C-1460 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
105 A-1-B)
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 117 (as highlighted)
2D 2E KAIG3-RFI-CO-C-1461 00 Civil Crescent 9/20/21 9/25/21 Approved as noted
Zone 2D 2E SP#121 (2 of 4)
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 103 - 105 (as
2C KAIG3-RFI-CO-C-1462 00 Civil Crescent 9/20/21 9/25/21 Approved as noted
highlighted) Zone 2C SP#121 (3 of 6)
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1463 00 Civil Crescent 9/20/21 9/25/21 Approved as noted
highlighted) Zone 2D SP#121 (4 of 13)
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1464 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1465 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1466 00 Civil Site Works 9/20/21 9/25/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

Zone K KAIG3-RFI-SW-C-1467 00 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 9/20/21 9/21/21 Code C (resubmit)

Zone K KAIG3-RFI-SW-C-1467 01 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/11/21 10/20/21 Approved as noted

Excavation for Telecommunication Line from (B/TL/21 to B/TL/36-P2) at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1468 00 Civil Site Works 9/20/21 9/21/21 Code C (resubmit)
attached drawing

Excavation for Telecommunication Line from (B/TL/21 to B/TL/36-P2) at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1468 01 Civil Site Works 10/17/21 10/21/21 Approved as noted
attached drawing

Zone K KAIG3-RFI-SW-C-1469 00 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 9/20/21 9/21/21 Code C (resubmit)

Zone K KAIG3-RFI-SW-C-1469 01 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/11/21 10/13/21 Code C (resubmit)

Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted in
Zone B KAIG3-RFI-SW-C-1470 00 Civil Site Works 9/20/21 9/21/21 Code C (resubmit)
the attached drawing

Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted in
Zone B KAIG3-RFI-SW-C-1470 01 Civil Site Works 10/12/21 10/14/21 Code C (resubmit)
the attached drawing

Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted in
Zone B KAIG3-RFI-SW-C-1470 02 Civil Site Works 10/21/21 10/28/21 Approved as noted
the attached drawing

2D KAIG3-RFI-CO-C-1471 00 Surface Preparation Prior to start Backfilling around Pilecap 118 as highlighted Zone 2D Civil Crescent 9/20/21 9/21/21 Approved as noted

Inspection and compaction test 1st layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP#121
2D KAIG3-RFI-CO-C-1472 00 Civil Crescent 9/20/21 9/25/21 Approved as noted
(1 of 4)
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (450mmØ-UPVC- Class Site Works beside
3A 3B KAIG3-RFI-SW-C-1473 00 4) from (MH-F-01 to MH-F-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 9/21/21 9/25/21 Approved as noted
in the attached Dwg. 9
kaig-qcals 129
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Site Works beside
Pipe Installation of Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to MH-F-
3A 3B KAIG3-RFI-SW-C-1474 00 Civil Circular Pathway Junction 9/21/21 9/25/21 Approved as noted
02 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Dwg.
9
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (450mmØ-UPVC- Class Site Works beside Parking
3A KAIG3-RFI-SW-C-1475 00 Civil 9/21/21 9/25/21 Approved as noted
4) from (MH-H-01 to MH-H-02). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
Pipe Installation of Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) from (MH-H-01 to MH-H- Site Works beside Parking
3A KAIG3-RFI-SW-C-1476 00 Civil 9/21/21 9/25/21 Approved as noted
02). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
Pipe Installation Sub Surface Drainage (main line) (size: 250mm Ø) and perforated Pipes (160 & 110mm Ø)
4B KAIG3-RFI-WG-P-1477 00 Civil Water Play Garden 9/22/21 9/28/21 Approved as noted
in Water Garden as per highlighted area in the attached Dwg.

Zone B KAIG3-RFI-SW-C-1477 00 Soil Preparation under Boulder No. RB- 063 prior to start cutting Civil Site Works 9/21/21 9/25/21 Approved as noted

Zone B KAIG3-RFI-SW-C-1478 00 Soil Preparation under Boulder No. RB-063 after cutting Civil Site Works 9/21/21 9/25/21 Approved as noted

Zone A KAIG3-RFI-SW-C-1479 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-169 (Stock Pile # 109 A-1-A) Civil Site Works 9/21/21 9/25/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
Zone B KAIG3-RFI-SW-C-1480 00 Civil Site Works 9/21/21 9/25/21 Approved as noted
105 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 7th lift of Rock Boulder no. RB-109
4A B KAIG3-RFI-SW-C-1481 00 Civil Site Works 9/21/21 9/25/21 Approved as noted
(Stock Pile # 105 A-1-B)

Zone G KAIG3-RFI-SW-C-1482 00 Soil Preparation under Boulder No. RB- 255 Civil Site Works 9/21/21 9/25/21 Approved as noted

Zone C KAIG3-RFI-SW-C-1483 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-063 (Stock Pile # 109 A-1-A) Civil Site Works 9/21/21 9/26/21 Approved as noted

Zone G KAIG3-RFI-SW-C-1484 00 Inspection and Compaction Test for Sub-Base (Rock Area) under Bouder No. RB-255 Civil Site Works 9/21/21 9/25/21 Approved as noted

Inspection and Compaction Test for Sub-Base (1 of 1) under 7th lift of Rock Boulder no. RB-109 (Stock Pile
4A B KAIG3-RFI-SW-C-1485 00 Civil Site Works 9/21/21 9/26/21 Approved as noted
# 109 A-1-A)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1486 00 Civil Site Works 9/21/21 9/26/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-
5A KAIG3-RFI-SW-C-1487 00 Civil Site Works 9/21/21 9/26/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B)
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-B1 to MH-
5A KAIG3-RFI-SW-C-1488 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1489 00 Civil Site Works 9/21/21 9/26/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for 1st Layer (1 of 12) backfilling (grading) at Zone-6A as highlighted in the
6A G-H KAIG3-RFI-SW-C-1490 00 Civil Site Works 9/21/21 9/25/21 Approved as noted
attached drawing

Zone D KAIG3-RFI-SW-C-1491 00 Inspection for the Excavation of Storm Box Culvert - SBC-05 (As Highlighted) Civil Site Works 9/21/21 9/25/21 Approved as noted

2B KAIG3-RFI-SW-C-1492 00 Reinforcement Inspection for the Foundation and Side Walls of SBC-06 Civil Site Works 9/21/21 9/25/21 Code C (resubmit)

2B KAIG3-RFI-SW-C-1492 01 Reinforcement Inspection for the Foundation and Side Walls of SBC-06 Civil Site Works 10/2/21 10/5/21 Code C (resubmit)

2B KAIG3-RFI-SW-C-1492 02 Reinforcement Inspection for the Foundation and Side Walls of SBC-06 Civil Site Works 10/11/21 10/20/21 Approved as noted

Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 117 (as highlighted)
2D 2E KAIG3-RFI-CO-C-1493 00 Civil Crescent 9/21/21 9/25/21 Approved as noted
Zone 2D 2E SP#121 (3 of 4)
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 103 - 105 (as
2C KAIG3-RFI-CO-C-1494 00 Civil Crescent 9/21/21 9/26/21 Approved as noted
highlighted) Zone 2C SP#121 (4 of 6)
Inspection and compaction test 5th layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1495 00 Civil Crescent 9/21/21 9/25/21 Approved as noted
highlighted) Zone 2D SP#121 (5 of 13)
Inspection and compaction test 2nd layer for backfilling around Pilecap 118 (as highlighted) Zone 2D
2D KAIG3-RFI-CO-C-1496 00 Civil Crescent 9/21/21 9/25/21 Approved as noted
SP#121 (2 of 4)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
5A 6A KAIG3-RFI-SW-C-1497 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-13, FW-A-14, FW-A-25 (As Highlighted) Civil Site Works 9/22/21 9/28/21 Code C (resubmit)

kaig-qcals 130
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
5A 6A KAIG3-RFI-SW-C-1497 01 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-13, FW-A-14, FW-A-25 (As Highlighted) Civil Site Works 10/9/21 10/18/21 Approved as noted

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1498 00 Civil Site Works 9/22/21 9/26/21 Approved as noted
D-08-02 - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-05 to MH-D-
4D KAIG3-RFI-SW-C-1499 00 Civil Site Works 9/22/21 9/26/21 Approved as noted
06 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1500 00 Civil Site Works 9/22/21 9/28/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1501 00 Civil Site Works 9/22/21 9/28/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1502 00 Civil Site Works 9/22/21 9/28/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B

Inspection & Compaction Test of Single Layer Backfilling (Sub-Grade) after Gravel laying for sub surface
4B KAIG3-RFI-WG-C-1503 00 Pipe Sleeves 03 nos. (110mm) at Bottom side of Planted Bed 1 inside Water Play Garden at highlighted area Civil Water Play Garden 9/22/21 9/28/21 Approved as noted
in attached drawings. (Stock Pile 117).
Inspection & Compaction Test of Single Layer Backfilling (Sub-Base) after Gravel laying for sub surface
4B KAIG3-RFI-WG-C-1504 00 Pipe Sleeves 03 nos. (110mm) at Bottom side of Planted Bed 1 inside Water Play Garden at highlighted area Civil Water Play Garden 9/22/21 9/26/21 Approved as noted
in attached &
Inspection drawings. (Stock
Compaction Pile
Test of 116).
1st Layer ((out of 5) Backfilling (Sub Grade) after Gravel laying for sub
4B KAIG3-RFI-WG-C-1505 00 surface Drainage Main Line (400, 315 & 250mm) between Geyse Garden and the Boundary Wall at Civil Water Play Garden 9/22/21 9/28/21 Approved as noted
highlighted &area
Excavation in attached
Surface drawings.
preparation under Stone Boulders at Bottom side of Planted bed 1 inside Water Play
4B KAIG3-RFI-WG-C-1506 00 Civil Water Play Garden 9/22/21 9/26/21 Approved as noted
Garden at highlighted area in attached drawing.
Zone B KAIG3-RFI-SW-C-1507 00 Inspection and Compaction Test for Sub-base (1 of 1) under Bouder No. RB-169b (Stock Pile # 109 A-1-A) Civil Site Works 9/22/21 9/26/21 Approved as noted
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeves Pipes (450mm drop to 315mm
4B KAIG3-RFI-WG-C-1508 00 Drop to 110mm from MH-C-4 to MH-C-4-1 to MH-C-4-2 to MH-C-4-3 to end and Sleeves 4 no's 110mm) Civil Water Play Garden 9/22/21 9/26/21 Approved as noted
(part 6) inside Water Garden at highlighted area in attached drawings.
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to MH-D-
5A KAIG3-RFI-SW-C-1509 00 Civil Site Works 9/25/21 9/27/21 Code C (resubmit)
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to MH-D-
5A KAIG3-RFI-SW-C-1509 01 Civil Site Works 10/3/21 10/6/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B

2B KAIG3-RFI-SW-C-1510 00 Inspection for Casting the Blinding Concrete under the SBC-05 (as Highlighted) Civil Site Works 9/25/21 9/28/21 Approved as noted

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1511 00 Civil Site Works 9/25/21 9/27/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1512 00 Civil Site Works 9/25/21 9/27/21 Approved as noted
D-08-02 - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1513 00 Civil Site Works 9/25/21 9/28/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 6th lift of Rock Boulder no. RB-108
4A B KAIG3-RFI-SW-C-1514 00 Civil Site Works 9/25/21 9/27/21 Approved as noted
(Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Sub-Base (1 of 1) under 6th lift of Rock Boulder no. RB-108 (Stock Pile
4A B KAIG3-RFI-SW-C-1515 00 Civil Site Works 9/25/21 9/28/21 Approved as noted
# 109 A-1-A)

Zone D KAIG3-RFI-SW-C-1516 00 Inspection for the Excavation of Storm Box Culvert - SBC-08 (As Highlighted) Civil Site Works 9/25/21 9/27/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 12) backfilling (grading) at Zone-6A as highlighted in
6A G-H KAIG3-RFI-SW-C-1517 00 Civil Site Works 9/26/21 9/29/21 Approved as noted
the attached drawing

Soil Preparation at Zone - 5A prior to start Cut and removal of cutting material and backfilling upto (-20cm)
5A G-H K-L KAIG3-RFI-SW-C-1518 00 Civil Site Works 9/26/21 9/30/21 Approved as noted
from FGL Level - as highlighted

5A 6A KAIG3-RFI-SW-C-1519 00 Surface Preparation Prior to Start Backfill Gravel for Manhole from FW-A-25 to FW-A-13 - as Highlighted Civil Site Works 9/26/21 9/28/21 Code C (not resubmit)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1520 00 Civil Picnic Area 9/26/21 9/28/21 Approved as noted
3) SA-21 (1 Layer Sub-Grade and 1 Layer Sub-Base under Footing)

kaig-qcals 131
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1521 00 Civil Picnic Area 9/26/21 9/29/21 Approved as noted
3) SA-21 (2 Layer Sub-Grade - Inside and Outside)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1522 00 Civil Picnic Area 9/26/21 9/28/21 Approved as noted
3) SA-21 (1 Layer Sub-Base - under Slab and Beam)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1523 00 Civil Picnic Area 9/26/21 9/28/21 Approved as noted
3) SA-22 (1 Layer Sub-Base under Footing)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
Zone G KAIG3-RFI-PA-C-1524 00 Civil Picnic Area 9/26/21 9/29/21 Approved as noted
3) SA-22 (2 Layer Sub-Grade - Inside and Outside)

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1525 00 Civil Picnic Area 9/26/21 9/30/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B

Inspection and compaction test 4th layer for backfilling around Strip footing and PC 117 (as highlighted)
2D 2E KAIG3-RFI-CO-C-1526 00 Civil Crescent 9/26/21 9/28/21 Approved as noted
Zone 2D 2E SP#121 (4 of 4)

Inspection and compaction test 5th layer for backfilling around Strip footing and PC 103 - 105 (as
2C KAIG3-RFI-CO-C-1527 00 Civil Crescent 9/26/21 9/27/21 Approved as noted
highlighted) Zone 2C SP#121 (5 of 6)

Inspection and compaction test 6th layer for backfilling around Strip footing and PC 112-114-116 (as
2D KAIG3-RFI-CO-C-1528 00 Civil Crescent 9/26/21 9/27/21 Approved as noted
highlighted) Zone 2D SP#121 (6 of 13)

Inspection and compaction test 3rd layer for backfilling around Pilecap 118 (as highlighted) Zone 2D
2D KAIG3-RFI-CO-C-1529 00 Civil Crescent 9/26/21 9/27/21 Approved as noted
SP#121 (3 of 4)

Surface Preparation Prior to start Backfilling around Pilecap and Strip footing between PC 145-147-149 as
2J KAIG3-RFI-CO-C-1530 00 Civil Crescent 9/27/21 9/30/21 Approved as noted
highlighted Zone 2J
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (800mm from MH-C-1 to MH-C-2 to
4B KAIG3-RFI-WG-C-1531 00 MH-C-3, 600mm from MH-C-3 to MH-C-4 and 400mm from MH-C-3 to MH-C-3-1) (Part 2) and Sub Civil Water Play Garden 9/26/21 9/29/21 Approved as noted
surface Drainage Sub line & Sleeves Pipes (250mm drop to 160mm Drop
2L KAIG3-RFI-CO-C-1532 00 Surface Preparation Prior to start Backfilling at Strip footing between PC 160-162 as highlighted Zone 2L Civil Crescent 9/26/21 9/28/21 Approved as noted
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (600mmØ-PP- Site Works beside
3A 3B KAIG3-RFI-SW-C-1533 00 CORRUGATED) from (MH-E-01 to OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As Civil Circular Pathway Junction 9/26/21 9/30/21 Approved as noted
per highlighted
Warning Area in thefor
Tape Installation attached
StormDwg.
Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-E- 8 beside
Site Works
3A 3B KAIG3-RFI-SW-C-1534 00 01 to OUTFULL-E ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the Civil Circular Pathway Junction 9/26/21 9/30/21 Approved as noted
attached Dwg. 8
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (450mmØ-UPVC- Class Site Works beside Parking
3A KAIG3-RFI-SW-C-1535 00 Civil 9/26/21 9/22/21 Approved as noted
4) from (MH-H-01 to MH-H-02). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
Warning Tape Installation for Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) from (MH-H-01 to Site Works beside Parking
3A KAIG3-RFI-SW-C-1536 00 Civil 9/26/21 9/28/21 Approved as noted
MH-H-02). BSIDE PARKING AREA. As per highlighted Area in the attached Dwg. Area
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (400mmØ-UPVC- Class Site Works beside
3A 3B KAIG3-RFI-SW-C-1537 00 4) from (MH-F-02 to MH-F-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 9/26/21 9/27/21 Approved as noted
in the attached Dwg. 9
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-F for (400mmØ-UPVC- Class 4) from (MH-F-02 to
3A 3B KAIG3-RFI-SW-C-1538 00 Civil Circular Pathway Junction 9/26/21 9/27/21 Approved as noted
MH-F-04 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Dwg.
9
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (450mmØ-UPVC- Class Site Works beside
3A 3B KAIG3-RFI-SW-C-1539 00 4) from (MH-F-01 to MH-F-01-4 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 9/26/21 10/2/21 Approved as noted
in the attached Dwg. 9
Site Works beside
Pipe Installation of Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to MH-F-01-
3A 3B KAIG3-RFI-SW-C-1540 00 Civil Circular Pathway Junction 9/26/21 9/30/21 Approved as noted
4 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Dwg.
9
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1541 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1542 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

Pipe Installation sub surface drainage (main line) (size:110 & 160 mm Ø) in water garden. As per highlighted
4D KAIG3-RFI-WG-P-1542 00 Civil Water Play Garden 9/28/21 9/30/21 Approved as noted
Area in the attached Dwg.
Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1543 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B
Pipe Installation sub surface drainage (main line) and corrugated PP (size:450 & 600 mm Ø) in water garden.
4B KAIG3-RFI-WG-P-1543 00 Civil Water Play Garden 10/4/21 10/7/21 Approved as noted
As per highlighted Area in the attached Dwg.
Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-05 to MH-D-
4D KAIG3-RFI-SW-C-1544 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
06 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1545 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B)

kaig-qcals 132
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08-01 to MH-
4D KAIG3-RFI-SW-C-1546 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
D-08-02 - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 105 A-1-B)

Zone F KAIG3-RFI-SW-C-1547 00 Soil Preparation under Boulder No. RB- 242 Civil Site Works 9/28/21 9/30/21 Approved as noted

Zone G KAIG3-RFI-SW-C-1548 00 Soil Preparation under Boulder No. RB- 263 Civil Site Works 9/28/21 9/30/21 Approved as noted

3A 3B KAIG3-RFI-SW-C-1549 00 Excavation for Storm Water Line from MH-F-01-4 to MH-F-04 (Main Line) as highlighted Civil Site Works 9/28/21 9/29/21 Approved as noted

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1550 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B

Excavation & Blinding levels for Manholes (6 no's) Inside Discovery Garden at highlighted area in attached
4B KAIG3-RFI-DG-C-1551 00 Civil Discovery Garden 9/27/21 9/28/21 Approved as noted
Drawing's.

Excavation & Surface preparation under Stone Boulders at Between Geyser Garden & Boundary wall along Water Play
4A KAIG3-RFI-WG-C-1552 00 Civil 9/27/21 9/30/21 Approved as noted
span 16-22, Inside Water Garden, At Highlighted area in attached Drawings. Garden/Geyser Garden

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line 110mm & Sleeves Pipes (Sleeves
4A KAIG3-RFI-WG-C-1553 00 Civil Water Play Garden 9/27/21 9/30/21 Approved as noted
110mm) (Part 6) Inside Water Play Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 2nd Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying for Sub
4A KAIG3-RFI-WG-C-1554 00 surface Drainage Main line (400, 315 & 250mm) Between Geyse Garden and the Boundary Wall, Inside Civil Water Play Garden 9/29/21 10/3/21 Approved as noted
Water Garden, at highlighted area in attached drawing

Inspection and compaction test 7th layer for backfilling around Strip footing and PC 112-114 (as highlighted)
2D 2E KAIG3-RFI-CO-C-1555 00 Civil Crescent 9/27/21 9/30/21 Approved as noted
Zone 2D SP#121 (7 of 13)

Inspection and compaction test 1st layer for backfilling around Strip footing and PC 145-147-149 (as
2J KAIG3-RFI-CO-C-1556 00 Civil Crescent 9/27/21 9/30/21 Approved as noted
highlighted) Zone 2J SP#121 (1 of 4)

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-03 to MH-D-
4B KAIG3-RFI-SW-C-1557 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-03 to MH-D-
4B KAIG3-RFI-SW-C-1558 00 Civil Site Works 9/28/21 9/30/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1559 00 Civil Site Works 9/29/21 10/4/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B
"Inspection for Casting the Blinding Concrete under the Gullies (G-H-01, G-H-02, G-H-03, G-H-04, G-H-05,
3A KAIG3-RFI-SW-C-1560 00 G-H-06, G-H-07, G-H-08, G-H-09, G-H-10, G-H-11, G-H-12, G-H-13, G-H-14, G-H-15, G-H-16, G-H-17, Civil Site Works 9/29/21 10/3/21 Approved
G-H-18, G-H-19, G-H-20, G-H-21) AND Manhole MH-H-01,

Zone F KAIG3-RFI-SW-C-1561 00 Soil Preparation under Boulder No. RB- 242 after cutting Civil Site Works 9/29/21 10/3/21 Approved as noted

Zone F KAIG3-RFI-SW-C-1562 00 Inspection and Compaction Test for Sub-base (1 of 1) under Bouder No. RB-242 (Stock Pile # 109 A-1-A) Civil Site Works 9/29/21 10/3/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-263 (Stock Pile #
Zone G KAIG3-RFI-SW-C-1563 00 Civil Site Works 9/29/21 10/3/21 Approved as noted
105 A-1-B)

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1564 00 Civil Site Works 9/29/21 10/3/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1565 00 Civil Site Works 9/29/21 10/3/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B
Inspection and compaction test 1st layer for backfilling around PC 160 -162 (as highlighted) Zone 2L
2L KAIG3-RFI-CO-C-1566 00 Civil Crescent 9/29/21 10/3/21 Approved as noted
SP#121 (1 of 4)

Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 145-147-149 (as
2J KAIG3-RFI-CO-C-1567 00 Civil Crescent 9/29/21 10/3/21 Approved as noted
highlighted) Zone 2J SP#121 (2 of 4)

Inspection and compaction test 6th layer for backfilling around Strip footing and PC 103 - 105 (as
2C KAIG3-RFI-CO-C-1568 00 Civil Crescent 9/29/21 10/3/21 Approved as noted
highlighted) Zone 2C SP#121 (6 of 6)

kaig-qcals 133
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 4th layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP#121
2D KAIG3-RFI-CO-C-1569 00 Civil Crescent 9/29/21 10/3/21 Approved as noted
(4 of 4)

Inspection and compaction test 8th layer for backfilling around Strip footing and PC 112-114 (as highlighted)
2D KAIG3-RFI-CO-C-1570 00 Civil Crescent 9/29/21 10/3/21 Approved as noted
Zone 2D SP#121 (8 of 13)

Inspection and Compaction Test for 3rd Layer (3 of 12) backfilling (grading) at Zone-6A as highlighted in the
6A G-H KAIG3-RFI-SW-C-1571 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
attached drawing

Inspection and Compaction test for Sanding Bedding for Fire Water Line at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1572 00 Civil Site Works 9/30/21 10/2/21 Code C (resubmit)
attached drawing
Inspection and Compaction test for Sanding Bedding for Fire Water Line at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1572 01 Civil Site Works 10/13/21 10/14/21 Approved as noted
attached drawing

Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-263 (Stock Pile #
Zone G KAIG3-RFI-SW-C-1573 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
105 A-1-B)

Zone B KAIG3-RFI-SW-C-1574 00 Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted) Civil Site Works 10/2/21 10/4/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1574 01 Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted) Civil Site Works 10/13/21 10/14/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1574 02 Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted) Civil Site Works 10/21/21 10/25/21 Approved as noted

Surface Preparation Prior to Start Backfill Gravel for Manhole MH-A-01-A1, MH-A-01-A2, MH-A-01-A1-
5A 6A KAIG3-RFI-SW-C-1575 00 Civil Site Works 10/2/21 10/5/21 Approved as noted
01, MH-D-01-B1, MH-D-01-B2 - as Highlighted
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) after Gravel laying for Sub surface
4A KAIG3-RFI-WG-C-1576 00 Drainage Sub line & Sleeves Pipes (250mm drop to 160mm Drop to 110mm and Sleeves 6 no's 110mm Civil Water Play Garden 9/29/21 10/3/21 Approved as noted
Along) from beside Planted Bed 2 to 3, Inside Water Garden
Excavation & Surface Preparation for foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, at
4C KAIG3-RFI-TG-C-1577 00 Civil Butterfly Garden 9/30/21 10/4/21 Approved as noted
highlighted area in attached drawings.
Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 166-168-170-172-174-176
2M 2N KAIG3-RFI-CO-C-1578 00 Civil Crescent 10/2/21 10/5/21 Approved as noted
as highlighted Zone 2M 2N

Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 145-147-149 (as
2J KAIG3-RFI-CO-C-1579 00 Civil Crescent 9/30/21 9/4/21 Approved as noted
highlighted) Zone 2J SP#121 (3 of 4)
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-05 to MH-D-
4D KAIG3-RFI-SW-C-1580 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
06 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1581 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
03-01 - as Highlighted (upto bottom of road - Total 11 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-01 to Outfall
4D KAIG3-RFI-SW-C-1582 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
D - as Highlighted (upto bottom of road - Total 13 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-07 to MH-D-
4D KAIG3-RFI-SW-C-1583 00 Civil Site Works 9/30/21 10/3/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B)

Zone-K KAIG3-RFI-SW-C-1584 00 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 9/30/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1584 01 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/14/21 10/16/21 Approved as noted

Zone-K KAIG3-RFI-SW-C-1585 00 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 9/30/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1585 01 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/14/21 10/16/21 Approved as noted

2B KAIG3-RFI-SW-C-1586 00 Inspection of Formwork for the Foundation and Kicker of SBC-06 Civil Site Works 10/2/21 10/5/21 Code C (resubmit)

2B KAIG3-RFI-SW-C-1586 01 Inspection of Formwork for the Foundation and Kicker of SBC-06 Civil Site Works 10/9/21 10/16/21 Approved as noted

2B KAIG3-RFI-SW-C-1587 00 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 Civil Site Works 10/2/21 10/5/21 Code C (resubmit)

2B KAIG3-RFI-SW-C-1587 01 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 Civil Site Works 10/12/21 10/18/21 Approved as noted

2B KAIG3-RFI-SW-C-1588 00 Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-05 Civil Site Works 10/2/21 10/5/21 Approved as noted

kaig-qcals 134
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2B KAIG3-RFI-SW-C-1589 00 Inspection of Formwork for the Foundation and Kicker of SBC-05 Civil Site Works 10/2/21 10/5/21 Approved as noted

2B KAIG3-RFI-SW-C-1590 00 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-05 Civil Site Works 10/2/21 10/6/21 Approved as noted

2B KAIG3-RFI-SW-C-1591 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-263 (Stock Pile # 109 A-1-A) Civil Site Works 10/2/21 10/5/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone-5A as highlighted in the
5A KAIG3-RFI-SW-C-1592 00 Civil Site Works 10/2/21 10/10/21 Approved as noted
attached drawing

Inspection for Sand Bedding under pipe for Fire Water Line at Zone-B as highlighted in the attached drawing
Zone B KAIG3-RFI-SW-C-1593 00 Civil Site Works 10/2/21 10/5/21 Code C (resubmit)
(Stock Pile # 67)

Inspection for Sand Bedding under pipe for Fire Water Line at Zone-B as highlighted in the attached drawing
Zone B KAIG3-RFI-SW-C-1593 01 Civil Site Works 10/13/21 10/14/21 Approved as noted
(Stock Pile # 67)

Inspection for Sand Bedding under pipe for Potable Water Line at Zone-B as highlighted in the attached
Zone B KAIG3-RFI-SW-C-1594 00 Civil Site Works 10/2/21 10/5/21 Code C (resubmit)
drawing (Stock Pile # 67)

Inspection for Sand Bedding under pipe for Potable Water Line at Zone-B as highlighted in the attached
Zone B KAIG3-RFI-SW-C-1594 01 Civil Site Works 10/13/21 10/14/21 Approved as noted
drawing (Stock Pile # 67)

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-03 to MH-D-
4D KAIG3-RFI-SW-C-1595 00 Civil Site Works 10/2/21 10/4/21 Approved as noted
04 - as Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B)
Zone B KAIG3-RFI-SW-C-1596 00 Soil Preparation under Boulder No. RB- 337 prior to start cutting Civil Site Works 10/3/21 10/7/21 Approved as noted
Inspection and compaction test 1at layer for backfilling around Strip footing and PC 166-168-170-172-174-
2M 2N KAIG3-RFI-CO-C-1597 00 Civil Crescent 10/2/21 10/5/21 Approved as noted
176 (as highlighted) Zone 2M 2N SP#121 (1 of 4)
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 145-147-149 (as
2J KAIG3-RFI-CO-C-1598 00 Civil Crescent 10/5/21 10/7/21 Approved as noted
highlighted) Zone 2J SP#121 (3 of 4)
Inspection and compaction test 9th layer for backfilling around Strip footing and PC 110-112 (as highlighted)
2D KAIG3-RFI-CO-C-1599 00 Civil Crescent 10/2/21 10/5/21 Approved as noted
Zone 2D SP#121 (9 of 13)
Inspection and compaction test 2nd layer for backfilling around PC 160 -162 (as highlighted) Zone 2L
2L KAIG3-RFI-CO-C-1600 00 Civil Crescent 10/2/21 10/5/21 Approved as noted
SP#121 (2 of 4)
Zone-K KAIG3-RFI-SW-C-1601 00 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/3/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1601 01 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/11/21 10/14/21 Approved as noted

Zone-K KAIG3-RFI-SW-C-1602 00 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/3/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1602 01 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 10/11/21 10/14/21 Approved as noted
Inspection and Compaction Test for 4th Layer (4 of 12) backfilling (grading) at Zone-6A as highlighted in the
6A KAIG3-RFI-SW-C-1603 00 Civil Site Works 10/3/21 10/4/21 Approved as noted
attached drawing

Zone-K KAIG3-RFI-SW-C-1604 00 Excavation for Fire Water Line including Pit K/F/02 at Zone-K as highlighted in the attached drawing Civil Site Works 10/4/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1604 01 Excavation for Fire Water Line including Pit K/F/02 at Zone-K as highlighted in the attached drawing Civil Site Works 10/11/21 10/14/21 Approved as noted

Zone-K KAIG3-RFI-SW-C-1605 00 Excavation for Potable Water Line at Zone-K including Pit K/PW/02 as highlighted in the attached drawing Civil Site Works 10/4/21 10/6/21 Code C (resubmit)

Zone-K KAIG3-RFI-SW-C-1605 01 Excavation for Potable Water Line at Zone-K including Pit K/PW/02 as highlighted in the attached drawing Civil Site Works 10/11/21 10/14/21 Approved as noted

Zone B KAIG3-RFI-SW-C-1606 00 Soil Preparation under Boulder No. RB- 337 after cutting Civil Site Works 10/4/21 10/7/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
4C KAIG3-RFI-SW-C-1607 00 Civil Site Works 10/4/21 10/5/21 Approved as noted
A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12 (As Highlighted)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) after Gravel laying for Sub surface
4A KAIG3-RFI-WG-C-1608 00 Drainage Sub line & Sleeves Pipes (250mm drop to 160mm Drop to 110mm and Sleeves 6 no's 110mm Civil Water Play Garden 10/3/21 10/6/21 Approved as noted
Along) from beside Planted Bed 2 to 3, Inside Water Garden,
Inspection & Compaction tests of 3rd Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying for Sub
4A KAIG3-RFI-WG-C-1609 00 surface Drainage Main line (400, 315 & 250mm) Between Geyse Garden and the Boundary Wall, Inside Civil Water Play Garden 10/4/21 10/7/21 Approved as noted
Water Garden, at highlighted area in attached drawin
Inspection and compaction test 3rd layer for backfilling around PC 160 -162 (as highlighted) Zone 2L
2L KAIG3-RFI-CO-C-1610 00 Civil Crescent 10/4/21 10/6/21 Approved as noted
SP#121 (3 of 4)
Surface Preparation Prior to Backfilling Inside Back of House at Aviary garden, At Highlighted area in the
4B KAIG3-RFI-AG-C-1611 00 Civil Aviary Garden 10/5/21 10/7/21 Approved as noted
attached drawing's.
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 166-168-170-172-174-
2M 2N KAIG3-RFI-CO-C-1612 00 Civil Crescent 10/4/21 10/7/21 Approved as noted
176 (as highlighted) Zone 2M 2N SP#121 (2 of 4)

kaig-qcals 135
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone B KAIG3-RFI-SW-C-1613 00 Excavation for MV Line FROM B/MV/17 TO B/MV/26 at Zone-B as highlighted in the attached drawing Civil Site Works 10/4/21 10/6/21 Approved as noted
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeves Pipes (250mm, 160mm &
4A KAIG3-RFI-WG-C-1614 00 Civil Water Play Garden 10/4/21 10/7/21 Approved as noted
110mm Sleeves) (Part 7) Inside Water Play Garden, at highlighted area in attached drawings.
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line (600mm & 450mm) Inside Geyser Water Play
4A KAIG3-RFI-WG-C-1615 00 Civil 10/4/21 10/6/21 Approved as noted
Garden, at highlighted area in attached drawings. Garden/Geyser Garden
Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01-B1 to MH-
KAIG3-RFI-SW-C-1616 00 Civil Site Works 10/5/21 10/7/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-05 to MH-D-
KAIG3-RFI-SW-C-1617 00 Civil Site Works 10/5/21 10/7/21 Approved as noted
06 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B)
Zone-G & K KAIG3-RFI-SW-C-1618 00 Excavation for Fire Water Line at Zone-G & K as highlighted in the attached drawing Civil Site Works 10/5/21 10/6/21 Code C (resubmit)

Zone-G & K KAIG3-RFI-SW-C-1618 01 Excavation for Fire Water Line at Zone-G & K as highlighted in the attached drawing Civil Site Works 10/11/21 10/14/21 Approved as noted

Excavation for Potable Water Line at Zone-G & K including Pit K/PW/08 as highlighted in the attached
Zone-G & K KAIG3-RFI-SW-C-1619 00 Civil Site Works 10/5/21 10/6/21 Code C (resubmit)
drawing
Excavation for Potable Water Line at Zone-G & K including Pit K/PW/08 as highlighted in the attached
Zone-G & K KAIG3-RFI-SW-C-1619 01 Civil Site Works 10/11/21 10/14/21 Approved as noted
drawing
Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone-5A as highlighted in the
5A KAIG3-RFI-SW-C-1620 00 Civil Site Works 10/5/21 10/9/21 Approved as noted
attached drawing
Surface Preparation Prior to Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02, MH-D-01-
KAIG3-RFI-ZG-C-1621 00 Civil Maze Garden 10/5/21 10/7/21 Approved as noted
A1-03, MH-D-01-A4 & MH-D-01-A5) Inside Maze garden, as per highlighted area in attached drawing's.
Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-03, MH-D-03-01, MH-D-04, MH-D-
KAIG3-RFI-SW-C-1622 00 Civil Site Works 10/5/21 10/7/21 Approved as noted
05, MH-D-06, MH-D-07, MH-D-08-01 - as Highlighted

Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-337 (Stock Pile #
KAIG3-RFI-SW-C-1623 00 Civil Site Works 10/5/21 10/11/21 Approved as noted
105 A-1-B)

Zone-G KAIG3-RFI-SW-C-1624 00 Excavation for Fire Water Line including Pit G/F/05 at Zone-G as highlighted in the attached drawing Civil Site Works 10/6/21 10/7/21 Code C (resubmit)

Zone-G KAIG3-RFI-SW-C-1624 01 Excavation for Fire Water Line including Pit G/F/05 at Zone-G as highlighted in the attached drawing Civil Site Works 10/12/21 10/14/21 Approved as noted

Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 34-36-38-40-42-44 as
1F 1G KAIG3-RFI-CO-C-1625 00 Civil Crescent 10/5/21 10/7/21 Approved as noted
highlighted Zone 1F 1G
Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01-B1 to MH-
KAIG3-RFI-SW-C-1626 00 Civil Site Works 10/5/21 10/9/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 105 A-1-B
Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-07 to MH-D-
KAIG3-RFI-SW-C-1627 00 Civil Site Works 10/5/21 10/9/21 Approved as noted
08 - as Highlighted (upto -20cm from FGL - Total 12 Layers) (Stock Pile # 105 A-1-B

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-05 to MH-D-
KAIG3-RFI-SW-C-1628 00 Civil Site Works 10/5/21 10/9/21 Approved as noted
06 - as Highlighted (upto bottom of road - Total 9 Layers) (Stock Pile # 105 A-1-B

Zone-G KAIG3-RFI-SW-C-1629 00 Excavation for Potable Water Line at Zone-G including Pit G/PW/07 as highlighted in the attached drawing Civil Site Works 10/6/21 10/7/21 Code C (resubmit)

Zone-G KAIG3-RFI-SW-C-1629 01 Excavation for Potable Water Line at Zone-G including Pit G/PW/07 as highlighted in the attached drawing Civil Site Works 10/12/21 10/14/21 Approved as noted

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1630 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4 (As Civil Site Works 10/6/21 10/13/21 Code C (resubmit)
Highlighted)
Excavation for MV Line FROM B/MV/26 TO B/MV/10 includign Pit B/MV/26, B/MV/18, B/MV/07,
Zone B KAIG3-RFI-SW-C-1631 00 Civil Site Works 10/6/21 10/11/21 Approved as noted
B/MV/10 at Zone-B as highlighted in the attached drawing
Inspection for Sand Bedding under MV Line from B/MV/17 to B/MV/26 at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1632 00 Civil Site Works 10/6/21 10/12/21 Code C (resubmit)
attached drawing (Stock Pile # 67)
Inspection for Sand Bedding under MV Line from B/MV/17 to B/MV/26 at Zone-B as highlighted in the
Zone B KAIG3-RFI-SW-C-1632 01 Civil Site Works 10/16/21 10/18/21 Approved as noted
attached drawing (Stock Pile # 67)
Inspection and Compaction Test for 5th Layer (5 of 12) backfilling (grading) at Zone-6A as highlighted in the
6A KAIG3-RFI-SW-C-1633 00 Civil Site Works 10/6/21 10/11/21 Approved as noted
attached drawing
Casting Blinding Concret under Manhole MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4 and
KAIG3-RFI-SW-C-1634 00 Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F- Civil Site Works 10/6/21 10/7/21 Approved as noted
12, G-F-13, G-F-14, G-F-15, G-F-16, G-F-17, G-F-18, G-F-19 to G-H-41 as highlighted.
Excavation for Foul Water Line Branches of FW-A-23, FW-A-22, FW-A-21, FW-A-20, FW-A-19, FW-A-
KAIG3-RFI-SW-C-1635 00 Civil Site Works 10/6/21 10/7/21 Code C (resubmit)
18 prior to start Gravel Bedding (as Highlighted

Excavation for Foul Water Line Branches of FW-A-23, FW-A-22, FW-A-21, FW-A-20, FW-A-19, FW-A-
KAIG3-RFI-SW-C-1635 01 Civil Site Works 10/12/21 10/14/21 Approved as noted
18 prior to start Gravel Bedding (as Highlighted

kaig-qcals 136
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Surface preparation Prior to Install Stone Boulders along Planted Bed 2 to 3 and above, Inside
4A KAIG3-RFI-WG-C-1636 00 Civil Water Play Garden 10/6/21 10/9/21 Approved as noted
Water Play Garden, At Highlighted area in attached Drawings.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1637 00 Sub surface Drainage Main lines (Part -2) at Bottom side of Geyser Garden, Inside Water Garden, at Civil Water Play Garden 10/6/21 10/12/21 Code C (resubmit)
highlighted area in attached drawings.(Stock pi
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1637 01 Sub surface Drainage Main lines (Part -2) at Bottom side of Geyser Garden, Inside Water Garden, at Civil Water Play Garden 10/23/21 10/27/21 Approved as noted
highlighted area in attached drawings.(Stock pi
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 166-168-170-172-174-
KAIG3-RFI-CO-C-1638 00 Civil Crescent 10/6/21 10/7/21 Code C (resubmit)
176 (as highlighted) Zone 2M 2N SP#121 (3 of 4)

Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 166-168-170-172-174-
2M 2N KAIG3-RFI-CO-C-1638 01 Civil Crescent 10/12/21 10/14/21 Approved as noted
176 (as highlighted) Zone 2M 2N SP#121 (3 of 4)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1639 00 Sub surface Drainage Main lines (Part 3) Inside Geyser Garden, at Water Garden, at highlighted area in Civil Water Play Garden 10/6/21 10/11/21 Approved as noted
attached drawings.(Stock pile # 117)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1640 00 Sub surface Drainage Main lines (Part 4) from Geyser to Mist Garden, at Water Garden, at highlighted area in Civil Water Play Garden 10/6/21 10/11/21 Approved as noted
attached drawings.(Stock pile # 117)
Inspection of Backfilling Gravel around the Manhole for MH-D-01-A1, MH-D-01-A2, MH-D-01-B1, MH-
KAIG3-RFI-SW-C-1641 00 Civil Site Works 10/6/21 10/11/21 Approved as noted
D-01-B2 - as Highlighted
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (450mmØ-UPVC- Class Site Works beside
KAIG3-RFI-SW-C-1642 00 4) from (MH-F-01 to MH-F-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 10/6/21 10/7/21 Approved as noted
in the attached Dwg. 9
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to
KAIG3-RFI-SW-C-1643 00 Civil Circular Pathway Junction 10/6/21 10/7/21 Approved as noted
MH-F-02 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Dwg.
9

Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-337 (Stock Pile #
KAIG3-RFI-SW-C-1644 00 Civil Site Works 10/7/21 10/12/21 Code C (resubmit)
105 A-1-B)

Surface Preparation Prior to Start Backfill Gravel around the Manhole for - FW-A-16, FW-A-17, FW-A-25 -
KAIG3-RFI-SW-C-1645 00 Civil Site Works 10/7/21 10/12/21 Approved as noted
as Highlighted
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone-5A as highlighted in the
5A KAIG3-RFI-SW-C-1646 00 Civil Site Works 10/7/21 10/12/21 Code C (resubmit)
attached drawing
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone-5A as highlighted in the
5A KAIG3-RFI-SW-C-1646 01 Civil Site Works 10/21/21 10/23/21 Approved as noted
attached drawing
Existing Levels Prior to Excavation for Stone Boulders Left Side of Water Play Garden, At Highlighted area
4A KAIG3-RFI-WG-C-1647 00 Civil Water Play Garden 10/7/21 10/9/21 Approved as noted
in attached Drawings.

Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 166-168-170-172-174-176
2M 2N KAIG3-RFI-CO-C-1648 00 Civil Crescent 10/7/21 10/12/21 Approved as noted
as highlighted Zone 2M 2N (continuation unto top of PC)

Inspection and Compaction Test for Backfilling Sub-base for Storm Water Line from MH-D-08-01 to MH-D-
4D KAIG3-RFI-SW-C-1649 00 Civil Site Works 10/7/21 10/14/21 Approved as noted
08-02 - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 109 A-1-A)
Inspection and Compaction Test for Sub-base for Storm Water Line from MH-D-03 to MH-D-04 - as
4D KAIG3-RFI-SW-C-1650 00 Civil Site Works 10/7/21 10/14/21 Approved as noted
Highlighted (upto bottom of road - Total 10 Layers) (Stock Pile # 105 A-1-B

Zone B KAIG3-RFI-SW-C-1651 00 Inspection of Formwork and Level for Walls and Top Slab of SBC-09 As Highlighted Civil Site Works 10/7/21 10/12/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1651 01 Inspection of Formwork and Level for Walls and Top Slab of SBC-09 As Highlighted Civil Site Works 10/21/21 10/24/21 Approved as noted

Inspection & Compaction tests of 4th Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying for Sub
4A KAIG3-RFI-WG-C-1652 00 surface Drainage Main line (400, 315 & 250mm) Between Geyse Garden and the Boundary Wall, Inside Civil Water Play Garden 10/7/21 10/12/21 Code C (resubmit)
Water Garden, at highlighted area in attached drawing
Inspection & Compaction tests of 4th Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying for Sub
4A KAIG3-RFI-WG-C-1652 01 surface Drainage Main line (400, 315 & 250mm) Between Geyse Garden and the Boundary Wall, Inside Civil Water Play Garden 10/23/21 10/25/21 Approved as noted
Water Garden, at highlighted area in attached drawing
Zone B KAIG3-RFI-SW-C-1653 00 Inspection of Steel reinforcement for Top Slab of SBC-09 As Highlighted Civil Site Works 10/7/21 10/21/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1653 01 Inspection of Steel reinforcement for Top Slab of SBC-09 As Highlighted Civil Site Works 10/21/21 10/24/21 Approved as noted

Zone B KAIG3-RFI-SW-C-1654 00 Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted Civil Site Works 10/7/21 10/12/21 Code C (resubmit)

Zone B KAIG3-RFI-SW-C-1654 01 Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted Civil Site Works 10/21/21 10/24/21 Approved as noted

kaig-qcals 137
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line & Sleeves Pipes (250mm,
4A KAIG3-RFI-WG-C-1655 00 160mm & 110mm Sleeves) (Part 7) and (315 mm Pipe of Part 6) Inside Water Play Garden, at highlighted Civil Water Play Garden 10/7/21 10/11/21 Approved as noted
area in attached drawings.

KAIG3-RFI-SW-C-1656 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-337 (Stock Pile # 109 A-1-A) Civil Site Works 10/9/21 10/14/21 Approved as noted

Excavation for MV Line FROM B/MV/19 TO B/MV/13 includign Pit B/MV/19, B/MV/06, B/MV/13 at
KAIG3-RFI-SW-C-1657 00 Civil Site Works 10/9/21 10/12/21 Code C (resubmit)
Zone-B as highlighted in the attached drawing
Excavation for MV Line FROM B/MV/19 TO B/MV/13 includign Pit B/MV/19, B/MV/06, B/MV/13 at
KAIG3-RFI-SW-C-1657 01 Civil Site Works 10/17/21 10/19/21 Approved as noted
Zone-B as highlighted in the attached drawing

KAIG3-RFI-SW-C-1658 00 Soil Preparation at Zone - 6A after Cutting - as highlighted Civil Site Works 10/9/21 10/10/21 Code C (not resubmit)

KAIG3-RFI-SW-C-1659 00 Excavation for Potable Water Line at Zone-F as highlighted in the attached drawing Civil Site Works 10/10/21 10/13/21 Approved as noted

Excavation for Fire Water Line including Pit F/F/07, F/F/06, F/F/05 at Zone-F as highlighted in the attached
KAIG3-RFI-SW-C-1660 00 Civil Site Works 10/10/21 10/13/21 Approved as noted
drawing
Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-
KAIG3-RFI-SW-C-1661 00 F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14 Civil Site Works 10/10/21 10/12/21 Approved as noted
as highlighted
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone-5A as highlighted in the
KAIG3-RFI-SW-C-1662 00 Civil Site Works 10/10/21 10/14/21 Approved as noted
attached drawing

Inspection and Compaction Test for 6th Layer (6 of 12) backfilling (grading) at Zone-6A as highlighted in the
KAIG3-RFI-SW-C-1663 00 Civil Site Works 10/10/21 10/14/21 Approved as noted
attached drawing

KAIG3-RFI-SW-C-1664 00 Excavation for Non-Potable Water Line at Zone-G & K as highlighted in the attached drawing Civil Site Works 10/10/21 10/12/21 Code C (not resubmit)
Excavation for MV Line FROM B/MV/13 TO G/MV/29 includign Pit B/MV/13, G/MV/22, G/MV/29 at
KAIG3-RFI-SW-C-1665 00 Civil Site Works 10/10/21 10/13/21 Approved as noted
Zone-G&K as highlighted in the attached drawing
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1666 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-20 (1 Layer Sub-Grade and 1 Layer Sub-Base under Footing

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1667 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-20 (2 Layer Sub-Grade - Inside and Outside)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1668 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-20 (1 Layer Sub-Base - under Slab and Beam)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1669 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-19 (1 Layer Sub-Base under Footing)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1670 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-19 (2 Layer Sub-Grade - Inside and Outside)
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 176 - 178 (as
KAIG3-RFI-CO-C-1671 00 Civil Crescent 10/10/21 10/14/21 Approved as noted
highlighted) Zone 2N SP#121 (1 of 4)
Inspection and compaction test 4th layer for backfilling around PC 162 (as highlighted) Zone 2L SP#121 (4
KAIG3-RFI-CO-C-1672 00 Civil Crescent 10/10/21 10/14/21 Approved as noted
of 4 for PC 162)(4 of 6 for PC 160)

Inspection and compaction test 10th layer for backfilling around Strip footing and PC 110-112 (as
KAIG3-RFI-CO-C-1673 00 Civil Crescent 10/10/21 10/14/21 Approved as noted
highlighted) Zone 2D SP#121 (10 of 13)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1674 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-21 (1 Layer Sub-Grade and 1 Layer Sub-Base under Footing)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1675 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-21 (2 Layer Sub-Grade - Inside and Outside)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1676 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
3) SA-21 (1 Layer Sub-Base - under Slab and Beam)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1677 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-A-01, MH-A-02, MH-A-03, MH-A-10, Civil Site Works 10/11/21 10/16/21 Approved as noted
MH-A-11, MH-A-12 (As Highlighted)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-1678 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
1) SA-16 (1 Layer Sub-Base under Footing)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-1679 00 Civil Picnic Area 10/11/21 10/14/21 Approved as noted
1) SA-16 (4 Layer Sub-Grade - Inside and Outside)

Inspection and Compaction Test for 7th Layer (7 of 12) backfilling (grading) at Zone-6A as highlighted in the
KAIG3-RFI-SW-C-1680 00 Civil Site Works 10/12/21 10/14/21 Approved as noted
attached drawing

kaig-qcals 138
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-CO-C-1681 00 Surface Preparation Prior to start Backfilling at Zone 2C internal Buildings (as Highligted) Civil Crescent 10/11/21 10/13/21 Approved as noted

Inspection and compaction test 1st layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone 2C
KAIG3-RFI-CO-C-1682 00 Civil Crescent 10/11/21 10/14/21 Code C (resubmit)
SP#121 (1 of 4)
Inspection and compaction test 1st layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone 2C
KAIG3-RFI-CO-C-1682 01 Civil Crescent 10/20/21 10/23/21 Approved as noted
SP#121 (1 of 4)
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 166-168, 170-172 (as
KAIG3-RFI-CO-C-1683 00 Civil Crescent 10/11/21 10/14/21 Approved as noted
highlighted) Zone 2M SP#121 (3 of 4)
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 176 - 178 (as
KAIG3-RFI-CO-C-1684 00 Civil Crescent 10/11/21 10/14/21 Approved as noted
highlighted) Zone 2N SP#121 (2 of 4)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1685 00 Sub surface Drainage Main lines (Part -2 Remaining pipe) (400mm from MH-C-3 to MH-C-3-1) Inside Civil Water Play Garden 10/11/21 10/14/21 Approved as noted
Water Garden, at highlighted area in attached drawing
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) for Sub surface
4A KAIG3-RFI-WG-C-1686 00 Drainage Main lines (Part -2) (800mm from MH-C-1 to MH-C-2 & 600mm from MH-C-3 to MH-C-4) at Civil Water Play Garden 10/11/21 10/14/21 Approved as noted
Bottom side of Geyser Garden, Inside Water Garden, at highlighted
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
4A KAIG3-RFI-WG-C-1687 00 Drainage Main lines (Part 3)(450mm from MH-C-4 to MH-C-5) Inside Geyser Garden, at Water Garden, at Civil Water Play Garden 10/11/21 10/14/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 11
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for Sub surface
4A KAIG3-RFI-WG-C-1688 00 Drainage Main lines (Part 4)(315mm from MH-C-7 upto connections before MH-C-8) from Geyser to Mist Civil Water Play Garden 10/11/21 10/14/21 Approved as noted
Garden, at Water Garden, at highlighted area in attached drawing
Inspection & Compaction tests of 5th Layer (out of 8) Backfilling (Sub-Grade) for Sub surface Drainage
4A KAIG3-RFI-WG-C-1689 00 Main line (400mm from MH-C-1 to MH-C-1-1, 315mm from MH-C-1-1 to MH-C-1-2 to MH-C-1-3 to MH- Civil Water Play Garden 10/11/21 10/16/21 Approved as noted
C-1-4 & 250mm from MH-C-1-4 Until Sleeves) Between Geyser Garden
Inspection and compaction test 11th layer for backfilling around Strip footing and PC 110-112 (as
KAIG3-RFI-CO-C-1690 00 Civil Crescent 10/11/21 10/14/21 Approved as noted
highlighted) Zone 2D SP#121 (11 of 13)
Inspection and compaction test 5th layer for backfilling around PC 160-162 (as highlighted) Zone 2L SP#121
KAIG3-RFI-CO-C-1691 00 Civil Crescent 10/11/21 10/14/21 Approved as noted
(4 of 4 for PC 162) (5 of 6 for PC 160).
Excavation & Soil Preparation for Water Feature Sleeves (2 no's of 200mm Dia.) beside Plant Room, Passing
KAIG3-RFI-AG-C-1692 00 Civil Aviary Garden 10/12/21 10/14/21 Approved as noted
under the Boundary wall of Aviary garden, At Highlighted area in the attached drawing's.
Inspection & Compaction tests after Excavation for Water Feature Sleeves (2 no's of 200mm Dia.) beside
KAIG3-RFI-AG-C-1693 00 Plant Room, Passing under the Boundary wall of Aviary garden, At Highlighted area in the attached Civil Aviary Garden 10/12/21 10/16/21 Approved as noted
drawing's.
Excavation for Potable Water Line including Pit F/PW/09 & F/PW/07 at Zone-F as highlighted in the
KAIG3-RFI-SW-C-1694 00 Civil Site Works 10/12/21 10/14/21 Code C (resubmit)
attached drawing

Excavation for Potable Water Line including Pit F/PW/09 & F/PW/07 at Zone-F as highlighted in the
KAIG3-RFI-SW-C-1694 01 Civil Site Works 10/21/21 10/25/21 Approved as noted
attached drawing
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (600mmØ-PP- Site Works beside
KAIG3-RFI-SW-C-1695 00 Corrugated) from (MH-F-01 to OUTFULL-F ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per Civil Circular Pathway Junction 10/13/21 10/16/21 Approved as noted
highlighted Area in the attached Dwg. 9
Pipe Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-01 to Site Works beside
KAIG3-RFI-SW-C-1696 00 OUTFULL-F ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Civil Circular Pathway Junction 10/13/21 10/14/21 Code C (resubmit)
Dwg.
Pipe Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-01 to 9 beside
Site Works
KAIG3-RFI-SW-C-1696 01 OUTFULL-F ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Civil Circular Pathway Junction 10/24/21 10/27/21 Approved as noted
Dwg.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) after Gravel laying for 9
4A KAIG3-RFI-WG-C-1697 00 Sub Surface Drainage Sub line & Sleeves Pipes (dia 110mm & 3 nos. Sleeves) (part 7) inside Water Play Civil Water Play Garden 10/13/21 10/16/21 Approved as noted
Garden at highlighted area in attached drawing (SP # 117).
Surface Preparation Prior to start Backfilling sorround the Manholes (type A 1 & B 1) (MH-D-01-B3 & MH-
KAIG3-RFI-SG-C-1698 00 Civil Sound & Light Garden 10/13/21 10/18/21 Approved as noted
D-01-B3-01) inside Sound & Light Garden as per highlighted area in attached drawing.
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (450mmØ-UPVC- Class Site Works beside
KAIG3-RFI-SW-C-1699 00 4) from (MH-F-01 to MH-F-01-4 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area Civil Circular Pathway Junction 10/13/21 10/16/21 Approved as noted
in the attached Dwg. 9
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to
KAIG3-RFI-SW-C-1700 00 Civil Circular Pathway Junction 10/13/21 10/16/21 Approved as noted
MH-F-01-4 ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached D
9
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 166-168, 170-172-174-
KAIG3-RFI-CO-C-1701 00 Civil Crescent 10/13/21 10/18/21 Approved as noted
176 (as highlighted) Zone 2M SP#121 (4 of 4)

Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 176 - 178 (as
KAIG3-RFI-CO-C-1702 00 Civil Crescent 10/13/21 10/18/21 Approved as noted
highlighted) Zone 2N SP#121 (3 of 4)

Inspection and compaction test 12th layer for backfilling around Strip footing and PC 110-112 (as
KAIG3-RFI-CO-C-1703 00 Civil Crescent 10/13/21 10/18/21 Approved as noted
highlighted) Zone 2D SP#121 (12 of 13)

KAIG3-RFI-CO-C-1704 00 Surface Preparation Prior to start Backfilling at PC 164 Zone 2L (as Highligted) Civil Crescent 10/13/21 10/16/21 Approved as noted

KAIG3-RFI-SW-C-1705 00 Excavation for Fire Water Line including Pit F/F/04 at Zone-F as highlighted in the attached drawing Civil Site Works 10/13/21 10/14/21 Code C (resubmit)

kaig-qcals 139
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-SW-C-1705 01 Excavation for Fire Water Line including Pit F/F/04 at Zone-F as highlighted in the attached drawing Civil Site Works 10/21/21 10/25/21 Approved as noted

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Base) (Out of 2 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1706 00 Sub Surface Drainage Sub line & Sleeves Pipes (dia 110mm & 3 nos. Sleeves) (part 7) inside Water Play Civil Water Play Garden 10/13/21 10/17/21 Approved as noted
Garden at highlighted area in attached drawing (SP # 116).
Excavation & Blinding levels for Manholes (10 no's: MH-C-1, MH-C-4, MH-C-5, MH-C-6, MH-C-7, MH-C-
Water Play/Geyser
4A KAIG3-RFI-WG-C-1707 00 1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4 & MH-C-3-1), at Geyser Garden, Inside Water Garden, at highlighted Civil 10/14/21 10/16/21 Approved as noted
Garden
area in attached drawings.
Notification to Start Cutting and Removal of disposal materials upto rock layer and Refill with approved
KAIG3-RFI-SW-C-1708 00 material upto (-75cm) from the top of asphalt level at North of SBC-09 as highlighted in the attached drawing Civil Site Works 10/14/21 10/17/21 Approved as noted

Inspection for Sand Bedding under pipe for Fire Water Line at Zone-F,G&K as highlighted in the attached
KAIG3-RFI-SW-C-1709 00 Civil Site Works 10/14/21 10/18/21 Approved as noted
drawing (Stock Pile # 67)

Inspection and Compaction Test for 8th Layer (8 of 12) backfilling (grading) at Zone-6A as highlighted in the
KAIG3-RFI-SW-C-1710 00 Civil Site Works 10/14/21 10/18/21 Approved as noted
drawing (SP#105- A-1-B)

KAIG3-RFI-SW-C-1711 00 Inspection of Steel reinforcement for Top Slab of SBC-05 As Highlighted Civil Site Works 10/14/21 10/16/21 Code C (resubmit)

KAIG3-RFI-SW-C-1711 01 Inspection of Steel reinforcement for Top Slab of SBC-05 As Highlighted Civil Site Works 10/21/21 10/25/21 Approved as noted

KAIG3-RFI-SW-C-1712 00 Inspection of Formwork and Level for Walls and Top Slab of SBC-05 As Highlighted Civil Site Works 10/14/21 10/16/21 Code C (resubmit)

KAIG3-RFI-SW-C-1712 01 Inspection of Formwork and Level for Walls and Top Slab of SBC-05 As Highlighted Civil Site Works 10/21/21 10/24/21 Approved as noted

Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (160mm & 110mm
4A KAIG3-RFI-WG-C-1713 00 connecting to Main line from MH-C-7 to MH-C-8 and 2 pipes of 110mm connected to MH-C-8 and Sleeves Civil Water Play/Mist Garden 10/14/21 10/18/21 Approved as noted
110mm) Inside Mist Garden, at highlighted area in attached drawing.

Excavation & Bed Preparation for Conduits (3 no's of 75mm) Laying for Normal Lighting Circuits, at Right Water Play/Geyser
4A KAIG3-RFI-WG-C-1714 00 Civil 10/14/21 10/18/21 Approved as noted
side of the Geyser Garden, at Water Garden, at highlighted area in attached drawings. Garden

KAIG3-RFI-SW-C-1715 00 Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted Civil Site Works 10/14/21 10/18/21 Code C (resubmit)

KAIG3-RFI-SW-C-1715 01 Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted Civil Site Works 10/21/21 10/25/21 Approved as noted

Excavation for MV Line FROM G/MV/29 TO G/MV/17 includign Pit G/MV/29, G/MV/07, G/MV/06,
KAIG3-RFI-SW-C-1716 00 Civil Site Works 10/14/21 10/16/21 Approved as noted
G/MV/17 at Zone-G as highlighted in the attached drawing
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line (Pipe Dia 450mm from MH-
4A KAIG3-RFI-WG-C-1717 00 Civil Water Play Garden 10/14/21 10/18/21 Approved as noted
C-4-1 to MH-C-4-2) (of Part 6) Inside Water Play Garden, at highlighted area in attached drawings.
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-1718 00 Civil Site Works 10/14/21 10/19/21 Approved as noted
H-01, MH-H-02, MH-H-03 (As Highlighted)
Inspection of Backfilling Gravel (3rd & 4th Layer) around the Manhole for MH-D-01-A1, MH-D-01-A2,
KAIG3-RFI-SW-C-1719 00 Civil Site Works 10/16/21 10/17/21 Approved as noted
MH-D-01-B2 - as Highlighted (SP# 118)
Inspection of Backfilling Gravel (1st & 2nd Layer) around the Manhole for FW-A-16 & FW-A-17 - as
KAIG3-RFI-SW-C-1720 00 Civil Site Works 10/16/21 10/17/21 Approved as noted
Highlighted (SP# 118)

KAIG3-RFI-SW-C-1721 00 Inspection of Backfilling Gravel (3rd Layer) around the Manhole for FW-A-16 - as Highlighted (SP# 118) Civil Site Works 10/16/21 10/18/21 Approved as noted

Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for MH-D-01-A1, MH-D-
KAIG3-RFI-SW-C-1722 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
01-A2, MH-D-01-B2 - as Highlighted (SP#108-A-1-B)

Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for FW-A-16 & FW-A-17
KAIG3-RFI-SW-C-1723 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
- as Highlighted (SP#108-A-1-B)

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-1724 00 Civil Site Works 10/16/21 10/21/21 Code C (resubmit)
D-01, MH-D-08, MH-D-08-02 (As Highlighted)

kaig-qcals 140
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-1724 01 Civil Site Works 10/16/21 10/28/21 Approved as noted
D-01, MH-D-08, MH-D-08-02 (As Highlighted)
Inspection for Sand Bedding under pipe for Fire Water Line at Zone - K as highlighted in the attached
KAIG3-RFI-SW-C-1725 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
drawing (Stock Pile # 67)
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 176 - 178 (as
KAIG3-RFI-CO-C-1726 00 Civil Crescent 10/17/21 10/21/21 Approved as noted
highlighted) Zone 2N SP#121 (4 of 4)
Inspection and compaction test 6th layer for backfilling around PC 160-162 (as highlighted) Zone 2L SP#121
KAIG3-RFI-CO-C-1727 00 Civil Crescent 10/17/21 10/21/21 Approved as noted
(4 of 4 for PC 162)(6 of 6 for PC 160)
Inspection and compaction test 13th layer for backfilling around Strip footing and PC 110-112 (as
KAIG3-RFI-CO-C-1728 00 Civil Crescent 10/17/21 10/21/21 Approved as noted
highlighted) Zone 2D SP#121 (13 of 13)
Inspection for Sand Bedding under MV Line from B/MV/18 to B/MV/07 at Zone-B as highlighted in the
KAIG3-RFI-SW-C-1729 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
attached drawing (Stock Pile # 67)

Inspection and Compaction Test for 9th Layer (9 of 12) backfilling (grading) at Zone-6A as highlighted in the
KAIG3-RFI-SW-C-1730 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
drawing (SP#108- A-1-B)

Inspection & Compaction Tests for 1st Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Back of
KAIG3-RFI-AG-C-1731 00 Civil Aviary Garden 10/16/21 10/19/21 Approved as noted
House at Aviary garden, At Highlighted area in the attached drawing's. (Stock Pile # 117)
Excavation & Bed Preparation for Sub surface Drainage Main & Sub line Pipes (250mm pipe connecting to
4A KAIG3-RFI-WG-C-1732 00 Main line & 250mm pipe Connecting to MH-C-4-3) (Part - 6 b) Inside Water Play Garden, at highlighted area Civil Water Play/Mist Garden 10/16/21 10/18/21 Approved as noted
in attached drawings.
Excavation for MV Line FROM B/MV/21 TO B/MV/12 includign Pit B/MV/21, B/MV/09, B/MV/12 at
KAIG3-RFI-SW-C-1733 00 Civil Site Works 10/16/21 10/19/21 Approved as noted
Zone-B as highlighted in the attached drawing
KAIG3-RFI-SW-C-1734 00 Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-08 Civil Site Works 10/17/21 10/18/21 Approved as noted

KAIG3-RFI-SW-C-1735 00 Inspection of Formwork and Level for the Foundation and Kicker of SBC-08 Civil Site Works 10/17/21 10/18/21 Code C (resubmit)

KAIG3-RFI-SW-C-1735 01 Inspection of Formwork and Level for the Foundation and Kicker of SBC-08 Civil Site Works 10/21/21 10/26/21 Approved as noted

KAIG3-RFI-SW-C-1736 00 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-08 Civil Site Works 10/25/21 10/27/21 Approved as noted
Inspection of Backfilling Gravel (1st, 2nd & 3rd Layer) around the Manhole for MH-D-03, MH-D-04, MH-
KAIG3-RFI-SW-C-1737 00 Civil Site Works 10/17/21 10/21/21 Approved as noted
D-05, MH-D-06, MH-D-08-01 - as Highlighted (SP# 118)
KAIG3-RFI-SW-C-1738 00 Inspection of Backfilling Gravel (4th Layer) around the Manhole for MH-D-05 - as Highlighted (SP# 118) Civil Site Works 10/17/21 10/21/21 Approved as noted
Inspection of Backfilling Gravel (1st. 2nd, 3rd & 4th Layer) around the Manhole for MH-D-01-B1 - as
KAIG3-RFI-SW-C-1739 00 Civil Site Works 10/17/21 10/21/21 Approved as noted
Highlighted (SP# 118)
KAIG3-RFI-SW-C-1740 00 Soil Preparation under Boulder No. RB- 170 Civil Site Works 10/18/21 10/19/21 Approved as noted
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line & Sleeves Pipes (160mm &
4A KAIG3-RFI-WG-C-1741 00 110mm connecting to Main line from MH-C-7 to MH-C-8 and 2 pipes of 110mm connected to MH-C-8 and Civil Water Play/Mist Garden 10/17/21 10/18/21 Approved as noted
Sleeves 110mm) Inside Mist Garden, at highlighted area in attached drawing.
Excavation & Surface Preparation for Plant Room & Boundary wall @ Grid (11-16/Right Side), of Aviary
KAIG3-RFI-AG-C-1742 00 Civil Aviary Garden 10/17/21 10/19/21 Approved as noted
garden, At Highlighted area in the attached drawing's.
Inspection & Compaction tests after Excavation for Plant Room & Boundary wall @ Grid (11-16/Right Side),
KAIG3-RFI-AG-C-1743 00 Civil Aviary Garden 10/17/21 10/21/21 Approved as noted
of Aviary garden, At Highlighted area in the attached drawing's.
Excavation & Surface Preparation for Low Voltage Duct Banks Going to Water Play Garden, Inside Water
4A KAIG3-RFI-WG-C-1744 00 Civil Water Play Garden 10/17/21 10/21/21 Approved as noted
Garden, at highlighted area in attached drawings.
Check levels for Bottom of Stone Boulders Inside Water Play Garden, at Top side of Planted bed 1, At
4A KAIG3-RFI-WG-C-1745 00 Civil Water Play Garden 10/17/21 10/20/21 Approved as noted
Highlighted area in attached Drawings.
KAIG3-RFI-SW-C-1746 00 Soil Preparation under Boulder No. RB- 169a Civil Site Works 10/18/21 10/19/21 Approved as noted
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Bouder No. RB-169a (Stock Pile #
KAIG3-RFI-SW-C-1747 00 Civil Site Works 10/18/21 10/21/21 Approved as noted
108 A-1-B)
KAIG3-RFI-SW-C-1748 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-170 (Stock Pile # 109 A-1-A) Civil Site Works 10/18/21 10/21/21 Approved as noted

Inspection and Compaction Test for 10th Layer (10 of 12) backfilling (grading) at Zone-6A as highlighted in
KAIG3-RFI-SW-C-1749 00 Civil Site Works 10/18/21 10/21/21 Approved as noted
the drawing (SP#108- A-1-B)

Inspection and Compaction Test for 11th Layer (11 of 12) backfilling (grading) at Zone-6A as highlighted in
KAIG3-RFI-SW-C-1750 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
the drawing (SP#108- A-1-B)

Inspection and compaction test 1st layer for backfilling around PC 164 (as highlighted) Zone 2L SP#121 (1
KAIG3-RFI-CO-C-1751 00 Civil Crescent 10/18/21 10/21/21 Approved as noted
of 5)
KAIG3-RFI-SW-C-1752 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-169a (Stock Pile # 109 A-1-A) Civil Site Works 10/19/21 10/23/21 Approved as noted
Surface Preparation for Storm Water Line from MH-D-04 to MH-D-05, prior to start back filling (as
KAIG3-RFI-SW-C-1753 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted)
Surface Preparation for Storm Water Line from MH-D-04 to MH-D-04-01 prior to start back filling (as
KAIG3-RFI-SW-C-1754 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted )

kaig-qcals 141
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Gravel (4th Layer) around the Manhole for MH-D-03, MH-D-06, MH-D-08-01 - as
KAIG3-RFI-SW-C-1756 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted (SP# 118)
Inspection of Backfilling Gravel (5th Layer) around the Manhole for MH-D-06, MH-D-08-01 - as
KAIG3-RFI-SW-C-1757 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted (SP# 118)
Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for FW-A-16 - as
KAIG3-RFI-SW-C-1758 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted (SP#108-A-1-B)
Inspection of Backfilling Sub-grade (2nd Layer) around the Manhole (above gravel) for FW-A-17 - as
KAIG3-RFI-SW-C-1759 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted (SP#108-A-1-B)

KAIG3-RFI-SW-C-1760 00 Inspection of Backfilling Gravel (3rd & 4th Layer) around the Manhole for MH-D-01-B1 - as Highlighted Civil Site Works 10/20/21 10/23/21 Approved as noted

Bed Preparation for N.G.L Before Backfilling, at Top Right side, inside Geyser Garden, At Highlighted area
4A KAIG3-RFI-WG-C-1761 00 Civil Water Play/geyser Garden 10/19/21 10/21/21 Approved as noted
in attached Drawings.

Inspection of Sand bedding for Conduits (3 no's of 75mm) Laying for Normal Lighting Circuits, at Right side
4A KAIG3-RFI-WG-C-1762 00 Civil Water Play/geyser Garden 10/19/21 10/23/21 Approved as noted
of the Geyser Garden, at Water Garden, at highlighted area in attached drawings. (Stock Pile # 67)

Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area in the Site Works beside Parking
KAIG3-RFI-SW-C-1763 00 Civil 10/19/21 cancelled
attached Dwg. Area
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4) from
Site Works/Crescent 02
KAIG3-RFI-SW-C-1764 00 (FW-A-13-4 to Garden of Origin). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Civil 10/19/21 10/21/21 Approved as noted
Zone 2H
Dwg.
Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to Garden of Origin). Site Works/Crescent 02
KAIG3-RFI-SW-C-1765 00 Civil 10/19/21 10/23/21 Approved as noted
At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. Zone 2H
KAIG3-RFI-CO-C-1766 00 Surface Preparation Prior to start Backfilling Between PC 180 to 182 Zone 2N (as Highligted) Civil Crescent 10/19/21 10/21/21 Approved as noted
Inspection of Backfilling Sub-grade (2nd Layer) around the Manhole (above gravel) for MH-D-01-A1 - as
KAIG3-RFI-SW-C-1767 00 Civil Site Works 10/19/21 10/21/21 Approved as noted
Highlighted (SP#108-A-1-B)
Inspection for Sanding Bedding for Fire Water Line at Zone- F as highlighted in the attached drawing
KAIG3-RFI-SW-C-1768 00 Civil Site Works 10/19/21 10/23/21 Approved as noted
(SP#67)
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-G & K as highlighted in the attached
KAIG3-RFI-SW-C-1769 00 Civil Site Works 10/19/21 10/23/21 Approved as noted
drawing (Stock Pile # 67)
Excavation for Telecommunication Line from (K/TL/20 to K/TL/11) including pit K/TL/20, K/TL/18,
KAIG3-RFI-SW-C-1770 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
K/TL/07, K/TL/23, K/TL/22, K/TL/11 at Zone-K as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (K/FS/18 to K/FS/08) including Pit K/FS/18, K/FS/16,
KAIG3-RFI-SW-C-1771 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
K/FS/11, K/FS/10, K/FS/07, K/FS/08 at Zone-K as highlighted in the attached drawing
Excavation for Potable Water Line (Branch) including Pit F/PW/12 at Zone-F as highlighted in the attached
KAIG3-RFI-SW-C-1772 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
drawing
Excavation for Fire Water Line (Branch) including Pit K/F/01, G/F/04, F/F/07, G/F/18 at Zone-F,G,K as
KAIG3-RFI-SW-C-1773 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
highlighted in the attached drawing
Excavation for Fire Water Line (Branch) including PitB/F/08 at Zone-B as highlighted in the attached
KAIG3-RFI-SW-C-1774 00 Civil Site Works 10/20/21 10/24/21 Approved as noted
drawing
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line & Sleeves Pipes (2no's of
4A KAIG3-RFI-WG-C-1775 00 160mm & 110mm connecting right side to Main line from MH-C-7 to MH-C-8 and 1 pipes of 110mm Civil Water Play/Mist Garden 10/20/21 10/24/21 Approved as noted
connected to MH-C-8 and Sleeves 110mm) Inside Mist Garden, at highlighted area.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
KAIG3-RFI-SG-C-1776 00 Walls (A, B, C, D, E, F, G & H) all Sides at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 10/20/21 10/23/21 Approved as noted
drawing's. (Stock Pile # 117)
Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) from Entrance wall At
KAIG3-RFI-ZG-C-1777 00 Civil Maze Garden 10/20/21 10/24/21 Code C (resubmit)
Elevation "A to B to C" at Maze garden, as per highlighted area in attached drawing's.
Excavation for MV Line FROM B/MV/10 TO B/MV/19 includign Pit B/MV/10, B/MV/19 at Zone-B as
KAIG3-RFI-SW-C-1778 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
highlighted in the attached drawing
Inspection and Compaction Test for 12th Layer (12 of 12) backfilling (grading) at Zone-6A as highlighted in
KAIG3-RFI-SW-C-1779 00 Civil Site Works 10/20/21 10/23/21 Approved as noted
the drawing (SP#108- A-1-B)

KAIG3-RFI-SW-C-1780 00 Soil Preparation under Boulder No. RB- 244a Civil Site Works 10/20/21 10/24/21 Approved as noted

Inspection and compaction test 2nd layer for backfilling around PC 164 (as highlighted) Zone 2L SP#121 (2
KAIG3-RFI-CO-C-1781 00 Civil Crescent 10/20/21 10/23/21 Approved as noted
of 5)

Inspection and compaction test 1st layer for backfilling around Strip footing & PC 180 - 182 (as highlighted)
KAIG3-RFI-CO-C-1782 00 Civil Crescent 10/20/21 10/23/21 Approved as noted
Zone 2N SP#121 (1 of 2) - total 2 layers

Excavation & Blinding levels for Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 &
4A KAIG3-RFI-WG-C-1783 00 Civil Water Play Garden 10/20/21 10/21/21 Approved as noted
MH-C-4-3), Inside Water Garden, at highlighted area in attached drawings.

KAIG3-RFI-SW-C-1784 00 Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - L - as highlighted Civil Site Works 10/21/21 10/25/21 Approved as noted

KAIG3-RFI-CO-C-1785 00 Surface Preparation Prior to start Backfilling For Zone 1P (as Highligted) Civil Crescent 10/20/21 10/24/21 Approved as noted

kaig-qcals 142
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Bed Preparation for Sub surface Drainage Sub lines & Sleeves Pipes (250mm drop to 160mm
4A KAIG3-RFI-WG-C-1786 00 & 110mm sleeves) connecting to Main line from MH-C-4-1 to MH-C-4-2,at Bottom Side of Planted bed 1, Civil Water Play Garden 10/21/21 10/23/21 Approved as noted
Inside Water Play Garden, at highlighted area in attached drawing.
Excavation & Soil Preparation for Water Feature Sleeves (3 no's of 315mm Dia.) and Return Pipe line of
KAIG3-RFI-TG-C-1787 00 Civil Butterfly Garden 10/21/21 10/23/21 Code C (resubmit)
160mm dia, Near Plant Room, @ Butterfly Garden, at highlighted area in attached drawings.
Excavation & Soil Preparation for Water Feature Sleeves (3 no's of 315mm Dia.) and Return Pipe line of
KAIG3-RFI-TG-C-1787 01 Civil Butterfly Garden 10/26/21 10/28/21 Approved as noted
160mm dia, Near Plant Room, @ Butterfly Garden, at highlighted area in attached drawings.
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1788 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-H-01, MH-H-02, MH-H-03 (As Civil Site Works 10/21/21 10/25/21 Approved as noted
Highlighted)
INSPECTION FOR INSTALLATION OF GULLIES, PIPE CONNECTION AND CONCRETE FOR
KAIG3-RFI-SW-C-1789 00 Civil Site Works 11/16/21 11/24/21 Approved as noted
SHORT PIECES FOR -G-X-01 (As Highlighted)
Inspection and Compaction Test for Backfilling 3rd Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1790 00 Civil Site Works 10/21/21 10/23/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B)
Inspection and Compaction Test for Backfilling 1st Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1791 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 6 Layers) (Stock Pile # 108 A-1- Civil Site Works 10/21/21 10/23/21 Approved as noted
B)
Excavation & Soil Preparation upto Bottom level of Stone Boulders at Left Side of Water Play Garden, At
4A KAIG3-RFI-WG-C-1792 00 Civil Water Play Garden 10/23/21 10/25/21 Approved as noted
Highlighted area in attached Drawings.

Inspection for Sand Bedding under pipe for Fire & Security Line at Zone-K as highlighted in the attached
KAIG3-RFI-SW-C-1793 00 Civil Site Works 10/23/21 10/26/21 Code C (resubmit)
drawing (Stock Pile # 67)

Inspection for Sand Bedding under pipe for Telecommunications Line at Zone-K as highlighted in the
KAIG3-RFI-SW-C-1794 00 Civil Site Works 10/23/21 10/26/21 Code C (resubmit)
attached drawing (Stock Pile # 67)

KAIG3-RFI-SW-C-1795 00 Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-244a (Stock Pile # 109 A-1-A) Civil Site Works 10/23/21 10/26/21 Approved as noted

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) after Gravel laying for Sub surface
4A KAIG3-RFI-WG-C-1796 00 Drainage Sub line & Sleeves Pipes (160mm & 110mm connecting to Main line from MH-C-7 to MH-C-8 and Civil Water Play/Mist Garden 10/23/21 10/26/21 Approved as noted
2 pipes of 110mm connected to MH-C-8 and Sleeves 1
Inspection & Compaction tests of Single Layer Backfilling(Sub-Base) after Sub-Grade laying for Sub surface
4A KAIG3-RFI-WG-C-1797 00 Drainage Sub line & Sleeves Pipes (160mm & 110mm connecting to Main line from MH-C-7 to MH-C-8 and Civil Water Play/Mist Garden 10/23/21 10/26/21 Approved as noted
2pipes of 110mm connected to MH-C-8 and Sleeves 1
Inspection and Compaction Test for Backfilling 4th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1798 00 Civil Site Works 10/23/21 10/26/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B
Inspection and Compaction Test for Backfilling 2nd Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1799 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 10/23/21 10/26/21 Approved as noted
B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-F-
KAIG3-RFI-SW-C-1800 00 Civil Site Works 10/23/21 10/27/21 Approved as noted
01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03 (As Highlighted)

KAIG3-RFI-SW-C-1801 00 Inspection for the Excavation of Storm Box Culvert - SBC-06 (As Highlighted) Civil Site Works 10/23/21 10/25/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-
KAIG3-RFI-SW-C-1802 00 Civil Site Works 10/24/21 10/27/21 Approved as noted
01-1, MH-E-01-2, MH-E-02 (As Highlighted)
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line Pipes (250mm pipe
4A KAIG3-RFI-WG-C-1803 00 Civil Water Play/Mist Garden 10/24/21 10/27/21 Approved as noted
Connecting to MH-C-4-3) (Part - 6 b) Inside Water Play Garden, at highlighted area in attached drawings.
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1804 00 Civil Site Works 10/24/21 10/28/21 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-01, MH-D-08-02,(As Highlighted)
Excavation for Storm Water Line from MH-G-01-05 to G-G-69 including Branch and Manhole MH-G-01-05,
KAIG3-RFI-SW-C-1805 00 MH-G-01-06, MH-G-01-07 and Gullies G-G-69, G-G-71, G-G-70, G-G-68, G-G-66&67, G-G-65 - as Civil Site Works 10/24/21 10/27/21 Approved as noted
highlighted

Excavation for Fire & Security Distribution Line from (K/FS/07 to K/FS/03) including Pit K/FS/07, K/FS/08,
KAIG3-RFI-SW-C-1806 00 Civil Site Works 10/24/21 10/26/21 Approved as noted
K/FS/19, K/FS/20, K/FS/21, K/FS/22, K/FS/03 at Zone-K as highlighted in the attached drawing

Excavation for Telecommunication Line from (K/TL/22 to K/TL/03) including pit K/TL/22, K/TL/11,
KAIG3-RFI-SW-C-1807 00 Civil Site Works 10/24/21 10/26/21 Approved as noted
K/TL/25, K/TL/14, K/TL/13, K/TL/12, K/TL/03 at Zone-K as highlighted in the attached drawing

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right side,
4A KAIG3-RFI-WG-C-1808 00 Civil Water Play/geyser Garden 10/24/21 10/27/21 Approved as noted
inside Geyser Garden, At Highlighted area in attached Drawings. (Stock Pile # 117)

Inspection and compaction test 1st layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#121 (1 of 3)
KAIG3-RFI-CO-C-1809 00 Civil Crescent 10/24/21 10/27/21 Approved as noted
- total 3 layers

Inspection and compaction test 2nd layer for backfilling around Strip footing & PC 180 - 182 (as
KAIG3-RFI-CO-C-1810 00 Civil Crescent 10/24/21 10/27/21 Approved as noted
highlighted) Zone 2N SP#121 (2 of 2) - total 2 layers

kaig-qcals 143
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 2nd layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone 2C
KAIG3-RFI-CO-C-1811 00 Civil Crescent 10/24/21 10/27/21 Approved as noted
SP#121 (2 of 3) - 3 layers total

KAIG3-RFI-SW-C-1812 00 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) Civil Site Works 10/24/21 10/26/21 Approved as noted
Inspection of Backfilling Sub-grade 1st Layer (1 of 3) around the Manhole (above gravel) for MH-D-03 - as
KAIG3-RFI-SW-C-1813 00 Civil Site Works 10/25/21 10/27/21 Approved as noted
Highlighted (SP#108-A-1-B)
Inspection of Backfilling Sub-grade 1st Layer (1 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-1814 00 Civil Site Works 10/25/21 10/27/21 Approved as noted
Highlighted (SP#108-A-1-B)
Inspection for Cutting and removal of disposal material upto the rock level near SBC-09 at Zone - B - as
KAIG3-RFI-SW-C-1815 00 Civil Site Works 10/25/21 10/28/21 Approved as noted
highlighted
Surface Preperation prior to start waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat
KAIG3-RFI-SW-C-1816 00 Civil Site Works 10/25/21 10/27/21 Approved as noted
and 3rd Coat) for FW-A-18,FW-A-19,(As Highlighted)
Notification to Start Cut and Fill upto (-20cm) from the finishing level in the crescent wadi garden as
6A KAIG3-RFI-SW-C-1817 00 Civil Site Works 10/25/21 10/26/21 Code C (resubmit)
highlighted in the attached grading drawing

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-
KAIG3-RFI-SW-C-1818 00 Civil Site Works 10/26/21 11/2/21 Approved as noted
01 (As Highlighted)

KAIG3-RFI-SW-C-1819 00 Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted Civil Site Works 10/25/21 10/27/21 Approved as noted

KAIG3-RFI-SW-C-1820 00 Soil Preparation after cutting near SBC-09 at Zone - B - as highlighted Civil Site Works 10/27/21 10/28/21 Approved as noted

Excavation & Soil Preparation for Stack Boulders at Top & Left Side of Mist Garden, at highlighted area in
4A KAIG3-RFI-WG-C-1821 00 Civil Water Play/Mist Garden 10/25/21 10/27/21 Approved as noted
attached drawings.
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line (315mm from MH-C-7 to MH-
4A KAIG3-RFI-WG-C-1822 00 C-8 Remaining Pipe) and Main Line (800mm from MH-C-2 to MH-C-3) Inside Mist Garden, at highlighted Civil Water Play/Mist Garden 10/25/21 10/27/21 Approved as noted
area in attached
Gravel drawings.
3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub lines & Sleeves Pipes (250mm drop
4A KAIG3-RFI-WG-C-1823 00 to 160mm & 110mm sleeves) connecting to Main line from MH-C-4-1 to MH-C-4-2,at Bottom Side of Civil Water Play Garden 10/25/21 10/27/21 Approved as noted
Planted bed 1, Inside Water Play Garden, at highlighted attached drawing
Excavation & Bed Preparation for Sub surface Drainage Sub line (160mm connecting to Sub Main line from
4A KAIG3-RFI-WG-C-1824 00 Civil Water Play/Mist Garden 10/25/21 10/31/21 Approved as noted
MH-C-7 to MH-C-8) Inside Mist Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
KAIG3-RFI-SG-C-1825 00 Walls (A, B, C, D, E, F, G & H) all Sides at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 10/25/21 10/28/21 Approved as noted
drawing's. (Stock Pile # 117)

Inspection of 1st Layer Gravel Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02, MH-D-
KAIG3-RFI-ZG-C-1826 00 Civil Maze Garden 10/25/21 10/27/21 Approved as noted
01-A1-03, MH-D-01-A4 & MH-D-01-A5) Inside Maze garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
KAIG3-RFI-ZG-C-1827 00 wall (Outer Side) from Elevation "B to C" at Maze garden, as per highlighted area in attached drawing's. Civil Maze Garden 10/25/21 10/28/21 Code C (resubmit)
(Stock Pile # 117)

Inspection and compaction test 4th layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
KAIG3-RFI-CO-C-1828 00 126 (as Highlighted) (strip footing 3 of 3 layers, only upto TOC of Mass concrete) (PC 4 of 4 upto TOC od Civil Crescent 10/25/21 10/28/21 Approved as noted
PC only) SP#121

Inspection for Sand Bedding under pipe for Fire & Security Line from K/FS/07 to K/FS/03 at Zone-K as
KAIG3-RFI-SW-C-1829 00 Civil Site Works 10/25/21 10/28/21 Approved as noted
highlighted in the attached drawing (Stock Pile # 67)
Inspection for Sand Bedding under pipe for Telecommunications Line from K/TL/22 TO K/TL/03 at Zone-K
KAIG3-RFI-SW-C-1830 00 Civil Site Works 10/25/21 11/1/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeve Pipes (250mm & 110mm)
4A KAIG3-RFI-WG-C-1831 00 Civil Water Play Garden 10/25/21 10/28/21 Approved as noted
Around the Boat Garden, at highlighted area in attached drawings.
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR SHORT
KAIG3-RFI-SW-C-1832 00 Civil Site Works 10/26/21 11/2/21 Approved as noted
PIECE FOR - FW-A-3-7 (As Highlighted)
KAIG3-RFI-SW-C-1833 00 Soil Preparation under Boulder No. RB- 324 Civil Site Works 10/26/21 10/28/21 Approved as noted
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-324 (Stock Pile #
KAIG3-RFI-SW-C-1834 00 Civil Site Works 10/26/21 10/31/21 Approved as noted
108 A-1-B)
KAIG3-RFI-SW-C-1835 00 Inspection of Duct Bank for the MV Line from B/MV/07 to B/MV/12 (As Highlighted) Civil Site Works 10/26/21 10/27/21 Code C (not resubmit)
Excavation for MV Line FROM B/MV/12 TO G/MV/19 includign Pit B/MV/12, G/MV/08, G/MV/36,
KAIG3-RFI-SW-C-1836 00 G/MV/35, G/MV/34, G/MV/09, G/MV/10, G/MV/31, G/MV/19 at Zone-B & G as highlighted in the attached Civil Site Works 10/26/21 10/28/21 Approved as noted
drawing
KAIG3-RFI-SW-C-1837 00 Soil Preparation under Boulder No. RB- 069 Civil Site Works 10/26/21 10/28/21 Approved as noted

kaig-qcals 144
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Sand Bedding under pipe for Fire Water Line at Zone - B as highlighted in the attached
KAIG3-RFI-SW-C-1838 00 Civil Site Works 10/26/21 10/31/21 Approved as noted
drawing (Stock Pile # 67)
Inspection and Compaction Test for Backfilling (1st Layer) for MV Line from B/MV/09 to B/MV/21 - as
KAIG3-RFI-SW-C-1839 00 Civil Site Works 10/26/21 10/31/21 Approved as noted
Highlighted (Stock Pile # 108 A-1-B
Inspection for Sand Bedding under MV Line from B/MV/21 to B/MV/12 at Zone-B as highlighted in the
KAIG3-RFI-SW-C-1840 00 Civil Site Works 10/26/21 10/31/21 Approved as noted
attached drawing (Stock Pile # 67)
Inspection and compaction test 2nd layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#121 (2 of
KAIG3-RFI-CO-C-1841 00 Civil Crescent 10/26/21 10/31/21 Approved as noted
3) - total 3 layers
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) after Gravel laying for Sub surface
4A KAIG3-RFI-WG-C-1842 00 Drainage Sub lines (160mm & 110mm connecting to Sub Main line from MH-C-7 to MH-C-8) Inside Mist Civil Water Play/Mist Garden 10/26/21 11/2/21 Approved as noted
Garden, at highlighted
Inspection areatests
& Compaction in attached drawings.
of Single (S
Layer Backfilling (Sub-Base) after Sub-Grade laying for Sub surface
4A KAIG3-RFI-WG-C-1843 00 Drainage Sub lines (160mm & 110mm connecting to Sub Main line from MH-C-7 to MH-C-8) Inside Mist Civil Water Play/Mist Garden 10/26/21 10/31/21 Approved as noted
Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right side, Water Play/Geyser
4A KAIG3-RFI-WG-C-1844 00 Civil 10/26/21 10/31/21 Approved as noted
inside Geyser Garden, At Highlighted area in attached Drawings. (Stock Pile # 117) Garden
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right side, Water Play/Geyser
4A KAIG3-RFI-WG-C-1845 00 Civil 10/26/21 10/31/21 Approved as noted
inside Geyser Garden, At Highlighted area in attached Drawings. (Stock Pile # 117) Garden

KAIG3-RFI-SW-C-1846 00 Soil Preparation under Boulder No. RB- 153 Civil Site Works 10/27/21 10/31/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling for MV Line From B/MV/12 to G/MV/19
KAIG3-RFI-SW-C-1847 00 Civil Site Works 10/27/21 11/1/21 Approved as noted
as highlighted (Stock Pile # 108 A-1-B)

Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-324 (Stock Pile #
KAIG3-RFI-SW-C-1848 00 Civil Site Works 10/27/21 10/31/21 Approved as noted
108 A-1-B)

KAIG3-RFI-SW-C-1849 00 Inspection for Backfilling Sub-base under Boulder no. RB-153 Civil Crescent 10/27/21 10/31/21 Approved as noted

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1850 00 Civil Picnic Area 10/27/21 11/1/21 Approved as noted
3) SA-23 (3 Layer Sub-Grade and 1 Layer Sub-Base under Footing)

Inspection and compaction test 5th layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124-
KAIG3-RFI-CO-C-1851 00 126 (as Highlighted) (strip footing 3 of 3 layers, only upto TOC of Mass concrete) (PC 5 of 5 upto TOC od Civil Crescent 10/27/21 10/31/21 Approved as noted
PC only) SP#121
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (110mmØ-UPVC- Class 4) from
Site Works/Crescent 2
KAIG3-RFI-SW-C-1852 00 (FW-A-13-4 to Garden of Origin). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Civil 10/27/21 10/28/21 Approved as noted
zone 2H
Dwg.
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to Garden Site Works/Crescent 2
KAIG3-RFI-SW-C-1853 00 Civil 10/27/21 10/28/21 Approved as noted
of Origin). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. zone 2H
Site Works near Aviary
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line- Outfall X & Outfull-B for (450mmØ-
KAIG3-RFI-SW-C-1854 00 Civil Garden and Management 10/27/21 cancelled
UPVC- Class 4) of Pipe Connection to the Culvert. At highlighted Area in the attached Dwg.
Building
Site Works near Aviary
Pipe Installation of Storm Water Line- Outfall X & Outfull-B for (450mmØ-UPVC- Class 4) of Pipe
KAIG3-RFI-SW-C-1855 00 Civil Garden and Management 10/27/21 11/2/21 Approved as noted
Connection to the Culvert. At highlighted Area in the attached Dwg.
Building
Inspection & Compaction tests of 4th/Final Layer Backfilling (Sub-base) (Out of 4 layers), at Top Right side, Water Play/Geyser
4A KAIG3-RFI-WG-C-1858 00 Civil 10/27/21 10/31/21 Approved as noted
inside Geyser Garden, At Highlighted area in attached Drawings. (Stock Pile # 11 Garden
Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) At Elevation "C to D to A" &
KAIG3-RFI-ZG-C-1859 00 Civil Maze Garden 10/27/21 10/31/21 Approved as noted
along Entrance wall, at Maze garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
KAIG3-RFI-ZG-C-1860 00 wall (Outer Side) from Entrance wall At Elevation "A to B" at Maze garden, as per highlighted area in Civil Maze Garden 10/27/21 11/2/21 Code C (resubmit)
attached drawing's.(Stock Pile # 117)
Inspection of 2nd Layer Gravel Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02, MH-D-
KAIG3-RFI-ZG-C-1861 00 Civil Maze Garden 10/27/21 11/2/21 Approved as noted
01-A1-03, MH-D-01-A4 & MH-D-01-A5) Inside Maze garden, as per highlighted area in attached drawing's.
Surface Preparation prior to Continue backfilling of PC and Stripfooting PC 134-136-138-140 Zone 2G (as
KAIG3-RFI-CO-C-1862 00 Civil Crescent 10/27/21 10/28/21 Approved as noted
highlighted) (2 of 4 layers) SP#121
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Area-
KAIG3-RFI-PA-C-1863 00 Civil Picnic Area 10/27/21 11/1/21 Approved as noted
3) SA-23 (2 Layer Sub-Grade - Inside and Outside)
KAIG3-RFI-SW-C-1864 00 Inspection for Excavation of Transition Area (As Highlighted) Civil Site Works 10/27/21 11/1/21 Approved as noted

KAIG3-RFI-SW-C-1865 00 Inspection for Backfilling Sub-base under Boulder no. RB-324 (Stock Pile # 109 A-1-A) Civil Site Works 10/28/21 11/2/21 Approved as noted

KAIG3-RFI-SW-C-1866 00 Inspection for Blinding Concrete under Transition Area (As Highlighted) Civil Site Works 10/28/21 11/2/21 Approved as noted

KAIG3-RFI-SW-C-1867 00 Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-09 (As Highlighted) Civil Site Works 10/28/21 10/30/21 Approved as noted

kaig-qcals 145
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-1868 00 Civil Site Works 10/28/21 10/30/21 Approved as noted
SBC-09 (As Highlighted)
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-1869 00 Civil Site Works 10/28/21 10/30/21 Approved as noted
SBC-09 (As Highlighted)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
KAIG3-RFI-SW-C-1870 00 Civil Site Works 10/28/21 10/30/21 Approved as noted
SBC-09 (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1871 00 Civil Site Works 10/28/21 11/1/21 Approved as noted
B)
Inspection and Compaction Test for Backfilling 1st Layer (1 of 3) for Telecom Line from B/TL/21 to
KAIG3-RFI-SW-C-1872 00 Civil Site Works 10/28/21 10/31/21 Approved as noted
B/TL/36 - as Highlighted (Stock Pile # 108 A-1-B)
Inspection and Compaction Test for Backfilling 2nd Layer (2 of 3) for Telecom Line from B/TL/21 to
KAIG3-RFI-SW-C-1873 00 Civil Site Works 10/28/21 11/2/21 Approved as noted
B/TL/36 - as Highlighted (Stock Pile # 108 A-1-B
Excavation for Telecommunication Line from (K/TL/13 to K/TL/19) including pit K/TL/13, K/TL/08,
KAIG3-RFI-SW-C-1874 00 Civil Site Works 10/28/21 11/1/21 Approved as noted
K/TL/09, K/TL/14, K/TL/15, K/TL/19 at Zone-K as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from (K/FS/21 to K/FS/05) including Pit K/FS/21, K/FS/23,
KAIG3-RFI-SW-C-1875 00 Civil Site Works 10/28/21 11/1/21 Approved as noted
K/FS/09, K/FS/05 at Zone-K as highlighted in the attached drawing
Excavation for Foul Water Line from FW-A-3-7 to FW-A-3-17 including the Manhole FW-A-3-7, FW-A-3-
KAIG3-RFI-SW-C-1876 00 8, FW-A-3-9, FW-A-3-10, FW-A-3-11, FW-A-3-12, FW-A-3-13, FW-A-3-14, FW-A-3-15, FW-A-3-16, Civil Site Works 10/28/21 11/1/21 Approved as noted
FW-A-3-17for
Excavation prior to start
Storm Gravel
Water LineBedding (as Highlighte
from MH-K-07 to Outfall K including Manhole MH-K-01, MH-K-02, MH-
KAIG3-RFI-SW-C-1877 00 K-03, MH-K-04, MH-K-05, MH-K-06, MH-K-07 & Outfall K, prior to start Gravel Bedding (as Civil Site Works 10/28/21 11/1/21 Approved as noted
Highlighted)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-D-01, MH-D-01-A1, MH-D-01-
KAIG3-RFI-SW-C-1878 00 A2, MH-D-01-A1-01, MH-D-01-B1, MH-D-01-B2, MH-D-02, MH-D-03, MH-D-03-01, MH-D-04,MH-D- Civil Site Works 10/30/21 11/7/21 Approved as noted
06 ,MH-D-08, MH-D-08-01, MH-D-08-02 (AS ATTACHED).
INSPECTION OF INSTALLATION OF ALL RINGS (RISER) FOR MH-H-01, MH-H-02, MH-H-03 (AS
KAIG3-RFI-SW-C-1879 00 Civil Site Works 10/30/21 11/4/21 Approved as noted
ATTACHED).
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-E-01, MH-E-01-1, MH-E-01-2,
KAIG3-RFI-SW-C-1880 00 Civil Site Works 10/30/21 11/4/21 Approved as noted
MH-E-02 (AS ATTACHED)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-F-01, MH-F-01-1, MH-F-01-2,
KAIG3-RFI-SW-C-1881 00 Civil Site Works 10/30/21 11/4/21 Approved as noted
MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (AS ATTACHED).
Excavation & Soil Preparation Prior to Install Stack Boulders, at Top Right side, inside Geyser Garden, At Water Play/Geyser
4A KAIG3-RFI-WG-C-1882 00 Civil 10/30/21 11/2/21 Approved as noted
Highlighted area in attached Drawings. Garden
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
4A KAIG3-RFI-WG-C-1883 00 Drainage Main lines (Part 3)(450mm from MH-C-5 to MH-C-6) Inside Geyser Garden, at Water Garden, at Civil Water Play Garden 10/30/21 11/3/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 11
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone 2G
KAIG3-RFI-CO-C-1884 00 Civil Crescent 10/30/21 11/2/21 Approved as noted
(as highlighted) (3 of 4 layers) SP#121

Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1885 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 10/30/21 11/2/21 Approved as noted
B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-1886 00 Civil Site Works 10/30/21 11/2/21 Approved as noted
Highlighted (SP#108 A-1-B)

Inspection and Compaction Test for 2nd Layer (2 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1887 00 Civil Site Works 10/30/21 11/2/21 Approved as noted
B)
Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) around the Manhole (above gravel) for MH-D-03 - as
KAIG3-RFI-SW-C-1888 00 Civil Site Works 10/30/21 11/2/21 Approved as noted
Highlighted (SP#108 A-1-B)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1889 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02 Civil Site Works 10/30/21 11/2/21 Approved as noted
(As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-F-
4A KAIG3-RFI-SW-C-1890 00 Civil Water Play Garden 10/30/21 11/2/21 Approved as noted
04 (As Highlighted)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) after Gravel laying for
KAIG3-RFI-WG-C-1891 00 Sub surface Drainage Main lines (Part 4) (315mm from MH-C-7 to MH-C-8 Remaining part), at Water Civil Site Works 10/30/21 11/3/21 Approved as noted
Garden, at highlighted area in attached drawings.(
KAIG3-RFI-SW-C-1892 00 Inspection and Compaction Test for NGL under Sub-Base of Bounder No. RB-069 Civil Site Works 10/30/21 11/2/21 Approved as noted

6B KAIG3-RFI-SW-C-1893 00 INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-7. (As Highlighted) Civil Site Works 10/31/21 11/3/21 Code C (resubmit)
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4, FW-
KAIG3-RFI-SW-C-1894 00 Civil Site Works 10/31/21 11/3/21 Approved as noted
A-3-6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8, FW-A-3-6.9, FW-A-3-6.10 - (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-14, FW-A-15, FW-A-16, FW-A-17,
KAIG3-RFI-SW-C-1895 00 Civil Site Works 10/31/21 11/2/21 Approved as noted
FW-A-18, FW-A-19, FW-A-20, FW-A-21, FW-A-22, FW-A-23, FW-A-24, FW-A-25. (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-A-01, MH-A-02, MH-A-03, MH-A-11,
KAIG3-RFI-SW-C-1896 00 Civil Site Works 11/1/21 11/8/21 Approved as noted
MH-A-12, MH-A-14.(As Highlighted)
Excavation & Bed Preparation for Sub surface Drainage Sub lines (110mm 2no's connecting to Main line
Water Play/Mist & Geyser
4A KAIG3-RFI-WG-C-1897 00 from MH-C-7 to MH-C-8), (110mm 2no's connecting MH-C-7), (250mm & drop to 160mm connecting to Civil 10/31/21 11/3/21 Approved as noted
Garden
Main line from MH-C-6 to MH-C-7) & (160 Sub line & Sleeves
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
KAIG3-RFI-SG-C-1898 00 Walls (A, B, C, D, E, F, G & H) all Sides at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 10/31/21 11/3/21 Approved as noted
drawing's. (Stock Pile # 117)

Inspection for Sand Bedding under MV Line From B/MV/12 to G/MV/19 as highlighted in the attached
KAIG3-RFI-SW-C-1899 00 Civil Site Works 10/31/21 11/2/21 Approved as noted
drawing (Stock Pile # 67)

kaig-qcals 146
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-SW-C-1900 00 Inspection for Backfilling Sub-base under Boulder no. RB-069 Civil Site Works 10/31/21 11/2/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1901 00 Civil Site Works 10/31/21 11/3/21 Approved as noted
B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 4) around the Manhole (above gravel) for MH-D-08-01 -
KAIG3-RFI-SW-C-1902 00 Civil Site Works 10/31/21 11/3/21 Approved as noted
as Highlighted (SP#108 A-1-B)

Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1903 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 10/31/21 11/3/21 Approved as noted
B)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1904 00 Civil Site Works 10/31/21 11/3/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B

Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-
KAIG3-RFI-SW-C-1905 00 Civil Site Works 10/31/21 11/2/21 Approved as noted
3-11 (as Highlighted
Inspection for Casting Blinding Concret under Manhole MH-K-03, MH-K-04, MH-K-05, MH-K-06, MH-K-
KAIG3-RFI-SW-C-1906 00 Civil Site Works 10/31/21 11/2/21 Approved as noted
07 - as highlighted
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1907 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, Civil Site Works 11/30/21 12/1/21 Approved as noted
MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (as highlighted area).

Excavation & Soil Preparation for Stack Boulders at Top & Right Side of Mist Garden, at highlighted area in
4A KAIG3-RFI-WG-C-1908 00 Civil Water Play/Mist Garden 10/31/21 11/2/21 Approved as noted
attached drawings.

300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (600mmØ-PP- Site Works beside
KAIG3-RFI-SW-C-1909 00 Corrugated) from (MH-F-01 to OUTFULL-F ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per Civil Circular Pathway Junction 10/31/21 11/2/21 Approved as noted
highlighted Area in the attached Dwg. 9
Warning Tape Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-01 to Site Works beside
KAIG3-RFI-SW-C-1910 00 OUTFULL-F ). BSIDE CIRCULAR PATHWAY JUNCTION 9. As per highlighted Area in the attached Civil Circular Pathway Junction 10/31/21 11/2/21 Approved as noted
Dwg. 9

KAIG3-RFI-SW-C-1911 00 INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-B-02, MH-B-04 .(As Highlighted) Civil Site Works 11/1/21 11/4/21 Approved as noted

INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-X-01-1, MH-X-02, MH-X-03 .(As
KAIG3-RFI-SW-C-1912 00 Civil Site Works 11/1/21 11/8/21 Approved as noted
Highlighted)
Site Works beside
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (400mmØ-UPVC- Class
KAIG3-RFI-SW-C-1913 00 Civil Circular Pathway Junction 10/31/21 11/1/21 Approved as noted
4). As per highlighted Area in the attached Dwg.
8
Site Works beside
Pipe Installation of Storm Water Line Outfall-G for (400mmØ-UPVC- Class 4). As per highlighted Area in
KAIG3-RFI-SW-C-1914 00 Civil Circular Pathway Junction 10/31/21 11/1/21 Approved as noted
the attached Dwg.
8

Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone-L as highlighted in the
KAIG3-RFI-SW-C-1915 00 Civil Site Works 11/1/21 11/4/21 Approved as noted
attached drawing

Inspection and Compaction Test for 4th Layer (4 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1916 00 Civil Site Works 11/1/21 11/4/21 Approved as noted
B)

Inspection and Compaction Test for Backfilling 3rd Layer (3 of 3) for Telecom Line from B/TL/21 to
KAIG3-RFI-SW-C-1917 00 Civil Site Works 11/1/21 11/3/21 Approved as noted
B/TL/36 - as Highlighted (Stock Pile # 108 A-1-B)

Excavation for Telecommunication Line from (K/TL/19 to K/TL/16) including pit K/TL/19, K/TL/16 at
KAIG3-RFI-SW-C-1918 00 Civil Site Works 11/1/21 11/3/21 Approved as noted
Zone-K as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from (K/FS/05 to K/FS/06) including Pit K/FS/05, K/FS/06
KAIG3-RFI-SW-C-1919 00 Civil Site Works 11/1/21 11/3/21 Approved as noted
at Zone-K as highlighted in the attached drawing

KAIG3-RFI-SW-C-1920 00 Inspection for Casting Blinding Concret under Manhole MH-K-01, MH-K-02 - as highlighted Civil Site Works 11/1/21 11/4/21 Approved as noted

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line Pipe (250mm pipe Connected to
4A KAIG3-RFI-WG-C-1921 00 Main line from MH-C-4-2 to MH-C-4-3) (Part - 6 b) Inside Water Play Garden, at highlighted area in Civil Water Play Garden 11/1/21 11/2/21 Approved as noted
attached drawings.

kaig-qcals 147
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
KAIG3-RFI-ZG-C-1922 00 wall (Outer Side) At Elevation "C to D to A" & along Entrance wall, at Maze garden, as per highlighted area Civil Maze Garden 11/1/21 11/4/21 Approved as noted
in attached drawing's.(Stock Pile # 117)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for Sub surface
4A KAIG3-RFI-WG-C-1923 00 Drainage Main lines (Part 4) (315mm from MH-C-7 to MH-C-8 Remaining part), at Water Garden, at Civil Water Play Garden 11/1/21 11/7/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 117)

Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-12, FW-A-3-13, FW-A-3-14, FW-
KAIG3-RFI-SW-C-1924 00 Civil Site Works 11/1/21 11/4/21 Approved as noted
A-3-15, FW-A-3-16, FW-A-3-17 (as Highlighted)

KAIG3-RFI-SW-C-1925 00 Inspection of Steel reinforcement for Top Slab of SBC-06 As Highlighted Civil Site Works 11/1/21 11/3/21 Approved as noted

KAIG3-RFI-SW-C-1926 00 Inspection of Formwork and Level for Walls and Top Slab of SBC-06 As Highlighted Civil Site Works 11/1/21 11/4/21 Approved as noted

KAIG3-RFI-SW-C-1927 00 Inspection of Concrete Pouring for Walls and Top Slab of SBC-06 As Highlighted Civil Site Works 11/1/21 11/4/21 Approved as noted
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
4A KAIG3-RFI-WG-C-1928 00 Drainage Main lines (Part 3)(450mm from MH-C-5 to MH-C-6) Inside Geyser Garden, at Water Garden, at Civil Water Play Garden 11/1/21 11/7/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 11)
Surface preparation prior to Backfilling Surround the Manhole (MH-C-8), Inside Water Garden, at
4A KAIG3-RFI-WG-C-1929 00 Civil Water Play Garden 11/1/21 11/3/21 Approved as noted
highlighted area in attached drawings.

Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (MH-C-8), Inside Water
4A KAIG3-RFI-WG-C-1930 00 Civil Water Play Garden 11/2/21 11/3/21 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manhole (MH-C-8),
4A KAIG3-RFI-WG-C-1931 00 Civil Water Play Garden 11/2/21 11/7/21 Approved as noted
Inside Water Garden, at highlighted area in attached drawings. (Stock Pile # 117)
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone 2G
KAIG3-RFI-CO-C-1932 00 Civil Crescent 11/1/21 11/4/21 Approved as noted
(as highlighted) (4 of 4 layers) SP#121

Surface Preparation Prior to start Backfilling For Zone 1B Around PC and Strip footing upto top of Mass
KAIG3-RFI-CO-C-1933 00 Civil Crescent 11/1/21 11/3/21 Approved as noted
Concrete PC 7-9-11 (as Highligted)

Inspection for Sand Bedding under pipe for Fire Water Line including Branch at Zone-F,G & K as
KAIG3-RFI-SW-C-1934 00 Civil Site Works 11/1/21 11/4/21 Approved as noted
highlighted in the attached drawing (Stock Pile # 67)

INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4, FW-A-3-


KAIG3-RFI-SW-C-1935 00 6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8, FW-A-3-6.9, FW-A-3-6.10, FW-A-3-6.11, FW-A-3-6.12 (As Civil Site Works 11/2/21 11/7/21 Approved as noted
Highlighted

INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-01, MH-A-02, MH-A-03, MH-A-06, MH-
KAIG3-RFI-SW-C-1936 00 A-07, MH-A-08, MH-A-09, MH-A-11, MH-A-12, MH-A-13, MH-A-14, MH-A-15, MH-X-01, MH-X-01-1, Civil Site Works 11/2/21 11/7/21 Approved as noted
MH-X-02, MH-X-03 (As Highlighted).
Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat)
KAIG3-RFI-SW-C-1937 00 Civil Site Works 11/2/21 11/8/21 Approved as noted
for FW-A-3-6.9, FW-A-3-6.10, FW-A-3-6.11, FW-A-3-6.12 (As Highlighted
KAIG3-RFI-SW-C-1938 00 INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-13. (As Highlighted) Civil Site Works 11/2/21 11/8/21 Code C (resubmit)

Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1939 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 11/2/21 11/4/21 Approved as noted
B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-1940 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
Highlighted (SP#108 A-1-B)

KAIG3-RFI-SW-C-1941 00 Soil Preparation under Boulder No. RB- 265 Civil Site Works 11/2/21 11/4/21 Approved as noted
Inspection of Backfilling Sub-grade 4th Layer (4 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-1942 00 Civil Site Works 11/2/21 11/6/21 Approved as noted
Highlighted (SP#108 A-1-B)
Inspection of Backfilling Sub-grade 2nd Layer (2 of 4) around the Manhole (above gravel) for MH-D-08-01 -
KAIG3-RFI-SW-C-1943 00 Civil Site Works 11/2/21 11/7/21 Approved as noted
as Highlighted (SP#108 A-1-B)
Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1944 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
KAIG3-RFI-SW-C-1945 00 Civil Site Works 11/7/21 11/13/21 Approved as noted
3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11 (As Highlighted)
KAIG3-RFI-SW-C-1946 00 Excavation for Storm Water Line Manhole - MH-K-01 prior to start Gravel Bedding (as Highlighted) Civil Site Works 11/2/21 11/6/21 Approved as noted

kaig-qcals 148
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Area - 09)
Zone L KAIG3-RFI-SW-C-1008 00 Civil Site Works 8/11/21 8/23/21 Code C (not resubmit)

Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/36 TO B/TL/42 at Zone-B
KAIG3-RFI-SW-C-2138 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
as highlighted in the attached drawing (SP # 67)

Inspection and compaction test 1st & 2nd layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
2E 6 KAIG3-RFI-MC-C-4715 00 Civil MCPE 3 3/20/22 3/22/22 Approved as noted
layer for red sand) SP# 67 & (1st & 2nd of 11th layer for sub grade) SP#124

Excavation & Surface Preparation for Seat Walls (Outer), Inside Physic garden, as highlighted area in
4D 4 KAIG3-RFI-PG-C-4127 00 Civil Physic Garden 2/19/22 2/23/22 Approved as noted
attached drawing's.
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3550 00 Civil Site Works 1/24/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)
6A 6 KAIG3-RFI-SW-C-3553 00 Surface Preparation Prior to Start Backfilling Gravel For Manholes FW-A-14 - AS Highlighted Civil Site Works 1/24/22 1/26/22 Approved as noted
"Inspection And Compaction Test of Backfilling Sub Grade (1 of 7) For Manholes FW-A-7, FW-A-8, FW-A-
6A 6 KAIG3-RFI-SW-C-3705 00 Civil Site Works 2/5/22 2/10/22 Code C (resubmit)
9, FW-A-10, FW-A-11, FW-A-12 - As Highlighted (SP#129 A-1-B)"
"Inspection And Compaction Test of Backfilling Sub Grade (1 of 7) For Manholes FW-A-7, FW-A-8, FW-A-
6A 6 KAIG3-RFI-SW-C-3705 01 Civil Site Works 2/16/22 2/21/22 Approved as noted
9, FW-A-10, FW-A-11, FW-A-12 - As Highlighted (SP#129 A-1-B)"
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/12 to G/FS/37 at
4 4 KAIG3-RFI-SW-C-3715 00 Civil Site Works 1/31/22 2/5/22 Approved as noted
Zone-G - as highlighted in the attached drawing (SP#130)
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/14 to G/TL/23 at Zone-G
4 4 KAIG3-RFI-SW-C-3716 00 Civil Site Works 1/31/22 2/5/22 Approved as noted
as highlighted in the attached drawing (SP#130)
Excavation & Soil Preparation Prior to Boulders, At Between Geyser Garden & Culvert near Boundary wall Water Play/Geyser
4A KAIG3-RFI-WG-C-3114 00 Civil 12/28/21 1/1/22 Approved as noted
span 14, at highlighted area in attached drawings. Garden
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21 & 24 to 29) and Emergency lines
4A 4 KAIG3-RFI-WG-C-5329 00 (MH/WG/EM/7 to 8 & 10 to 15), Inside water play Garden, at water Garden, as highlighted area in attached Civil Water Play Garden 5/11/22 5/16/22 Approved as noted
drawing's.
Inspection & Compaction Tests for 2nd Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Back of
4B 4 KAIG3-RFI-AG-C-3183 00 Civil Aviary Garden 1/3/22 1/8/22 Approved as noted
House at Aviary garden, At Highlighted area in the attached drawing's. (Stock Pile # 126)
Inspection & Compaction Tests for 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Back
4B 4 KAIG3-RFI-AG-C-3223 00 Civil Aviary Garden 1/6/22 1/11/22 Approved as noted
of House at Aviary garden, At Highlighted area in the attached drawing's. (Stock Pile # 126)

Concrete pouring for Footing of Boundary wall @ Grid (1-11/Left side) (16-20/Right side) at Aviary Garden,
4B KAIG3-RFI-AG-S-2519 00 Civil Water Play Garden 11/29/21 12/2/21 Approved as noted
As per Highlighted in attached Drawing's.

Steel Reinforcement for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Garden, As per
Zone K 5 KAIG3-RFI-AG-S-3362 00 Civil Site Works 1/12/22 1/17/22 Code C (resubmit)
Highlighted in attached Drawing's.

Steel Reinforcement for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Garden, As per
Zone K 5 KAIG3-RFI-AG-S-3362 01 Civil Site Works 2/7/22 2/10/22 Approved as noted
Highlighted in attached Drawing's.
2N 6 KAIG3-RFI-CC-C-4425 00 Surface Preparation Prior to start Backfilling for Childcare (as highlighted) Zone 2N Civil Child Care 3/6/22 3/9/22 Code C (resubmit)

2N 6 KAIG3-RFI-CC-C-4425 01 Surface Preparation Prior to start Backfilling for Childcare (as highlighted) Zone 2N Civil Child Care 3/21/22 3/23/22 Approved as noted

Inspection and compaction test 1st layer for Childcare Zone 2N (as highlighted) axis 02AT-02AR (1st of 2nd
2N 6 KAIG3-RFI-CC-C-4577 00 Civil Crescent 3/14/22 3/17/22 Code C (resubmit)
layer) SP#124

Inspection and compaction test 1st layer for Childcare Zone 2N (as highlighted) axis 02AT-02AR (1st of 2nd
2N 6 KAIG3-RFI-CC-C-4577 01 Civil Crescent 6/12/22 6/15/22 Code C (not resubmit)
layer) SP#124
2A 6 KAIG3-RFI-CF-C-4178 00 surface preparation prior to start backfilling inside cafeteria building zone 2A (as highlighted) Civil Cafeteria 2/20/22 2/23/22 Approved as noted
Inspection and compaction test 1st layer for backfilling inside cafeteria building zone 2A (as highlighted) (1st
2N 6 KAIG3-RFI-CF-C-4191 00 Civil Cafeteria 2/21/22 2/26/22 Approved as noted
of 4th Layers) SP#124
Inspection and compaction test 2nd layer for backfilling inside cafeteria building zone 2A (as highlighted)
2N 6 KAIG3-RFI-CF-C-4192 00 Civil Cafeteria 2/21/22 2/27/22 Approved as noted
(2nd of 4th Layers) SP#124

Inspection and compaction test 3rd layer for backfilling inside cafeteria building zone 2A (as highlighted)
2A 6 KAIG3-RFI-CF-C-4201 00 Civil Cafeteria 2/23/22 2/27/22 Approved as noted
(3rd of 4th Layers) SP#124

surface preparation prior to start backfilling inside cafeteria building axis (02D to 02A ) zone 2A (as
2A 6 KAIG3-RFI-CF-C-4202 00 Civil Cafeteria 2/23/22 2/26/22 Approved as noted
highlighted)
Inspection and compaction test 1st layer for backfilling inside cafeteria building axis ( 02D to 02A ) zone 2A
2A 6 KAIG3-RFI-CF-C-4203 00 Civil Cafeteria 2/23/22 3/2/22 Approved as noted
(as highlighted) (1st of 2nd Layers) SP#124
Inspection and compaction test 2nd layer for backfilling inside Cafeteria Building Axis (02D to 02A) zone 2A
2A 6 KAIG3-RFI-CF-C-4245 00 Civil Cafeteria 2/27/22 3/5/22 Approved as noted
as highlighted (2nd of 2nd layers) SP 124
Inspection and compaction test 4th layer for backfilling inside Cafeteria Building Zone 2A as highlighted
2A 6 KAIG3-RFI-CF-C-4246 00 Civil Cafeteria 2/27/22 3/5/22 Approved as noted
(2nd of 2nd layers) SP 124

kaig-qcals 149
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2A 6 KAIG3-RFI-CF-C-4248 00 Surface Preparation prior to start Blinding concrete at Cafeteria Foundation at Zone 2A as highlighted. Civil Cafeteria 2/27/22 3/3/22 Approved as noted

2B 2 KAIG3-RFI-CF-C-6580 00 Surface Preparation Prior to start backfilling at Cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted) Civil Cafeteria 7/24/22 7/31/22 Approved as noted

Surface Preparation prior to backfilling inside Cafeteria building btween Axis 02A - 02D zone 2A (as
2A 6 KAIG3-RFI-CF-C-6600 00 Civil Cafeteria 7/25/22 7/31/22 Approved as noted
Highlighted)

Inspection and compaction test 1st and 2nd layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
2B 6 KAIG3-RFI-CF-C-6617 00 Civil Cafeteria 7/26/22 8/1/22 Approved as noted
highlighted) (1st and 2nd of 12th layer) SP#125

5 5 KAIG3-RFI-CG-C-5621 00 Notification to start Excavation Prior to start Excavation for Cenozoic Garden zone 4 Civil Cenozoic Garden 5/30/22 5/31/22 Approved as noted

Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as
KAIG3-RFI-CO-C-1966 00 Civil Crescent 11/2/21 11/6/21 Approved as noted
highlighted) (1 of 2 layers) SP#121

Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as
KAIG3-RFI-CO-C-2022 00 Civil Crescent 11/6/21 11/9/21 Code C (resubmit)
highlighted) (2 of 2 layers) SP#121
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as
KAIG3-RFI-CO-C-2022 01 Civil Crescent 11/21/21 11/27/21 Code C (resubmit)
highlighted) (2 of 2 layers) SP#121
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as
KAIG3-RFI-CO-C-2022 02 Civil Crescent 6/12/22 6/15/22 Code C (not resubmit)
highlighted) (2 of 2 layers) SP#121

Surface Preparation Prior to start Backfilling around Pilecap 105-107-109 as highlighted Zone 2C (as
KAIG3-RFI-CO-C-2069 00 Civil Crescent 11/9/21 11/13/21 Approved as noted
highlighted)

Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zone
KAIG3-RFI-CO-C-2098 00 Civil Crescent 11/10/21 11/15/21 Approved as noted
1F 1G (as highlighted) (1 of 5 layers) SP#121
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zone
KAIG3-RFI-CO-C-2141 00 Civil Crescent 11/14/21 11/16/21 Approved as noted
1F 1G (as highlighted) (2 of 5 layers) SP#121
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (as
KAIG3-RFI-CO-C-2142 00 Civil Crescent 11/14/21 11/16/21 Approved as noted
highlighted) (1 of 5 layers) SP#121

KAIG3-RFI-CO-C-2170 00 Surface Preparation prior to start Backfilling around PC 28 30 as highlighted at Zone 1E Civil Crescent 11/15/21 11/17/21 Approved as noted

Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 105, 107, 109 Zone 2C (as
KAIG3-RFI-CO-C-2171 00 Civil Crescent 11/15/21 11/18/21 Approved as noted
highlighted) (2 of 5 layers) SP#121
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zone
KAIG3-RFI-CO-C-2172 00 Civil Crescent 11/15/21 11/18/21 Approved as noted
1F 1G (as highlighted) (3 of 5 layers) SP#121
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (as
KAIG3-RFI-CO-C-2215 00 Civil Crescent 11/16/21 11/20/21 Approved as noted
highlighted) (3 of 5 layers) SP#121
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zone
KAIG3-RFI-CO-C-2216 00 Civil Crescent 11/16/21 11/20/21 Approved as noted
1F 1G (as highlighted) (4 of 5 layers) SP#121
Inspection and compaction test 1st layer for backfilling of PC 28-30 Zone 1E (as highlighted) (1 of 4 layers)
KAIG3-RFI-CO-C-2264 00 Civil Crescent 11/18/21 11/23/21 Approved as noted
SP#121

Inspection and compaction test 2nd layer for backfilling of PC 28-30 Zone 1E (as highlighted) (2 of 4 layers)
KAIG3-RFI-CO-C-2311 00 Civil Crescent 11/21/21 11/27/21 Approved as noted
SP#121

Surface Preparation Prior to start Backfilling around Strip footing & Pilecap 8-10-12-14 as highlighted Zone
KAIG3-RFI-CO-C-2334 00 Civil Crescent 11/23/21 11/27/21 Approved as noted
1B (as highlighted)
Inspection and compaction test 3rd layer for backfilling of PC 28-30 Zone 1E (as highlighted) (3 of 4 layers)
KAIG3-RFI-CO-C-2341 00 Civil Crescent 11/23/21 11/25/21 Approved as noted
SP#121
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 34-36-38 Zone 1F (as
KAIG3-RFI-CO-C-2361 00 Civil Crescent 11/23/21 11/27/21 Approved as noted
highlighted) (3 of 5 layers) SP#121
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 34-36-38 Zone 1F (as
1F KAIG3-RFI-CO-C-2376 00 Civil Crescent 11/23/21 11/27/21 Approved as noted
highlighted) (4 of 5 layers) SP#121
Inspection and compaction test 5th layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zone
1F 1G KAIG3-RFI-CO-C-2381 00 Civil Crescent 11/28/21 12/1/21 Approved as noted
1F 1G (as highlighted) (5 of 5 layers) SP#121
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 8-10-12-14 Zone 1B (as
1B KAIG3-RFI-CO-C-2407 00 Civil Crescent 11/24/21 11/28/21 Approved as noted
highlighted) (1 of 2 layers) SP#121
Inspection and compaction test 4th layer for backfilling of PC 28-30 Zone 1E (as highlighted) (4 of 4 layers)
1E KAIG3-RFI-CO-C-2436 00 Civil Site Works 11/25/21 12/1/21 Approved as noted
SP#121
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 8-10-12-14 Zone 1B (as
KAIG3-RFI-CO-C-2482 00 Civil Crescent 11/28/21 12/1/21 Approved as noted
highlighted) (2 of 2 layers) SP#121
kaig-qcals 150
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-CO-C-2483 00 Surface Preparation Prior to start Backfilling at Promenad Bridge foundation (as highlighted) Civil Crescent 11/28/21 11/29/21 Approved as noted

Inspection and compaction test 1st layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (1 of 4
KAIG3-RFI-CO-C-2516 00 Civil Crescent 11/29/21 12/2/21 Approved as noted
layers) SP#121
Inspection and compaction test 2nd layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (2 of
1E KAIG3-RFI-CO-C-2571 00 Civil Crescent 12/1/21 12/6/21 Approved as noted
4 layers) SP#121
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 31-43 Zone 1F 1G (as
1F 1G KAIG3-RFI-CO-C-2573 00 Civil Crescent 12/1/21 12/2/21 Approved as noted
highlighted)
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 142-144 Zone 2H (as
2H KAIG3-RFI-CO-C-2574 00 Civil Crescent 12/1/21 12/2/21 Approved as noted
highlighted)
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2597 00 Civil Crescent 12/2/21 12/7/21 Code C (resubmit)
highlighted)
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2597 01 Civil Crescent 12/14/21 12/15/21 Approved as noted
highlighted)
Inspection and compaction test 3rd layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (3 of
1E KAIG3-RFI-CO-C-2599 00 Civil Crescent 12/2/21 12/7/21 Approved as noted
4 layers) SP#121
Inspection and compaction test 1st layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zone
1F 1G KAIG3-RFI-CO-C-2600 00 Civil Crescent 12/2/21 12/7/21 Approved as noted
1F 1G (as highlighted) (1 of 4 layers) SP#121

Inspection and compaction test 1st layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zone
2H KAIG3-RFI-CO-C-2601 00 Civil Crescent 12/2/21 12/7/21 Approved as noted
2H (as highlighted) (1 of 10 layers) SP#121

Inspection and compaction test 4th layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (4 of 4
1E KAIG3-RFI-CO-C-2631 00 Civil Crescent 12/5/21 12/8/21 Approved as noted
layers) SP#123

Inspection and compaction test 2nd layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zone
1F 1G KAIG3-RFI-CO-C-2632 00 Civil Crescent 12/5/21 12/8/21 Approved as noted
1F 1G (as highlighted) (2 of 4 layers) SP#123
Inspection and compaction test 3rd layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zone
2H KAIG3-RFI-CO-C-2652 00 Civil Crescent 12/6/21 12/15/21 Approved as noted
2H (as highlighted) (3 of 10 layers) SP#124

Inspection and compaction test 4th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zone
2H KAIG3-RFI-CO-C-2682 00 Civil Crescent 12/7/21 12/12/21 Approved as noted
2H (as highlighted) (4 of 10 layers) SP#124

Inspection and compaction test 3rd layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zone
1F 1G KAIG3-RFI-CO-C-2683 00 Civil Crescent 12/7/21 12/12/21 Approved as noted
1F 1G (as highlighted) (3 of 4 layers) SP#124

Inspection and compaction test 5th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zone
2H KAIG3-RFI-CO-C-2698 00 Civil Crescent 12/8/21 12/13/21 Approved as noted
2H (as highlighted) (5 of 10 layers) SP#124
Excavation (as per instruction of DAR) for the loose Exsisting NGL in at PC 22, 24 at Zone 1D (as
1D KAIG3-RFI-CO-C-2701 00 Civil Crescent 12/8/21 12/12/21 Code C (not resubmit)
highlighted)
Inspection and compaction test 6th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zone
2H KAIG3-RFI-CO-C-2717 00 Civil Crescent 12/9/21 12/14/21 Approved as noted
2H (as highlighted) (6 of 10 layers) SP#124
Inspection and compaction test 4th layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zone
1F 1G KAIG3-RFI-CO-C-2735 00 Civil Crescent 12/11/21 12/16/21 Approved as noted
1F 1G (as highlighted) (4 of 4 layers) SP#124
Surface Preparation Prior to start Backfilling at SIDE of PC and STRIP FOOTING between PC 22-24-26
1E KAIG3-RFI-CO-C-2736 00 Civil Crescent 12/12/21 12/16/21 Approved as noted
Zone 1D (as highlighted)
Inspection and compaction test 1st layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2777 00 Civil Site Works 12/13/21 12/19/21 Approved as noted
highlighted) (1 of 10 layers) SP#124
Inspection and compaction test 1st layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (1 of 4
1E KAIG3-RFI-CO-C-2778 00 Civil Site Works 12/13/21 12/18/21 Approved as noted
layers) SP#124
Surface Preparation Prior to start Backfilling at SIDE of PC and STRIP FOOTING between PC 193-195
2R KAIG3-RFI-CO-C-2810 00 Civil Crescent 12/14/21 12/18/21 Approved as noted
Zone 2R (as highlighted)
Inspection and compaction test 2nd layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (2 of 4
1E KAIG3-RFI-CO-C-2832 00 Civil Crescent 12/15/21 12/20/21 Approved as noted
layers) SP#124

2M KAIG3-RFI-CO-C-2833 00 Surface Preparation Prior to start Backfilling at PC 165 Zone 2M (as highlighted) Civil Crescent 12/15/21 12/19/21 Approved as noted

Inspection and compaction test 1st layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-CO-C-2845 00 Civil Crescent 12/16/21 12/21/21 Approved as noted
Zone 1G (1st of 6th layer)

Inspection and compaction test 2nd layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-CO-C-2846 00 Civil Crescent 12/16/21 12/20/21 Approved as noted
Zone 1G (1st of 6th layer) SP # 124
Inspection and compaction test 3rd layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-CO-C-2847 00 Civil Crescent 12/16/21 12/22/21 Approved as noted
Zone 1G (3rd of 6th layer) SP # 124

kaig-qcals 151
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 2nd layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2867 00 Civil Crescent 12/16/21 12/22/21 Approved as noted
highlighted) (2 of 10 layers) SP#124
Inspection and compaction test 1st layer for backfilling around PC 165 Zone 2M (as highlighted) (1 of 4
2M KAIG3-RFI-CO-C-2868 00 Civil Crescent 12/16/21 12/22/21 Approved as noted
layers) SP#124
Inspection and compaction test 3rd layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (3 of 4
1E KAIG3-RFI-CO-C-2869 00 Civil Crescent 12/16/21 12/22/21 Approved as noted
layers) SP#124

Inspection and compaction test 1st layer for backfilling around strip footing between PC 193-195 Zone 2R (as
2R KAIG3-RFI-CO-C-2873 00 Civil Crescent 12/16/21 12/22/21 Approved as noted
highlighted) (1 of 4 layers) SP#124

Inspection and compaction test 3rd layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2910 00 Civil Crescent 12/19/21 12/23/21 Approved as noted
highlighted) (3 of 10 layers) SP#124

Inspection and compaction test 2nd layer for backfilling around PC 165 Zone 2M (as highlighted) (2 of 4
2M KAIG3-RFI-CO-C-2911 00 Civil Crescent 12/19/21 12/23/21 Approved as noted
layers) SP#124

Inspection and compaction test 4th layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (4 of 4
1E KAIG3-RFI-CO-C-2912 00 Civil Crescent 12/19/21 12/23/21 Approved as noted
layers) SP#124

Inspection and compaction test 2nd layer for backfilling around strip footing between PC 193-195 Zone 2R
2R KAIG3-RFI-CO-C-2913 00 Civil Crescent 12/19/21 12/23/21 Approved as noted
(as highlighted) (2 of 4 layers) SP#124
Inspection and compaction test 4th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2951 00 Civil Crescent 12/20/21 12/23/21 Approved as noted
highlighted) (4 of 10 layers) SP#124

Inspection and compaction test 3rd layer for backfilling around PC 165 Zone 2M (as highlighted) (3 of 4
2M KAIG3-RFI-CO-C-2952 00 Civil Crescent 12/20/21 12/23/21 Approved as noted
layers) SP#124

Inspection and compaction test 3rd layer for backfilling around strip footing between PC 193-195 Zone 2R
2R KAIG3-RFI-CO-C-2953 00 Civil Crescent 12/20/21 12/23/21 Approved as noted
(as highlighted) (3 of 4 layers) SP#124
Inspection and compaction test 5th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2986 00 Civil Crescent 12/21/21 12/25/21 Approved as noted
highlighted) (5 of 10 layers) SP#124
Inspection and compaction test 4th layer for backfilling around PC 165 Zone 2M (as highlighted) (4 of 5
2M KAIG3-RFI-CO-C-2987 00 Civil Crescent 12/21/21 12/25/21 Approved as noted
layers) SP#124
Inspection and compaction test 4th layer for backfilling around strip footing between PC 193-195 Zone 2R
2R KAIG3-RFI-CO-C-2988 00 Civil Crescent 12/23/21 12/28/21 Approved as noted
(as highlighted) (4 of 4 layers) SP#124
Inspection and compaction test 6th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-2997 00 Civil Crescent 12/22/21 12/28/21 Approved as noted
highlighted) (6 of 10 layers) SP#124

Inspection and compaction test 7th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-3048 00 Civil Crescent 12/23/21 12/28/21 Approved as noted
highlighted) (7 of 10 layers) SP#124

Inspection and compaction test 5th layer for backfilling around PC 165 Zone 2M (as highlighted) (5 of 5
2M KAIG3-RFI-CO-C-3050 00 Civil Crescent 12/23/21 12/28/21 Approved as noted
layers) SP#124

1P KAIG3-RFI-CO-C-3104 00 Inspection & Compaction tests for 3rd layers for Backfilling for Zone 1P SP 124 (3 of 6) total 6 layers. Civil Crescent 12/27/21 1/1/22 Approved as noted

Inspection & Compaction tests for 8th layers for Backfilling for beside Strip Footing and PC 22-24-26 Zone
1D KAIG3-RFI-CO-C-3105 00 Civil Crescent 12/27/21 1/1/22 Approved as noted
1D (as highlighted) (8 of 10 layers) SP 124.
Surface Preparation Prior to start Backfilling For Zone 1P (as Highligted), Continuation for backfilling (3rd to
1P KAIG3-RFI-CO-C-3107 00 Civil Crescent 12/27/21 12/28/21 Approved as noted
6th Layer)
Inspection and compaction test 9th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D KAIG3-RFI-CO-C-3126 00 Civil Crescent 12/28/21 1/3/22 Approved as noted
highlighted) (9 of 10 layers) SP#124
Inspection and compaction test 4th layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (4 of
1P KAIG3-RFI-CO-C-3156 00 Civil Crescent 12/30/21 1/8/22 Approved as noted
6) - total 6 layers
Inspection and compaction test 10th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D 6 KAIG3-RFI-CO-C-3219 00 Civil Crescent 1/4/22 1/9/22 Approved as noted
highlighted) (10 of 12 layers) SP#124

1C 6 KAIG3-RFI-CO-C-3220 00 Surface Preparation Prior to start Backfilling at Strip footing and PC 14-16-18-20 Zone 1C (as highlighted) Civil Crescent 1/9/22 1/11/22 Approved as noted

Inspection and compaction test 11th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (as
1D 6 KAIG3-RFI-CO-C-3236 00 Civil Crescent 1/5/22 1/9/22 Approved as noted
highlighted) (11 of 12 layers) SP#124

Inspection and compaction test 5th layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (5 of
1P 6 KAIG3-RFI-CO-C-3250 00 Civil Crescent 1/6/22 1/11/22 Approved as noted
6) - total 6 layers

kaig-qcals 152
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 14-16 (1st of 5th
6 KAIG3-RFI-CO-C-3328 00 Civil Crescent 1/12/22 1/15/22 Approved as noted
Layers) & PC 18-20 (1st of 6th Layers) Zone 1C (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 14-16 (3rd of
1C 6 KAIG3-RFI-CO-C-3380 00 Civil Crescent 1/13/22 1/18/22 Approved as noted
5th Layers) & PC 18-20 (3rd of 6th Layers) Zone 1C (as highlighted) SP#124
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 14-16 (4th of 5th
1C 6 KAIG3-RFI-CO-C-3382 00 Civil Crescent 1/15/22 1/19/22 Approved as noted
Layers) & PC 18-20 (4th of 6th Layers) Zone 1C (as highlighted) SP#124
Inspection and compaction test 5th layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (as
2C 6 KAIG3-RFI-CO-C-3384 00 Civil Crescent 1/20/22 1/25/22 Approved as noted
highlighted) (5 of 5 layers) SP#124
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 14-16 (5th of 5th
1C 6 KAIG3-RFI-CO-C-3418 00 Civil Crescent 1/19/22 1/23/22 Approved as noted
Layers) & PC 18-20 (5th of 6th Layers) Zone 1C (as highlighted) SP#124
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 146-148-150 (1st
2J 6 KAIG3-RFI-CO-C-3481 00 of 8th Layers) Zone 2J (as highlighted) SP#124 Inspection and compaction test 1st layer for backfilling of Civil Crescent 1/20/22 1/23/22 Approved as noted
Strip Footing and PC between PC 146-148-150 (1st of 8th Layers) Zone 2J (as highlighted) SP#124
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 140-142 Zone 2H (as
2H 6 KAIG3-RFI-CO-C-3482 00 Civil Crescent 1/23/22 1/25/22 Approved as noted
highlighted)
Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 14-16 (5th of 5th
1C 6 KAIG3-RFI-CO-C-3483 00 Civil Crescent 1/23/22 1/27/22 Approved as noted
Layers) & PC 18-20 (6th of 6th Layers) Zone 1C (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 146-148-150
2J 6 KAIG3-RFI-CO-C-3496 00 Civil Crescent 1/22/22 1/25/22 Approved as noted
(2nd of 8th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 146-148-150
2J 6 KAIG3-RFI-CO-C-3528 00 Civil Crescent 1/23/22 1/26/22 Approved as noted
(3rd of 8th Layers) Zone 2J (as highlighted) SP#124

Inspection and Compaction Test 4th Layer for Backfilling of Strip Footing and PC between PC 146-148-150
2J 6 KAIG3-RFI-CO-C-3536 00 Civil Crescent 1/25/22 1/29/22 Approved as noted
(4th of 8th layers) at Zone 2J as highlighted SP 124.

Soil Preparation Prior to Backfilling Surround the Footings (6 no's) of Canopy, (At B.O.B) Inside Physic
2H 6 KAIG3-RFI-CO-C-3562 00 Civil Crescent 1/25/22 1/29/22 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 140-142 (2nd of
2H 6 KAIG3-RFI-CO-C-3602 00 Civil Crescent 1/26/22 1/30/22 Approved as noted
4th Layers) Zone 2H (as highlighted) SP#124

Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 146-148 (5th of
2J 6 KAIG3-RFI-CO-C-3604 00 Civil Crescent 1/26/22 1/30/22 Approved as noted
8th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 140-142 (3rd of
2H 6 KAIG3-RFI-CO-C-3632 00 Civil Crescent 1/27/22 2/1/22 Approved as noted
4th Layers) Zone 2H (as highlighted) SP#124

Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 146-148 (6th of
2J 6 KAIG3-RFI-CO-C-3634 00 Civil Crescent 1/27/22 2/1/22 Approved as noted
8th Layers) Zone 2J (as highlighted) SP#124
Surface Preparation Prior to start Backfilling for Strip footing & PC between PC(94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3653 00 Civil Crescent 1/31/22 2/5/22 Approved as noted
highlighted
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 140-142 (4th of
2H 6 KAIG3-RFI-CO-C-3668 00 Civil Crescent 1/31/22 2/3/22 Approved as noted
4th Layers) Zone 2H (as highlighted) SP#124
Inspection & Compaction tests of 7th Layer Backfilling of Strip Footing and PC between PC 146, 148, 150
2J 6 KAIG3-RFI-CO-C-3670 00 Civil Crescent 1/30/22 2/3/22 Approved as noted
(7th of 8th layers) at zone 2J as highlighted SP 124.
Inspection and compaction test 1st layer for Strip footing & PC between PC(94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3725 00 Civil Crescent 2/1/22 2/6/22 Approved as noted
highlighted) (1st of 5th Layers ) Zone 2A (as highlighted) SP#124
Surface Preparation prior to statr backfilling at strip footing and PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3726 00 Civil Crescent 2/1/22 2/5/22 Approved as noted
highlighted)

Inspection and compaction test 1st layer for Strip footing & PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3727 00 Civil Crescent 2/1/22 2/6/22 Approved as noted
highlighted) (1st of 5th Layers ) Zone 2F (as highlighted) SP#124

Inspection and compaction test 8th layer for backfilling of Strip Footing and PC between PC 146-148-150
2J 6 KAIG3-RFI-CO-C-3741 00 Civil Crescent 2/1/22 2/6/22 Approved as noted
(8th of 8th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 2nd layer for Strip footing & PC between PC(94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3744 00 Civil Crescent 2/2/22 2/7/22 Approved as noted
highlighted) (2nd of 5th Layers ) Zone 2A (as highlighted) SP#124
Inspection and compaction test 2nd layer for Strip footing & PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3745 00 Civil Crescent 2/2/22 2/7/22 Approved as noted
highlighted) (2nd of 5th Layers ) Zone 2F (as highlighted) SP#124
Inspection and compaction test 3rd layer for Strip footing & PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3774 00 Civil Crescent 2/3/22 2/8/22 Approved as noted
highlighted) (3rd of 5th Layers ) Zone 2F (as highlighted) SP#124

kaig-qcals 153
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 3rd layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3775 00 Civil Crescent 2/3/22 2/8/22 Approved as noted
highlighted) (2nd of 5th Layers ) SP#124

Inspection and compaction test 4th layer for Strip footing & PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3797 00 Civil Crescent 2/5/22 2/9/22 Approved as noted
highlighted) (4th of 5th Layers ) Zone 2F (as highlighted) SP#124

Inspection and compaction test 4th layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3798 00 Civil Crescent 2/5/22 2/9/22 Approved as noted
highlighted) (4th of 5th Layers ) SP#124

Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 150-152 Zone 2J (as
2J 6 KAIG3-RFI-CO-C-3814 00 Civil Crescent 2/6/22 2/9/22 Approved as noted
highlighted)

Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 150-152 (1st of
2J 6 KAIG3-RFI-CO-C-3826 00 Civil Crescent 2/6/22 2/10/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 5th layer for Strip footing & PC between PC 127-129 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3867 00 Civil Crescent 2/7/22 2/10/22 Approved as noted
highlighted) (5th of 5th Layers ) Zone 2F (as highlighted) SP#124

Inspection and compaction test 5th layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3868 00 Civil Crescent 2/7/22 2/10/22 Approved as noted
highlighted) (5th of 5th Layers ) SP#124

Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 150-152 (4th of
2J 6 KAIG3-RFI-CO-C-3869 00 Civil Crescent 2/8/22 2/13/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 150-152 (2nd of
2J 6 KAIG3-RFI-CO-C-3877 00 Civil Crescent 2/7/22 2/10/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 150-152 (3rd of
2J 6 KAIG3-RFI-CO-C-3878 00 Civil Crescent 2/7/22 2/10/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 93,95,97 Zone 2A (as
2A 6 KAIG3-RFI-CO-C-3884 00 Civil Crescent 2/8/22 2/13/22 Approved as noted
highlighted)

Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 93,95,97 (1st of
2A 6 KAIG3-RFI-CO-C-3885 00 Civil Crescent 2/8/22 2/14/22 Approved as noted
5th Layers) Zone 2A (as highlighted) SP#124

Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 32,34 (1st of 4th
1F 6 KAIG3-RFI-CO-C-3886 00 Civil Crescent 2/8/22 2/13/22 Approved as noted
Layers) Zone 2A (as highlighted) SP#124

Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 32-34 Zone 1F (as
1F 6 KAIG3-RFI-CO-C-3889 00 Civil Crescent 2/7/22 2/13/22 Approved as noted
highlighted)

2H 6 KAIG3-RFI-CO-C-3917 00 Surface Preparation Prior to start Backfilling for TUNNEL 1 (between axis 02-1 & 02-2) as highlighted Civil Crescent 2/8/22 2/10/22 Approved as noted

Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 150-152 (5th of
2J 6 KAIG3-RFI-CO-C-3952 00 Civil Crescent 2/9/22 2/14/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 150-152 (6th of
2J 6 KAIG3-RFI-CO-C-3953 00 Civil Crescent 2/9/22 2/14/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 32,34 (2nd of
1F 6 KAIG3-RFI-CO-C-3954 00 Civil Crescent 2/9/22 2/15/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 1st layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as
2H 6 KAIG3-RFI-CO-C-3955 00 Civil Crescent 2/9/22 2/14/22 Approved as noted
highlighted (1st of 2nd Layers) Zone 2H (as highlighted) SP#124

Inspection and compaction test 7th layer for backfilling of Strip Footing and PC between PC 150-152 (7th of
2J 6 KAIG3-RFI-CO-C-3971 00 Civil Crescent 2/10/22 2/15/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124
Inspection and compaction test 2nd layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as
2H 6 KAIG3-RFI-CO-C-3972 00 Civil Crescent 2/13/22 2/16/22 Approved as noted
highlighted (2nd of 4th Layers) Zone 2H (as highlighted) SP#124
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 131-133 Zone 2F (as
2F 6 KAIG3-RFI-CO-C-3986 00 Civil Crescent 2/10/22 2/15/22 Approved as noted
highlighted)
Inspection and compaction test 8th layer for backfilling of Strip Footing and PC between PC 150-152 (7th of
2J 6 KAIG3-RFI-CO-C-3988 00 Civil Crescent 2/12/22 2/16/22 Approved as noted
9th Layers) Zone 2J (as highlighted) SP#124
Inspection and compaction test 3rd layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as
2H 6 KAIG3-RFI-CO-C-4016 00 Civil Crescent 2/13/22 2/17/22 Approved as noted
highlighted (3rd of 4th Layers) Zone 2H (as highlighted) SP#124

kaig-qcals 154
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 131,133 (1st of
2F 6 KAIG3-RFI-CO-C-4017 00 Civil Crescent 2/13/22 2/18/22 Approved as noted
5th Layers) Zone 2F (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 32,34 (3rd of
1F 6 KAIG3-RFI-CO-C-4018 00 Civil Crescent 2/13/22 2/17/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 93,95,97 (2nd
2A 6 KAIG3-RFI-CO-C-4021 00 Civil Crescent 2/13/22 2/17/22 Approved as noted
of 5th Layers) Zone 2A (as highlighted) SP#124

Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 31-33 Zone 1F (as
6B 6 KAIG3-RFI-CO-C-4048 00 Civil Crescent 2/14/22 2/17/22 Approved as noted
highlighted)
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 31,33 (1st of 4th
1F 6 KAIG3-RFI-CO-C-4049 00 Civil Crescent 2/14/22 2/19/22 Approved as noted
Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 3th layer for backfilling of Strip Footing and PC between PC 93,95,97 (3th
2A 6 KAIG3-RFI-CO-C-4052 00 Civil Crescent 2/14/22 2/19/22 Approved as noted
of 5th Layers) Zone 2A (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 131,133 (2nd
2F 6 KAIG3-RFI-CO-C-4054 00 Civil Crescent 2/14/22 2/19/22 Approved as noted
of 5th Layers) Zone 2F (as highlighted) SP#124
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 93,95,97 (4th
2A 6 KAIG3-RFI-CO-C-4055 00 Civil Crescent 2/15/22 2/20/22 Approved as noted
of 5th Layers) Zone 2A (as highlighted) SP#124
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 131,133 (3rd of
2F 6 KAIG3-RFI-CO-C-4080 00 Civil Crescent 2/15/22 2/20/22 Approved as noted
5th Layers) Zone 2F (as highlighted) SP#124
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 32,34 (4th of
1F 6 KAIG3-RFI-CO-C-4081 00 Civil Crescent 2/15/22 2/20/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124
Inspection and compaction test 4th layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as
2H 6 KAIG3-RFI-CO-C-4082 00 Civil Crescent 2/15/22 2/20/22 Approved as noted
highlighted (4th of 4th Layers) Zone 2H (as highlighted) SP#124
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 81 to 83 Zone 1N (as
1N 6 KAIG3-RFI-CO-C-4083 00 Civil Crescent 2/15/22 2/19/22 Approved as noted
highlighted)
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 81 to 83 (1st of
1N 6 KAIG3-RFI-CO-C-4084 00 Civil Crescent 2/15/22 2/20/22 Approved as noted
4th Layers) Zone 1N (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 81 to 83 (2nd of
1N 6 KAIG3-RFI-CO-C-4091 00 Civil Crescent 2/15/22 2/21/22 Approved as noted
4th Layers) Zone 1N (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 81 to 83 (3rd of
1N 6 KAIG3-RFI-CO-C-4106 00 Civil Crescent 2/16/22 2/21/22 Approved as noted
6th Layers) Zone 1N (as highlighted) SP#124

Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 81 to 83 (4th of
1N 6 KAIG3-RFI-CO-C-4107 00 Civil Crescent 2/16/22 2/23/22 Approved as noted
6th Layers) Zone 1N (as highlighted) SP#124

Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 31,33 (2nd of
1F 6 KAIG3-RFI-CO-C-4108 00 Civil Crescent 2/16/22 2/20/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 31,33 (3rd of
1F 6 KAIG3-RFI-CO-C-4109 00 Civil Crescent 2/16/22 2/21/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 131,133 (4th of
2F 6 KAIG3-RFI-CO-C-4110 00 Civil Crescent 2/16/22 2/21/22 Approved as noted
5th Layers) Zone 2F (as highlighted) SP#124

Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 93,95,97 (5th
2A 6 KAIG3-RFI-CO-C-4130 00 Civil Crescent 2/17/22 2/23/22 Approved as noted
of 5th Layers) Zone 2A (as highlighted) SP#124

Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 31,33 (4th of
1F 6 KAIG3-RFI-CO-C-4151 00 Civil Crescent 2/20/22 2/26/22 Approved as noted
4th Layers) Zone 1F (as highlighted) SP#124

Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 81 to 83 (5th of
1N 6 KAIG3-RFI-CO-C-4154 00 Civil Crescent 2/19/22 2/23/22 Approved as noted
6th Layers) Zone 1N (as highlighted) SP#124
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 131,133 (5th of
2F 6 KAIG3-RFI-CO-C-4175 00 Civil Crescent 2/20/22 2/26/22 Approved as noted
5th Layers) Zone 2F (as highlighted) SP#124
Surface Preparation Prior to start Backfilling Beside PC and stripfooting outer between PC 91-93 (as
2A 6 KAIG3-RFI-CO-C-4244 00 Civil Crescent 2/26/22 3/1/22 Approved as noted
Highlighted) Zone 2A
1N 6 KAIG3-RFI-CO-C-4287 00 Surface Preparation Prior to start Continue Backfilling at Internal Building Zone 1N (as highlighted) Civil Cafeteria 2/28/22 3/2/22 Approved as noted

1N 6 KAIG3-RFI-CO-C-4339 00 Inspection and compaction test 1st layer for Internal Building for Zone 1N (as highlighted) (1st of 6th) Civil Crescent 3/2/22 3/7/22 Approved as noted

kaig-qcals 155
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 4th layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 02A-
2A 6 KAIG3-RFI-CO-C-4383 00 Civil Crescent 3/3/22 3/8/22 Approved as noted
02B ZONE 2A (as highlighted) (4th of 5th), SP#124

1N 6 KAIG3-RFI-CO-C-4389 00 Inspection and compaction test 2nd layer for Internal Building for Zone 1N (as highlighted) (2nd of 6th) Civil Crescent 3/5/22 3/8/22 Approved as noted

Inspection and compaction test 5th layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 02A-
2A 6 KAIG3-RFI-CO-C-4434 00 Civil Crescent 3/6/22 3/10/22 Approved as noted
02B ZONE 2A (as highlighted) (5th of 5th), SP#124

Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 77-79 Zone 1N (as
1N 6 KAIG3-RFI-CO-C-4451 00 Civil Crescent 3/7/22 3/8/22 Approved as noted
highlighted)

Inspection and compaction test 3rd layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as
1N 6 KAIG3-RFI-CO-C-4473 00 Civil Crescent 3/7/22 3/10/22 Approved as noted
highlighted) (3rd of 6th), SP#124

Inspection and compaction test 1st layer for Internal Building (2nd part) for Zone 1N Axis 01AN - 01AP (as
1N 6 KAIG3-RFI-CO-C-4474 00 Civil Crescent 3/7/22 3/10/22 Approved as noted
highlighted) (1st of 4th), SP#124
Inspection and compaction test 1st layer for Strip footing (side) Zone 1N between PC 79-81 (as highlighted)
1N 6 KAIG3-RFI-CO-C-4476 00 Civil Crescent 3/7/22 3/10/22 Approved as noted
(1st of 4th), SP#124

Inspection and compaction test 2nd & 3rd layer for Internal Building (2nd part) for Zone 1N Axis 01AN -
1N 6 KAIG3-RFI-CO-C-4481 00 Civil Crescent 3/8/22 3/12/22 Approved as noted
01AP (as highlighted) (1st of 4th), SP#124

Inspection and compaction test 4th & 5th layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as
1N 6 KAIG3-RFI-CO-C-4482 00 Civil Crescent 3/8/22 3/12/22 Approved as noted
highlighted) (4th & 5th of 6th), SP#124
Inspection and compaction test 1st layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zone
1N 6 KAIG3-RFI-CO-C-4483 00 Civil Crescent 3/8/22 3/12/22 Approved as noted
1N (as highlighted)
Inspection and compaction test 2nd & 3rd layer for Strip footing (side) Zone 1N between PC 79-81 (as
1N 6 KAIG3-RFI-CO-C-4484 00 Civil Crescent 3/8/22 3/12/22 Approved as noted
highlighted) (2nd & 3rd of 4th), SP#124
Inspection And Compaction Test 4th layer for Internal Building (2nd part) for Zone 1N Axis 01AN - 01AP as
1N 6 KAIG3-RFI-CO-C-4548 00 Civil Crescent 3/12/22 3/16/22 Approved as noted
highlighted (4th of 4th) SP 124.
Inspection And Compaction Test 6th layer for Internal Building for Zone 1N Axis 01AN - 01AP as
1N 6 KAIG3-RFI-CO-C-4549 00 Civil Crescent 3/12/22 3/16/22 Approved as noted
highlighted (6th of 6th) SP 124.
Inspection and compaction test 4th layer for Strip footing (side) Zone 1N between PC 79-81 (as highlighted)
1N 6 KAIG3-RFI-CO-C-4550 00 Civil Crescent 3/13/22 3/16/22 Approved as noted
(4th of 4th), SP#124

Inspection and compaction test 2nd layer for backfilling of PC and STRIP FOOTING between PC 77-79
1N 6 KAIG3-RFI-CO-C-4551 00 Civil Crescent 3/13/22 3/16/22 Approved as noted
Zone 1N (as highlighted) (2nd of 4th layer) SP#124

2Q 6 KAIG3-RFI-CO-C-4552 00 Surface Preparation prior to start Backfilling at Internal Building Zone 2Q as highlighted Axis 02AZ-02AY. Civil Crescent 3/12/22 3/16/22 Approved as noted

Inspection and compaction test 1st layer for Internal Building Zone 2Q (as highlighted) axis 02AZ-02AX (1st
1N 6 KAIG3-RFI-CO-C-4585 00 Civil Crescent 3/13/22 3/16/22 Approved as noted
of 4th layer) SP#124
Inspection and compaction test 4th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis:
1N 6 KAIG3-RFI-CO-C-4591 00 Civil Crescent 3/14/22 3/16/22 Approved as noted
01AN - 01AP (as highlighted) (4thof 6th), SP#124

Surface Preparation Prior to start Backfilling at Strip footing (outer) Zone 1P (as highlighted) axis 01AS -
1P 6 KAIG3-RFI-CO-C-4598 00 Civil Crescent 3/14/22 3/17/22 Approved as noted
01AQ

Inspection and compaction test 3rd layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zone
1N 6 KAIG3-RFI-CO-C-4602 00 Civil Crescent 3/15/22 3/17/22 Approved as noted
1N (as highlighted) (3rd of 4th layer) SP#124

Inspection and compaction test 2nd layer for Internal Building Zone 2Q (as highlighted) axis 02AZ-02AX
1N 6 KAIG3-RFI-CO-C-4603 00 Civil Crescent 3/15/22 3/19/22 Approved as noted
(2nd of 4th layer) SP#124

Inspection and compaction test 5th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis
1N 6 KAIG3-RFI-CO-C-4604 00 Civil Crescent 3/15/22 3/17/22 Approved as noted
01AN - 01AP (as highlighted) (5th of 6th), SP#124

Inspection and compaction test 4th layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zone
1N 6 KAIG3-RFI-CO-C-4623 00 Civil Crescent 3/16/22 3/20/22 Approved as noted
1N (as highlighted) (4th of 4th layer) SP#124

2H 6 KAIG3-RFI-CO-C-4624 00 Surface Preparation Prior to start Backfilling at Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 Civil Crescent 3/15/22 3/17/22 Approved as noted

Inspection and compaction test 1st layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (1st
2H 6 KAIG3-RFI-CO-C-4625 00 Civil Crescent 3/15/22 3/19/22 Approved as noted
of 4th layer) SP#124
Inspection and compaction test 1st layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AS - 01AQ
1P 6 KAIG3-RFI-CO-C-4648 00 Civil Crescent 3/16/22 3/20/22 Approved as noted
(1st of 4th layer) SP#124
kaig-qcals 156
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 2nd layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2
2H 6 KAIG3-RFI-CO-C-4649 00 Civil Crescent 3/16/22 3/20/22 Approved as noted
(2nd of 4th layer) SP#124
Inspection and compaction test 6th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis
1N 6 KAIG3-RFI-CO-C-4656 00 Civil Crescent 3/16/22 3/20/22 Approved as noted
01AN - 01AP (as highlighted) (6th of 6th), SP#124
2K 6 KAIG3-RFI-CO-C-4657 00 Surface Preparation Prior to start Backfilling at around PC 151 Zone 2K (as highlighted) Civil Crescent 3/16/22 3/20/22 Approved as noted
Surface Preparation Prior to start Backfilling at Strip footing and PC (outer) between PC 72-84 Zone 1N 1M
1N 6 KAIG3-RFI-CO-C-4658 00 Civil Crescent 3/16/22 3/20/22 Approved as noted
(as highlighted)
Inspection and compaction test 3rd layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (3rd
2H 6 KAIG3-RFI-CO-C-4670 00 Civil Crescent 3/17/22 3/21/22 Approved as noted
of 4th layer) SP#124
Inspection and compaction test 1st layer around Pilecap 151 at Zone 2K (as highlighted) (1st of 4th layer)
2K 6 KAIG3-RFI-CO-C-4671 00 Civil Crescent 3/17/22 3/21/22 Approved as noted
SP#124
Inspection and compaction test 2nd layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AS -
1P 6 KAIG3-RFI-CO-C-4672 00 Civil Crescent 3/17/22 3/20/22 Approved as noted
01AQ (2nd of 4th layer) SP#124
Inspection and Compaction Test 3rd Layer for Strip Footing (Outer) Zone 1P as highlighted axis 01AS -
1P 6 KAIG3-RFI-CO-C-4685 00 Civil Crescent 3/19/22 3/21/22 Approved as noted
01AQ (3rd of 4th layers) SP 124.
Inspection and Compaction Test 2nd around Pile Cap 151 at Zone 2K as highlighted (2nd of 4th layers) SP
2K 6 KAIG3-RFI-CO-C-4686 00 Civil Crescent 3/19/22 3/21/22 Approved as noted
124.
Inspection and compaction test 4th layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (4th
2E 6 KAIG3-RFI-CO-C-4716 00 Civil MCPE 3 3/20/22 3/22/22 Approved as noted
of 4th layer) SP#124
Inspection and compaction test 3rd layer around Pilecap 151 at Zone 2K (as highlighted) (3rd of 4th layer)
2K 6 KAIG3-RFI-CO-C-4728 00 Civil Crescent 3/21/22 3/23/22 Approved as noted
SP#124
Inspection and compaction test 4th layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AP - 01AR
1P 6 KAIG3-RFI-CO-C-4730 00 Civil Crescent 3/21/22 3/23/22 Approved as noted
(4th of 4th layer) SP#124
Inspection and compaction test 4th layer around Pilecap 151 at Zone 2K (as highlighted) (4th of 4th layer)
2K 2 KAIG3-RFI-CO-C-4763 00 Civil Crescent 3/22/22 3/24/22 Approved as noted
SP#124
Inspection and Compaction Test 1st, 2nd & 3rd layer (Red Sand) for beside of Retaining Wall Axis 1AP to
1 1 KAIG3-RFI-CO-C-4793 00 Civil Crescent 3/23/22 3/27/22 Approved as noted
AK zone 1 as highlighted (1st, 2nd & 3rd of 3rd layer for Red Sand) SP 133.
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AL TO 01AO Zone
1 1 KAIG3-RFI-CO-C-4852 00 Civil Crescent 3/27/22 3/29/22 Approved as noted
1 (as highlighted) (1st & 2nd of 8th) SP-124
Inspection and compaction test 3rd, 4th (Subgrade) for Beside of Retaining wall Axis 01AL TO 01AO Zone 1
1 1 KAIG3-RFI-CO-C-4881 00 Civil Crescent 3/28/22 4/2/22 Approved as noted
(as highlighted) (3rd & 4th of 8th) SP-124
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone 1
1 6 KAIG3-RFI-CO-C-4882 00 Civil Crescent 3/29/22 3/30/22 Approved as noted
(as highlighted) (1st & 2nd of 8th) SP-124
Inspection and compaction test 1st, 2nd & 3rd (Red sand) for Beside of Retaining wall Axis 01AJ TO 01AL
KAIG3-RFI-CO-C-4883 00 Civil Crescent 3/29/22 3/30/22 Approved as noted
Zone 1 (as highlighted) SP-133
Inspection and compaction test 3rd, 4th (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone 1
1 6 KAIG3-RFI-CO-C-4904 00 Civil Crescent 3/29/22 4/3/22 Approved as noted
(as highlighted) (3rd & 4th of 8th) SP-124
Inspection and compaction test 5th, 6th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone
1 6 KAIG3-RFI-CO-C-4905 00 Civil Crescent 3/29/22 4/3/22 Approved as noted
1 (as highlighted) (5th & 6th of 8th) SP-124
Inspection and compaction test 7th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone 1 (as
1 6 KAIG3-RFI-CO-C-4927 00 Civil Crescent 3/31/22 4/4/22 Approved as noted
highlighted) (7th of 8th) SP-124
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone 1
1 6 KAIG3-RFI-CO-C-4928 00 Civil Crescent 3/31/22 4/4/22 Approved as noted
(as highlighted) (1st& 2nd of 6th) SP-124
Inspection and compaction test of 3rd & 4th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL
1 1 KAIG3-RFI-CO-C-4966 00 Civil Crescent 4/3/22 4/7/22 Approved as noted
Zone 1 (as highlighted) (3rd & 4th of 6th) SP-124
Inspection and compaction test 5th (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone 1 (as
1 1 KAIG3-RFI-CO-C-4968 00 Civil Crescent 4/3/22 4/6/22 Approved as noted
highlighted) (5th of 8th) SP-124
Inspection and compaction test 8th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone 1 (as
1 6 KAIG3-RFI-CO-C-4982 00 Civil Crescent 4/4/22 4/7/22 Approved as noted
highlighted) (8th of 8th) SP-124
Inspection and compaction test 1st, 2nd & 3rd (Red sand) for Beside of Retaining wall Axis 01AK TO 01AL
4 4 KAIG3-RFI-CO-C-4984 00 Civil Site Works 4/7/22 4/10/22 Approved as noted
Zone 1 (as highlighted) SP-133
Inspection and compaction test of 5th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone 1
1 1 KAIG3-RFI-CO-C-4996 00 Civil Crescent 4/5/22 4/8/22 Approved as noted
(as highlighted) (5th of 6th) SP-124
Inspection of 1st & 2nd layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (1st
1 6 KAIG3-RFI-CO-C-5033 00 Civil Crescent 4/9/22 4/12/22 Approved as noted
& 2nd of 4th) (as highlighted) SP-124
Inspection and compaction test of 6th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone 1
1 6 KAIG3-RFI-CO-C-5035 00 Civil Crescent 4/9/22 4/12/22 Approved as noted
(as highlighted) (6th of 6th) SP-124
Inspection of 3rd layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (3rd of
1 6 KAIG3-RFI-CO-C-5038 00 Civil Crescent 4/10/22 4/13/22 Approved as noted
4th) (as highlighted) SP-124
Inspection and compaction test 10th layer for backfilling of RETAINING WALL (INNER AND OUTER)
1 6 KAIG3-RFI-CO-C-5060 00 Civil Crescent 4/11/22 4/13/22 Approved as noted
Zone 1 (as highlighted) (10th of 17 layers) SP#124
Inspection and compaction test 11th & 12th layer for backfilling of RETAINING WALL (INNER AND
1 6 KAIG3-RFI-CO-C-5066 00 Civil Crescent 4/16/22 4/18/22 Approved as noted
OUTER) Zone 1 axis AV-AR (as highlighted) (11th & 12th of 17 layers) SP#124
Inspection of 4th layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (4th of
1 6 KAIG3-RFI-CO-C-5080 00 Civil Crescent 4/13/22 4/16/22 Approved as noted
4th) (as highlighted) SP-124
Inspection and compaction test 13th & 14th layer for backfilling of RETAINING WALL (INNER AND
1 6 KAIG3-RFI-CO-C-5118 00 Civil Crescent 4/18/22 4/21/22 Approved as noted
OUTER) Zone 1 axis AV-AR (as highlighted) (13th & 14th of 17 layers) SP#124
Inspection and compaction test 15th & 16th layer for backfilling of RETAINING WALL (INNER AND
1 6 KAIG3-RFI-CO-C-5130 00 Civil Crescent 4/19/22 4/23/22 Approved as noted
OUTER) Zone 1 axis AV-AR (as highlighted) (15th & 16th of 17 layers) SP#124

kaig-qcals 157
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 17th layer for backfilling of RETAINING WALL (INNER AND OUTER)
1 6 KAIG3-RFI-CO-C-5198 00 Civil Crescent 4/24/22 4/26/22 Approved as noted
Zone 1 axis AV-AR (as highlighted) (17th of 17 layers) SP#125
Inspection and compaction test final layer under blinding for Internal Building (2nd part) for Zone 1N Axis
1N 6 KAIG3-RFI-CO-C-5207 00 Civil Crescent 4/25/22 4/28/22 Approved as noted
01AN - 01AP (as highlighted) (5th of 5th), SP#125
4 4 KAIG3-RFI-CO-C-5378 00 Surface Preparation prior to start backfilling at Retaining Wall as highlighted Axis 01K-01M Zone 4. Civil Crescent 5/14/22 5/16/22 Approved as noted
Inspection and compaction test 1st and 2nd layer Backfill for RETAINING WALL (as highlighted) axis 01K-
4 4 KAIG3-RFI-CO-C-5379 00 Civil Crescent 5/14/22 5/17/22 Approved as noted
01M Zone 4 (as highlighted) (1st & 2nd of 5th layer) SP#125
Inspection and compaction test 3rd and 4th layer Backfill for RETAINING WALL (as highlighted) axis 01K-
4 4 KAIG3-RFI-CO-C-5380 00 Civil Crescent 5/15/22 5/21/22 Approved as noted
01M Zone 4 (as highlighted) (3rd & 4th of 5th layer) SP#125
Inspection and compaction test 5th layer Backfill for RETAINING WALL (as highlighted) axis 01K-01M
4 4 KAIG3-RFI-CO-C-5428 00 Civil Crescent 5/19/22 5/21/22 Approved as noted
Zone 4 (as highlighted) ( 5th of 11th layer) SP#125
1A 6 KAIG3-RFI-CO-C-5484 00 Surface Preparation Prior to start Backfilling at TIP ZONE 1A (as highlighted) Civil Crescent 5/22/22 5/24/22 Approved as noted

2F 6 KAIG3-RFI-CO-C-5498 00 Excavation for strip footing between PC( 132-134 )& between PC( 126-128 )inner Zone 2F (as highlighted) Civil Crescent 5/24/22 5/26/22 Approved as noted

1N 6 KAIG3-RFI-CO-C-5503 00 Surface Preparation Prior to start Backfilling PC between PC 80 to 79 Zone 1N (as highlighted) Civil Crescent 5/24/22 5/26/22 Approved as noted

2K 6 KAIG3-RFI-CO-C-5517 00 Excavation for strip footing inner zone 2K (as highlighted) Civil Crescent 5/24/22 5/26/22 Approved as noted
Inspection and Compaction Test 4TH & 5TH layer for backfilling at Tip Zone 1A as highlighted (4th to 5th
1A 6 KAIG3-RFI-CO-C-5532 00 Civil Crescent 5/25/22 5/30/22 Approved as noted
of 7 layers (SP# 124).
Inspection and Compaction Test 1st & 2nd layer for backfilling PC between PC 80 to 79 Zone 1N as
1N 6 KAIG3-RFI-CO-C-5533 00 Civil Crescent 5/25/22 5/30/22 Approved as noted
highlighted (1st to 2nd of 6 layers (SP# 124).
1N 6 KAIG3-RFI-CO-C-5546 00 Surface Preparation Prior to start Backfilling between PC 77 & 79 Zone 1N (as highlighted) Civil Crescent 5/26/22 5/30/22 Approved as noted

Inspection and compaction test 1st layer for backfilling for Childcare Zone2N (as highlighted) (1st of 2nd
2N 6 KAIG3-RFI-CO-C-5549 00 Civil Child Care 5/26/22 5/30/22 Code C (resubmit)
layer) SP#124

Inspection and compaction test 1st layer for backfilling for Childcare Zone2N (as highlighted) (1st of 2nd
2N 6 KAIG3-RFI-CO-C-5549 01 Civil Child Care 6/20/22 6/22/22 Approved as noted
layer) SP#124

Inspection and compaction test 2nd & 3rd layer for backfilling PC between PC 80 to 79 Zone 1N (as
1N 6 KAIG3-RFI-CO-C-5563 00 Civil Crescent 5/29/22 5/31/22 Approved as noted
highlighted) (2nd & 3rd of 6th layer) SP#125
Inspection and compaction test 5th & 6th layer for backfilling PC between PC 80 to 79 Zone 1N (as
1N 6 KAIG3-RFI-CO-C-5598 00 Civil Crescent 5/30/22 6/4/22 Approved as noted
highlighted) (5th & 6th of 8th layer) SP#125
Inspection and compaction test 1st & 2nd layer for Backfilling between PC 77 & 79 Zone 1N (as
1N 6 KAIG3-RFI-CO-C-5640 00 Civil Crescent 6/1/22 6/5/22 Approved as noted
highlighted) (1st & 2nd of 5th layer) SP#124

Inspection and compaction test 5th layer for backfilling of PC beside STRIP FOOTING between PC 77-79
1N 6 KAIG3-RFI-CO-C-5641 00 Civil Crescent 6/1/22 6/5/22 Approved as noted
Zone 1N (as highlighted) (5th of 6th layer) SP#124

Inspection and compaction test 3rd layer for Backfilling between PC 77 & 79 Zone 1N (as highlighted) (3rd
1N 6 KAIG3-RFI-CO-C-5706 00 Civil Crescent 6/5/22 6/6/22 Approved as noted
of 5th layer) SP#125

Surface Preparation prior to Start backfilling at Retaining wall Axis 01AI TO 01AD (as highlighted) ZONE
1L 1K 6 KAIG3-RFI-CO-C-5929 00 Civil Crescent 6/19/22 6/23/22 Approved as noted
1K 1L

Inspection and compaction test 1st layer Backfill for Retaining wall Axis 01AA TO 01AC, 01AD TO 01AG
1 6 KAIG3-RFI-CO-C-5987 00 Civil Crescent 6/21/22 6/25/22 Approved as noted
(as highlighted) ZONE 1 SP#125

Inspection and compaction test 1st & 2nd layer Backfill for Retaining wall Axis 01AB TO 01AE, 01AG TO
1 6 KAIG3-RFI-CO-C-5988 00 Civil Crescent 6/21/22 6/26/22 Approved as noted
01AI (as highlighted) ZONE 1 SP#125

Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 16-18 Zone 1C (as
1C 6 KAIG3-RFI-CO-C-6037 00 Civil Crescent 6/22/22 6/26/22 Approved as noted
highlighted) axis 01H-01I

Inspection and compaction test 3rd layer Backfill for Retaining wall Axis 01AB TO 01AE, 01AG TO 01AI
1 6 KAIG3-RFI-CO-C-6064 00 Civil Crescent 6/23/22 6/28/22 Approved as noted
(as highlighted) ZONE 1 SP#125 (3rd of 5th)

Inspection and compaction test 1st layer Backfill for PC and STRIP FOOTING between PC 16-18 Zone 1C
1C 6 KAIG3-RFI-CO-C-6065 00 Civil Crescent 6/23/22 6/28/22 Approved as noted
(as highlighted) SP#125 (1st of 4th) axis 01I-01H

kaig-qcals 158
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Surface Preparation Prior to start Backfilling for TUNNEL 2(between axis 02-T & 02-S) zone 2G as
2G 6 KAIG3-RFI-CO-C-6098 00 Civil Crescent 6/26/22 6/30/22 Approved as noted
highlighted

Inspection and compaction test 1st layer for backfilling for Retaining wall Zone 1 (as highlighted) (1st of 1st
1 6 KAIG3-RFI-CO-C-6106 00 Civil Crescent 6/26/22 6/29/22 Approved as noted
layer) SP#125

Inspection and compaction test 1st & 2nd layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
2G 6 KAIG3-RFI-CO-C-6117 00 Civil Crescent 6/27/22 7/2/22 Approved as noted
zone 2G as highlighted (1st & 2nd of 16 layers )

Inspection and compaction test 2nd & 3rd layer Backfill for PC and STRIP FOOTING between PC 16-18
1C 6 KAIG3-RFI-CO-C-6119 00 Civil Crescent 6/27/22 6/30/22 Approved as noted
Zone 1C (as highlighted) SP#125 (2nd & 3rd of 4th) axis 01I-01H

Surface Preparation Prior to start Backfilling for footing at Diaphagm wall grid 02/AR Zone 2N (as
2N 6 KAIG3-RFI-CO-C-6120 00 Civil Crescent 6/27/22 7/2/22 Approved as noted
highlighted)

Inspection and compaction test 3rd & 4thlayer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
2G 6 KAIG3-RFI-CO-C-6182 00 Civil Crescent 6/29/22 7/4/22 Approved as noted
zone 2G as highlighted ( 3rd & 4th of 16 layers )

Surface Preparation Prior to start Backfilling between PC 143 -145 above tunnel slab zone 2H Axis 02 AA -
2H 6 KAIG3-RFI-CO-C-6183 00 Civil Crescent 6/29/22 7/3/22 Approved as noted
02 AB (as highlighted)

Inspection and compaction test 5th & 6th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
2G 6 KAIG3-RFI-CO-C-6217 00 Civil Crescent 7/2/22 7/7/22 Approved as noted
zone 2G as highlighted ( 5th & 6th of 16 layers )

2E 6 KAIG3-RFI-CO-C-6219 00 Surface Preparation Prior to start Backfilling around PC 25 Zone 2E (as highlighted) axis 02R Civil Crescent 7/2/22 7/6/22 Approved as noted

Inspection and compaction test 1st & 2nd layer for Backfilling around PC 25 Zone 2E (as highlighted) axis
2E 6 KAIG3-RFI-CO-C-6248 00 Civil Crescent 7/3/22 7/7/22 Approved as noted
02R ( 1st & 2nd of 7th layers )

Inspection and compaction test 1st layer for backfilling for footing at Diaphagm wall grid 02/AR Zone 2N
2N 6 KAIG3-RFI-CO-C-6257 00 Civil Crescent 7/4/22 7/6/22 Approved as noted
(as highlighted)SP#125 (1st of 6th Layers)

Inspection and compaction test 3rd &4th layer for Backfilling around PC 25 Zone 2E (as highlighted) axis
2E 6 KAIG3-RFI-CO-C-6259 00 Civil Crescent 7/6/22 7/14/22 Code C (not resubmit)
02R ( 3rd &4th of 7th layers )SP#125

Inspection and compaction test 7th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S) zone 2G
2G 6 KAIG3-RFI-CO-C-6336 00 Civil Crescent 7/6/22 7/14/22 Code C (not resubmit)
as highlighted ( 5th & 6th of 16 layers )

Surface Preparation Prior to start Backfilling for retianing wall Axis 01/AA-01/AH, Zone 1j 1k (as
1J 1K 6 KAIG3-RFI-CO-C-6337 00 Civil Crescent 7/6/22 7/14/22 Code C (not resubmit)
highlighted)

Inspection and compaction test 5th &6th layer for Backfilling around PC 125 Zone 2E (as highlighted) axis
2E 6 KAIG3-RFI-CO-C-6338 00 Civil Crescent 7/7/22 7/14/22 Code C (not resubmit)
02R ( 5th &6th of 7th layers )SP#125

Inspection and compaction test 8th and 9th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
2G 6 KAIG3-RFI-CO-C-6366 00 Civil Crescent 7/13/22 7/16/22 Code C (not resubmit)
zone 2G as highlighted ( 8th & 9th of 16 layers )

Inspection and compaction test 2nd layer for backfilling for footing at Diaphagm wall grid 02/AR Zone 2N
2N 6 KAIG3-RFI-CO-C-6367 00 Civil Crescent 7/13/22 7/17/22 Approved as noted
(as highlighted)SP#125 (2nd of 6th Layers)
Surface Preparation prior to Start backfilling at Retaining wall Axis 01AH TO 01AP (as highlighted) ZONE
1J 1P 6 KAIG3-RFI-CO-C-6375 00 Civil Crescent 7/13/22 7/16/22 Code C (not resubmit)
1J 1K
2D 2E 2 KAIG3-RFI-CO-C-6396 00 Excavation for Cretaceuos Garden zone 2D 2E (as highlighted) Civil Cretaceous Garden 7/18/22 7/27/22 Approved as noted

2R 6 KAIG3-RFI-CO-C-6406 00 Surface Preparation Prior to start Backfilling Infill Wall at Tip Zone 2R (as highlighted) Civil Crescent 7/16/22 7/20/22 Approved as noted

Inspection and compaction test 12th and 13th layer for backfilling for TUNNEL 2(between axis 02-T & 02-
2G 6 KAIG3-RFI-CO-C-6452 00 Civil Crescent 7/19/22 7/23/22 Approved as noted
S) zone 2G as highlighted ( 12th & 13th of 16 layers )

Inspection and compaction test 1st & 2nd layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R
2R 6 KAIG3-RFI-CO-C-6454 00 Civil Crescent 7/23/22 7/26/22 Approved as noted
(1st and 2nd of 7th layer)

kaig-qcals 159
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 3rd layer for backfilling for footing at Diaphagm wall grid 02/AR Zone 2N (as
2N 6 KAIG3-RFI-CO-C-6505 00 Civil Crescent 7/21/22 7/27/22 Approved as noted
highlighted)SP#125 (3rd of 6th Layers)

Inspection and compaction test 7th & 8th layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R
2 2 KAIG3-RFI-CO-C-6507 00 Civil Site Work 7/23/22 7/27/22 Approved as noted
(7th and 8th of 10th layer)
Inspection and compaction test 9th layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R (9th
2R 6 KAIG3-RFI-CO-C-6577 00 Civil Crescent 7/24/22 7/31/22 Approved as noted
of 10th layer)
Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 92-94 axis 02A - 02B
2A 6 KAIG3-RFI-CO-C-6581 00 Civil Crescent 7/25/22 7/31/22 Approved as noted
(as Highlighted) Zone 2A

Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 22-24 Axis 01/L -
1D 6 KAIG3-RFI-CO-C-6582 00 Civil Crescent 7/25/22 7/31/22 Approved as noted
01/K (as Highlighted) Zone 1D

Steel Reinforcement for buttress BOI, BOV & BII, BIV 118 at PC 183 and 184 Axis 02-AU bottom to Mid
4A KAIG3-RFI-CO-S-2517 00 Civil Water Play Garden 11/29/21 12/2/21 Approved as noted
CJ

2H KAIG3-RFI-CO-S-2633 00 Rock Investigation for Retaining wall at Zone 2 & 3 Axis 01-W to 01-R (as Highlighted) Civil Crescent 12/5/21 12/8/21 Approved as noted
Surface preparation prior to start Waterproofing for below Foundation (Inner Elevation) of Retaining Wall (as
3B KAIG3-RFI-CO-S-2634 00 Civil Site Works 12/5/21 12/7/21 Approved as noted
highlighted) AXIS AB to AA.
Application of Cementetous Waterproofing below Foundation (Inner Elevation) of Retaining Wall (as
4D KAIG3-RFI-CO-S-2635 00 Civil Physic Garden 12/5/21 12/11/21 Approved as noted
highlighted) AXIS AB to AA.

Application of Solvent Base Primer below Foundation (Inner Elevation) of Retaining Wall (as highlighted)
4D KAIG3-RFI-CO-S-2636 00 Civil Physic Garden 12/5/21 12/11/21 Approved as noted
AXIS AB to AA.

Application of 1st Layer 4mm thick, APP Bituminous Waterproofing below Foundation (Inner Elevation) of
4B KAIG3-RFI-CO-S-2637 00 Civil Water Play Garden 12/5/21 12/11/21 Approved as noted
Retaining Wall (as highlighted) AXIS AB to AA.

2E 6 KAIG3-RFI-CO-S-3356 00 Steel Reinforcement of Column/Buttress for PC 186 Axis 02 AV / 02 1 (2nd) Civil MCPE 3 1/12/22 1/17/22 Approved as noted

Base Primer Coating (50x50% Bitumin and Water) of foundation at South Administration Building (as
1C 6 KAIG3-RFI-CO-S-3357 00 Civil Crescent 1/12/22 1/17/22 Approved as noted
Highlighted) Zone 2C
Two Coat Bituminous Damp Proofing Coating of foundation at South Administration Building (as
2C 6 KAIG3-RFI-CO-S-3358 00 Civil Crescent 1/12/22 1/17/22 Approved as noted
Highlighted) Zone 2C
6A 6 KAIG3-RFI-CO-S-4622 00 SHuttering of Buttress BII 108, 109, 110 Zone 2M Civil Crescent 3/15/22 cancelled

1G 6 KAIG3-RFI-CO-S-5851 00 Concreting for Mass Concrete for Stip footing between PC 127-129 Zone 2F Civil Crescent 6/23/22 6/28/22 Code C (not resubmit)

2G 6 KAIG3-RFI-CO-S-6382 00 Steel Reinforcements of Slab of TUNNEL 1 part C (as highlighted) Zone 2H Civil Crescent 7/14/22 7/20/22 Approved as noted

C3 3 KAIG3-RFI-CO-S-6558 00 Shuttering for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlighted) Civil Site Work 7/26/22 7/28/22 Approved as noted
Excavation & Soil preparation for Plant Encloser room at Discovery Garden at highlighted area in attached
4B KAIG3-RFI-DG-C-0714 01 Civil Discovery Garden 6/12/22 6/13/22 Approved as noted
Drawing's.
Surface preparation prior to Backfilling Surround the Manholes (6 no's) (MH-D-09, MH-D-09-01, MH-D-09-
4B KAIG3-RFI-DG-C-2017 00 02, MH-D-09-03, MH-D-10 & MH-D-11) (Type A-1 no's, B-4 no's & C-1 no's) Inside Discovery Garden at Civil Discovery Garden 11/6/21 11/9/21 Approved as noted
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Low voltage Lines & Manholes/Handholes, Inside Discovery Garden at
4B KAIG3-RFI-DG-C-2018 00 Civil Discovery Garden 11/6/21 11/8/21 Approved as noted
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Telecom Lines & Manholes/Handholes, Inside Discovery Garden at
4B KAIG3-RFI-DG-C-2019 00 Civil Discovery Garden 11/6/21 11/8/21 Approved as noted
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Emergency Lines & Manholes/Handholes, Inside Discovery Garden at
4B KAIG3-RFI-DG-C-2077 00 Civil Discovery Garden 11/10/21 11/15/21 Approved as noted
highlighted area in attached Drawing's.
Excavation & Bed Preparation for Fire Alarm & Security Lines and Manholes/Handholes, Inside Discovery
4B KAIG3-RFI-DG-C-2078 00 Civil Discovery Garden 11/10/21 11/15/21 Approved as noted
Garden at highlighted area in attached Drawing's.
Sand Bedding for Low voltage Lines, Telecom lines, Emergency Lines and Fire Alarm & Security Lines,
4B KAIG3-RFI-DG-C-2153 00 Civil Discovery Garden 11/14/21 11/16/21 Approved as noted
Inside Discovery Garden at highlighted area in attached Drawing's.
Inspection for Installed Rings (Risers) and Top Slab for Manholes (6 no's) (MH-D-09, MH-D-09-01, MH-D-
4B KAIG3-RFI-DG-C-2194 00 09-02, MH-D-09-03, MH-D-10 & MH-D-11) (Type A-1 no's, B-4 no's & C-1 no's) Inside Discovery Garden Civil Discovery Garden 11/17/21 11/21/21 Code C (not resubmit)
at highlighted area in attached Drawing's.

1st Layer Gravel Backfilling Surround the Manholes (6 no's) (MH-D-09, MH-D-09-01, MH-D-09-02, MH-
4B KAIG3-RFI-DG-C-2300 00 D-09-03, MH-D-10 & MH-D-11) (Type A-1 no's, B-4 no's & C-1 no's) Inside Discovery Garden at Civil Discovery Garden 11/21/21 11/23/21 Approved as noted
highlighted area in attached Drawing's.
2nd Layer Gravel Backfilling Surround the Manholes (4 no's) (MH-D-09, MH-D-09-03, MH-D-10 & MH-D-
4B KAIG3-RFI-DG-C-2401 00 Civil Discovery Garden 11/24/21 11/27/21 Approved as noted
11) (Type B-3 no's & C-1 no's) Inside Discovery Garden at highlighted area in attached Drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) after gravel, Surround
4B KAIG3-RFI-DG-C-2402 00 the Manholes (2 no's) (MH-D-09-01 & MH-D-09-02) (Type A-1 no's & B-1 no's) Inside Discovery Garden at Civil Discovery Garden 11/24/21 11/28/21 Approved as noted
highlighted&area
Inspection in attachedtests
Compaction Drawing's. (StockBackfilling
of 2nd Layer ile 126) (Sub-Grade) (Out of 3 layers) after gravel, Surround
4B KAIG3-RFI-DG-C-2473 00 the Manholes (2 no's) (MH-D-09-01 & MH-D-09-02) (Type A-1 no's & B-1 no's) Inside Discovery Garden at Civil Discovery Garden 11/28/21 12/1/21 Approved as noted
highlighted area in attached Drawing's. (Stock Pile 126)

kaig-qcals 160
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers) after gravel, Surround
4B KAIG3-RFI-DG-C-2577 00 the Manholes (2 no's) (MH-D-09-01 & MH-D-09-02) (Type A-1 no's & B-1 no's) Inside Discovery Garden at Civil Discovery Garden 12/2/21 12/8/21 Approved as noted
highlighted area in attached Drawing's. (Stocc Pile 126).
3rd Layer Gravel Backfilling Surround the Manholes (2 no's) (MH-D-09 & MH-D-09-03) (Type B-1 no's &
4B KAIG3-RFI-DG-C-2588 00 Civil Discovery Garden 12/2/21 12/7/21 Approved as noted
C-1 no's) Inside Discovery Garden at highlighted area in attached Drawing's. (Stock pile # 118)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) after gravel, Surround
4B KAIG3-RFI-DG-C-2589 00 the Manholes (2 no's) (MH-D-10 & MH-D-11) (Type B-2 no's) Inside Discovery Garden at highlighted area Civil Discovery Garden 12/2/21 12/8/21 Approved as noted
in attached Drawing's. (Stock pile # 126)
4th Layer Gravel Backfilling Surround the Manholes (1 no's) (MH-D-09) (Type C-1 no's) Inside Discovery
4B KAIG3-RFI-DG-C-2716 00 Civil Discovery Garden 12/11/21 12/16/21 Approved as noted
Garden at highlighted area in attached Drawing's. (Stock pile # 118)
Installation of red tiles for Red Tiles for TELECOM straight UPVC conduits (Dia. 3 inch) at Discovery
4B KAIG3-RFI-DG-C-2870 00 Civil Discovery Garden 12/18/21 cancelled
Garden as per attached highlighted drawing
Installation of red tiles for Power (Low Voltage LV & Emergency EM) straight UPVC ducts (Dia. 3 inch) at
4B KAIG3-RFI-DG-C-2871 00 Civil Discovery Garden 12/16/21 cancelled
Discovery Garden as per attached highlighted drawing
Sand Cover Protection & Warning Tiles on Low voltage Lines, Telecom lines, Emergency Lines and Fire
4B KAIG3-RFI-DG-C-2898 00 Civil Discovery Garden 12/18/21 12/23/21 Code C (resubmit)
Alarm & Security Lines, Inside Discovery Garden at highlighted area in attached Drawing's.
Sand Cover Protection & Warning Tiles on Low voltage Lines, Telecom lines, Emergency Lines and Fire
4B 4 KAIG3-RFI-DG-C-2898 01 Civil Discovery Garden 1/1/22 1/5/22 Approved as noted
Alarm & Security Lines, Inside Discovery Garden at highlighted area in attached Drawing's.
Soil preparation prior to Backfilling along the (Remaining) Boundary wall (All Side), (At B.O.B Level
4B 4 KAIG3-RFI-DG-C-3346 00 Civil Discovery Garden 1/12/22 1/15/22 Approved as noted
+877.40), at Discovery Garden at highlighted area in attached Drawing's.
Soil preparation prior to Backfilling along the Plant room (Outer Side), (At B.O.B Level +877.32), at
4B 4 KAIG3-RFI-DG-C-3378 00 Civil Discovery Garden 1/13/22 1/17/22 Approved as noted
Discovery Garden at highlighted area in attached Drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) along the (Remaining)
4B 4 KAIG3-RFI-DG-C-3391 00 Boundary wall (All Side), (from B.O.B Level +877.40), at Discovery Garden at highlighted area in attached Civil Discovery Garden 1/15/22 1/18/22 Approved as noted
Drawing's. &
Inspection (Stock Pile # 126)
Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the (Remaining)
4B 4 KAIG3-RFI-DG-C-3445 00 Boundary wall (All Side), (from B.O.B Level +877.40), at Discovery Garden at highlighted area in attached Civil Discovery Garden 1/18/22 1/23/22 Approved as noted
Drawing's. &
Inspection (Stock Pile # 126)
Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) (After 3 layers Gravel),
4B 4 KAIG3-RFI-DG-C-3479 00 Surround the Manhole (MH-D-09-03), Inside Discovery Garden at highlighted area in attached Drawing's. Civil Discovery Garden 1/20/22 1/25/22 Approved as noted
(Stock Pile&
Inspection # 126)
Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) (After 3 layers
4B 4 KAIG3-RFI-DG-C-3485 00 Gravel), Surround the Manhole (MH-D-09-03), Inside Discovery Garden at highlighted area in attached Civil Discovery Garden 1/22/22 1/27/22 Approved as noted
Drawing's.Pouring
Concrete (Stock for
PileBlinding
# 126) Under Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telecom
4B 4 KAIG3-RFI-DG-C-3605 00 (MH/DG/TC/01-16), Emergency (MH/DG/EM/01-17) and Fire Alarm & Security (MH/DG/FA/01-17), Civil Discovery Garden 1/26/22 1/29/22 Approved as noted
Inside Discovery Garden at highlighted area in attached Drawing's.
Soil preparation & Existing Levels prior to Backfilling, at Center, Inside Discovery Garden at highlighted
4B 4 KAIG3-RFI-DG-C-3691 00 Civil Discovery Garden 1/31/22 2/5/22 Approved as noted
area in attached Drawing's.
Inspection for Installation of Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telecom
4B 4 KAIG3-RFI-DG-C-3719 00 (MH/DG/TC/01-16), Emergency (MH/DG/EM/01-17) and Fire Alarm & Security (MH/DG/FA/01-17), Civil Discovery Garden 1/31/22 2/9/22 Approved as noted
Inside Discovery Garden at highlighted area in attached Drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Inside
4B 4 KAIG3-RFI-DG-C-3808 00 Civil Discovery Garden 2/6/22 2/10/22 Approved as noted
Discovery Garden at highlighted area in attached Drawing's. (Stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Inside
4B 4 KAIG3-RFI-DG-C-3881 00 Civil Discovery Garden 2/8/22 2/13/22 Approved as noted
Discovery Garden at highlighted area in attached Drawing's. (Stock pile # 126)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Inside
4B 4 KAIG3-RFI-DG-C-3919 00 Civil Discovery Garden 2/10/22 2/15/22 Approved as noted
Discovery Garden at highlighted area in attached Drawing's. (Stock pile # 126)
Surface Preparation prior to backfilling Sorround with (58) Manholes at Discovery Garden at highlighted area
4B 4 KAIG3-RFI-DG-C-4596 00 Civil Discovery Garden 3/15/22 cancelled
in attached drawings.
Surface preparation prior to Backfilling Surround of (25) Electrical handholes at (MH DG LV 1 to 8),(MH
4B 4 KAIG3-RFI-DG-C-4719 00 Civil Discovery Garden 3/21/22 3/24/22 Approved as noted
DG ME 1 to 17) Discovery Garden, at highlighted area in attached drawings
Surface preparation prior to Backfilling Surround of (30) Low current handholes at (MH DG TC 1 to 16),
4B 4 KAIG3-RFI-DG-C-4720 00 Civil Discovery Garden 3/21/22 3/24/22 Approved as noted
(MH DG FA 1 to 17), at Discovery Garden, as highlighted area in attached drawings
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant room
4B 4 KAIG3-RFI-DG-C-4943 00 Civil Discovery Garden 4/2/22 4/5/22 Approved as noted
(Outer Side), at Discovery Garden at highlighted area in attached Drawing's. (Stock pile 126)
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 no's)
4B 4 KAIG3-RFI-DG-C-5009 00 Electrical handholes at (MH/DG/LV/1 to 8),(MH/DG/EM/1 to 17) Discovery Garden, at highlighted area in Civil Discovery Garden 4/6/22 4/9/22 Code C (resubmit)
attached drawings.
Inspection (Stock Tests
& Compaction pile 126)
for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 no's)
4B 4 KAIG3-RFI-DG-C-5009 01 Electrical handholes at (MH/DG/LV/1 to 8),(MH/DG/EM/1 to 17) Discovery Garden, at highlighted area in Civil Discovery Garden 4/21/22 4/24/22 Code C (resubmit)
attached drawings.
Inspection (Stock Tests
& Compaction pile 126)
for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 no's)
4B 4 KAIG3-RFI-DG-C-5009 02 Electrical handholes at (MH/DG/LV/1 to 8),(MH/DG/EM/1 to 17) Discovery Garden, at highlighted area in Civil Discovery Garden 5/17/22 5/21/22 Approved as noted
attached drawings.
Inspection (Stock Tests
& Compaction pile 126)
for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 no's)
4B 4 KAIG3-RFI-DG-C-5010 00 Low current handholes at (MH/DG/TC/1 to 16) & (MH/DG/FA/1 to 17), at Discovery Garden, as highlighted Civil Discovery Garden 4/6/22 4/9/22 Code C (resubmit)
area in attached
Inspection drawings. Tests
& Compaction (Stockforpile
1st126)
Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 no's)
4B 4 KAIG3-RFI-DG-C-5010 01 Low current handholes at (MH/DG/TC/1 to 16) & (MH/DG/FA/1 to 17), at Discovery Garden, as highlighted Civil Discovery Garden 4/21/22 4/24/22 Code C (resubmit)
area in attached
Inspection drawings. Tests
& Compaction (Stockforpile
1st126)
Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 no's)
4B 4 KAIG3-RFI-DG-C-5010 02 Low current handholes at (MH/DG/TC/1 to 16) & (MH/DG/FA/1 to 17), at Discovery Garden, as highlighted Civil Discovery Garden 5/17/22 5/21/22 Approved as noted
area in attached drawings. (Stock pile 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant room
4B 4 KAIG3-RFI-DG-C-5011 00 Civil Discovery Garden 4/6/22 4/10/22 Approved as noted
(Outer Side), at Discovery Garden at highlighted area in attached Drawing's. (Stock pile 126)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant room
4B 4 KAIG3-RFI-DG-C-5021 00 Civil Discovery Garden 4/7/22 4/12/22 Approved as noted
(Outer Side), at Discovery Garden at highlighted area in attached Drawing's. (Stock pile 126)
Inspection & Compaction Tests for 2nd Layer Backfilling (Out of 2 layers Sub Grade and Final Layer Sub
4B 4 KAIG3-RFI-DG-C-5730 00 Base) Surround (25 no's) Electrical handholes at (MH/DG/LV/1 to 8),(MH/DG/EM/1 to 17) Discovery Civil Discovery Garden 6/6/22 6/9/22 Approved as noted
Garden, at highlighted
Inspection & Compaction areaTests
in attached
for 2nddrawings. (Stoc (Out of 2 layers Sub Grade and Final Layer Sub
Layer Backfilling
4B 4 KAIG3-RFI-DG-C-5731 00 Base) Surround (30 no's) Low current handholes at (MH/DG/TC/1 to 16) & (MH/DG/FA/1 to 17), at Civil Discovery Garden 6/6/22 6/9/22 Approved as noted
Discovery Garden, as highlighted area in attached drawing
Excavation & Bed Preparation for Irrigation Sub-Main Line Distribution Network (50,90 mm line) at
4B 4 KAIG3-RFI-DG-C-6034 00 Civil Discovery Garden 6/22/22 6/27/22 Approved as noted
Discovery Garden, as highlighted area in the attached drawings.
Sand Bedding for Irrigation Sub-Main Line Distribution Network (50,90 mm Line) at Discovery Garden , as
4B 4 KAIG3-RFI-DG-C-6085 00 Civil Discovery Garden 7/17/22 7/17/22 Approved as noted
Heighlighted area in the attached drawings.
Surface Preparation prior to Backfilling to support Irrigation Sub-Main Line Distribution Network (50,90 mm
4B 4 KAIG3-RFI-DG-C-6441 00 Civil Discovery Garden 7/17/22 7/20/22 Approved as noted
line) at Discovery Garden, as highlighted in the attached drawings.(Previous Backfill SP 126)

kaig-qcals 161
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Thrust Block for Irrigation ROW Sub-mainline Including Branches; (90&50mmØ- UPVC-
4B 4 KAIG3-RFI-DG-C-6579 00 Civil Discovery Garden 7/24/22 7/26/22 Approved as noted
Claas-5 ) (Red Line), inside Discovery Garden, as highlighted area in attached drawing's.
Excavation and Soil preparation for Foundation of Boundary Wall @ Grid (M/22-29) & (29-30/M-R), at
5A 5 KAIG3-RFI-EC-C-4988 00 Civil Energy Center 2 4/4/22 4/19/22 Code C (resubmit)
Energy Center 2, as highlighted area in attached drawing's.
Excavation and Soil preparation for Foundation of Boundary Wall @ Grid (M/22-29) & (29-30/M-R), at
5A 5 KAIG3-RFI-EC-C-4988 01 Civil Energy Center 2 5/12/22 5/16/22 Approved as noted
Energy Center 2, as highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5083 00 Civil Energy Center 2 4/13/22 4/16/22 Code C (resubmit)
Boundary Wall @ Grid (M/21-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 126)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5083 01 Civil Energy Center 2 5/12/22 5/15/22 Approved as noted
Boundary Wall @ Grid (M/21-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5094 00 Civil Energy Center 2 4/16/22 4/18/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5096 00 Civil Energy Center 2 4/18/22 4/23/22 Code C (resubmit)
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5096 01 Civil Energy Center 2 5/12/22 5/15/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5154 00 Civil Energy Center 2 4/20/22 4/24/22 Code C (resubmit)
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5154 01 Civil Energy Center 2 5/12/22 5/15/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5186 00 Civil Energy Center 2 4/23/22 4/25/22 Code C (resubmit)
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5186 01 Civil Energy Center 2 5/12/22 5/15/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5206 00 Civil Maze Garden 4/25/22 4/27/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Excavation & Surface Preparation prior to Blinding under Foundation of Boundary Wall @ Grid (M/27-29),
5A 5 KAIG3-RFI-EC-C-5221 00 Civil Energy Center 2 4/26/22 4/30/22 Approved as noted
(R/21-29) & (M-R/29-30), at Energy Center 2, as highlighted area in attached drawing's.
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling upto Bottom of Blinding (+868.65 &
5A 5 KAIG3-RFI-EC-C-5253 00 +869.35) under Foundation of Boundary Wall @ Grid (R/22-28) & (O-R/29-30), at Energy Center 2, as Civil Energy Center 2 4/30/22 5/8/22 Approved as noted
highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5257 00 Civil Energy Center 2 5/5/22 5/9/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5296 00 Civil Energy Center 2 5/8/22 5/12/22 Approved as noted
Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Excavation & Surface Preparation for Foundation of Boundary Wall @ Grid (M/16-22), at Energy Center 2,
5A 5 KAIG3-RFI-EC-C-5325 00 Civil Energy Center 2 5/10/22 5/11/22 Approved as noted
as highlighted area in attached drawing's.

5A 5 KAIG3-RFI-EC-C-5336 00 Disposal of Excavated Material offsite, at Energy Center 2, as highlighted area in attached drawing's. Civil Energy Center 2 5/11/22 cancelled

Inspection & Compaction tests of 9th (Final) Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation
5A 5 KAIG3-RFI-EC-C-5347 00 Civil Energy Center 2 5/12/22 5/17/22 Approved as noted
of Boundary Wall @ Grid (M/22-29), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5376 00 Civil Energy Center 2 5/14/22 5/17/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Excavation & Surface Preparation for Foundation of Boundary Wall @ Grid (R/16-22), at Energy Center 2,
5A 5 KAIG3-RFI-EC-C-5406 00 Civil Energy Center 2 5/16/22 5/19/22 Approved as noted
as highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5407 00 Civil Energy Center 2 5/16/22 5/21/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5430 00 Civil Energy Center 2 5/19/22 5/22/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5431 00 Civil Energy Center 2 5/19/22 5/22/22 Approved as noted
Boundary Wall @ Grid (R/16-22), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5477 00 Civil Energy Center 2 5/22/22 5/25/22 Approved as noted
Boundary Wall @ Grid (R/16-22), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5478 00 Civil Energy Center 2 5/22/22 5/25/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5512 00 Civil Energy Center 2 5/24/22 5/28/22 Approved as noted
Boundary Wall @ Grid (R/16-22), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)

kaig-qcals 162
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5513 00 Civil Energy Center 2 5/24/22 5/28/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Soil preparation Prior to Backfilling @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area in
5A 5 KAIG3-RFI-EC-C-5534 00 Civil Energy Center 2 5/25/22 5/30/22 Approved as noted
attached drawing's.

Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (4-15/L, 15/L-R & 15-16/R), at
5A 5 KAIG3-RFI-EC-C-5550 00 Civil Energy Center 2 5/26/22 5/30/22 Approved as noted
Energy Center 2, as highlighted area in attached drawing's.

Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (0-4A/A-C & 6-12B/A), at Energy
5A 5 KAIG3-RFI-EC-C-5552 00 Civil Energy Center 2 5/26/22 5/30/22 Approved as noted
Center 2, as highlighted area in attached drawing's.

Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Grade) (Out of 4 layers), for Foundation
5A 5 KAIG3-RFI-EC-C-5572 00 Civil Energy Center 2 5/28/22 5/30/22 Approved as noted
of Boundary Wall @ Grid (R/16-22), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5573 00 Civil Energy Center 2 5/28/22 5/30/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5586 00 Civil Energy Center 2 5/29/22 5/31/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Soil preparation Prior to Backfilling @ Grid (11-15/A-L), inside Energy Center 2, as highlighted area in
5A 5 KAIG3-RFI-EC-C-5595 00 Civil Energy Center 2 5/30/22 6/1/22 Approved as noted
attached drawing's.

Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5596 00 Civil Energy Center 2 5/30/22 6/1/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5597 00 Civil Energy Center 2 5/30/22 6/1/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5601 00 Civil Energy Center 2 5/30/22 6/1/22 Approved as noted
walls, @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5631 00 Civil Energy Center 2 5/31/22 6/5/22 Approved as noted
walls, @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 9th Layer Backfilling (Sub-Grade) (Out of 11 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5632 00 Civil Energy Center 2 5/31/22 6/5/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5643 00 Civil Energy Center 2 6/1/22 6/6/22 Approved as noted
walls, @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 10th Layer Backfilling (Sub-Grade) (Out of 11 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5644 00 Civil Energy Center 2 6/1/22 6/5/22 Approved as noted
Boundary Wall @ Grid (M/16-22), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5645 00 Civil Energy Center 2 6/1/22 6/5/22 Approved as noted
Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5646 00 Civil Energy Center 2 6/1/22 6/5/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5685 00 Civil Energy Center 2 6/4/22 6/6/22 Approved as noted
Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5686 00 Civil Energy Center 2 6/4/22 6/6/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 11th (Fianl) Layer Backfilling (Sub-Grade Out of 11 layers), for
5A 5 KAIG3-RFI-EC-C-5726 00 Foundation of Boundary Wall @Grid (M/16-22), at Energy Center 2, as highlighted area in attached Civil Energy Center 2 6/6/22 6/9/22 Approved as noted
drawing's.(SP 135)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5727 00 Civil Energy Center 2 6/6/22 6/9/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5728 00 Civil Energy Center 2 6/6/22 6/9/22 Approved as noted
Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5729 00 Civil Energy Center 2 6/6/22 6/9/22 Approved as noted
walls, @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5761 00 Civil Energy Center 2 6/8/22 6/12/22 Approved as noted
walls, @ Grid (0-3/A-L), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5762 00 Civil Energy Center 2 6/8/22 6/12/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)

kaig-qcals 163
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5763 00 Civil Energy Center 2 6/8/22 6/12/22 Approved as noted
Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) @ Grid (2-11B/E-L),
5A 5 KAIG3-RFI-EC-C-5764 00 Civil Energy Center 2 6/8/22 6/13/22 Approved as noted
inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) inside the Boundary
5A 5 KAIG3-RFI-EC-C-5797 00 Civil Energy Center 2 6/11/22 6/12/22 Approved as noted
walls, @ Grid (0-3/A-L), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5798 00 Civil Energy Center 2 6/11/22 6/13/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) for Foundation of
5A 5 KAIG3-RFI-EC-C-5799 00 Civil Energy Center 2 6/11/22 6/12/22 Approved as noted
Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 6th (Final) Layer Backfilling (Sub-Grade) (Out of 6 layers) for Foundation
5A 5 KAIG3-RFI-EC-C-5816 00 Civil Energy Center 2 6/13/22 6/18/22 Approved as noted
of Boundary Wall @ Grid (4-7/L), at Energy Center 2, as highlighted area in attached drawing's.(SP 135)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5832 00 Civil Energy Center 2 6/13/22 6/16/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation of
5A 5 KAIG3-RFI-EC-C-5840 00 Civil Energy Center 2 6/14/22 6/18/22 Approved as noted
Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in attached drawing's. (SP 135)
Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (0-4A/J-R), at Energy Center 2, as
5A 5 KAIG3-RFI-EC-C-5852 00 Civil Energy Center 2 6/14/22 6/19/22 Approved as noted
highlighted area in attached drawing's.
Excavation & Soil Preparation for Foundation of Boundary Wall & inside @ Grid (0-4A/A-K), at Energy
5A 5 KAIG3-RFI-EC-C-5860 00 Civil Energy Center 2 6/15/22 6/19/22 Approved as noted
Center 2, as highlighted area in attached drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) @ Grid (2-11B/E-L),
5A 5 KAIG3-RFI-EC-C-5901 00 Civil Energy Center 2 6/16/22 6/19/22 Approved as noted
inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) @ Grid (3-11B/A-E
5A 5 KAIG3-RFI-EC-C-5902 00 Civil Energy Center 2 6/16/22 6/19/22 Approved as noted
and 11B-15/A-L), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 9th (Final) Layer Backfilling (Sub-Grade)(Out of 9 layers), Upto Bottom of
5A 5 KAIG3-RFI-EC-C-5927 00 Blinding under Foundation of Boundary Wall @ Grid (4-12B/A), at Energy Center 2, as highlighted area in Civil Energy Center 2 6/18/22 6/21/22 Approved as noted
attached drawing's. (SP 135)

Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers) @ Grid (3-
5A 5 KAIG3-RFI-EC-C-5946 00 Civil Energy Center 2 6/19/22 6/25/22 Approved as noted
11B/A-E and 11B-15/A-L), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 layers) @ Grid (2-
5A 5 KAIG3-RFI-EC-C-5947 00 Civil Energy Center 2 6/19/22 6/22/22 Approved as noted
11B/E-L), inside Energy Center 2, as highlighted area in attached drawing's. (SP 135)

5 5 KAIG3-RFI-JG-C-5620 00 Notification to start Excavation Prior to start Excavation for Jurassic Garden zone 5 Civil Site Works 5/30/22 5/31/22 Approved as noted

1G KAIG3-RFI-LM-C-2788 00 Surface Preparation Prior to start Backfilling at LARGE MOSQUE (as Highlighted) Zone 1G Civil Large Mosque 12/13/21 12/15/21 Code C (not resubmit)

1G KAIG3-RFI-LM-C-2844 00 Surface Preparation Prior to start Backfilling at LARGE MOSQUE along axis 6 (as Highlighted) Zone 1G Civil Large Morsque 12/16/21 12/20/21 Approved as noted

Excavation upto rock level and Surface Preparation prior Backfilling for Large Mosque Zone 1G (as
1G KAIG3-RFI-LM-C-2901 00 Civil Large Mosque 12/18/21 12/21/21 Approved as noted
highlighted)
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-LM-C-2902 00 Civil Large Mosque 12/18/21 12/22/21 Approved as noted
Zone 1G (4th of 6th layer) SP # 124

Inspection and compaction test 5th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-LM-C-2903 00 Civil Large Mosque 12/18/21 12/23/21 Approved as noted
Zone 1G (5th of 6th layer) SP # 124

Inspection and compaction test 6th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-LM-C-2936 00 Civil Large Mosque 12/20/21 12/23/21 Approved as noted
Zone 1G (6th of 6th layer) SP # 124
Inspection and compaction test 1st layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted)
1G KAIG3-RFI-LM-C-2937 00 Civil Large Mosque 12/20/21 12/23/21 Approved as noted
Zone 1G (1st of 4th layer) SP # 124
Inspection and compaction test 1st layer (SubGrade) for backfilling LARGE MOSQUE (as Highlighted) Zone
1G KAIG3-RFI-LM-C-2938 00 Civil Large Mosque 12/20/21 12/25/21 Approved as noted
1G (1st of 1st layer) SP # 110
Inspection and compaction test 2nd layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (2nd
1G KAIG3-RFI-LM-C-2990 00 Civil Large Mosque 12/21/21 12/25/21 Approved as noted
of 4th layer) SP # 124
Inspection and compaction test 3rd layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (3rd of
1G KAIG3-RFI-LM-C-2999 00 Civil Large Mosque 12/22/21 12/28/21 Approved as noted
4th layer) SP # 124
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (4th of
1G 6 KAIG3-RFI-LM-C-3958 00 Civil Large Mosque 2/10/22 2/15/22 Approved as noted
8th layer) SP # 124
Inspection and compaction test 5th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (5th of
1G 6 KAIG3-RFI-LM-C-3968 00 Civil Large Mosque 2/10/22 2/16/22 Approved as noted
8th layer) SP # 124
Inspection and compaction test 6th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (5th of
1G 6 KAIG3-RFI-LM-C-3987 00 Civil Large Mosque 2/12/22 2/19/22 Approved as noted
8th layer) SP # 124

kaig-qcals 164
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 7th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (7th of
1G 6 KAIG3-RFI-LM-C-4022 00 Civil Large Mosque 2/14/22 2/20/22 Approved as noted
12th layer) SP # 124
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
1G 6 KAIG3-RFI-LM-C-4036 00 Civil Large Mosque 2/14/22 2/16/22 Approved as noted
Zone 1G (4th of 12th layer) SP # 124
Inspection and compaction test 5th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
1G 6 KAIG3-RFI-LM-C-4037 00 Civil Large Mosque 2/14/22 2/16/22 Approved as noted
Zone 1G (5th of 12th layer) SP # 124
Inspection and compaction test 6th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
1G 6 KAIG3-RFI-LM-C-4038 00 Civil Large Mosque 2/14/22 2/19/22 Approved as noted
Zone 1G (6th of 12th layer) SP # 124

Inspection and compaction test 8th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (8th of
1G 6 KAIG3-RFI-LM-C-4118 00 Civil Large Mosque 2/16/22 2/21/22 Approved as noted
12th layer) SP # 124

Inspection and compaction test 9th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (9th of
1G 6 KAIG3-RFI-LM-C-4126 00 Civil Large Mosque 2/17/22 2/23/22 Approved as noted
12th layer) SP # 124

Inspection and compaction test 10th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (10th
1G 6 KAIG3-RFI-LM-C-4152 00 Civil Large Mosque 2/19/22 2/26/22 Approved as noted
of 12th layer) SP # 124

Inspection and compaction test 11th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (11th
1G 6 KAIG3-RFI-LM-C-4174 00 Civil Large Mosque 2/27/22 3/3/22 Approved as noted
of 12th layer) SP # 124

Surface Preparation Prior to start Backfilling ( 3m external ) around LARGE MOSQUE (as Highlighted)
1G 6 KAIG3-RFI-LM-C-4205 00 Civil Large Mosque 2/23/22 2/28/22 Approved as noted
Zone 1G

Inspection and Compaction Test 1st Layer for Backfilling (3M external) around Large Mosque as highlighted
1G 6 KAIG3-RFI-LM-C-4255 00 Civil Large Mosque 2/27/22 3/3/22 Approved as noted
zone 1G as highlighted (1st of 4th layers) SP 124.

Inspection and Compaction Test 2nd Layer for Backfilling (3M external) around Large Mosque as
1G 6 KAIG3-RFI-LM-C-4256 00 Civil Large Mosque 2/27/22 3/5/22 Approved as noted
highlighted zone 1G as highlighted (2nd of 4th layers) SP 124.
Inspection and compaction test 3rd layer for Backfilling ( 3m external ) around LARGE MOSQUE (as
1G 6 KAIG3-RFI-LM-C-4362 00 Civil Large Mosque 3/6/22 3/9/22 Approved as noted
Highlighted) Zone 1G (3rd of 4th Layers) SP#124
Inspection and Compaction Test 4th layer for Backfilling (3m External) around Large Mosque as highlighted
1G 6 KAIG3-RFI-LM-C-4521 00 Civil Large Mosque 3/9/22 3/13/22 Code C (not resubmit)
Zone 1G (4th of 4th layers) SP 124.
Inspection and compaction test for sand cover above mecanical pipes inside LARGE MOSQUE (as
1G 1 KAIG3-RFI-LM-C-4936 00 Civil Large Mosque 3/31/22 4/3/22 Approved as noted
Highlighted) Zone 1G SP#133
Inspection and compaction test final layer for backfilling under slab on grade blinding of LARGE MOSQUE
1G 6 KAIG3-RFI-LM-C-5034 00 Civil Large Mosque 4/10/22 4/14/22 Approved as noted
(as Highlighted) Zone 1G (11th of 11th layer) SP # 124 axis 5-6, C-F
Inspection and compaction test redsand Cover for Mechanical pipe at LARGE MOSQUE (as Highlighted)
1G 6 KAIG3-RFI-LM-C-5270 00 Civil Large Mosque 5/5/22 5/8/22 Approved as noted
Zone 1G SP # 133
Soil Preparation Prior to Backfilling Surround Pargola Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom
4B 4 KAIG3-RFI-MB-C-3486 00 Civil Management Building 1/22/22 1/26/22 Code C (resubmit)
of Blinding Level) at Management Building, As Highlighted in attached Drawings.
Soil Preparation Prior to Backfilling Surround Pargola Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom
4B 4 KAIG3-RFI-MB-C-3486 01 Civil Management Building 2/9/22 2/13/22 Approved as noted
of Blinding Level) at Management Building, As Highlighted in attached Drawings.
Excavation & Soil Preparation for Water Feature and Mechanical Room, at Grid (F-Q/10-13), at Management
4B 4 KAIG3-RFI-MB-C-3516 00 Civil Management Building 1/23/22 1/27/22 Approved as noted
Building, As Highlighted in attached Drawings.
Inspection & Compaction tests After Excavation for Water Feature, at Grid (F-Q/10-13), at Management
4B 4 KAIG3-RFI-MB-C-3539 00 Civil Management Building 1/24/22 1/27/22 Approved as noted
Building, As Highlighted in attached Drawings.
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling Prior to Blinding Under Water Feature
4B 4 KAIG3-RFI-MB-C-3695 00 Foundation, at Grid (F-Q/10-13), at Management Building, As Highlighted in attached Drawings.(Stock Pile Civil Management Building 1/31/22 2/5/22 Approved as noted
# 116)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
4B 4 KAIG3-RFI-MB-C-3992 00 Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom of Blinding Level) at Management Building, As Civil Management Building 2/13/22 2/17/22 Approved as noted
Highlighted in attached Drawings. (Stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
4B 4 KAIG3-RFI-MB-C-4001 00 Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom of Blinding Level) at Management Building, As Civil Management Building 2/13/22 2/19/22 Approved as noted
Highlighted in attached Drawings. (Stock pile # 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
4B 4 KAIG3-RFI-MB-C-4093 00 Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom of Blinding Level) at Management Building, As Civil Management Building 2/16/22 2/23/22 Approved as noted
Highlighted in attached Drawings. (Stock pile # 126)

Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround
4B 4 KAIG3-RFI-MB-C-4194 00 Pargola Footings (6 no's), at Grid (G&P/3, 4 & 5), (at Bottom of Blinding Level) at Management Building, Civil Management Building 2/21/22 2/26/22 Approved as noted
As Highlighted in attached Drawings. (Stock pil

kaig-qcals 165
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation & Surface Preparation for Foundations of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at
4B 4 KAIG3-RFI-MB-C-4929 00 Civil Management Building 3/31/22 4/4/22 Approved as noted
Management Building, As Highlighted in attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.

Inspection & Compaction Tests after Excavation for Foundations of Pargola (6 no's), at Grid (G & P/3, 4 &
4B 4 KAIG3-RFI-MB-C-4930 00 Civil Management Building 3/31/22 4/4/22 Approved as noted
5), at Management Building, As Highlighted in attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.

Surface Preparation prior to Backfilling along External Grade Beam & Foundations, from outer side, at Grids
4B 4 KAIG3-RFI-MB-C-5001 00 (3/A-E & R-X) (A & X/3-9) (B & W/9-19) (18/B-F) (F/18-20) (20/F-Q) (Q/19-20) & (19/Q-T) at Civil Management Building 4/6/22 4/10/22 Approved as noted
Management Building as highlighted area in attached Draw

Surface Preparation prior to Backfilling along External Grade Beam & Foundations, from outer side, at Grids
4B 4 KAIG3-RFI-MB-C-5278 00 (W/9-12), at Management Building as highlighted area in attached Drawing's KAIG3-SCR-MB-S-0015-01- Civil Management Building 5/7/22 5/10/22 Approved as noted
Reply and KAIG3-SCR-GN-A-0011-01.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers), along External Grade
4B 4 KAIG3-RFI-MB-C-5327 00 Beam & Foundations, from outer side, at Grids (3/A-E & R-X) (A & X/3-9) (B & W/9-19) (18/B-F) (F/18- Civil Management Building 5/10/22 5/16/22 Approved as noted
20) (20/F-Q) (Q/19-20) & (19/Q-T) at Management

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers), along External Grade
4B 4 KAIG3-RFI-MB-C-5412 00 Beam & Foundations, from outer side, at Grids (3/A-E & R-X) (A & X/3-9) (B & W/9-19) (18/B-F) (F/18- Civil Management Building 5/16/22 5/21/22 Approved as noted
20) (20/F-Q) (Q/19-20) & (19/Q-T) at Management

Surface Preparation prior to Backfilling Surround the Pargola Foundations, at Grid (G & P/3, 4 & 5), at
4B 4 KAIG3-RFI-MB-C-5574 00 Civil Management Building 5/29/22 5/31/22 Approved as noted
Management Building, As Highlighted in attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pargola
4B 4 KAIG3-RFI-MB-C-5838 00 Footings (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in attached Drawings Civil Management Building 6/13/22 6/16/22 Approved as noted
and KAIG3-SCR-MB-S-0159-00-Reply. (SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pargola
4B 4 KAIG3-RFI-MB-C-5862 00 Footings (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in attached Drawings Civil Management Building 6/15/22 6/19/22 Approved as noted
and KAIG3-SCR-MB-S-0159-00-Reply. (SP 135)
Inspection & Compaction tests for Existing Fill Material Inside Staircase room (GF-5076) at Grid (7-8/F-H),
4B 4 KAIG3-RFI-MB-C-5903 00 Civil Management Building 6/16/22 6/21/22 Approved as noted
at Management Building, As Highlighted in attached Drawings.
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pargola
4B 4 KAIG3-RFI-MB-C-5926 00 Footings (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in attached Drawings Civil Mnagement Building 6/18/22 6/22/22 Approved as noted
and KAIG3-SCR-MB-S-0159-00-Reply. (SP 135)
Inspection & Compaction Tests of 4 th layer Backfilling (Sub-Grade) (Out of 4 Layers) at Level +879.70
4B 4 KAIG3-RFI-MB-C-6036 00 Surround the Pargola Footings (6 nos) at Grid (G & P/3 ,4 & 5), at Management Building, as highlighted area Civil Management Building 6/22/22 6/28/22 Code C (resubmit)
in the attached drawings and KAIG3-SCR-MB-S-

KAIG3-RFI-MC-C-2214 00 Excavation for the loose Exsisting NGL in MCPE 4 Zone 1N (as highlighted) Civil MCPE 4 11/16/21 11/20/21 Approved as noted

KAIG3-RFI-MC-C-2262 00 Surface Preparation Prior to start Backfilling at MCPE 4 Zone 1N (as highlighted) Civil MCPE 4 11/18/21 cancelled

Zone 1N KAIG3-RFI-MC-C-2438 00 Surface Preparation Prior to start Backfilling at MCPE 4 Zone 1N (as highlighted) Civil MCPE 4 11/25/21 11/29/21 Approved as noted

Inspection and compaction test 1st layer for backfilling of MCPE 4 Zone 1N (as highlighted) (1 of 6 layers)
1N KAIG3-RFI-MC-C-2572 00 Civil MCPE 4 12/1/21 12/6/21 Approved as noted
SP#121

Inspection and compaction test 2nd layer for backfilling of MCPE 4 Zone 1N (as highlighted) (2 of 6 layers)
1N KAIG3-RFI-MC-C-2598 00 Civil MCPE 4 12/2/21 12/7/21 Approved as noted
SP#121

Inspection and compaction test 3rd layer for backfilling of MCPE 4 Zone 1N (as highlighted) (3 of 6 layers)
1N KAIG3-RFI-MC-C-2651 00 Civil MCPE 4 12/6/21 12/11/21 Approved as noted
SP#124

Inspection and compaction test 4th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (4 of 6 layers)
1N KAIG3-RFI-MC-C-2684 00 Civil MCPE 4 12/7/21 12/12/21 Approved as noted
SP#124

2E 2F KAIG3-RFI-MC-C-2927 00 Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F axis 02R to 03A (as highlighted) Civil MCPE 3 12/19/21 12/23/21 Approved as noted

Inspection and compaction test 1st layer for backfilling red sand @ MCPE 3 Zone 2E 2F (as highlighted) (1
2E 2F KAIG3-RFI-MC-C-2954 00 Civil MCPE 3 12/20/21 12/23/21 Approved as noted
of 6 layers) SP#67

Inspection and compaction test 2nd layer for backfilling red sand @ MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F KAIG3-RFI-MC-C-2989 00 Civil MCPE 3 12/21/21 12/26/21 Approved as noted
of 6 layers) SP#67

kaig-qcals 166
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 3nd layer for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2 layer red
2E 2F KAIG3-RFI-MC-C-2998 00 Civil MCPE 3 12/25/21 12/28/21 Approved as noted
sand, 1 of 8 layers subgrade) SP # 124
Inspection and compaction test 4th layer for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2 layer red
2E 2F KAIG3-RFI-MC-C-3049 00 Civil MCPE 3 12/25/21 12/30/21 Approved as noted
sand, 2 of 8 layers subgrade) SP # 124
Inspection and compaction test 3rd layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F KAIG3-RFI-MC-C-3106 00 Civil MCPE 3 12/27/21 1/1/22 Approved as noted
layer red sand, 3 of 8 layers subgrade) SP # 124
Inspection and compaction test 4th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F KAIG3-RFI-MC-C-3127 00 Civil MCPE 3 12/28/21 1/3/22 Approved as noted
layer red sand, 4 of 8 layers subgrade) SP # 124
Inspection and compaction test 5th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F KAIG3-RFI-MC-C-3174 00 Civil MCPE 3 12/30/21 1/8/22 Approved as noted
layer red sand, 5 of 8 layers subgrade) SP # 124
Inspection and compaction test 6th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F 6 KAIG3-RFI-MC-C-3235 00 Civil MCPE 3 1/5/22 1/9/22 Approved as noted
layer red sand, 6 of 8 layers subgrade) SP # 124
Inspection and compaction test 7th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F 6 KAIG3-RFI-MC-C-3249 00 Civil MCPE 3 1/6/22 1/11/22 Approved as noted
layer red sand, 7 of 8 layers subgrade) SP # 124

2E 6 KAIG3-RFI-MC-C-3326 00 Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E axis 03A, 03-2 to 03-1 (as highlighted) Civil MCPE 3 1/11/22 1/16/22 Approved as noted

Inspection and compaction test 8th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted) (2
2E 2F 6 KAIG3-RFI-MC-C-3327 00 Civil MCPE 3 1/11/22 1/15/22 Approved as noted
layer red sand, 8 of 8 layers subgrade) SP # 124

2M 2N 6 KAIG3-RFI-MC-C-3372 00 Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2M 2N axis 03S to 02P (as highlighted) Civil MCPE 1 1/13/22 1/17/22 Approved as noted

Inspection and compaction test 2nd layer for backfilling of MCPE 3 (as highlighted) Zone 2E (2nd of 4th
2E 6 KAIG3-RFI-MC-C-3381 00 Civil MCPE 3 1/13/22 1/18/22 Approved as noted
layer) SP#124

Inspection and compaction test 3rd layer for backfilling of MCPE 3 (as highlighted) Zone 2E (2nd of 4th
2E 6 KAIG3-RFI-MC-C-3383 00 Civil MCPE 3 1/15/22 1/19/22 Approved as noted
layer) SP#124

Inspection and compaction test 1st layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (1st of 6th
2M 2N 6 KAIG3-RFI-MC-C-3419 00 Civil MCPE 1 1/17/22 1/19/22 Approved as noted
layer) SP#124
Inspection and compaction test 2nd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (2nd of 6th
2M 2N 6 KAIG3-RFI-MC-C-3448 00 Civil MCPE 1 1/19/22 1/22/22 Approved as noted
layer) SP#124
Inspection and compaction test 3rd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (3rd of 6th
2M 2N 6 KAIG3-RFI-MC-C-3449 00 Civil MCPE 1 1/19/22 1/22/22 Approved as noted
layer) SP#124

Inspection and compaction test 4th layer for backfilling of MCPE 3 (as highlighted) Zone 2E (4th of 4th
2E 6 KAIG3-RFI-MC-C-3450 00 Civil MCPE 3 1/20/22 1/22/22 Approved as noted
layer) SP#124

2M 2N 6 KAIG3-RFI-MC-C-3452 00 Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N 2M axis 03S to 03R (as highlighted) Civil MCPE 1 1/23/22 1/22/22 Approved as noted

Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3477 00 Civil MCPE 1 1/20/22 1/23/22 Approved as noted
layer) SP#124
Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3478 00 Civil MCPE 1 1/20/22 1/25/22 Approved as noted
layer) SP#124
Inspection and compaction test 1st layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (1st of 6th
2M 2N 6 KAIG3-RFI-MC-C-3527 00 Civil MCPE 1 1/23/22 1/26/22 Approved as noted
layer) SP#124
Inspection and Compaction Test 2nd Layer for backfilling of MCPE 1 as highlighted Zone 2M 2N (2nd of 6th
2M 2N 6 KAIG3-RFI-MC-C-3561 00 Civil MCPE 1 1/25/22 1/29/22 Approved as noted
Layer) SP 124.

2K 6 KAIG3-RFI-MC-C-3563 00 Surface Preparation Prior to Start Backfilling at MCPE 2 Axis 03-2, 02AH to AF Zone 2K as highlighted. Civil MCPE 2 1/25/22 1/29/22 Approved as noted

Inspection and Compaction Test 1st Layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (1st of 6th Layer)
2K 6 KAIG3-RFI-MC-C-3564 00 Civil MCPE 2 1/25/22 1/29/22 Approved as noted
SP 124 as highlighted.

Inspection and Compaction Test 3rd Layer for backfilling of MCPE 1 as highlighted Zone 2M 2N (3rd of 6th
2M 2N 6 KAIG3-RFI-MC-C-3571 00 Civil MCPE 1 1/25/22 1/30/22 Approved as noted
Layer) SP 124.

Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3601 00 Civil MCPE 1 1/26/22 2/1/22 Approved as noted
layer) SP#124

Inspection and compaction test 2nd layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (2nd
2K 6 KAIG3-RFI-MC-C-3603 00 Civil MCPE 2 1/26/22 1/30/22 Approved as noted
of 6th Layers) Zone 2k (as highlighted) SP#124
Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3631 00 Civil MCPE 1 1/27/22 2/2/22 Approved as noted
layer) SP#124
Inspection and compaction test 3rd layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (3rd
2K 6 KAIG3-RFI-MC-C-3633 00 Civil MCPE 2 1/27/22 2/1/22 Approved as noted
of 6th Layers) Zone 2k (as highlighted) SP#124
Inspection and compaction test 4th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (4th
2K 6 KAIG3-RFI-MC-C-3669 00 Civil MCPE 2 1/30/22 2/3/22 Approved as noted
of 6th Layers) Zone 2k (as highlighted) SP#124
kaig-qcals 167
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2G 6 KAIG3-RFI-MC-C-3686 00 Surface Preparation prior to start Backfilling at MCPE 2 Zone 2G 2H 2J 2K Axis (AF to AB) as highlighted. Civil MCPE 2 1/30/22 2/2/22 Approved as noted

Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3697 00 Civil MCPE 1 1/31/22 2/3/22 Approved as noted
layer) SP#124
Inspection and compaction test 5th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (5th
2K 6 KAIG3-RFI-MC-C-3698 00 Civil MCPE 2 1/31/22 2/3/22 Approved as noted
of 6th Layers) Zone 2k (as highlighted) SP#124

Inspection and compaction test 1st layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3699 00 Civil MCPE 2 1/31/22 2/5/22 Approved as noted
(1st of 6th Layers) SP#124

Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of 6th
2M 2N 6 KAIG3-RFI-MC-C-3706 00 Civil MCPE 1 1/31/22 2/5/22 Approved as noted
layer) SP#124

Inspection and compaction test 2nd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3724 00 Civil MCPE 2 2/1/22 2/6/22 Approved as noted
(2nd of 6th Layers) SP#124

Inspection and compaction test 3rd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3746 00 Civil MCPE 2 2/2/22 2/7/22 Approved as noted
(3rd of 6th Layers) SP#124

Inspection and compaction test 4th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3773 00 Civil MCPE 2 2/3/22 2/8/22 Approved as noted
(4th of 6th Layers) SP#124

Inspection and compaction test 5th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3796 00 Civil MCPE 2 2/5/22 2/9/22 Approved as noted
(5th of 6th Layers) SP#124

Inspection and compaction test 7th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (7th of 12th
2M 6 KAIG3-RFI-MC-C-3827 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 7th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (7th of 12th
2M 6 KAIG3-RFI-MC-C-3839 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 2nd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (2nd of
2M 6 KAIG3-RFI-MC-C-3840 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
12th layer) SP#124
Inspection and compaction test 3rd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (3rd of 12th
2M 6 KAIG3-RFI-MC-C-3841 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of 12th
2M 6 KAIG3-RFI-MC-C-3842 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of 12th
2M 6 KAIG3-RFI-MC-C-3843 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of 12th
2M 6 KAIG3-RFI-MC-C-3844 00 Civil MCPE 1 2/6/22 2/10/22 Approved as noted
layer) SP#124

Inspection and compaction test 6th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (6th
2K 6 KAIG3-RFI-MC-C-3865 00 Civil MCPE 2 2/7/22 2/10/22 Approved as noted
of 6th Layers) Zone 2k (as highlighted) SP#124

Inspection and compaction test 6th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3866 00 Civil MCPE 2 2/7/22 2/10/22 Approved as noted
(6th of 6th Layers) SP#124

Inspection and compaction test 8th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (8th of 12th
2M 6 KAIG3-RFI-MC-C-3879 00 Civil MCPE 1 2/7/22 2/10/22 Approved as noted
layer) SP#124

kaig-qcals 168
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 9th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (9th of 12th
2M 6 KAIG3-RFI-MC-C-3880 00 Civil MCPE 1 2/9/22 2/13/22 Approved as noted
layer) SP#124

Inspection and compaction test 9th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (9th of 12th
2M 6 KAIG3-RFI-MC-C-3887 00 Civil MCPE 1 2/8/22 2/13/22 Approved as noted
layer) SP#124

Inspection and compaction test 9th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (9th of 12th
2M 6 KAIG3-RFI-MC-C-3888 00 Civil MCPE 1 2/8/22 2/13/22 Approved as noted
layer) SP#124

2G 6 KAIG3-RFI-MC-C-3916 00 Surface Preparation Prior to start Backfilling at MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted) Civil MCPE 2 2/8/22 2/13/22 Approved as noted

Inspection and compaction test 10th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (10th of
2M 6 KAIG3-RFI-MC-C-3950 00 Civil MCPE 1 2/9/22 2/14/22 Approved as noted
12th layer) SP#124

Inspection and compaction test 10th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted) Zone
2M 6 KAIG3-RFI-MC-C-3951 00 Civil MCPE 1 2/9/22 2/14/22 Approved as noted
2M 2N (10th of 12th layer) SP#124
Inspection and compaction test 1st layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3956 00 Civil MCPE 2 2/9/22 2/14/22 Approved as noted
(1st of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124
Inspection and compaction test 11th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (11th of
2M 6 KAIG3-RFI-MC-C-3969 00 Civil MCPE 1 2/10/22 2/15/22 Approved as noted
12th layer) SP#124
Inspection and compaction test 11th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted) Zone
2M 6 KAIG3-RFI-MC-C-3970 00 Civil MCPE 1 2/10/22 2/15/22 Approved as noted
2M 2N (11th of 12th layer) SP#124
Inspection and compaction test 2nd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-3989 00 Civil MCPE 2 2/12/22 2/16/22 Approved as noted
(1st of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124

Inspection and compaction test 3rd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-4019 00 Civil MCPE 2 2/13/22 2/19/22 Approved as noted
(3rd of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124

Inspection and compaction test 12th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (12th of
2M 6 KAIG3-RFI-MC-C-4050 00 Civil MCPE 1 2/14/22 2/19/22 Approved as noted
12th layer) SP#124

Inspection and compaction test 12th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted) Zone
2M 6 KAIG3-RFI-MC-C-4051 00 Civil MCPE 1 2/14/22 2/19/22 Approved as noted
2M 2N (12th of 12th layer) SP#124

Inspection and compaction test 4th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-4053 00 Civil MCPE 2 2/14/22 2/19/22 Approved as noted
(4th of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124

Inspection and compaction test 5th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-4079 00 Civil MCPE 2/15/22 2/20/22 Approved as noted
(5th of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124

Inspection and compaction test 6th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
2G 6 KAIG3-RFI-MC-C-4131 00 Civil MCPE 2/17/22 2/23/22 Approved as noted
(6th of 6th Layers) Zone 2G 2H 2J 2K (as highlighted) SP#124

2E 6 KAIG3-RFI-MC-C-4193 00 Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F (as highlighted) Civil MCPE 3 2/21/22 2/24/22 Approved as noted

Inspection and compaction test 1st layer for backfilling (red sand) for MCPE3 from axis (02 R to 02 S) zone
2E 6 KAIG3-RFI-MC-C-4200 00 Civil MCPE 3 2/23/22 2/27/22 Approved as noted
2E 2F (as highlighted) (1st of 3rd Layers) SP#67

Inspection and Compaction Test 2nd layer for backfilling (Red Sand) for MCPE 3 from Axis (02 R to 02 S)
2E 6 KAIG3-RFI-MC-C-4233 00 Civil MCPE 3 2/24/22 3/1/22 Approved as noted
Zone 2E 2F as highlighted (2nd of 3rd layer) SP 67

Inspection and compaction test 7th layer for MCPE 2 zone 2H, 2J & 2K Axis (AH-AB) as highlighted (7th of
2H 6 KAIG3-RFI-MC-C-4247 00 Civil MCPE 2 2/27/22 3/3/22 Approved as noted
11th layers) SP 124

Inspection and compaction test 3rd layer for backfilling (red sand) for MCPE3 from axis (02 R to 02 S) zone
2E 6 KAIG3-RFI-MC-C-4286 00 Civil MCPE 3 2/27/22 3/2/22 Approved as noted
2E 2F (as highlighted) (3rd of 3rd Layers) SP#67

Inspection and compaction test 8th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (8th
2H 6 KAIG3-RFI-MC-C-4297 00 Civil MCPE 2 2/28/22 3/5/22 Approved as noted
of 11th Layers) SP#124

kaig-qcals 169
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2E 6 KAIG3-RFI-MC-C-4298 00 Inspection and compaction test 1st layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (1st of 8th) Civil MCPE 3 2/28/22 3/5/22 Approved as noted

Inspection and compaction test 1st layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 02A-
2E 6 KAIG3-RFI-MC-C-4299 00 Civil MCPE 3 3/3/22 3/5/22 Approved as noted
02B ZONE 2A (as highlighted) (1st of 5th), SP#124
Inspection and compaction test 9th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (9th
2H 6 KAIG3-RFI-MC-C-4336 00 Civil MCPE 2 3/2/22 3/5/22 Approved as noted
of 11th Layers) SP#124
Inspection and compaction test 2nd layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (2nd of 8th)
2E 6 KAIG3-RFI-MC-C-4337 00 Civil MCPE 2 3/2/22 3/5/22 Approved as noted

Inspection and compaction test 2nd layer for Strip footing and PC between PC 91-93 outer AXIS 02-2, 02A-
2A 6 KAIG3-RFI-MC-C-4338 00 Civil Crescent 3/3/22 3/5/22 Approved as noted
02B zone 2A (as highlighted) (2nd of 5th) SP 124.
Inspection and compaction test 10th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted)
2E 6 KAIG3-RFI-MC-C-4366 00 Civil MCPE 2 3/2/22 3/7/22 Approved as noted
(10th of 11th Layers) SP#124
Inspection and compaction test 3rd layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (3rd of 8th)
2E 6 KAIG3-RFI-MC-C-4367 00 Civil MCPE 3 3/2/22 3/7/22 Approved as noted

Inspection and compaction test 3rd layer for Strip footing and PC between PC 91-93 outer AXIS 02-2, 02A-
2E 6 KAIG3-RFI-MC-C-4368 00 Civil MCPE 3 3/2/22 3/7/22 Approved as noted
02B zone 2A (as highlighted) (3rd of 5th) SP 124.
Inspection and compaction test 4th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (4th of 8th),
2E 6 KAIG3-RFI-MC-C-4382 00 Civil MCPE 3 3/3/22 3/8/22 Approved as noted
SP#124
Inspection and compaction test 5th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (5th of 8th),
2E 6 KAIG3-RFI-MC-C-4417 00 Civil MCPE 3 3/5/22 3/9/22 Approved as noted
SP#124
Inspection and compaction test 11th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted)
2H 6 KAIG3-RFI-MC-C-4423 00 Civil MCPE 2 3/6/22 3/10/22 Approved as noted
(11th of 11th Layers) SP#124
Inspection and compaction test 6th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (6th of 8th),
2E 6 KAIG3-RFI-MC-C-4424 00 Civil MCPE 3 3/6/22 3/10/22 Approved as noted
SP#124
Inspection and compaction test 7th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (7th of 8th),
2E 6 KAIG3-RFI-MC-C-4475 00 Civil MCPE 3 3/7/22 3/10/22 Approved as noted
SP#124
Inspection and Compaction Test 7th Layer for MCPE 2 Axis (03-I to 03-E) as highlighted 7th of 12th layers
2G 6 KAIG3-RFI-MC-C-4512 00 Civil MCPE 2 3/9/22 3/12/22 Approved as noted
Zone 2G 2H as highlighted SP 124.
Inspection and Compaction Test 8th layer for MCPE for MCPE 3 Zone 2E 2F axis 02S-02R as highlighted
2E 6 KAIG3-RFI-MC-C-4520 00 Civil MCPE 3 3/13/22 3/15/22 Approved as noted
8th of 8th SP 124.
Inspection And Compaction Test 8th layer for MCPE 2 Axis (03-I to 03-E) as highlighted (8th of 12th layer
2G 6 KAIG3-RFI-MC-C-4547 00 Civil MCPE 2 3/12/22 3/13/22 Approved as noted
zone 2G 2H as highlighted SP 124.
Inspection and compaction test 9th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (9th of 12th
2G 6 KAIG3-RFI-MC-C-4562 00 Civil MCPE 2 3/13/22 3/16/22 Approved as noted
Layers) Zone 2G 2H (as highlighted) SP#124
Inspection and compaction test 10th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (10th of 12th
2G 6 KAIG3-RFI-MC-C-4597 00 Civil MCPE 2 3/14/22 3/17/22 Approved as noted
Layers) Zone 2G 2H (as highlighted) SP#124
Inspection and compaction test 11th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (11th of 12th
2G 6 KAIG3-RFI-MC-C-4601 00 Civil MCPE 2 3/15/22 3/17/22 Approved as noted
Layers) Zone 2G 2H (as highlighted) SP#124
Inspection and compaction test 12th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (12th of 12th
2G 6 KAIG3-RFI-MC-C-4650 00 Civil MCPE 2 3/17/22 3/21/22 Approved as noted
Layers) Zone 2G 2H (as highlighted) SP#124

2E 6 KAIG3-RFI-MC-C-4673 00 Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F axis 02S (as highlighted) Civil MCPE 3 3/17/22 3/20/22 Approved as noted

Inspection and compaction test 1st layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st layer for
2E 6 KAIG3-RFI-MC-C-4714 00 Civil MCPE 3 3/20/22 3/21/22 Approved as noted
red sand) SP# 67 & (0 of 11th layer for sub grade) SP#124

Inspection and compaction test 5th & 6th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (6 of 14
1N 6 KAIG3-RFI-MC-C-4721 00 Civil MCPE 4 3/21/22 3/24/22 Approved as noted
layers) SP#124

1N 6 KAIG3-RFI-MC-C-4727 00 Surface Preparation Prior to continue Backfilling at MCPE 4 Zone 1N (as highlighted) Civil MCPE 4 3/21/22 3/24/22 Approved as noted

Inspection and compaction test 3rd & 4th layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
2E 6 KAIG3-RFI-MC-C-4731 00 Civil MCPE 3 3/21/22 3/23/22 Approved as noted
layer for red sand) SP# 67 & (3rd & 4th of 11th layer for sub grade) SP#124

Inspection and compaction test 5TH & 6TH layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
2E 2 KAIG3-RFI-MC-C-4761 00 Civil MCPE 3 3/22/22 3/24/22 Approved as noted
layer for red sand) & (5th & 6th of 11th layer for sub grade) SP#124

Inspection and compaction test 7th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (7 of 14 layers)
1N 1 KAIG3-RFI-MC-C-4762 00 Civil MCPE 4 3/22/22 3/26/22 Approved as noted
SP#124
Inspection and Compaction Test 8th & 9th layer backfilling of MCPE 4 Zone 1N as highlighted (8 & 9 of 14
1N 1 KAIG3-RFI-MC-C-4791 00 Civil MCPE 4 3/23/22 3/27/22 Approved as noted
layers) SP 124.

kaig-qcals 170
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test 7th layer MCPE 3 zone 2E 2F axis 02S (as highlighted) (1st of 1st layer for
2E 2F 2 KAIG3-RFI-MC-C-4792 00 Civil MCPE 3 3/23/22 3/26/22 Approved as noted
Red Sand) & (7th of 11th layer for Sub Grade) SP 124.
Inspection and compaction test 8th layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st layer for
2E 2F 2 KAIG3-RFI-MC-C-4851 00 Civil MCPE 3 3/27/22 3/29/22 Approved as noted
red sand) & (8th of 11th layer for sub grade) SP#124
Inspection and compaction test 9th & 10th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (9th &
1N 6 KAIG3-RFI-MC-C-4921 00 Civil Site Works 3/30/22 4/4/22 Approved as noted
10th of 14 layers) SP#124
Inspection and compaction test 11th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (11th of 14
1N 6 KAIG3-RFI-MC-C-4958 00 Civil MCPE 4 4/2/22 4/5/22 Approved as noted
layers) SP#124
Surface Preparation Prior to start Backfilling at MCPE 1 external area at Zone 2N 2M (as highlighted) axis
2N 2M 2 KAIG3-RFI-MC-C-4967 00 Civil MCPE 1 4/3/22 4/5/22 Approved as noted
03R - 03U
Inspection and compaction test 2nd layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis 03R
2N 2M 2 KAIG3-RFI-MC-C-4983 00 Civil MCPE 1 4/6/22 4/10/22 Approved as noted
- 03U) (1 of 3 layers) SP#124

Inspection and compaction test 1st layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis 03R -
2N 2M 2 KAIG3-RFI-MC-C-4997 00 Civil MCPE 1 4/5/22 4/5/22 Approved as noted
03U) (1 of 3 layers) SP#124

Inspection and compaction test 12th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (12th of 12
1N 6 KAIG3-RFI-MC-C-5008 00 Civil MCPE 4 4/6/22 4/10/22 Approved as noted
layers) SP#124

Inspection and compaction test 3rd layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis 03R -
2N 2M 6 KAIG3-RFI-MC-C-5065 00 Civil MCPE 1 4/12/22 4/14/22 Approved as noted
03U) (3 of 3 layers) SP#124, under Blinding

Surface Preparation Prior to start Backfilling at MCPE 1 Internal area at Zone 2N 2M (as highlighted) axis
2N 2M 6 KAIG3-RFI-MC-C-5142 00 Civil MCPE 1 4/19/22 4/24/22 Approved as noted
03R - 03T

Inspection and compaction test 1st layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2N 2M 6 KAIG3-RFI-MC-C-5143 00 Civil MCPE 1 4/20/22 4/23/22 Approved as noted
highlighted) (1st of 17th layer) SP#124

Inspection and compaction test 2nd layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5163 00 Civil MCPE 1 4/21/22 4/24/22 Approved as noted
highlighted) (2nd of 17th layer) SP#125

Inspection and compaction test 3rd layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5183 00 Civil MCPE 1 4/23/22 4/25/22 Approved as noted
highlighted) (3rd of 17th layer) SP#125

Inspection and compaction test 4th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5199 00 Civil MCPE 1 4/24/22 4/27/22 Approved as noted
highlighted) (4th of 17th layer) SP#125

Inspection and compaction test 5th & 6th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R -
2M 2N 6 KAIG3-RFI-MC-C-5219 00 Civil MCPE 1 4/26/22 4/28/22 Approved as noted
03T (as highlighted) (5th & 6th of 17th layer) SP#125

Inspection and compaction test 7th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5229 00 Civil MCPE 1 4/27/22 4/30/22 Approved as noted
highlighted) (7th of 17th layer) SP#125

2M 2N 6 KAIG3-RFI-MC-C-5479 00 Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N 2M axis 02/AN to 02/AP (as highlighted) Civil MCPE 1 5/22/22 5/24/22 Approved as noted

Inspection and compaction test 1st layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5480 00 Civil MCPE 1 5/24/22 5/28/22 Approved as noted
Zone 2M 2N (1st of 12th layer) SP#124

Inspection and compaction test 8th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5497 00 Civil MCPE 1 5/23/22 5/28/22 Approved as noted
highlighted) (8th of 17th layer) SP#125

Inspection and compaction test 2nd layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5499 00 Civil MCPE 1 5/24/22 5/28/22 Approved as noted
Zone 2M 2N (2nd of 12th layer) SP#124

Inspection and compaction test 3rd layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5500 00 Civil MCPE 1 5/24/22 5/30/22 Approved as noted
Zone 2M 2N (3rd of 12th layer) SP#124

Inspection and compaction test 9th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5501 00 Civil MCPE 1 5/24/22 5/30/22 Approved as noted
highlighted) (9th of 17th layer) SP#125

Inspection and compaction test 4th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5547 00 Civil MCPE 1 5/26/22 5/31/22 Approved as noted
Zone 2M 2N (4thof 12th layer) SP#124

kaig-qcals 171
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 10th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5548 00 Civil MCPE 1 5/26/22 5/30/22 Approved as noted
highlighted) (10th of 17th layer) SP#125
Inspection and compaction test 11th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
2M 2N 6 KAIG3-RFI-MC-C-5599 00 Civil MCPE 1 5/30/22 6/1/22 Approved as noted
highlighted) (11th of 17th layer) SP#125
Inspection and compaction test 5th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5600 00 Civil MCPE 1 5/30/22 6/1/22 Approved as noted
Zone 2M 2N (5th of 12th layer) SP#125

2E 2F 6 KAIG3-RFI-MC-C-5651 00 Surface Preparation prior to Start backfilling at MCPE 3 Inner wall Axis 03A to 02S (as highlighted) Civil MCPE 3 6/1/22 6/5/22 Approved as noted

Inspection and compaction test 1st layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted))
2M 2N 6 KAIG3-RFI-MC-C-5696 00 Civil MCPE 3 6/5/22 6/7/22 Approved as noted
(1st of 6th layer) SP#125
Inspection and compaction test 2nd layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted))
2M 2N 6 KAIG3-RFI-MC-C-5716 00 Civil MCPE 3 6/6/22 6/9/22 Approved as noted
(2nd of 6th layer) SP#125
Inspection and compaction test 7th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5735 00 Civil MCPE 1 6/7/22 6/11/22 Approved as noted
Zone 2M 2N ( 7th of 12th layer) SP#125
Inspection and compaction test 3rd layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted))
2M 2N 6 KAIG3-RFI-MC-C-5736 00 Civil MCPE 2 6/7/22 6/11/22 Approved as noted
3rd of 6th layer) SP#125
Inspection and compaction test 4th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5752 00 Civil MCPE 3 6/8/22 6/13/22 Approved as noted
(4th of 6th layer) SP#125
Inspection and compaction test 8th & 9th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as
2M 2N 6 KAIG3-RFI-MC-C-5753 00 Civil MCPE 1 6/8/22 6/12/22 Approved as noted
highlighted) Zone 2M 2N ( 8th & 9th of 12th layer) SP#125
Inspection and compaction test 10th layer for backfilling of MCPE 1 axis 02AN to 02AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5776 00 Civil MCPE 1 6/9/22 6/13/22 Approved as noted
Zone 2M 2N (10th of 12th layer)
Inspection and compaction test 5th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-5796 00 Civil MCPE 3 6/11/22 6/14/22 Approved as noted
(5th of 6th layer) SP#125
Surface Preparation Prior to start Backfilling for MCPE 3 (S.O.G) axis 02/P to 02/S Zone 2E 2F (as
2E 2F 6 KAIG3-RFI-MC-C-5831 00 Civil MCPE 3 6/13/22 6/16/22 Approved as noted
highlighted)

2M 2N 6 KAIG3-RFI-MC-C-5859 00 Surface Preparation prior to Start backfilling at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) Civil MCPE 1 6/14/22 6/18/22 Approved as noted

Inspection and compaction test 1st and 2nd layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) (1st
2M 2N 6 KAIG3-RFI-MC-C-5881 00 Civil MCPE 1 6/15/22 6/19/22 Approved as noted
and 2nd layer) SP#125
Inspection and compaction test 3rd and 4th layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) (3rd
2M 2N 6 KAIG3-RFI-MC-C-5928 00 Civil MCPE 1 6/19/22 6/22/22 Approved as noted
and 4th layer) SP#125
Inspection and compaction test 1st & 2nd layer Sub-Grade for Backfill for MCPE 3 (SOG) Axis 02 P to 02 S
2E 2F 6 KAIG3-RFI-MC-C-5986 00 Civil MCPE 3 6/21/22 6/26/22 Approved as noted
ZONE 2E 2F as highlighted SP#125
Inspection and compaction test 3RD & 4TH layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to
2E 2F KAIG3-RFI-MC-C-6063 00 Civil MCPE 3 6/23/22 6/28/22 Approved as noted
02 S Zone 2E 2F (as highlighted) SP-125 (3rd & 4th of 12th) "

1P 6 KAIG3-RFI-MC-C-6067 00 Surface Preparation prior to Start backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlighted) Civil MCPE 4 6/25/22 6/28/22 Code C (resubmit)

1P 6 KAIG3-RFI-MC-C-6067 01 Surface Preparation prior to Start backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlighted) Civil MCPE 4 8/18/22 Open

2H 6 KAIG3-RFI-MC-C-6097 00 Surface Preparation Prior to start Backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as highlighted) Civil MCPE 2 6/26/22 6/30/22 Approved as noted

Inspection and compaction test 1st & 2nd layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-6116 00 Civil MCPE 2 6/27/22 7/2/22 Approved as noted
highlighted) (1st & 2nd of 12 layers )
"Inspection and compaction test 5th & 6th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to
2E 2F KAIG3-RFI-MC-C-6118 00 Civil MCPE 3 6/27/22 7/2/22 Approved as noted
02 S Zone 2E 2F (as highlighted) SP-125 ( 5th & 6th of 12th) "
Inspection and compaction test 3rd & 4th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-6181 00 Civil MCPE 2 6/29/22 7/4/22 Approved as noted
highlighted) (3rd & 4th of 12 layers )
Inspection and compaction test 5th & 6th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-6216 00 Civil MCPE 2 7/2/22 7/7/22 Approved as noted
highlighted) (5th & 6th of 12 layers )
Inspection and compaction test 6th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6218 00 Civil MCPE 3 7/2/22 7/6/22 Approved as noted
(6th of 12th layer) SP#125
Inspection and compaction test 7th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6246 00 Civil MCPE 3 7/3/22 7/7/22 Approved as noted
(7th of 12th layer) SP#125
"Inspection and compaction test 7th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to 02 S
2E 2F 6 KAIG3-RFI-MC-C-6247 00 Civil MCPE 3 7/3/22 7/7/22 Approved as noted
Zone 2E 2F (as highlighted) SP-125 ( 7th of 12th) "
Inspection and compaction test 8th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6258 00 Civil MCPE 3 7/6/22 7/13/22 Approved as noted
(8th of 12th layer) SP#125
Inspection and compaction test 7th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-6260 00 Civil MCPE 2 7/6/22 7/13/22 Approved as noted
highlighted) (7th of 12 layers )

kaig-qcals 172
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2H 6 KAIG3-RFI-MC-C-6261 00 Surface Preparation Prior to start Backfilling for MCPE 2 wall inner axis AA-E (as highlighted) zone 2H Civil MCPE 2 7/4/22 7/6/22 Approved as noted

2E 6 KAIG3-RFI-MC-C-6262 00 Surface Preparation Prior to start Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as highlighted) Civil MCPE 3 7/4/22 7/7/22 Approved as noted

Inspection and compaction test 9th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6296 00 Civil MCPE 3 7/6/22 7/13/22 Approved as noted
(9th of 12th layer) SP#125
Inspection and compaction test 1st layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted)
2H 6 KAIG3-RFI-MC-C-6297 00 Civil MCPE 2 7/7/22 7/14/22 Code C (resubmit)
zone 2H (1st of 12th Layer)SP#125
Inspection and compaction test 2nd and 3rd layer for Backfilling at MCPE 2 wall inner axis AA-E (as
2H 6 KAIG3-RFI-MC-C-6339 00 Civil MCPE 2 7/7/22 7/16/22 Code C (resubmit)
highlighted) zone 2H (2nd and 3rd of 12th Layer)SP#125
Inspection and compaction test 10th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6340 00 Civil MCPE 3 7/7/22 7/16/22 Code C (resubmit)
(10th of 12th layer) SP#125
Inspection and compaction test 1st & 2nd layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 6 KAIG3-RFI-MC-C-6341 00 Civil MCPE 3 7/7/22 7/16/22 Code C (resubmit)
highlighted) (1st & 2nd of 11 th layer) SP#125
"Inspection and compaction test 1st & 2nd layer for Backfilling retianing wall Axis 01/AA-01/AH, Zone 1j
1J 1K 6 KAIG3-RFI-MC-C-6374 00 Civil Crescent 7/13/22 CANCELLED
1k (as highlighted) "
Inspection and compaction test 4th and 5th layer for Backfilling at MCPE 2 wall inner axis AA-E (as
2H 6 KAIG3-RFI-MC-C-6407 00 Civil MCPE 2 7/16/22 7/20/22 Approved as noted
highlighted) zone 2H (4th and 5th of 12th Layer)SP#125
Inspection and compaction test 3rd & 4th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 6 KAIG3-RFI-MC-C-6408 00 Civil ,CPE 3 7/16/22 7/20/22 Approved as noted
highlighted) (3rd & 4th of 11 th layer) SP#125

Inspection and compaction test 6th layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted)
2H 6 KAIG3-RFI-MC-C-6451 00 Civil MCPE 2 7/19/22 7/23/22 Approved as noted
zone 2H (6th of 12th Layer)SP#125

Inspection and compaction test 5th & 6th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 6 KAIG3-RFI-MC-C-6453 00 Civil MCPE 3 7/19/22 7/23/22 Approved as noted
highlighted) (5th & 6th of 11 th layer) SP#125

Inspection and compaction test 8th and 9th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to
2E 2F 6 KAIG3-RFI-MC-C-6473 00 Civil MCPE 3 7/21/22 7/27/22 Approved as noted
02 S Zone 2E 2F (as highlighted) SP-125 ( 8th & 9th of 12th)

Inspection and compaction test 7th & 8th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 2F 6 KAIG3-RFI-MC-C-6506 00 Civil MCPE 3 7/21/22 7/27/22 Approved as noted
highlighted) (7th & 8th of 11th layer) SP#125

2J 6 KAIG3-RFI-MC-C-6508 00 Surface Preparation Prior to start Backfilling for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted) Civil MCPE 2 7/24/22 7/27/22 Approved as noted

"Inspection and compaction test 8th and 9th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to
2E 2F 6 KAIG3-RFI-MC-C-6536 00 Civil MCPE 3 7/21/22 7/27/22 Approved as noted
02 S Zone 2E 2F (as highlighted) SP-125 ( 8th and 9th of 12th) "

Inspection and compaction test 9th & 10th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 6 KAIG3-RFI-MC-C-6574 00 Civil MCPE 3 7/24/22 7/31/22 Approved as noted
highlighted) (9th & 10th of 11th layer) SP#125

"Inspection and compaction test 10th and 11th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P
2E 2F 6 KAIG3-RFI-MC-C-6575 00 Civil MCPE 3 7/24/22 7/31/22 Approved as noted
to 02 S Zone 2E 2F outer site (as highlighted) SP-125 ( 10th and 11th of 12th) "

"Inspection and compaction test 10th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to 02 S
2E 2F 6 KAIG3-RFI-MC-C-6576 00 Civil MCPE 3 7/24/22 7/31/22 Approved as noted
Zone 2E 2F (as highlighted) SP-125 ( 10th of 12th) "

Inspection and compaction test 11th and 12th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as
2M 2N 6 KAIG3-RFI-MC-C-6599 00 Civil MCPE 3 7/26/22 7/31/22 Approved as noted
highlighted) (11th and 12th of 12th layer) SP#125
Inspection and compaction test 1st and 2nd layer Backfill ffor MCPE 2 Axis 02AB-02AD, Zone 2J (as
2J 6 KAIG3-RFI-MC-C-6616 00 Civil MCPE 2 7/26/22 8/1/22 Approved as noted
highlighted) (1st and 2nd of 12th layer) SP#125
Surface Preparation Prior to start Backfilling at Soak Away of North Admin Building (as Highlighted) Zone
2Q KAIG3-RFI-NA-C-2737 00 Civil North Admin 12/11/21 12/18/21 Code C (not resubmit)
2Q

1N KAIG3-RFI-NM-C-3159 00 Surface Preparation Prior to start Backfilling at NORTH SMALL MOSQUE (as Highlighted) Zone 1N Civil North Small Mosque 12/29/21 1/3/22 Approved as noted

Inspection for application of Base Primer (50%x50% Bitumin & Water) on Beam at Saeting Area (3) Zone-K
KAIG3-RFI-PA-C-1950 00 Civil Picnic Area 11/2/21 11/3/21 Approved as noted
(SA-34) - As Highlighted
kaig-qcals 173
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and wall
KAIG3-RFI-PA-C-1954 00 Civil Picnic Area 11/2/21 11/4/21 Approved as noted
at Seating Area (3) Zone-K (SA-34) - As Highlighted
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
KAIG3-RFI-PA-C-1955 00 Civil Picnic Area 11/2/21 11/3/21 Approved as noted
wall at Seating Area (3) Zone-K (SA-34) - As Highlighted

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-1999 00 Civil Picnic Area 11/4/21 11/7/21 Approved as noted
3) SA-32 (1 Layer Sub-Grade & 1 Layer Sub-Base - Under footing)

Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-2000 00 Civil Picnic Area 11/4/21 11/7/21 Approved as noted
2) SA-29 (1 Layer Sub-Base - Under footing
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-2001 00 Civil Picnic Area 11/4/21 11/7/21 Approved as noted
2) SA-29 (2 Layer Sub-Grade - Inside and Outside)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-2002 00 Civil Picnic Area 11/4/21 11/7/21 Approved as noted
3) SA-32 (2 Layer Sub-Grade - Inside and Outside)
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Area-
KAIG3-RFI-PA-C-2003 00 Civil Picnic Area 11/4/21 11/7/21 Approved as noted
1) SA-6 (1 Layer Sub-Grade & 1 Layer Sub-Base under Footing)
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
KAIG3-RFI-PA-C-2328 00 Civil Picnic Area 11/21/21 11/23/21 Approved as noted
Area (3) Zone-G (SA-31) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
KAIG3-RFI-PA-C-2329 00 Civil Picnic Area 11/21/21 11/23/21 Approved as noted
Area (3) Zone-K (SA-33) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
KAIG3-RFI-PA-C-2330 00 Civil Picnic Area 11/21/21 11/23/21 Approved as noted
Area (3) Zone-K (SA-32) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
KAIG3-RFI-PA-C-2331 00 Civil Picnic Area 11/21/21 11/23/21 Approved as noted
Area (3) Zone-K (SA-27) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
KAIG3-RFI-PA-C-2332 00 Civil Picnic Area 11/21/21 11/23/21 Approved as noted
Area (2) Zone-K (SA-31) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundation
Zone G KAIG3-RFI-PA-C-2342 00 Civil Picnic Area 11/23/21 11/25/21 Approved as noted
and wall of Seating Area (3) at Zone-G (SA-31) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundation
KAIG3-RFI-PA-C-2351 00 Civil Picnic Area 11/23/21 11/25/21 Approved as noted
and wall of Seating Area (3) at Zone-K (SA-32) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundation
KAIG3-RFI-PA-C-2352 00 Civil Picnic Area 11/23/21 11/25/21 Approved as noted
and wall of Seating Area (3) at Zone-K (SA-33) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundation
KAIG3-RFI-PA-C-2353 00 Civil Picnic Area 11/23/21 11/25/21 Approved as noted
and wall of Seating Area (3) at Zone-K (SA-27) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundation
Zone K KAIG3-RFI-PA-C-2354 00 Civil Picnic Area 11/23/21 11/25/21 Approved as noted
and wall of Seating Area (2) at Zone-K (SA-31) - As Highlighted

Zone L KAIG3-RFI-PA-C-2555 00 Excavation and Soil Preparation under canopy at Seating Area (1) Zone-L (SA-15) - As Highlighted Civil Picnic Area 11/30/21 12/5/21 Approved as noted

Zone K KAIG3-RFI-PA-C-2602 00 Excavation and Soil Preparation under canopy at Seating Area (1) Zone-K (SA-17) - As Highlighted Civil Picnic Area 12/2/21 12/7/21 Approved as noted

Inspection for Compaction Test for Sub-Base under canopy at Seating Area (1) Zone-L (SA-15) - As
Zone L KAIG3-RFI-PA-C-2603 00 Civil Picnic Area 12/2/21 12/8/21 Approved as noted
Highlighted (SP# 110 A-1-A)
Excavation and Soil Preparation under Canopy Foundation of Seating Area (1) at Zone-G (SA-10, SA-11,
Zone G KAIG3-RFI-PA-C-2888 00 Civil Picnic Area 12/18/21 12/21/21 Approved as noted
SA-12, S-13) - As Highlighted
Inspection and Compaction Test for Sub-Base under Canopy Foundation of Seating Area (1) Zone-G (SA-10,
Zone G KAIG3-RFI-PA-C-2933 00 Civil Picnic Area 12/20/21 12/23/21 Approved as noted
SA-11, SA-12, SA-13) - As Highlighted (SP# 110 A-1-A)
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-
Zone G KAIG3-RFI-PA-C-2977 00 Civil Picnic Area 12/21/21 12/23/21 Approved as noted
11, SA-12, SA-13) - As Highlighted
Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-17 ) -
Zone K & L KAIG3-RFI-PA-C-2980 00 Civil Picnic Area 12/21/21 12/23/21 Approved as noted
As Highlighted
Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-
Zone K & L KAIG3-RFI-PA-C-3122 00 Civil Picnic Area 12/28/21 12/30/21 Approved as noted
17 ) - As Highlighted
Surface Preparation prior to start Water Proofing for Canopy Foundation of Seating Area (1) Zone-K & L
Zone K & L KAIG3-RFI-PA-C-3123 00 Civil Picnic Area 12/28/21 12/30/21 Approved as noted
(SA-15, SA-16, SA-17 ) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Canopy Foundation at Seating
Zone K & L 5 KAIG3-RFI-PA-C-3178 00 Civil Picnic Area 1/1/22 1/3/22 Approved as noted
Area (1) Zone-K & L (SA-15, SA-16, SA-17) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Canopy
Zone K & L 5 KAIG3-RFI-PA-C-3179 00 Civil Picnic Area 1/1/22 1/3/22 Approved as noted
Foundation of Seating Area (1) at Zone-K & L (SA-15, SA-16, SA-17) - As Highlighted
Excavation and Soil Preparation under Canopy Foundation at Seating Area (1) Zone-K (SA-14) - As
Zone K 5 KAIG3-RFI-PA-C-3180 00 Civil Picnic Area 1/1/22 1/5/22 Approved as noted
Highlighted
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As
Zone K 5 KAIG3-RFI-PA-C-3257 00 Civil Picnic Area 1/8/22 1/11/22 Approved as noted
Highlighted
Surface Preparation prior to start Water Proofing for Canopy Foundation of Seating Area (1) Zone-G (SA-10,
G4 5 KAIG3-RFI-PA-C-3385 00 Civil Picnic Area 1/15/22 1/17/22 Approved as noted
SA-11, SA-12, SA-13 ) - As Highlighted

kaig-qcals 174
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Soil Preparation prior to start Backfilling Outside And Inside Of Seating Area SA: 2-31, SA: 2-17, SA: 3-
4 4 KAIG3-RFI-PA-C-4526 00 Civil Picnic Area 3/10/22 3/14/22 Approved as noted
32, SA: 3-33, SA: 3-27, SA: 3-24, SA: 3-34, SA: 2-28 SA: 2-37 - As Highlighted"
"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 2) Outside And Inside of Seating
4 4 KAIG3-RFI-PA-C-4587 00 Area - SA: 2-31, SA: 2-17, SA: 3-32, SA: 3-33, SA: 3-27, SA: 3-24, SA: 3-34, SA: 2-28, SA: 2-37 - As Civil Picnic Area 3/14/22 3/16/22 Approved as noted
Highlighted (SP # 131 A-1-B)"
"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 2) Outside And Inside of Seating
4 4 KAIG3-RFI-PA-C-4665 00 Area - SA: 2-31, SA: 2-17, SA: 3-32, SA: 3-33, SA: 3-27, SA: 3-24, SA: 3-34, SA: 2-28, SA: 2-37 - As Civil Picnic Area 3/19/22 3/21/22 Approved as noted
Highlighted (SP # 131 A-1-B)"
G4 4 KAIG3-RFI-PA-C-5575 00 "Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As Highlighted" Civil Picnic Area 5/28/22 5/31/22 Approved as noted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As
G4 4 KAIG3-RFI-PA-C-5576 00 Civil Picnic Area 5/28/22 5/31/22 Approved as noted
Highlighted

G4 4 KAIG3-RFI-PA-C-5630 00 "Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-12) - As Highlighted" Civil Picnic Area 5/31/22 6/2/22 Approved as noted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-12) - As
G4 4 KAIG3-RFI-PA-C-5636 00 Civil Picnic Area 5/31/22 6/2/22 Approved as noted
Highlighted

G4 4 KAIG3-RFI-PA-C-5750 00 "Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-10) - As Highlighted" Civil Picnic Area 6/7/22 6/12/22 Approved as noted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-10) - As
G4 4 KAIG3-RFI-PA-C-5751 00 Civil Picnic Area 6/7/22 6/9/22 Approved as noted
Highlighted

K5 5 KAIG3-RFI-PA-C-5868 00 "Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K (SA-14) - As Highlighted" Civil Picnic Area 6/15/22 6/20/22 Approved as noted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K (SA-14) - As
K5 5 KAIG3-RFI-PA-C-5869 00 Civil Picnic Area 6/15/22 6/19/22 Approved as noted
Highlighted

L5 5 KAIG3-RFI-PA-C-5937 00 "Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As Highlighted" Civil Picnic Area 6/19/22 6/22/22 Approved as noted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As
L5 5 KAIG3-RFI-PA-C-5938 00 Civil Picnic Area 6/19/22 6/21/22 Approved as noted
Highlighted

L5 5 KAIG3-RFI-PA-C-6081 00 Inspection of Formworks for Canopy Column Neck of Seating Area 1 Zone K (SA-16) as highlighted. Civil Picnic Area 6/25/22 6/27/22 Approved as noted

K5 5 KAIG3-RFI-PA-C-6082 00 Inspection of Concrete Pouring for Canopy Column Neck of Seating Area 1 Zone K (SA-16) as highlighted. Civil Picnic Area 6/25/22 6/27/22 Approved as noted

Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-G-M (SA-9,10,11)
1P 6 KAIG3-RFI-PA-S-3359 00 Civil Crescent 1/12/22 1/17/22 Approved as noted
As Highlighted
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and wall
2J 6 KAIG3-RFI-PA-S-3360 00 Civil Crescent 1/12/22 1/15/22 Approved as noted
at Seating Area (2) Zone-K (SA-32) - As Highlighted
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and wall
2B 2 KAIG3-RFI-PA-S-3361 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
at Seating Area (2) Zone-K (SA-30) - As Highlighted

Excavation & Soil preparation prior to Backfilling Under the Foundation of Plant Room at Physic Garden, at
4D 4 KAIG3-RFI-PG-C-1277 01 Civil Physic Garden 1/5/22 1/8/22 Approved as noted
highlighted area in attached drawings.

Inspection & Compaction tests of Backfilling (1 layer out of 1) Under the Foundation of Plant Room at
4D 4 KAIG3-RFI-PG-C-1308 01 Civil Physic Garden 1/5/22 1/10/22 Approved as noted
Physic Garden, at highlighted area in attached drawings. (Stock Pile # 117).

Excavation & Blinding levels for Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per
KAIG3-RFI-PG-C-2087 00 Civil Physic Garden 11/10/21 11/14/21 Approved as noted
highlighted area in attached drawing's.
Inspection for Installed Rings (Risers) and Top Slab for Manholes (14 no's) (MH-D-03-02, MH-D-03-02-01,
KAIG3-RFI-PG-C-2228 00 MH-D-03-02-02, MH-D-03-02-03, MH-D-03-03, MH-D-03-04, MH-D-03-04-01, MH-D-05-01, MH-D-05- Civil Physic Garden 11/17/21 11/11/21 Approved as noted
01-01, MH-D-05-01-02, MH-D-05-02, MH-D-05-03, MH-D-05-04 & MH-
Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-D-04-01) at Entrance of Physic
KAIG3-RFI-PG-C-2277 00 Civil Physic Garden 11/20/21 11/11/21 Approved as noted
garden, as per highlighted area in attached drawing's.
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-D-04-01) at
KAIG3-RFI-PG-C-2346 00 Civil Physic Garden 11/29/21 11/27/21 Approved as noted
Entrance of Physic garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade and
4D KAIG3-RFI-PG-C-2410 00 single layer Sub base) Surround the Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per Civil Physic Garden 11/25/21 11/28/21 Approved as noted
highlighted area in attached drawing's. (Stock Pile 126)
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after Sub grade) Surround the
4D KAIG3-RFI-PG-C-2454 00 Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per highlighted area in attached drawing's. Civil Physic Garden 11/27/21 12/2/21 Approved as noted
(Stock Pile # 116)
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19) of
4D KAIG3-RFI-PG-C-2455 00 Civil Physic Garden 11/27/21 12/1/21 Approved as noted
Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2522 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 11/30/21 12/5/21 Approved as noted
Pile # 126)

kaig-qcals 175
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2576 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/2/21 12/8/21 Approved as noted
Pile # 126)
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19) of
4D KAIG3-RFI-PG-C-2596 00 Civil Physic Garden 12/4/21 12/7/21 Approved as noted
Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's.
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC3-20 to EXC4-
4D KAIG3-RFI-PG-C-2622 00 Civil Physic Garden 12/5/21 12/8/21 Approved as noted
52 to EXC4-44) of Physic Garden as per highlighted area in attached drawing's.
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Boundary
4D KAIG3-RFI-PG-C-2640 00 Wall (Outer side) @ Grid (EXC4-11/12 to 27/28) of Physic Garden as per highlighted area in attached Civil Physic Garden 12/6/21 12/11/21 Approved as noted
drawing's. (Stock Pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boundary
4D KAIG3-RFI-PG-C-2653 00 Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) of Physic Garden as per highlighted area in Civil Physic Garden 12/6/21 12/11/21 Approved as noted
attached drawing's. (Stock Pile # 126)
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC3-01 to EXC4-
4D KAIG3-RFI-PG-C-2655 00 Civil Physic Garden 12/7/21 12/12/21 Approved as noted
01 to EXC4-09) of Physic Garden as per highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boundary
4D KAIG3-RFI-PG-C-2711 00 Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to EXC4-09) of Civil Physic Garden 12/9/21 12/14/21 Approved as noted
Physic Garden as per highlighted area in attached drawing
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2712 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/9/21 12/14/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2713 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/9/21 12/14/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2731 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/12/21 12/15/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2768 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/14/21 12/20/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2769 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/14/21 12/20/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boundary
4D KAIG3-RFI-PG-C-2791 00 Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to EXC4-09) of Civil Physic Garden 12/14/21 12/21/21 Approved as noted
Physic Garden as per highlighted area in attached drawing
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2858 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/16/21 12/22/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-2859 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/16/21 12/23/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boundary
4D KAIG3-RFI-PG-C-2860 00 Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to EXC4-09) of Civil Physic Garden 12/16/21 12/23/21 Approved as noted
Physic Garden as per highlighted area in attached drawing
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boundary
4D KAIG3-RFI-PG-C-2992 00 Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to EXC4-09) of Civil Physic Garden 12/22/21 12/25/21 Approved as noted
Physic Garden as per highlighted area in attached drawing.
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC1-05 to EXC3-
4D KAIG3-RFI-PG-C-3000 00 Civil Physic Garden 12/22/21 12/27/21 Approved as noted
10 & EXC1-12 to EXC3-11) of of Physic Garden as per highlighted area in attached drawing's.
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-3001 00 side) of Outer Canopy 3, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/22/21 12/25/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-3002 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/22/21 12/25/21 Approved as noted
Pile # 126)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Outer
4D KAIG3-RFI-PG-C-3082 00 side) of Outer Canopy 1, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 12/26/21 1/3/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 7th (final) Layer Backfilling (Sub-Grade) (Out of 7 layers) along the
4D KAIG3-RFI-PG-C-3083 00 Boundary Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to Civil Physic Garden 12/26/21 12/30/21 Code C (resubmit)
EXC4-09) of Physic Garden as per highlighted area in attached drawing.
Inspection & Compaction tests of 7th (final) Layer Backfilling (Sub-Grade) (Out of 7 layers) along the
4D 4 KAIG3-RFI-PG-C-3083 01 Boundary Wall (Outer side) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) and (EXC3-01 to EXC4-01 to Civil Physic Garden 1/5/22 1/11/22 Approved as noted
EXC4-09) of Physic Garden as per highlighted area in attached drawing.
Inspection & Compaction Tests of 3rd Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundary
4D KAIG3-RFI-PG-C-3138 00 Wall (Outer side) @ Grid (EXC1-05 to EXC3-10 to 01 & EXC1-12 to EXC3-11 to 20) at Physic Garden as Civil Physic Garden 12/28/21 1/3/22 Approved as noted
per highlighted area in attached drawing's. (Stock Pile 126).
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19) of
4D KAIG3-RFI-PG-C-3153 00 Civil Physic Garden 12/30/21 1/4/22 Approved as noted
Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3238 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/5/22 1/9/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3266 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/8/22 1/12/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3308 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/10/22 1/15/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3330 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/11/22 1/17/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3392 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/15/22 1/19/22 Code C (resubmit)
Pile # 126)

kaig-qcals 176
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3392 01 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 1/27/22 2/1/22 Approved as noted
Pile # 126)
Soil Preparation Prior to Backfilling Surround the Footings (6 no's) of Canopy, (At B.O.B) Inside Physic
4D 4 KAIG3-RFI-PG-C-3540 00 Civil Physic Garden 1/25/22 1/27/22 Approved as noted
Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Footings
4D 4 KAIG3-RFI-PG-C-3641 00 Civil Physic Garden 1/29/22 2/2/22 Approved as noted
(6 no's) of Canopy, Inside Physic Garden, at highlighted area in attached drawings. (Stock pile # 126)
Surface preparation prior to Backfillling along the Boundary Wall (Inner side) @ Grid (EXC1-13 to EXC4-51
4D 4 KAIG3-RFI-PG-C-3644 00 to EXC4-43) and Outer Canopy 3 (Inner Side), (at B.O.B levels +873.21, 873.605, 874.205 & 874.190) Civil Physic Garden 1/29/22 2/1/22 Approved as noted
Inside Physic Garden, as highlighted area in attac
Surface preparation prior to Backfilling Surround the Manholes (4 no's) (MH-D-03-03, MH-D-03-04, MH-D-
4D 4 KAIG3-RFI-PG-C-3645 00 Civil Physic Garden 1/29/22 2/1/22 Approved as noted
05-01 & MH-D-05-01-01), Inside Physic garden, as highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Footings
4D 4 KAIG3-RFI-PG-C-3693 00 Civil Physic Garden 1/31/22 2/6/22 Code C (resubmit)
(6 no's) of Canopy, Inside Physic Garden, at highlighted area in attached drawings. (Stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Footings
4D 4 KAIG3-RFI-PG-C-3693 01 Civil Physic Garden 2/14/22 2/19/22 approved as noted
(6 no's) of Canopy, Inside Physic Garden, at highlighted area in attached drawings. (Stock pile # 126)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-3694 00 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) (from B.O.B levels +873.21, 873.605 & Civil Physic Garden 1/31/22 2/6/22 Code C (resubmit)
874.205) Inside Physic Garden, as highlighted area in at
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-3694 01 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) (from B.O.B levels +873.21, 873.605 & Civil Physic Garden 2/14/22 2/19/22 approved as noted
874.205) Inside Physic Garden, as highlighted area in at
1st Layer Gravel Backfilling Surround the Manholes (5 no's) (MH-D-03-02, 03-03, MH-D-03-04, MH-D-05-
4D 4 KAIG3-RFI-PG-C-3728 00 Civil Physic Garden 2/1/22 2/6/22 Approved as noted
01 & MH-D-05-01-01), Inside Physic garden, as highlighted area in attached drawing's. (Stock pile # 118)
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
4D 4 KAIG3-RFI-PG-C-3828 00 side) of Outer Canopy 2, at Out side of Physic garden, as per highlighted area in attached drawing's. (Stock Civil Physic Garden 2/6/22 2/10/22 Approved as noted
Pile # 126)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Manholes
4D 4 KAIG3-RFI-PG-C-3901 00 (4 no's) (MH-D-03-02, 03-03, MH-D-03-04 & MH-D-05-01), Inside Physic garden, as highlighted area in Civil Physic Garden 2/8/22 2/14/22 Approved as noted
attached drawing's. (Stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the
4D 4 KAIG3-RFI-PG-C-4039 00 Manholes (4 no's) (MH-D-03-02, 03-03, MH-D-03-04 & MH-D-05-01), Inside Physic garden, as highlighted Civil Physic Garden 2/14/22 2/19/22 Approved as noted
area in attached drawing's. (Stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4226 00 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) and Outer Canopy 3 (Inner Side) (at B.O.B Civil Physic Garden 2/24/22 3/1/22 Approved as noted
levels +873.21, 873.605, 874.205 & 874.190) Inside P
Surface preparation prior to Backfillling along the Boundary Wall (Inner side) @ Grid (EXC1-04 to EXC4-02
4D 4 KAIG3-RFI-PG-C-4227 00 to EXC4-10) and Outer Canopy 1 & 2 (Inner Side), (at B.O.B levels +873.21, 873.605, 874.205 & 874.190) Civil Physic Garden 2/24/22 2/27/22 Approved as noted
Inside Physic Garden, as highlighted area in a
Surface preparation prior to Backfilling Surround the Manholes (1 no's) (MH-D-05-01-02), Inside Physic
4D 4 KAIG3-RFI-PG-C-4228 00 Civil Physic Garden 2/24/22 2/28/22 Approved as noted
garden, as highlighted area in attached drawing's.
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Footings
4D 4 KAIG3-RFI-PG-C-4243 00 Civil Physic Garden 2/26/22 3/1/22 Approved as noted
(6 no's) of Canopy, Inside Physic Garden, at highlighted area in attached drawings. (Stock pile # 126)
Inspection and compaction test 1th layer of subgrade (out of 5 layers ) for Backfilling Surround the Manholes
4D 4 KAIG3-RFI-PG-C-4260 00 Civil Physic Garden 2/27/22 3/3/22 Approved as noted
( MH-D-05-01-01), Inside Physic garden, as highlighted area in attached drawing's. (stock pile # 126)
Inspection of 1st layer Gravel Backfilling Surround the Manhole (MH-D-05-01-02), Inside Physic garden, as
4D 4 KAIG3-RFI-PG-C-4261 00 Civil Physic Garden 2/27/22 3/1/22 Approved as noted
highlighted area in attached drawing's. (stock pile # 118)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4284 00 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) and Outer Canopy 3 (Inner Side) (at B.O.B Civil Physic Garden 2/27/22 3/5/22 Approved as noted
levels +873.21, 873.605, 874.205 & 874.190) Inside P
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4285 00 Wall (Inner side) @ Grid (EXC1-04 to EXC4-02 to EXC4-10) and Outer Canopy 1 & 2 (Inner Side), (at Civil Physic Garden 2/27/22 3/3/22 Approved as noted
B.O.B levels +873.21, 873.605, 874.205 & 874.190) Ins
Inspection and compaction test 2nd layer of subgrade (out of 5 layers ) for Backfilling Surround the
4D 4 KAIG3-RFI-PG-C-4326 00 Manholes ( MH-D-05-01-01), Inside Physic garden, as highlighted area in attached drawing's. (stock pile # Civil Physic Garden 3/1/22 3/5/22 Approved as noted
126)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Manhole
4D 4 KAIG3-RFI-PG-C-4327 00 Civil Physic Garden 3/1/22 3/5/22 Approved as noted
(MH-D-05-01-02), Inside Physic garden, as highlighted area in attached drawing's. (stock pile # 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4329 00 Wall (Inner side) @ Grid (EXC1-04 to EXC4-02 to EXC4-10) and Outer Canopy 1 & 2 (Inner Side), (at Civil Physic Garden 3/1/22 3/5/22 Approved as noted
B.O.B levels +873.21, 873.605, 874.205 & 874.190) Ins
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4330 00 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) and Outer Canopy 3 (Inner Side) (at B.O.B Civil Physic Garden 3/1/22 3/5/22 Approved as noted
levels +873.21, 873.605, 874.205 & 874.190) Inside P
Excavation and Bed preparation for water feature lines (90mm and 110mm HDPE ) from center to outer side
4D 4 KAIG3-RFI-PG-C-4332 00 Civil Physic Garden 3/2/22 3/5/22 Approved as noted
of plant room at Physic Garden, as highlighted area in attached drawing's.
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Footings
4D 4 KAIG3-RFI-PG-C-4361 00 Civil Physic Garden 3/2/22 3/7/22 Approved as noted
(6 no's) of Canopy, Inside Physic Garden, at highlighted area in attached drawings. (Stock pile # 126)
Sand bedding for water feature lines (90mm and 110mm HDPE ) from center to outer side of plant room at
4D 4 KAIG3-RFI-PG-C-4376 00 Civil Physic Garden 3/3/22 3/8/22 Approved as noted
Physic Garden, as highlighted area in attached drawing's.
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4446 00 Wall (Inner side) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) and Outer Canopy 3 (Inner Side) (at B.O.B Civil Physic Garden 3/7/22 3/10/22 Approved as noted
levels +873.21, 873.605, 874.205 & 874.190) Inside P
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Boundary
4D 4 KAIG3-RFI-PG-C-4447 00 Wall (Inner side) @ Grid (EXC1-04 to EXC4-02 to EXC4-10) and Outer Canopy 1 & 2 (Inner Side), (at Civil Physic Garden 3/7/22 3/12/22 Approved as noted
B.O.B levels +873.21, 873.605, 874.205 & 874.190) Ins
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Manhole
4D 4 KAIG3-RFI-PG-C-4448 00 Civil Physic Garden 3/7/22 3/10/22 Approved as noted
(MH-D-05-01-02), Inside Physic garden, as highlighted area in attached drawing's. (stock pile # 126)

kaig-qcals 177
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 3rd layer of subgrade (out of 5 layers ) for Backfilling Surround the
4D 4 KAIG3-RFI-PG-C-4449 00 Manholes ( MH-D-05-01-01), Inside Physic garden, as highlighted area in attached drawing's. (stock pile # Civil Physic Garden 3/7/22 3/10/22 Approved as noted
126)

4D 4 KAIG3-RFI-PG-C-4542 00 Excavation and Bed preparation for wet well( E ) ,at Water Garden as highlighted area in attached drawing's. Civil Physic Garden 3/10/22 3/13/22 Approved as noted

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) above sand cover (Out of 2 layers) for
4D 4 KAIG3-RFI-PG-C-4567 00 Water Feature Lines ( HDPE 90mm & 110mm ) from center to outer side of plant room at Physic Garden, as Civil Physic Garden 3/13/22 3/15/22 Approved as noted
highlighted area in attached drawing's.

Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Inside Physic Garden, as
4D 4 KAIG3-RFI-PG-C-4578 00 Civil Physic Garden 3/14/22 3/17/22 Approved as noted
highlighted area in attached drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) above sand cover (Out of 2 layers) for
4D 4 KAIG3-RFI-PG-C-4579 00 Water Feature Lines ( HDPE 90mm & 110mm ) from center to outer side of plant room at Physic Garden, as Civil Physic Garden 3/14/22 3/17/22 Approved as noted
highlighted area in attached drawing's.

Surface preparation prior to Backfilling ( Inside two plant rooms) at Physic Garden, as highlighted areas in
4D 4 KAIG3-RFI-PG-C-4580 00 Civil Physic Garden 3/15/22 3/16/22 Approved as noted
attached drawing's.
Inspection Compaction tests of 1st Layer Backfilling (Out of 1 layer)under the foundation of plant room and
4D 4 KAIG3-RFI-PG-C-4642 00 Civil Physic Garden 3/16/22 3/19/22 Approved as noted
foundation of part of seat wall at Physic garden, as highlighted area
Excavation and Soil preparation under Fountain of (5 nos) at Physic Garden as highlighted area in attached
4D 4 KAIG3-RFI-PG-C-4748 00 Civil Physic Garden 3/23/22 3/27/22 Approved as noted
drawing's.
Surface preparation prior to Backfilling Along the walls (Inner Side) of Outer canopy 1, (At Level 874.19),
4D 4 KAIG3-RFI-PG-C-4946 00 Civil Physic Garden 4/2/22 4/4/22 Approved as noted
Inside Physic Garden, as highlighted areas in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the walls (Inner
4D 4 KAIG3-RFI-PG-C-4947 00 Civil Physic Garden 4/2/22 4/6/22 Approved as noted
Side) of Outer canopy 2 & 3, Inside Physic Garden, as highlighted areas in attached drawing's. (SP 126)
Surface preparation and Compaction tests for existing fill material prior toBackfilling Inside Outer Canopy 1,
4D 4 KAIG3-RFI-PG-C-4971 00 Civil Physic Garden 4/4/22 4/6/22 Approved as noted
Inside Physic Garden, as highlighted areas in attached drawing's.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Inside Outer canopy 2
4D 4 KAIG3-RFI-PG-C-5019 00 Civil Physic Garden 4/7/22 4/11/22 Code C (resubmit)
& 3, Inside Physic Garden, as highlighted areas in attached drawing's. (SP 126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Inside Outer canopy 2
4D 4 KAIG3-RFI-PG-C-5019 01 Civil Physic Garden 4/20/22 4/24/22 Approved as noted
& 3, Inside Physic Garden, as highlighted areas in attached drawing's. (SP 126)
Inspection & Compaction Test for 1st layer (Sub-Grade) Backfilling (out of 3 layers) inside Outer Canopy,
4D 4 KAIG3-RFI-PG-C-5157 00 Civil Physic Garden 4/20/22 4/24/22 Approved as noted
inside Physic Garden as highlighted areas in attached drawings SP 135.
Excavation and Soil preparation for Foundation of Seat Walls (Inner), Inside Physic Garden as highlighted
4D 4 KAIG3-RFI-PG-C-5377 00 Civil Physic Garden 5/15/22 5/17/22 Approved as noted
area in attached drawing's.
Excavation & Bed preparation for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant room
4D 4 KAIG3-RFI-PG-C-5432 00 Civil Physic Garden 5/19/22 5/21/22 Approved as noted
to Outer Canopy 2 (Outer side), at Physic garden, as highlighted area in attached drawing's.

Concrete Pouring for Thrust Blocks for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant
4D 4 KAIG3-RFI-PG-C-5633 00 Civil Physic Garden 5/31/22 6/1/22 Approved as noted
room to Outer Canopy 2 (Outer side), at Physic garden, as highlighted area in attached drawing's.
Sand Cover & Pipe Protection for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant room
4D 4 KAIG3-RFI-PG-C-5787 00 Civil Physic Garden 6/9/22 6/12/22 Approved as noted
to Outer Canopy 2 (Outer side), at Physic garden, as highlighted area in attached drawing's.
Excavation & Bed preparation for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer
4D 4 KAIG3-RFI-PG-C-5818 00 Civil Physic Garden 6/12/22 6/13/22 Approved as noted
Canopy 3 (Outer side), at Physic garden, as highlighted area in attached drawing's.
Excavation and Soil preparation for Fountain 3 at Center, Inside Physic Garden as highlighted area in
4D 4 KAIG3-RFI-PG-C-5839 00 Civil Physic Garden 6/14/22 6/19/22 Approved as noted
attached drawing's.
Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer Canopy 3 (Outer
4D 4 KAIG3-RFI-PG-C-5853 00 Civil Physic Garden 6/14/22 6/16/22 Approved as noted
side), at Physic garden, as highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-5861 00 Lines (Main 110 dia & Sub 63mm 4 no's) from Plant room to Outer Canopy 2 (Outer side), at Physic garden, Civil Physic Garden 6/15/22 6/19/22 Approved as noted
as highlighted area in attached drawing's. (SP
Sand Cover & Pipe Protection for Water Feature Lines (Main 160 dia.HDPE) From Plant Room to Outer
4D 4 KAIG3-RFI-PG-C-6039 00 Civil Physic Garden 6/23/22 6/26/22 Approved as noted
Conopy 3 (Outer side) at Physic Garden, as highlighted area in the attached drawings.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 Layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6088 00 Lines (Main 110 dia & Sub 63mm 4 nos) from Plant Room To Outer Canopy 2 (Outer Side), at Physic Civil Physic Garden 7/17/22 6/17/22 Approved as noted
Garden,as Highlighted area in attachrd drawings.(sp 135)

Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/ 02,04,05,06) &
4D 4 KAIG3-RFI-PG-C-6099 00 Civil Physic Garden 6/26/22 6/30/22 Approved as noted
Emergency (MH/PG/EM/ 02,03,04,07,08),Inside Physic Garden as highlighted area in attached drawing's.

kaig-qcals 178
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation and Blinding Levels for Low Current Handholes of (MH/PG/LC/ 02,04,05,06,07,08,17) & Fire
4D 4 KAIG3-RFI-PG-C-6100 00 Alarm & Security (MH/PG/FA/ 01,02,03,04,05),Inside Physic Garden as highlighted area in attached Civil Physic Garden 6/26/22 6/30/22 Approved as noted
drawing's.
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/ 02,04,05,06) &
4D 4 KAIG3-RFI-PG-C-6166 00 Civil Physic Garden 6/29/22 7/2/22 Approved as noted
Emergency (MH/PG/EM/ 02,03,04,07,08),Inside Physic Garden as highlighted area in attached drawing's.
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/ 02,04,05,06,07,08,17) & Fire
4D 4 KAIG3-RFI-PG-C-6167 00 Alarm & Security (MH/PG/FA/ 01,02,03,04,05),Inside Physic Garden as highlighted area in attached Civil Physic Garden 6/29/22 7/2/22 Approved as noted
drawing's.
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/03), Inside Physic
4D 4 KAIG3-RFI-PG-C-6204 00 Civil Physic Garden 6/30/22 7/6/22 Approved as noted
Garden as highlighted area in attached drawing's.
Excavation and Blinding Levels for Low Current Handhole (MH/PG/LC/03) Inside Physic Garden as
4D 4 KAIG3-RFI-PG-C-6205 00 Civil Physic Garden 6/30/22 7/6/22 Approved as noted
highlighted area in attached drawing's.
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/03), Inside Physic
4D 4 KAIG3-RFI-PG-C-6253 00 Civil Physic Garden 7/3/22 7/6/22 Approved as noted
Garden as highlighted area in attached drawing's.
Concrete Pouring for Blinding under Low Current Handhole (MH/PG/LC/03) Inside Physic Garden as
4D 4 KAIG3-RFI-PG-C-6254 00 Civil Physic Garden 7/3/22 7/6/22 Approved as noted
highlighted area in attached drawing's.
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/09, 10, 11 & 12) and
4D 4 KAIG3-RFI-PG-C-6276 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Emergency (MH/PG/EM/10, 11, 12 & 13), Inside Physic Garden as highlighted in attached drawing's.

Excavation and Blinding Levels for Low Current Handholes (MH/PG/LC/11, 13, 14, 15 & 16) and Fire
4D 4 KAIG3-RFI-PG-C-6277 00 Alarm & Security (MH/PG/FA/07, 09, 10, 11 & 12), Inside Physic Garden as highlighted in attached Civil Physic Garden 7/4/22 7/7/22 Approved as noted
drawing's.

Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/09, 10, 11 & 12) and
4D 4 KAIG3-RFI-PG-C-6298 00 Civil Physic Garden 7/5/22 7/7/22 Approved as noted
Emergency (MH/PG/EM/10, 11, 12 & 13), Inside Physic Garden as highlighted in attached drawing's.
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/11, 13, 14, 15 & 16) and Fire
4D 4 KAIG3-RFI-PG-C-6299 00 Alarm & Security (MH/PG/FA/07, 09, 10, 11 & 12), Inside Physic Garden as highlighted in attached Civil Physic Garden 7/5/22 7/7/22 Approved as noted
drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6442 00 Lines (Main 160 dia.HDPE) From Plant Room to Outer Conopy 3 (Outer side) at Physic Garden, as Civil Physic Garden 7/18/22 7/23/22 Approved as noted
highlighted area in the attached drawings.(SP 135)
Inspection for Installed Electrical Handholes of Low Voltage (MH/PG/LV/02, 03, 04, 05, 06, 09, 10, 11 &
4D 4 KAIG3-RFI-PG-C-6456 00 12) and Emergency (MH/PG/EM/02, 03, 04, 07, 08, 10, 11, 12 & 13), Inside Physic Garden as highlighted in Civil Physic Garden 7/18/22 7/21/22 Approved as noted
attached drawing's.
Inspection for Installed Low Current Handholes (MH/PG/LC/02, 03, 04, 05, 06, 07, 08, 11, 13, 14, 15, 16 &
4D 4 KAIG3-RFI-PG-C-6457 00 17) and Fire Alarm & Security (MH/PG/FA/01, 02, 03, 04, 05, 07, 09, 10, 11 & 12), Inside Physic Garden as Civil Physic Garden 7/18/22 7/21/22 Approved as noted
highlighted in attached drawing's.
Surface preparation prior to Backfilling Along the wall (Inner Side) of Plant room, from Inside Physic
4D 4 KAIG3-RFI-PG-C-6495 00 Civil Physic Garden 7/19/22 7/23/22 Approved as noted
Garden, as highlighted areas in attached drawing's.
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6498 00 Lines (Main 110 dia & Sub 63mm 4 no's) from Plant room to Outer Canopy 2 (Outer side), at Physic garden, Civil Physic Garden 7/20/22 7/26/22 Approved as noted
as highlighted area in attached drawing's. (SP
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the wall (Inner
4D 4 KAIG3-RFI-PG-C-6537 00 Civil Physic Garden 7/21/22 7/26/22 Approved as noted
Side) of Plant room, from Inside Physic Garden, as highlighted areas in attached drawing's.(SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6566 00 Lines (Main 160 dia.HDPE) From Plant Room to Outer Conopy 3 (Outer side) at Physic Garden, as Civil Site Work 7/24/22 7/28/22 Approved as noted
highlighted area in the attached drawings.(SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the wall (Inner
4D 4 KAIG3-RFI-PG-C-6567 00 Civil Physic Garden 7/24/22 7/28/22 Approved as noted
Side) of Plant room, from Inside Physic Garden, as highlighted areas in attached drawing's.(SP 135)
Excavation & Bed preparation for Irrigation Lines (63 dia.) from Outer Canopy 1 to Outer Canopy 3 (Outer
4D 4 KAIG3-RFI-PG-C-6602 00 Civil Physic Garden 7/25/22 7/28/22 Approved as noted
side), at Physic garden, as highlighted area in attached drawing's.
Excavation and Bed preparation for Water Feature Lines (90mm Supply and 160mm Drain pipes) At
4D 4 KAIG3-RFI-PG-C-6618 00 Civil Physic Garden 7/26/22 8/1/22 Approved as noted
Fountain 3, inside Physic Garden, as highlighted area in attached drawing's.

2D 2E 2 KAIG3-RFI-RG-C-5511 00 "Notification to start excavation works for cretaceous garden zone 2D,2E (as highlighted)" Civil Cretaceous Garden 5/24/22 5/25/22 Approved as noted

2C KAIG3-RFI-SA-C-2583 00 Anti Termite Application under Blinding of Soak Away for South Admin Bldg. Zone 2C Civil South Admin 12/16/21 12/19/21 Code C (not resubmit)

2C KAIG3-RFI-SA-C-2584 00 Concreting & shutter of Blinding at Soak Away for South Admin Bldg. Zone 2C Civil South Admin 12/16/21 12/19/21 Code C (not resubmit)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
KAIG3-RFI-SG-C-1997 00 Walls (A, B, C, D, E, F, G & H) all Sides at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/4/21 11/9/21 Approved as noted
drawing's. (Stock Pile # 117)
Surface Preparation & Levels prior to Backfilling along the Boundary walls (Inner Side) @ Elevation B, C,
KAIG3-RFI-SG-C-2021 00 Civil Sound & Light Garden 11/7/21 11/10/21 Approved as noted
D, E & F, at Sound & Light garden, as per highlighted area in attached drawing's & Survey Data.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
KAIG3-RFI-SG-C-2037 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/8/21 11/13/21 Approved as noted
drawing's. (Stock Pile # 117)
Surface preparation prior to Backfilling Surround the Manholes (Type 'B' 2 No's)(MH-D-01-B4 & MH-D-01-
KAIG3-RFI-SG-C-2063 00 Civil Sound & Light Garden 11/9/21 11/13/21 Approved as noted
B5) Inside Sound & Light garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side)
KAIG3-RFI-SG-C-2064 00 @ Elevation B (Out of 8 layers) & @ Elevation C, D, E & F (Out of 4 layers), at Sound & Light garden, as Civil Sound & Light Garden 11/9/21 11/14/21 Approved as noted
per highlighted area in attached drawing's.

kaig-qcals 179
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Surface Preparation & Levels prior to Backfilling along the Boundary wall @ Elevation 'F' (Inner Side at
KAIG3-RFI-SG-C-2065 00 Sound garden) and Whispering Cave 1 & 2 (Inner Side), at Sound & Light garden, as per highlighted area in Civil Sound & Light Garden 11/9/21 11/13/21 Approved as noted
attached drawing's & Survey Data.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
KAIG3-RFI-SG-C-2066 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/9/21 11/14/21 Approved as noted
drawing's. (Stock Pile # 117)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
KAIG3-RFI-SG-C-2067 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/9/21 11/14/21 Approved as noted
drawing's. (Stock Pile # 117)
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manholes (Type 'B' 2 No's)(MH-D-
KAIG3-RFI-SG-C-2088 00 Civil Sound & Light Garden 11/10/21 11/14/21 Approved as noted
01-B4 & MH-D-01-B5) Inside Sound & Light garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
KAIG3-RFI-SG-C-2089 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/10/21 11/15/21 Approved as noted
drawing's. (Stock Pile # 117)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side)
KAIG3-RFI-SG-C-2090 00 @ Elevation B (Out of 8 layers) & @ Elevation C, D, E & F (Out of 4 layers), at Sound & Light garden, as Civil Sound & Light Garden 11/10/21 11/15/21 Approved as noted
per highlighted area in attached drawing's.
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundary
KAIG3-RFI-SG-C-2113 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 11/13/21 11/16/21 Approved as noted
drawing's. (Stock Pile # 117)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side)
KAIG3-RFI-SG-C-2114 00 @ Elevation B (Out of 8 layers) & @ Elevation C, D, E & F (Out of 4 layers), at Sound & Light garden, as Civil Sound & Light Garden 11/11/21 11/16/21 Approved as noted
per highlighted area in attached drawing's.
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side)
KAIG3-RFI-SG-C-2182 00 @ Elevation B (Out of 8 layers), at Sound & Light garden, as per highlighted area in attached drawing's. Civil Sound & Light Garden 11/15/21 11/18/21 Approved as noted
(Stock Pile # 117)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side)
KAIG3-RFI-SG-C-2183 00 @ Elevation B (Out of 8 layers), at Sound & Light garden, as per highlighted area in attached drawing's. Civil Sound & Light Garden 11/15/21 11/20/21 Approved as noted
(Stock Pile # 117)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-28 & 32 ) As
KAIG3-RFI-SG-C-2188 00 Civil Sound & Light Garden 11/16/21 11/21/21 Approved as noted
Highlighted

Inspection for Installed Rings (Risers) and Top Slab for Manholes (4 No's)(MH-D-01-B3, MH-D-01-B3-01,
KAIG3-RFI-SG-C-2193 00 Civil Sound & Light Garden 11/17/21 11/21/21 Approved as noted
MH-D-01-B4 & MH-D-01-B5) Inside Sound & Light garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side) @
5A KAIG3-RFI-SG-C-2252 00 Elevation B (Out of 8 layers), at Sound & Light garden, as per highlighted area in attached drawing's. (Stock Civil Sound & Light Garden 11/18/21 11/21/21 Code C (resubmit)
Pile # 117)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side) @
5A 5 KAIG3-RFI-SG-C-2252 01 Elevation B (Out of 8 layers), at Sound & Light garden, as per highlighted area in attached drawing's. (Stock Civil Sound & Light Garden 2/13/22 3/2/22 Approved as noted
Pile # 117)

Excavation & Bed Preparation for Fire Alarm & Security Lines, Telecom Lines, Emergency Lines and Low
KAIG3-RFI-SG-C-2278 00 Civil Sound & Light Garden 11/20/21 11/23/21 Approved as noted
Voltage Lines, Inside Sound & Light garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Manholes
KAIG3-RFI-SG-C-2347 00 (Type 'B' 2 No's)(MH-D-01-B4 & MH-D-01-B5) Inside Sound & Light garden, as per highlighted area in Civil Sound & Light Garden 11/29/21 11/27/21 Approved as noted
attached drawing's. (Stock pile # 126)
Inspection & Compaction tests after Excavation for Fire Alarm & Security Lines, Telecom Lines, Emergency
KAIG3-RFI-SG-C-2362 00 Civil Sound & Light Garden 11/23/21 11/27/21 Approved as noted
Lines and Low Voltage Lines, Inside Sound & Light garden, as per highlighted area in attached drawing's.

Sand Bedding for Fire Alarm & Security Lines, Telecom Lines, Emergency Lines and Low Voltage Lines,
4B KAIG3-RFI-SG-C-2404 00 Civil Sound & Light Garden 11/24/21 11/28/21 Approved as noted
Inside Sound & Light garden, as per highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the
5A KAIG3-RFI-SG-C-2409 00 Manholes (Type 'B' 2 No's)(MH-D-01-B4 & MH-D-01-B5) Inside Sound & Light garden, as per highlighted Civil Sound & Light Garden 11/25/21 11/28/21 Approved as noted
area in attached drawing's. (Stock pile # 126)
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Manhole
KAIG3-RFI-SG-C-2471 00 (Type 'B' 1 No's)(MH-D-01-B4) Inside Sound & Light garden, as per highlighted area in attached drawing's. Civil Sound & Light Garden 11/28/21 12/1/21 Approved as noted
(Stock pile # 126)
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (Inner
KAIG3-RFI-SG-C-2474 00 Civil Sound & Light Garden 11/28/21 12/1/21 Approved as noted
Side) At Elevation (A & G), Inside Sound & Light garden, as per highlighted area in attached drawing's.
Surface Preparation & Levels prior to Backfilling Surround the Seat walls B, D, E & F (All Sides), at Sound
5A KAIG3-RFI-SG-C-2476 00 Civil Sound & Light Garden 11/28/21 11/30/21 Approved as noted
& Light garden, as per highlighted area in attached drawing's & Survey Data.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Seat walls
5A KAIG3-RFI-SG-C-2550 00 Civil Sound & Light Garden 12/1/21 12/9/21 Approved as noted
B, D, E & F (All Sides), at Sound & Light garden, as per highlighted area in attached drawing's
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage pipes (110mm Pipes) along the
5A KAIG3-RFI-SG-C-2621 00 Boundary wall (Inner Side) At Elevation (A & G), Inside Sound & Light garden, as per highlighted area in Civil Sound & Light Garden 12/4/21 12/6/21 Approved as noted
attached drawing's. (Stock pile #118)
Perforated Pipes Installation for subsurface drainage (110mmØ- UPVC PIPE CL.4) in Sound & Light
5A KAIG3-RFI-SG-C-2623 00 Civil Sound & Light Garden 12/5/21 cancelled
Garden. As per highlighted Area in the attached Dwg
Surface Preparation prior to Backfilling along the Walls (Outer Side) of Whispering Cave 1 & 2, (From
5A KAIG3-RFI-SG-C-2702 00 Bottom of Blinding Levels +873.25 & +873.65), From Inside Sound & Light Garden, At highlighted area in Civil Sound & Light Garden 12/8/21 12/12/21 Approved as noted
attached Drawing's
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A KAIG3-RFI-SG-C-2715 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside Sound Civil Sound & Light Garden 12/11/21 12/16/21 Approved as noted
& Light Garden, At highlighted area in attached drawing
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A KAIG3-RFI-SG-C-2767 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and at Civil Sound & Light Garden 12/14/21 12/20/21 Approved as noted
wall Elevation 'F' (Inner Side), at Sound & Light Garden
kaig-qcals 180
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A KAIG3-RFI-SG-C-2857 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and at Civil Sound & Light Garden 12/16/21 12/22/21 Approved as noted
wall Elevation 'F' (Inner Side), at Sound & Light Garden
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A KAIG3-RFI-SG-C-2897 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and at Civil Sound & Light Garden 12/18/21 12/23/21 Approved as noted
wall Elevation 'F' (Inner Side), at Sound & Light Garden
Sand Cover Protection & Warning Tiles on Fire Alarm & Security Lines, Telecom Lines, Emergency Lines
5A KAIG3-RFI-SG-C-2925 00 Civil Sound & Light Garden 12/20/21 12/23/21 Code C (resubmit)
and Low Voltage Lines, Inside Sound & Light garden, as per highlighted area in attached drawing's.
Sand Cover Protection & Warning Tiles on Fire Alarm & Security Lines, Telecom Lines, Emergency Lines
5A KAIG3-RFI-SG-C-2925 01 Civil Sound & Light Garden 12/25/21 12/30/21 Approved as noted
and Low Voltage Lines, Inside Sound & Light garden, as per highlighted area in attached drawing's.
Surface Preparation prior to Backfilling Inside Whispering Cave 1 & 2, (From Bottom of Blinding Levels
5A KAIG3-RFI-SG-C-2968 00 Civil Sound & Light Garden 12/21/21 12/25/21 Approved as noted
+873.25 & +873.65), From Inside Sound & Light Garden, At highlighted area in attached Drawing's
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside Whispering
5A KAIG3-RFI-SG-C-2991 00 Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside Sound & Light Garden, At Civil Sound & Light Garden 12/22/21 12/28/21 Approved as noted
highlighted area in attached Drawing's. (Stock pile 126).
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Seat
5A KAIG3-RFI-SG-C-3058 00 Civil Sound & Light Garden 12/25/21 12/28/21 Approved as noted
walls B, D, E & F (All Sides), at Sound & Light garden, as per highlighted area in attached drawing's
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside Whispering
5A KAIG3-RFI-SG-C-3063 00 Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside Sound & Light Garden, At Civil Sound & Light Garden 12/25/21 12/30/21 Approved as noted
highlighted area in attached Drawing's. (Stock pile 126).
Inspection & Compaction tests of 3rd layer Backfilling (Sub-Grade) (Out of 4 layers) inside Whispering Cave
5A KAIG3-RFI-SG-C-3084 00 1 & 2 (from Bottom of Blinding Levels +873.25 & +873.65 from inside Sound & Light Garden as per Civil Sound & Light Garden 12/27/21 12/30/21 Approved as noted
highlighted area in attached drawing (stock pile 126).
Inspection & Compaction tests of 4th final layers for Backfilling (Sub Grade) (out of 4 layers) inside
5A KAIG3-RFI-SG-C-3108 00 Whispering Cave 1 & 2 from Bottom of Blinding Levels +873.25 & 873.65) from inside Sound & Light Civil Sound & Light Garden 12/27/21 1/1/22 Approved as noted
Garden at
Surface highlighted
Preparation areatoinBackfilling
prior attached drawing (stock
along the pile 126).
Boundary Walls Outer Side at Elevation 'G, Whispering
5A KAIG3-RFI-SG-C-3154 00 Cave 1, F, E, D and All Sides at Wall Elevation 'I & H', (From Bottom of Blinding Level +873.25), at Sound Civil Sound & Light Garden 12/30/21 1/4/22 Approved as noted
Inspection & Compaction
& Light Garden, tests of
At highlighted 1stin
area Layer Backfilling
attached drawing(Sub-Grade) (Out of 4 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3201 00 Walls Outer Side at Elevation 'G, Whispering Cave 1, F, E, D and All Sides at Wall Elevation 'I & H', (From Civil Sound & Light Garden 1/4/22 1/9/22 Approved as noted
Surface
Bottom ofPreparation prior to
Blinding Level Backfilling
+873.25), along &
at Sound theLight
Boundary
GardenWalls Outer Sidearea
at highlighted at Elevation 'A,drawing.
in attached Whispering
5A 5 KAIG3-RFI-SG-C-3221 00 Cave 2, B and C', (From Bottom of Blinding Level +873.25), at Sound & Light Garden, At highlighted area Civil Sound & Light Garden 1/4/22 1/6/22 Approved as noted
in attached Drawing's
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3239 00 Walls Outer Side at Elevation 'G, Whispering Cave 1, F, E, D and All Sides at Wall Elevation 'I & H', (From Civil Sound & Light Garden 1/6/22 1/11/22 Approved as noted
Bottom of Blinding Level +873.25), at Sound & Light Garden
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3307 00 Walls Outer Side at Elevation 'A, Whispering Cave 2, B and C', (From Bottom of Blinding Level +873.25), at Civil Sound & Light Garden 1/10/22 1/15/22 Approved as noted
Sound & Light Garden, At highlighted area in attched drawing.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3377 00 Walls Outer Side at Elevation 'A, Whispering Cave 2, B and C', (From Bottom of Blinding Level +873.25), at Civil Sound & Light Garden 1/13/22 1/18/22 Approved as noted
Sound & Light Garden, At highlighted area in
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3517 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 1/23/22 1/27/22 Approved as noted
drawing's. (Stock pile # 126)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A 5 KAIG3-RFI-SG-C-3538 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and at Civil Sound & Light 1/24/22 1/27/22 Approved as noted
wall Elevation
Inspection 'F' (Inner Side),
& Compaction tests at
of Sound & Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
6th Layer
5A 5 KAIG3-RFI-SG-C-3608 00 Side) of Whispering Cave 1, (From Bottom of Blinding Levels +873.25), From Inside and at wall Elevation Civil Sound & Light Garden 1/26/22 1/30/22 Approved as noted
'F' (Inner Side),
Inspection at Sound &tests
& Compaction Light garden,
of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3609 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 1/26/22 1/30/22 Approved as noted
drawing's. (Stock pile # 126)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
5A 5 KAIG3-RFI-SG-C-3642 00 (Outer Side) of Whispering Cave 1, (From Bottom of Blinding Levels +873.25), From Inside and at wall Civil Sound & Light Garden 1/29/22 2/2/22 Approved as noted
Elevation 'F' (Inner Side), at Sound & Light garden,
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Boundary
5A 5 KAIG3-RFI-SG-C-3643 00 walls (Inner Side) @ Elevation A & G, at Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 1/29/22 2/2/22 Approved as noted
drawing's. (Stock pile # 126)
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (Inner
5A 5 KAIG3-RFI-SG-C-3806 00 Side) At Elevation (G, WC-1 & F), Inside Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 2/5/22 2/8/22 Approved as noted
drawing's.
Excavation & Blinding Levels of Electrical Handholes of Low Voltage (MH/SG/LV/07-12), Emergency
5A 5 KAIG3-RFI-SG-C-3831 00 (MH/SG/EM/05-09), Fire Alarm & Security (MH/SG/FA/07-12) and Telecom (MH/SG/TC/07-14) Inside Civil Sound & Light Garden 2/6/22 2/9/22 Approved as noted
Light garden, at Sound & Light garden, as per highlighted area in
Inspection & Compaction tests after Excavation for Electrical Handholes of Low Voltage (MH/SG/LV/07-
5A 5 KAIG3-RFI-SG-C-3832 00 12), Emergency (MH/SG/EM/05-09), Fire Alarm & Security (MH/SG/FA/07-12) and Telecom Civil Sound & Light Garden 2/6/22 2/10/22 Approved as noted
(MH/SG/TC/07-14)
Inspection & CompactionInsidetests
Light garden,
after at Sound
Excavation for&Sub
Light garden,
surface as per hpipe Lines (110mm Pipes) along
Drainage
5A 5 KAIG3-RFI-SG-C-3882 00 the Boundary wall (Inner Side) At Elevation (G, WC-1 & F), Inside Sound & Light garden, as per highlighted Civil Sound & Light Garden 2/8/22 2/10/22 Approved as noted
area in attached drawing's.
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/SG/LV/07-12), Emergency
5A 5 KAIG3-RFI-SG-C-3883 00 (MH/SG/EM/05-09), Fire Alarm & Security (MH/SG/FA/07-12) and Telecom (MH/SG/TC/07-14) Inside Civil Sound & Light Garden 2/8/22 2/20/22 Approved as noted
Light garden, at Sound & Light garden, as per highlighted area
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (Outer
5A 5 KAIG3-RFI-SG-C-4030 00 Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and at Civil Sound & Light Garden 2/13/22 2/17/22 Approved as noted
wall Elevation 'F' (Inner Side), at Sound &
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage pipes (110mm Pipes) along the
5A 5 KAIG3-RFI-SG-C-4056 00 Boundary wall (Inner Side) At Elevation (G, WC-1 & F), Inside Sound & Light garden, as per highlighted Civil Sound & Light Garden 2/14/22 2/15/22 Approved as noted
area in attached drawing's.(Stock pile # 118)

kaig-qcals 181
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side) @
5A 5 KAIG3-RFI-SG-C-4094 00 Elevation B (Out of 10 layers), at Sound & Light garden, as per highlighted area in attached drawing's. Civil Sound & Light Garden 2/16/22 2/21/22 Approved as noted
(Stock pile # 126)
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
5A 5 KAIG3-RFI-SG-C-4095 00 (Outer Side) of Whispering Cave 1 & 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside Civil Sound & Light Garden 2/16/22 2/21/22 Approved as noted
and at wall Elevation 'F' (Inner Side), at Sound &
Inspection & Compaction tests of 9th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side) @
5A 5 KAIG3-RFI-SG-C-4170 00 Elevation B (Out of 10 layers), at Sound & Light garden, as per highlighted area in attached drawing's. Civil Sound & Light Garden 2/20/22 2/26/22 Approved as noted
(Stock pile # 126)
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
5A 5 KAIG3-RFI-SG-C-4171 00 (Outer Side) of Whispering Cave 2, (From Bottom of Blinding Levels +873.25 & +873.65), From Inside and Civil Sound & Light Garden 2/20/22 2/26/22 Approved as noted
at wall Elevation 'F' (Inner Side), at Sound & Lig
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (Inner
5A 5 KAIG3-RFI-SG-C-4257 00 Side) At Elevation (A, WC-2 & B), Inside Sound & Light garden, as per highlighted area in attached Civil Sound & Light Garden 2/27/22 3/3/22 Approved as noted
drawing's.
Excavation & Surface Preparation for Seat Walls (A & C) and along Whispering Cave-1, Inside Sound &
5A 5 KAIG3-RFI-SG-C-4258 00 Civil Sound & Light Garden 2/27/22 3/3/22 Approved as noted
Light garden, as per highlighted area in attached drawing's.
Excavation & Blinding Levels of Electrical Handholes of Low Voltage (MH/SG/LV/01-06), Emergency
5A 5 KAIG3-RFI-SG-C-4259 00 (MH/SG/EM/01-04), Fire Alarm & Security (MH/SG/FA/01-05) and Telecom (MH/SG/TC/01-06) Inside Civil Sound & Light Garden 2/27/22 3/3/22 Approved as noted
Sound garden, at Sound & Light garden, as per highlighted area in
Concrete pouring for blinding under Electrical Handholes of Low Voltage (MH/SG/LV/01-06), Emergency
5A 5 KAIG3-RFI-SG-C-4309 00 (MH/SG/EM/01-04), Fire Alarm & Security (MH/SG/FA/01-05) and Telecom (MH/SG/TC/01-06) Inside Civil Sound & Light Garden 2/28/22 3/3/22 Approved as noted
Sound garden, at Sound & Light garden, as per highlighted area
Excavation & Blinding Levels for Manholes of (MH/SG/TC/01) and (MH/SG/FA/01 ), at Sound & Light
5A 5 KAIG3-RFI-SG-C-4467 00 Civil Sound & Light Garden 3/7/22 3/10/22 Approved as noted
Garden, as highlighted area in attached drawing's.
Excavation and Surface preparation for Blinding under along Whispering Cave-2, Inside Sound & Light
5A 5 KAIG3-RFI-SG-C-4527 00 Civil Sound & Light Garden 3/9/22 3/14/22 Approved as noted
garden, as per highlighted area in attached drawing's.
Excavation and Bed preparation for Electric line, at Sound & Light Garden, as highlighted area in attached
5A 5 KAIG3-RFI-SG-C-4628 00 Civil Sound & Light Garden 3/17/22 3/21/22 Approved as noted
drawing's.
Compaction Test after Excavation of EleLine at Sound & Light Garden as highlighted area in attached
5A 5 KAIG3-RFI-SG-C-4641 00 Civil Sound & Light Garden 3/17/22 3/20/22 Approved as noted
drawings.
Compaction tests after Excavation of Low current line, at Sound & Light Garden, as highlighted area in
5A 5 KAIG3-RFI-SG-C-4649 00 Civil Sound & Light Garden 3/17/22 3/20/22 Approved as noted
attached drawing's.
Excavation and Bed preparation for Low Current line (FA), at Sound & Light Garden, as highlighted area in
5A 5 KAIG3-RFI-SG-C-4668 00 Civil Sound & Light Garden 3/19/22 3/21/22 Approved as noted
attached drawing's.

5A 5 KAIG3-RFI-SG-C-4683 00 Sand bedding for Electric line, at Sound & Light Garden, as highlighted area in attached drawing's. Civil Sound & Light Garden 3/20/22 3/23/22 Approved as noted

Sand bedding for Low Current line (FA), at Sound & Light Garden, as highlighted area in attached
5A 5 KAIG3-RFI-SG-C-4684 00 Civil Sound & Light Garden 3/20/22 3/23/22 Approved as noted
drawing's.
Excavation & Blinding Levels for Low Current Handholes of Telecom (MH/SG/TC/02 to 05) and Fire Alarm
5A 5 KAIG3-RFI-SG-C-4906 00 Civil Sound & Light Garden 3/30/22 4/2/22 Approved as noted
& Security (MH/SG/FA/05 & 06), at Sound & Light Garden, as highlighted area in attached drawing's.
Excavation & Bed Preparation for Sub surface Drainage Branch pipes (PP 110mm dia) along the Walk way
5A 5 KAIG3-RFI-SG-C-4908 00 Civil Sound & Light Garden 3/30/22 4/4/22 Approved as noted
(Inner side), at Sound & Light Garden, as highlighted area in attached drawing's.
Concrete Pouring for Blinding under Low Current Handhole of Fire Alarm & Security (MH/SG/FA/ 06), at
5A 5 KAIG3-RFI-SG-C-4942 00 Civil Sound & Light Garden 3/31/22 4/7/22 Approved as noted
Sound & Light Garden, as highlighted area in attached drawing's.
Inspection of Installed Electrical Handholes of Low Voltage (MH/SG/LV/01-12), Emergency
5A 5 KAIG3-RFI-SG-C-5078 00 Civil Sound & Light Garden 4/13/22 4/16/22 Approved as noted
(MH/SG/EM/01-09), Inside Sound & Light garden, as per highlighted area in attached drawing's.
Inspection of Installed Low Current Handholes of Fire Alarm & Security (MH/SG/FA/01-12) and Telecom
5A 5 KAIG3-RFI-SG-C-5079 00 Civil Sound & Light Garden 4/13/22 4/16/22 Approved as noted
(MH/SG/TC/01-14), Inside Sound & Light garden, as per highlighted area in attached drawing's.

Excavation & Bed preparation for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and
5A 5 KAIG3-RFI-SG-C-5086 00 Civil Sound & Light Garden 4/14/22 4/16/22 Approved as noted
Emergency (from MH/SG/EM/3 to 4), at Sound & Light Garden, as highlighted area in attached drawing's.

Excavation & Bed preparation for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire
5A 5 KAIG3-RFI-SG-C-5087 00 Alarm & Security (from MH/SG/FA/1-2-3-4-5 to 6), at Sound & Light Garden, as highlighted area in Civil Sound & Light Garden 4/14/22 4/18/22 Approved as noted
attached drawing's.
Sand Bedding for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (from
5A 5 KAIG3-RFI-SG-C-5119 00 Civil Sound & Light Garden 4/18/22 4/21/22 Approved as noted
MH/SG/EM/3 to 4), at Sound & Light Garden, as highlighted area in attached drawing's.

Sand Bedding for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alarm &
5A 5 KAIG3-RFI-SG-C-5120 00 Security (from MH/SG/FA/1-2-3-4-5 to 6), at Sound & Light Garden, as highlighted area in attached Civil Sound & Light Garden 4/18/22 4/21/22 Approved as noted
drawing's.

Surface preparation Prior to Backfilling surround the Foundation of Seat walls A & C and walls of
5A 5 KAIG3-RFI-SG-C-5381 00 Civil Sound & Light Garden 5/15/22 5/19/22 Approved as noted
Whispering Cave 1 & 2 (All Sides) @ Sound & Light Garden, At highlighted area in attached Drawing's
Surface Preparation Prior to Backfilling Surround Electrical Handholes (Inside Light Garden) of Low Voltage
5A 5 KAIG3-RFI-SG-C-6130 00 (MH/SG/LV/7 to 12) and Emergency (MH/SG/EM/5 to 9) @ Sound & Light Garden, At highlighted area in Civil Sound & Light Garden 6/28/22 6/30/22 Approved as noted
attached Drawing's

kaig-qcals 182
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Surface Preparation Prior to Backfilling Surround Low Current Handholes (Inside Light Garden) of Telecom
5A 5 KAIG3-RFI-SG-C-6131 00 (MH/SG/TC/7 to 14) and Fire Alarm & Security (MH/SG/FA/7 to 12) @ Sound & Light Garden, At Civil Sound & Light Garden 6/28/22 6/30/22 Approved as noted
highlighted&area
Inspection in attachedtests
Compaction Drawing's
of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Electrical
5A 5 KAIG3-RFI-SG-C-6250 00 Handholes (Inside Light Garden) of Low Voltage (MH/SG/LV/7 to 12) and Emergency (MH/SG/EM/5 to 9) Civil Sound & Light Garden 7/3/22 7/7/22 Approved as noted
@ Sound &&Light
Inspection Garden,tests
Compaction At highlighted area
of 1st Layer in attac (Sub-Grade) (Out of 3 layers) Surround Low Current
Backfilling
5A 5 KAIG3-RFI-SG-C-6251 00 Handholes (Inside Light Garden) of Telecom (MH/SG/TC/7 to 14) and Fire Alarm & Security (MH/SG/FA/7 Civil Sound & Light Garden 7/3/22 7/7/22 Approved as noted
to 12) @ Sound
Inspection & Light Garden,
& Compaction tests of At
1sthighlighted are
Layer Backfilling (Sub-Grade) (Out of 2 layers) surround the Seat walls
5A 5 KAIG3-RFI-SG-C-6370 00 A & C and walls of Whispering Cave 1 & 2 (All Sides) at Sound & Light Garden, At highlighted area in Civil Sound & Light Garden 7/13/22 7/16/22 Approved as noted
attached
Sand Drawing's.(SP
Cover & Protection135)
for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire
5A 5 KAIG3-RFI-SG-C-6494 00 Alarm & Security (from MH/SG/FA/1-2-3-4-5 to 6), at Sound & Light Garden, as highlighted area in Civil Sound & Light Garden 7/19/22 7/21/22 Approved as noted
attached drawing's.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Low Current
5A 5 KAIG3-RFI-SG-C-6532 00 Handholes (Inside Light Garden) of Telecom (MH/SG/TC/7 to 14) and Fire Alarm & Security (MH/SG/FA/7 Civil Sound & Light Garden 7/21/22 7/26/22 Approved as noted
to 12) @ Sound
Inspection & Light Garden,
& Compaction tests of At
2ndhighlighted are
Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Electrical
5A 5 KAIG3-RFI-SG-C-6533 00 Handholes (Inside Light Garden) of Low Voltage (MH/SG/LV/7 to 12) and Emergency (MH/SG/EM/5 to 9) Civil Sound & Light Garden 7/21/22 7/26/22 Approved as noted
@ Sound & Light Garden, At highlighted area in attac
Warning Tiles & Tape for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (from
5A 5 KAIG3-RFI-SG-C-6549 00 Civil Sound & Light Garden 7/23/22 7/24/22 Approved as noted
MH/SG/EM/3 to 4), at Sound & Light Garden, as highlighted area in attached drawing's.
Warning Tiles & Tape for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alarm
5A 5 KAIG3-RFI-SG-C-6550 00 & Security (from MH/SG/FA/1-2-3-4-5 to 6), at Sound & Light Garden, as highlighted area in attached Civil Sound & Light Garden 7/23/22 7/24/22 Approved as noted
drawing's.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-
KAIG3-RFI-SW-C-0402 02 2.1, FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4, FW7, FW6-2, FW6-3, FW12, FW12-1, FW12.2, FW13, Civil Site Works 10/31/21 11/4/21 Approved as noted
FW14) as highlighted.
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4,
KAIG3-RFI-SW-C-0405 01 Civil Site Works 11/1/21 11/7/21 Approved as noted
FW6-2, FW6-3, FW12, FW12-1, FW12.2, FW13, FW14) - As Highlighted
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) as
KAIG3-RFI-SW-C-0411 02 Civil Site Works 11/1/21 11/8/21 Approved as noted
highlighted.
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-A-07, MH-A-
KAIG3-RFI-SW-C-0413 01 Civil Site Works 11/4/21 11/9/21 Approved as noted
08, MH-A-09) as highlighted.
INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR -G-A-03, G-A-
KAIG3-RFI-SW-C-0457 01 Civil Site Works 11/16/21 11/21/21 Approved as noted
06, G-A-07, G-A-08, G-A10, G-A-11 (As Highlighted).

Inspection for the Installation of Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-07, G-X-08,
KAIG3-RFI-SW-C-0472 01 Civil Site Works 11/16/21 11/18/21 Approved as noted
G-X-09 (as Highlighted)

INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW6 and FW9) - As
KAIG3-RFI-SW-C-0793 01 Civil Site Works 11/1/21 11/8/21 Approved as noted
Highlighted.

INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-B-01) - As


KAIG3-RFI-SW-C-0794 01 Civil Site Works 11/4/21 11/8/21 Approved as noted
Highlighted
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1-2, FW1-3,
KAIG3-RFI-SW-C-0816 01 Civil Site Works 11/1/21 11/8/21 Approved as noted
FW1-3.2, FW5, FW8, FW9-1, FW10, FW11) - As Highlighted
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2, FW1-2.1, FW1-3, FW5, FW6, FW7, FW8,
KAIG3-RFI-SW-C-0817 01 Civil Site Works 11/1/21 11/7/21 Approved as noted
FW9, FW9-1, FW10, FW11) - As Highlighted
INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-
KAIG3-RFI-SW-C-0883 02 Civil Site Works 11/15/21 11/18/21 Approved as noted
A-3-6.12) - As Highlighted

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
4C KAIG3-RFI-SW-C-1358 01 Civil Site Works 11/13/21 11/17/21 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-07, MH-D-08-01 (As Highlighted)

Zone K 5 KAIG3-RFI-SW-C-1469 02 Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 1/11/22 1/17/22 Approved as noted
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-1630 01 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4 (As Civil Site Works 11/14/21 11/17/21 Approved as noted
Highlighted)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-337 (Stock Pile #
KAIG3-RFI-SW-C-1644 01 Civil Site Works 10/27/21 10/28/21 Approved as noted
105 A-1-B)
Inspection for Sand Bedding under pipe for Fire & Security Line at Zone-K as highlighted in the attached
KAIG3-RFI-SW-C-1793 01 Civil Site Works 10/30/21 11/1/21 Approved as noted
drawing (Stock Pile # 67)
Inspection for Sand Bedding under pipe for Telecommunications Line at Zone-K as highlighted in the
KAIG3-RFI-SW-C-1794 01 Civil Site Works 10/30/21 11/1/21 Approved as noted
attached drawing (Stock Pile # 67)
Notification to Start Cut and Fill upto (-20cm) from the finishing level in the crescent wadi garden as
6A 6 KAIG3-RFI-SW-C-1817 01 Civil Site Works 2/7/22 2/10/22 Approved as noted
highlighted in the attached grading drawing
6B 6 KAIG3-RFI-SW-C-1893 01 INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-7. (As Highlighted) Civil Site Works 2/14/22 2/19/22 Approved as noted
KAIG3-RFI-SW-C-1938 01 INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-13. (As Highlighted) Civil Site Works 11/24/21 12/5/21 Approved as noted
"Inspection and Compaction Test for 5th Layer (5 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1947 00 Civil Site Works 11/2/21 11/7/21 Approved as noted
B)
Inspection of Backfilling Sub-grade 3rd Layer (3 of 4) around the Manhole (above gravel) for MH-D-08-01 -
KAIG3-RFI-SW-C-1948 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
as Highlighted (SP#108 A-1-B)

kaig-qcals 183
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

INSPECTION FOR INSTALLATION OF SLABS FOR FW-A-13, FW-A-14, FW-A-15, FW-A-16, FW-A-
KAIG3-RFI-SW-C-1949 00 Civil Site Works 11/2/21 11/7/21 Approved as noted
17, FW-A-18, FW-A-19, FW-A-20, FW-A-21, FW-A-22, FW-A-23, FW-A-24, FW-A-25. (As Highlighte

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-
KAIG3-RFI-SW-C-1957 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
03 (As Highlighted)

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
KAIG3-RFI-SW-C-1958 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-E-03 (As Highlighted

Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-
KAIG3-RFI-SW-C-1959 00 Civil Site Works 11/2/21 11/6/21 Code C (resubmit)
02, MH-E-03 - AS Highlighted
Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-
KAIG3-RFI-SW-C-1959 01 Civil Site Works 11/9/21 11/15/21 Approved as noted
02, MH-E-03 - AS Highlighted
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-F - as highlighted in the attached
KAIG3-RFI-SW-C-1960 00 Civil Site Works 11/2/21 11/4/21 Approved as noted
drawing (Stock Pile # 67)

Excavation for Storm Water Line from MH-G-01-05 to MH-G-01-02 including Branch and Manhole MH-G-
KAIG3-RFI-SW-C-1961 00 01-05, MH-G-01-04, MH-G-01-03, MH-G-01-02 and Gullies G-G-63&64, G-G-62, G-G-61, G-G-60, G-G- Civil Site Works 11/2/21 11/4/21 Approved as noted
59, G-G-58, G-G-57, G-G-56 - as highlighted

Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/21 TO B/TL/36 at Zone-B
KAIG3-RFI-SW-C-1962 00 Civil Site Works 11/2/21 11/6/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-265 (Stock Pile #
KAIG3-RFI-SW-C-1963 00 Civil Site Works 11/2/21 11/6/21 Approved as noted
108 A-1-B)

KAIG3-RFI-SW-C-1964 00 Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K - as highlighted Civil Site Works 11/2/21 11/4/21 Approved as noted

KAIG3-RFI-SW-C-1965 00 Inspection of Steel reinforcement for Top Slab of SBC-08 As Highlighted Civil Site Works 11/2/21 11/3/21 Approved as noted

KAIG3-RFI-SW-C-1971 00 "Inspection of Formwork and Level for Walls and Top Slab of SBC-08 As Highlighted" Civil Site Works 11/2/21 11/4/21 Approved as noted

KAIG3-RFI-SW-C-1972 00 Inspection of Concrete Pouring for Walls and Top Slab of SBC-08 As Highlighted Civil Site Works 11/2/21 11/7/21 Approved as noted
KAIG3-RFI-SW-C-1973 00 Surface Preparation prior to start Waterproofing for SBC-05 as highlighted. Civil Site Works 11/2/21 11/4/21 Approved as noted
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-1974 00 Civil Site Works 11/3/21 11/6/21 Approved as noted
K-05, MH-K-06, MH-K-07,(As Highlighted)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-265 (Stock Pile #
KAIG3-RFI-SW-C-1975 00 Civil Site Works 11/3/21 11/7/21 Approved as noted
108 A-1-B)
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/24 TO B/FS/36 at Zone-B as
KAIG3-RFI-SW-C-1976 00 Civil Site Works 11/3/21 11/6/21 Approved as noted
highlighted in the attached drawing (SP # 67)

Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone-L as highlighted in the
KAIG3-RFI-SW-C-1977 00 Civil Site Works 11/3/21 11/6/21 Approved as noted
attached drawing

KAIG3-RFI-SW-C-1978 00 Soil Preparation prior to start Backfill (-40cm from FGL) at Zone - K (Next to RB-334) as highlighted Civil Site Works 11/3/21 11/7/21 Approved as noted

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1979 00 Civil Site Works 11/3/21 11/6/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-1980 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 11/3/21 11/6/21 Approved as noted
B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 4) around the Manhole (above gravel) for MH-D-08-01 -
KAIG3-RFI-SW-C-1981 00 Civil Site Works 11/3/21 11/7/21 Approved as noted
as Highlighted (SP#108 A-1-B)

Excavation and Removal of Disposal Materials (-75cm) from Asphalt Level and Bed Preperation prior to start
KAIG3-RFI-SW-C-1982 00 Civil Site Works 11/3/21 11/6/21 Code C (not resubmit)
backfill at Zone-4A&4B as per the attached Drawing and Survey Report (From ST.0+20 to ST.0+220)

Inspection for Sand Bedding under pipe for Potable Water Line including branch at Zone-F&G- as
KAIG3-RFI-SW-C-1983 00 Civil Site Works 11/3/21 11/7/21 Approved as noted
highlighted in the attached drawing (Stock Pile # 67)
INSPECTION OF INSTALLATION OF ALL SLABS FOR MH-D-01, MH-D-01-A1, MH-D-01-A2, MH-
KAIG3-RFI-SW-C-1984 00 D-01-A1-01, MH-D-01-B1, MH-D-01-B2, MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-06, MH- Civil Site Works 11/4/21 11/9/21 Approved as noted
D-08-01, MH-D-08-02 (AS ATTACHED)
INSPECTION OF INSTALLATION OF SLAB FOR MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02, MH-E-
KAIG3-RFI-SW-C-1985 00 03, MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04, MH-H-01, Civil Site Works 11/4/21 11/9/21 Approved as noted
MH-H-02, MH-H-03 (AS ATTACHED)

kaig-qcals 184
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

INSPECTION FOR INSTALLATION OFSLAB FOR MH-B-01, MH-B-02, MH-B-03, MH-B-04 .(As
4A KAIG3-RFI-SW-C-1989 00 Civil Site Works 11/4/21 11/9/21 Code C (resubmit)
Highlighted)

INSPECTION FOR INSTALLATION OFSLAB FOR MH-B-01, MH-B-02, MH-B-03, MH-B-04 .(As
4A 4 KAIG3-RFI-SW-C-1989 01 Civil Site Works 2/14/22 2/19/22 Code C (not resubmit)
Highlighted)
Inspection and Compaction Test for 6th Layer (6 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-1990 00 Civil Site Works 11/4/21 11/7/21 Approved as noted
B)

KAIG3-RFI-SW-C-1991 00 Inspection for Backfilling Sub-base under Boulder no. RB-265 (Stock Pile # 109 A-1-A) Civil Site Works 11/4/21 11/7/21 Approved as noted

Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/21) including Pit B/FS/24, B/FS/22,
KAIG3-RFI-SW-C-1992 00 Civil Site Works 11/4/21 11/6/21 Approved as noted
B/FS/16, B/FS/19, B/FS/21 at Zone-B as highlighted in the attached drawing

Inspection for Backfilling Subgrade behind the 2nd lift of Rock for Boulder no. RB-069 (under 2nd layer of
KAIG3-RFI-SW-C-1993 00 Civil Site Works 11/4/21 11/7/21 Approved as noted
rock) SP# 108 A-1-B
Inspection for Backfilling Subbase behind the 2nd lift of Rock for Boulder no. RB-069 (under 2nd layer of
KAIG3-RFI-SW-C-1994 00 Civil Site Works 11/4/21 11/7/21 Approved as noted
rock) SP# 109 A-1-A

Excavation for Telecommunication Line from (B/TL/21 to B/TL/42) including pit B/TL/21, B/TL/19,
KAIG3-RFI-SW-C-1995 00 Civil Site Works 11/4/21 11/8/21 Approved as noted
B/TL/17, B/TL/25, B/TL/42 at Zone-B as highlighted in the attached drawing

Inspection and Compaction Test for 7th Layer (7 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-2008 00 Civil Site Works 11/6/21 11/9/21 Approved as noted
B)

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-2009 00 Civil Site Works 11/6/21 11/7/21 Approved as noted
04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-2010 00 Civil Site Works 11/6/21 11/7/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B)

KAIG3-RFI-SW-C-2011 00 Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-05 (As Highlighted) Civil Site Works 11/6/21 11/7/21 Approved as noted

Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-2012 00 Civil Site Works 11/6/21 11/7/21 Approved as noted
SBC-05 (As Highlighted)
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-2013 00 Civil Site Works 11/6/21 11/7/21 Approved as noted
SBC-05 (As Highlighted)
Inspection for Sand Bedding under pipe for Potable Water Line including branch at Zone-G&K- as
KAIG3-RFI-SW-C-2014 00 Civil Site Works 11/6/21 11/7/21 Approved as noted
highlighted in the attached drawing (Stock Pile # 67)

KAIG3-RFI-SW-C-2015 00 Inspection and Compaction Test for NGL for Telecom Line at Zone - K Civil Site Works 11/6/21 11/9/21 Approved as noted

Inspection and Compaction Test for 8th Layer (8 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-2023 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
B)

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-2024 00 Civil Site Works 11/7/21 11/9/21 Approved as noted
04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-2025 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
05 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1-B

KAIG3-RFI-SW-C-2026 00 Inspection of Steel Reinforcement for the Foundation and Side Walls of SBC-06 (As Highlighted) Civil Site Works 11/8/21 11/8/21 Approved as noted

KAIG3-RFI-SW-C-2027 00 Inspection of Formwork for the Foundation and Kicker of SBC-06 (As Highlighted) Civil Site Works 11/8/21 11/10/21 Approved as noted

KAIG3-RFI-SW-C-2028 00 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 (As Highlighted) Civil Site Works 11/8/21 11/10/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone-L as highlighted in the
KAIG3-RFI-SW-C-2029 00 Civil Site Works 11/7/21 11/9/21 Approved as noted
attached drawing
Inspection for Sand Bedding under pipe for Telecommunications Line from K/TL/13 TO K/TL/10 at Zone-K
KAIG3-RFI-SW-C-2030 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Inspection for Sand Bedding under pipe for Fire & Security Line from K/FS/21 TO K/FS/04 at Zone-K as
KAIG3-RFI-SW-C-2031 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
highlighted in the attached drawing (SP # 67)

KAIG3-RFI-SW-C-2032 00 Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted Civil Site Works 11/7/21 11/9/21 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-2038 00 Civil Site Works 11/7/21 11/13/21 Approved as noted
K-04 (As Highlighted)

kaig-qcals 185
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to JURASIC Site Works/Crescent 2
KAIG3-RFI-SW-C-2039 00 Civil 11/7/21 11/10/21 Approved as noted
GARDEN). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. Zone 2H

Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/21 TO B/TL/42 at Zone-B
KAIG3-RFI-SW-C-2040 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/24 TO B/FS/21 at Zone-B as
KAIG3-RFI-SW-C-2041 00 Civil Site Works 11/7/21 11/10/21 Approved as noted
highlighted in the attached drawing (SP # 67)
Inspection for Sand Bedding under pipe for Fire & Security Line from KK/D-FS/04 TO K/FS/06 at Zone-K
KAIG3-RFI-SW-C-2042 00 Civil Site Works 11/7/21 11/13/21 Approved as noted
as highlighted in the attached drawing (SP # 67)

Inspection for Sand Bedding under pipe for Telecommunications Line from KK/D-TL/33 TO K/TL/16 at
KAIG3-RFI-SW-C-2043 00 Civil Site Works 11/7/21 11/13/21 Approved as noted
Zone-K as highlighted in the attached drawing (SP # 67)

Inspection of Backfilling Gravel 1st Layer (1 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-E-
3B KAIG3-RFI-SW-C-2044 00 Civil Site Works 11/7/21 11/10/21 Code C (resubmit)
03 - AS Highlighted (SP# 118)
Inspection of Backfilling Gravel 1st Layer (1 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-E-
3B KAIG3-RFI-SW-C-2044 01 Civil Site Works 11/28/21 12/1/21 Approved as noted
03 - AS Highlighted (SP# 118)
Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-04 to MH-D-
KAIG3-RFI-SW-C-2045 00 04-01 including Manholes - as Highlighted (upto -20cm from FGL - Total 9 Layers) (Stock Pile # 108 A-1- Civil Site Works 11/8/21 11/10/21 Approved as noted
B)

Excavation for Storm Water Line from MH-G-01-02 to G-G-52&53 including Branches, Manhole MH-G-01-
KAIG3-RFI-SW-C-2046 00 Civil Site Works 11/8/21 11/10/21 Approved as noted
01, MH-G-01, Gullies G-G-54, G-G-55, G-G-50&51, G-G-52&53, and Out Fall-G- as highlighted

KAIG3-RFI-SW-C-2047 00 Inspection and Compaction Test for NGL for Fire & Security Line at Zone - K (As Highlighted) Civil Site Works 11/8/21 11/10/21 Approved as noted

Excavation for Telecommunication Line from (B/TL/42 to B/TL/36) including pit B/TL/37 at Zone-B as
KAIG3-RFI-SW-C-2048 00 Civil Site Works 11/8/21 11/13/21 Approved as noted
highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (B/FS/21 to B/FS/36) including Pit B/FS/37 at Zone-B
KAIG3-RFI-SW-C-2049 00 Civil Site Works 11/8/21 11/13/21 Approved as noted
as highlighted in the attached drawing
Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
KAIG3-RFI-SW-C-2050 00 Civil Site Works 11/8/21 11/13/21 Approved as noted
B)
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-K for (600mmØ & 800mmØ -
Site Works/Crescent 2
KAIG3-RFI-SW-C-2053 00 PP-Corrugated) from (MH-K-01 to MH-K-07 ). CRECENT-02 ZONE-2P, 2N & 2M.. As per highlighted Civil 11/8/21 11/10/21 Approved as noted
Zone 2P, 2N & 2M
Area in the attached Dwg.

Pipe Installation of Storm Water Line Outfall-K for (600mmØ & 800mmØ -PP-Corrugated) from (MH-K-01 Site Works/Crescent 2
KAIG3-RFI-SW-C-2054 00 Civil 11/8/21 11/10/21 Approved as noted
to MH-K-07 ). CRECENT-02 ZONE-2P, 2N & 2M.. As per highlighted Area in the attached Dwg. Zone 2P, 2N & 2M

Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ & 250mmØ - UPVC-
Site Works/Crescent 2
KAIG3-RFI-SW-C-2055 00 Class 4) from (FW-A-3-7 to FW-A-3-14). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in Civil 11/8/21 11/10/21 Approved as noted
Zone 2P, 2N & 2M
the attached Dwg.

Pipe Installation of Foul Water Line for (160mmØ & 250mmØ - UPVC- Class 4) from (FW-A-3-7 to FW-A- Site Works/Crescent 2
KAIG3-RFI-SW-C-2056 00 Civil 11/8/21 11/10/21 Approved as noted
3-14). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in the attached Dwg. Zone 2P, 2N & 2M

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-2057 00 Civil Site Works 11/8/21 11/10/21 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-E-03 (As Highlighted)

Inspection and Compaction Test for 10th Layer (10 of 14) Backfilling around SBC-09 (Stock Pile 109 A-1-
KAIG3-RFI-SW-C-2058 00 Civil Site Works 11/9/21 11/14/21 Approved as noted
A).
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - G&K - as highlighted
KAIG3-RFI-SW-C-2059 00 Civil Site Works 11/9/21 11/13/21 Approved as noted
(Excluding Road)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
KAIG3-RFI-SW-C-2060 00 Civil Site Works 11/9/21 11/10/21 Approved as noted
SBC-05 (As Highlighted)

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to MH-D-
KAIG3-RFI-SW-C-2061 00 Civil Site Works 11/9/21 11/18/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A

KAIG3-RFI-SW-C-2062 00 Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted Civil Site Works 11/9/21 11/10/21 Approved as noted
Inspection of Backfilling Sub-grade 5th Layer (5 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-2070 00 Civil Site Works 11/9/21 11/18/21 Approved as noted
Highlighted (SP#108 A-1-B)

KAIG3-RFI-SW-C-2071 00 Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-01 - as Highlighted Civil Site Works 11/9/21 11/18/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 6) backfilling (grading) at Zone - K (Next to RB-334) as
KAIG3-RFI-SW-C-2072 00 Civil Site Works 11/9/21 11/18/21 Approved as noted
highlighted
kaig-qcals 186
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

KAIG3-RFI-SW-C-2073 00 Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K as highlighted Civil Site Works 11/9/21 11/18/21 Approved as noted

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
KAIG3-RFI-SW-C-2074 00 Civil Site Works 11/9/21 11/18/21 Approved as noted
piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-D-08 (As Highlighted)

Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01-B1 to MH-
KAIG3-RFI-SW-C-2079 00 Civil Site Works 11/10/21 11/14/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A)

KAIG3-RFI-SW-C-2080 00 Inspection for Casting Blinding Concrete under Gullies - G-F-13, G-F-44&45, G-F-42&43 - as highlighted Civil Site Works 11/10/21 11/15/21 Approved as noted

KAIG3-RFI-SW-C-2081 00 Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-08 (As Highlighted) Civil Site Works 11/10/21 11/13/21 Approved as noted

INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-04, MH-K-05, MH-K-
KAIG3-RFI-SW-C-2082 00 Civil Site Works 11/10/21 11/14/21 Code C (resubmit)
06, MH-K-07 (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-04, MH-K-05, MH-K-
KAIG3-RFI-SW-C-2082 01 Civil Site Works 11/21/21 11/24/21 Approved as noted
06, MH-K-07 (As Highlighted)
KAIG3-RFI-SW-C-2083 00 Soil Preparation under Boulder No. RB- 266A Civil Site Works 11/10/21 11/14/21 Approved as noted
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-2084 00 Civil Site Works 11/10/21 11/13/21 Approved as noted
SBC-08 (As Highlighted)
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab of
KAIG3-RFI-SW-C-2085 00 Civil Site Works 11/10/21 11/13/21 Approved as noted
SBC-08 (As Highlighted)

KAIG3-RFI-SW-C-2094 00 INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-01 (As Highlighted) Civil Site Works 11/11/21 11/14/21 Code C (resubmit)

KAIG3-RFI-SW-C-2094 01 INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-01 (As Highlighted) Civil Site Works 11/21/21 11/24/21 Code C (not resubmit)

KAIG3-RFI-SW-C-2095 00 Soil Preparation under Boulder No. RB- 266B Civil Site Works 11/10/21 11/14/21 Approved as noted
Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-09 (Stock Pile # 109 A-
KAIG3-RFI-SW-C-2096 00 Civil Site Works 11/10/21 11/14/21 Approved as noted
1-A)
Inspection of Backfilling Sub-grade 6th Layer (6 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-2097 00 Civil Site Works 11/10/21 11/14/21 Code C (resubmit)
Highlighted (SP#108 A-1-B)
Inspection of Backfilling Sub-grade 6th Layer (6 of 6) around the Manhole (above gravel) for MH-D-06 - as
KAIG3-RFI-SW-C-2097 01 Civil Site Works 11/20/21 11/22/21 Approved as noted
Highlighted (SP#108 A-1-B)
Site Works beside
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G from (MH-G-01-05 to MH-
KAIG3-RFI-SW-C-2099 00 Civil Circular Pathway Junction 11/10/21 11/13/21 Approved as noted
G-07) for (400mmØ-UPVC- Class 4). As per highlighted Area in the attached Dwg.
8

Site Works beside


Warning Tape Installation for Storm Water Line Outfall-G from (MH-G-01-05 to MH-G-07) for (400mmØ-
KAIG3-RFI-SW-C-2100 00 Civil Circular Pathway Junction 11/10/21 11/13/21 Approved as noted
UPVC- Class 4). As per highlighted Area in the attached Dwg.
8

300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (110mmØ-UPVC- Class 4) from
Site Works/Crescent 2
KAIG3-RFI-SW-C-2101 00 (FW-A-13-4 to JURASIC GARDEN). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Civil 11/10/21 11/13/21 Approved as noted
Zone 2H
Dwg.
Excavation for Fire & Security Distribution Line from (G/FS/52 to G/TL/50) including Pit G/FS/52, G/FS/30
KAIG3-RFI-SW-C-2102 00 Civil Site Works 11/10/21 11/13/21 Approved as noted
at Zone-G as highlighted in the attached drawing
Excavation for Telecommunication Line from (G/TL/54 to G/TL/50) including pit G/TL/54, G/TL/50 at
KAIG3-RFI-SW-C-2103 00 Civil Site Works 11/10/21 11/14/21 Approved as noted
Zone-G as highlighted in the attached drawing

Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01 to MH-D-
KAIG3-RFI-SW-C-2104 00 Civil Site Works 11/11/21 11/14/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A

Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-09 (Stock Pile # 109 A-
KAIG3-RFI-SW-C-2106 00 Civil Site Works 11/11/21 11/15/21 Approved as noted
1-A)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-2107 00 Civil Site Works 11/11/21 11/14/21 Code C (resubmit)
K-01. (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-2107 01 Civil Site Works 11/21/21 11/24/21 Approved as noted
K-01. (As Highlighted)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
KAIG3-RFI-SW-C-2108 00 Civil Site Works 11/11/21 11/15/21 Approved as noted
SBC-08 (As Highlighted)

KAIG3-RFI-SW-C-2109 00 Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-02 - as Highlighted Civil Site Works 11/11/21 11/15/21 Approved as noted

kaig-qcals 187
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
KAIG3-RFI-SW-C-2110 00 Civil Site Works 11/11/21 11/14/21 Code C (resubmit)
3-12, FW-A-3-13, FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-3-17 . (As Highlighted)

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
KAIG3-RFI-SW-C-2110 01 Civil Site Works 11/21/21 11/24/21 Approved as noted
3-12, FW-A-3-13, FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-3-17 . (As Highlighted)

INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - FW-A-3-8, FW-A-3-9, FW-A-3-
KAIG3-RFI-SW-C-2111 00 Civil Site Works 11/11/21 11/14/21 Code C (resubmit)
10, FW-A-3-11, FW-A-3-12, FW-A-3-13, FW-A-3-15, FW-A-3-16, FW-A-3-17 (As Highlighted)

INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - FW-A-3-8, FW-A-3-9, FW-A-3-
KAIG3-RFI-SW-C-2111 01 Civil Site Works 11/21/21 11/24/21 Code C (not resubmit)
10, FW-A-3-11, FW-A-3-12, FW-A-3-13, FW-A-3-15, FW-A-3-16, FW-A-3-17 (As Highlighted)

KAIG3-RFI-SW-C-2112 00 Inspection for Backfilling Sub-base under Boulder no. RB-266A (SP # 109 A-1-A) Civil Site Works 11/11/21 11/15/21 Approved as noted
Surface Preparation for Storm Water Line from MH-K-07 to MH-K-01, prior to start back filling (as
KAIG3-RFI-SW-C-2121 00 Civil Site Works 11/13/21 11/15/21 Approved as noted
Highlighted)
Inspection And Compaction Test For Backfilling 1st Layer (1 of 9) For Storm Water Line From MH-K-07 To
KAIG3-RFI-SW-C-2122 00 Civil Site Works 11/21/21 11/27/21 Approved as noted
MH-K-01 as Highlighted (SP#109 A-1-A)
Surface Preparation for Foul Water Line from FW-A-3.7 to FW-A-3.17, prior to start back filling (as
KAIG3-RFI-SW-C-2123 00 Civil Site Works 11/13/21 11/15/21 Approved as noted
Highlighted)
Inspection And Compaction Test For Backfilling 1st Layer (1 of 9) For Foul Water Line From FW-A-3-7 To
KAIG3-RFI-SW-C-2124 00 Civil Site Works 11/21/21 11/27/21 Approved as noted
FW-A-3-17 as Highlighted (SP#109 A-1-A)

Inspection for Sand bedding under pipe for Fire & Security Distribution Line from (G/FS/52 to G/TL/50)
KAIG3-RFI-SW-C-2131 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
including Pit G/FS/52, G/FS/30 at Zone-G as highlighted in the attached drawing

KAIG3-RFI-SW-C-2132 00 Inspection for Backfilling Sub-base under Boulder no. RB-266B (Stock Pile # 109 A-1-A) Civil Site Works 11/14/21 11/16/21 Approved as noted

KAIG3-RFI-SW-C-2133 00 Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K as highlighted Civil Site Works 11/14/21 11/16/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 6) backfilling (grading) at Zone - K (Next to RB-334) as
KAIG3-RFI-SW-C-2134 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
highlighted
Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01-B1 to MH-
KAIG3-RFI-SW-C-2135 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A)
Inspection and Compaction Test for 13th Layer (13 of 14) Backfilling around SBC-09 (Stock Pile # 109 A-
KAIG3-RFI-SW-C-2136 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
1-A)
Inspection and Compaction Test for 14th Layer (14 of 14) Backfilling around SBC-09 (Stock Pile # 109 A-
KAIG3-RFI-SW-C-2137 00 Civil Site Works 11/14/21 11/17/21 Approved as noted
1-A
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/21 TO B/FS/36 at Zone-B as
KAIG3-RFI-SW-C-2139 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
highlighted in the attached drawing (SP # 67)
Inspection for Sand Bedding under pipe for Telecommunications Line from G/TL/50 TO G/TL/54 at Zone-G
KAIG3-RFI-SW-C-2140 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Excavation for Telecommunication Line from (G/TL/50 to G/TL/43) including pit G/TL/54, G/TL/44,
KAIG3-RFI-SW-C-2143 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
G/TL/13, G/TL/21, G/TL/43 at Zone-G as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (G/TL/50 to G/TL/43) including Pit G/FS/08, G/FS/07
KAIG3-RFI-SW-C-2144 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
at Zone-G as highlighted in the attached drawing
Excavation for MV Line FROM G/MV/12 TO K/MV/02 includign Pit G/MV/12, G/MV/13, K/MV/01,
KAIG3-RFI-SW-C-2145 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
K/MV/02 at Zone-G & K as highlighted in the attached drawing
Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-6.12, FW-A-3-6.11, FW-A-3-6.10,
KAIG3-RFI-SW-C-2146 00 FW-A-3-6.9, FW-A-3-6.8, FW-A-3-6.7, FW-A-3-6.6, FW-A-3-6.5, FW-A-3-6.4, FW-A-3-6.3, FW-A-3-6.2 - Civil Site Works 11/14/21 11/17/21 Approved as noted
AS Highlighted
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-2147 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-3-8, FW-A-3-9, FW-A-3-10 (As Civil Site Works 11/14/21 11/17/21 Approved as noted
Highlighted)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-2148 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Civil Site Works 11/14/21 11/17/21 Approved as noted
Excavation
Highlighted)for Storm Water Line from MH-G-01 to G-G-72 including Branches, Manhole MH-G-01, MH-G-
02, MH-G-03, MH-G-03-01, MH-G-03-02,Gullies G-G-48&49, G-G-47, G-G-33, G-G-35, G-G-34, G-G-37,
KAIG3-RFI-SW-C-2149 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
G-G-36, G-G-38, G-G-41, G-G-40, G-G-39, G-G-44, G-G-42, G-G-43, G-G-45, G-G-46, G-G-72 as
highlighted.
Excavation for Foul Water Line from FW-A-13-5 to FW-A-13-8 including Manhole FW-A-13-5, FW-A-13-
KAIG3-RFI-SW-C-2150 00 Civil Site Works 11/14/21 11/18/21 Approved as noted
6, FW-A-13-7, FW-A-13-8 prior to start Gravel Bedding (as Highlighted)

Excavation for Telecommunication Line from (K/TL/01 to G/TL/54) including pit K/TL/01, G/TL/54 at
KAIG3-RFI-SW-C-2151 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
Zone-G And K as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (K/FS/01 to G/FS/52) including Pit K/FS/01, G/FS/52
KAIG3-RFI-SW-C-2152 00 Civil Site Works 11/14/21 11/16/21 Approved as noted
at Zone-G,K as highlighted in the attached drawing
INSPECTION FOR INSTALLATION OF GULLIES AND PIPE CONNECTION FOR - G-E-08, G-E-09,
KAIG3-RFI-SW-C-2160 00 Civil Site Works 11/14/21 11/17/21 Approved as noted
G-E-10, G-E-11, G-E-12, G-E-13, G-E-14, G-E-15 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
KAIG3-RFI-SW-C-2161 00 Civil Site Works 11/15/21 11/20/21 Approved as noted
3-6.1 . (As Highlighted)

kaig-qcals 188
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-6.1 (As
KAIG3-RFI-SW-C-2162 00 Civil Site Works 11/15/21 11/17/21 Approved as noted
Highlighted)
KAIG3-RFI-SW-C-2163 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW1, FW1-1) - As Highlighted Civil Site Works 11/15/21 11/18/21 Approved as noted

4C KAIG3-RFI-SW-C-2164 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-1) - As Highlighted Civil Site Works 11/15/21 11/17/21 Code C (resubmit)

4C 4 KAIG3-RFI-SW-C-2164 01 INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-1) - As Highlighted Civil Site Works 2/14/22 2/19/22 Code C (not resubmit)

KAIG3-RFI-SW-C-2165 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-7) (As Highlighted). Civil Site Works 11/15/21 11/17/21 Approved as noted

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01 to MH-D-
KAIG3-RFI-SW-C-2166 00 Civil Site Works 11/15/21 11/18/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A)

Excavation for Storm Water Line from Outfall L to MH-L-04 including Manhole MH-L-01, MH-L-02, MH-
KAIG3-RFI-SW-C-2167 00 Civil Site Works 11/15/21 11/18/21 Approved as noted
L-03, MH-L-04 - As highlighted
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line Outfall-K for (600mmØ & 800mmØ -
Site Work/Crescent 2
KAIG3-RFI-SW-C-2173 00 PP-Corrugated) from (MH-K-01 to MH-K-07 ). CRECENT-02 ZONE-2P, 2N & 2M.. As per highlighted Civil 11/15/21 11/17/21 Approved as noted
Zone 2P, 2N & 2M.
Area in the attached Dwg.

Warning Tape Installation for Storm Water Line Outfall-K for (600mmØ & 800mmØ -PP-Corrugated) from
Site Work/Crescent 2
KAIG3-RFI-SW-C-2174 00 (MH-K-01 to MH-K-07 ). CRECENT-02 ZONE-2P, 2N & 2M.. As per highlighted Area in the attached Civil 11/15/21 11/17/21 Approved as noted
Zone 2P, 2N & 2M.
Dwg.

300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (160mmØ & 250mmØ - UPVC- Class
Site Work/Crescent 2
KAIG3-RFI-SW-C-2175 00 4) from (FW-A-3-7 to FW-A-3-14). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in the Civil 11/15/21 11/17/21 Approved as noted
Zone 2P, 2N & 2M.
attached Dwg.

Warning Tape Installation for Foul Water Line for (160mmØ & 250mmØ - UPVC- Class 4) from (FW-A-3-7 Site Work/Crescent 2
KAIG3-RFI-SW-C-2176 00 Civil 11/15/21 11/17/21 Approved as noted
to FW-A-3-14). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in the attached Dwg. Zone 2P, 2N & 2M.

Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ & 110mmØ - UPVC-
Class 4) from (FW-A-23 to FW-A-23-01), (FW-A-22 to FW-A-22-01 & FW-A-22-02), (FW-A-19 to FW-A- Site Work beside Energy
KAIG3-RFI-SW-C-2177 00 Civil 11/16/21 11/17/21 Approved as noted
19-01 & FW-A-19-02), (FW-A-20 & FW-A-21 to Pump Station) at beside Energy Center-02 as per Center 02
highlighted Area in the attached Dwg.

Pipe Installation of Foul Water Line for (160mmØ & 110mmØ - UPVC-Class 4) from (FW-A-23 to FW-A-
Site Work beside Energy
KAIG3-RFI-SW-C-2178 00 23-01), (FW-A-22 to FW-A-22-01 & FW-A-22-02), (FW-A-19 to FW-A-19-01 & FW-A-19-02), (FW-A-20 Civil 11/16/21 11/18/21 Approved as noted
Center 02
& FW-A-21 to Pump Station) at beside Energy Center-02 as per highlighted Area in the attached Dwg.
Site Works beside
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (400mmØ, 450mmØ-
KAIG3-RFI-SW-C-2179 00 Civil Circular Pathway Junction 11/15/21 11/17/21 Approved as noted
UPVC- Class 4) from ( MH-G-01 to MH-G-01-05 ). As per highlighted Area in the attached Dwg.
8

Site Works beside


Pipe Installation of Storm Water Line Outfall-G for (400mmØ, 450mmØ-UPVC- Class 4) from ( MH-G-01
KAIG3-RFI-SW-C-2180 00 Civil Circular Pathway Junction 11/15/21 11/18/21 Approved as noted
to MH-G-01-05 ). As per highlighted Area in the attached Dwg.
8

300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line (150mmØ UPVC- Class 4) from ( MB to Site Works between Two
KAIG3-RFI-SW-C-2181 00 Civil 11/16/21 11/17/21 Approved as noted
FW-6-2) between 2 buildings of Management Building at highlighted area in the attached Dwg. Management Building

KAIG3-RFI-SW-C-2195 00 Soil Preparation prior to start backfill around SBC-08 at Zone - 4B - as highlighted Civil Site Works 11/15/21 11/16/21 Approved as noted
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
KAIG3-RFI-SW-C-2196 00 Civil Site Works 11/15/21 11/18/21 Approved as noted
K-02, MH-K-03 . (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-02, MH-K-03
KAIG3-RFI-SW-C-2197 00 Civil Site Works 11/15/21 11/17/21 Approved as noted
(As Highlighted)
Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-K-05, MH-K-06, MH-K-07 - AS
KAIG3-RFI-SW-C-2198 00 Civil Site Works 11/15/21 11/18/21 Approved as noted
Highlighted
Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-8, FW-A-3-9, FW-A-3-10 - AS
KAIG3-RFI-SW-C-2199 00 Civil Site Works 11/15/21 11/17/21 Approved as noted
Highlighted
Excavation for Storm Water Line from MH-M-15 to MH-M-12 including Manhole MH-M-15, MH-M-14,
KAIG3-RFI-SW-C-2201 00 Civil Site Works 11/16/21 11/18/21 Approved as noted
MH-M-13, MH-M-12 - As highlighted

Notification to start backfilling for the existing trench from stage 2 excavation (the level and location not clear
KAIG3-RFI-SW-C-2202 00 Civil Site Works 11/16/21 11/23/21 Code C (resubmit)
in 5x5 network) at Zone-G as highlighted in the attached drawing and survey report

Notification to start backfilling for the existing trench from stage 2 excavation (the level and location not clear
KAIG3-RFI-SW-C-2202 01 Civil Site Works 11/27/21 12/7/21 Approved as noted
in 5x5 network) at Zone-G as highlighted in the attached drawing and survey report

kaig-qcals 189
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Backfilling Gravel (2nd Layer) around the Manhole for FW-A-3-6.8, FW-A-3-6.7, FW-A-3-
KAIG3-RFI-SW-C-2203 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
6.6, FW-A-3-6.5, FW-A-3-6.4, FW-A-3-6.3, FW-A-3-6.2 - as Highlighte

Inspection And Compaction Test For Backfilling 2nd Layer (2 of 14) For Foul Water Line From FW-A-3-6.7
KAIG3-RFI-SW-C-2204 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
To FW-A-3-6.5 as Highlighted (SP#109 A-1-A)

Inspection of Backfilling Gravel (1st Layer) around the Manhole for FW-A-3-6.8, FW-A-3-6.7, FW-A-3-6.6,
KAIG3-RFI-SW-C-2205 00 Civil Site Works 11/16/21 11/20/21 Approved as noted
FW-A-3-6.5, FW-A-3-6.4, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted

Inspection And Compaction Test For Backfilling 1st Layer (1 of 14) For Foul Water Line From FW-A-3-6.7
KAIG3-RFI-SW-C-2209 00 Civil Site Works 11/16/21 11/20/21 Approved as noted
To FW-A-3-6.5 as Highlighted (SP#109 A-1-A)

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-2210 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-3-7, FW-A-3-11, FW-A-3-12, FW-A-3- Civil Site Works 11/17/21 11/20/21 Approved as noted
13, FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-3-17 (As Hig

Inspection and Compaction Test for 3rd Layer (3 of 6) backfilling (grading) at Zone - K (Next to RB-334) as
KAIG3-RFI-SW-C-2211 00 Civil Site Works 11/16/21 11/22/21 Approved as noted
highlighted

Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01-B1 to MH-
KAIG3-RFI-SW-C-2212 00 Civil Site Works 11/16/21 11/20/21 Approved as noted
D-01-B2 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A)

KAIG3-RFI-SW-C-2213 00 Inspection and Compaction Test for 1st Layer (1 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/16/21 11/20/21 Approved as noted

KAIG3-RFI-SW-C-2217 00 Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K as highlighted Civil Site Works 11/16/21 11/21/21 Approved as noted

KAIG3-RFI-SW-C-2218 00 Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted Civil Site Works 11/16/21 11/21/21 Approved as noted

Inspection for Sand Bedding under pipe for Telecommunication Line from G/TL/50 to G/TL/43 at Zone-G as
KAIG3-RFI-SW-C-2219 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
highlighted in the attached drawing
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from G/TL/50 to G/TL/43 at
KAIG3-RFI-SW-C-2220 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
Zone-G as highlighted in the attached drawing
Inspection for Sand Bedding under pipe for Telecommunication Line from K/TL/01 to G/TL/54 at Zone-G &
KAIG3-RFI-SW-C-2221 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
K as highlighted in the attached drawing
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from K/FS/01 to G/FS/52 at
KAIG3-RFI-SW-C-2222 00 Civil Site Works 11/17/21 11/21/21 Approved as noted
Zone-G & K as highlighted in the attached drawing

KAIG3-RFI-SW-C-2223 00 Inspection and Compaction Test for 2nd Layer (2 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/17/21 11/21/21 Approved as noted

Excavation for Telecommunication Line from (B/TL/35 to G/TL/30) including pit G/TL/32, G/TL/30 at
KAIG3-RFI-SW-C-2224 00 Civil Site Works 11/17/21 11/22/21 Approved as noted
Zone-G as highlighted in the attached drawing
Inspection for Casting Blinding Concrete under Manhole MH-L-01, MH-L-02, MH-L-03, MH-L-04 - as
KAIG3-RFI-SW-C-2225 00 Civil Site Works 11/17/21 11/20/21 Approved as noted
highlighted
Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-
KAIG3-RFI-SW-C-2226 00 Civil Site Works 11/17/21 11/20/21 Approved as noted
A-13-8 (as Highlighted

Excavation for Foul Water Line from FW-A-13 to FW-A-13-4 including Manhole FW-A-13-1, FW-A-13-2,
KAIG3-RFI-SW-C-2227 00 Civil Site Works 11/17/21 11/20/21 Approved as noted
FW-A-13-3, FW-A-13-4 prior to start Gravel Bedding (as Highlighted)

Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B KAIG3-RFI-SW-C-2240 00 Civil Site Works beside Parking 11/17/21 11/21/21 Code C (resubmit)
highlighted Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B KAIG3-RFI-SW-C-2240 01 Civil Site Works beside Parking 12/5/21 12/9/21 Code C (resubmit)
highlighted Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-2240 02 Civil Site Works beside Parking 1/17/22 1/20/22 Code C (resubmit)
highlighted Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-2240 03 Civil Site Works beside Parking 2/13/22 2/16/22 Approved as noted
highlighted Area in the attached Dwg.
Warning Tape Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted
KAIG3-RFI-SW-C-2241 00 Civil Site Works beside Parking 11/17/21 11/18/21 Approved as noted
Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B KAIG3-RFI-SW-C-2242 00 Civil Site Works beside Parking 11/17/21 11/21/21 Code C (resubmit)
highlighted Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B KAIG3-RFI-SW-C-2242 01 Civil Site Works beside Parking 12/5/21 12/9/21 Code C (resubmit)
highlighted Area in the attached Dwg.
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-2242 02 Civil Site Works beside Parking 1/17/22 1/20/22 Code C (resubmit)
highlighted Area in the attached Dwg.

kaig-qcals 190
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-2242 03 Civil Site Works beside Parking 2/13/22 2/16/22 Approved as noted
highlighted Area in the attached Dwg.
Warning Tape Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted
KAIG3-RFI-SW-C-2243 00 Civil Site Works beside Parking 11/17/21 11/18/21 Approved as noted
Area in the attached Dwg.

KAIG3-RFI-SW-C-2244 00 Excavation for Storm Water Line from MH-A-12 to Water Tank - As highlighted Civil Site Works 11/17/21 11/20/21 Code C (not resubmit)

KAIG3-RFI-SW-C-2245 00 Excavation for Storm Water Line from MH-A-11 to Water Tank - As highlighted Civil Site Works 11/17/21 11/20/21 Code C (not resubmit)

Excavation for Fire & Security Distribution Line from (B/FS/27 to G/FS/10) including Pit G/FS/17, G/FS/10
KAIG3-RFI-SW-C-2246 00 Civil Site Works 11/17/21 11/22/21 Approved as noted
at Zone-G as highlighted in the attached drawing

Inspection And Compaction Test For Backfilling 1st Layer (1 of 14) For Foul Water Line From FW-A-3-6.4
KAIG3-RFI-SW-C-2247 00 Civil Site Works 11/18/21 11/23/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#109 A-1-A)

Inspection And Compaction Test For Backfilling 1st Layer (1 of 19) For Foul Water Line From FW-A-3-6.5
KAIG3-RFI-SW-C-2248 00 Civil Site Works 11/18/21 11/24/21 Code C (not resubmit)
To FW-A-3-6.4 as Highlighted (SP#109 A-1-A)

Inspection And Compaction Test For Backfilling 2nd Layer (2 of 19) For Foul Water Line From FW-A-3-6.5
KAIG3-RFI-SW-C-2249 00 Civil Site Works 11/18/21 11/23/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#109 A-1-A)

Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6.10,
KAIG3-RFI-SW-C-2250 00 Civil Site Works 11/18/21 11/23/21 Approved as noted
FW-A-3-6.11, FW-A-3-6.12 - as Highlighted SP#118

KAIG3-RFI-SW-C-2254 00 Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-7 - AS Highlighted Civil Site Works 11/18/21 11/21/21 Approved as noted

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
KAIG3-RFI-SW-C-2255 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-K-02, MH-K-03, MH-K-07 (As Civil Site Works 11/18/21 11/20/21 Approved as noted
Highlighted)

KAIG3-RFI-SW-C-2256 00 Inspection and Compaction Test for 3rd Layer (3 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/18/21 11/23/21 Approved as noted

Excavation for Telecommunication Line from (F/TL/16 to F/TL/12) including branch and pit F/TL/16,
KAIG3-RFI-SW-C-2257 00 Civil Site Works 11/18/21 11/22/21 Approved as noted
F/TL/04, F/TL/03, F/TL/14, F/TL/12 at Zone-F as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from (F/FS/14 to F/FS/17) including branch and Pit
KAIG3-RFI-SW-C-2258 00 Civil Site Works 11/18/21 11/22/21 Approved as noted
F/FS/14, F/FS/04, F/FS/03, F/FS/11, F/FS/17 at Zone-F as highlighted in the attached drawing

Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-01 to MH-D-
KAIG3-RFI-SW-C-2259 00 Civil Site Works 11/18/21 11/21/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A)

Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-1, FW-A-13-2, FW-A-13-3, FW-
KAIG3-RFI-SW-C-2260 00 Civil Site Works 11/18/21 11/23/21 Approved as noted
A-13-4 (as Highlighted)

Excavation for Storm Water Line from MH-G-03 to MH-G-06 including Branches, Manhole MH-G-04, MH-
KAIG3-RFI-SW-C-2263 00 Civil Site Works 11/18/21 11/23/21 Approved as noted
G-05, MH-G-03, MH-G-06 and Gullies G-G-32, G-G-31, G-G-30, G-G-29, G-G-28 - as highlighted

KAIG3-RFI-SW-C-2265 00 Soil Preparation prior to start Backfill (-40cm from FGL) at Zone - K (Near Tower-3) as highlighted Civil Site Works 11/18/21 11/23/21 Approved as noted

Inspection and Compaction Test for 4th Layer (4 of 6) backfilling (grading) at Zone - K (Next to RB-334) as
KAIG3-RFI-SW-C-2270 00 Civil Site Works 11/20/21 11/24/21 Approved as noted
highlighted (SP#109 A-1-A)

KAIG3-RFI-SW-C-2271 00 Inspection and Compaction Test for 4th Layer (4 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/20/21 11/23/21 Approved as noted

Inspection of Backfilling Gravel (1ST & 2ND & 3RD Layer Out Of 6) around the Manhole for MH-D-01 as
KAIG3-RFI-SW-C-2272 00 Civil Site Works 11/20/21 11/21/21 Approved as noted
Highlighted SP#118

kaig-qcals 191
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Gravel (1ST & 2ND & 3RD Layer Out Of 3) around the Manhole for MH-D-02 as
KAIG3-RFI-SW-C-2273 00 Civil Site Works 11/20/21 11/21/21 Approved as noted
Highlighted SP#118
Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-3-11, FW-A-3-12, FW-A-3-13,
KAIG3-RFI-SW-C-2274 00 Civil Site Works 11/20/21 11/23/21 Approved as noted
FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-3-17 AS Highlighted SP#118
Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-K-02, MH-K-03, MH-K-04 - AS
6B KAIG3-RFI-SW-C-2275 00 Civil Site Works 11/20/21 11/23/21 Code C (resubmit)
Highlighted SP#118
Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-K-02, MH-K-03, MH-K-04 - AS
6B KAIG3-RFI-SW-C-2275 01 Civil Site Works 11/27/21 11/29/21 Approved as noted
Highlighted SP#118
Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6.10,
KAIG3-RFI-SW-C-2282 00 Civil Site Works 11/20/21 11/21/21 Approved as noted
FW-A-3-6.11, FW-A-3-6.12 - as Highlighted SP#118
Inspection of Backfilling Gravel (3rd Layer Out of 5) around the Manhole for FW-A-3-6.8, FW-A-3-6.7,
KAIG3-RFI-SW-C-2283 00 Civil Site Works 11/20/21 11/23/21 Approved as noted
FW-A-3-6.6, FW-A-3-6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#118
Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K (Near RB-333) as
Zone K KAIG3-RFI-SW-C-2284 00 Civil Site Works 11/20/21 11/24/21 Approved as noted
highlighted
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.7
KAIG3-RFI-SW-C-2285 00 Civil Site Works 11/20/21 11/24/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#109 A-1-A)
Inspection of Backfilling Sub Grade Above Gravel (1St Layer out of 8) around the Manhole for FW-A-3-6.4 -
KAIG3-RFI-SW-C-2286 00 Civil Site Works 11/21/21 11/24/21 Approved as noted
as Highlighted SP#109 A-1-A
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 14) For Foul Water Line From FW-A-3-6.4
KAIG3-RFI-SW-C-2287 00 Civil Site Works 11/20/21 11/24/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#109 A-1-A)
Inspection of Backfilling Sub grade above gravel (1st Layer Out Of 3) around the Manhole for MH-D-02 as
KAIG3-RFI-SW-C-2288 00 Civil Site Works 11/20/21 11/24/21 Approved as noted
Highlighted SP#109 A-1-A
Inspection for Sand Bedding under pipe for Telecommunication Line from B/TL/35 to G/TL/30 at Zone-G as
KAIG3-RFI-SW-C-2289 00 Civil Site Works 11/20/21 11/27/21 Approved as noted
highlighted in the attached drawing (SP # 67)
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from B/FS/27 to G/FS/10 at
KAIG3-RFI-SW-C-2290 00 Civil Site Works 11/20/21 11/27/21 Approved as noted
Zone-G as highlighted in the attached drawing (SP # 67)
Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-L-01, MH-L-02,MH-L-03,
KAIG3-RFI-SW-C-2301 00 Civil Site Works 11/21/21 11/24/21 Approved as noted
MH-L-04 - as highlighted
Inspection For Installation Of All Rings (Riser) For MH-L-01, MH-L-02, MH-L-03, MH-L-04. (As
KAIG3-RFI-SW-C-2302 00 Civil Site Works 11/21/21 11/24/21 Approved as noted
Highlighted)

KAIG3-RFI-SW-C-2303 00 Inspection For Installation Of Slabs For (MH-L-01, MH-L-02, MH-L-03, MH-L-04) (As Highlighted). Civil Site Works 11/21/21 11/24/21 Approved as noted

Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-5, FW-A-13-6, FW-A-
KAIG3-RFI-SW-C-2304 00 Civil Site Works 11/21/21 11/24/21 Approved as noted
13-7, FW-A-13-8 - as highlighted
Inspection For Installation Of All Rings (Riser) For FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8. (As
KAIG3-RFI-SW-C-2305 00 Civil Site Works 11/21/21 11/24/21 Approved as noted
Highlighted)
"Inspection For Installation Of Slabs For (FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8) (As
KAIG3-RFI-SW-C-2306 00 Civil Site Works 11/21/21 11/24/21 Code C (not resubmit)
Highlighted)."

KAIG3-RFI-SW-C-2307 00 Inspection and Compaction Test for 5th Layer (5 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/21/21 11/24/21 Approved as noted

Excavation for Fire & Security Distribution Line from (G/FS/33 to H/FS/06) including Pit G/FS/33 at Zone-G
KAIG3-RFI-SW-C-2308 00 Civil Site Works 11/21/21 11/23/21 Approved as noted
as highlighted in the attached drawing
Excavation for Telecommunication Line from (G/TL/29 to H/TL/06) including pit G/TL/29 at Zone-G as
KAIG3-RFI-SW-C-2309 00 Civil Site Works 11/21/21 11/23/21 Approved as noted
highlighted in the attached drawing
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-
KAIG3-RFI-SW-C-2310 00 Civil Site Works 11/21/21 11/25/21 Approved as noted
B as highlighted in the attached drawing
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/21 to B/TL/36) at Zone-B as
KAIG3-RFI-SW-C-2312 00 Civil Site Works 11/21/21 11/25/21 Approved as noted
highlighted in the attached drawing

KAIG3-RFI-SW-C-2313 00 Inspection of Steel Reinforcement for the Foundation and Walls of Transition Area (As Highlighted Civil Site Works 11/21/21 11/23/21 Approved as noted

KAIG3-RFI-SW-C-2314 00 Inspection of Formwork for the Foundation and Kicker of Transition Area (As Highlighted) Civil Site Works 11/21/21 11/23/21 Approved as noted

KAIG3-RFI-SW-C-2315 00 Inspection of Concrete Pouring for the Foundation and Kicker of Transition Area (As Highlighted) Civil Site Works 11/21/21 11/23/21 Approved as noted

KAIG3-RFI-SW-C-2316 00 Soil Preparation under Boulder No. RB- 239 prior to start cutting Civil Site Works 11/21/21 11/25/21 Approved as noted

Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from F/FS/14 to F/FS/04 at
KAIG3-RFI-SW-C-2317 00 Civil Site Works 11/21/21 11/27/21 Approved as noted
Zone-F as highlighted in the attached drawing
Inspection for Sand Bedding under pipe for Telecommunication Line from F/TL/16 to F/TL/04 at Zone-F as
KAIG3-RFI-SW-C-2318 00 Civil Site Works 11/21/21 11/27/21 Approved as noted
highlighted in the attached drawing
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/24 to B/FS/21) at Zone-
KAIG3-RFI-SW-C-2319 00 Civil Site Works 11/21/21 11/23/21 Approved as noted
B as highlighted in the attached drawing
kaig-qcals 192
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/21 to B/TL/42) at Zone-B as
KAIG3-RFI-SW-C-2320 00 Civil Site Works 11/21/21 11/23/21 Approved as noted
highlighted in the attached drawing
Surface Preparation Prior to Start Backfill Gravel for Gullis G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-
KAIG3-RFI-SW-C-2321 00 Civil Site Works 11/21/21 11/27/21 Approved as noted
13, G-E-14, G-E-15 - AS Highlighted
Site Works beside
Bedding Gravel 3/8" and Geotextile Sorround Storm Water Line Outfall-G for (800mmØ -PP-Corrugated)
KAIG3-RFI-SW-C-2324 00 Civil Circular Pathway Junction 11/21/21 11/23/21 Approved as noted
from (MH-G-03 to Outfull G) as per highlighted Area in the attached Dwg.
8
Site Works beside
Pipe Installation of Storm Water Line Outfull-G for (800mmØ -PP-Corrugated) from (MH-G-03 to Outfull G)
KAIG3-RFI-SW-C-2325 00 as per highlighted Area in the attached Dwg. Civil Circular Pathway Junction 11/21/21 11/24/21 Approved as noted
8
Bedding Gravel 3/8" and Geotextile Sorround Storm Water Line Outfall-G for (1600mmØ -UPVC-Class 4) Site Work/Crescent 2
KAIG3-RFI-SW-C-2326 00 Civil 11/21/21 11/23/21 Approved as noted
from (FW-A-3-14 to FW-A-3-17)at Crescent-02 Zone 2N & 2M as per highlighted Area in the attached Dwg. Zone 2N & 2M.
Pipe Installation of Foul Water Line (1600mmØ -UPVC-Class 4) from (FW-A-3-14 to FW-A-3-17)at Site Work/Crescent 2
KAIG3-RFI-SW-C-2327 00 Civil 11/21/21 11/24/21 Approved as noted
Crescent-02 Zone 2N & 2M as per highlighted Area in the attached Dwg. Zone 2N & 2M.
Pipe Conection to the Catch Basin of Storm Water Line Outfall-E for (315mmØ-UPVC- CLASS 4) from (G- Site Works beside
KAIG3-RFI-SW-C-2333 00 E-08 to G-E-15 ). BSIDE CIRCULAR PATHWAY JUNCTION 8. As per highlighted Area in the attached Civil Circular Pathway Junction 11/24/21 11/27/21 Approved as noted
Dwg. 8
Inspection of Backfilling Sub grade above gravel (2nd Layer Out Of 3) around the Manhole for MH-D-02 as
KAIG3-RFI-SW-C-2335 00 Civil Site Works 11/23/21 11/27/21 Approved as noted
Highlighted SP#109 A-1-A
Inspection of Backfilling Gravel 3rd Layer (3 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6.10,
KAIG3-RFI-SW-C-2336 00 Civil Site Works 11/23/21 11/27/21 Approved as noted
FW-A-3-6.11, FW-A-3-6.12 - as Highlighted SP#11
"Inspection of Backfilling Gravel (4th Layer Out of 5) around the Manhole for FW-A-3-6.8, FW-A-3-6.7, Site Work/Crescent 2
KAIG3-RFI-SW-C-2337 00 Civil 11/24/21 11/27/21 Approved as noted
FW-A-3-6.6- as Highlighted SP#118" Zone 2H
Inspection of Backfilling Sub Grade Above Gravel (1st Layer Out of 5) Around The Manhole for FW-A-3- Site Work/Crescent 2
KAIG3-RFI-SW-C-2338 00 Civil 11/24/21 11/28/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#109 A-1-A Zone 2H
Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.7 Site Work/Crescent 2
KAIG3-RFI-SW-C-2339 00 Civil 11/24/21 11/28/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#109 A-1-A) Zone 2J, 2K & 1C, 1D
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2340 00 Civil Site Works 11/23/21 12/7/21 Code C (resubmit)
To FW-A-3-6.2 as Highlighted (SP#109 A-1-A)
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2340 01 Civil Site Works 12/7/21 12/12/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#109 A-1-A)

Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K&L (Near Crusher) as
KAIG3-RFI-SW-C-2343 00 Civil Site Works 11/29/21 11/25/21 Approved as noted
highlighted

KAIG3-RFI-SW-C-2344 00 Inspection and Compaction Test for 6th Layer (6 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/29/21 11/27/21 Approved as noted

Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-01 to MH-D-
KAIG3-RFI-SW-C-2345 00 Civil Site Works 11/29/21 11/27/21 Approved as noted
01-B1 - as Highlighted (upto -20cm from FGL - Total 10 Layers) (Stock Pile # 109 A-1-A

Inspection of Backfilling Sub Grade Above Gravel (2nd Layer out of 8) around the Manhole for FW-A-3-6.4
5A KAIG3-RFI-SW-C-2355 00 Civil Site Works 11/23/21 12/5/21 Approved as noted
- as Highlighted SP#109 A-1-A

KAIG3-RFI-SW-C-2356 00 Inspection and Compaction Test for 7th Layer (7 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/23/21 11/27/21 Approved as noted

KAIG3-RFI-SW-C-2357 00 Soil Preparation under Boulder No. RB- 240 prior to start cutting Civil Site Works 11/23/21 11/27/21 Approved as noted

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As
KAIG3-RFI-SW-C-2358 00 Civil Site Works 11/23/21 11/25/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As
KAIG3-RFI-SW-C-2359 00 Civil Site Works 11/23/21 11/25/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at
KAIG3-RFI-SW-C-2360 00 Civil 11/23/21 11/29/21 Approved as noted
Zone-B (As Highlighted)

KAIG3-RFI-SW-C-2371 00 Soil Preperation Prior to Start Backfill Gravel for Manhole MH-D-08-02 -as Highlighted Civil Site Works 11/23/21 11/24/21 Approved as noted

Inspection of Backfilling Sub grade above gravel (3rd Layer Out Of 3) around the Manhole for MH-D-02 as
KAIG3-RFI-SW-C-2372 00 Civil Site Works 11/23/21 12/1/21 Approved as noted
Highlighted SP#109 A-1-A

KAIG3-RFI-SW-C-2373 00 Soil Preparation under Boulder No. RB- 314 Civil Site Works 11/23/21 11/27/21 Approved as noted

Excavation for Fire Water Line from B/F/12 to Thrust Block including Pit B/F/12, B/F/13, B/F/10, B/F/17,
Zone B & C KAIG3-RFI-SW-C-2374 00 Civil Site Works 11/23/21 11/27/21 Approved as noted
B/F/09 at Zone-B & C as highlighted in the attached drawing
Excavation for Potable Water Line from B/PW/11 to Near B/PW/06 including Pit B/PW/11, B/PW/08,
Zone B & C KAIG3-RFI-SW-C-2375 00 Civil Site Works 11/23/21 11/27/21 Approved as noted
B/PW/12, B/PW/06 at Zone-B&C as highlighted

kaig-qcals 193
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (250mmØ-UPVC- Class 4) from Site Work/Crescent 2
2H KAIG3-RFI-SW-C-2377 00 Civil 11/24/21 11/27/21 Approved as noted
(FW-A-13-5 to FW-A-13-8). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. Zone 2H.
Pipe Installation of Storm Water Line Outfall-L for (450mmØ-UPVC- Class 4) from (MH-L-04 to Outfall- Site Work/Crescent 2
2J 2K 1C 1D KAIG3-RFI-SW-C-2380 00 Civil 11/24/21 11/27/21 Approved as noted
L). Between CRECENTS ZONE-2J, 2K & 1C,1D. As per highlighted Area in the attached Dwg. Zone 2J, 2K & 1C, 1D
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (250mmØ-UPVC- Class 4) from Site Work/Crescent 2
2H 2G KAIG3-RFI-SW-C-2381 00 Civil 11/24/21 11/25/21 Approved as noted
(FW-A-13 to FW-A-13-5). At CRECENT-02 ZONE-2H, 2G. As per highlighted Area in the attached Dwg. Zone 2H, 2G.
Pipe Installation of Foul Water Line for (250mmØ-UPVC- Class 4) from (FW-A-13 to FW-A-13-5). At Site Work/Crescent 2
2H 2G KAIG3-RFI-SW-C-2382 00 Civil 11/24/21 11/28/21 Approved as noted
CRECENT-02 ZONE-2H, 2G. As per highlighted Area in the attached Dwg. Zone 2H, 2G.
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-A for (315mmØ-UPVC- Site Works near Water
KAIG3-RFI-SW-C-2383 00 Civil 11/24/21 11/25/21 Code C (not resubmit)
Class-4 ) from (MH-A-11 & MH-A-12 to Water Tank ). At highlighted Area in the attached Dwg. tank
Pipe Installation of Storm Water Line OutFall-A for (315mmØ-UPVC- Class-4 ) from (MH-A-11 & MH-A- Site Works near Water
KAIG3-RFI-SW-C-2384 00 Civil 11/24/21 12/7/21 Code C (not resubmit)
12 to Water Tank ). At highlighted Area in the attached Dwg. tank

KAIG3-RFI-SW-C-2385 00 Inspection for Backfilling Sub-base under Boulder no. RB-314 (Stock Pile # 109 A-1-A) Civil Site Works 11/23/21 11/27/21 Approved as noted

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2386 00 Civil Site Works 11/23/21 11/25/21 Approved as noted
Highlighted)

Inspection of Formwork for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As
KAIG3-RFI-SW-C-2387 00 Civil Site Works 11/23/21 11/25/21 Approved as noted
Highlighted)

Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at
KAIG3-RFI-SW-C-2388 00 Civil Site Works 11/23/21 11/29/21 Approved as noted
Zone-B (As Highlighted)
Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-1, FW-A-13-2 as
KAIG3-RFI-SW-C-2389 00 Civil Site Works 11/24/21 11/27/21 Approved as noted
highlighted

KAIG3-RFI-SW-C-2390 00 Inspection For Installation Of All Rings (Riser) For FW-A-13-1, FW-A-13-2, (As Highlighted) Civil Site Works 11/24/21 11/27/21 Approved as noted

KAIG3-RFI-SW-C-2391 00 Inspection For Installation Of Slabs For (FW-A-13-1, FW-A-13-2) (As Highlighted) Civil Site Works 11/24/21 12/7/21 Code C (not resubmit)

Zone 2B KAIG3-RFI-SW-C-2392 00 Soil Preparation prior to start backfill around SBC-05 at Zone - 2B - as highlighted Civil Site Works 11/24/21 11/27/21 Approved as noted

KAIG3-RFI-SW-C-2393 00 Inspection and Compaction Test for 8th Layer (8 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A) Civil Site Works 11/24/21 11/28/21 Approved as noted

KAIG3-RFI-SW-C-2394 00 INSPECTION FOR INSTALLATION OF SLAB FOR FW-A-13. (As Highlighted) Civil Site Works 11/24/21 12/7/21 Code C (not resubmit)

KAIG3-RFI-SW-C-2395 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW5, FW6) - As Highlighted Civil Site Works 11/24/21 11/27/21 Approved as noted

Excavation for MV Line from B/MV/16 TO B/MV/06 including Pit - B/MV/16 at Zone-B as highlighted in
Zone B KAIG3-RFI-SW-C-2396 00 Civil Site Works 11/24/21 11/27/21 Approved as noted
the attached drawing
INSPECTION FOR INSTALLATION OF GULLIES G-F-01, G-F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-
F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14, G-F-15, G-F-16, G-F-17, G-F-18, G-F-19,
5A 3A KAIG3-RFI-SW-C-2397 00 Civil Site Works 12/13/21 12/16/21 Approved as noted
G-F-20, G-F-21, G-F-22, G-F-23, G-F-24, G-F-25, G-F-26, G-F-27, G-F-28, G-F-32, G-F-33, G-F-37, G-F-
40 AS HIGHLIGHTED.
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/06 to B/MV/13 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2398 00 Civil Site Works 11/24/21 11/29/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2399 00 Civil Site Works 11/24/21 11/29/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at
Zone B KAIG3-RFI-SW-C-2400 00 Civil Site Works 11/24/21 11/29/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Backfilling Gravel (1st Layer of 2) G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13 - AS
3B KAIG3-RFI-SW-C-2411 00 Civil Site Works 11/24/21 11/29/21 Approved as noted
Highlighted

Zone B KAIG3-RFI-SW-C-2412 00 Inspection and Compaction Test for 1st Layer (1 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A) Civil Site Works 11/25/21 11/28/21 Approved as noted

Zone F G KAIG3-RFI-SW-C-2413 00 Soil Preparation under Boulder No. RB- 239 after cutting Civil Site Works 11/25/21 11/29/21 Approved as noted

Zone F G KAIG3-RFI-SW-C-2414 00 Inspection for Backfilling Sub-base under Boulder No. RB-239 (SP # 109 A-1-A) Civil Site Works 11/25/21 11/29/21 Approved as noted

kaig-qcals 194
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2B KAIG3-RFI-SW-C-2415 00 Inspection and Compaction Test for 2nd Layer (2 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A) Civil Site Works 11/25/21 11/29/21 Approved as noted

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2416 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2417 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
Highlighted)
Site Works beside
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (800mmØ-PP-
3A 3B KAIG3-RFI-SW-C-2420 00 Civil Circular Pathway Junction 11/25/21 11/28/21 Approved as noted
Corrugated) from ( MH-G-03 to Outfull-G ). As per highlighted Area in the attached Dwg.
8
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-G for (800mmØ-PP-Corrugated) from ( MH-G-03
3A 3B KAIG3-RFI-SW-C-2421 00 Civil Circular Pathway Junction 11/25/21 11/28/21 Approved as noted
to Outfull-G ). As per highlighted Area in the attached Dwg.
8
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-L for (450mmØ-UPVC- Class
Site Work/Crescent 2
3A 3B KAIG3-RFI-SW-C-2422 00 4) from (MH-L-04 to Outfall-L). Between CRECENTS ZONE-2J, 2K & 1C,1D. As per highlighted Area in Civil 11/25/21 11/28/21 Approved as noted
Zone 2J, 2K & 1C, 1D
the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-L for (450mmØ-UPVC- Class 4) from (MH-L-04 to Site Work/Crescent 2
2J 2K 1C 1D KAIG3-RFI-SW-C-2423 00 Civil 11/25/21 11/29/21 Approved as noted
Outfall-L). Between CRECENTS ZONE-2J, 2K & 1C,1D. As per highlighted Area in the attached Dwg. Zone 2J, 2K & 1C, 1D
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (600mmØ-PP- Site Works beside
3A 3B KAIG3-RFI-SW-C-2424 00 Corrugated) from ( MH-G-03 to MH-G-06 ) and (450mmØ-UPVC- Class 4) from ( MH-G-03 to MH-G-03- Civil Circular Pathway Junction 11/25/21 11/28/21 Approved as noted
01 ). As per highlighted Area in the attached Dwg. 8
Pipe Installation of Storm Water Line Outfall-G for (600mmØ-PP-Corrugated) from ( MH-G-03 to MH-G- Site Works beside
3A 3B KAIG3-RFI-SW-C-2425 00 06 ) and (450mmØ-UPVC- Class 4) from ( MH-G-03 to MH-G-03-01 ). As per highlighted Area in the Civil Circular Pathway Junction 11/25/21 11/28/21 Approved as noted
attached Dwg. 8
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at
KAIG3-RFI-SW-C-2427 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
Zone-B (As Highlighted)
Inspection and Compaction Test for 6th Layer (6 of 6) backfilling (grading) at Zone - K (Next to RB-334) as
Zone K KAIG3-RFI-SW-C-2428 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
highlighted (SP#109 A-1-A)
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - at Zone-K (Next to
Zone K KAIG3-RFI-SW-C-2435 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
RB-334) as Highlighted
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K (Near RB-333) as
Zone K KAIG3-RFI-SW-C-2436 00 Civil Crescent 11/25/21 11/29/21 Approved as noted
highlighted
Inspection and Compaction Test for 1st Layer (1 of 2) backfilling (grading) at Zone - K (Near Tower-3) as
Zone K KAIG3-RFI-SW-C-2437 00 Civil Site Works 11/25/21 11/29/21 Approved as noted
highlighted
Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-3, FW-A-13-4 as
6B KAIG3-RFI-SW-C-2439 00 Civil Site Works 11/27/21 11/29/21 Approved as noted
highlighted

6B KAIG3-RFI-SW-C-2440 00 Inspection For Installation Of All Rings (Riser) For FW-A-13-4 (As Highlighted) Civil Site Works 11/27/21 11/29/21 Approved as noted

6B KAIG3-RFI-SW-C-2441 00 Inspection For Installation Of Slabs For (FW-A-13-4) (As Highlighted). Civil Site Works 11/27/21 11/29/21 Code C (not resubmit)

Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2442 00 Civil Site Works 11/27/21 12/1/21 Code C (not resubmit)
To FW-A-3-6.2 as Highlighted (SP#109 A-1-A)
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2443 00 Civil Site Works 11/27/21 12/1/21 Approved as noted
as Highlighted SP#109 A-1-A
Inspection of Backfilling Sub Grade Above Gravel (1st Layer out of 8) around the Manhole for FW-A-3-6.6,
5A KAIG3-RFI-SW-C-2444 00 Civil Site Works 11/27/21 12/1/21 Approved as noted
FW-A-3-6.7- as Highlighted SP#109 A-1-A
Inspection of Backfilling Sub Grade Above Gravel (2nd Layer Out of 5) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2445 00 Civil Site Works 11/27/21 12/1/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#109 A-1-A
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.7
5A KAIG3-RFI-SW-C-2456 00 Civil Site Works 11/27/21 12/1/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#109 A-1-A)
Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for FW-A-3-7, FW-A-3-8, FW-
5A KAIG3-RFI-SW-C-2457 00 Civil Site Works 11/27/21 11/29/21 Approved as noted
A-3-9, FW-A-3-10, FW-A-3-10, FW-A-3-12, FW-A-3-14 as Highlighted SP#118
Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for MH-K-6, MH-K-5, MH-K-4,
6B KAIG3-RFI-SW-C-2458 00 Civil Site Works 11/27/21 11/29/21 Approved as noted
MH-K-3, MH-K-2 as Highlighted SP#118

KAIG3-RFI-SW-C-2459 00 Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted Civil Site Works 11/27/21 11/28/21 Approved as noted

2B KAIG3-RFI-SW-C-2460 00 Inspection and Compaction Test for 3rd Layer (3 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A) Civil Site Works 11/27/21 11/30/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K&L (Near Crusher) as
Zone K & L KAIG3-RFI-SW-C-2461 00 Civil Site Works 11/27/21 11/30/21 Approved as noted
highlighted
Sand Bedding under pipe for Potable Water Line from B/PW/11 to Near B/PW/06 at Zone-B&C as
Zone B & C KAIG3-RFI-SW-C-2462 00 Civil Site Works 11/27/21 12/1/21 Approved as noted
highlighted (SP# 67)
Inspection of Backfilling Gravel (1ST, 2ND, 3RD, 4TH, 5TH Layer out of 5) around the Manhole for MH-
4C KAIG3-RFI-SW-C-2463 00 Civil Site Works 11/28/21 11/29/21 Approved as noted
D-08-02 as Highlighted SP#118
Inspection of Backfilling Sub Grade Above Gravel (1st Layer out of 1) around the Manhole for MH-D-08-02
4C KAIG3-RFI-SW-C-2464 00 Civil Site Works 11/28/21 11/30/21 Approved as noted
as Highlighted SP#109 A-1-A
"Inspection of Backfilling Gravel (4th, 5th Layer out of 5) around the Manhole for MH-D-01 as Highlighted
5A KAIG3-RFI-SW-C-2465 00 Civil Site Works 11/28/21 11/29/21 Approved as noted
SP#118"
kaig-qcals 195
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2B KAIG3-RFI-SW-C-2466 00 Inspection and Compaction Test for 4th Layer (4 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A) Civil Site Works 11/28/21 12/1/21 Approved as noted

KAIG3-RFI-SW-C-2467 00 INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-D-08 . (As Highlighted) Civil Site Works 11/28/21 11/29/21 Approved as noted

KAIG3-RFI-SW-C-2468 00 Inspection For Installation Of Slab For (MH-D-08) (As Highlighted). Civil Site Works 11/28/21 11/29/21 Code C (not resubmit)

Inspection of Backfilling Gravel 2nd Layer (2 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-E-
3B KAIG3-RFI-SW-C-2469 00 Civil Site Works 11/28/21 12/1/21 Approved as noted
03 - AS Highlighted (SP# 118)
"Inspection of Backfilling Gravel (2nd Layer of 2) G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13 - AS
3B KAIG3-RFI-SW-C-2470 00 Civil Site Works 11/28/21 12/2/21 Approved as noted
Highlighted"
Casting Blinding Concret under Manhole MH-G-01-05, MH-G-01-06, MH-G-01-07, and Gullies G-G-
3B KAIG3-RFI-SW-C-2484 00 Civil Site Works 11/28/21 11/29/21 Approved as noted
63&64, G-G-65, G-G-66&67, G-G-68, G-G-69, G-G-70, G-G-71 as highlighted
Excavation for Telecommunication Line from (B/TL/10 to C/TL/14) including pit B/TL/10, B/TL/12,
BC KAIG3-RFI-SW-C-2485 00 Civil Site Works 11/28/21 11/29/21 Code C (resubmit)
B/TL/13, C/TL/14 at Zone-B & C as highlighted in the attached drawing
Excavation for Telecommunication Line from (B/TL/10 to C/TL/14) including pit B/TL/10, B/TL/12,
BC 3 KAIG3-RFI-SW-C-2485 01 Civil Site Works 2/2/22 2/6/22 Approved as noted
B/TL/13, C/TL/14 at Zone-B & C as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (B/FS/14 to B/FS/06) including Pit B/FS/14, B/FS/15,
B KAIG3-RFI-SW-C-2486 00 Civil Site Works 11/28/21 11/29/21 Code C (resubmit)
B/FS/06 at Zone-B as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from (B/FS/14 to B/FS/06) including Pit B/FS/14, B/FS/15,
B 3 KAIG3-RFI-SW-C-2486 01 Civil Site Works 2/3/22 2/6/22 Approved as noted
B/FS/06 at Zone-B as highlighted in the attached drawing
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ & 110mmØ - UPVC-
Site Works beside Energy
5A KAIG3-RFI-SW-C-2487 00 Class 4) from (FW-A-23 to FW-A-23-01), (FW-A-22 to FW-A-22-01 & FW-A-22-02), (FW-A-19 to FW-A- Civil 11/29/21 12/1/21 Approved as noted
Center 2
19-01 & FW-A-19-02), (FW-A-20 & FW-A-21 to Pump Station). At highlighted area
Warning Tape Installation for Foul Water Line for (160mmØ & 110mmØ - UPVC- Class 4) from (FW-A-23
Site Works beside Energy
5A KAIG3-RFI-SW-C-2488 00 to FW-A-23-01), (FW-A-22 to FW-A-22-01 & FW-A-22-02), (FW-A-19 to FW-A-19-01 & FW-A-19-02), Civil 11/29/21 11/30/21 Approved as noted
Center 2
(FW-A-20 & FW-A-21 to Pump Station). At Beside Energy Center-02.
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ- UPVC- Class 4) from
Site Work/Crescent 2
6B KAIG3-RFI-SW-C-2489 00 (FW-A-3-14 to FW-A-3-17). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in the attached Civil 11/29/21 12/1/21 Approved as noted
Zone 2N & 2M.
Dwg.
Warning Tape Installation for Foul Water Line for (160mmØ- UPVC- Class 4) from (FW-A-3-14 to FW-A- Site Work/Crescent 2
6B KAIG3-RFI-SW-C-2490 00 Civil 11/29/21 11/30/21 Approved as noted
3-17). At CRECENT-02 ZONE- 2N & 2M. As per highlighted Area in the attached Dwg. Zone 2N & 2M.
Site Works beside
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (400mmØ, 450mmØ-
3A 3B KAIG3-RFI-SW-C-2491 00 Civil Circular Pathway Junction 11/29/21 12/1/21 Approved as noted
UPVC- Class 4) from ( MH-G-01 to MH-G-01-05 ). As per highlighted Area in the attached Dwg.
8
Site Works beside
Warning Tape Installation for Storm Water Line Outfall-G for (400mmØ, 450mmØ-UPVC- Class 4) from
3A 3B KAIG3-RFI-SW-C-2492 00 Civil Circular Pathway Junction 11/29/21 11/30/21 Approved as noted
( MH-G-01 to MH-G-01-05 ). As per highlighted Area in the attached Dwg.
8
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (250mmØ-UPVC- Class 4) from Site Works/Crescent 02
6A KAIG3-RFI-SW-C-2493 00 Civil 11/29/21 12/1/21 Approved as noted
(FW-A-13-5 to FW-A-13-8). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. Zone 2H
Warning Tape Installation for Foul Water Line for (250mmØ-UPVC- Class 4) from (FW-A-13-5 to FW-A- Site Works/Crescent 02
6A KAIG3-RFI-SW-C-2494 00 Civil 11/29/21 11/30/21 Approved as noted
13-8). At CRECENT-02 ZONE-2H. As per highlighted Area in the attached Dwg. Zone 2H
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-A for (315mmØ-UPVC-
4C KAIG3-RFI-SW-C-2495 00 Civil Site near Water Tank 11/29/21 12/1/21 Code C (not resubmit)
Class-4 ) from (MH-A-11 & MH-A-12 to Water Tank ). At highlighted Area in the attached Dwg.
Warning Tape Installation for Storm Water Line Outfall-A for (315mmØ-UPVC- Class-4 ) from (MH-A-11
4C KAIG3-RFI-SW-C-2496 00 Civil Site near Water Tank 11/29/21 11/30/21 Approved as noted
& MH-A-12 to Water Tank ). At highlighted Area in the attached Dwg.
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (600mmØ-PP- Site Works beside
3A 3B KAIG3-RFI-SW-C-2497 00 Corrugated) from ( MH-G-03 to MH-G-06 ) and (450mmØ-UPVC- Class 4) from ( MH-G-03 to MH-G-03- Civil Circular Pathway Junction 11/29/21 12/1/21 Approved as noted
01 ). As per highlighted Area in the attached Dwg. 8
Warning Tape Installation for Storm Water Line Outfall-G for (600mmØ-PP-Corrugated) from ( MH-G-03 Site Works beside
3A 3B KAIG3-RFI-SW-C-2498 00 to MH-G-06 ) and (450mmØ-UPVC- Class 4) from ( MH-G-03 to MH-G-03-01 ). As per highlighted Area in Civil Circular Pathway Junction 11/29/21 11/30/21 Approved as noted
the attached Dwg. 8
Zone K KAIG3-RFI-SW-C-2501 00 Soil Preparation under Boulder No. RB- 277 Civil Site Works 11/29/21 12/1/21 Approved as noted

Soil Preparation prior to start backfilling for the existing trench from stage 2 excavation (the level and
Zone G KAIG3-RFI-SW-C-2502 00 Civil Site Works 11/29/21 12/1/21 Approved as noted
location not clear in 5x5 network) at Zone-G as highlighted in the attached drawing and survey report

2B KAIG3-RFI-SW-C-2503 00 Inspection and Compaction Test for 5th Layer (5 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A) Civil Site Works 11/29/21 12/2/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2504 00 Soil Preparation under Boulder No. RB- 283 Civil Site Works 11/29/21 12/1/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2505 00 Soil Preparation under Boulder No. RB- 319 Civil Site Works 11/29/21 12/1/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K (Near Tower-3) as
Zone K KAIG3-RFI-SW-C-2506 00 Civil Site Works 11/29/21 12/2/21 Approved as noted
highlighted (SP#110 A-1-A)
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K (Near RB-333) as
Zone K KAIG3-RFI-SW-C-2507 00 Civil Site Works 11/29/21 12/1/21 Approved as noted
highlighted (SP# 110 A-1-A)
Excavation for MV Line from B/MV/16 TO B/MV/14 including Pit - B/MV/05, B/MV/14 at Zone-B as
Zone B KAIG3-RFI-SW-C-2509 00 Civil Site Works 11/29/21 12/1/21 Code C (not resubmit)
highlighted in the attached drawing
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B&G
Zone B & G KAIG3-RFI-SW-C-2510 00 Civil Site Works 11/29/21 12/1/21 Approved as noted
(As Highlighted)
kaig-qcals 196
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Formwork for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B&G (As
Zone B & G KAIG3-RFI-SW-C-2511 00 Civil Site Works 11/29/21 12/1/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at
Zone B & G KAIG3-RFI-SW-C-2512 00 Civil Site Works 11/30/21 11/30/21 Approved as noted
Zone-B&G (As Highlighted)

3B KAIG3-RFI-SW-C-2513 00 Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-E-04 as highlighted Civil Site Works 11/29/21 11/30/21 Code C (not resubmit)

3B KAIG3-RFI-SW-C-2514 00 INSPECTION OF INSTALLATION OF SLAB FOR MH-E-04 (AS ATTACHED) Civil Site Works 11/29/21 11/30/21 Code C (not resubmit)

Inspection And Compaction Test For Backfilling 2nd Layer (2 of 9) For Foul Water Line From FW-A-3-7 To
6B KAIG3-RFI-SW-C-2515 00 Civil Site Works 11/29/21 12/2/21 Approved as noted
FW-A-3-17 as Highlighted (SP#110 A-1-A)
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 9) For Storm Water Line From MH-K-07
6B KAIG3-RFI-SW-C-2523 00 Civil Site Works 11/29/21 12/2/21 Approved as noted
To MH-K-01 as Highlighted (SP#110 A-1-A)
INSPECTION FOR INSTALLATION OF GULLIES FOR - G-E-01, G-E-02, G-E-03 G-E-04, G-E-07 (As
3B KAIG3-RFI-SW-C-2524 00 Civil Site Works 11/30/21 11/30/21 Approved as noted
Highlighted)
Inspection and Compaction Test for Backfilling (2nd Layer out of 4) for Storm Water Line from MH-E-01-1
3B KAIG3-RFI-SW-C-2525 00 Civil Site Works 11/29/21 12/1/21 Code C (not resubmit)
to MH-E-01-2 - as Highlighted (Stock Pile # 110 A-1-A)
4B KAIG3-RFI-SW-C-2526 00 Inspection of Steel Reinforcement for the Top Slab of SBC-06 (As Highlighted) Civil Site Works 11/29/21 12/1/21 Approved as noted
2B KAIG3-RFI-SW-C-2527 00 "Inspection of Formwork for the Wall and Top Slab of SBC-06 (As Highlighted) Civil Site Works 11/29/21 12/1/21 Approved as noted

2B KAIG3-RFI-SW-C-2528 00 "Inspection of Concrete Pouring for the Wall and Top Slab of SBC-06 (As Highlighted)" Civil Site Works 11/29/21 12/2/21 Approved as noted

"Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-E-01, G-E-02, G-E-03 G-E-04, G-E-07, G-
3B KAIG3-RFI-SW-C-2529 00 Civil Site Works 11/29/21 11/30/21 Approved as noted
E-14, G-E-15 (As Highlighted)"
Inspection of Formwork for the Duct Bank of Fire & Security Distribution Line between B/FS/21 to B/FS/37
Zone B KAIG3-RFI-SW-C-2530 00 Civil Site Works 11/29/21 12/2/21 Approved as noted
at Zone-B (As Highlighted)
Inspection of Concrete Pouirng for the Duct Bank of Fire & Security Distribution Line between B/FS/21 to
Zone B KAIG3-RFI-SW-C-2531 00 Civil Site Works 12/5/21 12/1/21 Approved as noted
B/FS/37 at Zone-B (As Highlighted)
Inspection of Formwork for the Duct Bank of Telecommunications Line between B/TL/421 to B/TL/37 at
Zone B KAIG3-RFI-SW-C-2532 00 Civil Site Works 11/29/21 12/1/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Concrete Pouring for the Duct Bank of Telecommunications Line between B/TL/421 to
Zone B KAIG3-RFI-SW-C-2533 00 Civil Site Works 12/5/21 12/1/21 Approved as noted
B/TL/37 at Zone-B (As Highlighted)
Sand Bedding under pipe for Fire Water Line from B/F/12 to Thrust Block at Zone-B & C as highlighted in
Zone B & C KAIG3-RFI-SW-C-2534 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
the attached drawing (SP # 67)

2B KAIG3-RFI-SW-C-2535 00 Inspection and Compaction Test for 6th Layer (6 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A) Civil Site Works 11/30/21 12/5/21 Approved as noted

Zone L KAIG3-RFI-SW-C-2536 00 Inspection for Backfilling Sub-base under Boulder no. RB-319 (Stock Pile # 110 A-1-A) Civil Site Works 11/30/21 12/5/21 Approved as noted

Zone L KAIG3-RFI-SW-C-2537 00 Inspection for Backfilling Sub-base under Boulder no. RB-283 (Stock Pile # 110 A-1-A) Civil Site Works 11/30/21 12/5/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-277 (Stock Pile #
Zone K KAIG3-RFI-SW-C-2538 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
110 A-1-B)
Inspection of Thrust Block for UPVC Pipe (250mm) for Fire Water Line at Zone-B - As Highlighted in the
Zone B KAIG3-RFI-SW-C-2539 00 Civil Site Works 11/30/21 12/7/21 Approved as noted
attached drawing
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2540 00 Civil Site Works 11/30/21 12/1/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2541 00 Civil Site Works 11/30/21 12/2/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at
Zone G KAIG3-RFI-SW-C-2542 00 Civil Site Works 11/30/21 12/1/21 Approved as noted
Zone-G (As Highlighted)
Inspection of Backfilling Sub Grade Above Gravel (4th Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2551 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
as Highlighted SP#110 A-1-A
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2552 00 Civil Site Works 11/30/21 12/5/21 Code C (not resubmit)
To FW-A-3-6.2 as Highlighted (SP#110 A-1-A)
Inspection of Backfilling Sub Grade Above Gravel (2nd Layer out of 8) around the Manhole for FW-A-3-6.6,
5A KAIG3-RFI-SW-C-2553 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
FW-A-3-6.7- as Highlighted SP#110 A-1-A
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer Out of 5) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2554 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#110 A-1-A
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at
Zone B KAIG3-RFI-SW-C-2556 00 Civil Site Works 11/30/21 12/1/21 Approved as noted
Zone-B (As Highlighted)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at
Zone B KAIG3-RFI-SW-C-2557 00 Civil Site Works 11/30/21 12/1/21 Approved as noted
Zone-B (As Highlighted)

kaig-qcals 197
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Notification to Start Excavation for Telecommunication & (Fire & Security)Distribution Route at Zone L superseded by RFI-
Zone L KAIG3-RFI-SW-C-2558 00 Civil Site Works 11/30/21 cancelled
(As Highlighted) 1919-00
Inspection of Backfilling Gravel (1st layer out of 2) for Gullies G-E-01, G-E-02, G-E-03 G-E-04, G-E-07, G-
3B KAIG3-RFI-SW-C-2559 00 Civil Site Works 11/30/21 12/5/21 Approved as noted
E-14, G-E-15 (As Highlighted) SP#118

Pipe Installation of Storm Water Line- Outfall F for (315mmØ-upvc class 4) . (G-F-
Zone 3 KAIG3-RFI-SW-C-2560 00 Civil Site Works 11/29/21 12/6/21 Approved as noted
15,17,18,21,23,25,27,32,22,37 & 40 catch basin) as per highlighted Area in the attached Dwg.

2B KAIG3-RFI-SW-C-2561 00 Inspection and Compaction Test for 7th Layer (7 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A) Civil Site Works 12/1/21 12/6/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2562 00 Inspection and Compaction Test for NGL of Fire & Security Line at Zone - G (As Highlighted). Civil Site Works 12/1/21 12/6/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2563 00 Inspection and Compaction Test for NGL of Telecommunication Line at Zone - G (As Highlighted Civil Site Works 12/1/21 12/6/21 Approved as noted
4C KAIG3-RFI-SW-C-2564 00 INSPECTION OF INSTALLATION OF SLAB FOR MH-A-06 (AS ATTACHED) Civil Site Works 12/1/21 12/5/21 Approved as noted

3A KAIG3-RFI-SW-C-2565 00 INSPECTION OF INSTALLATION OF SLAB FOR MH-F-02, MH-F-03, MH-F-04 (AS ATTACHED) Civil Site Works 12/1/21 12/5/21 Approved as noted

Casting Blinding Concret under Manhole MH-G-01-01, MH-G-01-02, MH-G-01-03, MH-G-01-04, MH-G-
3B KAIG3-RFI-SW-C-2566 00 01, MH-G-02, MH-G-03 and Gullies G-G-62, G-G-61, G-G-62, G-G-59, G-G-58, G-G-57, G-G-56, G-G-55, Civil Site Works 12/1/21 12/5/21 Approved as noted
G-G-54, G-G-52&53, G-G-50&51, G-G-48&49, G-G-47 as highlighted

Zone K KAIG3-RFI-SW-C-2567 00 Inspection for Backfilling Sub-base under Boulder no. RB-277 (Stock Pile # 110 A-1-A) Civil Site Works 12/1/21 12/6/21 Approved as noted

Zone F KAIG3-RFI-SW-C-2568 00 Soil Preparation under Boulder No. RB- 240 after cutting Civil Site Works 12/1/21 12/5/21 Approved as noted
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-240 (Stock Pile #
Zone F KAIG3-RFI-SW-C-2569 00 Civil Site Works 12/1/21 12/7/21 Approved as noted
110 A-1-B)

Inspection and Compaction Test for 1st Layer (1 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2570 00 Civil Site Works 12/1/21 12/8/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 110 A-1-A)

Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for FW-A-3-7, FW-A-3-8, FW-
6B KAIG3-RFI-SW-C-2578 00 Civil Site Works 12/1/21 12/5/21 Approved as noted
A-3-9, FW-A-3-10, FW-A-3-12, FW-A-3-14 as Highlighted SP#11
Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for MH-K-6, MH-K-5, MH-K-4,
6B KAIG3-RFI-SW-C-2579 00 Civil Site Works 12/1/21 12/5/21 Approved as noted
MH-K-3, MH-K-2 as Highlighted SP#118

Inspection of Concrete Encasement for Storm Water Line Branches for Gullies G-E-08, G-E-09, G-E-10, G-
3B KAIG3-RFI-SW-C-2586 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
E-11, G-E-12, G-E-13, G-E-14, G-E-15 and Outfall E as highlighted

Zone F KAIG3-RFI-SW-C-2606 00 Inspection for Backfilling Sub-base under Boulder no. RB-240 (Stock Pile # 110 A-1-A) Civil Site Works 12/4/21 12/8/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2607 00 Soil Preparation under Boulder No. RB- 252 Civil Site Works 12/4/21 12/7/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2608 00 Inspection for Backfilling Sub-base under Boulder no. RB-252 (Stock Pile # 110 A-1-A) Civil Site Works 12/4/21 12/9/21 Approved as noted

Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K&L (Near Crusher) as
Zone K & L KAIG3-RFI-SW-C-2609 00 Civil Site Works 12/4/21 12/8/21 Approved as noted
highlighted (SP# 110 A-1-A)

3B KAIG3-RFI-SW-C-2610 00 Inspection of Concrete Encasement for Storm Water Line Branch for Gully G-E-02 as highlighted Civil Site Works 12/4/21 12/6/21 Approved as noted

Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/10
Zone B KAIG3-RFI-SW-C-2611 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
at Zone-B (As Highlighted)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at
Zone B KAIG3-RFI-SW-C-2612 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2613 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
Highlighted)
Inspection of water proofing for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2614 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
Highlighted)
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K(SA-16) - As
Zone K KAIG3-RFI-SW-C-2615 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
Highlighted
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K (SA-17) - As
Zone K KAIG3-RFI-SW-C-2616 00 Civil Site Works 12/4/21 12/6/21 Approved as noted
Highlighted

Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01, MH-G-01-1, MH-G-
3B KAIG3-RFI-SW-C-2617 00 Civil Site Works 12/5/21 12/6/21 Code C (resubmit)
01-2, MH-G-01-3, MH-G-01-4, MH-G-01-5 MH-G-01-7, MH-G-02, MH-G-03, MH-G-04 as highlighted

kaig-qcals 198
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01, MH-G-01-1, MH-G-
3B 3 KAIG3-RFI-SW-C-2617 01 Civil Site Works 2/14/22 2/15/22 Approved as noted
01-2, MH-G-01-3, MH-G-01-4, MH-G-01-5 MH-G-01-7, MH-G-02, MH-G-03, MH-G-04 as highlighted

INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-G-01-1, MH-G-01-
3B KAIG3-RFI-SW-C-2618 00 Civil Site Works 12/5/21 12/6/21 Code C (not resubmit)
2, MH-G-01-3, MH-G-01-4, MH-G-01-5 MH-G-01-7 (As Highlighted)
Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-E-01, MH-E-02, MH-E-04 - AS
3B KAIG3-RFI-SW-C-2624 00 Civil Site Works 12/5/21 12/9/21 Approved as noted
Highlighted SP#118
Zone G KAIG3-RFI-SW-C-2625 00 Soil Preparation under Boulder No. RB- 157 Civil Site Works 12/5/21 12/8/21 Approved as noted
Inspection of Formwork for Duct Bank of Telecommunications line from B/TL/42 to B/TL/36 at Zone-B - As
Zone B KAIG3-RFI-SW-C-2626 00 Civil Site Works 12/5/21 12/7/21 Approved as noted
Highlighted

"Casting Blinding Concret under Manhole MH-G-03-01, MH-G-03-02, MH-G-04, MH-G-05, MH-G-04 and
3A KAIG3-RFI-SW-C-2627 00 Gullies G-G-28, G-G-29, G-G-30, G-G-31, G-G-32, G-G-34, G-G-35, G-G-36, G-G-37, G-G-38, G-G-39, Civil Site Works 12/5/21 12/7/21 Approved as noted
G-G-40, G-G-41, G-G-42, G-G-43, G-G-44, G-G-45, G-G-46, G-G-72

Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K (Near Tower-3) as
Zone K KAIG3-RFI-SW-C-2628 00 Civil Site Works 12/5/21 12/9/21 Approved as noted
highlighted (SP#110 A-1-A)
Inspection And Compaction Test For Backfilling 6th Layer (6 of 14) For Foul Water Line From FW-A-3-6.7
5A KAIG3-RFI-SW-C-2629 00 Civil Site Works 12/5/21 12/7/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#110 A-1-A)

Surface Preparation prior to start Water Proofing for Concrete Encasement of Storm Water Line Branch for
3B KAIG3-RFI-SW-C-2630 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Gully G-E-02, G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13, G-E-14, G-E-15 as highlighted

Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2641 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Highlighted)
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/06 to G/MV/13 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2642 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Highlighted)
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line between B/TL/42 to B/TL/36 at
Zone B KAIG3-RFI-SW-C-2643 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Zone-B - As Highlighted
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between B/FS/21 to B/FS/36 at
Zone B KAIG3-RFI-SW-C-2644 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Zone-B - As Highlighted
Inspection of formwork for Duct Bank of Fire & Security line from B/FS/21 to B/FS/36 at Zone-B - As
Zone B KAIG3-RFI-SW-C-2645 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Highlighted
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between
Zone B KAIG3-RFI-SW-C-2646 00 Civil Site Works 12/6/21 12/12/21 Approved as noted
B/FS/21 to B/FS/37 at Zone-B (As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line between B/TL/421 to
Zone B KAIG3-RFI-SW-C-2647 00 Civil Site Works 12/6/21 12/12/21 Approved as noted
B/TL/37 at Zone-B (As Highlighted)
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2648 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2649 00 Civil Site Works 12/6/21 12/9/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at
Zone G KAIG3-RFI-SW-C-2650 00 Civil Site Works 12/6/21 12/12/21 Approved as noted
Zone-G (As Highlighted)
Inspection And Compaction Test For Backfilling 7th Layer (7 of 14) For Foul Water Line From FW-A-3-6.7
5A KAIG3-RFI-SW-C-2657 00 Civil Site Works 12/6/21 12/11/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#129 A-1-A)
Surface Preparation Prior to Start Backfilling Gravel For GULLIES G-F-1, G-F-2, G-F-3, G-F-4, G-F-5, G-F-
5A 3A KAIG3-RFI-SW-C-2658 00 6, G-F-7, G-F-8, G-F-9, G-F-10, G-F-11, G-F-12,G-F-13, G-F-14, G-F-15,G-F-16, G-F-17, G-F-18, G-F-19, Civil Site Works 12/6/21 12/12/21 Approved as noted
G-F-20, G-F-21, G-F-22, G-F-23, G-F-24, G-F-25,

Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-F-01, MH-F-01-1, MH-F-01-2, MH-
3A KAIG3-RFI-SW-C-2659 00 Civil Site Works 12/6/21 12/12/21 Approved as noted
F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 - AS Highlighted SP#118

3A KAIG3-RFI-SW-C-2660 00 Surface Preparation Prior to Start Backfilling Sub Grade For Main line F AS Highlighted Civil Site Works 12/6/21 12/11/21 Approved as noted

Inspection of Water Proofing for Concrete Encasement of Storm Water Line Branch for Gully G-E-02, G-E-
3B KAIG3-RFI-SW-C-2661 00 Civil Site Works 12/6/21 12/7/21 Approved as noted
08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13, G-E-14, G-E-15 as highlighted

Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-L (SA-15) - As
Zone L KAIG3-RFI-SW-C-2662 00 Civil Site Works 12/6/21 12/8/21 Approved as noted
Highlighted
Inspection for Rough Grading (backfilling) upto (-40cm) from the Final Grading Level at Zone-K (Near
Zone K KAIG3-RFI-SW-C-2663 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
Tower-3) as Highlighted
Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-03-1, MH-G-03-2, MH-G-
3B KAIG3-RFI-SW-C-2664 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
05 as highlighted

kaig-qcals 199
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-01, MH-G-02, MH-G-03,
3B KAIG3-RFI-SW-C-2665 00 Civil Site Works 12/7/21 12/9/21 Code C (not resubmit)
MH-G-03-1, MH-G-03-2 MH-G-04, MH-G-05 (As Highlighted)
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2666 00 Civil Site Works 12/7/21 12/9/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2667 00 Civil Site Works 12/7/21 12/9/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at
Zone G KAIG3-RFI-SW-C-2668 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
Zone-G (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2669 00 Civil Site Works 12/7/21 12/11/21 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2670 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
129 A-1-B)

Inspection and Compaction Test for 2nd Layer (2 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2671 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Surface Preparation prior to start Waterproofing for Blinding Concrete under Canopy Foundation of Seating
Zone K & L KAIG3-RFI-SW-C-2672 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
Area (1) Zone-K&L (SA-15, SA-16, SA-17 ) - As Highlighted

Surface Preparation Prior to Start Backfill Sub grade for Foul line between FW-A-3-6 TO FW-A-3-7 - AS
6B KAIG3-RFI-SW-C-2673 00 Civil Site Works 12/7/21 12/11/21 Approved as noted
Highlighted

4B KAIG3-RFI-SW-C-2674 00 Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 (As Highlighted) Civil Site Works 12/7/21 12/9/21 Approved as noted

Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K&L (Near RB-300) as
Zone K & L KAIG3-RFI-SW-C-2675 00 Civil Site Works 12/7/21 12/11/21 Approved as noted
highlighted
Excavation for Fire & Security Distribution Line between K/FS/23 to K/FS/09) including Pit K/FS/09 at
Zone K KAIG3-RFI-SW-C-2679 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
Zone-K as highlighted in the attached drawing
Excavation for Telecommunication Line between K/TL/09 to K/TL/15) including pit K/TL/10 at Zone-K as
Zone K KAIG3-RFI-SW-C-2680 00 Civil Site Works 12/7/21 12/12/21 Approved as noted
highlighted in the attached drawing
Zone G KAIG3-RFI-SW-C-2681 00 Soil Preparation under Boulder No. RB- 158 Civil Site Works 12/7/21 12/12/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2685 00 Inspection for Backfilling Sub-base under Boulder no. RB-158 (Stock Pile # 110 A-1-A) Civil Site Works 12/7/21 12/12/21 Approved as noted

Zone B KAIG3-RFI-SW-C-2686 00 Inspection and Compaction Test for NGL of Fire & Security Line at Zone - B (As Highlighted) Civil Site Works 12/7/21 12/11/21 Approved as noted

Zone B KAIG3-RFI-SW-C-2687 00 Inspection and Compaction Test for NGL of Telecommunication Line at Zone - B (As Highlighted) Civil Site Works 12/7/21 12/11/21 Approved as noted

Zone B KAIG3-RFI-SW-C-2688 00 Excavation for MV Line from B/MV/06 TO B/MV/12 at Zone-B as highlighted in the attached drawing Civil Site Works 12/8/21 12/12/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2689 00 Civil Site Works 12/8/21 12/13/21 Approved as noted
129 A-1-B)
Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall and
4B KAIG3-RFI-SW-C-2690 00 Civil Site Works 12/8/21 12/12/21 Approved as noted
Top Slab of SBC-06 (As Highlighted)
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2691 00 Civil Site Works 12/8/21 12/12/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2692 00 Civil Site Works 12/8/21 12/12/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at
Zone B KAIG3-RFI-SW-C-2693 00 Civil Site Works 12/8/21 12/14/21 Approved as noted
Zone-B (As Highlighted)
Inspection And Compaction Test For Backfilling 4th Layer (4 of 9) For Foul Water Line From FW-A-3-7 To
6B KAIG3-RFI-SW-C-2694 00 Civil Site Works 12/8/21 12/13/21 Approved as noted
FW-A-3-17 as Highlighted (SP#129 A-1-A)
Inspection And Compaction Test For Backfilling 4th Layer (4 of 9) For Storm Water Line From MH-K-07 To
6B KAIG3-RFI-SW-C-2695 00 Civil Site Works 12/8/21 12/13/21 Approved as noted
MH-K-01 as Highlighted (SP#129 A-1-A)

"Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6B KAIG3-RFI-SW-C-2696 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-13-1, FW-A-13-2, FW-A-13-3, Civil Site Works 12/8/21 12/14/21 Approved as noted
FW-A-13-4, FW-A-13-5, FW-A-13-6 (As High

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
3B KAIG3-RFI-SW-C-2697 00 Civil Site Works 12/8/21 12/12/21 Approved as noted
piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-E-04 (As Highlighted)

Inspection And Compaction Test For Backfilling Subgrade 1st Layer (1 of 6) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2703 00 Civil Site Works 12/9/21 12/13/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)

kaig-qcals 200
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
4C KAIG3-RFI-SW-C-2704 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-2, FW6-3) - As Highlighted Civil Site Works 12/9/21 12/11/21 Approved as noted
4A KAIG3-RFI-SW-C-2705 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW8) - As Highlighted Civil Site Works 12/9/21 12/11/21 Approved as noted
Inspection and Compaction Test for 4th Layer (4 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2706 00 Civil Site Works 12/9/21 12/14/21 Approved as noted
129 A-1-B)

Inspection and Compaction Test for 3rd Layer (3 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2707 00 Civil Site Works 12/9/21 12/13/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-

300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (250mmØ-UPVC Pipes class 4)
2H 2G KAIG3-RFI-SW-C-2708 00 Civil Site Works/Crescent 2 12/9/21 12/13/21 Approved as noted
from ( FW-A-13 to FW-A-13-5 ) at Crescnt 2 Zone 2H, 2G. As per highlighted Area in the attached Dwg.

Warning Tape Installation for Foul Water Line for (250mmØ-UPVC Pipes class 4) from ( FW-A-13 to FW-
2H 2G KAIG3-RFI-SW-C-2709 00 Civil Site Works/Crescent 2 12/9/21 12/13/21 Approved as noted
A-13-5 ) at Crescnt 2 Zone 2H, 2G. As per highlighted Area in the attached Dwg.

Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K&L (Near Crusher) as
Zone K & L KAIG3-RFI-SW-C-2718 00 Civil Site Works 12/9/21 12/14/21 Approved as noted
highlighted (SP# 129 A-1-B)

Inspection and Compaction Test for 4th Layer (4 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2719 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Zone G KAIG3-RFI-SW-C-2720 00 Inspection for Backfilling Sub-base under Boulder no. RB-157 (SP # 110 A-1-A) Civil Site Works 12/11/21 12/16/21 Approved as noted

Zone F KAIG3-RFI-SW-C-2721 00 Excavation for Potable Water Line at Zone-F - as highlighted Civil Site Works 12/11/21 12/14/21 Approved as noted

Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
2B KAIG3-RFI-SW-C-2722 00 Civil Site Works 12/11/21 12/12/21 Approved as noted
SBC-06 (As Highlighted)

Zone B KAIG3-RFI-SW-C-2723 00 Excavation for Potable Water Line Pit B/PW/04 at Zone-B - as highlighted Civil Site Works 12/11/21 12/14/21 Approved as noted

Inspection for Blinding Concrete under Potable Water Line Pit B/PW/04, B/PW/06, B/PW/07, B/PW/08,
Zone B C F KAIG3-RFI-SW-C-2724 00 Civil Site Works 12/11/21 12/13/21 Approved as noted
B/PW/012, F/PW/04, F/PW/07 at Zone-B, C, F - as highlighted

Zone F KAIG3-RFI-SW-C-2725 00 Excavation for Potable Water Line at Zone-F including Pit - F/PW/04 - as highlighted Civil Site Works 12/11/21 12/14/21 Approved as noted

Inspection And Compaction Test For Backfilling 8th Layer (8 of 14) For Foul Water Line From FW-A-3-6.7
5A KAIG3-RFI-SW-C-2726 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#129 A-1-B)

Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2727 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub Grade Above Gravel (5th Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2732 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
as Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer out of 8) around the Manhole for FW-A-3-6.6,
5A KAIG3-RFI-SW-C-2733 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
FW-A-3-6.7- as Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (4th Layer Out of 5) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2734 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#129 A-1-B
Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for FW-A-3-11, FW-A-3-13 as
5A KAIG3-RFI-SW-C-2738 00 Civil Site Works 12/11/21 12/14/21 Approved as noted
Highlighted SP#118
Inspection of Backfilling Sub-grade above gravel 1st Layer (1 out of 5) around the Manhole for FW-A-3-7,
5A KAIG3-RFI-SW-C-2739 00 FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11, FW-A-3-12, FW-A-3-13, FW-A-3-14 as Highlighted Civil Site Works 12/11/21 12/16/21 Approved as noted
SP#129 A-1-B
Inspection of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 5) around the Manhole for MH-K-6,
6B KAIG3-RFI-SW-C-2740 00 Civil Site Works 12/11/21 12/16/21 Approved as noted
MH-K-5, MH-K-4, MH-K-3, MH-K-2 as Highlighted SP#129 A-1-B
Inspection of Backfilling Gravel 1st Layer (1 out of 2) around the Manhole for MH-E-01, MH-E-02, MH-E-
3B KAIG3-RFI-SW-C-2741 00 Civil Site Works 12/11/21 12/15/21 Approved as noted
04 as Highlighted SP#118
"NSPECTION FOR INSTALLATION OF GULLIES G-G-54, G-G-55, G-G-56, G-G-57, G-G-58, G-G-59,
3B KAIG3-RFI-SW-C-2742 00 G-G-60, G-G-61, G-G-62, G-G-63, G-G-64, G-G-65, G-G-66, G-G-67, G-G-68, G-G-69, G-G-70, G-G-71 as Civil Site Works 12/11/21 12/13/21 Approved as noted
highlighted
300 mm Gravel 3/8" Backfilling and Geotextile for Strom Water Line OUTFAL G for (315mmØ-UPVC
4 KAIG3-RFI-SW-C-2743 00 Pipes class 4) from ( Catch Basin Pipes Connection G-G-68, 69, 65, 62, 63, 64, 60, 61, 59, 58, 57, 56, 55, 54, Civil Site Works 12/12/21 12/13/21 Approved as noted
50, 51, 52, 53, 47, 48, 49) As per highlighted ArEA
Pipe Installation for Storm Water Line OUTFALL-G for ((315mmØ-UPVC Pipes class 4) from ( Catch
4B KAIG3-RFI-SW-C-2744 00 Basin Pipes Connection G-G-68, 69, 65, 62, 63, 64, 60, 61, 59, 58, 57, 56, 55, 54, 50, 51, 52, 53, 47, 48, Civil Site Works 12/12/21 12/16/21 Approved as noted
49)As per highlighted Area in the attached Dwg.
Fire Fighting Networks sand cover & pipes protection (30 cm above pipes). As per highlighted Area in the
4C 4D 5A KAIG3-RFI-SW-C-2745 00 Civil Site Works 12/13/21 12/15/21 Approved as noted
attached Dwg.
'Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
4C 4D 5A KAIG3-RFI-SW-C-2746 00 Civil Site Works 12/12/21 12/18/21 Approved as noted
Area in the attached Dwg.

kaig-qcals 201
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection And Compaction Test For Backfilling 5th Layer (5 of 9) For Foul Water Line From FW-A-3-7 To
6B KAIG3-RFI-SW-C-2747 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
FW-A-3-17 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test For Backfilling 5th Layer (5 of 9) For Storm Water Line From MH-K-07 To
6B KAIG3-RFI-SW-C-2748 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
MH-K-01 as Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub Grade Above Gravel (6th Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2749 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
as Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (5th Layer Out of 5) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2750 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (4th Layer out of 8) around the Manhole for FW-A-3-6.6,
5A KAIG3-RFI-SW-C-2751 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
FW-A-3-6.7- as Highlighted SP#129 A-1-B
Inspection And Compaction Test For Backfilling 9th Layer (9 of 14) For Foul Water Line From FW-A-3-6.7
5A KAIG3-RFI-SW-C-2752 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
To FW-A-3-6.4 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2753 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test For Backfilling Subgrade 2nd Layer (2 of 6) For Foul Water Line From
6B KAIG3-RFI-SW-C-2754 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
FW-A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level at Zone - K&L (Near
Zone K & L KAIG3-RFI-SW-C-2755 00 Civil Site Works 12/12/21 12/18/21 Approved as noted
Crusher) as highlighted
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line between K/FS/23 to K/FS/09 at
Zone K KAIG3-RFI-SW-C-2756 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
Zone-K as highlighted in the attached drawing
Inspection of Sand Bedding under pipe for Telecommunication Line between K/TL/09 to K/TL/15 at Zone-K
Zone K KAIG3-RFI-SW-C-2757 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
as highlighted in the attached drawing
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2758 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2759 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at
Zone B KAIG3-RFI-SW-C-2760 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
Zone-B (As Highlighted)

Excavation for MV Line from F/MV/01 TO B/MV/11 including Pit - F/MV/01, F/MV/09, F/MV/06,
Zone F KAIG3-RFI-SW-C-2761 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
F/MV/02, F/MV/03, F/MV/11 at Zone-F as highlighted in the attached drawin

Inspection and Compaction Test for 5th Layer (5 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2762 00 Civil Site Works 12/12/21 12/15/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

4B KAIG3-RFI-SW-C-2763 00 Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted Civil Site Works 12/12/21 12/14/21 Approved as noted

4B KAIG3-RFI-SW-C-2764 00 Soil Preparation prior to start backfill around SBC-06 - as highlighted Civil Site Works 12/12/21 12/14/21 Approved as noted

Excavation for Foul Water Line from FW-A-09 to FW-A-06 including Manhole FW-A-09, FW-A-08, FW-A-
6A KAIG3-RFI-SW-C-2765 00 Civil Site Works 12/12/21 12/16/21 Approved as noted
07, FW-A-06 prior to start Gravel Bedding (as Highlighted)
Excavation for Storm Water Line from MH-M-09 to MH-M-04 including Manhole MH-M-09, MH-M-08,
6A KAIG3-RFI-SW-C-2770 00 Civil Site Works 12/12/21 12/16/21 Code C (resubmit)
MH-M-07, MH-M-06, MH-M-05, MH-M-04 - As highlighted
Excavation for Storm Water Line from MH-M-09 to MH-M-04 including Manhole MH-M-09, MH-M-08,
6A KAIG3-RFI-SW-C-2770 01 Civil Site Works 8/25/22 Open
MH-M-07, MH-M-06, MH-M-05, MH-M-04 - As highlighted
Surface Preperation prior to start backfilling gravel around the Duct Bank of MV Line from B/MV/19 to
Zone B KAIG3-RFI-SW-C-2771 00 Civil Site Works 12/13/21 12/16/21 Approved as noted
B/MV/06 at Zone-B (As Highlighted)
Inspection for Backfilling Subgrade behind the 2nd lift of Rock for Boulder no. RB-157 (under 2nd layer of
Zone G KAIG3-RFI-SW-C-2772 00 Civil Site Works 12/13/21 12/19/21 Approved as noted
rock) - SP# 129 A-1-B
Inspection for Backfilling Subbase behind the 2nd lift of Rock for Boulder no. RB-157 (under 2nd layer of
Zone G KAIG3-RFI-SW-C-2773 00 Civil Site Works 12/13/21 12/19/21 Approved as noted
rock) SP# 110 A-1-A
Surface Preparation Prior to Start Backfill Gravel for Manhole from FW-A-25, FW-A-24, FW-A-23, FW-A-
5A KAIG3-RFI-SW-C-2774 00 Civil Site Works 12/13/21 12/15/21 Approved as noted
22,-FW-A-21, FW-A-19 - as Highlighted

Zone B KAIG3-RFI-SW-C-2775 00 Excavation for Potable Water Line Pit B/PW/11 at Zone-B - as highlighted Civil Site Works 12/13/21 12/19/21 Approved as noted

Inspection And Compaction Test For Backfilling Subgrade 3rd Layer (3 of 6) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2776 00 Civil Site Works 12/13/21 12/18/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)
Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-K & L
Zone K & L KAIG3-RFI-SW-C-2779 00 Civil Site Works 12/13/21 12/15/21 Approved as noted
(SA-15, SA-16, SA-17 ) - As Highlighted

4B KAIG3-RFI-SW-C-2780 00 Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 (As Highlighted) Civil Site Works 12/13/21 12/16/21 Approved as noted

kaig-qcals 202
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall and
4B KAIG3-RFI-SW-C-2781 00 Civil Site Works 12/13/21 12/16/21 Approved as noted
Top Slab of SBC-06 (As Highlighted)

4C KAIG3-RFI-SW-C-2782 00 Soil Preperation Prior to Start Backfill Gravel around Manhole - MH-A-01 - as Highlighted Civil Site Works 12/13/21 12/15/21 Approved as noted

Excavation for Fire & Security Distribution Line from G/FS/26 to K/FS/12, including Pit G/FS/26, G/FS/46,
Zone G & K KAIG3-RFI-SW-C-2783 00 Civil Site Works 12/14/21 12/18/21 Approved as noted
G/FS/20, K/FS/25, K/FS/26, K/FS/12 at Zone-G & K as highlighted in the attached drawing

Excavation for Telecommunication Line between G/TL/27 to K/TL/06) including pit G/TL/27, G/TL/39,
Zone G & K KAIG3-RFI-SW-C-2784 00 Civil Site Works 12/14/21 12/18/21 Approved as noted
G/TL/45, G/TL/17, K/TL/27, K/TL/28, K/TL/06 at Zone-G & K as highlighted in the attached drawing

Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - F (Near RB-244) as
Zone F KAIG3-RFI-SW-C-2785 00 Civil Site Works 12/14/21 12/20/21 Approved as noted
highlighted

4B KAIG3-RFI-SW-C-2786 00 Inspection and Compaction Test for 1st Layer (1 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B) Civil Site Works 12/14/21 12/18/21 Approved as noted

4B KAIG3-RFI-SW-C-2787 00 Inspection and Compaction Test for 2nd Layer (2 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B) Civil Site Works 12/14/21 12/19/21 Approved as noted

Pipe Installation for Storm Water Line OUTFALL-G for (450mmØ-UPVC Pipes class 4) from ( MH-G-03-
4 KAIG3-RFI-SW-C-2789 00 Civil Site Works 12/13/21 12/16/21 Approved as noted
01 & MH-G-03-02.)As per highlighted Area in the attached Dwg.

300 mm Gravel 3/8" Bedding and Geotextile for Strom Water Line OUTFAL G for (450mmØ-UPVC Pipes
4 KAIG3-RFI-SW-C-2790 00 Civil Site Works 12/13/21 12/16/21 Approved as noted
class 4) from ( MH-G-03-01 & MH-G-03-02.)As per highlighted Area in the attached Dwg.

Inspection And Compaction Test For Backfilling Gravel 1st Layer (1 of 9) Around Manhole MH-K-07 as
6B KAIG3-RFI-SW-C-2795 00 Civil Site Works 12/14/21 cancelled
Highlighted (SP#118)
Zone G KAIG3-RFI-SW-C-2796 00 Soil Preparation under Boulder No. RB- 269 Civil Site Works 12/14/21 12/18/21 Approved as noted

Inspection and Compaction Test for 6th Layer (6 of 6) Backfilling for the existing trench from stage 2
Zone G KAIG3-RFI-SW-C-2797 00 Civil Site Works 12/14/21 12/19/21 Approved as noted
excavation at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2798 00 Civil Site Works 12/14/21 12/16/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2799 00 Civil Site Works 12/14/21 12/16/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at
Zone B KAIG3-RFI-SW-C-2800 00 Civil Site Works 12/14/21 12/18/21 Approved as noted
Zone-B (As Highlighted)

Inspection for Rough Grading (Backfilling) upto (-40cm) from the Final Grading Level at Zone -G, for the
Zone G KAIG3-RFI-SW-C-2801 00 Civil Site Works 12/14/21 12/19/21 Approved as noted
existing trench from stage 2 excavation - as highlighted in the attached drawing

Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7, FW-A-3-8, FW-A-3-9 (as
6B KAIG3-RFI-SW-C-2802 00 Civil Site Works 12/14/21 12/16/21 Approved as noted
Highlighted
Inspection of Steel Reinforcement for the Duct Bank of MV Line between B/MV/12 to G/MV/08 at Zone-B
Zone B KAIG3-RFI-SW-C-2803 00 Civil Site Works 12/14/21 12/16/21 Approved as noted
(As Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from B/MV/12 to near G/MV/08 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2804 00 Civil Site Works 12/14/21 12/16/21 Approved as noted
Highlighted)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line between B/MV/12 to G/MV/08 at
Zone B KAIG3-RFI-SW-C-2805 00 Civil Site Works 12/14/21 12/18/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line between B/MV/12 to G/MV/08 at
Zone B KAIG3-RFI-SW-C-2806 00 Civil Site Works 12/14/21 12/18/21 Approved as noted
Zone-B (As Highlighted)

INSPECTION FOR INSTALLATION OF GULLIES G-G-37, G-G-40, G-G-42, G-G-44, G-G-45, G-G-47,
3B KAIG3-RFI-SW-C-2811 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
G-G-48, G-G-49, G-G-50, G-G-51, G-G-52, G-G-53, G-G-72 as highlighted

Inspection of Backfilling Gravel 1st Layer (1 out of 2) around the Manhole for MH-A-01 - as Highlighted
4C KAIG3-RFI-SW-C-2812 00 Civil Site Works 12/15/21 12/19/21 Approved as noted
(SP# 118)
Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-25, FW-A-24, FW-A-
5A KAIG3-RFI-SW-C-2813 00 Civil Site Works 12/15/21 12/20/21 Approved as noted
23, FW-A-22, FW-A-21 & FW-A-19 - as Highlighted (SP# 118)

5A KAIG3-RFI-SW-C-2814 00 Soil Preparation Prior to Start Backfill Gravel for Manhole from FW-A-18 - as Highlighted Civil Site Works 12/15/21 12/18/21 Approved as noted

4C KAIG3-RFI-SW-C-2815 00 Soil Preperation Prior to Start Backfill Gravel around Manhole - MH-A-02, MH-A-10 - as Highlighted Civil Site Works 12/15/21 12/20/21 Approved as noted

Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/13 to G/MV/22
Zone B & G KAIG3-RFI-SW-C-2816 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
at Zone-B & G (As Highlighted)

kaig-qcals 203
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/22 to G/MV/06
Zone G KAIG3-RFI-SW-C-2817 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
at Zone- G (As Highlighted)
Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-A-01 - as Highlighted
4C KAIG3-RFI-SW-C-2818 00 Civil Site Works 12/15/21 12/19/21 Approved as noted
(SP# 118)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-269 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2819 00 Civil Site Works 12/15/21 12/20/21 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-269 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2820 00 Civil Site Works 12/15/21 12/20/21 Approved as noted
129 A-1-B)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
4B KAIG3-RFI-SW-C-2821 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
SBC-06 (As Highlighted)

4B KAIG3-RFI-SW-C-2822 00 Inspection and Compaction Test for 3rd Layer (3 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B) Civil Site Works 12/15/21 12/20/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2823 00 Soil Preparation under Boulder No. RB- 266C Civil Site Works 12/15/21 12/19/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2824 00 Inspection for Backfilling Sub-base under Boulder no. RB-266C (Stock Pile # 110 A-1-A) Civil Site Works 12/15/21 12/19/21 Approved as noted

4B KAIG3-RFI-SW-C-2825 00 Soil Preparation prior to start backfill around SBC-06 - as highlighted Civil Site Works 12/15/21 12/21/21 Approved as noted

Inspection And Compaction Test For Backfilling Subgrade 6th Layer (6 of 6) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2826 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade above gravel 2nd Layer (2 out of 5) around the Manhole for FW-A-3-7,
5A KAIG3-RFI-SW-C-2827 00 FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11, FW-A-3-12, FW-A-3-13, FW-A-3-14 as Highlighted Civil Site Works 12/15/21 12/19/21 Approved as noted
SP#129 A-1-

Inspection of Backfilling Sub-grade Above Gravel 2nd Layer (2 out of 5) around the Manhole for MH-K-6,
6B KAIG3-RFI-SW-C-2828 00 Civil Site Works 12/15/21 12/19/21 Approved as noted
MH-K-5, MH-K-4, MH-K-3, MH-K-2 as Highlighted SP#129 A-1-B

Inspection And Compaction Test For Backfilling 6th Layer (6 of 9) For Foul Water Line From FW-A-3-7 To
6B KAIG3-RFI-SW-C-2829 00 Civil Site Works 12/15/21 12/19/21 Approved as noted
FW-A-3-17 as Highlighted (SP#129 A-1-B)

Inspection And Compaction Test For Backfilling 6th Layer (6 of 9) For Storm Water Line From MH-K-07 To
6B KAIG3-RFI-SW-C-2830 00 Civil Site Works 12/15/21 12/19/21 Approved as noted
MH-K-01 as Highlighted (SP#129 A-1-B)

Inspection And Compaction Test For Backfilling Subgrade 4th Layer (4 of 6) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2831 00 Civil Site Works 12/15/21 12/20/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)

Inspection of Formwork for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-G (As
Zone G KAIG3-RFI-SW-C-2834 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
Highlighted)

Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-G
Zone G KAIG3-RFI-SW-C-2835 00 Civil Site Works 12/15/21 12/18/21 Approved as noted
(As Highlighted)

Inspection of Steel Reinforcement for the Duct Bank of MV Line between G/MV/06 to G/MV/17 at Zone-G
Zone G KAIG3-RFI-SW-C-2836 00 Civil Site Works 12/16/21 12/19/21 Approved as noted
(As Highlighted)

Inspection of Formwork for the Duct Bank of MV Line from G/MV/06 to near G/MV/17 at Zone-G (As
Zone B KAIG3-RFI-SW-C-2837 00 Civil Site Works 12/16/21 12/19/21 Approved as noted
Highlighted)

Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line between G/MV/06 to G/MV/17 at
Zone G KAIG3-RFI-SW-C-2838 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
Zone-G (As Highlighted)

4B KAIG3-RFI-SW-C-2839 00 Inspection and Compaction Test for 4th Layer (4 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B) Civil Site Works 12/16/21 12/22/21 Approved as noted

4B KAIG3-RFI-SW-C-2840 00 Inspection and Compaction Test for 1st Layer (1 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B) Civil Site Works 12/16/21 12/22/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Boulder No. RB-269 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2841 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
129 A-1-B)

Zone G KAIG3-RFI-SW-C-2842 00 Inspection for Backfilling Sub-base under Boulder no. RB-269 (Stock Pile # 110 A-1-A) Civil Site Works 12/18/21 12/22/21 Approved as noted

Excavation for Fire & Security Distribution Line from B/FS/15 to B/FS/17, including Pit B/FS/17 at Zone-B
Zone B KAIG3-RFI-SW-C-2843 00 Civil Site Works 12/18/21 12/21/21 Code C (not resubmit)
as highlighted in the attached drawing
kaig-qcals 204
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Sub Grade Above Gravel (6th Layer Out of 6) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2848 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#129 A-1-B

Inspection of Backfilling Sub Grade Above Gravel (7th Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2849 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
as Highlighted SP#129 A-1-B

Inspection of Backfilling Sub Grade Above Gravel (5th Layer out of 8) around the Manhole for FW-A-3-6.6,
5A KAIG3-RFI-SW-C-2850 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
FW-A-3-6.7- as Highlighted SP#129 A-1-B

Inspection And Compaction Test For Backfilling 6th Layer (6 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2851 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#129 A-1-B)

Inspection And Compaction Test For Backfilling 10th Layer (10 of 14) For Foul Water Line From FW-A-3-
5A KAIG3-RFI-SW-C-2852 00 Civil Site Works 12/16/21 12/22/21 Approved as noted
6.7 To FW-A-3-6.4 as Highlighted (SP#129 A-1-B)
Excavation for Telecommunication Line between B/TL/12 to B/TL/15, including pit B/TL/15 at Zone-B as
Zone B KAIG3-RFI-SW-C-2873 00 Civil Site Works 12/18/21 12/21/21 Code C (not resubmit)
highlighted in the attached drawing
Inspection and Compaction Test for 5th Layer (5 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2874 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
(1st Part)
Inspection and Compaction Test for 2nd Layer (2 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2875 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
(2nd Part)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6B KAIG3-RFI-SW-C-2876 00 Civil Site Works 12/18/21 12/20/21 Approved as noted
piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-13-7 (As Highlighted)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6B KAIG3-RFI-SW-C-2877 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-L-03, MH-L-04 (As Highlighted) Civil Site Works 12/18/21 12/20/21 Approved as noted

3B KAIG3-RFI-SW-C-2878 00 Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01-6 as highlighted Civil Site Works 12/18/21 12/22/21 Approved as noted

3B KAIG3-RFI-SW-C-2879 00 INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-01-6 (As Highlighted) Civil Site Works 12/18/21 12/20/21 Approved as noted

3B KAIG3-RFI-SW-C-2880 00 Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-06 as highlighted Civil Site Works 12/18/21 12/22/21 Approved as noted

Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-25, FW-A-24, FW-A-
5A KAIG3-RFI-SW-C-2881 00 Civil Site Works 12/18/21 12/20/21 Approved as noted
23, FW-A-22, FW-A-21 & FW-A-19 - as Highlighted (SP# 118)
Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-18 - as Highlighted
5A KAIG3-RFI-SW-C-2882 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
(SP# 118)
Inspection and Compaction Test for 6th Layer (6 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2883 00 Civil Site Works 12/18/21 12/23/21 Approved as noted
(1st Part)

3B KAIG3-RFI-SW-C-2884 00 INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-06 (As Highlighted) Civil Site Works 12/18/21 12/20/21 Approved as noted

Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-E-01, MH-E-02, MH-E-
3B KAIG3-RFI-SW-C-2885 00 Civil Site Works 12/18/21 12/20/21 Approved as noted
04 as Highlighted SP#118
Inspection of Backfilling Gravel 1st Layer ( 1 out of 2) For GULLIES - G-F-1, G-F-2, G-F-3, G-F-4, G-F-5,
5A 3A KAIG3-RFI-SW-C-2886 00 G-F-6, G-F-7, G-F-8, G-F-9, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14, G-F-15, G-F-16, G-F-17, G-F-18, Civil Site Works 12/18/21 12/20/21 Approved as noted
G-F-19, G-F-20, G-F-21, G-F-22, G-F-23, G-F-24,
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - C & H (Near Crescent) as
Zone C & H KAIG3-RFI-SW-C-2887 00 Civil Site Works 12/18/21 12/21/21 Code C (resubmit)
highlighted
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - C & H (Near Crescent) as
Zone C & H KAIG3-RFI-SW-C-2887 01 Civil Site Works 5/23/22 5/25/22 Approved as noted
highlighted
Inspection and Compaction Test for 3rd Layer (3 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2889 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
(2nd Part)
Inspection and Compaction Test for 7th Layer (7 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2890 00 Civil Site Works 12/20/21 12/23/21 Approved as noted
(1st Part)
Inspection And Compaction Test For Backfilling Subgrade 5th Layer (5 of 6) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2891 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 4) around the Manhole for MH-K-7 as
6B KAIG3-RFI-SW-C-2892 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
Highlighted SP#129 A-1-B
INSPECTION FOR INSTALLATION OF GULLIES G-G-38, G-G-39, G-G-41, G-G-43, G-G-46 as
3B KAIG3-RFI-SW-C-2893 00 Civil Site Works 12/18/21 12/26/21 Approved as noted
highlighted
Inspection of Backfilling Sub-grade above gravel 3rd Layer (3 out of 5) around the Manhole for FW-A-3-7 as
5A KAIG3-RFI-SW-C-2894 00 Civil Site Works 12/18/21 12/22/21 Approved as noted
Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (7th Layer Out of 7) Around The Manhole for FW-A-3-
5A KAIG3-RFI-SW-C-2904 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#129 A-1-B
Inspection of Backfilling Sub Grade Above Gravel (8th Layer out of 8) around the Manhole for FW-A-3-6.4 -
5A KAIG3-RFI-SW-C-2905 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
as Highlighted SP#129 A-1-B

kaig-qcals 205
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Sub Grade Above Gravel (6th Layer out of 8) around the Manhole for FW-A-3-6.6 -
5A KAIG3-RFI-SW-C-2906 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
as Highlighted SP#129 A-1-B
Inspection And Compaction Test For Backfilling 7th Layer (7 of 14) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2907 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test For Backfilling 11th Layer (11 of 14) For Foul Water Line From FW-A-3-
5A KAIG3-RFI-SW-C-2908 00 Civil Site Works 12/19/21 12/23/21 Approved as noted
6.6 To FW-A-3-6.4 as Highlighted (SP#129 A-1-B)
INSPECTION FOR INSTALLATION OF GULLIES FOR - G-E-05, G-E-06, G-E-16 G-E-17 (As
3B KAIG3-RFI-SW-C-2909 00 Civil Site Works 12/19/21 12/22/21 Approved as noted
Highlighted)
Inspection And Compaction Test For Backfilling Gravel 1st Layer (1 of 2) Around Manhole MH-F-01-1,
3A KAIG3-RFI-SW-C-2914 00 Civil Site Works 12/19/21 12/22/21 Approved as noted
MH-F-01-2, MH-F-01-3, MH-F-01-4 as Highlighted (SP#118)

Zone G KAIG3-RFI-SW-C-2915 00 Excavation for Potable Water Line at Zone-G including Pit - G/PW/02 - as highlighted Civil Site Works 12/19/21 12/22/21 Approved as noted

Zone G & K KAIG3-RFI-SW-C-2916 00 Excavation for Potable Water Line at Zone-G&K including Pit - K/PW/01 - as highlighted Civil Site Works 12/19/21 12/22/21 Approved as noted

Inspection for backfilling gravel 1st Layer (1 of 1) around the Duct Bank of MV Line from B/MV/19 to
Zone B KAIG3-RFI-SW-C-2917 00 Civil Site Works 12/19/21 12/22/21 Approved as noted
B/MV/06 at Zone-B (As Highlighted) SP#118
Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-18 - as Highlighted
5A KAIG3-RFI-SW-C-2918 00 Civil Site Works 12/19/21 12/22/21 Approved as noted
(SP# 118)
Excavation for MV Line from F/MV/04 TO F/MV/05 at Zone-F including Pit F/MV/04, F/MV/11, F/MV/06,
Zone F KAIG3-RFI-SW-C-2919 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
F/MV/05 as highlighted in the attached drawing
Isnspection of Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2920 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
Highlighted)
Inspection for Installation Of Isolation Potable Water Line Pit B/PW/04, B/PW/06, B/PW/07, B/PW/08 - as
Zone B KAIG3-RFI-SW-C-2928 00 Civil Site Works 12/19/21 12/22/21 Approved as noted
highlighted
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at Zone-B (As
Zone B KAIG3-RFI-SW-C-2929 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
Highlighted)
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B & G (As
Zone B & G KAIG3-RFI-SW-C-2930 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
Highlighted)
Inspection of Water Proofing for the Duct Bank of MV Line from G/MV/22 to G/MV/06 at Zone- G (As
Zone G KAIG3-RFI-SW-C-2931 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
Highlighted)
Inspection and Compaction Test for 4th Layer (4 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2932 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
(2nd Part)
Inspection of Backfilling subgrade above Gravel 1st Layer (1 out of 4) around the Manhole for FW-A-25,
5A KAIG3-RFI-SW-C-2934 00 Civil Site Works 12/20/21 12/22/21 Approved as noted
FW-A-24, FW-A-23, FW-A-22, FW-A-21 & FW-A-19 - as Highlighted (SP# 129 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - C&H (Near Crescent)
Zone C & H KAIG3-RFI-SW-C-2935 00 Civil Site Works 12/20/21 12/26/21 Code C (resubmit)
as highlighted (SP# 129 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - C&H (Near Crescent)
Zone C & H KAIG3-RFI-SW-C-2935 01 Civil Site Works 5/23/22 5/25/22 Approved as noted
as highlighted (SP# 129 A-1-B)
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ - UPVC- Class 4) from Site Works beside Energy
5A KAIG3-RFI-SW-C-2939 00 Civil 12/20/21 12/22/21 Approved as noted
(FW-A-20 to Pump Station). At Beside Energy Center-02. As per highlighted Area in the attached Dwg. Center 2
Pipe Installation of Foul Water Line for (160mmØ - UPVC- Class 4) from (FW-A-20 to Pump Station). At Site Works beside Energy
5A KAIG3-RFI-SW-C-2940 00 Civil 12/20/21 12/22/21 Approved as noted
Beside Energy Center-02. As per highlighted Area in the attached Dwg. Center 2
Site Works near Aviary
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall X & Outfull-B for (450mmØ-
4C KAIG3-RFI-SW-C-2941 00 Civil Garden & Management & 12/20/21 12/22/21 Code C (not resubmit)
UPVC- Class 4) of Pipe Connection to the Culvert. At highlighted Area in the attached Dwg.
Maintenance Building
Site Works near Aviary
Warning Tape Installation for Storm Water Line- Outfall X & Outfull-B for (450mmØ-UPVC- Class 4) of
4C KAIG3-RFI-SW-C-2942 00 Civil Garden & Management & 12/20/21 12/22/21 Approved as noted
Pipe Connection to the Culvert. At highlighted Area in the attached Dwg.
Maintenance Building
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) from
6A KAIG3-RFI-SW-C-2943 00 (FW-A-06 to FW-A-09). At CRECENT-02 ZONE- ZONE- 2B, 2C & 2D. As per highlighted Area in the Civil Site Work/Crescent 02 12/20/21 12/22/21 Approved as noted
attached Dwg.
Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-06 to FW-A-09). At
6A KAIG3-RFI-SW-C-2944 00 Civil Site Work/Crescent 02 12/20/21 12/23/21 Approved as noted
CRECENT-02 ZONE- ZONE- 2B, 2C & 2D. As per highlighted Area in the attached Dwg.
Excavation for MV Line from K/MV/02 TO K/MV/04 at Zone-K & L including Pit K/MV/02, L/MV08,
Zone K & L KAIG3-RFI-SW-C-2945 00 Civil Site Works 12/20/21 12/23/21 Approved as noted
K/MV/04, F/MV/05 as highlighted in the attached drawing

Zone G KAIG3-RFI-SW-C-2946 00 Soil Preparation under Boulder No. RB- 271 Civil Site Works 12/20/21 12/23/21 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-271 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2947 00 Civil Site Works 12/20/21 12/25/21 Approved as noted
129 A-1-B)
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/05, F/PW/06, F/PW/09, F/PW/10,
Zone F KAIG3-RFI-SW-C-2948 00 Civil Site Works 12/20/21 12/23/21 Approved as noted
F/PW/11, F/PW/12 at Zone-F - as highlighted

6A KAIG3-RFI-SW-C-2949 00 Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (as Highlighted) Civil Site Works 12/20/21 12/23/21 Code C (resubmit)

6A 6 KAIG3-RFI-SW-C-2949 01 Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (as Highlighted) Civil Site Works 1/19/22 1/20/22 Approved as noted

kaig-qcals 206
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

6A KAIG3-RFI-SW-C-2950 00 Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (as Highlighted) Civil Site Works 12/20/21 1/3/22 Approved as noted

6A KAIG3-RFI-SW-C-2955 00 Excavation for Foul Water Line Branch from FW-A-13-6 prior to start Gravel Bedding (as Highlighted) Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2956 00 Excavation for Potable Water Line branch at Zone-K including Pit - K/PW/05 - as highlighted Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone B KAIG3-RFI-SW-C-2957 00 Excavation for Potable Water Line branch at Zone-B including Pit - B/PW/04 - as highlighted Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone F KAIG3-RFI-SW-C-2958 00 Excavation for Potable Water Line branch at Zone-F including Pit - F/PW/10, F/PW/11 - as highlighted Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone K KAIG3-RFI-SW-C-2959 00 Soil Preparation under Boulder No. RB- 273 Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2960 00 Soil Preparation under Boulder No. RB- 152 Civil Site Works 12/20/21 12/23/21 Approved as noted

Zone G KAIG3-RFI-SW-C-2961 00 Inspection for Backfilling Sub-base under Boulder no. RB-152 (Stock Pile # 110 A-1-A) Civil Site Works 12/20/21 12/23/21 Approved as noted

Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/34 to G/MV/09 at Zone-G
Zone G KAIG3-RFI-SW-C-2962 00 Civil Site Works 12/20/21 12/26/21 Approved as noted
(As Highlighted)
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/10 to G/MV/31 at Zone-G
Zone G KAIG3-RFI-SW-C-2963 00 Civil Site Works 12/20/21 12/26/21 Approved as noted
(As Highlighted)
Inspection and Compaction Test for 5th Layer (5 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2964 00 Civil Site Works 12/21/21 12/25/21 Approved as noted
(2nd Part)
Inspection and Compaction Test for 5th Layer (5 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B)
4B KAIG3-RFI-SW-C-2965 00 Civil Site Works 12/21/21 12/25/21 Approved as noted
(2nd Part)
Inspection And Compaction Test For Backfilling Subgrade 7th Layer (7 of 7) For Foul Water Line From FW-
6B KAIG3-RFI-SW-C-2969 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
A-3-7 To FW-A-3-6 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel (8th Layer Out of 8) Around The
5A KAIG3-RFI-SW-C-2970 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
Manhole for FW-A-3-6.5, FW-A-3-6.3, FW-A-3-6.2 - as Highlighted SP#129 A-1-
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel (9th Layer out of 9) around the
5A KAIG3-RFI-SW-C-2971 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
Manhole for FW-A-3-6.4 - as Highlighted SP#129 A-1-B
Inspection And Compaction Test For Backfilling 8th Layer (8 of 8) For Foul Water Line From FW-A-3-6.4
5A KAIG3-RFI-SW-C-2972 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
To FW-A-3-6.2 as Highlighted (SP#129 A-1-B)
Inspection And Compaction Test For Backfilling 12th Layer (12 of 12) For Foul Water Line From FW-A-3-
5A KAIG3-RFI-SW-C-2973 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
6.6 To FW-A-3-6.4 as Highlighted (SP#129 A-1-B)

3B KAIG3-RFI-SW-C-2974 00 INSPECTION OF INSTALLATION OF SLAB FOR MH-G-05 (AS ATTACHED) Civil Site Works 12/21/21 12/29/21 Approved as noted
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
3B KAIG3-RFI-SW-C-2975 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-G-01-7, MH-G-01-6, MH-G-01-5, Civil Site Works 12/21/21 12/28/21 Approved as noted
MH-G-01-4, MH-G-01-3, MH-G-01-2, MH-G-0
Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone - C&H (Near Crescent)
Zone C & H KAIG3-RFI-SW-C-2976 00 Civil Site Works 12/22/21 12/25/21 Approved as noted
as highlighted (SP# 129 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-273 (Stock Pile #
Zone K KAIG3-RFI-SW-C-2978 00 Civil Site Works 12/21/21 12/25/21 Approved as noted
129 A-1-B)
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from G/MV/22 to G/MV/06 at
Zone G KAIG3-RFI-SW-C-2979 00 Civil Site Works 12/21/21 12/25/21 Approved as noted
Zone- G (As Highlighted)
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at
Zone B & G KAIG3-RFI-SW-C-2981 00 Civil Site Works 12/21/21 12/25/21 Approved as noted
Zone-B & G (As Highlighted)
Surface Preparation prior to start Water Proofing for the Duct Bank of Fire & Security Distribution Line from
Zone B KAIG3-RFI-SW-C-2982 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
B/FS/21 to B/FS/36 at Zone-B (As Highlighted)
Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from
Zone B KAIG3-RFI-SW-C-2983 00 Civil Site Works 12/21/21 12/23/21 Approved as noted
B/TL/42 to B/TL/36 at Zone-B (As Highlighted

2B KAIG3-RFI-SW-C-2984 00 Inspection of Steel Reinforcement for the Slab of Transition Area - SBC-01 (As Highlighted) Civil Site Works 12/22/21 12/28/21 Approved as noted

Inspection for Casting the Blinding Concrete under the Manhole for FW-A-7, FW-A-8, FW-A-9 (as
6A KAIG3-RFI-SW-C-2985 00 Civil Site Works 12/22/21 12/23/21 Approved as noted
Highlighted
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-271 (Stock Pile #
Zone G KAIG3-RFI-SW-C-2993 00 Civil Site Works 12/22/21 12/25/21 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-273 (Stock Pile #
Zone K KAIG3-RFI-SW-C-2994 00 Civil Site Works 12/22/21 12/25/21 Approved as noted
129 A-1-B)

Zone G KAIG3-RFI-SW-C-2995 00 Inspection of Sand Bedding for Potable Water Line at Zone-G - as highlighted (Stock Pile # 67) Civil Site Works 12/22/21 12/25/21 Approved as noted

kaig-qcals 207
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone G & K KAIG3-RFI-SW-C-2996 00 Inspection of Sand bedding for Potable Water Line at Zone-G & K - as highlighted (Stock Pile # 67). 67) Civil Site Works 12/22/21 12/25/21 Approved as noted

Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
4B KAIG3-RFI-SW-C-3000 00 Civil Site Works 12/22/21 12/25/21 Approved as noted
B) (1st Part)
Inspection and Compaction Test for 6th Layer (6 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
4B KAIG3-RFI-SW-C-3001 00 Civil Site Works 12/22/21 12/25/21 Approved as noted
B) (2nd Part)
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3002 00 Civil Site Works 12/22/21 12/26/21 Approved as noted
Highlighted)
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3003 00 Civil Site Works 12/22/21 12/26/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3004 00 Civil Site Works 12/22/21 12/26/21 Approved as noted
Highlighted)
Inspection of Formwork for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3005 00 Civil Site Works 12/22/21 12/26/21 Approved as noted
Highlighted)
Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-07, FW-A-09 as
6A KAIG3-RFI-SW-C-3006 00 Civil Site Works 12/22/21 12/26/21 Approved as noted
highlighted

Zone F KAIG3-RFI-SW-C-3007 00 Inspection and Compaction Test for MV line from F/MV/11 to F/MV/06 at Zone-F (Stock Pile # 97 A-1-B) Civil Site Works 12/22/21 12/28/21 Approved as noted

Excavation for Telecommunication Line between G/TL/16 to G/TL/27 including pit G/TL/16, G/TL/41,
Zone G KAIG3-RFI-SW-C-3008 00 Civil Site Works 12/22/21 12/26/21 Code C (resubmit)
G/TL/36, G/TL/28 at Zone-G as highlighted in the attached drawing
Excavation for Telecommunication Line between G/TL/16 to G/TL/27 including pit G/TL/16, G/TL/41,
Zone G 3 KAIG3-RFI-SW-C-3008 01 Civil Site Works 1/19/22 1/23/22 Approved as noted
G/TL/36, G/TL/28 at Zone-G as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from G/FS/19 to G/FS/44, including Pit G/FS/19, G/FS/24,
Zone G KAIG3-RFI-SW-C-3009 00 Civil Site Works 12/22/21 12/26/21 Code C (resubmit)
G/FS/38, G/FS/40 at Zone-G - as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from G/FS/19 to G/FS/44, including Pit G/FS/19, G/FS/24,
Zone G 3 KAIG3-RFI-SW-C-3009 01 Civil Site Works 1/19/22 1/23/22 Approved as noted
G/FS/38, G/FS/40 at Zone-G - as highlighted in the attached drawing
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-07 (AS
6A 6 KAIG3-RFI-SW-C-3010 00 Civil Site Works 12/22/21 12/27/21 Code C (resubmit)
ATTACHED)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-07 (AS
6A 6 KAIG3-RFI-SW-C-3010 01 Civil Site Works 8/8/22 Open
ATTACHED)
Inspection and Compaction Test for 10th Layer (10 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
4B KAIG3-RFI-SW-C-3011 00 Civil Site Works 12/23/21 12/28/21 Approved as noted
1-B) (1st Part)
Inspection and Compaction Test for 7th Layer (7 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
4B KAIG3-RFI-SW-C-3012 00 Civil Site Works 12/23/21 1/2/22 Approved as noted
B) (2nd Part)

Zone K KAIG3-RFI-SW-C-3013 00 Excavation for Potable Water Line (Branch) at Zone- K including Pit - K/PW/03 - as highlighted Civil Site Works 12/23/21 12/30/21 Approved as noted

6A KAIG3-RFI-SW-C-3014 00 Excavation for Foul Water Line Branch from FW-A-13-7 prior to start Gravel Bedding (as Highlighted) Civil Site Works 12/23/21 12/30/21 Approved as noted

Zone G KAIG3-RFI-SW-C-3015 00 Inspection for Backfilling Sub-base under Boulder no. RB-271 (Stock Pile # 110 A-1-A) Civil Site Works 12/23/21 12/30/21 Approved as noted

Zone K KAIG3-RFI-SW-C-3016 00 Inspection for Backfilling Sub-base under Boulder no. RB-273 (Stock Pile # 110 A-1-A) Civil Site Works 12/23/21 12/30/21 Approved as noted

Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone - C&H (Near Crescent)
Zone C & H KAIG3-RFI-SW-C-3017 00 Civil Site Works 12/23/21 12/28/21 Approved as noted
as highlighted (SP# 129 A-1-B)
Excavation for MV Line from G/MV/05 TO G/MV/12 at Zone-G including Pit G/MV/05, G/MV/16,
Zone G KAIG3-RFI-SW-C-3018 00 Civil Site Works 12/23/21 12/25/21 Approved as noted
G/MV/12 as highlighted in the attached drawing
Inspection of Sand Bedding under pipe for MV Line FROM G/MV/12 TO K/MV/04 at Zone-G & K as
Zone G & K KAIG3-RFI-SW-C-3019 00 Civil Site Works 12/23/21 12/25/21 Approved as noted
highlighted in the attached drawing (SP # 67)
Inspection of Sand Bedding under pipe for MV Line from F/MV/05 TO F/MV/06 at Zone-F as highlighted in
Zone F KAIG3-RFI-SW-C-3020 00 Civil Site Works 12/23/21 12/28/21 Approved as noted
the attached drawing (SP # 67)
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (315mmØ - UPVC- Class 4) from Site Works/Crescent
6A KAIG3-RFI-SW-C-3021 00 (FW-A-06 to FW-A-09). At CRECENT-02 ZONE- ZONE- 2B, 2C & 2D. As per highlighted Area in the Civil between Zone 2B, 2C & 12/23/21 12/26/21 Approved as noted
attached Dwg. 2D
Site Works/Crescent
Warning Tape Installation for Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-06 to FW-A-
6A KAIG3-RFI-SW-C-3022 00 Civil between Zone 2B, 2C & 12/23/21 12/26/21 Approved as noted
09). At CRECENT-02 ZONE- ZONE- 2B, 2C & 2D. As per highlighted Area in the attached Dwg.
2D
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ - UPVC- Class 4) from Site Works beside Energy
5A KAIG3-RFI-SW-C-3023 00 Civil 12/23/21 12/26/21 Approved as noted
(FW-A-20 to Pump Station). At Beside Energy Center-02. As per highlighted Area in the attached Dwg. Center 2
Warning Tape Installation for Foul Water Line for (160mmØ - UPVC- Class 4) from (FW-A-20 to Pump Site Works beside Energy
5A KAIG3-RFI-SW-C-3024 00 Civil 12/23/21 12/26/21 Approved as noted
Station). At Beside Energy Center-02. As per highlighted Area in the attached Dwg. Center 2
Bedding of Gravel 3/8" and Geotextile Surrounding Strom Water Line OUTFAL-G for (315mmØ-UPVC
Zone 4 KAIG3-RFI-SW-C-3025 00 Pipes-Class 4) from ( Catch Basin Pipes Connection G-G-70, 40, 43, 45, 31, 33, With Backdrop) As per Civil Site Works 12/23/21 12/26/21 Approved as noted
highlighted Area in the attached Dwg.
Pipe Installation of Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipes-Class 4) from ( Catch Basin
Zone 4 KAIG3-RFI-SW-C-3026 00 Pipes Connection G-G-70, 71, 66, 67, 33, 34, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 72, 31, 32, 30, 29, 28, Civil Site Works 12/23/21 1/3/22 Approved as noted
With Backdrop) as per highlighted area in attached drawing.
kaig-qcals 208
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone F KAIG3-RFI-SW-C-3038 00 Inspection for Installation Of Isolation Potable Water Line Pit F/PW/09, F/PW/10, as highlighted Civil Site Works 12/23/21 12/26/21 Approved as noted

Inspection of Sand Bedding under pipe for MV Line from F/MV/04 TO F/MV/11 at Zone-F as highlighted in
Zone F KAIG3-RFI-SW-C-3039 00 Civil Site Works 12/23/21 12/28/21 Approved as noted
the attached drawing (SP # 67)
Inspection of Sand Bedding under pipe for MV Line from F/MV/08 TO F/MV/03 at Zone-F as highlighted in
Zone F KAIG3-RFI-SW-C-3040 00 Civil Site Works 12/23/21 12/28/21 Approved as noted
the attached drawing (SP # 67)

Zone F KAIG3-RFI-SW-C-3041 00 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 12/23/21 12/28/21 Code C (resubmit)

Zone F 4 KAIG3-RFI-SW-C-3041 01 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 1/9/22 1/12/22 Code C (resubmit)

Zone F 4 KAIG3-RFI-SW-C-3041 02 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 2/1/22 2/6/22 Approved as noted

Zone B KAIG3-RFI-SW-C-3042 00 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-B as highlighted (SP # 67) Civil Site Works 12/23/21 12/30/21 Approved as noted

Zone F KAIG3-RFI-SW-C-3043 00 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F - as highlighted (SP # 67) Civil Site Works 12/23/21 12/28/21 Approved as noted

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 out of 3) above gravel around the
5A KAIG3-RFI-SW-C-3044 00 Civil Site Works 12/25/21 12/30/21 Approved as noted
Manhole for FW-A-18 - as Highlighted (SP# 129 A-1-B)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at
Zone B KAIG3-RFI-SW-C-3045 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
Zone-B (As Highlighted)
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone - C&H (Near Crescent)
Zone C & H KAIG3-RFI-SW-C-3046 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
as highlighted (SP# 129 A-1-B)
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level at Zone - C & H (Near
Zone C & H KAIG3-RFI-SW-C-3047 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
Crescent) as highlighted
Inspection for Blinding Concrete under Potable Water Line Pit G/PW/02, G/PW/07, K/PW/01, K/PW/02,
Zone G & K KAIG3-RFI-SW-C-3051 00 Civil Site Works 12/25/21 12/29/21 Approved as noted
K/PW/03, K/PW/08, K/PW/09 at Zone-G & K - as highlighted
Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
4B KAIG3-RFI-SW-C-3052 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
1-B) (1st Part)
Inspection and Compaction Test for 8th Layer (8 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
4B KAIG3-RFI-SW-C-3053 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
B) (2nd Part

2B KAIG3-RFI-SW-C-3054 00 Inspection of Formwork for the Walls & Top Slab of Transition Area - SBC-01 (As Highlighted Civil Site Works 12/25/21 12/28/21 Approved as noted

2B KAIG3-RFI-SW-C-3055 00 Inspection of Concrete Pouring for the Walls & Top Slab of Transition Area - SBC-01 (As Highlighted) Civil Site Works 12/25/21 12/29/21 Approved as noted

Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from B/TL/35 to
Zone B & G KAIG3-RFI-SW-C-3059 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
G/TL/32 at Zone-B & G (As Highlighted)

Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between
Zone B & G KAIG3-RFI-SW-C-3060 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
B/FS/27 to G/FS/17 at Zone-B & G (As Highlighted)

Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/46 to K/FS/12, at
Zone G & K KAIG3-RFI-SW-C-3061 00 Civil Site Works 12/25/21 12/30/21 Approved as noted
Zone-G & K as highlighted (SP # 67)
Inspection of Sand Bedding under pipe for Telecommunication Line from G/TL/45 to K/TL/06 at Zone-G &
Zone G & K KAIG3-RFI-SW-C-3062 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
K as highlighted in the attached drawing (SP # 67)
Inspection for Installation Of Isolation Potable Water Line Pit F/PW/04, F/PW/05, F/PW/06, F/PW/07 - as
Zone F KAIG3-RFI-SW-C-3067 00 Civil Site Works 12/25/21 12/28/21 Approved as noted
highlighted
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (As
Zone B KAIG3-RFI-SW-C-3068 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
Highlighted)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at
Zone B KAIG3-RFI-SW-C-3069 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (As
Zone B KAIG3-RFI-SW-C-3070 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
Highlighted)
Inspection of Water proofing for the Duct Bank of Telecommunications Line from B/TL/42 to B/TL/36 at
Zone B KAIG3-RFI-SW-C-3071 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
Zone-B (As Highlighted)
Inspection of Water Proofing for the Duct Bank of Fire & Security Distribution Line from B/FS/21 to
Zone B KAIG3-RFI-SW-C-3072 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
B/FS/36 at Zone-B (As Highlighted)
Inspection of Backfilling Gravel around the Duct Bank of MV Line from G/MV/22 to G/MV/06 at Zone- G
Zone G KAIG3-RFI-SW-C-3073 00 Civil Site Works 12/26/21 12/29/21 Approved as noted
(As Highlighted) (SP # 118)
Inspection of backfilling Gravel around the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B &
Zone B & G KAIG3-RFI-SW-C-3074 00 Civil Site Works 12/26/21 12/29/21 Approved as noted
G (As Highlighted) (SP # 118)
kaig-qcals 209
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
4B KAIG3-RFI-SW-C-3075 00 Civil Site Works 12/26/21 12/30/21 Approved as noted
1-B) (1st Part).
Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
4B KAIG3-RFI-SW-C-3076 00 Civil Site Works 12/26/21 12/30/21 Approved as noted
B) (2nd Part).
Excavation for MV Line from G/MV/02 TO G/MV/05 at Zone-G including Pit G/MV/02, G/MV03,
Zone G KAIG3-RFI-SW-C-3077 00 Civil Site Works 12/26/21 12/28/21 Approved as noted
G/MV/27, G/MV/05 as highlighted in the attached drawing
Inspection of Sand Bedding under pipe for MV Line from G/MV/05 TO G/MV/13 at Zone-G as highlighted
Zone G KAIG3-RFI-SW-C-3078 00 Civil Site Works 12/26/21 12/30/21 Approved as noted
in the attached drawing (SP # 67)
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/16 to G/TL/26 at Zone-G
Zone G KAIG3-RFI-SW-C-3079 00 Civil Site Works 12/26/21 12/30/21 Approved as noted
as highlighted in the attached drawing (SP # 67)
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/19 to G/FS/40 at
Zone G KAIG3-RFI-SW-C-3080 00 Civil Site Works 12/26/21 12/30/21 Approved as noted
Zone-G - as highlighted in the attached drawing (SP # 67)
Inspection & Compaction tests for Backfilling Sub-Grade 1st layers (1 of 4) for Storm Water Line from MH-
4A KAIG3-RFI-SW-C-3085 00 Civil Site Works 12/27/21 1/3/22 Approved as noted
G-01-04 to MH-G-01-05 as highlighted (SP 129 A-1-B).

4B KAIG3-RFI-SW-C-3086 00 Inspection & Compaction tests for 13th layers (13 of 14) Backfilling around SBC-06 (SP 129 A-1-B) 1st part. Civil Site Works 12/27/21 1/1/22 Approved as noted

Inspection & Compaction tests for 10th layers (10 of 14) Backfilling around SBC-06 (SP 129 A-1-B) 2nd
4B KAIG3-RFI-SW-C-3087 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
part.

Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from G/TL/32 to
Zone G KAIG3-RFI-SW-C-3088 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
G/TL/30 at Zone-G (As Highlighted)

Inspection of Concrete (Plain) Pouring for the Duct Bank of Fire & Security Distrubution Line from G/FS/17
Zone G KAIG3-RFI-SW-C-3089 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
to G/FS/10 at Zone-G (As Highlighted)

Inspection of Steel Reinforcement for Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at
Zone G KAIG3-RFI-SW-C-3090 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
Zone-G (As Highlighted)

Inspection of Formwork for Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G
Zone G KAIG3-RFI-SW-C-3091 00 Civil Site Works 12/27/21 12/30/21 Approved as noted
(As Highlighted)

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications Line from G/TL/32 to
Zone G KAIG3-RFI-SW-C-3092 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
G/TL/30 at Zone-G (As Highlighted)
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between G/FS/17 to G/FS/10 at
Zone G KAIG3-RFI-SW-C-3093 00 Civil Site Works 12/27/21 12/30/21 Approved as noted
Zone-G - As Highlighted
Inspection of Formwork for Duct Bank of Fire & Security Distrubution Line from G/FS/17 to G/FS/10 at
Zone G KAIG3-RFI-SW-C-3094 00 Civil Site Works 12/27/21 12/30/21 Approved as noted
Zone-G (As Highlighted)
Inspection of Reinforced Concrete Pouring for Duct Bank of Line from G/FS/17 to G/FS/10 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3095 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
Highlighted)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/21 to G/TL/51) at
Zone G KAIG3-RFI-SW-C-3096 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
Zone-G as highlighted in the attached drawing.
Inspection of Sand Covering Layer for Protection of Fire & Security Distrubution Line from (G/FS/07 to
Zone G KAIG3-RFI-SW-C-3097 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
G/FS/52) at Zone-G as highlighted in the attached drawing.

Zone K KAIG3-RFI-SW-C-3098 00 Inspection of Sand Bedding under Pipe for Potable Water Line (Branch) at Zone K as highlighted (SP 67). Civil Site Works 12/27/21 1/1/22 Approved as noted

Excavation for MV Line from G/MV/25 to G/MV/02 at Zone G including Pit G/MV/25, G/MV/24,
Zone G KAIG3-RFI-SW-C-3099 00 Civil Site Works 12/27/21 12/30/21 Approved as noted
G/MV/14, G/MV/18, G/MV/02 as highlighted in the attached drawing
Inspection of Sand Bedding for MV Line fromG/MV/02 to G/MV/25 at Zone G as highlighted in the attached
Zone G KAIG3-RFI-SW-C-3100 00 Civil Site Works 12/27/21 1/1/22 Approved as noted
drawing.

6A KAIG3-RFI-SW-C-3101 00 Inspection for Manhole Base installation and UPVC Pipe connection for FW-A-08 as highlighted. Civil Site Works 12/27/21 12/29/21 Approved as noted

6A KAIG3-RFI-SW-C-3102 00 Inspection of Installation of all Rings (Raiser) and Slab for FW-A-08 as attached. Civil Site Works 12/27/21 1/6/22 Code C (not resubmit)
Surface Preparation prior to start backfilling Gravel for Manholes and Gullies MH-G-01-5, MH-G-01-4, MH-
3B KAIG3-RFI-SW-C-3103 00 G-01-3, MH-G-01-2, MH-G-01-1, G-G-54, G-G-55, G-G-56, G-G-57, G-G-58, G-G-59, G-G-60, G-G-61, G- Civil Site Works 12/27/21 1/1/22 Approved as noted
G-62, G-G-63, G-G-64, G-G-65 as highlighted SP 118.
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/40 to G/FS/46 at
Zone G KAIG3-RFI-SW-C-3117 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
Zone-G - as highlighted in the attached drawing (SP # 67)
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/26 to G/TL/45 at Zone-G
Zone G KAIG3-RFI-SW-C-3118 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
as highlighted in the attached drawing (SP # 67)
Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
4B KAIG3-RFI-SW-C-3119 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
1-B) (2nd Part)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/06 to G/MV/17
Zone G KAIG3-RFI-SW-C-3120 00 Civil Site Works 12/28/21 12/30/21 Approved as noted
at Zone- G (As Highlighted)

kaig-qcals 210
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 2) for Storm Water Line From MH-
3B KAIG3-RFI-SW-C-3121 00 F-01 To MH-F-01-04 including all the Manholes and Gullies (Around) As Highlighted in the attached Civil Site Works 12/28/21 1/1/22 Approved as noted
Drawing (SP#129 A-1-B)
Inspection of Backfilling Gravel around the Manholes for MH-F-01, MH-F-02, MH-F-03, MH-F-04 - AS
3A KAIG3-RFI-SW-C-3124 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
Highlighted (SP # 118)

Zone B KAIG3-RFI-SW-C-3125 00 Soil Preparation under Boulder No. RB- 137 Civil Site Works 12/28/21 1/1/22 Approved as noted

Zone B KAIG3-RFI-SW-C-3128 00 Soil Preparation under Boulder No. RB- 136 Civil Site Works 12/28/21 1/1/22 Approved as noted

Zone B KAIG3-RFI-SW-C-3129 00 Soil Preparation under Boulder No. RB- 135 Civil Site Works 12/28/21 1/1/22 Approved as noted

Zone B KAIG3-RFI-SW-C-3130 00 Soil Preparation under Boulder No. RB- 134 Civil Site Works 12/28/21 1/1/22 Approved as noted

Zone B KAIG3-RFI-SW-C-3131 00 Inspection for Backfilling Sub-base under Boulder no. RB-134 (SP # 110 A-1-A) Civil Site Works 12/28/21 1/1/22 Approved as noted

Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3132 00 Civil Site Works 12/28/21 1/3/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3133 00 Civil Site Works 12/28/21 1/3/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3134 00 Civil Site Works 12/28/21 1/3/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Above
Zone G KAIG3-RFI-SW-C-3135 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
Gravel) of MV Line from G/MV/22 to G/MV/06 at Zone- G (As Highlighted) (SP # 129 A-1-B)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Above
Zone B & G KAIG3-RFI-SW-C-3141 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
Gravel) of MV Line from B/MV/13 to G/MV/22 at Zone- B & G (As Highlighted) (SP # 129 A-1-B)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Above
Zone B KAIG3-RFI-SW-C-3142 00 Civil Site Works 12/28/21 1/1/22 Approved as noted
Gravel) of MV Line from B/MV/19 to B/MV/06 at Zone- B (As Highlighted) (SP # 129 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/21 to B/TL/42 at
Zone B KAIG3-RFI-SW-C-3143 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
Zone-B as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/24 to
Zone B KAIG3-RFI-SW-C-3144 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
B/FS/21 at Zone-B as highlighted in the attached drawing
Inspection for Laying of Red Tiles above the pipe for MV Line from C/MV/02 to B/MV/26 & B/MV/18 to
Zone B KAIG3-RFI-SW-C-3145 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
B/MV/07 at Zone-B as highlighted in the attached drawing
Excavation for MV Line from G/MV/01 TO G/MV/25 at Zone-G including Pit G/MV/01, G/MV28,
Zone G KAIG3-RFI-SW-C-3146 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
G/MV/15, G/MV/25 as highlighted in the attached drawing
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 2) for Storm Water Line From MH-
3B KAIG3-RFI-SW-C-3147 00 F-01 To MH-F-04 including all the Manholes (Around) As Highlighted in the attached Drawing (SP#129 A- Civil Site Works 12/29/21 1/9/22 Approved as noted
1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3148 00 Civil Site Works 12/29/21 1/5/22 Code C (resubmit)
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Zone B 4 KAIG3-RFI-SW-C-3148 01 Civil Site Works 1/8/22 1/11/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3149 00 Civil Site Works 12/29/21 1/5/22 Code C (resubmit)
129 A-1-B)
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Zone B 4 KAIG3-RFI-SW-C-3149 01 Civil Site Works 1/8/22 1/11/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Zone B KAIG3-RFI-SW-C-3150 00 Civil Site Works 12/29/21 1/5/22 Code C (resubmit)
129 A-1-B)
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Zone B 4 KAIG3-RFI-SW-C-3150 01 Civil Site Works 1/8/22 1/11/22 Approved as noted
129 A-1-B)
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
3A 3B KAIG3-RFI-SW-C-3157 00 Civil Site Works 12/29/21 1/5/22 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) As attached
Inspection for Installation Of Isolation Potable Water Line Pit K/PW/02, K/PW/09, G/PW/02, G/PW/07 - as
5A 5B KAIG3-RFI-SW-C-3158 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
highlighted
Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
4B KAIG3-RFI-SW-C-3160 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
1-B) (2nd Part)
Inspection of Sand Bedding under pipe for MV Line from G/MV/25 TO G/MV/02 at Zone-G as highlighted
Zone G KAIG3-RFI-SW-C-3161 00 Civil Site Works 12/29/21 1/3/22 Code C (not resubmit)
in the attached drawing
Inspection of Water proofing for the Duct Bank of MV Line from G/MV/06 to G/MV/17 at Zone-G (As
Zone G KAIG3-RFI-SW-C-3162 00 Civil Site Works 12/29/21 1/3/22 Approved as noted
Highlighted)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/26 to B/MV/18,
Zone B & G KAIG3-RFI-SW-C-3163 00 B/MV/12 to G/MV/08, G/MV/36 to G/MV/35, G/MV/34 to G/MV/09, G/MV/10 to G/MV/31 at Zone-B & G Civil Site Works 12/30/21 1/3/22 Approved as noted
(As Highlighted)

kaig-qcals 211
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/15 at
Zone B KAIG3-RFI-SW-C-3164 00 Civil Site Works 12/29/21 1/5/22 Approved as noted
Zone-B - as highlighted

Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/26 to B/MV/18, B/MV/12 to
Zone B & G KAIG3-RFI-SW-C-3165 00 G/MV/08, G/MV/36 to G/MV/35, G/MV/34 to G/MV/09, G/MV/10 to G/MV/31 at Zone-B & G (As Civil Site Works 12/30/21 1/3/22 Approved as noted
Highlighted)

Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for MH-A-02, MH-A-10 as
4C KAIG3-RFI-SW-C-3166 00 Civil Site Works 12/29/21 1/4/22 Approved as noted
Highlighted SP#118

Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the Green Tiles for
Zone B 4 KAIG3-RFI-SW-C-3167 00 Telecommunication Line from B/TL/25 to B/TL/42 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 1/1/22 1/9/22 Approved as noted
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
Zone B 4 KAIG3-RFI-SW-C-3168 00 Fire & Security Distribution Line from B/FS/19 to B/FS/21 at Zone-B as highlighted in the attached drawing Civil Site Works 1/1/22 1/8/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
4A 4 KAIG3-RFI-SW-C-3169 00 Civil Site Works 1/1/22 1/8/22 Approved as noted
G-01-01 To MH-G-01 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 3) for Storm Water Line From MH-
4A 4 KAIG3-RFI-SW-C-3170 00 Civil Site Works 1/1/22 1/8/22 Approved as noted
G-01-02 To MH-G-01-01 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
4A 4 KAIG3-RFI-SW-C-3171 00 Civil Site Works 1/1/22 1/8/22 Approved as noted
G-01-04 To MH-G-03 As Highlighted (SP#129 A-1-B)
Surface Preparation prior to start backfilling Gravel for the Duct Bank of MV Line from G/MV/06 to
Zone G 3 KAIG3-RFI-SW-C-3172 00 Civil Site Works 1/1/22 1/4/22 Approved as noted
G/MV/17 at Zone- G (As Highlighted)
Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-G
Zone G 3 KAIG3-RFI-SW-C-3173 00 Civil Site Works 1/1/22 1/3/22 Approved as noted
(SA-10, SA-11, SA-12, SA-13 ) - As Highlighted
Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-11, SA-12, SA-13 )
Zone G 3 KAIG3-RFI-SW-C-3176 00 Civil Site Works 1/1/22 1/5/22 Approved as noted
- As Highlighted
Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-11, SA-12,
Zone G 3 KAIG3-RFI-SW-C-3177 00 Civil Site Works 1/1/22 1/6/22 Approved as noted
SA-13 ) - As Highlighted
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As
Zone G 3 KAIG3-RFI-SW-C-3181 00 Civil Site Works 1/1/22 1/3/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As
Zone G 3 KAIG3-RFI-SW-C-3182 00 Civil Site Works 1/1/22 1/3/22 Approved as noted
Highlighted)
Inspection & Compaction tests of 13th Layer (13 of 13) Backfilling around SBC-06 (Stock Pile 129 A-1-B)
4B 4 KAIG3-RFI-SW-C-3185 00 Civil Site Works 1/2/22 1/8/22 Approved as noted
(2nd part).
Inspection of Steel Reinforcement for Duck Bank of MV Line from G/MV/08 to G/MV/36 at Zone G - As
Zone G 3 KAIG3-RFI-SW-C-3186 00 Civil Site Works 1/2/22 1/5/22 Approved as noted
Highlighted
Inspection of Formwork for the Duck Bank of MV Line from G/MV/08 to G/MV/36 at Zone G - As
Zone G 3 KAIG3-RFI-SW-C-3187 00 Civil Site Works 1/2/22 1/5/22 Approved as noted
Highlighted
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/08 to G/MV/36 at Zone G - As
Zone G 3 KAIG3-RFI-SW-C-3188 00 Civil Site Works 1/2/22 1/5/22 Approved as noted
Highlighted
Inspection of Sand Covering Layer for Protection of Telecommunication Line from (K/TL/03 to near
Zone K 5 KAIG3-RFI-SW-C-3189 00 Civil Site Works 1/2/22 1/4/22 Approved as noted
K/TL/16) at Zone K as highlighted area in attached drawing
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/03 to near
Zone K 5 KAIG3-RFI-SW-C-3190 00 Civil Site Works 1/2/22 1/4/22 Approved as noted
K/FS/06) at Zone K as highlighted area in attached drawing
Inspection of Sand Covering Layer for Protection of Telecommunication Line from (K/TL/54 to near
Zone G & K 3 KAIG3-RFI-SW-C-3191 00 Civil Site Works 1/2/22 1/6/22 Approved as noted
K/TL/06) at Zone G & K as highlighted area in attached drawing
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/52 to near
Zone G & K 3 KAIG3-RFI-SW-C-3192 00 Civil Site Works 1/2/22 1/6/22 Code C (resubmit)
K/FS/01) at Zone G & K as highlighted area in attached drawing
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/52 to near
Zone G & K 3 KAIG3-RFI-SW-C-3192 01 Civil Site Works 2/14/22 2/16/22 approved as noted
K/FS/01) at Zone G & K as highlighted area in attached drawing
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at
Zone G 3 KAIG3-RFI-SW-C-3193 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
Zone-G - As Highlighted
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06
Zone G 3 KAIG3-RFI-SW-C-3194 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
at Zone-G - As Highlighted
Inspection of Formwork for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-G - As
Zone G 3 KAIG3-RFI-SW-C-3195 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
Highlighted

kaig-qcals 212
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Formwork for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at Zone-
Zone G 3 KAIG3-RFI-SW-C-3196 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
G - As Highlighted
Inspection of Concrete Pouring for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-
Zone G 3 KAIG3-RFI-SW-C-3197 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
G - As Highlighted
Inspection of Concrete Pouring for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at
Zone G 3 KAIG3-RFI-SW-C-3198 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
Zone-G - As Highlighted
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) from
Site Works/Crescent 1
6A 6 KAIG3-RFI-SW-C-3199 00 (FW-A-13.5 to CENOZOIC GARDEN ). At CRECENT-01 ZONE- 1D. As per highlighted Area in the Civil 1/3/22 1/5/22 Approved as noted
Zone 1D
attached Dwg.
Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-13.5 to CENOZOIC Site Works/Crescent 1
6A 6 KAIG3-RFI-SW-C-3200 00 Civil 1/3/22 1/9/22 Approved as noted
GARDEN ). At CRECENT-01 ZONE- 1D. As per highlighted Area in the attached Dwg. Zone 1D
Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And GULLIES MH-G-01-5, MH-G-01-4,
3B 3 KAIG3-RFI-SW-C-3202 00 MH-G-01-3, MH-G-01-2, G-G-56, G-G-57, G-G-58, G-G-59, G-G-60, G-G-61, G-G-62, G-G-63&64, G-G- Civil Site Works 1/3/22 1/8/22 Approved as noted
65 - AS Highlighted SP#118
Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-G-01, MH-G-02, MH-G-03, MH-
3B 3 KAIG3-RFI-SW-C-3203 00 G-04 And GULLIES G-G-47, G-G-48&49, G-G-50&51, G-G-52 & 53, G-G-35, G-G-34, G-G-33, G-G-32, Civil Site Works 1/3/22 1/5/22 Approved as noted
G-G-31 - AS Highlighted
Inspection of backfilling Gravel for the Duct Bank of MV Line from G/MV/06 to G/MV/17 at Zone- G (As
Zone G 3 KAIG3-RFI-SW-C-3204 00 Civil Site Works 1/3/22 1/5/22 Approved as noted
Highlighted) SP # 118

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) for MV line from G/MV/06 to G/MV/17 at
Zone G 3 KAIG3-RFI-SW-C-3205 00 Civil Site Works 1/3/22 1/9/22 Approved as noted
Zone-G (Stock Pile # 129 A-1-B)

INSPECTION FOR INSTALLATION OF GULLIES G-F-29, G-F-30, G-F-31, G-F-34, G-F-35, G-F-36, G-
5A 3A 5 KAIG3-RFI-SW-C-3206 00 Civil Site Works 1/4/22 1/11/22 Approved as noted
F-38, G-F-39, G-F-41, G-F-42, G-F-43, G-F-44, G-F-45 as highlighted
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-D-07 (As
3B 3 KAIG3-RFI-SW-C-3207 00 Civil Site Works 1/4/22 1/10/22 Approved as noted
Highlighted)
INSPECTION OF INSTALLATION OF SLAB FOR MH-G-01, MH-G-01-6, MH-G-02, MH-G-03, MH-G-
3B 3 KAIG3-RFI-SW-C-3208 00 Civil Site Works 1/4/22 1/11/22 Approved as noted
03-1, MH-G-03-2, MH-G-04, MH-G-06 (AS ATTACHED)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-G-01-3, MH-G-01-2, MH-G-01-1,
3B 3 KAIG3-RFI-SW-C-3209 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
MH-G-01, MH-G-02, MH-G-03, MH-G-03-1, MH-G-03-02, MH-G-04, MH-G-05, MH-G-06 AS
HIGHLIGHTED.
Surface Preparation Prior to Start Backfilling Gravel For GULLIES G-F-29, G-F-30, G-F-31, G-F-34, G-F-
5A 3A 5 KAIG3-RFI-SW-C-3210 00 Civil Site Works 1/4/22 1/8/22 Approved as noted
35, G-F-36, G-F-38, G-F-39, G-F-41, G-F-42, G-F-43, G-F-44, G-F-45 - AS Highlighted SP#118

Inspection for Installation Of Isolation Potable Water Line Pit K/PW/01, K/PW/03, K/PW/07, K/PW/08 - as
5A 5B 5 KAIG3-RFI-SW-C-3211 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
highlighted

Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/21 to
Zone K 5 KAIG3-RFI-SW-C-3212 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
L/FS/04) at Zone-K as highlighted in the attached drawing

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/13 to K/TL/20) at
Zone K 5 KAIG3-RFI-SW-C-3213 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
Zone-K as highlighted in the attached drawing

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3B 3 KAIG3-RFI-SW-C-3214 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
G-02 To MH-G-03 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3B 3 KAIG3-RFI-SW-C-3215 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
G-03 To MH-G-04 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3B 3 KAIG3-RFI-SW-C-3216 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
G-04 To MH-G-05 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3B 3 KAIG3-RFI-SW-C-3217 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
G-05 To MH-G-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F & K - As Highlighted
F&K 5 KAIG3-RFI-SW-C-3218 00 Civil Site Works 1/4/22 1/9/22 Approved as noted
in the attached drawing
Inspection and Compaction Test for backfilling Sub-Base under Boulder No. RB-137 (Stock Pile # 110 A-1-
Zone B 3 KAIG3-RFI-SW-C-3224 00 Civil Site Works 1/5/22 1/9/22 Approved as noted
A)
Inspection and Compaction Test for backfilling Sub-base under Boulder No. RB-136 (Stock Pile # 110 A-1-
Zone B 3 KAIG3-RFI-SW-C-3225 00 Civil Site Works 1/5/22 1/9/22 Approved as noted
A)

kaig-qcals 213
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-135 (Stock Pile # 110 A-1-
Zone B 3 KAIG3-RFI-SW-C-3226 00 Civil Site Works 1/5/22 1/9/22 Approved as noted
A

Zone G 3 KAIG3-RFI-SW-C-3227 00 Soil Preparation under Boulder No. RB- 270 Civil Site Works 1/5/22 1/9/22 Approved as noted

Zone K 5 KAIG3-RFI-SW-C-3228 00 Excavation for Potable Water Line (Branch) at Zone- K including Pit - K/PW/07 - as highlighted Civil Site Works 1/5/22 1/10/22 Approved as noted

Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3229 00 Civil Site Works 1/5/22 1/10/22 Approved as noted
MH-G-01-01 To MH-G-01 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3230 00 Civil Site Works 1/5/22 1/9/22 Approved as noted
MH-G-01-02 To MH-G-01-01 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3231 00 Civil Site Works 1/5/22 1/10/22 Approved as noted
MH-G-01-04 To MH-G-01-03 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3232 00 Civil Site Works 1/5/22 1/9/22 Approved as noted
MH-G-01-04 To MH-G-01-05 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the pipe for
4B 4 KAIG3-RFI-SW-C-3233 00 Fire & Security Distribution Line from B/FS/19 to B/FS/21 at Zone-B as highlighted in the attached drawing Civil Site Works 1/6/22 1/12/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the Green Tiles for
Zone B 4 KAIG3-RFI-SW-C-3234 00 Telecommunication Line from B/TL/25 to B/TL/42 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 1/8/22 1/12/22 Code C (resubmit)
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the Green Tiles for
Zone B 4 KAIG3-RFI-SW-C-3234 01 Telecommunication Line from B/TL/25 to B/TL/42 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 2/1/22 2/6/22 Code C (not resubmit)
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
Zone B 4 KAIG3-RFI-SW-C-3240 00 Fire & Security Distribution Line from B/FS/19 to B/FS/24 at Zone-B as highlighted in the attached drawing Civil Site Works 1/6/22 1/12/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
Zone B 4 KAIG3-RFI-SW-C-3241 00 Telecommunications Line from B/TL/25 to B/TL/21 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 1/6/22 1/12/22 Approved as noted
Pile # 129 A-1-B)
Excavation for Fire & Security Distribution Line from (K/FS/01 to K/FS/13) including Pit K/FS/01, K/FS/03,
Zone K 5 KAIG3-RFI-SW-C-3242 00 Civil Site Works 1/6/22 1/10/22 Approved as noted
K/FS/02, K/FS/24, K/FS/17, K/FS/13 at Zone-K as highlighted in the attached drawing
Excavation for Telecommunication Line between K/TL/01 to K/TL/21) including pit K/TL/01, K/TL/03,
Zone K 5 KAIG3-RFI-SW-C-3243 00 Civil Site Works 1/6/22 1/10/22 Approved as noted
K/TL/02, K/TL/26, K/TL/04, K/TL/21 at Zone-K as highlighted in the attached drawing
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-270 (Stock Pile #
Zone G 3 KAIG3-RFI-SW-C-3244 00 Civil Site Works 1/8/22 1/12/22 Approved as noted
129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3245 00 Civil Site Works 1/6/22 1/11/22 Approved as noted
MH-G-02 To MH-G-03 As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3246 00 Civil Site Works 1/6/22 1/11/22 Approved as noted
MH-G-03 To MH-G-04 As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3247 00 Civil Site Works 1/6/22 1/11/22 Approved as noted
MH-G-04 To MH-G-05 As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3248 00 Civil Site Works 1/6/22 1/11/22 Approved as noted
MH-G-05 To MH-G-06 As Highlighted in the attached Drawing (SP#129 A-1-B)
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3251 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
attached Dwg.
Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
3B 3 KAIG3-RFI-SW-C-3252 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
Area in the attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3253 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
attached Dwg.
Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
3B 3 KAIG3-RFI-SW-C-3254 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
Area in the attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3255 00 Civil Site Works 1/8/22 1/11/22 Code C (resubmit)
attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3255 01 Civil Site Works 1/17/22 1/20/22 Code C (resubmit)
attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3255 02 Civil Site Works 2/2/22 2/6/22 Code C (resubmit)
attached Dwg.

Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3255 03 Civil Site Works 2/8/22 2/10/22 Approved as noted
attached Dwg.

kaig-qcals 214
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Warning Tape Installation for Fire Fighting Networks for (160mmØ-UPVC-Class-5). As per highlighted
3B 3 KAIG3-RFI-SW-C-3256 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
Area in the attached Dwg.

Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-270 (Stock Pile # 110 A-1-
Zone G 3 KAIG3-RFI-SW-C-3258 00 Civil Site Works 1/8/22 1/12/22 Approved as noted
A)

Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FGL in
Zone C,D,E 2 KAIG3-RFI-SW-C-3259 00 Civil Site Works 1/8/22 1/11/22 Code C (resubmit)
hardscape area at Zone - C, D & E, as highlighted in the attached drawing

Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FGL in
Zone C,D,E 2 KAIG3-RFI-SW-C-3259 01 Civil Site Works 2/13/22 2/17/22 Code C (resubmit)
hardscape area at Zone - C, D & E, as highlighted in the attached drawing
Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FGL in
Zone C,D,E 2 KAIG3-RFI-SW-C-3259 02 Civil Site Works 2/27/22 3/1/22 Approved as noted
hardscape area at Zone - C, D & E, as highlighted in the attached drawing
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3260 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
MH-G-01-01 To MH-G-01 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 3) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3261 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
MH-G-01-02 To MH-G-01-01 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3262 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
MH-G-01-04 To MH-G-01-03 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3263 00 Civil Site Works 1/8/22 1/12/22 Approved as noted
MH-G-01-04 To MH-G-01-05 As Highlighted (SP#129 A-1-B)

Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from F/TL/12 to
Zone F 5 KAIG3-RFI-SW-C-3264 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
F/TL/04 at Zone-F (As Highlighted)

Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line from F/FS/17
Zone F 5 KAIG3-RFI-SW-C-3265 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
to F/FS/04 at Zone- F (As Highlighted)

Inspection for Installation Of Isolation Potable Water Line Pit B/F/06, B/F/07, B/F/09, B/F/12 - as highlighted
Zone B 3 KAIG3-RFI-SW-C-3269 00 Civil Site Works 1/8/22 1/11/22 Approved as noted

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
5A, 3A 5 KAIG3-RFI-SW-C-3270 00 Civil Site Works 1/8/22 1/11/22 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) As attached

Excavation for Foul Water Line from FW-A-13 to FW-A-9 including Manhole FW-A-12, FW-A-11, FW-A-
6A 6 KAIG3-RFI-SW-C-3271 00 Civil Site Works 1/8/22 1/10/22 Approved as noted
10 prior to start Gravel Bedding (as Highlighted)

Excavation for Storm Water Line from MH-M-11 to MH-M-09 including Manhole MH-M-10, MH-M-09 -
6A 6 KAIG3-RFI-SW-C-3272 00 Civil Site Works 1/8/22 1/10/22 Code C (resubmit)
As highlighted

Excavation for Storm Water Line from MH-M-11 to MH-M-09 including Manhole MH-M-10, MH-M-09 -
6A 6 KAIG3-RFI-SW-C-3272 01 Civil Site Works 1/10/22 1/10/22 Approved as noted
As highlighted

Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manholes And Gullies MH-G-01-5, MH-G-01-4,
3B 3 KAIG3-RFI-SW-C-3273 00 MH-G-01-3, MH-G-01-2 and G-G-56, G-G-57, G-G-58, G-G-59, G-G-60, G-G-61, G-G-62, G-G-63&64, G- Civil Site Works 1/8/22 1/18/22 Approved as noted
G-65 - AS Highlighted (SP#118)
Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes And Gullies MH-G-01-1, MH-G-02, MH-
3A 3 KAIG3-RFI-SW-C-3274 00 G-03, MH-G-04 and G-G-55, G-G-54, G-G-52&53, G-G-50&51, G-G-48&49, G-G-47, G-G-33, G-G-32, G- Civil Site Works 1/8/22 1/10/22 Approved as noted
G-31 - AS Highlighted (SP#118)
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 3) for Storm Water Line From MH-
4A 4 KAIG3-RFI-SW-C-3275 00 Civil Site Works 1/8/22 1/12/22 Approved as noted
G-01-03 To MH-G-01-02 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the Red Tiles for MV Line from
Zone B 4 KAIG3-RFI-SW-C-3276 00 C/MV/02 to B/MV/17 & B/MV/18 to B/MV/07 at Zone-B as highlighted in the attached drawing (SP # 129 Civil Site Works 1/8/22 1/11/22 Code C (not resubmit)
A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 3) to cover the Red Tiles for MV Line from
Zone B 4 KAIG3-RFI-SW-C-3277 00 Civil Site Works 1/8/22 1/11/22 Code C (not resubmit)
B/MV/17 to B/MV/26 at Zone-B as highlighted in the attached drawing (SP # 129 A-1-B)

Inspection of Sand Covering Layer for Protection of MV Line from (C/MV/02 to C/MV/26 & B/MV/18 to
Zone B 4 KAIG3-RFI-SW-C-3278 00 Civil Site Works 1/9/22 1/15/22 Code C (resubmit)
B/MV/07) at Zone-B as highlighted in the attached drawing

Inspection of Sand Covering Layer for Protection of MV Line from (C/MV/02 to C/MV/26 & B/MV/18 to
Zone B 4 KAIG3-RFI-SW-C-3278 01 Civil Site Works 6/19/22 6/22/22 Approved as noted
B/MV/07) at Zone-B as highlighted in the attached drawing

kaig-qcals 215
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Sand Covering Layer for Protection of MV Line from (K/MV/01 to L/MV/08) at Zone-K&L as
Zone K & L 5 KAIG3-RFI-SW-C-3279 00 Civil Site Works 1/9/22 1/15/22 Code C (resubmit)
highlighted in the attached drawing

Inspection of Sand Covering Layer for Protection of MV Line from (K/MV/01 to L/MV/08) at Zone-K&L as
Zone K & L 5 KAIG3-RFI-SW-C-3279 01 Civil Site Works 2/1/22 2/3/22 Approved as noted
highlighted in the attached drawing

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/10 to K/TL/42
Zone K 5 KAIG3-RFI-SW-C-3280 00 Civil Site Works 1/9/22 1/11/22 Approved as noted
at Zone-B as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/04 to
Zone K 5 KAIG3-RFI-SW-C-3281 00 Civil Site Works 1/9/22 1/11/22 Approved as noted
K/FS/06 at Zone-K as highlighted in the attached drawing

Inspection for Blinding Concrete under Fire Water Line Pit F/F/04, F/F/05, F/F/06, F/F/07, F/F/09, G/F/04,
Zone F,G,K 3 KAIG3-RFI-SW-C-3282 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
G/F/05, G/F/18, K/F/01, K/F/02, K/F/03 at Zone-F, G & K - as highlighted

Inspection for Casting the Blinding Concrete under the Manhole for FW-A-10, FW-A-11, FW-A-12 (as
6A 6 KAIG3-RFI-SW-C-3283 00 Civil Site Works 1/9/22 1/11/22 Approved as noted
Highlighted)

Inspection and Compaction test for NGL of Fire & Security Distribution Line from (K/FS/01 to K/FS/13) at
Zone K 5 KAIG3-RFI-SW-C-3284 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
Zone-K - as highlighted in the attached drawing

Inspection and Compaction Test for NGL of Telecommunication Line from (K/TL/01 to K/TL/21) at Zone-K
Zone K 5 KAIG3-RFI-SW-C-3285 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
as highlighted in the attached drawing

Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line between G/TL/44 to
Zone G 3 KAIG3-RFI-SW-C-3286 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
G/TL/50 at Zone-G (As Highlighted)

Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between
Zone G 3 KAIG3-RFI-SW-C-3287 00 Civil Site Works 1/9/22 1/11/22 Approved as noted
G/FS/08 to G/FS/30 at Zone- G (As Highlighted)

Inspection for Sand bedding under pipe for MV Line from F/MV/04 TO G/MV/25 at Zone-F & G - as
Zone F,G 5 KAIG3-RFI-SW-C-3288 00 Civil Site Works 1/9/22 1/15/22 Approved as noted
highlighted in the attached drawing

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3289 00 Civil Site Works 1/9/22 1/12/22 Approved as noted
MH-G-02 To MH-G-03 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3290 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
MH-G-03 To MH-G-04 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3291 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
MH-G-04 To MH-G-05 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3292 00 Civil Site Works 1/9/22 1/12/22 Approved as noted
MH-G-05 To MH-G-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 5) for Storm Water Line From MH-
3B 3 KAIG3-RFI-SW-C-3293 00 Civil Site Works 1/9/22 1/12/22 Approved as noted
G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes And Gullies MH-G-02, MH-G-03, MH-G-
3A 3 KAIG3-RFI-SW-C-3294 00 04 and G-G-52&53, G-G-50&51, G-G-48&49, G-G-47, G-G-33, G-G-32, G-G-31 - AS Highlighted Civil Site Works 1/9/22 1/12/22 Code C (resubmit)
(SP#118)
Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes And Gullies MH-G-02, MH-G-03, MH-G-
3A 3 KAIG3-RFI-SW-C-3294 01 04 and G-G-52&53, G-G-50&51, G-G-48&49, G-G-47, G-G-33, G-G-32, G-G-31 - AS Highlighted Civil Site Works 2/1/22 2/3/22 Approved as noted
(SP#118)
Inspection of Sand Bedding under pipe for Potable Water Line (Branch) at Zone- K - as highlighted (SP #
Zone K 5 KAIG3-RFI-SW-C-3295 00 Civil Site Works 1/9/22 1/15/22 Approved as noted
67)

4C 4 KAIG3-RFI-SW-C-3296 00 Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-07 & MH-D-08 as Highlighted Civil Site Works 1/9/22 1/11/22 Approved as noted

4B 4 KAIG3-RFI-SW-C-3297 00 Surface Preparation prior to start Waterproofing for SBC-01 Transition Area - as highlighted Civil Site Works 1/9/22 1/11/22 Approved as noted

Zone F 5 KAIG3-RFI-SW-C-3298 00 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 1/9/22 1/15/22 Code C (resubmit)

Zone F 5 KAIG3-RFI-SW-C-3298 01 Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 2/1/22 2/6/22 Approved as noted

Zone F 5 KAIG3-RFI-SW-C-3299 00 Inspection of Sand Bedding under pipe for Fire Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 1/9/22 1/15/22 Code C (resubmit)

Zone F 5 KAIG3-RFI-SW-C-3299 01 Inspection of Sand Bedding under pipe for Fire Water Line branch at Zone-F as highlighted (SP # 67) Civil Site Works 2/1/22 2/6/22 Approved as noted

kaig-qcals 216
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/13 to K/MV/01) at Zone-G&K as
Zone 5 G & K 5 KAIG3-RFI-SW-C-3300 00 Civil Site Works 1/10/22 1/12/22 Approved as noted
highlighted in the attached drawing

Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for MH-A-02, MH-A-10 as
4C 4 KAIG3-RFI-SW-C-3301 00 Civil Site Works 1/10/22 1/12/22 Approved as noted
Highlighted SP#118

Inspection of Backfilling Gravel (1st layer out of 2) for Gullies G-F-29, G-F-30, G-F-35, G-F-36, G-F-39 (As
3B 3 KAIG3-RFI-SW-C-3302 00 Civil Site Works 1/9/22 1/12/22 Approved as noted
Highlighted) SP#118

Inspection And Compaction Test For Backfilling 1ST Layer (01 of 04) Around Gullies G-F-31, G-F-34, G-
3B 3 KAIG3-RFI-SW-C-3303 00 Civil Site Works 1/9/22 1/13/22 Approved as noted
F-38, G-F-41 as Highlighted (SP#129 A-1-B)

Zone B 4 KAIG3-RFI-SW-C-3304 00 Inspection for Installation Of Isolation Potable Water Line Pit B/F/08 as highlighted Civil Site Works 1/10/22 1/11/22 Approved as noted

Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-A-01 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3309 00 Civil Site Works 1/10/22 1/12/22 Approved as noted
(SP# 118)

Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - F (Near RB-244) as
Zone F 4 KAIG3-RFI-SW-C-3310 00 Civil Site Works 1/10/22 1/15/22 Approved as noted
highlighted (SP# 129 A-1-B)

Zone F 4 KAIG3-RFI-SW-C-3311 00 Excavation for Potable Water Line branch at Zone-F including Pit - F/PW/06 - as highlighted Civil Site Works 1/10/22 1/13/22 Approved as noted

Zone F 4 KAIG3-RFI-SW-C-3312 00 Excavation for Fire Water Line branch at Zone-F including Pit - F/F/09 - as highlighted Civil Site Works 1/10/22 1/13/22 Approved as noted

Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 5) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3313 00 Civil Site Works 1/10/22 1/15/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3314 00 Civil Site Works 1/11/22 1/15/22 Approved as noted
MH-G-01-03 To MH-G-01-02 As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the pipe for
Zone B 4 KAIG3-RFI-SW-C-3315 00 Fire & Security Distribution Line from B/FS/19 to B/FS/24 at Zone-B as highlighted in the attached drawing Civil Site Works 1/10/22 1/15/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the pipe for
Zone B 4 KAIG3-RFI-SW-C-3316 00 Telecommunications Line from B/TL/25 to B/TL/21 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 1/10/22 1/15/22 Approved as noted
Pile # 129 A-1-B)
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (K/FS/01 to K/FS/13) at
Zone K 5 KAIG3-RFI-SW-C-3317 00 Civil Site Works 1/10/22 1/15/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP # 130)

Inspection of Sand Bedding under pipe for Telecommunication Line from K/TL/01 to K/TL/21) at Zone-K as
Zone K 5 KAIG3-RFI-SW-C-3318 00 Civil Site Works 1/10/22 1/15/22 Approved as noted
highlighted in the attached drawing (SP # 130)

Inspection of Backfilling Gravel 3rd Layer (3 out of 3) around the Manhole for MH-A-01 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3319 00 Civil Site Works 1/11/22 1/12/22 Approved as noted
(SP# 118)

Zone K G 5 KAIG3-RFI-SW-C-3320 00 Inspection for Installation Of Isolation Potable Water Line Pit F/F/05, F/F/06, F/F/07, G/F/05 - as highlighted Civil Site Works 1/11/22 1/13/22 Approved as noted

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 5) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3321 00 Civil Site Works 1/11/22 1/17/22 Code C (resubmit)
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 5) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3321 01 Civil Site Works 1/25/22 1/29/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line From
4A 4 KAIG3-RFI-SW-C-3322 00 Civil Site Works 1/11/22 1/17/22 Code C (not resubmit)
MH-G-01-03 To MH-G-01-02 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
Zone 3 3 KAIG3-RFI-SW-C-3323 00 Civil Site Works 1/11/22 1/17/22 Approved as noted
G-03 To MH-G-03-01 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
Zone 3 3 KAIG3-RFI-SW-C-3324 00 Civil Site Works 1/11/22 1/17/22 Approved as noted
G-03-01 To MH-G-03-02 As Highlighted (SP#129 A-1-B)

Inspection And Compaction Test For Backfilling 2nd Layer (2 of 4) Around Gullies G-F-31, G-F-34, G-F-38,
3B 3 KAIG3-RFI-SW-C-3325 00 Civil Site Works 1/11/22 1/15/22 Approved as noted
G-F-41 as Highlighted (SP#129 A-1-B)

kaig-qcals 217
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Zone K 5 KAIG3-RFI-SW-C-3331 00 Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing Civil Site Works 1/11/22 1/17/22 Approved as noted

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/10
Zone K 5 KAIG3-RFI-SW-C-3332 00 Civil Site Works 1/11/22 1/15/22 Code C (resubmit)
& K-TL-16 to End of Line at Zone-K as highlighted in the attached drawi

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/10
Zone K 5 KAIG3-RFI-SW-C-3332 01 Civil Site Works 1/31/22 2/1/22 Approved as noted
& K-TL-16 to End of Line at Zone-K as highlighted in the attached drawi

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Zone K 5 KAIG3-RFI-SW-C-3333 00 Civil Site Works 1/11/22 1/15/22 Code C (resubmit)
K/FS/04 & K/FS/06 to End of Line at Zone-K as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Zone K 5 KAIG3-RFI-SW-C-3333 01 Civil Site Works 1/31/22 2/1/22 Approved as noted
K/FS/04 & K/FS/06 to End of Line at Zone-K as highlighted in the attached drawing

Inspection and compaction test of Backfilling Sub Grade (1st Layer out of 4) around gullies G-F-42, G-F-43
3A 3 KAIG3-RFI-SW-C-3335 00 Civil Site Works 1/12/22 1/17/22 Code C (not resubmit)
as Highlighted (SP#129 A-1-B)

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at Zone-B (As
Zone B 3 KAIG3-RFI-SW-C-3336 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
Highlighted)

Inspection of Formwork for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at Zone-B (As
Zone B 3 3 KAIG3-RFI-SW-C-3337 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
Highlighted)

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at
Zone B 3 3 KAIG3-RFI-SW-C-3338 00 Civil Site Works 1/12/22 1/17/22 Approved as noted
Zone-B (As Highlighted)

Inspection of Thrust Block for UPVC Pipe (200 & 250mm Dia) for Fire Water Line at Zone- B & C - As
B&C 3 KAIG3-RFI-SW-C-3339 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
Highlighted in the attached drawing

Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at Zone-B (As
Zone B 3 3 KAIG3-RFI-SW-C-3340 00 Civil Site Works 1/12/22 1/13/22 Approved as noted
Highlighted)

Inspection of Formwork for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at Zone-B (As
Zone B 3 3 KAIG3-RFI-SW-C-3341 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
Highlighted)

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at
Zone B 3 3 KAIG3-RFI-SW-C-3342 00 Civil Site Works 1/12/22 1/17/22 Approved as noted
Zone-B (As Highlighted)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/11
Zone K 5 KAIG3-RFI-SW-C-3343 00 Civil Site Works 1/12/22 1/15/22 Code C (resubmit)
& between K-TL-23 to K-TL-07 at Zone-K as highlighted in the attached drawing 1/12/2022

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/11
Zone K 5 KAIG3-RFI-SW-C-3343 01 Civil Site Works 1/31/22 2/1/22 Approved as noted
& between K-TL-23 to K-TL-07 at Zone-K as highlighted in the attached drawing 1/12/2022

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Zone K 5 5 KAIG3-RFI-SW-C-3344 00 Civil Site Works 1/12/22 1/15/22 Code C (resubmit)
K/FS/08 at Zone-K as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Zone K 5 5 KAIG3-RFI-SW-C-3344 01 Civil Site Works 1/31/22 2/1/22 Approved as noted
K/FS/08 at Zone-K as highlighted in the attached drawing

Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-K
Zone K 5 5 KAIG3-RFI-SW-C-3345 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
(SA-14 ) - As Highlighted

Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-10, FW-A-11 as
6A 6 KAIG3-RFI-SW-C-3348 00 Civil Site Works 1/12/22 1/16/22 Approved as noted
highlighted

INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-10, FW-A-11
6A 6 KAIG3-RFI-SW-C-3349 00 Civil Site Works 1/12/22 1/16/22 Approved as noted
(AS ATTACHED)

Inspection of Backfilling Gravel 1st Layer (1 out of 4) around the Manhole for MH-D-08 as Highlighted
4C 4 KAIG3-RFI-SW-C-3350 00 Civil Site Works 1/12/22 1/15/22 Approved as noted
SP#118

Inspection And Compaction Test of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 4) around the
4C 4 KAIG3-RFI-SW-C-3351 00 Civil Site Works 1/12/22 1/17/22 Approved as noted
Manhole for MH-A-01, MH-A-02, MH-A-10 as Highlighted SP#129 A-1-B

Zone K 5 5 KAIG3-RFI-SW-C-3352 00 Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlighted Civil Site Works 1/12/22 1/17/22 Approved as noted

Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlighted
Zone K 5 5 KAIG3-RFI-SW-C-3353 00 Civil Site Works 1/12/22 1/17/22 Approved as noted

Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And Gullies MH-G-01, MH-G-01-01 and
3A 3 KAIG3-RFI-SW-C-3354 00 Civil Site Works 1/12/22 1/17/22 Approved as noted
G-G-52&53, G-G-50&51, G-G-55, G-G-54 - AS Highlighted (SP#118)

kaig-qcals 218
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

3A 3B 3 KAIG3-RFI-SW-C-3355 00 Notification to Start Road Constrution From ST 00 to ST 2149 as per the approved Shop Drawing No # 167 Civil Site Works 1/12/22 1/15/22 Approved as noted

Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3363 00 Telecommunications Line from K/TL/19 to K/TL/18 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/12/22 1/17/22 Code C (resubmit)
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3363 01 Telecommunications Line from K/TL/19 to K/TL/18 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 2/1/22 2/6/22 Approved as noted
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3364 00 Fire & Security Distribution Line from K/FS/04 to K/FS/05) at Zone-K as highlighted in the attached drawing Civil Site Works 1/12/22 1/17/22 Code C (resubmit)
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3364 01 Fire & Security Distribution Line from K/FS/04 to K/FS/05) at Zone-K as highlighted in the attached drawing Civil Site Works 2/1/22 2/6/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3365 00 Telecommunications Line from K/TL/10 to K/TL/19 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/12/22 1/17/22 Code C (resubmit)
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
Zone K 5 5 KAIG3-RFI-SW-C-3365 01 Telecommunications Line from K/TL/10 to K/TL/19 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 2/1/22 2/6/22 Approved as noted
Pile # 129 A-1-B)
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (110mmØ - UPVC- Class 4) from
Site Works/Crescent 1
6A 6 KAIG3-RFI-SW-C-3366 00 (FW-A-13.5 to CENOZOIC GARDEN ). At CRECENT-01 ZONE- 1D. As per highlighted Area in the Civil 1/13/22 1/17/22 Approved as noted
Zone 1D
attached Dwg.

Warning Tape Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-13.5 to Site Works/Crescent 1
6A 6 KAIG3-RFI-SW-C-3367 00 Civil 1/13/22 1/17/22 Approved as noted
CENOZOIC GARDEN ). At CRECENT-01 ZONE- 1D. As per highlighted Area in the attached Dwg Zone 1D

300 mm Gravel 3/8" Backfilling and Geotextile for Strom Water Line OUTFAL-G for (315mmØ-UPVC
4 4 KAIG3-RFI-SW-C-3368 00 Pipes-Class 4) from ( Catch Basin Pipes Connection G-G-70, 46, 45, 30, 31, 33, With Backdrop) As per Civil Site Works 1/13/22 1/17/22 Approved as noted
highlighted Area in the attached Dwg.
Warning Tape Installation of Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipes-Class 4) from
4 4 KAIG3-RFI-SW-C-3369 00 ( Catch Basin Pipes Connection G-G-70, 46, 45, 30, 31, 33, With Backdrop) As per highlighted Area in the Civil Site Works 1/13/22 1/17/22 Approved as noted
attached Dwg.
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) from
Site Works/Crescent 2
6A 6 KAIG3-RFI-SW-C-3370 00 (FW-A-09 to FW-A-12). At CRECENT-02 ZONE- ZONE-2E & 2F. As per highlighted Area in the attached Civil 1/13/22 1/17/22 Approved as noted
Zone 2E & 2F
Dwg.
Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-09 to FW-A-12). At Site Works/Crescent 2
6A 6 KAIG3-RFI-SW-C-3371 00 Civil 1/13/22 1/17/22 Approved as noted
CRECENT-02 ZONE- ZONE-2E & 2F. As per highlighted Area in the attached Dwg. Zone 2E & 2F

Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone - F (Near RB-244) as
F 4 KAIG3-RFI-SW-C-3373 00 Civil Site Works 1/13/22 1/17/22 Approved as noted
highlighted (SP# 129 A-1-B)

Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall and
2B 2 KAIG3-RFI-SW-C-3374 00 Civil Site Works 1/13/22 1/15/22 Approved as noted
Top Slab of SBC-01-Transition Area (As Highlighted)

Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/05 to G/MV/12) at Zone-G as
5G 3 KAIG3-RFI-SW-C-3375 00 Civil Site Works 1/15/22 1/17/22 Approved as noted
highlighted in the attached drawing

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/13 to L/MV/08 at Zone-G,K&L
5G K L 5 KAIG3-RFI-SW-C-3376 00 Civil Site Works 1/15/22 1/19/22 Code C (resubmit)
as highlighted in the attached drawing

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/13 to L/MV/08 at Zone-G,K&L
5G K L 5 KAIG3-RFI-SW-C-3376 01 Civil Site Works 2/1/22 2/6/22 Approved as noted
as highlighted in the attached drawing
Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes And Gullies MH-G-03-01, MH-G-03-02,
3A 3 KAIG3-RFI-SW-C-3379 00 MH-G-05, MH-G-06 and G-G-28, G-G-29, G-G-30, G-G-34, G-G-35, G-G-36, G-G-37, G-G-38, G-G-39, G- Civil Site Works 1/13/22 1/17/22 Approved as noted
G-40, G-G-41, G-G-42, G-G-43, G-G-44, G-G-45, G-G-46, G-G
Inspection of Sand bedding for Potable Water Line at Zone-K as highlighted in the attached drawing (Stock
K5 5 KAIG3-RFI-SW-C-3386 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
Pile # 130)

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/45 to K/TL/20) at
G K5 5 KAIG3-RFI-SW-C-3387 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
Zone-G&K as highlighted (SP#130)

Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/46 to
G K5 5 KAIG3-RFI-SW-C-3388 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
K/FS/18) at Zone-G&K as highlighted (SP# 130)

Inspection and Compaction Test of Backfilling Sub-grade above Gravel - 2nd Layer (2 out of 4) around the
4C 4 KAIG3-RFI-SW-C-3389 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
Manhole for MH-A-01, MH-A-02, MH-A-10 as Highlighted (SP#129 A-1-B)

Excavation for Potable Water Line at Zone-F &G including branch and Pit F/PW/03, F/PW/13, F/PW/14,
F G4 4 KAIG3-RFI-SW-C-3393 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
G/PW/01- as highlighted in the attached drawing

kaig-qcals 219
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation for Fire Water Line at Zone-F & G including branch and Pit F/F/08, F/F/03, F/F/11, G/F/06,
F G4 4 KAIG3-RFI-SW-C-3394 00 Civil Site Works 1/15/22 1/18/22 Approved as noted
G/F/03, G/F/01, G/F/02 as highlighted in the attached drawing

Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line From
3 3 KAIG3-RFI-SW-C-3395 00 Civil Site Works 1/15/22 1/22/22 Approved as noted
MH-G-03-01 To MH-G-03-02 As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 2ndt Layer (2 of 4) for Storm Water Line From
3 3 KAIG3-RFI-SW-C-3396 00 Civil Site Works 1/15/22 1/22/22 Approved as noted
MH-G-03 To MH-G-03-01 As Highlighted (SP#129 A-1-B)

Surface Preperation prior to start backfilling Gravel around the Gullies for (G-G-28, G-G-29, G-G-30 ) - as
3 3 KAIG3-RFI-SW-C-3397 00 Civil Site Works 1/16/22 1/17/22 Approved as noted
Highlighted

6A 6 KAIG3-RFI-SW-C-3398 00 Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-12 as highlighted Civil Site Works 1/16/22 1/20/22 Approved as noted

INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-12, (AS
6A 6 KAIG3-RFI-SW-C-3399 00 Civil Site Works 1/16/22 1/20/22 Code C (not resubmit)
ATTACHED)

3A 3 KAIG3-RFI-SW-C-3400 00 Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manhole MH-G-05 AS Highlighted SP#118) Civil Site Works 1/16/22 1/18/22 Approved as noted

FK 5 KAIG3-RFI-SW-C-3401 00 Inspection for Installation Of Isolation Fire Water Line Pit F/F/09, K/F/02 as highlighted Civil Site Works 1/16/22 1/17/22 Approved as noted

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
3B 3 KAIG3-RFI-SW-C-3402 00 Civil Site Works 1/16/22 1/18/22 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) As attached

Inspection of Backfilling Sub Grade Above Gravel (1ST Layer out of 8) around the Manhole And Gullies for
5A 5 KAIG3-RFI-SW-C-3403 00 MH-G-01 ,MH-G-03-01, G-G-28, G-G-29, G-G-30, G-G-34, G-G-35, G-G-36, G-G-37, G-G-38, G-G- Civil Site Works 1/16/22 1/18/22 Code C (resubmit)
39, G-G-40, G-G-41, G-G-42, G-G-43, G-G-44, G-G-45, G-G-46, G-G-72 AS HIGHLIGHTED
Inspection of Backfilling Sub Grade Above Gravel (1ST Layer out of 8) around the Manhole And Gullies for
5A 5 KAIG3-RFI-SW-C-3403 01 MH-G-01 ,MH-G-03-01, G-G-28, G-G-29, G-G-30, G-G-34, G-G-35, G-G-36, G-G-37, G-G-38, G-G- Civil Site Works 1/20/22 1/25/22 Approved as noted
39, G-G-40, G-G-41, G-G-42, G-G-43, G-G-44, G-G-45, G-G-46, G-G-72 AS HIGHLIGHTED
Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B - As Highlighted in
B 3 KAIG3-RFI-SW-C-3404 00 Civil Site Works 1/16/22 1/17/22 Approved as noted
the attached drawing

Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B - As Highlighted in
B3 3 KAIG3-RFI-SW-C-3405 00 Civil Site Works 1/16/22 1/17/22 Approved as noted
the attached drawing

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/14 to K/TL/11
K5 5 KAIG3-RFI-SW-C-3406 00 Civil Site Works 1/16/22 1/18/22 Code C (resubmit)
at Zone-K as highlighted in the attached drawing

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/14 to K/TL/11
K5 5 KAIG3-RFI-SW-C-3406 01 Civil Site Works 1/31/22 2/1/22 Approved as noted
at Zone-K as highlighted in the attached drawing
Site Works beside
Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
4C 4D 5A 4 KAIG3-RFI-SW-C-3408 00 Civil Butterfly, Physic & Maze 1/17/22 1/19/22 Approved as noted
attached Dwg.
Garden
Site Works beside
Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
4C 4D 5A 4 KAIG3-RFI-SW-C-3408 01 Civil Butterfly, Physic & Maze 2/8/22 2/9/22 Approved as noted
attached Dwg.
Garden
Site Works beside
Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per
4C 4D 5A 4 KAIG3-RFI-SW-C-3409 00 Civil Butterfly, Physic & Maze 1/17/22 1/18/22 Approved as noted
highlighted Area in the attached Dwg.
Garden
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (315mmØ - UPVC- Class 4) from
Site Works/Crescent 2
6A 6 KAIG3-RFI-SW-C-3410 00 (FW-A-09 to FW-A-12). At CRECENT-02 ZONE- ZONE-2E & 2F. As per highlighted Area in the attached Civil 1/17/22 1/18/22 Approved as noted
Zone 2E & 2F
Dwg.

Warning Tape Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-09 to FW-A-12). Site Works/Crescent 2
6A 6 KAIG3-RFI-SW-C-3411 00 Civil 1/17/22 1/18/22 Approved as noted
At CRECENT-02 ZONE- ZONE-2E & 2F. As per highlighted Area in the attached Dwg. Zone 2E & 2F

Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
4A 4 KAIG3-RFI-SW-C-3412 00 Civil Site Work next to Toilet 1 1/17/22 1/20/22 Code C (resubmit)
attached Dwg.

Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
4A 4 KAIG3-RFI-SW-C-3412 01 Civil Site Work next to Toilet 1 2/13/22 2/16/22 Approved as noted
attached Dwg.

Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per
4A 4 KAIG3-RFI-SW-C-3413 00 Civil Site Work next to Toilet 1 1/17/22 1/18/22 Code C (resubmit)
highlighted Area in the attached Dwg.

Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per
4A 4 KAIG3-RFI-SW-C-3413 01 Civil Site Work next to Toilet 1 2/23/22 2/26/22 Approved as noted
highlighted Area in the attached Dwg.

kaig-qcals 220
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3414 00 Civil Site Work beside Parking 1/17/22 1/20/22 Code C (resubmit)
attached Dwg.

Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3414 01 Civil Site Work beside Parking 2/13/22 2/16/22 approved as noted
attached Dwg.

Warning Tape Installation of Fire Fighting Networks for (160 & 250mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-3415 00 Civil Site Work beside Parking 1/17/22 1/18/22 Code C (resubmit)
highlighted Area in the attached Dwg.

Warning Tape Installation of Fire Fighting Networks for (160 & 250mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-3415 01 Civil Site Work beside Parking 2/23/22 2/26/22 Approved as noted
highlighted Area in the attached Dwg.

Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3416 00 Civil Site Works 1/18/22 1/18/22 Code C (resubmit)
attached Dwg.

Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
3B 3 KAIG3-RFI-SW-C-3416 01 Civil Site Works 2/2/22 2/6/22 Approved as noted
attached Dwg.

Warning Tape Installation of Fire Fighting Networks for (160, 200 & 250mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-3417 00 Civil Site Works 1/18/22 1/23/22 Code C (resubmit)
highlighted Area in the attached Dwg.

Warning Tape Installation of Fire Fighting Networks for (160, 200 & 250mmØ-UPVC-Class-5). As per
3B 3 KAIG3-RFI-SW-C-3417 01 Civil Site Works 2/8/22 2/9/22 Approved as noted
highlighted Area in the attached Dwg.

Inspection of Sand bedding under pipe for Fire Water Line at Zone-K as highlighted in the attached drawing
K5 5 KAIG3-RFI-SW-C-3420 00 Civil Site Works 1/17/22 1/18/22 Approved as noted
(SP # 130)

Inspection of Sand Bedding under pipe for Potable Water Line at Zone-F & G including branch - as
FG4 4 KAIG3-RFI-SW-C-3421 00 Civil Site Works 1/17/22 1/19/22 Approved as noted
highlighted in the attached drawing (SP # 130)

Inspection of Sand Bedding under pipe for Fire Water Line at Zone-F & G including branch - as highlighted
FG4 4 KAIG3-RFI-SW-C-3422 00 Civil Site Works 1/17/22 1/19/22 Approved as noted
in the attached drawing (SP # 130)

Surface Preparation prior to start waterproofing for Duct Bank of Telecommunications line from G/TL/29 to
G 3 KAIG3-RFI-SW-C-3423 00 Civil Site Works 1/17/22 1/20/22 Approved as noted
near H/TL/06 at Zone-G - As Highlighted

Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line from G/FS/33 to near
G 3 KAIG3-RFI-SW-C-3424 00 Civil Site Works 1/17/22 1/20/22 Approved as noted
H/FS/06 at Zone-G - As Highlighted

Inspection of Waterproofing for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at
G 3 KAIG3-RFI-SW-C-3425 00 Civil Site Works 1/17/22 1/20/22 Approved as noted
Zone-G - As Highlighted

Inspection of waterproofing for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-G -
G 3 KAIG3-RFI-SW-C-3426 00 Civil Site Works 1/17/22 1/20/22 Approved as noted
As Highlighted

Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-05 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-3427 00 Civil Site Works 1/17/22 1/18/22 Approved as noted
Highlighted

Surface Preparation prior to start backfilling Sub-grade to Protect the Sand Covering Layer of
GK5 5 KAIG3-RFI-SW-C-3428 00 Civil Site Works 1/17/22 1/18/22 Approved as noted
Telecommunications Line (beside) from (G/TL/45 to K/TL/20) at Zone-G&K as highlighted
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to Protect the Sand Covering Layer of
GK5 5 KAIG3-RFI-SW-C-3429 00 Telecommunications Line (beside) from (G/TL/45 to K/TL/20) at Zone-G&K as highlighted (SP # 129 A-1- Civil Site Works 1/17/22 1/22/22 Approved as noted
B)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
2B 2 KAIG3-RFI-SW-C-3430 00 Civil Site Works 1/18/22 1/20/22 Approved as noted
SBC-01 - Transition Area (As Highlighted)

Inspection and Compaction Test of Backfilling Sub-grade above Gravel - 3rd Layer (3 out of 4) around the
4C 4 KAIG3-RFI-SW-C-3431 00 Civil Site Works 1/18/22 1/22/22 Approved as noted
Manhole for MH-A-01, MH-A-02, MH-A-10 as Highlighted (SP#129 A-1-B)
INSPECTION FOR INSTALLATION OF GULLIES FOR - G-H-01, G-H-02, G-H-03 G-H-04, G-H-05, G-
3A 3 KAIG3-RFI-SW-C-3435 00 H-06, G-H-07, G-H-08, G-H-09, G-H-10, G-H-11, G-H-12, G-H-13, G-H-14, G-H-15, G-H-16, G-H-17, G- Civil Site Works 1/17/22 1/20/22 Approved as noted
H-18, G-H-19, G-H-020, G-H-21 (As Highlighted)
Inspection And Compaction Test Of Backfilling Sub-grade Above Gravel 1st Layer (1 of 3) For Manholes
3A 3 KAIG3-RFI-SW-C-3436 00 And Gullies MH-G-02, MH-G-03, MH-G-04 and G-G-52&53, G-G-50&51, G-G-48&49, G-G-47, G-G-33, Civil Site Works 1/17/22 1/22/22 Approved as noted
G-G-32, G-G-31 - AS Highlighted (SP#129)
Inspection And Compaction Test of Backfilling Sub-Grade Above Gravel 1st Layer (1 of 2) For Manhole
3A 3 KAIG3-RFI-SW-C-3437 00 Civil Site Works 1/17/22 1/22/22 Approved as noted
MH-G-05 AS Highlighted SP#129)

Excavation for Fire Water Line at Zone-B including branch and Pit B/F/04 as highlighted in the attached
B3 3 KAIG3-RFI-SW-C-3438 00 Civil Site Works 1/18/22 1/20/22 Approved as noted
drawing

kaig-qcals 221
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation for Potable Water Line at Zone-B including branch and Pit B/PW/05 - as highlighted in the
B3 3 KAIG3-RFI-SW-C-3439 00 Civil Site Works 1/18/22 1/20/22 Approved as noted
attached drawing
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3440 00 Fire & Security Distribution Line from K/FS/23 to K/FS/08) at Zone-K as highlighted in the attached drawing Civil Site Works 1/18/22 1/19/22 Code C (resubmit)
(Stock Pile # 129 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3440 01 Fire & Security Distribution Line from K/FS/23 to K/FS/08) at Zone-K as highlighted in the attached drawing Civil Site Works 1/31/22 2/5/22 Approved as noted
(Stock Pile # 129 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3441 00 Telecommunications Line from K/TL/09 to K/TL/11 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/18/22 1/19/22 Code C (resubmit)
Pile # 129 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3441 01 Telecommunications Line from K/TL/09 to K/TL/11 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/31/22 2/6/22 Approved as noted
Pile # 129 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3442 00 Fire & Security Distribution Line from K/FS/23 to K/FS/04) at Zone-K as highlighted in the attached drawing Civil Site Works 1/18/22 1/19/22 Code C (resubmit)
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3442 01 Fire & Security Distribution Line from K/FS/23 to K/FS/04) at Zone-K as highlighted in the attached drawing Civil Site Works 1/31/22 2/6/22 Approved as noted
(Stock Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3443 00 Telecommunications Line from K/TL/09 to K/TL/10 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/18/22 1/19/22 Code C (resubmit)
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pipe for
K5 5 KAIG3-RFI-SW-C-3443 01 Telecommunications Line from K/TL/09 to K/TL/10 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 1/31/22 2/6/22 Approved as noted
Pile # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & above the
K5 5 KAIG3-RFI-SW-C-3444 00 pipe for Fire & Security Distribution Line from K/FS/06 to End of Line) at Zone-K as highlighted in the Civil Site Works 1/18/22 1/22/22 Approved as noted
attached drawing (Stock Pile # 129 A-1-
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 3) for Storm Water Line From
3 3 KAIG3-RFI-SW-C-3447 00 Civil Site Works 1/22/22 1/27/22 Code C (not resubmit)
MH-G-03 To MH-G-03-01 And From MH-G-03-01 To MH-G-03-02 As Highlighted (SP#129 A-1-B
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & above the
K5 5 KAIG3-RFI-SW-C-3453 00 pipe for Telecommunications Line from K/TL/16 to end of line at Zone-K as highlighted in the attached Civil Site Works 1/19/22 1/25/22 Code C (resubmit)
drawing (SP # 129 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & above the
K5 5 KAIG3-RFI-SW-C-3453 01 pipe for Telecommunications Line from K/TL/16 to end of line at Zone-K as highlighted in the attached Civil Site Works 2/7/22 2/14/22 Approved as noted
drawing (SP # 129 A-1-B)
Excavation for Telecommunication Line between C/TL/15 to G/TL/29) including branch and pit C/TL/15,
BCG 3 KAIG3-RFI-SW-C-3454 00 C/TL/27, B/TL/49, B/TL/40, B/TL/39, G/TL/33, G/TL/31 at Zone-B,C,G as highlighted in the attached Civil Site Works 1/19/22 1/25/22 Approved as noted
drawing
Excavation for Fire & Security Distribution Line from (C/FS/08 to G/FS/33) including Branch and Pit
BCG 3 KAIG3-RFI-SW-C-3455 00 C/FS/08, C/FS/06, C/FS/04, B/FS/38, G/FS/16, G/FS/18 at Zone-B,C,G as highlighted in the attached Civil Site Works 1/19/22 1/25/22 Approved as noted
drawing
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone - F (Near RB-244) as
F 5 KAIG3-RFI-SW-C-3456 00 Civil Site Works 1/19/22 1/24/22 Approved as noted
highlighted (SP# 129 A-1-B)

2B 2 KAIG3-RFI-SW-C-3457 00 Inspection for Casting the Blinding Concrete under the Foundation of SBC-05 -Wing Wall (as Highlighted) Civil Site Works 1/19/22 1/23/22 Approved as noted

Inspection of Backfilling Sub-grade 1st Layer (1 of 3) For Storm Water Line Above Warning Tape From
3A 3 KAIG3-RFI-SW-C-3458 00 Civil Site Works 1/19/22 1/23/22 Approved as noted
MH-G-01 To MH-G-02 And From MH-G-01 To G-G-50 As Highlighted (SP#12

K5 5 KAIG3-RFI-SW-C-3459 00 Inspection for Installation Of Isolation Fire Water Line Pit K/F/01, K/F/03 - as highlighted Civil Site Works 1/19/22 1/20/22 Approved as noted

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
3B 3 KAIG3-RFI-SW-C-3460 00 Civil Site Works 1/19/22 1/23/22 Approved as noted
Application of Primer (1st Coat, 2nd Coat and 3rd Coat) As attached

Inspection of Backfilling Sub-grade (above Gravel) 2nd Layer (2 out of 4) around the Manhole for FW-A-25,
5A 5 KAIG3-RFI-SW-C-3461 00 Civil Site Works 1/19/22 1/23/22 Code C (not resubmit)
FW-A-24, FW-A-23, FW-A-22, FW-A-21 & FW-A-19 - as Highlighted (SP# 129 A-1-B)

Inspection of Steel Reinforcement for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L
KL5 5 KAIG3-RFI-SW-C-3464 00 Civil Site Works 1/19/22 1/20/22 Approved as noted
(As Highlighted)

Inspection of Formwork for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As
KL5 5 KAIG3-RFI-SW-C-3465 00 Civil Site Works 1/19/22 1/20/22 Approved as noted
Highlighted)

kaig-qcals 222
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Concrete Pouring for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As
KL5 5 KAIG3-RFI-SW-C-3466 00 Civil Site Works 1/19/22 1/20/22 Approved as noted
Highlighted)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Fire
K5 5 KAIG3-RFI-SW-C-3470 00 Water Line from Thrust Block to Thrust Block at Zone-K as highlighted in the attached drawing (Stock Pile # Civil Site Works 1/20/22 1/23/22 Approved as noted
129)
Inspection and Compaction Test for NGL of Telecommunication Line between C/TL/15 to G/TL/29) at Zone-
BCG 3 KAIG3-RFI-SW-C-3471 00 Civil Site Works 1/20/22 1/23/22 Approved as noted
B,C,G as highlighted in the attached drawing. (Proctor : 2.17)

Inspection for Blinding Concrete under Potable Water Line Pit B/PW/05, F/PW/03, F/PW/13, F/PW/14,
BFG 3 KAIG3-RFI-SW-C-3472 00 Civil Site Works 1/20/22 1/25/22 Approved as noted
G/PW/01 at Zone-B,F&G - as highlighted

Inspection for Blinding Concrete under Fire Water Line Pit B/F/04, B/F/05, F/F/03, F/F/08, F/F/11, G/F/01,
BFG 3 KAIG3-RFI-SW-C-3473 00 Civil Site Works 1/20/22 1/25/22 Approved as noted
G/F/02, G/F/03, G/F/06 at Zone-B,F&G - as highlighted

Inspection of Backfilling Gravel 2nd Layer (2 out of 4) around the Manhole for MH-D-08 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3474 00 Civil Site Works 1/20/22 1/25/22 Approved as noted
(SP#118)

5 5 KAIG3-RFI-SW-C-3475 00 Soil Preparation prior to start backfill around SBC-01-Transition Area - as highlighted Civil Site Works 1/22/22 1/24/22 Approved as noted

Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-17)
KL 5 KAIG3-RFI-SW-C-3476 00 Civil Site Works 1/20/22 1/25/22 Code C (resubmit)
- As Highlighted

Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-17)
KL 5 KAIG3-RFI-SW-C-3476 01 Civil Site Works 5/14/22 5/16/22 Approved as noted
- As Highlighted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16,
KL 5 KAIG3-RFI-SW-C-3480 00 Civil Site Works 1/20/22 1/24/22 Code C (resubmit)
SA-17) - As Highlighted

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16,
KL 5 KAIG3-RFI-SW-C-3480 01 Civil Site Works 5/15/22 5/17/22 Approved as noted
SA-17) - As Highlighted

Surface Preparation prior to start Backfilling Gravel for Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1,
3A 3 KAIG3-RFI-SW-C-3484 00 Civil Site Works 1/20/22 1/24/22 Approved as noted
FW-A-13, FW-A-12, FW-A-11, FW-A-10, FW-A-9 as highlighted SP # 118.

Inspection of sand bedding under pipe for Fire Water Line at Zone-B including branch and Pit B/F/04 as
B 3 KAIG3-RFI-SW-C-3489 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
highlighted in the attached drawing (SP#130)

Inspection of Sand bedding for Potable Water Line at Zone-B including branch and Pit B/PW/05 - as
B 3 KAIG3-RFI-SW-C-3490 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
highlighted in the attached drawing (SP#130)

Inspection of Backfilling Gravel 3rd Layer (3 out of 4) around the Manhole for MH-D-08 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3491 00 Civil Site Works 1/22/22 1/23/22 Approved as noted
(SP#118)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3492 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
- as highlighted (SP#129 A-1-B)

Inspection of Backfilling Gravel 4th Layer (4 out of 6) around the Manhole for MH-D-08 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3493 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
(SP#118)

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/19, B/TL/25, B/TL/37, B/TL/42 at
B 3 KAIG3-RFI-SW-C-3494 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
Zone-B - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/19, B/FS/21, B/FS/22, B/FS/37 at
B 3 KAIG3-RFI-SW-C-3495 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
Zone-B - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fire
K5 5 KAIG3-RFI-SW-C-3497 00 Civil Site Works 1/22/22 1/27/22 Approved as noted
Water Line from K/F/02 to Thrust Block at Zone-K as highlighted in the attached drawing (Stock Pile # 129)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Potable
K5 5 KAIG3-RFI-SW-C-3498 00 Civil Site Works 1/22/22 1/27/22 Approved as noted
Water Line Branch at Zone-G&K as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1, FW-
6A 6 KAIG3-RFI-SW-C-3499 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
A-13 - As Highlighted (SP#118)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
6A 6 KAIG3-RFI-SW-C-3500 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-12, FW-A-11, FW-A-10, FW-A-09, FW- Civil Site Works 1/22/22 1/26/22 Approved as noted
A-08, FW-A-07 (As Highlighted)
Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) For Storm Water Line Above Warning Tape From
3A 3 KAIG3-RFI-SW-C-3501 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
Wadi To MH-G-01 To MH-G-02 As Highlighted (SP#128)

kaig-qcals 223
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And Gullies MH-G-01-07, MH-G-01-06,
3A 3 KAIG3-RFI-SW-C-3502 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
G-G-66, G-G-67, G-G-68, G-G-69, G-G-70, G-G-71 AS Highlighted SP#118)

Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 2) For Manhole MH-G-03-02 AS
3A 3 KAIG3-RFI-SW-C-3503 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
Highlighted SP#129)
Surface Preparation Prior to Start Backfilling Gravel For Manholes And Gullies MH-H-01, MH-H-02, MH-
3A 3 KAIG3-RFI-SW-C-3504 00 H-03, G-H-01, G-H-02, G-H-03 ,G-H-04, G-H-05, G-H-06, G-H-07, G-H-08, G-H-09, G-H-10 ,G-H-11, G- Civil Site Works 2/2/22 2/6/22 Approved as noted
H-12, G-H-13, G-H-14, G-H-15, G-H-16, G-H-17, G-H-18, G-H
Surface Preparation Prior to Start Backfilling Gravel For Manholes FW-A-08, FW-A-07, FW-A-06, FW-A-
3A 3 KAIG3-RFI-SW-C-3505 00 Civil Site Works 1/22/22 1/25/22 Approved as noted
05, FW-A-04, - AS Highlighted

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-3506 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
6A 6 KAIG3-RFI-SW-C-3507 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2 -
6A 6 KAIG3-RFI-SW-C-3508 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4 -
6A 6 KAIG3-RFI-SW-C-3509 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-4 to SBC - As
6A 6 KAIG3-RFI-SW-C-3510 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/36, B/TL/35, G/TL/32 at Zone-
BG 3 KAIG3-RFI-SW-C-3511 00 Civil Site Works 1/23/22 2/1/22 Approved as noted
B&G - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/36, B/FS/27, G/FS/17 at Zone-B&G -
BG 3 KAIG3-RFI-SW-C-3512 00 Civil Site Works 1/23/22 2/1/22 Approved as noted
as highlighted

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3513 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
- as highlighted (SP#129 A-1-B)
Excavation for MV Line from G/MV/25 TO G/MV/02 at Zone-G including Pit G/MV/24, G/MV14,
G 3 KAIG3-RFI-SW-C-3514 00 Civil Site Works 1/23/22 1/25/22 Code C (resubmit)
G/MV/15, G/MV/02 as highlighted in the attached drawing

Excavation for MV Line from G/MV/25 TO G/MV/02 at Zone-G including Pit G/MV/24, G/MV14,
G 3 KAIG3-RFI-SW-C-3514 01 Civil Site Works 1/26/22 1/29/22 Approved as noted
G/MV/15, G/MV/02 as highlighted in the attached drawing

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fire
K5 5 KAIG3-RFI-SW-C-3515 00 Civil Site Works 1/23/22 1/27/22 Approved as noted
Water Line from Thrust Block to K/F/02 at Zone-K as highlighted in the attached drawing (Stock Pile # 129)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for Fire
K5 5 KAIG3-RFI-SW-C-3519 00 Water Line from Thrust Block to Thrust Block at Zone-K as highlighted in the attached drawing (Stock Pile # Civil Site Works 1/23/22 1/26/22 Approved as noted
129)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
6A 6 KAIG3-RFI-SW-C-3520 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3521 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
- As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3522 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
- As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 3) For Storm Water Line above Warning Tape From
3A 3 KAIG3-RFI-SW-C-3523 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Wadi To MH-G-01 To MH-G-02 As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3524 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 4th Layer (4 of 5) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3525 00 Civil Site Works 1/23/22 1/27/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3526 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

kaig-qcals 224
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3530 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3531 00 Civil Site Works 1/23/22 1/26/22 Approved as noted
Highlighted (SP#129 A-1-B)

Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from
F 5 KAIG3-RFI-SW-C-3532 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
F/TL/12 to F/TL/04 at Zone-F (As Highlighted)

Inspection of Water proofing for the Duct Bank of Telecommunications Line from F/TL/12 to F/TL/04 at
F 5 KAIG3-RFI-SW-C-3533 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
Zone-F (As Highlighted)

Surface Preparation prior to start water proofing for the Duct Bank of Fire & Security Distribution Line from
F 5 KAIG3-RFI-SW-C-3534 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
F/FS/17 to F/FS/04 at Zone- F (As Highlighted)

Inspection of Water Proofing for the Duct Bank of Fire & Security Distribution Line from F/FS/17 to F/FS/04
F 5 KAIG3-RFI-SW-C-3535 00 Civil Site Works 1/23/22 1/25/22 Approved as noted
at Zone- F (As Highlighted)

Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (As
4A 3B 4 KAIG3-RFI-SW-C-3537 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted)

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
6A 6 KAIG3-RFI-SW-C-3541 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-3542 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-4 to SBC - As
6A 6 KAIG3-RFI-SW-C-3543 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
6A 6 KAIG3-RFI-SW-C-3544 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3545 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
- As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3546 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
- As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3547 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3548 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3549 00 Civil Site Works 1/24/22 1/27/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1,
6A 6 KAIG3-RFI-SW-C-3551 00 Civil Site Works 1/24/22 1/26/22 Approved as noted
FW-A-13 - As Highlighted (SP#118)

Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manholes and Gullies MH-G-01-07, MH-G-01-06,
3A 3 KAIG3-RFI-SW-C-3552 00 Civil Site Works 1/24/22 1/26/22 Approved as noted
G-G-66, G-G-67, G-G-68, G-G-69, G-G-70, G-G-71 - AS Highlighted (SP#118)

Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10,
6A 6 KAIG3-RFI-SW-C-3554 00 Civil Site Works 1/24/22 1/26/22 Approved as noted
FW-A-11, FW-A-12, FW-A-14 - As Highlighted (SP#118)

4C 4 KAIG3-RFI-SW-C-3555 00 Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-07 as Highlighted Civil Site Works 1/25/22 1/26/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3556 00 Civil Site Works 1/29/22 2/1/22 Approved as noted
- as highlighted (SP#129 A-1-B

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3A 3 KAIG3-RFI-SW-C-3557 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
H-02 To MH-H-03 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection of Backfilling Gravel 5th Layer (5 out of 6) around the Manhole for MH-D-08 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3558 00 Civil Site Works 1/25/22 1/26/22 Approved as noted
(SP#118)

6A 6 KAIG3-RFI-SW-C-3559 00 Surface Preparation Prior to Start Backfilling Gravel For Manhole - FW-A-13-2 - as Highlighted Civil Site Works 1/25/22 1/26/22 Approved as noted

kaig-qcals 225
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3 -
6A 6 KAIG3-RFI-SW-C-3560 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3A 3 KAIG3-RFI-SW-C-3565 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
H-01 To MH-H-02 As Highlighted in the attached Drawing (SP#129 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From MH-
3A 3 KAIG3-RFI-SW-C-3566 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
H-01 To Outfall H - As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 3nd Layer (3 of 3) above the Sand cover for Fire
K5 5 KAIG3-RFI-SW-C-3567 00 Water Line from Thrust Block to Thrust Block at Zone-K as highlighted in the attached drawing (Stock Pile # Civil Site Works 1/25/22 1/29/22 Approved as noted
129)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
GK5 5 KAIG3-RFI-SW-C-3568 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
Potable Water Line Branch at Zone-G&K as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above the Sand cover for Potable
G5 5 KAIG3-RFI-SW-C-3569 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Water Line Branch at Zone-G as highlighted in the attached drawing (Stock Pile # 129 A-1-B)

Inspection for Installation of Fire Line Isolation Pit B/F/04, B/F/05, F/F/03, F/F/08, G/F/01, G/F/02, G/F/03,
BFG 3 KAIG3-RFI-SW-C-3570 00 Civil Site Works 1/25/22 1/26/22 Approved as noted
G/F/06 - as highlighted

Inspection for Installation of Potable Water Line Isolation Pit - B/PW/05, F/PW/03, F/PW/13, F/PW/14,
BFG 3 KAIG3-RFI-SW-C-3572 00 Civil Site Works 1/25/22 1/26/22 Approved as noted
G/PW/01 - as highlighted

Excavation for Telecommunication Line between C/TL/15 to BG/D/TL/03) including branch and pit
BC 3 KAIG3-RFI-SW-C-3573 00 Civil Site Works 1/25/22 2/2/22 Approved as noted
C/TL/15, C/TL/27, B/TL/49, B/TL/40, B/TL/39 at Zone-B&C as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from (C/FS/08 to B/RC-FS/18) including Branch and Pit
BC 3 KAIG3-RFI-SW-C-3574 00 Civil Site Works 1/25/22 2/2/22 Approved as noted
C/FS/08, C/FS/06, C/FS/04, B/FS/38 at Zone-B&C as highlighted in the attached drawing

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As
6A 6 KAIG3-RFI-SW-C-3575 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Gravel 3rd Layer (3 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1, FW-
6A 6 KAIG3-RFI-SW-C-3576 00 Civil Site Works 1/25/22 1/26/22 Approved as noted
A-13 - As Highlighted (SP#118

Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
6A 6 KAIG3-RFI-SW-C-3577 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-3578 00 Civil Site Works 1/25/22 1/30/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-4 to SBC - As
6A 6 KAIG3-RFI-SW-C-3579 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
6A 6 KAIG3-RFI-SW-C-3580 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3581 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
- As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3582 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
- As Highlighted (SP#129 A-1-B

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3583 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3584 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3585 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3586 00 Civil Site Works 1/25/22 1/29/22 Approved as noted
Highlighted (SP#129 A-1-B)

Excavation for Telecommunication Line between G/TL/14 to G/TL/23 including pit G/TL/14, G/TL/23 at
G4 4 KAIG3-RFI-SW-C-3587 00 Civil Site Works 1/26/22 2/2/22 Approved as noted
Zone-G as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from G/FS/12 to G/FS/37, including Pit G/FS/12, G/FS/23
G4 4 KAIG3-RFI-SW-C-3588 00 Civil Site Works 1/26/22 2/2/22 Approved as noted
at Zone-G - as highlighted in the attached drawing

kaig-qcals 226
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation for MV Line from B/MV/25 TO B/MV/02 at Zone-B including Pit B/MV/25, B/MV1B, B/MV/02
B4 4 KAIG3-RFI-SW-C-3589 00 Civil Site Works 1/26/22 1/29/22 Approved as noted
as highlighted in the attached drawing

Inspection of Backfilling Gravel 1st Layer (1 of 5) around the Manhole for MH-D-07 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3590 00 Civil Site Works 1/26/22 1/29/22 Approved as noted
(SP#118)

Inspection of Backfilling Sub-grade (above the gravel) 1st Layer (1 of 3) around the Manhole for MH-D-08 -
4C 4 KAIG3-RFI-SW-C-3591 00 Civil Site Works 1/26/22 1/30/22 Approved as noted
as Highlighted (SP#129 A-1-B)

Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/01 to
K 5 KAIG3-RFI-SW-C-3592 00 Civil Site Works 1/26/22 1/30/22 Approved as noted
K/FS/13) at Zone-K as highlighted in the attached drawing
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/01 to K/TL/21) at
K 5 KAIG3-RFI-SW-C-3593 00 Civil Site Works 1/26/22 1/30/22 Approved as noted
Zone-K as highlighted in the attached drawing
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3
6A 6 KAIG3-RFI-SW-C-3594 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
including Manhole FW-A-13-3 - As Highlighted (SP#129 A-1-B

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
6A 6 KAIG3-RFI-SW-C-3595 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-4 to SBC
6A 6 KAIG3-RFI-SW-C-3596 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
6A 6 KAIG3-RFI-SW-C-3597 00 Civil Site Works 1/26/22 1/30/22 Approved as noted
including Manhole FW-A-13 - As Highlighted (SP#129 A-1-B)

"Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3598 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
including Manhole FW-A-13-1 - As Highlighted (SP#129 A-1-B)"
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3599 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
- As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3600 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
Highlighted (SP#129 A-1-B)
Pipe Installation of Strom Water Line OUTFAL-H for (315mmØ-UPVC Pipes-Class 4) from ( Catch Basin
3 3 KAIG3-RFI-SW-C-3601 00 Pipes Connection G-H-1, 2, 3, 6, 5, 4, 9, 8, 7, 10, 11, 12, 13, 14, 15, 16, 17, 18, 21, 20, 19, With Backdrop) Civil Site Works 1/25/22 2/1/22 Approved as noted
As per highlighted Area in the attached Dwg
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3613 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3614 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3615 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection for Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing for short
3B 3 KAIG3-RFI-SW-C-3616 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Gullies G-H-1, G-H-2, G-H-3, G-H-4, Civil Site Works 1/27/22 2/6/22 Approved as noted
G-H-5, G-H-6, G-H-7, G-H-8, G-H-9,

Sand Cover & Pipes Protection (30 cm above Pipes) of Main Fire Water Pipes (250mmØ-UPVC-Class-5) in
4D 4 KAIG3-RFI-SW-C-3617 00 Civil Site Works 1/26/22 1/27/22 Approved as noted
between K/F/03 and G/F/05 Pit . As per highlighted Area in the attached Dwg.

Warning Tape Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) in between K/F/03 and
4D 4 KAIG3-RFI-SW-C-3618 00 Civil Site Works 1/26/22 2/1/22 Approved as noted
G/F/05 Pit . As per highlighted Area in the attached Dwg.

6A 6 KAIG3-RFI-SW-C-3619 00 Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole FW-A-13-2 - As Highlighted (SP#118) Civil Site Works 1/27/22 1/29/22 Approved as noted

Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10,
6A 6 KAIG3-RFI-SW-C-3620 00 Civil Site Works 1/27/22 1/29/22 Approved as noted
FW-A-11, FW-A-12 - As Highlighted (SP#118)

Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-3621 00 Civil Site Works 1/27/22 2/6/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3
6A 6 KAIG3-RFI-SW-C-3622 00 Civil Site Works 1/27/22 2/6/22 Approved as noted
including Manhole FW-A-13-3 - As Highlighted (SP#129 A-1-B

Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (2nd Part) -
4A 4 KAIG3-RFI-SW-C-3623 00 Civil Site Works 1/29/22 2/5/22 Code C (resubmit)
As Highlighted
Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (2nd Part) -
4A 4 KAIG3-RFI-SW-C-3623 01 Civil Site Works 2/15/22 2/17/22 Approved as noted
As Highlighted

kaig-qcals 227
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Sub-grade 5th Layer (6 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
6A 6 KAIG3-RFI-SW-C-3624 00 Civil Site Works 1/27/22 2/2/22 Approved as noted
including Manhole FW-A-13 - As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3625 00 Civil Site Works 1/27/22 2/2/22 Approved as noted
including Manhole FW-A-13-1 - As Highlighted (SP#129 A-1-B
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3626 00 Civil Site Works 1/27/22 2/2/22 Approved as noted
- As Highlighted (SP#129 A-1-B)
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/17, B/TL/21, G/TL/29, G/TL/31 at
3 3 KAIG3-RFI-SW-C-3627 00 Civil Site Works 1/27/22 2/1/22 Approved as noted
Zone-B&G - as highlighted
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/16, B/FS/24, G/FS/18, G/FS/33 at
3 3 KAIG3-RFI-SW-C-3628 00 Civil Site Works 1/27/22 2/1/22 Approved as noted
Zone-B&G - as highlighted
Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B&C - As Highlighted
3 3 KAIG3-RFI-SW-C-3629 00 Civil Site Works 1/27/22 2/1/22 Approved as noted
in the attached drawing
Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B&C - As Highlighted
3 3 KAIG3-RFI-SW-C-3630 00 Civil Site Works 1/27/22 2/1/22 Approved as noted
in the attached drawing
Inspection and Compaction Test For Backfilling Subgrade 5th Layer (5 of 5) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3635 00 Civil Site Works 1/29/22 2/3/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#129 A-1-B)
Inspection for Blinding Concrete under foundation of Storm Box Culvert - SBC-09 - Wing Wall - As
4A 4 KAIG3-RFI-SW-C-3636 00 Civil Site Works 1/29/22 2/1/22 Approved as noted
Highlighted
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As
6A 6 KAIG3-RFI-SW-C-3637 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
6A 6 KAIG3-RFI-SW-C-3638 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3639 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3640 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3647 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3648 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Gravel 3rd Layer (3 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10,
6A 6 KAIG3-RFI-SW-C-3649 00 Civil Site Works 1/29/22 2/1/22 Approved as noted
FW-A-11, FW-A-12 - As Highlighted (SP#118)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/38 to G/TL/27) at
5 5 KAIG3-RFI-SW-C-3650 00 Civil Site Works 1/29/22 2/1/22 Approved as noted
Zone-G as highlighted in the attached drawing
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/38 to
G 3 KAIG3-RFI-SW-C-3651 00 Civil Site Works 1/29/22 2/1/22 Approved as noted
G/FS/44) at Zone-G as highlighted in the attached drawing
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3652 00 Civil Site Works 1/29/22 2/2/22 Approved as noted
- as highlighted (SP#129 A-1-B
Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3654 00 Civil Site Works 1/30/22 2/2/22 Approved as noted
- as highlighted (SP#129 A-1-B
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone - F (Near RB-244) as
F 5 KAIG3-RFI-SW-C-3655 00 Civil Site Works 1/30/22 2/5/22 Approved as noted
highlighted (SP# 129 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-3656 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Water Line from Thrust Block to K/F/02 at Zone-K as highlighted in the attached drawing (Stock Pile # 129)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fire
FGK 3 KAIG3-RFI-SW-C-3657 00 Water Line from Thrust Block to Thrust Block at Zone-F,G,K as highlighted in the attached drawing (Stock Civil Site Works 1/30/22 2/3/22 Approved as noted
Pile # 129 A-1-B)
Inspection for Rough Grading (Backfilling) upto (-40cm) from the Final Grading Level at Zone - F (Near RB-
F 5 KAIG3-RFI-SW-C-3658 00 Civil Site Works 1/30/22 2/5/22 Approved as noted
244) as highlighted
Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole FW-A-13-2, FW-A-14 - As Highlighted
6A 6 KAIG3-RFI-SW-C-3659 00 Civil Site Works 1/30/22 2/2/22 Approved as noted
(SP#118)
Inspection for Casting Blinding Concrete under Manhole - MH-M-12, MH-M-13, MH-M-14, MH-M-15 - as
3B 3 KAIG3-RFI-SW-C-3660 00 Civil Site Works 1/30/22 2/1/22 Approved as noted
highlighted
Inspection and Compaction Test for Backfilling Sub-grade (above gravel) 1st Layer (1 of 5) For Manholes
4A 4 KAIG3-RFI-SW-C-3661 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
MH-G-01-07, MH-G-01-06 - AS Highlighted (SP# 129)
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) beside Fire & Security Distribution Line
G 3 KAIG3-RFI-SW-C-3662 00 from G/FS/38 to near G/FS/19 & G/FS/44 to G/FS/25 at Zone-G as highlighted in the attached drawing Civil Site Works 1/30/22 2/3/22 Approved as noted
(Stock Pile # 129 A-1-B)

kaig-qcals 228
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) beside Telecommunications Line from
G 3 KAIG3-RFI-SW-C-3663 00 G/TL/38 to near G/TL/16 & G/TL/27 to G/TL/39 at Zone-G as highlighted in the attached drawing (Stock Civil Site Works 1/30/22 2/3/22 Approved as noted
Pile # 129 A-1-B)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/38 to near
G 3 KAIG3-RFI-SW-C-3664 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
G/TL/16 & G/TL/27 to G/TL/39) at Zone-G as highlighted in the attached drawing (SP # 130)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/38 to near
G 3 KAIG3-RFI-SW-C-3665 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
G/FS/19 & G/FS/44 to G/FS/25) at Zone-G as highlighted in the attached drawing
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-3671 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3
6A 6 KAIG3-RFI-SW-C-3672 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
including Manhole FW-A-13-3 - As Highlighted (SP#129 A-1-B
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
6A 6 KAIG3-RFI-SW-C-3673 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
including Manhole FW-A-13 - As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3674 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
including Manhole FW-A-13-1 - As Highlighted (SP#129 A-1-B
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3675 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
- As Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As
6A 6 KAIG3-RFI-SW-C-3676 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
6A 6 KAIG3-RFI-SW-C-3677 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - As
6A 6 KAIG3-RFI-SW-C-3678 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)

Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - As
6A 6 KAIG3-RFI-SW-C-3679 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
6A 6 KAIG3-RFI-SW-C-3680 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
6A 6 KAIG3-RFI-SW-C-3681 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Highlighted (SP#129 A-1-B)
Inspection of Backfilling Gravel 4th Layer (4 of 4) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10,
6A 6 KAIG3-RFI-SW-C-3682 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
FW-A-11, FW-A-12 - As Highlighted (SP#118)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/02 to
K 5 KAIG3-RFI-SW-C-3683 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
K/FS/13) at Zone-K as highlighted in the attached drawing

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/02 to K/TL/21) at
K 5 KAIG3-RFI-SW-C-3684 00 Civil Site Works 1/30/22 2/3/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP # 130)

3A 3 KAIG3-RFI-SW-C-3685 00 Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manhole MH-G-06 - As Highlighted SP#118) Civil Site Works 1/30/22 2/3/22 Approved as noted

"Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 8) around SBC-01-Transition
3 3 KAIG3-RFI-SW-C-3687 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
Area - as highlighted (SP#129 A-1-B)"

Excavation for Fire & Security Distribution Line from B/FS/31 to G/FS/38, including Pit B/FS/31, G/FS/51,
3 3 KAIG3-RFI-SW-C-3688 00 G/FS/47, G/FS/22, G/FS/02, G/FS/06, G/FS/05, G/FS/01, G/FS/11, G/FS/34, G/FS/38 at Zone-B&G - as Civil Site Works 1/31/22 2/3/22 Approved as noted
highlighted in the attached drawing

Excavation for Telecommunication Line between B/TL/32 to G/TL/38 including pit B/TL/32, G/TL/04,
3 3 KAIG3-RFI-SW-C-3689 00 G/TL/52, G/TL/03, G/TL/09, G/TL/06, G/TL/07, G/TL/08, G/TL/40, G/TL/19, G/TL/38 at Zone-B&G as Civil Site Works 1/31/22 2/3/22 Approved as noted
highlighted in the attached drawing
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/25 to G/MV/28) at Zone-G - as
4 4 KAIG3-RFI-SW-C-3690 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
highlighted in the attached drawing
Excavation for Telecommunication Line between K/TL/21 to K/TL/06 including pit K/TL/21, K/TL/05,
5 5 KAIG3-RFI-SW-C-3700 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
K/TL/06 at Zone-K as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from K/FS/13 to K/FS/12, including Pit K/FS/13, K/FS/14,
5 5 KAIG3-RFI-SW-C-3701 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
K/FS/12 at Zone-K - as highlighted in the attached drawing

Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (F/FS/04 to
4 4 KAIG3-RFI-SW-C-3702 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
G/FS/07) at Zone-F&G as highlighted in the attached drawing

kaig-qcals 229
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (F/TL/04 to G/TL/21) at
4 4 KAIG3-RFI-SW-C-3703 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
Zone-F&G as highlighted in the attached drawing (SP # 130)

Inspection for Sand bedding under pipe for MV Line from G/MV/18 TO G/MV/03 at Zone - G - as
4 4 KAIG3-RFI-SW-C-3704 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
highlighted in the attached drawing

3A 3 KAIG3-RFI-SW-C-3707 00 Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-15 - AS Highlighted Civil Site Works 1/31/22 2/5/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade Above Warning Tape 1st Layer (1 of 8) For Foul
6A 6 KAIG3-RFI-SW-C-3708 00 Civil Site Works 1/31/22 2/6/22 Approved as noted
Water Line From FW-A-14 to FW-A-15 - As Highlighted (SP#129 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3709 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-7 to FW-A-6 - As Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3710 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-8 to FW-A-7 - As Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3711 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-12 to FW-A-11 - As Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3712 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-11 to FW-A-10 - As Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3713 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-10 to FW-A-9 - As Highlighted (SP#129 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3714 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-9 to FW-A-8 - As Highlighted (SP#129 A-1-B)
Inspection of Sand Bedding under pipe for MV Line from B/MV/25 TO B/MV/02 at Zone-B - as highlighted
4 4 KAIG3-RFI-SW-C-3717 00 Civil Site Works 1/31/22 2/3/22 Approved as noted
in the attached drawing (SP # 130)
Inspection of Steel Reinforcement for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wall
2B 2 KAIG3-RFI-SW-C-3721 00 Civil Site Works 1/31/22 2/2/22 Approved as noted
(As Highlighted)
Inspection of Formwork for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-3722 00 Civil Site Works 1/31/22 2/2/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wall
2B 2 KAIG3-RFI-SW-C-3723 00 Civil Site Works 1/31/22 2/5/22 Approved as noted
(As Highlighted)
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/39, B/TL/40, B/TL/49, G/TL/33 at
3 3 KAIG3-RFI-SW-C-3730 00 Civil Site Works 2/1/22 2/2/22 Approved as noted
Zone-B&G - as highlighted
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/38, G/FS/16 at Zone-B&G - as
3 3 KAIG3-RFI-SW-C-3731 00 Civil Site Works 2/1/22 2/2/22 Approved as noted
highlighted
Inspection for Casting Blinding Concrete under Manhole - MH-M-07, MH-M-08, MH-M-09, MH-M-10 - as
6A 6 KAIG3-RFI-SW-C-3732 00 Civil Site Works 2/1/22 2/2/22 Approved as noted
highlighted
"Inspection of Backfilling Gravel 2nd Layer (2 of 5) around the Manhole for MH-D-07 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3733 00 Civil Site Works 2/1/22 2/3/22 Approved as noted
(SP#118)"
Inspection of Sand Covering Layer for protection of MV Line from G/MV/03 TO G/MV/05 at Zone-G - as
4 4 KAIG3-RFI-SW-C-3734 00 Civil Site Works 2/2/22 2/7/22 Approved as noted
highlighted in the attached drawing (SP # 130)

Inspection And Compaction Test of Backfilling Sub-grade Above Warning Tape 2nd Layer (2 of 8) For Foul
6A 6 KAIG3-RFI-SW-C-3735 00 Civil Site Works 2/1/22 cancelled
Water Line From FW-A-14 to FW-A-15 - As Highlighted (SP#129 A-1-B)

"Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around SBC-01-Transition
2B 2 KAIG3-RFI-SW-C-3736 00 Civil Site Works 2/1/22 2/6/22 Approved as noted
Area - as highlighted (SP#129 A-1-B)"
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-3737 00 Water Line from Thrust Block to K/F/02 at Zone-K as highlighted in the attached drawing (Stock Pile # 129 Civil Site Works 2/1/22 2/6/22 Approved as noted
A-1-B)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3738 00 Water Line from Thrust Block to Thrust Block at Zone-F,G,K as highlighted in the attached drawing (Stock Civil Site Works 2/1/22 2/6/22 Approved as noted
Pile # 129 A-1-B)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/45 to K/TL/06
4 4 KAIG3-RFI-SW-C-3739 00 Civil Site Works 2/1/22 2/5/22 Approved as noted
at Zone-G&K as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/46 to
4 4 KAIG3-RFI-SW-C-3740 00 Civil Site Works 2/1/22 2/5/22 Approved as noted
K/FS/12 at Zone-G&K as highlighted in the attached drawing

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/05 to G/MV/12 at Zone-G as
5 5 KAIG3-RFI-SW-C-3742 00 Civil Site Works 2/1/22 2/5/22 Approved as noted
highlighted in the attached drawing

kaig-qcals 230
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3743 00 Water Line (Branch) from F-F-05 to end of Line at Zone-F as highlighted in the attached drawing (Stock Pile Civil Site Works 2/1/22 2/6/22 Approved as noted
# 129 A-1-B)

Excavation for Telecommunication Line between G/TL/11 to G/TL/14 including pit G/TL/11, G/TL/12,
4 4 KAIG3-RFI-SW-C-3747 00 Civil Site Works 2/2/22 2/6/22 Approved as noted
G/TL/22, G/TL/14 at Zone-G as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from G/FS/15 to G/FS/12, including Pit G/FS/15, G/FS/04,
4 4 KAIG3-RFI-SW-C-3748 00 Civil Site Works 2/2/22 2/6/22 Approved as noted
G/FS/12 at Zone-G - as highlighted in the attached drawing
6 6 KAIG3-RFI-SW-C-3749 00 Soil Preparation under Boulder No. RB- 155 Civil Site Works 2/2/22 2/5/22 Approved as noted
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line between G/TL/31 to G/TL/29
3 3 KAIG3-RFI-SW-C-3750 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
at Zone-G - As Highlighted
Inspection of Formwork for Duct Bank of Telecommunications line between G/TL/31 to G/TL/29 at Zone-G
3 3 KAIG3-RFI-SW-C-3751 00 Civil Site Works 2/2/22 2/14/22 Approved as noted
- As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line between G/TL/31 to
3 3 KAIG3-RFI-SW-C-3752 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
G/TL/29 at Zone-G - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/TL/31 to
3 3 KAIG3-RFI-SW-C-3753 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
G/TL/29 at Zone-G - As Highlighted
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/12 to K/TL/13
5 5 KAIG3-RFI-SW-C-3754 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
at Zone-K as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/22 to
5 5 KAIG3-RFI-SW-C-3755 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
K/FS/21 at Zone-K as highlighted in the attached drawing

Pipe Installation of Strom Water pipe OUT FALL-M for (315 & 450 mmØ-UPVC pipes-Class 4) from
7 7 KAIG3-RFI-SW-C-3757 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
( MH-M-12 to MH-M-15) As per high lighted Area in the attached Dwg.

Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 & 450 mm Ø- UPVC Pipes-Class 4 ) for
7 7 KAIG3-RFI-SW-C-3758 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
Storm Water pipe Out Fall ( MH-M-12 to MH-M-15 ) As per high lighted Area in the attached Dwg.

Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at
3 3 KAIG3-RFI-SW-C-3759 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
Zone-G - As Highlighted

Inspection of Formwork for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - As
3 3 KAIG3-RFI-SW-C-3760 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
Highlighted

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between G/FS/18 to
3 3 KAIG3-RFI-SW-C-3761 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
G/FS/33 at Zone-G - As Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at
3 3 KAIG3-RFI-SW-C-3762 00 Civil Site Works 2/2/22 2/5/22 Approved as noted
Zone-G - As Highlighted

Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from B/FS/31 to G/FS/38 at
3 3 KAIG3-RFI-SW-C-3763 00 Civil Site Works 2/2/22 2/9/22 Approved as noted
Zone-B&G - as highlighted in the attached drawing (SP#130)

Inspection of Sand Bedding under pipe for Telecommunication Line between B/TL/32 to G/TL/38 at Zone-
4 4 KAIG3-RFI-SW-C-3764 00 Civil Site Works 2/2/22 2/9/22 Approved as noted
B&G as highlighted in the attached drawing (SP#130)

Inspection of Sand Bedding under pipe for Telecommunication Line from K/TL/21 to K/TL/06 at Zone-K as
5 5 KAIG3-RFI-SW-C-3765 00 Civil Site Works 2/2/22 2/7/22 Approved as noted
highlighted in the attached drawing (SP#130)

Inspection of Sand bedding under pipe for Fire & Security Distribution Line from K/FS/13 to K/FS/12 at
5 5 KAIG3-RFI-SW-C-3766 00 Civil Site Works 2/2/22 2/7/22 Approved as noted
Zone-K - as highlighted in the attached drawing (SP#130)

6 6 KAIG3-RFI-SW-C-3767 00 Soil Preparation under Boulder No. RB- 318 Civil Site Works 2/3/22 2/6/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer above Red Tiles for MV Line from
5 5 KAIG3-RFI-SW-C-3768 00 Civil Site Works 2/3/22 2/10/22 Approved as noted
G/MV/13 to L/MV/08 at Zone-G,K&L as highlighted in the attached drawing (Stock Pile # 131 A-1-B)
Inspection of Backfilling Gravel 3rd Layer (3 of 5) around the Manhole for MH-D-07 - as Highlighted
4C 4 KAIG3-RFI-SW-C-3769 00 Civil Site Works 2/3/22 2/7/22 Approved as noted
(SP#118)

Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 8) around SBC-01-Transition Area
2B 2 KAIG3-RFI-SW-C-3770 00 Civil Site Works 2/3/22 2/9/22 Approved as noted
- as highlighted (SP#131 A-1-B

Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-12, MH-M-13, MH-M-15
3B 3 KAIG3-RFI-SW-C-3771 00 Civil Site Works 2/3/22 2/8/22 Approved as noted
as highlighted

INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-M-12, MH-M-13, MH-M-15 (As
3B 3 KAIG3-RFI-SW-C-3772 00 Civil Site Works 2/3/22 2/9/22 Approved as noted
Highlighted)

kaig-qcals 231
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Boulder No. RB-155 (Stock Pile #
6 6 KAIG3-RFI-SW-C-3776 00 Civil Site Works 2/3/22 2/7/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Boulder No. RB-155 (Stock Pile #
6 6 KAIG3-RFI-SW-C-3777 00 Civil Site Works 2/3/22 2/8/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3778 00 Water Line from Thrust Block to Thrust Block at Zone-F,G,K as highlighted in the attached drawing (Stock Civil Site Works 2/3/22 2/8/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3779 00 Water Line (Branch) from F-F-05 to end of Line at Zone-F as highlighted in the attached drawing (Stock Pile Civil Site Works 2/3/22 2/8/22 Approved as noted
# 131 A-1-B)

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line near G/FS/18 at Zone-G - As
3 3 KAIG3-RFI-SW-C-3780 00 Civil Site Works 2/3/22 2/9/22 Approved as noted
Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line near G/TL/31 at Zone-G -
3 3 KAIG3-RFI-SW-C-3781 00 Civil Site Works 2/3/22 2/9/22 Approved as noted
As Highlighted

Inspection and Compaction Test for Backfilling Sub-Grade 1st Layer (1 of 1) above Red Tiles for MV Line
5 5 KAIG3-RFI-SW-C-3782 00 Civil Site Works 2/5/22 2/10/22 Approved as noted
from G/MV/05 to G/MV/12 at Zone G as highlighted in the attached drawing (stock pile131 A-1-B)

3B 3 KAIG3-RFI-SW-C-3783 00 Inspection For Installation Of Slabs For (MH-M-15) (As Highlighted). Civil Site Works 2/3/22 2/8/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-3784 00 Inspection of Backfilling Gravel 3rd Layer (3 of 3) around Manhole FW-A-14 - As Highlighted (SP#118) Civil Site Works 2/3/22 2/6/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3785 00 Civil Site Works 2/3/22 2/8/22 Approved as noted
A-14 to FW-A-13 - As Highlighted (SP#129 A-1-B)

3A 3 KAIG3-RFI-SW-C-3788 00 Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole FW-A-15 - As Highlighted (SP#118) Civil Site Works 2/3/22 2/6/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3789 00 Civil Site Works 2/3/22 2/8/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#129 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-3790 00 Telecommunication Line from G/TL/45 to K/TL/06 at Zone-G&K as highlighted in the attached drawing Civil Site Works 2/5/22 2/10/22 Approved as noted
(Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
4 4 KAIG3-RFI-SW-C-3791 00 Security Distribution Line from G/FS/46 to K/FS/12 at Zone-G&K as highlighted in the attached drawing Civil Site Works 2/5/22 2/10/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/01 to K/TL/02
5 5 KAIG3-RFI-SW-C-3792 00 Civil Site Works 2/5/22 2/8/22 Approved as noted
at Zone-K as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/01 to
5 5 KAIG3-RFI-SW-C-3793 00 Civil Site Works 2/5/22 2/8/22 Approved as noted
K/FS/02 at Zone-K as highlighted in the attached drawing
Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-155 (Stock Pile # 110 A-1-
6 6 KAIG3-RFI-SW-C-3794 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-318 (Stock Pile #
6 6 KAIG3-RFI-SW-C-3795 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-318 (Stock Pile #
6 6 KAIG3-RFI-SW-C-3799 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
131 A-1-B)
Inspection of Thrust Block for UPVC Pipe (250 mm Dia) for Fire Water Line at Zone- F&G - As Highlighted
3 3 KAIG3-RFI-SW-C-3800 00 Civil Site Works 2/5/22 2/8/22 Approved as noted
in the attached drawing

3 3 KAIG3-RFI-SW-C-3801 00 Soil Preparation under Boulder No. RB- 144 priior to start cutting Civil Site Works 2/5/22 2/7/22 Approved as noted

3B 3 KAIG3-RFI-SW-C-3802 00 Inspection of Steel Reinforcement for the Footing and Wing Walls of SBC-09 - (As Highlighted) Civil Site Works 2/5/22 2/8/22 Code C (resubmit)

3B 3 KAIG3-RFI-SW-C-3802 01 Inspection of Steel Reinforcement for the Footing and Wing Walls of SBC-09 - (As Highlighted) Civil Site Works 2/10/22 2/14/22 Approved as noted

3B 3 KAIG3-RFI-SW-C-3803 00 Inspection of Formwork for the Footing of SBC-09 - Wing Wall (As Highlighted) Civil Site Works 2/5/22 2/8/22 Code C (resubmit)

3B 3 KAIG3-RFI-SW-C-3803 01 Inspection of Formwork for the Footing of SBC-09 - Wing Wall (As Highlighted) Civil Site Works 2/10/22 3/2/22 Approved as noted

3B 3 KAIG3-RFI-SW-C-3804 00 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) Civil Site Works 2/5/22 2/8/22 Code C (resubmit)

kaig-qcals 232
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

3B 3 KAIG3-RFI-SW-C-3804 01 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) Civil Site Works 2/10/22 2/14/22 Approved as noted

4 4 KAIG3-RFI-SW-C-3805 00 Inspection of Concrete Pouring for the Expansion Joint of SBC-06 (As Highlighted) Civil Site Works 2/5/22 2/14/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-3809 00 Inspection of Backfilling Gravel 4th Layer (4 of 4) around Manhole FW-A-14 - As Highlighted (SP#118) Civil Site Works 2/5/22 2/8/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3810 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-14 to FW-A-13 - As Highlighted (SP#131 A-1-B)

3A 3 KAIG3-RFI-SW-C-3811 00 Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole FW-A-15 - As Highlighted (SP#118) Civil Site Works 2/5/22 2/9/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3812 00 Civil Site Works 2/5/22 2/9/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-3815 00 Water Line from B/F/12 to near Thrust Block at Zone-B&C as highlighted in the attached drawing (Stock Pile Civil Site Works 2/6/22 2/10/22 Approved as noted
# 131 A-1-B)
Inspection of Sand Bedding under pipe for Telecommunication Line from G/TL/11 to G/TL/14 at Zone-G as
4 4 KAIG3-RFI-SW-C-3816 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
highlighted in the attached drawing (SP#130)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from G/FS/15 to G/FS/12 at
4 4 KAIG3-RFI-SW-C-3817 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
Zone-G - as highlighted in the attached drawing (SP#130)

Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for G/RC-TL/3 and G/RC-TL/2
3 3 KAIG3-RFI-SW-C-3818 00 Civil Site Works 2/6/22 2/8/22 Approved as noted
at Zone-G - As Highlighted

Inspection of Formwork for Duct Bank of Telecommunications line from G/RC-TL/3 to G/RC-TL/2 at Zone-
3 3 KAIG3-RFI-SW-C-3819 00 Civil Site Works 2/6/22 2/8/22 Approved as noted
G - As Highlighted

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for G/RC-TL/3 and
3 3 KAIG3-RFI-SW-C-3820 00 Civil Site Works 2/6/22 2/9/22 Approved as noted
G/RC-TL/2 at Zone-G - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/RC-TL/3 and
3 3 KAIG3-RFI-SW-C-3821 00 Civil Site Works 2/6/22 2/9/22 Approved as noted
G/RC-TL/2 at Zone-G - As Highlighted
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for G/RC-FS/27 and G/RC-FS/11 at
3 3 KAIG3-RFI-SW-C-3822 00 Civil Site Works 2/6/22 2/8/22 Approved as noted
Zone-G - As Highlighted
Inspection of Formwork for Duct Bank of Fire & Security line from G/RC-FS/27 to G/RC-FS/11 at Zone-G -
3 3 KAIG3-RFI-SW-C-3823 00 Civil Site Works 2/6/22 2/8/22 Approved as noted
As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for G/RC-FS/27 and G/RC-
3 3 KAIG3-RFI-SW-C-3824 00 Civil Site Works 2/6/22 2/9/22 Approved as noted
FS/11 at Zone-G - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/RC-FS/27 and
3 3 KAIG3-RFI-SW-C-3825 00 Civil Site Works 2/6/22 2/9/22 Approved as noted
G/RC-FS/11 at Zone-G - As Highlighted

Excavation & Soil preparation for Foundation of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-3833 00 Civil 2/7/22 2/10/22 Approved as noted
Attached Highlighted Drawing's. Wall

Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-07, MH-M-08, MH-M-09,
3B 3 KAIG3-RFI-SW-C-3834 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
MH-M-10 as highlighted

INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-M-07, MH-M-08, MH-M-09,
3B 3 KAIG3-RFI-SW-C-3835 00 Civil Site Works 2/6/22 2/9/22 Approved as noted
MH-M-10 (As Highlighted)

Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3836 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3837 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-318 (Stock Pile # 110 A-1-
6 6 KAIG3-RFI-SW-C-3838 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A)

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3845 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-12 to FW-A-11 including manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3846 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-11 to FW-A-10 Including Manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3847 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-10 to FW-A-9 Including Manhole - As Highlighted (SP#131 A-1-B)

kaig-qcals 233
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3848 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-9 to FW-A-8 Including Manholes - As Highlighted (SP#131 A-1-B)

6A 6 KAIG3-RFI-SW-C-3849 00 Inspection of Backfilling Gravel 5th Layer (5 of 5) around Manhole FW-A-14 - As Highlighted (SP#118) Civil Site Works 2/6/22 2/10/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3850 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-14 to FW-A-13 - As Highlighted (SP#131 A-1-B)

3A 3 KAIG3-RFI-SW-C-3851 00 Inspection of Backfilling Gravel 3rd Layer (3 of 3) around Manhole FW-A-15 - As Highlighted (SP#118) Civil Site Works 2/6/22 2/9/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3852 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#131 A-1-B)
Inspection for Sand bedding under pipe for MV Line from G/MV/25 TO G/MV/18 at Zone - G - as
4 4 KAIG3-RFI-SW-C-3853 00 Civil Site Works 2/6/22 2/10/22 Approved as noted
highlighted in the attached drawing
6 6 KAIG3-RFI-SW-C-3854 00 Soil Preparation under Boulder No. RB- 144 - after cutting Civil Site Works 2/7/22 2/10/22 Approved as noted
Inspection of Backfilling Sub-grade above Gravel 1st Layer (1 of 2) around the Manhole for MH-D-07 - as
4C 4 KAIG3-RFI-SW-C-3855 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
Highlighted (SP#131 A-1-B))
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3856 00 Water Line from Thrust Block to Thrust Block at Zone-F,G,K as highlighted in the attached drawing (Stock Civil Site Works 2/7/22 2/10/22 Approved as noted
Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover forPotable
4 4 KAIG3-RFI-SW-C-3857 00 Water Line from near F-PW-09 to near K-PW-08 at Zone-F,G,K as highlighted in the attached drawing Civil Site Works 2/7/22 2/10/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection of Steel Reinforcement for the Wing Walls and Wall and Slab of Extension Area of SBC-05 - (As
2B 2 KAIG3-RFI-SW-C-3858 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
Highlighted)
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-A-08, MH-A-11, MH-A-12 as
4C 4 KAIG3-RFI-SW-C-3859 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
Highlighted
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & above the
5 5 KAIG3-RFI-SW-C-3860 00 pipe for Telecommunications Line from K/TL/13 to K/TL/12 at Zone-K as highlighted in the attached Civil Site Works 2/7/22 2/10/22 Code C (resubmit)
drawing (SP # 131 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & above the
5 5 KAIG3-RFI-SW-C-3860 01 pipe for Telecommunications Line from K/TL/13 to K/TL/12 at Zone-K as highlighted in the attached Civil Site Works 2/24/22 3/1/22 Approved as noted
drawing (SP # 131 A-1-B)

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
3B 3 KAIG3-RFI-SW-C-3870 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-12, MH-M-13, MH-M-15 (As Civil Site Works 2/7/22 2/9/22 Approved as noted
Highlighted)
Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-M-12, MH-M-13, MH-M-15 - AS
3B 3 KAIG3-RFI-SW-C-3871 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
Highlighted

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K 5 KAIG3-RFI-SW-C-3872 00 Fire & Security Distribution Line from K/FS/21 to K/FS/22 at Zone-K as highlighted in the attached drawing Civil Site Works 2/7/22 2/10/22 Code C (resubmit)
(Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K 5 KAIG3-RFI-SW-C-3872 01 Fire & Security Distribution Line from K/FS/21 to K/FS/22 at Zone-K as highlighted in the attached drawing Civil Site Works 2/24/22 3/1/22 Approved as noted
(Stock Pile # 131 A-1-B)

Inspection of Sand bedding under pipe for Telecommunication Line from (B/TL/12 to C/TL/14) at Zone-B &
B 3 KAIG3-RFI-SW-C-3873 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
C as highlighted in the attached drawing (SP#130)

Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (B/FS/15 to B/FS/06) at
B 3 KAIG3-RFI-SW-C-3874 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
Zone-B as highlighted in the attached drawing (SP#130)

"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 3) around Manhole
3A 3 KAIG3-RFI-SW-C-3875 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
FW-A-15, FW-A-14 - As Highlighted (SP#131)"
Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3876 00 Civil Site Works 2/7/22 2/10/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-144 (Stock Pile #
6 6 KAIG3-RFI-SW-C-3890 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
K 5 KAIG3-RFI-SW-C-3891 00 Fire & Security Distribution Line from K/FS/01 to K/FS/02 at Zone-K as highlighted in the attached drawing Civil Site Works 2/8/22 2/13/22 Approved as noted
(Stock Pile # 131 A-1-B)

kaig-qcals 234
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
5 5 KAIG3-RFI-SW-C-3892 00 Telecommunications Line from K/TL/01 to K/TL/02 at Zone-K as highlighted in the attached drawing (SP # Civil Site Works 2/8/22 2/13/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 3) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-3893 00 Water Line (Branch) from F-F-05 to end of Line at Zone-F as highlighted in the attached drawing (Stock Pile Civil Site Works 2/8/22 2/13/22 Approved as noted
# 131 A-1-B)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/02 to K/TL/21
5 5 KAIG3-RFI-SW-C-3894 00 Civil Site Works 2/8/22 2/9/22 Approved as noted
at Zone-K as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/02 to
5 5 KAIG3-RFI-SW-C-3895 00 Civil Site Works 2/8/22 2/9/22 Approved as noted
K/FS/13 at Zone-K as highlighted in the attached drawing

Inspection of Backfilling Sub-grade above Gravel 2nd Layer (2 of 2) around the Manhole for MH-D-07 - as
4C 4 KAIG3-RFI-SW-C-3896 00 Civil Site Works 2/8/22 2/14/22 Approved as noted
Highlighted (SP#131 A-1-B))

"Soil Preparation prior to start backfilling around Manhole for FW5, FW6, FW7, FW8 - as highlighted.
4B 4 KAIG3-RFI-SW-C-3897 00 Civil Site Works 2/8/22 2/10/22 Approved as noted
(ZHBG Corrective action to close Site Instruction # KAIG3-SI-GN-C-0023-00)"

Inspection of Sand bedding under pipe for Telecommunication Line from (B/TL/10 to B/TL/12) at Zone-B -
4 4 KAIG3-RFI-SW-C-3898 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
as highlighted in the attached drawing (SP#130)

Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (B/FS/14 to B/FS/15) at
B 3 KAIG3-RFI-SW-C-3899 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Zone-B as highlighted in the attached drawing (SP#130)

Inspection of Sand Covering Layer for Protection of MV Line from (F/MV/11 to F/MV/04 and G/MV/01 to
5 5 KAIG3-RFI-SW-C-3900 00 Civil Site Works 2/8/22 2/10/22 Approved as noted
G/MV/28) at Zone-G as highlighted (SP#130)

F 5 KAIG3-RFI-SW-C-3902 00 "Inspection for Installation Of Isolation Fire Water Line Pit F/F/04, G/F/18 as highlighted " Civil Site Works 2/8/22 2/14/22 Approved as noted

Inspection of Backfilling Gravel 1ST Layer (1 of 1) around Manhole MH-M-12, MH-M-13 As Highlighted
3B 3 KAIG3-RFI-SW-C-3903 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
(SP#118)

"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 3) around
3A 3 KAIG3-RFI-SW-C-3904 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Manhole FW-A-15, FW-A-14 - As Highlighted (SP#131)"

Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3905 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#131 A-1-B)

Inspection & Compaction tests after Excavation for Foundation of Boundary wall Span 50B, 51, 52, 53, 54 &
2B 2 KAIG3-RFI-SW-C-3907 00 Civil Site Works 2/8/22 2/10/22 Approved as noted
55, As per Attached Highlighted Drawing's.

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3908 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Boulder no. RB-155 (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3909 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Boulder no. RB-155 (Stock Pile # 110 A-1-A)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3910 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Boulder no. RB-318 (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3911 00 Civil Site Works 2/8/22 2/13/22 Approved as noted
Boulder no. RB-318 (Stock Pile # 110 A-1-A)
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/40 at Zone-B - As
3 3 KAIG3-RFI-SW-C-3912 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Highlighted

Inspection of Formwork for Duct Bank of Telecommunications line between B/TL/39 and B/RC-TL/02 at
3 3 KAIG3-RFI-SW-C-3913 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Zone-B - As Highlighted

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/40 at
3 3 KAIG3-RFI-SW-C-3914 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Zone-B - As Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/39 and
3 3 KAIG3-RFI-SW-C-3915 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
B/RC-TL/02 at Zone-B - As Highlighted

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/12 to K/TL/13) at
5 5 KAIG3-RFI-SW-C-3921 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Zone-K as highlighted in the attached drawing

kaig-qcals 235
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/22 to
5 5 KAIG3-RFI-SW-C-3922 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
K/FS/21) at Zone-K as highlighted in the attached drawing
5 5 KAIG3-RFI-SW-C-3923 00 Soil Preparation under Boulder No. RB- 156 Civil Site Works 2/9/22 2/10/22 Approved as noted
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling Sub-base under Boulder No. RB-144
6 6 KAIG3-RFI-SW-C-3924 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
(Stock Pile # 110 A-1-A)
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling Sub-base under Boulder No. RB-156
6 6 KAIG3-RFI-SW-C-3925 00 Civil Site Works 2/9/22 2/10/22 Approved as noted
(Stock Pile # 110 A-1-A)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3926 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Boulder no. RB-155 (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3927 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Boulder no. RB-155 (Stock Pile # 110 A-1-A)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3928 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Boulder no. RB-318 (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3929 00 Civil Site Works 2/9/22 2/15/22 Approved as noted
Boulder no. RB-318 (Stock Pile # 110 A-1-A)
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/18 at Zone-B - As
3 3 KAIG3-RFI-SW-C-3930 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
Highlighted"
Inspection of Formwork for Duct Bank of Fire & Security line between B/FS/38 and B/RC-FS/18 at Zone-B -
3 3 KAIG3-RFI-SW-C-3931 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/18 at Zone-B -
3 3 KAIG3-RFI-SW-C-3932 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/FS/38 and B/RC-
3 3 KAIG3-RFI-SW-C-3933 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
FS/18 at Zone-B - As Highlighted

Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole for MH-A-08, MH-A-11, MH-A-12 as
4C 4 KAIG3-RFI-SW-C-3934 00 Civil Site Works 2/9/22 2/12/22 Approved as noted
Highlighted (SP#118)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-3935 00 Water Line from B/F/12 to near Thrust Block at Zone-B&C as highlighted in the attached drawing (Stock Pile Civil Site Works 2/9/22 2/14/22 Approved as noted
# 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-3936 00 Water Line from Thrust Block to K/F/02 at Zone-K as highlighted in the attached drawing (Stock Pile # 129 Civil Site Works 2/9/22 2/14/22 Approved as noted
A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-3937 00 Water Line from K/F/02 to Thrust Block at Zone-K as highlighted in the attached drawing (Stock Pile # 131 Civil Site Works 2/9/22 2/14/22 Approved as noted
A-1-B)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/49 and
3 3 KAIG3-RFI-SW-C-3938 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
B/TL/40 at Zone-B - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/RC-FS/8 and B/RC-
3 3 KAIG3-RFI-SW-C-3939 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
FS/11 at Zone-B - As Highlighted

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
5 5 KAIG3-RFI-SW-C-3940 00 Telecommunications Line from K/TL/02 to K/TL/21 at Zone-K as highlighted in the attached drawing (SP # Civil Site Works 2/9/22 2/14/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
5 5 KAIG3-RFI-SW-C-3941 00 Fire & Security Distribution Line from K/FS/02 to K/FS/13 at Zone-K as highlighted in the attached drawing Civil Site Works 2/9/22 2/14/22 Approved as noted
(Stock Pile # 131 A-1-B)

"Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3
6A 6 KAIG3-RFI-SW-C-3942 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
including Manhole FW-A-13-3 - As Highlighted (SP#131 A-1-B)"

Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
6A 6 KAIG3-RFI-SW-C-3943 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
- As Highlighted (SP#131 A-1-B)

"Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
6A 6 KAIG3-RFI-SW-C-3944 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
including Manhole FW-A-13-1 - As Highlighted (SP#131 A-1-B)"
Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
6A 6 KAIG3-RFI-SW-C-3945 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
including Manhole FW-A-13 - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1ST Layer (1 of 4) around
3B 3 KAIG3-RFI-SW-C-3946 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
Manhole MH-M-12, MH-M-13 As Highlighted (SP#131) A-1-B"
Inspection And Compaction Test of Backfilling Sub Grade Above Warning Tape 1ST Layer (1 of 4) For
3B 3 KAIG3-RFI-SW-C-3947 00 Civil Site Works 2/9/22 2/16/22 Approved as noted
Storm Water Line From MH-M-12 To MH-M-15 As Highlighted (SP#131) A-1-B
kaig-qcals 236
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 3rd Layer (3 of 3) around Manhole
3A 3 KAIG3-RFI-SW-C-3948 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
FW-A-15, FW-A-14 - As Highlighted (SP#131) A-1-B"
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3949 00 Civil Site Works 2/9/22 2/14/22 Approved as noted
A-14 to FW-A-15 - As Highlighted (SP#131 A-1-B)

2B 2 KAIG3-RFI-SW-C-3957 00 Excavation for Storm Water Line near SBC-01 - as highlighted in the attached drawing. Civil Site Works 2/9/22 2/12/22 Approved as noted

Inspection of Storm Water Line Pipe Installation 800mm dia (Connection to the existing culvert SBC-01) - as
2B 2 KAIG3-RFI-SW-C-3959 00 Civil Site Works 2/10/22 2/12/22 Approved as noted
per attached approved drawing and survey data.
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover forPotable
4 4 KAIG3-RFI-SW-C-3960 00 Water Line from near F-PW-09 to near K-PW-08 at Zone-F,G,K as highlighted in the attached drawing Civil Site Works 2/10/22 2/17/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection annd Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for
5A 5 KAIG3-RFI-SW-C-3961 00 Civil Site Works 2/12/22 2/15/22 Approved as noted
Boulder no RB-155 (Stock Pile 131 A-1-B).
Inspection annd Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for
5A 5 KAIG3-RFI-SW-C-3962 00 Civil Site Works 2/12/22 2/15/22 Approved as noted
Boulder no RB-155 (Stock Pile 110 A-1-A).
Inspection annd Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for
5A 5 KAIG3-RFI-SW-C-3963 00 Civil Site Works 2/12/22 2/15/22 Approved as noted
Boulder no RB-318 (Stock Pile 131 A-1-B).
Inspection annd Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for
5A 5 KAIG3-RFI-SW-C-3964 00 Civil Site Works 2/12/22 2/14/22 Approved as noted
Boulder no RB-318 (Stock Pile 110 A-1-A).
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3965 00 Civil Site Works 2/10/22 2/16/22 Approved as noted
Boulder no. RB-156 (Stock Pile # 131 A-1-B).
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
3A 3 KAIG3-RFI-SW-C-3966 00 Civil Site Works 2/10/22 2/14/22 Approved as noted
Application of Primer For Storm Water Line H And F (1st Coat, 2nd Coat and 3rd Coat) As attached.
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
5 5 KAIG3-RFI-SW-C-3973 00 Civil Site Works 2/10/22 2/14/22 Approved as noted
Boulder no. RB-156 (Stock Pile # 110 A-1-A)
Inspection and Compaction test for NGL of Foul Water Line from FW5 to FW8 including Manhole FW5,
4C 4 KAIG3-RFI-SW-C-3974 00 FW6, FW7, FW8 - as highlighted (ZHBG Corrective action to close Site Instruction # KAIG3-SI-GN-C- Civil Site Works 2/10/22 2/15/22 Approved as noted
0023-00).
2B 2 KAIG3-RFI-SW-C-3975 00 Inspection of Formwork for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted). Civil Site Works 2/10/22 2/14/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-3976 00 Inspection of Concrete Pouring for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted). Civil Site Works 2/10/22 2/16/22 Approved as noted

Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/18 to G/MV/03) at Zone-G as
5 5 KAIG3-RFI-SW-C-3977 00 Civil Site Works 2/12/22 2/14/22 Approved as noted
highlighted (SP#130)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3978 00 Civil Site Works 2/12/22 2/16/22 Approved as noted
Boulder no. RB-156 (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for
5 5 KAIG3-RFI-SW-C-3979 00 Civil Site Works 2/12/22 2/16/22 Approved as noted
Boulder no. RB-156 (Stock Pile # 110 A-1-A)
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/25 to B/MV/02) at Zone-G as
5 5 KAIG3-RFI-SW-C-3980 00 Civil Site Works 2/12/22 2/14/22 Approved as noted
highlighted (SP#130)
Inspection of Backfilling Gravel 1st Layer (1 of 2) around Manholes for MH-H-01, MH-H-02, MH-H-03 -
3A 3 KAIG3-RFI-SW-C-3981 00 Civil Site Works 2/12/22 2/14/22 Approved as noted
AS Highlighted (SP#118)
"Inspection of Backfilling Sub-grade 1st Layer (1 of 3) around Gullies for G-H-21, G-H-20, G-H-19, G-H-18,
3A 3 KAIG3-RFI-SW-C-3982 00 G-H-17, G-H-16, G-H-15, G-H-14, G-H-13, G-H-12, G-H-11, G-H-10, G-H-9, G-H-8, G-H-7, G-H-6, G-H- Civil Site Works 2/12/22 2/17/22 Approved as noted
5, G-H-4, G-H-3, G-H-2, G-H-1 - AS Highlighted (SP#
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for Foul Water Line from FW5
4B 4 KAIG3-RFI-SW-C-3983 00 to FW8 including Manhole FW5, FW6, FW7, FW8 - as highlighted. (Stock Pile #131 A-1-B) (ZHBG Civil Site Works 2/13/22 2/16/22 Approved as noted
Corrective action to close Site Instruction # KAIG3-SI-GN
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
BC 3 KAIG3-RFI-SW-C-3984 00 Civil Site Works 2/10/22 2/14/22 Approved as noted
attached Dwg.
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 3) around Manhole
6A 6 KAIG3-RFI-SW-C-3993 00 Civil Site Works 2/12/22 2/16/22 Approved as noted
FW-A-13-2 - As Highlighted (SP#131) A-1-B
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3994 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
A-13-2 to FW-A-13-3 including Manhole FW-A-13-3 - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 9) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3995 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
A-13-1 to FW-A-13-2 including Manhole FW-A-13-1 - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 9) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-3996 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
A-13 to FW-A-13-1 including Manhole FW-A-13 - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 4) around
3B 3 KAIG3-RFI-SW-C-3997 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
Manhole MH-M-13 As Highlighted (SP#131) A-1-B"
Inspection And Compaction Test of Backfilling Sub Grade 2nd Layer (2 of 4) For Storm Water Line From
3B 3 KAIG3-RFI-SW-C-3998 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
MH-M-12 To MH-M-15 As Highlighted (SP#131) A-1-B
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 4th Layer (4 of 4) around Manhole
3A 3 KAIG3-RFI-SW-C-3999 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
FW-A-15 - As Highlighted (SP#131) A-1-B"

kaig-qcals 237
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 3) around Manhole
6A 6 KAIG3-RFI-SW-C-4000 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
FW-A-13-2 - As Highlighted (SP#131) A-1-B

4C 4 KAIG3-RFI-SW-C-4002 00 Soil Preparation prior to start backfilling Gravel around Manhole for FW1-3 - as highlighted. Civil Site Works 2/13/22 2/17/22 Approved as noted

"Inspection of backfilling Gravel 1st Layer ( 1 of 2) around Manhole for FW1-3 - as highlighted.(SP # 118) "
4C 4 KAIG3-RFI-SW-C-4003 00 Civil Site Works 2/13/22 2/17/22 Approved as noted

4B 4 KAIG3-RFI-SW-C-4004 00 Surface Preparation prior to start Waterproofing for SBC-06 - Expansion Joint - as highlighted Civil Site Works 2/13/22 2/14/22 Approved as noted

Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 - Expansion Joint (As
4B 4 KAIG3-RFI-SW-C-4005 00 Civil Site Works 2/13/22 2/14/22 Approved as noted
Highlighted)
Inspection for application of Damp Proof (1st Coat & 2nd Coat) on top of Primer for External Wall and Top
4B 4 KAIG3-RFI-SW-C-4006 00 Civil Site Works 2/13/22 2/14/22 Approved as noted
Slab of SBC-01-Expansion Joint (As Highlighted)
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
4B 4 KAIG3-RFI-SW-C-4007 00 Civil Site Works 2/13/22 2/14/22 Approved as noted
SBC-06 - Expansion Joint (As Highlighted)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4008 00 Civil Site Works 2/13/22 2/19/22 Approved as noted
Water Line (Branch) at Zone-B as highlighted in the attached drawing (Stock Pile # 131 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/16 to G/TL/38
4 4 KAIG3-RFI-SW-C-4009 00 Civil Site Works 2/13/22 2/14/22 Approved as noted
at Zone-G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/19 to
4 4 KAIG3-RFI-SW-C-4010 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
G/FS/38 at Zone-G - as highlighted in the attached drawing
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/12 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4011 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
Highlighted
Inspection of Formwork for Duct Bank of Telecommunications line between B/TL/40 and B/RC-TL/40 at
3 3 KAIG3-RFI-SW-C-4012 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
Zone-B - As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/12 at
3 3 KAIG3-RFI-SW-C-4013 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
Zone-B - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/40 and
3 3 KAIG3-RFI-SW-C-4014 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
B/RC-TL/40 at Zone-B - As Highlighted
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for Foul Water Line from FW5
4B 4 KAIG3-RFI-SW-C-4015 00 to FW8 including Manhole FW5, FW6, FW7, FW8 - as highlighted. (Stock Pile #131 A-1-B) (ZHBG Civil Site Works 2/13/22 2/17/22 Approved as noted
Corrective action to close Site Instruction # KAIG3-SI-GN
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
4C 4 KAIG3-RFI-SW-C-4020 00 Civil Site Works 2/13/22 2/17/22 Approved as noted
attached Dwg.
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/10 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4023 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
Highlighted"
Inspection of Formwork for Duct Bank of Fire & Security line between B/FS/38 and B/RC-FS/18 at Zone-B -
3 3 KAIG3-RFI-SW-C-4024 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/10 at Zone-B -
3 3 KAIG3-RFI-SW-C-4025 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/FS/38 and B/RC-
3 3 KAIG3-RFI-SW-C-4026 00 Civil Site Works 2/13/22 2/15/22 Approved as noted
FS/18 at Zone-B - As Highlighted
Inspection of Steel Reinforcement for the Footing and Walls of Corner Connection between SBC-01 & SBC-
3B 3 KAIG3-RFI-SW-C-4027 00 Civil Site Works 2/13/22 2/16/22 Approved as noted
02 - (As Highlighted)
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-02 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-4028 00 Civil Site Works 2/13/22 2/16/22 Approved as noted
Highlighted)"
"Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
6A 6 KAIG3-RFI-SW-C-4029 00 Civil Site Works 2/14/22 2/16/22 Approved as noted
Application of Primer For Storm Water Line G (1st Coat, 2nd Coat and 3rd Coat) As attached"
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
FG 4 KAIG3-RFI-SW-C-4031 00 Civil Site Works 2/13/22 2/16/22 Approved as noted
attached Dwg.
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F&G - As Highlighted
4 4 KAIG3-RFI-SW-C-4033 00 Civil Site Works 2/13/22 2/14/22 Approved as noted
in the attached drawing"

4A 4 KAIG3-RFI-SW-C-4034 00 INSPECTION OF INSTALLATION OF SLAB FOR FW1-2 (AS ATTACHED) Civil Site Works 2/14/22 2/19/22 Approved as noted

"INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-13-7, (AS
6B 6 KAIG3-RFI-SW-C-4035 00 Civil Site Works 2/14/22 2/20/22 Approved as noted
ATTACHED)"

4B 4 KAIG3-RFI-SW-C-4040 00 INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-14) (As Highlighted). Civil Site Works 2/14/22 2/16/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for Foul Water Line from FW5
4B 4 KAIG3-RFI-SW-C-4041 00 to FW8 including Manhole FW5, FW6, FW7, FW8 - as highlighted. (Stock Pile #131 A-1-B) (ZHBG Civil Site Works 2/14/22 2/21/22 Approved as noted
Corrective action to close Site Instruction # KAIG3-SI-GN

kaig-qcals 238
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Concrete Encasement for Storm Water Line Pipe 800mm dia (Connection to the existing culvert
2B 2 KAIG3-RFI-SW-C-4042 00 Civil Site Works 2/14/22 2/26/22 Approved as noted
SBC-01) - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4043 00 Water Line from Thrust Block to near Thrust Block at Zone-B, as highlighted in the attached drawing (Stock Civil Site Works 2/14/22 2/19/22 Approved as noted
Pile # 131 A-1-B)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/38 to G/TL/26
4 4 KAIG3-RFI-SW-C-4044 00 Civil Site Works 2/14/22 2/15/22 Approved as noted
at Zone-G - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/38 to
4 4 KAIG3-RFI-SW-C-4045 00 Civil Site Works 2/14/22 2/15/22 Approved as noted
G/FS/40 at Zone-G - as highlighted in the attached drawing

"INSPECTION FOR INSTALLATION OF SLABS FOR (MH-H-01, MH-H-02, MH-H-03) (As


4B 4 KAIG3-RFI-SW-C-4046 00 Civil Site Works 2/14/22 2/19/22 Approved as noted
Highlighted)."

4B 4 KAIG3-RFI-SW-C-4047 00 Inspection For Installation Of Slab For (MH-L-01) (As Highlighted). Civil Site Works 2/14/22 cancelled

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/27 to G/MV/05 at Zone-G as
5 5 KAIG3-RFI-SW-C-4057 00 Civil Site Works 2/14/22 2/15/22 Approved as noted
highlighted in the attached drawing
"Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) around Gullies for G-H-21, G-H-20, G-H-19, G-H-
3A 3 KAIG3-RFI-SW-C-4058 00 18, G-H-17, G-H-16, G-H-15, G-H-14, G-H-13, G-H-12, G-H-11, G-H-10, G-H-9, G-H-8, G-H-7, G-H-6, Civil Site Works 2/14/22 2/20/22 Approved as noted
G-H-5, G-H-4, G-H-3, G-H-2, G-H-1 - AS Highlighted (SP#
Inspection and Compaction Test for NGL of Telecommunication and Fire & Security Line from B/TL/12 to
3 3 KAIG3-RFI-SW-C-4059 00 Civil Site Works 2/14/22 2/19/22 Approved as noted
B/RC-TL/7 and B/FS/15 to B/RC-FS/4 at Zone-B as highlighted in the attached drawing.
Excavation for Telecommunication Line between B/TL/36 to G/TL/32 including pit B/TL/36, B/TL/35,
4 4 KAIG3-RFI-SW-C-4060 00 Civil Site Works 2/14/22 2/19/22 Approved as noted
G/TL/32 at Zone-B&G as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from B/FS/36 to G/FS/17, including Pit B/FS/36, B/FS/27,
3 3 KAIG3-RFI-SW-C-4061 00 Civil Site Works 2/14/22 2/19/22 Approved as noted
G/FS/36 at Zone-B&G - as highlighted in the attached drawing

"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-4062 00 Civil Site Works 2/15/22 2/15/22 Approved as noted
Highlighted)"

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) for Foul Water Line from FW5
4B 4 KAIG3-RFI-SW-C-4063 00 to FW8 including Manhole FW5, FW6, FW7, FW8 - as highlighted. (Stock Pile #131 A-1-B) (ZHBG Civil Site Works 2/15/22 2/21/22 Approved as noted
Corrective action to close Site Instruction # KAIG3-SI-GN

"Excavation for Storm Water Line from MH-M-06 to MH-M-04 including Manhole MH-M-05, MH-M-04 -
6A 6 KAIG3-RFI-SW-C-4064 00 Civil Site Works 2/15/22 2/19/22 Approved as noted
As highlighted "

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
4 4 KAIG3-RFI-SW-C-4065 00 Telecommunications Line from G/TL/16 to G/TL/38 at Zone-G as highlighted in the attached drawing (SP # Civil Site Works 2/15/22 2/20/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
4 4 KAIG3-RFI-SW-C-4066 00 Fire & Security Distribution Line from G/FS/19 to G/FS/38 at Zone-G as highlighted in the attached drawing Civil Site Works 2/15/22 2/20/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/26 to G/TL/27
4 4 KAIG3-RFI-SW-C-4067 00 Civil Site Works 2/15/22 2/16/22 Approved as noted
at Zone-G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/40 to
4 4 KAIG3-RFI-SW-C-4068 00 Civil Site Works 2/15/22 2/15/22 Approved as noted
G/FS/44 at Zone-G - as highlighted in the attached drawing
"Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/01, K/TL/08, K/TL/09, K/TL/10,
5 5 KAIG3-RFI-SW-C-4069 00 Civil Site Works 2/15/22 2/19/22 Approved as noted
K/TL/12, K/TL/13, K/TL/15, K/TL/16, K/TL/19 at Zone-K - as highlighted "
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/01, K/FS/04, K/FS/05, K/FS/06,
5 5 KAIG3-RFI-SW-C-4070 00 Civil Site Works 2/15/22 2/19/22 Approved as noted
K/FS/09, K/FS/21, K/FS/22, K/FS/23 at Zone-K - as highlighted
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 7) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4073 00 Civil Site Works 2/15/22 cancelled
A-13-2 to FW-A-13-3 including Manhole FW-A-13-3 - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4074 00 Civil Site Works 2/15/22 cancelled
FW-A-13-1 to FW-A-13-2 including Manhole FW-A-13-1 - As Highlighted (SP#131 A-1-B)"
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4075 00 Civil Site Works 2/15/22 2/21/22 Approved as noted
FW-A-13 to FW-A-13-1 including Manhole FW-A-13 - As Highlighted (SP#131 A-1-B)

kaig-qcals 239
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 3rd Layer (3 of 4) around
3B 3 KAIG3-RFI-SW-C-4076 00 Civil Site Works 2/15/22 cancelled
Manhole MH-M-13 As Highlighted (SP#131) A-1-B"
Inspection And Compaction Test of Backfilling Sub Grade 3rd Layer (3 of 4) For Storm Water Line From
3B 3 KAIG3-RFI-SW-C-4077 00 Civil Site Works 2/15/22 cancelled
MH-M-12 To MH-M-15 As Highlighted (SP#131) A-1-B
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 3rd Layer (3 of 3) around Manhole
6A 6 KAIG3-RFI-SW-C-4078 00 Civil Site Works 2/15/22 cancelled
FW-A-13-2 - As Highlighted (SP#131) A-1-B
Inspection of Backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manholes for MH-H-01, MH-H-
3A 3 KAIG3-RFI-SW-C-4085 00 Civil Site Works 2/15/22 2/20/22 Approved as noted
02, MH-H-03 - AS Highlighted (SP#131- A-1-B)
Inspection of Sand bedding under pipe for Telecommunication Line between B/TL/12 to B/TL/15 at Zone-B
3 3 KAIG3-RFI-SW-C-4086 00 Civil Site Works 2/15/22 2/21/22 Approved as noted
as highlighted in the attached drawing (SP#130)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/15 to B/FS/17 at
3 3 KAIG3-RFI-SW-C-4087 00 Civil Site Works 2/15/22 2/21/22 Approved as noted
Zone-B - as highlighted in the attached drawing (SP#130)
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/12 to G/MV/13) at Zone-G as
4 4 KAIG3-RFI-SW-C-4088 00 Civil Site Works 2/15/22 2/19/22 Code C (resubmit)
highlighted (SP#130)
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/12 to G/MV/13) at Zone-G as
4 4 KAIG3-RFI-SW-C-4088 01 Civil Site Works 2/21/22 2/24/22 Approved as noted
highlighted (SP#130)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/39 to G/TL/45) at
3 3 KAIG3-RFI-SW-C-4089 00 Civil Site Works 2/15/22 2/19/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/25 to
4 4 KAIG3-RFI-SW-C-4090 00 Civil Site Works 2/15/22 2/19/22 Approved as noted
G/FS/46) at Zone-G as highlighted in the attached drawing

"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) for Foul Water Line from FW5
4B 4 KAIG3-RFI-SW-C-4097 00 to FW8 including Manhole FW5, FW6, FW7, FW8 - as highlighted. (Stock Pile #131 A-1-B) (ZHBG Civil Site Works 2/16/22 2/24/22 Approved as noted
Corrective action to close Site Instruction # KAIG3-SI-GN

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/50 to K/TL/01
4K 4 KAIG3-RFI-SW-C-4098 00 Civil Site Works 2/16/22 2/19/22 Approved as noted
at Zone-G&K - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/30 to
4 4 KAIG3-RFI-SW-C-4099 00 Civil Site Works 2/16/22 2/19/22 Approved as noted
K/FS/01 at Zone-G&K - as highlighted in the attached drawing

Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
4 4 KAIG3-RFI-SW-C-4100 00 Telecommunications Line between G/TL/38 to G/TL/27 at Zone-G as highlighted in the attached drawing (SP Civil Site Works 2/16/22 2/21/22 Approved as noted
# 131 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
4 4 KAIG3-RFI-SW-C-4101 00 Fire & Security Distribution Line between G/FS/38 to G/FS/44 at Zone-G as highlighted in the attached Civil Site Works 2/16/22 2/21/22 Approved as noted
drawing (Stock Pile # 131 A-1-B)
Inspection and Compcation Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
5 5 KAIG3-RFI-SW-C-4102 00 between G/MV/27 to G/MV/05 at Zone-G as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 2/16/22 2/21/22 Approved as noted

Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4103 00 Civil Site Works 2/16/22 2/19/22 Approved as noted
Highlighted
Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4104 00 Civil Site Works 2/16/22 2/19/22 Approved as noted
Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/11 at
3 3 KAIG3-RFI-SW-C-4105 00 Civil Site Works 2/16/22 2/20/22 Approved as noted
Zone-B - As Highlighted
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4111 00 Civil Site Works 2/16/22 2/19/22 Approved as noted
Highlighted"

3 3 KAIG3-RFI-SW-C-4112 00 "Inspection of Formwork for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As Highlighted" Civil Site Works 2/16/22 2/19/22 Approved as noted

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B -
3 3 KAIG3-RFI-SW-C-4113 00 Civil Site Works 2/16/22 2/20/22 Approved as noted
As Highlighted
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
K 5 KAIG3-RFI-SW-C-4114 00 Civil Site Works 2/16/22 2/20/22 Approved as noted
attached Dwg.

3B 3 KAIG3-RFI-SW-C-4116 00 "Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-14 as highlighted " Civil Site Works 2/16/22 2/20/22 Approved as noted

INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) And Slab FOR MH-M-14, (As
3B 3 KAIG3-RFI-SW-C-4117 00 Civil Site Works 2/16/22 2/20/22 Approved as noted
Highlighted)
Inspection of Thrust Block for UPVC Pipe (250 mm Dia) for Fire Water Line at Zone- B - As Highlighted in
3 3 KAIG3-RFI-SW-C-4119 00 Civil Site Works 2/17/22 2/19/22 Approved as noted
the attached drawing
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-K - As Highlighted in
5 5 KAIG3-RFI-SW-C-4120 00 Civil Site Works 2/17/22 2/19/22 Approved as noted
the attached drawing"

kaig-qcals 240
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole for MH-A-11, as Highlighted (SP#118)
4C 4 KAIG3-RFI-SW-C-4121 00 Civil Site Works 2/17/22 2/20/22 Approved as noted

Inspection and Compaction Test for Backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manhole
4C 4 KAIG3-RFI-SW-C-4122 00 Civil Site Works 2/17/22 2/23/22 Approved as noted
for MH-A-12, as Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manhole
4C 4 KAIG3-RFI-SW-C-4123 00 Civil Site Works 2/17/22 2/23/22 Approved as noted
for FW1-3 - as highlighted.(SP# 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4124 00 Water Line from Thrust Block to near Thrust Block at Zone-B, as highlighted in the attached drawing (Stock Civil Site Works 2/17/22 2/23/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Potable
3 3 KAIG3-RFI-SW-C-4125 00 Water Line near PW-02 at Zone-B, as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 2/17/22 2/23/22 Approved as noted
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Potable
3 3 KAIG3-RFI-SW-C-4132 00 Water Line from near Toilet 1 to near PW-02 at Zone-B, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/17/22 2/23/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 5) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4133 00 Water Line from Thrust Block to near B/F/05 at Zone-B, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/17/22 2/23/22 Approved as noted
131 A-1-B)
3B 3 KAIG3-RFI-SW-C-4134 00 Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-09 - (As Highlighted) Civil Site Works 2/17/22 2/20/22 Approved as noted

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from F/TL/04 to G/TL/21 at
4 4 KAIG3-RFI-SW-C-4135 00 Civil Site Works 2/19/22 2/20/22 Approved as noted
Zone-F&G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from F/FS/04 to
4 4 KAIG3-RFI-SW-C-4136 00 Civil Site Works 2/19/22 2/20/22 Approved as noted
G/FS/07 at Zone-F&G - as highlighted in the attached drawing
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/18 to G/MV/14) at Zone-G as
3B 3 KAIG3-RFI-SW-C-4137 00 Civil Site Works 2/20/22 2/23/22 Approved as noted
highlighted (SP#130)
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/16 to B/MV/12 at
3 3 KAIG3-RFI-SW-C-4138 00 Civil Site Works 2/17/22 2/19/22 Approved as noted
Zone- B (As Highlighted)
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/16 to B/MV/12 at Zone- B (As
3 3 KAIG3-RFI-SW-C-4139 00 Civil Site Works 2/17/22 2/19/22 Approved as noted
Highlighted)
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-03 - Wing Wall (As
KAIG3-RFI-SW-C-4140 00 Civil Site Works 2/19/22 2/21/22 Approved as noted
Highlighted)"
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
K 5 KAIG3-RFI-SW-C-4141 00 Civil Site Works 2/17/22 2/20/22 Approved as noted
Water pipe Out Fall ( MH-M-11 to MH-M-06 ) As per high lighted Area in the attached Dwg.
'Pipe Installation of Strom Water pipe OUT FALL-M for (450 mmØ-UPVC pipes-Class 4) from ( MH-M-11
3 3 KAIG3-RFI-SW-C-4142 00 Civil Site Works 2/17/22 2/21/22 Approved as noted
to MH-M-06) As per high lighted Area in the attached Dwg.

B 3 KAIG3-RFI-SW-C-4143 00 Inspection for Installation Of Isolation Fire Water Line Pit B/F/15- as highlighted Civil Site Works 2/17/22 2/19/22 Approved as noted

"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-03 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-4144 00 Civil Site Works 2/19/22 2/21/22 Approved as noted
Highlighted)"
Inspection of Formwork for the Footing and Kicker of Corner Connection between SBC-01 & SBC-02 - (As
3B 3 KAIG3-RFI-SW-C-4145 00 Civil Site Works 2/19/22 2/20/22 Approved as noted
Highlighted)

Inspection of Concrete Pouring for the Footing and Kicker of Corner Connection between SBC-01 & SBC-02
3B 3 KAIG3-RFI-SW-C-4146 00 Civil Site Works 2/19/22 2/21/22 Approved as noted
- (As Highlighted)

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/52 to G/TL/38) at
3 3 KAIG3-RFI-SW-C-4147 00 Civil Site Works 2/19/22 2/23/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/47 to
4 4 KAIG3-RFI-SW-C-4148 00 Civil Site Works 2/19/22 2/23/22 Approved as noted
G/FS/38) at Zone-G as highlighted in the attached drawing
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the Green Tiles above pipe for
4 4 KAIG3-RFI-SW-C-4149 00 Telecommunication Line from G/TL/50 to K/TL/01 at Zone-G&K - as highlighted in the attached drawing Civil Site Works 2/19/22 2/23/22 Approved as noted
(SP # 131 A-1-B)
Inspection and Compaction Test for backfilling 1st layer (1of 1) to cover the GreenTiles above the pipe for
4 4 KAIG3-RFI-SW-C-4150 00 Fire & Security Distribution Line from G/FS/30 to K/FS/01 at Zone-G&K - as highlighted in the attached Civil Site Works 2/19/22 2/23/22 Approved as noted
drawing (SP# 131 A-1-B)
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-4 to SBC
7 7 KAIG3-RFI-SW-C-4155 00 Civil Site Works 2/19/22 2/23/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#131 A-1-B)

3B 3 KAIG3-RFI-SW-C-4156 00 "Inspection of Backfilling Gravel 1ST Layer (1 of 2) around Manhole MH-M-15 As Highlighted (SP#118)" Civil Site Works 2/19/22 2/23/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4157 00 Inspection of Steel Reinforcement for the Footing and Walls of SBC-02 - Wing Wall - (As Highlighted) Civil Site Works 2/20/22 2/24/22 Approved as noted

4B 4 KAIG3-RFI-SW-C-4158 00 "Soil Preparation prior to start backfill around SBC-06-Expansion Joint - as highlighted" Civil Site Works 2/20/22 2/24/22 Approved as noted

"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-06-Expansion
4B 4 KAIG3-RFI-SW-C-4159 00 Civil Site Works 2/20/22 2/26/22 Approved as noted
Joint - as highlighted (SP#131 A-1-B)"

kaig-qcals 241
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (2 of 8) around SBC-06-Expansion
4B 4 KAIG3-RFI-SW-C-4160 00 Civil Site Works 2/20/22 2/26/22 Approved as noted
Joint - as highlighted (SP#131 A-1-B)"
"Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) around Gullies for G-H-21, G-H-20, G-H-19, G-H-
3A 3 KAIG3-RFI-SW-C-4161 00 18, G-H-17, G-H-16, G-H-15, G-H-14, G-H-13, G-H-12, G-H-11, G-H-10, G-H-9, G-H-8, G-H-7, G-H-6, Civil Site Works 2/24/22 2/28/22 Approved as noted
G-H-5, G-H-4, G-H-3, G-H-2, G-H-1 - AS Highlighted (SP#
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/21 to G/TL/50
4 4 KAIG3-RFI-SW-C-4162 00 Civil Site Works 2/20/22 2/24/22 Approved as noted
at Zone-G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/07 to
4 4 KAIG3-RFI-SW-C-4163 00 Civil Site Works 2/20/22 2/24/22 Approved as noted
G/FS/30 at Zone-G - as highlighted in the attached drawing
Inspection for Installation of Fire & Security Line Pit - B/FS/05, B/FS/16, B/FS/19, B/FS/21, B/FS/22,
3 3 KAIG3-RFI-SW-C-4164 00 B/FS/24, B/FS/27, B/FS/36, B/FS/37, B/FS/38, B/FS/40, G/FS/10, G/FS/16, G/FS/17, G/FS/18, G/FS/33, Civil Site Works 2/20/22 3/10/22 Approved as noted
G/FS/42, G/FS/43 - as highlighted
"Inspection for Installation of Telecommunication Line Pit - B/TL/17, B/TL/19, B/TL/21, B/TL/25, B/TL/35,
3 3 KAIG3-RFI-SW-C-4165 00 B/TL/36, B/TL/37, B/TL/39, B/TL/40, B/TL/41, B/TL/42, B/TL/43, B/TL/49, B/TL/50, G/TL/25, G/TL/29, Civil Site Works 2/20/22 3/10/22 Approved as noted
G/TL/30, G/TL/31, G/TL/32, G/TL/33 - as highligh
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-4 to SBC
6A 6 KAIG3-RFI-SW-C-4166 00 Civil Site Works 2/20/22 2/26/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#131 A-1-B)
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-4 to SBC
6A 6 KAIG3-RFI-SW-C-4167 00 Civil Site Works 2/20/22 2/26/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#131 A-1-B)

3B 3 KAIG3-RFI-SW-C-4168 00 "Inspection of Backfilling Gravel 2nd Layer (2 of 2) around Manhole MH-M-15 As Highlighted (SP#118)" Civil Site Works 2/20/22 2/24/22 Approved as noted

"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 2) around Manhole
3B 3 KAIG3-RFI-SW-C-4169 00 Civil Site Works 2/20/22 2/26/22 Approved as noted
MH-M-15 As Highlighted (SP#131) A-1-B"
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes).Pipes (50 & 200 &160 & 80mmØ-
FG 4 KAIG3-RFI-SW-C-4173 00 UPVC-Class-5) From Point (647430.475 East & 2713701.779 North) to Vlve Pit( F/PW/07 ) to Vlve Pit Civil Site Works 2/20/22 2/24/22 Approved as noted
(G/PW/01) TO Point (647460.85 East & 2713863.959 North) I
Surface Preparation prior to start backfilling Gravel around the Potable Water Line Pit - G/PW/07 - As
4 4 KAIG3-RFI-SW-C-4176 00 Civil Site Works 2/20/22 cancelled
Highlighted
Surface Preparation prior to start backfilling Gravel around the Fire Water Line Pit - G/F/04 & G/F/05 - As
4 4 KAIG3-RFI-SW-C-4177 00 Civil Site Works 2/20/22 cancelled
Highlighted
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-04 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-4179 00 Civil Site Works 2/21/22 2/24/22 Approved as noted
Highlighted)"
"Inspection and Compaction Test for backfilling sub-grade 3rd & 4th Layer (4 of 8) around SBC-06-
4B 4 KAIG3-RFI-SW-C-4180 00 Civil Site Works 2/21/22 2/26/22 Approved as noted
Expansion Joint - as highlighted (SP#131 A-1-B)"

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4181 00 Water Line from Thrust Block to near Thrust Block at Zone-B, as highlighted in the attached drawing (Stock Civil Site Works 2/21/22 2/26/22 Approved as noted
Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 5) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4182 00 Water Line from Thrust Block to near B/F/05 at Zone-B, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/21/22 2/26/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
3 3 KAIG3-RFI-SW-C-4183 00 Potable Water Line near PW-02 at Zone-B, as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 2/21/22 2/26/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
3 3 KAIG3-RFI-SW-C-4184 00 Potable Water Line from near Toilet 1 to near PW-02 at Zone-B, as highlighted in the attached drawing Civil Site Works 2/21/22 2/26/22 Approved as noted
(Stock Pile # 131 A-1-B)
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-04 - Wing Wall (As
2B 2 KAIG3-RFI-SW-C-4185 00 Civil Site Works 2/21/22 2/27/22 Approved as noted
Highlighted)"
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fire
3 3 KAIG3-RFI-SW-C-4186 00 Water Line from Thrust Block to near L-F-03 at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/21/22 2/26/22 Approved as noted
131 A-1-B)

2B 2 KAIG3-RFI-SW-C-4187 00 Inspection of Formwork for the Wing Wall of SBC-05 (As Highlighted) Civil Site Works 2/21/22 2/24/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4188 00 Inspection of Concrete Pouring for the Wing Wall of SBC-05 (As Highlighted) Civil Site Works 2/21/22 2/26/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Potable
3 3 KAIG3-RFI-SW-C-4189 00 Water Line from near Toilet 1 to near B/PW/05 at Zone-B, as highlighted in the attached drawing (SP # 131 Civil Site Works 2/24/22 3/1/22 Approved as noted
A-1-B)

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/14 to G/MV/27 at Zone-G as
4 4 KAIG3-RFI-SW-C-4190 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
highlighted in the attached drawing

Inspection of Backfilling Sub-grade 8th Layer (8 of 11) For Foul Water Line From FW-A-13-4 to SBC
6A 6 KAIG3-RFI-SW-C-4195 00 Civil Site Works 2/21/22 2/26/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#131 A-1-B)

kaig-qcals 242
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Backfilling Sub-grade 9th Layer (9 of 11) For Foul Water Line From FW-A-13-4 to SBC
6A 6 KAIG3-RFI-SW-C-4196 00 Civil Site Works 2/21/22 2/27/22 Approved as noted
including Manhole FW-A-13-4 - As Highlighted (SP#131 A-1-B)

"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 8) around
3B 3 KAIG3-RFI-SW-C-4197 00 Civil Site Works 2/21/22 2/27/22 Approved as noted
Manhole MH-M-15 As Highlighted (SP#131) A-1-B"

"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 3rd Layer (3 of 8) around Manhole
3B 3 KAIG3-RFI-SW-C-4198 00 Civil Site Works 2/21/22 cancelled
MH-M-15 As Highlighted (SP#131) A-1-B"

Inspection of Casting the Blinding Under MV Pulling Box Type-01 number: G/MV/ 07, G/MV/ 08, G/MV/
G 3 KAIG3-RFI-SW-C-4204 00 Civil Site Works 2/23/22 3/5/22 Approved as noted
09, G/MV/ 34, G/MV/ 35, G/MV/ 36 (as Highlighted)

'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
K 5 KAIG3-RFI-SW-C-4206 00 Civil Site Works 2/23/22 2/27/22 Approved as noted
attached Dwg.

Potable Water Pipes Sand Cover & Pipes Protection (30cm above Pipes) as per highlighted area in attached
B 3 KAIG3-RFI-SW-C-4208 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
drawing.

Fire Fighting Pipes Sand Cover & Pipes Protection (30cm above Pipes) as per highlighted area in attached
B 3 KAIG3-RFI-SW-C-4210 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
drawing.

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/07 to G/TL/38
G 3 KAIG3-RFI-SW-C-4212 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
at Zone-G - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/05 to
G 3 KAIG3-RFI-SW-C-4213 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
G/FS/38 at Zone-G - as highlighted in the attached drawing
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/27 to G/TL/45
G 3 KAIG3-RFI-SW-C-4214 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
at Zone-G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/44 to
G 3 KAIG3-RFI-SW-C-4215 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
G/FS/46 at Zone-G - as highlighted in the attached drawing
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
FG 4 KAIG3-RFI-SW-C-4216 00 Telecommunication Line from F/TL/04 to G/TL/50 at Zone-F&G - as highlighted in the attached drawing Civil Site Works 2/24/22 3/1/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pipe for
FG 4 KAIG3-RFI-SW-C-4217 00 Fire & Security Distribution Line from F/FS/04 to G/FS/30) at Zone-F&G as highlighted in the attached Civil Site Works 2/24/22 3/1/22 Approved as noted
drawing (SP # 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fire
FG 4 KAIG3-RFI-SW-C-4218 00 Water Line from Near F/F/08 to near G/F/01 at Zone-F&G, as highlighted in the attached drawing (Stock Pile Civil Site Works 2/24/22 3/1/22 Approved as noted
# 131 A-1-B)
"Inspection and Compaction Test for backfilling sub-grade 5th & 6th Layer (6 of 8) around SBC-06-
4B 4 KAIG3-RFI-SW-C-4219 00 Civil Site Works 2/24/22 3/1/22 Approved as noted
Expansion Joint - as highlighted (SP#131 A-1-B)"
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/52 to G/TL/07) at
G 3 KAIG3-RFI-SW-C-4220 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/47 to G/FS/05) at
G 3 KAIG3-RFI-SW-C-4221 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
Zone-G as highlighted in the attached drawing ( SP#130)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/14 to G/TL/23) at
G 3 KAIG3-RFI-SW-C-4222 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)

Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/12 to G/FS/37) at
G 3 KAIG3-RFI-SW-C-4223 00 Civil Site Works 2/24/22 2/27/22 Approved as noted
Zone-G as highlighted in the attached drawing ( SP#130)

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/03 to K/TL/12) at
K 5 KAIG3-RFI-SW-C-4224 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP#130)

Inspection of Sand Covering Layer for Protection of Fire & Security Line from (K/FS/03 to K/FS/22) at
K 5 KAIG3-RFI-SW-C-4225 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP#130)
300mm Gravel 3/8 Backfilling and Geotextile of Storm Water Line (450mmØ - UPVC - Class 4) from Site Works Crescent at
7 6 KAIG3-RFI-SW-C-4231 00 Civil 2/24/22 2/28/22 Approved as noted
(MH-M-11 to (MH-M-06) at Crescent as per attached highlighted drawing) Zone 7
Warning Tape Installation of Storm Water Line for (450mm Ø UPVC - Class 4) from (MH-M-11) to (MH- Site Works Crescent at
7 6 KAIG3-RFI-SW-C-4232 00 Civil 2/24/22 2/28/22 Approved as noted
M-06) at Crescent as per highlighted area in the attached drawing. Zone 7

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/21 to K/TL/06) at
K 5 KAIG3-RFI-SW-C-4234 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP#130)

Inspection of Sand Covering Layer for Protection of Fire & Security Line from (K/FS/13 to K/FS/12) at
K 5 KAIG3-RFI-SW-C-4235 00 Civil Site Works 2/24/22 2/28/22 Approved as noted
Zone-K as highlighted in the attached drawing (SP#130)

kaig-qcals 243
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Surface Preperation prior to start backfilling behind the boundary wall (External Side) upto Kicker Level at
3B 3 KAIG3-RFI-SW-C-4236 00 Civil Site Works 2/24/22 3/2/22 Approved as noted
Zone-2B (Span#67C to Span#74) - As Highlighted"

6A 6 KAIG3-RFI-SW-C-4237 00 Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-M-14 - as Highlighted Civil Site Works 2/24/22 2/27/22 Approved as noted

Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-3 & FW-A-3-1 to FW-A-3-A including Manhole
6A 6 KAIG3-RFI-SW-C-4239 00 FW-A-3-5, FW-A-3-4, FW-A-3-3, FW-A-3-1, FW-A-3, FW-A-3-A prior to start Gravel Bedding (as Civil Site Works 2/26/22 3/1/22 Code C (resubmit)
Highlighted)

Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-3 & FW-A-3-1 to FW-A-3-A including Manhole
6A 6 KAIG3-RFI-SW-C-4239 01 FW-A-3-5, FW-A-3-4, FW-A-3-3, FW-A-3-1, FW-A-3, FW-A-3-A prior to start Gravel Bedding (as Civil Site Works 3/5/22 3/8/22 Approved as noted
Highlighted)
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03,
4 4 KAIG3-RFI-SW-C-4240 00 F/TL/04, F/TL/16, G/TL/43, G/TL/21, G/TL/13, G/TL/44, G/TL/50, G/TL/54, G/TL/16 at Zone-F&G - as Civil Site Works 2/26/22 2/28/22 Approved as noted
highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/17, F/FS/11, F/FS/03, F/FS/04,
4 4 KAIG3-RFI-SW-C-4241 00 Civil Site Works 2/26/22 3/17/22 Approved as noted
F/FS/14, G/FS/07, G/FS/21, G/FS/08, G/FS/30, G/FS/52, G/FS/19 at Zone-F&G - as highlighted

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-4242 00 Water Line from Thrust Block to near L-F-03 at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/26/22 2/28/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Potable
5 5 KAIG3-RFI-SW-C-4249 00 Water Line from near L/PW/02 to End of Line at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/26/22 3/2/22 Approved as noted
131 A-1-B)

Excavation for Non-Potable Water Line from NPW-ISC-01 to NPW-ISC-03 including Pit NPW-ISC-01,
FG 4 KAIG3-RFI-SW-C-4250 00 Civil Site Works 2/26/22 2/28/22 Approved as noted
NPW-ISC-02, NPW-ISC-03 at Zone-F & G as highlighted in the attached drawing

Inspection of Sand Bedding under pipe for Non-Potable Water Line from NPW-ISC-01 to NPW-ISC-03
FG 4 KAIG3-RFI-SW-C-4251 00 including Pit NPW-ISC-01, NPW-ISC-02, NPW-ISC-03 at Zone-F & G as highlighted in the attached Civil Site Works 2/26/22 3/2/22 Approved as noted
drawing (SP# 130)

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
3B 3 KAIG3-RFI-SW-C-4252 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-07, MH-M-08, MH-M-09, Civil Site Works 2/26/22 2/28/22 Approved as noted
MH-M-10 (As Highlighted)

Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-M-07, MH-M-08, MH-M-09, MH-M-
6A 6 KAIG3-RFI-SW-C-4253 00 Civil Site Works 2/26/22 3/1/22 Approved as noted
10 as Highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) behind the boundary wall
3B 3 KAIG3-RFI-SW-C-4254 00 (External Side) upto Kicker Level at Zone-2B (Span#67C to Span#74) - As Highlighted (Stock Pile # 131 A- Civil Site Works 2/27/22 3/3/22 Approved as noted
1-B)

"Inspection and Compaction Test for backfilling sub-grade 7th & 8th Layer (8 of 8) around SBC-06-
4B 4 KAIG3-RFI-SW-C-4263 00 Civil Site Works 2/27/22 3/3/22 Approved as noted
Expansion Joint - as highlighted (SP#131 A-1-B)"

2B 2 KAIG3-RFI-SW-C-4264 00 Inspection of Formwork for the Footing of SBC-02 - Wing Wall - (As Highlighted) Civil Site Works 2/27/22 3/2/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4265 00 "Inspection of Concrete Pouring for the Footing of SBC-02 - Wing Wall - (As Highlighted)" Civil Site Works 2/27/22 3/2/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-4266 00 Inspection of Backfilling Gravel 1st Layer (1 of 2) around Manhole for MH-M-14 - as Highlighted Civil Site Works 2/27/22 3/1/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-4267 00 Inspection of Backfilling Gravel 2nd Layer (2 of 2) around Manhole for MH-M-14 - as Highlighted Civil Site Works 2/27/22 3/1/22 Approved as noted

Inspection of Backfilling Sub-grade above gravel 1st Layer (1 of 8) around Manhole for MH-M-14 - as
6A 6 KAIG3-RFI-SW-C-4268 00 Civil Site Works 2/27/22 3/3/22 Approved as noted
Highlighted (Stock Pile # 131 A-1-B)

Inspection of Backfilling Sub-grade above gravel 2nd Layer (2 of 8) around Manhole for MH-M-14 - as
6A 6 KAIG3-RFI-SW-C-4269 00 Civil Site Works 2/27/22 3/5/22 Approved as noted
Highlighted (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) behind the boundary wall
3B 3 KAIG3-RFI-SW-C-4270 00 (External Side) upto Kicker Level at Zone-2B (Span#67C to Span#74) - As Highlighted (Stock Pile # 131 A- Civil Site Works 2/27/22 3/5/22 Approved as noted
1-B)

kaig-qcals 244
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Potable
3F&G 3 KAIG3-RFI-SW-C-4271 00 Water Line from F/PW/04 to Bend Point 647447.191, 2713805.351 at Zone-F&G, as highlighted in the Civil Site Works 2/27/22 3/2/22 Approved as noted
attached drawing (Stock Pile # 131 A-1-B)
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4272 00 Telecommunication Line from G/TL/27 to G/TL/39 at Zone-G - as highlighted in the attached drawing Civil Site Works 2/27/22 3/3/22 Code C (not resubmit)
(Stock Pile # 131 A-1-B)"
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) above Green Tiles for Fire & Security
4 4 KAIG3-RFI-SW-C-4273 00 Distribution Line from G/FS/44 to G/FS/25 at Zone-G - as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/27/22 3/3/22 Code C (resubmit)
131 A-1-B)
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) above Green Tiles for Fire & Security
4 4 KAIG3-RFI-SW-C-4273 01 Distribution Line from G/FS/44 to G/FS/25 at Zone-G - as highlighted in the attached drawing (Stock Pile # Civil Site Works 3/20/22 3/27/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4 4 KAIG3-RFI-SW-C-4275 00 Civil Site Works 2/27/22 3/3/22 Approved as noted
from G/MV/18 to G/MV/27 at Zone-G as highlighted in the attached drawing (SP#131 A-1-B)
"Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/08,
3 3 KAIG3-RFI-SW-C-4276 00 Civil Site Works 2/27/22 3/2/22 Approved as noted
B/RC-TL/31, B/RC-TL/32, B/RC-TL/33, B/RC-TL/34 at Zone-B - As Highlighted"
Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/08, B/RC-TL/31, B/RC-
3 3 KAIG3-RFI-SW-C-4277 00 Civil Site Works 2/27/22 3/2/22 Approved as noted
TL/32, B/RC-TL/33, B/RC-TL/34 at Zone-B - As Highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/08,
3 3 KAIG3-RFI-SW-C-4278 00 Civil Site Works 2/28/22 3/3/22 Approved as noted
B/RC-TL/31, B/RC-TL/32, B/RC-TL/33, B/RC-TL/34 at Zone-B - As Highlighted
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at
3 3 KAIG3-RFI-SW-C-4279 00 Civil Site Works 2/27/22 3/2/22 Approved as noted
Zone-B - As Highlighted"
"Inspection of Formwork for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4280 00 Civil Site Works 2/27/22 3/2/22 Approved as noted
Highlighted"
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7
3 3 KAIG3-RFI-SW-C-4281 00 Civil Site Works 2/27/22 3/3/22 Approved as noted
at Zone-B - As Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/RC-TL/11 and
3 3 KAIG3-RFI-SW-C-4282 00 Civil Site Works 2/28/22 3/3/22 Approved as noted
C/TL/15 at Zone-B&C - As Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/RC-FS/8 and
3 3 KAIG3-RFI-SW-C-4283 00 Civil Site Works 2/28/22 3/3/22 Approved as noted
C/FS/08 at Zone-B&C - As Highlighted

Surface Preparation prior to start water proofing for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at
4 4 KAIG3-RFI-SW-C-4289 00 Civil Site Works 2/28/22 3/2/22 Approved as noted
Zone- F&G (As Highlighted)

Inspection of Water proofing for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G (As
4 4 KAIG3-RFI-SW-C-4290 00 Civil Site Works 2/28/22 3/2/22 Approved as noted
Highlighted)

Surface Preparation prior to start backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to
4 4 KAIG3-RFI-SW-C-4291 00 Civil Site Works 2/28/22 3/3/22 Approved as noted
G/MV/01 at Zone- F&G (As Highlighted)

6 6 KAIG3-RFI-SW-C-4292 00 Soil Preparation under Boulder No. RB- 141 Civil Site Works 3/1/22 3/5/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-4293 00 Water Line from Thrust Block to near L-F-03 at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 2/28/22 3/5/22 Approved as noted
131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
5 5 KAIG3-RFI-SW-C-4294 00 Potable Water Line from near L/PW/02 to End of Line at Zone-K, as highlighted in the attached drawing Civil Site Works 2/28/22 3/5/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4300 00 Telecommunication Line from G/TL/07 to G/TL/38 at Zone-G - as highlighted in the attached drawing (Stock Civil Site Works 2/28/22 3/5/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Fire &
4 4 KAIG3-RFI-SW-C-4301 00 Security Distribution Line from G/FS/05 to G/FS/38 at Zone-G -as highlighted in the attached drawing (Stock Civil Site Works 2/28/22 3/5/22 Approved as noted
Pile # 131 A-1-B)
4 4 KAIG3-RFI-SW-C-4302 00 Inspection of Formwork for the Wing Wall of SBC-09 (As Highlighted) Civil Site Works 2/28/22 3/3/22 Approved as noted

4 4 KAIG3-RFI-SW-C-4303 00 Inspection of Concrete Pouring for the Wing Wall of SBC-09 (As Highlighted) Civil Site Works 2/28/22 3/3/22 Approved as noted

kaig-qcals 245
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/14 to G/TL/23
4 4 KAIG3-RFI-SW-C-4304 00 Civil Site Works 2/28/22 3/2/22 Approved as noted
at Zone-G - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/12 to
4 4 KAIG3-RFI-SW-C-4305 00 Civil Site Works 2/28/22 3/2/22 Approved as noted
G/FS/37 at Zone-G - as highlighted in the attached drawing

Inspection of Backfilling Sub-grade above gravel 3rd Layer (3 of 8) around Manhole for MH-M-14 - as
6A 6 KAIG3-RFI-SW-C-4306 00 Civil Site Works 2/28/22 3/5/22 Approved as noted
Highlighted (Stock Pile # 131 A-1-B)

Inspection of Backfilling Sub-grade above gravel 4th Layer (4 of 8) around Manhole for MH-M-14 - as
6A 6 KAIG3-RFI-SW-C-4310 00 Civil Site Works 2/28/22 3/7/22 Approved as noted
Highlighted (Stock Pile # 131 A-1-B)

"Inspection Of Backfilling Gravel (1st And 2nd Layer Out Of 2) For Manhole MH-M-07, MH-M-08, MH-
6A 6 KAIG3-RFI-SW-C-4311 00 Civil Site Works 3/1/22 3/3/22 Approved as noted
M-09, MH-M-10 SP#118 as Highlighted"

2 2 KAIG3-RFI-SW-C-4312 00 Soil Preparation under Boulder No. RB- 058 Civil Site Works 3/1/22 3/5/22 Approved as noted

"Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-058 (Rock Area) Stock
2 2 KAIG3-RFI-SW-C-4313 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
Pile # 110 A-1-A "

2B 2 KAIG3-RFI-SW-C-4314 00 Inspection of Steel Reinforcement for the Footing and Walls of SBC-03 - Wing Wall - (As Highlighted) Civil Site Works 3/1/22 3/5/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4315 00 Inspection of Formwork for the Footing of SBC-03 - Wing Wall - (As Highlighted) Civil Site Works 3/1/22 3/5/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4316 00 Inspection of Concrete Pouring for the Footing of SBC-03 - Wing Wall - (As Highlighted) Civil Site Works 3/1/22 3/5/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4317 00 Inspection of Steel Reinforcement for the Upstand of SBC-05 (As Highlighted) Civil Site Works 3/1/22 3/5/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4318 00 Inspection of Formwork for the Upstand of SBC-05 (As Highlighted) Civil Site Works 3/1/22 3/8/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4319 00 Inspection of Concrete Pouing for the Upstand of SBC-05 (As Highlighted) Civil Site Works 3/1/22 3/10/22 Approved as noted

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/27 to G/TL/39) at
5 5 KAIG3-RFI-SW-C-4320 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP # 130)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/44 to
5 5 KAIG3-RFI-SW-C-4321 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
G/FS/25) at Zone-G as highlighted in the attached drawing (SP#130)
Inspection and Compaction Test for 1st & 2nd Layer (2 of 10) Backfilling under Boulder No. RB-141 (Stock
6 6 KAIG3-RFI-SW-C-4322 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) behind the boundary wall
3B 3 KAIG3-RFI-SW-C-4323 00 (External Side) upto Kicker Level at Zone-2B (Span#67C to Span#74) - As Highlighted (Stock Pile # 131 A- Civil Site Works 3/1/22 3/7/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4324 00 Water Line from Near F/F/08 to near G/F/01 at Zone-F&G, as highlighted in the attached drawing (Stock Pile Civil Site Works 3/1/22 3/5/22 Approved as noted
# 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
3 3 KAIG3-RFI-SW-C-4325 00 Potable Water Line from F/PW/04 to Bend Point 647447.191, 2713805.351 at Zone-F&G, as highlighted in Civil Site Works 3/1/22 3/5/22 Approved as noted
the attached drawing (Stock Pile # 131 A-1-B)
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) from
6 6 KAIG3-RFI-SW-C-4333 00 (FW-A-3-9 to Child Care Building). At CRECENT Overall,Zone 2N. As per highlighted Area in the attached Civil Site Works 3/1/22 3/3/22 Approved as noted
Dwg.
' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-9 to Child Care
6 6 KAIG3-RFI-SW-C-4334 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
Building). At CRECENT Overall Zone 2N. As per highlighted Area in the attached Dwg.
Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/14, K/TL/25, K/TL/11, K/TL/22,
5 5 KAIG3-RFI-SW-C-4340 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
K/TL/23, K/TL/07, K/TL/18, K/TL/20 at Zone-K - as highlighted
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/20, K/FS/19, K/FS/08, K/FS/07,
5 5 KAIG3-RFI-SW-C-4341 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
K/FS/10, K/FS/11, K/FS/16, K/FS/18 at Zone-K - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Red Tiles for MV Line
4 4 KAIG3-RFI-SW-C-4342 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
from G/MV/18 to G/MV/27 at Zone-G as highlighted in the attached drawing (SP#131 A-1-B)

Inspection and Compaction Test for backfiling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4 4 KAIG3-RFI-SW-C-4343 00 Civil Site Works 3/1/22 3/5/22 Approved as noted
from G/MV/14 to G/MV/18 at Zone-G - as highlighted in the attached drawing (SP # 131 A-1-B)

Inspection and Compaction Test for 3rd & 4th Layer (4 of 10) Backfilling under Boulder No. RB-141 (Stock
6 6 KAIG3-RFI-SW-C-4344 00 Civil Site Works 3/2/22 3/7/22 Approved as noted
Pile # 131 A-1-B)

kaig-qcals 246
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

2B 2 KAIG3-RFI-SW-C-4345 00 Inspection of Steel Reinforcement for the Footing and Walls of SBC-04 - Wing Wall - (As Highlighted) Civil Site Works 3/2/22 3/5/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4346 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 9) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4347 00 Civil Site Works 3/2/22 3/7/22 Approved as noted
A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4348 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
FW-A-12 to FW-A-11 including manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4349 00 Civil Site Works 3/2/22 3/7/22 Approved as noted
FW-A-11 to FW-A-10 Including Manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4350 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
FW-A-10 to FW-A-9 Including Manhole - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4351 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
FW-A-9 to FW-A-8 Including Manholes - As Highlighted (SP#131 A-1-B)

"Inspection and Compaction Test for NGL of Foul Water Line from FW-A-3 to FW-A-3-1 at Zone-6 as
6A 6 KAIG3-RFI-SW-C-4352 00 Civil Site Works 3/2/22 3/8/22 Approved as noted
highlighted in the attached drawing."

Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fire
5 5 KAIG3-RFI-SW-C-4353 00 Water Line from Thrust Block to near L-F-03 at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 3/2/22 3/7/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 3) above the Sand cover for Potable
5 5 KAIG3-RFI-SW-C-4354 00 Water Line from near L/PW/02 to End of Line at Zone-K, as highlighted in the attached drawing (Stock Pile # Civil Site Works 3/2/22 3/7/22 Approved as noted
131 A-1-B)

Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/02, K/TL/26, K/TL/04, K/TL/21,
5 5 KAIG3-RFI-SW-C-4355 00 Civil Site Works 3/2/22 3/5/22 Approved as noted
K/TL/06, K/TL/05 at Zone-K - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/02, K/FS/24, K/FS/17, K/FS/13,
5 5 KAIG3-RFI-SW-C-4356 00 Civil Site Works 3/2/22 3/5/22 Approved as noted
K/FS/14, K/FS/12 at Zone-K - as highlighted

Inspection of backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G
4 4 KAIG3-RFI-SW-C-4357 00 Civil Site Works 3/2/22 3/5/22 Code C (resubmit)
(As Highlighted) SP#118

Inspection of backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G
4 4 KAIG3-RFI-SW-C-4357 01 Civil Site Works 3/9/22 3/12/22 Approved as noted
(As Highlighted) SP#118

Excavation for Foul Water Line from FW-A-3 to FW-A-4 including Manhole FW-A-4 prior to start Gravel
6A 6 KAIG3-RFI-SW-C-4358 00 Civil Site Works 3/2/22 3/5/22 Code C (resubmit)
Bedding (as Highlighted)

Excavation for Foul Water Line from FW-A-3 to FW-A-4 including Manhole FW-A-4 prior to start Gravel
6A 6 KAIG3-RFI-SW-C-4358 01 Civil Site Works 3/16/22 3/10/22 Approved as noted
Bedding (as Highlighted)

kaig-qcals 247
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Sand Covering Layer for Protection of Telecommunications Line from (B/TL/32 to G/TL/03) at
3 3 KAIG3-RFI-SW-C-4359 00 Civil Site Works 3/2/22 3/7/22 Approved as noted
Zone-B&G as highlighted in the attached drawing (SP#130)

Inspection of Sand Covering Layer for Protection of Fire & Security Line from (B/FS/31 to G/FS/02) at
4 4 KAIG3-RFI-SW-C-4360 00 Civil Site Works 3/2/22 3/7/22 Approved as noted
Zone-B&G as highlighted in the attached drawing ( SP#130)

2B 2 KAIG3-RFI-SW-C-4372 00 Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-02 - (As Highlighted) Civil Site Works 3/3/22 3/7/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Red Tiles for MV Line
2B 2 KAIG3-RFI-SW-C-4373 00 Civil Site Works 3/3/22 3/8/22 Approved as noted
from G/MV/18 to G/MV03 at Zone-G as highlighted in the attached drawing (SP#131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4374 00 Telecommunication Line from G/TL/14 to G/TL/23 at Zone-G - as highlighted in the attached drawing (SP# Civil Site Works 3/3/22 3/8/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
4 4 KAIG3-RFI-SW-C-4375 00 Security Distribution Line from G/FS/12 to G/FS/37 at Zone-G - as highlighted in the attached drawing Civil Site Works 3/3/22 3/8/22 Approved as noted

Inspection and Compaction Test for 5th & 6th Layer (6 of 10) Backfilling under Boulder No. RB-141 (Stock
6 6 KAIG3-RFI-SW-C-4380 00 Civil Site Works 3/3/22 3/8/22 Approved as noted
Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) behind the boundary wall
3B 3 KAIG3-RFI-SW-C-4381 00 (External Side) upto Kicker Level at Zone-2B (Span#67C to Span#74) - As Highlighted (Stock Pile # 131 A- Civil Site Works 3/3/22 3/8/22 Approved as noted
1-B)

Excavation for Foul Water Line from FW-A-3 to near FW-A-2 prior to start Gravel Bedding (as Highlighted)
6A 6 KAIG3-RFI-SW-C-4384 00 Civil Site Works 3/3/22 3/8/22 Approved as noted

'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4385 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
(FW-A-3-6 to FW-A-3-3). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

' Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-3-6 to FW-A-3-3). At
7 7 KAIG3-RFI-SW-C-4386 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (200mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4387 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
(FW-A-3 to FW-A-3-A). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

' Pipe Installation of Foul Water Line for (200mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3-A). At
7 7 KAIG3-RFI-SW-C-4388 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

3B 3 KAIG3-RFI-SW-C-4389 00 INSPECTION OF INSTALLATION OF SLAB FOR MH-E-01-1, MH-E-03, MH-F-01-3 (AS ATTACHED) Civil Site Works 3/5/22 3/10/22 Approved as noted

"INSPECTION OF INSTALLATION OF ALL SLABS FOR MH-D-01, MH-D-01-A1-01 (AS


5A 5 KAIG3-RFI-SW-C-4390 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
ATTACHED)."

kaig-qcals 248
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Sand bedding under pipe for MV Line from G/MV/25 TO G/MV/24 at Zone-G - as highlighted
G 3 KAIG3-RFI-SW-C-4391 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
in the attached drawing (SP#130)

Inspection of backfilling Sub-grade above gravel 1st Layer (1 of 8) around Manhole MH-M-07, MH-M-08,
6A 6 KAIG3-RFI-SW-C-4392 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)

Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for C/RC-TL/1 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4393 00 Civil Site Works 3/5/22 3/7/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

Inspection of Formwork for Duct Bank of Telecommunications line for C/RC-TL/1 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4394 00 Civil Site Works 3/5/22 3/7/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for C/RC-TL/1 at
3 3 KAIG3-RFI-SW-C-4395 00 Civil Site Works 3/5/22 3/10/22 Approved as noted
Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4396 00 Civil Site Works 3/5/22 3/7/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)"

"Inspection of Formwork for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As Highlighted
3 3 KAIG3-RFI-SW-C-4397 00 Civil Site Works 3/5/22 3/7/22 Approved as noted
(SCR:KAIG3-SCR-CO-S-0129-00)"

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C -
3 3 KAIG3-RFI-SW-C-4398 00 Civil Site Works 3/5/22 3/10/22 Approved as noted
As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4399 00 Water Line from Near F/F/08 to near G/F/01 at Zone-F&G, as highlighted in the attached drawing (Stock Pile Civil Site Works 3/5/22 3/9/22 Approved as noted
# 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Potable
3 3 KAIG3-RFI-SW-C-4400 00 Water Line from Bend Point 647447.191, 2713805.351 to G/PW/01 at Zone-G, as highlighted in the attached Civil Site Works 3/5/22 3/9/22 Approved as noted
drawing (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 1) beside Telecommunication Line
5 5 KAIG3-RFI-SW-C-4401 00 between K/TL/23 to K/TL/20 at Zone-K - as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 3/5/22 3/9/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Potable
4 4 KAIG3-RFI-SW-C-4402 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4403 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)

Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/27, K/TL/28, G/TL/17, G/TL/45,
5 5 KAIG3-RFI-SW-C-4404 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
G/TL/39, G/TL/27, G/TL/26, G/TL/38, G/TL/41 at Zone-G&K - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/26, K/FS/25, G/FS/20, G/FS/46,
5 5 KAIG3-RFI-SW-C-4405 00 Civil Site Works 3/5/22 3/8/22 Approved as noted
G/FS/25, G/FS/44, G/FS/40, G/FS/38, G/FS/24 at Zone-G&K - as highlighted

4B 4 KAIG3-RFI-SW-C-4406 00 INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-02, MH-A-08, MH-A-12) (As Highlighted). Civil Site Works 3/5/22 3/9/22 Approved as noted

4A 4 KAIG3-RFI-SW-C-4407 00 INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-3, FW9, FW12, FW12-1) - As Highlighted Civil Site Works 3/5/22 3/10/22 Approved as noted

"INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-6.2, FW-A-3-6.10, FW-A-3-12 (As


6B 6 KAIG3-RFI-SW-C-4408 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
Highlighted)."

kaig-qcals 249
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4409 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4410 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4411 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
FW-A-12 to FW-A-11 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4412 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
FW-A-11 to FW-A-10 Including Manhole FW-A-11 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4413 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
FW-A-10 to FW-A-9 Including Manhole FW-A-10 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4414 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
FW-A-9 to FW-A-8 Including Manhole FW-A-8 - As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4415 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4416 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for 7th & 8th Layer (8 of 10) Backfilling under Boulder No. RB-141 (Stock
6 6 KAIG3-RFI-SW-C-4418 00 Civil Site Works 3/5/22 3/9/22 Approved as noted
Pile # 131 A-1-B)

2B 2 KAIG3-RFI-SW-C-4419 00 Inspection of Formwork for the Footing of SBC-04 - Wing Wall - (As Highlighted) Civil Site Works 3/5/22 3/8/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4420 00 "Inspection of Formwork for the Concrete Pouring of SBC-04 - Wing Wall - (As Highlighted)" Civil Site Works 3/5/22 3/8/22 Approved as noted

Inspection of Rough Grading (Backfilling) behind the boundary wall (External Side) upto Kicker Level at
2B 2 KAIG3-RFI-SW-C-4421 00 Civil Site Works 3/6/22 3/9/22 Approved as noted
Zone-2B (Span#67C to Span#74) - As Highlighted
Inspection and Compaction Test of Backfilling Sub-grade 1st & 2nd Layer (2 of 3) for Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4422 00 Civil Site Works 3/6/22 3/10/22 Approved as noted
FW-A-3 to FW-A-2 - As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test of Backfilling Sub-grade 1st & 2nd Layer (2 of 3) for Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4426 00 Civil Site Works 3/6/22 3/10/22 Approved as noted
FW-A-4 to FW-A-3 - As Highlighted (SP#131 A-1-B)
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/01 to G/MV/25 at Zone-G as
4 4 KAIG3-RFI-SW-C-4427 00 Civil Site Works 3/6/22 3/8/22 Approved as noted
highlighted in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4 4 KAIG3-RFI-SW-C-4428 00 from G/MV/01 to G/MV/25 at Zone-G as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 3/6/22 3/10/22 Approved as noted
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for
4 4 KAIG3-RFI-SW-C-4429 00 Potable Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 3/6/22 3/10/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4430 00 Civil Site Works 3/6/22 3/10/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/09 to G/TL/07
4 4 KAIG3-RFI-SW-C-4431 00 Civil Site Works 3/6/22 3/8/22 Approved as noted
at Zone-G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/22 to
4 4 KAIG3-RFI-SW-C-4432 00 Civil Site Works 3/6/22 3/8/22 Approved as noted
G/FS/05 at Zone-G - as highlighted in the attached drawing
Excavation for Non-Potable Water Line from Point (E-647312.1368, N-2714142.4171) to Point (E-
4 4 KAIG3-RFI-SW-C-4433 00 647374.0293, N-2713912.7965 including Pit NPW-ISC-08, POC-04, ARV-02 at Zone-B as highlighted in the Civil Site Works 3/6/22 3/8/22 Approved as noted
attached drawing
Installation of Yellow Warning Tape for Medium Voltage Ductbank (UPVC Conduit Dia.160mm) at North of
4D 4 KAIG3-RFI-SW-C-4435 00 Physic Garden (from Manhole no.G/MV/14 to G/MV/18 and G/MV/18 to G/MV/27) as per attached Civil Site Works 3/6/22 3/8/22 Approved as noted
highlighted drawings.
Installation of Orange Warning Tape for Low Current Duct Bank (UPVC Conduit dia. 110m mm- Fire &
4D 4 KAIG3-RFI-SW-C-4436 00 Security ) Manhole no.(G/RC-FS/01 to G/RC-FS/40) at from North Physic Garden to Northwest Maze Civil Site Works 3/6/22 3/8/22 Approved as noted
Garden and Manhole no.(G/RC-FS/38 to G/RC-FS/19) at from Northw
Installation of Orange Warning Tape for Low Current Duct Bank (UPVC Conduit dia. 110mm - TELECOM)
4D 4 KAIG3-RFI-SW-C-4437 00 Manhole no.(G/TL/08 to G/TL/26) at from North Physic Garden to Northwest Maze Garden and Manhole no. Civil Site Works 3/6/22 3/8/22 Approved as noted
(G/TL/38 to G/TL/16) at from Northwest Maze Garden to Sou

2B 2 KAIG3-RFI-SW-C-4438 00 Inspection of Concrete Pouring for the Wing Wall of SBC-02 (As Highlighted) Civil Site Works 3/7/22 3/10/22 Approved as noted

kaig-qcals 250
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for 8th Layer (8 of 10) Backfilling under Boulder No. RB-141 (Stock Pile #
6 6 KAIG3-RFI-SW-C-4439 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 3) for Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4440 00 Civil Site Works 3/7/22 3/12/22 Approved as noted
A-3 to FW-A-2 - As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 3) for Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4441 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
A-4 to FW-A-3 - As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4442 00 Water Line from Near F/F/08 to near G/F/01 at Zone-F&G, as highlighted in the attached drawing (Stock Pile Civil Site Works 3/7/22 3/10/22 Approved as noted
# 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for
3 3 KAIG3-RFI-SW-C-4443 00 Potable Water Line from Bend Point 647447.191, 2713805.351 to G/PW/01 at Zone-G, as highlighted in the Civil Site Works 3/7/22 3/10/22 Approved as noted
attached drawing (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4444 00 Civil Site Works 3/1/22 3/7/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4452 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4453 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4454 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-9 to FW-A-8 Including Manhole FW-A-8 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4455 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-10 to FW-A-9 Including Manhole FW-A-10 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4456 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-11 to FW-A-10 Including Manhole FW-A-11 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4457 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
FW-A-12 to FW-A-11 - As Highlighted (SP#131 A-1-B)

"Inspection And Compaction Test of backfilling Sub-grade 2nd Layer (2 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4458 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"

Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4459 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4460 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4461 00 Telecommunication Line from G/TL/09 to G/TL/07 at Zone-G - as highlighted in the attached drawing (Stock Civil Site Works 3/7/22 3/10/22 Approved as noted
Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
4 4 KAIG3-RFI-SW-C-4462 00 Security Distribution Line from G/FS/22 to G/FS/05 at Zone-G - as highlighted in the attached drawing Civil Site Works 3/7/22 3/10/22 Approved as noted
(Stock Pile # 131 A-1-B)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/32 to G/TL/03 at
3 3 KAIG3-RFI-SW-C-4463 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
Zone-B&G - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/31 to
4 4 KAIG3-RFI-SW-C-4464 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
G/FS/02 at Zone-B&G - as highlighted in the attached drawing

Inspection for Blinding Concrete under Telecommunication Line Pit G/TL/09, G/TL/06, G/TL/07, G/TL/08,
4 4 KAIG3-RFI-SW-C-4465 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
G/TL/40, G/TL/19 at Zone-G - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01,
4 4 KAIG3-RFI-SW-C-4466 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
G/FS/11, G/FS/34 at Zone-G - as highlighted

kaig-qcals 251
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation for Non-Potable Water Line from Near NPW-ISC-14 to Near POC-15 including Pit NPW-ISC-
3 3 KAIG3-RFI-SW-C-4470 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
12, NPW-ISC-13 at Zone-B&C as highlighted in the attached drawing
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) from
2E 2 KAIG3-RFI-SW-C-4473 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
(FW-A-3 to FW-A-3-1). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.
' Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3-1). At
7 7 KAIG3-RFI-SW-C-4474 00 Civil Site Works 3/7/22 3/10/22 Approved as noted
CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.
Inspection and Compaction Test for NGL of Non-Potable Water Line at Zone-4A - as highlighted in the
4A 4 KAIG3-RFI-SW-C-4477 00 Civil Site Works 3/8/22 3/10/22 Approved as noted
attached drawing.
Inspection and Compaction Test for 9th Layer (9 of 10) Backfilling under Boulder No. RB-141 (Stock Pile #
6 6 KAIG3-RFI-SW-C-4478 00 Civil Site Works 3/8/22 3/12/22 Approved as noted
131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4479 00 Telecommunication Line from B/TL/32 to G/TL/52 at Zone-B&G - as highlighted in the attached drawing Civil Site Works 3/8/22 3/12/22 Approved as noted
(Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
4 4 KAIG3-RFI-SW-C-4480 00 Security Distribution Line from B/FS/31 to G/FS/47 at Zone-B&G - as highlighted in the attached drawing Civil Site Works 3/8/22 3/12/22 Approved as noted
(Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 5) above the Sand cover for Potable
4 4 KAIG3-RFI-SW-C-4485 00 Civil Site Works 3/8/22 3/12/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 5) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4486 00 Civil Site Works 3/8/22 3/12/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)

Inspection of Sand Bedding Under Pipe For Non-Potable Water Line from Near NPW-ISC-14 to Near POC-
3 3 KAIG3-RFI-SW-C-4487 00 Civil Site Works 3/8/22 3/12/22 Approved as noted
15 at Zone-B&C as highlighted in the attached drawing (SP#130)

Excavation for Non-Potable Water Line from Point (E-647458.14, N-2713872.795) to Point (E-647482.769,
4 4 KAIG3-RFI-SW-C-4491 00 Civil Site Works 3/8/22 3/10/22 Approved as noted
N-2713795.046 at Zone-B&G as highlighted in the attached drawing

2B 2 KAIG3-RFI-SW-C-4492 00 Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-03 - (As Highlighted) Civil Site Works 3/8/22 3/10/22 Approved as noted

"Inspection of Sand Bedding under pipe for Non-Potable Water Line from Point (E-647312.1368, N-
4 4 KAIG3-RFI-SW-C-4493 00 2714142.4171) to Point (E-647374.0293, N-2713912.7965) at Zone-B as highlighted in the attached drawing Civil Site Works 3/9/22 3/12/22 Approved as noted
(Stock Pile # 130)"

Inspection and Compaction Test for Backfilling Sub-grade above gravel 2nd Layer (2 of 2) around Manhole
4C 4 KAIG3-RFI-SW-C-4494 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
for MH-A-12, as Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade above gravel 2nd Layer (2 of 2) around Manhole
4C 4 KAIG3-RFI-SW-C-4495 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
for FW1-3 - as highlighted.(SP# 131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Gravel around Manhole
4C 4 KAIG3-RFI-SW-C-4496 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
for MH-A-11, as Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for 10th Layer (10 of 10) Backfilling under Boulder No. RB-141 (Stock Pile
6 6 KAIG3-RFI-SW-C-4497 00 Civil Site Works 3/9/22 3/14/22 Approved as noted
# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB-141 (Stock
6 6 KAIG3-RFI-SW-C-4498 00 Civil Site Works 3/12/22 3/16/22 Approved as noted
Pile # 110 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 5) above the Sand cover for Potable
4C 4 KAIG3-RFI-SW-C-4499 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 5) above the Sand cover for Fire
4 4 KAIG3-RFI-SW-C-4500 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
Water Line Branch at Zone-F, as highlighted in the attached drawing (Stock Pile # 131 A-1-B)
Inspection for Laying of Red Tiles above the pipe for MV Line from F/MV/11 to F/MV/04 at Zone-F as
F 5 KAIG3-RFI-SW-C-4501 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
highlighted in the attached drawing

kaig-qcals 252
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
F 5 KAIG3-RFI-SW-C-4502 00 from F/MV/11 to F/MV/04 at Zone-F as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 3/9/22 3/13/22 Approved as noted

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone-F
F 5 KAIG3-RFI-SW-C-4503 00 Civil Site Works 3/9/22 3/13/22 Code C (resubmit)
(As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone-F
F 5 KAIG3-RFI-SW-C-4503 01 Civil Site Works 3/30/22 4/2/22 Approved as noted
(As Highlighted)
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from F/MV/06 to F/MV/11
F 5 KAIG3-RFI-SW-C-4504 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
at Zone- F (As Highlighted)

Inspection of Water Proofing for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone- F (As
F 5 KAIG3-RFI-SW-C-4505 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
Highlighted)

Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4506 00 Civil Site Works 3/9/22 3/13/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4507 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4508 00 FW-A-8 to FW-A-12 Including Manholes FW-A-8, FW-A-10, FW-A-11 - As Highlighted (SP#131 A-1-B)" Civil Site Works 3/9/22 3/12/22 Approved as noted

"Inspection And Compaction Test of backfilling Sub-grade 3rd Layer (3 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4509 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4510 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4511 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (315mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4516 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
(FW-A-3-6 to FW-A-3-3). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (200mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4517 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
(FW-A-3 to FW-A-3-A). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

' Warning Tape Installation of Foul Water Line for ((315mmØ - UPVC- Class 4) from (FW-A-3-6 to FW-A-
7 7 KAIG3-RFI-SW-C-4518 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
3-3). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

' Warning Tape Installation of Foul Water Line for (200mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3-
7 7 KAIG3-RFI-SW-C-4519 00 Civil Site Works 3/9/22 3/12/22 Approved as noted
A). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

Surface Preparation prior to Backfilling gravel for the Ductbank of Telecommunication Line from F/TL/03 to
F 5 KAIG3-RFI-SW-C-4522 00 Civil Site Works 3/9/22 cancelled
F/TL/04 at zone-F as highlighted.

Surface Preparation prior to Backfilling gravel for the Ductbank of Fire & Security Distribution Line from
F 5 KAIG3-RFI-SW-C-4523 00 Civil Site Works 3/9/22 cancelled
F/FS/03 to F/FS/04 at zone-F as highlighted.

2B 2 KAIG3-RFI-SW-C-4524 00 Inspection of Formwork for the Wing Wall of SBC-04 (As Highlighted) Civil Site Works 3/9/22 3/13/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4525 00 Inspection of Concrete Pouring for the Wing Wall of SBC-04 (As Highlighted) Civil Site Works 3/9/22 3/10/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4528 00 Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-04 - (As Highlighted) Civil Site Works 3/10/22 3/13/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4529 00 Inspection of Formwork for the Wing Wall of SBC-02 (As Highlighted) Civil Site Works 3/10/22 3/14/22 Approved as noted

Excavation for Non-Potable Water Line from Thrust Block to Thrust Block at Zone-B&G as highlighted in
4 4 KAIG3-RFI-SW-C-4530 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
the attached drawing

Excavation for Non-Potable Water Line from Thrust Block to near Thrust Block at Zone-G as highlighted in
4 4 KAIG3-RFI-SW-C-4531 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
the attached drawing

kaig-qcals 253
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/35 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4532 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
Excavation for Fire Water Line at Zone-C,H,L including branch and Pit - C/F/11, C/F/12, C/F/13, H/F/02,
3 3 KAIG3-RFI-SW-C-4533 00 H/F/04, H/F/05, H/F/06, H/F/07, H/F/09, H/F/12, L/F/04, L/F/02, L/F/06, L/F/01, L/F/03 - as highlighted Civil Site Works 3/10/22 3/13/22 Approved as noted

Excavation for Potable Water Line at Zone-C,H,L including branch & Pit - C/PW/05, C/PW/06, H/PW/01,
3 3 KAIG3-RFI-SW-C-4534 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
H/PW/02, H/PW/03, L/PW/01, L/PW/04, L/PW/02 - as highlighted

Surface Preparation prior to start backfilling gravel around Potable Water Line Pit F/PW/08, F/PW/07,
4 4 KAIG3-RFI-SW-C-4535 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
F/PW/14, F/PW/13, F/PW/04, G/PW/01 at Zone-G - as highlighted

Surface Preparation prior to start backfilling gravel around Fire Water Line Pit F/F/09, F/F/04, F/F/10, F/F/11,
4 4 KAIG3-RFI-SW-C-4536 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
F/F/08, G/F/018, G/F/06, G/F/02, G/F/01 at Zone-F&G - as highlighted

Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/35 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4537 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/35 at
3 3 KAIG3-RFI-SW-C-4538 00 Civil Site Works 3/10/22 3/13/22 Approved as noted
Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35,
3 3 KAIG3-RFI-SW-C-4539 00 C/RC-FS/33, C/RC-FS/32, C/RC-FS/31, C/RC-FS/28 at Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S- Civil Site Works 3/10/22 3/13/22 Approved as noted
0129-00)"
"Inspection of Formwork for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35, C/RC-FS/33,
3 3 KAIG3-RFI-SW-C-4540 00 C/RC-FS/32, C/RC-FS/31, C/RC-FS/28 at Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)" Civil Site Works 3/10/22 3/13/22 Approved as noted

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-
3 3 KAIG3-RFI-SW-C-4544 00 FS/35, C/RC-FS/33, C/RC-FS/32, C/RC-FS/31, C/RC-FS/28 at Zone-C - As Highlighted (SCR:KAIG3-SCR- Civil Site Works 3/10/22 3/13/22 Approved as noted
CO-S-0129-00)
Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4546 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
FW-A-3-6.2 to FW-A-3-3 - As Highlighted (SP#131 A-1-B)
Surface Preparation prior to start backfilling gravel around Potable Water Line Pit F/PW/05, F/PW/06,
B 3 KAIG3-RFI-SW-C-4553 00 F/PW/09, F/PW/10, F/PW/11, G/PW/12, G/PW/07, K/PW/02, K/PW/08, K/PW/09 at Zone-B, F, G & K - as Civil Site Works 3/21/22 3/22/22 Approved as noted
highlighted

Surface Preparation prior to start backfilling gravel around Fire Water Line Pit B/F/04, B/F/05, B/F/06,
B 3 KAIG3-RFI-SW-C-4554 00 Civil Site Works 3/21/22 3/22/22 Approved as noted
B/F/07, B/F/08, B/F/09, B/F/15 at Zone-B - as highlighted

Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line between
4 4 KAIG3-RFI-SW-C-4555 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
G/TL/44 to G/TL/50 at Zone-G (As Highlighted)

Inspection of water proofing for the Duct Bank of Telecommunications Line between G/TL/44 to G/TL/50 at
4 4 KAIG3-RFI-SW-C-4556 00 Civil Site Works 3/12/22 3/29/22 Approved as noted
Zone-G (As Highlighted)
Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line between G/FS/08 to
G 3 KAIG3-RFI-SW-C-4557 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
near G/FS/30 at Zone-G - As Highlighted

Inspection of Waterproofing for Duct Bank of Fire & Security line between G/FS/08 to G/FS/30 at Zone-G -
G 3 KAIG3-RFI-SW-C-4558 00 Civil Site Works 3/12/22 3/15/22 Approved as noted
As Highlighted

Inspection of Sand Bedding under pipe for Potable Water Line at Zone-C,H,L including branch - as
C 3 KAIG3-RFI-SW-C-4559 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
highlighted (SP#130)
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-C,H,L including branch - as highlighted
C 3 KAIG3-RFI-SW-C-4560 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
(SP # 130)
"Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 1) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4561 00 Civil Site Works 3/12/22 cancelled
A-3-1 to FW-A-3 to FW-3-A - As Highlighted (SP#131 A-1-B)"
Excavation for Fire & Security Distribution Line from (between B/FS/15 to B/FS/06) including Pit B/FS/06 at
B 3 KAIG3-RFI-SW-C-4563 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
Zone-B as highlighted in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit -
F 5 KAIG3-RFI-SW-C-4564 00 F/PW/06, F/PW/07, F/PW/14, F/PW/13, F/PW/04, G/PW/01 at Zone-F&G - as highlighted (Stock Pile # 131 Civil Site Works 3/13/22 3/16/22 Approved as noted
A-1-B)
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit F/F/09,
F 5 KAIG3-RFI-SW-C-4565 00 F/F/04, F/F/10, F/F/11, F/F/08, G/F/018, G/F/06, G/F/02, G/F/01 at Zone-F&G - as highlighted (Stock Pile # Civil Site Works 3/13/22 3/16/22 Approved as noted
131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4569 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)

kaig-qcals 254
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4570 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)

"Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4571 00 FW-A-8 to FW-A-12 Including Manholes FW-A-8, FW-A-10, FW-A-11 - As Highlighted (SP#131 A-1-B)" Civil Site Works 3/13/22 3/16/22 Approved as noted

"Inspection And Compaction Test of backfilling Sub-grade 4th Layer (4 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4572 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4573 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4574 00 Civil Site Works 3/13/22 3/16/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4575 00 Civil Site Works 3/16/22 3/20/22 Approved as noted
FW-A-3-6.2 to FW-A-3-3 - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 3) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4576 00 Civil Site Works 3/13/22 cancelled
FW-A-3-1 to FW-A-3 to FW-3-A - As Highlighted (SP#131 A-1-B)"
Inspection for Blinding Concrete under Potable Water Line Pit for H/PW/03, L/PW/01, L/PW/02, L/PW/04
H 3 KAIG3-RFI-SW-C-4581 00 Civil Site Works 3/13/22 3/15/22 Approved as noted
at Zone-H&L - as highlighted
Inspection for Blinding Concrete under Fire Water Line Pit for H/F/06, H/F/07, H/F/09, H/F/12, L/F/01,
H 3 KAIG3-RFI-SW-C-4582 00 Civil Site Works 3/13/22 3/15/22 Approved as noted
L/F/02, L/F/03, L/F/06 at Zone-H&L - as highlighted
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (400mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4583 00 (FW-A-3 to FW-A-4 & A-3 to A-2). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Civil Site Works 3/13/22 3/15/22 Approved as noted
Dwg.
Pipe Installation of Foul Water Line for (400mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-4 & A-3 to A-
7 7 KAIG3-RFI-SW-C-4584 00 Civil Site Works 3/13/22 3/15/22 Approved as noted
2). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.
"Excavation for Non-Potable Water Line Branches at Zone-G&K including Pit POC-27, POC-NPW, POC-
4 4 KAIG3-RFI-SW-C-4586 00 Civil Site Works 3/14/22 3/19/22 Approved as noted
28, POC-43 - as highlighted in the attached drawing"

2B 2 KAIG3-RFI-SW-C-4588 00 Inspection of Formwork for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted) Civil Site Works 3/14/22 3/15/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4589 00 "Inspection of Concrete Pouring for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted)" Civil Site Works 3/14/22 3/17/22 Approved as noted

Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for F/PW/06 at Zone-F
4 4 KAIG3-RFI-SW-C-4590 00 Civil Site Works 3/14/22 3/16/22 Approved as noted
- as highlighted
Inspection of Steel Reinforcement for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As
4 4 KAIG3-RFI-SW-C-4592 00 Civil Site Works 3/14/22 3/17/22 Approved as noted
Highlighted) SCR:KAIG3-SCR-CO-S-0129-00
Inspection of Formwork for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As
4 4 KAIG3-RFI-SW-C-4593 00 Civil Site Works 3/14/22 3/17/22 Approved as noted
Highlighted) SCR:KAIG3-SCR-CO-S-0129-00
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at
4 4 KAIG3-RFI-SW-C-4594 00 Civil Site Works 3/14/22 3/17/22 Approved as noted
Zone-F (As Highlighted) SCR:KAIG3-SCR-CO-S-0129-00
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit F/PW/03, F/PW/04 at
F 5 KAIG3-RFI-SW-C-4599 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
Zone-F - as highlighted
Surface Preparation prior to start backfilling Sub-grade around Fire Water Line Pit F/F/03, G/F/03 at Zone-
F 5 KAIG3-RFI-SW-C-4600 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
F&G - as highlighted
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/10 to
K 5 KAIG3-RFI-SW-C-4605 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
K/FS/16 at Zone-K as highlighted in the attached drawing
Excavation for MV Line from B/MV/21 TO C/MV/30 at Zone-B&C including Pit B/MV/21, B/MV08,
B 3 KAIG3-RFI-SW-C-4606 00 Civil Site Works 3/15/22 3/19/22 Approved as noted
C/MV/04, C/MV/05, C/MV/30-as highlighted in the attached drawing
Inspection of Sand bedding under pipe for Non-Potable Water Line from Thrust Block to Thrust Block at
G 3 KAIG3-RFI-SW-C-4607 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit -
F 5 KAIG3-RFI-SW-C-4608 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
F/PW/03 at Zone-F - as highlighted (Stock Pile # 131 A-1-B)
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit F/F/03,
F 5 KAIG3-RFI-SW-C-4609 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
G/F/03 at Zone-F&G - as highlighted (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit -
F 5 KAIG3-RFI-SW-C-4610 00 F/PW/06, F/PW/07, F/PW/14, F/PW/13, F/PW/03, F/PW/04, G/PW/01 at Zone-F&G - as highlighted (Stock Civil Site Works 3/15/22 3/20/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit F/F/09,
F 5 KAIG3-RFI-SW-C-4611 00 F/F/03, F/F/04, F/F/10, F/F/11, F/F/08, G/F/018, G/F/06, G/F/03, G/F/02, G/F/01 at Zone-F&G - as Civil Site Works 3/15/22 3/20/22 Approved as noted
highlighted (Stock Pile # 131 A-1-B)

kaig-qcals 255
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
K 5 KAIG3-RFI-SW-C-4612 00 Security Distribution Line from K/FS/10 to K/FS/16 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 3/15/22 3/20/22 Approved as noted
Pile 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
K 5 KAIG3-RFI-SW-C-4613 00 Telecommunication Line, between K-TL-23 to K-TL-07 at Zone-K as highlighted in the attached drawing Civil Site Works 3/15/22 3/20/22 Approved as noted
(Stock Pile # 131 A-1-B)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/12 to K/TL/03
K 5 KAIG3-RFI-SW-C-4614 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
at Zone-K - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/22 to
K 5 KAIG3-RFI-SW-C-4615 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
K/FS/03 at Zone-K as highlighted in the attached drawing
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 11) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4616 00 Civil Site Works 3/15/22 3/20/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4617 00 Civil Site Works 3/15/22 3/20/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4618 00 FW-A-8 to FW-A-12 Including Manholes FW-A-8, FW-A-10, FW-A-11 - As Highlighted (SP#131 A-1-B)" Civil Site Works 3/15/22 3/20/22 Approved as noted

"Inspection And Compaction Test of backfilling Sub-grade 5th Layer (5 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4619 00 Civil Site Works 3/15/22 3/20/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4620 00 Civil Site Works 3/15/22 3/20/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4621 00 Civil Site Works 3/15/22 3/20/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/11 to B/MV/02 at Zone-B as
B 3 KAIG3-RFI-SW-C-4629 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
highlighted in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
B 3 KAIG3-RFI-SW-C-4630 00 from B/MV/11 to B/MV/02 at Zone-B as highlighted in the attached drawing (Stock Pile # 131 A-1-B) Civil Site Works 3/15/22 3/20/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 1) above Green Tiles for
K 5 KAIG3-RFI-SW-C-4631 00 Telecommunication Line from K/TL/12 to K/TL/03 at Zone-K - as highlighted in the attached drawing (Stock Civil Site Works 3/15/22 3/20/22 Approved as noted
Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Fire &
K 5 KAIG3-RFI-SW-C-4632 00 Security Distribution Line from K/FS/22 to K/FS/03 at Zone-K as highlighted in the attached drawing (Stock Civil Site Works 3/15/22 3/20/22 Approved as noted
Pile # 131 A-1-B)
Excavation for Fire Water Line at Zone-C including branch and Pit - C/F/16, C/F/17, C/F/18 - as highlighted
C 3 KAIG3-RFI-SW-C-4633 00 Civil Site Works 3/15/22 3/20/22 Approved as noted

C 3 KAIG3-RFI-SW-C-4634 00 Excavation for Potable Water Line at Zone-C including branch & Pit - C/PW/06 - as highlighted Civil Site Works 3/15/22 3/17/22 Approved as noted

Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/05, C/PW/08, H/PW/02 at Zone-
C 3 KAIG3-RFI-SW-C-4635 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
C&H - as highlighted

Inspection for Blinding Concrete under Fire Water Line Pit for C/F/11, C/F/12, C/F/13, H/F/02, H/F/04,
C 3 KAIG3-RFI-SW-C-4636 00 Civil Site Works 3/15/22 3/17/22 Approved as noted
H/F/05 at Zone-C&H - as highlighted
Inspection of Casting Concrete for Short piece and Surface Preperation prior to start waterproofing for short
4B 4 KAIG3-RFI-SW-C-4637 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Connection from MH-B-01 to SBC and Civil Site Works 3/16/22 3/17/22 Approved as noted
from near G-X-9 to SBC (As Highlighted)
Inspection of Sand Bedding under pipe for Non-Potable Water Line from Thrust Block to Thrust Block at
4 4 KAIG3-RFI-SW-C-4638 00 Civil Site Works 3/16/22 3/20/22 Approved as noted
Zone-B&G as highlighted in the attached drawing (SP#130)
"Inspection of Sand bedding under pipe for Non-Potable Water Line from Point (E-647458.14, N-
4 4 KAIG3-RFI-SW-C-4639 00 2713872.795) to near Thrust Block at Zone-B&G as highlighted in the attached drawing (SP# 130)" Civil Site Works 3/16/22 3/19/22 Approved as noted

Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/25 to G/MV/24) at Zone-G as
4 4 KAIG3-RFI-SW-C-4640 00 Civil Site Works 3/16/22 3/19/22 Approved as noted
highlighted (SP#130)
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (400mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4645 00 (FW-A-3 to FW-A-4 & A-3 to A-2). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Civil Site Works 3/16/22 3/20/22 Approved as noted
Dwg.

' Warning Tape Installation of Foul Water Line for (400mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-4 &
7 7 KAIG3-RFI-SW-C-4646 00 Civil Site Works 3/16/22 3/20/22 Approved as noted
A-3 to A-2). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

Inspection for Installation Of Isolation Fire Water Line Pit L/F/02, L/F/03, L/F/06, H/F/07, H/F/09 - as
L 5 KAIG3-RFI-SW-C-4647 00 Civil Site Works 3/16/22 3/20/22 Approved as noted
highlighted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit -
4 4 KAIG3-RFI-SW-C-4651 00 F/PW/06, F/PW/07, F/PW/14, F/PW/13, F/PW/03, F/PW/04, G/PW/01 at Zone-F&G - as highlighted (Stock Civil Site Works 3/19/22 3/21/22 Approved as noted
Pile # 131 A-1-B)
kaig-qcals 256
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit F/F/09,
4 4 KAIG3-RFI-SW-C-4652 00 F/F/03, F/F/04, F/F/10, F/F/11, F/F/08, G/F/018, G/F/06, G/F/03, G/F/02, G/F/01 at Zone-F&G - as Civil Site Works 3/19/22 3/21/22 Approved as noted
highlighted (Stock Pile # 131 A-1-B)
Excavation for Non-Potable Water Line from Point (E-647440.195, N-2713700.32) to Point (E-647443.05,
4 4 KAIG3-RFI-SW-C-4653 00 Civil Site Works 3/16/22 3/17/22 Approved as noted
N-2713724.177 at Zone-G as highlighted in the attached drawing
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/12 to G/TL/14) at
3 3 KAIG3-RFI-SW-C-4654 00 Civil Site Works 3/16/22 3/19/22 Approved as noted
Zone-G as highlighted in the attached drawing (SP#130)
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/04 to G/FS/12) at
3 3 KAIG3-RFI-SW-C-4655 00 Civil Site Works 3/16/22 3/19/22 Approved as noted
Zone-G as highlighted in the attached drawing ( SP#130)

C 3 KAIG3-RFI-SW-C-4659 00 Inspection of Sand Bedding under pipe for Fire Water Line at Zone-C - as highlighted Civil Site Works 3/17/22 3/21/22 Approved as noted

Inspection of Steel Reinforcement for the Top Slab of Corner Connection between SBC-01 & SBC-02 - (As
3B 3 KAIG3-RFI-SW-C-4660 00 Civil Site Works 3/17/22 3/22/22 Approved as noted
Highlighted)

C 3 KAIG3-RFI-SW-C-4661 00 Excavation for Fire Water Line at Zone-C including branch and Pit - C/F/04 - as highlighted Civil Site Works 3/17/22 3/21/22 Approved as noted

C 3 KAIG3-RFI-SW-C-4662 00 Excavation for Potable Water Line at Zone-C including branch & Pit - C/PW/01 - as highlighted Civil Site Works 3/17/22 3/21/22 Approved as noted

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/38 to G/MV/13 at Zone-G - as
4 4 KAIG3-RFI-SW-C-4663 00 Civil Site Works 3/19/22 3/20/22 Approved as noted
highlighted (SCR: KAIG3-SCR-SW-E0081-00)
Excavation for MV Line from C/MV/14 TO H/MV/05 at Zone-C&H including Pit C/MV/14, C/MV20,
3 3 KAIG3-RFI-SW-C-4664 00 C/MV/13, C/MV/12, H/MV/25, H/MV/02, H/MV/11, H/MV/10, H/MV/05 -as highlighted in the attached Civil Site Works 3/19/22 3/21/22 Approved as noted
drawing
"Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 1) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4674 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
A-3-1 to FW-A-3 to FW-3-A - As Highlighted (SP#131 A-1-B)"
Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4675 00 FW-A-3-6.2 To FW-A-3-6.1 And From FW-A-3-6 to FW-A-3-3 As Highlighted (SP#131 A-1-B) Civil Site Works 3/17/22 3/21/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 12) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4676 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4677 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 15th Layer (15 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4678 00 FW-A-8 to FW-A-12 Including Manholes FW-A-8, FW-A-10, FW-A-11 - As Highlighted (SP#131 A-1-B)" Civil Site Works 3/17/22 3/21/22 Approved as noted

"Inspection And Compaction Test of backfilling Sub-grade 6th Layer (6 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4679 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4680 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4681 00 Civil Site Works 3/17/22 3/21/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 3) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4687 00 Civil Site Works 3/19/22 3/21/22 Approved as noted
A-3 to FW-3-A - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 3) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4688 00 Civil Site Works 3/19/22 3/21/22 Approved as noted
A-2 to FW-A-4 - As Highlighted (SP#131 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4689 00 FW-A-3-6.2 To FW-A-3-6.1 And From FW-A-3-6 to FW-A-3-3 As Highlighted (SP#131 A-1-B) Civil Site Works 3/19/22 3/22/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4690 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#131 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 15th Layer (15 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4691 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#131 A-1-B)
"Inspection And Compaction Test of Backfilling Sub-grade 16th Layer (16 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4692 00 FW-A-8 to FW-A-12 Including Manholes FW-A-8, FW-A-10, FW-A-11 - As Highlighted (SP#131 A-1-B)" Civil Site Works 3/22/22 3/24/22 Approved as noted

"Inspection And Compaction Test of backfilling Sub-grade 7th Layer (7 of 8) around Manhol MH-M-07,
6A 6 KAIG3-RFI-SW-C-4693 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
MH-M-08, MH-M-09, MH-M-10 - as Highlighted (SP#131 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 8th Layer (8 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4694 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#131 A-1-B)

kaig-qcals 257
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 8) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4695 00 Civil Site Works 3/19/22 3/24/22 Approved as noted
MH-M-08 To MH-M-10 As Highlighted (SP#131 A-1-B)
"Excavation for Non-Potable Water Line Branches at Zone-B including Pit POC-07, POC-08, NPW-ISC-12,
4 4 KAIG3-RFI-SW-C-4696 00 Civil Site Works 3/19/22 3/21/22 Approved as noted
NPW-ISC-13 - as highlighted in the attached drawing"

Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 6) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4697 00 Civil Site Works 3/20/22 3/22/22 Approved as noted
A-3 to FW-A-3-A - As Highlighted (SP#133 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2nd of 3) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4698 00 Civil Site Works 3/20/22 3/22/22 Approved as noted
FW-A-2 to FW-A-4 - As Highlighted (SP#133 A-1-B)

Inspection of Sand Bedding under pipe for Fire & Security Distribution Line (between B/FS/15 to B/FS/06) at
3 3 KAIG3-RFI-SW-C-4699 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Zone-B as highlighted (SP#132)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4 4 KAIG3-RFI-SW-C-4700 00 from G/MV/38 to G/MV/13 at Zone-G - as highlighted - Stock Pile# 133 A-1-B (SCR: KAIG3-SCR-SW-E- Civil Site Works 3/20/22 3/22/22 Approved as noted
0081-00)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
4 4 KAIG3-RFI-SW-C-4704 00 Telecommunication Line from G/TL/39 to G/TL/45 at Zone-G - as highlighted in the attached drawing (Stock Civil Site Works 3/20/22 3/22/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
4 4 KAIG3-RFI-SW-C-4705 00 Security Distribution Line from G/FS/25 to G/FS/46 at Zone-G as highlighted in the attached drawing (Stock Civil Site Works 3/20/22 3/22/22 Approved as noted
Pile# 133 A-1-B)
Excavation for MV Line Between B/MV/17 TO C/MV/40 at Zone-C including Pit C/MV/02 - as highlighted
3 3 KAIG3-RFI-SW-C-4706 00 Civil Site Works 3/20/22 3/22/22 Approved as noted
in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit -
4 4 KAIG3-RFI-SW-C-4707 00 F/PW/06, F/PW/07, F/PW/14, F/PW/13, F/PW/03, F/PW/04, G/PW/01 at Zone-F&G - as highlighted (Stock Civil Site Works 3/20/22 3/27/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit F/F/09,
4 4 KAIG3-RFI-SW-C-4708 00 F/F/03, F/F/04, F/F/10, F/F/11, F/F/08, G/F/018, G/F/06, G/F/03, G/F/02, G/F/01 at Zone-F&G - as Civil Site Works 3/20/22 3/26/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)
Inspection for Installation Of Isolation Fire Water Line Pit L/F/04, C/F/11, C/F/12, H/F/02, H/F/04, H/F/05,
L 5 KAIG3-RFI-SW-C-4709 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
H/F/06, H/F/12 - as highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-G
4 4 KAIG3-RFI-SW-C-4710 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
(As Highlighted)
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/40 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4711 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
Inspection of Formwork for Duct Bank of Telecommunications line from B/TL/35 to B/TL/36 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4712 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/40 at
3 3 KAIG3-RFI-SW-C-4713 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Zone-B - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/35 to B/TL/36
4B 4 KAIG3-RFI-SW-C-4722 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
at Zone-B - As Highlighted
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/17 at Zone-C - As
3 3 KAIG3-RFI-SW-C-4723 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)"

"Inspection of Formwork for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 at Zone-B - As
3 3 KAIG3-RFI-SW-C-4724 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)"

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/17 at Zone-B -
3 3 KAIG3-RFI-SW-C-4725 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 at
3 3 KAIG3-RFI-SW-C-4726 00 Civil Site Works 3/20/22 3/23/22 Approved as noted
Zone-B - As Highlighted"

2B 2 KAIG3-RFI-SW-C-4732 00 Inspection of Steel Reinforcement for the Upstand of SBC-02 (As Highlighted) Civil Site Works 3/21/22 3/22/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4733 00 Inspection of Steel Reinforcement for the Upstand of SBC-03 (As Highlighted) Civil Site Works 3/21/22 3/22/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4734 00 Inspection of Steel Reinforcement for the Upstand of SBC-04 (As Highlighted) Civil Site Works 3/21/22 3/22/22 Approved as noted

Inspection of Formwork for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 - (As
3B 3 KAIG3-RFI-SW-C-4735 00 Civil Site Works 3/21/22 3/22/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 -
3B 3 KAIG3-RFI-SW-C-4736 00 Civil Site Works 3/21/22 3/23/22 Approved as noted
(As Highlighted)

kaig-qcals 258
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

3 3 KAIG3-RFI-SW-C-4737 00 "Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/06 at Zone-C - as highlighted " Civil Site Works 3/21/22 3/23/22 Approved as noted

5 5 KAIG3-RFI-SW-C-4738 00 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/16, C/F/17 at Zone-C - as highlighted Civil Site Works 3/21/22 3/23/22 Approved as noted

Inspection of Sand bedding under pipe for Fire Water Line at Zone-C including branch - as highlighted (Stock
2 2 KAIG3-RFI-SW-C-4739 00 Civil Site Works 3/21/22 3/23/22 Approved as noted
Pile # 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-C including branch - as highlighted
3 3 KAIG3-RFI-SW-C-4740 00 Civil Site Works 3/21/22 3/23/22 Approved as noted
(Stock Pile # 132)
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for C/PW/01 at Zone-C
6 6 KAIG3-RFI-SW-C-4741 00 Civil Site Works 3/21/22 3/22/22 Approved as noted
- as highlighted

6 6 KAIG3-RFI-SW-C-4742 00 Soil Preparation under Boulder No. RB- 322 Civil Site Works 3/21/22 3/22/22 Approved as noted

4A 4 KAIG3-RFI-SW-C-4743 00 Soil Preparation under Boulder No. RB- 321 Civil Site Works 3/21/22 3/22/22 Approved as noted

Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 6) For Foul Water Line From FW-
6A 6 KAIG3-RFI-SW-C-4749 00 Civil Site Works 3/21/22 3/23/22 Approved as noted
A-3 to FW-A-3-A - As Highlighted (SP#133 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3rd of 4) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4750 00 Civil Site Works 3/21/22 3/23/22 Approved as noted
FW-A-2 to FW-A-4 - As Highlighted (SP#133 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 14) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4751 00 Civil Site Works 3/24/22 3/26/22 Approved as noted
FW-A-7 to FW-A-6 - As Highlighted (SP#133 A-1-B)

Inspection And Compaction Test of Backfilling Sub-grade 16th Layer (16 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4752 00 Civil Site Works 3/24/22 3/26/22 Approved as noted
FW-A-8 to FW-A-7 including manholes - As Highlighted (SP#133 A-1-B)

"Inspection And Compaction Test of Backfilling Sub-grade 17th Layer (17 of 17) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4753 00 Civil Site Works 3/24/22 3/26/22 Approved as noted
FW-A-8 to FW-A-10 Including Manholes FW-A-8, FW-A-10- As Highlighted (SP#133 A-1-B)"

Inspection And Compaction Test of backfilling Sub-grade 8th Layer (8 of 8) around Manhol MH-M-07, MH-
6A 6 KAIG3-RFI-SW-C-4754 00 Civil Site Works 3/24/22 3/26/22 Approved as noted
M-08- as Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 9th Layer (9 of 10) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4755 00 Civil Site Works 3/24/22 3/26/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#133 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4756 00 FW-A-3-6.2 To FW-A-3-6.1 And From FW-A-3-6 to FW-A-3-3 As Highlighted (SP#133 A-1-B) Civil Site Works 3/21/22 3/26/22 Approved as noted

3 3 KAIG3-RFI-SW-C-4757 00 "Soil Preparation prior to start backfilling around SBC at Zone-H - As highlighted " Civil Site Works 3/21/22 3/23/22 Approved as noted

Surface Preparation prior to start backfilling gravel around Potable Water Line Pit for F/PW/09, F/PW/10,
4 4 KAIG3-RFI-SW-C-4758 00 Civil Site Works 3/21/22 3/24/22 Approved as noted
G/PW/07, K/PW/02, K/PW/08, K/PW/09 at Zone-F,G&K - as highlighted

Surface Preparation prior to start backfilling gravel around Fire Water Line Pit F/F/05, F/F/06, F/F/07,
4 4 KAIG3-RFI-SW-C-4759 00 Civil Site Works 3/21/22 3/24/22 Approved as noted
G/F/04, G/F/05, K/F/02, K/F/03 at Zone-F,G&K - as highlighted

2B 2 KAIG3-RFI-SW-C-4760 00 Surface Preparation prior to start Waterproofing for SBC-05 - as highlighted Civil Site Works 3/21/22 3/23/22 Approved as noted

Inspection of Sand bedding under pipe for Non-Potable Water Line Branches at Zone-B - as highlighted in
4 4 KAIG3-RFI-SW-C-4764 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
the attached drawing (Stock Pile # 132)

Inspection of Sand bedding under pipe for MV Line Between B/MV/17 TO C/MV/40 at Zone-C - as
3 3 KAIG3-RFI-SW-C-4765 00 Civil Site Works 3/22/22 3/23/22 Approved as noted
highlighted in the attached drawing (Stock Pile # 132)

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 3) around SBC at Zone-H - As
3 3 KAIG3-RFI-SW-C-4766 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
highlighted

kaig-qcals 259
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) under Boulder No. RB-321
6 6 KAIG3-RFI-SW-C-4767 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
(Stock Pile # 133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) under Boulder No. RB-322
6 6 KAIG3-RFI-SW-C-4768 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
(Stock Pile # 133 A-1-B)

3B 3 KAIG3-RFI-SW-C-4769 00 Inspection of Steel Reinforcement for the Upstand of SBC-09 (As Highlighted) Civil Site Works 3/22/22 3/27/22 Approved as noted

"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-06 - Wing Wall (Right
4 4 KAIG3-RFI-SW-C-4770 00 Civil Site Works 3/22/22 3/24/22 Approved as noted
Side) - As Highlighted"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-4771 00 Civil Site Works 3/22/22 3/26/22 Approved as noted
for C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-4772 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
for C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B)

2B 2 KAIG3-RFI-SW-C-4773 00 Inspection of Formwork for the Wing Wall ( F3 & F4) of SBC-03 (As Highlighted) Civil Site Works 3/22/22 3/23/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4774 00 "Inspection of Concrete Pouring for the Wing Wall ( F3 & F4) of SBC-03 (As Highlighted)" Civil Site Works 3/22/22 3/23/22 Approved as noted

"Inspection and Compaction test for backfilling Sub-grade 2nd & 3rd layer (3 of 3) around SBC at Zone-H -
H (3, 6) 6 KAIG3-RFI-SW-C-4775 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
As highlighted "
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) under Boulder No. RB-321
L6 6 KAIG3-RFI-SW-C-4780 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
(Stock Pile # 133 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) under Boulder No. RB-322
L6 6 KAIG3-RFI-SW-C-4781 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
(Stock Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Telecommunication Line
B3 3 KAIG3-RFI-SW-C-4782 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
Pit upto bottom of blinding for B/TL/10 & B/TL/12 at Zone-B - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) under Telecommunication Line
B3 3 KAIG3-RFI-SW-C-4783 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
Pit upto bottom of blinding for B/TL/13 at Zone-B - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) under Telecommunication Line
G4 4 KAIG3-RFI-SW-C-4784 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
Pit upto bottom of blinding for G/TL/03 at Zone-G - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Telecommunication Line
G4 4 KAIG3-RFI-SW-C-4785 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
Pit upto bottom of blinding for G/TL/52 at Zone-G - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Fire & Security
B3 3 KAIG3-RFI-SW-C-4786 00 Distribution Line Pit, upto bottom of blinding for B/FS/14 & B/FS/15 at Zone-B - as highlighted (SP# 133 A- Civil Site Works 3/23/22 3/26/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) under Fire & Security
G4 4 KAIG3-RFI-SW-C-4787 00 Distribution Line Pit, upto bottom of blinding for G/FS/02 at Zone-G - as highlighted (SP# 133 A-1-B) Civil Site Works 3/23/22 3/26/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Fire & Security
G4 4 KAIG3-RFI-SW-C-4788 00 Distribution Line Pit, upto bottom of blinding for G/FS/47 at Zone-G - as highlighted (SP# 133 A-1-B) Civil Site Works 3/23/22 3/26/22 Approved as noted

Inspection of Sand Bedding under pipe for Non-Potable Water Line Branches at Zone-G&K - as highlighted
GK 45 5 KAIG3-RFI-SW-C-4789 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
in the attached drawing (SP#132)
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) under Boulder No. RB-321
L6 6 KAIG3-RFI-SW-C-4790 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
(Stock Pile # 133 A-1-B)
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4794 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
B/PW/05, B/PW/07 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4795 00 Civil Site Works 3/23/22 3/26/22 Approved as noted
B/F/04, B/F/05, B/F/06, B/F/07, B/F/15 at Zone-B - as highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from K/TL/22 to K/TL/23
K5 5 KAIG3-RFI-SW-C-4796 00 Civil Site Works 3/23/22 3/27/22 Approved as noted
at Zone-K - As Highlighted
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from K/FS/07 to K/FS/10 at
K5 5 KAIG3-RFI-SW-C-4797 00 Civil Site Works 3/23/22 3/27/22 Approved as noted
Zone-K - As Highlighted"
Excavation for Telecommunication Line between B/TL/32 to B/TL/30 and B/TL/51 including pit B/TL/30,
6A 6 KAIG3-RFI-SW-C-4798 00 Civil Site Works 4/16/22 4/19/22 Approved as noted
B/TL/31, B/TL/51, B/TL/48, B/TL/32 at Zone-B as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from B/FS/31 to B/FS/04 and B/FS/44, including Pit
6A 6 KAIG3-RFI-SW-C-4799 00 Civil Site Works 4/16/22 4/19/22 Approved as noted
B/FS/04,B/FS/03, B/FS/44, B/FS/31 at Zone-B - as highlighted in the attached drawing

6A 6 KAIG3-RFI-SW-C-4800 00 "Inspection for Installation of MV Line Junction Pit - B/MV/26, G/MV/05, G/MV/17- as highlighted " Civil Site Works 4/16/22 4/24/22 Code C (not resubmit)

kaig-qcals 260
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation for Foul Water Line from FW-A-3-7.1 to FW-A-3-7.2 including Manhole FW-A-3-7.2 prior to
6A 6 KAIG3-RFI-SW-C-4801 00 Civil Site Works 4/16/22 4/20/22 Approved as noted
start Gravel Bedding (as Highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 9th Layer (10 of 10) for Storm Water Line From
6A 6 KAIG3-RFI-SW-C-4802 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
MH-M-08 To MH-M-07 As Highlighted (SP#133 A-1-B)
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 13) For Foul Water Line From
6A 6 KAIG3-RFI-SW-C-4803 00 FW-A-3-6.2 To FW-A-3-6.1 And From FW-A-3-6 to FW-A-3-3 As Highlighted (SP#133 A-1-B) Civil Site Works 3/23/22 3/27/22 Approved as noted

Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) under Boulder No. RB-322
L6 6 KAIG3-RFI-SW-C-4809 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
(Stock Pile # 133 A-1-B)
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-06 - Wing Wall (As
4 4 KAIG3-RFI-SW-C-4810 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
Highlighted)"
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Telecommunication Line
B3 3 KAIG3-RFI-SW-C-4811 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
Pit upto bottom of blinding for B/TL/10 & B/TL/12 at Zone-B - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) under Telecommunication Line
B3 3 KAIG3-RFI-SW-C-4812 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
Pit upto bottom of blinding for B/TL/13 at Zone-B - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Telecommunication Line
G4 4 KAIG3-RFI-SW-C-4813 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
Pit upto bottom of blinding for G/TL/52 at Zone-G - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Fire & Security
B3 3 KAIG3-RFI-SW-C-4814 00 Distribution Line Pit, upto bottom of blinding for B/FS/14 & B/FS/15 at Zone-B - as highlighted (SP# 133 A- Civil Site Works 3/24/22 3/27/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Fire & Security
G4 4 KAIG3-RFI-SW-C-4815 00 Distribution Line Pit, upto bottom of blinding for G/FS/47 at Zone-G - as highlighted (SP# 133 A-1-B) Civil Site Works 3/24/22 3/27/22 Approved as noted

Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
2B 2 KAIG3-RFI-SW-C-4816 00 Civil Site Works 3/24/22 3/30/22 Approved as noted
External Wall, Top Slab, Upstand and Wing Wall of SBC-5 (As Highlighted)

Excavation for Fire Water Line at Zone-L & M including Pit - FF-08, M/F/02, M/F/01, FF-10 - as highlighted
LM5 5 KAIG3-RFI-SW-C-4817 00 Civil Site Works 3/24/22 3/27/22 Approved as noted

Excavation for Potable Water Line at Zone-L&M including branch & Pit - PW-13, L/PW/07, L/PW/10, PW-
LM5 5 KAIG3-RFI-SW-C-4818 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
10 - as highlighted

Surface Preparation prior to start Waterproofing for Corner connection between SBC-1 & SBC-2 - as
2B 2 KAIG3-RFI-SW-C-4819 00 Civil Site Works 3/24/22 3/30/22 Approved as noted
highlighted
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4820 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
B/PW/02, B/PW/06 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4821 00 Civil Site Works 3/24/22 3/27/22 Approved as noted
B/F/08, B/F/09 at Zone-B - as highlighted
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit for
F4 4 KAIG3-RFI-SW-C-4822 00 Civil Site Works 3/24/22 3/28/22 Approved as noted
F/PW/09, F/PW/10 at Zone-F - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit
F4 4 KAIG3-RFI-SW-C-4823 00 Civil Site Works 3/24/22 3/28/22 Approved as noted
F/F/05, F/F/06, F/F/07 at Zone-F - as highlighted
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit for
GK 4 5 5 KAIG3-RFI-SW-C-4824 00 G/PW/07, K/PW/08, K/PW/02, K/PW/09 at Zone-G&K - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 3/24/22 3/28/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit
GK 4 5 5 KAIG3-RFI-SW-C-4825 00 Civil Site Works 3/24/22 3/28/22 Approved as noted
G/F/04, G/F/05, K/F/02, K/F/03 at Zone-G&K - as highlighted
"Inspection of Thrust Block for Non-Potable Water Line ( Dia 250mm & 200mm) at Zone-G&K - As
GK 4 5 5 KAIG3-RFI-SW-C-4826 00 Civil Site Works 3/24/22 3/28/22 Approved as noted
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)"
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/04, B/F/17, B/F/10 at Zone-B&C - as
BC 3 3 KAIG3-RFI-SW-C-4827 00 Civil Site Works 3/24/22 3/28/22 Approved as noted
highlighted
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 4) under Boulder No. RB-321
L6 6 KAIG3-RFI-SW-C-4828 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
(Stock Pile # 133 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 4) under Boulder No. RB-322
L6 6 KAIG3-RFI-SW-C-4829 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
(Stock Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Telecommunication Line
B3 3 KAIG3-RFI-SW-C-4830 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
Pit upto bottom of blinding for B/TL/10 & B/TL/12 at Zone-B - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Telecommunication Line
G4 4 KAIG3-RFI-SW-C-4831 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
Pit upto bottom of blinding for G/TL/52 at Zone-G - as highlighted (SP# 133 A-1-B)

kaig-qcals 261
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Fire & Security
B3 3 KAIG3-RFI-SW-C-4832 00 Distribution Line Pit, upto bottom of blinding for B/FS/14 & B/FS/15 at Zone-B - as highlighted (SP# 133 A- Civil Site Works 3/26/22 3/28/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Fire & Security
G4 4 KAIG3-RFI-SW-C-4833 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
Distribution Line Pit, upto bottom of blinding for G/FS/47 at Zone-G - as highlighted (SP# 133 A-1-B)
Inspection and Compaction Test for Backfilling Sub-Base 1st Layer (1 of 1) under Boulder No. RB-321
L6 6 KAIG3-RFI-SW-C-4834 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
(Stock Pile # 110 A-1-A)
Inspection and Compaction Test for Backfilling Sub-Base 1st Layer (1 of 1) under Boulder No. RB-322
L6 6 KAIG3-RFI-SW-C-4835 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
(Stock Pile # 110 A-1-A)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-09 (AS
6A 6 KAIG3-RFI-SW-C-4836 00 Civil Site Works 3/26/22 3/30/22 Code C (not resubmit)
ATTACHED)

C 3 KAIG3-RFI-SW-C-4837 00 "Inspection for Installation Of Isolation Fire Water Line Pit C/F/13, C/F/16, C/F/17, as highlighted " Civil Site Works 3/26/22 3/28/22 Approved as noted

"Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4838 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
B/PW/05, B/PW/07 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4839 00 Civil Site Works 3/26/22 3/28/22 Approved as noted
B/F/04, B/F/05, B/F/06, B/F/07, B/F/15 at Zone-B - as highlighted

5 5 KAIG3-RFI-SW-C-4843 00 Inspection of Sand Bedding under Pipe for Fire Water Line at Zone L & M as highlighted (Stock Pile # 132). Civil Site Works 3/27/22 3/29/22 Approved as noted

Inspection of Sand Bedding under Pipe for Potable Water Line at Zone L & M as highlighted (Stock Pile #
5 5 KAIG3-RFI-SW-C-4844 00 Civil Site Works 3/27/22 3/29/22 Approved as noted
132).

2B 2 KAIG3-RFI-SW-C-4845 00 Inspection of Formwork for the Upstand of SBC-02 as highlighted. Civil Site Works 3/27/22 3/31/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4846 00 Inspection of concrete Pouring for the upstand of SBC-02 as highlighted. Civil Site Works 3/27/22 3/30/22 Approved as noted

3B 3 KAIG3-RFI-SW-C-4847 00 Inspection of Formwork for the Upstand of SBC-09 as highlighted. Civil Site Works 3/27/22 3/28/22 Approved as noted

3B 3 KAIG3-RFI-SW-C-4848 00 Inspection of concrete Pouring for the upstand of SBC-09 as highlighted. Civil Site Works 3/27/22 3/30/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4849 00 Inspection of Formwork for the Upstand of SBC-03 as highlighted. Civil Site Works 3/27/22 3/28/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4850 00 Inspection of concrete Pouring for the upstand of SBC-03 as highlighted. Civil Site Works 3/27/22 3/30/22 Approved as noted

Inspection of Steel Reinforcement for the Duct Bank of MV Line fron B/MV/08 to B/MV/21 at Zone B & C
BC 3 3 KAIG3-RFI-SW-C-4853 00 Civil Site Works 3/27/22 3/31/22 Approved as noted
as highlighted SCR: KAIG3-SCR-CO-S-0129-00.

Inspection of Formwork for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at Zone B C as
BC 3 3 KAIG3-RFI-SW-C-4854 00 Civil Site Works 3/27/22 3/31/22 Approved as noted
highlighted SCR: KAIG3-SCR-CO-S-0129-00.
Inspection of Reinforcement Concrete Pouring for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at
BC 3 3 KAIG3-RFI-SW-C-4855 00 Civil Site Works 3/27/22 3/30/22 Approved as noted
Zone B C as highlighted SCR: KAIG3-SCR-CO-S-0129-00.

C3 3 KAIG3-RFI-SW-C-4856 00 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. Civil Site Works 3/27/22 3/30/22 Code C (resubmit)

C3 3 KAIG3-RFI-SW-C-4856 01 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. Civil Site Works 8/3/22 Open

Inspection and Compaction for Backfilling Sub-Grade 2nd Layer (2 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4857 00 Civil Site Works 3/27/22 3/29/22 Approved as noted
B/PW/02, B/PW/06 at Zone B as highlighted (Stock Pile 133 A-1-B).

kaig-qcals 262
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test for Backfilling Sub-Grade 2nd Layer 2nd Layer (2 of 4) around fire Water
B3 3 KAIG3-RFI-SW-C-4858 00 Civil Site Works 3/27/22 3/28/22 Approved as noted
Line Pit B/F/08 - B/F/09 at Zone B as highlighted.

Inspection of Blinding Concrete under Telecommunication Line Pit for B/TL/13, B/TL/12, B/TL/10,
BCG 4 4 KAIG3-RFI-SW-C-4859 00 Civil Site Works 3/27/22 3/31/22 Approved as noted
B/TL/32, C/TL/14, G/TL/03, G/TL/52, G/TL/04, G/TL/23, G/TL/12 at Zone B, C & G as highlighted.
Inspection of Blinding Concrete under Fire & Security Line Pit for B/FS/06, B/FS/15, B/FS/14, B/FS/31,
BCG 4 4 KAIG3-RFI-SW-C-4860 00 Civil Site Works 3/27/22 3/31/22 Approved as noted
G/FS/02, G/FS/47, G/FS/51, G/FS/37, G/FS/04 at Zone B & G as highlighted.

4 4 KAIG3-RFI-SW-C-4861 00 Inspection of Steel Reinforcement for the Footing and Walls of SBC-06 - Wing Wall as highlighted. Civil Site Works 3/27/22 3/28/22 Approved as noted

4 4 KAIG3-RFI-SW-C-4862 00 Inspection of Formwork for the Footing of SBC-06 Wing Wall as highlighted. Civil Site Works 3/27/22 3/28/22 Approved as noted

4 4 KAIG3-RFI-SW-C-4863 00 Inspection of Concrete Pouring for the Footing of SBC 06 Wing Wall as highlighted. Civil Site Works 3/27/22 3/31/22 Approved as noted

Inspection and compaction test for Backfilling Sub-Grade 1st Layer (1 of 7) for cancelled brach line of Foul
5A 5 KAIG3-RFI-SW-C-4864 00 Civil Site Works 3/27/22 3/29/22 Approved as noted
Water line from FW-A-18 to E C Building at Zone 5A as highlighted.

"Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit for
F4 4 KAIG3-RFI-SW-C-4865 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
F/PW/09, F/PW/10 at Zone-F - as highlighted (Stock Pile # 133 A-1-B)"
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) from
7 7 KAIG3-RFI-SW-C-4866 00 Civil Site Works 3/27/22 3/30/22 Approved as noted
(FW-A-13 to FW-A-12). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-13 to FW-A-12). At
7 7 KAIG3-RFI-SW-C-4867 00 Civil Site Works 3/27/22 3/30/22 Approved as noted
CRECENT Wadi Zone 7.As per highlighted Area in the attached Dwg.

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit
F4 4 KAIG3-RFI-SW-C-4868 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
F/F/05, F/F/06, F/F/07 at Zone-F - as highlighted

Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit for
GK45 5 KAIG3-RFI-SW-C-4869 00 G/PW/07, K/PW/08, K/PW/02, K/PW/09 at Zone-G&K - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 3/28/22 3/30/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit
GK45 5 KAIG3-RFI-SW-C-4870 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
G/F/04, G/F/05, K/F/02, K/F/03 at Zone-G&K - as highlighted

"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4871 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
B/PW/05, B/PW/07 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4872 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
B/F/04, B/F/05, B/F/06, B/F/07, B/F/15 at Zone-B - as highlighted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) for cancelled branch line of
5A 5 KAIG3-RFI-SW-C-4873 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
Foul Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)

Surface Preparation prior to start Waterproofing for the Duct Bank of MV Line from K/MV04 to L/MV/08 at
KL5 5 KAIG3-RFI-SW-C-4874 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
Zone-K & L (As Highlighted)

Inspection of Waterproofing for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As
KL5 5 KAIG3-RFI-SW-C-4875 00 Civil Site Works 3/28/22 3/31/22 Approved as noted
Highlighted)
Surface Preparation prior to start backfilling gravel for the Duct Bank of MV Line from K/MV04 to L/MV/08
KL5 5 KAIG3-RFI-SW-C-4876 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
at Zone-K & L (As Highlighted)

KL5 5 KAIG3-RFI-SW-C-4877 00 Excavation for Fire Water Line at Zone-L - as highlighted Civil Site Works 3/28/22 3/31/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-4878 00 Excavation for Potable Water Line at Zone-L - as highlighted Civil Site Works 3/28/22 3/31/22 Approved as noted

kaig-qcals 263
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) for cancelled branch line of Foul
5A 5 KAIG3-RFI-SW-C-4879 00 Civil Site Works 3/28/22 3/30/22 Approved as noted
Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)

L5 5 KAIG3-RFI-SW-C-4880 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 3/28/22 3/30/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-4884 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 3/28/22 3/30/22 Approved as noted

"Inspection for the Excavation and Soil Preparation for Foul Water Line prior to start backfilling at Zone-4A
L5 5 KAIG3-RFI-SW-C-4885 00 - As Highlighted (ZHBG - action to close Non-Conformance Report # KAIG3-NCR-GN-C-0003-00)" Civil Site Works 3/28/22 3/31/22 Approved as noted

"Inspection and Compaction Test for Backfilling Sub-grade 1st & 2nd Layer (2 of 8) for Foul Water Line at
4A 4 KAIG3-RFI-SW-C-4886 00 Zone-4A - As Highlighted (Stock Pile # 133 A-1-B) (ZHBG - action to close Non-Conformance Report # Civil Site Works 3/29/22 4/2/22 Approved as noted
KAIG3-NCR-GN-C-0003-00)"
4A 4 KAIG3-RFI-SW-C-4887 00 Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-06 - (As Highlighted) Civil Site Works 3/29/22 4/2/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-4888 00 Surface Preparation prior to start backfill around SBC-05 (Wing Wall) at Zone - 2B - as highlighted Civil Site Works 3/29/22 4/2/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) for cancelled branch line of Foul
5A 5 KAIG3-RFI-SW-C-4889 00 Civil Site Works 3/29/22 4/2/22 Approved as noted
Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)

"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4890 00 Civil Site Works 3/29/22 4/2/22 Approved as noted
B/PW/02, B/PW/06 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4891 00 Civil Site Works 3/29/22 4/2/22 Approved as noted
B/F/08, B/F/09 at Zone-B - as highlighted

Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit for
GK45 5 KAIG3-RFI-SW-C-4892 00 G/PW/07, K/PW/08, K/PW/02, K/PW/09 at Zone-G&K - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 3/29/22 4/3/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
GK45 5 KAIG3-RFI-SW-C-4893 00 Civil Site Works 3/29/22 4/3/22 Approved as noted
G/F/04, G/F/05, K/F/02, K/F/03 at Zone-G&K - as highlighted

"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit for
F4 4 KAIG3-RFI-SW-C-4894 00 Civil Site Works 3/29/22 4/3/22 Approved as noted
F/PW/09, F/PW/10 at Zone-F - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
F4 4 KAIG3-RFI-SW-C-4895 00 Civil Site Works 3/29/22 4/3/22 Approved as noted
F/F/05, F/F/06, F/F/07 at Zone-F - as highlighted
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
2B 2 KAIG3-RFI-SW-C-4896 00 Civil Site Works 3/29/22 4/2/22 Approved as noted
External Wall, Top Slab of Corner Connection between SBC-01 & SBC-02 (As Highlighted)

Inspection of backfilling gravel for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L -
KL5 5 KAIG3-RFI-SW-C-4897 00 Civil Site Works 3/29/22 3/30/22 Approved as noted
As Highlighted (Stock Pile # 118)

Excavation for MV Line from H/MV/28 TO L/MV/14 at Zone-H&L including Pit H/MV/28, H/MV/24,
HL6 6 KAIG3-RFI-SW-C-4898 00 H/MV/03, H/MV/19, H/MV/13, H/MV/32, L/MV/09, L/MV/17, L/MV/11, L/MV/14 - as highlighted in the Civil Site Works 3/29/22 3/31/22 Approved as noted
attached drawing

"Inspection of Excavation for Storm Water Line at Zone-4B including Manhole MH-O-01 and Gully G-O-47
4B 4 KAIG3-RFI-SW-C-4899 00 Civil Site Works 3/29/22 4/2/22 Approved as noted
- As highlighted "

Inspection and Compaction Test for backfilling Sub-grade 1st & 2nd Layer (2 of 2) above gravel for the Duct
KL5 5 KAIG3-RFI-SW-C-4900 00 Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L - As Highlighted (Stock Pile # 133 A-1-B) Civil Site Works 3/30/22 4/3/22 Approved as noted

"Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4910 00 Civil Site Works 3/30/22 4/3/22 Approved as noted
B/PW/05, B/PW/07 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4911 00 Civil Site Works 3/30/22 4/3/22 Approved as noted
B/F/04, B/F/05, B/F/06, B/F/07, B/F/15 at Zone-B - as highlighted

BC 3 3 KAIG3-RFI-SW-C-4912 00 "Inspection for Installation of Fire Water Line Isolation Pit B/F/10, C/F/04 as highlighted " Civil Site Works 3/30/22 4/6/22 Approved as noted

kaig-qcals 264
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection for Installation of Potable Water Line Isolation Pit C/PW/05, C/PW/06, C/PW/08 - as highlighted
BC 3 3 KAIG3-RFI-SW-C-4913 00 Civil Site Works 3/30/22 4/5/22 Approved as noted

"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-4914 00 Civil Site Works 3/30/22 4/3/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-4915 00 Civil Site Works 3/30/22 4/4/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) for cancelled branch line of Foul
5A 5 KAIG3-RFI-SW-C-4916 00 Civil Site Works 3/30/22 4/3/22 Approved as noted
Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) for cancelled branch line of Foul
5A 5 KAIG3-RFI-SW-C-4917 00 Civil Site Works 3/30/22 4/5/22 Approved as noted
Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 3rd & 4th Layer (4 of 8) for Foul Water Line at
4A 4 KAIG3-RFI-SW-C-4918 00 Zone-4A - As Highlighted (Stock Pile # 133 A-1-B) (ZHBG - action to close Non-Conformance Report # Civil Site Works 3/30/22 4/3/22 Approved as noted
KAIG3-NCR-GN-C-0003-00)"

Surface Preparation prior to start Waterproofing for SBC-09 Upstand, Footing and wall of Wing Wall - as
4 4 KAIG3-RFI-SW-C-4919 00 Civil Site Works 3/30/22 4/2/22 Approved as noted
highlighted

"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-08 - Wing Wall (Right
4 4 KAIG3-RFI-SW-C-4920 00 Civil Site Works 3/30/22 4/4/22 Approved as noted
Side) - As Highlighted"

4 4 KAIG3-RFI-SW-C-4922 00 Inspection of Formwork for the Wing Walls of SBC-06 - (As Highlighted) Civil Site Works 3/30/22 4/4/22 Approved as noted

4 4 KAIG3-RFI-SW-C-4923 00 Inspection of Concrete Pouring for the Wing Walls of SBC-06 - (As Highlighted) Civil Site Works 3/30/22 4/2/22 Approved as noted

Inspection of Sand bedding under pipe for MV Line Between H/MV/28 TO L/MV/14 at Zone-H&L - as
HL 6 6 KAIG3-RFI-SW-C-4932 00 Civil Site Works 3/31/22 4/4/22 Approved as noted
highlighted in the attached drawing (Stock Pile # 132)
"Inspection and Compaction Test for Backfilling Sub-grade 5th & 6th Layer (of 8) for Foul Water Line at
4A 4 KAIG3-RFI-SW-C-4933 00 Zone-4A - As Highlighted (Stock Pile # 133 A-1-B) (ZHBG - action to close Non-Conformance Report # Civil Site Works 3/31/22 4/4/22 Approved as noted
KAIG3-NCR-GN-C-0003-00)"
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) for cancelled branch line of Foul
5A 5 KAIG3-RFI-SW-C-4934 00 Civil Site Works 4/4/22 4/6/22 Approved as noted
Water Line from FW-A-18 to E C Building at Zone-5A as highlighted (SP# 133 A-1-B)
"Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-4935 00 Civil Site Works 3/31/22 4/5/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"
"Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-4937 00 Civil Site Works 3/31/22 4/4/22 Approved as noted
B/PW/02, B/PW/06 at Zone-B - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit
B3 3 KAIG3-RFI-SW-C-4938 00 Civil Site Works 3/31/22 4/4/22 Approved as noted
B/F/08, B/F/09 at Zone-B - as highlighted

"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-4940 00 Civil Site Works 3/31/22 4/4/22 Approved as noted
(SP#133 A-1-B)"

"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-4941 00 Civil Site Works 4/3/22 4/6/22 Approved as noted
(SP#133 A-1-B)"

Inspection of Thrust Block for UPVC Pipe (200 & 250 mm Dia) for Fire Water Line at Zone- C,H,L - As
C H L (356) 5 KAIG3-RFI-SW-C-4948 00 Civil Site Works 4/2/22 4/4/22 Approved as noted
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
"Excavation for Non-Potable Water Line at Zone-K including Branch & Pit POC-42, POC-41, NPW-ISC-07
K5 5 KAIG3-RFI-SW-C-4949 00 Civil Site Works 4/2/22 4/4/22 Approved as noted
- as highlighted in the attached drawing"
"Inspection of Excavation for Storm Water Line at Zone-4C including Manhole MH-Y-01, MH-Y-02 - As
4C 4 KAIG3-RFI-SW-C-4950 00 Civil Site Works 4/2/22 4/6/22 Approved as noted
highlighted "
"Inspection and Compaction Test for Backfilling Sub-grade 7th & 8th Layer (8 of 8) for Foul Water Line at
4A 4 KAIG3-RFI-SW-C-4951 00 Zone-4A - As Highlighted (Stock Pile # 133 A-1-B) (ZHBG - action to close Non-Conformance Report # Civil Site Works 4/2/22 4/6/22 Approved as noted
KAIG3-NCR-GN-C-0003-00)"
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/12 to G/TL/23
G4 4 KAIG3-RFI-SW-C-4952 00 Civil Site Works 4/2/22 4/4/22 Approved as noted
at Zone-G - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/04 to
G4 4 KAIG3-RFI-SW-C-4953 00 Civil Site Works 4/2/22 4/4/22 Approved as noted
G/FS/37 at Zone-G - as highlighted in the attached drawing

kaig-qcals 265
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Right Side) -
4 4 KAIG3-RFI-SW-C-4954 00 Civil Site Works 4/2/22 4/4/22 Approved as noted
As Highlighted"

L5 5 KAIG3-RFI-SW-C-4955 00 Inspection for Installation of Fire Water Line Isolation Pit L/F/01 at Zone - L - as highlighted Civil Site Works 4/2/22 4/6/22 Approved as noted

Inspection for Installation of Potable Water Line Isolation Pit C/PW/01, H/PW/02 at Zone- C & H - as
CH 3 3 KAIG3-RFI-SW-C-4956 00 Civil Site Works 4/2/22 4/7/22 Approved as noted
highlighted

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/21 to K/TL/06
K5 5 KAIG3-RFI-SW-C-4959 00 Civil Site Works 4/3/22 4/5/22 Approved as noted
at Zone-K - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/13 to
K5 5 KAIG3-RFI-SW-C-4960 00 Civil Site Works 4/3/22 4/5/22 Approved as noted
K/FS/12 at Zone-K - as highlighted in the attached drawing
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/24 to G/MV/25 at Zone-G - as
G4 4 KAIG3-RFI-SW-C-4961 00 Civil Site Works 4/3/22 4/5/22 Approved as noted
highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
G4 4 KAIG3-RFI-SW-C-4962 00 Telecommunication Line from G/TL/12 to G/TL/23 at Zone-G - as highlighted in the attached drawing (Stock Civil Site Works 4/3/22 4/6/22 Approved as noted
Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
G4 4 KAIG3-RFI-SW-C-4963 00 Security Distribution Line from G/FS/04 to G/FS/37 at Zone-G - as highlighted in the attached drawing Civil Site Works 4/3/22 4/6/22 Approved as noted
(Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-4964 00 Civil Site Works 4/3/22 4/6/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
4 4 KAIG3-RFI-SW-C-4965 00 Civil Site Works 4/4/22 4/7/22 Approved as noted
SBC-9 - Upstand, Footing and Wall of Wing Wall (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
K5 5 KAIG3-RFI-SW-C-4972 00 Telecommunication Line from K/TL/21 to K/TL/06 at Zone-K - as highlighted in the attached drawing (Stock Civil Site Works 4/4/22 4/7/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 1) above Green Tiles for Fire &
K5 5 KAIG3-RFI-SW-C-4973 00 Security Distribution Line from K/FS/13 to K/FS/12 at Zone-K - as highlighted in the attached drawing Civil Site Works 4/4/22 4/7/22 Approved as noted
(Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4G 4 KAIG3-RFI-SW-C-4974 00 Civil Site Works 4/4/22 4/9/22 Approved as noted
from G/MV/24 to G/MV/25 at Zone-G - as highlighted (Stock Pile # 133 A-1-B)"

Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-K including Branch - as
K5 5 KAIG3-RFI-SW-C-4975 00 Civil Site Works 4/4/22 4/7/22 Approved as noted
highlighted in the attached drawing (Stock Pile # 132)

"Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-4976 00 Civil Site Works 4/4/22 4/7/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

4 4 KAIG3-RFI-SW-C-4977 00 Surface Preparation prior to backfilling sub-grade around SBC-09 - Wing Wall - as highlighted Civil Site Works 4/4/22 4/10/22 Approved as noted

4B 4 KAIG3-RFI-SW-C-4978 00 Inspection of Excavation for Storm Water Line at Zone-4B - As highlighted Civil Site Works 4/4/22 4/6/22 Approved as noted

Surface Preparation prior to start backfilling Sub-grade around, Corner connection between SBC-1 & SBC-2 -
2B 2 KAIG3-RFI-SW-C-4979 00 Civil Site Works 4/5/22 4/10/22 Approved as noted
as highlighted
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for K/PW/01 at Zone-
K5 5 KAIG3-RFI-SW-C-4980 00 Civil Site Works 4/5/22 4/10/22 Approved as noted
K - as highlighted
Surface Preparation prior to start backfilling Sub-grade around Fire Water Line Pit K/F/01 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-4989 00 Civil Site Works 4/5/22 4/10/22 Approved as noted
highlighted
Inspection of Steel Reinforcement for the Footing and Walls of SBC-08 - Wing Wall (Right Side) - As
4 4 KAIG3-RFI-SW-C-4990 00 Civil Site Works 4/5/22 4/7/22 Approved as noted
Highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-4991 00 Civil Site Works 4/5/22 4/10/22 Approved as noted
(Right Side) - as highlighted

"Inspection for Installation of Telecommunication Line Pit - F/TL/12, 14, 03,04,16, G/TL/43, 21, 13, 44, 54,
4 4 KAIG3-RFI-SW-C-4994 00 16, 17, 45, 39, 27, 26, 41, 19, 40, 08, 07, 06, 09, K/TL/01, 03, 12, 10, 15, 19, 16, 14, 02, 26, 04, 21, 05, 07, Civil Site Works 4/5/22 4/7/22 Approved as noted
23, 22, 11, 25, 28, 27 - as high

kaig-qcals 266
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection for Installation of Fire & Security Line Pit - F/FS/17, 11, 03, 04,14, G/FS/07, 21, 08, 30, 52, 19,
4 4 KAIG3-RFI-SW-C-4995 00 20, 46, 25, 44, 10, 38, 24, 34, 11, 01, 05, 06, 22, K/FS/01, 03, 21, 23, 04, 09, 05, 06, 20, 02, 24, 17, 13, 18, Civil Site Works 4/5/22 4/7/22 Approved as noted
16, 10, 07, 08, 19, 26, 25,
4 4 KAIG3-RFI-SW-C-4998 00 Inspection of Formwork for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted Civil Site Works 4/6/22 4/13/22 Approved as noted

4 4 KAIG3-RFI-SW-C-4999 00 Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted Civil Site Works 4/6/22 4/9/22 Code C (resubmit)

4 4 KAIG3-RFI-SW-C-4999 01 Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted Civil Site Works 5/26/22 5/30/22 Approved as noted

"Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5000 00 Civil Site Works 4/6/22 4/10/22 Approved as noted
(SP#133 A-1-B)"

Inspection of Steel Reinforcement (Horizontal) for the Walls of SBC-08 - Wing Wall (Right Side) - As
4 4 KAIG3-RFI-SW-C-5002 00 Civil Site Works 4/6/22 4/10/22 Approved as noted
Highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5003 00 Civil Site Works 4/6/22 4/11/22 Approved as noted
(Left Side) - as highlighted

Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) around Potable Water Line Pit
K5 5 KAIG3-RFI-SW-C-5004 00 Civil Site Works 4/6/22 4/10/22 Approved as noted
for K/PW/01 at Zone-K - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) around Fire Water Line Pit
K5 5 KAIG3-RFI-SW-C-5005 00 Civil Site Works 4/6/22 4/10/22 Approved as noted
K/F/01 at Zone-K - as highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5006 00 Civil Site Works 4/6/22 4/11/22 Approved as noted
(SP#133 A-1-B)"

Inspection for Installation of Potable Water Line Isolation Pit H/PW/03, L/PW/01, L/PW/02, L/PW/04 at
6 6 KAIG3-RFI-SW-C-5007 00 Civil Site Works 4/7/22 4/12/22 Approved as noted
Zone- H & L - as highlighted

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) around Potable Water Line Pit
K5 5 KAIG3-RFI-SW-C-5014 00 Civil Site Works 4/7/22 4/11/22 Approved as noted
for K/PW/01 at Zone-K - as highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) around Fire Water Line Pit
K5 5 KAIG3-RFI-SW-C-5015 00 Civil Site Works 4/7/22 4/11/22 Approved as noted
K/F/01 at Zone-K - as highlighted (SP # 133 A-1-B)

"Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5016 00 Civil Site Works 4/7/22 4/12/22 Approved as noted
(SP#133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Telecommunication Line
B3 3 KAIG3-RFI-SW-C-5017 00 between B/TL/12 to C/TL/14 at Zone-B - as highlighted in the attached drawing (Stock Pile # 133 A-1-B) Civil Site Works 4/7/22 4/11/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5018 00 Civil Site Works 4/9/22 4/12/22 Approved as noted
(Left Side) - as highlighted

'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
C 3 KAIG3-RFI-SW-C-5023 00 Civil Site Works 4/18/22 4/19/22 Approved as noted
attached Dwg.

'Warning Tape Installation of Main Fire Water Pipes (200&250mmØ-UPVC-Class-5). As per highlighted
C 3 KAIG3-RFI-SW-C-5024 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
Area in the attached Dwg.

"Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5025 00 Civil Site Works 4/9/22 4/12/22 Approved as noted
(SP#133 A-1-B)"

Surface Preparation prior to start Waterproofing for SBC-02 Upstand, Footing and wall of Wing Wall - as
2B 2 KAIG3-RFI-SW-C-5026 00 Civil Site Works 4/9/22 4/10/22 Approved as noted
highlighted

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) around Potable Water Line Pit
K5 5 KAIG3-RFI-SW-C-5027 00 Civil Site Works 4/9/22 4/12/22 Approved as noted
for K/PW/01 at Zone-K - as highlighted (SP# 133 A-1-B)

kaig-qcals 267
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) around Fire Water Line Pit
K5 5 KAIG3-RFI-SW-C-5028 00 Civil Site Works 4/9/22 4/12/22 Approved as noted
K/F/01 at Zone-K - as highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Telecommunication Line
B3 3 KAIG3-RFI-SW-C-5029 00 from B/TL/10 to B/TL/12 at Zone-B - as highlighted in the attached drawing (Stock Pile # 133 A-1-B) Civil Site Works 4/9/22 4/12/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Fire & Security
B3 3 KAIG3-RFI-SW-C-5041 00 Distribution Line between B/FS/15 to B/FS/06 at Zone-B - as highlighted in the attached drawing (Stock Pile Civil Site Works 4/10/22 4/13/22 Approved as noted
# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5042 00 Civil Site Works 4/10/22 4/13/22 Approved as noted
(Right Side) - as highlighted

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/04 at Zone-
BC3 3 KAIG3-RFI-SW-C-5043 00 Civil Site Works 4/10/22 4/12/22 Approved as noted
B&C (As Highlighted)

"Excavation for Storm Water Line from MH-K-07 to MH-K-08 including Manhole MH-K-07, MH-K-08 -
6B 6 KAIG3-RFI-SW-C-5046 00 Civil Site Works 4/10/22 4/11/22 Approved as noted
As highlighted "

Excavation for Foul Water Line from FW-A-3-7 to FW-A-3-7.1 including Manhole FW-A-3-7, FW-A-3-7.1
6A 6 KAIG3-RFI-SW-C-5047 00 Civil Site Works 4/10/22 4/11/22 Approved as noted
prior to start Gravel Bedding (as Highlighted)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line fromThrust Block to Thrust
GK 5 KAIG3-RFI-SW-C-5048 00 Civil Site Works 4/11/22 4/13/22 Approved as noted
Block at Zone-G & K as highlighted in the attached drawing (SP# 132)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside Telecommunication Line
B3 3 KAIG3-RFI-SW-C-5051 00 from B/TL/10 to B/TL/12 at Zone-B - as highlighted in the attached drawing (Stock Pile # 133 A-1-B) Civil Site Works 4/16/22 4/18/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5052 00 Civil Site Works 4/16/22 4/17/22 Approved as noted
(Left Side) - as highlighted
"Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5053 00 Civil Site Works 4/11/22 4/14/22 Approved as noted
(SP#133 A-1-B)"

4 4 KAIG3-RFI-SW-C-5054 00 Inspection of Formwork for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted Civil Site Works 4/11/22 4/13/22 Approved as noted

4 4 KAIG3-RFI-SW-C-5055 00 Inspection of Concrete Pouring for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted Civil Site Works 4/11/22 4/16/22 Approved as noted

6B 6 KAIG3-RFI-SW-C-5058 00 Inspection for Casting Blinding Concrete under Manhole - MH-K-08 - as highlighted Civil Site Works 4/11/22 4/13/22 Approved as noted

6B 6 KAIG3-RFI-SW-C-5059 00 "Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7.1 (as Highlighted)" Civil Site Works 4/11/22 4/13/22 Approved as noted

6B 6 KAIG3-RFI-SW-C-5061 00 Inspection for Casting Blinding Concrete under Manhole - MH-O-01 - as highlighted Civil Site Works 4/11/22 4/14/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-5062 00 Inspection for Casting Blinding Concrete under Manhole - MH-Y-01, MH-Y-02 - as highlighted Civil Site Works 4/11/22 4/14/22 Approved as noted

"Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between B/RC-FS/38 and
B3 3 KAIG3-RFI-SW-C-5063 00 Civil Site Works 4/11/22 4/12/22 Approved as noted
C/FS/04 at Zone-B - As Highlighted SCR:KAIG3-SCR-CO-S-0129-00"

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) besdie Fire Water Line (upto
C2 2 KAIG3-RFI-SW-C-5064 00 Civil Site Works 4/16/22 4/18/22 Approved as noted
the sand cover level) at Zone-C - as highlighted (SP # 133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5067 00 Civil Site Works 4/16/22 4/17/22 Approved as noted
(Right Side) - as highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/05 to C/MV/30 at Zone-C
C3 3 KAIG3-RFI-SW-C-5071 00 Civil Site Works 4/13/22 4/16/22 Approved as noted
(As Highlighted)

kaig-qcals 268
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B 6 KAIG3-RFI-SW-C-5072 00 Civil Site Works 4/13/22 4/18/22 Approved as noted
3-7.1 (As Highlighted)

"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-6.1 (As
6B 6 KAIG3-RFI-SW-C-5073 00 Civil Site Works 4/17/22 4/20/22 Code C (resubmit)
Highlighted) "

"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-6.1 (As
6B 6 KAIG3-RFI-SW-C-5073 01 Civil Site Works 8/7/22 Open
Highlighted) "

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
6B 6 KAIG3-RFI-SW-C-5074 00 Civil Site Works 4/13/22 4/18/22 Approved as noted
K-08 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-02, MH-K-03
6B 6 KAIG3-RFI-SW-C-5075 00 Civil Site Works 4/17/22 4/20/22 Code C (resubmit)
(As Highlighted) "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-02, MH-K-03
6B 6 KAIG3-RFI-SW-C-5075 01 Civil Site Works 8/6/22 Open
(As Highlighted) "

Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
2 2 KAIG3-RFI-SW-C-5076 00 Civil Site Works 4/13/22 4/16/22 Approved as noted
SBC-2 - Upstand, Footing and Wall of Wing Wall (As Highlighted)

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes(PP Line 600 dia) & (200&315 mm Ø- UPVC
4B 4 KAIG3-RFI-SW-C-5081 00 Pipes-Class 4 ) for Storm Water pipe Out Fall ( Out Fall y to MH-y-01 ) & (mh-y-01 to ticket building) As Civil Site Works 4/13/22 4/17/22 Approved as noted
per high lighted Area in the attached Dwg.
'Pipe Installation of Strom Water pipe OUT FALL-Y for (PP Line 600 dia) & (200&315 mm Ø- UPVC
4B 4 KAIG3-RFI-SW-C-5082 00 Pipes-Class 4 )for Storm Water pipe Out Fall ( Out Fall y to MH-y-01 ) & (mh-y-01 to ticket building) As per Civil Site Works 4/13/22 4/17/22 Approved as noted
high lighted Area in the attached Dwg.
Inspection for Blinding Concrete under MV Line Pulling Pit B/MV/26, G/MV/17, G/MV/05 - as highlighted
4 4 KAIG3-RFI-SW-C-5085 00 Civil Site Works 4/14/22 4/18/22 Approved as noted

Surface Preparation prior to start backfilling Gravel for the Duct Bank of Fire & Security Distribution Line
G4 4 KAIG3-RFI-SW-C-5088 00 Civil Site Works 4/14/22 4/18/22 Approved as noted
from G/FS/08 to G/FS/52 (As Highlighted)

Surface Preparation prior to backfilling gravel for the Duct Bank of Telecommunications Line from G/TL/44
G4 4 KAIG3-RFI-SW-C-5089 00 Civil Site Works 4/14/22 4/18/22 Approved as noted
to G/TL/50 (As Highlighted)

"Excavation for Non-Potable Water Line at Zone K For Branch & Pit ISC-05 as highlighted in the attached
K5 5 KAIG3-RFI-SW-C-5090 00 Civil Site Works 4/14/22 4/18/22 Approved as noted
drawing"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Non-
G&K 5 KAIG3-RFI-SW-C-5093 00 Potable Water Line fromThrust Block to Thrust Block at Zone-G & K as highlighted in the attached drawing Civil Site Works 4/16/22 4/18/22 Approved as noted
(SP# 133 A-1-B)

K5 5 KAIG3-RFI-SW-C-5105 00 Surface Preparation prior to start backfilling Sub-grade under Cesspool-1 at Zone-K - as highlighted Civil Site Works 4/17/22 4/19/22 Approved as noted

"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone K as highlighted in the attached
K5 5 KAIG3-RFI-SW-C-5106 00 Civil Site Works 4/17/22 4/20/22 Approved as noted
drawing (Stock Pile # 132)"

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes(PP Line 800 dia) for Storm Water pipe Out Fall
4B 4 KAIG3-RFI-SW-C-5107 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
( Out Fall o to MH-o-01 ) As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-O for (PP Line 800 dia) for Storm Water pipe Out Fall
4B 4 KAIG3-RFI-SW-C-5108 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
( Out Fall O to MH-O-01 ) As per high lighted Area in the attached Dwg.
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) beside Fire Water Line (upto
C2 2 KAIG3-RFI-SW-C-5109 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
the sand cover level) at Zone-C - as highlighted (SP # 133 A-1-B)"

6B 6 KAIG3-RFI-SW-C-5110 00 "Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7.2 (as Highlighted)" Civil Site Works 4/17/22 4/18/22 Approved as noted

Inspection for Blinding Concrete under MV Line Junction Pit for C/MV/02, B/MV/17, B/MV/18, B/MV/07
BC3 3 KAIG3-RFI-SW-C-5111 00 Civil Site Works 4/17/22 4/18/22 Approved as noted
at Zone-B&C - as highlighted

Excavation for Fire Water Line at Zone-G&K including branch and Pit - K/F/08, G/F/12, G/F/11, G/F/10,
GK45 5 KAIG3-RFI-SW-C-5112 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
G/F/08, G/F/07 - as highlighted

kaig-qcals 269
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation for Potable Water Line at Zone-G&K including branch & Pit - PW-01, G/PW/06, G/PW/05,
GK45 5 KAIG3-RFI-SW-C-5113 00 Civil Site Works 4/17/22 4/19/22 Approved as noted
G/PW/09, G/PW/10, G/PW/04, K/PW/04 - as highlighted

"Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 8) around SBC-05 as highlighted
2B 2 KAIG3-RFI-SW-C-5114 00 Civil Site Works 4/18/22 4/23/22 Approved as noted
(SP#133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-09 - Wing Wall
4 4 KAIG3-RFI-SW-C-5115 00 Civil Site Works 4/18/22 4/21/22 Approved as noted
(Left & Right Side) - as highlighted

Surface Preparation prior to start Waterproofing for SBC-06- Footing and wall of Wing Wall - as highlighted
4 4 KAIG3-RFI-SW-C-5116 00 Civil Site Works 4/18/22 4/20/22 Approved as noted

Inspection and Copmaction Test for backfilling Sub-grade 1st Layer (1 of 9) under Cesspool-1 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-5117 00 Civil Site Works 4/18/22 4/21/22 Approved as noted
highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Non-
G 5 KAIG3-RFI-SW-C-5124 00 Potable Water Line fromThrust Block to near Tower-2 at Zone-G as highlighted in the attached drawing (SP# Civil Site Works 4/18/22 4/23/22 Approved as noted
133 A-1-B)

Surface Preparation prior to start water proofing for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at
F 5 KAIG3-RFI-SW-C-5126 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
Zone-F (As Highlighted)

Inspection of Water Proofing for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As
F 5 KAIG3-RFI-SW-C-5127 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
Highlighted)
' Gravel 3/8" Backfilling and Geotextile in pipes(PP Line 800 dia) for Storm Water pipe Out Fall (Out Fall o
4B 4 KAIG3-RFI-SW-C-5128 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
to MH-o-01) . As per high lighted Area in the attached Dwg.
' Warning Tape Installation in pipes(PP Line 800 dia) for Storm Water pipe Out Fall ( Out Fall o to MH-o-
4B 4 KAIG3-RFI-SW-C-5129 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
01 ) . As per high lighted Area in the attached Dwg.
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B 6 KAIG3-RFI-SW-C-5131 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
3-7.2 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-7.2 (As
6B 6 KAIG3-RFI-SW-C-5132 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
Highlighted) "

Inspection of Sand bedding under pipe for Telecommunication Line from B/TL/32 to B/TL/30 and B/TL/51
B4 4 KAIG3-RFI-SW-C-5133 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
at Zone-B as highlighted in the attached drawing (SP#132)

Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/31 to B/FS/04 and
B4 4 KAIG3-RFI-SW-C-5134 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
B/FS/44 at Zone-B - as highlighted (Stock Pile # 132)
Inspection and Copmaction Test for backfilling Sub-grade 2nd Layer (2 of 9) under Cesspool-1 at Zone-K -
K5 5 KAIG3-RFI-SW-C-5135 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
as highlighted
Inspection for Blinding Concrete under MV Line Junction Pit for B/MV/19, B/MV/06, B/MV/16, B/MV/13,
BG34 4 KAIG3-RFI-SW-C-5136 00 Civil Site Works 4/19/22 4/21/22 Approved as noted
G/MV/22, G/MV/29, G/MV/06 at Zone-B&G - as highlighted
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) beside Fire Water Line (upto
C2 3 KAIG3-RFI-SW-C-5144 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
the sand cover level) at Zone-C - as highlighted (SP # 133 A-1-B)"

Inspection and Copmaction Test for backfilling Sub-grade 3rd Layer (3 of 9) under Cesspool-1 at Zone-K - as
C2 3 KAIG3-RFI-SW-C-5145 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
highlighted

Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/24 to G/MV/14
G4 4 KAIG3-RFI-SW-C-5146 00 Civil Site Works 4/20/22 4/21/22 Approved as noted
at Zone-G (As Highlighted)

Inspection of Water Proofing for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-G (As
G4 4 KAIG3-RFI-SW-C-5147 00 Civil Site Works 4/20/22 4/21/22 Approved as noted
Highlighted)

"Excavation for Storm Water Line from MH-K-08 to MH-K-09 including Manhole MH-K-09 - As
6B 6 KAIG3-RFI-SW-C-5148 00 Civil Site Works 4/20/22 4/24/22 Approved as noted
highlighted "

Surface Preparation prior to start Backfilling Sub-grade for excavated trench done by previous contractor at
4B 4 KAIG3-RFI-SW-C-5149 00 Civil Site Works 4/20/22 4/24/22 Approved as noted
Zone-4B - As Highlighted

4 4 KAIG3-RFI-SW-C-5150 00 "Inspection of Steel Reinforcement for the Upstand of SBC-06 (Right Side) As Highlighted" Civil Site Works 4/20/22 4/23/22 Approved as noted

4 4 KAIG3-RFI-SW-C-5151 00 "Inspection of Steel Reinforcement for the Upstand of SBC-08 (Right Side) As Highlighted" Civil Site Works 4/20/22 4/23/22 Approved as noted

kaig-qcals 270
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation for Foul Water Line from FW-A-3-7.2 to FW-A-3-7.3 including Manhole FW-A-3-7.3 prior to
6A 6 KAIG3-RFI-SW-C-5152 00 Civil Site Works 4/20/22 4/24/22 Approved as noted
start Gravel Bedding (as Highlighted)

Surface Preparation prior to start backfilling sub-grade under Fire Water Line Pit K/F/08, G/F/12, G/F/11,
GK45 5 KAIG3-RFI-SW-C-5153 00 Civil Site Works 4/20/22 4/24/22 Approved as noted
G/F/10, G/F/08, G/F/07 Zone-G&K - as highlighted

' Gravel 3/8" Backfilling and Geotextile in pipes(PP Line 600 dia) for Storm Water pipe Out Fall (Out Fall o
4B 4 KAIG3-RFI-SW-C-5160 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
to MH-o-01) . As per high lighted Area in the attached Dwg.

' Warning Tape Installation in pipes(PP Line 600 dia) for Storm Water pipe Out Fall ( Out Fall o to MH-o-
4B 4 KAIG3-RFI-SW-C-5161 00 Civil Site Works 4/20/22 4/23/22 Approved as noted
01 ) . As per high lighted Area in the attached Dwg.

Surface Preparation prior to start backfilling sub-grade under Potable Water Line Pit G/PW/04, G/PW/05,
GK45 5 KAIG3-RFI-SW-C-5162 00 Civil Site Works 4/20/22 4/24/22 Approved as noted
G/PW/06, G/PW/09, G/PW/10, K/PW/04 Zone-G&K - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit
GK45 5 KAIG3-RFI-SW-C-5164 00 Civil Site Works 4/21/22 4/26/22 Approved as noted
K/F/08, G/F/12, G/F/11, G/F/10, G/F/08, G/F/07 Zone-G&K - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Line Pit
GK45 5 KAIG3-RFI-SW-C-5165 00 Civil Site Works 4/21/22 4/26/22 Approved as noted
G/PW/04, G/PW/05, G/PW/06, G/PW/09, G/PW/10, K/PW/04 Zone-G&K - as highlighted

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) beside Fire Water Line (upto
C2 2 KAIG3-RFI-SW-C-5166 00 Civil Site Works 4/21/22 4/24/22 Approved as noted
the sand cover level) at Zone-C - as highlighted (SP # 133 A-1-B)"
Inspection and Copmaction Test for backfilling Sub-grade 4th Layer (4 of 9) under Cesspool-1 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-5167 00 Civil Site Works 4/21/22 4/24/22 Approved as noted
highlighted
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-G including branch - as highlighted
G4 4 KAIG3-RFI-SW-C-5168 00 Civil Site Works 4/21/22 4/24/22 Approved as noted
(Stock Pile # 132)
Inspection of Sand Bedding under pipe for Potable Water Line at Zone-G including branch - as highlighted
G4 4 KAIG3-RFI-SW-C-5169 00 Civil Site Works 4/21/22 4/24/22 Approved as noted
(Stock Pile # 132)
Excavation and Soil Preparation prior to start backfilling sub-grade for Fire Water Line Pit - G/F/09 at Zone-
G4 4 KAIG3-RFI-SW-C-5170 00 Civil Site Works 4/21/22 4/26/22 Approved as noted
G - as highlighted
Excavation and Soil Preparation prior to start backfilling sub-grade for Potable Water Line Pit - G//PW/11 at
K5 5 KAIG3-RFI-SW-C-5171 00 Civil Site Works 4/21/22 4/26/22 Approved as noted
Zone-K - as highlighted
Inspection for Blinding Concrete under Potable Water Line Pit for G/PW/11, G/PW/10, G/PW/04, G/PW/09,
GK45 5 KAIG3-RFI-SW-C-5175 00 Civil Site Works 4/23/22 4/24/22 Approved as noted
G/PW/05, G/PW/06, K/PW/04 at Zone-G&K - as highlighted
Inspection for Blinding Concrete under Fire Water Line Pit for G/F/12, G/F/11, G/F/10, G/F/09, G/F/08,
GK45 5 KAIG3-RFI-SW-C-5176 00 Civil Site Works 4/23/22 4/24/22 Approved as noted
G/F/07, K/F/08 at Zone-G&K - as highlighted

6B 6 KAIG3-RFI-SW-C-5177 00 Inspection for Casting Blinding Concrete under Manhole - MH-K-09 - as highlighted Civil Site Works 4/23/22 4/24/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit
6B 6 KAIG3-RFI-SW-C-5178 00 Civil Site Works 4/23/22 4/26/22 Approved as noted
G/F/09 Zone-G - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Line Pit
K5 5 KAIG3-RFI-SW-C-5179 00 Civil Site Works 4/23/22 4/26/22 Approved as noted
G/PW/11 at Zone-K - as highlighted

Inspection and Copmaction Test for backfilling Sub-grade 5th Layer (5 of 9) under Cesspool-1 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-5180 00 Civil Site Works 4/23/22 4/25/22 Approved as noted
highlighted

Inspection of Sand Bedding under pipe for Fire Water Line at Zone-G&K including branch - as highlighted
GK4 4 KAIG3-RFI-SW-C-5181 00 Civil Site Works 4/23/22 4/25/22 Approved as noted
(Stock Pile # 132)

Inspection of Sand Bedding under pipe for Potable Water Line at Zone-G&K including branch - as
GK45 5 KAIG3-RFI-SW-C-5182 00 Civil Site Works 4/23/22 4/25/22 Approved as noted
highlighted (Stock Pile # 132)

kaig-qcals 271
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/48, B/TL/31, B/TL/30, B/TL/51 at
B4 4 KAIG3-RFI-SW-C-5184 00 Civil Site Works 4/23/22 4/24/22 Approved as noted
Zone-B - as highlighted

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/03, B/FS/04, B/FS/44 at Zone-B - as
B4 4 KAIG3-RFI-SW-C-5185 00 Civil Site Works 4/23/22 4/24/22 Approved as noted
highlighted

Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-5187 00 Check Existing Levels for Base of Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. Civil 4/23/22 4/26/22 Approved as noted
Wall

Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/12, G/MV/16, G/MV/18, K/MV/01,
GKL45 5 KAIG3-RFI-SW-C-5190 00 Civil Site Works 4/23/22 4/24/22 Approved as noted
K/MV/02, L/MV/08 - as highlighted

4 4 KAIG3-RFI-SW-C-5191 00 "Inspection of Formwork for the Upstand of SBC-06 (Right Side) As Highlighted" Civil Site Works 4/23/22 4/24/22 Approved as noted

4 4 KAIG3-RFI-SW-C-5192 00 "Inspection of Concrete Pouring for the Upstand of SBC-06 (Right Side) As Highlighted" Civil Site Works 4/23/22 4/26/22 Approved as noted

4 4 KAIG3-RFI-SW-C-5193 00 "Inspection of Formwork for the Upstand of SBC-08 (Right Side) As Highlighted" Civil Site Works 4/23/22 4/24/22 Approved as noted

4 4 KAIG3-RFI-SW-C-5194 00 "Inspection of Concrete Pouring for the Upstand of SBC-08 (Right Side) As Highlighted" Civil Site Works 4/23/22 4/26/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) beside Fire Water Line (upto
C2 2 KAIG3-RFI-SW-C-5195 00 Civil Site Works 4/23/22 4/26/22 Approved as noted
the sand cover level) at Zone-C - as highlighted (SP # 133 A-1-B)"

'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
CHL 5 KAIG3-RFI-SW-C-5196 00 Civil Site Works 4/24/22 4/25/22 Approved as noted
attached Dwg.
'Warning Tape Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area
CHL 5 KAIG3-RFI-SW-C-5197 00 Civil Site Works 5/10/22 5/11/22 Approved as noted
in the attached Dwg.
Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 3 layers) for Foundation of Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-5202 00 Civil 4/24/22 4/27/22 Approved as noted
Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. (SP 135) Wall
Inspection and Copmaction Test for backfilling Sub-grade 6th Layer (6 of 9) under Cesspool-1 at Zone-K - as
K 5 KAIG3-RFI-SW-C-5203 00 Civil Site Works 4/24/22 4/27/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-5204 00 Civil Site Works 4/24/22 4/27/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone K including Branch as
K 5 KAIG3-RFI-SW-C-5205 00 Civil Site Works 4/24/22 4/27/22 Approved as noted
highlighted in the attached drawing (SP# 132)

B3 3 KAIG3-RFI-SW-C-5208 00 Inspection for Installation of MV Line Junction Pit - B/MV/18 - as highlighted Civil Site Works 4/25/22 4/30/22 Code C (not resubmit)

Inspection and Copmaction Test for backfilling Sub-grade 7th Layer (7 of 9) under Cesspool-1 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-5209 00 Civil Site Works 4/25/22 4/27/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-5210 00 Civil Site Works 4/25/22 4/27/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection of Sand bedding under pipe for Potable Water Line at Zone-C including branch - as highlighted
C36 3 KAIG3-RFI-SW-C-5211 00 Civil Site Works 4/25/22 4/27/22 Approved as noted
(Stock Pile # 132)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit
K5 5 KAIG3-RFI-SW-C-5212 00 Civil Site Works 4/25/22 4/28/22 Approved as noted
K/F/08 Zone-K - as highlighted
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Line Pit
K5 5 KAIG3-RFI-SW-C-5213 00 Civil Site Works 4/25/22 4/28/22 Approved as noted
K/PW/04 Zone-K - as highlighted

Inspection & Compaction Tests of 2nd Layer Backfilling (Sub Grade) (Out of 3 layers) for Foundation of Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-5214 00 Civil 4/25/22 4/28/22 Approved as noted
Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. (SP 135) Wall

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-
BFG34 4 KAIG3-RFI-SW-C-5222 00 13, NPW-ISC-20, NPW-ISC-01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Civil Site Works 4/26/22 4/30/22 Approved as noted
Zone-B,F&G - as highlighted
Inspection and Copmaction Test for backfilling Sub-grade 8th Layer (8 of 9) under Cesspool-1 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-5223 00 Civil Site Works 4/26/22 4/28/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-5224 00 Civil Site Works 4/26/22 4/28/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B as highlighted in the
B 3 KAIG3-RFI-SW-C-5225 00 Civil Site Works 4/26/22 4/28/22 Approved as noted
attached drawing (SP# 132)

kaig-qcals 272
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Installation of Fire Water Line Isolation Pit G/F/07, G/F/08, G/F/09 at Zone - G - as
G5 5 KAIG3-RFI-SW-C-5226 00 Civil Site Works 4/27/22 4/30/22 Approved as noted
highlighted
Inspection for Installation of Potable Water Line Isolation Pit G/PW/05, G/PW/06 at Zone- G - as highlighted
G5 5 KAIG3-RFI-SW-C-5227 00 Civil Site Works 4/27/22 4/30/22 Approved as noted

Inspection and Copmaction Test for backfilling Sub-grade 9th Layer (9 of 15) under Cesspool-1 at Zone-K -
K5 5 KAIG3-RFI-SW-C-5230 00 Civil Site Works 4/27/22 4/30/22 Approved as noted
as highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-5231 00 Civil Site Works 4/27/22 4/30/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

F4 4 KAIG3-RFI-SW-C-5232 00 Excavation for Potable Water Line at Zone-F including branch & Pit - F-PW-15, F/PW/14 - as highlighted Civil Site Works 4/27/22 4/30/22 Approved as noted

Inspection & Compaction Tests of 3rd (Final) Layer Backfilling (Sub Grade) (Out of 3 layers)(Upto B.O.B
Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-5233 00 levels +865.49) for Foundation of Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. (SP Civil 4/27/22 4/30/22 Approved as noted
Wall
135)

Check Surface & Levels (after 3 layers of Subgrade Backfilling), Upto B.O.B levels under Foundation of Site Works/Boundary
2B 2 KAIG3-RFI-SW-C-5239 00 Civil 4/27/22 4/30/22 Approved as noted
Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. Wall

Excavation for MV Line Between C/MV/40 TO C/MV/23 at Zone-C including Pit C/MV/40, C/MV/23 - as
C3 3 KAIG3-RFI-SW-C-5241 00 Civil Site Works 4/28/22 5/7/22 Approved as noted
highlighted in the attached drawing
Inspection and Copmaction Test for backfilling Sub-grade 10th Layer (10 of 15) under Cesspool-1 at Zone-K
K5 5 KAIG3-RFI-SW-C-5242 00 Civil Site Works 4/28/22 5/7/22 Approved as noted
- as highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 5) for excavated trench done by
4B 4 KAIG3-RFI-SW-C-5243 00 Civil Site Works 4/28/22 4/30/22 Approved as noted
previous contractor at Zone-4B - As Highlighted (Stock Pile # 133 A-1-B)"

Bedding of Gravel 3/8" and Geotextile surrounding in pipes (450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-5244 00 Civil Site Works 4/28/22 5/5/22 Approved as noted
Water pipe Out Fall-K ( MH-K-07 to MH-K-09 ).As per high lighted Area in the attached Dwg.

Pipe Installation of Strom Water pipe OUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for Storm Water
7 6 KAIG3-RFI-SW-C-5245 00 Civil Site Works 4/28/22 5/5/22 Approved as noted
pipe Out Fall( MH-K-07 to MH-K-09 ). As per high lighted Area in the attached Dwg.

Inspection for Installation of Fire Water Line Isolation Pit G/F/10, G/F/11, G/F/12 at Zone - G - as
5G 5 KAIG3-RFI-SW-C-5247 00 Civil Site Works 4/28/22 4/8/22 Approved as noted
highlighted
Inspection for Installation of Potable Water Line Isolation Pit G/PW/09, G/PW/10, G/PW/11 at Zone- G&K -
5G 5 KAIG3-RFI-SW-C-5248 00 Civil Site Works 4/28/22 5/8/22 Approved as noted
as highlighted

K5 5 KAIG3-RFI-SW-C-5255 00 "Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted " Civil Site Works 4/30/22 5/11/22 Code C (resubmit)

K5 5 KAIG3-RFI-SW-C-5255 01 "Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted " Civil Site Works 8/6/22 Open

Inspection for Installation of Potable Water Line Isolation Pit G/PW/04, K/PW/04 at Zone- G&K - as
K5 5 KAIG3-RFI-SW-C-5256 00 Civil Site Works 4/30/22 5/7/22 Code C (resubmit)
highlighted
Inspection for Installation of Potable Water Line Isolation Pit G/PW/04, K/PW/04 at Zone- G&K - as
K5 5 KAIG3-RFI-SW-C-5256 01 Civil Site Works 6/14/22 6/16/22 Approved as noted
highlighted
"Sand Bedding under pipe for Potable Water Line at Zone-F including branch - as highlighted (Stock Pile #
F4 4 KAIG3-RFI-SW-C-5259 00 Civil Site Works 5/5/22 5/9/22 Approved as noted
132)"
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
6B 6 KAIG3-RFI-SW-C-5260 00 Civil Site Works 5/5/22 5/7/22 Code C (resubmit)
K-09 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
6B 6 KAIG3-RFI-SW-C-5260 01 Civil Site Works 7/31/22 8/3/22 Approved as noted
K-09 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-09 (As
6B 6 KAIG3-RFI-SW-C-5261 00 Civil Site Works 5/5/22 5/11/22 Code C (resubmit)
Highlighted) "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-09 (As
6B 6 KAIG3-RFI-SW-C-5261 01 Civil Site Works 8/7/22 Open
Highlighted) "

Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/14 to B/FS/06) at Zone-
B 3 KAIG3-RFI-SW-C-5262 00 Civil Site Works 5/5/22 5/7/22 Approved as noted
B as highlighted in the attached drawing (SP#132)

Sand Covering Layer for Protection of Telecommunications Line from (B/TL/10 to C/TL/14) at Zone-B as
B 3 KAIG3-RFI-SW-C-5263 00 Civil Site Works 5/5/22 5/7/22 Approved as noted
highlighted in the attached drawing (SP#132)
Excavation for Fire Water Line near Management Building at Zone-F including branch and Pit - F/F/10,
F4 4 KAIG3-RFI-SW-C-5264 00 Civil Site Works 5/5/22 5/7/22 Approved as noted
F/F/03 - as highlighted

kaig-qcals 273
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation for MV Line from B/MV/01 TO B/MV/15 and B/MV/23 to G/MV/20 at Zone-B&G including Pit
BG4 4 KAIG3-RFI-SW-C-5265 00 B/MV/01, B/MV/15, B/MV/23, G/MV/21, G/MV/37, G/MV/26, G/MV/20 - as highlighted in the attached Civil Site Works 5/5/22 5/9/22 Approved as noted
drawing

Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06, F/MV/05,
FG4 4 KAIG3-RFI-SW-C-5268 00 Civil Site Works 5/5/22 5/9/22 Approved as noted
G/MV/14, G/MV/24, G/MV/25, G/MV/15, G/MV/01 - as highlighted

"Excavation for Non-Potable Water Line at Zone K including Branch & Pit POC-NPW/PT3/18, NPW-ISC-
K5 5 KAIG3-RFI-SW-C-5269 00 Civil Site Works 5/5/22 5/9/22 Approved as noted
06, POC-39, POC-40 as highlighted "

BG4 4 KAIG3-RFI-SW-C-5271 00 "Inspection for Installation of MV Line Junction Pit - B/MV/07, G/MV/16- as highlighted " Civil Site Works 5/7/22 5/16/22 Code C (not resubmit)

Inspection and Compaction Test for backfilling Sub-grade above Sand Covering for Non-Potable Water Line
B 2 KAIG3-RFI-SW-C-5272 00 Civil Site Works 5/7/22 5/9/22 Approved as noted
at Zone-B as highlighted in the attached drawing (Stock Pile# 133 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B & G as highlighted in
BG4 4 KAIG3-RFI-SW-C-5273 00 Civil Site Works 5/7/22 5/9/22 Approved as noted
the attached drawing (SP# 132)
Excavation for MV Line from G/MV/31 to G/MV/11 at Zone-G including Pit G/MV/31, G/MV/19, G/MV/11
G4 4 KAIG3-RFI-SW-C-5274 00 Civil Site Works 5/7/22 5/9/22 Approved as noted
- as highlighted in the attached drawing

F4 4 KAIG3-RFI-SW-C-5275 00 Excavation for Potable Water Line Branch at Zone-F including Pit - F-PW-08, F/PW/02 - as highlighted Civil Site Works 5/7/22 5/9/22 Approved as noted

' Sand Cover For Fire Water Pipes (200 & 250mmØ-UPVC-Class-5) . As per highlighted Area in the attached
C 3 KAIG3-RFI-SW-C-5279 00 Civil Site Works 5/8/22 5/11/22 Approved as noted
Dwg.
Inspection of Sand Bedding under pipe for Fire Water Line near Management Building at Zone-F including
F4 4 KAIG3-RFI-SW-C-5280 00 Civil Site Works 5/7/22 5/9/22 Approved as noted
branch - as highlighted (Stock Pile # 132)
Inspection of Sand Bedding under pipe for MV Line from B/MV/01 TO B/MV/15 and B/MV/23 to G/MV/20
G4 4 KAIG3-RFI-SW-C-5285 00 Civil Site Works 5/8/22 5/11/22 Approved as noted
at Zone-B&G - as highlighted (Stock Pile # 132)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/05 at Zone-
C3 3 KAIG3-RFI-SW-C-5286 00 Civil Site Works 5/8/22 5/9/22 Approved as noted
B&C (As Highlighted)
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone K including Branch - as
K5 5 KAIG3-RFI-SW-C-5287 00 Civil Site Works 5/8/22 5/11/22 Approved as noted
highlighted (Stock Pile # 132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B & G as highlighted in
G4 4 KAIG3-RFI-SW-C-5288 00 Civil Site Works 5/8/22 5/9/22 Approved as noted
the attached drawing (SP# 132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B as highlighted in the
B3 3 KAIG3-RFI-SW-C-5289 00 Civil Site Works 5/8/22 5/9/22 Approved as noted
attached drawing (SP# 132)
Excavation for Foul Water Line from FW-A-3-7.3 to FW-A-3-7.4 including Manhole FW-A-3-7.4 prior to
6A 6 KAIG3-RFI-SW-C-5290 00 Civil Site Works 5/8/22 5/9/22 Approved as noted
start Gravel Bedding (as Highlighted)
K5 5 KAIG3-RFI-SW-C-5291 00 Excavation for Potable Water Line at Zone-K - as highlighted Civil Site Works 5/8/22 5/9/22 Approved as noted
K5 5 KAIG3-RFI-SW-C-5292 00 Excavation for Fire Water Line at Zone-K including branch and Pit - K/F/07- as highlighted Civil Site Works 5/8/22 5/9/22 Approved as noted

"Excavation for Storm Water Line from MH-K-09 to MH-K-10 including Manhole MH-K-10 - As
6B 6 KAIG3-RFI-SW-C-5293 00 Civil Site Works 5/8/22 5/10/22 Approved as noted
highlighted "

6B 6 KAIG3-RFI-SW-C-5294 00 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted Civil Site Works 5/8/22 5/10/22 Approved as noted

F4 4 KAIG3-RFI-SW-C-5295 00 "Inspection for Installation of MV Line Junction Pit - F/MV/11, F/MV/06 - as highlighted " Civil Site Works 5/8/22 5/16/22 Code C (resubmit)

F4 4 KAIG3-RFI-SW-C-5295 01 "Inspection for Installation of MV Line Junction Pit - F/MV/11, F/MV/06 - as highlighted " Civil Site Works 8/6/22 Open

Inspection of Excavation for Storm Water Line From G-O-47 to G-O-46 at Zone-2B including Gully G-O-46
2B 2 KAIG3-RFI-SW-C-5299 00 Civil Site Works 5/8/22 5/12/22 Approved as noted
- As highlighted
Excavation for MV Line from B/MV/15 TO B/MV/23 at Zone-B including Pit B/MV/22 - as highlighted in
B4 4 KAIG3-RFI-SW-C-5300 00 Civil Site Works 5/8/22 5/9/22 Approved as noted
the attached drawing
Surface Preparation prior to start Waterproofing for SBC-08 (Right Side)- Upstand, Footing and wall of Wing
4 4 KAIG3-RFI-SW-C-5304 00 Civil Site Works 5/9/22 5/10/22 Approved as noted
Wall - as highlighted

Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
4 4 KAIG3-RFI-SW-C-5305 00 Civil Site Works 5/9/22 5/12/22 Approved as noted
SBC-6 (Right Side) - Upstand, Footing and Wall of Wing Wall (As Highlighted)

Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/11 to B/MV/25 at Zone-B as
4B 4 KAIG3-RFI-SW-C-5306 00 Civil Site Works 5/9/22 5/10/22 Approved as noted
highlighted in the attached drawing
Inspection for Installation of MV Line Junction Pit - B/MV/13, F/MV/04, F/MV/05, G/MV/24 - as
BFG 4 KAIG3-RFI-SW-C-5307 00 Civil Site Works 5/9/22 5/16/22 Code C (resubmit)
highlighted

kaig-qcals 274
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection for Installation of MV Line Junction Pit - B/MV/13, F/MV/04, F/MV/05, G/MV/24 - as
BFG 4 KAIG3-RFI-SW-C-5307 01 Civil Site Works 8/6/22 Open
highlighted

Inspection and Compaction Test for backfilling Sub-grade above Sand Covering for Non-Potable Water Line
BFG 4 KAIG3-RFI-SW-C-5308 00 Civil Site Works 5/9/22 5/12/22 Approved as noted
at Zone-B & G as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/20 to C/MV/14 at Zone-C
C3 3 KAIG3-RFI-SW-C-5309 00 Civil Site Works 5/9/22 5/11/22 Approved as noted
(As Highlighted)

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/13 to C/MV/20 at Zone-C
C3 3 KAIG3-RFI-SW-C-5310 00 Civil Site Works 5/9/22 5/11/22 Approved as noted
(As Highlighted)

Inspection of Sand bedding under pipe for MV Line from B/MV/15 TO B/MV/23 at Zone-B - as highlighted
4B 4 KAIG3-RFI-SW-C-5313 00 Civil Site Works 5/9/22 5/12/22 Approved as noted
in the attached drawing (Stock Pile # 132)

K5 5 KAIG3-RFI-SW-C-5314 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-K - as highlighted (Stock Pile # 132) Civil Site Works 5/9/22 5/12/22 Approved as noted

Inspection of Sand bedding under pipe for Fire Water Line at Zone-K including branch - as highlighted
K5 5 KAIG3-RFI-SW-C-5315 00 Civil Site Works 5/9/22 5/12/22 Approved as noted
(Stock Pile # 132)

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5316 00 Civil Site Works 5/9/22 5/12/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5317 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
MH-Y-02 To Outfall Y - As Highlighted (SP#133 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5318 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
MH-O-01 To Outfall O - As Highlighted (SP#133 A-1-B)

3 3 KAIG3-RFI-SW-C-5319 00 Inspection for Installation of MV Line Junction Pit - B/MV/16, G/MV/18, K/MV/02 - as highlighted Civil Site Works 5/10/22 5/16/22 Code C (not resubmit)

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4B 4 KAIG3-RFI-SW-C-5320 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
from B/MV/11 to B/MV/25 at Zone-B as highlighted (Stock Pile # 133 A-1-B)"
Inspection of Compaction Test for backfilling Sub-grade 1 st Layer (1 of 1) above Sand Covering for Non-
G4 4 KAIG3-RFI-SW-C-5321 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
Potable Water Line at Zone-B & G as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for Non-
B3 3 KAIG3-RFI-SW-C-5322 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
Potable Water Line at Zone-B as highlighted in the attached drawing (SP# 133 A-1-B))
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5323 00 Civil Site Works 5/10/22 5/16/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"
Inspection for Blinding Concrete under Fire Water Line Pit for F/F/01, F/F/03, F/F/10 at Zone-F - as
F4 4 KAIG3-RFI-SW-C-5330 00 Civil Site Works 5/16/22 5/16/22 Code C (not resubmit)
highlighted
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/03, F/MV/09, F/MV/01 - as highlighted
F4 4 KAIG3-RFI-SW-C-5331 00 Civil Site Works 5/10/22 5/16/22 Approved as noted

Inspection for Blinding Concrete under Potable Water Line Pit F/PW/14, F/PW/15, F/PW/08, F/PW/02 - as
F4 4 KAIG3-RFI-SW-C-5332 00 Civil Site Works 5/16/22 5/16/22 Code C (not resubmit)
highlighted
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
CHL 5 KAIG3-RFI-SW-C-5333 00 Civil Site Works 5/10/22 5/14/22 Approved as noted
attached Dwg.

'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
C 3 KAIG3-RFI-SW-C-5334 00 Civil Site Works 5/10/22 5/14/22 Approved as noted
attached Dwg.

' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for
7 6 KAIG3-RFI-SW-C-5337 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
Storm Water pipe Out Fall( MH-K-07 to MH-K-09 ). As per high lighted Area in the attached Dwg.

' Warning Tape Installation in pipesOUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for Storm Water
7 6 KAIG3-RFI-SW-C-5338 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
pipe Out Fall( MH-K-07 to MH-K-09 ). As per high lighted Area in the attached Dwg.

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5339 00 Civil Site Works 5/11/22 5/16/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"

Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5340 00 Civil Site Works 5/11/22 5/16/22 Approved as noted
MH-Y-02 To Outfall Y - As Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5341 00 Civil Site Works 5/11/22 5/16/22 Approved as noted
MH-O-01 To Outfall O - As Highlighted (SP#133 A-1-B)

kaig-qcals 275
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Excavation for Storm Water Line from MH-O-01 to G-O-44 and G-O-45 including Gully G-O-
2B 2 KAIG3-RFI-SW-C-5342 00 Civil Site Works 5/11/22 5/16/22 Approved as noted
44, G-O-45 at Zone-2B - As highlighted

C3 3 KAIG3-RFI-SW-C-5343 00 Excavation for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted in the attached drawing Civil Site Works 5/11/22 5/14/22 Code C (not resubmit)

C3 3 KAIG3-RFI-SW-C-5343 01 Excavation for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted in the attached drawing Civil Site Works 5/23/22 5/30/22 Approved as noted

Inspection for Blinding Concrete under MV Line Junction Pit B/MV/15, B/MV/22, G/MV/11, G/MV/26 - as
4 4 KAIG3-RFI-SW-C-5344 00 Civil Site Works 5/11/22 5/11/22 Approved as noted
highlighted

Inspection for Sand bedding under pipe for MV Line from G/MV/31 to G/MV/11 at Zone-G - as highlighted
G4 4 KAIG3-RFI-SW-C-5345 00 Civil Site Works 5/11/22 5/16/22 Approved as noted
in the attached drawing (Stock Pile # 132)

'Warning Tape Installation of Fire Fighting Networks for (200&250mmØ-UPVC-Class-5). As per highlighted
C 3 KAIG3-RFI-SW-C-5346 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
Area in the attached Dwg.

'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) from
7 6 KAIG3-RFI-SW-C-5348 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
(FW-A-3-11). At CRECENT Zone 7 ( Devonian Garden). As per highlighted Area in the attached Dwg.

' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-11). At CRECENT
7 6 KAIG3-RFI-SW-C-5349 00 Civil Site Works 5/11/22 5/14/22 Approved as noted
Zone 7 ( Devonian Garden). As per highlighted Area in the attached Dwg.

Installation of Yellow Warning Tape for Medium Voltage Ductbank (UPVC Conduit Dia. 160mm) at Aviary
4A 4 KAIG3-RFI-SW-C-5350 00 Garden (from Manhole no. B/MV/02 to B/MV/11 & B/MV/11 to B/MV/25) as per attached highilghted Civil Aviary Garden 5/11/22 5/12/22 Approved as noted
drawings.

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- C - as highlighted in the
C3 3 KAIG3-RFI-SW-C-5351 00 Civil Site Works 5/11/22 5/14/22 Approved as noted
attached drawing (SP# 132)

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/10 to C/TL/14 at
C3 3 KAIG3-RFI-SW-C-5352 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
Zone-B&C - as highlighted in the attached drawing
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/14 to
B 3 KAIG3-RFI-SW-C-5353 00 Civil Site Works 5/11/22 5/12/22 Approved as noted
B/FS/06 at Zone-B - as highlighted in the attached drawing

5 5 KAIG3-RFI-SW-C-5354 00 Inspection of Excavation for RO Water Line at Area-D - As highlighted Site Works 5/11/22 5/16/22 Approved as noted

G 5 KAIG3-RFI-SW-C-5355 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted Civil Site Works 5/11/22 5/16/22 Approved as noted

Pipe sleeve installation for strip footing ; (160mmØupvc class 4) Between axis (AM&AN) at Crescent ; as per
7 6 KAIG3-RFI-SW-C-5356 00 Civil Site Works 5/11/22 5/14/22 Approved as noted
high lighted attached approved shop drawing.

G4 4 KAIG3-RFI-SW-C-5359 00 Inspection for Installation of MV Line Junction Pit - B/MV/17, G/MV/14 - as highlighted Civil Site Works 5/12/22 5/16/22 Code C (resubmit)

G4 4 KAIG3-RFI-SW-C-5359 01 Inspection for Installation of MV Line Junction Pit - B/MV/17, G/MV/14 - as highlighted Civil Site Works 8/6/22 Open

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5360 00 Civil Site Works 5/12/22 5/17/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5361 00 Civil Site Works 5/12/22 5/17/22 Approved as noted
MH-Y-02 To Outfall Y - As Highlighted (SP#133 A-1-B)
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) for Storm Water Line From
2 2 KAIG3-RFI-SW-C-5362 00 Civil Site Works 5/12/22 5/17/22 Approved as noted
MH-O-01 To Outfall O - As Highlighted (SP#133 A-1-B)
Surface Preparation prior to start backfill around SBC-06 (Wing Wall) - Right Side at Zone - 4 - as
4 4 KAIG3-RFI-SW-C-5363 00 Civil Site Works 5/12/22 5/14/22 Code C (not resubmit)
highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 1) above Sand Covering for Non-
C3 3 KAIG3-RFI-SW-C-5364 00 Civil Site Works 5/12/22 5/17/22 Approved as noted
Potable Water Line at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Non-
B3 3 KAIG3-RFI-SW-C-5365 00 Civil Site Works 5/12/22 5/17/22 Approved as noted
Potable Water Line at Zone-B as highlighted in the attached drawing (SP# 133 A-1-B))
Inspection for Installation of MV Line Junction Pit - C/MV/02, G/MV/01, G/MV/15, K/MV/01 - as
C3 3 KAIG3-RFI-SW-C-5366 00 Civil Site Works 5/14/22 5/19/22 Code C (not resubmit)
highlighted
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 8) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5367 00 Civil Site Works 5/14/22 5/17/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"

kaig-qcals 276
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles
B3 3 KAIG3-RFI-SW-C-5368 00 Telecommunication Line from B/TL/10 to C/TL/14 at Zone-B&C - as highlighted in the attached drawing Civil Site Works 5/14/22 5/17/22 Approved as noted
(Stock Pile # 133 A-1-B)
Inspection and Compactin Test for backfilling Sub-grade 1st Layer ( 1 of 1) above GreenTiles for Fire &
B3 3 KAIG3-RFI-SW-C-5369 00 Security Distribution Line from B/FS/14 to B/FS/06 at Zone-B - as highlighted in the attached drawing (Stock Civil Site Works 5/14/22 5/17/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5370 00 Civil Site Works 5/14/22 5/17/22 Approved as noted
Right Side at Zone - 4 - as highlighted
"Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) around, Corner connection
2B 2 KAIG3-RFI-SW-C-5371 00 Civil Site Works 5/14/22 5/19/22 Approved as noted
between SBC-1 & SBC-2 - as highlighted (Stock Pile #133 A-1-B)"
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5372 00 Civil Site Works 5/14/22 5/19/22 Approved as noted
Right Side at Zone - 4 - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-5373 00 Water Line From C/F/04 to C/F/05 at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/14/22 5/17/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-5374 00 Water Line From C/F/11 to SBC at Zone- C&H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/15/22 5/19/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fire
H3 3 KAIG3-RFI-SW-C-5375 00 Water Line From SBC to near H/F/12 at Zone- H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/15/22 5/19/22 Approved as noted

Inspection for Blinding Concrete under MV Line Junction Pit B/MV/08, B/MV/09, B/MV/21, C/MV/12,
B3 5 KAIG3-RFI-SW-C-5382 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
G/MV/10, H/MV/05, H/MV/13 - as highlighted

F4 4 KAIG3-RFI-SW-C-5383 00 Inspection of Excavation for Heating and Chilled Water Line Branch at Zone-F - As highlighted Civil Site Works 5/15/22 5/16/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-5384 00 Water Line From C/F/04 to C/F/05 at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/15/22 5/19/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for Potble
C3 3 KAIG3-RFI-SW-C-5385 00 Water Line From C/PW/01 to near C/PW/02 at Zone- C - as highlighted in the attached drawing (SP# 133 A- Civil Site Works 5/15/22 5/19/22 Approved as noted
1-B)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/13 to C/MV/12 at Zone-C
C3 3 KAIG3-RFI-SW-C-5386 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
(As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at Zone-
C3 3 KAIG3-RFI-SW-C-5387 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
C&H (As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/25 to H/MV/02 at Zone-H
H4 4 KAIG3-RFI-SW-C-5388 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
(As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/02 to H/MV/11 at Zone-H
H4 4 KAIG3-RFI-SW-C-5389 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
(As Highlighted)

E2 2 KAIG3-RFI-SW-C-5390 00 Excavation for Non-Potable Water Line near Tower-1 at Zone E - as highlighted Civil Site Works 5/15/22 5/19/22 Approved as noted

Inspection for Installation of Telecommunication Line Pit - B/TL/48, B/TL/31, B/TL/30, B/TL/51 as
B4 4 KAIG3-RFI-SW-C-5391 00 Civil Site Works 5/15/22 5/19/22 Approved as noted
highlighted

B4 4 KAIG3-RFI-SW-C-5397 00 Inspection for Installation of Fire & Security Line Pit - B/FS/03, B/FS/04, B/FS/44 - as highlighted Civil Site Works 5/15/22 5/19/22 Approved as noted

'Warning Tape Installation of Potable Water Pipe for (200mmØ-UPVC-Class-5). As per highlighted Area in
C H L (356) 4 KAIG3-RFI-SW-C-5398 00 Civil Site Works 5/16/22 5/17/22 Approved as noted
the attached Dwg.
'Warning Tape Installation of Potable Water Pipe for (200mmØ-UPVC-Class-5). As per highlighted Area in
C 3 KAIG3-RFI-SW-C-5399 00 Civil Site Works 5/16/22 5/17/22 Approved as noted
the attached Dwg.
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5400 00 Civil Site Works 5/16/22 5/21/22 Approved as noted
Right Side at Zone - 4 - as highlighted

4 4 KAIG3-RFI-SW-C-5401 00 Inspection for Installation of MV Line Junction Pit - B/MV/15, B/MV/22 - as highlighted Civil Site Works 5/16/22 5/19/22 Code C (not resubmit)

Inspection of Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone E - as highlighted
2 2 KAIG3-RFI-SW-C-5402 00 Civil Site Works 5/16/22 5/21/22 Approved as noted
(Stock Pile # 132)
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Fire
CH 3 KAIG3-RFI-SW-C-5403 00 Water Line From C/F/11 to SBC at Zone- C&H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/16/22 5/21/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 4) above Sand Covering for Potble
CH 3 KAIG3-RFI-SW-C-5404 00 Water Line From C/PW/01 to near C/PW/02 at Zone- C - as highlighted in the attached drawing (SP# 133 A- Civil Site Works 5/16/22 5/21/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Potble
CH 3 KAIG3-RFI-SW-C-5405 00 Water Line From C/PW/05 to SBC at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/16/22 5/21/22 Approved as noted

Surface Preparation prior to start backfill around SBC-06 (Wing Wall) - Right Side at Zone - 4 - as
4 4 KAIG3-RFI-SW-C-5409 00 Civil Site Works 5/16/22 5/17/22 Approved as noted
highlighted
Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-02, NPW-ISC-03, NPW-
BFG 4 KAIG3-RFI-SW-C-5410 00 Civil Site Works 5/16/22 5/19/22 Code C (resubmit)
ISC-04, NPW-ISC-21, NPW-ISC-08, NPW-ISC-12, NPW-ISC-13 - as highlighted
Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-02, NPW-ISC-03, NPW-
BFG 4 KAIG3-RFI-SW-C-5410 01 Civil Site Works 5/25/22 5/28/22 Approved as noted
ISC-04, NPW-ISC-21, NPW-ISC-08, NPW-ISC-12, NPW-ISC-13 - as highlighted

kaig-qcals 277
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- G&K - As
GK45 4 KAIG3-RFI-SW-C-5413 00 Civil Site Works 5/17/22 5/21/22 Approved as noted
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5414 00 Civil Site Works 5/17/22 5/21/22 Approved as noted
Right Side at Zone - 4 - as highlighted
Inspection of Steel Reinforcement for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As
C3 3 KAIG3-RFI-SW-C-5415 00 Civil Site Works 5/17/22 5/24/22 Approved as noted
Highlighted) SCR-KAIG3-SCR-CO-S-0129-00
Inspection of Formwork for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As
C3 3 KAIG3-RFI-SW-C-5416 00 Civil Site Works 5/17/22 5/24/22 Approved as noted
Highlighted) SCR-KAIG3-SCR-CO-S-0129-00
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at
C3 3 KAIG3-RFI-SW-C-5417 00 Civil Site Works 5/17/22 5/24/22 Approved as noted
Zone-C (As Highlighted) SCR-KAIG3-SCR-CO-S-0129-00
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
4 4 KAIG3-RFI-SW-C-5418 00 Civil Site Works 5/17/22 5/22/22 Approved as noted
SBC-08 (Right Side) - Upstand, Footing and Wall of Wing Wall (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 3rd Laye (3 of 4) above Sand Covering for Potble
C3 3 KAIG3-RFI-SW-C-5419 00 Water Line From C/PW/01 to near C/PW/02 at Zone- C - as highlighted in the attached drawing (SP# 133 A- Civil Site Works 5/17/22 5/21/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 3) above Sand Covering for Potble
CH 3 KAIG3-RFI-SW-C-5420 00 Water Line From C/PW/05 to SBC at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/17/22 5/21/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fire
H35 5 KAIG3-RFI-SW-C-5421 00 Water Line From SBC to near H/F/12 at Zone- H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/17/22 5/21/22 Approved as noted

Excavation for Non-Potable Water Line near Tower-1 including Pit NPW-ISC-29 at Zone D - as highlighted
D2 2 KAIG3-RFI-SW-C-5422 00 Civil Site Works 5/17/22 5/21/22 Approved as noted

F4 4 KAIG3-RFI-SW-C-5423 00 Excavation for Potable Water Line at Zone-F - as highlighted Civil Site Works 5/17/22 5/17/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Potble
H 4 KAIG3-RFI-SW-C-5424 00 Water Line From SBC to near H/PW/03 at Zone- H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/17/22 5/21/22 Approved as noted

Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-05, NPW-ISC-06, NPW-
K5 5 KAIG3-RFI-SW-C-5425 00 Civil Site Works 5/19/22 5/25/22 Code C (not resubmit)
ISC-07 - as highlighted
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
C 3 KAIG3-RFI-SW-C-5429 00 Civil Site Works 5/19/22 5/22/22 Approved as noted
attached Dwg.
Inspection and Compaction Test for backfilling Sub-grade 4th Laye (4 of 4) above Sand Covering for Potble
C3 3 KAIG3-RFI-SW-C-5435 00 Water Line From C/PW/01 to near C/PW/02 at Zone- C - as highlighted in the attached drawing (SP# 133 A- Civil Site Works 5/19/22 5/22/22 Approved as noted
1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Laye (3 of 3) above Sand Covering for Potble
CH34 4 KAIG3-RFI-SW-C-5436 00 Water Line From C/PW/05 to SBC at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/19/22 5/21/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 3) above Sand Covering for Potble
H4 4 KAIG3-RFI-SW-C-5437 00 Water Line From SBC to near H/PW/03 at Zone- H - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/19/22 5/22/22 Approved as noted

"Inspection of Thrust Block for Potable Water Line ( Dia 50mm & 110mm) at Zone-G&K - As Highlighted
GK45 4 KAIG3-RFI-SW-C-5438 00 Civil Site Works 5/19/22 5/24/22 Approved as noted
(SCR-KAIG3-SCR-SW-C-0021-00)"
Inspection for Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone D - as highlighted
D2 2 KAIG3-RFI-SW-C-5439 00 Civil Site Works 5/19/22 5/21/22 Approved as noted
(SP # 132)

Surface Preparation prior to start backfill around SBC-08 (Wing Wall) - Right Side at Zone - 4 - as
4 4 KAIG3-RFI-SW-C-5441 00 Civil Site Works 5/19/22 5/22/22 Approved as noted
highlighted

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5442 00 Civil Site Works 5/19/22 5/22/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP#133)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) above Sand Covering for Potble
CH34 4 KAIG3-RFI-SW-C-5443 00 Water Line From C/PW/05 to SBC at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 5/19/22 5/22/22 Approved as noted

C 3 KAIG3-RFI-SW-C-5444 00 Excavation for Non-Potable Water Line near Plaza Area at Zone C - as highlighted Civil Site Works 5/19/22 5/23/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-5449 00 Excavation for Non-Potable Water Line at Zone G including POC-29, POC-30- as highlighted Civil Site Works 5/21/22 5/22/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5450 00 Civil Site Works 5/21/22 5/23/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP#133)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5451 00 Civil Site Works 5/21/22 5/23/22 Approved as noted
Right Side at Zone - 4 - as highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at Zone-H
H4 4 KAIG3-RFI-SW-C-5452 00 Civil Site Works 5/21/22 5/24/22 Approved as noted
(As Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line between H/MV/10 to H/MV/05 at
H4 4 KAIG3-RFI-SW-C-5453 00 Civil Site Works 5/21/22 5/24/22 Approved as noted
Zone-H (As Highlighted)

kaig-qcals 278
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5454 00 Civil Site Works 5/22/22 5/24/22 Approved as noted
attached drawing (SP# 132)

G4 4 KAIG3-RFI-SW-C-5455 00 Excavation for Non-Potable Water Line at Zone G - as highlighted Civil Site Works 5/19/22 5/21/22 Approved as noted

Inspection of Excavation for RO Water Line at Area-D Including Pit ROW-ISC-03, ROW-ISC-02, ARV-03-
4 4 KAIG3-RFI-SW-C-5456 00 Civil Site Works 5/19/22 5/21/22 Approved as noted
As highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit G/DC/06, G/DH/05,
G5 5 KAIG3-RFI-SW-C-5457 00 Civil Site Works 5/19/22 5/21/22 Approved as noted
G/DC/11, G/DH/19 - As highlighted
Excavation for Telecommunication Line between B/TL/12 to B/TL/15 including pit B/TL/15 at Zone-B as
B3 3 KAIG3-RFI-SW-C-5458 00 Civil Site Works 5/19/22 5/22/22 Approved as noted
highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from B/FS/15 to B/FS/17 and B/FS/17 at Zone-B - as
B3 3 KAIG3-RFI-SW-C-5459 00 Civil Site Works 5/19/22 5/22/22 Approved as noted
highlighted in the attached drawing
Excavation for Telecommunication Line from H/TL/17 to H/TL/20 including pit H/TL/17, H/TL/20 at Zone-
H4 4 KAIG3-RFI-SW-C-5469 00 Civil Site Works 5/22/22 5/24/22 Approved as noted
H as highlighted in the attached drawing
Excavation for Fire & Security Distribution Line from H/FS/18 to H/FS/24 Including Pit H/FS/18, H/FS/24 at
H4 4 KAIG3-RFI-SW-C-5470 00 Civil Site Works 5/22/22 5/24/22 Approved as noted
Zone-H - as highlighted in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 8) around SBC-06 (Wing Wall) -
H4 4 KAIG3-RFI-SW-C-5471 00 Civil Site Works 5/22/22 5/25/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP#133)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5472 00 Civil Site Works 5/22/22 5/25/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone G - as highlighted (Stock Pile #
G4 4 KAIG3-RFI-SW-C-5473 00 Civil Site Works 5/22/22 5/26/22 Approved as noted
132)

B34 4 KAIG3-RFI-SW-C-5481 00 Inspection for Blinding Concrete under MV Line Pit B/MV/12, B/MV/02 - as highlighted Civil Site Works 5/22/22 5/24/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-5482 00 Inspection for Casting Blinding Concrete under Manhole - MH-M-04, MH-M-06 - as highlighted Civil Site Works 5/22/22 5/24/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-5483 00 "Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted)" Civil Site Works 5/22/22 5/24/22 Approved as noted

Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone G - as highlighted (Stock Pile #
G4 4 KAIG3-RFI-SW-C-5485 00 Civil Site Works 5/23/22 5/26/22 Approved as noted
132)
Inspection of Sand bedding under pipe for Telecommunication Line between B/TL/12 to B/TL/15 at Zone-B
B3 3 KAIG3-RFI-SW-C-5486 00 Civil Site Works 5/23/22 5/26/22 Approved as noted
as highlighted in the attached drawing (SP#132)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/15 to B/FS/17 at
B3 3 KAIG3-RFI-SW-C-5487 00 Civil Site Works 5/23/22 5/26/22 Approved as noted
Zone-B - as highlighted in the attached drawing (SP#132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5488 00 Civil Site Works 5/23/22 5/25/22 Approved as noted
attached drawing (SP# 132)

6 6 KAIG3-RFI-SW-C-5489 00 Excavation for MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as highlighted Civil Site Works 5/23/22 5/25/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5490 00 Civil Site Works 5/23/22 5/26/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)

4 4 KAIG3-RFI-SW-C-5491 00 Inspection for Installation of MV Line Junction Pit - C/MV/12, G/MV/10, H/MV/05 - as highlighted Civil Site Works 5/23/22 5/25/22 Code C (resubmit)

4 4 KAIG3-RFI-SW-C-5491 01 Inspection for Installation of MV Line Junction Pit - C/MV/12, G/MV/10, H/MV/05 - as highlighted Civil Site Works 8/6/22 Open

Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as
6 6 KAIG3-RFI-SW-C-5492 00 Civil Site Works 5/23/22 5/24/22 Approved as noted
highlighted
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 10) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5493 00 Civil Site Works 5/23/22 5/26/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP#133)
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/05, C/PW/08 as
3 3 KAIG3-RFI-SW-C-5494 00 Civil Site Works 5/23/22 5/25/22 Approved as noted
highlighted.
Surface Preparation prior to start backfilling around Fire Water Line Pit for C/F/11, C/F/12, C/F/13 as
3 3 KAIG3-RFI-SW-C-5495 00 Civil Site Works 5/23/22 5/25/22 Approved as noted
highlighted.
"Surface Preparation prior to start backfilling under Non-Potable Water Line upto (-20cm) form FGL near
C 3 KAIG3-RFI-SW-C-5496 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
Plaza Area at Zone C - as highlighted "
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Potble
C6 6 KAIG3-RFI-SW-C-5504 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
Water Line at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B)
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from C/MV/40 to C/MV/23
C6 6 KAIG3-RFI-SW-C-5505 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
at Zone- C (As Highlighted)
Inspection of Water Proofing for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone- C (As
C6 6 KAIG3-RFI-SW-C-5506 00 Civil Site Works 5/24/22 5/26/22 Approved as noted
Highlighted)

kaig-qcals 279
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Surface Preparation prior to start backfilling sub-grade for the Duct Bank of MV Line from C/MV/40 to
C6 6 KAIG3-RFI-SW-C-5507 00 Civil Site Works 5/24/22 5/26/22 Approved as noted
C/MV/23 at Zone- C (As Highlighted)
Inspection of Sand Bedding under pipe for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted
C3 3 KAIG3-RFI-SW-C-5508 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
in the attached drawing (Stock Pile # 132)
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5509 00 Civil Site Works 5/24/22 5/30/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5510 00 Civil Site Works 5/24/22 5/26/22 Approved as noted
attached drawing (SP# 132)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5518 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)
Inspection and Compaction Test for backfilling Sub-grade 9th Layer (9 of 10) around SBC-06 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5519 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP#133)
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
GK 5 KAIG3-RFI-SW-C-5520 00 Civil Site Works 5/24/22 5/28/22 Approved as noted
attached Dwg.
Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
GK 5 KAIG3-RFI-SW-C-5521 00 Civil Site Works 5/24/22 5/28/22 Code C (resubmit)
attached Dwg.
Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
GK 5 KAIG3-RFI-SW-C-5521 01 Civil Site Works 6/1/22 6/4/22 Approved as noted
attached Dwg.
'Warning Tape Installation of Potable Water Pipe for (110mmØ-UPVC-Class-5). As per highlighted Area in
C 3 KAIG3-RFI-SW-C-5522 00 Civil Site Works 5/25/22 5/26/22 Approved as noted
the attached Dwg.

HL6 6 KAIG3-RFI-SW-C-5523 00 Excavation for MV Line Pit H/MV/07, L/MV/03 - as highlighted Civil Site Works 5/25/22 5/28/22 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
6B 6 KAIG3-RFI-SW-C-5524 00 Civil Site Works 5/25/22 5/31/22 Approved as noted
M-04, MH-M-06 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-06 (As
6B 6 KAIG3-RFI-SW-C-5525 00 Civil Site Works 5/25/22 6/1/22 Approved as noted
Highlighted) "

BGL3 3 KAIG3-RFI-SW-C-5526 00 Inspection for Installation of MV Line Junction Pit - B/MV/12, G/MV/11, L/MV/08 - as highlighted Civil Site Works 5/25/22 5/31/22 Approved as noted

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5527 00 Civil Site Works 5/25/22 5/28/22 Approved as noted
attached drawing (SP# 132)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5528 00 Civil Site Works 5/25/22 5/30/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection of Sand bedding under pipe for Telecommunication Line from H/TL/17 to H/TL/20 at Zone-H as
H4 4 KAIG3-RFI-SW-C-5529 00 Civil Site Works 5/25/22 5/28/22 Approved as noted
highlighted in the attached drawing (Stock Pile # 132)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from H-FS-18 to H-FS-24 at
4 4 KAIG3-RFI-SW-C-5530 00 Civil Site Works 5/25/22 5/28/22 Approved as noted
Zone-H - as highlighted in the attached drawing (SP # 132)
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5531 00 Civil Site Works 5/25/22 5/30/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)
Inspection for Blinding Concrete under MV Line Pit B/MV/23, F/MV/08, G/MV/21, G/MV/28 - as
4 4 KAIG3-RFI-SW-C-5538 00 Civil Site Works 5/26/22 5/31/22 Approved as noted
highlighted

C 3 KAIG3-RFI-SW-C-5539 00 Excavation for Non-Potable Water Line near Plaza Area at Zone C - as highlighted Civil Site Works 5/26/22 5/30/22 Approved as noted

C 3 KAIG3-RFI-SW-C-5540 00 "Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted " Civil Site Works 5/26/22 5/31/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Potble
C 6 KAIG3-RFI-SW-C-5541 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
Water Line at Zone- C - as highlighted in the attached drawing (SP# 133 A-1-B)

BHL 5 KAIG3-RFI-SW-C-5542 00 Inspection for Installation of MV Line Junction Pit - B/MV/02, H/MV/08, L/MV/06 - as highlighted Civil Site Works 5/26/22 6/4/22 Code C (not resubmit)

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5543 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5544 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
for C/PW/05, C/PW/08 as highlighted. (SP#133)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5545 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)
Inspection of Sand Bedding under pipe for Non-Potable Water Line near Plaza Area at Zone C - as
C 3 KAIG3-RFI-SW-C-5556 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
highlighted (Stock Pile # 132)
"Inspection and Compaction Test for backfilling Sub-grade 10th Layer (Final) (10 of 10) around SBC-06
4 4 KAIG3-RFI-SW-C-5557 00 Civil Site Works 5/26/22 5/30/22 Approved as noted
(Wing Wall) - Right Side at Zone - 4 - as highlighted (SP#133)"
Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-08 at Zone B - as
B4 4 KAIG3-RFI-SW-C-5558 00 Civil Site Works 5/26/22 6/10/22 Code C (not resubmit)
highlighted

kaig-qcals 280
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

L5 5 KAIG3-RFI-SW-C-5559 00 Excavation for Potable Water Line at Zone-L - as highlighted Civil Site Works 5/26/22 5/30/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-5560 00 Excavation for Fire Water Line at Zone-L - as highlighted Civil Site Works 5/26/22 5/30/22 Approved as noted

B4 4 KAIG3-RFI-SW-C-5561 00 Surface Prepatio prior to start back filling around Manhole - FW10 at Zone B - as highlighted Civil Site Works 5/26/22 5/30/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-5562 00 Inspection of Formwork for the Upstand of SBC-04 (As Highlighted) Civil Site Works 5/28/22 5/30/22 Approved as noted

2B 2 KAIG3-RFI-SW-C-5565 00 Inspection of Concrete Pouring for the Upstand of SBC-04 (As Highlighted) Civil Site Works 5/28/22 5/30/22 Approved as noted

Inspection for Blinding Concrete under MV Line Pit B/MV/10, G/MV/19, G/MV/31, G/MV/27, G/MV/03,
BG4 4 KAIG3-RFI-SW-C-5566 00 Civil Site Works 5/28/22 5/31/22 Approved as noted
G/MV/02 - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5567 00 Civil Site Works 5/28/22 5/30/22 Approved as noted
attached drawing (SP# 132)
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) for the Duct Bank of MV Line
C6 6 KAIG3-RFI-SW-C-5568 00 Civil Site Works 5/28/22 5/30/22 Approved as noted
from C/MV/40 to C/MV/23 at Zone- C (As Highlighted) Stock Pile # 133 A-1-B)"
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit G/DH/04 - As
G5 5 KAIG3-RFI-SW-C-5569 00 Civil Site Works 5/28/22 5/30/22 Approved as noted
highlighted
"Inspection for Installation of Telecommunication Line Pit - B/TL/32, B/TL/10, B/TL/12, B/TL/13,
BGK 5 KAIG3-RFI-SW-C-5570 00 B/TL/42, G/TL/23, G/TL/52, G/TL/04, G/TL/50, G/TL/43, G/TL/40, G/TL/38, G/TL/03 K/TL/20, Civil Site Works 5/28/22 5/31/22 Approved as noted
K/TL/18, K/TL/13, K/TL/12, K/TL/09, K/TL/08 - as hig
"Inspection for Installation of Fire & Security Line Pit - B/FS/31, B/FS/15, B/FS/06 G/FS/37, G/FS/47,
BGK 5 KAIG3-RFI-SW-C-5571 00 Civil Site Works 5/28/22 5/30/22 Approved as noted
G/FS/51, G/FS/40, G/FS/04, K/FS/24 - as highlighted "
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- F - As Highlighted
F4 4 KAIG3-RFI-SW-C-5577 00 Civil Site Works 5/29/22 5/30/22 Approved as noted
(SCR-KAIG3-SCR-SW-C-0021-00)
"Inspection of Thrust Block for Potable Water Line ( Dia 160mm & 80mm) at Zone-F - As Highlighted
F4 4 KAIG3-RFI-SW-C-5578 00 Civil Site Works 5/29/22 5/30/22 Approved as noted
(SCR-KAIG3-SCR-SW-C-0021-00)"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fire
G5 5 KAIG3-RFI-SW-C-5579 00 Civil Site Works 5/29/22 5/31/22 Approved as noted
Water Line at Zone- G - as highlighted in the attached drawing (SP# 133 A-1-B)

L5 5 KAIG3-RFI-SW-C-5580 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 5/29/22 5/31/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-5581 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 5/29/22 5/31/22 Approved as noted

"Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV Line
C6 6 KAIG3-RFI-SW-C-5582 00 Civil Site Works 5/29/22 5/31/22 Approved as noted
from C/MV/40 to C/MV/23 at Zone- C (As Highlighted) Stock Pile # 133 A-1-B)"

B4 4 KAIG3-RFI-SW-C-5583 00 Inspection of Steel Reinforcement for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) Civil Site Works 5/29/22 5/31/22 Code C (resubmit)

B4 4 KAIG3-RFI-SW-C-5583 1 Inspection of Steel Reinforcement for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) Civil Site Works 6/13/22 6/16/22 Approved as noted

B4 4 KAIG3-RFI-SW-C-5584 00 Inspection of Formwork for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) Civil Site Works 5/29/22 5/31/22 Code C (resubmit)

B4 4 KAIG3-RFI-SW-C-5584 1 Inspection of Formwork for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) Civil Site Works 6/13/22 6/16/22 Approved as noted

B4 4 KAIG3-RFI-SW-C-5585 00 "Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) " Civil Site Works 5/29/22 5/31/22 Code C (resubmit)

B4 4 KAIG3-RFI-SW-C-5585 1 "Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) " Civil Site Works 6/13/22 6/16/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5587 00 Civil Site Works 5/29/22 6/1/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 10) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5588 00 Civil Site Works 5/29/22 5/31/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5589 00 Civil Site Works 5/29/22 6/1/22 Approved as noted
for C/PW/05, C/PW/08 as highlighted. (SP#133)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5590 00 Civil Site Works 5/29/22 6/1/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

kaig-qcals 281
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Pipe sleeve installation for inner strip footing ; (160mmØupvc class 4) Between axis (02U to 02V) at
2F 2 KAIG3-RFI-SW-C-5605 00 Civil Site Works 5/30/22 6/1/22 Approved as noted
Crescent ; as per high lighted attached approved shop drawing.
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fire
K5 5 KAIG3-RFI-SW-C-5606 00 Civil Site Works 5/30/22 6/1/22 Approved as noted
Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

L5 5 KAIG3-RFI-SW-C-5607 00 Excavation for Potable Water Line at Zone-L - as highlighted Civil Site Works 5/30/22 6/1/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-5608 00 Excavation for Fire Water Line at Zone-L including Pit L/F/08, L/F/09, L/F/10, L/F/11 - as highlighted Civil Site Works 5/30/22 6/1/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 10) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5609 00 Civil Site Works 5/30/22 6/1/22 Approved as noted
Right Side at Zone - 4 - as highlighted (SP# 133)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted in the
K5 5 KAIG3-RFI-SW-C-5610 00 Civil Site Works 5/30/22 5/31/22 Approved as noted
attached drawing (SP# 132)

5A 5 KAIG3-RFI-SW-C-5611 00 "Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-20 - AS Highlighted " Civil Site Works 5/30/22 6/1/22 Approved as noted

B3 3 KAIG3-RFI-SW-C-5612 00 Inspection for Installation of MV Line Junction Pit - B/MV/06 - as highlighted Civil Site Works 5/30/22 6/2/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-5613 00 Inspection of Steel Reinforcement for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) Civil Site Works 5/30/22 6/1/22 Code C (resubmit)

G4 4 KAIG3-RFI-SW-C-5613 01 Inspection of Steel Reinforcement for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) Civil Site Works 6/14/22 6/16/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-5614 00 "Inspection of Formwork for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) " Civil Site Works 5/30/22 6/1/22 Code C (resubmit)

G4 4 KAIG3-RFI-SW-C-5614 01 "Inspection of Formwork for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) " Civil Site Works 6/14/22 6/16/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-5615 00 "Inspection of Concrete Pouring for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) " Civil Site Works 5/30/22 6/1/22 Code C (resubmit)

G4 4 KAIG3-RFI-SW-C-5615 01 "Inspection of Concrete Pouring for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) " Civil Site Works 6/14/22 6/16/22 Approved as noted

'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
F4 4 KAIG3-RFI-SW-C-5618 00 Civil Site Works 5/30/22 5/31/22 Approved as noted
attached Dwg.
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
5 5 KAIG3-RFI-SW-C-5619 00 Civil Site Works 5/30/22 5/31/22 Approved as noted
attached Dwg.

Soil Preparation near SBC-06 (Right Side) prior to Casting the Concrete aroun the Pipe at Zone 4 as
4A 4 KAIG3-RFI-SW-C-5622 00 Civil Site Works 5/31/22 6/1/22 Approved as noted
highlighted. (ZHBG - action to close Non-Conformance Report (KAIG-NCR-SW-C-0005-00).

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fire
G5 5 KAIG3-RFI-SW-C-5623 00 Civil Site Works 5/31/22 6/4/22 Approved as noted
Water Line at Zone- G - as highlighted in the attached drawing (SP# 133 A-1-B)

"Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV Line
C6 6 KAIG3-RFI-SW-C-5624 00 Civil Site Works 5/31/22 6/4/22 Approved as noted
from C/MV/40 to C/MV/23 at Zone- C (As Highlighted) Stock Pile # 133 A-1-B)"

C3 3 KAIG3-RFI-SW-C-5625 00 Inspection for Blinding Concrete under MV Line Pit C/MV/23 - as highlighted Civil Site Works 5/31/22 6/2/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5626 00 Excavation for MV Line Pit B/MV/04, C/MV/18, C/MV/19, C/MV/21, C/MV/31- as highlighted Civil Site Works 5/31/22 6/4/22 Code C (resubmit)

C3 3 KAIG3-RFI-SW-C-5626 01 Excavation for MV Line Pit B/MV/04, C/MV/18, C/MV/19, C/MV/21, C/MV/31- as highlighted Civil Site Works 6/7/22 6/9/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 9th Layer (9 of 10) around SBC-08 (Wing Wall) -
4 4 KAIG3-RFI-SW-C-5627 00 Civil Site Works 5/31/22 6/4/22 Code C (resubmit)
Right Side at Zone - 4 - as highlighted (SP# 133)

Inspection & Compaction tests of 9th (Final) Layer (Sub Base) Backfilling (after 8 layers of Sub Grade)
4 4 KAIG3-RFI-SW-C-5627 01 Behind SBC-08 (Wing Walls), at Wadi 3, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Site Works 7/3/22 7/7/22 Approved as noted
140)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5628 00 Civil Site Works 5/31/22 6/5/22 Approved as noted
for C/PW/05, C/PW/08 as highlighted. (SP#133)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5629 00 Civil Site Works 5/31/22 6/5/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

kaig-qcals 282
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

'Warning Tape Installation of Potable Water Pipe for (160&75mmØ-UPVC-Class-5). As per highlighted Area
F 5 KAIG3-RFI-SW-C-5634 00 Civil Site Works 5/31/22 6/1/22 Approved as noted
in the attached Dwg.

'Warning Tape Installation of Fire Fighting Networks for (200&160mmØ-UPVC-Class-5). As per highlighted
F 5 KAIG3-RFI-SW-C-5635 00 Civil Site Works 5/31/22 6/1/22 Approved as noted
Area in the attached Dwg.
"Inspection of formwork around the pipe near SBC-06 (Right Side) prior to Casting the concrete at Zone-4 -
4A 4 KAIG3-RFI-SW-C-5637 00 As Highlighted (ZHBG - action to close Non-Conformance Report # KAIG3-NCR-SW-C-0005-00)" Civil Site Works 5/31/22 6/1/22 Approved as noted

"Inspection of Concrete Pouring around the pipe near SBC-06 (Right Side) at Zone-4 - As Highlighted
4A 4 KAIG3-RFI-SW-C-5638 00 Civil Site Works 5/31/22 6/2/22 Approved as noted
(ZHBG - action to close Non-Conformance Report # KAIG3-NCR-SW-C-0005-00)"

Inspection and compaction test 5th & 6th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as
2M 2N 6 KAIG3-RFI-SW-C-5639 00 Civil MCPE 1 6/1/22 6/5/22 Approved as noted
highlighted) Zone 2M 2N (5th & 6th of 12th layer) SP#125

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Fire
F4 4 KAIG3-RFI-SW-C-5652 00 Civil Site Works 6/1/22 6/5/22 Approved as noted
Water Line at Zone- F - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5653 00 Civil Site Works 6/1/22 6/5/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

L5 5 KAIG3-RFI-SW-C-5654 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 6/1/22 6/5/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-5655 00 Inspection of Sand Beding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 6/1/22 6/5/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside Fire Water Line at Zone-
G5 5 KAIG3-RFI-SW-C-5656 00 Civil Site Works 6/1/22 6/5/22 Approved as noted
G - as highlighted (SP# 133 A-1-B)
Inspection of backfilling Gravel 1st and 2nd Layer (2 of 2) For Manhole FW-A-20 - As Highlighted (Stock
5A 5 KAIG3-RFI-SW-C-5657 00 Civil Site Works 6/1/22 6/6/22 Approved as noted
Pile # 118)

H4 4 KAIG3-RFI-SW-C-5658 00 Inspection for Installation of MV Line Junction Pit - H/MV/03 - as highlighted Civil Site Works 6/1/22 6/5/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Cover at Zone - F -
F4 4 KAIG3-RFI-SW-C-5659 00 Civil Site Works 6/2/22 6/5/22 Approved as noted
as highlighted. (SP#133)
Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-12, NPW-ISC-13 ,
B3 3 KAIG3-RFI-SW-C-5660 00 Civil Site Works 6/2/22 6/6/22 Approved as noted
NPW-ISC-20 at Zone B - as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/10, C/MV/18, C/MV/19, C/MV/31, C/MV/21 -
BC3 3 KAIG3-RFI-SW-C-5661 00 Civil Site Works 6/2/22 6/5/22 Code C (resubmit)
as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/10, C/MV/18, C/MV/19, C/MV/31, C/MV/21 -
BC3 3 KAIG3-RFI-SW-C-5661 01 Civil Site Works 6/11/22 6/13/22 Approved as noted
as highlighted

Inspection of Excavation for Heating and Chilled Water Line including Pit B/DC/07, AV-02, AV-01,
4A 4 KAIG3-RFI-SW-C-5662 00 Civil Site Works 6/2/22 6/6/22 Approved as noted
B/DC/02, B/DC/06, AV-03, Av-04 at Zone-B - As highlighted

HL35 5 KAIG3-RFI-SW-C-5663 00 Inspection for Installation of MV Line Junction Pit - H/MV/07, L/MV/03 - as highlighted Civil Site Works 6/2/22 6/9/22 Approved as noted

Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/15 to B/FS/17) at Zone-
B 2 KAIG3-RFI-SW-C-5664 00 Civil Site Works 6/2/22 6/5/22 Approved as noted
B as highlighted in the attached drawing (SP#132)

Sand Covering Layer for Protection of Telecommunications Line from (B/TL/12 to B/TL/15) at Zone-B as
B4 4 KAIG3-RFI-SW-C-5665 00 Civil Site Works 6/2/22 6/5/22 Approved as noted
highlighted in the attached drawing (SP#132)

F4 4 KAIG3-RFI-SW-C-5666 00 Inspection for Blinding Concrete under Fire Water Line Pit for F/F/10 at Zone-F - as highlighted Civil Site Works 5/16/22 5/19/22 Approved as noted

F4 4 KAIG3-RFI-SW-C-5667 00 Inspection for Blinding Concrete under Potable Water Line Pit F/PW/15, F/PW/08, F/PW/02 - as highlighted Civil Site Works 5/16/22 5/19/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Cover for Potable
GK 5 5 KAIG3-RFI-SW-C-5672 00 Civil Site Works 6/4/22 6/7/22 Approved as noted
Water Line at Zone - G & K - as highlighted. (SP#133 A-1-B)

Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/44 to B/FS/31) at Zone-
B 2 KAIG3-RFI-SW-C-5673 00 Civil Site Works 6/4/22 6/6/22 Approved as noted
B as highlighted in the attached drawing (SP#132)

Sand Covering Layer for Protection of Telecommunications Line from (B/TL/51 to B/TL/32) at Zone-B as
B 2 KAIG3-RFI-SW-C-5674 00 Civil Site Works 6/4/22 6/6/22 Approved as noted
highlighted in the attached drawing (SP#132)

kaig-qcals 283
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/02 to C/MV/40 at Zone-C
C3 3 KAIG3-RFI-SW-C-5675 00 Civil Site Works 6/4/22 6/5/22 Approved as noted
(As Highlighted)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/30 to B/TL/31
B 3 KAIG3-RFI-SW-C-5676 00 Civil Site Works 6/4/22 6/5/22 Approved as noted
at Zone-B - As Highlighted
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/04 to B/FS/03 at
B 3 KAIG3-RFI-SW-C-5677 00 Civil Site Works 6/4/22 6/5/22 Approved as noted
Zone-B - As Highlighted"
CGH 5 KAIG3-RFI-SW-C-5678 00 Excavation for MV Line Pit C/MV/15, G/MV/30, H/MV/09- as highlighted Civil Site Works 6/4/22 6/6/22 Approved as noted
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25, H/MV/02, H/MV/11,
CGH 5 KAIG3-RFI-SW-C-5679 00 Civil Site Works 6/4/22 6/7/22 Approved as noted
H/MV/09, H/MV/28 - as highlighted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fire
F4 4 KAIG3-RFI-SW-C-5680 00 Civil Site Works 6/4/22 6/6/22 Approved as noted
Water Line at Zone- F - as highlighted in the attached drawing (SP# 133 A-1-B)

"Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-01, NPW-ISC-02,
4 4 KAIG3-RFI-SW-C-5688 00 Civil Site Works 6/4/22 6/6/22 Approved as noted
NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone F&G - as highlighted "

Inspection of Steel Reinforcement for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG 4 KAIG3-RFI-SW-C-5689 00 Civil Site Works 6/4/22 6/7/22 Code C (resubmit)
Highlighted)
Inspection of Steel Reinforcement for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG 4 KAIG3-RFI-SW-C-5689 01 Civil Site Works 6/12/22 6/14/22 Approved as noted
Highlighted)

FG 4 KAIG3-RFI-SW-C-5690 00 Inspection of Formwork for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted) Civil Site Works 6/4/22 6/7/22 Code C (resubmit)

FG 4 KAIG3-RFI-SW-C-5690 01 Inspection of Formwork for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted) Civil Site Works 6/12/22 6/15/22 Approved as noted

Inspection of Concrete Pouring for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted)
FG 4 KAIG3-RFI-SW-C-5691 00 Civil Site Works 6/4/22 6/7/22 Code C (resubmit)

Inspection of Concrete Pouring for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted)
FG 4 KAIG3-RFI-SW-C-5691 01 Civil Site Works 6/12/22 6/16/22 Approved as noted

"Inspection of Thrust Block for Potable Water Line ( Dia 80 & 50mm) at Zone-M - As Highlighted (SCR-
M5 5 KAIG3-RFI-SW-C-5694 00 Civil Site Works 6/4/22 6/5/22 Approved as noted
KAIG3-SCR-SW-C-0021-00)"
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- M - As Highlighted
M5 5 KAIG3-RFI-SW-C-5695 00 Civil Site Works 6/4/22 6/5/22 Approved as noted
(SCR-KAIG3-SCR-SW-C-0021-00)

D2 2 KAIG3-RFI-SW-C-5697 00 Excavation for Non-Potable Water Line near Tower-1 at Zone D - as highlighted Civil Site Works 6/5/22 6/9/22 Approved as noted

"Excavation for Non-Potable Water Line at Zone G including Pit - NPW-ISC-18, POC-11 - As highlighted "
G34 4 KAIG3-RFI-SW-C-5698 00 Civil Site Works 6/5/22 6/8/22 Approved as noted

Inspection of Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone D - as highlighted
D2 2 KAIG3-RFI-SW-C-5699 00 Civil Site Works 6/5/22 6/8/22 Approved as noted
(Stock Pile # 132)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5700 00 Civil Site Works 6/5/22 6/7/22 Approved as noted
for C/PW/08 as highlighted. (SP#133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5701 00 Civil Site Works 6/5/22 6/9/22 Approved as noted
for C/PW/08 as highlighted. (SP#133 A-1-B)
"Surface Preparation prior to start Waterproofing for Concrete Encaseent around the pipe near SBC-06 (Right
4A 4 KAIG3-RFI-SW-C-5702 00 Side) at Zone-4 - As Highlighted (ZHBG - action to close Non-Conformance Report # KAIG3-NCR-SW-C- Civil Site Works 6/5/22 6/7/22 Approved as noted
0005-00)"
Excavation for Telecommunication Line between H/TL/17 to H/TL/20 including pit H/TL/17 at Zone-H as
H4 4 KAIG3-RFI-SW-C-5703 00 Civil Site Works 6/5/22 6/9/22 Approved as noted
highlighted in the attached drawing
Excavation for Fire & Security Distribution Line between H/FS/18 to H/FS/24 Including Pit H/FS/18 at Zone-
H4 4 KAIG3-RFI-SW-C-5704 00 Civil Site Works 6/5/22 6/9/22 Approved as noted
H - as highlighted in the attached drawing

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5705 00 Civil Site Works 6/5/22 6/7/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-5712 00 Civil Site Works 6/5/22 6/11/22 Code C (resubmit)
Highlighted)
Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-5712 01 Civil Site Works 7/14/22 7/17/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G
BG4 4 KAIG3-RFI-SW-C-5713 00 Civil Site Works 6/5/22 6/11/22 Code C (resubmit)
(As Highlighted)
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G
BG4 4 KAIG3-RFI-SW-C-5713 01 Civil Site Works 7/14/22 7/18/22 Approved as noted
(As Highlighted)

kaig-qcals 284
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/17 to C/MV/02) at Zone-B&G -
BG3 3 KAIG3-RFI-SW-C-5714 00 Civil Site Works 6/5/22 6/7/22 Approved as noted
as highlighted (SP#132)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5715 00 Civil Site Works 6/5/22 6/7/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

"Inspection of Waterproofing for Concrete Encasement around the pipe near SBC-06 (Right Side) at Zone-4
4A 4 KAIG3-RFI-SW-C-5717 00 - As Highlighted (ZHBG - action to close Non-Conformance Report # KAIG3-NCR-SW-C-0005-00)" Civil Site Works 6/6/22 6/7/22 Approved as noted

"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone G - As highlighted (Stock Pile
G34 4 KAIG3-RFI-SW-C-5718 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
# 132)"
Excavation for Non-Potable Water Line at Zone B&C including Pit - NPW-ISC-09, NPW-ISC-10, POC-06 -
BC3 3 KAIG3-RFI-SW-C-5719 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
As highlighted

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5720 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
for C/PW/05 as highlighted. (SP#133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5721 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

Inspection of Sand Bedding under pipe for Telecommunication Line between H/TL/17 to H/TL/20 at Zone-H
H4 4 KAIG3-RFI-SW-C-5722 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
as highlighted in the attached drawing (SP# 132)

Inspection of Sand bedding under pipe for Fire & Security Distribution Line between H/FS/18 to H/FS/24 at
H4 4 KAIG3-RFI-SW-C-5723 00 Civil Site Works 6/6/22 6/9/22 Approved as noted
Zone-H - as highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B&C - As highlighted (Stock Pile
BC34 4 KAIG3-RFI-SW-C-5724 00 Civil Site Works 6/7/22 6/11/22 Approved as noted
# 132)
C3 3 KAIG3-RFI-SW-C-5725 00 Inspection for Installation of MV Line Junction Pit - C/MV/15 - as highlighted Civil Site Works 8/3/22 Open
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5737 00 Civil Site Works 6/7/22 6/9/22 Approved as noted
for C/PW/05 as highlighted. (SP#133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5738 00 Civil Site Works 6/7/22 6/13/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

Inspection for Installation of Fire Water Line Isolation Pit L/F/08, L/F/09, L/F/10, L/F/11 at Zone - L - as
L5 5 KAIG3-RFI-SW-C-5739 00 Civil Site Works 6/7/22 6/16/22 Approved as noted
highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 5) beside Non-Potable Water Line
C3 3 KAIG3-RFI-SW-C-5740 00 Civil Site Works 6/7/22 6/9/22 Approved as noted
near Plaza Area at Zone C - as highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5741 00 Civil Site Works 6/7/22 6/9/22 Approved as noted
Potable Water Line at Zone- K - as highlighted (SP# 133)

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B-FS-15 to B-
B4 4 KAIG3-RFI-SW-C-5742 00 Civil Site Works 6/7/22 6/8/22 Approved as noted
FS-17 at Zone-B as highlighted in the attached drawing

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/12 to B/TL/15 at
B4 4 KAIG3-RFI-SW-C-5743 00 Civil Site Works 6/7/22 6/8/22 Approved as noted
Zone-B - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B-FS-44 to B-
B4 4 KAIG3-RFI-SW-C-5744 00 Civil Site Works 6/7/22 6/8/22 Approved as noted
FS-31 at Zone-B as highlighted in the attached drawing

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/51 to B/TL/32 at
B4 4 KAIG3-RFI-SW-C-5745 00 Civil Site Works 6/7/22 6/8/22 Approved as noted
Zone-B - as highlighted in the attached drawing

C3 3 KAIG3-RFI-SW-C-5754 00 Excavation for Potable Water Line near Plaza area at Zone-C including Pit C/PW/02 - as highlighted Civil Site Works 6/8/22 6/9/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5755 00 Excavation for Fire Water Line near Plaza area at Zone-C including Pit C/F/05 - as highlighted Civil Site Works 6/8/22 6/9/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5756 00 Civil Site Works 6/8/22 6/13/22 Approved as noted
for C/PW/05 as highlighted. (SP#133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 7) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5757 00 Civil Site Works 6/8/22 6/13/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non-Potable water line
B3 3 KAIG3-RFI-SW-C-5758 00 Pit - NPW-ISC-12, NPW-ISC-13 , NPW-ISC-20 at Zone B - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 6/8/22 6/12/22 Approved as noted

kaig-qcals 285
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 10) beside Non-Potable Water Line
C3 3 KAIG3-RFI-SW-C-5759 00 Civil Site Works 6/8/22 6/12/22 Approved as noted
near Plaza Area at Zone C - as highlighted

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-5760 00 Civil Site Works 6/8/22 6/12/22 Approved as noted
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

G34 4 KAIG3-RFI-SW-C-5765 00 Excavation for Non-Potable Water Line at Zone G - As highlighted Civil Site Works 6/9/22 6/12/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-5766 00 Excavation for MV Line Pit G/MV/20 - as highlighted Civil Site Works 6/9/22 6/13/22 Approved as noted
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 5) beside Non-Potable Water Line
6 3 KAIG3-RFI-SW-C-5767 00 Civil Site Works 6/9/22 6/13/22 Approved as noted
near Plaza Area at Zone C - as highlighted
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 1) above GreenTiles for Fire &
B4 4 KAIG3-RFI-SW-C-5768 00 Security Distribution Line from B-FS-44 to B-FS-31 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 6/9/22 6/13/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 1) above Green Tiles for
B4 4 KAIG3-RFI-SW-C-5769 00 Telecommunication Line from B/TL/51 to B/TL/32 at Zone-B - as highlighted in the attached drawing (Stock Civil Site Works 6/9/22 6/13/22 Approved as noted
Pile # 133 A-1-B)
Inspection of Sand bedding under pipe for Potable Water Line near Plaza area at Zone-C - as highlighted
C3 3 KAIG3-RFI-SW-C-5770 00 Civil Site Works 6/9/22 6/13/22 Approved as noted
(Stock Pile # 132)

Inspection of Sand bedding under pipe for Fire Water Line near Plaza area at Zone-C - as highlighted
C3 3 KAIG3-RFI-SW-C-5771 00 Civil Site Works 6/9/22 6/13/22 Approved as noted
(StockPile # 132)

Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 10) beside Non-Potable Water Line
C 3 KAIG3-RFI-SW-C-5772 00 Civil Site Works 6/9/22 6/13/22 Approved as noted
near Plaza Area at Zone C - as highlighted
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/17 to C/MV/02 at Zone-B&C as
BC 3 KAIG3-RFI-SW-C-5773 00 Civil Site Works 6/9/22 6/11/22 Approved as noted
highlighted in the attached drawing
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non-Potable water line
CFG34 4 KAIG3-RFI-SW-C-5774 00 Pit - NPW-ISC-01, NPW-ISC-02 , NPW-ISC-03, NPW-ISC-08, NPW-ISC-21 at Zone C,F,G - as highlighted Civil Site Works 6/9/22 6/13/22 Approved as noted
(Stock Pile # 133 A-1-B)
Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from
BC 3 KAIG3-RFI-SW-C-5775 00 B/TL/36 to G/RC-TL/1, G/RC-TL/2 to C/TL/15 & B/TL/37 to B/RC-TL/35 at Zone-B&C (As Highlighted) Civil Site Works 6/9/22 6/11/22 Approved as noted

'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
LM 5 KAIG3-RFI-SW-C-5777 00 Civil Site Works 6/9/22 6/12/22 Approved as noted
attached Dwg.
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
LM 5 KAIG3-RFI-SW-C-5778 00 Civil Site Works 6/9/22 6/12/22 Approved as noted
attached Dwg.

Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line from B/fS/26 to B/RC-
BC 3 KAIG3-RFI-SW-C-5779 00 Civil Site Works 6/9/22 6/11/22 Approved as noted
FS/12, B/RC-FS/8 to C/RC-FS/34 & C/FS/08 to G/RC-FS/11 at Zone-B&C - As Highlighted

Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from B/MV/13 to C/MV/30
BC 3 KAIG3-RFI-SW-C-5780 00 Civil Site Works 6/9/22 6/11/22 Approved as noted
at Zone- B&C (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B 6B KAIG3-RFI-SW-C-5781 00 Civil Site Works 6/9/22 6/14/22 Approved as noted
6 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-6 (As
6B 6B KAIG3-RFI-SW-C-5782 00 Civil Site Works 6/9/22 6/13/22 Approved as noted
Highlighted) "

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) around Concrete Encasement
4A 4 KAIG3-RFI-SW-C-5783 00 near SBC-06 (Right Side) at Zone-4 - As Highlighted (ZHBG - action to close Non-Conformance Report # Civil Site Works 6/9/22 6/13/22 Approved as noted
KAIG3-NCR-SW-C-0005-00)"

Excavation for Telecommunication Line from B/TL/42 to C/TL/49 & C/TL/51 to C/TL/18 including pit
BC 3 KAIG3-RFI-SW-C-5784 00 B/TL/43, B/TL/50, B/TL/18, B/TL/11, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/18, 49 at Zone-B&C as Civil Site Works 6/9/22 6/12/22 Approved as noted
highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from B/FS/21 to C/FS/46 & C/FS/47 to C/FS/15 and
BC 3 KAIG3-RFI-SW-C-5785 00 B/FS/40, B/FS/05, C/FS/10, C/FS/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/15, C/FS/48 at Zone-B&C Civil Site Works 6/9/22 6/12/22 Approved as noted
- as highlighted in the attached drawing

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) around Concrete Encasement
4A 4 KAIG3-RFI-SW-C-5786 00 near SBC-06 (Right Side) at Zone-4 - As Highlighted (ZHBG - action to close Non-Conformance Report # Civil Site Works 6/9/22 6/13/22 Approved as noted
KAIG3-NCR-SW-C-0005-00)"

kaig-qcals 286
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

G3 3 KAIG3-RFI-SW-C-5788 00 "Excavation for Non-Potable Water Line Pit at Zone G - NPW-ISC-16 - As highlighted " Civil Site Works 6/11/22 6/13/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5789 00 Inspection for Installation of MV Line Junction Pit - C/MV/21, C/MV/31 - as highlighted Civil Site Works 6/11/22 6/14/22 Approved as noted

Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone G - As highlighted (Stock Pile #
G34 4 KAIG3-RFI-SW-C-5790 00 Civil Site Works 6/11/22 6/13/22 Approved as noted
132)
Inspection and Compaction Test for backfilling Sub-grade 3rd layer (3 of 5) beside Non-Potable Water Line
C 3 KAIG3-RFI-SW-C-5791 00 Civil Site Works 6/11/22 6/14/22 Approved as noted
near Plaza Area at Zone C - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd layer (3 of 10) beside Non-Potable Water Line
C 3 KAIG3-RFI-SW-C-5792 00 Civil Site Works 6/11/22 6/13/22 Approved as noted
near Plaza Area at Zone C - as highlighted

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
BC3 3 KAIG3-RFI-SW-C-5793 00 Civil Site Works 6/11/22 6/13/22 Approved as noted
from B/MV/17 to C/MV/02 at Zone-B&C as highlighted (Stock Pile # 133 A-1-B)"

Inspection and compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above GreenTiles for Fire &
B4 4 KAIG3-RFI-SW-C-5794 00 Security Distribution Line from B-FS-15 to B-FS-17 at Zone-B as highlighted in the attached drawing (Stock Civil Site Works 6/11/22 6/13/22 Approved as noted
Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Green Tiles for
B4 4 KAIG3-RFI-SW-C-5795 00 Telecommunication Line from B/TL/12 to B/TL/15 at Zone-B - as highlighted in the attached drawing (Stock Civil Site Works 6/11/22 6/13/22 Approved as noted
Pile # 133 A-1-B)

B4 4 KAIG3-RFI-SW-C-5800 00 Excavation for Non-Potable Water Line at Zone B - As highlighted Civil Site Works 6/11/22 6/14/22 Approved as noted

Excavation for Telecommunication Line at Zone-B,F&G including pit B/TL/34, B/TL/30, F/TL/10, G/TL/01,
BFG4 4 KAIG3-RFI-SW-C-5801 00 Civil Site Works 6/11/22 6/13/22 Approved as noted
G/TL/03 - as highlighted in the attached drawing

Excavation for Fire & Security Distribution at Zone-B,F&G including Pit B/FS/02, B/FS/04, F/FS/09,
BFG4 4 KAIG3-RFI-SW-C-5802 00 Civil Site Works 6/11/22 6/13/22 Approved as noted
G/FS/02, G/FS/45 at Zone-B&C - as highlighted in the attached drawing

"Inspection of Thrust Block for Potable Water Line ( Dia 80mm) at Zone-L - As Highlighted (SCR-KAIG3-
L5 5 KAIG3-RFI-SW-C-5805 00 Civil Site Works 6/12/22 6/14/22 Approved as noted
SCR-SW-C-0021-00)"
Inspection of Thrust Block for UPVC Pipe (200 & 160 mm Dia) for Fire Water Line at Zone- L - As
L5 5 KAIG3-RFI-SW-C-5806 00 Civil Site Works 6/12/22 6/14/22 Approved as noted
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
Inspection for Installation of MV Line Junction Pit - B/MV/04, C/MV/18, C/MV/19, H/MV/32 - as
B CH35 5 KAIG3-RFI-SW-C-5807 00 Civil Site Works 6/12/22 6/14/22 Approved as noted
highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/01, G/MV/20, L/MV/07, L/MV/09 - as
B CH35 5 KAIG3-RFI-SW-C-5808 00 Civil Site Works 6/12/22 6/14/22 Approved as noted
highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted in the
D2 2 KAIG3-RFI-SW-C-5809 00 Civil Site Works 6/12/22 6/13/22 Approved as noted
attached drawing (SP# 132)

B3 3 KAIG3-RFI-SW-C-5810 00 "Excavation for Non-Potable Water Line at Zone B including Pit NPW-ISC-14, POC-09 - As highlighted " Civil Site Works 6/12/22 6/14/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non-Potable water line
B3 3 KAIG3-RFI-SW-C-5811 00 Pit - NPW-ISC-12, NPW-ISC-13 , NPW-ISC-20 at Zone B - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 6/12/22 6/14/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) around Concrete Encasement
4A 4 KAIG3-RFI-SW-C-5812 00 near SBC-06 (Right Side) at Zone-4 - As Highlighted (SP#110) (ZHBG - action to close Non-Conformance Civil Site Works 6/12/22 6/18/22 Approved as noted
Report # KAIG3-NCR-SW-C-0005-00)"

Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/23, G/MV/03,
CGH34 4 KAIG3-RFI-SW-C-5813 00 G/MV/19, G/MV/27, G/MV/31, H/MV/02, H/MV/09, H/MV/25 at Zone-C,G&H (As Highlighted) Civil Site Works 6/12/22 6/16/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 8) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5814 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
for C/PW/05 as highlighted. (SP#133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5815 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

G4 4 KAIG3-RFI-SW-C-5821 00 Excavation for MV Line Pit G/MV/33 at Zone-G - as highlighted Civil Site Works 6/13/22 6/15/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5822 00 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted Civil Site Works 6/13/22 6/16/22 Approved as noted

Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-C&K - as highlighted
CK35 5 KAIG3-RFI-SW-C-5823 00 Civil Site Works 6/13/22 6/16/22 Approved as noted

kaig-qcals 287
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted in the
D2 2 KAIG3-RFI-SW-C-5824 00 Civil Site Works 6/13/22 6/15/22 Approved as noted
attached drawing (SP# 132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- G - as highlighted in the
G4 4 KAIG3-RFI-SW-C-5825 00 Civil Site Works 6/13/22 6/14/22 Approved as noted
attached drawing (SP# 132)
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-5826 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
Highlighted)
Inspection of Formwork for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-5827 00 Civil Site Works 6/13/22 6/18/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-5828 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
Highlighted)
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B - As highlighted (Stock Pile #
B3 3 KAIG3-RFI-SW-C-5829 00 Civil Site Works 6/13/22 6/14/22 Approved as noted
132)"
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B - As highlighted (Stock Pile #
B4 4 KAIG3-RFI-SW-C-5830 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
132)"
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - G/MV/02 at Zone-B&G (As
G4 4 KAIG3-RFI-SW-C-5833 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
Highlighted)

Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/23, G/MV/02 G/MV/03, G/MV/19,
CGH34 4 KAIG3-RFI-SW-C-5834 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
G/MV/27, G/MV/31, H/MV/02, H/MV/09, H/MV/25 at Zone-C,G&H (As Highlighted)

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/23, G/MV/02 G/MV/03,
CGH34 4 KAIG3-RFI-SW-C-5835 00 G/MV/19, G/MV/27, G/MV/31, H/MV/02, H/MV/09, H/MV/25 at Zone-C,G&H (As Highlighted) Civil Site Works 6/13/22 6/16/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5836 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th layer (4 of 10) beside Non-Potable Water Line
C 3 KAIG3-RFI-SW-C-5837 00 Civil Site Works 6/13/22 6/16/22 Approved as noted
near Plaza Area at Zone C - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non-Potable water line
CFG34 4 KAIG3-RFI-SW-C-5841 00 Pit - NPW-ISC-01, NPW-ISC-02 , NPW-ISC-03, NPW-ISC-08, NPW-ISC-21 at Zone C,F,G - as highlighted Civil Site Works 6/14/22 6/16/22 Approved as noted
(Stock Pile # 133 A-1-B)

Surface Preparation prior to start Waterproofing for the Duct Bank of MV Line from C/MV/02 to C/MV/40 at
C3 3 KAIG3-RFI-SW-C-5842 00 Civil Site Works 6/14/22 6/15/22 Approved as noted
Zone-C (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to protect
G4 4 KAIG3-RFI-SW-C-5843 00 the pipe for Non-Potable Water Line at Zone- G - as highlighted in the attached drawing (SP# 132) Civil Site Works 6/14/22 6/16/22 Approved as noted

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line Branch at Zone- G - as
G4 4 KAIG3-RFI-SW-C-5844 00 Civil Site Works 6/14/22 6/18/22 Code C (not resubmit)
highlighted in the attached drawing (SP# 132)

D2 2 KAIG3-RFI-SW-C-5845 00 Surface Preparation prior to start backfilling Sub-grade under Cesspool-3 at Zone-D - as highlighted Civil Site Works 6/14/22 6/18/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5846 00 Civil Site Works 6/14/22 6/16/22 Approved as noted
Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 10) around Potable Water Line Pit
3 3 KAIG3-RFI-SW-C-5847 00 Civil Site Works 6/14/22 6/16/22 Approved as noted
for C/PW/05 as highlighted. (SP#133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 10) around Fire Water Line Pit for
3 3 KAIG3-RFI-SW-C-5848 00 Civil Site Works 6/14/22 6/16/22 Approved as noted
C/F/11, C/F/12, C/F/13 as highlighted. (SP # 133)

C3 3 KAIG3-RFI-SW-C-5849 00 "Excavation for MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22 at Zone-C - as highlighted " Civil Site Works 6/15/22 6/18/22 Approved as noted

"Inspection for Installation of Non-Potable Water Line Isolation Pit NPW-ISC-05, NPW-ISC-07 at Zone- K -
K5 5 KAIG3-RFI-SW-C-5850 00 Civil Site Works 6/15/22 6/19/22 Approved as noted
as highlighted (Red Line - NPW-ISC-05)"
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) from
2M 2 KAIG3-RFI-SW-C-5856 00 (FW-A-3-12)&(FW-A-3-14). At CRECENT Zone 2M ( Devonian Garden). As per highlighted Area in the Civil Site Works 6/14/22 6/16/22 Approved as noted
attached Dwg.

' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-12)&(FW-A-3-14). At
2M 2 KAIG3-RFI-SW-C-5857 00 Civil Site Works 6/14/22 6/16/22 Approved as noted
CRECENT Zone 2M ( Devonian Garden). As per highlighted Area in the attached Dwg.

kaig-qcals 288
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Pipe sleeve installation for strip footing Mechanical; (160mmØupvc class 4) From axis (02&AE) to (02/AG)
2K 2 KAIG3-RFI-SW-C-5858 00 Civil Site Works 6/14/22 6/18/22 Approved as noted
at Crescent ; as per high lighted attached approved shop drawing.

Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
4D 4 KAIG3-RFI-SW-C-5863 00 Civil Site Works 6/15/22 6/19/22 Approved as noted
Highlighted)
Inspection of Formwork for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG4 4 KAIG3-RFI-SW-C-5864 00 Civil Site Works 6/15/22 6/16/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG4 4 KAIG3-RFI-SW-C-5865 00 Civil Site Works 6/15/22 6/18/22 Approved as noted
Highlighted)

F 4 KAIG3-RFI-SW-C-5866 00 Excavation for Non-Potable Water Line Branch including Pit POC-0:NPW at Zone F As highlighted Civil Site Works 6/15/22 6/18/22 Approved as noted

2 2 KAIG3-RFI-SW-C-5867 00 Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as Highlighted) Civil Site Works 6/15/22 6/16/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5870 00 Civil Site Works 6/15/22 6/19/22 Approved as noted
Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B)

4D 4 KAIG3-RFI-SW-C-5871 00 Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-03-01 - As Highlighted Civil Site Works 6/15/22 6/18/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-5872 00 Civil Site Works 6/15/22 6/19/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

L5 5 KAIG3-RFI-SW-C-5875 00 Excavation for Potable Water Line at Zone-L including Pit - L/PW/06 - as highlighted Civil Site Works 6/15/22 6/18/22 Approved as noted

Inspection of Water proofing for the Duct Bank of Telecommunications Line from B/TL/36 to G/RC-TL/1,
BC3 3 KAIG3-RFI-SW-C-5876 00 Civil Site Works 6/15/22 6/16/22 Approved as noted
G/RC-TL/2 to C/TL/15 & B/TL/37 to B/RC-TL/35 at Zone-B&C (As Highlighted)

inspection of Waterproofing for Duct Bank of Fire & Security line from B/fS/26 to B/RC-FS/12, B/RC-FS/8
BC 3 KAIG3-RFI-SW-C-5877 00 Civil Site Works 6/15/22 6/16/22 Approved as noted
to C/RC-FS/34 & C/FS/08 to G/RC-FS/11 at Zone-B&C - As Highlighted

Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to C/MV/30 at Zone- B&C (As
BC3 3 KAIG3-RFI-SW-C-5878 00 Civil Site Works 6/15/22 6/16/22 Approved as noted
Highlighted)
Inspection of Waterproofing for the Duct Bank of MV Line from C/MV/02 to C/MV/40 at Zone-C (As
C 3 KAIG3-RFI-SW-C-5879 00 Civil Site Works 6/15/22 6/16/22 Approved as noted
Highlighted)
Surface Preparation prior to start backfilling Sub-grade for the Duct Bank of MV Line from C/MV/02 to
C 3 KAIG3-RFI-SW-C-5880 00 Civil Site Works 6/15/22 6/18/22 Approved as noted
C/MV/40 at Zone-C (As Highlighted)
Surface Preparation prior to start backfilling gravel around MV Line Pit C/MV/02 at Zone-C (As
C 3 KAIG3-RFI-SW-C-5882 00 Civil Site Works 6/15/22 6/18/22 Approved as noted
Highlighted)
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/01, F/PW/11 as
CF34 4 KAIG3-RFI-SW-C-5883 00 Civil Site Works 6/15/22 6/18/22 Approved as noted
highlighted.
Surface Preparation prior to start backfilling around Fire Water Line Pit for B/F/10, B/F/12, B/F/17, C/F/04 as
BC3 3 KAIG3-RFI-SW-C-5884 00 Civil Site Works 6/15/22 6/18/22 Approved as noted
highlighted.
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 3) for Storm Water Line beside
4D 4 KAIG3-RFI-SW-C-5886 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Manhole MH-D-01 as highlighted (SP 133 A-1-B).

L5 5 KAIG3-RFI-SW-C-5887 00 Excavation for Fire Water Line at Zone L including Pit L/F/12, L/F/14 as highlighted. Civil Site Works 6/16/22 6/19/22 Code C (resubmit)

L5 5 KAIG3-RFI-SW-C-5887 01 Excavation for Fire Water Line at Zone L including Pit L/F/12, L/F/14 as highlighted. Civil Site Works 6/30/22 7/7/22 Approved as noted
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (2 of 3) for Storm Water Line beside
4D 4 KAIG3-RFI-SW-C-5888 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Manhole MH-D-01 as highlighted (SP 133 A-1-B).
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (2 of 8) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-5889 00 Civil Site Works 6/16/22 21-Jun Approved as noted
highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 3) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5890 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Potable Water Line at Zone D as highlighted (SP 133 A-1-B).

Inspection for Backfilling Gravel 1st Layer (1 of 10) around Manhole MH-D-03-01 as highlighted (Stock Pile
4D 4 KAIG3-RFI-SW-C-5891 00 Civil Site Works 6/16/22 6/18/22 Approved as noted
118).

Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 3) above Sand Covering for Non-
G4 4 KAIG3-RFI-SW-C-5892 00 Civil Site Works 6/16/22 6/19/22 Code C (not resubmit)
Potable Water Line at Zone G as highlighted (SP 133 A-1-B).

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50, B/T/18, B/TL/11,
BC34 4 KAIG3-RFI-SW-C-5893 00 Civil Site Works 6/16/22 6/18/22 Approved as noted
C/TL/12, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/49 at Zone B & C as highlighted.

kaig-qcals 289
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05, B/FS/41, B/FS/10,
BC34 4 KAIG3-RFI-SW-C-5894 00 Civil Site Works 6/16/22 6/18/22 Approved as noted
C/TL/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/46 at Zone B as highlighted.

Inspection and Compaction Test for Backfilling Sub-Grade 3rd Layer (3 of 6) around Non-Potable Water
BFG34 4 KAIG3-RFI-SW-C-5895 00 Line Pit NPW-ISC-01, NPW-ISC-02, NPW-ISC-03, NPW-ISC-08, NPW-ISC-12, NPW-ISC-13 at Zone B F Civil Site Works 6/18/22 6/21/22 Approved as noted
G as highlighted (Stock Pile 133 A-1-B).

Inspection of Sand Bedding under Pipe for Non-Potable Water Line branch at Zone F - as highlighted (Stock
F4 4 KAIG3-RFI-SW-C-5896 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Pile 132).
C3 3 KAIG3-RFI-SW-C-5897 00 Excavation for MV Line Pit C/MV/24, C/MV/41 at Zone C as highlighted. Civil Site Works 6/16/22 6/19/22 Approved as noted
Inspection and Compaction test for Backfilling Sub-Grade 5th Layer (5 of 10) beside Non-Potable Water Line
C3 3 KAIG3-RFI-SW-C-5898 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
near Plaza Area at Zone C as highlighted.
Surface Preparation prior to Backfilling Gravel for the Duct Bank of Telecommunications Line between
BC3 3 KAIG3-RFI-SW-C-5899 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
B/RC-TL/11 and C/TL/15 at Zone B & C as highlighted.
Surface Preparation prior to Backfilling Gravel for the Duct Bank of Fire & Security Line between B/RC-
BC34 4 KAIG3-RFI-SW-C-5900 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
FS/08 and C/TL/15 at Zone B & C as highlighted.
Surface Preparation prior to Backfilling Gravel for the Duct Bank of MV Line from B/MV/08 to C/MV/30 at
BC3 3 KAIG3-RFI-SW-C-5904 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Zone B & C as highlighted.
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 4) for the Duck Bank of MV Line
C3 3 KAIG3-RFI-SW-C-5905 00 Civil Site Works 6/16/22 6/20/22 Approved as noted
from C/MV/02 to C/MV/40 at Zone C as highlighted (SP 133 A-1-B).
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 6) around MV Line Pit C/MV/02 at
C3 3 KAIG3-RFI-SW-C-5906 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
Zone C as highlighted (SP 133 A-1-B).
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 6) around Potable Water Line Pit
CF34 4 KAIG3-RFI-SW-C-5907 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
for C/PW/01, F/PW/11 as highlighted (SP 133 A-1-B).
Inspection and Compaction test for Backfilling Sub-Grade 1st Layer (1 of 6) around Fire Water Line Pit for
BC3 3 KAIG3-RFI-SW-C-5908 00 Civil Site Works 6/16/22 6/19/22 Approved as noted
B/FW/10, F/PW/12, B/F/04 as highlighted (SP 133 A-1-B).
Inspection of Blinding Concrete under MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22, C/MV/40,
C3 3 KAIG3-RFI-SW-C-5909 00 Civil Site Works 6/18/22 6/20/22 Approved as noted
C/MV/24, C/MV/41 at Zone-C - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/01, H/MV/30, L/MV/07, L/MV/09 - as
BHL345 5 KAIG3-RFI-SW-C-5910 00 Civil Site Works 6/18/22 6/23/22 Code C (resubmit)
highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/01, H/MV/30, L/MV/07, L/MV/09 - as
BHL345 5 KAIG3-RFI-SW-C-5910 01 Civil Site Works 7/5/22 7/6/22 Approved as noted
highlighted

C&K 3 KAIG3-RFI-SW-C-5911 00 Inspection for Installation of Fire Water Line Isolation Pit C/F/05, K/F/07 at Zone - C&K - as highlighted Civil Site Works 6/18/22 6/23/22 Code C (resubmit)

C&K 3 KAIG3-RFI-SW-C-5911 01 Inspection for Installation of Fire Water Line Isolation Pit C/F/05, K/F/07 at Zone - C&K - as highlighted Civil Site Works 7/6/22 7/7/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5912 00 Excavation for Potable Water Line near Plaza area at Zone-C including Pit C/PW/04 - as highlighted Civil Site Works 6/18/22 6/21/22 Approved as noted

Inspection of Sand Bedding under Pipe for Fire Water Line near Plaza area at Zone C as highlighted (Stock
C3 3 KAIG3-RFI-SW-C-5913 00 Civil Site Works 6/20/22 6/22/22 Approved as noted
Pile 132).

Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 3) for Storm Water Line beside
4D 4 KAIG3-RFI-SW-C-5914 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
Manhole MH-D-01 - As Highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5916 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line between
BC3 3 KAIG3-RFI-SW-C-5917 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
B/RC-TL/11 and C/TL/15 at Zone-B&C - As Highlighted (SP# 118)

Inspection of backfilling Gravel 1st Layer ( 1 of 1) for Duct Bank of Fire & Security line between
BC34 4 KAIG3-RFI-SW-C-5918 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
B/RC-FS/08 and C/FS/08 at Zone-B&C - As Highlighted
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/08 to C/MV/30
BC3 3 KAIG3-RFI-SW-C-5919 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
at Zone- B&C (As Highlighted) (Stock Pile # 118)

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV Line
C3 3 KAIG3-RFI-SW-C-5920 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
from C/MV/02 to C/MV/40 at Zone-C (As Highlighted) Stock Pile # 133 A-1B)"

Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 6) around Potable Water Line Pit
CF34 4 KAIG3-RFI-SW-C-5921 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
for C/PW/01, F/PW/11 as highlighted. (SP#133)

kaig-qcals 290
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

B3 3 KAIG3-RFI-SW-C-5922 00 "Excavation for MV Line Pit - B/MV05 at Zone-B - as highlighted (Red Line - B/MV/05)" Civil Site Works 6/20/22 6/23/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Potble
LM 5 KAIG3-RFI-SW-C-5923 00 Civil Site Works 6/18/22 6/22/22 Approved as noted
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fire
LM 5 KAIG3-RFI-SW-C-5924 00 Civil Site Works 6/18/22 6/22/22 Approved as noted
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - G/MV/08, G/MV/09,
G3 3 KAIG3-RFI-SW-C-5925 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
G/MV/34, G/MV/35, G/MV/36 at Zone-G (As Highlighted)
Inspection for Backfilling Gravel 2nd Layer (2 of 2) around Manhole MH-D-03-01 - As Highlighted (Stock
4D 4 KAIG3-RFI-SW-C-5930 00 Civil Site Works 6/19/22 6/21/22 Approved as noted
Pile # 118)
Inspection of Excavation for Heating and Chilled Water Line at Zone-B&G including Pit G/DC/13 - As
BG34 4 KAIG3-RFI-SW-C-5931 00 Civil Site Works 6/19/22 6/21/22 Approved as noted
highlighted
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) above Gravel around the
5A 5 KAIG3-RFI-SW-C-5932 00 Civil Site Works 6/19/22 6/22/22 Approved as noted
Manhole for MH-D-01 as Highlighted (SP#133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-5933 00 Civil Site Works 6/19/22 6/22/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
D2 2 KAIG3-RFI-SW-C-5934 00 Civil Site Works 6/19/22 6/22/22 Approved as noted
Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection of backfilling Gravel 1st & 2nd Layer (2 of 2) around Fire Water Line Pit for B/F/17 as
C3 3 KAIG3-RFI-SW-C-5935 00 Civil Site Works 6/19/22 6/21/22 Approved as noted
highlighted. (Stock Pile # 118)
Surface Preparation prior to start backfilling Sub-grade around MV Line Pit B/MV/17, B/MV/26, B/MV/18,
B3 3 KAIG3-RFI-SW-C-5936 00 Civil Site Works 6/19/22 6/21/22 Approved as noted
B/MV/07 at Zone-B (As Highlighted)

H6 6 KAIG3-RFI-SW-C-5939 00 Excavation for MV Line Pit H/MV/29, H/MV/06, H/MV/04 at Zone-H - as highlighted Civil Site Works 6/19/22 6/22/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5940 00 Inspection of Blinding Concrete under MV Line Pit C/MV/05, C/MV/30 at Zone-C - as highlighted Civil Site Works 6/19/22 6/20/22 Approved as noted

Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/40 at Zone-C (As
C3 3 KAIG3-RFI-SW-C-5941 00 Civil Site Works 6/19/22 6/21/22 Approved as noted
Highlighted)
Inspection for Installation of Potable Water Line Isolation Pit C/PW/02, F/PW/08 at Zone- G&K - as
CF34 4 KAIG3-RFI-SW-C-5942 00 Civil Site Works 6/19/22 6/23/22 Code C (resubmit)
highlighted
Inspection for Installation of Potable Water Line Isolation Pit C/PW/02, F/PW/08 at Zone- G&K - as
CF34 4 KAIG3-RFI-SW-C-5942 01 Civil Site Works 7/6/22 7/7/22 Approved as noted
highlighted
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-46, G-O-47 - as
2B 2 KAIG3-RFI-SW-C-5943 00 Civil Site Works 6/19/22 6/23/22 Approved as noted
highlighted "
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-46, G-O-47 - as
2B 2 KAIG3-RFI-SW-C-5943 01 Civil Site Works 7/4/22 7/6/22 Approved as noted
highlighted "
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Gravel for Gully G-G-69
3A 3 KAIG3-RFI-SW-C-5944 00 Civil Site Works 6/19/22 6/23/22 Approved as noted
- AS Highlighted (SP#133 A-1-B)

3A 3 KAIG3-RFI-SW-C-5945 00 Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Gully G-G-69- AS Highlighted (SP#118) Civil Site Works 6/20/22 6/23/22 Approved as noted

'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
L 2 KAIG3-RFI-SW-C-5952 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
attached Dwg.
Inspection of Formwork for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG4 4 KAIG3-RFI-SW-C-5954 00 Civil Site Works 6/20/22 6/25/22 Approved as noted
Highlighted)
Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As
FG4 4 KAIG3-RFI-SW-C-5955 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
Highlighted)
Inspection of Sand bedding under pipe for Potable Water Line near Plaza area at Zone-C - as highlighted
C3 3 KAIG3-RFI-SW-C-5956 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
(Stock Pile # 132)
Inspection of Sand bedding under pipe for Fire Water Line near Plaza area at Zone-C - as highlighted (Stock
C3 3 KAIG3-RFI-SW-C-5957 00 Civil Site Works 6/22/22 6/25/22 Approved as noted
Pile # 132)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-5958 00 Civil Site Works 6/20/22 6/20/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV Line
C3 3 KAIG3-RFI-SW-C-5959 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
from C/MV/02 to C/MV/40 at Zone-C (As Highlighted) Stock Pile # 133 A-1B)"

kaig-qcals 291
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 6) around Potable Water Line Pit
CF34 4 KAIG3-RFI-SW-C-5960 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
for C/PW/01, F/PW/11 as highlighted. (SP#133)
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit for
BC3 3 KAIG3-RFI-SW-C-5961 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
B/F/10, B/F/12, B/F/17, C/F/04 as highlighted. (Stock Pile # 133 A-1-B)"
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) above Gravel around the
5A 5 KAIG3-RFI-SW-C-5962 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
Manhole for MH-D-01 as Highlighted (SP#133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Non-Potable water line
BFG34 4 KAIG3-RFI-SW-C-5963 00 Pit - NPW-ISC-01, NPW-ISC-02 , NPW-ISC-03, NPW-ISC-08, NPW-ISC-12, NPW-ISC-13 at Zone B,F,G Civil Site Works 6/20/22 6/23/22 Approved as noted
- as highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-5964 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection of Blinding Concrete under MV Line Pit G/MV/33, H/MV/29, H/MV/06, H/MV/04 at Zone-G&H
GH36 6 KAIG3-RFI-SW-C-5965 00 Civil Site Works 6/20/22 6/25/22 Approved as noted
- as highlighted
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35, G/MV36,
G3 3 KAIG3-RFI-SW-C-5967 00 Civil Site Works 6/20/22 6/25/22 Approved as noted
G/MV/08 at Zone-G (As Highlighted)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35,
G3 3 KAIG3-RFI-SW-C-5968 00 Civil Site Works 6/20/22 6/23/22 Approved as noted
G/MV36, G/MV/08 at Zone-G (As Highlighted)

BG3 3 KAIG3-RFI-SW-C-5969 00 Inspection for Installation of MV Line Junction Pit - B/MV/09, G/MV/12 - as highlighted Civil Site Works 6/20/22 6/23/22 Code C (resubmit)

BG3 3 KAIG3-RFI-SW-C-5969 01 Inspection for Installation of MV Line Junction Pit - B/MV/09, G/MV/12 - as highlighted Civil Site Works 7/5/22 7/6/22 Approved as noted

'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
L 3 KAIG3-RFI-SW-C-5971 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
attached Dwg.
Excavation for Telecommunication Line from C/TL/27 to C/TL/56 at Zone-C including pit C/TL/27,
C3 3 KAIG3-RFI-SW-C-5973 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
C/TL/56 - as highlighted in the attached drawing

Excavation for Fire & Security Distribution from C/FS/04 to C/FS/21 at Zone-C including Pit C/FS/04,
C3 3 KAIG3-RFI-SW-C-5974 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
C/FS/52, C/FS/21 - as highlighted in the attached drawing

Excavation for Telecommunication Line from C/TL/49 to C/TL/18 at Zone-C including pit C/TL/49,
C3 3 KAIG3-RFI-SW-C-5975 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
C/TL/51, C/TL/18 - as highlighted in the attached drawing

Excavation for Fire & Security Distribution Line from C/FS/46 to C/FS/15 at Zone-C including Pit C/FS/46,
C3 3 KAIG3-RFI-SW-C-5976 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
C/FS/45, C/FS/47, C/FS/15 - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 9) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-5977 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/22, C/MV/25,
C3 3 KAIG3-RFI-SW-C-5978 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
C/MV/08, C/MV/38 at Zone-C (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/22, C/MV/25, C/MV/08, C/MV/38 at
C3 3 KAIG3-RFI-SW-C-5979 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
Zone-C (As Highlighted)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/22, C/MV/25, C/MV/08,
C3 3 KAIG3-RFI-SW-C-5980 00 Civil Site Works 6/21/22 6/26/22 Approved as noted
C/MV/38 at Zone-C (As Highlighted)
"Excavation for Storm Water Line from MH-O-01 to MH-O-06 at Zone-2B including Manhole MH-O-01,
2B 2 KAIG3-RFI-SW-C-5981 00 MH-O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 and Gullies G-O-43, G-O-34, G-O-33, G-O-32, G-O- Civil Site Works 6/21/22 6/23/22 Approved as noted
29, G-O-28 - As highlighted "
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01 at Zone-F&G - as
FG4 4 KAIG3-RFI-SW-C-5982 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
highlighted
Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/09, G/FS/45 at Zone-F&G - as
FG4 4 KAIG3-RFI-SW-C-5983 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
highlighted

L5 5 KAIG3-RFI-SW-C-5984 00 Excavation for MV Line Pit - L/MV/17 at Zone-L - as highlighted Civil Site Works 6/21/22 CANCELLED

Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) above Gravel around the
5A 5 KAIG3-RFI-SW-C-5985 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
Manhole for MH-D-01 as Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-5989 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

C 3 KAIG3-RFI-SW-C-5990 00 Excavation for Non-Potable Water Line near Plaza Area at Zone C - As highlighted Civil Site Works 6/23/22 6/13/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-5991 00 Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As Highlighted) Civil Site Works 6/21/22 6/25/22 Approved as noted

kaig-qcals 292
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Fire Water Line Pit for
BC3 3 KAIG3-RFI-SW-C-5992 00 Civil Site Works 6/18/22 6/21/22 Approved as noted
B/F/10, B/F/12, B/F/17, C/F/04 as highlighted. (Stock Pile # 133 A-1-B)

C3 3 KAIG3-RFI-SW-C-5995 00 Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As Highlighted) Civil Site Works 6/21/22 6/23/22 Approved as noted

BH36 6 KAIG3-RFI-SW-C-5996 00 Inspection of Blinding Concrete under MV Line Pit B/MV/05, H/MV/10 at Zone-B&H - as highlighted Civil Site Works 6/21/22 6/25/22 Approved as noted

Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/23, G/MV/19, G/MV/31 at Zone-
CG34 4 KAIG3-RFI-SW-C-5997 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
C&G (As Highlighted)

Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/23, G/MV/19, G/MV/31 at
CG34 4 KAIG3-RFI-SW-C-5998 00 Civil Site Works 6/21/22 6/23/22 Approved as noted
Zone-C&G (As Highlighted)

3B 3 KAIG3-RFI-SW-C-5999 00 "INSPECTION FOR INSTALLATION OF SLAB FOR MH-M-12, MH-M-13 (As Highlighted)" Civil Site Works 8/3/22 Open

"Surface Prepatio prior to start backfilling around Non-Potable water line Pit - NPW-ISC-04 at Zone G -as
G4 4 KAIG3-RFI-SW-C-6000 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
highlighted "

Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Potble
LM5 5 KAIG3-RFI-SW-C-6001 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fire
LM5 5 KAIG3-RFI-SW-C-6002 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Surface Preparation prior to start backfilling for Foul Water Line between FW-A-12 and FW-A-13 - As
6A 6 KAIG3-RFI-SW-C-6003 00 Civil Site Works 6/21/22 6/25/22 Approved as noted
Highlighted

L5 5 KAIG3-RFI-SW-C-6004 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 6/21/22 6/25/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-6005 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 6/21/22 6/25/22 Code C (resubmit)

L5 5 KAIG3-RFI-SW-C-6005 01 Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) Civil Site Works 6/30/22 6/25/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Potble
LM5 5 KAIG3-RFI-SW-C-6006 00 Civil Site Works 6/22/22 6/26/22 Code C (not resubmit)
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fire
LM5 5 KAIG3-RFI-SW-C-6007 00 Civil Site Works 6/22/22 6/26/22 Code C (not resubmit)
Water Line at Zone- L&M - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6008 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection of Sand bedding under pipe for Non-Potable Water Line near Plaza Area at Zone C - As
C 3 KAIG3-RFI-SW-C-6009 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
highlighted (Stock Pile # 132) - (Red Line)
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 9) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-6010 00 Civil Site Works 6/26/22 6/29/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted in the
D2 2 KAIG3-RFI-SW-C-6011 00 Civil Site Works 6/22/22 6/25/22 Approved as noted
attached drawing (SP# 132)

CH23 3 KAIG3-RFI-SW-C-6012 00 Inspection for Installation of MV Line Junction Pit - C/MV/24, C/MV/41, H/MV/10 - as highlighted Civil Site Works 6/22/22 6/23/22 Code C (resubmit)

CH23 3 KAIG3-RFI-SW-C-6012 01 Inspection for Installation of MV Line Junction Pit - C/MV/24, C/MV/41, H/MV/10 - as highlighted Civil Site Works 7/5/22 7/6/22 Approved as noted

Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) above Gravel around the
5A 5 KAIG3-RFI-SW-C-6013 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
Manhole for MH-D-01 as Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6014 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Non-Potable water line
FG4 4 KAIG3-RFI-SW-C-6015 00 Pit - NPW-ISC-01, NPW-ISC-02 , NPW-ISC-03 at Zone B,F,G - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 6/22/22 6/28/22 Approved as noted

kaig-qcals 293
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Non-Potable water line
G4 4 KAIG3-RFI-SW-C-6016 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
Pit - NPW-ISC-04 at Zone G - as highlighted (SP # 133 A-1-B)

Surface Preparation prior to start backfilling for Telecommunication Line Pit F/TL/03, F/TL/04 at Zone-F - as
F4 4 KAIG3-RFI-SW-C-6017 00 Civil Site Works 6/22/22 CANCELLED
highlighted
Surface Preparation prior to start backfilling around Fire & Security Line Pit F/FS/03, F/FS/04 at Zone-F - as
F4 4 KAIG3-RFI-SW-C-6018 00 Civil Site Works 6/22/22 CANCELLED
highlighted
Inspection of Sand bedding under pipe for Telecommunication Line from C/TL/49 to C/TL/18 at Zone-C - as
C3 3 KAIG3-RFI-SW-C-6019 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
highlighted in the attached drawing (SP# 132)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from C/FS/46 to C/FS/15 at
C3 3 KAIG3-RFI-SW-C-6020 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
Zone-C - as highlighted (Stock Pile # 132)

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for Storm
4B 4 KAIG3-RFI-SW-C-6023 00 Civil Site Works 6/22/22 6/27/22 Approved as noted
Water pipe Out Fall-O ( G-O-46 to G-O-47 )(Red Line).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4) For Storm Water
4B 4 KAIG3-RFI-SW-C-6024 00 Civil Site Works 6/22/22 6/27/22 Approved as noted
pipe Out Fall( G-O-46 to G-O-47 ) (Red Line). As per high lighted Area in the attached Dwg.

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Gravel for the Duct Bank
BC3 3 KAIG3-RFI-SW-C-6026 00 of Telecommunications Line between B/RC-TL/11 and C/TL/15 at Zone-B&C - As Highlighted (SP# 133 A- Civil Site Works 6/22/22 6/26/22 Approved as noted
1-B)
Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 1) above Gravel for Duct Bank of
BC3 3 KAIG3-RFI-SW-C-6027 00 Fire & Security line between B/RC-FS/08 and C/FS/08 at Zone-B&C - As Highlighted (Stock Pile # 133 A-1- Civil Site Works 6/22/22 6/26/22 Approved as noted
B)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Gravel for the Duct Bank
BC3 3 KAIG3-RFI-SW-C-6028 00 of MV Line from B/MV/08 to C/MV/30 at Zone- B&C (As Highlighted) (Stock Pile # 133 A-1-B) Civil Site Works 6/22/22 6/27/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for the Duct Bank of MV Line
C3 3 KAIG3-RFI-SW-C-6029 00 Civil Site Works 6/22/22 6/26/22 Approved as noted
from C/MV/02 to C/MV/40 at Zone-C (As Highlighted) Stock Pile # 133 A-1B"

Inspection and Compaction Test for backfilling Sub-Grade 4th Layer (4 of 6) around Potable Water Line Pit
CF34 4 KAIG3-RFI-SW-C-6030 00 Civil Site Works 6/22/22 6/27/22 Approved as noted
for C/PW/01, F/PW/11 as highlighted. (SP#133)

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit for
BC3 3 KAIG3-RFI-SW-C-6031 00 Civil Site Works 6/22/22 6/27/22 Approved as noted
B/F/10, B/F/12, B/F/17, C/F/04 as highlighted. (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for Backfilling Sub-Grade 2nd Layer (2 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6032 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
FW-A-12 and FW-A-13 as highlighted (SP 133 1-A-B).
Inspection and Compaction Test for Backfilling Sub-Grade 1st Layer (1 of 6) around MV Line Pit B/MV/17,
BC3 3 KAIG3-RFI-SW-C-6033 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
B/MV/26, B/MV/18 B/MV/07 at Zone B as highlighted (SP 133 1-A-B).

Inspection & Compaction Tests for Backfilling Sub-Grade 1st layer (1 of 2) above Sand Covering for MV
B 2 KAIG3-RFI-SW-C-6040 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
Line from B/MV/17 to B/MV/26 at Zone B as highlighted in the attached drawings (Stock Pile 133 A-1-B).

Inspection & Compaction Tests for Backfilling (Sub-Grade) 1st Layers (1 of 3) above Gravel for Manhole
5A 5 KAIG3-RFI-SW-C-6041 00 Civil Site Works 6/23/22 6/26/22 Code C (resubmit)
FW-A-20 as highlighted area in the attached drawings (SP 133 A-1-B).

Inspection & Compaction Tests for Backfilling (Sub-Grade) 5th Layers (5 of 5) above Gravel around the
5A 5 KAIG3-RFI-SW-C-6042 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
Manhole for MH-D-01 as highlighted area in the attached drawings (SP 133 A-1-B).

Inspection & Compaction Tests for Backfilling (Sub-Grade) 4th Layers (4 of 12) above Gravel around the
4D 4 KAIG3-RFI-SW-C-6043 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
Manhole for MH-D-03-01 as highlighted area in the attached drawings (SP 133 A-1-B).

Surface Preparation prior to start Backfilling Sub-Grade for MV Line from F/MV/06 to F/MV/11 at Zone F
C6 6 KAIG3-RFI-SW-C-6044 00 Civil Site Works 6/23/22 6/26/22 Approved as noted
as highlighted.
Inspection of Steel Reinforcement for Footing and Wall of Lie Pulling Pit G/MV/07, H/MV/24, H/MV/28 at
GH46 6 KAIG3-RFI-SW-C-6045 00 Civil Site Works 6/23/22 6/27/22 Approved as noted
Zone G & H as highlighted.
Inspection of Formwork for Footing of MV Line Pulling Pit G/MV/07, H/MV/24, H/MV/28 at Zone G & H
GH46 6 KAIG3-RFI-SW-C-6046 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
as highlighted.
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit G/MV/07, H/MV/24, H/MV/28 at Zone G
GH46 6 KAIG3-RFI-SW-C-6047 00 Civil Site Works 6/23/22 6/27/22 Approved as noted
& H as highlighted.

F4 4 KAIG3-RFI-SW-C-6048 00 Installation for Installation of MV Line Junction Pit F/MV/09 as highlighted. Civil Site Works 6/23/22 7/2/22 Approved as noted

Inspection of Formwork for Wall of MV Line Pulling Pit G/MV/02, H/MV/09, H/MV/25 at Zone H as
H6 6 KAIG3-RFI-SW-C-6049 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
highlighted.

kaig-qcals 294
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit G/MV/02, H/MV/09, H/MV/25 at Zone H
H6 6 KAIG3-RFI-SW-C-6050 00 Civil Site Works 6/23/22 6/27/22 Approved as noted
as highlighted.
Surface Preparation prior to start Backfilling Gravel for Duct Bank of MV Line from B/MV/09 to B/MV/08
BC3 3 KAIG3-RFI-SW-C-6051 00 Civil Crescent 6/23/22 6/26/22 Approved as noted
at Zone B & C as highlighted.

Surface Preparation prior to start Backfilling Gravel for Duct Bank of Telecommunication Line between
BC3 3 KAIG3-RFI-SW-C-6052 00 Civil Crescent 6/23/22 6/27/22 Approved as noted
B/RC/10 and C/TL/56 at Zone B & C as highlighted.

Surface Preparation prior to start Backfilling Gravel for Duct Bank of Fire & Security Line between B/RC/10
BC34 4 KAIG3-RFI-SW-C-6053 00 Civil Site Works 6/23/22 6/27/22 Approved as noted
and C/TL/56 at Zone B & C as highlighted.

Inspection and Compaction Test For Backfilling Subgrade 6th Layer (6 of 6) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-6054 00 Civil Site Works 6/23/22 6/28/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering to protect
D2 2 KAIG3-RFI-SW-C-6055 00 the pipe for Non-Potable Water Line at Zone- D - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 6/26/22 6/24/22 Approved as noted

"Surface Preparation prior to start backfilling for Telecommunication Line Pit F/TL/03, F/TL/04, F/TL/12,
FG4 4 KAIG3-RFI-SW-C-6056 00 Civil Site Works 6/23/22 6/26/22 Code C (resubmit)
F/TL/14, G/TL/43, G/TL/21, G/TL/13 at Zone-F&G - as highlighted "

"Surface Preparation prior to start backfilling for Telecommunication Line Pit F/TL/03, F/TL/04, F/TL/12,
FG4 4 KAIG3-RFI-SW-C-6056 01 Civil Site Works 7/6/22 7/7/22 Approved as noted
F/TL/14, G/TL/43, G/TL/21, G/TL/13 at Zone-F&G - as highlighted "

Surface Preparation prior to start backfilling around Fire & Security Line Pit F/FS/03, F/FS/04, F/FS/11,
FG4 4 KAIG3-RFI-SW-C-6057 00 Civil Site Works 6/23/22 6/26/22 Code C (resubmit)
F/FS/14, F/FS/17, G/FS/07, G/FS/21 at Zone-F&g - as highlighted

Surface Preparation prior to start backfilling around Fire & Security Line Pit F/FS/03, F/FS/04, F/FS/11,
FG4 4 KAIG3-RFI-SW-C-6057 01 Civil Site Works 7/6/22 7/7/22 Approved as noted
F/FS/14, F/FS/17, G/FS/07, G/FS/21 at Zone-F&g - as highlighted

'Warning Tape Installation of Potable Water Pipe for (50&75mmØ-UPVC-Class-5). As per highlighted Area
LM 5 KAIG3-RFI-SW-C-6059 00 Civil Site Works 6/23/22 6/26/22 Approved as noted
in the attached Dwg.
'Warning Tape Installation of Potable Water Pipe for (75mmØ-UPVC-Class-5). As per highlighted Area in
L 5 KAIG3-RFI-SW-C-6060 00 Civil Site Works 6/23/22 6/26/22 Approved as noted
the attached Dwg.
'Warning Tape Installation of Fire Fighting Networks for (160mmØ-UPVC-Class-5). As per highlighted Area
LM 5 KAIG3-RFI-SW-C-6061 00 Civil Site Works 6/23/22 6/26/22 Approved as noted
in the attached Dwg.
'Warning Tape Installation of Fire Fighting Networks for (200&160mmØ-UPVC-Class-5). As per highlighted
L 5 KAIG3-RFI-SW-C-6062 00 Civil Site Works 6/23/22 6/26/22 Approved as noted
Area in the attached Dwg.

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2of 6) around MV Line Pit C/MV/02 at
C3 3 KAIG3-RFI-SW-C-6069 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of backfilling Gravel 1st Layer (1 of 1) for Duct Bank of Fire & Security line between
BC34 4 KAIG3-RFI-SW-C-6070 00 Civil Site Works 6/25/22 6/28/22 Approved as noted
B/RC-FS/07 and C/FS/52 at Zone-B&C - As Highlighted

"Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line between
BC3 3 KAIG3-RFI-SW-C-6071 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
B/RC-TL/10 and C/TL/56 at Zone-B&C (As Highlighted)"

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/09 to B/MV/08
BC3 3 KAIG3-RFI-SW-C-6072 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
at Zone- B&C (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for MV
B 3 KAIG3-RFI-SW-C-6073 00 Line from B/MV/17 to B/MV/26 at Zone-B - as highlighted in the attached drawing (Stock Pile # 133 A-1-B) Civil Site Works 6/25/22 6/29/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit B/MV/17,
B3 3 KAIG3-RFI-SW-C-6074 00 Civil Site Works 6/25/22 6/30/22 Approved as noted
B/MV/26, B/MV/18, B/MV/07 at Zone-B As Highlighted - (Stock Pile# 133 A-1-B)"

4 4 KAIG3-RFI-SW-C-6075 00 Inspection of Excavation for RO Water Line at Area-B ARV-03- As highlighted Civil Site Works 6/25/22 6/27/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6076 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Non-Potable water line
FG4 4 KAIG3-RFI-SW-C-6077 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
Pit - NPW-ISC-01, NPW-ISC-03 at Zone B,F,G - as highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Non-Potable water line
G4 4 KAIG3-RFI-SW-C-6078 00 Civil Site Works 6/25/22 6/29/22 Approved as noted
Pit - NPW-ISC-04 at Zone G - as highlighted (SP # 133 A-1-B)

kaig-qcals 295
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6079 00 Civil Site Works 6/26/22 6/29/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

Surface Preparation prior to start backfilling gravel around MV Line Pit F/MV/11 at Zone-C (As Highlighted)
C3 3 KAIG3-RFI-SW-C-6080 00 Civil Site Works 6/25/22 6/26/22 Code C (resubmit)

Surface Preparation prior to start backfilling gravel around MV Line Pit F/MV/11 at Zone-C (As Highlighted)
C3 3 KAIG3-RFI-SW-C-6080 01 Civil Site Works 7/16/22 7/18/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6089 00 Civil Site Works 6/26/22 6/29/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Non-Potable water line
G4 4 KAIG3-RFI-SW-C-6090 00 Civil Site Works 6/26/22 6/30/22 Approved as noted
Pit - NPW-ISC-04 at Zone G - as highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6091 00 Civil Site Works 6/26/22 6/30/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection for Blinding Concrete under Fire & Security Line Pit C/FS/04, C/FS/06, C/FS/52 at Zone-B - as
BC34 4 KAIG3-RFI-SW-C-6092 00 Civil Site Works 6/26/22 6/30/22 Approved as noted
highlighted

BC34 4 KAIG3-RFI-SW-C-6093 00 Inspection for Blinding Concrete under Telecom Line Pit C/TL/27, Pit C/TL/71 at Zone-B - as highlighted Civil Site Works 6/26/22 6/30/22 Approved as noted

G3 3 KAIG3-RFI-SW-C-6094 00 Excavation for Potable Water Line near Plaza area at Zone-G including Pit G/PW/03 - as highlighted Civil Site Works 6/26/22 6/28/22 Approved as noted

G3 3 KAIG3-RFI-SW-C-6095 00 "Excavation for Fire Water Line near Plaza area at Zone-B including Pit B/F/14 - as highlighted " Civil Site Works 6/26/22 6/28/22 Approved as noted

"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-08 - Wing Wall (Left Side)
4 4 KAIG3-RFI-SW-C-6096 00 Civil Site Works 6/26/22 6/28/22 Approved as noted
- As Highlighted"

6A 6 KAIG3-RFI-SW-C-6101 00 Excavation for Foul Water Line from FW-A-06 to FW-A-04 prior to start Gravel Bedding (as Highlighted) Civil Site Works 6/26/22 6/28/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6107 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

G5 5 KAIG3-RFI-SW-C-6108 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-G - as highlighted (Stock Pile # 132) Civil Site Works 6/27/22 6/30/22 Approved as noted

G5 5 KAIG3-RFI-SW-C-6109 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-G - as highlighted (Stock Pile # 132) Civil Site Works 6/27/22 6/30/22 Approved as noted

Excavation for Telecommunication Line at Zone-G including pit G/TL/16 - as highlighted in the attached
G4 4 KAIG3-RFI-SW-C-6110 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
drawing

C3 3 KAIG3-RFI-SW-C-6111 00 Excavation for Fire & Security Distribution Line at Zone-G including Pit G/FS/19 - as highlighted Civil Site Works 6/27/22 6/30/22 Approved as noted

Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6112 00 Civil Site Works 6/27/22 7/2/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test For Backfilling Subgrade 7th Layer (7 of 7) for Storm Water Line From
3B 3 KAIG3-RFI-SW-C-6113 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
MH-G-01-07 To MH-G-01-06 As Highlighted in the attached Drawing (SP#133 A-1-B)

Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/40, G/MV/27, G/MV/03 at Zone-
CG34 4 KAIG3-RFI-SW-C-6114 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
C&G (As Highlighted)
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/40, G/MV/27, G/MV/03 at
CG34 4 KAIG3-RFI-SW-C-6121 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
Zone-C&G (As Highlighted)
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from G/FS/02 to F/FS/09 at
B3 3 KAIG3-RFI-SW-C-6122 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
Zone-B - as highlighted in the attached drawing (SP#132)

Inspection of Sand bedding under pipe for Telecommunication Line between GTL/03 to F/TL/10 at Zone-B
B3 3 KAIG3-RFI-SW-C-6123 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
as highlighted in the attached drawing (SP#132)

"Surface Preparation prior to start backfilling around the Potable Water Line Pit - F/PW/08 , F/PW/02 - As
4 4 KAIG3-RFI-SW-C-6124 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
Highlighted "
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Left Side) -
4 4 KAIG3-RFI-SW-C-6125 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
As Highlighted"

kaig-qcals 296
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (PP 600&800 mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6126 00 Civil Site Works 6/27/22 6/29/22 Approved as noted
Storm Water pipe Out Fall-O ( MH-O-01 to MH-O-06 ).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6127 00 Civil Site Works 6/27/22 6/30/22 Approved as noted
Storm Water pipe Out Fall-O ( MH-O-01 to MH-O-06 ).As per high lighted Area in the attached Dwg.

Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 6) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6128 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- G - as highlighted in the
G4 4 KAIG3-RFI-SW-C-6129 00 Civil Site Works 6/28/22 6/30/22 Approved as noted
attached drawing (SP# 132)

B3 3 KAIG3-RFI-SW-C-6137 00 Inspection of Sand bedding under pipe for RO Water Line at Zone-B- As highlighted (Stock Pile # 132) Civil Site Works 6/28/22 7/2/22 Approved as noted

Inspection for Installation of MV Line Junction Pit - B/MV/08, C/MV/30, C/MV/05, G/MV/22 - as
BCG3 3 KAIG3-RFI-SW-C-6138 00 Civil Site Works 6/28/22 6/30/22 Approved as noted
highlighted
C3 3 KAIG3-RFI-SW-C-6139 00 Inspection for Blinding Concrete under Telecom Line Pit C/TL/49 at Zone-C - as highlighted Civil Site Works 6/28/22 6/30/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-6140 00 Inspection for Blinding Concrete under Fire & Security Line Pit C/FS/46 at Zone-C - as highlighted Civil Site Works 6/28/22 6/30/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Non-Potable water line
G4 4 KAIG3-RFI-SW-C-6141 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
Pit - NPW-ISC-04 at Zone G - as highlighted (SP # 133 A-1-B)

F4 4 KAIG3-RFI-SW-C-6142 00 Surface Preparation prior to start backfilling around Fire Water Line Pit for F/F/10 - as highlighted. Civil Site Works 6/30/22 7/4/22 Approved as noted

Inspection of backfilling Gravel for the Duct Bank of Fire & Security Distribution Line from G/FS/08 to
G4 4 KAIG3-RFI-SW-C-6143 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
G/FS/30 - As Highlighted (Stock Pile # 118)
Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from G/TL/44 to G/TL/50 -
G4 4 KAIG3-RFI-SW-C-6144 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
As Highlighted (Stock Pile # 118)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for the Duct Bank of MV Line
BC3 3 KAIG3-RFI-SW-C-6145 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
from B/MV/08 to B/MV/21at Zone- B&C - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade around MV Line Junction Pit - B/MV/08,
BC3 3 KAIG3-RFI-SW-C-6148 00 Civil Site Works 6/28/22 7/2/22 Approved as noted
C/MV/30, C/MV/05 - as highlighted (Stock Pile # 133 A-1-B)

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
2 2 KAIG3-RFI-SW-C-6149 00 Civil Site Works 6/28/22 6/30/22 Approved as noted
O-01 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-01 (As
6B 6 KAIG3-RFI-SW-C-6150 00 Civil Site Works 6/28/22 6/30/22 Approved as noted
Highlighted) "

'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (dia 400mmØ - UPVC- Class 4)
7 6 KAIG3-RFI-SW-C-6151 00 Civil Site Works 6/28/22 6/29/22 Approved as noted
from (FW-A-4 to FW-A-6). At CRECENT Wadi Zone 7. As per highlighted Area in the attached Dwg.

' Pipe Installation of Foul Water Line for (dia 400mmØ - UPVC- Class 4) from (FW-A-4 to FW-A-6). At
7 6 KAIG3-RFI-SW-C-6152 00 Civil Site Works 6/28/22 6/30/22 Approved as noted
CRECENT Wadi Zone 7.As per highlighted Area in the attached Dwg.

Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6,
H6 6 KAIG3-RFI-SW-C-6153 00 Civil Site Works 6/28/22 6/29/22 Approved as noted
H/MV/04 at Zone-H (As Highlighted)
Excavation for Storm Water Line from MH-G-06 to near MH-G-07 including branch, Manhole MH-G-07 and
3 3 KAIG3-RFI-SW-C-6154 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
Gullies G-G-26 & G-G-27 - As highlighted

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit B/MV/17,
B3 3 KAIG3-RFI-SW-C-6155 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
B/MV/26, B/MV/18, B/MV/07 at Zone-B As Highlighted - (Stock Pile# 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel for Duct Bank of
BC34 4 KAIG3-RFI-SW-C-6156 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
Fire & Security line between B/RC-FS/07 and C/FS/52 at Zone-B&C - As Highlighted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above Gravel for the Duct Bank
BC3 3 KAIG3-RFI-SW-C-6157 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
of Telecommunications Line between B/RC-TL/10 and C/TL/56 at Zone-B&C (As Highlighted)

Inspection and Compaction Test for Backfilling Sub-grade 8th Layer (8 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6158 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

kaig-qcals 297
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H (As
H6 6 KAIG3-RFI-SW-C-6159 00 Civil Site Works 6/29/22 7/2/22 Approved as noted
Highlighted)

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-
H6 6 KAIG3-RFI-SW-C-6160 00 Civil Site Works 6/29/22 7/2/22 Approved as noted
H (As Highlighted)

C3 3 KAIG3-RFI-SW-C-6161 00 Inspection of Blinding Concrete under MV Line Pit C/MV/04 at Zone-C - as highlighted Civil Site Works 6/29/22 7/2/22 Approved as noted

G3 3 KAIG3-RFI-SW-C-6162 00 Inspection for Blinding Concrete under Potable Water Line Pit G/PW/03 - as highlighted Civil Site Works 6/29/22 7/2/22 Approved as noted

B3 3 KAIG3-RFI-SW-C-6163 00 Inspection for Blinding Concrete under Fire Water Line Pit for B/F/14 at Zone-B - as highlighted Civil Site Works 6/29/22 7/2/22 Approved as noted

Inspection of backfilling Gravel 1st layer (1 of 1) for MV Line from F/MV/06 to F/MV/11 at Zone- F - As
C6 6 KAIG3-RFI-SW-C-6164 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
Highlighted (Stock Pile# 118)

Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/08, C/MV/38, G/MV/02 at Zone-
CG34 4 KAIG3-RFI-SW-C-6165 00 Civil Site Works 6/29/22 7/2/22 Approved as noted
C&G (As Highlighted)

Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/08, C/MV/38, G/MV/02 at
CG34 4 KAIG3-RFI-SW-C-6170 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
Zone-C&G (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 9) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-6171 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
FG34 4 KAIG3-RFI-SW-C-6172 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
Zone-F&G (As Highlighted)

"Inspection and Compaction Test for backfilling around the Potable Water Line Pit - F/PW/08 , F/PW/02 -
4 4 KAIG3-RFI-SW-C-6173 00 Civil Site Works 6/29/22 7/4/22 Approved as noted
As Highlighted (Stock Pile # 133 A-1-B)"

BC3 3 KAIG3-RFI-SW-C-6174 00 Excavation for Telecommunication Line Branch at Zone-B&C - as highlighted in the attached drawing Civil Site Works 6/29/22 6/7/22 Approved as noted

Excavation for Non-Potable Water Line at Zone C,H & L including Pit POC-18, NPW-ISC-25, POC-33,
CHL36 6 KAIG3-RFI-SW-C-6175 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
POC-34, POC-35, NPW-ISC24 - As highlighted

Excavation for RO Water Line at Zone C,H & L including Pit RO-ISC-08, RO-ISC-10, RO-ISC-09, - As
CHL36 6 KAIG3-RFI-SW-C-6176 00 Civil Site Works 6/29/22 7/3/22 Approved as noted
highlighted

Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - H/MV/11 at Zone-H (As
H6 6 KAIG3-RFI-SW-C-6177 00 Civil Site Works 6/30/22 7/2/22 Approved as noted
Highlighted)

H6 6 KAIG3-RFI-SW-C-6178 00 Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted) Civil Site Works 6/30/22 7/2/22 Approved as noted

H6 6 KAIG3-RFI-SW-C-6179 00 Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted) Civil Site Works 6/30/22 7/3/22 Approved as noted

Surface Preparation prior to start backfill gravel for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at
B 2 KAIG3-RFI-SW-C-6180 00 Civil Site Works 6/30/22 7/3/22 Approved as noted
Zone-B (As Highlighted)

kaig-qcals 298
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Class
4B 4 KAIG3-RFI-SW-C-6185 00 Civil Site Works 7/2/22 7/3/22 Approved as noted
4 ) for Storm Water pipe Out Fall-O ( MH-O-01 to MH-O-06 ).As per high lighted Area in the attached Dwg.

' Warning Tape Installation in pipes OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6186 00 Civil Site Works 6/30/22 7/3/22 Approved as noted
Storm Water pipe Out Fall-O ( MH-O-01 to MH-O-06 ).As per high lighted Area in the attached Dwg.

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/09 to B/MV/21
B 2 KAIG3-RFI-SW-C-6187 00 Civil Site Works 6/30/22 7/4/22 Approved as noted
at Zone-B - As Highlighted (Stock Pile # 118)

Inspection and Compaction Test for Backfilling Sub-grade 9th Layer (9 of 12) above Gravel around Manhole
4D 4 KAIG3-RFI-SW-C-6188 00 Civil Site Works 6/30/22 7/4/22 Approved as noted
MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around the Potable Water Line
4 4 KAIG3-RFI-SW-C-6189 00 Civil Site Works 7/2/22 7/4/22 Approved as noted
Pit - F/PW/08 , F/PW/02 - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Junction Pit -
BC3 3 KAIG3-RFI-SW-C-6190 00 Civil Site Works 6/30/22 7/4/22 Approved as noted
B/MV/08, C/MV/30, C/MV/05 - as highlighted (SP # 133 A-1-B)

"Surface Preparation after removal of Manhole installed by old contractor, prior to start backfill sub-grade
BC3 2 KAIG3-RFI-SW-C-6191 00 Civil Site Works 6/30/22 7/3/22 Approved as noted
beside the Storm Water Line at Zone-4 (As Highlighted) "

Inspection and Compaction Test for backfilling Sub-grade 1st & 2nd Layer (2 of 4) beside the Storm Water
B 2 KAIG3-RFI-SW-C-6192 00 Civil Site Works 6/30/22 7/5/22 Approved as noted
Line at Zone-4 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel for the Duct Bank
B 2 KAIG3-RFI-SW-C-6193 00 Civil Site Works 6/30/22 7/6/22 Approved as noted
of MV Line from B/MV/09 to B/MV/21 at Zone-B - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Potble
L5 5 KAIG3-RFI-SW-C-6194 00 Civil Site Works 6/30/22 7/6/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fire
L5 5 KAIG3-RFI-SW-C-6195 00 Civil Site Works 6/30/22 7/6/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Surface Preparation prior to start Water Proofing for Duct Bank of Telecommunications line from K/TL/22 to
K5 5 KAIG3-RFI-SW-C-6196 00 Civil Site Works 6/30/22 7/2/22 Approved as noted
K/TL/23 at Zone-K - As Highlighted
Surface Preparation prior to start Water Proofing for Duct Bank of Fire & Security line from K/FS/07 to
K5 5 KAIG3-RFI-SW-C-6197 00 Civil Site Works 6/30/22 7/2/22 Approved as noted
K/FS/10 at Zone-K - As Highlighted

"Surface Preparation prior to start backfilling Gravel for the Duct Bank of Telecommunications Line from
B3 3 KAIG3-RFI-SW-C-6198 00 Civil Site Works 6/30/22 7/5/22 Approved as noted
B/TL/36 and B/TL/42 at Zone-B&C (As Highlighted)"

Surface Preparation prior to start backfill gravel for Duct Bank of Fire & Security line between B/FS/21 and
B3 3 KAIG3-RFI-SW-C-6199 00 Civil Site Works 6/30/22 7/5/22 Approved as noted
B/FS/36 at Zone-B - As Highlighted
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 9) under Cesspool-3 at Zone-D - as
D2 2 KAIG3-RFI-SW-C-6200 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
highlighted (Stock Pile # 133 A-1-B)

' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (dia 400mmØ - UPVC- Class 4)
7 6 KAIG3-RFI-SW-C-6201 00 Civil Site Works 6/30/22 7/2/22 Approved as noted
from (FW-A-4 to FW-A-6). At CRECENT Wadi Zone 7.As per highlighted Area in the attached Dwg.

' Warning Tape Installation of Foul Water Line for (dia 400mmØ - UPVC- Class 4) from (FW-A-4 to FW-A-
7 6 KAIG3-RFI-SW-C-6202 00 Civil Site Works 6/30/22 7/2/22 Approved as noted
6). At CRECENT Wadi Zone 7.As per highlighted Area in the attached Dwg.

Inspection of Steel Reinforcement for the Footing and Walls of SBC-08 - Wing Wall (Left Side) - As
4 4 KAIG3-RFI-SW-C-6206 00 Civil Site Works 7/3/22 7/5/22 Approved as noted
Highlighted

4 4 KAIG3-RFI-SW-C-6207 00 Inspection of Formwork for the Footing of SBC-08 - Wing Wall (Left Side) - As Highlighted Civil Site Works 7/2/22 7/6/22 Approved as noted

4 4 KAIG3-RFI-SW-C-6208 00 Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Left Side) - As Highlighted Civil Site Works 7/2/22 7/5/22 Approved as noted

BCG3 3 KAIG3-RFI-SW-C-6209 00 Inspection for Installation of MV Line Junction Pit - B/MV/19, C/MV/04, G/MV/06 - as highlighted Civil Site Works 7/2/22 7/6/22 Approved as noted

kaig-qcals 299
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for Backfilling Sub-grade 10th Layer (10 of 12) above Gravel around
4D 4 KAIG3-RFI-SW-C-6210 00 Civil Site Works 7/5/22 7/6/22 Code C (not resubmit)
Manhole MH-D-03-01 - As Highlighted (Stock Pile # 133 A-1-B)

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around the Potable Water Line
4 4 KAIG3-RFI-SW-C-6211 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Pit - F/PW/08 , F/PW/02 - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-6 to FW-A-4 - As
6A 6 KAIG3-RFI-SW-C-6212 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Highlighted (SP#133 A-1-B)
Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35 at Zone-G (As
G3 3 KAIG3-RFI-SW-C-6213 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35 at Zone-G
G3 3 KAIG3-RFI-SW-C-6214 00 Civil Site Works 7/2/22 7/3/22 Approved as noted
(As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Non-
G3 3 KAIG3-RFI-SW-C-6215 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Potable Water Line at Zone- G - as highlighted in the attached drawing (SP# 133 A-1-B)

"Excavation for Storm Water Line from MH-M-04 to MH-M-03 including Manhole MH-M-04, MH-M-03 -
6A 6 KAIG3-RFI-SW-C-6220 00 Civil Site Works 7/2/22 7/7/22 Approved as noted
As highlighted "

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit B/MV/17,
B3 3 KAIG3-RFI-SW-C-6221 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
B/MV/26, B/MV/18, B/MV/07 at Zone-B As Highlighted - (Stock Pile# 133 A-1-B)"

Inspection for Casting the Blinding Concrete under the Gullies for G-O-28, G-O-29, G-O-32, G-O-33, G-O-
2 2 KAIG3-RFI-SW-C-6222 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
34 & G-O-43 (as Highlighted)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone C - As highlighted (Stock Pile#
C3 3 KAIG3-RFI-SW-C-6223 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
132)

C3 3 KAIG3-RFI-SW-C-6224 00 Inspection of Sand bedding under pipe for RO Water Line at Zone C - As highlighted (Stock Pile # 132) Civil Site Works 7/2/22 7/6/22 Approved as noted

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
2 2 KAIG3-RFI-SW-C-6225 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
O-02, MH-O-03, MH-O-05 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-03 (As
6B 6 KAIG3-RFI-SW-C-6227 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Highlighted) "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-O-02, MH-O-05 (As
6B 6 KAIG3-RFI-SW-C-6228 00 Civil Site Works 7/2/22 7/6/22 Approved as noted
Highlighted) "
Inspection for Installation of Telecommunication Line Pit - B/TL/43, B/TL/50, C/TL/12, C/TL/11, C/TL/15,
BC3 3 KAIG3-RFI-SW-C-6229 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
C/TL/54, C/TL/51, C/TL/49 - as highlighted
Inspection for Installation of Fire & Security Line Pit - B/FS/05, C/FS/10, C/FS/09, C/FS/13, C/FS/08,
BC3 3 KAIG3-RFI-SW-C-6230 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
C/FS/12, C/FS/47, C/FS/46 - as highlighted

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Junction Pit -
BC3 3 KAIG3-RFI-SW-C-6231 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
B/MV/08, C/MV/30, C/MV/05 - as highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit C/MV/02 at
C3 3 KAIG3-RFI-SW-C-6232 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-24, NPW-ISC-25
HL45 5 KAIG3-RFI-SW-C-6233 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
at Zone-H&L - as highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit C/MV/04 at
C3 3 KAIG3-RFI-SW-C-6234 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of Backfilling Sub-grade 2nd Layer (2 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
6A 6 KAIG3-RFI-SW-C-6235 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
Highlighted (SP#133 A-1-B)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Fire Water Line Pit for
F4 4 KAIG3-RFI-SW-C-6236 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
F/F/10 - as highlighted. (Stock Pile #133 A-1-B)

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around the Potable Water Line
4 4 KAIG3-RFI-SW-C-6237 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
Pit - F/PW/08 , F/PW/02 - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication and
FG4 4 KAIG3-RFI-SW-C-6238 00 Fire&Security Line Pit - F/TL/16, F/FS/14, G/TL/43, G/FS/07, G/TL/21, G/FS/21, G/TL/13 - as highlighted Civil Site Works 7/4/22 7/7/22 Approved as noted
(Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication and
FG4 4 KAIG3-RFI-SW-C-6239 00 Fire&Security Line Pit - F/TL/05, F/FS/10, G/TL/01, G/FS/45 - as highlighted (Stock Pile # 133 A-1-B) Civil Site Works 7/5/22 7/7/22 Approved as noted

kaig-qcals 300
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone H&L - As highlighted (Stock
HL356 6 KAIG3-RFI-SW-C-6240 00 Civil Site Works 7/3/22 7/7/22 Approved as noted
Pile# 132)
Inspection of Sand bedding under pipe for RO Water Line at Zone H&L - As highlighted (Stock Pile # 132)
HL356 6 KAIG3-RFI-SW-C-6241 00 Civil Site Works 7/3/22 7/7/22 Approved as noted

Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
GK45 5 KAIG3-RFI-SW-C-6242 00 Civil Site Works 7/3/22 7/5/22 Approved as noted
Zone-G&K (As Highlighted)
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/01 to B/MV/15, B/MV/15 to
BG4 4 KAIG3-RFI-SW-C-6243 00 B/MV/22, B/MV/23 to G/MV/21, G/MV/26 to G/MV/20) at Zone-B&G as highlighted in the attached Civil Site Works 7/3/22 7/6/22 Approved as noted
drawing (Stock Pile # 132)
Inspection for Casting the Blinding Concrete under the Foull Water Line Manhole FW-A-3-1, FW-A-3, FW-
6A 6 KAIG3-RFI-SW-C-6244 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
A-3-A (as Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
2 2 KAIG3-RFI-SW-C-6245 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
O-04, MH-O-06 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-04, MH-O-06
6B 6 KAIG3-RFI-SW-C-6255 00 Civil Site Works 7/3/22 7/6/22 Approved as noted
(As Highlighted) "
6B 6 KAIG3-RFI-SW-C-6256 00 INSPECTION FOR INSTALLATION OF SLAB FOR MH-O-02 (As Highlighted) Civil Site Works 7/3/22 7/6/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Non-
4B 4 KAIG3-RFI-SW-C-6265 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Potable Water Line at Zone- G - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of Backfilling Sub-grade 3rd Layer (3 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
6A 6 KAIG3-RFI-SW-C-6266 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Highlighted (SP#133 A-1-B)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around Fire Water Line Pit for
F4 4 KAIG3-RFI-SW-C-6267 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
F/F/10 - as highlighted. (Stock Pile #133 A-1-B)

"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around the Potable Water Line
4 4 KAIG3-RFI-SW-C-6268 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Pit - F/PW/08 , F/PW/02 - As Highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) beside the Storm Water Line at
B 2 KAIG3-RFI-SW-C-6269 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Zone-4 - As Highlighted (Stock Pile # 133 A-1-B)

Surface Preparation prior to start backfilling around Potable Water Line Pit for L/PW/01, L/PW/02, L/PW/04,
L5 5 KAIG3-RFI-SW-C-6270 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
PW-14 - as highlighted.
Surface Preparation prior to start backfilling around Fire Water Line Pit for L/F/01, L/F/02, L/F/03, L/F/06,
L5 5 KAIG3-RFI-SW-C-6271 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
L/F/08, L/F/09, L/F/10 - as highlighted.

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Potble
L5 5 KAIG3-RFI-SW-C-6272 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fire
L5 5 KAIG3-RFI-SW-C-6273 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit C/MV/04
C3 3 KAIG3-RFI-SW-C-6274 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
at Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

B3 3 KAIG3-RFI-SW-C-6275 00 Surface Preparation prior to start backfilling around Potable Water Line Pit for B/PW/11 - as highlighted. Civil Site Works 7/4/22 7/7/22 Approved as noted

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (PP 600 mm Ø- UPVC Pipes-Class 4 ) for Storm
4C 4 KAIG3-RFI-SW-C-6278 00 Civil Site Works 7/4/22 7/6/22 Approved as noted
Water pipe Out Fall-G ( MH-G-06 to MH-G-07 ).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-G for (PP 600 mm Ø- UPVC Pipes-Class 4 ) for Storm
4C 4 KAIG3-RFI-SW-C-6279 00 Civil Site Works 7/4/22 7/6/22 Approved as noted
Water pipe Out Fall-G ( MH-G-06 to MH-G-07 ).As per high lighted Area in the attached Dwg.

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit for
B3 3 KAIG3-RFI-SW-C-6280 00 Civil Site Works 7/4/22 7/14/22 Approved as noted
B/PW/11 - as highlighted.

Inspection and Compaction Test for backfilling Sub-grade 3rd & 4th Layer (4 of 4) beside the Storm Water
B 2 KAIG3-RFI-SW-C-6281 00 Civil Site Works 7/4/22 7/13/22 Approved as noted
Line at Zone-4 - As Highlighted (Stock Pile # 133 A-1-B)

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line from
B3 3 KAIG3-RFI-SW-C-6282 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
B/TL/36 and B/TL/42 at Zone-B&C - As Highlighted (Stock Pile # 118)

kaig-qcals 301
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of backfilling gravel 1st Layer (1 of 1) for Duct Bank of Fire & Security line between B/FS/21 and
B3 3 KAIG3-RFI-SW-C-6283 00 Civil Site Works 7/4/22 7/7/22 Approved as noted
B/FS/36 at Zone-B - As Highlighted (Stock Pile # 118)

Surface Preparation prior to start backfilling gravel around MV Line Pit C/MV/04 at Zone-C (As
C3 3 KAIG3-RFI-SW-C-6284 00 Civil Site Works 7/4/22 7/6/22 Approved as noted
Highlighted)
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
K5 5 KAIG3-RFI-SW-C-6285 00 Civil Site Works 7/4/22 7/5/22 Approved as noted
Zone-K (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Cover at Zone - F -
F4 4 KAIG3-RFI-SW-C-6286 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
as highlighted. (SP#133 A-1-B)

Inspection of Backfilling Sub-grade 4th Layer (4 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
6A 6 KAIG3-RFI-SW-C-6287 00 Civil Site Works 7/5/22 7/13/22 Approved as noted
Highlighted (SP#133 A-1-B)
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit for
F4 4 KAIG3-RFI-SW-C-6288 00 Civil Site Works 7/5/22 7/13/22 Approved as noted
F/F/10 - as highlighted. (Stock Pile #133 A-1-B)

Surface Preparation prior to start backfilling around MV Line Pit B/MV/01, B/MV/15 , B/MV/22 ,
BG4 4 KAIG3-RFI-SW-C-6289 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
G/MV/01 ,G/MV/04 , G/MV/15 , G/MV/24 and G/MV/25 at Zone-B,G (As Highlighted)

Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - B/MV/10 at Zone-B (As
B4 4 KAIG3-RFI-SW-C-6290 00 Civil Site Works 7/5/22 7/6/22 Approved as noted
Highlighted)

B4 4 KAIG3-RFI-SW-C-6291 00 Inspection of Formwork for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B (As Highlighted) Civil Site Works 7/5/22 7/6/22 Approved as noted

B4 4 KAIG3-RFI-SW-C-6292 00 Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B (As Highlighted) Civil Site Works 7/5/22 7/7/22 Approved as noted

Inspection of Formwork for Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H (As
H6 6 KAIG3-RFI-SW-C-6293 00 Civil Site Works 7/5/22 7/6/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H
H6 6 KAIG3-RFI-SW-C-6294 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
(As Highlighted)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Junction Pit -
BC3 3 KAIG3-RFI-SW-C-6295 00 Civil Site Works 7/5/22 7/13/22 Approved as noted
B/MV/08, C/MV/30, C/MV/05 - as highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Potble
L5 5 KAIG3-RFI-SW-C-6302 00 Civil Site Works 7/5/22 7/14/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fire
L5 5 KAIG3-RFI-SW-C-6303 00 Civil Site Works 7/5/22 7/14/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside Gravel for the Duct
B3 3 KAIG3-RFI-SW-C-6304 00 Bank of Telecommunications Line from B/TL/36 and B/TL/42 at Zone-B&C - As Highlighted (Stock Pile # Civil Site Works 7/6/22 7/13/22 Approved as noted
133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside gravel for Duct Bank of
B3 3 KAIG3-RFI-SW-C-6305 00 Fire & Security line between B/FS/21 and B/FS/36 at Zone-B - As Highlighted (Stock Pile # 133 A-1-B) Civil Site Works 7/6/22 7/13/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Potable Water Line Pit
L5 5 KAIG3-RFI-SW-C-6306 00 Civil Site Works 7/5/22 7/14/22 Approved as noted
for L/PW/01, L/PW/02, L/PW/04, PW-14 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) around Fire Water Line Pit for
L5 5 KAIG3-RFI-SW-C-6307 00 Civil Site Works 7/5/22 7/14/22 Approved as noted
L/F/01, L/F/02, L/F/03, L/F/06, L/F/08, L/F/09, L/F/10 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit C/MV/04 at
C3 3 KAIG3-RFI-SW-C-6308 00 Civil Site Works 7/5/22 7/13/22 Approved as noted
Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit C/MV/02 at
C3 3 KAIG3-RFI-SW-C-6309 00 Civil Site Works 7/5/22 7/13/22 Approved as noted
Zone-C - As Highlighted (Stock Pile# 133 A-1-B)

B3 3 KAIG3-RFI-SW-C-6310 00 Inspection for Installation of Potable Water Line Isolation Pit - B/PW/11 at Zone- B - as highlighted Civil Site Works 7/5/22 7/7/22 Approved as noted

3 3 KAIG3-RFI-SW-C-6311 00 Inspection for Casting Blinding Concrete under Manhole - MH-G-07 - as highlighted Civil Site Works 7/5/22 7/7/22 Approved as noted

"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-29, G-O-32, G-O-33,
2B B KAIG3-RFI-SW-C-6312 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
G-O-43, G-O-44 - as highlighted "

kaig-qcals 302
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Backfilling Sub-grade 5th Layer (5 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
6A 6 KAIG3-RFI-SW-C-6313 00 Civil Site Works 7/6/22 7/14/22 Approved as noted
Highlighted (SP#133 A-1-B)
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit for
F4 4 KAIG3-RFI-SW-C-6314 00 Civil Site Works 7/6/22 7/14/22 Approved as noted
F/F/10 - as highlighted. (Stock Pile #133 A-1-B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
2 2 KAIG3-RFI-SW-C-6315 00 Civil Site Works 7/6/22 7/7/22 Approved as noted
G-07 (As Highlighted)

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6320 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
Water pipe Out Fall-M ( MH-M-11 to MH-M-12 ).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6321 00 Civil Site Works 7/5/22 7/7/22 Approved as noted
Water pipe Out Fall-M ( MH-M-11 to MH-M-12 ).As per high lighted Area in the attached Dwg.

Inspection of Formwork for WALL of MV Line Pulling Pit - C/MV/22, C/MV/25, G/MV/08, G/MV/36 at
CG3 3 KAIG3-RFI-SW-C-6323 00 Civil Site Works 7/7/22 7/16/22 Approved as noted
Zone-C&G (As Highlighted)

Inspection of Concrete Pouirng for WALL of MV Line Pulling Pit - C/MV/22, C/MV/25, G/MV/08,
CG3 3 KAIG3-RFI-SW-C-6324 00 Civil Site Works 7/7/22 7/18/22 Approved as noted
G/MV/36 at Zone-C&G (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-G-07 (As
3 3 KAIG3-RFI-SW-C-6325 00 Civil Site Works 7/6/22 7/14/22 Approved as noted
Highlighted) "
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Telecommunication Line
GK45 5 KAIG3-RFI-SW-C-6326 00 Pit G/TL/44, G/TL/50, G/TL/54, G/TL/16, K/TL/01, K/TL/03, K/TL/12, K/TL/13, K/TL/08, K/TL/09 at Civil Site Works 7/6/22 7/14/22 Approved as noted
Zone-G&K - as highlighted
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Fire & Security Line Pit
GK45 5 KAIG3-RFI-SW-C-6327 00 G/FS/08, G/FS/30, G/FS/52, G/FS/19, K/FS/01, K/FS/03, K/FS/22, K/FS/21, K/FS/23 at Zone-G&K - as Civil Site Works 7/6/22 7/14/22 Approved as noted
highlighted
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Telecommunication Line Pit -
FG4 4 KAIG3-RFI-SW-C-6328 00 Civil Site Works 7/6/22 7/14/22 Approved as noted
F/TL/16, G/TL/43, G/TL/21, G/TL/13 - as highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Fire &Security Line Pit -
FG4 4 KAIG3-RFI-SW-C-6329 00 Civil Site Works 7/6/22 7/14/22 Approved as noted
F/FS/14, G/FS/07, G/FS/21 - as highlighted (Stock Pile # 133)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside Gravel for the Duct
B3 3 KAIG3-RFI-SW-C-6330 00 Bank of Telecommunications Line from B/TL/36 and B/TL/42 at Zone-B - As Highlighted (Stock Pile # 133 Civil Site Works 7/6/22 7/14/22 Approved as noted
A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside gravel for Duct Bank of
B3 3 KAIG3-RFI-SW-C-6331 00 Fire & Security line between B/FS/21 and B/FS/36 at Zone-B - As Highlighted (Stock Pile # 133 A-1-B) Civil Site Works 7/6/22 7/14/22 Approved as noted

BCGH34 Surface Preparation (Internal & External) prior to start Water Proofing for MV Line Pit - B/MV/23,
6 KAIG3-RFI-SW-C-6332 00 Civil Site Works 7/6/22 7/7/22 Approved as noted
6 C/MV/23, G/MV/31, G/MV/19, G/MV/21, H/MV/02, H/MV/09, H/MV/25 - as highlighted

Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around Fire Water Line Pit for
F4 4 KAIG3-RFI-SW-C-6333 00 Civil Site Works 7/7/22 7/16/22 Approved as noted
F/F/10 - as highlighted. (Stock Pile #133 A-1-B)

Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/01 to B/MV/22 and B/MV/23 to
BG3 3 KAIG3-RFI-SW-C-6334 00 Civil Site Works 7/7/22 7/14/22 Approved as noted
G/MV/21 at Zone-B and Zone-G as highlighted in the attached drawing

Excavation for Storm Water Line between MH-O-11 to MH-O-08-1 including branch, Manhole MH-O-08-1,
2 2 KAIG3-RFI-SW-C-6335 00 MH-O-08, MH-O-09, MH-O-10 and Gullies G-O-18, G-O-09, G-O-08, G-O-07, G-O-19, G-O-17, G-O-16, Civil Site Works 7/7/22 7/16/22 Approved as noted
G-O-15, G-O-14, G-O-13 - As highlighted

C2 2 KAIG3-RFI-SW-C-6342 00 Excavation for Fire Water Line at Zone-C - as highlighted Civil Site Works 7/7/22 7/16/22 Approved as noted

C2 2 KAIG3-RFI-SW-C-6343 00 Excavation for Potable Water Line at Zone-C - as highlighted Civil Site Works 7/7/22 7/16/22 Approved as noted

Surface Preparation prior to start backfill gravel for the Duct Bank of MV Line from B/MV/07 to B/MV/06 at
B 3 KAIG3-RFI-SW-C-6344 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
Zone-B (As Highlighted)

Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 10) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6345 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- B&C - as highlighted in
BC34 4 KAIG3-RFI-SW-C-6346 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
the attached drawing (SP# 132)

kaig-qcals 303
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Potble
L5 5 KAIG3-RFI-SW-C-6347 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Fire
L5 5 KAIG3-RFI-SW-C-6348 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
Water Line at Zone- L - as highlighted in the attached drawing (SP# 133 A-1-B)

Surface Preparation prior to start backfilling sub-grade around MV Line Pit B/MV/09, B/MV/12, B/MV/19 at
B3 3 KAIG3-RFI-SW-C-6349 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
Zone-B (As Highlighted)

Surface Preparation prior to start backfilling sub-grade around MV Line Pit B/MV/04, F/MV/09 at Zone-B&F
BF4 4 KAIG3-RFI-SW-C-6350 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
(As Highlighted)

Surface Preparation prior to start backfill for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-
F4 4 KAIG3-RFI-SW-C-6351 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
F (As Highlighted)

Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Telecommunication Line Pit -
FG4 4 KAIG3-RFI-SW-C-6352 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
F/TL/16, G/TL/43, G/TL/21, G/TL/13 - as highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Fire &Security Line Pit -
FG4 4 KAIG3-RFI-SW-C-6353 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
F/FS/14, G/FS/07, G/FS/21 - as highlighted (Stock Pile # 133)
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-G - as highlighted in the attached
G4 4 KAIG3-RFI-SW-C-6354 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
drawing (Stock Pile # 132)

Inspection of Sand bedding under pipe for Fire & Security Distribution Line at Zone-G - as highlighted
G3 3 KAIG3-RFI-SW-C-6355 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
(Stock Pile # 132)

Surface Preparation prior to start Water Proofing for Short Piece of MV Line for Pit F/MV/08 and F/MV/09
F4 4 KAIG3-RFI-SW-C-6356 00 Civil Site Works 7/13/22 7/14/22 Approved as noted
at Zone - F- as highlighted

Inspection for Casting Blinding Concrete under Manhole - MH-O-09, MH-O-10, MH-O- 08-1 and Gullies G-
3 3 KAIG3-RFI-SW-C-6357 00 O-19, G-O-17, G-O-16, G-O-15, G-O-14, G-O-13, G-O-18, G-O-09, G-O-08, G-O-07 - as highlighted Civil Site Works 7/13/22 7/20/22 Approved as noted

AB3 3 KAIG3-RFI-SW-C-6358 00 Inspection of Excavation for RO Water Line at Area-A&B - As highlighted Civil Site Works 7/13/22 7/16/22 Approved as noted

Inspection of Steel Reinforcement (Horizontal) and One side Formwork for Walls of SBC-08 - Wing Wall
L5 5 KAIG3-RFI-SW-C-6359 00 Civil Site Works 7/13/22 CANCELLED
(Left Side) - As Highlighted

6A 6 KAIG3-RFI-SW-C-6360 00 Excavation for MV Line Pit - L/MV/15 , L/MV/02 , L/MV/17 at Zone-L - as highlighted Civil Site Works 7/13/22 7/16/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 10) for Foul Water Line between
6A 6 KAIG3-RFI-SW-C-6361 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Potable Water Line Pit
L5 5 KAIG3-RFI-SW-C-6362 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
for L/PW/01, L/PW/02, L/PW/04, PW-14 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 7) around Fire Water Line Pit for
L5 5 KAIG3-RFI-SW-C-6363 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
L/F/01, L/F/02, L/F/03, L/F/06, L/F/08, L/F/09, L/F/10 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/10 to B/MV/19
B 2 KAIG3-RFI-SW-C-6364 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
at Zone-B - As Highlighted (Stock Pile# 132)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) for the Duct Bank of MV Line
B 2 KAIG3-RFI-SW-C-6365 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
from B/MV/07 to B/MV/10 at Zone-B - As Highlighted (Stock Pile# 133 A-1-B)

"Excavation for Storm Water Line from MH-M-02 to MH-M-03 including Manhole MH-M-02, MH-M-03 -
6A 6 KAIG3-RFI-SW-C-6372 00 Civil Maze Garden 7/13/22 7/16/22 Approved as noted
As highlighted "

Surface Preparation prior to start water proofing for the short pices of foul water line manhole FW-A-6 at
6A 6 KAIG3-RFI-SW-C-6373 00 Civil Site Works 7/13/22 7/14/22 Approved as noted
Zone-6A (As Highlighted)

Inspection and Compaction test for Backfilling Sub-grade 1st Layer (1 of 4) (above gravel) around the
3B 3 KAIG3-RFI-SW-C-6376 00 Civil Site Works 7/13/22 7/17/22 Code C (not resubmit)
Manhole for MH-E-04 as Highlighted (SP#133 A-1-B)

kaig-qcals 304
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from C/TL/54 to C/TL/51
C3 3 KAIG3-RFI-SW-C-6377 00 Civil Site Works 7/13/22 7/16/22 Approved as noted
at Zone-C - As Highlighted

C3 3 KAIG3-RFI-SW-C-6378 00 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/04 - as highlighted Civil Site Works 7/13/22 7/16/22 Approved as noted

C 3 KAIG3-RFI-SW-C-6379 00 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/10, at Zone-C - as highlighted Civil Site Works 7/13/22 7/16/22 Approved as noted

C 3 KAIG3-RFI-SW-C-6380 00 Inspection for Casting the Blinding Concrete under the Gullies for G-G-26, G-G-27 (as Highlighted) Civil Site Works 7/13/22 7/16/22 Approved as noted

Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-6 (As
6A 6 KAIG3-RFI-SW-C-6381 00 Civil Site Works 7/14/22 7/16/22 Approved as noted
Highlighted)

4 4 KAIG3-RFI-SW-C-6383 00 Inspection of Formwork for the wall of SBC-08 - Wing Wall (Left Side) - As Highlighted Civil Site Works 7/14/22 7/17/22 Approved as noted

4 4 KAIG3-RFI-SW-C-6384 00 Inspection of Concrete Pouring for the wall of SBC-08 - Wing Wall (Left Side) - As Highlighted Civil Site Works 7/14/22 7/20/22 Approved as noted

Inspection of Blinding Concrete under MV Line Pit L/MV/17, L/MV/02, L/MV/15 at Zone-L - as highlighted
L5 5 KAIG3-RFI-SW-C-6385 00 Civil Site Works 7/14/22 7/17/22 Approved as noted

3 AB 3 KAIG3-RFI-SW-C-6386 00 Inspection of Sand bedding under pipe for RO Water Line at Area-A&B - As highlighted (Stock Pile # 132) Civil Site Works 7/14/22 7/20/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 9th & 10th Layer (10 of 10) for Foul Water Line
6A 6 KAIG3-RFI-SW-C-6387 00 Civil Site Works 7/14/22 7/20/22 Approved as noted
between FW-A-12 and FW-A-13 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) for the Duct Bank of MV Line
B 2 KAIG3-RFI-SW-C-6388 00 Civil Site Works 7/14/22 7/20/22 Approved as noted
from B/MV/07 to B/MV/10 at Zone-B - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above gravel for the Duct Bank
B 2 KAIG3-RFI-SW-C-6389 00 Civil Site Works 7/14/22 7/20/22 Approved as noted
of MV Line from B/MV/10 to B/MV/19 at Zone-B - As Highlighted (Stock Pile# 133 A-1-B)

C2 2 KAIG3-RFI-SW-C-6390 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-C - as highlighted (Stock Pile# 132) Civil Site Works 7/16/22 7/17/22 Approved as noted

1J 1K 6 KAIG3-RFI-SW-C-6399 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-C - as highlighted (Stock Pile# 132) Civil Crescent 7/19/22 7/23/22 Approved as noted

Surface Preparation prior to start backfilling around foul water line manhole FW-A-6 at Zone-6A (As
6A 6 KAIG3-RFI-SW-C-6393 00 Civil Site Works 7/14/22 7/17/22 Approved as noted
Highlighted)

Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication Line Pit -
KG4 4 KAIG3-RFI-SW-C-6394 00 Civil Site Works 7/14/22 7/17/22 Approved as noted
G/TL/44, K/TL/01 , K/TL/12 - as highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit -
KG5 5 KAIG3-RFI-SW-C-6395 00 Civil Site Works 7/14/22 7/17/22 Approved as noted
G/FS/08 , K/FS/01 , K/FS/22 - as highlighted (Stock Pile # 133 A-1-B)

C3 3 KAIG3-RFI-SW-C-6397 00 Inspection for Installation of Potable Water Line Pit C/PW/04 - as highlighted Civil Site Works 7/14/22 7/27/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-6398 00 Inspection for installation of Fire Water Line Pit for C/F/10, at Zone-C - as highlighted Civil Site Works 7/14/22 7/17/22 Approved as noted

C2 2 KAIG3-RFI-SW-C-6399 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-C - as highlighted (Stock Pile# 132) Civil Site Works 7/16/22 7/17/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-6400 00 Inspection for Installation of MV Line Junction Pit - G/MV/26 - as highlighted Civil Site Works 7/16/22 7/24/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Potable Water Line Pit
L5 5 KAIG3-RFI-SW-C-6401 00 Civil Site Works 7/16/22 7/20/22 Approved as noted
for L/PW/01, L/PW/02, L/PW/04, PW-14 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) around Fire Water Line Pit for
L5 5 KAIG3-RFI-SW-C-6402 00 Civil Site Works 7/16/22 7/20/22 Approved as noted
L/F/01, L/F/02, L/F/03, L/F/06, L/F/08, L/F/09, L/F/10 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit
B3 3 KAIG3-RFI-SW-C-6403 00 Civil Site Works 7/16/22 7/20/22 Approved as noted
for B/PW/11 - as highlighted.
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Fire Water Line Pit for
B3 3 KAIG3-RFI-SW-C-6404 00 Civil Site Works 7/16/22 7/20/22 Approved as noted
B/F/12 as highlighted (Stock Pile # 133 A-1-B)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6A 6 KAIG3-RFI-SW-C-6405 00 Civil Site Works 7/16/22 7/21/22 Approved as noted
3-1 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6A 6 KAIG3-RFI-SW-C-6409 00 Civil Site Works 7/16/22 7/21/22 Approved as noted
3 (As Highlighted)

kaig-qcals 305
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3 (As
6B 6 KAIG3-RFI-SW-C-6410 00 Civil Site Works 7/16/22 7/21/22 Approved as noted
Highlighted) "
Inspection and Compaction Test for backfilling Sub-grade 9th Layer (9 of 12) under Cesspool-3 at Zone-D -
D2 2 KAIG3-RFI-SW-C-6411 00 Civil Site Works 7/16/22 7/20/22 Approved as noted
as highlighted (Stock Pile # 133 A-1-B)
Inspection of Formwork for Wall of MV Line Pulling Pit - B/MV/10 & G/MV/07 at Zone-B&G (As
BG3 3 KAIG3-RFI-SW-C-6412 00 Civil Site Works 7/16/22 7/26/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - B/MV/10 & G/MV/07 at Zone-B&G (As
BG3 3 KAIG3-RFI-SW-C-6413 00 Civil Site Works 7/16/22 7/26/22 Approved as noted
Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV/01,
BFG34 4 KAIG3-RFI-SW-C-6414 00 B/MV/04, B/MV15, B/MV/22, F/MV/04, G/MV/01 at Zone-B,F,G - As Highlighted (Stock Pile # 133 A-1- Civil Site Works 7/16/22 7/20/22 Approved as noted
B)
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
G3 3 KAIG3-RFI-SW-C-6415 00 Civil Site Works 7/16/22 7/18/22 Approved as noted
Zone-G (As Highlighted)

"Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/02, K/TL/03, K/TL/14,
K5 5 KAIG3-RFI-SW-C-6416 00 Civil Site Works 7/16/22 7/18/22 Approved as noted
K/TL/25, K/TL/11, K/TL/22, K/TL/23 at Zone-K - as highlighted "

Surface Preparation prior to start backfilling around Fire & Security Line Pit K/FS/02, K/FS/03, K/FS/20,
K5 5 KAIG3-RFI-SW-C-6417 00 Civil Site Works 7/16/22 7/18/22 Approved as noted
K/FS/19, K/FS/08, K/FS/07, K/FS/10 at Zone-K - as highlighted
Excavation for Non-Potable Water Line Branch including Pit POC-32 & POC-12 at Zone-G - As highlighted
G3 3 KAIG3-RFI-SW-C-6418 00 Civil Site Works 7/18/22 7/23/22 Approved as noted

6B 6 KAIG3-RFI-SW-C-6419 00 Inspection and Compaction test for NGL of Storm Water Line Branch at Zone-6B -as highlighted Civil Site Works 7/18/22 7/26/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit B/MV/09,
B3 3 KAIG3-RFI-SW-C-6420 00 Civil Site Works 7/18/22 7/24/22 Approved as noted
B/MV/12, B/MV/19 at Zone-B - As Highlighted (Stock Pile# 133 A-1-B)

6A 6 KAIG3-RFI-SW-C-6423 00 Inspection for Casting Blinding Concrete under Manhole - MH-M-03 - as highlighted Civil Site Works 7/18/22 7/20/22 Approved as noted

"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-4 , FW-A-3-3 (as
6B 6 KAIG3-RFI-SW-C-6424 00 Civil Site Works 7/18/22 7/20/22 Approved as noted
Highlighted)"
Surface Preparation prior to start backfilling sub-grade for MV Line from G/MV/36 to B/MV/09 at Zone-G &
GB3 3 KAIG3-RFI-SW-C-6425 00 Civil Site Works 7/18/22 7/20/22 Approved as noted
Zone-B (As Highlighted)

"Surface Preparation prior to start backfilling Gravel for the Duct Bank of Telecommunications Line from
GB3 3 KAIG3-RFI-SW-C-6426 00 Civil Site Works 7/18/22 7/20/22 Approved as noted
B/TL/40 to G/TL/33 at Zone-B & Zone-G (As Highlighted)"

Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6428 00 Civil Site Works 7/18/22 7/21/22 Approved as noted
Water pipe Out Fall-M ( MH-M-04 to MH-M-03 ).As per high lighted Area in the attached Dwg.

Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6429 00 Civil Site Works 7/18/22 7/21/22 Approved as noted
Water pipe Out Fall-M ( MH-M-04 to MH-M-03 ).As per high lighted Area in the attached Dwg.

G3 3 KAIG3-RFI-SW-C-6430 00 Excavation for Non-Potable Water Line Pit POC-NPW/PT1 at Zone-B - As highlighted Civil Site Works 7/18/22 7/20/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Potable Water Line Pit
G3 3 KAIG3-RFI-SW-C-6431 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
for L/PW/01, L/PW/02, L/PW/04, PW-14 - as highlighted. (Stock Pile # 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) around Fire Water Line Pit for
L5 5 KAIG3-RFI-SW-C-6432 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
L/F/01, L/F/02, L/F/03, L/F/06, L/F/08, L/F/09, L/F/10 - as highlighted. (Stock Pile # 133 A-1-B)

"Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Telecommunication Line Pit
KG5 5 KAIG3-RFI-SW-C-6433 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
- G/TL/44, K/TL/01 , K/TL/12 - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit -
KG5 5 KAIG3-RFI-SW-C-6434 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
G/FS/08, K/FS/01, K/FS/22 - as highlighted (SP # 133 A-1-B)

Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/26, K/TL/04, K/TL/21,
K5 5 KAIG3-RFI-SW-C-6435 00 Civil Site Works 7/18/22 7/19/22 Approved as noted
K/TL/07 at Zone-K - as highlighted

Surface Preparation prior to start backfilling around Fire & Security Line Pit K/FS/24, K/FS/17, K/FS/13,
K5 5 KAIG3-RFI-SW-C-6436 00 Civil Site Works 7/18/22 7/19/22 Approved as noted
K/FS/16 at Zone-K - as highlighted

G4 4 KAIG3-RFI-SW-C-6437 00 Inspection for Installation of MV Line Junction Pit - G/MV/20 - as highlighted Civil Site Works 7/18/22 7/24/22 Approved as noted

kaig-qcals 306
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6438 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
from F/MV/01 to F/MV/08 at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV/04,
BF4 4 KAIG3-RFI-SW-C-6439 00 Civil Site Works 7/18/22 7/23/22 Approved as noted
F/MV/09 at Zone-B&F (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to protect
BC34 4 KAIG3-RFI-SW-C-6440 00 the pipe for Non-Potable Water Line at Zone- B&C - as highlighted in the attached drawing (SP# 133 A-1-B) Civil Site Works 7/18/22 7/23/22 Approved as noted

Inspection & Compaction tests of 10th (Final) Layer (Sub Base) Backfilling (after 9th layer Sub Base & 8
4B 4 KAIG3-RFI-SW-C-6443 00 layers of Sub Grade) Behind SBC-08 (Wing Walls), at Wadi 3, Inside Water Garden, as highlighted area in Civil Site Work 7/19/22 7/23/22 Approved as noted
attached drawing's. (SP 140)
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlighted
L 5 KAIG3-RFI-SW-C-6445 00 Civil Site Work 7/17/22 7/20/22 Approved as noted
Area in the attached Dwg.
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlighted
L 5 KAIG3-RFI-SW-C-6445 01 Civil Site Work 7/26/22 7/31/22 Code C (resubmit)
Area in the attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlighted
L 5 KAIG3-RFI-SW-C-6445 02 Civil Site Work 8/4/22 Open
Area in the attached Dwg.
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
L 5 KAIG3-RFI-SW-C-6446 00 Civil Site Work 7/18/22 7/23/22 Code C (resubmit)
attached Dwg.
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
L 5 KAIG3-RFI-SW-C-6446 01 Civil Site Work 7/26/22 7/31/22 Code C (resubmit)
attached Dwg.
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
L 5 KAIG3-RFI-SW-C-6446 02 Civil Site Work 8/4/22 Open
attached Dwg.
Surface Preparation prior to start backfilling around MV Line Pit G/MV/20 G/MV/26 , F/MV/04 , at Zone-
GF4 4 KAIG3-RFI-SW-C-6447 00 Civil Site Work 7/18/22 7/19/22 Code C (resubmit)
G,F (As Highlighted)
Inspection of backfilling Gravel 1st layer (1 of 1) for foul water line manhole FW-A-6 at Zone-6A - As
6A 6 KAIG3-RFI-SW-C-6448 01 Civil Site Work 7/25/22 7/27/22 Approved as noted
Highlighted (Stock Pile # 138)
Inspection of backfilling Gravel 1st layer (1 of 1) for foul water line manhole FW-A-6 at Zone-6A - As
6A 6 KAIG3-RFI-SW-C-6448 00 Civil Site Work 7/18/22 7/19/22 Code C (resubmit)
Highlighted (Stock Pile # 118)

Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 ,
CG3 3 KAIG3-RFI-SW-C-6449 00 Civil Site Work 7/19/22 7/21/22 Approved as noted
G/MV/31 , G/MV/03 , G/MV/27 at Zone-C&G (As Highlighted)

Inspection of Formwork for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 , G/MV/31 ,
CG3 3 KAIG3-RFI-SW-C-6450 00 Civil Site Work 7/19/22 7/21/22 Approved as noted
G/MV/03 , G/MV/27 at Zone-C&G (As Highlighted)

G4 4 KAIG3-RFI-SW-C-6464 00 Inspection of Blinding Concrete under MV Line Pit G/MV/37 at Zone-G - as highlighted Civil Site Work 7/18/22 7/24/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit B/MV/01,
BFG34 4 KAIG3-RFI-SW-C-6465 00 B/MV/04, B/MV15, B/MV/22, F/MV/04, G/MV/01 at Zone-B,F,G - As Highlighted (Stock Pile # 133 A-1- Civil Site Work 7/18/22 7/23/22 Approved as noted
B)

Inspection and Compaction Test for backfilling Sub-garde 1st layer (1 of 14) above gravel for foul water line
6A 6 KAIG3-RFI-SW-C-6466 00 Civil Site Work 7/18/22 7/23/22 Approved as noted
manhole FW-A-6 at Zone-6A - As Highlighted (SP# 133)

Inspection and Compaction Test for backfilling Sub-garde 2nd layer (2 of 14) above gravel for foul water line
6A 6 KAIG3-RFI-SW-C-6467 00 Civil Site Work 7/18/22 7/23/22 Approved as noted
manhole FW-A-6 at Zone-6A - As Highlighted (SP# 133)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit F/MV/11 at
F4 4 KAIG3-RFI-SW-C-6468 00 Civil Site Work 7/18/22 7/23/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of Waterproofing (Internal & External) for MV Line Pit - B/MV/23, C/MV/23, G/MV/31,
BCGH346 6 KAIG3-RFI-SW-C-6469 00 Civil Site Work 7/19/22 7/21/22 Approved as noted
G/MV/19, G/MV/21, H/MV/02, H/MV/09, H/MV/25 - as highlighted

Inspection of Water Proofing for Encasement of Crossing Pipe and Surface Preparation prior to start
G4 4 KAIG3-RFI-SW-C-6470 00 backfilling around Telecommunication and Fire&Security Line Pit G/TL/23 and G/FS/37 at Zone-G - as Civil Site Work 7/19/22 7/21/22 Approved as noted
highlighted
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 mm Ø- UPVC Pipes-Class 4 ) for Storm
5A 5 KAIG3-RFI-SW-C-6471 00 Water pipe Out Fall-E between ( G-E-03,G-E-04,G-E-05,G-E-06,G-E-16,G-E-17 to connection with main Civil Site Work 7/19/22 7/19/22 Code C (resubmit)
line).As per high lighted Area in the attached Dwg.
Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 mm Ø- UPVC Pipes-Class 4 ) for Storm
5A 5 KAIG3-RFI-SW-C-6471 01 Water pipe Out Fall-E between ( G-E-03,G-E-04,G-E-05,G-E-06,G-E-16,G-E-17 to connection with main Civil Site Work 7/20/22 7/21/22 Approved as noted
line).As per high lighted Area in the attached Dwg.
'Pipe Installation of Strom Water pipe OUT FALL-E for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
5A 5 KAIG3-RFI-SW-C-6472 00 pipe Out Fall-E between ( G-E-03,G-E-04,G-E-05,G-E-06,G-E-16,G-E-17 to connection with main line).As Civil Site Work 7/19/22 7/21/22 Approved as noted
per high lighted Area in the attached Dwg.

kaig-qcals 307
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 , G/MV/31
CG3 3 KAIG3-RFI-SW-C-6474 00 Civil Site Work 7/19/22 7/26/22 Approved as noted
, G/MV/03 , G/MV/27 at Zone-C&G (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit
B3 3 KAIG3-RFI-SW-C-6475 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
for B/PW/11 - as highlighted. (SP# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Fire Water Line Pit for
B3 3 KAIG3-RFI-SW-C-6476 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
B/F/12 as highlighted (Stock Pile # 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit F/MV/09
F4 4 KAIG3-RFI-SW-C-6477 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
at Zone-F (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6478 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
from F/MV/01 to F/MV/08 at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside MV Line from G/MV/19
G3 3 KAIG3-RFI-SW-C-6479 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
to G/MV/11 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)"
Surface Preparation prior to start backfilling around MV Line Pit G/MV/19 G/MV/11 at Zone-G (As
G3 3 KAIG3-RFI-SW-C-6480 00 Civil Site Work 7/19/22 7/21/22 Approved as noted
Highlighted)

Surface Preparation prior to start backfilling for the Duct Bank of MV Line from B/MV/06 to B/MV/13 at
B2 2 KAIG3-RFI-SW-C-6481 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
Zone-B (As Highlighted)

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit B/MV/09,
B3 3 KAIG3-RFI-SW-C-6482 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
B/MV/12, B/MV/19 at Zone-B - As Highlighted (Stock Pile# 133 A-1-B)"

"Surface Preparation prior to start backfilling for the Duct Bank of Telecommunications Line from B/TL/36
B3 3 KAIG3-RFI-SW-C-6483 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
and B/TL/35 at Zone-B (As Highlighted)"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to protect
B4 4 KAIG3-RFI-SW-C-6484 00 the pipe for Non-Potable Water Line at Zone- B - as highlighted in the attached drawing (SP# 131 A-1-B) Civil Site Work 7/20/22 7/26/22 Approved as noted

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit B/MV/09,
B3 3 KAIG3-RFI-SW-C-6485 00 Civil Site Work 7/20/22 7/26/22 Code C (resubmit)
B/MV/12, B/MV/19 at Zone-B - As Highlighted (Stock Pile# 131 A-1-B)"
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit B/MV/09,
B3 3 KAIG3-RFI-SW-C-6485 01 Civil Site Work 7/31/22 8/6/22 Approved as noted
B/MV/12, B/MV/19 at Zone-B - As Highlighted (Stock Pile# 131 A-1-B)"
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-11 (As
6B 6 KAIG3-RFI-SW-C-6486 00 Civil Site Work 7/19/22 7/27/22 Approved as noted
Highlighted)"
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6A 6 KAIG3-RFI-SW-C-6487 00 Civil Site Work 7/19/22 7/27/22 Approved as noted
3-4 (As Highlighted)
Surface Preparation prior to start backfilling sub-grade for the Duct Bank of Fire & Security Distribution Line
B3 3 KAIG3-RFI-SW-C-6488 00 Civil Site Work 7/19/22 7/23/22 Approved as noted
from B/FS/27 to B/FS/36 (As Highlighted)

Surface Preparation prior to start backfilling around MV Line Pit K/MV/01 K/MV/02, at Zone-K (As
K5 5 KAIG3-RFI-SW-C-6489 00 Civil Site Work 7/20/22 7/23/22 Approved as noted
Highlighted)

Surface Preparation prior to start backfilling Fire&Security Line Pit G/FS/46, G/FS/20, K/FS/25, K/FS/26,
KG5 5 KAIG3-RFI-SW-C-6490 00 Civil Site Work 7/20/22 7/23/22 Approved as noted
K/FS/14 at zone G&K (As Highlighted)
Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/45, G/TL/17, K/TL/27,
KG5 5 KAIG3-RFI-SW-C-6491 00 Civil Site Work 7/20/22 7/23/22 Approved as noted
K/TL/28, K/TL/05 at Zone-G&K - as highlighted
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for Storm
4B 4 KAIG3-RFI-SW-C-6496 00 Water pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O-03)&(G- Civil Site Work 7/20/22 7/23/22 Code C (resubmit)
O-32 to MH-O-04).As per high lighted Area in the attached D
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for Storm
4B 4 KAIG3-RFI-SW-C-6496 01 Water pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O-03)&(G- Civil Site Work 7/28/22 7/31/22 Approved as noted
O-32 to MH-O-04).As per high lighted Area in the attached D
'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
4B 4 KAIG3-RFI-SW-C-6497 00 pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O-03)&(G-O-32 Civil Site Work 7/20/22 7/23/22 Code C (resubmit)
to MH-O-04).As per high lighted Area in the attached Dwg.
'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
4B 4 KAIG3-RFI-SW-C-6497 01 pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O-03)&(G-O-32 Civil Site Work 7/28/22 7/31/22 Approved as noted
to MH-O-04).As per high lighted Area in the attached Dwg.
"Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Telecommunication Line Pit
KG5 5 KAIG3-RFI-SW-C-6499 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
- G/TL/44, K/TL/01 - as highlighted (Stock Pile # 133 A-1-B)"
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit -
6A 6 KAIG3-RFI-SW-C-6500 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
G/FS/08, K/FS/01, - as highlighted (SP # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-garde 3rd layer (3 of 14) above gravel for foul water line
6A 6 KAIG3-RFI-SW-C-6501 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
manhole FW-A-6 at Zone-6A - As Highlighted (SP# 133)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit F/MV/11
F4 4 KAIG3-RFI-SW-C-6502 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

kaig-qcals 308
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit B/MV/01,
BFG34 4 KAIG3-RFI-SW-C-6503 00 B/MV/04, B/MV15, B/MV/22, F/MV/04, G/MV/01 at Zone-B,F,G - As Highlighted (Stock Pile # 133 A-1- Civil Site Work 7/20/22 7/26/22 Approved as noted
B)

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-27, POC-PT2, POC-
KG5 5 KAIG3-RFI-SW-C-6504 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
28, POC-30, POC-TT4, POC Water tank at Zone-G&K - as highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit G/MV/19,
G3 3 KAIG3-RFI-SW-C-6509 00 Civil Site Work 7/20/22 7/26/22 Code C (resubmit)
G/MV/11 at Zone-G - As Highlighted (Stock Pile# 131 A-1-B)

Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/19 to G/MV/11) at Zone-G as
G3 3 KAIG3-RFI-SW-C-6510 00 Civil Site Work 7/20/22 7/23/22 Approved as noted
highlighted in the attached drawing (Stock Pile # 132)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit
B3 3 KAIG3-RFI-SW-C-6511 00 Civil Site Work 7/20/22 7/27/22 Approved as noted
for B/PW/11 - as highlighted. (SP# 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) around Fire Water Line Pit for
B3 3 KAIG3-RFI-SW-C-6512 00 Civil Site Work 7/20/22 7/27/22 Approved as noted
B/F/12 as highlighted (Stock Pile # 131 A-1-B)

B4 4 KAIG3-RFI-SW-C-6513 00 Excavation for Non-Potable Water Line including Pit POC-14 at Zone-B - As highlighted Civil Site Work 7/20/22 7/23/22 Approved as noted

Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted
G5 5 KAIG3-RFI-SW-C-6514 00 Civil Site Work 7/21/22 7/26/22 Approved as noted
(Stock Pile# 132)

Inspection of Water Proofing and Surface Preparation prior to start backfilling for Duct Bank of
K5 5 KAIG3-RFI-SW-C-6515 00 Civil Site Work 7/21/22 7/24/22 Approved as noted
Telecommunications line from K/TL/22 to K/TL/23 at Zone-K - As Highlighted

Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - G/MV/37, L/MV/02,
GL45 5 KAIG3-RFI-SW-C-6516 00 Civil Site Work 7/20/22 7/24/22 Approved as noted
L/MV/17, L/MV/15 at Zone-G&L (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/37, L/MV/15, L/MV/02, L/MV/17 at
GL45 5 KAIG3-RFI-SW-C-6517 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
Zone-G&L (As Highlighted)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/37, L/MV/17, L/MV/02,
GL45 5 KAIG3-RFI-SW-C-6518 00 Civil Site Work 7/20/22 7/26/22 Approved as noted
L/MV/15 at Zone-G&L (As Highlighted)
"Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-10, NPW-ISC-
B3 3 KAIG3-RFI-SW-C-6520 00 Civil Site Work 7/21/22 7/26/22 Approved as noted
11,NPW-ISC-09, POC-06 at Zone-B - as highlighted "

Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit -
KG5 5 KAIG3-RFI-SW-C-6521 00 Civil Site Work 7/21/22 7/27/22 Approved as noted
G/FS/08, K/FS/01, - as highlighted (SP # 133 A-1-B)

"Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 4) for Telecommunication Line Pit
KG5 5 KAIG3-RFI-SW-C-6522 00 Civil Site Work 7/21/22 7/27/22 Approved as noted
- G/TL/44, K/TL/01 - as highlighted (Stock Pile # 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit K/MV/01,
K4 4 KAIG3-RFI-SW-C-6523 00 Civil Site Work 7/21/22 7/27/22 Approved as noted
K/MV/02 at Zone-K - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering to protect
B4 4 KAIG3-RFI-SW-C-6524 00 the pipe for Non-Potable Water Line at Zone- B - as highlighted in the attached drawing (SP# 131 A-1-B) Civil Site Work 7/21/22 7/27/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6525 00 Civil Site Work 7/21/22 7/26/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6526 00 Civil Site Work 7/21/22 7/26/22 Approved as noted
from F/MV/01 to F/MV/08 at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/19 to G/MV/11 at Zone-G - as
4G 4 KAIG3-RFI-SW-C-6527 00 Civil Site Work 7/21/22 7/24/22 Approved as noted
highlighted
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B - As highlighted (Stock Pile#
B4 4 KAIG3-RFI-SW-C-6528 00 Civil Site Work 7/21/22 7/26/22 Approved as noted
132)

Inspectionand Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
4G 4 KAIG3-RFI-SW-C-6529 00 Civil Site Work 7/21/22 7/27/22 Code C (resubmit)
from G/MV/19 to G/MV/11 at Zone-G - as highlighted (SP#131)

B4 4 KAIG3-RFI-SW-C-6530 00 Inspection for the Excavation of Storm Box Culvert - SBC-07 (As Highlighted) Civil Site Work 7/21/22 7/26/22 Approved as noted
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between AV-14 and G/DH/19 at
G5 5 KAIG3-RFI-SW-C-6538 00 Civil Site Work 7/23/22 7/26/22 Approved as noted
Zone-G - As highlighted (Stock Pile# 132)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B - As highlighted (Stock Pile#
B4 4 KAIG3-RFI-SW-C-6539 00 Civil Site Work 7/23/22 7/27/22 Approved as noted
132)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
6 6 KAIG3-RFI-SW-C-6540 00 Civil Site Work 7/23/22 7/31/22 Approved as noted
M-03 (As Highlighted)

kaig-qcals 309
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-03 (As
6 6 KAIG3-RFI-SW-C-6541 00 Civil Site Work 7/28/22 7/31/22 Approved as noted
Highlighted)
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-5 , FW-A-3-6 (as
6B 6 KAIG3-RFI-SW-C-6542 00 Civil Site Work 7/23/22 7/26/22 Approved as noted
Highlighted)"
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6543 00 Civil Site Work 7/23/22 7/27/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of Water Proofing and Surface Preparation prior to start backfilling for Duct Bank of
2B 2 KAIG3-RFI-SW-C-6544 00 Civil Site Work 7/24/22 7/26/22 Approved as noted
Fire&Security line from K/FS/07 to K/FS/10 at Zone-K - As Highlighted

"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-07, G-O-08, G-O-09,
2B 2 KAIG3-RFI-SW-C-6545 00 Civil Site Work 7/23/22 7/26/22 Approved as noted
G-O-18, G-O-19, G-O-17, G-O-16, G-O-15, G-O-14, G-O-13 - as highlighted "

Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Telecommunication Line Pit
K5 5 KAIG3-RFI-SW-C-6552 00 Civil Site Work 7/24/22 7/28/22 Approved as noted
K/TL/02, K/TL/14, K/TL/25, K/TL/11, K/TL/22 at Zone-K - as highlighted

"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Fire & Security Line Pit
K5 5 KAIG3-RFI-SW-C-6553 00 Civil Site Work 7/23/22 7/27/22 Approved as noted
K/FS/02, K/FS/20, K/FS/19, K/FS/18, K/FS/07 at Zone-K - as highlighted "

4 4 KAIG3-RFI-SW-C-6554 00 Inspection for Blinding Concrete under Storm Box Culvert - SBC-07 including Wing Wall - As Highlighted Civil Site Work 7/24/22 7/27/22 Approved as noted

Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (Stock
B3 3 KAIG3-RFI-SW-C-6555 00 Civil Site Work 7/24/22 7/31/22 Approved as noted
Pile# 132)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-08-01, MH-O-
2 2 KAIG3-RFI-SW-C-6557 00 Civil Site Work 7/24/22 7/31/22 Approved as noted
10 (As Highlighted) "

"Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02,
GHL56 6 KAIG3-RFI-SW-C-6559 00 Civil Site Work 7/24/22 7/26/22 Approved as noted
H/MV/04, H/MV/06, H/MV/29 and L/MV/17 at Zone-G&H&L (As Highlighted) "

"Inspection of Formwork for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02, H/MV/04,
GHL56 6 KAIG3-RFI-SW-C-6560 00 Civil Site Work 7/24/22 7/27/22 Approved as noted
H/MV/06, H/MV/29 and L/MV/17 at Zone-G&H&L (As Highlighted) "

Inspection of Casting the Concrete Encasement and Surface Preperation prior to start waterproofing and
4C 4 KAIG3-RFI-SW-C-6561 01 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) For Storm Water Line between MH-A-08 and G-A- Civil Site Work 8/3/22 Open
23 As attached (ZHBG - action to close Non-Confor

Inspection of Casting the Concrete Encasement and Surface Preperation prior to start waterproofing and
4C 4 KAIG3-RFI-SW-C-6561 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) For Storm Water Line between MH-A-08 and G-A- Civil Site Work 7/24/22 7/27/22 Code C (resubmit)
23 As attached
Surface Preparation prior to start backfill for the Duct Bank of MV Line between F/MV/01 to F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6562 00 Civil Site Work 7/24/22 7/27/22 Approved as noted
Zone-F (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6563 00 Civil Site Work 7/24/22 7/28/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit B/MV/01,
BFG34 4 KAIG3-RFI-SW-C-6564 00 B/MV/04, B/MV15, B/MV/22, F/MV/04, G/MV/01 at Zone-B,F,G - As Highlighted (Stock Pile # 133 A-1- Civil Site Work 7/24/22 7/28/22 Approved as noted
B)

"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Fire & Security Line Pit
K5 5 KAIG3-RFI-SW-C-6565 00 K/FS/24, K/FS/17, K/FS/13, K/FS/14, K/FS/16 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)" Civil Site Work 7/24/22 7/31/22 Approved as noted

"Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02, H/MV/04,
GHL56 6 KAIG3-RFI-SW-C-6571 00 Civil Site Work 7/24/22 7/27/22 Approved as noted
H/MV/06, H/MV/29 and L/MV/17 at Zone-G&H&L (As Highlighted) "

Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/11 to K/TL/22
K5 5 KAIG3-RFI-SW-C-6572 00 Civil Site Work 7/24/22 7/26/22 Approved as noted
at Zone-K - as highlighted in the attached drawing

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from F/FS/08 to
K5 5 KAIG3-RFI-SW-C-6573 00 Civil Site Work 7/24/22 7/26/22 Approved as noted
K/FS/07 at Zone- K - as highlighted in the attached drawing

"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Telecommunication Line
K5 5 KAIG3-RFI-SW-C-6578 00 Pit K/TL/26, K/TL/04, K/TL/21, K/TL/05, K/TL/07 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)" Civil Site Work 7/24/22 7/31/22 Approved as noted

Inspection of Formwork for Side Walls of MV Line Pulling Pit - L/MV/15 , L/MV/02 and L/MV/17 at Zone-
5 5 KAIG3-RFI-SW-C-6583 00 Civil Site Work 7/25/22 7/28/22 Approved as noted
L (As Highlighted)

kaig-qcals 310
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/15 , L/MV/02 and L/MV/17
L5 5 KAIG3-RFI-SW-C-6584 00 Civil Site Work 7/25/22 7/31/22 Approved as noted
at Zone-L (As Highlighted)
"Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/13 and G/MV/38 - as highlighted (SCR:
G5 5 KAIG3-RFI-SW-C-6585 00 Civil Site Work 7/25/22 7/27/22 Approved as noted
KAIG3-SCR-SW-E0081-00)"

F4 4 KAIG3-RFI-SW-C-6586 00 "Inspection for Installation of MV Line Junction Pit - F/MV/01 - as highlighted " Civil Site Work 7/25/22 7/27/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit F/MV/11 at
F4 4 KAIG3-RFI-SW-C-6587 00 Civil Site Work 7/25/22 7/31/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6588 00 Civil Site Work 7/25/22 7/31/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit G/MV/26,
G5 5 KAIG3-RFI-SW-C-6589 00 Civil Site Work 7/25/22 7/31/22 Approved as noted
G/MV/15, G/MV/25 and G/MV/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

5 5 KAIG3-RFI-SW-C-6590 00 Surface Preparation prior to start Waterproofing for Cesspool-2 - as highlighted Civil Site Work 7/26/22 7/27/22 Approved as noted

6B 6 KAIG3-RFI-SW-C-6591 00 Inspection of Excavation for Storm Water Line at Zone-6B near MH-K-09 - As highlighted Civil Site Work 7/25/22 7/28/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-6592 00 Inspection of Excavation for Foul Water Line branch at Zone-6B near FW-A-3-7.3 - as Highlighted Civil Site Work 7/25/22 7/28/22 Approved as noted

BG34 4 KAIG3-RFI-SW-C-6593 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-B&G - As highlighted Civil Site Work 7/25/22 7/28/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-6594 00 Inspection for Casting the Blinding Concrete under the Foul Water Line Manhole FW-A-4 (as Highlighted) Civil Site Work 7/25/22 7/27/22 Approved as noted

6A 6 KAIG3-RFI-SW-C-6595 00 Inspection for Casting Blinding Concrete under Manhole - MH-M-02, MH-M-05 - as highlighted Civil Site Work 7/26/22 7/27/22 Approved as noted

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6597 00 Civil Site Work 7/25/22 7/27/22 Approved as noted
Water pipe Out Fall-M ( MH-M-03 to MH-M-02 ).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6598 00 Civil Site Work 7/25/22 7/27/22 Approved as noted
Water pipe Out Fall-M ( MH-M-03 to MH-M-02 ).As per high lighted Area in the attached Dwg.

INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B 6 KAIG3-RFI-SW-C-6601 00 Civil Site Work 7/25/22 7/27/22 Approved as noted
3-6 (As Highlighted)

Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between G/DC/13 and B/DC/02
BG34 4 KAIG3-RFI-SW-C-6604 00 Civil Site Work 7/26/22 7/31/22 Approved as noted
at Zone-B&G - As highlighted (Stock Pile# 132)
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Stock
G5 5 KAIG3-RFI-SW-C-6605 00 Civil Site Work 7/26/22 8/1/22 Approved as noted
Pile# 132)
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between AV-10 and G/DC/20 at
G5 5 KAIG3-RFI-SW-C-6606 00 Civil Site Work 7/26/22 8/1/22 Approved as noted
Zone-G - As highlighted (Stock Pile# 132)

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
3B 3 KAIG3-RFI-SW-C-6607 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-O-01, MH-O-02, MH-O-03, MH- Civil Site Work 7/26/22 7/28/22 Approved as noted
O-04, MH-O-5 and MH-O-06 (As Highlighted)

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6A 6 KAIG3-RFI-SW-C-6608 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-11 (As Highlighted) Civil Site Work 7/27/22 7/31/22 Approved as noted

Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/37, H/MV/28, H/MV/11 and H/MV/24 at
34GH 4 KAIG3-RFI-SW-C-6609 00 Civil Site Work 7/27/22 7/31/22 Approved as noted
Zone-G&H (As Highlighted)
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between G/DH/19 and G/DH/17
G5 5 KAIG3-RFI-SW-C-6610 00 Civil Site Work 7/26/22 7/31/22 Approved as noted
at Zone-G - As highlighted (Stock Pile# 132)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit K/MV/01,
K4 4 KAIG3-RFI-SW-C-6611 00 Civil Site Work 7/26/22 7/31/22 Approved as noted
K/MV/02 at Zone-K - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6612 00 Civil Site Work 7/26/22 7/31/22 Approved as noted
between F/MV/01 to F/MV/09 at Zone-F - As Highlighted

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/09 at
F4 4 KAIG3-RFI-SW-C-6613 00 Civil Site Work 7/26/22 7/31/22 Code C (resubmit)
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

kaig-qcals 311
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit B/MV/01,
BFG34 4 KAIG3-RFI-SW-C-6614 00 B/MV/04, B/MV15, B/MV/22, F/MV/04, G/MV/01 at Zone-B,F,G - As Highlighted (Stock Pile # 133 A-1- Civil Site Work 7/26/22 7/31/22 Approved as noted
B)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- F - as highlighted in the
F4 4 KAIG3-RFI-SW-C-6615 00 Civil Site Work 7/26/22 7/31/22 Approved as noted
attached drawing (Stock Pile# 132)
G4 4 KAIG3-RFI-SW-C-6619 00 Excavation for Potable Water Line at Zone-G - as highlighted Civil Site Work 7/26/22 7/31/22 Approved as noted
G4 4 KAIG3-RFI-SW-C-6620 00 Excavation for Fire Water Line at Zone-G - as highlighted Civil Site Work 7/26/22 7/31/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) for Storm Water Line from MH-
6A 6 KAIG3-RFI-SW-C-6621 00 Civil Site Work 7/27/22 7/31/22 Approved as noted
M-03 to MH-M-04 at Zone-6A - As Highlighted (Stock Pile # 133 A-1-B)

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/37 H/MV/28, H/MV/11 and
GH34 4 KAIG3-RFI-SW-C-6622 00 Civil Site Work 7/27/22 7/31/22 Approved as noted
H/MV/24 at Zone-G&H (As Highlighted)

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-39, POC-41, POC-42,
GK35 5 KAIG3-RFI-SW-C-6623 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
POC-43 and POC-29 at Zone-G&K - as highlighted

Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-O-01, MH-O-02, MH-O-03, MH-O-
C2 2 KAIG3-RFI-SW-C-6624 00 04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G-O-35, G-O-36, G-O-43, G-O-44 - AS Civil Site Work 7/27/22 8/1/22 Approved as noted
Highlighted

Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for C/MV/38,
C 3 KAIG3-RFI-SW-C-6625 00 Civil Site Work 7/28/22 8/31/22 Approved as noted
C/MV/08, C/MV/22, C/MV/40 and C/MV/25 (As Highlighted)

Surface Preparation prior to Primer caot Damp proofing for Boundary wall Footings Inner Face @ Span 67C,
KAIG3-RFI-SW-S-2378 00 Civil Site Works 11/24/21 11/27/21 Approved as noted
68A, 68B, 69, 70, 71, 72 & 73, As per Attached Highlighted Drawing's.

KAIG3-RFI-SW-S-2379 00 Inspection of Concrete Pouring for Walls and Top Slab of SBC-02 (Part-4) As Highlighted Civil Site Works 11/24/21 11/27/21 Approved as noted

Solvent Base Primer Coat for Boundary wall (Inner Face) @ Span 34, 35, 36 & 37, As per Attached
2B KAIG3-RFI-SW-S-2580 00 Civil Site Works 12/2/21 12/7/21 Approved as noted
Highlighted Drawing's.
Single Layer Membrane Water proofing for Boundary wall (Inner Face) @ Span 34, 35, 36 & 37, As per
Zone B & G KAIG3-RFI-SW-S-2581 00 Civil Site Works 12/2/21 12/6/21 Approved as noted
Attached Highlighted Drawing's.
Protection layer of 4mm thk Bituminous Protection Board for boundary Wall (Inner Face) @ Span 34, 35, 36
Zone B & G KAIG3-RFI-SW-S-2582 00 Civil Site Works 12/2/21 12/6/21 Approved as noted
& 37, As per Attached Highlighted Drawing's.

Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner Face) @
5A KAIG3-RFI-SW-S-2583 00 Civil Site Works 12/2/21 12/7/21 Approved as noted
Span 34, 35, 36 & 37, As per Attached Highlighted Drawing's.

Aluminium Flashing & Sealant for boundary Wall (Inner Face) @ Span 34, 35, 36 & 37, As per Attached
6B KAIG3-RFI-SW-S-2584 00 Civil Site Works 12/2/21 12/8/21 Approved as noted
Highlighted Drawing's.
Single Layer Membrane Water proofing for Boundary wall (Inner Face) @ Span 31, 32 & 33, As per
6B KAIG3-RFI-SW-S-2585 00 Civil Site Works 12/2/21 12/8/21 Approved as noted
Attached Highlighted Drawing's.

Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner Face) @
Zone K KAIG3-RFI-SW-S-2587 00 Civil Site Works 12/2/21 12/7/21 Approved as noted
Span 31, 32 & 33, As per Attached Highlighted Drawing's.

Excavation & Soil preparation for Foundations (16 no's) at Grid (A & B/1-8) of Canopy at New Ticketing
2B 2 KAIG3-RFI-TB-C-3462 00 Civil New Ticketing Booth 1/19/22 1/23/22 Approved as noted
Booths, at highlighted area in attached drawings.
Surface preparation prior to Backfilling Surround conopy footings (4 nos ) at grid (A & B / 1 & 2 ) and new
2B 2 KAIG3-RFI-TB-C-4365 00 Civil New Ticket Booth 3/2/22 3/5/22 Approved as noted
ticketing booths 6A & 7A, (at B.O.B Levels) at new ticketing booths at highlighted area in attached drawings

Inspection & Compaction tests of 1st Layer Backfilling (Out of 6 layers) Surround conopy footings (4 nos )
2B 2 KAIG3-RFI-TB-C-4371 00 at grid (A & B / 1 & 2 ) and new ticketing booths 6A & 7A, (at B.O.B Levels) at new ticketing booths at Civil New Ticket Booth 3/3/22 3/8/22 Approved as noted
highlighted area in attached drawings

Surface preparation prior to Backfilling Surround conopy footings (12 nos ) at grid (A & B / 3 to 8 ) and new
2B 2 KAIG3-RFI-TB-C-4489 00 ticketing booths from 1A to 6A, (at B.O.B Levels) at new ticketing booths at highlighted area in attached Civil New Ticketing Booth 3/8/22 3/12/22 Approved as noted
drawings

Inspection Compaction tests of 1st Layer Backfilling (Out of 6 layers) Surround conopy footings (12 nos ) at
2B 2 KAIG3-RFI-TB-C-4568 00 grid (A & B / 3 to 8 ) and new ticketing booths from 1A to 6A, (at B.O.B Levels) at new ticketing booths at Civil New Ticket Booth 3/13/22 3/16/22 Approved as noted
highlighted area in attached drawing

Inspection Compaction tests of 2nd Layer Backfilling (Out of 6 layers) Surround conopy footings (12 nos ) at
2B 2 KAIG3-RFI-TB-C-4701 00 Civil New Ticketing Booth 3/20/22 3/22/22 Approved as noted
grat (A & B 2 to 7 ) and new ticketing booths 2A to 6A, (at B.O

kaig-qcals 312
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection Compaction tests of 3rd Layer (Sub Grade) Backfilling (Out of 6 layers) Surround conopy footings
2B 2 KAIG3-RFI-TB-C-4841 00 (12 nos ) at grid (A & B / 2 to 7) and new ticketing booths from 2A to 6A, at New ticketing booths at Civil New Ticketing Booth 3/28/22 3/29/22 Approved as noted
highlighted area in attached drawings. (Stock

Sand Cover & Protection of HDPE Pipe Installation of water features pipes, (160mmØ CLASS-PE100),
4C KAIG3-RFI-TG-C-2728 00 Civil Butterfly Garden 12/11/21 12/14/21 Approved as noted
Inside Butterfly Garden, as highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub surface HDPE
4C KAIG3-RFI-TG-C-2793 00 Pipe Installed of water features pipes, (160mmØ CLASS-PE100), Inside Butterfly Garden, as highlighted Civil Butterfly Garden 12/14/21 12/20/21 Approved as noted
area in attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub surface HDPE
4C KAIG3-RFI-TG-C-2808 00 Pipe Installed of water features pipes, (160mmØ CLASS-PE100), Inside Butterfly Garden, as highlighted Civil Butterfly Garden 12/15/21 12/22/21 Approved as noted
area in attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub surface
4C KAIG3-RFI-TG-C-2896 00 HDPE Pipe Installed of water features pipes, (160mmØ CLASS-PE100), Inside Butterfly Garden, as Civil Butterfly Garden 12/18/21 12/22/21 Approved as noted
highlighted area in attached drawings. (Stock Pile 126).

Excavation & Blinding levels under foundation at Grid (A/7-9) @ Butterfly Garden, at highlighted area in
4C 4 KAIG3-RFI-TG-C-3184 00 Civil Butterfly Garden 1/3/22 1/6/22 Approved as noted
attached drawings.
Excavation & Surface Preparation for Internal foundations, Inside Butterfly Garden, at highlighted area in
4C 4 KAIG3-RFI-TG-C-3268 00 Civil Butterfly Garden 1/8/22 1/11/22 Approved as noted
attached drawings.

Soil Preparation Prior to Backfilling along the Footing (Inner Side), (at B.O.B level +875.26), at Grid (B/1-
4C 4 KAIG3-RFI-TG-C-3692 00 Civil Butterfly Garden 1/31/22 2/5/22 Approved as noted
21) & (1&21/A-B), Inside Butterfly Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footing
4C 4 KAIG3-RFI-TG-C-3786 00 (Inner Side), (from B.O.B level +875.26 to T.O.F +876.51), at Grid (B/1-21) & (1&21/A-B), Inside Butterfly Civil Butterfly Garden 2/3/22 2/8/22 Approved as noted
Garden, at highlighted area in attached drawing.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footing
4C 4 KAIG3-RFI-TG-C-3813 00 (Inner Side), (from B.O.B level +875.26 to T.O.F +876.51), at Grid (B/1-21) & (1&21/A-B), Inside Butterfly Civil Butterfly Garden 2/6/22 2/10/22 Approved as noted
Garden, at highlighted area in attached draw

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footing
4C 4 KAIG3-RFI-TG-C-3863 00 (Inner Side), (from B.O.B level +875.26 to T.O.F +876.51), at Grid (B/1-21) & (1&21/A-B), Inside Butterfly Civil Butterfly Garden 2/7/22 2/10/22 Code C (resubmit)
Garden, at highlighted area in attached draw

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footing
4C 4 KAIG3-RFI-TG-C-3863 01 (Inner Side), (from B.O.B level +875.26 to T.O.F +876.51), at Grid (B/1-21) & (1&21/A-B), Inside Butterfly Civil Butterfly Garden 4/17/22 5/9/22 Approved as noted
Garden, at highlighted area in attached draw

Soil preparation prior to Backfilling along the Boundary wall (Existing) Outer Side, (At Existing surface
4C 4 KAIG3-RFI-TG-C-3991 00 levels as per attached Grading Layouts) at Elevation (D to A to B to C), at Butterfly Garden, at highlighted Civil Butterfly Garden 2/12/22 2/16/22 Approved as noted
area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers), along the Boundary
4C 4 KAIG3-RFI-TG-C-4096 00 wall (Existing) Outer Side, at Elevation (D to A to B to C), at Butterfly Garden, at highlighted area in Civil Butterfly Garden 2/17/22 2/23/22 Approved as noted
attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers), along the Boundary
4C 4 KAIG3-RFI-TG-C-4129 00 wall (Existing) Outer Side, at Elevation (D to A to B to C), at Butterfly Garden, at highlighted area in Civil Butterfly Garden 2/19/22 2/26/22 Approved as noted
attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4C 4 KAIG3-RFI-TG-C-4238 00 wall (Existing) Outer Side, at Elevation (D to A to B to C), at Butterfly Garden, at highlighted area in Civil Butterfly Garden 2/26/22 3/2/22 Approved as noted
attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4C 4 KAIG3-RFI-TG-C-4328 00 wall (Existing) Outer Side, at Elevation (D to A to B to C), at Butterfly Garden, at highlighted area in Civil Butterfly Garden 3/1/22 3/5/22 Approved as noted
attached drawings. (Stock Pile # 126)

kaig-qcals 313
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Blinding Levels for Storm Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and (MH-D-07-
4C 4 KAIG3-RFI-TG-C-4746 00 Civil Butterfly Garden 3/22/22 3/23/22 Code C (not resubmit)
01-01A), at Butter Fly Garden, as highlighted area
Concrete pouring for Blinding under Storm Water Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and
4C 4 KAIG3-RFI-TG-C-4747 00 Civil Butterfly Garden 3/22/22 3/23/22 Code C (resubmit)
(MH-D-07-01-01A), at Butter Fly Garden, as highlighted area
Concrete pouring for Blinding under Storm Water Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and
4C 4 KAIG3-RFI-TG-C-4747 01 Civil Butterfly Garden 6/1/22 6/4/22 Approved as noted
(MH-D-07-01-01A), at Butter Fly Garden, as highlighted area
Soil Preparation Prior to Backfilling along the Footing (Outer Side), (at B.O.B level +874.895, 875.18,
4C 4 KAIG3-RFI-TG-C-4807 00 Civil Butterfly Garden 3/27/22 3/31/22 Approved as noted
879.79 & 874.895), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-4945 00 Civil Butterfly Garden 4/2/22 4/6/22 Approved as noted
(Outer Side), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.(SP 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5020 00 Civil Butterfly Garden 4/9/22 4/12/22 Code C (resubmit)
(Outer Side), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.(SP 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5020 01 Civil Butterfly Garden 4/12/22 4/13/22 Approved as noted
(Outer Side), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.(SP 126)

Inspection of Installed Storm Water Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and (MH-D-07-01-
4C 4 KAIG3-RFI-TG-C-5077 00 Civil Butterfly Garden 4/13/22 4/20/22 Approved as noted
01A), at Butterfly Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5101 00 Civil Butterfly Garden 4/17/22 4/19/22 Approved as noted
(Outer Side), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.(SP 126)

Surface preparation Prior to Backfilling Surround the Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and
4C 4 KAIG3-RFI-TG-C-5102 00 Civil Butterfly Garden 4/17/22 4/19/22 Approved as noted
(MH-D-07-01-01A), at Butterfly Garden, as highlighted area in attached drawing's.

1st Layer Gravel Backfilling Surround the Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and (MH-D-07-
4C 4 KAIG3-RFI-TG-C-5122 00 Civil Butterfly Garden 4/18/22 4/20/22 Approved as noted
01-01A), at Butterfly Garden, as highlighted area in attached drawing's. (SP 118)

Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 2 Layers) Surround the
4C 4 KAIG3-RFI-TG-C-5140 00 Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and (MH-D-07-01-01A), at Butterfly Garden, as Civil Butterfly Garden 4/19/22 4/24/22 Approved as noted
highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footing
4C 4 KAIG3-RFI-TG-C-5215 00 (Inner Side), (from B.O.B level +875.26 to T.O.F +876.51), at Grid (B/1-21) & (1&21/A-B), Inside Butterfly Civil Butterfly Garden 4/25/22 4/27/22 Approved as noted
Garden, at highlighted area in attached draw

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5216 00 Civil Butterfly Garden 4/25/22 4/27/22 Approved as noted
(Outer Side), at Grid (A/1-21), Inside Butterfly Garden, at highlighted area in attached drawings.(SP 126)

Soil Preparation Prior to Backfilling Between the Foundations (Inner Side), at Grid (A-B/8-21), Inside
4C 4 KAIG3-RFI-TG-C-5217 00 Civil Butterfly Garden 4/25/22 4/28/22 Approved as noted
Butterfly Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5234 00 Foundations (Inner Side), at Grid (A-B/1-2 & 8-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 4/27/22 4/30/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5235 00 Foundations (Inner Side), at Grid (A-B/1-2 & 8-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 4/27/22 4/30/22 Code C (not resubmit)
drawings.(SP 135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5235 01 Foundations (Inner Side), at Grid (A-B/1-2 & 8-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 4/30/22 5/8/22 Approved as noted
drawings.(SP 135)
Soil Preparation Prior to Backfilling Between the Foundations (Inner Side), at Grid (A-B/1-8), Inside
4C 4 KAIG3-RFI-TG-C-5236 00 Civil Butterfly Garden 4/27/22 5/5/22 Approved as noted
Butterfly Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5250 00 Foundations (Inner Side), at Grid (A-B/1-8), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 4/28/22 5/8/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5252 00 Foundations (Inner Side), at Grid (A-B/1-2 & 8-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 4/28/22 5/7/22 Code C (resubmit)
drawings.(SP 135)

kaig-qcals 314
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5252 01 Foundations (Inner Side), at Grid (A-B/1-2 & 8-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/11/22 5/12/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5267 00 Foundations (Inner Side), at Grid (A-B/1-8), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/7/22 5/11/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5328 00 Foundations (Inner Side), at Grid (A-B/1-2 & 14-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/10/22 5/16/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5357 00 (Outer Side complete), at Grid (A/1-21), at Butterfly Garden, at highlighted area in attached drawings.(SP Civil Butterfly Garden 5/12/22 5/17/22 Approved as noted
135)

Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5358 00 Foundations (Inner Side), at Grid (A-B/1-2 & 14-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/12/22 5/17/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5392 00 Foundations (Inner Side), at Grid (A-B/1-2 & 14-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/15/22 5/19/22 Approved as noted
drawings.(SP 135)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
4C 4 KAIG3-RFI-TG-C-5393 00 (Outer Side complete), at Grid (A/1-21), at Butterfly Garden, at highlighted area in attached drawings.(SP Civil Butterfly Garden 5/15/22 5/19/22 Approved as noted
135)

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5394 00 Foundations (Inner Side), at Grid (A-B/2-8), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/15/22 5/19/22 Approved as noted
drawings.(SP 135)
Excavation & Blinding Levels for Storm Water Manholes of 2 no's (MH-D-07-03) and (MH-D-07-01-01B),
4C 4 KAIG3-RFI-TG-C-5395 00 Civil Butterfly Garden 5/15/22 5/17/22 Approved as noted
at Butterfly Garden, as highlighted area in attached drawing's.

Concrete Pouring for Blindings under Storm Water Manholes of 2 no's (MH-D-07-03) and (MH-D-07-01-
4C 4 KAIG3-RFI-TG-C-5411 00 Civil Butterfly Garden 5/16/22 5/17/22 Approved as noted
01B), at Butterfly Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5426 00 Foundations (Inner Side), at Grid (A-B/1-2 & 14-21), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/17/22 5/21/22 Approved as noted
drawings.(SP 135)

Excavation and Bed preparation for Water Feature Lines (HDPE dia 110 mm Supply) from water feature
4C 4 KAIG3-RFI-TG-C-5445 00 Civil Butterfly Garden 5/19/22 5/21/22 Approved as noted
plant room upto inside Butterfly Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the
4C 4 KAIG3-RFI-TG-C-5591 00 Foundations (Inner Side), at Grid (A-B/2-14), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 5/29/22 5/31/22 Approved as noted
drawings.(SP 135)
Excavation and Soil preparation for Pool (1 to 10) inside Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-C-5592 00 Civil Butterfly Garden 5/29/22 6/1/22 Approved as noted
drawing's.

Sand Cover & Pipe Protection for Water Feature Lines (HDPE dia 110 mm Supply) from water feature plant
4B 4 KAIG3-RFI-TG-C-5617 00 Civil Site Works 5/30/22 6/1/22 Approved as noted
room upto inside Butterfly Garden, as highlighted area in attached drawing's.

Excavation and Surface preparation for Foundation of Seat Walls (08 no's) inside Butterfly Garden, as
4C 4 KAIG3-RFI-TG-C-5650 00 Civil Butterfly Garden 6/2/22 6/6/22 Approved as noted
highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Feature
4C 4 KAIG3-RFI-TG-C-5668 00 Lines (HDPE dia 110 mm Supply) from water feature plant room upto inside Butterfly Garden, as highlighted Civil Butterfly Garden 6/2/22 6/6/22 Approved as noted
area in attached drawing's. (SP 135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Feature
4C 4 KAIG3-RFI-TG-C-5684 00 Lines (HDPE dia 110 mm Supply) from water feature plant room upto inside Butterfly Garden, as highlighted Civil Butterfly Garden 6/4/22 6/8/22 Approved as noted
area in attached drawing's. (SP 135)

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Upto B.O.B level) for Foundation of
4C 4 KAIG3-RFI-TG-C-5687 00 Civil Butterfly Garden 6/4/22 6/8/22 Approved as noted
Seat Walls (08 no's) inside Butterfly Garden, as highlighted area in attached drawing's.(SP 135)

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Feature
4C 4 KAIG3-RFI-TG-C-5749 00 Lines (HDPE dia 110 mm Supply) from water feature plant room upto inside Butterfly Garden, as highlighted Civil Butterfly Garden 6/7/22 6/9/22 Approved as noted
area in attached drawing's. (SP 135)

kaig-qcals 315
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 4th (Final) Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water
4C 4 KAIG3-RFI-TG-C-5817 00 Feature Lines (HDPE dia 110 mm Supply) from water feature plant room upto inside Butterfly Garden, as Civil Butterfly Garden 6/12/22 6/14/22 Approved as noted
highlighted area in attached drawing's. (SP 135)

Surface Preparation Prior to Backfilling Surround the Manholes (2 nos) , (MH-D-07-03), and (MH-D-07-01-
4C 4 KAIG3-RFI-TG-C-5972 00 Civil Butterfly Garden 6/21/22 6/25/22 Approved as noted
01B) , at Butterfly Garden, as highlighted in the attached drawings.
Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 8 layers of Sub-Grade) in
4C 4 KAIG3-RFI-TG-C-6102 00 Between the Foundations (Inner Side), at Grid (A-B/2-14), Inside Butterfly Garden, at highlighted area in Civil Butterfly Garden 6/26/22 6/29/22 Approved as noted
attached drawings.(SP 135)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) along the Footing (Outer Side), at Grid
4C 4 KAIG3-RFI-TG-C-6103 00 (A/6-14) Bottom Level for Blinding of Remaining Boundary Wall, at Butterfly Garden, at highlighted area in Civil Butterfly Garden 6/26/22 6/29/22 Approved as noted
attached drawings.(SP 135)

1st Layer Gravel Backfilling Surround the Manholes (2 nos) , (MH-D-07-03), and (MH-D-07-01-01B) , at
4C 4 KAIG3-RFI-TG-C-6132 00 Civil Butterfly Garden 6/28/22 6/30/22 Approved as noted
Butterfly Garden, as highlighted in the attached drawings. (SP 118)

Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 7 layers) in Between the
4C 4 KAIG3-RFI-TG-C-6168 00 Foundations (Inner Side), at Grid (A-B/2-14), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 6/29/22 7/4/22 Approved as noted
drawings.(SP 135)
Inspection & Compaction tests of 1st Layer Backfilling (Sub Grade) (Out of 3 layers) Surround the Manholes
4C 4 KAIG3-RFI-TG-C-6322 00 (2 nos) , (MH-D-07-03), and (MH-D-07-01-01B), at Butterfly Garden, as highlighted in the attached Civil Butterfly Garden 7/6/22 7/14/22 Code C (resubmit)
drawings. (SP 135)

Inspection & Compaction tests of 7th (Final) Layer (Sub-Grade) Backfilling (Out of 7 layers) in Between the
4C 4 KAIG3-RFI-TG-C-6392 00 Foundations (Inner Side), at Grid (A-B/2-14), Inside Butterfly Garden, at highlighted area in attached Civil Butterfly Garden 7/14/22 7/18/22 Approved as noted
drawings.(SP 135)

1st Coat Bituminous Damp proofing for Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some Water Play/ Geyser
4A KAIG3-RFI-TG-S-2593 00 Civil 12/4/21 12/8/21 Approved as noted
part of A to B) @ Butterfly Garden, at highlighted area's in attached Drawing's. Garden

2nd Coat Bituminous Damp proofing for Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some
4D KAIG3-RFI-TG-S-2594 00 Civil Physic Garden 12/4/21 12/8/21 Approved as noted
part of A to B) @ Butterfly Garden, at highlighted area's in attached Drawing's.

2M 2 KAIG3-RFI-VG-C-5301 00 Notification to start Excavation Prior to start Excavation for Deonian Garden Zone 2M Civil Devonian Garden 5/8/22 5/10/22 Approved as noted

Inspection and Compaction Test 1st Layer (Sub-Grade) for Backfilling for Devonian Garden Zone 2M (1st
2M 6 KAIG3-RFI-VG-C-5408 00 Civil Devonian Garden 5/17/22 5/21/22 Approved as noted
Layer of 4th) as highlighted SP-124.
Inspection and compaction test 2nd layer (Subgrade) for backfilling for Devonian Garden Zone 2M ( 2nd
2M 6 KAIG3-RFI-VG-C-5440 00 Civil Devonian Garden 5/19/22 5/22/22 Approved as noted
layer of 4th ) (as highlighted) SP-124
"Inspection and compaction test 1st & 2nd layer (Subgrade) for backfilling for Devonian Garden Foul Water
2M 6 KAIG3-RFI-VG-C-5951 00 Branch line from FW-A-3-14 & FW-A-3-12 Zone 2M ( 1st & 2nd layer of 4th ) (as highlighted) SP-125 " Civil Devonian Garden 6/20/22 6/25/22 Approved as noted

Inspection and compaction test 2nd layer (Sub-Grade) for Backfill for Devonian Garden Foul Water Branch
2M 6 KAIG3-RFI-VG-C-6066 00 Civil Devonian Garden 6/25/22 6/28/22 Approved as noted
line from FW-A-3-14 & FW-A-3-12 Zone 2M (2nd layer of 2nd) as highlighted SP-125.

2M 2N 6 KAIG3-RFI-VG-C-6226 00 Surface Preparation Prior to start Backfilling for Devonian Garden (as highlighted) Zone 2M Civil Devonian Garden 7/2/22 7/5/22 Code C (resubmit)

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (Final Layer) Surround the Manhole
4A KAIG3-RFI-WG-C-1951 00 Civil Water Play Garden 11/2/21 11/9/21 Approved as noted
(MH-C-8), Inside Water Garden, at highlighted area in attached drawings. (Stock Pile # 116)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-1952 00 Sub surface Drainage Main line Pipes (250mm pipe Connecting to MH-C-4-3) (Part - 6 b) Inside Water Play Civil Water Play Garden 11/2/21 11/6/21 Approved as noted
Garden, at highlighted area in attached drawing.

Excavation & Bed Preparation for Sub surface Drainage lines (110mm connecting MH-C-4 & Sleeves),
4A KAIG3-RFI-WG-C-1967 00 (250mm Subline & drop 110mm connecting to Main line from MH-C-3 to MH-C-3-1 & Sleeves), (Part 7), at Civil Water Play Garden 11/2/21 11/7/21 Approved as noted
Between Geyser & Aviary Garden, Inside Water Garden, at highlighted area.

Surface preparation prior to Backfilling Surround the Manholes (13 no's: MH-C-2, MH-C-3, MH-C-4, MH-
4A KAIG3-RFI-WG-C-1968 00 C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-3-1, MH-C-4-1, MH-C-4-2 & MH-C-4- Civil Water Play Garden 11/3/21 11/4/21 Code C (resubmit)
3), Inside Water Garden, at highlighted area in attached drawing

kaig-qcals 316
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Surface preparation prior to Backfilling Surround the Manholes (13 no's: MH-C-2, MH-C-3, MH-C-4, MH-
4A KAIG3-RFI-WG-C-1968 01 C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-3-1, MH-C-4-1, MH-C-4-2 & MH-C-4- Civil Water Play Garden 11/11/21 11/15/21 Approved as noted
3), Inside Water Garden, at highlighted area in attached drawing

Excavation & Bed Preparation for Conduits (75mm) Laying for Low Voltage, Emergency and Fire &
4A KAIG3-RFI-WG-C-1969 00 Security Lines, running Under the Bolders, at Left side of Planted Bed # 3, Inside Water Play Garden, at Civil Water Play Garden 11/3/21 11/7/21 Approved as noted
highlighted area in attached drawings.

Excavation & Bed Preparation for Conduits (160mm) Laying for Low Voltage Power Containment Lines,
4A KAIG3-RFI-WG-C-1970 00 running Under the Bolders, Between Water Play Garden and Aviary Garden, at highlighted area in attached Civil Water Play Garden 11/3/21 11/7/21 Approved as noted
drawings.

Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Line, running Water Play/Geyser
4A KAIG3-RFI-WG-C-1986 00 Civil 11/3/21 11/6/21 Approved as noted
Under the Bolders, at Top Left Side of Geyser Garden, at highlighted area in attached drawings. Garden

Excavation & Bed Preparation for Conduits (75mm) Laying for UPS Circuits Line, running Under the Water Play/Geyser
4A KAIG3-RFI-WG-C-1987 00 Civil 11/3/21 11/7/21 Approved as noted
Bolders, at Inside Geyser Garden, at highlighted area in attached drawings. Garden

Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manholes (8 no's: MH-C-2, MH-C-3,
4A KAIG3-RFI-WG-C-1988 00 MH-C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3 & MH-C-4-3), Inside Water Garden, at highlighted Civil Water Play Garden 11/4/21 11/6/21 Code C (resubmit)
area in attached drawings.

Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manholes (8 no's: MH-C-2, MH-C-3,
4A KAIG3-RFI-WG-C-1988 01 MH-C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3 & MH-C-4-3), Inside Water Garden, at highlighted Civil Water Play Garden 11/11/21 11/14/21 Approved as noted
area in attached drawings.

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line & Sleeve Pipes (250mm &
4A KAIG3-RFI-WG-C-1996 00 Civil Water Play Garden 11/4/21 11/13/21 Approved as noted
110mm) Around the Boat Garden, at highlighted area in attached drawings.

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub lines (110mm 2no's connecting to
Water Play, Geyser &
4A KAIG3-RFI-WG-C-1998 00 Main line from MH-C-7 to MH-C-8), (110mm 2no's connecting MH-C-7), (250mm & drop to 160mm Civil 11/4/21 11/10/21 Approved as noted
Mist Garden
connecting to Main line from MH-C-6 to MH-C-7) & (160 Sub line

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
4A KAIG3-RFI-WG-C-2004 00 Drainage Main lines (Part 3)(450mm from MH-C-5 to MH-C-6) Inside Geyser Garden, at Water Garden, at Civil Water Play Garden 11/4/21 11/9/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 11

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
4A KAIG3-RFI-WG-C-2005 00 Drainage Main lines (Part 3)(450mm from MH-C-5 to MH-C-6) Inside Geyser Garden, at Water Garden, at Civil Water Play Garden 11/4/21 11/10/21 Approved as noted
highlighted area in attached drawings.(Stock pile # 11

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-2006 00 Sub surface Drainage Main line Pipes (250mm pipe Connecting to MH-C-4-3) (Part - 6 b) Inside Water Play Civil Water Play Garden 11/4/21 11/9/21 Approved as noted
Garden, at highlighted area in attached drawing

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (8 no's: MH-
4A KAIG3-RFI-WG-C-2007 00 C-2, MH-C-3, MH-C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3 & MH-C-4-3), Inside Water Garden, at Civil Water Play Garden 11/4/21 11/6/21 Code C (resubmit)
highlighted area in attached drawings.(Stock Pile # 117)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (8 no's: MH-
4A KAIG3-RFI-WG-C-2007 01 C-2, MH-C-3, MH-C-5, MH-C-6, MH-C-1-1, MH-C-1-2, MH-C-1-3 & MH-C-4-3), Inside Water Garden, at Civil Water Play Garden 8/25/22 Open
highlighted area in attached drawings.(Stock Pile # 117)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel laying for
4A KAIG3-RFI-WG-C-2020 00 Sub surface Drainage Main line Pipes (250mm pipe Connecting to MH-C-4-3) (Part - 6 b) Inside Water Play Civil Water Play Garden 11/7/21 11/14/21 Approved as noted
Garden, at highlighted area in attached drawing

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) for Sub surface
4A KAIG3-RFI-WG-C-2033 00 Drainage Sleeve Pipes (2 no's 110mm) Connected to main line Around the Boat Garden, at highlighted area Civil Water Play Garden 11/7/21 11/10/21 Approved as noted
in attached drawings. (Stock Pile # 117)

kaig-qcals 317
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub garde ) for Sub surface
4A KAIG3-RFI-WG-C-2034 00 Drainage Sleeve Pipes (2 no's 110mm) Connected to main line Around the Boat Garden, at highlighted area Civil Water Play Garden 11/7/21 11/14/21 Approved as noted
in attached drawings. (Stock Pile # 116)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) for Sub surface
Water Play, Geyser &
4A KAIG3-RFI-WG-C-2035 00 Drainage Sub lines (110mm 2no's connecting to Main line from MH-C-7 to MH-C-8), (110mm 2no's Civil 11/8/21 11/14/21 Approved as noted
Mist Garden
connecting MH-C-7), Inside Mist & Geyser Garden, at highlighted drawing.

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub garde) for Sub surface
Water Play, Geyser &
4A KAIG3-RFI-WG-C-2036 00 Drainage Sub lines (110mm 2no's connecting to Main line from MH-C-7 to MH-C-8), (110mm 2no's Civil 11/8/21 11/22/21 Approved as noted
Mist Garden
connecting MH-C-7), Inside Mist & Geyser Garden, at highlighted drawing.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2051 00 Civil Water Play Garden 11/8/21 11/14/21 Approved as noted
wall (Outer Side) @ Jetty # 1, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2052 00 Civil Water Play Garden 11/8/21 11/14/21 Approved as noted
wall (Outer Side) @ Jetty # 2, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Inspection & Compaction Tests of 2nd Layer Sub Garde (Out of 2 Layers) Backfilling (after laying Gravel)
Water Play, Geyser &
4A KAIG3-RFI-WG-C-2068 00 for Sub surface Drainage Sub lines (110mm 2no's connecting to Main line from MH-C-7 to MH-C-8), Civil 11/9/21 11/15/21 Approved as noted
Mist Garden
(110mm 2no's connecting MH-C-7), Inside Mist & Geyser

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2075 00 Civil Water Play Garden 11/9/21 11/15/21 Approved as noted
wall (Outer Side) @ Jetty # 1, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2076 00 Civil Water Play Garden 11/9/21 11/14/21 Approved as noted
wall (Outer Side) @ Jetty # 2, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage lines (110mm connecting MH-C-4 &
4A KAIG3-RFI-WG-C-2086 00 Sleeves), (250mm Subline & drop 110mm connecting to Main line from MH-C-3 to MH-C-3-1 & Sleeves), Civil Water Play Garden 11/10/21 11/13/21 Approved as noted
(Part 7), at Between Geyser & Aviary Garden, Inside Water

Excavation & Bed Preparation for Laying of Lighting Control Lines & Low Current Lines, running Under the
4A KAIG3-RFI-WG-C-2091 00 Civil Water Play Garden 11/10/21 11/15/21 Approved as noted
Bolders, at Left side of Planted Bed # 2, Inside Water Play Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2092 00 base from level +874.15 to +874.90) after Gravel laying for Sub surface Drainage Sub lines (160 Sub line & Civil 11/11/21 11/15/21 Approved as noted
Garden
Sleeves 110mm connecting MH-C-4-1), Inside

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2093 00 base from level +874.15 to +874.90) after Gravel laying for Sub surface Drainage Sub lines (160 Sub line & Civil 11/11/21 11/16/21 Approved as noted
Garden
Sleeves 110mm connecting MH-C-4-1), Inside

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2115 00 base from level +874.05 to +875.05) after Gravel laying for Sub surface Drainage Sub lines (250mm Civil 11/11/21 11/15/21 Approved as noted
Garden
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2116 00 base from level +875.30 to +876.55) after Gravel laying for Sub surface Drainage Sub lines (160mm Civil 11/11/21 11/15/21 Approved as noted
Garden
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden

Excavation & Bed Preparation for Sub surface Drainage lines (250mm Main line from MH-C-1 End) &
4A KAIG3-RFI-WG-C-2117 00 (250mm Sub Main line connecting to Main line running from MH-C-5 to MH-C-6 and Sleeves 110mm 3 Civil Water Play Garden 11/11/21 11/15/21 Approved as noted
no's), (Part 5), at Geyser Garden, Inside Water Garden, at highlighted area.

Soil Preparation prior to Backfilling (From Bottom of Blinding level upto Bottom of Mulch level) along the
4A KAIG3-RFI-WG-C-2119 00 Boundary Wall (Inner Sides) of span 40, 41, 42, 43, 44, 45, 46, 48 & 49 of Water Garden, as per highlighted Civil Water Play Garden 11/14/21 11/16/21 Approved as noted
area in attached drawings.

kaig-qcals 318
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2120 00 Manholes (3 no's: MH-C-5, MH-C-6 & MH-C-4-3), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/13/21 11/16/21 Approved as noted
drawings. (Stock pile # 117)

Inspection of 3rd Layer of Gravel Backfilling Surround the Manholes (5 no's: MH-C-2, MH-C-3, MH-C-1-1,
4A KAIG3-RFI-WG-C-2125 00 Civil Water Play Garden 11/13/21 11/15/21 Approved as noted
MH-C-1-2 & MH-C-1-3), Inside Water Garden, at highlighted area in attached drawings.

Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-4-1), Inside Water Garden, at
4A KAIG3-RFI-WG-C-2126 00 Civil Water Play Garden 11/13/21 11/15/21 Approved as noted
highlighted area in attached drawings.
Excavation & Soil Preparation for Stack Boulders at Right Side of Entrance of Mist Garden, at highlighted Water Play & Mist
4A KAIG3-RFI-WG-C-2127 00 Civil 11/13/21 11/15/21 Approved as noted
area in attached drawings. Garden
Inspection & Compaction tests of Sigle Layer Backfilling (Sub-Base) (from level +874.15 to +874.90) after
Water Play/Geyser
4A KAIG3-RFI-WG-C-2128 00 Sub Grade laying for Sub surface Drainage Sub lines (160 Sub line & Sleeves 110mm connecting MH-C-4- Civil 11/14/21 11/17/21 Approved as noted
Garden
1), Inside Geyser Garden, at highlighted area in attached drawing.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
base from level +875.30 to +876.55) after Gravel laying for Sub surface Drainage Sub lines (160mm Water Play/Geyser
4A KAIG3-RFI-WG-C-2129 00 Civil 11/14/21 11/16/21 Approved as noted
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden at highlighted area in attached Garden
drawing SP 117

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
base from level +874.05 to +875.05) after Gravel laying for Sub surface Drainage Sub lines (250mm Water Play/Geyser
4A KAIG3-RFI-WG-C-2130 00 Civil 11/14/21 11/16/21 Approved as noted
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden at highlighted area in attached Garden
drawing SP 117

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying Sub Grade) Surround the
4A KAIG3-RFI-WG-C-2154 00 Manholes (3 no's: MH-C-5, MH-C-6 & MH-C-4-3), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/14/21 11/17/21 Approved as noted
drawings. (Stock pile # 116)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2155 00 Manholes (3 no's: MH-C-1-1, MH-C-1-2 & MH-C-1-3), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/14/21 11/18/21 Approved as noted
drawings. (Stock pile # 117)
Inspection of 4th Layer of Gravel Backfilling Surround the Manholes (2 no's: MH-C-2, MH-C-3), Inside
4A KAIG3-RFI-WG-C-2156 00 Civil Water Play Garden 11/14/21 11/15/21 Approved as noted
Water Garden, at highlighted area in attached drawings.
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-4-1), Inside
4A KAIG3-RFI-WG-C-2157 00 Civil Water Play Garden 11/14/21 11/16/21 Approved as noted
Water Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
base from level +875.25 to +876.00) after Gravel laying for Sub surface Drainage line Pipe (250mm pipe
4A KAIG3-RFI-WG-C-2158 00 Civil Water Play Garden 11/14/21 11/16/21 Approved as noted
Connected to Main line from MH-C-4-2 to MH-C-4-3) inside Water Play Garden at highlighted area in
attached drawing (SP 117).

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage lines (250mm Main line from MH-C-1
4A KAIG3-RFI-WG-C-2159 00 Civil Water Play Garden 11/14/21 11/16/21 Approved as noted
to End (Part 5), at Geyser Garden, Inside Water Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2184 00 Civil Water Play Garden 11/15/21 11/18/21 Approved as noted
wall (Outer Side) @ Jetty # 1, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2185 00 Civil Water Play Garden 11/15/21 11/18/21 Approved as noted
wall (Outer Side) @ Jetty # 2, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 117)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
base from level +874.05 to +875.05) after Gravel laying for Sub surface Drainage Sub lines (250mm Water Play/Geyser
4A KAIG3-RFI-WG-C-2186 00 Civil 11/15/21 11/22/21 Approved as noted
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden at highlighted area in attached Garden
drawing.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2187 00 base from level +875.30 to +876.55) after Gravel laying for Sub surface Drainage Sub lines (160mm Civil 11/15/21 11/20/21 Approved as noted
Garden
connecting to Main line from MH-C-6 to MH-C-7), Geyser Garden at highlighted area in attached drawing.

Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-1-4), Inside Water Garden, at
4A KAIG3-RFI-WG-C-2189 00 Civil Water Play Garden 11/15/21 11/17/21 Approved as noted
highlighted area in attached drawings.
Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-4), Inside Water Garden, at
4A KAIG3-RFI-WG-C-2190 00 Civil Water Play Garden 11/15/21 11/18/21 Approved as noted
highlighted area in attached drawings.
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-1-4), Inside
4A KAIG3-RFI-WG-C-2191 00 Civil Water Play Garden 11/15/21 11/17/21 Approved as noted
Water Garden, at highlighted area in attached drawings.

kaig-qcals 319
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-4), Inside Water
4A KAIG3-RFI-WG-C-2192 00 Civil Water Play Garden 11/15/21 11/17/21 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection for Installed Rings (Risers) and Slab for Manholes (16 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4,
4A KAIG3-RFI-WG-C-2200 00 MH-C-5, MH-C-6, MH-C-7, MH-C-8, MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-3-1, MH-C-4- Civil Water Play Garden 11/15/21 11/17/21 Approved as noted
1, MH-C-4-2 & MH-C-4-3), Inside Water Garden, at highlighted area in attached drawing.

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2207 00 Manholes (1 no's: MH-C-4-1), Inside Water Garden, at highlighted area in attached drawings.(Stock pile # Civil Water Play Garden 11/17/21 11/21/21 Approved as noted
117)

Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables), passing under the
4A KAIG3-RFI-WG-C-2229 00 boulders, at Right side of Entrance of Mist Garden, at Water Garden at highlighted area in attached Civil Water Play Garden 11/17/21 11/22/21 Approved as noted
Drawing's.
Excavation & Soil Preparation for Stack Boulders, Bottom side of Geyser Garden, at highlighted area in Water Play/Geyser
4A KAIG3-RFI-WG-C-2230 00 Civil 11/17/21 11/22/21 Approved as noted
attached drawings. Garden
Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables of Power
4A KAIG3-RFI-WG-C-2232 00 Containment), passing under the boulders, at Left side of Water Play Garden, Inside Water Garden at Civil Water Play Garden 11/17/21 11/22/21 Code C (resubmit)
highlighted area in attached Drawing's.

Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables of Power
4A KAIG3-RFI-WG-C-2232 01 Containment), passing under the boulders, at Left side of Water Play Garden, Inside Water Garden at Civil Water Play Garden 11/27/21 11/30/21 Approved as noted
highlighted area in attached Drawing's.
Excavation & Soil Preparation for Stack Boulders, Left side of Planted Bed # 3, Inside Water Play Garden, at
4A KAIG3-RFI-WG-C-2233 00 Civil Water Play Garden 11/17/21 11/22/21 Approved as noted
highlighted area in attached drawings.
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2234 00 Manholes (2 no's: MH-C-2, MH-C-3), Inside Water Garden, at highlighted area in attached drawings. (Stock Civil Water Play Garden 11/18/21 11/23/21 Approved as noted
pile # 117)

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround the
4A KAIG3-RFI-WG-C-2235 00 Manholes (2 no's: MH-C-2, MH-C-3), Inside Water Garden, at highlighted area in attached drawings. (Stock Civil Water Play Garden 11/18/21 11/24/21 Approved as noted
pile # 116)

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround the
4A KAIG3-RFI-WG-C-2236 00 Manholes (3 no's: MH-C-1-1, MH-C-1-2 & MH-C-1-3), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/18/21 11/23/21 Approved as noted
drawings. (Stock pile # 116)

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround the
4A KAIG3-RFI-WG-C-2237 00 Manholes (1 no's: MH-C-4-1), Inside Water Garden, at highlighted area in attached drawings.(Stock pile # Civil Water Play Garden 11/17/21 11/21/21 Approved as noted
116)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of
4A KAIG3-RFI-WG-C-2238 00 Blinding level upto Bottom of Mulch) along the Boundary Wall (Inner Sides) of span 40, 41, 42, 43, 44, 45, Civil Water Play Garden 11/17/21 11/20/21 Approved as noted
46, 48 & 49 of Water Garden, as per highlighted

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of
4A KAIG3-RFI-WG-C-2239 00 Blinding level upto Bottom of Mulch) along the Boundary Wall (Inner Sides) of span 40, 41, 42, 43, 44, 45, Civil Water Play Garden 11/17/21 11/23/21 Approved as noted
46, 48 & 49 of Water Garden, as per highlighted

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2251 00 Civil Water Play Garden 11/18/21 11/24/21 Approved as noted
Manhole (1 no's: MH-C-4), Inside Water Garden, at highlighted area in attached drawings. (Stock pile # 117)

Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround the
4A KAIG3-RFI-WG-C-2253 00 Civil Water Play Garden 11/18/21 11/23/21 Approved as noted
Manhole (1 no's: MH-C-4), Inside Water Garden, at highlighted area in attached drawings. (Stock pile # 116)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of
4A KAIG3-RFI-WG-C-2261 00 Blinding level upto Bottom of Mulch) along the Boundary Wall (Inner Sides) of span 40, 41, 42, 43, 44, 45, Civil Water Play Garden 11/18/21 11/25/21 Approved as noted
46, 48 & 49 of Water Garden, as per highlighted

Excavation for Tree Pits (26 no's) at surround the Geyser Garden Inside Water Garden, at highlighted area in Water Play/Geyser
4A KAIG3-RFI-WG-C-2266 00 Civil 11/18/21 11/24/21 Approved as noted
attached drawings. Garden

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2267 00 base from level +873.55 to +874.30) after Gravel laying for Sub surface Drainage lines (250mm Main line Civil Water Play Garden 11/18/21 11/23/21 Approved as noted
from MH-C-1 to End (Part 5), at Geyser Garden,

kaig-qcals 320
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2268 00 base from level +875.30 to +876.55) after Gravel laying for Sub surface Drainage Sub lines (160mm Civil 11/20/21 11/23/21 Approved as noted
Garden
connecting to Main line from MH-C-6 to MH-C-7), Inside Geyser Garden

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2269 00 base from level +873.55 to +874.30) after Gravel laying for Sub surface Drainage lines (250mm Main line Civil Water Play Garden 11/21/21 11/27/21 Approved as noted
from MH-C-1 to End (Part 5), at Geyser Garden,

Excavation for Planter Boxs, between boulders at Bottom side of Planted bed 1, at Water Garden, at Water Play/Geyser
4A KAIG3-RFI-WG-C-2276 00 Civil 11/20/21 11/23/21 Approved as noted
highlighted area in attached drawings. Garden
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Branch lines (110mm Branch lines 4
4A KAIG3-RFI-WG-C-2279 00 no's) Around the Boat Garden, and 110 mm pipe connected to MH-C-3-1, at highlighted area in attached Civil Water Play Garden 11/20/21 11/21/21 Approved as noted
drawings.

Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-C-7), (from Bottom of Blinding
4A KAIG3-RFI-WG-C-2280 00 Civil Water Play Garden 11/21/21 11/23/21 Approved as noted
level) Inside Water Garden, at highlighted area in attached drawings.

Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-C-7), (from
4A KAIG3-RFI-WG-C-2281 00 Civil Water Play Garden 11/21/21 11/23/21 Approved as noted
Bottom of Blinding level) Inside Water Garden, at highlighted area in attached drawings.

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround the
4A KAIG3-RFI-WG-C-2291 00 Manhole (1 no's: MH-C-1-4), (Upto level +876.341), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/21/21 11/24/21 Approved as noted
drawings. (Stock pile # 126)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling (from level +873.55 to +874.30) after
4A KAIG3-RFI-WG-C-2292 00 Sub-Grade (2 layers) laying for Sub surface Drainage lines (250mm Main line from MH-C-1 to End (Part 5), Civil Water Play Garden 11/21/21 11/27/21 Code C (resubmit)
at Geyser Garden, Inside Water Garden, at highlighted

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling (from level +873.55 to +874.30) after
4A KAIG3-RFI-WG-C-2292 01 Sub-Grade (2 layers) laying for Sub surface Drainage lines (250mm Main line from MH-C-1 to End (Part 5), Civil Water Play Garden 12/12/21 12/14/21 Approved as noted
at Geyser Garden, Inside Water Garden, at highlighted

Inspection & Compaction Tests of Single Layer (Final) Sub Base Backfilling (after laying Sub Grade)
4A KAIG3-RFI-WG-C-2293 00 Surround the Manhole (1 no's: MH-C-1-4), (Upto level +876.541), Inside Water Garden, at highlighted area Civil Water Play Garden 11/21/21 11/27/21 Code C (resubmit)
in attached drawings. (Stock pile # 116)

Inspection & Compaction Tests of Single Layer (Final) Sub Base Backfilling (after laying Sub Grade)
4A KAIG3-RFI-WG-C-2293 01 Surround the Manhole (1 no's: MH-C-1-4), (Upto level +876.541), Inside Water Garden, at highlighted area Civil Water Play Garden 11/30/21 12/5/21 Approved as noted
in attached drawings. (Stock pile # 116)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2294 00 base from level +875.91 to +876.66) after Gravel laying for Sub surface Drainage lines (250mm Subline & Civil Water Play Garden 11/21/21 11/27/21 Approved as noted
drop 110mm connecting to Main line from MH-C-3

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
Water Play/Geyser
4A KAIG3-RFI-WG-C-2295 00 base from level +875.30 to +876.55) after Gravel laying for Sub surface Drainage Sub lines (160mm Civil 11/21/21 11/24/21 Approved as noted
Garden
connecting to Main line from MH-C-6 to MH-C-7), Inside geyser Garden

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2296 00 Civil Water Play Garden 11/21/21 11/24/21 Approved as noted
wall (Outer Side) @ Jetty # 1, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutment
4A KAIG3-RFI-WG-C-2297 00 Civil Water Play Garden 11/21/21 11/24/21 Approved as noted
wall (Outer Side) @ Jetty # 2, Boat Garden , at highlighted area in attached drawings. (Stock Pile # 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of
4A KAIG3-RFI-WG-C-2298 00 Blinding level upto Bottom of Mulch) along the Boundary Wall (Inner Sides) of span 40, 41, 42, 43, 44, 45, Civil Water Play Garden 11/21/21 11/27/21 Approved as noted
46, 48 & 49 of Water Garden, as per highlighted

Inspection & Compaction tests of Single (Final) Layer (Sub-Base) Backfilling (Out of sub grade 3 layers and
Water Play/Geyser
4A KAIG3-RFI-WG-C-2322 00 single layer Sub base from level +874.05 to +875.05) after Gravel laying for Sub surface Drainage Sub lines Civil 11/21/21 11/24/21 Approved as noted
Garden
(250mm connecting to Main line from MH

kaig-qcals 321
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2348 00 base from level +875.59 to +876.28) after Gravel laying for Sub surface Drainage Branch lines (110mm Civil Water Play Garden 11/29/21 11/27/21 Approved as noted
Branch lines 4 no's) Around the Boat Garden, at h

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A KAIG3-RFI-WG-C-2349 00 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 11/29/21 11/29/21 Approved as noted
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of Single Layer (Final) Backfilling (Sub-Base) (after 4 layers Sub grade) from
4A KAIG3-RFI-WG-C-2350 00 level +875.30 to +876.55) for Sub surface Drainage Sub lines (160mm connecting to Main line from MH-C-6 Civil Water Play Garden 11/29/21 11/27/21 Approved as noted
to MH-C-7), Inside Geyser Garden, at highlighted

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2364 00 base from level +875.59 to +876.28) after Gravel laying for Sub surface Drainage Branch lines (110mm Civil Water Play Garden 11/23/21 11/27/21 Approved as noted
Branch lines 4 no's) Around the Boat Garden, at highlighted area.

Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (After 2 layers of Sub Grade from level
4A KAIG3-RFI-WG-C-2365 00 +875.59 to +876.28) for Sub surface Drainage Branch lines (110mm Branch lines 4 no's) Around the Boat Civil Water Play Garden 11/23/21 11/28/21 Approved as noted
Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4B KAIG3-RFI-WG-C-2366 00 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 11/23/21 11/28/21 Code C (resubmit)
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4B KAIG3-RFI-WG-C-2366 01 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 12/1/21 12/6/21 Approved as noted
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade and
4B KAIG3-RFI-WG-C-2367 00 single layer Sub base from level +875.67 to +876.17) after Gravel laying for Sub surface Drainage Sub lines Civil Water Play Garden 11/23/21 11/27/21 Approved as noted
(110mm sub lines) Around the Boat Garden,

Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (After Single layer Sub Grade from
4B KAIG3-RFI-WG-C-2368 00 level +875.67 to +876.17) for Sub surface Drainage Sub lines (110mm sub lines) Around the Boat Garden, at Civil Water Play Garden 11/23/21 11/28/21 Approved as noted
highlighted area in attached drawings. (Stock Pile 116)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2369 00 base from level +875.30 to +876.30) after Gravel laying for Sub surface Drainage Main lines (250mm & Civil Water Play Garden 11/23/21 11/27/21 Approved as noted
160mm Main lines) only between Planted bed of Boat Garden & Boundary Wall Span 9 SP 126.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2370 00 base from level +875.30 to +876.30) after Gravel laying for Sub surface Drainage Main lines (250mm & Civil Water Play Garden 11/23/21 11/27/21 Approved as noted
160mm Main lines) only between Planted bed of Boat Garden & Boundary Wall Span 9 SP 126.

Excavation & Soil Preparation Between Geyser Garden & Mist Garden (Left side) , at highlighted area in Water Play/ Geyser and
4B KAIG3-RFI-WG-C-2405 00 Civil 11/24/21 11/28/21 Approved as noted
attached drawings. Mist Garden
Excavation & Soil Preparation at Between Boat Garden & Boundary wall (Span 11 & 12) Inside Boat
5A KAIG3-RFI-WG-C-2406 00 Civil Water Play Garden 11/24/21 11/28/21 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2408 00 base from level +875.20 to +876.20) after Gravel laying for Sub surface Drainage Main lines (250mm Main Civil Water Play Garden 11/24/21 11/28/21 Approved as noted
line) only between Boat Garden & Boundary wall

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4B KAIG3-RFI-WG-C-2418 00 base from level +875.20 to +875.95) after Gravel laying for Sub surface Drainage Main lines (250mm Main Civil Water Play Garden 11/25/21 11/29/21 Approved as noted
line) between Boat Garden & Boundary wall (span 3,4,5) at highlighted in attached drawing (SP 126).

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4B KAIG3-RFI-WG-C-2419 00 base from level +875.20 to +875.95) after Gravel laying for Sub surface Drainage Main lines (250mm Main Civil Water Play Garden 11/25/21 12/2/21 Approved as noted
line) between Boat Garden & Boundary wall span 3,4,5) at highlighted in attached drawing (SP 126).

kaig-qcals 322
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-C-3-1), (from Bottom of
4A KAIG3-RFI-WG-C-2429 00 Civil Water Play Garden 11/25/21 11/28/21 Approved as noted
Blinding level) Inside Water Garden, at highlighted area in attached drawings.
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
base from level +875.91 to +876.66) after Gravel laying for Sub surface Drainage lines (250mm Subline &
4A KAIG3-RFI-WG-C-2430 00 Civil Water Play Garden 11/25/21 12/1/21 Approved as noted
drop 110mm connecting to Main line from MH-C-3 to MH-C-3-1 & 110mm sleeve), part 7 between Geyser,
Aviary Garden & inside Water Play Garden at highlighted in attached drawing (SP 126).
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
base from level +875.30 to +876.30) after Gravel laying for Sub surface Drainage Main lines (250mm &
4B KAIG3-RFI-WG-C-2431 00 Civil Water Play Garden 11/25/21 11/29/21 Approved as noted
160mm Main lines) only between Planted bed of Boat Garden & Bpoundary Wall span 9 at highlighted area
in attached drawing.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2432 00 base from level +875.20 to +876.20) after Gravel laying for Sub surface Drainage Main lines (250mm Main Civil Water Play Garden 11/25/21 11/29/21 Approved as noted
line) only between Boat Garden & Boundary wall

Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-C-3-1),
4A KAIG3-RFI-WG-C-2433 00 Civil Water Play Garden 11/25/21 11/29/21 Approved as noted
Inside Water Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
base from level +873.47 to +874.22) after Gravel laying for Sub surface Drainage lines (110mm connecting
4A KAIG3-RFI-WG-C-2434 00 Civil Water Play Garden 11/25/21 11/29/21 Approved as noted
MH-C-4 & Sleeves 4 no's), (Part 7), between Geyser, Water Play Garden at highlighted area in attached
drawing.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4B KAIG3-RFI-WG-C-2446 00 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 11/27/21 12/2/21 Approved as noted
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4B KAIG3-RFI-WG-C-2447 00 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 11/27/21 11/30/21 Code C (not resubmit)
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (After Laying 3 layers of Sub
4B KAIG3-RFI-WG-C-2448 00 Grade) from level +875.30 to +876.30) after Gravel laying for Sub surface Drainage Main lines (250mm & Civil Water Play Garden 11/27/21 12/2/21 Approved as noted
160mm Main lines) only between Planted bed ofBoat Garden

Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-1), Inside Water Garden, at
KAIG3-RFI-WG-C-2449 00 Civil Water Play Garden 11/27/21 11/29/21 Approved as noted
highlighted area in attached drawings.
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-1), Inside Water
4A KAIG3-RFI-WG-C-2450 00 Civil Water Play Garden 11/27/21 11/30/21 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2451 00 base from level +875.20 to +876.20) after Gravel laying for Sub surface Drainage Main lines (250mm Main Civil Water Play Garden 11/27/21 12/1/21 Approved as noted
line) only between Boat Garden & Boundary wall

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Upto Level +876.433) (after laying
4A KAIG3-RFI-WG-C-2452 00 Gravel) Surround the Manhole (01 no's) (MH-C-3-1), Inside Water Garden, at highlighted area in attached Civil Water Play Garden 11/27/21 12/2/21 Approved as noted
drawings. (Stock pile # 126)
Excavation & Soil Preparation at Left Side of Planted Bed 2, Inside Water Play Garden, at Water Garden, at
4A KAIG3-RFI-WG-C-2453 00 Civil Water Play Garden 11/28/21 11/30/21 Approved as noted
highlighted area in attached drawings.

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers Sub Grade)
4B KAIG3-RFI-WG-C-2472 00 (from level +875.20 to +875.95) for Sub surface Drainage Main lines (250mm Main line) between Boat Civil Water Play Garden 11/28/21 11/30/21 Code C (resubmit)
Garden & Boundary wall (span 3, 4 & 5), at highlighted area

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers Sub Grade)
4B KAIG3-RFI-WG-C-2472 01 (from level +875.20 to +875.95) for Sub surface Drainage Main lines (250mm Main line) between Boat Civil Water Play Garden 12/5/21 12/8/21 Approved as noted
Garden & Boundary wall (span 3, 4 & 5), at highlighted area

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 3 layers Sub Grade)
4B KAIG3-RFI-WG-C-2477 00 (from level +875.20 to +876.20) for Sub surface Drainage Main lines (250mm Main line) only between Boat Civil Water Play Garden 11/28/21 12/5/21 Approved as noted
Garden & Boundary wall (span 6, 7 & 8), at highlighted area

Inspection & Compaction tests of 1st Layer Backfilling (Sub Grade) Between Geyser Garden & Aviary
4A KAIG3-RFI-WG-C-2478 00 Civil Water Play Garden 11/28/21 12/1/21 Approved as noted
Garden), at highlighted area in attached drawings. (Stock pile # 126)

kaig-qcals 323
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers Sub Grade)
4A KAIG3-RFI-WG-C-2479 00 (from level +875.91 to +876.66) for Sub surface Drainage lines (250mm Subline & drop 110mm connecting Civil Water Play Garden 11/28/21 12/2/21 Approved as noted
to Main line from MH-C-3 to MH-C-3-1 & 110mm Sleeve

Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden), at highlighted area in
4A KAIG3-RFI-WG-C-2480 00 Civil Water Play Garden 11/29/21 11/30/21 Approved as noted
attached drawings.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A KAIG3-RFI-WG-C-2499 00 base, (from level +875.40 to +876.90) Surround the Manhole (01 no's) (MH-C-3-1), Inside Water Garden, at Civil Water Play Garden 11/29/21 12/5/21 Approved as noted
highlighted area in attached drawings. (Stock Pile 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
4A KAIG3-RFI-WG-C-2500 00 base from level +875.082 to +876.582) for supporting Gravel Backfilling of MH-C-1) Inside Water Garden, Civil Water Play Garden 11/29/21 12/2/21 Code C (resubmit)
at highlighted area in attached drawings. (Stock Pile 126).

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
4A KAIG3-RFI-WG-C-2500 01 base from level +875.082 to +876.582) for supporting Gravel Backfilling of MH-C-1) Inside Water Garden, Civil Water Play Garden 12/12/21 12/14/21 Approved as noted
at highlighted area in attached drawings. (Stock Pile 126).

Excavation & Soil Preparation Prior to Stack Boulders 2nd Line at Left Side of Planted Bed 2, Inside Water
4A KAIG3-RFI-WG-C-2520 00 Civil Water Play Garden 11/30/21 12/5/21 Approved as noted
Play Garden, at Water Garden, at highlighted area in attached drawings.

Excavation & Soil Preparation Prior to Stack Boulders 2nd Line towards aviary, Inside Geyser Garden, at Water Play/ Geyser
4A KAIG3-RFI-WG-C-2521 00 Civil 11/30/21 12/5/21 Approved as noted
Water Garden, at highlighted area in attached drawings. Garden

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Base) (from level +875.30) Sub surface
4B KAIG3-RFI-WG-C-2543 00 Drainage Main lines (250mm & 160mm Main lines) only between Planted bed of Boat Garden & Boundary Civil Water Play Garden 11/30/21 12/5/21 Approved as noted
wall span 9, at highlighted area in attached drawings. (Stock Pile 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Behind the Boulder,
4B KAIG3-RFI-WG-C-2544 00 Between Boat Garden & Boundary wall (Span 9 to 12), Inside Boat Garden, at highlighted area in attached Civil Water Play Garden 11/30/21 12/5/21 Approved as noted
drawings. (Stock pile # 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (from level +875.91) for Sub surface
4A KAIG3-RFI-WG-C-2545 00 Drainage lines (250mm Subline & drop 110mm connecting to Main line from MH-C-3 to MH-C-3-1 & Civil Water Play Garden 11/30/21 12/6/21 Approved as noted
110mm Sleeve), (Part 7), at Between Geyser & Aviary Garden

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A KAIG3-RFI-WG-C-2546 00 base, (from level +875.40 to +876.90) Surround the Manhole (01 no's) (MH-C-3-1), Inside Water Garden, at Civil Water Play Garden 11/30/21 12/6/21 Approved as noted
highlighted area in attached drawings. (Stock 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
4A KAIG3-RFI-WG-C-2547 00 base from level +875.082 to +876.582) for supporting Gravel Backfilling of MH-C-1) Inside Water Garden, Civil Water Play Garden 11/30/21 12/5/21 Code C (resubmit)
at highlighted area in attached drawings. (Stock Pile 126).

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer Sub
4A KAIG3-RFI-WG-C-2547 01 base from level +875.082 to +876.582) for supporting Gravel Backfilling of MH-C-1) Inside Water Garden, Civil Water Play Garden 12/23/21 12/25/21 Approved as noted
at highlighted area in attached drawings. (Stock Pile 126).

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4B KAIG3-RFI-WG-C-2575 00 base from level +875.082 to +876.582) after Gravel laying for Sub surface Drainage Branch lines (110 mm Civil Water Play Garden 12/1/21 12/6/21 Approved as noted
pipe connected to MH-C-3-1) inside Water Garden

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) (Out of 5 layers) Behind the Boulder,
4B KAIG3-RFI-WG-C-2590 00 Between Boat Garden & Boundary wall (Span 9 to 12), Inside Boat Garden, at highlighted area in attached Civil Water Play Garden 12/2/21 12/8/21 Approved as noted
drawings. (Stock pile # 116)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A KAIG3-RFI-WG-C-2591 00 base, (from level +875.40 to +876.90) Surround the Manhole (01 no's) (MH-C-3-1), Inside Water Garden, at Civil Water Play Garden 12/2/21 12/8/21 Approved as noted
highlighted area in attached drawings. (Stock Pile 126).

kaig-qcals 324
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.082) for Sub surface
4B KAIG3-RFI-WG-C-2592 00 Drainage Branch lines (110 mm pipe connected to MH-C-3-1) inside Water Garden, at highlighted area in Civil Water Play Garden 12/2/21 12/8/21 Approved as noted
attached drawings. (Stock pile # 126)

Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (from level +875.082) for Sub surface
4B KAIG3-RFI-WG-C-2604 00 Drainage Branch lines (110 mm pipe connected to MH-C-3-1) inside Water Garden, at highlighted area in Civil Water Play Garden 12/4/21 12/9/21 Code C (not resubmit)
attached drawings. (Stock pile # 126)

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A KAIG3-RFI-WG-C-2605 00 base, (from level +875.40 to +876.90) Surround the Manhole (01 no's) (MH-C-3-1), Inside Water Garden, at Civil Water Play Garden 12/4/21 12/9/21 Code C (not resubmit)
highlighted area in attached drawings. (Stock Pile 126).

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surface
4B KAIG3-RFI-WG-C-2619 00 Drainage Main lines (250mm Main line) between Boat Garden & Boundary wall (span 3, 4 & 5), at Civil Water Play Garden 12/4/21 12/12/21 Approved as noted
highlighted area in attached drawings. (Stock pile # 126)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers Sub Grade) (from level
4B KAIG3-RFI-WG-C-2620 00 +875.20 to +877.00) for Sub surface Drainage Main lines (250mm Main line) only between Boat Garden & Civil Water Play Garden 12/4/21 12/8/21 Approved as noted
Boundary wall (span 6, 7 & 8), at highlighted area in attached drawing.

Excavation & Bed Preparation for Sub surface Drainage lines (Sub lines 110mm & Sleeves Connected to Sub
4A KAIG3-RFI-WG-C-2654 00 Main line 160mm Which is connecting to Main line 315mm running from MH-C-7 to MH-C-8, Inside Mist Civil Water Play/Mist Garden 12/7/21 12/11/21 Approved as noted
Garden, at Water Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2676 00 base, from level +873.86 to +874.61) after Gravel laying for Sub surface Drainage Main line (450mm from Civil Water Play Garden 12/8/21 12/13/21 Approved as noted
MH-C-4 to MH-C-4-1), Inside Water Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2677 00 base, from level +873.86 to +874.61) after Gravel laying for Sub surface Drainage Main line (450mm from Civil Water Play Garden 12/8/21 12/14/21 Code C (resubmit)
MH-C-4 to MH-C-4-1), Inside Water Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer Sub
4A KAIG3-RFI-WG-C-2677 01 base, from level +873.86 to +874.61) after Gravel laying for Sub surface Drainage Main line (450mm from Civil Water Play Garden 12/22/21 12/23/21 Approved as noted
MH-C-4 to MH-C-4-1), Inside Water Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Base) (Out of 5 layers) Behind the
4B KAIG3-RFI-WG-C-2678 00 Boulder, Between Boat Garden & Boundary wall (Span 9 to 12), Inside Boat Garden, at highlighted area in Civil Water Play Garden 12/8/21 12/15/21 Approved as noted
attached drawings. (Stock pile # 116)

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surface
4B KAIG3-RFI-WG-C-2699 00 Drainage Main lines (250mm Main line) between Boat Garden & Boundary wall (span 3, 4 & 5), at Civil Water Play Garden 12/8/21 12/13/21 Approved as noted
highlighted area in attached drawings. (Stock pile # 126)

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers of Sub Grade),
4A KAIG3-RFI-WG-C-2700 00 from level +873.86 to +874.61) for Sub surface Drainage Main line (450mm from MH-C-4 to MH-C-4-1), Civil Water Play Garden 12/8/21 12/16/21 Code C (not resubmit)
Inside Water Garden, at highlighted area in attached drawing.

Excavation & Bed Preparation for Conduits (160mm) Laying for Low Voltage Sub Main Containment Lines,
4A KAIG3-RFI-WG-C-2714 00 running Under the Bolders, Between Water Play Garden and Aviary Garden, at highlighted area in attached Civil Water Play Garden 12/9/21 12/15/21 Approved as noted
drawings.

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surface
4B KAIG3-RFI-WG-C-2729 00 Drainage Main lines (250mm Main line) between Boat Garden & Boundary wall (span 3, 4 & 5), at Civil Water Play Garden 12/11/21 12/15/21 Approved as noted
highlighted area in attached drawings. (Stock pile # 126)

Excavation & Bed Preparation for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Boat
4B KAIG3-RFI-WG-C-2792 00 Civil Water Play Garden 12/14/21 12/15/21 Approved as noted
Garden from Culvert Side, at highlighted area in attached drawings.

Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Lines, running
Water Play/Geyser
4A KAIG3-RFI-WG-C-2807 00 Under the Bolders, at bottom side of step 3 & 4 at Right side of Geyser Garden, at highlighted area in Civil 12/14/21 12/20/21 Code C (resubmit)
Garden
attached drawings.

kaig-qcals 325
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Lines, running
Water Play/Geyser
4A KAIG3-RFI-WG-C-2807 01 Under the Bolders, at bottom side of step 3 & 4 at Right side of Geyser Garden, at highlighted area in Civil 12/27/21 1/1/21 Approved as noted
Garden
attached drawings.

Surface Preparation prior to Backfilling along the Boundary Wall (Outer Sides) of span 42, 43, 44, 45 & 46
4A KAIG3-RFI-WG-C-2809 00 (From Bottom of Blinding levels 878.665, 878.400, 878.425, 878.45 & 878.45) of Water Garden, as per Civil Water Play Garden 12/15/21 12/19/21 Approved as noted
highlighted area in attached drawings.
Excavation & Soil Preparation Prior to Stack Boulders at Bottom Right Side of Geyser Garden, at highlighted Water Play/ Geyser
4A KAIG3-RFI-WG-C-2861 00 Civil 12/16/21 12/20/21 Approved as noted
area in attached drawings. Garden

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes (2 no's of 110mm) Connecting to Gully
4B KAIG3-RFI-WG-C-2862 00 Civil Water Play Garden 12/16/21 12/19/21 Approved as noted
Inside Boat Garden from Culvert Side, at highlighted area in attached drawings.(Stock pile # 118)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surface
4B KAIG3-RFI-WG-C-2863 00 Drainage Main lines (250mm Main line) between Boat Garden & Boundary wall (span 3, 4 & 5), at Civil Water Play Garden 12/16/21 12/20/21 Approved as noted
highlighted area in attached drawings. (Stock pile # 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
4B KAIG3-RFI-WG-C-2864 00 Wall (Outer Sides) of span 42, 43, 44, 45 & 46 (From Bottom of Blinding levels 878.665, 878.400, 878.425, Civil Water Play Garden 12/16/21 12/23/21 Approved as noted
878.45 & 878.45) of Water Garden, as per highlighted area in attached drawing.

Excavation & Soil Preparation Prior to Boulders at Part 2, at Left Side of Planted Bed 2, Inside Water Play
4A KAIG3-RFI-WG-C-2865 00 Civil Water Play Garden 12/18/21 12/21/21 Approved as noted
Garden, at Water Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade and
Water Play/ Geyser
4A KAIG3-RFI-WG-C-2866 00 single layer Sub base from level +875.10 to +875.50) Prior to Stack Boulders at Bottom Right Side of Geyser Civil 12/18/21 12/23/21 Approved as noted
Garden
Garden, at highlighted area in attached drawing.

Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surface
4B KAIG3-RFI-WG-C-2895 00 Drainage Main lines (250mm Main line) between Boat Garden & Boundary wall (span 3, 4 & 5), at Civil Water Play Garden 12/18/21 12/23/21 Approved as noted
highlighted area in attached drawings. (Stock pile # 126)

Excavation & Soil Preparation Prior to Stack Boulders at Bottom Left Side of Geyser Garden, at highlighted Water Play/ Geyser
4A KAIG3-RFI-WG-C-2899 00 Civil 12/19/21 12/23/21 Approved as noted
area in attached drawings. Garden

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-2922 00 base from level +875.00 to +876.00) for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Civil Water Play Garden 12/19/21 12/25/21 Approved as noted
Boat Garden from Culvert Side, at highlighted a area

Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (After laying Single layer Sub
Water Play/ Geyser
4A KAIG3-RFI-WG-C-2923 00 grade, from level +875.10 to +875.50) Prior to Stack Boulders at Bottom Right Side of Geyser Garden, at Civil 12/19/21 12/23/21 Approved as noted
Garden
highlighted area in attached drawings. (Stock Pile 126).

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
4A 4B KAIG3-RFI-WG-C-2924 00 Wall (Outer Sides) of span 42, 43, 44, 45 & 46 (From Bottom of Blinding levels 878.665, 878.400, 878.425, Civil Water Play Garden 12/19/21 12/25/21 Approved as noted
878.45 & 878.45) of Water Garden, as per highlighted area.

Surface Preparation prior to Backfilling along the Boundary Wall (Outer Sides) of span 1 & 49 (From Bottom
4A KAIG3-RFI-WG-C-2926 00 Civil Water Play Garden 12/20/21 12/23/21 Approved as noted
of Blinding levels 878.156 & 878.156) of Water Garden, as per highlighted area in attached drawings.

Inspection & Compaction tests of One Layer Backfilling (Sub-Base), from level +875.50 to +875.75, (After
Water Play/Geyser
4A KAIG3-RFI-WG-C-2966 00 laying Sub base Ref: RFI-C-2923) Prior to Stack Boulders at Bottom Right Side of Geyser Garden, at Civil 12/21/21 12/26/21 Approved as noted
Garden
highlighted area in attached drawings. (Stock Pile 116).

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
4A/4B KAIG3-RFI-WG-C-2967 00 Wall (Outer Sides) of span 42, 43, 44, 45 & 46 (From Bottom of Blinding levels 878.665, 878.400, 878.425, Civil Water Play Garden 12/21/21 12/25/21 Approved as noted
878.45 & 878.45) of Water Garden, as per highlighted area.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-3003 00 base from level +875.00 to +875.90) for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Civil Water Play Garden 12/22/21 12/25/21 Approved as noted
Boat Garden from Culvert Side, at highlighted area

kaig-qcals 326
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer Sub
4B KAIG3-RFI-WG-C-3004 00 base from level +875.00 to +875.90) for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Civil Water Play Garden 12/22/21 12/28/21 Approved as noted
Boat Garden from Culvert Side, at highlighted area

Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (after 3 layers of Sub Grade from level
4B KAIG3-RFI-WG-C-3027 00 +875.00 to +875.90) for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Boat Garden from Civil Water Play Garden 12/23/21 12/28/21 Approved as noted
Culvert Side, at highlighted area in attached drawing.

Excavation & Soil Preparation Prior to Stack Boulders, at 2nd to 5th line of boulders at Bottom Right Side of Water Play/Geyser
4A KAIG3-RFI-WG-C-3028 00 Civil 12/23/21 12/27/21 Approved as noted
Geyser Garden, at highlighted area in attached drawings. Garden

Excavation & Soil Preparation Prior to Stack Boulders, at Bottom Left Side of Geyser Garden, at highlighted Water Play/Geyser
4A KAIG3-RFI-WG-C-3029 00 Civil 12/23/21 12/27/21 Approved as noted
area in attached drawings. Garden
Excavation & Soil Preparation Prior to Stack Boulders, at Between Boat Garden & Culvert, Inside Water
4B KAIG3-RFI-WG-C-3030 00 Civil Water Play Garden 12/23/21 12/27/21 Approved as noted
Garden, at highlighted area in attached drawings.

Inspection & Compaction Tests of 1st Layer Sub Garde Backfilling (Out of 4 Layers) along the Boundary
4A KAIG3-RFI-WG-C-3034 00 Wall (Inner Side) of span 1 (From Bottom of Blinding levels 878.156) of Water Garden, as per highlighted Civil Water Play Garden 12/23/21 12/30/21 Approved as noted
area in attached drawings.(Stock Pile # 126)

Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundary
4A KAIG3-RFI-WG-C-3035 00 Wall (Inner Side) of span 49 (From Bottom of Blinding levels 878.156) of Water Garden, as per highlighted Civil Water Play Garden 12/25/21 12/30/21 Code C (resubmit)
area in attached drawings.(Stock Pile # 126)

Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundary
4A 4 KAIG3-RFI-WG-C-3035 01 Wall (Inner Side) of span 49 (From Bottom of Blinding levels 878.156) of Water Garden, as per highlighted Civil Water Play Garden 1/3/22 1/9/22 Approved as noted
area in attached drawings.(Stock Pile # 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers Sub grade and Final
Water Play/Geyser
4A KAIG3-RFI-WG-C-3036 00 layer Sub base from level +875.62 to +876.57) Prior to Stack Boulders, at 2nd to 5th line of boulders at Civil 12/25/21 12/28/21 Approved as noted
Garden
Bottom Right Side of Geyser Garden, at highlighted area in attached drawing.

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
4A/4B KAIG3-RFI-WG-C-3037 00 Wall (Outer Sides) of span 42, 43, 44, 45 & 46 (From Bottom of Blinding levels 878.665, 878.400, 878.425, Civil Water Play Garden 12/25/21 12/28/21 Approved as noted
878.45 & 878.45) of Water Garden, as per highlighted area in attached drawing

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base from level
Water Play/Geyser
4A KAIG3-RFI-WG-C-3064 00 +875.62 to +876.57) Prior to Stack Boulders, at 2nd to 5th line of boulders at Bottom Right Side of Geyser Civil 12/26/21 12/28/21 Approved as noted
Garden
Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base from level
Water Play/Geyser
4A KAIG3-RFI-WG-C-3065 00 +875.62 to +876.57) Prior to Stack Boulders, at 2nd to 5th line of boulders at Bottom Right Side of Geyser Civil 12/26/21 12/30/21 Approved as noted
Garden
Garden, at highlighted area in attached drawing

Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base from
Water Play/Geyser
4A KAIG3-RFI-WG-C-3066 00 level +875.62 to +876.57) Prior to Stack Boulders, at 2nd to 5th line of boulders at Bottom Right Side of Civil 12/26/21 1/1/22 Approved as noted
Garden
Geyser Garden, at highlighted area in attached drawing.

Inspection & Compaction tests of 5th (final) Layer Backfilling (Sub-Grade) (Out of 5 layers) along the
4A 4B KAIG3-RFI-WG-C-3081 00 Boundary Wall (Outer Sides) of span 42, 43, 44, 45 & 46 (From Bottom of Blinding levels 878.665, 878.400, Civil Water Play Garden 12/26/21 1/1/22 Approved as noted
878.425, 878.45 & 878.45) of Water Garden, as per highlighted area in attached drawing (Stock Pile 126).

Inspection & Compaction tests of 2nd layers for Backfilling (Sub Grade) (out of 4 layers) along the Boundary
4A KAIG3-RFI-WG-C-3111 00 Wall (Inner side) of Span 1 from Bottom of Blinding Level +878.156 at Water Play Garden as highlighted Civil Water Play Garden 12/27/21 1/1/22 Approved as noted
area in attached drawing (stock pile 126).

Excavation & Soil preparation prior to Boulders at Bottom left side of Mist Garden at highlighted area in
4A KAIG3-RFI-WG-C-3113 00 Civil Water Play/Mist Garden 12/27/21 1/1/22 Approved as noted
attached drawings.
Excavation & Soil Preparation Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side of Mist
4A KAIG3-RFI-WG-C-3115 00 Civil Water Play/Mist Garden 12/28/21 1/1/22 Approved as noted
Garden, at highlighted area in attached drawings.

kaig-qcals 327
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction Tests of 3rd Layer Sub Garde Backfilling (Out of 4 Layers) along the Boundary
4A KAIG3-RFI-WG-C-3137 00 Wall (Inner Side) of span 1 (From Bottom of Blinding levels 878.156) of Water Garden, as per highlighted Civil Water Play Garden 12/28/21 1/1/22 Approved as noted
area in attached drawings.(Stock Pile # 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) (Out of 2 layers), (from level +877.00 to
4A KAIG3-RFI-WG-C-3151 00 +877.25) Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side of Mist Garden, at highlighted Civil Maze Garden 12/29/21 1/4/22 Code C (resubmit)
area in attached drawings.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) (Out of 2 layers), (from level +877.00 to
4A 5 KAIG3-RFI-WG-C-3151 01 +877.25) Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side of Mist Garden, at highlighted Civil Maze Garden 1/5/22 1/8/22 Approved as noted
area in attached drawings.

Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Base) (Out of 2 layers), (from level
4A KAIG3-RFI-WG-C-3152 00 +877.25 to +877.45) Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side of Mist Garden, at Civil Water Play/Mist Garden 12/29/21 1/4/22 Code C (resubmit)
highlighted area in attached drawings.

Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Base) (Out of 2 layers), (from level
4A 4 KAIG3-RFI-WG-C-3152 01 +877.25 to +877.45) Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side of Mist Garden, at Civil Water Play/Mist Garden 1/6/22 1/10/22 Approved as noted
highlighted area in attached drawings.
Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundary
4A 4 KAIG3-RFI-WG-C-3155 00 Wall (Inner Side) of span 1 (From Bottom of Blinding levels 878.156) of Water Garden, as per highlighted Civil Water Play Garden 1/1/22 1/8/22 Approved as noted
area in attached drawings.(Stock Pile # 126)
Excavation & Soil Preparation for Culvert (Part 1) along Boat Garden, Inside Water Garden, at highlighted Water Play
4A 4 KAIG3-RFI-WG-C-3347 00 Civil 1/12/22 1/15/22 Approved as noted
area in attached drawings. Garden/Culvert

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes (110mm) Connecting to Gully Inside Boat
4B 4 KAIG3-RFI-WG-C-3446 00 Civil Water Play Garden 1/19/22 1/20/22 Approved as noted
Garden from Culvert Side, at highlighted area in attached drawings.(Stock pile # 118)

Excavation & Soil preparation prior to Boulders between Geyser Garden & Boundary Wall (span 15 & 16) Water Play/Geyser
4A 4 KAIG3-RFI-WG-C-3463 00 Civil 1/20/22 1/25/22 Approved as noted
inside Water Play Garden at highlighted area in attached drawings. Garden

Excavation for Electrical Power Containment Lines at Bottom Left side of Mist Garden inside Water Garden
4A 4 KAIG3-RFI-WG-C-3467 00 Civil Water Play/Mist Garden 1/20/22 1/24/22 Approved as noted
at highlighted area in attached drawing.

Excavation for Electrical Low Current, Power Containment & Fire alarm Lines Between Geyser Garden & Water Play/Geyser
4A 4 KAIG3-RFI-WG-C-3468 00 Civil 1/20/22 1/24/22 Approved as noted
Open Channel, Inside Water Garden, at highlighted area in attached drawings. Garden

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (from level +875.45 to +875.70),
4B 4 KAIG3-RFI-WG-C-3487 00 (after Gravel laying) for Sub surface Pipes (110mm) Connecting to Gully Inside Boat Garden from Culvert Civil Water Play Garden 1/22/22 1/25/22 Approved as noted
Side, at highlighted area in attached drawings.(SP 126)

Inspection & Compaction tests of Single Layer Backfilling (Sub-Base) (from level +875.70 to +875.90),
4B 4 KAIG3-RFI-WG-C-3488 00 (after Sub-Grade) for Sub surface Pipes (110mm) Connecting to Gully Inside Boat Garden from Culvert Side, Civil Water Play Garden 1/22/22 1/27/22 Approved as noted
at highlighted area in attached drawings.(Stock Pile 116)

Excavation & Soil Preparation Prior to Boulders, at Left Side Geyser Garden (Remaining part) towards Water Water Play/Geyser
4A 4 KAIG3-RFI-WG-C-3518 00 Civil 1/24/22 1/26/22 Approved as noted
play garden , Inside Water Garden, at highlighted area in attached drawings. Garden

Excavation & Bed Preparation for Sub surface Pipe (110mm) Sub line Between Mist garden & Water play
4A 4 KAIG3-RFI-WG-C-3606 00 Civil Water Play Garden 1/26/22 1/29/22 Approved as noted
garden, Inside Water Garden, at highlighted area in attached drawings.

Soil Preparation Prior to Backfilling along the Boundary wall Foundation (Inner & Outer Sides) @ span 2 (At
4B 4 KAIG3-RFI-WG-C-3607 00 Civil Water Play Garden 1/26/22 1/29/22 Approved as noted
B.O.B +878.30) , at Water Garden, as highlighted in Attached Drawings.

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipe (110mm) Sub line Between Mist garden &
4A 4 KAIG3-RFI-WG-C-3666 00 Water play garden and (250mm) Main line Connected to MH-C-4-2, (Part 7), Inside Water Garden, at Civil Water Play Garden 1/30/22 2/1/22 Approved as noted
highlighted area in attached drawings.(Stock pile # 118)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4B 4 KAIG3-RFI-WG-C-3667 00 wall Foundation (Inner & Outer Sides) @ span 2 (from B.O.B +878.30), at Water Garden, as highlighted in Civil Water Play Garden 1/30/22 2/3/22 Approved as noted
Attached Drawing.(Stock pile # 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4B 4 KAIG3-RFI-WG-C-3729 00 wall Foundation (Inner & Outer Sides) @ span 2 (from B.O.B +878.30), at Water Garden, as highlighted in Civil Water Play Garden 2/1/22 2/6/22 Code C (resubmit)
Attached Drawing.(Stock pile # 126)

kaig-qcals 328
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4B 4 KAIG3-RFI-WG-C-3729 01 wall Foundation (Inner & Outer Sides) @ span 2 (from B.O.B +878.30), at Water Garden, as highlighted in Civil Water Play Garden 2/13/22 2/17/22 Approved as noted
Attached Drawing.(Stock pile # 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A 4 KAIG3-RFI-WG-C-3787 00 base from level +878.10 to +879.50) for Sub surface Pipe (110mm) Sub line Between Mist garden & Water Civil Water Play Garden 2/3/22 2/8/22 Approved as noted
play garden, Inside Water Garden, at highlighted

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A 4 KAIG3-RFI-WG-C-3807 00 base from level +878.10 to +879.50) for Sub surface Pipe (110mm) Sub line Between Mist garden & Water Civil Water Play Garden 2/6/22 2/10/22 Approved as noted
play garden, Inside Water Garden, at highlighted

Excavation & Bed Preparation for Water Feature Line (Part 1) (HDPE 300mm Main line & 3 Sub lines of
4A 4 KAIG3-RFI-WG-C-3830 00 Civil Water Play Garden 2/6/22 2/10/22 Approved as noted
75mm) Inside Water play garden, at Water Garden, at highlighted area in attached drawings.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A 4 KAIG3-RFI-WG-C-3861 00 base from level +878.10 to +879.50) for Sub surface Pipe (110mm) Sub line Between Mist garden & Water Civil Water Play Garden 2/7/22 2/10/22 Approved as noted
play garden, Inside Water Garden, at highlighted

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer Sub
4A 4 KAIG3-RFI-WG-C-3918 00 base from level +878.10 to +879.50) for Sub surface Pipe (110mm) Sub line Between Mist garden & Water Civil Water Play Garden 2/9/22 2/13/22 Approved as noted
play garden, Inside Water Garden, at highlighted

Sand Bedding for Water Feature Lines (Part 1) (HDPE 300mm Main line & 3 Sub lines of 75mm) Inside
4A 4 KAIG3-RFI-WG-C-3990 00 Civil Water Play Garden 2/12/22 2/16/22 Approved as noted
Water play garden, at Water Garden, at highlighted area in attached drawings.

Excavation & Bed Preparation for Water Feature Line (Part 2) (HDPE 160mm, 110mm & 90mm Lines)
4A 4 KAIG3-RFI-WG-C-4071 00 Civil Water Play Garden 2/15/22 2/20/22 Approved as noted
Inside Water play garden, at Water Garden, at highlighted area in attached drawings.

Sand Bedding for Water Feature Line (Part 2) (HDPE 160mm, 110mm & 90mm Lines) Inside Water play
4A 4 KAIG3-RFI-WG-C-4072 00 Civil Water Play Garden 2/16/22 2/23/22 Approved as noted
garden, at Water Garden, at highlighted area in attached drawings.

Excavation & Bed Preparation for Irrigation Sub-main Line Distribution network (Part 1) (50mm Line) Inside
4A 4 KAIG3-RFI-WG-C-4128 00 Civil Water Play Garden 2/19/22 2/23/22 Approved as noted
Water play garden, at Water Garden, at highlighted area in attached drawings.

Excavation & Bed Preparation for Water Feature Line (Part 3) (HDPE 250mm & 110mm Lines) Inside Water
4A 4 KAIG3-RFI-WG-C-4172 00 Civil Water Play Garden 2/21/22 2/24/22 Approved as noted
play garden, at Water Garden, at highlighted area in attached drawings.

Excavation & Soil Preparation for Open Channel (Part 2) at Wadi # 3, Inside Water Garden, At Highlighted Water Play Garden Wadi
4A 4 KAIG3-RFI-WG-C-4199 00 Civil 2/23/22 2/27/22 Approved as noted
area in attached Drawings. 3
Sand Bedding for Water Feature Line (Part 3) (HDPE 250mm & 110mm Lines) Inside Water play garden, at
4A 4 KAIG3-RFI-WG-C-4229 00 Civil Water Play Garden 2/24/22 3/1/22 Approved as noted
Water Garden, at highlighted area in attached drawings.
Excavation & Bed Preparation for Irrigation Sub-main Line Distribution network (Part 2) (110mm Line)
4A 4 KAIG3-RFI-WG-C-4230 00 Between Water play garden & Boundary wall span (33-37), at Water Garden, at highlighted area in attached Civil Water Play Garden 2/24/22 2/27/22 Code C (resubmit)
drawings.

Excavation & Bed Preparation for Irrigation Sub-main Line Distribution network (Part 2) (110mm Line)
4A 4 KAIG3-RFI-WG-C-4230 01 Between Water play garden & Boundary wall span (33-37), at Water Garden, at highlighted area in attached Civil Water Play Garden 3/16/22 3/19/22 Approved as noted
drawings.

Inspection and compaction tests for 6th layer of Backfill (out of 8 layers ) (sub grade ) along the Boundary
4A 4 KAIG3-RFI-WG-C-4288 00 wall (Outer side) Span 30, 33, 34, 35, 36 & 37 of Water Garden, At Highlighted area in the attached Civil Water Play Garden 2/28/22 3/3/22 Code C (resubmit)
drawing's, (Stock Pile # 126)

Inspection and compaction tests for 6th layer of Backfill (out of 8 layers ) (sub grade ) along the Boundary
4A 4 KAIG3-RFI-WG-C-4288 01 wall (Outer side) Span 30, 33, 34, 35, 36 & 37 of Water Garden, At Highlighted area in the attached Civil Water Play Garden 3/13/22 3/16/22 Approved as noted
drawing's, (Stock Pile # 126)

Sand Cover & Pipes Protection for Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of
4A 5 KAIG3-RFI-WG-C-4308 00 75mm) and (Part 2 - HDPE 160mm, 110mm & 90mm Lines) Inside Water play garden, at Water Garden, at Civil Maze Garden 2/28/22 3/3/22 Approved as noted
highlighted area in attached drawings.

Surface preparation prior to Backfilling Surround the Manhole (MH-C-4-2) Inside water Garden, at
4A 4 KAIG3-RFI-WG-C-4363 00 Civil Water Play Garden 3/2/22 3/5/22 Approved as noted
highlighted area in attached drawings

kaig-qcals 329
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Gravel Backfilling (50 cm height) Surround the Manhole (MH-C-4-2) Inside water Garden, at highlighted
4A 4 KAIG3-RFI-WG-C-4364 00 Civil Water Play Garden 3/2/22 3/5/22 Approved as noted
area in attached drawings (SP 118 )

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) above sand cover (Out of 5 layers) for
4A 4 KAIG3-RFI-WG-C-4370 00 Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of 75mm) and (Part 2 - HDPE 160mm, Civil Water Play Garden 3/3/22 3/8/22 Approved as noted
110mm & 90mm Lines) Inside Water play garden, at

Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/28 to 25),
4B 4 KAIG3-RFI-WG-C-4378 00 (MH/WG/LV/44 to 47) and (MH/WG/FA/27 to 31 ), inside Boat Garden, as highlighted area in attached Civil Water Play Garden 3/6/22 3/9/22 Approved as noted
drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) above sand cover (Out of 5 layers) for
4A 4 KAIG3-RFI-WG-C-4445 00 Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of 75mm) and (Part 2 - HDPE 160mm, Civil Water Play Garden 3/6/22 3/10/22 Approved as noted
110mm & 90mm Lines) Inside Water play garden, at

Excavation and Bed preparation for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water
4A 4 KAIG3-RFI-WG-C-4450 00 Civil Water Play Garden 3/7/22 3/10/22 Approved as noted
Garden as highlighted area in attached drawing's.

Surface preparation and Compaction blinding of Electrical Handholes of Emergency (MH/WG/EM/27),


4B 4 KAIG3-RFI-WG-C-4469 00 Civil Water Play Garden 3/7/22 3/12/22 Code C (resubmit)
(MH/WG/LV/46) and (MH/WG/FA/28 ), inside Boat Garden, as highlighted area in attached drawing's.

Surface preparation and Compaction blinding of Electrical Handholes of Emergency (MH/WG/EM/27),


4B 4 KAIG3-RFI-WG-C-4469 01 Civil Water Play Garden 4/10/22 4/11/22 Approved as noted
(MH/WG/LV/46) and (MH/WG/FA/28 ), inside Boat Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) above sand cover (Out of 5 layers) for
4A 4 KAIG3-RFI-WG-C-4488 00 Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of 75mm) and (Part 2 - HDPE 160mm, Civil Water Play Garden 3/8/22 3/12/22 Approved as noted
110mm & 90mm Lines) Inside Water play garden, at

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) above sand cover (Out of 5 layers) for
4A 4 KAIG3-RFI-WG-C-4513 00 Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of 75mm) and (Part 2 - HDPE 160mm, Civil Water Play Garden 3/9/22 3/12/22 Approved as noted
110mm & 90mm Lines) Inside Water play garden, at

Sand bedding for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water Garden as
4A 4 KAIG3-RFI-WG-C-4514 00 Civil Water Play Garden 3/9/22 3/12/22 Approved as noted
highlighted area in attached drawing's.

Concrete Pouring for Electrical Handholes of Emergency (MH/WG/LV/44 to 47) and (MH/WG/FA/27 to 31)
4B 4 KAIG3-RFI-WG-C-4515 00 Civil Water Play Garden 3/9/22 3/13/22 Code C (resubmit)
inside Boat Garden as highlighted area in attached draiwings.

Concrete Pouring for Electrical Handholes of Emergency (MH/WG/LV/44 to 47) and (MH/WG/FA/27 to 31)
4B 4 KAIG3-RFI-WG-C-4515 01 Civil Water Play Garden 5/21/22 5/31/22 Approved as noted
inside Boat Garden as highlighted area in attached draiwings.

Excavation and Bed Preparation for Wet Well € at Water Play Garden in highlighted area in attached
4A 4 KAIG3-RFI-WG-C-4541 00 Civil Water Play Garden 3/10/22 3/14/22 Approved as noted
drawing.

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) above sand cover (Out of 5 layers) for
4A 4 KAIG3-RFI-WG-C-4543 00 Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lines of 75mm) and (Part 2 - HDPE 160mm, Civil Water Play Garden 3/13/22 3/16/22 Approved as noted
110mm & 90mm Lines) Inside Water play garden, at

Excavation and Bed preparation for water feature lines (part 4-1) (HDPE 110-63 mm )inside Mist Garden,at
4A 4 KAIG3-RFI-WG-C-4566 00 Civil Water Play Garden 3/13/22 3/15/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Inspection and compaction tests for 7th layer of Backfill (out of 8 layers ) (sub grade ) along the Boundary
4A 4 KAIG3-RFI-WG-C-4595 00 wall (Outer side) Span 30, 33, 34, 35 and 36 of Water Garden, At Highlighted area in the attached drawing's, Civil Water Play Garden 3/17/22 3/20/22 Approved as noted
(Stock Pile # 126)
Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Span 7,8,9,10 and 11 at Water
4A 4 KAIG3-RFI-WG-C-4626 00 Civil Water Play Garden 3/15/22 3/24/22 Approved as noted
Garden, as Highlighted area in the attached drawing's

Excavation and Bed preparation for Irrigation Sub-Main line Distribtion network (part 1) ( 50,63,110 mm ),
4A 4 KAIG3-RFI-WG-C-4643 00 Civil Water Play Garden 3/16/22 3/20/22 Approved as noted
(East of geyser Garden),at Water Garden as highlighted area in attached drawing's.

Excavation & Blinding Levels for Electrical Handholes of (MH WG EM 7to 15and 29) (MH WG LV 17 to
4B 4 KAIG3-RFI-WG-C-4644 00 Civil Water Play Garden 3/17/22 3/20/22 Approved as noted
29 and 53) inside water play Garden, at water Gardenas

Excavation & Blinding Levels for Low current Handholes of (MH WG LC 5 to 9) and (MH WG FA 7 to 16
4B 4 KAIG3-RFI-WG-C-4666 00 Civil Water Play Garden 3/17/22 3/20/22 Approved as noted
32), inside water play Garden, at water Gardenas highlighted area in attached drawing's.

kaig-qcals 330
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Sand bedding for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water Garden as
4A 4 KAIG3-RFI-WG-C-4667 00 Civil Water Play Garden 3/21/22 3/23/22 Code C (resubmit)
highlighted area in attached drawing's.
Sand bedding for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water Garden as
4A 4 KAIG3-RFI-WG-C-4667 01 Civil Water Play Garden 4/5/22 4/6/22 Approved as noted
highlighted area in attached drawing's.

Excavation and Soil preparation between Boat Garden and Boundary wall, Span (12,13), inside boat garden
4B 4 KAIG3-RFI-WG-C-4702 00 Civil Water Play Garden 3/20/22 3/23/22 Approved as noted
at water Garden highlighted area in attached drawing's.

Inspection of Thrust Block for HDPE Water Feature pipes at Water Garden, as highlighted area in attached
4D 4 KAIG3-RFI-WG-C-4703 00 Civil Water Play Garden 3/20/22 3/22/22 Approved as noted
drawing's. attached KAIG3-SCR-SW-C-0021-00
Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29),
2H 6 KAIG3-RFI-WG-C-4717 00 (MH/WG/LV/1 to 56) and 14 Nos (MH/WG/FA/1 7to 29&53 ), inside water play Garden, at water Gardenas Civil Crescent 3/20/22 3/21/22 Code C (resubmit)
highlighted area in attached drawing's.

Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29),
2H 6 KAIG3-RFI-WG-C-4717 01 (MH/WG/LV/1 to 56) and 14 Nos (MH/WG/FA/1 7to 29&53 ), inside water play Garden, at water Gardenas Civil Crescent 5/10/22 5/19/22 Approved as noted
highlighted area in attached drawing's.

Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/5 to 9) and (MH/WG/FA/7 to
4B 4 KAIG3-RFI-WG-C-4718 00 Civil Water Play Garden 3/20/22 3/21/22 Code C (resubmit)
16 & 32), inside water play Garden, at water Gardenas highlighted area in attached drawing's.

Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/5 to 9) and (MH/WG/FA/7 to
4B 4 KAIG3-RFI-WG-C-4718 01 Civil Water Play Garden 5/10/22 5/19/22 Approved as noted
16 & 32), inside water play Garden, at water Gardenas highlighted area in attached drawing's.

Sand bedding for Irrigation Sub-Main line Distribtion network ( 50,63,110 mm ),(East of Mist & geyser
4A 4 KAIG3-RFI-WG-C-4744 00 Civil Water Play Garden 3/21/22 3/23/22 Approved as noted
Garden),at Water Garden as highlighted area in attached drawing's.

Inspection and compaction tests for 8th layer of Backfill (sub grade ) along the Boundary wall (Outer side)
4A 4 KAIG3-RFI-WG-C-4776 00 Civil Water Play Garden 3/22/22 3/24/22 Approved as noted
Span 30, 33, 34, 35, 36 of Water Garden,

Inspection & Compaction tests of 1st Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Garden
4B 4 KAIG3-RFI-WG-C-4777 00 Civil Water Play Garden 3/23/22 3/24/22 Approved as noted
and Boundary wall, Span (12,13), inside boat garden at water Garden

Sand bedding for Irrigation Sub-Main line Distribtion network (part 2) ( 50,110 mm line ),(inside water play
4A 4 KAIG3-RFI-WG-C-4778 00 Civil Water Play Garden 3/23/22 3/26/22 Approved as noted
Garden),at Water Garden

Inspection & Compaction tests of 2nd Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Garden
4B 4 KAIG3-RFI-WG-C-4779 00 Civil Water Play Garden 3/23/22 3/26/22 Approved as noted
and Boundary wall, Span (12,13), inside boat garden at water Garden

Inspection & Compaction tests of 3rd Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Garden
4B 4 KAIG3-RFI-WG-C-4804 00 Civil Water Play Garden 3/24/22 3/28/22 Approved as noted
and Boundary wall, Span (12,13), inside boat garden at water Garden

Sand cover and pipes protection for water feature lines (HDPE 110,63 and 50 mm )inside Mist Garden,at
4A 4 KAIG3-RFI-WG-C-4805 00 Civil Water Play Garden 3/24/22 3/27/22 Code C (resubmit)
Water Garden as highlighted area in attached drawing's.
Sand cover and pipes protection for water feature lines (HDPE 110,63 and 50 mm )inside Mist Garden,at
4A 4 KAIG3-RFI-WG-C-4805 01 Civil Water Play Garden 4/5/22 4/6/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Sand cover and pipes protection for water feature line (part 3) (HDPE 250, and 110mm )insidewater play
4A 4 KAIG3-RFI-WG-C-4806 00 Civil Water Play Garden 3/24/22 3/28/22 Code C (resubmit)
Garden,at Water Garden as highlighted area in attached drawing's..

Sand cover and pipes protection for water feature line (part 3) (HDPE 250, and 110mm )insidewater play
4A 4 KAIG3-RFI-WG-C-4806 01 Civil Water Play Garden 4/2/22 4/6/22 Approved as noted
Garden,at Water Garden as highlighted area in attached drawing's..

Excavation and Bed preparation for Sub surface Pipes Main & Sub line (110mm) along Aviary Garden
4B 4 KAIG3-RFI-WG-C-4808 00 Civil Water Play Garden 3/27/22 3/30/22 Approved as noted
(Connected to MH-C-3-1), inside Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 4th Layer Backfilling (Sub-base) (Out of 5 layers) between Boat Garden
4B 4 KAIG3-RFI-WG-C-4840 00 and Boundary wall at Span (12 & 13), inside boat garden at water Garden highlighted area in attached Civil Water Play Garden 3/27/22 3/29/22 Approved as noted
drawing's.(Stock Pile # 116)

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes Main & Sub line (110mm) along Aviary
4B 4 KAIG3-RFI-WG-C-4902 00 Garden (Connected to MH-C-3-1), inside Water Garden as highlighted area in attached drawing's.(Stock pile Civil Water Play Garden 3/29/22 4/2/22 Approved as noted
118)

Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-4903 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 3/29/22 4/2/22 Approved as noted
drawing's (Stock Pile 126)

kaig-qcals 331
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation and Bed preparation for water feature lines (part 6) (HDPE 250 mm) from Water play Garden to
4A 4 KAIG3-RFI-WG-C-4907 00 Civil Water Play Garden 3/30/22 4/2/22 Approved as noted
entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser
4A 4 KAIG3-RFI-WG-C-4924 00 Civil Site Works 3/30/22 4/3/22 Approved as noted
Garden, Inside Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of One Layer (Sub Grade) Backfilling after Sand Cover for water feature line
4A 4 KAIG3-RFI-WG-C-4925 00 (part 3) (HDPE 250 and 110mm) inside water play Garden, at Water Garden, as highlighted area in attached Civil Water Play Garden 3/31/22 4/3/22 Approved as noted
drawing's. (Stock Pile 126)

4A 4 KAIG3-RFI-WG-C-4931 00 Excavation and Soil preparation for wet well ( F ), at Water Garden as highlighted area in attached drawing's. Civil Water Play Garden 3/31/22 4/4/22 Approved as noted

Inspection and Compaction Tests of 2nd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-4939 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 3/31/22 4/5/22 Approved as noted
drawing's (Stock Pile 126)

Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/17 to 21, 23-26, 29 & 53) and
4B 4 KAIG3-RFI-WG-C-4957 00 Emergency (MH/WG/EM/7 to 13, 15 & 29), inside water play Garden, at water Garden, as highlighted in Civil Water Play Garden 4/3/22 4/10/22 Approved as noted
attached drawing's.

Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-base) (Out of 5 layers) between Boat
4B 4 KAIG3-RFI-WG-C-4970 00 Garden and Boundary wall at Span (12 & 13), inside boat garden at water Garden highlighted area in attached Civil Water Play Garden 4/3/22 4/7/22 Approved as noted
drawing's.(Stock Pile # 116)

Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F ),
4A 4 KAIG3-RFI-WG-C-4981 00 Civil Water Play Garden 4/4/22 4/9/22 Approved as noted
inside Water Garden as highlighted area in attached drawing's. (SP 126)
Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-4985 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/4/22 4/9/22 Approved as noted
Inspection
highlightedand
areaCompaction
in attached Tests of 1st(SP
drawing's. Layer (Sub Garde) Backfilling (Out of 2 Layers) for water feature
126)
4A 4 KAIG3-RFI-WG-C-4986 00 lines (HDPE 110, 63 and 50 mm) inside Mist Garden,at Water Garden as highlighted area in attached Civil Water Play Garden 4/4/22 4/9/22 Approved as noted
drawing's. (SP 126)
Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-4987 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 4/4/22 4/7/22 Code C (resubmit)
drawing's (Stock Pile 126)

Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-4987 01 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 4/9/22 4/10/22 Approved as noted
drawing's (Stock Pile 126)
Excavation and Soil preparation for Boat Garden Lake, inside Water Garden, as highlighted area in attached
4B 4 KAIG3-RFI-WG-C-4992 00 Civil Water Play Garden 4/5/22 4/10/22 Approved as noted
drawing's.
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4B 4 KAIG3-RFI-WG-C-4993 00 wall Foundation (Inner Sides) @ span 2 (from B.O.B +878.30), at Water Garden, as highlighted in Attached Civil Water Play Garden 4/5/22 4/3/22 Approved as noted
Drawing.(Stock pile # 126)

Inspection & Compaction Tests of 2nd Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F ),
4A 4 KAIG3-RFI-WG-C-5012 00 Civil Water Play Garden 4/6/22 4/10/22 Approved as noted
inside Water Garden as highlighted area in attached drawing's. (SP 126)

Inspection and Compaction Tests of 2nd Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5013 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/7/22 4/12/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection & Compaction Tests of 3rd Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F ),
4A 4 KAIG3-RFI-WG-C-5022 00 Civil Water Play Garden 4/7/22 4/11/22 Approved as noted
inside Water Garden as highlighted area in attached drawing's. (SP 126)

Excavation & Bed Preparation for Low Current Line of Fire Alarm & Security, At left side of Planted Bed 3,
4B 4 KAIG3-RFI-WG-C-5030 00 Civil Water Play Garden 4/9/22 CANCELLED
at water play Garden, inside water Garden, as highlighted area in attached drawing's.

Excavation & Bed Preparation for Electrical Lines of Low Voltage and Emergency lines, from Right side of
4B 4 KAIG3-RFI-WG-C-5031 00 Planted Bed 2 to left side of Planted Bed 3, at water play Garden, inside water Garden, as highlighted area in Civil Water Play Garden 4/9/22 CANCELLED
attached drawing's.

Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5032 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/9/22 4/12/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

kaig-qcals 332
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction Tests of 4th (Final) Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F
4A 4 KAIG3-RFI-WG-C-5036 00 Civil Water Play Garden 4/9/22 4/12/22 Approved as noted
), inside Water Garden as highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
4B 4 KAIG3-RFI-WG-C-5037 00 wall Foundation (Inner Sides) @ span 2 (from B.O.B +878.30), at Water Garden, as highlighted in Attached Civil Water Play Garden 4/9/22 4/12/22 Approved as noted
Drawing.(Stock pile # 126)

Excavation and Bed preparation for Sub surface Branch Pipe lines (160mm & 110mm) Connected to Main
4A 4 KAIG3-RFI-WG-C-5039 00 Civil Water Play Garden 4/10/22 4/13/22 Approved as noted
Line 315mm of MH-C-8, (Part 2-1) inside Mist Garden as highlighted area in attached drawing's.

Excavation and Bed preparation for water feature lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at
4A 4 KAIG3-RFI-WG-C-5040 00 Civil Water Play Garden 4/10/22 4/13/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/44 to 47) and Emergency
4B 4 KAIG3-RFI-WG-C-5045 00 Civil Water Play Garden 4/10/22 4/14/22 Approved as noted
(MH/WG/EM/25 to 28), inside Boat Garden, at water Garden, as highlighted in attached drawing's.

Inspection and Compaction Tests of 4th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5049 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/10/22 4/13/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Sand Bedding for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at Water Garden as
4A 4 KAIG3-RFI-WG-C-5050 00 Civil Water Play Garden 4/11/22 4/14/22 Code C (resubmit)
highlighted area in attached drawing's.
Sand Bedding for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at Water Garden as
4A 4 KAIG3-RFI-WG-C-5050 01 Civil Water Play Garden 4/14/22 4/16/22 Approved as noted
highlighted area in attached drawing's.

Sand Cover and Pipe Protection for Water Feature Line (Part 6) (HDPE 250 mm) from Water play Garden to
4A 4 KAIG3-RFI-WG-C-5056 00 Civil Water Play Garden 4/11/22 4/13/22 Approved as noted
entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Inspection & Compaction Tests after Excavation and Check Levels prior to Blinding of wet well ( F ), at
4A 4 KAIG3-RFI-WG-C-5057 00 Civil Water Play Garden 4/12/22 4/16/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Inspection and Compaction Tests of 5th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5069 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/12/22 4/16/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature Line
4A 4 KAIG3-RFI-WG-C-5070 00 (Part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser Garden, Inside Water Garden as Civil Water Play Garden 4/12/22 4/16/22 Approved as noted
highlighted area in attached drawing's.

Inspection and Compaction Tests of 6th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5084 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/13/22 4/17/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature Line
4A 4 KAIG3-RFI-WG-C-5091 00 (Part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser Garden, Inside Water Garden as Civil Water Play Garden 4/14/22 4/17/22 Approved as noted
highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and Final layer Sub
4B 4 KAIG3-RFI-WG-C-5095 00 Civil Water Play Garden 4/16/22 4/18/22 Approved as noted
base) for Boat Garden Lake (Part 1), inside Water Garden, as highlighted area in attached drawing's.(SP 126)

Inspection and Compaction Tests of 2nd (Final) Layer (Sub Garde) Backfilling (Out of 2 Layers)(Upto Level
4A 4 KAIG3-RFI-WG-C-5097 00 +875.70) for water feature lines (HDPE 110, 63 and 50 mm) inside Mist Garden,at Water Garden as Civil Water Play Garden 4/17/22 4/20/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection and Compaction Tests of 7th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5098 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/17/22 4/18/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Gravel 3/8 Bedding & Geotextile Surround for Sub surface Branch Pipe lines (160mm & 110mm) Connected
4A 4 KAIG3-RFI-WG-C-5099 00 Civil Water Play Garden 4/17/22 4/19/22 Approved as noted
to Main Line 315mm of MH-C-8, (Part 2-1) inside Mist Garden as highlighted in attached drawing's.(SP 118)

Excavation and Bed preparation for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyser
4A 4 KAIG3-RFI-WG-C-5100 00 Civil Water Play Garden 4/17/22 4/20/22 Approved as noted
Garden, at Water Garden as highlighted area in attached drawing's.

kaig-qcals 333
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature Line
4A 4 KAIG3-RFI-WG-C-5103 00 (Part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser Garden, Inside Water Garden as Civil Water Play Garden 4/17/22 4/19/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection and Compaction Tests of 8th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5104 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/18/22 4/19/22 Approved as noted
highlighted area in attached drawing's. (SP 126)

Inspection and Compaction Tests of 9th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub surface
4B 4 KAIG3-RFI-WG-C-5123 00 Pipes Main & Sub line (110mm) along Aviary Garden (Connected to MH-C-3-1), inside Water Garden as Civil Water Play Garden 4/19/22 4/21/22 Approved as noted
highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature Line
4A 4 KAIG3-RFI-WG-C-5125 00 (Part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser Garden, Inside Water Garden as Civil Water Play Garden 4/19/22 4/21/22 Approved as noted
highlighted area in attached drawing's. (SP 135)

Inspection and Compaction Tests of 4th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-5137 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 4/19/22 4/21/22 Approved as noted
drawing's (Stock Pile 135)

Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers), along the
4B 4 KAIG3-RFI-WG-C-5138 00 Boundary wall Foundation (Inner Sides) @ span 2 (from B.O.B +878.30 upto +879.40), at Water Garden, as Civil Water Play Garden 4/19/22 4/23/22 Approved as noted
highlighted in Attached Drawing.(Stock pile # 13

Inspection & Compaction tests of One Layer (Sub-base) Backfilling (Upto Level +872.00) (Above Sub
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5139 00 Grade) Prior to Boulders installation, Infront of Wing Walls, Near Boundary wall (Span 13), at Wadi 3, inside Civil 4/19/22 4/24/22 Approved as noted
3
water Garde, at highlighted area in attached dr

Sand Bedding for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water
4A 4 KAIG3-RFI-WG-C-5141 00 Civil Water Play Garden 4/19/22 4/21/22 Approved as noted
Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water
4A 4 KAIG3-RFI-WG-C-5155 00 Feature Line (Part 6) (HDPE 250 mm) from Water play Garden to entrance of Geyser Garden, Inside Water Civil Water Play Garden 4/20/22 4/24/22 Approved as noted
Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and Final layer Sub
4B 4 KAIG3-RFI-WG-C-5156 00 Civil Water Play Garden 4/20/22 4/23/22 Approved as noted
base) for Boat Garden Lake, inside Water Garden, as highlighted area in attached drawing's.(SP 135)
Inspection of Thrust Block for Non-Potable Water (Irrigation Line) (110mmØ UPVC Class 5) at Water Play
4A 4 KAIG3-RFI-WG-C-5158 00 Civil Water Play Garden 4/20/22 4/23/22 Approved as noted
Garden as highlighted area in attached drawing.
Inspection of Thrust Block for Irrigation Main Line 110 , 63 & 50mmØ UPVC Class 5) Geyser to Mist
4A 4 KAIG3-RFI-WG-C-5159 00 Civil Water Play Garden 4/20/22 4/23/22 Approved as noted
Garden as highlighted area in attached drawing.

Sand Bedding (after 5 layers Sub-Grade) for Water Feature Line (Part 6) (HDPE 250 mm) from Water play
4A 4 KAIG3-RFI-WG-C-5174 00 Civil Water Play Garden 4/21/22 4/24/22 Approved as noted
Garden to entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Sand Cover and Pipe Protection for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at
4A 4 KAIG3-RFI-WG-C-5188 00 Civil Water Play Garden 4/23/22 4/24/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub surface Branch
4A 4 KAIG3-RFI-WG-C-5189 00 Pipe lines (160mm & 110mm) Connected to Main Line 315mm of MH-C-8, (Part 2-1) inside Mist Garden as Civil Water Play Garden 4/23/22 4/27/22 Approved as noted
highlighted area in attached drawing's. (SP 13

Inspection and Compaction Tests of 5th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-5200 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 4/24/22 4/27/22 Approved as noted
drawing's (Stock Pile 135)

Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 2 layers) above Sand Cover for
4A 4 KAIG3-RFI-WG-C-5201 00 Water Feature Lines (part 5-1) (HDPE dia 90 mm and 110, 63 and 50mm) Inside Mist Garden, at Water Civil Water Play Garden 4/24/22 4/27/22 Approved as noted
Garden as highlighted area in attached drawing's. (

Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wing
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5218 00 Walls of SBC-09, Near Boundary wall (Span 13), at Wadi 3, inside water Garde, at highlighted area in Civil 4/25/22 4/27/22 Approved as noted
3
attached drawing's. (SP 135)

Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wing
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5220 00 Walls of SBC-09, Near Boundary wall (Span 13), at Wadi 3, inside water Garde, at highlighted area in Civil 4/26/22 4/28/22 Approved as noted
3
attached drawing's. (SP 135)

kaig-qcals 334
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Base) (After 2 layers Sub Grade) for
4B 4 KAIG3-RFI-WG-C-5228 00 Civil Water Play Garden 4/26/22 4/30/22 Approved as noted
Boat Garden Lake, inside Water Garden, as highlighted area in attached drawing's.(SP 116)

Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wing
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5237 00 Walls of SBC-09, Near Boundary wall (Span 13), at Wadi 3, inside water Garde, at highlighted area in Civil 4/27/22 5/7/22 Approved as noted
3
attached drawing's. (SP 135)

Excavation and Bed preparation for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat
4A 4 KAIG3-RFI-WG-C-5240 00 Civil Water Play Garden 4/28/22 5/7/22 Approved as noted
garden to the entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers)(Upto Level
4A 4 KAIG3-RFI-WG-C-5246 00 +875.70) for Sub surface Branch Pipe lines (160mm & 110mm) Connected to Main Line 315mm of MH-C- Civil Water Play Garden 4/28/22 5/8/22 Approved as noted
8, (Part 2-1)&inside
Inspection Mist Garden
Compaction tests ofas2nd
highlighted area in
(Final) Layer attached drawing.
Backfilling (Sub-Grade) (Out of 2 layers)(Upto Level
4A 4 KAIG3-RFI-WG-C-5249 00 +875.70) for Water Feature Lines (part 5-1) (HDPE dia 90 mm and 110, 63 and 50mm) Inside Mist Garden, Civil Water Play Garden 4/28/22 5/8/22 Approved as noted
at Water Garden as highlighted area in attached d
Inspection & Compaction tests of 8th Layer (Sub-Grade) Backfilling (Out of 8 layers and Final Layer sub
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5251 00 Base) at Behind the Wing Walls of SBC-09, Near Boundary wall (Span 13), at Wadi 3, inside water Garde, at Civil 4/28/22 5/8/22 Approved as noted
3
highlighted area in attached drawing's. (SP 1

Inspection and Compaction Tests of 10th Layer (Sub Base) Backfilling upto Bottom of Boulders (+878.40)
4B 4 KAIG3-RFI-WG-C-5254 00 (After 9 Layers of Sub Garde) for Sub surface Pipes Main & Sub line (110mm) along Aviary Garden Civil Water Play Garden 4/30/22 5/8/22 Approved as noted
(Connected to MH-C-3-1), inside Water Garden as highlig

Inspection & Compaction tests of 9th (Final) Layer (Sub-Base) Backfilling (after 8 layers Sub Grade) Prior to
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5266 00 Boulders at Behind the Wing Walls of SBC-09, Near Boundary wall (Span 13), at Wadi 3, inside Water Civil 5/7/22 5/11/22 Approved as noted
3
Garde, at highlighted area in attached drawing
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21 & 24 to 29) and
4A 4 KAIG3-RFI-WG-C-5283 00 Emergency lines (MH/WG/EM/7 to 8 & 10 to 15), Inside water play Garden, at water Garden, as highlighted Civil Water Play Garden 5/8/22 5/10/22 Approved as noted
area in attached drawing's.

Excavation & Bed Preparation for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alarm
4A 4 KAIG3-RFI-WG-C-5284 00 & Security (from MH/WG/FA/7 to 8 & 10 to 16), Inside water play Garden, at water Garden, as highlighted Civil Water Play Garden 5/8/22 5/10/22 Approved as noted
area in attached drawing's.

Excavation and Bed preparation for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Geyser
4A 4 KAIG3-RFI-WG-C-5298 00 Civil Water Play Garden 5/8/22 5/10/22 Approved as noted
Garden to Centre of Mist Garden, at Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the
4A 4 KAIG3-RFI-WG-C-5302 00 Civil Water Play Garden 5/8/22 5/11/22 Approved as noted
entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Inspection and Compaction Tests of 6th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boundary
4B 4 KAIG3-RFI-WG-C-5312 00 Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the attached Civil Water Play Garden 5/9/22 5/12/22 Approved as noted
drawing's (Stock Pile 135)

Sand Bedding for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Centre of
4A 4 KAIG3-RFI-WG-C-5326 00 Civil Water Play Garden 5/10/22 5/16/22 Approved as noted
Mist Garden, at Water Garden as highlighted area in attached drawing's.

Sand Bedding for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alarm & Security (from
4A 4 KAIG3-RFI-WG-C-5335 00 MH/WG/FA/7 to 8 & 10 to 16), Inside water play Garden, at water Garden, as highlighted area in attached Civil Water Play Garden 5/11/22 5/16/22 Approved as noted
drawing's.

Excavation and Bed preparation for water feature lines (part 7) (HDPE dia 160 mm) between Water play
4A 4 KAIG3-RFI-WG-C-5396 00 Civil Water Play Garden 5/16/22 5/19/22 Approved as noted
garden and Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (part 7) (HDPE dia 160 mm) between Water play garden and Geyser
4A 4 KAIG3-RFI-WG-C-5427 00 Civil Water Play Garden 5/17/22 5/21/22 Approved as noted
Garden, at Water Garden as highlighted area in attached drawing's.

Surface Preparation prior to Backfilling for area's of Jetty 1 & 2, at Boat Garden, inside Water Garden, as
4B 4 KAIG3-RFI-WG-C-5433 00 Civil Water Play Garden 5/19/22 5/21/22 Code C (resubmit)
highlighted area in attached drawing's.
Surface Preparation prior to Backfilling for area's of Jetty 1 & 2, at Boat Garden, inside Water Garden, as
4B 4 KAIG3-RFI-WG-C-5433 01 Civil Water Play Garden 6/1/22 6/5/22 Approved as noted
highlighted area in attached drawing's.

Sand Cover & Pipe Protection for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyser
4A 4 KAIG3-RFI-WG-C-5446 00 Civil Water Play Garden 5/19/22 5/24/22 Approved as noted
Garden, at Water Garden as highlighted area in attached drawing's.

Sand Cover & Pipe Protection for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat
4A 4 KAIG3-RFI-WG-C-5447 00 Civil Water Play Garden 5/19/22 5/22/22 Approved as noted
garden to the entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

kaig-qcals 335
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Excavation and Bed preparation for water feature lines (part 7) (HDPE dia 250 mm, 2 no's) between Water
4A 4 KAIG3-RFI-WG-C-5448 00 Civil Water Play Garden 5/19/22 5/21/22 Approved as noted
play garden and Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (part 7) (HDPE dia 250 mm, 2 no's) between Water play garden and
4A 4 KAIG3-RFI-WG-C-5462 00 Civil Water Play Garden 6/14/22 6/16/22 Approved as noted
Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Sand Cover & Pipe Protection for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Geyser
4A 4 KAIG3-RFI-WG-C-5464 00 Civil Water Play Garden 5/22/22 5/24/22 Approved as noted
Garden to Centre of Mist Garden, at Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5465 00 (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the entrance of Geyser Garden, Inside Water Civil Water Play Garden 5/22/22 5/25/22 Approved as noted
Garden as highlighted area in attached drawing.

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5466 00 (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area in attached Civil Water Play Garden 5/22/22 5/25/22 Approved as noted
drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub Base)
4B 4 KAIG3-RFI-WG-C-5467 00 for area's of Jetty 1 & 2, at Boat Garden, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Water Play Garden 5/22/22 5/25/22 Approved as noted
135)

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5468 00 (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Centre of Mist Garden, at Water Garden as Civil Water Play Garden 5/25/22 5/28/22 Approved as noted
highlighted area in attached drawing's. (SP 1

Inspection & Compaction tests of 2nd Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub Base)
4B 4 KAIG3-RFI-WG-C-5514 00 for area's of Jetty 1 & 2, at Boat Garden, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Water Play Garden 5/24/22 5/28/22 Approved as noted
135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5515 00 (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the entrance of Geyser Garden, Inside Water Civil Water Play Garden 5/24/22 5/28/22 Approved as noted
Garden as highlighted area in attached draw

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5516 00 (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area in attached Civil Water Play Garden 5/24/22 5/28/22 Approved as noted
drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub surface Branch
4A 4 KAIG3-RFI-WG-C-5551 00 Pipe lines (160mm sub main & 110mm sleeves 2no's) Connected to Main Line 315mm of MH-C-8, inside Civil Water Play Garden 5/26/22 5/30/22 Approved as noted
Mist Garden as highlighted area in attached drawi

Inspection & Compaction tests of 3rd Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub Base)
4B 4 KAIG3-RFI-WG-C-5553 00 for area's of Jetty 1 & 2, at Boat Garden, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Water Play Garden 5/26/22 5/30/22 Approved as noted
135)

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5554 00 (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the entrance of Geyser Garden, Inside Water Civil Water Play Garden 5/26/22 5/30/22 Approved as noted
Garden as highlighted area in attached draw

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5555 00 (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area in attached Civil Water Play Garden 5/26/22 5/30/22 Approved as noted
drawing's. (SP 135)

Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5564 00 (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Centre of Mist Garden, at Water Garden as Civil Water Play Garden 5/26/22 5/30/22 Approved as noted
highlighted area in attached drawing's. (SP 1

Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 4 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5593 00 (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Centre of Mist Garden, at Water Garden as Civil Water Play Garden 5/29/22 5/31/22 Approved as noted
highlighted area in attached drawing's. (SP 1

Inspection & Compaction tests of 4th Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub Base)
4B 4 KAIG3-RFI-WG-C-5594 00 for area's of Jetty 1 & 2, at Boat Garden, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Water Play Garden 5/29/22 5/31/22 Approved as noted
135)

kaig-qcals 336
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Sand Cover & Pipe Protection for water feature lines (part 7) (HDPE dia 160 mm) between Water play
4A 4 KAIG3-RFI-WG-C-5602 00 Civil Water Play Garden 5/30/22 6/1/22 Approved as noted
garden and Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 6 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5603 00 (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the entrance of Geyser Garden, Inside Water Civil Water Play Garden 5/30/22 6/1/22 Approved as noted
Garden as highlighted area in attached draw

Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5604 00 (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area in attached Civil Water Play Garden 5/30/22 6/1/22 Approved as noted
drawing's. (SP 135)
Excavation and Bed preparation for Water Feature Lines (HDPE), Surround Boat garden Lake, Inside Water
4B 4 KAIG3-RFI-WG-C-5616 00 Civil Water Play Garden 5/30/22 6/1/22 Approved as noted
Garden as highlighted area in attached drawing's.
Excavation & Surface Peparation for Foundation of Boundary Wall at Span 12 at Water Play Garden as
4B 4 KAIG3-RFI-WG-C-5642 00 Civil Water Play Garden 6/1/22 6/6/22 Approved as noted
highlighted in the attached drawing.
Sand Bedding for Water Feature Lines (HDPE), Surround Boat garden Lake, Inside Water Garden as
4B 4 KAIG3-RFI-WG-C-5647 00 Civil Water Play Garden 6/1/22 6/5/22 Approved as noted
highlighted area in attached drawing's.
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub Base) (After 4 layers Sub-Grade) for
4B 4 KAIG3-RFI-WG-C-5648 00 area's of Jetty 1 & 2, at Boat Garden, Inside Water Garden, as highlighted area in attached drawing's. (SP Civil Water Play Garden 6/1/22 6/6/22 Approved as noted
140)

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5649 00 (part 7) (HDPE dia 160 mm) between Water play garden and Geyser Garden, at Water Garden as highlighted Civil Water Play Garden 6/1/22 6/5/22 Approved as noted
area in attached drawing's.

Inspection & Compaction tests of 5th (Final) Layer (Sub-Grade) Backfilling (Out of 5 layers) for water
4A 4 KAIG3-RFI-WG-C-5669 00 feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the entrance of Geyser Garden, Civil Water Play Garden 6/4/22 6/7/22 Approved as noted
Inside Water Garden as highlighted area in attac

Inspection & Compaction tests of 4th (Final) Layer (Sub-Grade) Backfilling (Out of 4 layers) for water
4A 4 KAIG3-RFI-WG-C-5670 00 feature lines (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Centre of Mist Garden, at Water Civil Water Play Garden 6/4/22 6/8/22 Approved as noted
Garden as highlighted area in attached drawing'

Inspection & Compaction tests of 5th (Final) Layer (Sub-Grade) Backfilling (Out of 5 layers) for water
4A 4 KAIG3-RFI-WG-C-5671 00 feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area Civil Water Play Garden 6/4/22 6/7/22 Approved as noted
in attached drawing's. (SP 135)

Inspection & Compaction tests of 3rd Layer Backfilling (Out of 3 layers Sub-Grade and final layer Sub Base)
Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5681 00 Infront of SBC-08 (Wing Walls), at Wadi 3, Inside Water Garden, as highlighted area in attached drawing's. Civil 6/4/22 6/7/22 Approved as noted
3
(SP 135)

Sand Cover & Pipe Protection for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat
4B 4 KAIG3-RFI-WG-C-5682 00 Civil Water Play Garden 6/4/22 6/6/22 Approved as noted
garden to the entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Upto B.O.B level +875.379) for
4B 4 KAIG3-RFI-WG-C-5683 00 Foundation of Boundary Wall at Span 12, at Water Garden, as Highlighted area in the attached drawing's.(SP Civil Water Play Garden 6/4/22 6/8/22 Approved as noted
135)
Sand Bedding for water feature line (part 6 Branch level above) (HDPE dia 250 mm) Between Water play &
4A 4 KAIG3-RFI-WG-C-5707 00 Civil Water Play Garden 6/5/22 6/7/22 Approved as noted
Geyser Garden, at Water Garden as highlighted area in attached drawing's.
Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5708 00 (part 6 Branch Remaining) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area Civil Water Play Garden 6/5/22 6/7/22 Approved as noted
in attached drawing's. (SP 135)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5709 00 (part 7) (HDPE dia 160 mm) between Water play garden and Geyser Garden, at Water Garden as highlighted Civil Water Play Garden 6/5/22 6/7/22 Approved as noted
area in attached drawing's. (SP 135)
Sand Bedding for water feature lines (part 6 next level) (HDPE dia 250 mm) From entrance of Boat garden to
4A 4 KAIG3-RFI-WG-C-5710 00 Civil Water Play Garden 6/5/22 6/7/22 Approved as noted
the entrance of Geyser Garden, Inside Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (part 5 Next level) (HDPE dia 160 mm) from Centre of Geyser Garden
4A 4 KAIG3-RFI-WG-C-5711 00 Civil Water Play Garden 6/5/22 6/7/22 Approved as noted
to Centre of Mist Garden, at Water Garden as highlighted area in attached drawing's.
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5732 00 (part 7) (HDPE dia 160 mm) between Water play garden and Geyser Garden, at Water Garden as highlighted Civil Water Play Garden 6/6/22 6/9/22 Approved as noted
area in attached drawing's. (SP 135)
Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-5733 00 (part 6 Branch Remaining) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area Civil Water Play Garden 6/6/22 6/9/22 Approved as noted
in attached drawing's. (SP 135)

kaig-qcals 337
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of Final Layer (Sub Base) Backfilling (after 3 layers Sub-Grade) Infront of Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-5734 00 Civil 6/6/22 6/9/22 Approved as noted
SBC-08 (Wing Walls), at Wadi 3, Inside Water Garden, as highlighted area in attached drawing's. (SP 140) 3

Excavation & Soil Preparation for Open Channel (Part 3) of Wadi # 3, (Near to SBC 8) Inside Water Garden, Water Play Garden/Wadi
4A 4 KAIG3-RFI-WG-C-5819 00 Civil 6/12/22 6/13/22 Approved as noted
At Highlighted area in attached Drawings. 3

Sand Bedding (above 5 layers Sub-Grade) for water feature lines (part 7) (HDPE dia 110 & 50 mm) between
4A 4 KAIG3-RFI-WG-C-5820 00 Civil Water Play Garden 6/12/22 6/14/22 Approved as noted
Water play garden and Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Excavation & Blinding Levels for Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6 to 8) inside
4A 4 KAIG3-RFI-WG-C-5854 00 Civil Water Play Garden 6/14/22 6/18/22 Approved as noted
Mist Garden, at water Garden, as highlighted area in attached drawing's.

Excavation & Blinding Levels for Low Current Handholes of Fire Alarm & Security (MH/WG/FA/1 & 2)
4A 4 KAIG3-RFI-WG-C-5855 00 Civil Water Play Garden 6/14/22 6/18/22 Approved as noted
inside Mist Garden, at water Garden, as highlighted area in attached drawing's.

Concrete Pouring for Thrust Blocks for Water Feature Lines (Part 6) (HDPE 250 mm) from Water play
4 A/B 4 KAIG3-RFI-WG-C-5885 00 Garden to entrance of Geyser Garden and Surround Boat garden Lake, Inside Water Garden as highlighted Civil Water Play Garden 6/16/22 6/18/22 Approved as noted
area in attached drawing's & KAIG3-SCR-SW-C-0021-00-Rep

Sand Cover & Pipe Protection for water feature lines (part 6 next level) (HDPE dia 200 mm) From entrance
4A 4 KAIG3-RFI-WG-C-5948 00 of Boat garden to Geyser Garden upto Water Play Garden, Inside Water Garden as highlighted area in Civil Water Play Garden 6/19/22 6/22/22 Approved as noted
attached drawing's.

Sand Cover & Pipe Protection for water feature lines (part 5 Next level) (HDPE dia 50, 110 & 160 mm) from
4A 4 KAIG3-RFI-WG-C-5949 00 Water play Garden to Geyser Garden upto Centre of Mist Garden, at Water Garden as highlighted area in Civil Water Play Garden 6/19/22 6/21/22 Approved as noted
attached drawing's.
Sand Cover for Water Feature Lines (HDPE),Surround Boat Garden Lake,inside Water Garden,as highlighted
4B 4 KAIG3-RFI-WG-C-5953 00 Civil Water Play Garden 6/20/22 6/22/22 Approved as noted
in the attached drawings
Inspection and Compaction Tests of the 7th Layer (Sub Grade) Backfilling (out of 7 Layers) along the
4B 4 KAIG3-RFI-WG-C-5970 00 Boundary Wall Foundation (Inner Side) at Span 7 , 8, 9, 10 and 11 at Water Garden, as highlighted in the Civil Water Play Garden 6/21/22 CANCELLED
attached drawings (Stock Pile 135).
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (out of 2 layers) for Water Feature Lines
4A 4 KAIG3-RFI-WG-C-5993 00 (HDPE dia 200 mm) from Entrance of Boat Garden to the Entrace of Water Play Garden , Inside Water Civil Water Play Garden 6/22/22 6/27/22 Approved as noted
Garden , as highlighted in the attached drawings
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (out of 2 layers) for Water Feature Lines
4A 4 KAIG3-RFI-WG-C-5994 00 (HDPE dia 50, 110, 160 mm) from Water Play Garden to Geyser Garden upto Centre of Mist Garden , at Civil Water Play Garden 6/21/22 6/25/22 Approved as noted
Water Garden , as highlighted area in the atta

Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside
4A 4 KAIG3-RFI-WG-C-6021 00 Civil Water Play Garden 6/22/22 6/25/22 Approved as noted
Mist Garden, at Water Garden, as highlighted area in the attached drawings.

Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03)
4A 4 KAIG3-RFI-WG-C-6022 00 Civil Water Play Garden 6/22/22 6/25/22 Approved as noted
Inside Mist Garden, at Water Garden, as highlighted area in the attached drawings.

Sand Cover & Pipe Protection for Water Feature Lines (Part 6 next level) (HDPE dia 200 mm) at Geyser
4A 4 KAIG3-RFI-WG-C-6025 00 Civil Water Play Garden 6/22/22 6/27/22 Approved as noted
Garden Inside Water Garden, as highlighted area in the attached drawings.

Sand Cover & Pipe Protection for Water Feature Lines (Part 6 next level) (HDPE dia 200 mm) at Geyser
4A 4 KAIG3-RFI-WG-C-6025 01 Civil Water Play Garden 7/7/22 6/16/22 Approved as noted
Garden Inside Water Garden, as highlighted area in the attached drawings.

Excavation and Bed Preparation for Irrigation Sub-main Line Distribution network (Part 3) (50,110 mm),
4A 4 KAIG3-RFI-WG-C-6038 00 Civil Water Play Garden 6/23/22 6/28/22 Approved as noted
(East of Geyser Garden) at Water Garden, as highlighted area in the attached drawings.

Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (out of 2 layers) for Water Feature Lines
4A 4 KAIG3-RFI-WG-C-6068 00 (HDPE dia 200 mm) from Entrance of Boat Garden to the Entrace of Water Play Garden , Inside Water Civil Water Play Garden 6/25/22 6/29/22 Approved as noted
Garden , as highlighted in the attached drawings

kaig-qcals 338
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (out of 2 layers) for Water Feature Lines
4A 4 KAIG3-RFI-WG-C-6083 00 (HDPE dia 50, 110, 160 mm) from Water Play Garden to Geyser Garden upto Centre of Mist Garden , at Civil Water Play Garden 6/25/22 6/29/22 Approved as noted
Water Garden , as highlighted area in the Atta

Inspection & Compaction tests of 9th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water feature lines
4A 4 KAIG3-RFI-WG-C-6084 00 (part 6 Branch Remaining) (HDPE dia 250 mm) Inside Geyser Garden, at Water Garden as highlighted area Civil Water Play Garden 6/25/22 6/29/22 Approved as noted
in attached drawing's. (SP 135)Drawings (SP

Excavation and Bed preparation for water feature lines (HDPE 50mm ) at Entrance of Mist Garden,Inside
4A 4 KAIG3-RFI-WG-C-6086 00 Civil Water Play Garden 6/25/22 6/28/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Sand Bedding for water feature lines (HDPE 50mm ) at Entrance of Mist Garden,Inside Water Garden as
4A 4 KAIG3-RFI-WG-C-6087 00 Civil Water Play Garden 6/25/22 6/29/22 Approved as noted
highlighted area in the attached drawings

Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6 to 8)
4A 4 KAIG3-RFI-WG-C-6104 00 Civil Water Play Garden 6/26/22 7/2/22 Approved as noted
Inside Mist Garden,at Water Garden, as highlighted area in attached drawings.

Concrete Pouring for Blinding Under Low Current Handholes of Fire Alarm & Security (MH/WG/FA/1 & 2)
4A 4 KAIG3-RFI-WG-C-6105 00 Civil Water Play Garden 6/26/22 7/2/22 Approved as noted
Inside Mist Garden, at Water Garden, as highlighted area in attached drawings

Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside Mist Garden, at
4A 4 KAIG3-RFI-WG-C-6134 00 Civil Water Play Garden 6/28/22 7/2/22 Approved as noted
Water Garden, as highlighted area in the attached drawings.

Sand Bedding for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03) Inside Mist
4A 4 KAIG3-RFI-WG-C-6135 00 Civil Water Play Garden 6/28/22 7/2/22 Approved as noted
Garden, at Water Garden, as highlighted area in the attached drawings.

Sand Bedding for Irrigation Sub-main Line Distribution network (Part 3) (50,110 mm),(East of Geyser
4A 4 KAIG3-RFI-WG-C-6136 00 Civil Water Play Garden 6/28/22 7/4/22 Approved as noted
Garden) at Water Garden, as highlighted area in the attached drawings.

Excavation and Bed preparation for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm),
4A 4 KAIG3-RFI-WG-C-6147 00 Civil Water Play Garden 6/29/22 7/4/22 Approved as noted
Bottom Left Side of Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Sand Bedding for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm), Bottom Left Side
4A 4 KAIG3-RFI-WG-C-6203 00 Civil Water Play Garden 6/30/22 7/4/22 Approved as noted
of Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) for water feature lines
4B 4 KAIG3-RFI-WG-C-6249 00 (part 6) (HDPE dia 250 mm) near entrance of Boat garden, Inside Water Garden as highlighted area in Civil Water Play Garden 7/3/22 7/7/22 Approved as noted
attached drawing's. (SP 135)

Excavation and Compaction tests for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary
5A 5 KAIG3-RFI-WG-C-6252 00 Garden, Inside Water Garden as highlighted area in attached drawing's. (Above old Backfill Ref no. C-5609- Civil Water Play Garden 7/3/22 7/7/22 Approved as noted
00-B with SP # 133)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for water feature lines
4B 4 KAIG3-RFI-WG-C-6263 00 (part 6) (HDPE dia 250 mm) near entrance of Boat garden, Inside Water Garden as highlighted area in Civil Water Play Garden 7/4/22 7/7/22 Approved as noted
attached drawing's. (SP 135)
Sand Bedding for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary Garden, Inside
4B 4 KAIG3-RFI-WG-C-6264 00 Civil Water Play Garden 7/4/22 7/7/22 Approved as noted
Water Garden as highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) Out of 4 layers (2 layers Sub-Grade & 2
4B 4 KAIG3-RFI-WG-C-6300 00 Layer Sub Base) for water feature lines (part 6) (HDPE dia 250 mm) near entrance of Boat garden, Inside Civil Water Play Garden 7/5/22 7/13/22 Approved as noted
Water Garden as highlighted area in attached
Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Base) Out of 4 layers (2 layers Sub-
4B 4 KAIG3-RFI-WG-C-6301 00 Grade & 2 Layer Sub Base) for water feature lines (part 6) (HDPE dia 250 mm) near entrance of Boat garden, Civil Water Play Garden 7/6/22 7/14/22 Approved as noted
Inside Water Garden as highlighted area in a
Sand Cover & Pipe Protection for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary
4B 4 KAIG3-RFI-WG-C-6368 00 Civil Water Play Garden 7/13/22 7/17/22 Approved as noted
Garden, Inside Water Garden as highlighted area in attached drawing's.

Sand Cover & Pipe Protection for Water Feature Line (HDPE 50mm) at Entrance of Mist Garden,Inside
4A 4 KAIG3-RFI-WG-C-6369 00 Civil Water Play Garden 7/13/22 7/16/22 Approved as noted
Water Garden as highlighted area in attached drawing's.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Water Feature
4B 4 KAIG3-RFI-WG-C-6444 00 Lines (200mm HDPE), Between Boat garden & Aviary Garden, Inside Water Garden as highlighted area in Civil Water Play Garden 7/17/22 7/20/22 Approved as noted
attached drawing's.(SP 135)

kaig-qcals 339
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Surface Preparation prior to Backfilling Behind Boulders of Boat Garden, inside Water Garden, as
4B 4 KAIG3-RFI-WG-C-6455 00 Civil Water Play Garden 7/20/22 7/24/22 Approved as noted
highlighted area in attached drawing's.

Inspection and Compaction Tests of 7th (Final) Layer (Sub Garde) Backfilling (Out of 7 Layers) along the
4B 4 KAIG3-RFI-WG-C-6462 00 Boundary Wall Foundation (Inner side) at Span 7, 8, 9, 10 and 11 at Water Garden, as Highlighted area in the Civil Water Play Garden 7/18/22 7/23/22 Approved as noted
attached drawing's (Stock Pile 135)

Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside Mist
4A 4 KAIG3-RFI-WG-C-6463 00 Civil Water Play Garden 7/19/22 7/21/22 Approved as noted
Garden, at Water Garden, as highlighted area in the attached drawings.

Sand Cover & Protection for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03)
4A 4 KAIG3-RFI-WG-C-6492 00 Civil Water Play Garden 7/19/22 7/21/22 Approved as noted
Inside Mist Garden, at Water Garden, as highlighted area in the attached drawings.

Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside Mist
5A 5 KAIG3-RFI-WG-C-6493 00 Civil Sound & Light Garden 7/19/22 7/21/22 Approved as noted
Garden, at Water Garden, as highlighted area in the attached drawings.

Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/09 to 16 & Pulling pit to
4A 4 KAIG3-RFI-WG-C-6519 00 LV/10) and Emergency lines (Pulling pit to MH/WG/EM/01 to 06), between Mist & Geyser Garden, at water Civil Water Play Garden 7/20/22 7/23/22 Approved as noted
Garden, as highlighted area in attached drawing's.

Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/01, 03, 04, 05 & 06) &
4A 4 KAIG3-RFI-WG-C-6531 00 Low Voltage (MH/WG/LV/05, 09, 10, 11, 12, 14, 15 & 16), between Mist & Geyser Garden, inside water Civil Water Play Garden 7/21/22 7/24/22 Approved as noted
Garden, as highlighted area in attached drawing's.

Excavation & Blinding Levels for Low Current Handholes (MH/WG/LC/01 & 04) and Fire Alarm & Security
4A 4 KAIG3-RFI-WG-C-6534 00 (MH/WG/FA/03 & 06), between Mist & Geyser Garden, inside water Garden, as highlighted area in attached Civil Water Play Garden 7/21/22 7/26/22 Approved as noted
drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-6535 00 Civil Water Play Garden 7/21/22 7/26/22 Approved as noted
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Concrete Pouring for Blinding Under Electrical Handholes of Emergency (MH/WG/EM/01, 03, 04, 05 & 06)
4A 4 KAIG3-RFI-WG-C-6546 00 & Low Voltage (MH/WG/LV/05, 09, 10, 11, 12, 14, 15 & 16), between Mist & Geyser Garden, inside water Civil Water Play Garden 7/23/22 7/27/22 Approved as noted
Garden, as highlighted area in attached drawing's.

Concrete Pouring for Blinding Under Low Current Handholes (MH/WG/LC/01 & 04) and Fire Alarm &
4A 4 KAIG3-RFI-WG-C-6547 00 Security (MH/WG/FA/03 & 06), between Mist & Geyser Garden, inside water Garden, as highlighted area in Civil Water Play Garden 7/24/22 7/31/22 Approved as noted
attached drawing's.

Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/09 to 16 & Pulling pit to LV/10) and
4A 4 KAIG3-RFI-WG-C-6548 00 Emergency lines (Pulling pit to MH/WG/EM/01 to 06), between Mist & Geyser Garden, at water Garden, as Civil Water Play Garden 7/23/22 7/27/22 Approved as noted
highlighted area in attached drawing's.

Inspection of Thrust Block for Irrigation lines Submain Line Including Branches (110mmØ & 50mmØ -
4A 4 KAIG3-RFI-WG-C-6569 00 Civil Water Play Garden 7/24/22 7/26/22 Approved as noted
UPVC-Claas-5), Between Geyser Garden & Boundary Wall, as highlighted area in attached drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-6570 00 Civil Water Play Garden 7/24/22 7/28/22 Approved as noted
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) Under Water Fountain
4A 4 KAIG3-RFI-WG-C-6603 00 Civil Water Play Garden 7/26/22 7/31/22 Approved as noted
Inside Geyser Garden, at Water Garden as highlighted area in attached drawing's. (SP 135)

Concrete pouring & Shuttering for Walls & Column's @ span 20 & 21 and C20 & C21 for boundary wall at
4B KAIG3-RFI-WG-S-2518 00 Civil Water Play Garden 11/29/21 12/6/21 Approved as noted
Water Garden, as per Highlighted in Attached Drawings

Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) from Entrance wall At
KAIG3-RFI-ZG-C-1777 01 Civil Maze Garden 10/31/21 11/2/21 Approved as noted
Elevation "A to B to C" at Maze garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
KAIG3-RFI-ZG-C-1827 01 wall (Outer Side) from Elevation "B to C" at Maze garden, as per highlighted area in attached drawing's. Civil Maze Garden 11/9/21 11/13/21 Approved as noted
(Stock Pile # 117)

kaig-qcals 340
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundary
KAIG3-RFI-ZG-C-1860 01 wall (Outer Side) from Entrance wall At Elevation "A to B" at Maze garden, as per highlighted area in Civil Maze Garden 11/9/21 11/13/21 Approved as noted
attached drawing's.(Stock Pile # 117)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (Type 'A' 4
5A KAIG3-RFI-ZG-C-1953 00 no's) (MH-D-01-A1-02, MH-D-01-A1-03, MH-D-01-A4 & MH-D-01-A5) Inside Maze garden, as per Civil Maze Garden 11/2/21 11/6/21 Code C (resubmit)
highlighted area in attached drawing's. (Stock Pile # 117)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (Type 'A' 4
5A KAIG3-RFI-ZG-C-1953 01 no's) (MH-D-01-A1-02, MH-D-01-A1-03, MH-D-01-A4 & MH-D-01-A5) Inside Maze garden, as per Civil Maze Garden 11/28/21 12/2/21 Approved as noted
highlighted area in attached drawing's. (Stock Pile # 117)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundary
KAIG3-RFI-ZG-C-2016 00 wall (Outer Side) At Elevation "C to D to A" & along Entrance wall, at Maze garden, as per highlighted area Civil Maze Garden 11/6/21 11/9/21 Approved as noted
in attached drawing's.(Stock Pile # 117)

Surface preparation Prior to Backfilling (From Bottom of Blinding level upto Bottom of Finish Floor level)
KAIG3-RFI-ZG-C-2118 00 along Circular Walls (6, 7, 8, 9 & 10) Half Part 1 (Inner & Outer Sides), at Maze garden, as highlighted area Civil Maze Garden 11/13/21 11/15/21 Approved as noted
in attached drawing's.

Surface preparation Prior to Backfilling (From Bottom of Blinding level upto Bottom of Finish Floor level)
KAIG3-RFI-ZG-C-2168 00 along Circular Walls (2, 3, 4 & 5) Half Part 1 (Inner & Outer Sides), at Maze garden, as highlighted area in Civil Maze Garden 11/15/21 11/17/21 Approved as noted
attached drawing's.

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
KAIG3-RFI-ZG-C-2169 00 Between Circular Walls (9 & 10) Half Part 1, at Maze garden, as highlighted area in attached drawing's. Civil Maze Garden 11/15/21 11/18/21 Approved as noted
(Stock pile # 117)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
KAIG3-RFI-ZG-C-2208 00 Between Circular Walls 7&8 (top of sub grade 875.83 & 875.71) and 8&9 (top of sub grade 875.83 & Civil Maze Garden 11/16/21 11/20/21 Approved as noted
875.94) Half Part 1, at Maze garden, as highlighted area in attached drawing.

Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blinding
KAIG3-RFI-ZG-C-2231 00 & after laying Sub Grade) Between Circular Walls 7&8 (top of sub Base 875.03 & 875.91) 8&9 (top of sub Civil Maze Garden 11/18/21 11/23/21 Approved as noted
Base 875.03 & 876.14) and 9&10 (top of sub Bas

Surface Preparation Prior to Backfilling Between Circular Walls and the Boundary wall from Elevation "B to
KAIG3-RFI-ZG-C-2299 00 Civil Maze Garden 11/21/21 11/23/21 Approved as noted
C", (Inside) Maze garden, as per highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) Between Circular
5A KAIG3-RFI-ZG-C-2363 00 Walls and the Boundary wall from Elevation "B to C", (Inside) Maze garden, as per highlighted area in Civil Maze Garden 11/23/21 11/27/21 Approved as noted
attached drawing's. (Stock pile # 126)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2403 00 Between Circular Walls 4&5, 5&6 and 6&7 at Half Part 1, at Maze garden, as highlighted area in attached Civil Maze Garden 11/24/21 11/29/21 Approved as noted
drawing's. (Stock pile # 126)

Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2475 00 after Sub Garde, Between Circular Walls 4&5, 5&6 and 6&7 at Half Part 1, at Maze garden, as highlighted Civil Maze Garden 11/28/21 12/1/21 Approved as noted
area in attached drawing's. (Stock pile # 116)

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2548 00 Between Circular Walls 2&3 (top of sub grade 875.15 & 875.25) and 3&4 (top of sub grade 875.25 & Civil Maze Garden 12/1/21 12/8/21 Approved as noted
875.35), at Half Part 1, inside Maze garden, as highlighted

Soil preparation Prior to Backfilling (From Bottom of Blinding) along Circular Walls (2, 3, 4, 5, 6, 7, 8, 9 &
5A KAIG3-RFI-ZG-C-2549 00 Civil Maze Garden 12/1/21 12/8/21 Approved as noted
10) Half Part 2 (All Sides), at Maze garden, as highlighted area in attached drawing's.

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2595 00 Between Circular Walls 8&9 (top of sub grade 875.84 & 875.96) and 9&10 (top of sub grade 876.07 & Civil Maze Garden 12/4/21 12/8/21 Approved as noted
875.96), at Half Part 2, inside Maze garden, as highlighted

Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2639 00 after Sub Garde, Between Circular Walls 8&9 (top of sub grade 876.09 & 876.21) and 9&10 (top of sub Civil Maze Garden 12/6/21 12/11/21 Approved as noted
grade 876.21 & 876.32), at Half Part 2, inside Maze Garden

kaig-qcals 341
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2656 00 after Sub Garde, Between Circular Walls 2&3 (top of sub grade 875.40 & 875.50) and 3&4 (top of sub grade Civil Maze Garden 12/7/21 12/12/21 Approved as noted
875.50 & 875.60), at Half Part 1, inside Maze Garden

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
5A KAIG3-RFI-ZG-C-2710 00 Between Circular Walls 6&7 (top of sub grade 875.55 & 875.72) and 7&8 (top of sub grade 875.72 & Civil Maze Garden 12/9/21 12/16/21 Approved as noted
875.84), at Half Part 2, inside Maze garden, as highlighted

Soil preparation Prior to Backfilling (From Bottom of Blinding Level +875.02) along 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-2730 00 Civil Maze Garden 12/12/21 12/14/21 Approved as noted
Sides), at Right Side of Entrance of Maze garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-2794 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/14/21 12/20/21 Approved as noted
area in attached drawing's. (Stock Pile 126).

Soil preparation Prior to Backfilling along 1 Curved Wall (All Sides), Left Side at Entrance and Circular Wall
5A KAIG3-RFI-ZG-C-2855 00 (10) (Outer Sides) Half Part 2, (From Bottom of Blinding Levels +875.02 and +875.82) inside Maze garden, Civil Maze Garden 12/16/21 12/20/21 Approved as noted
as highlighted area in attached drawing

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-2856 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/16/21 12/23/21 Approved as noted
area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-2900 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/19/21 12/25/21 Approved as noted
area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-2921 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/19/21 12/25/21 Approved as noted
area in attached drawing's. (Stock Pile # 126).
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3031 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/23/21 12/28/21 Approved as noted
area in attached drawing's. (Stock Pile 126).
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3032 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/23/21 12/28/21 Approved as noted
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding) along
5A KAIG3-RFI-ZG-C-3033 00 Circular Walls 10 (Outer Side) (top of sub grade 876.07), at Half Part 2, inside Maze garden, as highlighted Civil Maze Garden 12/23/21 12/28/21 Approved as noted
area in attached drawing's. (Stock pile 126).

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3056 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/25/21 12/30/21 Approved as noted
area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3057 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/25/21 12/30/21 Approved as noted
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction tests of 6th layers for Backfilling (Sub Grade) (out of 8 layers) for 1 Curved Wall
5A KAIG3-RFI-ZG-C-3109 00 all sides at Right side of Entrance (from Bottom of Blinding Level +875.02) at Maze Garden as highlighted Civil Maze Garden 12/27/21 1/1/22 Approved as noted
area in attached drawing (stock pile 126).

Inspection & Compaction tests of 4th layers for Backfilling (Sub Grade) (out of 8 layers) for 1 Curved Wall
5A KAIG3-RFI-ZG-C-3110 00 all sides at Left side of Entrance (from Bottom of Blinding Level +875.02) at Maze Garden as highlighted Civil Maze Garden 12/27/21 1/1/22 Approved as noted
area in attached drawing (stock pile 126).

Inspection & Compaction tests of Final layer for Backfilling (Sub Base) after Sub Grade (start from bottom of
5A KAIG3-RFI-ZG-C-3112 00 Blinding ) along Circular Walls 10 (outer side) (top of Sub Base 876.32) at half part 2 inside Maze Garden as Civil Maze Garden 12/27/21 1/1/22 Approved as noted
highlighted area in attached drawing (stock pile 116).

kaig-qcals 342
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3116 00 Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/28/21 1/3/22 Approved as noted
area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3136 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/28/21 1/1/22 Approved as noted
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction tests of 8th (Final) Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved
5A KAIG3-RFI-ZG-C-3139 00 Wall (All Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as Civil Maze Garden 12/29/21 1/4/22 Code C (resubmit)
highlighted area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 8th (Final) Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved
5A 5 KAIG3-RFI-ZG-C-3139 01 Wall (All Sides), at Right Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as Civil Maze Garden 2/1/22 2/6/22 Code C (not resubmit)
highlighted area in attached drawing's. (Stock Pile 126).

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall (All
5A KAIG3-RFI-ZG-C-3140 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 12/29/21 1/4/22 Code C (resubmit)
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall (All
5A 5 KAIG3-RFI-ZG-C-3140 01 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 2/1/22 2/6/22 Code C (not resubmit)
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall (All
5A 5 KAIG3-RFI-ZG-C-3175 00 Sides), at Left Side of Entrance (From Bottom of Blinding Level +875.02), at Maze garden, as highlighted Civil Maze Garden 1/2/22 1/8/22 Code C (not resubmit)
area in attached drawing's. (Stock Pile # 126).

Inspection & Compaction Tests of Final Layer Sub Base Backfilling (after Sub grade) Between Circular
5A 5 KAIG3-RFI-ZG-C-3222 00 Walls 6&7 and 7&8, at Half Part 2, inside Maze garden, as highlighted area in attached drawing's.(Stock pile Civil Maze Garden 1/5/22 1/11/22 Approved as noted
# 116)

Soil preparation Prior to Backfilling along Walls (Outer Sides) at 2 Straight Walls, Circular Wall 1 (Outer
5A 5 KAIG3-RFI-ZG-C-3237 00 Side at Half part 1 & Both Sides at Half part 2) and Small Straight wall (All Sides), (From Bottom of Civil Maze Garden 1/5/22 1/9/22 Approved as noted
Blinding Levels +874.66 and +874.45) inside M

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (Outer
5A 5 KAIG3-RFI-ZG-C-3267 00 Sides) at 3 Straight Walls and Circular Wall 1 (Outer Side) inside Maze garden, as highlighted area in Civil Maze Garden 1/8/22 1/12/22 Approved as noted
attached drawing's.

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (Outer
5A 5 KAIG3-RFI-ZG-C-3305 00 Sides) at 3 Straight Walls and Circular Wall 1 (Outer Side) inside Maze garden, as highlighted area in Civil Maze Garden 1/10/22 1/15/22 Approved as noted
attached drawing's.

Inspection & Compaction Tests of First Layer Sub Grade Backfilling Between Circular Walls 2&3, 3&4, 4&5
5A 5 KAIG3-RFI-ZG-C-3306 00 Civil Maze Garden 1/10/22 1/15/22 Approved as noted
and 5&6, at Half Part 2, inside Maze garden, as highlighted area in attached drawing's.(Stock pile # 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (Outer
5A 5 KAIG3-RFI-ZG-C-3329 00 Sides) at 3 Straight Walls and Circular Wall 1 (Outer Side) inside Maze garden, as highlighted area in Civil Maze Garden 1/11/22 1/17/22 Approved as noted
attached drawing's. (Stock pile # 126)

Soil preparation Prior to Backfilling Between 2 Straight Walls and at Entrance, inside Maze garden, (From
5A 5 KAIG3-RFI-ZG-C-3407 00 Civil Maze Garden 1/16/22 1/19/22 Code C (resubmit)
Bottom of Blinding Levels +875.02, +874.66 and +874.45), as highlighted area in attached drawing's.

Soil preparation Prior to Backfilling Between 2 Straight Walls and at Entrance, inside Maze garden, (From
5A 5 KAIG3-RFI-ZG-C-3407 01 Civil Maze Garden 1/30/22 2/2/22 Approved as noted
Bottom of Blinding Levels +875.02, +874.66 and +874.45), as highlighted area in attached drawing's.

Inspection & Compaction tests Prior to Blinding under Circular Walls (Remaining part), inside Maze garden,
5A 5 KAIG3-RFI-ZG-C-3432 00 Civil Maze Garden 1/17/22 1/22/22 Approved as noted
as highlighted area in attached drawing's.
Excavation & Soil preparation for Electrical Low Voltage Manholes (16 no's), inside Maze garden, as
5A 5 KAIG3-RFI-ZG-C-3433 00 Civil Maze Garden 1/18/22 1/23/22 Approved as noted
highlighted area in attached drawing's.

kaig-qcals 343
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests after Excavation for Electrical Low Voltage Manholes (16 no's), inside Maze
5A 5 KAIG3-RFI-ZG-C-3434 00 Civil Maze Garden 1/18/22 1/23/22 Approved as noted
garden, as highlighted area in attached drawing's.

Concrete Pouring for Blinding under Electrical Low Voltage Handholes (16 no's), (MH/ZG/LV/1 to
5A 5 KAIG3-RFI-ZG-C-3469 00 Civil Maze Garden 1/20/22 2/1/22 Approved as noted
MH/ZG/LV/16) inside Maze garden, as highlighted area in attached drawing's.

Excavation & Soil preparation for Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10), Fire
5A 5 KAIG3-RFI-ZG-C-3610 00 Alarm & Security (MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05 & 08-12), inside Maze garden, as Civil Maze Garden 1/27/22 2/1/22 Approved as noted
highlighted area in attached drawing's.

Inspection & Compaction tests after Excavation for Electrical Handholes of Emergency (MH/ZG/EM/01-06
5A 5 KAIG3-RFI-ZG-C-3611 00 & 09-10), Fire Alarm & Security (MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05 & 08-12), inside Civil Maze Garden 1/27/22 2/1/22 Approved as noted
Maze garden, as highlighted area in attached drawing's.

Concrete pouring for Blinding under Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10), Fire
5A 5 KAIG3-RFI-ZG-C-3612 00 Alarm & Security (MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05 & 08-12), inside Maze garden, as Civil Maze Garden 1/27/22 2/1/22 Approved as noted
highlighted area in attached drawing's.

Excavation & Bed preparation for Water Feature Lines from centre to outside, beside Plant room, at Maze
5A 5 KAIG3-RFI-ZG-C-3646 00 Civil Maze Garden 1/30/22 2/2/22 Approved as noted
garden, as highlighted area in attached drawing's.
Sand Bedding for Water Feature Lines from centre to outside, beside Plant room, at Maze garden, as
5A 5 KAIG3-RFI-ZG-C-3696 00 Civil Maze Garden 1/31/22 2/5/22 Approved as noted
highlighted area in attached drawing's.

Inspection for Installation of Electrical Handholes of Low Voltage (10 no's), (MH/ZG/LV/1-5 & 12-16)
5A 5 KAIG3-RFI-ZG-C-3720 00 Civil Maze Garden 1/31/22 2/19/22 Approved as noted
inside Maze garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Straight
5A 5 KAIG3-RFI-ZG-C-3756 00 Walls and at Entrance, inside Maze garden, (From Bottom of Blinding Levels +875.02, +874.66 and Civil Maze Garden 2/2/22 2/7/22 Approved as noted
+874.45), as highlighted area in attached drawing's.(St

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Straight
5A 5 KAIG3-RFI-ZG-C-3829 00 Walls and at Entrance, inside Maze garden, (From Bottom of Blinding Levels +875.02, +874.66 and Civil Maze Garden 2/6/22 2/10/22 Approved as noted
+874.45), as highlighted area in attached drawing's.(St

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Straight
5A 5 KAIG3-RFI-ZG-C-3862 00 Walls and at Entrance, inside Maze garden, (From Bottom of Blinding Levels +875.02, +874.66 and Civil Maze Garden 2/7/22 2/14/22 Approved as noted
+874.45), as highlighted area in attached drawing's.(St

Inspection of Installed Electrical Handholes of Low Voltage (MH/ZG/LV/6, 10 & 11), Emergency
4A 5 KAIG3-RFI-ZG-C-3864 00 (MH/ZG/EM/01-06 & 09-10), Fire Alarm & Security (MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05, Civil Maze Garden 2/7/22 2/23/22 Approved as noted
09-11 & 13) inside Maze garden, as highlighted area in attached draw

Sand Cover & Pipes Protection for Water Feature Lines (110mmØ CLASS-PE100) from centre to outside,
5A 5 KAIG3-RFI-ZG-C-3906 00 Civil Maze Garden 2/8/22 2/12/22 Approved as noted
beside Plant room, at Maze garden, as highlighted area in attached drawing's.

Sand Bedding for Water Feature Line (63mmØ) from centre to outside, beside Plant room, at Maze garden, as
5A 5 KAIG3-RFI-ZG-C-3920 00 Civil Maze Garden 2/12/22 2/16/22 Approved as noted
highlighted area in attached drawing's.

Sand Cover & Pipes Protection for Water Feature Line (63mmØ) from centre to outside, beside Plant room, at
5A 5 KAIG3-RFI-ZG-C-4092 00 Civil Maze Garden 2/16/22 2/21/22 Approved as noted
Maze garden, as highlighted area in attached drawing's.

Surface Preparation Prior to Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garden, as
5A 5 KAIG3-RFI-ZG-C-4262 00 Civil Maze Garden 2/27/22 3/2/22 Approved as noted
per highlighted area in attached drawing's.
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/ZG/EM/07 & 08),
5A 5 KAIG3-RFI-ZG-C-4296 00 (MH/ZG/LV/07 & 08) & Telecom (MH/ZG/TC/09 ), inside Maze garden, as highlighted area in attached Civil Maze Garden 2/28/22 3/5/22 Approved as noted
drawing's.

Concrete pouring for blinding under Electrical Handholes of Emergency (MH/ZG/EM/07 & 08),
5A 5 KAIG3-RFI-ZG-C-4307 00 (MH/ZG/LV/07 & 08) & Telecom (MH/ZG/TC/09 ), inside Maze garden, as highlighted area in attached Civil Maze Garden 2/28/22 3/3/22 Approved as noted
drawing's.
1st layer Gravel Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garden, as per
4D 5 KAIG3-RFI-ZG-C-4331 00 Civil Maze Garden 3/1/22 3/5/22 Approved as noted
highlighted area in attached drawing's . ( STOCK PILE 118)

kaig-qcals 344
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
2nd layer Gravel Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garden, as per
5A 5 KAIG3-RFI-ZG-C-4377 00 Civil Maze Garden 3/3/22 3/7/22 Approved as noted
highlighted area in attached drawing's . ( STOCK PILE 118)
Excavation & Blinding Levels for Manholes of (MH/ZG/TC/06) and (MH/ZG/LV/09 ), at Maze Garden, as
5A 5 KAIG3-RFI-ZG-C-4468 00 Civil Maze Garden 3/7/22 3/12/22 Approved as noted
highlighted area in attached drawing's.

5A 5 KAIG3-RFI-ZG-C-4490 00 Excavation and Bed preparation for Electric line, at Maze Garden, as highlighted area in attached drawing's. Civil Maze Garden 3/8/22 3/12/22 Approved as noted

5A 5 KAIG3-RFI-ZG-C-4545 00 Compaction tests after Excavation of Electric line, at Maze Garden, as highlighted area in attached drawing's. Civil Maze Garden 3/13/22 cancelled

5A 5 KAIG3-RFI-ZG-C-4627 00 Sand Bedding for Electric Line at Maze Garden as highlighted area in attached drawing. Civil Maze Garden 3/17/22 3/20/22 Approved as noted

5A 5 KAIG3-RFI-ZG-C-4682 00 Sand Bedding for Low current line, at Maze Garden, as highlighted area in attached drawing's. Civil Maze Garden 3/17/22 3/20/22 Approved as noted

Excavation and Soil preparation under location of foundation of plant room at Mazer Garden as highlighted
5A 5 KAIG3-RFI-ZG-C-4745 00 Civil Maze Garden 3/22/22 3/24/22 Approved as noted
area in attached drawing's.

5A 5 KAIG3-RFI-ZG-C-4842 00 Soil preparation prior to Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, at highlighted area Civil
in attached drawing's.
Maze Garden 3/29/22 3/31/22 Approved as noted

Inspection of 1st Layer Gravel Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, at
5A 5 KAIG3-RFI-ZG-C-4901 00 Civil Maze Garden 3/29/22 3/30/22 Approved as noted
highlighted area in attached drawing's.(SP 118)
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of Damp
5A 5 KAIG3-RFI-ZG-C-4909 00 proofing for Encasement concrete of Manholes (MH-D-01-A3), Inside Maze Garden, at highlighted area in Civil Maze Garden 3/30/22 3/31/22 Approved as noted
attached drawing's.
Inspection of 2nd Layer Gravel Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, at
5A 5 KAIG3-RFI-ZG-C-4926 00 Civil Maze Garden 3/31/22 4/3/22 Approved as noted
highlighted area in attached drawing's.(SP 118)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) (After 2 layers Gravel)
5A 5 KAIG3-RFI-ZG-C-4944 00 Surround the Manhole (MH-D-01-A3), Inside Maze Garden, at highlighted area in attached drawing's.(SP Civil Maze Garden 4/2/22 4/6/22 Approved as noted
126)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers Gravel)
5A 5 KAIG3-RFI-ZG-C-5044 00 Civil Maze Garden 4/10/22 4/13/22 Approved as noted
Surround the Manhole (MH-D-01-A3), at Maze Garden, at highlighted area in attached drawing's.(SP 126)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers Gravel)
5A 5 KAIG3-RFI-ZG-C-5068 00 Civil Maze Garden 4/12/22 4/14/22 Approved as noted
Surround the Manhole (MH-D-01-A3), at Maze Garden, at highlighted area in attached drawing's.(SP 126)

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers Gravel)
5A 5 KAIG3-RFI-ZG-C-5092 00 Civil Maze Garden 4/14/22 4/17/22 Approved as noted
Surround the Manhole (MH-D-01-A3), at Maze Garden, at highlighted area in attached drawing's.(SP 126)

Excavation & Compaction Test for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and
5A 5 KAIG3-RFI-ZG-C-5172 00 Civil Maze Garden 4/26/22 5/5/22 Code C (not resubmit)
Emergency (from MH/ZG/EM/5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Excavation & Compaction Test for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and
5A 5 KAIG3-RFI-ZG-C-5172 01 Civil Maze Garden 4/30/22 5/8/22 Approved as noted
Emergency (from MH/ZG/EM/5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Excavation & Compaction Test for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alarm
5A 5 KAIG3-RFI-ZG-C-5173 00 Civil Maze Garden 4/26/22 5/5/22 Code C (not resubmit)
& Security (from MH/ZG/FA/4 to 5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Excavation & Compaction Test for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alarm
5A 5 KAIG3-RFI-ZG-C-5173 01 Civil Maze Garden 4/30/22 5/8/22 Approved as noted
& Security (from MH/ZG/FA/4 to 5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Surface preparation Prior to Backfilling (At Bottom of Blinding level) along Circular Walls (Remaining
5A 5 KAIG3-RFI-ZG-C-5238 00 Civil Maze Garden 4/27/22 5/7/22 Approved as noted
Parts) (All sides), Inside Maze Garden, at highlighted area in attached drawing's.

Sand Bedding for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and Emergency (from
5A 5 KAIG3-RFI-ZG-C-5276 00 Civil Maze Garden 5/7/22 5/11/22 Approved as noted
MH/ZG/EM/5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alarm & Security (from
5A 5 KAIG3-RFI-ZG-C-5277 00 Civil Maze Garden 5/7/22 5/11/22 Approved as noted
MH/ZG/FA/4 to 5 to 6), Inside Maze Garden, as highlighted area in attached drawing's.

Excavation & Bed preparation for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01, at
5A 5 KAIG3-RFI-ZG-C-5297 00 Civil Maze Garden 5/8/22 5/11/22 Approved as noted
Maze garden, as highlighted area in attached drawing's.
Inspection & Compaction Tests of Backfilling (Sub Grade) (Upto level +876.20) for Support from bothsides
5A 5 KAIG3-RFI-ZG-C-5303 00 of Sand bedding for Electrical & Low Current Lines, Inside Maze Garden, as highlighted area in attached Civil Maze Garden 5/9/22 5/12/22 Approved as noted
drawing's. (SP 135)

kaig-qcals 345
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Sand Bedding for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01, at Maze garden, as
5A 5 KAIG3-RFI-ZG-C-5324 00 Civil Maze Garden 5/10/22 5/16/22 Approved as noted
highlighted area in attached drawing's.
Sand Cover and Pipe Protection for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01, at
5A 5 KAIG3-RFI-ZG-C-5434 00 Civil Maze Garden 5/19/22 5/21/22 Approved as noted
Maze garden, as highlighted area in attached drawing's.
Inspection of Installed Low Current Handholes of Telecom (MH/ZG/TC/06 & 08) inside Maze garden, as
5A 5 KAIG3-RFI-ZG-C-5535 00 Civil Maze Garden 5/26/22 5/31/22 Approved as noted
highlighted area in attached drawing's.

Inspection & Compaction Tests of 1 st layer Backfilling (Sub-Grade) (Out of 2 Layers) Along Circular Wall
5A 5 KAIG3-RFI-ZG-C-6035 00 Civil Maze Garden 6/23/22 6/28/22 Approved as noted
(some Parts),Inside Maze Garden, as highlighted area in the attached drawings (SP 135).

Surface Preparation and Compaction Tests Prior to Backfilling for Support from bothside for Sand Cover of
5A 5 KAIG3-RFI-ZG-C-6133 00 Civil Maze Garden 6/28/22 7/2/22 Approved as noted
Electrical and Low Current Lines, Inside Maze Garden, as highlighted area in attached drawing's.

Inspection & Compaction Tests of 2nd (Final) layer Backfilling (Sub-Grade) (Out of 2 Layers) Along
5A 5 KAIG3-RFI-ZG-C-6146 00 Civil Maze Garden 6/28/22 7/2/22 Approved as noted
Circular Wall (some Parts),Inside Maze Garden, as highlighted area in the attached drawings (SP 135).

Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze
5A 5 KAIG3-RFI-ZG-C-6169 00 Civil Maze Garden 6/29/22 7/4/22 Code C (resubmit)
Garden, as highlighted area in attached drawing's
Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze
5A 5 KAIG3-RFI-ZG-C-6169 01 Civil Maze Garden 7/17/22 7/20/22 Approved as noted
Garden, as highlighted area in attached drawing's

Inspection & Compaction Tests of Backfilling (Sub Grade) for Support from bothsides of Sand Cover of
5A 5 KAIG3-RFI-ZG-C-6316 00 Civil Maze Garden 7/5/22 7/14/22 Approved as noted
Electrical Lines, Inside Maze Garden, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction Tests of Backfilling (Sub Grade) for Support from bothsides of Sand Cover of Low
5A 5 KAIG3-RFI-ZG-C-6317 00 Civil Maze Garden 7/5/22 7/14/22 Approved as noted
Current Lines, Inside Maze Garden, as highlighted area in attached drawing's. (SP 135)

Sand Cover & Protection for Electrical Lines of Low Voltage (from MH/ZG/LV/1 to 16, 2 to 5, 6 to 11 and
5A 5 KAIG3-RFI-ZG-C-6318 00 Some part between 6 to 10) and Emergency (from MH/ZG/EM/1 to 10, 2 to 6 & Some part between 1 to 2), Civil Maze Garden 7/6/22 7/7/22 Approved as noted
Inside Maze Garden, as highlighted area in attache

Sand Cover & Protection for Low Current Lines of Telecom (from MH/ZG/TC/2 to 5, 13 to 1 & Some part
5A 5 KAIG3-RFI-ZG-C-6319 00 between 1 to 2) and Fire Alarm & Security (from MH/ZG/FA/2 to 8, 8 to 1 & Some part between 1 to 2), Civil Maze Garden 7/6/22 7/7/22 Approved as noted
Inside Maze Garden, as highlighted area in attached dr

Surface Preparation prior to Backfilling along Foundation of Plant Room (Inner sides) from Inside Maze
5A 5 KAIG3-RFI-ZG-C-6371 00 Civil Maze Garden 7/13/22 7/16/22 Approved as noted
Garden, at highlighted area in attached drawing's.

Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation of
5A 5 KAIG3-RFI-ZG-C-6421 00 Civil Maze Garden 7/16/22 7/20/22 Approved as noted
Plant Room (Inner sides) from Inside Maze Garden, at highlighted area in attached drawing's.(SP 135)

Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation of
5A 5 KAIG3-RFI-ZG-C-6422 00 Civil Maze Garden 7/18/22 7/23/22 Approved as noted
Plant Room (Inner sides) from Inside Maze Garden, at highlighted area in attached drawing's.(SP 135)

Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze Garden, as
5A 5 KAIG3-RFI-ZG-C-6458 00 Civil Maze Garden 7/18/22 7/23/22 Approved as noted
highlighted area in attached drawing's & KAIG3-SCR-ZG-LC-0030-00-Reply

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation of
5A 5 KAIG3-RFI-ZG-C-6459 00 Civil Maze Garden 7/18/22 7/26/22 Approved as noted
Plant Room (Inner sides) from Inside Maze Garden, at highlighted area in attached drawing's.(SP 135)

Warning Tiles & Tape for Electrical Lines of Low Voltage (from MH/ZG/LV/1 to 16, 2 to 5, 6 to 11 and
5A 5 KAIG3-RFI-ZG-C-6460 00 Some part between 6 to 10) and Emergency (from MH/ZG/EM/1 to 10, 2 to 6 & Some part between 1 to 2), Civil Maze Garden 7/18/22 7/20/22 Approved as noted
Inside Maze Garden, as highlighted area in attached d

Warning Tiles & Tape for Low Current Lines of Telecom (from MH/ZG/TC/2 to 5, 13 to 1 & Some part
5A 5 KAIG3-RFI-ZG-C-6461 00 between 1 to 2) and Fire Alarm & Security (from MH/ZG/FA/2 to 8, 8 to 1 & Some part between 1 to 2), Civil Maze Garden 7/18/22 7/20/22 Approved as noted
Inside Maze Garden, as highlighted area in attached drawi

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation of
5A 5 KAIG3-RFI-ZG-C-6551 00 Civil Maze Garden 7/23/22 7/27/22 Approved as noted
Plant Room (Inner sides) from Inside Maze Garden, at highlighted area in attached drawing's.(SP 135)
Surface Preparation & Compaction Tests of Existing fill Material for Electrical Lines of Low Voltage (from
5A 5 KAIG3-RFI-ZG-C-6568 00 MH/ZG/LV/06 to 09) and Emergency (from MH/ZG/EM/01 to 07 to 08), Inside Maze Garden, as highlighted Civil Maze Garden 7/24/22 7/31/22 Approved as noted
area in attached drawing's. (Previous Stock Pile
kaig-qcals 346
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) along
5A 5 KAIG3-RFI-ZG-C-6596 00 Foundation of Plant Room (Inner sides) from Inside Maze Garden, at highlighted area in attached drawing's. Civil Maze Garden 7/26/22 7/31/22 Approved as noted
(SP 135)
2nd Coat Damp Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to A" @ Maze Garden,
4A KAIG3-RFI-ZG-S-2766 00 Civil Water Play/Mist Garden 12/12/21 12/13/21 Approved as noted
At Highlighted Area in Attached Drawing's.

2B 2 KAIG3-RFI-SW-C-6628 00 INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLY G-O-28 - as highlighted Civil Site Work 7/27/22 7/31/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) for Storm Water Line from
6A 6 KAIG3-RFI-SW-C-6629 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
MH-M-03 to MH-M-04 at Zone-6A - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit G/MV/26,
G5 5 KAIG3-RFI-SW-C-6630 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
G/MV/15, G/MV/25 and G/MV/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit F/MV/11 at
F4 4 KAIG3-RFI-SW-C-6631 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit K/MV/01,
K4 4 KAIG3-RFI-SW-C-6632 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
K/MV/02 at Zone-K - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Non-
F4 4 KAIG3-RFI-SW-C-6633 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
Potable Water Line at Zone- F - as highlighted in the attached drawing (Stock Pile# 133 A-1-B)

Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (Stock
B3 3 KAIG3-RFI-SW-C-6634 00 Civil Site Work 7/27/22 8/1/22 Approved as noted
Pile# 132)

GK5 5 KAIG3-RFI-SW-C-6635 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K - As highlighted Civil Site Work 7/27/22 7/31/22 Approved as noted

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( Dia315&400mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6636 00 Storm Water pipe Out Fall-O From (MH-O-08-1 to MH-O-11) Including Branches and Gullyes G-O- Civil Site Work 7/27/22 7/31/22 Approved as noted
(09,13,14,15,16,17,18,19&28) Connected with main Line.As per

'Pipe Installation of Strom Water pipe OUT FALL-O for ( Dia315&400mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6637 00 Storm Water pipe Out Fall-O From (MH-O-08-1 to MH-O-11) Including manhole(MH-O-08,MH-O- Civil Site Work 7/27/22 8/1/22 Approved as noted
09&MH-O-10) and Gullyes G-O-(09,13,14,15,16,17,18,19&28) Connected wi

2M 6 KAIG3-RFI-VG-C-6638 00 Notification to start laying of lower membrane (EPDM) at DEVONIAN GARDEN zone 2M (as highlighted) Civil Devonian Garden 7/27/22 7/31/22 Approved as noted

Inspection and compaction test 2nd layer for backfilling for Childcare Zone 2N (as highlighted) (2nd of 2nd
2N 2 KAIG3-RFI-CC-C-6639 00 Civil Child Care 7/27/22 8/6/22 Approved as noted
layer) SP#125
Sand Bedding for Water Feature Lines (90mm Supply and 160mm Drain pipes) At Fountain 3, inside Physic
4D 4 KAIG3-RFI-PG-C-6640 00 Civil Physic Garden 7/27/22 8/1/22 Approved as noted
Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-6641 00 Civil Water Play Garden 7/27/22 8/1/22 Approved as noted
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6642 00 Lines (Main 160 dia.HDPE) From Plant Room to Outer Conopy 3 (Outer side) at Physic Garden, as Civil Physic Garden 7/27/22 8/1/22 Approved as noted
highlighted area in the attached drawings.(SP 135)

Sand Bedding for Irrigation Lines (63 dia.) from Outer Canopy 1 to Outer Canopy 3 (Outer side), at Physic
4D 4 KAIG3-RFI-PG-C-6643 00 Civil Physic Garden 7/27/22 8/1/22 Approved as noted
garden, as highlighted area in attached drawing's.

Excavation and Bed preparation for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden
4A 4 KAIG3-RFI-WG-C-6644 00 Civil Water Play Garden 7/27/22 7/31/22 Approved as noted
to Fountain of Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Inspection and compaction test 1st and 2nd layer Backfilling strip footing at CRESCENT between PC 22-24
1D 6 KAIG3-RFI-CO-C-6645 00 Civil Crescent 7/27/22 8/3/22 Approved as noted
Axis 01/L - 01/K (as Highlighted) Zone 1D( 1st and 2nd of 3rd Layers)

Inspection and compaction test 1st and 2nd layer for Backfilling strip footing at CRESCENT between PC 92-
2A 6 KAIG3-RFI-CO-C-6646 00 Civil Crescent 7/27/22 8/2/22 Approved as noted
94 axis 02A - 02B (as Highlighted) Zone 2A( 1st and 2nd of 4th Layers)

Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - G/MV/13, G/MV/38 at
G 5 KAIG3-RFI-SW-C-6648 00 Civil Site Work 7/28/22 8/1/22 Approved as noted
Zone-G (As Highlighted) (SCR: KAIG3-SCR-SW-E0081-00)

kaig-qcals 347
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/13, G/MV/38 at Zone-G (As
G 5 KAIG3-RFI-SW-C-6649 00 Civil Site Work 7/28/22 7/31/22 Approved as noted
Highlighted) ( SCR: KAIG3-SCR-SW-E0081-00)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/13 and G/MV/38 at Zone-G (As
G 5 KAIG3-RFI-SW-C-6650 00 Civil Site Work 7/28/22 8/1/22 Approved as noted
Highlighted) ( SCR: KAIG3-SCR-SW-E0081-00)

2 2 KAIG3-RFI-SW-C-6651 00 Inspection for Casting the Blinding Concrete under the Gully for G-O-32, G-O-34 (as Highlighted) Civil Site Work 7/28/22 8/2/22 Approved as noted

"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-45, G-O-32, G-O-34 -
2B 2 KAIG3-RFI-SW-C-6652 00 Civil Site Work 7/28/22 8/1/22 Approved as noted
as highlighted "
3 3 KAIG3-RFI-SW-C-6653 00 Inspection of Excavation for RO Water Line at Area-B - As highlighted Civil Site Work 7/28/22 8/1/22 Approved as noted
Inspection of Excavation for MV Line from C/MV/30 to C/MV/03 including Pit - C/MV/03 at Zone-C - as
L5 5 KAIG3-RFI-SW-C-6654 00 Civil Site Work 7/28/22 8/1/22 Approved as noted
highlighted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) for Storm Water Line from MH-
6A 6 KAIG3-RFI-SW-C-6655 00 Civil Site Work 7/28/22 8/2/22 Approved as noted
M-03 to MH-M-04 at Zone-6A - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit F/MV/11 at
F4 4 KAIG3-RFI-SW-C-6656 00 Civil Site Work 7/28/22 8/2/22 Approved as noted
Zone-F - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit K/MV/01,
K4 4 KAIG3-RFI-SW-C-6657 00 Civil Site Work 7/28/22 8/2/22 Approved as noted
K/MV/02 at Zone-K - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Non-
F4 4 KAIG3-RFI-SW-C-6658 00 Civil Site Work 7/28/22 8/2/22 Approved as noted
Potable Water Line at Zone- F - as highlighted in the attached drawing (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6659 00 Civil Site Work 7/28/22 8/2/22 Code C (resubmit)
between F/MV/01 to F/MV/09 at Zone-F - As Highlighted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6659 01 Civil Site Work 8/13/22 Open
between F/MV/01 to F/MV/09 at Zone-F - As Highlighted

"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Fire & Security Line Pit
K5 5 KAIG3-RFI-SW-C-6660 00 K/FS/24, K/FS/17, K/FS/13, K/FS/14, K/FS/16 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)" Civil Site Work 7/28/22 8/2/22 Approved as noted

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
6B 6 KAIG3-RFI-SW-C-6661 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for storm water pipe from G-O-46 to G-O-47 and G- Civil Site Work 7/28/22 7/31/22 Approved as noted
O-47 to SBC1 corner As attached
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR MH-M-02 and MH-M-
L5 5 KAIG3-RFI-SW-C-6662 00 Civil Site Work 7/28/22 8/3/22 Approved as noted
05 (AS ATTACHED)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-
L5 5 KAIG3-RFI-SW-C-6663 00 Civil Site Work 7/28/22 Open
M-02 and MH-M-05 (As Highlighted)
"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Telecommunication Line
K5 5 KAIG3-RFI-SW-C-6664 00 Pit K/TL/26, K/TL/04, K/TL/21, K/TL/05, K/TL/07 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)" Civil Site Work 7/28/22 8/2/22 Approved as noted

Surface Preparation prior to start water proofing for MV Line Pit B/MV/10, and G/MV/28 at Zone-B and
BG KAIG3-RFI-SW-C-6665 00 Civil Site Work 7/30/22 8/31/22 Approved as noted
Zone-G (As Highlighted)
Inspection and compaction test 3rd and 4th layer Backfill ffor MCPE 2 Axis 02AB-02AD, Zone 2J (as
2J 6 KAIG3-RFI-MC-C-6666 00 Civil MCPE 2 7/28/22 8/2/22 Approved as noted
highlighted) (3rd and 4th of 12th layer) SP#125
Inspection and compaction test 3rd and 4th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
2B 6 KAIG3-RFI-CF-C-6667 00 Civil Cefeteria 7/28/22 8/2/22 Approved as noted
highlighted) (3rd and 4th of 12th layer) SP#125
Inspection and compaction test 10th layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R
2R 2 KAIG3-RFI-CO-C-6668 00 Civil Crescent 7/28/22 8/2/22 Approved as noted
(10th of 10th layer)
Surface Preparation prior to backfilling inside Cafeteria building W10 and W11 btween Axis 02B - 02C zone
2A 6 KAIG3-RFI-CO-C-6669 00 Civil Cefeteria 7/28/22 8/2/22 Approved as noted
2A (as Highlighted)

Sand Bedding for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden to Fountain of
4A 4 KAIG3-RFI-WG-C-6670 00 Civil Water Play Garden 7/28/22 8/2/22 Approved as noted
Geyser Garden, at Water Garden as highlighted area in attached drawing's.

2L 6 KAIG3-RFI-CO-C-6671 00 Surface Preparation for Mockup soil permability at crescent internal garden (as Highlighted) Zone 2L Civil Crescent 8/2/22 Open

2L 6 KAIG3-RFI-CO-C-6672 00 150mm Gravel 3/4 for Mockup soil permability at crescent internal garden (as Highlighted) Zone 2L Civil Crescent 7/28/22 8/2/22 Approved as noted

H6 6 KAIG3-RFI-SW-C-6673 00 NGL for Disposal Material in Wadi-03 (Right Side) as per attached data. Civil Site Work 7/28/22 7/31/22 Approved as noted
Excavation for Wadi-03 (Left Side) upto excavation level as per the approved shop drawing KAIG3-SD-SW-
H6 6 KAIG3-RFI-SW-C-6674 00 Civil Site Work 7/28/22 7/31/22 Approved as noted
L-HP-2026-00 - as attached data.

kaig-qcals 348
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Laying lower EPDM layer including TWO Protection layers of Geotextile as per approved matrial as
2M 6 KAIG3-RFI-VG-C-6675 00 Civil Devonian Garden 7/30/22 8/3/22 Approved as noted
highlighted , at DEVONIAN GARDEN, Zone 2M
Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6676 00 Water pipe Out Fall-M ( MH-M-04 to MH-M-05 to MH-M-06 ).As per high lighted Area in the attached Civil Site Work 7/31/22 8/2/22 Approved as noted
Dwg.

'Pipe Installation (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-M ( MH-M-04 to
7 6 KAIG3-RFI-SW-C-6677 00 Civil Site Work 7/30/22 8/7/22 Approved as noted
MH-M-05 to MH-M-06 ).As per high lighted Area in the attached Dwg.

4 4 KAIG3-RFI-SW-C-6678 00 Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - As Highlighted Civil Site Work 7/30/22 8/3/22 Approved as noted

"Inspection for Casting the Concrete Encasement and Surface Preperation prior to start waterproofing and
6B 6 KAIG3-RFI-SW-C-6679 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Storm Water Line and Short piece for Gullies G- Civil Site Work 7/30/22 8/3/22 Approved as noted
E-04, G-E-05, G-E-06, G-E-16, G-E-17 - As

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6680 00 Civil Site Work 7/30/22 8/3/22 Code C (resubmit)
between F/MV/01 to F/MV/09 at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)"

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV Line
F4 4 KAIG3-RFI-SW-C-6680 01 Civil Site Work 8/14/22 Open
between F/MV/01 to F/MV/09 at Zone-F - As Highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
B3 3 KAIG3-RFI-SW-C-6681 00 Civil Site Work 7/30/22 8/2/22 Approved as noted
from B/MV/01 to B/MV/22 at Zone-B as highlighted (SP# 133)

Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC-NPW/FC at Zone-B - as
B3 3 KAIG3-RFI-SW-C-6682 00 Civil Site Work 7/31/22 8/4/22 Code C (resubmit)
highlighted

Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC-NPW/FC at Zone-B - as
B3 3 KAIG3-RFI-SW-C-6682 01 Civil Site Work 8/13/22 Open
highlighted

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) for Storm Water Line from MH-
6A 6 KAIG3-RFI-SW-C-6683 00 Civil Site Work 7/31/22 8/4/22 Approved as noted
M-03 to MH-M-04 at Zone-6A - As Highlighted (Stock Pile # 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/04,
FG4 4 KAIG3-RFI-SW-C-6684 00 Civil Site Work 7/31/22 8/4/22 Approved as noted
G/MV/01 at Zone-F,G - As Highlighted (Stock Pile # 133 A-1-B)

4 4 KAIG3-RFI-SW-C-6685 00 Inspection of Excavation for RO Water Line at Area-A &D - As highlighted Civil Site Work 7/31/22 8/2/22 Approved as noted
Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for B/MV/10 and
BG35 5 KAIG3-RFI-SW-C-6686 00 Civil Site Work 7/30/22 8/2/22 Approved as noted
G/MV/28 (As Highlighted)

Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 3 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-6687 00 Civil Site Work 7/30/22 8/2/22 Approved as noted
MH-O-01 and MH-O-08 - As Highlighted (SP# 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 3 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-6688 00 Civil Site Work 7/30/22 8/2/22 Approved as noted
MH-K-07 and MH-K-09 - As Highlighted (SP# 131 A-1-B)

2B 2 KAIG3-RFI-SW-C-6689 00 Surface Preparation Prior to Start Backfill Gravel for Manhole MH-K-08 & MH-K-09 As Highlighted Civil Site Work 7/30/22 8/2/22 Approved as noted

Surface Preparation prior to start backfilling Fire&Security Line Pit K/FS/04, K/FS/09, K/FS/05 and K/FS/06
K5 5 KAIG3-RFI-SW-C-6690 00 Civil Site Work 7/31/22 8/4/22 Code C (resubmit)
at zone K (As Highlighted)
Surface Preparation prior to start backfilling Fire&Security Line Pit K/FS/04, K/FS/09, K/FS/05 and K/FS/06
K5 5 KAIG3-RFI-SW-C-6690 01 Civil Site Work 8/15/22 Open
at zone K (As Highlighted)
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21) and Emergency lines
4A 4 KAIG3-RFI-WG-C-6691 00 (MH/WG/EM/7 to 8), Inside water play Garden, at water Garden, as highlighted area in attached drawing's. Civil Water Play Garden 7/30/22 8/2/22 Approved as noted
(SP # 132)

Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) at (Inner side) of the
4B 4 KAIG3-RFI-WG-C-6692 00 Civil Water Play Garden 7/30/22 8/2/22 Approved as noted
Boundary wall Span 3, 4, 5 & 6 of Water Garden, as highlighted area in attached drawing's. (SP 135)

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) for Electrical Lines of
5A 5 KAIG3-RFI-SG-C-6693 00 Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (from MH/SG/EM/3 to 4), at Sound & Light Civil Sound & Light Garden 7/30/22 8/2/22 Approved as noted
Garden, as highlighted area in attached drawing's. (SP

kaig-qcals 349
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) for Low Current Lines
5A 5 KAIG3-RFI-SG-C-6694 00 of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alarm & Security (from MH/SG/FA/1-2-3-4-5 to 6), Civil Sound & Light Garden 7/30/22 8/2/22 Approved as noted
at Sound & Light Garden, as highlighted area in

Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) Under Water
4A 4 KAIG3-RFI-WG-C-6695 00 Civil Water Play Garden 7/30/22 8/2/22 Approved as noted
Fountain Inside Geyser Garden, at Water Garden as highlighted area in attached drawing's. (SP 135)

Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency
4A 4 KAIG3-RFI-WG-C-6696 00 Civil Water Play Garden 7/31/22 8/4/22 Approved as noted
lines (MH/WG/EM/25 to 28), inside Boat Garden, at water Garden, as highlighted area in attached drawing's.

Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31),
4A 4 KAIG3-RFI-WG-C-6697 00 Civil Water Play Garden 7/31/22 8/4/22 Approved as noted
inside Boat Garden, at water Garden, as highlighted area in attached drawing's.

Excavation and Bed preparation for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside Butterfly
4C 4 KAIG3-RFI-TG-C-6698 00 Civil Butterfly Garden 7/31/22 8/6/22 Approved as noted
Garden, as highlighted area in attached drawing's.

Inspection & Compaction tests of 3rd (final) Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the wall
4D 4 KAIG3-RFI-PG-C-6699 00 Civil Physic Garden 7/31/22 8/6/22 Approved as noted
(Inner Side) of Plant room, from Inside Physic Garden, as highlighted in attached drawing's.(SP 135)

Excavation and Soil preparation for Fountain 1, Along the wall (Inner Side) of Plant room, from Inside Physic
4D 4 KAIG3-RFI-PG-C-6700 00 Civil Physic Garden 7/31/22 8/6/22 Approved as noted
Garden, as highlighted in attached drawing's.

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-6701 00 Civil Water Play Garden 7/31/22 8/6/22 Approved as noted
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Inspection and compaction test 1st and 2nd layer for Backfillinginside Cafeteria building btween Axis 02A -
2A 2 KAIG3-RFI-CF-C-6702 00 Civil Cafeteria 7/31/22 8/7/22 Approved as noted
02D zone 2A (as Highlighted)( 1st and 2nd of 5th Layers)

Inspection and compaction test 13th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6703 00 Civil MCPE 3 7/31/22 8/4/22 Approved as noted
(13th of 13th layer) SP#125
Inspection and compaction test 11th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
2E 6 KAIG3-RFI-MC-C-6704 00 Civil MCPE 3 7/31/22 8/4/22 Approved as noted
highlighted) (11th of 11th layer) SP#125
Inspection and compaction test 1st and 2nd layer Mockup soil permability at crescent internal garden (as
2L 6 KAIG3-RFI-CO-C-6705 00 Civil Crescent 7/31/22 8/4/22 Approved as noted
Highlighted) Zone 2L (1st and 2nd of 12th layer)
Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/10, K/TL/15, K/TL/19
K5 5 KAIG3-RFI-SW-C-6706 00 Civil Site Work 7/31/22 8/4/22 Code C (resubmit)
and K/TL/16 at Zone-K - as highlighted
Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/10, K/TL/15, K/TL/19
K5 5 KAIG3-RFI-SW-C-6706 01 Civil Site Work 8/15/22 Open
and K/TL/16 at Zone-K - as highlighted

Inspection and Compaction Test for backfilling sub-grade 2nd Layer ( 2 of 3 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-6707 00 Civil Site Work 7/31/22 8/6/22 Approved as noted
MH-O-01 and MH-O-08 - As Highlighted (SP# 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 2nd Layer ( 2 of 3 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-6708 00 Civil Site Work 7/31/22 8/4/22 Approved as noted
MH-K-07 and MH-K-09 - As Highlighted (SP# 131 A-1-B)

2B 2 KAIG3-RFI-SW-C-6709 00 Inspection Backfilling Gravel 1st layer ( 1 of 2 ) for Manhole MH-K-08 & MH-K-09 As Highlighted Civil Site Work 7/31/22 8/2/22 Approved as noted

Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Primer (1st
G5 5 KAIG3-RFI-SW-C-6710 00 Civil Site Work 8/1/22 Open
Coat, 2nd Coat and 3rd Coat) for G/MV/02 and G/MV/03 (As Highlighted)

Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - B/MV/11 at Zone-B (As
B 2 KAIG3-RFI-SW-C-6711 00 Civil Site Work 8/3/22 Open
Highlighted)
Inspection and compaction test 7th and 8th layer for Backfilling at MCPE 2 wall inner axis AA-E (as
2H 6 KAIG3-RFI-MC-C-6712 00 Civil MCPE 2 7/31/22 8/7/22 Approved as noted
highlighted) zone 2H (7th and 8th of 12th Layer)SP#125

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside MV Line from B/MV/06
BG3 3 KAIG3-RFI-SW-C-6713 00 Civil Site Work 7/31/22 8/6/22 Approved as noted
to B/MV/13 and B/MV/12 to G/MV/08 at Zone-B&G -As Highlighted (Stock Pile# 131 A-1-B)

C2 2 KAIG3-RFI-SW-C-6714 00 Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/06 - as highlighted. Civil Site Work 7/31/22 8/6/22 Code C (resubmit)

C2 2 KAIG3-RFI-SW-C-6714 01 Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/06 - as highlighted. Civil Site Work 8/21/22 Open

kaig-qcals 350
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

C2 2 KAIG3-RFI-SW-C-6715 00 Surface Preparation prior to start backfilling around Fire Water Line Pit for C/F/16, C/F/17 - as highlighted. Civil Site Work 7/31/22 8/6/22 Approved as noted

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) beside Fire & Security
B3 3 KAIG3-RFI-SW-C-6716 00 Civil Site Work 7/31/22 8/6/22 Approved as noted
Distribution Line from B/FS/27 to B/FS/36 - As Highlighted (Stock Pile# 131 A-1-B)

Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from B/TL/36 and B/TL/35
B3 3 KAIG3-RFI-SW-C-6717 00 Civil Site Work 7/31/22 8/2/22 Approved as noted
at Zone-B - As Highlighted (Stock Pile# 138)

Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line from
BG3 3 KAIG3-RFI-SW-C-6718 00 Civil Site Work 8/1/22 Open
B/TL/39 to G/TL/33 at Zone-B & Zone-G (As Highlighted)"

Inspection and compaction test 3rd layer for Backfilling strip footing at CRESCENT between PC 92-94 axis
2A 6 KAIG3-RFI-CO-C-6719 00 Civil Crescent 7/31/22 8/4/22 Approved as noted
02A - 02B (as Highlighted) Zone 2A( 3rd of 4th Layers)
Inspection and compaction test 5th and 6th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as
2J 6 KAIG3-RFI-MC-C-6720 00 Civil MCPE 2 7/31/22 8/6/22 Approved as noted
highlighted) (5th and 6th of 12th layer) SP#125
Inspection and compaction test 5th and 6th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
2B 6 KAIG3-RFI-CF-C-6721 00 Civil Cafeteria 7/31/22 8/6/22 Approved as noted
highlighted) (5th and 6th of 12th layer) SP#125

Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feature
4D 4 KAIG3-RFI-PG-C-6722 00 Lines (Main 160 dia.HDPE) From Plant Room to Outer Conopy 3 (Outer side) at Physic Garden, as Civil Physic Garden 7/31/22 8/6/22 Approved as noted
highlighted area in the attached drawings.(SP 135)

Inspection and compaction test 1st and 2nd layer for Backfilling retianing wall Axis 01/AA - 01/AH, (as
1J 1K 6 KAIG3-RFI-CO-C-6723 00 Civil Crescent 8/1/22 Open
highlighted) Zone 1j 1k (1st & 2nd of 3rd layer) "

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6724 00 Civil Site Work 8/1/22 Open
Boulder in Wadi-03 (Left Side) - as highlighted (Stock Pile # 131 A-1-B)

C3 3 KAIG3-RFI-SW-C-6725 00 Inspection of Excavation for Non-Potable Water Line at Zone-C - as highlighted Civil Site Work 8/2/22 Open
4 4 KAIG3-RFI-SW-C-6726 00 Inspection of Formwork for the Footing and Kicker of SBC-07 - As Highlighted Civil Site Work 8/2/22 Open

4 4 KAIG3-RFI-SW-C-6727 00 Inspection of Concrete Pouring for the Footing and Kicker of SBC-07 - As Highlighted Civil Site Work 8/2/22 Open

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) for Storm Water Line from MH-
6A 6 KAIG3-RFI-SW-C-6728 00 Civil Site Work 8/2/22 Open
M-03 to MH-M-04 at Zone-6A - As Highlighted (Stock Pile # 133 A-1-B)

Inspection for Installation of Slab for MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
BG4 4 KAIG3-RFI-SW-C-6729 00 Civil Site Work 8/2/22 Open
Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel for Manhole MH-
2B 6 KAIG3-RFI-SW-C-6730 00 Civil Site Work 8/2/22 Open
K-08 & MH-K-09 - As Highlighted (Stock Pile# 131 A-1-B)

Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
C3 3 KAIG3-RFI-SW-C-6731 00 Civil Site Work 8/1/22 Open
attached Dwg.
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in the
C3 3 AIG3-RFI-SW-C-6732 00 Civil Site Work 8/1/22 Open
attached Dwg.
Sand Cover & Protection for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8), Inside Maze Garden,
5A 5 KAIG3-RFI-ZG-C-6733 00 Civil Maze Garden 8/1/22 Open
as highlighted area in attached drawing's. (SP 132)

Warning Tiles & Warning Tape for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8), Inside Maze
5A 5 KAIG3-RFI-ZG-C-6734 00 Civil Maze Garden 8/1/22 Open
Garden, as highlighted area in attached drawing's.

Surface Preparation Prior to Backfilling along Foundation of Plant Room (from Outer sides)(at B.O.B Level
5A 5 KAIG3-RFI-ZG-C-6735 00 Civil Maze Garden 8/1/22 Open
+874.98) at Maze Garden, at highlighted area in attached drawing's.

Surface preparation for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inner line (as
2D 2 KAIG3-RFI-CO-C-6736 00 Civil Crescent 8/1/22 Open
highlighted) at CRESCENT ,KAIG3-SCR-CO-S-0193-00

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-G for (PP 600 mm Ø- UPVC Pipes-Class 4 ) for
4C 4 KAIG3-RFI-SW-C-6737 00 Civil Site Work 8/1/22 Open
Storm Water pipe Out Fall-G ( MH-G-06 to MH-G-07 ).As per high lighted Area in the attached Dwg.

Warning Tape Installation in pipes OUT FALL-G for(PP 600 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
4C 4 KAIG3-RFI-SW-C-6738 00 Civil Site Work 8/1/22 Open
pipe Out Fall-G ( MH-G-06 to MH-G-07 ).As per high lighted Area in the attached Dwg.

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for
7 6 KAIG3-RFI-SW-C-6739 00 Civil Site Work 8/2/22 Open
Storm Water pipe Out Fall-M ( MH-M-11 to MH-M-12 ).As per high lighted Area in the attached Dwg.

kaig-qcals 351
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6740 00 Civil Site Work 8/2/22 Open
Water pipe Out Fall-M ( MH-M-11 to MH-M-12 ).As per high lighted Area in the attached Dwg.

Inspection and compaction test 3rd and 4th layer for Mockup soil permability at crescent internal garden (as
2L 6 KAIG3-RFI-CO-C-6741 00 Civil Crescent 8/2/22 Open
Highlighted) Zone 2L (3th and 4th of 12th layer)SP#125

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling between Boundary Wall & Circular
5A 5 KAIG3-RFI-ZG-C-6742 00 Civil Maze Garden 8/2/22 Open
Walls, all around Inside Maze Garden, as highlighted area in attached drawing's. (SP 140)

Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Outer Face) (At Bottom of
4B 4 KAIG3-RFI-AG-C-6743 00 Civil Aviary Garden 8/10/22 Open
Blinding Level) @ Grid (1-23/Left Side), at Aviary Garden, As per Highlighted in attached Drawing's.

Inspection and compaction test 1st layer Backfilling around strip footing at Chid Care between (as
2N 6 KAIG3-RFI-CC-C-6744 00 Civil Child Care 8/2/22 Open
Highlighted) Zone 2N( 1st of 5th Layers)
Warning Tape Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area
C 3 KAIG3-RFI-SW-C-6746 00 Civil Site Work 8/2/22 Open
in the attached Dwg.

Inspection and FDT for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Non-Potable Water
K5 5 KAIG3-RFI-SW-C-6747 00 Civil Site Work 8/6/22 Open
Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and FDT for backfilling Sub-grade 2nd Laye (2 of 4) above Sand Covering for Non-Potable Water
K5 5 KAIG3-RFI-SW-C-6748 00 Civil Site Work 8/3/22 Open
Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Primer (1st
G5 5 KAIG3-RFI-SW-C-6749 00 Civil Site Work 8/3/22 Open
Coat, 2nd Coat and 3rd Coat) for G/MV/08, G/MV/09, G/MV/34, G/MV/35 and G/MV/36 (As Highlighted)

Inspection and Compaction Test for backfilling sub-grade 3rd Layer ( 3 of 3 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-6750 00 Civil Site Work 8/3/22 Open
MH-O-01 and MH-O-08 - As Highlighted (SP# 131 A-1-B)

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for
7 6 KAIG3-RFI-SW-C-6751 00 Civil Site Work 8/3/22 Open
Storm Water pipe Out Fall-M ( MH-M-04 to MH-M-03 ).As per high lighted Area in the attached Dwg.

Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6752 00 Civil Site Work 8/3/22 Open
Water pipe Out Fall-M ( MH-M-04 to MH-M-03 ).As per high lighted Area in the attached Dwg.

Inspection and compaction test 7th and 8th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
2B 6 KAIG3-RFI-CF-C-6753 00 Civil Cafeteria 8/3/22 Open
highlighted) (7th and 8th of 12th layer) SP#125
Inspection and compaction test 11th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6754 00 Civil MCPE 1 8/3/22 Open
Zone 2M 2N ( 11th of 12th layer) SP#125
Inspection and compaction test 14th and 15th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
2G 6 KAIG3-RFI-CO-C-6755 00 Civil Crescent 8/3/22 Open
zone 2G as highlighted ( 14th & 15th of 16 layers )

Inspection and compaction test 5th, 6th and 7th layer for Mockup soil permability at crescent internal garden
2L 6 KAIG3-RFI-CO-C-6756 00 Civil Crescent 8/4/22 Open
(as Highlighted) Zone 2L (5th, 6th and 7th of 12th layer)SP#125

Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/24 to 28) and Emergency lines
4A 4 KAIG3-RFI-WG-C-6757 00 Civil Water Play Garden 8/3/22 Open
(MH/WG/EM/10 to 15), Inside water play Garden, at water Garden, as highlighted area in attached drawing's.

Sand Cover & Protection for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alarm &
4A 4 KAIG3-RFI-WG-C-6758 00 Security (from MH/WG/FA/7 to 8 & 10 to 16), Inside water play Garden, at water Garden, as highlighted Civil Water Play Garden 8/3/22 Open
area in attached drawing's.

Bedding of Gravel 3/8" and Geotextile surrounding in pipes (110 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6759 00 Civil Site Work 8/4/22 Open
Water pipe Out Fall-K Next to ( MH-K-09 ) .As per high lighted Area in the attached Dwg.

Pipe Installation(110 mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-K Next to ( MH-K-09 ).As
7 6 KAIG3-RFI-SW-C-6760 00 Civil Site Work 8/4/22 Open
per high lighted Area in the attached Dwg.
H6 6 KAIG3-RFI-SW-C-6761 00 Soil Preparation under Boulder No. WRB- 54 priior to start cutting Civil Site Work 8/3/22 Open
H6 6 KAIG3-RFI-SW-C-6762 00 Soil Preparation under Boulder No. WRB- 55 priior to start cutting Civil Site Work 8/3/22 Open

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) beside MV Line from B/MV/06
B3 3 KAIG3-RFI-SW-C-6763 00 Civil Site Work 8/3/22 Open
to B/MV/13 and B/MV/12 to G/MV/08 at Zone-B&G -As Highlighted (Stock Pile# 131 A-1-B)

kaig-qcals 352
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) beside Fire & Security
B3 3 KAIG3-RFI-SW-C-6764 00 Civil Site Work 8/3/22 Open
Distribution Line from B/FS/27 to B/FS/36 - As Highlighted (Stock Pile# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Pit B/MV/09,
B3 3 KAIG3-RFI-SW-C-6765 00 Civil Site Work 8/3/22 Open
B/MV/12, B/MV/19 at Zone-B - As Highlighted (Stock Pile# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Gravel for Manhole MH-
2B 2 KAIG3-RFI-SW-C-6766 00 Civil Site Work 8/3/22 Open
K-08 & MH-K-09 - As Highlighted (Stock Pile# 131 A-1-B)

Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C - as highlighted (Stock Pile #
C3 3 KAIG3-RFI-SW-C-6767 00 Civil Site Work 8/3/22 Open
132)

3 3 KAIG3-RFI-SW-C-6768 00 Inspection of Sand bedding under pipe for RO Water Line at Area-B - As highlighted (Stock Pile# 132) Civil Site Work 8/3/22 Open

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-6769 00 Civil Site Work 8/3/22 Open
Water Line at Zone- C - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Plaza Area - as highlighted in
3 3 KAIG3-RFI-SW-C-6770 00 Civil Site Work 8/3/22 Open
the attached drawing (SP# 132)

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-E for ( 315 mm Ø- UPVC Pipes-Class 4 ) for
5A 5 KAIG3-RFI-SW-C-6771 00 Storm Water pipe Out Fall-E between ( G-E-03,G-E-04,G-E-05,G-E-06,G-E-16,G-E-17 to connection with Civil Site Work 8/3/22 Open
main line).As per high lighted Area in the attached Dw

Warning Tape Installation in pipes OUT FALL-E for ( 315 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
5A 5 KAIG3-RFI-SW-C-6772 00 pipe Out Fall-E between ( G-E-03,G-E-04,G-E-05,G-E-06,G-E-16,G-E-17 to connection with main line).As Civil Site Work 8/3/22 Open
per high lighted Area in the attached Dwg.

Excavation for Hot Water (Supply and Return) pipes and CHW (Supply and Return) pipes at MCPE 3 axis
2F 6 KAIG3-RFI-CO-C-6773 00 Civil MCPE 3 8/7/22 Open
03A to axis 03C as highlighted Zone 2F (as highlighted)

Excavation and Removal of Disposal Material in Wadi-03 (Right Side) as per approved shop drawing
H6 6 KAIG3-RFI-SW-C-6774 00 Civil Site Work 8/4/22 Open
KAIG3-SD-SW-L-HP-2026-00 and DAR Civil Team Instruction's.

H6 6 KAIG3-RFI-SW-C-6775 00 Soil Preparation under Boulder No. WRB-25 Civil Site Work 8/4/22 Open

4 4 KAIG3-RFI-SW-C-6776 00 Inspection of Sand bedding under pipe for RO Water Line at Area-A &D - As highlighted (Stock Pile# 132) Civil Site Work 8/4/22 Open

G4 4 KAIG3-RFI-SW-C-6777 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-G - as highlighted (Stock Pile# 132) Civil Site Work 8/4/22 Open

G4 4 KAIG3-RFI-SW-C-6778 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-G - as highlighted (Stock Pile# 132) Civil Site Work 8/4/22 Open

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/11 to C/TL/12
C3 3 KAIG3-RFI-SW-C-6779 00 Civil Site Work 8/6/22 Open
and C/TL/15 to C/TL/11 at Zone-C - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from C/FS/10 to C/FS/09 and
C3 3 KAIG3-RFI-SW-C-6780 00 Civil Site Work 8/6/22 Open
C/FS/08 to C/FS/12 at Zone-C - As Highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-6781 00 Civil Site Work 8/4/22 Open
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)
Inspection of Thrust Block for RO Water Line ( Dia 200mm) at Zone-B,C,H - As Highlighted ( SCR :
6 6 KAIG3-RFI-SW-C-6783 00 Civil Site Work 8/7/22 Open
KAIG3-SCR-SW-C-0021-00 )

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-6784 00 Civil Site Work 8/6/22 Open
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Sand Bedding for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside Butterfly Garden, as
4C 4 KAIG3-RFI-TG-C-6785 00 Civil Butterfly Garden 8/6/22 Open
highlighted area in attached drawing's.
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency lines
4A 4 KAIG3-RFI-WG-C-6786 00 Civil Water Play Garden 8/4/22 Open
(MH/WG/EM/25 to 28), inside Boat Garden, at water Garden, as highlighted area in attached drawing's.

Sand Bedding for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31), inside Boat
4A 4 KAIG3-RFI-WG-C-6787 00 Civil Water Play Garden 8/4/22 Open
Garden, at water Garden, as highlighted area in attached drawing's.

Inspection of Thrust Block for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden to
4A 4 KAIG3-RFI-WG-C-6788 00 Civil Water Play Garden 8/4/22 Open
Fountain of Geyser Garden, at Water Garden as highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) for Electrical
5A 5 KAIG3-RFI-SG-C-6789 00 Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (from MH/SG/EM/3 to 4), at Sound & Civil Sound & Light Garden 8/4/22 Open
Light Garden, as highlighted area in attached drawin
kaig-qcals 353
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Laying lower EPDM layer including TWO Protection layers of Geotextile as per approved matrial as
2M 6 KAIG3-RFI-VG-C-6790 00 Civil Devonian Garden 8/4/22 Open
highlighted , at DEVONIAN GARDEN, Zone 2M

Inspection and compaction test 2nd layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
2A 6 KAIG3-RFI-CF-C-6791 00 Civil Cafeteria 8/4/22 Open
zone 2A (as Highlighted)( 2nd of 5th Layers)
Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 21-23-25 Axis 01K -
1D 6 KAIG3-RFI-CO-C-6792 00 Civil Crescent 8/4/22 Open
01M (as Highlighted) Zone 1D

Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) for Low
5A 5 KAIG3-RFI-SG-C-6793 00 Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alarm & Security (from MH/SG/FA/1- Civil Sound & Light Garden 8/4/22 Open
2-3-4-5 to 6), at Sound & Light Garden, as highlighted

Excavation for Electrical Line of LV Submain Cable Containment , at water Play Garden inside Water
4A 4 KAIG3-RFI-WG-C-6794 00 Civil Water Play Garden 8/6/22 Open
Garedn, as highlighted area in attached drawing's.

Excavation for Electrical Line From Pulling Pit to (MH/WG/LV/23) to (MH/WG/LV/22) , at water Play
4A 4 KAIG3-RFI-WG-C-6795 00 Civil Water Play Garden 8/6/22 Open
Garden inside Water Garedn, as highlighted area in attached drawing's.

Excavation & Blinding Levels for Electrical Handhole of Low Voltage (MH/WG/LV/22) at Water Play
4A 4 KAIG3-RFI-WG-C-6796 00 Civil Water Play Garden 8/6/22 Open
Garden, inside water Garden, as highlighted area in attached drawing's.

Warning Tiles & Warning Tape for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21),
4A 4 KAIG3-RFI-WG-C-6797 00 ((MH/WG/LV/24 to 28) and Emergency lines (MH/WG/EM/07 to 08) , (MH/WG/EM/10 to 15), Inside water Civil Water Play Garden 8/6/22 Open
play Garden, at water Garden, as highlighted area in attached drawing's.

G4 4 KAIG3-RFI-SW-C-6798 00 Surface Preparation prior to start backfilling around MV Line Pit G/MV/28 at Zone-G (As Highlighted) Civil Site Work 8/6/22 Open

Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/38 at Zone-G (As Highlighted) ( SCR:
G5 5 KAIG3-RFI-SW-C-6799 00 Civil Site Work 8/6/22 Open
KAIG3-SCR-SW-E0081-00)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/38 at Zone-G (As Highlighted)
G5 5 KAIG3-RFI-SW-C-6800 00 Civil Site Work 8/6/22 cancelled
( SCR: KAIG3-SCR-SW-E0081-00)
Warning Tiles & Warning Tape for Low Current Lines (from MH/WG/LC/5 to 9) and Fire Alarm & Security
4A 4 KAIG3-RFI-WG-C-6801 00 (from MH/WG/FA/7 to 8 & 10 to 16), Inside water play Garden, at water Garden, as highlighted area in Civil Water Play Garden 8/6/22 Open
attached drawing's.
H6 6 KAIG3-RFI-SW-C-6803 00 Soil Preparation under Boulder No. WRB- 54 after cutting Civil Site Work 8/6/22 Open
H6 6 KAIG3-RFI-SW-C-6804 00 Soil Preparation under Boulder No. WRB- 55 after cutting Civil Site Work 8/6/22 Open

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for
6 6 KAIG3-RFI-SW-C-6806 00 Civil Site Work 8/6/22 Open
Boulder in Wadi-03 (Left Side) - as highlighted (Stock Pile # 134 A-1-A)

Inspection and Compaction Test for backfilling Sub-Base (as Rock area) under Boulder No. WRB- 54 - As
H6 6 KAIG3-RFI-SW-C-6807 00 Civil Site Work 8/6/22 Open
Highlighted (SP# 134 A-1-A)
Inspection and Compaction Test for backfilling Sub-Base (as Rock area) under Boulder No. WRB- 55 - As
H6 6 KAIG3-RFI-SW-C-6808 00 Civil Site Work 8/6/22 Open
Highlighted (SP# 134 A-1-A)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Boulder No. WRB-25 - As
H6 6 KAIG3-RFI-SW-C-6809 00 Civil Site Work 8/6/22 Open
Highlighted (Stock Pile# 133 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Boulder No. WRB-25 -
H6 6 KAIG3-RFI-SW-C-6810 00 Civil Site Work 8/7/22 Open
As Highlighted (Stock Pile# 133 A-1-B)
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 3 layers) along Foundation of
5A 5 KAIG3-RFI-ZG-C-6811 00 Plant Room (from Outer sides)(at B.O.B Level +874.98) at Maze Garden, at highlighted area in attached Civil Maze Garden 8/6/22 Open
drawing's.

Inspection and compaction test 8th and 9th layer for Mockup soil permability at crescent internal garden (as
2L 6 KAIG3-RFI-CO-C-6812 00 Civil Crescent 8/7/22 Open
Highlighted) Zone 2L (8th and 9th of 12th layer)SP#125

Inspection and compaction test 9th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 6 KAIG3-RFI-CF-C-6813 00 Civil Cafeteria 8/7/22 Open
(9th of 12th layer) SP#125
Inspection and compaction test 3rd layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
2A 6 KAIG3-RFI-CF-C-6814 00 Civil Cafeteria 8/7/22 Open
zone 2A (as Highlighted)( 3rd of 5th Layers)
Inspection and compaction test 12th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-6815 00 Civil MCPE 1 8/10/22 Open
Zone 2M 2N ( 12th of 13th layer) SP#125
Inspection and compaction test 8th and 9th layer for Backfilling at MCPE 2 wall inner axis AA-E (as
2H 6 KAIG3-RFI-MC-C-6816 00 Civil MCPE 2 8/7/22 Open
highlighted) zone 2H (8th and 9th of 12th Layer)SP#125

kaig-qcals 354
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 1st and 2nd layer for Backfilling strip footing at CRESCENT between PC 21-
1D 6 KAIG3-RFI-CO-C-6817 00 Civil Crescent 8/15/22 Open
23-25 Axis 01K - 01M (1st and 2nd of 15th layer)SP#125

Inspection and compaction test 3rd layer Backfilling strip footing at CRESCENT between PC 22-24 Axis
1D 6 KAIG3-RFI-CO-C-6819 00 Civil Crescent 8/7/22 Open
01/L - 01/K (as Highlighted) Zone 1D( 3rd of 3rd Layers)SP#125

Inspection and compaction test 4th layer for Backfilling strip footing at CRESCENT between PC 92-94 axis
2A 6 KAIG3-RFI-CO-C-6820 00 Civil Crescent 8/7/22 Open
02A - 02B (as Highlighted) Zone 2A( 4th of 4th Layers)SP#125

Inspection and compaction test 2nd layer Backfilling around strip footing at Chid Care between (as
2N 6 KAIG3-RFI-CC-C-6821 00 Civil Child Care 8/7/22 Open
Highlighted) Zone 2N( 2nd of 5th Layers)

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for
4B 4 KAIG3-RFI-SW-C-6822 00 Storm Water pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O- Civil Site Work 8/7/22 Open
03)&(G-O-32 to MH-O-04).As per high lighted Area in the attached drawing.

Warning Tape Installation in pipes OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
4B 4 KAIG3-RFI-SW-C-6823 00 pipe Out Fall-O between ( G-O-44 to MH-O-01)&(G-O-43 to MH-O-02)&(G-O-33 to MH-O-03)&(G-O-32 Civil Site Work 8/7/22 Open
to MH-O-04).As per high lighted Area in the attached Dwg.

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-6824 00 Civil Site Work 8/7/22 Open
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

6B 6 KAIG3-RFI-SW-C-6825 00 INSPECTION FOR INSTALLATION OF SLAB FOR MH-O-09 (As Highlighted) Civil Site Work 8/7/22 Open

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-6826 00 Civil Site Work 8/7/22 Open
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

LM5 5 KAIG3-RFI-SW-C-6827 00 Inspection of Excavation for Non-Potable Water Line at Zone-L&M - as highlighted Civil Site Work 8/7/22 Open

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-6828 00 Civil Site Work 8/7/22 Open
Water Line at Zone-C - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-C - as highlighted in the
C3 3 KAIG3-RFI-SW-C-6829 00 Civil Site Work 8/7/22 Open
attached drawing (SP# 132)
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-C - as highlighted in the attached
C3 3 KAIG3-RFI-SW-C-6830 00 Civil Site Work 8/7/22 Open
drawing (SP# 132)
Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Primer (1st
G5 5 KAIG3-RFI-SW-C-6831 00 Civil Site Work 8/7/22 Open
Coat, 2nd Coat and 3rd Coat) for G/MV/27 (As Highlighted)
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/38, C/MV/08, C/MV/22,
CG3 3 KAIG3-RFI-SW-C-6832 00 Civil Site Work 8/7/22 Open
C/MV/25 and G/MV/37 at Zone-C&G (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-
6B 6 KAIG3-RFI-SW-C-6833 00 Civil Site Work 8/7/22 Open
3-5 (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-14 (As
6B 6 KAIG3-RFI-SW-C-6834 00 Civil Site Work 8/7/22 Open
Highlighted)

G4 4 KAIG3-RFI-SW-C-6835 00 Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/13 at Zone-G (As Highlighted) Civil Site Work 8/8/22 Open

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Potable
C3 3 KAIG3-RFI-SW-C-6836 00 Civil Site Work 8/7/22 Open
Water Line at Zone- C - as highlighted in the attached drawing (SP# 131 A-1-B)

Excavation for Tree Pits (08 no's) Along Boundary Wall (Inner side), at Discovery Garden, as highlighted in
4B 4 KAIG3-RFI-DG-C-6837 00 Civil Discovery Garden 8/8/22 Open
the attached drawings.
Excavation & Soil Preparation for Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted area in
4B 4 KAIG3-RFI-WG-C-6838 00 Civil Water Play Garden 8/7/22 Open
attached Drawings.

Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security (from MH/WG/FA/07 to
4A 4 KAIG3-RFI-WG-C-6839 00 Civil Water Play Garden 8/7/22 Open
Pulling Pit), Inside water play Garden, at water Garden, as highlighted area in attached drawing's.

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6840 00 Civil Water Play Garden 8/7/22 Open
Boulder in Wadi-03 (Left Side) - as highlighted (Stock Pile # 134 A-1-A)

67 7 KAIG3-RFI-CO-C-6841 00 Excavation for retaining wall between axis 02/M to axis 02/K as highlighted Zone 6 & 7 (as highlighted) Civil Crescent 8/7/22 Open

kaig-qcals 355
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and compaction test 6th layer for backfilling at TIP Zone 1A(as highlighted) ( 6th of 7th layer)
1A 6 KAIG3-RFI-CO-C-6842 00 Civil Crescent 8/8/22 Open
SP#125

G 5 KAIG3-RFI-SW-C-6843 00 Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/13 at Zone-G&H (As Highlighted) Civil Site Work 8/8/22 Open

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
K5 5 KAIG3-RFI-SW-C-6844 00 Civil Site Work 8/8/22 Open
Potable Water Line at Zone- K - as highlighted in the attached drawing (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 4) for Fire & Security Line Pit
K5 5 KAIG3-RFI-SW-C-6845 00 Civil Site Work 8/8/22 Open
K/FS/24, K/FS/17, K/FS/13, K/FS/14, K/FS/16 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 4) for Telecommunication Line Pit
K5 5 KAIG3-RFI-SW-C-6846 00 Civil Site Work 8/8/22 Open
K/TL/26, K/TL/04, K/TL/21, K/TL/05, K/TL/07 at Zone-K - as highlighted (Stock Pile# 133 A-1-B)

6A 6 KAIG3-RFI-SW-C-6847 00 Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted) Civil Site Work 8/8/22 Open

Inspection of Excavation for MV Line from D/MV/18 to E/MV/09 and D/MV/19 to E/MV/08 including all
DE2 2 KAIG3-RFI-SW-C-6848 00 Civil Site Work 8/8/22 Open
Pit - at Zone-D&E - as highlighted
Inspection of Excavation for MV Line from D/MV/18 to E/MV/09 and D/MV/19 to E/MV/08 including all
DE2 2 KAIG3-RFI-SW-C-6848 01 Civil Site Work 8/10/22 Open
Pit - at Zone-D&E - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Boulder No. WRB-25 -
H6 6 KAIG3-RFI-SW-C-6849 00 Civil Site Work 8/8/22 Open
As Highlighted (Stock Pile# 133 A-1-B)

Sand Bedding for Electrical Line of LV Submain Cable Containment & From Pulling Pit to (MH/WG/LV/23)
4A 4 KAIG3-RFI-WG-C-6851 00 Civil Water Play Garden 8/8/22 Open
to (MH/WG/LV/22) , at water Play Garden inside Water Garedn, as highlighted area in attached drawing's.

Concrete Pouring for Blinding under Electrical Handhole of Low Voltage (MH/WG/LV/22) at Water Play
4A 4 KAIG3-RFI-WG-C-6852 00 Civil Water Play Garden 8/8/22 Open
Garden, inside water Garden, as highlighted area in attached drawing's.

Sand Bedding for Low Current Lines of Fire Alarm & Security (from MH/WG/FA/07 to Pulling Pit), Inside
4A 4 KAIG3-RFI-WG-C-6853 00 Civil Water Play Garden 8/8/22 Open
water play Garden, at water Garden, as highlighted area in attached drawing's.

Excavation and Bed preparation for Sub surface Pipes (dia 110 mm Sub main & Sleeves) at entrance of Boat
4A 4 KAIG3-RFI-WG-C-6854 00 Civil Water Play Garden 8/8/22 Open
garden, Inside Water Garden as highlighted area in attached drawing's.

Sand Cover & Protection for Irrigation Sub-Main Line Distribution Network (50,90 mm line) at Discovery
4B 4 KAIG3-RFI-DG-C-6855 00 Civil Discovery Garden 8/8/22 Open
Garden, as highlighted area in the attached drawings.
Surface Preparation prior to Backfilling at Chid Care between axis (02AT , 02AR) & (02-2 , 02-1) (as
2N 6 KAIG3-RFI-CC-C-6857 00 Civil Child Care 8/8/22 Open
Highlighted) Zone 2N
2M 6 KAIG3-RFI-VG-C-6858 00 Excavation for Devonian Garden foundation zone 2M (as highlighted) Civil Devonian Garden 8/8/22 Open

Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water
4D 4 KAIG3-RFI-PG-C-6859 00 Feature Lines (Main 160 dia.HDPE) From Plant Room to Outer Conopy 3 (Outer side) at Physic Garden, as Civil Physic Garden 8/9/22 Open
highlighted area in the attached drawings.(SP 135)

Inspection of Thrust Blocks for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm),
4A 4 KAIG3-RFI-WG-C-6860 00 Civil Water Play Garden 8/9/22 Open
Bottom Left Side of Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Excavation and Bed preparation for Water Feature Lines at Water Fountain of Geyser Garden, at Water
4A 4 KAIG3-RFI-WG-C-6861 00 Civil Water Play Garden 8/9/22 Open
Garden as highlighted area in attached drawing's.
Sand Bedding for Water Feature Lines at Water Fountain of Geyser Garden, at Water Garden as highlighted
4A 4 KAIG3-RFI-WG-C-6862 00 Civil Water Play Garden 8/9/22 Open
area in attached drawing's.

6A 6 KAIG3-RFI-SW-C-6863 00 Inspection of Formwork for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted) Civil Site Work 8/9/22 Open

6A 6 KAIG3-RFI-SW-C-6864 00 Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted) Civil Site Work 8/9/22 Open
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for
K5 5 KAIG3-RFI-SW-C-6865 00 Telecommunication Line from k/TL/11 to k/TL/22 at Zone-k - as highlighted in the attached drawing (Stock Civil Site Work 8/9/22 Open
Pile # 133 A-1-B)

Inspection and compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
K5 5 KAIG3-RFI-SW-C-6866 00 Security Distribution Line from k-FS-07 to k-FS-08 at Zone-k as highlighted in the attached drawing (Stock Civil Site Work 8/9/22 Open
Pile # 133 A-1-B)

kaig-qcals 356
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection of backfilling Gravel for the Duct Bank of Fire & Security Distribution Line from K/FS/07 to
K5 5 KAIG3-RFI-SW-C-6867 00 Civil Site Work 8/9/22 Open
K/FS/10 - As Highlighted (Stock Pile # 138)

Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-25 - As
H6 6 KAIG3-RFI-SW-C-6868 00 Civil Site Work 8/9/22 Open
Highlighted (Stock Pile# 134 A-1-A)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 2) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6869 00 Civil Site Work 8/9/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Telecommunication Line
K5 5 KAIG3-RFI-SW-C-6870 00 Civil Site Work 8/15/22 Open
Pit K/TL/02, K/TL/14, K/TL/25, K/TL/11, K/TL/22 at Zone-K - as highlighted
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Fire & Security Line Pit
K5 5 KAIG3-RFI-SW-C-6871 00 Civil Site Work 8/10/22 Open
K/FS/02, K/FS/20, K/FS/19, K/FS/07 at Zone-K - as highlighted

Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-L&M - as highlighted (Stock
LM5 5 KAIG3-RFI-SW-C-6872 00 Civil Site Work 8/9/22 Open
Pile# 132)

Inspection Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for Non-
C3 3 KAIG3-RFI-SW-C-6873 00 Civil Site Work 8/9/22 Open
Potable Water Line at Zone-C - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 1) above Sand Covering for RO
C3 3 KAIG3-RFI-SW-C-6874 00 Civil Site Work 8/9/22 Open
Water Line at Zone-C - as highlighted in the attached drawing (Stock Pile# 131 A-1-B)
Inspection and Compaction Test for backfilling Sub-grade 10th Layer (10 of 12) under Cesspool-3 at Zone-D
D3 3 KAIG3-RFI-SW-C-6875 00 Civil Site Work 8/9/22 Open
- as highlighted (Stock Pile # 131 A-1-B)
Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for
7 6 KAIG3-RFI-SW-C-6876 00 Civil Site Work 8/9/22 Open
Storm Water pipe Out Fall-M ( MH-M-03 to MH-M-02 ).As per high lighted Area in the attached Dwg.

Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6877 00 Civil Site Work 8/9/22 Open
Water pipe Out Fall-M ( MH-M-03 to MH-M-02 ).As per high lighted Area in the attached Dwg.

Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from k/TL/22 to k/TL/23 -
K5 5 KAIG3-RFI-SW-C-6878 00 Civil Site Work 8/9/22 Open
As Highlighted (Stock Pile # 138)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit G/MV/15,
G5 5 KAIG3-RFI-SW-C-6879 00 Civil Site Work 8/10/22 Open
G/MV/25 and G/MV/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/28 at
G5 5 KAIG3-RFI-SW-C-6880 00 Civil Site Work 8/10/22 Open
Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Fire
C3 3 KAIG3-RFI-SW-C-6881 00 Civil Site Work 8/10/22 Open
Water Line at Zone-C - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for
C3 3 KAIG3-RFI-SW-C-6882 00 Civil Site Work 8/10/22 Open
Potable Water Line at Zone- C - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-6883 00 Civil Water Play Garden 8/9/22 Open
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Warning Tiles & Tape above Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside Mist
4A 4 KAIG3-RFI-WG-C-6884 00 Civil Water Play Garden 8/9/22 Open
Garden, at Water Garden, as highlighted area in the attached drawings.

Warning Tiles & Tape above Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03)
4A 4 KAIG3-RFI-WG-C-6885 00 Civil Water Play Garden 8/9/22 Open
Inside Mist Garden, at Water Garden, as highlighted area in the attached drawings.
Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for ( Dia315&400mm Ø- UPVC Pipes-Class 4
4B 4 KAIG3-RFI-SW-C-6886 00 ) for Storm Water pipe Out Fall-O From (MH-O-08-1 to MH-O-11) Including manhole(MH-O-08,MH-O- Civil Site Work 8/9/22 Open
09&MH-O-10) and Gullyes G-O-(09,13,14,15,16,17,18,19&28) Co
Warning Tape Installation in pipes OUT FALL-Ofor ( Dia315&400mm Ø- UPVC Pipes-Class 4 ) for Storm
4B 4 KAIG3-RFI-SW-C-6887 00 Water pipe Out Fall-O From (MH-O-08-1 to MH-O-11) Including manhole(MH-O-08,MH-O-09&MH-O-10) Civil Site Work 8/9/22 Open
and Gullyes G-O-(09,13,14,15,16,17,18,19&28) Connected with m

Inspection and compaction test 10th and 11th layer for Mockup soil permability at crescent internal garden (as
2L 6 KAIG3-RFI-CO-C-6888 00 Civil Site Work 8/10/22 Open
Highlighted) Zone 2L (10th and 11th of 12th layer)SP#125

Inspection and compaction test 10th and 11th layer for Backfilling at MCPE 2 wall inner axis AA-E (as
2H 6 KAIG3-RFI-MC-C-6889 00 Civil MCPE 2 8/11/22 Open
highlighted) zone 2H (10th and 11th of 12th Layer)SP#125

Inspection and compaction test 3rd and 4th layer for Backfilling strip footing at CRESCENT between PC 21-
1D 6 KAIG3-RFI-CO-C-6890 00 Civil Crescent 8/10/22 Open
23-25 Axis 01K - 01M (3rd and 4th of 15th layer)SP#125

kaig-qcals 357
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 1st layer Backfilling above the Chid Care footing between (as Highlighted)
2N 6 KAIG3-RFI-CC-C-6891 00 Civil Child Care 8/16/22 Open
Zone 2N( 1st of 4th Layers) SP#125

Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-09, NPW-ISC-10, NPW-ISC-11 - as
B3 3 KAIG3-RFI-SW-C-6892 00 Civil Site Work 8/10/22 Open
highlighted (Red Line - Adjusted the Pit - NPW-ISC-10)

Inspection and Compaction Test for Backfilling Subgrade 2nd Layer (2 of 2) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6893 00 Civil Site Work 8/10/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-H - as highlighted in the
H6 6 KAIG3-RFI-SW-C-6894 00 Civil Site Work 8/10/22 Open
attached drawing (SP# 132)

Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-H - as highlighted in the attached
H6 6 KAIG3-RFI-SW-C-6895 00 Civil Site Work 8/10/22 Open
drawing (SP# 132)

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 3) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6896 00 Civil Site Work 8/10/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Subgrade 2nd Layer (2 of 3) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6897 00 Civil Site Work 8/11/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6898 00 Civil Site Work 8/11/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 134 A-1-A)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit G/MV/15,
G5 5 KAIG3-RFI-SW-C-6899 00 Civil Site Work 8/11/22 Open
G/MV/25 and G/MV/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/28
G5 5 KAIG3-RFI-SW-C-6900 00 Civil Site Work 8/11/22 Open
at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for
L5 5 KAIG3-RFI-SW-C-6901 00 Civil Site Work 8/10/22 Open
Potable Water Line at Zone- L - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fire
L5 5 KAIG3-RFI-SW-C-6902 00 Civil Site Work 8/11/22 Open
Water Line at Zone- L - as highlighted in the attached drawing (SP# 131 A-1-B)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6A 6 KAIG3-RFI-SW-C-6903 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-05 and MH-M-06 (As Civil Site Work 8/13/22 Open
Highlighted)
INSPECTION FOR INSTALLATION OF SLAB FOR B/MV/07 , B/MV/12 , B/MV/09 AND B/MV/18 (As
B 2 KAIG3-RFI-SW-C-6904 00 Civil Site Work 8/13/22 Open
Highlighted)

Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34,
G 5 KAIG3-RFI-SW-C-6905 00 Civil Site Work 8/13/22 Open
G/MV/35 and G/MV/36 at Zone-G (As Highlighted)

2M 6 KAIG3-RFI-VG-C-6906 00 Excavation for Devonian Garden foundations between axis 02-AM & 02-AL zone 2M (as highlighted) Civil Devonian Garden 8/10/22 Open

Bedding of Gravel 3/8" and Geotextile surrounding in pipes (Dia400mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6907 00 Water pipe Out Fall-K From (MH-K-09 to MH-K-10) (Red Line) .As per high lighted Area in the attached Civil Site Work 8/10/22 Open
Dwg.

Pipe Installation (Dia400mm Ø- UPVC Pipes-Class 4) for Storm Water pipe Out Fall-K From (MH-K-09 to
7 6 KAIG3-RFI-SW-C-6908 00 Civil Site Work 8/10/22 Open
MH-K-10) (Red Line) .As per high lighted Area in the attached Dwg.

Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160 mmØ - UPVC- Class 4) from
7 6 KAIG3-RFI-SW-C-6909 00 (FW-A-3-7 to FW-A-3-7-1 to FW-A-3-7-2 to FW-A-3-7-3). At CRECENT Zone 7.As per highlighted Area Civil Site Work 8/11/22 Open
in the attached Dwg.

2D 2E 6 KAIG3-RFI-RG-C-6911 00 Notification to start backfilling works in Cretaceous Garden zone 2D,2E (as highlighted) Civil Cretaceous Garden 8/11/22 Open

Surface Preparation prior to backfilling inside Cafeteria building btween Axis 02B - 02D zone 2A (as
2A 6 KAIG3-RFI-CO-C-6912 00 Civil Cafeteria 8/11/22 Open
Highlighted)

Inspection and compaction test 4th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
2A 6 KAIG3-RFI-CF-C-6913 00 Civil Cafeteria 8/11/22 Open
zone 2A (as Highlighted)( 4th of 5th Layers)

kaig-qcals 358
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 10th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 6 KAIG3-RFI-CF-C-6914 00 Civil Cafeteria 8/11/22 Open
(10th of 12th layer) SP#125

Inspection and compaction test 2nd layer Backfilling above the Chid Care footing between (as Highlighted)
2N 6 KAIG3-RFI-CC-C-6915 00 Civil Child Care 8/16/22 Open
Zone 2N( 2nd of 4th Layers) SP#125

G4 4 KAIG3-RFI-SW-C-6916 00 Inspection for Installation of Slab for MV Line Pulling Pit - G/MV19, G/MV/31 at Zone-G (As Highlighted) Civil Site Work 8/11/22 Open

6 6 KAIG3-RFI-SW-C-6917 00 Surface Preparation Prior to Start Backfill for Storm Water Line Manhole MH-L-03 - As Highlighted Civil Site Work 8/11/22 Open

Surface Preparation prior to start backfilling around foul water line manhole FW-A-13-5, FW-A-13-6, FW-A-
2G 6 KAIG3-RFI-SW-C-6918 00 Civil Crescent 8/11/22 Open
13-7 - at Zone-6 (As Highlighted)

Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) for MV Line from D/MV/34 to
DE2 2 KAIG3-RFI-SW-C-6920 00 Civil Site Work 8/11/22 Open
E/MV/01 and D/MV/35 to E/MV/03 - at Zone-D&E - as highlighted (Stock Pile# 131 A-1-B)

BC3 3 KAIG3-RFI-SW-C-6922 00 Inspection for Installation of MV Line Junction Pit - B/MV/17, B/MV/26, C/MV/02 - as highlighted Civil Site Work 8/11/22 Open

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for Storm Water Line from MH-
2 2 KAIG3-RFI-SW-C-6923 00 Civil Site Work 8/11/22 Open
O-08-1 to MH-O-11 at Zone-2 - As Highlighted (Stock Pile # 131 A-1-B)

4 4 KAIG3-RFI-SW-C-6924 00 Inspection of Steel Reinforcement for the Top Slab of SBC-07 - (Right Side) - As Highlighted Civil Site Work 8/13/22 Open

4 4 KAIG3-RFI-SW-C-6925 00 Inspection of Steel Reinforcement for the Upstand of SBC-08 (Left Side) As Highlighted Civil Site Work 8/13/22 Open

Excavation and Bed preparation for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunnel,
4C 4 KAIG3-RFI-TG-C-6926 00 Civil Butterfly Garden 8/13/22 Open
inside Butterfly Garden, as highlighted area in attached drawing's.

Excavation & Bed preparation for Irrigation Line (90 mm dia) from Plant room to exit way from Outer side,
5A 5 KAIG3-RFI-ZG-C-6927 00 Civil Maze Garden 8/11/22 Open
at Maze garden, as highlighted area in attached drawing's.

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for
7 6 KAIG3-RFI-SW-C-6928 00 Storm Water pipe Out Fall-M ( MH-M-04 to MH-M-05 to MH-M-06 ).As per high lighted Area in the Civil Site Work 8/11/22 Open
attached Dwg.
Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
7 6 KAIG3-RFI-SW-C-6929 00 Water pipe Out Fall-M ( MH-M-04 to MH-M-05 to MH-M-06 ).As per high lighted Area in the attached Civil Site Work 8/11/22 Open
Dwg.

4 4 KAIG3-RFI-SW-C-6930 00 Inspection of Formwork for the Upstand of SBC-08 (Left Side) - As Highlighted Civil Site Work 8/13/22 Open

4 4 KAIG3-RFI-SW-C-6931 00 Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted Civil Site Work 8/20/22 Open

Inspection of Sand bedding under pipe for MV Line from D/MV/18 to D/MV/03 and D/MV/19 to D/MV/08 -
D2 2 KAIG3-RFI-SW-C-6932 00 Civil Site Work 8/13/22 Open
at Zone-D - as highlighted (Stock Pile# 132)

Surface Preparation prior to start Waterproofing for SBC-08 (Left Side)- Footing and wall of Wing Wall - as
4 4 KAIG3-RFI-SW-C-6933 00 Civil Site Work 8/13/22 Open
highlighted

Inspection and Compaction Test for Backfilling Subgrade 3rd Layer (3 of 3) under 2nd lift of Rock for
4 4 KAIG3-RFI-SW-C-6934 00 Civil Site Work 8/13/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

G4 4 KAIG3-RFI-SW-C-6935 00 Inspection for Installation of Non-Potable Water Line Pit - POC-27, POC-28, POC-30 - as highlighted Civil Site Work 8/13/22 Open

B4 4 KAIG3-RFI-SW-C-6936 00 Excavation for Fire Water Line at Zone-B - as highlighted Civil Site Work 8/13/22 Open

B4 4 KAIG3-RFI-SW-C-6937 00 Excavation for Potable Water Line at Zone-B - as highlighted Civil Site Work 8/13/22 Open

5 5 KAIG3-RFI-SW-C-6938 00 Inspection of Excavation for RO Water Line at Zone-B,G,K&L - As highlighted Civil Site Work 8/13/22 Open

kaig-qcals 359
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

B4 4 KAIG3-RFI-SW-C-6939 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-B - As highlighted Civil Site Work 8/13/22 Open

Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K including Pit K/DC/02, K/DC/01,
GK5 5 KAIG3-RFI-SW-C-6940 00 Civil Site Work 8/13/22 Open
G/DC/16, G/DC/08, G/DC/15 - As highlighted

Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K including Pit K/DC/02, K/DC/01,
GK5 5 KAIG3-RFI-SW-C-6940 01 Civil Site Work 8/16/22 Open
G/DC/16, G/DC/08, G/DC/15 - As highlighted

Substrait Sand Bedding for Hot Water (Supply and Return) pipes and CHW (Supply and Return) pipes at
2F 6 KAIG3-RFI-CO-C-6941 00 Civil MCPE 3 8/13/22 Open
MCPE 3 axis 03A to axis 03C as highlighted Zone 2F (as highlighted)

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit G/MV/15,
G5 5 KAIG3-RFI-SW-C-6942 00 Civil Site Work 8/13/22 Open
G/MV/25 and G/MV/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/28
G5 5 KAIG3-RFI-SW-C-6943 00 Civil Site Work 8/13/22 Open
at Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of Formwork for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22, C/MV/38, C/MV/08,
CG 5 KAIG3-RFI-SW-C-6944 00 Civil Site Work 8/13/22 Open
G/MV/37 at Zone-C&G (As Highlighted)

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22, C/MV/38, C/MV/08,
CG 5 KAIG3-RFI-SW-C-6945 00 Civil Site Work 8/13/22 Open
G/MV/37 at Zone-C&G at Zone-C&G (As Highlighted)

Surface Preparation prior to start backfilling around MV Line Pit B/MV/23 and G/MV/21 at Zone-G (As
BG 5 KAIG3-RFI-SW-C-6946 00 Civil Site Work 8/13/22 Open
Highlighted)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low voltage
4B 4 KAIG3-RFI-DG-C-6947 00 Civil Discovery Garden 8/13/22 Open
Lines & Emergency Lines, Inside Discovery Garden at highlighted area in attached Drawing's. (SP 140)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low voltage
4B 4 KAIG3-RFI-DG-C-6947 01 Civil Discovery Garden 8/18/22 Open
Lines & Emergency Lines, Inside Discovery Garden at highlighted area in attached Drawing's. (SP 140)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telecom and
4B 4 KAIG3-RFI-DG-C-6948 00 Civil Discovery Garden 8/13/22 Open
Fire Alarm & Security Lines, Inside Discovery Garden at highlighted area in attached Drawing's. (SP 140)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telecom and
4B 4 KAIG3-RFI-DG-C-6948 01 Civil Discovery Garden 8/18/22 Open
Fire Alarm & Security Lines, Inside Discovery Garden at highlighted area in attached Drawing's. (SP 140)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Irrigation Sub-Main Line
4B 4 KAIG3-RFI-DG-C-6949 00 Civil Discovery Garden 8/13/22 Open
Distribution Network (50,90 mm line) at Discovery Garden, as highlighted in attached drawings.(SP 140)

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Irrigation Sub-Main Line
4B 4 KAIG3-RFI-DG-C-6949 01 Civil Discovery Garden 8/18/22 Open
Distribution Network (50,90 mm line) at Discovery Garden, as highlighted in attached drawings.(SP 140)

Excavation & Soil preparation prior to Boulders Along Boundary Wall (Inner side), at Discovery Garden, as
4B 4 KAIG3-RFI-DG-C-6950 00 Civil Discovery Garden 8/13/22 Open
highlighted in the attached drawings.

GK5 5 KAIG3-RFI-SW-C-6951 00 Inspection of Excavation for Non-Potable Water Line at Zone-G&K includig Pit POC-46 - as highlighted Civil Site Work 8/13/22 Open

INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-G-26, G-G-27 - as


2B 1 KAIG3-RFI-SW-C-6952 00 Civil Site Work 8/14/22 Open
highlighted

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for
6 6 KAIG3-RFI-SW-C-6953 00 Civil Site Work 8/14/22 Open
Boulder in Wadi-03 (Left Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Subgrade 4th Layer (4 of 5) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6954 00 Civil Site Work 8/14/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection of Sand bedding under pipe for MV Line from D/MV/03 to D/MV/36 and D/MV/08 to D/MV/09 -
D2 2 KAIG3-RFI-SW-C-6955 00 Civil Site Work 8/14/22 Open
at Zone-D - as highlighted (Stock Pile# 132)

Inspection of Sand bedding under pipe for MV Line from D/MV/36 to E/MV/02 and D/MV/09 to E/MV/05 -
DE2 2 KAIG3-RFI-SW-C-6956 00 Civil Site Work 8/14/22 Open
at Zone-D&E - as highlighted (Stock Pile# 132)

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-14, NPW-ISC-16
BG5 5 KAIG3-RFI-SW-C-6957 00 Civil Site Work 8/14/22 Open
and NPW-ISC-18 at Zone-B&G - as highlighted

kaig-qcals 360
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

4 4 KAIG3-RFI-SW-C-6958 00 Inspection of Formwork for the Wall and Slab of SBC-07 (Right Side) - As Highlighted Civil Site Work 8/15/22 Open

Inspection of Sand Covering Layer for Protection of MV Line from (H/MV/28 to H/MV/13) at Zone-H as
H6 6 KAIG3-RFI-SW-C-6959 00 Civil Site Work 8/15/22 Open
highlighted in the attached drawing (Stock Pile # 132)

4 4 KAIG3-RFI-SW-C-6960 00 Inspection of Concrete Pouring for the Wall and Slab of SBC-07 (Right Side) - As Highlighted Civil Site Work 8/15/22 Open

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/28 at
G5 5 KAIG3-RFI-SW-C-6961 00 Civil Site Work 8/14/22 Open
Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

K5 5 KAIG3-RFI-SW-C-6962 00 Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC- 44 at Zone-K - as highlighted Civil Site Work 8/14/22 Open

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV/23
BG 4 KAIG3-RFI-SW-C-6963 00 Civil Site Work 8/14/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Storm Water Line from
2 2 KAIG3-RFI-SW-C-6964 00 Civil Site Work 8/14/22 Open
MH-O-08-1 to MH-O-11 at Zone-2 - As Highlighted (Stock Pile # 131 A-1-B)

Inspection of Formwork for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34, G/MV/35 and
G5 5 KAIG3-RFI-SW-C-6965 00 Civil Site Work 8/15/22 Open
G/MV/36 at Zone-G (As Highlighted)

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34, G/MV/35
G5 5 KAIG3-RFI-SW-C-6966 00 Civil Site Work 8/15/22 Open
and G/MV/36 at Zone-G (As Highlighted)
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) along Foundation of
4B 4 KAIG3-RFI-AG-C-6967 00 Boundary wall (Outer Face) @ Grid (1-23/Left Side), at Aviary Garden, As per Highlighted in attached Civil Aviary Garden 8/14/22 Open
Drawing's. (SP 135)
Inspection and compaction test 5th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
2A 6 KAIG3-RFI-CF-C-6968 00 Civil Cafeteria 8/14/22 Open
zone 2A (as Highlighted)(5th of 5th Layers)

Inspection and compaction test 5th and 6th layer for Backfilling strip footing at CRESCENT between PC 21-
1D 6 KAIG3-RFI-CO-C-6970 00 Civil Crescent 8/14/22 Open
23-25 Axis 01K - 01M (5th and 6th of 15th layer)SP#125

Inspection and compaction test 12th layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted)
2H 6 KAIG3-RFI-MC-C-6971 00 Civil MCPE 2 8/14/22 Open
zone 2H (12th of 13th Layer)SP#125

Inspection and compaction test 9th and 10th layers for backfilling for ETFE Pump room axis 02/AD - 02/1
2J 6 KAIG3-RFI-CO-C-6972 00 Civil Crescent 8/15/22 Open
(Continue backfilling) Zone 2J (as highlighted) (9th and 10th of 11th Layers)SP#124

Inspection and compaction test 1st layer Backfilling in slope for Devonian Garden (as highlighted) Part A (1st
2M 6 KAIG3-RFI-VG-C-6973 00 Civil Devonian Garden 8/15/22 Open
of 3rd layer)

Inspection and compaction test 2nd layer Backfilling in slope for Devonian Garden (as highlighted) Part A
2M 6 KAIG3-RFI-VG-C-6974 00 Civil Devonian Garden 8/15/22 Open
(2nd of 3rd layer)

Inspection and compaction test 3rd layer Backfilling in slope for Devonian Garden (as highlighted) Part A
2M 6 KAIG3-RFI-VG-C-6975 00 Civil Devonian Garden 8/15/22 Open
(3rd of 3rd layer)

2M 6 KAIG3-RFI-VG-C-6976 00 200mm Protection 3/4" Gravel for Devonian garden (as Highlighted) Zone 2M Civil Crescent 8/16/22 Open

Inspection and compaction test 1st layer for Backfilling inside Cafeteria building( Second Part) btween Axis
2A 6 KAIG3-RFI-CF-C-6977 00 Civil Cafeteria 8/15/22 Open
02B - 02D zone 2A (as Highlighted) (1st of 5th Layers)

Inspection of Steel Reinforcement for Footing and wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01,
2 2 KAIG3-RFI-SW-C-6978 00 E/MV/03, D/MV/04, D/MV/32, D/MV/03, D/MV/08, D/MV/33, D/MV/31, D/MV/17 and D/MV/18 at Zone- Civil Site Work 8/15/22 Open
E&D (As Highlighted)

Inspection for Blinding Concrete under MV Line Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32, D/MV/03,
2 2 KAIG3-RFI-SW-C-6979 00 Civil Site Work 8/15/22 Open
D/MV/08, D/MV/33, D/MV/31 and D/MV/17 at Zone-E&D (As Highlighted)

Inspection of Formwork for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32 and
2 2 KAIG3-RFI-SW-C-6980 00 Civil Site Work 8/16/22 Open
D/MV/03 at Zone-E&D (As Highlighted)

Inspection of Formwork for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32 and
2 2 KAIG3-RFI-SW-C-6980 01 Civil Site Work 8/25/22 Open
D/MV/03 at Zone-E&D (As Highlighted)

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32
2 2 KAIG3-RFI-SW-C-6981 00 Civil Site Work 8/16/22 Open
and D/MV/03 at Zone-E&D (As Highlighted)

kaig-qcals 361
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/28 at
G5 5 KAIG3-RFI-SW-C-6982 00 Civil Site Work 8/16/22 Open
Zone-G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit B/MV/23
BG5 5 KAIG3-RFI-SW-C-6983 00 Civil Site Work 8/16/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/03, D/MV/08, D/MV/33 and D/MV/31
D2 2 KAIG3-RFI-SW-C-6984 00 Civil Site Work 8/17/22 Open
at Zone- D (As Highlighted)

Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/03, D/MV/08, D/MV/33 and
D2 2 KAIG3-RFI-SW-C-6985 00 Civil Site Work 8/17/22 Open
D/MV/31 at Zone- D (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 14) around foul water line manhole
6 6 KAIG3-RFI-SW-C-6986 00 Civil Site Work 8/15/22 Open
FW-A-13-5, FW-A-13-6 - at Zone-6 - As Highlighted (SP#133)

Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-G&K - As highlighted
GK5 5 KAIG3-RFI-SW-C-6987 00 Civil Site Work 8/15/22 Open
(Stock Pile# 132)

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 4th lift of Rock for Boulder
6 6 KAIG3-RFI-SW-C-6988 00 Civil Site Work 8/15/22 Open
in Wadi-03 (Left Side) - as highlighted (Stock Pile # 134 A-1-A)

Inspection and Compaction Test for Backfilling Subgrade 5th Layer (5 of 5) under 2nd lift of Rock for
6 6 KAIG3-RFI-SW-C-6989 00 Civil Site Work 8/16/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for
6 6 KAIG3-RFI-SW-C-6990 00 Civil Site Work 8/16/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 131 A-1-B)

Sand Bedding for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunnel, inside Butterfly
4C 4 KAIG3-RFI-TG-C-6991 00 Civil Butterfly Garden 8/15/22 Open
Garden, as highlighted area in attached drawing's.

4A 4 KAIG3-RFI-WG-C-6992 00 Sand Cover & Protection for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden to Fountain ofCivil
Geyser Garden, Water
at Water Garden
Play as highlighted
Garden area in attached
8/15/22 Open drawing's.

Sand Bedding for Irrigation Line (90 mm dia) from Plant room to exit way from Outer side, at Maze garden,
5A 5 KAIG3-RFI-ZG-C-6993 00 Civil Maze Garden 8/15/22 Open
as highlighted area in attached drawing's.
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) along Foundation of
4B 4 KAIG3-RFI-AG-C-6994 00 Boundary wall (Outer Face) @ Grid (1-23/Left Side), at Aviary Garden, As per Highlighted in attached Civil Aviary Garden 8/15/22 Open
Drawing's. (SP 135)
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low Voltage
4A 4 KAIG3-RFI-WG-C-6995 00 (MH/WG/LV/17 to 21 & 24 to 28) and Emergency lines (MH/WG/EM/7 to 8 & 10 to 15), Inside water play Civil Water Play Garden 8/15/22 Open
Garden, at water Garden, as highlighted in attached
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telecom
4A 4 KAIG3-RFI-WG-C-6996 00 (from MH/WG/LC/5 to 9) and Fire Alarm & Security (from MH/WG/FA/7 to 8 & 10 to 16), Inside water Civil Water Play Garden 8/15/22 Open
play Garden, at water Garden, as highlighted in attached

2N 6 KAIG3-RFI-CO-C-6997 00 Surface Preparation Prior to start Backfilling at Diaphragm wall Zone 2N (as highlighted) axis 02AR Civil Crescent 8/15/22 Open

2M 2N 6 KAIG3-RFI-MC-C-6998 00 Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N (as highlighted) axis 03V Civil MCPE 1 8/15/22 Open

Inspection and compaction test 11th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 6 KAIG3-RFI-CF-C-6999 00 Civil Cafeteria 8/16/22 Open
(11th of 18th layer) SP#125

Inspection and compaction test 2nd and 3rd layer for Backfilling inside Cafeteria building( Second Part)
2A 6 KAIG3-RFI-CF-C-7000 00 Civil Cafeteria 8/16/22 Open
btween Axis 02B - 02D zone 2A (as Highlighted) (2nd and 3rd of 5th Layers)

Inspection and compaction test 7th and 8th layer for Backfilling strip footing at CRESCENT between PC 21-
1D 6 KAIG3-RFI-CO-C-7001 00 Civil Crescent 8/16/22 Open
23-25 Axis 01K - 01M (7th and 8th of 15th layer)SP#125

Inspection and compaction test 6th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7002 00 Civil MCPE 2 8/16/22 Open
(6th of 12th layer) SP#125

Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/PG/LV/09-12) and Emergency
4D 4 KAIG3-RFI-PG-C-7003 00 Civil Physic Garden 8/16/22 Open
(MH/PG/EM/10-13), Inside Physic Garden as highlighted in attached drawing's.

Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/13-17) and Fire Alarm & Security lines
4D 4 KAIG3-RFI-PG-C-7004 00 Civil Physic Garden 8/16/22 Open
(MH/PG/FA/09-12), Inside Physic Garden as highlighted in attached drawing's.

kaig-qcals 362
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Warning Tape for Electrical Lines of Low voltage Lines & Emergency Lines, Inside Discovery Garden at
4B 4 KAIG3-RFI-DG-C-7005 00 Civil Discovery Garden 8/16/22 Open
highlighted area in attached Drawing's.

Warning Tape for Low Current Lines of Telecom and Fire Alarm & Security Lines, Inside Discovery Garden
4B 4 KAIG3-RFI-DG-C-7006 00 Civil Discovery Garden 8/16/22 Open
at highlighted area in attached Drawing's.

Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - Wing Wall (Right Side) - As
4 4 KAIG3-RFI-SW-C-7007 00 Civil Site Work 8/16/22 Open
Highlighted

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 14) around foul water line
6 6 KAIG3-RFI-SW-C-7008 00 Civil Site Work 8/16/22 Open
manhole FW-A-13-5, FW-A-13-6 - at Zone-6 - As Highlighted (SP#133)

H6 6 KAIG3-RFI-SW-C-7009 00 Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) above Sand Covering for Non-Potable Water
Civil Line at Zone-H Site
- as Work
highlighted in the8/16/22
attached drawing
Open
(SP# 131 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) above Sand Covering for RO
H6 6 KAIG3-RFI-SW-C-7010 00 Civil Site Work 8/16/22 Open
Water Line at Zone-H - as highlighted in the attached drawing (SP# 131 A-1-B)

Surface Preparation prior to start backfilling for MV Line from G/MV/14 to G/MV/24 at Zone-G (As
G3 3 KAIG3-RFI-SW-C-7011 00 Civil Site Work 8/16/22 Open
Highlighted)

Surface Preparation prior to start backfilling for the Duct Bank of Telecommunications Line from B/TL/30 to
B3 3 KAIG3-RFI-SW-C-7012 00 Civil Site Work 8/16/22 Open
B/TL/31 at Zone-B (As Highlighted)

Surface Preparation prior to start backfilling for the Duct Bank of Fire & Security Distribution Line from
B3 3 KAIG3-RFI-SW-C-7013 00 Civil Site Work 8/16/22 Open
B/FS/03 to B/FS/04 at Zone-B (As Highlighted)

H6 6 KAIG3-RFI-SW-C-7014 00 INSPECTION FOR INSTALLATION OF SLAB FOR H/MV/25 AND H/MV/02 (As Highlighted) Civil Site Work 8/16/22 Open

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for MV Line from G/MV/14 to
G3 3 KAIG3-RFI-SW-C-7015 00 Civil Site Work 8/17/22 Open
G/MV/24 at Zone-G (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 2) for the Duct Bank of
B3 3 KAIG3-RFI-SW-C-7016 00 Civil Site Work 8/17/22 Open
Telecommunications Line from B/TL/30 to B/TL/31 at Zone-B (As Highlighted)

Inspection for Laying of Red Tiles above the pipe for MV Line from H/MV/28 to H/MV/13 at Zone-H - as
H6 6 KAIG3-RFI-SW-C-7017 00 Civil Site Work 8/16/22 Open
highlighted

Sand Bedding for Water Feature Lines (HDPE dia 63 mm) from Water play garden to Fountain of Geyser
4A 4 KAIG3-RFI-WG-C-7018 00 Civil Water Play Garden 8/16/22 Open
Garden, at Water Garden as highlighted area in attached drawing's.

Inspection and Compaction Test for backfilling Sub-grade 1st layer ( 1 of 2 ) for the Duct Bank of Fire &
B3 3 KAIG3-RFI-SW-C-7019 00 Civil Site Work 8/17/22 Open
Security Distribution Line from B/FS/03 to B/FS/04 at Zone-B (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit B/MV/23
BG5 G KAIG3-RFI-SW-C-7020 00 Civil Site Work 8/17/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 8 ) for storm water Line between
2B 2 KAIG3-RFI-SW-C-7021 00 Civil Site Work 8/17/22 Open
MH-K-09 and MH-K-10 including branch - As Highlighted (SP# 133 A-1-B)

D2 2 KAIG3-RFI-SW-C-7022 00 Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/17 at Zone- D (As Highlighted) Civil Site Work 8/17/22 Open

D2 2 KAIG3-RFI-SW-C-7023 00 Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/17 at Zone- D (As Highlighted) Civil Site Work 8/17/22 Open

Surface Preparation prior to start backfilling around Non potable water line-Manhole POC-27 and POC28 -
G5 5 KAIG3-RFI-SW-C-7024 00 Civil Site Work 8/17/22 Open
As Highlighted

Surface Preparation prior to start backfilling beside the Telecommunications Line (To confine the sand cover)
G4 4 KAIG3-RFI-SW-C-7025 00 Civil Site Work 8/17/22 Open
between G/TL/16 & G/TL/41 at Zone-G (As Highlighted)

Surface Preparation prior to start backfilling beside the Fire&Security Line (To confine the sand cover)
G4 4 KAIG3-RFI-SW-C-7026 00 Civil Site Work 8/17/22 Open
between G/FS/19 & G/FS/24 at Zone-G (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 5) upto blinding level for
6 6 KAIG3-RFI-SW-C-7027 00 Civil Site Work 8/17/22 Open
excavated area beside foul water line manhole FW-A-13-7- at Zone-6 - As Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) upto blinding level for
6 6 KAIG3-RFI-SW-C-7028 00 Civil Site Work 8/17/22 Open
excavated area beside foul water line manhole FW-A-13-7- at Zone-6 - As Highlighted (SP#133 A-1-B)

kaig-qcals 363
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

H3 3 KAIG3-RFI-SW-C-7029 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-H- As highlighted Civil Site Work 8/17/22 Open

B3 3 KAIG3-RFI-SW-C-7030 00 Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-16, NPW-ISC-18 - as highlighted Civil Site Work 8/17/22 Open

Surface Preparation prior to start backfilling around MV Line Pit H/MV/02, H/MV/05, H/MV/10 and
H6 6 KAIG3-RFI-SW-C-7031 00 Civil Site Work 8/17/22 Open
H/MV/11 at Zone-H (As Highlighted)

Surface Preparation prior to start backfilling around MV Line Pit H/MV/03, H/MV/13, H/MV/19 and
H6 6 KAIG3-RFI-SW-C-7032 00 Civil Site Work 8/17/22 Open
H/MV/24 at Zone-H (As Highlighted)

Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for
6 6 KAIG3-RFI-SW-C-7033 00 Civil Site Work 8/17/22 Open
Boulder in Wadi-03 (Right Side) - as highlighted (Stock Pile # 134 A-1-A)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-L - as highlighted in the
L5 5 KAIG3-RFI-SW-C-7034 00 Civil Site Work 8/17/22 Open
attached drawing (SP# 132)

Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-L - as highlighted in the attached
L5 5 KAIG3-RFI-SW-C-7035 00 Civil Site Work 8/17/22 Open
drawing (SP# 132)

Inspection and compaction test 12th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 2 KAIG3-RFI-CF-C-7036 00 Civil Cafeteria 8/17/22 Open
(12th of 18th layer) SP#125

Inspection and compaction test 13th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
2M 2N 6 KAIG3-RFI-MC-C-7037 00 Civil MCPE 1 8/17/22 Open
Zone 2M 2N ( 13th of 13th layer) SP#125

Inspection and compaction test 7th layer for backfilling PC between PC 80 to 79 Zone 1N (as highlighted)
1N 6 KAIG3-RFI-CO-C-7038 00 Civil Crescent 8/17/22 Open
(7th of 8th layer) SP#125

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and
6 6 KAIG3-RFI-SW-C-7039 00 Application of Primer (1st Coat, 2nd Coat and 3rd Coat) Concrete encasement of storm water pipe As Civil Site Work 8/17/22 Open
highlighted

D2 2 KAIG3-RFI-SW-C-7040 00 Inspection for Blinding Concrete under MV Line Pit - D/MV/18 at Zone-D (As Highlighted) Civil Site Work 8/17/22 Open

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for MV Line from G/MV/14 to
G3 3 KAIG3-RFI-SW-C-7041 00 Civil Site Work 8/18/22 Open
G/MV/24 at Zone-G (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 2) for the Duct Bank of
B3 3 KAIG3-RFI-SW-C-7042 00 Civil Site Work 8/18/22 Open
Telecommunications Line from B/TL/30 to B/TL/31 at Zone-B (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 2nd layer ( 2 of 2 ) for the Duct Bank of Fire &
B3 3 KAIG3-RFI-SW-C-7043 00 Civil Site Work 8/18/22 Open
Security Distribution Line from B/FS/03 to B/FS/04 at Zone-B (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit B/MV/23
BG5 5 KAIG3-RFI-SW-C-7044 00 Civil Site Work 8/18/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and compaction test 4th layer Backfilling in slope for Devonian Garden (as highlighted) Part A
2M 6 KAIG3-RFI-VG-C-7045 00 Civil Devonian Garden 8/17/22 Open
(4th of 5th layer)

Excavation & Soil Preparation for Open Channel 1, (Wadi # 1), Inside Water Garden, At Highlighted area in Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-7046 00 Civil 8/17/22 Open
attached Drawings. 1

Surface Preparation Prior to start Backfilling at Internal Building at zone 1N 1P (as highlighted) Beside
1N 1P 6 KAIG3-RFI-CO-C-7047 00 Civil Crescent 8/17/22 Open
Pilecap AT AXIS 01AO

Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - Wing Wall (Left Side) - As
4 4 KAIG3-RFI-SW-C-7048 00 Civil Site Work 8/18/22 Open
Highlighted

4 4 KAIG3-RFI-SW-C-7049 00 Inspection of Formwork for the Footing and Walls of SBC-07 - Wing Wall - As Highlighted Civil Site Work 8/18/22 Open

4 4 KAIG3-RFI-SW-C-7050 00 Inspection of Concrete Pouring for the Footing and Walls of SBC-07 - Wing Wall - As Highlighted Civil Site Work 8/18/22 Open

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (110 mm Ø- UPVC Pipes-Class 4 ) for
7 7 KAIG3-RFI-SW-C-7051 00 Civil Site Work 8/18/22 Open
Storm Water pipe Out Fall-K Next to ( MH-K-09 ) .As per high lighted Area in the attached Dwg.

Warning Tape Installation in pipes OUT FALL-K for (110 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
7 7 KAIG3-RFI-SW-C-7052 00 Civil Site Work 8/18/22 Open
pipe Out Fall-K Next to ( MH-K-09 ) .As per high lighted Area in the attached Dwg.

kaig-qcals 364
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 13th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 2 KAIG3-RFI-CF-C-7053 00 Civil Cafeteria 8/18/22 Open
(13th of 18th layer) SP#125

Inspection and compaction test 4th and 5th layer for Backfilling inside Cafeteria building( Second Part)
2A 2 KAIG3-RFI-CF-C-7054 00 Civil Cafeteria 8/18/22 Open
btween Axis 02B - 02D zone 2A (as Highlighted) (4th and 5th of 8th Layers)

Inspection and compaction test 9th and 10th layer for Backfilling strip footing at CRESCENT between PC
1D 6 KAIG3-RFI-CO-C-7055 00 Civil Crescent 8/18/22 Open
21-23-25 Axis 01K - 01M (9th and 10th of 15th layer)SP#125

Inspection and compaction test 7th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7056 00 Civil MCPE 2 8/18/22 Open
(7th of 12th layer) SP#125

Inspection and compaction test 1st & 2nd layer for Backfilling at Internal Building at zone 1N 1P (as
1N 1P 6 KAIG3-RFI-CO-C-7057 00 Civil Crescent 8/18/22 Open
highlighted) Beside Pilecap AT AXIS 01AO (1st & 2nd of 9th layers)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7058 00 Civil Site Work 8/18/22 Open
Manhole POC-27 and POC-28 - As Highlighted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 14) around foul water line manhole
6 6 KAIG3-RFI-SW-C-7059 00 Civil Site Work 8/18/22 Open
FW-A-13-5, FW-A-13-6 - at Zone-6 - As Highlighted (SP#133)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) for MV Line from G/MV/14 to
G3 3 KAIG3-RFI-SW-C-7060 00 Civil Site Work 8/20/22 Open
G/MV/24 at Zone-G (As Highlighted)

BG5 5 KAIG3-RFI-SW-C-7061 00 Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit B/MV/23 and G/MV/21at
Civil Zone-B&G - As
SiteHighlighted
Work (Stock8/20/22
Pile# 133 A-1-B)
Open

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7062 00 Civil Site Work 8/20/22 Open
Manhole POC-27 and POC-28 - As Highlighted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) upto blinding level for
6 6 KAIG3-RFI-SW-C-7063 00 Civil Site Work 8/20/22 Open
excavated area beside foul water line manhole FW-A-13-7- at Zone-6 - As Highlighted (SP#133 A-1-B)

Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 5th lift of Rock for
6 6 KAIG3-RFI-SW-C-7064 00 Civil Site Work 8/18/22 Open
Boulder in Wadi-03 (Left Side) - as highlighted (Stock Pile # 131 A-1-B)

Surface Preparation (Curing) prior to start waterproofing for Footing and Column Neck of Seating Area (1) at
G4 4 KAIG3-RFI-PA-C-7065 00 Civil Picnic Area 8/18/22 Open
Zone-G (SA-10) - As Highlighted

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
6H 6 KAIG3-RFI-SW-C-7066 00 Civil Site Work 8/20/22 Open
from H/MV/28 to H/MV/19 at Zone-H - as highlighted (SP#131)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
6H 6 KAIG3-RFI-SW-C-7067 00 Civil Site Work 8/20/22 Open
Potable Water Line at Zone-H - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for RO
6H 6 KAIG3-RFI-SW-C-7068 00 Civil Site Work 8/20/22 Open
Water Line at Zone-H - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H- As highlighted (Stock
H3 3 KAIG3-RFI-SW-C-7069 00 Civil Site Work 8/20/22 Open
Pile# 132)

Inspection for application of Primer, 1st coat and 2nd coat for Footing and Column neck of Seating Area 1 at
G4 4 KAIG3-RFI-PA-C-7070 00 Civil Picnic Area 8/21/22 Open
zone G (SA-10) as highlighted in drawing.

Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low Voltage
4A 4 KAIG3-RFI-WG-C-7071 00 (MH/WG/LV/1 to 3 & 8 to 9), Inside Mist Garden, at water Garden, as highlighted in attached drawing's.(SP Civil Water Play Garden 8/20/22 Open
140)

4A 4 KAIG3-RFI-WG-C-7072 00 Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Fire Alarm & Security from ( MH/WG/FA1
Civil to 3 Garden
Water Play ), Inside Mist Garden,
8/20/22 at water Open
Garden, as highlighted in attached drawing's.(SP 140)

Surface Preparation Prior to start Backfilling at Internal Building at zone 2A (as highlighted) AXIS 02A -
2A 2 KAIG3-RFI-CO-C-7073 00 Civil Crescent 8/20/22 Open
02B

Inspection and compaction test 14th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 2 KAIG3-RFI-CF-C-7074 00 Civil Cafeteria 8/20/22 Open
(14th of 18th layer) SP#125

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) beside the Telecommunications
G4 4 KAIG3-RFI-SW-C-7075 00 Line (To confine the sand cover) between G/TL/16 & G/TL/41 at Zone-G - As Highlighted (Stock Pile# 133 Civil Site Work 8/20/22 Open
A-1-B)

kaig-qcals 365
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) beside the Fire&Security Line
G4 4 KAIG3-RFI-SW-C-7076 00 (To confine the sand cover) between G/FS/19 & G/FS/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1- Civil Site Work 8/20/22 Open
B)

L5 5 KAIG3-RFI-SW-C-7077 00 Inspection of Excavation for MV Line Pulling Pit - L/MV/16, L/MV/05, L/MV/01 - as highlighted " Civil Site Work 8/21/22 Open

L5 5 KAIG3-RFI-SW-C-7077 01 Inspection of Excavation for MV Line Pulling Pit - L/MV/16, L/MV/05, L/MV/01 - as highlighted " Civil Site Work 8/25/22 Open

Surface Preparation prior to start backfilling around MV Line Pit C/MV/19 and C/MV/18 at Zone-C (As
C2 2 KAIG3-RFI-SW-C-7078 00 Civil Site Work 8/23/22 Open
Highlighted)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Line
H6 6 KAIG3-RFI-SW-C-7079 00 Civil Site Work 8/21/22 Open
from H/MV/19 to H/MV/13 at Zone-H - as highlighted (SP#131)

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/04, G/DH/05
G4 4 KAIG3-RFI-SW-C-7080 00 Civil Site Work 8/21/22 Open
and G/DC/06 at Zone-G - as highlighted

Surface Prepatio prior to start backfilling for Non-Potable water line Pit - NPW-ISC-16 NPW-ISC-18 and at
G4 4 KAIG3-RFI-SW-C-7081 00 Civil Site Work 8/20/22 Open
Zone G -as highlighted

Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/08 at Zone-G - as
G5 5 KAIG3-RFI-SW-C-7082 00 Civil Site Work 8/23/22 Open
highlighted

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short
6B 6 KAIG3-RFI-SW-C-7083 00 piece and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-3-7, FW-A-3-7.1 and FW-A-3- Civil Site Work 8/23/22 Open
7.2 (As Highlighted)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit
G5 5 KAIG3-RFI-SW-C-7084 00 Civil Site Work 8/24/22 Open
G/FS/01 at zone G (As Highlighted)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunication Line Pit
G5 5 KAIG3-RFI-SW-C-7085 00 Civil Site Work 8/24/22 Open
G/TL/08 at Zone-G - as highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 10) around foul water line manhole
G5 5 KAIG3-RFI-SW-C-7086 00 Civil Site Work 8/24/22 Open
FW-A-13-7 - at Zone-6 - As Highlighted (SP#133)

Excavation & Bed preparation for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room to
4D 4 KAIG3-RFI-PG-C-7087 00 Civil Physic Garden 8/20/22 Open
Outer Canopy 3 (Outer side), at Physic garden, as highlighted area in attached drawing's.

Sand Cover and Protection for Water Feature Lines from Water play garden to Fountain of Geyser Garden, at
4A 4 KAIG3-RFI-WG-C-7088 00 Civil Water Play Garden 8/20/22 Open
Water Garden as highlighted area in attached drawing's.

Excavation & Bed Preparation for Irrigation Sub-Main Line Distribution Network (50,63,90 mm line) at
5A 5 KAIG3-RFI-SG-C-7090 00 Civil Sound & Light Garden 8/20/22 Open
Sound And Light Garden, as highlighted area in the attached drawings.

G4 4 KAIG3-RFI-SW-C-7091 00 Inspection of Excavation for Heating and Chilled Water Line Pit G/DC/03 at Zone-G - As highlighted Civil Site Work 8/21/22 Open

Surface Preparation Prior to Start Backfilling for Storm Water Line Manhole MH-O-08-1, MH-O-09, MH-O-
26 6 KAIG3-RFI-SW-C-7092 00 10 and Gullies G-O-07, G-O-08, G-O-09, G-O-18, G-O-19, G-O-17, G-O-16, G-O-15, G-O-14 - As Civil Site Work 8/21/22 Open
Highlighted

Surface Preparation prior to start backfilling beside the Telecommunications Line (To confine the sand cover)
G4 4 KAIG3-RFI-SW-C-7093 00 Civil Site Work 8/21/22 Open
from G/TL/49 & G/TL/51 at Zone-G (As Highlighted)

Surface Preparation prior to start backfilling beside the Fire&Security Line (To confine the sand cover) from
G4 4 KAIG3-RFI-SW-C-7094 00 Civil Site Work 8/21/22 Open
G/FS/46 & G/FS/47 at Zone-G (As Highlighted)

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit B/MV/23
BG 5 KAIG3-RFI-SW-C-7095 00 Civil Site Work 8/21/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7096 00 Civil Site Work 8/21/22 Open
Manhole POC-27 and POC-28 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) upto blinding level for excavated
6 6 KAIG3-RFI-SW-C-7097 00 Civil Site Work 8/21/22 Open
area beside foul water line manhole FW-A-13-7- at Zone-6 - As Highlighted (SP#133 A-1-B)

kaig-qcals 366
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Telecommunications
G4 4 KAIG3-RFI-SW-C-7098 00 Line (To confine the sand cover) between G/TL/16 & G/TL/41 at Zone-G - As Highlighted (Stock Pile# 133 Civil Site Work 8/21/22 Open
A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Fire&Security Line
G4 4 KAIG3-RFI-SW-C-7099 00 (To confine the sand cover) between G/FS/19 & G/FS/24 at Zone-G - As Highlighted (Stock Pile# 133 A-1- Civil Site Work 8/21/22 Open
B)

D2 2 KAIG3-RFI-SW-C-7100 00 Surface Prepatio prior to start backfilling for Non-Potable water line Pit - NPW-ISC-30 at Zone D - as highlighted "  Civil Site Work 8/21/22 Open

Excavation & Soil preparation prior to Boulders Along Boundary Wall (Inner side), at Discovery Garden, as
4B 4 KAIG3-RFI-DG-C-7101 00 Civil Site Work 8/21/22 Open
highlighted in the attached drawings.

Sand Cover & Protection for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm),
4A 4 KAIG3-RFI-WG-C-7102 00 Civil Water Play Garden 8/21/22 Open
Bottom Left Side of Geyser Garden, at Water Garden as highlighted area in attached drawing's.

Inspection and compaction test 11th and 12th layer for Backfilling strip footing at CRESCENT between PC
1D 6 KAIG3-RFI-CO-C-7104 00 Civil Crescent 8/21/22 Open
21-23-25 Axis 01K - 01M (11th and 12th of 15th layer)SP#125

Inspection and compaction test 8th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7105 00 Civil MCPE 2 8/21/22 Open
(8th of 12th layer) SP#125

Inspection and compaction test 8th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2J 6 KAIG3-RFI-MC-C-7106 00 Civil MCPE 2 8/21/22 Open
highlighted) (8th of 12 layers )

Inspection and compaction test 3rd & 4th layer for Backfilling at Internal Building at zone 1N 1P (as
1N 1P 6 KAIG3-RFI-CO-C-7107 00 Civil Crescent 8/21/22 Open
highlighted) Beside Pilecap AT AXIS 01AO (3rd & 4th of 9th layers)

Inspection and compaction test 8th layer for backfilling PC between PC 80 to 79 Zone 1N (as highlighted)
1N 6 KAIG3-RFI-CO-C-7108 00 Civil Crescent 8/21/22 Open
(8th of 8th layer) SP#125

Inspection and compaction test 1st & 2nd layer for Backfilling at MCPE 1 Zone 2N (as highlighted) axis
2M 2N 6 KAIG3-RFI-MC-C-7109 00 Civil MCPE 1 8/21/22 Open
03V, 03-1 to 02-2, (1st & 2nd of 3rd layers)

Excavation Under Blinding for Stone Edger inside water play Garden, at water Gardenas highlighted area in
4B 4 KAIG3-RFI-WG-C-7110 00 Civil Water Play Garden 8/21/22 Open
attached drawing's.
Inspection & Compaction test for 1st Layer Subgrade (Out of 2 layers Subgrade) above Sub surface Pipes (dia
4B 4 KAIG3-RFI-WG-C-7111 00 110 mm Sub main & Sleeves) at entrance of Boat garden, Inside Water Garden as highlighted area in attached Civil Water Play Garden 8/21/22 Open
drawing's. (SP# 135 )
Sand Cover & Protection for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside Butterfly
4C 4 KAIG3-RFI-TG-C-7112 00 Civil Butterfly Garden 8/21/22 Open
Garden, as highlighted area in attached drawing's.

Inspection of Thrust Block for HDPE Water Feature pipes at Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-C-7113 00 Civil Butterfly Garden 8/21/22 Open
drawing's. attached KAIG3-SCR-SW-C-0021-00

Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/41 at Zone-G - as
G4 4 KAIG3-RFI-SW-C-7114 00 Civil Site Work 8/21/22 Open
highlighted

Surface Preparation prior to start backfilling for Fire&Security Line Pit G/FS/24 at Zone-G (As Highlighted)
G4 4 KAIG3-RFI-SW-C-7115 00 Civil Site Work 8/21/22 Open

Surface Preparation prior to start backfilling around MV Line Pit G/MV/18 and G/MV/14 at Zone-G - As
G4 4 KAIG3-RFI-SW-C-7116 00 Civil Site Work 8/21/22 Open
Highlighted

Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-G&K - as highlighted (Stock
GK5 5 KAIG3-RFI-SW-C-7117 00 Civil Site Work 8/21/22 Open
Pile# 132)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) For Manholes MH-O-01, MH-
C2 2 KAIG3-RFI-SW-C-7118 00 O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G-O-34, G-O- Civil Site Work 8/23/22 Open
43, G-O-44 and branches - as Highlighted (Stock Pile# 131 A-1-B)

"Inspection for Blinding Concrete under MV Line Pit - C/MV/13 and C/MV/20 at Zone-C (As Highlighted) "
C3 3 KAIG3-RFI-SW-C-7119 00 Civil Site Work 8/21/22 Open

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DC/15, G/DC/08,
GK5 5 KAIG3-RFI-SW-C-7120 00 Civil Site Work 8/21/22 Open
G/DC/16, K/DC/01, K/DC/02 at Zone-G&K - as highlighted

Inspection of Thrust Block for Fire Fighting Pipes at Butterfly Garden, as highlighted area in attached
4C 4 KAIG3-RFI-TG-C-7121 00 Civil Butterfly Garden 8/21/22 Open
drawing's. attached KAIG3-SCR-SW-C-0021-00

kaig-qcals 367
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Sand Cover & Protection for Irrigation Sub-Main Line Distribution Network (50,110 mm line) East of Geyser
4A 4 KAIG3-RFI-WG-C-7122 00 Civil Water Play Garden 8/21/22 Open
Garden inside Water Garden, as highlighted area in the attached drawings.

Inspection for Installation of MV Line Pit Slab - C/MV/13, C/MV/31, C/MV/21, C/MV/19, C/MV/18,
5 5 KAIG3-RFI-SW-C-7123 00 Civil Site Work 8/21/22 Open
C/MV/15, G/MV/01, G/MV/14, H/MV/05, H/MV/32, L/MV/07, L/MV/08, L/MV/09 - as highlighted

6B 6 KAIG3-RFI-SW-C-7125 00 KAIG3-SD-SW-C-DP-1229-03, KAIG3-SD-SW-C-DP-7104-01, KAIG3-SD-GN-G-SU-4009-01 Civil Site Work 8/22/22 Open

"Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
4 4 KAIG3-RFI-SW-C-7126 00 Civil Site Work 8/22/22 Open
SBC-08 (Left Side) Footing and Wall of Wing Wall (As Highlighted)"

Surface Preparation prior to start backfilling for Footing and Column Neck of Seating Area (1) at Zone-G
G4 4 KAIG3-RFI-PA-C-7127 00 Civil Picnic Area 8/22/22 Open
(SA-10) - As Highlighted

BG4 4 KAIG3-RFI-SW-C-7128 00 Excavation for Fire Water Line at Zone-B&G - as highlighted Civil Site Work 8/22/22 Open

B4 4 KAIG3-RFI-SW-C-7129 00 Excavation for Potable Water Line at Zone-B - as highlighted Civil Site Work 8/22/22 Open

Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit F/DH/04, F/DC/05,
G4 4 KAIG3-RFI-SW-C-7130 00 Civil Site Work 8/22/22 Open
G/DC/01, G/DH/02 - As highlighted

4 4 KAIG3-RFI-SW-C-7131 00 Inspection of Excavation for RO Water Line at Area-A - As highlighted Civil Site Work 8/22/22 Open

BG4 4 KAIG3-RFI-SW-C-7132 00 Inspection of Excavation for Non-Potable Water Line at Zone-B&G - as highlighted Civil Site Work 8/22/22 Open

Inspection of Excavation for Heating and Chilled Water Line at Zone-B including Pit G/DC/20, G/DH/21,
B4 4 KAIG3-RFI-SW-C-7133 00 Civil Site Work 8/22/22 Open
G/DC/22 - As highlighted

Inspection of Excavation for Storm Water Line at Zone-2&3 including Manhole MH-O-11 and Gullies G-O-
2 3 KAIG3-RFI-SW-C-7134 00 Civil Site Work 8/22/22 Open
10, G-O-11, G-O-12 - As highlighted

"Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) around MV Line Pit B/MV/23
BG4 4 KAIG3-RFI-SW-C-7135 00 Civil Site Work 8/22/22 Open
and G/MV/21at Zone-B&G - As Highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7136 00 Civil Site Work 8/22/22 Open
Manhole POC-27 and POC-28 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/18
G4 4 KAIG3-RFI-SW-C-7137 00 Civil Site Work 8/22/22 Open
and G/MV/14 at Zone-G - As Highlighted (SP#133)

"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7138 00 Civil Site Work 8/22/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Red Tiles for MV Line
H6 6 KAIG3-RFI-SW-C-7139 00 Civil Site Work 8/22/22 Open
from H/MV/19 to H/MV/13 at Zone-H - as highlighted (SP#131)

Surface Preparation prior to start backfilling around MV Line Pit B/MV/15, C/MV/12 and C/MV/21 at Zone-
H6 6 KAIG3-RFI-SW-C-7140 00 Civil Site Work 8/23/22 Open
B&C- As Highlighted

300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for(160 mmØ - UPVC- Class 4) from
7 6 KAIG3-RFI-SW-C-7141 00 (FW-A-3-7 to FW-A-3-7-1 to FW-A-3-7-2 to FW-A-3-7-3). At CRECENT Zone 7.As per highlighted Area Civil Site Work 8/23/22 Open
in the attached Dwg.

Warning Tape Installation of Foul Water Line for (160 mmØ - UPVC- Class 4) from (FW-A-3-7 to FW-A-3-
7 6 KAIG3-RFI-SW-C-7142 00 Civil Site Work 8/23/22 Open
7-1 to FW-A-3-7-2 to FW-A-3-7-3). At CRECENT Zone 7.As per highlighted Area in the attached Dwg.

Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (Dia400mm Ø- UPVC Pipes-Class 4) for
7 6 KAIG3-RFI-SW-C-7143 Storm Water pipe Out Fall-K From (MH-K-09 to MH-K-10) (Red Line) .As per high lighted Area in the Civil Site Work 8/23/22 Open
attached Dwg.

kaig-qcals 368
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Warning Tape Installation in pipes OUT FALL-K for(Dia400mm Ø- UPVC Pipes-Class 4) for Storm Water
7 6 KAIG3-RFI-SW-C-7144 00 Civil Site Work 8/23/22 Open
pipe Out Fall-K From (MH-K-09 to MH-K-10) (Red Line) .As per high lighted Area in the attached Dwg.

Inspection & Compaction tests of 3rd (Final) Layer (Sub-Grade) Backfilling along Foundation of Boundary
4B 4 KAIG3-RFI-AG-C-7145 00 wall (Outer Face) @ Grid (1-23/Left Side), at Aviary Garden, As per Highlighted in attached Drawing's. (SP Civil Aviary Garden 8/22/22 Open
135)

Inspection & Compaction Tests of 1st Layer Backfilling Subgrade (Out of 2 Layers Subgrade) for Water
4A 4 KAIG3-RFI-WG-C-7146 00 Feature Lines (HDPE dia 63 mm) from Water play garden to Fountain of Geyser Garden, at Water Garden as Civil Water Play Garden 8/22/22 Open
highlighted area in attached drawing's. ( SP# 135 )

Inspection and compaction test 1st layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (1st
2N 2 KAIG3-RFI-CO-C-7147 00 Civil Crescent 8/22/22 Open
of 4th) axis 02AR

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside the Telecommunications
C3 3 KAIG3-RFI-SW-C-7148 00 Line (To confine the sand cover) from C/TL/49 & C/TL/51 at Zone-G - As Highlighted (Stock Pile# 131 A-1- Civil Site Work 8/22/22 Open
B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside the Fire&Security Line
C3 3 KAIG3-RFI-SW-C-7149 00 Civil Site Work 8/22/22 Open
(To confine the sand cover) from C/FS/46 & C/FS/47 at Zone-C - As Highlighted (Stock Pile# 131 A-1-B)

H6 6 KAIG3-RFI-SW-C-7150 00 Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit H/MV/02, H/MV/03,
Civil
H/MV/13 and H/MV/24
Site Work
at Zone-H - As Highlighted
8/22/22 (SP#131
OpenA-1-B)

Inspectionand Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
L5 5 KAIG3-RFI-SW-C-7151 00 Civil Site Work 8/22/22 Open
Potable Water Line at Zone-L - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-44 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-7152 00 Civil Site Work 8/23/22 Open
highlighted

B4 4 KAIG3-RFI-SW-C-7153 00 Inspection of Sand bedding under pipe for RO Water Line at Zone-B - As highlighted (Stock Pile#132) Civil Site Work 8/23/22 Open

BG4 4 00 Inspection of Sand bedding under pipe for Fire Water Line at Zone-B&G - as highlighted (Stock Pile# 132) Civil Site Work 8/23/22 Open
KAIG3-RFI-SW-C-7154

BG4 4 KAIG3-RFI-SW-C-7155 00 Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B&G - as highlighted Civil Site Work 8/23/22 Open

B4 4 KAIG3-RFI-SW-C-7156 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-B - as highlighted (stock Pile# 132) Civil Site Work 8/23/22 Open

Surface Preparation prior to start backfilling for SBC-08 (Left Side) - Footing and wall of Wing Wall - as
4 4 KAIG3-RFI-SW-C-7158 00 Civil Site Work 8/23/22 Open
highlighted
Surface Preparation prior to start backfilling for Footing and Column Neck of Seating Area (1) at Zone-K
K5 5 KAIG3-RFI-PA-C-7159 00 Civil Picnic Area 8/23/22 Open
(SA-17) - As Highlighted

4 4 KAIG3-RFI-SW-C-7160 00 Inspection of Steel Reinforcement for the Top Slab of SBC-07 - (Left Side) - As Highlighted Civil Site Work 8/23/22 Open

Inspection and compaction test 15th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 6 KAIG3-RFI-CF-C-7161 00 Civil Cafeteria 8/23/22 Open
(15th of 18th layer) SP#125
Inspection and compaction test 1st & 2nd layer for Backfilling at Internal Building at zone 2A (as
2A 6 KAIG3-RFI-CO-C-7162 00 Civil Crescent 8/22/22 Open
highlighted) AXIS 02A - 02B (1st & 2nd of 8th layers )
Inspection and compaction test 9th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 2 KAIG3-RFI-MC-C-7163 00 Civil MCPE 2 8/23/22 Open
highlighted) (9th of 12 layers )
Inspection and compaction test 9th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 2 KAIG3-RFI-MC-C-7164 00 Civil MCPE 2 8/23/22 Open
(9th of 12th layer) SP#125

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7165 00 Civil Site Work 8/23/22 Open
Manhole POC-27 and POC-28 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/18
G4 4 KAIG3-RFI-SW-C-7166 00 Civil Site Work 8/23/22 Open
and G/MV/14 at Zone-G - As Highlighted (SP#133)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7167 00 Civil Site Work 8/23/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)

kaig-qcals 369
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non-Potable water line Pit -
D2 2 KAIG3-RFI-SW-C-7168 00 Civil Site Work 8/23/22 Open
NPW-ISC-30 at Zone D - as highlighted (Stock Pile# 133 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) upto blinding level for excavated
6 6 KAIG3-RFI-SW-C-7169 00 Civil Site Work 8/23/22 Open
area beside foul water line manhole FW-A-13-7- at Zone-6 - As Highlighted (SP#133 A-1-B)

Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/PG/LV/06-12) and Emergency
4D 4 KAIG3-RFI-PG-C-7170 00 Civil Physic Garden 8/23/22 Open
(MH/PG/EM/04-13), Inside Physic Garden as highlighted in attached drawing's.

Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/06-17) and Fire Alarm & Security lines
4D 4 KAIG3-RFI-PG-C-7171 00 Civil Physic Garden 8/23/22 Open
(MH/PG/FA/03-12), Inside Physic Garden as highlighted in attached drawing's.

Sand Bedding for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room to Outer Canopy 3
4D 4 KAIG3-RFI-PG-C-7174 00 Civil Physic Garden 8/23/22 Open
(Outer side), at Physic garden, as highlighted area in attached drawing's.

Sand Bedding for Irrigation Sub-Main Line Distribution Network (50,63,90 mm line) at Sound And Light
5A 5 KAIG3-RFI-SG-C-7175 00 Civil Sound & Light Garden 8/23/22 Open
Garden, as highlighted area in the attached drawings.

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit H/MV/02,
H6 6 KAIG3-RFI-SW-C-7176 00 Civil Site Work 8/23/22 Open
H/MV/03, H/MV/13 and H/MV/24 at Zone-H - As Highlighted (SP#131 A-1-B)

Surface Preparation prior to start backfilling for Non potable water line pit POC-18 at zone C - As
C3 3 KAIG3-RFI-SW-C-7177 00 Civil Site Work 8/23/22 Open
Highlighted

Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Non potable water line-
G5 5 KAIG3-RFI-SW-C-7178 00 Civil Site Work 8/24/22 Open
Manhole POC-27 and POC-28 - As Highlighted (SP# 133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/18
G4 4 KAIG3-RFI-SW-C-7179 00 Civil Site Work 8/24/22 Open
and G/MV/14 at Zone-G - As Highlighted (SP#133)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7180 00 Civil Site Work 8/24/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)

Inspection of Sand Covering to protect the pipe for Fire Water Line at Zone-B&G - as highlighted (Stock
BG4 4 KAIG3-RFI-SW-C-7181 00 Civil Site Work 8/23/22 Open
Pile# 132)
Inspection of Sand Covering to protect the pipe for Potable Water Line at Zone-B&G - as highlighted (stock
BG4 4 KAIG3-RFI-SW-C-7182 00 Civil Site Work 8/23/22 Open
Pile# 132)

BG4 4 KAIG3-RFI-SW-C-7184 00 Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B&G - as highlighted Civil Site Work 8/23/22 Open

Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B&G - As highlighted (Stock
BG4 4 KAIG3-RFI-SW-C-7185 00 Civil Site Work 8/23/22 Open
Pile#132)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit C/MV/21,
6 6 KAIG3-RFI-SW-C-7186 00 Civil Site Work 8/24/22 Open
C/MV/12 C/MV/15 and H/MV/25 at Zone-C&H - As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Footing and Column Neck of
G4 4 KAIG3-RFI-PA-C-7187 00 Civil Picnic Area 8/24/22 Open
Seating Area (1) at Zone-G (SA-10) - As Highlighted

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Footing and Column Neck of
K5 5 KAIG3-RFI-PA-C-7188 00 Civil Picnic Area 8/24/22 Open
Seating Area (1) at Zone-K (SA-17) - As Highlighted

Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Stock
G4 4 KAIG3-RFI-SW-C-7189 00 Civil Site Work 8/24/22 Open
Pile# 132)

Inspectionand Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
L5 5 KAIG3-RFI-SW-C-7190 00 Civil Site Work 8/24/22 Open
Potable Water Line at Zone-L - as highlighted in the attached drawing (SP# 131 A-1-B)

Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 2A (as highlighted)
2A 6 KAIG3-RFI-CO-C-7191 00 Civil Crescent 8/24/22 Open
AXIS 02A - 02B (3rd of 8th layers )

kaig-qcals 370
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 13th and 14th layer for Backfilling strip footing at CRESCENT between PC
1D 6 KAIG3-RFI-CO-C-7192 00 Civil Crescent 8/24/22 Open
21-23-25 Axis 01K - 01M (13th and 14th of 15th layer)SP#125

Inspection and compaction test 5th & 6th layer for Backfilling at Internal Building at zone 1N 1P (as
1N 1P 6 KAIG3-RFI-CO-C-7193 00 Civil Crescent 8/24/22 Open
highlighted) Beside Pilecap AT AXIS 01AO (5th & 6th of 9th layers)

Surface Preparation Prior to start Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted) zone 2J 2K
2J 2K 6 KAIG3-RFI-MC-C-7194 00 Civil MCPE 2 8/24/22 Open

Inspection and compaction test 2nd layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (2nd
2N 6 KAIG3-RFI-CO-C-7195 00 Civil Crescent 8/24/22 Open
of 4th) axis 02AR
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 2A (as highlighted)
2A 6 KAIG3-RFI-CO-C-7196 00 Civil Crescent 8/24/22 Open
AXIS 02A - 02B (4th of 8th layers )
Inspection and compaction test 16th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
2B 6 KAIG3-RFI-CF-C-7197 00 Civil Cafeteria 8/24/22 Open
highlighted) (16th of 18th layer) SP#125
Inspection and compaction test 10th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7198 00 Civil MCPE 2 8/24/22 Open
(10th of 12th layer) SP#125
Inspection and compaction test 10th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-7199 00 Civil MCPE 2 8/24/22 Open
highlighted) (10th of 12 layers )
Surface Preparation Prior to start Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zone 2A (as
2A 6 KAIG3-RFI-CF-C-7200 00 Civil Cafeteria 8/24/22 Open
highlighted)

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for RO
L5 5 KAIG3-RFI-SW-C-7201 00 Civil Site Work 8/24/22 Open
Water Line at Zone-L - as highlighted (SP# 131 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit C/MV/21,
6 6 KAIG3-RFI-SW-C-7202 00 Civil Site Work 8/24/22 Open
C/MV/12 C/MV/15 and H/MV/25 at Zone-C&H - As Highlighted (SP#131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) For Manholes MH-O-01, MH-
C2 2 KAIG3-RFI-SW-C-7203 00 O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G-O-34, G-O- Civil Site Work 8/24/22 Open
43, G-O-44 and branches - as Highlighted (Stock Pile# 131 A-1-B)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Fire&Security Line
C3 3 KAIG3-RFI-SW-C-7204 00 (To confine the sand cover) from C/FS/46 & C/FS/47 at Zone-C - As Highlighted (Stock Pile# 131 A-1-B) Civil Site Work 8/24/22 Open

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Telecommunications
C3 3 KAIG3-RFI-SW-C-7205 00 Line (To confine the sand cover) from C/TL/49 & C/TL/51 at Zone-G - As Highlighted (Stock Pile# 131 A-1- Civil Site Work 8/24/22 Open
B)

Sand Covering Layer for Protection of Telecommunications Line between (G/TL/16 and G/TL/41) at Zone-G
G4 4 KAIG3-RFI-SW-C-7206 00 Civil Site Work 8/24/22 Open
as highlighted in the attached drawing (SP#132)

Sand Covering Layer for Protection of Fire & Security Line between (G/FS/19 and G/FS/24) at Zone-G as
G4 4 KAIG3-RFI-SW-C-7207 00 Civil Site Work 8/24/22 Open
highlighted in the attached drawing (SP#132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-L&M - as highlighted
LM5 5 KAIG3-RFI-SW-C-7208 00 Civil Site Work 8/25/22 Open
(Stock Pile#132)
Excavation for Storm Water Line from MH-G-14 to MH-G-12 including branch and Manhole MH-G-14,
3 3 KAIG3-RFI-SW-C-7209 00 Civil Site Work 8/25/22 Open
MH-G-13, MH-G-12 - As highlighted

B3 3 KAIG3-RFI-SW-C-7211 00 "Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/11 at Zone-B (As Highlighted) " Civil Site Work 8/24/22 Open

"Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/11 at Zone-B (As
BG3 3 KAIG3-RFI-SW-C-7212 00 Civil Site Work 8/24/22 Open
Highlighted) "

C3 3 KAIG3-RFI-SW-C-7213 00 INSPECTION FOR INSTALLATION OF SLAB FOR C/MV/23 and C/MV/40 at zone C (As Highlighted) Civil Site Work 8/24/22 Open

Surface Preparation prior to start backfilling for Telecommunications Line pit B/TL/30 and B/TL/31 at Zone-
B3 3 KAIG3-RFI-SW-C-7214 00 Civil Site Work 8/24/22 Open
B (As Highlighted)
Surface Preparation prior to start backfilling for Fire & Security Distribution Line pit B/FS/03 and B/FS/04 at
B3 3 KAIG3-RFI-SW-C-7215 00 Civil Site Work 8/24/22 Open
Zone-B (As Highlighted)
Surface Preparation prior to start backfilling for Fire&Security Line Pit G/FS/01 at zone G (As Highlighted)
G4 4 KAIG3-RFI-SW-C-7216 00 Civil Site Work 8/25/22 Open
(SP#133)
Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/19, L/MV/16, L/MV/05 and L/MV/01 at
5 5 KAIG3-RFI-SW-C-7217 00 Civil Site Work 8/25/22 Open
Zone-H&L (As Highlighted)

kaig-qcals 371
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/19, L/MV/16, L/MV/05 and
5 5 KAIG3-RFI-SW-C-7218 00 Civil Site Work 8/25/22 Open
L/MV/01 at Zone-H&L (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit
5 5 KAIG3-RFI-SW-C-7219 00 Civil Site Work 8/25/22 Open
G/FS/01 at zone G (As Highlighted) (SP#133)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunication Line
G5 5 KAIG3-RFI-SW-C-7220 00 Civil Site Work 8/25/22 Open
Pit G/TL/08 at Zone-G - as highlighted (SP#133)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 10) around foul water line
6 6 KAIG3-RFI-SW-C-7221 00 Civil Site Work 8/25/22 Open
manhole FW-A-13-7 - at Zone-6 - As Highlighted (SP#133)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/18
G4 4 KAIG3-RFI-SW-C-7222 00 Civil Site Work 8/25/22 Open
and G/MV/14 at Zone-G - As Highlighted (SP#133)

"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7223 00 Civil Site Work 8/25/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non-Potable water line Pit -
D2 2 KAIG3-RFI-SW-C-7224 00 Civil Site Work 8/25/22 Open
NPW-ISC-30 at Zone D - as highlighted (Stock Pile# 133 A-1-B)"

inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunications Line pit
3B 3 KAIG3-RFI-SW-C-7225 00 Civil Site Work 8/25/22 Open
B/TL/30 and B/TL/31 at Zone-B (As Highlighted) (SP#133)

inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire & Security Distribution
3B 3 KAIG3-RFI-SW-C-7226 00 Civil Site Work 8/25/22 Open
Line pit B/FS/03 and B/FS/04 at Zone-B (As Highlighted) (SP#133)

Inspection of Formwork for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at Zone-E
2 2 KAIG3-RFI-SW-C-7227 00 Civil Site Work 8/25/22 Open
(As Highlighted)
Inspection of Concrete Pouring for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at
2 2 KAIG3-RFI-SW-C-7228 00 Civil Site Work 8/25/22 Open
Zone-E (As Highlighted)
"Inspection and compaction test for 1st layer under lower EPDM for cretaceous garden zone 2D,2E (as
2D 2 KAIG3-RFI-RG-C-7229 00 Civil Cretaceous Garden 8/25/22 Open
highlighted), KAIG3-SCR-GN-C-0027-00 "

Inspection and compaction test 5th and 6th layer for Backfilling at Internal Building at zone 2A (as
2A 6 KAIG3-RFI-CO-C-7230 00 Civil Crescent 8/25/22 Open
highlighted) AXIS 02A - 02B (5th and 6th of 8th layers )

Inspection and compaction test 1st & 2nd layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2
2A 6 KAIG3-RFI-CF-C-7231 00 Civil Cafeteria 8/25/22 Open
Zone 2A (as highlighted) ( 1st & 2nd of 5th layers )

Inspection and compaction test 11th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7232 00 Civil MCPE 2 8/25/22 Open
(11th of 12th layer) SP#125
Inspection and compaction test 11th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as
2H 6 KAIG3-RFI-MC-C-7233 00 Civil MCPE 2 8/25/22 Open
highlighted) (11th of 12 layers )
nspection and compaction test 1st layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7234 00 Civil MCPE 4 8/25/22 Open
highlighted)
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Fire Water Line Pit for
C2 2 KAIG3-RFI-SW-C-7235 00 Civil Site Work 8/25/22 Open
C/F/16, C/F/17 - as highlighted. (SP#133)

inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit C/MV/19
C2 2 KAIG3-RFI-SW-C-7236 00 Civil Site Work 8/25/22 Open
and C/MV/18 at Zone-C (As Highlighted)(SP#133)

inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Potable Water Line Pit
C2 2 KAIG3-RFI-SW-C-7237 00 Civil Site Work 8/25/22 Open
for C/PW/06 - as highlighted. (SP#133)

"inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 9) for Storm Water Line Manhole
6 6 KAIG3-RFI-SW-C-7238 00 MH-O-08-1, MH-O-09, MH-O-10 and Gullies G-O-07, G-O-08, G-O-09, G-O-18, G-O-19, G-O-17, G-O-16, Civil Site Work 8/25/22 Open
G-O-15, G-O-14 - As Highlighted"

inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line pit
C3 3 KAIG3-RFI-SW-C-7239 00 Civil Site Work 8/25/22 Open
POC-18 at zone C - As Highlighted (SP#133)
Sand Covering Layer for Protection of Telecommunications Line from (C/TL/49 to C/TL/51) at Zone-C as
C3 3 KAIG3-RFI-SW-C-7240 00 Civil Site Work 8/25/22 Open
highlighted in the attached drawing (SP#132)
Sand Covering Layer for Protection of Fire & Security Line from (C/FS/46 to C/FS/47) at Zone-C as
C3 3 KAIG3-RFI-SW-C-7241 00 Civil Site Work 8/25/22 Open
highlighted in the attached drawing (SP#132)

kaig-qcals 372
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Excavation & Surface Preparation Prior to Cast Blinding of boundary wall @ span 47 @ Water Garden at
4B 4 KAIG3-RFI-WG-C-7242 00 Civil Water Play Garden 8/27/22 Open
highlighted area in attached Drawing's.

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 14) around foul water line manhole
6 6 KAIG3-RFI-SW-C-7243 00 Civil Site Work 8/27/22 Open
FW-A-13-5, FW-A-13-6 - at Zone-6 - As Highlighted (SP#133)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit
G5 5 KAIG3-RFI-SW-C-7244 00 Civil Site Work 8/27/22 Open
G/FS/01 at zone G (As Highlighted) (SP#133)

Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/18
G4 4 KAIG3-RFI-SW-C-7245 00 Civil Site Work 8/27/22 Open
and G/MV/14 at Zone-G - As Highlighted (SP#133)

"Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7246 00 Civil Site Work 8/27/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunications Line pit
B3 3 KAIG3-RFI-SW-C-7247 00 Civil Site Work 8/27/22 Open
B/TL/30 and B/TL/31 at Zone-B (As Highlighted) (SP#133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire & Security Distribution
B3 3 KAIG3-RFI-SW-C-7248 00 Civil Site Work 8/27/22 Open
Line pit B/FS/03 and B/FS/04 at Zone-B (As Highlighted) (SP#133 A-1-B)

G4 4 KAIG3-RFI-SW-C-7249 00 Surface Preparation prior to start backfilling around MV Line Pit G/MV/37 at Zone-G (As Highlighted) Civil Site Work 8/27/22 Open

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Footing and Column Neck
K5 5 KAIG3-RFI-PA-C-7250 00 Civil Picnic Area 8/27/22 Open
of Seating Area (1) at Zone-K (SA-17) - As Highlighted (Stock Pile# 131 A-1-B)"

Inspection and compaction test 3rd layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zone
2A 6 KAIG3-RFI-CF-C-7252 00 Civil Cafeteria 8/27/22 Open
2A (as highlighted) ( 3rd of 5th layers )
Surface Preparation Prior to start Backfilling at Internal Building at zone 1N (as highlighted) Axis 01-2 to 01-
1N 6 KAIG3-RFI-CO-C-7253 00 Civil Crescent 8/27/22 Open
1, 01An to 01AM
Inspection and compaction test 3rd layer for Backfilling at MCPE 1 Zone 2N (as highlighted) axis 03V, 03-
2M 2N 6 KAIG3-RFI-MC-C-7254 00 Civil MCPE 1 8/27/22 Open
1 to 02-2, (3rd of 3rd layers)
Surface Preparation Prior to Backfilling, at entrance of Boat garden, Inside Water Garden as highlighted area
4B 4 KAIG3-RFI-WG-C-7255 00 Civil Water Play Garden 8/27/22 Open
in attached drawing's.(SP# 135)

Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders of
4B 4 KAIG3-RFI-WG-C-7256 00 Civil Water Play Garden 8/27/22 Open
Boat Garden, inside Water Garden, as highlighted area in attached drawing's. (SP 135)

Inspection and Compaction Test for backfilling Gravel 1st Layer (1 of 1) For Manholes MH-O-01, MH-O-02,
C2 2 KAIG3-RFI-SW-C-7257 00 MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G-O-34, G-O-43, G- Civil Site Work 8/27/22 Open
O-44 and branches - as Highlighted (Stock Pile# 138)

B4 4 KAIG3-RFI-SW-C-7258 00 Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B - As highlighted (Stock Pile#132) Civil Site Work 8/27/22 Open

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Footing and Column Neck
G4 4 KAIG3-RFI-PA-C-7259 00 Civil Picnic Area 8/28/22 Open
of Seating Area (1) at Zone-G (SA-10) - As Highlighted (Stock Pile# 131 A-1-B)"

Inspection of Excavation for Heating and Chilled Water Line at Zone-F including Pit F/DC/01 & F/DC/02 -
F4 4 KAIG3-RFI-SW-C-7260 00 Civil Site Work 8/28/22 Open
As highlighted

Inspection & Compaction Tests of 1st Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
4B 4 KAIG3-RFI-WG-C-7262 00 Civil Water Play Garden 8/28/22 Open
Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted area in attached Drawings.SP# 135 .

4 4 KAIG3-RFI-SW-C-7263 00 Inspection of Formwork for Wall and Top Slab of SBC-07 - (Left Side) - As Highlighted Civil Site Work 8/28/22 Open

4 4 KAIG3-RFI-SW-C-7264 00 Inspection of Concrete Pouring for Wall and Top Slab of SBC-07 - (Left Side) - As Highlighted Civil Site Work 8/28/22 Open

3 3 KAIG3-RFI-SW-C-7265 00 Inspection and Compaction Test for NGL of Storm Water Line Branch - at Zone-3 - as highlighted Civil Site Work 8/28/22 Open

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunication Line Pit
G5 5 KAIG3-RFI-SW-C-7266 00 Civil Site Work 8/28/22 Open
G/TL/08 at Zone-G - as highlighted (SP#133)

kaig-qcals 373
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B&C - As highlighted (Stock
4 4 KAIG3-RFI-SW-C-7267 00 Civil Site Work 8/28/22 Open
Pile#132)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunication Line Pit
G5 5 KAIG3-RFI-SW-C-7268 00 Civil Site Work 8/28/22 Open
G/TL/08 at Zone-G - as highlighted (SP#133 A-1-B)

C3 3 KAIG3-RFI-SW-C-7269 00 Inspection of Excavation for RO Water Line at Area-B - As highlighted Civil Site Work 8/28/22 Open

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/02, G/DH/21,
G4 4 KAIG3-RFI-SW-C-7270 00 Civil Site Work 8/28/22 Open
G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as highlighted

D2 2 KAIG3-RFI-SW-C-7271 00 Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/18 at Zone- D (As Highlighted) Civil Site Work 8/28/22 Open

D2 2 KAIG3-RFI-SW-C-7272 00 Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/18 at Zone- D (As Highlighted) Civil Site Work 8/28/22 Open

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit
G5 5 KAIG3-RFI-SW-C-7273 00 Civil Site Work 8/28/22 Open
G/FS/01 at zone G (As Highlighted) (SP#133)
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit G/MV/14 at
G4 4 KAIG3-RFI-SW-C-7274 00 Civil Site Work 8/28/22 Open
Zone-G - As Highlighted (SP#133)

"Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) for Non-Potable water line Pit -
G4 4 KAIG3-RFI-SW-C-7275 00 Civil Site Work 8/28/22 Open
NPW-ISC-16 & NPW-ISC-18 at Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunications Line pit
B3 3 KAIG3-RFI-SW-C-7276 00 Civil Site Work 8/28/22 Open
B/TL/30 and B/TL/31 at Zone-B (As Highlighted) (SP#133 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire & Security Distribution
B3 3 KAIG3-RFI-SW-C-7277 00 Civil Site Work 8/28/22 Open
Line pit B/FS/03 and B/FS/04 at Zone-B (As Highlighted) (SP#133 A-1-B)

Inspection and compaction test 3rd layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (3rd
2N 6 KAIG3-RFI-CO-C-7279 00 Civil Crescent 8/28/22 Open
of 4th) axis 02AR

Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze
5A 5 KAIG3-RFI-ZG-C-7280 00 Civil Maze Garden 8/28/22 Open
Garden, as highlighted area in attached drawing's

Inspection & Compaction Tests of Single Layer (Sub-Base) Backfilling on Irrigation (Main, Sub & Sleeves)
4A 4 KAIG3-RFI-WG-C-7281 00 lines (part 4) ( 50, 110, 160 & 200 mm), Bottom Left Side of Geyser Garden, at Water Garden as highlighted Civil Water Play Garden 8/28/22 Open
area in attached drawing's.
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/37 at
G4 4 KAIG3-RFI-SW-C-7282 00 Civil Site Work 8/28/22 Open
Zone-G (As Highlighted)
Surface Preparation prior to start backfilling for Non potable water line pit POC-9, POC-10 and POC-11 at
G3 3 KAIG3-RFI-SW-C-7283 00 Civil Site Work 8/28/22 Open
zone B&G - As Highlighted

Inspection for Laying of Green Tiles and Warning Tape above the pipe for Telecommunication Line from
C3 3 KAIG3-RFI-SW-C-7285 00 Civil Site Work 8/28/22 Open
C/TL/49 to C/TL/51 at Zone-C - As highlighted

Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from C/FS/46 to
C3 3 KAIG3-RFI-SW-C-7286 00 Civil Site Work 8/28/22 Open
C/FS/47 at Zone-C - as highlighted in the attached drawing

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for F/DH/04, F/DC/01,
G4 4 KAIG3-RFI-SW-C-7287 00 Civil Site Work 8/28/22 Open
F/DC/05 at Zone-F&G - as highlighted

Sand Cover & Protection for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunnel, inside
4C 4 KAIG3-RFI-TG-C-7296 00 Civil Butterfly Garden 8/28/22 Open
Butterfly Garden, as highlighted area in attached drawing's.
Inspection and compaction test 6th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
2A 6 KAIG3-RFI-CF-C-7297 00 Civil Cafeteria 8/28/22 Open
zone 2A (as Highlighted)(6th of 6th Layers)

kaig-qcals 374
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and compaction test 7th layer for Backfilling inside Cafeteria building( Second Part) btween Axis
2A 6 KAIG3-RFI-CF-C-7298 00 Civil Cafeteria 8/28/22 Open
02B - 02D zone 2A (as Highlighted) (7th of 7th Layers)

Inspection and compaction test 4th layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zone
2A 6 KAIG3-RFI-CF-C-7299 00 Civil Cafeteria 8/28/22 Open
2A (as highlighted) ( 4th of 5th layers )

2A 6 KAIG3-RFI-CF-C-7300 00 Surface Preparation Prior to start Backfilling at cafeteria raft area axis 02-2 , 02-1 Zone 2A (as highlighted) Civil Cafeteria 8/28/22 Open

B3 3 KAIG3-RFI-SW-C-7301 0 inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunications Line pit B/TL/30
Civil
and B/TL/31 at Zone-B
Site Work
(As Highlighted) 8/29/22
(SP#133 A-1-B)9/3/22 Approved as noted

B3 3 KAIG3-RFI-SW-C-7302 0 Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire & Security Distribution Line pitCivil
B/FS/03 and B/FS/04Site
at Zone-B
Work (As Highlighted)
8/29/22(SP#1339/3/22
A-1-B) Approved as noted

G4 4 KAIG3-RFI-SW-C-7303 0 Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/37 at Zone-G (As Highlighted) Site Work
Civil 8/29/22 9/3/22 Approved as noted

D2 2 KAIG3-RFI-SW-C-7304 0 "Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) for Non-Potable water line Pit - NPW-ISC-30
Civil at Zone D - asSite
highlighted
Work (Stock Pile#
8/29/22
133 A-1-B)"9/3/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-7305 0 Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunication Line Pit G/TL/41Civil
at Zone-G - as highlighted
Site Work
(SP#133) 8/29/22 9/3/22 Approved as noted

G4 4 KAIG3-RFI-SW-C-7306 0 Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit G/FS/24 at Zone-G
Civil (As Highlighted)
Site(SP#133)
Work 8/29/22 9/3/22 Approved as noted

LM5 5 KAIG3-RFI-SW-C-7307 0 inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for Non-Potable Water
CivilLine at Zone-L&M
Site- Work
as highlighted (Stock
8/29/22
Pile#133) 9/3/22 Approved as noted

LG4 4 KAIG3-RFI-SW-C-7308 0 "Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - L/MV/17, L/MV/02, L/MV/15, G/MV/13 and G/MV/38
Civil at Zone-L&G
Site
(AsWork
Highlighted) (SCR:
8/29/22
KAIG3-SCR-SW-E-0081-00)"
9/1/22 Approved as noted

C2 2 KAIG3-RFI-SW-C-7309 0 inspection for backfilling gravel 1st Layer (1 of 1) around Potable Water Line Pit for C/PW/06 - as highlighted. (SP#138)
Civil Site Work 8/29/22 8/31/22 Approved as noted

Inspection & Compaction Tests of 2nd Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side)
4 4 KAIG3-RFI-SW-C-7310 0 Civil Site Work 8/29/22 9/3/22 Approved as noted
- Footing and wall of Wing Wall - as highlighted. SP # ( 135 )

4B 4 KAIG3-RFI-WG-C-7311 0 Inspection & Compaction Tests of 2nd Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside Open Channel
Civil2, (Wadi # 2),Water
InsidePlay
Water
Garden
Garden, At Highlighted
8/29/22 area9/3/22
in attached Drawings.SP# 135
Approved
. as noted

4D 4 KAIG3-RFI-PG-C-7312 0 Sand Bedding for Electrical Lines of Low Voltage (MH/PG/LV/06-12) and Emergency (MH/PG/EM/04-13), Inside Physic
Civil Garden as highlighted in attached drawing's.
Physic Garden 8/29/22 9/3/22 Approved as noted

4D 4 KAIG3-RFI-PG-C-7313 0 Sand Bedding for Low Current Lines (MH/PG/LC/06-17) and Fire Alarm & Security lines (MH/PG/FA/03-12), Inside
Civil
Physic Garden asPhysic
highlighted
Gardenin attached drawing's.
8/29/22 9/3/22 Approved as noted

2 6 KAIG3-RFI-SW-C-7314 0 inspection for backfilling gravel 1st Layer (1 of 1) for Storm Water Line Manhole MH-O-08-1, MH-O-09, MH-O-10Civil
and Gullies G-O-07,Site
G-O-08,
WorkG-O-09, G-O-18,
8/29/22
G-O-19, G-O-17,
8/31/22 G-O-16, G-O-15, G-O-14
Approved
- As Highlighted
as noted (SP#138)

B4 4 KAIG3-RFI-SW-C-7315 0 Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for RO Water Line Civil
at Zone-B - As highlighted (Stock Pile#131)8/29/22
Site Work 9/3/22 Approved as noted

C2 2 KAIG3-RFI-SW-C-7316 0 Inspection backfilling Gravel 2nd Layer (2 of 2) For Manholes MH-O-01, MH-O-02, MH-O-03, MH-O-04, MH-O-05,
Civil
MH-O-06 And GULLIES
Site Work
G-O-28, G-O-29,
8/29/22
G-O-33, G-O-34,
8/31/22
G-O-43, G-O-44 and branches
Approved
- as as
Highlighted
noted (Stock Pile# 138)

FG4 4 KAIG3-RFI-SW-C-7317 0 Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) for Non potable water line pit POC-9, POC-10
Civil and POC-11 atSite
zoneWork
B&G - As Highlighted
8/29/22(SP#131)9/3/22 Approved as noted

BG3 3 KAIG3-RFI-SW-C-7318 0 "Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-04, G-DC-06, F-DH-04, F-DC-05 and F-DC-01
Civil as highlighted " Site Work 8/29/22 9/3/22 Code C (not resubmit)

G4 4 KAIG3-RFI-SW-C-7319 00 Inspection for Casting the Concrete encasement for mv line form G/MV/21 to G/MV/37 As highlighted Civil Site Work 8/31/22 9/1/22 Approved as noted

"Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-21, G-DC-20, G-DC-22, G-DC-03,
G4 4 KAIG3-RFI-SW-C-7320 00 Civil Site Work 8/31/22 9/3/22 Code C (not resubmit)
G-DH-05, G-DC-01 and G-DH-02 as highlighted "

kaig-qcals 375
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

4C 4 KAIG3-RFI-TG-C-7321 0 Excavation & Compaction Test Prior to Blinding under Gabions Inside Butterfly Garden, at highlighted area in attached
Civildrawings.( SP#
Butterfly
135 ) Garden 8/29/22 9/3/22 Approved as noted

C3 3 KAIG3-RFI-SW-C-7323 0 Inspection of Sand bedding under pipe for RO Water Line at Area-B - As highlighted (Stock Pile# 132) Civil Site Work 8/29/22 9/3/22 Approved as noted

4 4 KAIG3-RFI-SW-C-7324 00 Inspection of Formwork for the Footing of SBC-07 - Wing Wall (Right Side) - As Highlighted Civil Site Work 8/30/22 9/3/22 Approved as noted

4 4 KAIG3-RFI-SW-C-7325 00 Inspection of Concrete Pouring for the Footing of SBC-07 - Wing Wall (Right Side) - As Highlighted Civil Site Work 8/30/22 9/5/22 Approved as noted

"Inspection for Installation of Heating and Chilled Water Line Pit G-DC-08, G-DC-15, G-DC-16, K-DC-01,
GK5 5 KAIG3-RFI-SW-C-7326 00 Civil Site Work 8/30/22 9/3/22 Code C (not resubmit)
K-DC-02 - as highlighted "
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/37 at
G4 4 KAIG3-RFI-SW-C-7327 00 Civil Site Work 8/31/22 9/3/22 Approved as noted
Zone-G (As Highlighted)

"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non-Potable water line Pit -
D2 2 KAIG3-RFI-SW-C-7328 00 Civil Site Work 8/31/22 9/3/22 Approved as noted
NPW-ISC-30 at Zone D - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunication Line Pit
G4 4 KAIG3-RFI-SW-C-7329 00 Civil Site Work 8/31/22 9/3/22 Approved as noted
G/TL/41 at Zone-G - as highlighted (SP#133)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit
G4 4 KAIG3-RFI-SW-C-7330 00 Civil Site Work 8/31/22 9/3/22 Approved as noted
G/FS/24 at Zone-G (As Highlighted) (SP#133)

5A 5 KAIG3-RFI-ZG-C-7331 0 Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze Garden, as highlighted area in
Civil
attached drawing'sMaze Garden 8/29/22 9/3/22 Approved as noted

Inspection and compaction test 17th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
2B 6 KAIG3-RFI-CF-C-7332 0 Civil Cafeteria 8/29/22 9/1/22 Approved as noted
(17th of 18th layer) SP#125
Inspection and compaction test 12th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
2J 6 KAIG3-RFI-MC-C-7333 0 Civil MCPE 2 8/29/22 9/1/22 Approved as noted
(12th of 13th layer) SP#125
Inspection and compaction test 1st layer for Backfilling at Internal Building at zone 1N (as highlighted) Axis
1N 6 KAIG3-RFI-CO-C-7334 0 Civil Crescent 8/29/22 9/1/22 Approved as noted
01-2 to 01-1, 01An to 01AM (1ST layer of 8th )
Inspection and compaction test 2nd layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7335 0 Civil MCPE 4 8/29/22 9/1/22 Approved as noted
highlighted) ( 2nd layer of 7th )
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/04 to 16 ) and Emergency lines
4A 4 KAIG3-RFI-WG-C-7336 00 ( MH/WG/EM/01 to 06 ), between Mist & Geyser Garden, at water Garden, as highlighted area in attached Civil Water Play Garden 8/30/22 9/1/22 Approved as noted
drawing's.

Sand Cover & Protection for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31),
4B 4 KAIG3-RFI-WG-C-7337 00 Civil Water Play Garden 8/30/22 9/1/22 Approved as noted
inside Boat Garden, at water Garden, as highlighted area in attached drawing's.

Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency lines
4B 4 KAIG3-RFI-WG-C-7338 00 Civil Water Play Garden 8/30/22 9/1/22 Approved as noted
(MH/WG/EM/25 to 28), inside Boat Garden, at water Garden, as highlighted area in attached drawing's

Inspection & Compaction Tests of 3rd Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side)
4 4 KAIG3-RFI-SW-C-7339 00 Civil Site Work 8/30/22 9/3/22 Approved as noted
- Footing and wall of Wing Wall - as highlighted. SP # ( 135 )

Inspection and compaction test 1st layer for Backfilling at cafeteria raft area axis 02-2 , 02-1 Zone 2A (as
2A 6 KAIG3-RFI-CF-C-7340 00 Civil Cafeteria 8/30/22 9/3/22 Approved as noted
highlighted)
Inspection and compaction test 5th layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zone 2A
2A 6 KAIG3-RFI-CF-C-7341 00 Civil Cafeteria 9/1/22 9/5/22 Approved as noted
(as highlighted) ( 5th of 5th layers )
Inspection and compaction test 2nd layer for Backfilling at Internal Building at zone 1N (as highlighted)
1N 6 KAIG3-RFI-CO-C-7342 00 Civil Crescent 8/30/22 9/3/22 Approved as noted
Axis 01-2 to 01-1, 01An to 01AM (2nd layer of 8th )
Inspection and compaction test 3rd layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7343 00 Civil MCPE 4 8/31/22 9/3/22 Approved as noted
highlighted) ( 3rd layer of 7th )

Inspection & Compaction Tests of 3rd Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
4B 4 KAIG3-RFI-WG-C-7344 00 Civil Water Play Garden 8/30/22 9/3/22 Approved as noted
Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted area in attached Drawings.SP# 135 .

Surface Preparation Prior to start Backfilling FOR infill wall around stripfooting and pile cap at zone 1G (as
1G 6 KAIG3-RFI-CO-C-7345 00 Civil Crescent 9/4/22 9/6/22 Approved as noted
highlighted) AXIS 01V - 01S
Inspection and compaction test 4th layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (4th
2N 6 KAIG3-RFI-CO-C-7346 00 Civil Crescent 8/30/22 9/5/22 Approved as noted
of 5th) axis 02AR
Inspection and compaction test 6th layer for Backfilling at Internal Building at zone 2A (as highlighted)
2A 6 KAIG3-RFI-CO-C-7347 00 Civil Crescent 8/31/22 9/5/22 Approved as noted
AXIS 02A - 02B ( 6th of 8th layers )

L5 5 KAIG3-RFI-SW-C-7348 00 Inspection of Excavation for MV Line from L/MV/14 to L/MV/06 at Zone-L - as highlighted Civil Site Work 8/31/22 9/3/22 Approved as noted

kaig-qcals 376
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/37 at
G4 4 KAIG3-RFI-SW-C-7349 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Zone-G (As Highlighted)

"Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) for Non-Potable water line Pit -
D2 2 KAIG3-RFI-SW-C-7350 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
NPW-ISC-30 at Zone D - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunication Line Pit
G4 4 KAIG3-RFI-SW-C-7351 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
G/TL/41 at Zone-G - as highlighted (SP#133)
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit
G4 4 KAIG3-RFI-SW-C-7352 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
G/FS/24 at Zone-G (As Highlighted) (SP#133)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from C/TL/12 to C/TL/15
C3 3 KAIG3-RFI-SW-C-7353 00 Civil Site Work 8/31/22 9/1/22 Approved as noted
at Zone-C - As Highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from C/FS/09 to C/FS/08 at
C3 3 KAIG3-RFI-SW-C-7354 00 Civil Site Work 8/31/22 9/1/22 Approved as noted
Zone-C - As Highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/03 to C/MV/30 at Zone-C
C3 3 KAIG3-RFI-SW-C-7355 00 Civil Site Work 8/31/22 9/1/22 Approved as noted
(As Highlighted)

Inspection & Compaction Tests of Backfilling (Sub Grade) for Support to Sand Cover of Low Current Lines,
4B 4 KAIG3-RFI-WG-C-7356 00 Civil Water Play Garden 8/31/22 9/5/22 Approved as noted
Inside Boat Garden at Water Garden, as highlighted area in attached drawing's. (SP# 135)

Inspection & Compaction Tests of 4th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side)
4 4 KAIG3-RFI-SW-C-7357 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
- Footing and wall of Wing Wall - as highlighted. SP # ( 135 )

Inspection & Compaction Tests of 4th Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside Water Play Garden/Wadi
4B 4 KAIG3-RFI-WG-C-7358 00 Civil 8/31/22 9/5/22 Approved as noted
Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted area in attached Drawings.SP# 135 . 2

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 2) above gravel around Potable
C2 2 KAIG3-RFI-SW-C-7359 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Water Line Pit for C/PW/06 - as highlighted. (SP#131)

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 4) above gravel for Storm Water
6 6 KAIG3-RFI-SW-C-7360 00 Line Manhole MH-O-08-1, MH-O-09, MH-O-10 and Gullies G-O-07, G-O-08, G-O-09, G-O-18, G-O-19, G- Civil Site Work 8/31/22 9/5/22 Approved as noted
O-17, G-O-16, G-O-15, G-O-14 - As Highlighted (SP#131)

Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 2) above Sand Covering for RO
B4 4 KAIG3-RFI-SW-C-7361 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Water Line at Zone-B - As highlighted (Stock Pile#131)

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 4) above gravel For Manholes MH-
C2 2 KAIG3-RFI-SW-C-7362 00 O-01, MH-O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G- Civil Site Work 8/31/22 9/5/22 Approved as noted
O-34, G-O-43, G-O-44 and branches - as Highlighted (Stock Pil

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for RO
BC34 4 KAIG3-RFI-SW-C-7363 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Water Line at Zone-B&C - As highlighted (Stock Pile#131)

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for
C3 3 KAIG3-RFI-SW-C-7364 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Telecommunications Line from (C/TL/49 to C/TL/51) at Zone-C as highlighted (SP#131)

Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for Fire &
C3 3 KAIG3-RFI-SW-C-7365 00 Security Line from (C/FS/46 to C/FS/47) at Zone-C as highlighted in the attached drawing (SP#131) Civil Site Work 8/31/22 9/5/22 Approved as noted

inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit for
C2 2 KAIG3-RFI-SW-C-7366 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
C/F/16, C/F/17 - as highlighted. (SP#131)

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit C/MV/19
C2 2 KAIG3-RFI-SW-C-7367 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
and C/MV/18 at Zone-C- As Highlighted (SP#131)

Inspection for Installation of Heating and Chilled wahter Line Pit G-DC-13, B-DC-02 and B-DC-06 as
BG35 5 KAIG3-RFI-SW-C-7368 00 Civil Site Work 8/31/22 9/3/22 Code C (not resubmit)
highlighted

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Footing and Column Neck
K5 5 KAIG3-RFI-PA-C-7369 00 Civil Picnic Area 8/31/22 9/5/22 Approved as noted
of Seating Area (1) at Zone-K (SA-17) - As Highlighted (Stock Pile# 131 A-1-B)"

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Footing and Column Neck
G4 4 KAIG3-RFI-PA-C-7370 00 Civil Picnic Area 8/31/22 9/5/22 Approved as noted
of Seating Area (1) at Zone-G (SA-10) - As Highlighted (Stock Pile# 131 A-1-B)"

B4 4 KAIG3-RFI-SW-C-7371 00 Excavation for Potable Water Line at Zone-B - as highlighted Civil Site Work 8/31/22 9/3/22 Approved as noted

kaig-qcals 377
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
B4 4 KAIG3-RFI-SW-C-7372 00 Excavation for Fire Water Line at Zone-B - as highlighted Civil Site Work 8/31/22 9/3/22 Approved as noted
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for B/DC/02, B/DC/06,
BG35 5 KAIG3-RFI-SW-C-7373 00 Civil Site Work 9/1/22 9/3/22 Code C (not resubmit)
G/DC/13 at Zone-B&G - as highlighted

B4 4 KAIG3-RFI-SW-C-7374 00 Inspection of Sand bedding under pipe for Potable Water Line at Zone-B - as highlighted (Stock Pile# 132) Civil Site Work 9/1/22 9/5/22 Approved as noted

B4 4 KAIG3-RFI-SW-C-7375 00 Inspection od Sand bedding under pipe for Fire Water Line at Zone-B - as highlighted (Stock Pile# 132) Civil Site Work 9/1/22 9/5/22 Approved as noted

Inspectionand Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for RO
BC34 4 KAIG3-RFI-SW-C-7376 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
Water Line at Zone-B&C - As highlighted (Stock Pile#131)

"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above sand cover for Non-
G4 4 KAIG3-RFI-SW-C-7377 00 Civil Site Work 9/3/22 9/5/22 Approved as noted
Potable water line Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

Inspection for Installation of Heating and Chilled water Line Pit G/DC/08, G/DC/15, G/DC/16, K/DC/01,
BG35 5 KAIG3-RFI-SW-C-7378 00 Civil Site Work 9/1/22 Open
K/DC/02 as highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) for Non-Potable water line
B3 3 KAIG3-RFI-SW-C-7379 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
Zone-B - as highlighted (Stock Pile# 133 A-1-B)
Inspection of backfilling Gravel 1st Layer (1 of 3) for Non potable water line pit POC-43 at Zone K - As
K5 5 KAIG3-RFI-SW-C-7380 00 Civil Site Work 9/3/22 9/5/22 Approved as noted
Highlighted (Stock Pile # 138)

CK35 5 KAIG3-RFI-SW-C-7381 00 Inspection for Installation of Non-Potable Water Line Pit - POC-18, POC-19 and POC-43 - as highlighted Civil Site Work 8/31/22 9/1/22 Approved as noted

"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above sand cover for Non-
G4 4 KAIG3-RFI-SW-C-7382 00 Civil Site Work 8/31/22 9/5/22 Approved as noted
Potable water line Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) for Non potable water line pit
BG35 5 KAIG3-RFI-SW-C-7383 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
POC-9, POC-10 and POC-11 at zone B&G - As Highlighted (SP#131)

Inspection of Formwork for Side Walls of MV Line Pulling Pit - L/MV/16 and L/MV/05 at Zone-L (As
L5 5 KAIG3-RFI-SW-C-7384 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/16 and L/MV/05 at Zone-L
L5 5 KAIG3-RFI-SW-C-7385 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
(As Highlighted)
Inspection & Compaction Tests of Single Layer (Sub-Grade) Backfilling on Fire Fighting Lines (Pipe dia 50
4C 4 KAIG3-RFI-TG-C-7386 00 & 80 mm) from FHC to End of Tunnel, inside Butterfly Garden, as highlighted area in attached drawing's. Civil Butterfly Garden 8/31/22 9/5/22 Approved as noted
( SP# 135 )
Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 1N (as highlighted) Axis
1N 6 KAIG3-RFI-CO-C-7387 00 Civil Crescent 8/31/22 9/5/22 Approved as noted
01-2 to 01-1, 01AM to 01AN (3rd layer of 8th )
Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden & Boat Garden ), at
4A 4 KAIG3-RFI-WG-C-7388 00 Civil Water Play Garden 8/31/22 9/3/22 Code C (resubmit)
highlighted area in attached drawings
Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden & Boat Garden ), at
4A 4 KAIG3-RFI-WG-C-7388 01 Civil Water Play Garden 9/13/22 9/15/22 Approved as noted
highlighted area in attached drawings
Inspection and compaction test 4th and 5th layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) ( 4th
2M 2N 6 KAIG3-RFI-MC-C-7389 00 Civil MCPE 1 8/31/22 9/6/22 Approved as noted
and 5th layer) SP#125
Surface Preparation Prior to start Backfilling at Internal Building at zone 2R (as highlighted) Axis 02-BB to
2R 6 KAIG3-RFI-CO-C-7390 00 Civil Crescent 8/31/22 9/3/22 Approved as noted
02-BA
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/16, L/MV/05, L/MV/01 and H/MV/19 -
HL56 6 KAIG3-RFI-SW-C-7392 00 Civil Site Work 9/4/22 9/5/22 Approved as noted
as highlighted
Inspection of Steel Reinforcement for footing and wall of MV Line Pulling Pit - L/MV/01, L/MV/05,
HL56 6 KAIG3-RFI-SW-C-7393 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
L/MV/16 and H/MV/19 at Zone-H&L (As Highlighted)

"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above sand cover for Non-
G4 4 KAIG3-RFI-SW-C-7394 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
Potable water line Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) for Non-Potable water line Zone-
B3 3 KAIG3-RFI-SW-C-7395 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
B - as highlighted (Stock Pile# 133 A-1-B)
Surface Preparation prior to start backfilling for Non potable water line pit POC-43 at zone K - As
K5 5 KAIG3-RFI-SW-C-7396 00 Civil Site Work 9/1/22 9/3/22 Approved as noted
Highlighted

"Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) for Non-Potable water line Pit -
D2 2 KAIG3-RFI-SW-C-7397 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
NPW-ISC-30 at Zone D - as highlighted (Stock Pile# 133 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunication Line Pit
G4 4 KAIG3-RFI-SW-C-7398 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
G/TL/41 at Zone-G - as highlighted (SP#133)

kaig-qcals 378
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit
G4 4 KAIG3-RFI-SW-C-7399 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
G/FS/24 at Zone-G (As Highlighted) (SP#133)
Inspection of Steel Reinforcement for slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone-L (As
L5 5 KAIG3-RFI-SW-C-7400 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
Highlighted)
Excavation & Compaction Test Prior to Blinding under Gabions Inside Butterfly Garden, at highlighted area
4C 4 KAIG3-RFI-TG-C-7401 00 Civil Butterfly Garden 9/3/22 9/6/22 Approved as noted
in attached drawings.( SP# 135 )
Inspection & Compaction tests after Excavation for ( Sub-Grade ) Layer for Lake of Mist Garden , as
4A 4 KAIG3-RFI-WG-C-7402 00 Civil Water Play Garden 9/1/22 9/6/22 Approved as noted
Highlighted area in attached Drawings ( Stock Pile # 126 )
Warning Tiles & Warning Tape for Electrical Lines of Low Voltage (MH/WG/LV/04 to 16 ) and Emergency
4A 4 KAIG3-RFI-WG-C-7403 00 lines ( MH/WG/EM/01 to 06 ), between Mist & Geyser Garden, at water Garden, as highlighted area in Civil Water Play Garden 9/1/22 9/3/22 Approved as noted
attached drawing's.
Inspection and compaction test 7th layer for Backfilling at Internal Building at zone 2A (as highlighted) AXIS
2A 6 KAIG3-RFI-CO-C-7404 00 Civil Crescent 9/4/22 9/5/22 Approved as noted
02A - 02B ( 7th of 7th layers )
Inspection and compaction test 4th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7405 00 Civil MCPE 4 9/1/22 9/5/22 Approved as noted
highlighted) ( 4th layer of 7th )
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 1N (as highlighted) Axis
1N 6 KAIG3-RFI-CO-C-7406 00 Civil Crescent 9/1/22 9/5/22 Approved as noted
01-2 to 01-1, 01AM to 01AN (4th layer of 8th )
Inspection and compaction test 1st layer for Backfilling at Internal Building at zone 2R (as highlighted) Axis
2R 6 KAIG3-RFI-CO-C-7407 00 Civil Crescent 9/1/22 9/7/22 Approved as noted
02-1 to 02-2, 02BB to 02BA (1St layer of 8th )

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) for Non potable water line pit
BG3 3 KAIG3-RFI-SW-C-7408 00 Civil Site Work 9/1/22 9/5/22 Approved as noted
POC-9, POC-10 and POC-11 at zone B&G - As Highlighted (SP#131)

C3 3 KAIG3-RFI-SW-C-7409 00 "Inspection for Installation of MV Line Junction Pit - C/MV/20 and C/MV/13 - as highlighted " Civil Site Work 9/1/22 9/5/22 Approved as noted

Inspection & Compaction Tests of 5th Layer Backfilling Sub-Base (Out of 5 Layer) Near SBC-08 Inside
4B 4 KAIG3-RFI-WG-C-7410 00 Civil Water Play Garden 9/3/22 9/6/22 Approved as noted
Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted area in attached Drawings.SP# 140 .

Inspection & Compaction Tests of 5th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side)
4 4 KAIG3-RFI-SW-C-7411 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
- Footing and wall of Wing Wall - as highlighted. SP # ( 135 )

Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/37 at
G4 4 KAIG3-RFI-SW-C-7412 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
Zone-G - As Highlighted (Stock Pile# 133)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) for Non potable water line pit
BG3 3 KAIG3-RFI-SW-C-7413 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
POC-9, POC-10 and POC-11 at zone B&G - As Highlighted (Stock Pile#131)

Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 2) above gravel around Potable
C2 2 KAIG3-RFI-SW-C-7414 00 Civil Site Work 9/3/22 9/7/22 Approved as noted
Water Line Pit for C/PW/06 - as highlighted. (Stock Pile#131)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit C/MV/19
C2 2 KAIG3-RFI-SW-C-7415 00 Civil Site Work 9/3/22 9/7/22 Approved as noted
and C/MV/18 at Zone-C- As Highlighted (SP#131)

inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit for
C2 2 KAIG3-RFI-SW-C-7416 00 Civil Site Work 9/3/22 9/7/22 Approved as noted
C/F/16, C/F/17 - as highlighted. (SP#131)

"Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 4) above gravel for Storm Water
26 6 KAIG3-RFI-SW-C-7417 00 Line Manhole MH-O-08-1, MH-O-09, MH-O-10 and Gullies G-O-07, G-O-08, G-O-09, G-O-18, G-O-19, Civil Site Work 9/3/22 9/7/22 Approved as noted
G-O-17, G-O-16, G-O-15, G-O-14 - As Highlighted (Stock

Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 4) above gravel For Manholes MH-
C2 2 KAIG3-RFI-SW-C-7418 00 O-01, MH-O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G- Civil Site Work 9/3/22 9/6/22 Approved as noted
O-34, G-O-43, G-O-44 and branches - as Highlighted (Stock Pil

Inspection of Excavation for Heating and Chilled Water Line at Zone-H&L including branch and Pit
5 5 KAIG3-RFI-SW-C-7419 00 Civil Site Work 9/3/22 9/5/22 Approved as noted
H/DH/11, H/DH/12, H/DC/10, H/DC/09 - As highlighted

Inspection of Excavation for Heating and Chilled Water Line Pit G/DH/19, G/DC/18 at Zone-G - As
G5 5 KAIG3-RFI-SW-C-7420 00 Civil Site Work 9/3/22 9/4/22 Code C (resubmit)
highlighted
Inspection of Excavation for Heating and Chilled Water Line Pit G/DH/19, G/DC/18 at Zone-G - As
G5 5 KAIG3-RFI-SW-C-7420 01 Civil Site Work 9/15/22 Open
highlighted

H6 6 KAIG3-RFI-SW-C-7421 00 Inspection of Excavation for MV Line from H/MV/08 to H/MV/31 at Zone-H - as highlighted Civil Site Work 9/3/22 9/5/22 Approved as noted

kaig-qcals 379
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for RO
C3 3 KAIG3-RFI-SW-C-7422 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)

"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
C3 3 KAIG3-RFI-SW-C-7423 00 Civil Site Work 9/3/22 9/6/22 Approved as noted
Potable Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)"

Surface Preparation prior to start backfilling for Non potable water line pit POC-6 at zone B - As Highlighted
B4 4 KAIG3-RFI-SW-C-7424 00 Civil Site Work 9/4/22 9/5/22 Approved as noted

"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) above sand cover for Non-
G4 4 KAIG3-RFI-SW-C-7425 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Potable water line Zone-G - as highlighted (Stock Pile# 133 A-1-B)"

Inspection & Compaction Tests of Single Layer (Sub-Base) Backfilling, at the Entrance of Boat garden,
4B 4 KAIG3-RFI-WG-C-7426 00 Civil Water Play Garden 9/3/22 9/6/22 Approved as noted
Inside Water Garden as highlighted area in attached drawing's.(SP# 140)

Excavation & Compaction Test Prior to Blinding under Gabions Inside Aviary Garden, at highlighted area in
4B 4 KAIG3-RFI-AG-C-7430 00 Civil Aviary Garden 9/3/22 9/7/22 Approved as noted
attached drawings.( Subgrade SP# 73 )
Excavation & Compaction Test Prior to Blinding under Gabions Inside Aviary Garden, at highlighted area in
4B 4 KAIG3-RFI-AG-C-7431 00 Civil Aviary Garden 9/3/22 9/7/22 Approved as noted
attached drawings.( Sub-GradeSP# 73 )
Inspection and compaction test 2nd layer for Backfilling at Internal Building at zone 2R (as highlighted) Axis
2R 6 KAIG3-RFI-CO-C-7432 00 Civil Crescent 9/4/22 9/8/22 Approved as noted
02-1 to 02-2, 02BB to 02BA (2nd layer of 8th )
Inspection and compaction test 5th layer for Backfilling at Internal Building at zone 1N (as highlighted) Axis
1N 6 KAIG3-RFI-CO-C-7433 00 Civil Crescent 9/4/22 9/7/22 Approved as noted
01-2 to 01-1, 01AM to 01AN (5th layer of 8th )
Inspection and compaction test 5th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7434 00 Civil MCPE 4 9/4/22 9/7/22 Approved as noted
highlighted) ( 5th layer of 7th )
Inspection of Thrust Block for Non-Potable Water (Irrigation Line ); at Sound & Light Garden, as
5A 5 KAIG3-RFI-SG-C-7435 00 Civil Sound & Light Garden 9/4/22 9/6/22 Approved as noted
highlighted area in attached drawing's.
Inspection of Thrust Block for Non-Potable Water (Irrigation Line ); at Maze Garden, as highlighted area in
5A 5 KAIG3-RFI-ZG-C-7436 00 Civil Maze Garden 9/4/22 9/5/22 Approved as noted
attached drawing's.
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) for Non-Potable water line
B3 3 KAIG3-RFI-SW-C-7437 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Zone-B - as highlighted (Stock Pile# 133 A-1-B)
Inspection of backfilling Gravel 2nd Layer (2 of 3) for Non potable water line pit POC-43 at Zone K - As
K5 5 KAIG3-RFI-SW-C-7438 00 Civil Site Work 9/4/22 9/5/22 Approved as noted
Highlighted (Stock Pile # 138)
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit G/MV/37 at
G4 4 KAIG3-RFI-SW-C-7439 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Zone-G - As Highlighted (Stock Pile# 133)
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Stock
G4 4 KAIG3-RFI-SW-C-7440 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Pile# 132)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line pit
B4 4 KAIG3-RFI-SW-C-7441 00 Civil Site Work 9/4/22 9/7/22 Code C (resubmit)
POC-6 at zone B - As Highlighted (Stock Pile# 131 A-1-B)

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line pit
B4 4 KAIG3-RFI-SW-C-7441 01 Civil Site Work 9/13/22 Open
POC-6 at zone B - As Highlighted (Stock Pile# 131 A-1-B)

G4 4 KAIG3-RFI-SW-C-7443 00 Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted Civil Site Work 9/4/22 9/5/22 Code C (resubmit)

G4 4 KAIG3-RFI-SW-C-7443 01 Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted Civil Site Work 9/18/22 9/20/22 Approved as noted

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for RO
C3 3 KAIG3-RFI-SW-C-7444 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)

"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
C3 3 KAIG3-RFI-SW-C-7445 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
Potable Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)"

"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 9) for Storm Water Line from
6A 6 KAIG3-RFI-SW-C-7446 00 Civil Site Work 9/4/22 9/7/22 Approved as noted
MH-M-02 to MH-M-03 at Zone-6A - As Highlighted (Stock Pile # 131 A-1-B)"

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B - as highlighted (Stock
B3 3 KAIG3-RFI-SW-C-7447 00 Civil Site Work 9/4/22 9/5/22 Approved as noted
Pile#132)
F4 4 KAIG3-RFI-SW-C-7448 00 Excavation for Fire Water Line at Zone-F including Pit F/F/01 - as Highlighted Civil Site Work 9/5/22 9/8/22 Approved as noted

kaig-qcals 380
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel for Non potable
K5 5 KAIG3-RFI-SW-C-7449 00 Civil Site Work 9/5/22 9/8/22 Approved as noted
water line pit POC-43 at Zone K - As Highlighted (SP# 133)

Inspection of Sand bedding under pipe for MV Line from L/MV/14 to L/MV/06 at Zone-L - as highlighted
L5 5 KAIG3-RFI-SW-C-7450 00 Civil Site Work 9/5/22 9/8/22 Approved as noted
(Stock Pile# 132)
Excavation & Soil Preparation Prior to Boulders Walls Inside Mist Garden , at water Garden, as highlighted
4A 4 KAIG3-RFI-WG-C-7451 00 Civil Water Play Garden 9/4/22 9/8/22 Approved as noted
area in attached drawing's.

'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (400mm Ø- UPVC Pipes-Class 4 ) for Storm
B 2 KAIG3-RFI-SW-C-7452 00 Civil Site Works 9/4/22 9/5/22 Approved as noted
Water pipe Out Fall-G From (MH-G-12 to MH-G-14).As per high lighted Area in the attached Dwg.

'Pipe Installation of Strom Water pipe OUT FALL-G for (400mm Ø- UPVC Pipes-Class 4 ) for Storm Water
B 2 KAIG3-RFI-SW-C-7453 00 Civil Site Works 9/4/22 9/11/22 Approved as noted
pipe Out Fall-G From (MH-G-12 to MH-G-14).As per high lighted Area in the attached Dwg.

Inspection & Compaction Tests of Single Layer Backfilling (Sub-Base) for Electrical Lines of Low Voltage
4A 4 KAIG3-RFI-WG-C-7454 00 (MH/WG/LV/04 to 16 ) and Emergency lines ( MH/WG/EM/01 to 06 ), between Mist & Geyser Garden, at Civil Water Play Garden 9/4/22 9/8/22 Approved as noted
water Garden, as highlighted area in attached drawing

Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Inner Face) (At Bottom of
4B 4 KAIG3-RFI-AG-C-7455 00 Civil Aviary Garden 9/4/22 9/5/22 Approved as noted
Blinding Level) @ Grid (16-25/Right Side), at Aviary Garden, As per Highlighted in attached Drawing's.

Sand Cover & Protection for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room to Outer
4D 4 KAIG3-RFI-PG-C-7456 00 Civil Physic Garden 9/4/22 9/5/22 Approved as noted
Canopy 3 (Outer side), at Physic garden, as highlighted area in attached drawing's.

Inspection & Compaction Tests of 6th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side)
4 4 KAIG3-RFI-SW-C-7457 00 Civil Site Works 9/4/22 9/7/22 Approved as noted
- Footing and wall of Wing Wall - as highlighted. SP # ( 135 )

Inspection of Sand bediing under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Stock
G4 4 KAIG3-RFI-SW-C-7458 00 Civil Site Works 9/5/22 9/7/22 Code C (not resubmit)
Pile# 132)
Surface Preparation prior to start Water Proofing for Duct Bank of Telecommunications line from B/TL11 to
C3 3 KAIG3-RFI-SW-C-7459 00 Civil Site Works 9/5/22 9/6/22 Approved as noted
C/TL/51 at Zone-C - As Highlighted
KAIG3-RFI-SW-C-7460 00
Inspection of Water Proofing for Duct Bank of Telecommunications line from B/TL11 to C/TL/51 at Zone-C
C3 3 KAIG3-RFI-SW-C-7461 00 Civil Site Works 9/5/22 9/6/22 Approved as noted
- As Highlighted
Inspection of Water Proofing for Duct Bank of Fire & Security line from C/FS/10 to C/FS/47 at Zone-C - As
C3 3 KAIG3-RFI-SW-C-7462 00 Civil Site Works 9/5/22 9/6/22 Approved as noted
Highlighted

C3 3 KAIG3-RFI-SW-C-7463 00 Surface Preparation Prior to Start Backfilling Gravel around Manhole FW-A-06 - as Highlighted Civil Site Works 9/5/22 9/7/22 Approved as noted

Surface Preparation Prior to Start Backfill Gravel for Storm Water Line Manhole MH-M-02, MH-M-03, MH-
6 6 KAIG3-RFI-SW-C-7464 00 Civil Site Works 9/5/22 9/7/22 Approved as noted
M-04, MH-M-05 - As Highlighted

6A 6 KAIG3-RFI-SW-C-7465 00 Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted) Civil Site Works 9/5/22 9/6/22 Approved as noted

Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
B3 3 KAIG3-RFI-SW-C-7466 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
Potable Water Line at Zone-B - as highlighted (SP#131)

"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non-
C3 3 KAIG3-RFI-SW-C-7467 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
Potable Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)"

"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 9) for Storm Water Line from
6A 6 KAIG3-RFI-SW-C-7468 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
MH-M-02 to MH-M-03 at Zone-6A - As Highlighted (Stock Pile # 131 A-1-B)"

Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for RO
C3 3 KAIG3-RFI-SW-C-7469 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
Water Line at Zone-C - As highlighted (Stock Pile#131 A-1-B)

Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B - as highlighted (Stock
B3 3 KAIG3-RFI-SW-C-7470 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
Pile#132)

Warning Tape & Tiles on Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31), inside
4B 4 KAIG3-RFI-WG-C-7471 00 Civil Water Play Garden 9/5/22 9/8/22 Approved as noted
Boat Garden, at water Garden, as highlighted area in attached drawing's.

kaig-qcals 381
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D

Warning Tape & Tiles on for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency lines
4B 4 KAIG3-RFI-WG-C-7472 00 Civil Water Play Garden 9/5/22 9/8/22 Approved as noted
(MH/WG/EM/25 to 28), inside Boat Garden, at water Garden, as highlighted area in attached drawing's.

Inspection & Compaction Tests of 7th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Behind
4 4 KAIG3-RFI-SW-C-7473 00 Civil Site Works 9/5/22 9/8/22 Approved as noted
Wing Walls) - Footing and wall of Wing Wall - as highlighted. (SP 135)

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for Footing and Column Neck
K5 5 KAIG3-RFI-PA-C-7474 00 Civil Picnic Area 9/5/22 9/8/22 Approved as noted
of Seating Area (1) at Zone-K (SA-17) - As Highlighted (Stock Pile# 131 A-1-B)"

"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for Footing and Column Neck
G4 4 KAIG3-RFI-PA-C-7475 00 Civil Picnic Area 9/5/22 9/8/22 Approved as noted
of Seating Area (1) at Zone-G (SA-10) - As Highlighted (Stock Pile# 131 A-1-B)"

Surface Preparation Prior to start Backfilling for Isolated footing of Internal building of Zone 2C (as
2C 6 KAIG3-RFI-CO-C-7476 00 Civil Crescent 9/5/22 9/7/22 Approved as noted
highlighted) between P2 - P3
Surface Preparation Prior to start Backfilling for MCPE2 UNDER SHAFT Zone 2J 2H 2G 2K (as
2J 6 KAIG3-RFI-CO-C-7477 00 Civil MCPE 2 9/5/22 9/7/22 Approved as noted
highlighted) axis 03H , 03G ,03F
Surface Preparation Prior to start Backfilling for Isolated footing of Internal building at AXIS 02 BA - 02 AZ
2R 6 KAIG3-RFI-CO-C-7478 00 Civil Crescent 9/5/22 9/8/22 Approved as noted
Zone 2R (as highlighted)
Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 2R (as highlighted) Axis
2R 6 KAIG3-RFI-CO-C-7479 00 Civil Crescent 9/5/22 9/10/22 Approved as noted
02-1 to 02-2, 02BB to 02BA (3rd layer of 8th )

Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 4) above gravel For Manholes MH-
C2 2 KAIG3-RFI-SW-C-7480 00 O-01, MH-O-02, MH-O-03, MH-O-04, MH-O-05, MH-O-06 And GULLIES G-O-28, G-O-29, G-O-33, G- Civil Site Works 9/6/22 9/8/22 Approved as noted
O-34, G-O-43, G-O-44 and branches - as Highlighted (Stock Pil

Inspection of Formwork for Slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone- L (As
L5 5 KAIG3-RFI-SW-C-7481 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
Highlighted)
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone- L (As
L5 5 KAIG3-RFI-SW-C-7482 00 Civil Site Works 9/6/22 9/10/22 Approved as noted
Highlighted)

L5 5 KAIG3-RFI-SW-C-7483 00 "Inspection of Formwork for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L (As Highlighted) " Civil Site Works 9/6/22 9/8/22 Approved as noted

L5 5 KAIG3-RFI-SW-C-7484 00 "Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L (As Highlighted) " Civil Site Works 9/6/22 9/10/22 Approved as noted

Surface Preparation prior to start backfilling for Duct Bank of Telecommunications line from B/TL11 to
C3 3 KAIG3-RFI-SW-C-7485 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
C/TL/51 at Zone-C - As Highlighted
Surface Preparation prior to start backfilling for Duct Bank of Fire & Security line from C/FS/10 to C/FS/47
C3 3 KAIG3-RFI-SW-C-7486 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
at Zone-C - As Highlighted
H6 6 KAIG3-RFI-SW-C-7487 00 Excavation for Potable Water Line at Zone-H - as highlighted Civil Site Works 9/6/22 9/7/22 Approved as noted
H6 6 KAIG3-RFI-SW-C-7488 00 Excavation for Fire Water Line at Zone-H - as highlighted Civil Site Works 9/6/22 9/7/22 Approved as noted
"Inspection of Thrust Block for Potable Water Line ( Dia 80mm) at Zone-B - As Highlighted (SCR-KAIG3-
B4 4 KAIG3-RFI-SW-C-7489 00 Civil Site Works 9/6/22 9/7/22 Approved as noted
SCR-SW-C-0021-00)"
Inspection of Thrust Block for UPVC Pipe (200 & 160 mm Dia) for Fire Water Line at Zone- B - As
B4 4 KAIG3-RFI-SW-C-7490 00 Civil Site Works 9/6/22 9/7/22 Approved as noted
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
Level and Location for Foundation of strip footing between PC 23 & PC 25 zone 1D at CRESCENT AXIS
2G 2H 2 KAIG3-RFI-JG-C-7491 00 Civil Jurassic Garden 9/6/22 9/8/22 Code C (not resubmit)
01-M TO 01-L (as highlighted) TOC 866.00 - 867.00
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 5 layers) along Foundation of
4B 4 KAIG3-RFI-AG-C-7492 00 Boundary wall (Inner Face) @ Grid (16-23/Right Side), at Aviary Garden, As per Highlighted in attached Civil Aviary Garden 9/6/22 9/8/22 Approved as noted
Drawing's. (SP 142)

Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Inner Face) (At Bottom of
4B 4 KAIG3-RFI-AG-C-7493 00 Civil Aviary Garden 9/6/22 9/7/22 Approved as noted
Blinding Level) @ Grid (2-14/Left Side), at Aviary Garden, As per Highlighted in attached Drawing's.

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Gravel for Non potable
K5 5 KAIG3-RFI-SW-C-7494 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
water line pit POC-43 at Zone-K - As Highlighted (SP# 133)

Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) for Non-Potable water line
B3 3 KAIG3-RFI-SW-C-7495 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
Zone-B - as highlighted (Stock Pile# 133 A-1-B)

"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 9) for Storm Water Line from
6A 6 KAIG3-RFI-SW-C-7496 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
MH-M-02 to MH-M-03 at Zone-6A - As Highlighted (Stock Pile # 131 A-1-B)"

Inspection of Backfilling Gravel 1st Layer (1 of 4) around Manhole FW-A-06 - as Highlighted (Stock Pile#
6A 6 KAIG3-RFI-SW-C-7497 00 Civil Site Works 9/6/22 9/7/22 Approved as noted
138)

kaig-qcals 382
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812

SUB Location / Building Date STATUS


ZONE RFI NUMBER REV. DESCRIPTION DISCIPLINE Remarks
ZONE Name Submitted Replied Approved Approved as Noted Code C/Code D
"Inspection of backfilling Gravel 1st Layer (1 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03,
6 6 KAIG3-RFI-SW-C-7498 00 Civil Site Works 9/6/22 9/7/22 Approved as noted
MH-M-04, MH-M-05 - As Highlighted (Stock Pile# 138)"
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non-
B3 3 KAIG3-RFI-SW-C-7503 00 Civil Site Works 9/6/22 9/8/22 Approved as noted
Potable Water Line at Zone-B - as highlighted (SP# 131)
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 2R (as highlighted) Axis
2R 6 KAIG3-RFI-CO-C-7504 00 Civil Crescent 9/6/22 9/11/22 Approved as noted
02-1 to 02-2, 02BB to 02BA (4th layer of 8th )
Inspection and compaction test 5th layer continuation backfilling for Internal Building (2nd part) for Zone 1N
1N 6 KAIG3-RFI-CO-C-7505 00 Civil Crescent 9/6/22 9/10/22 Approved as noted
Axis 01AN - 01AP (as highlighted) (5th of 8th)

Inspection and compaction test 1st & 2nd layer for Backfilling for Isolated footing of Internal building of
2C 6 KAIG3-RFI-CO-C-7506 00 Civil Crescent 9/6/22 9/8/22 Approved as noted
Zone 2C (as highlighted) between P2 - P3 (1st & 2nd layer of 9th )

Inspection and compaction test 1st layer for MCPE2 UNDER SHAFT Zone 2J 2H 2G 2K (as
2J 6 KAIG3-RFI-MC-C-7507 00 Civil MCPE 2 9/10/22 9/10/22 Approved as noted
highlighted) axis 03H , 03G ,03F, 1st Layer of 2nd (SP 125)
Inspection and compaction test 1st layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted)
2J 6 KAIG3-RFI-MC-C-7508 00 Civil MCPE 2 9/7/22 9/10/22 Approved as noted
zone 2J 2K, 1st layer of 13th

H6 6 KAIG3-RFI-SW-C-7509 00 Inspection of Formwork for Side Walls of MV Line Pulling Pit - H/MV/19 at Zone-H (As Highlighted) Civil Site Works 9/7/22 9/10/22 Approved as noted

Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - H/MV/19 at Zone-H (As
H6 6 KAIG3-RFI-SW-C-7510 00 Civil Site Works 9/7/22 9/10/22 Approved as noted
Highlighted)

H6 6 KAIG3-RFI-SW-C-7511 00 Inspection of Formwork for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted) Civil Site Works 9/7/22 9/11/22 Approved as noted

H6 6 KAIG3-RFI-SW-C-7512 00 Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted) Civil Site Works 9/7/22 9/10/22 Approved as noted

4 4 KAIG3-RFI-SW-C-7513 00 Inspection of Formwork for the Wall of SBC-07 - Wing Wall - As Highlighted Civil Site Works 9/7/22 9/11/22 Approved as noted

4 4 KAIG3-RFI-SW-C-7514 00 Inspection of Concrete Pouring for the Wall of SBC-07 - Wing Wall - As Highlighted Civil Site Works 9/7/22 9/10/22 Approved as noted

Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Non-
B3 3 KAIG3-RFI-SW-C-7515 00 Civil Site Works 9/7/22 9/10/22 Approved as noted
Potable Water Line at Zone-B - as highlighted (SP#136)

Inspection of Backfilling Gravel 2nd Layer (2 of 4) around Manhole FW-A-06 - as Highlighted (Stock Pile#
6 6 KAIG3-RFI-SW-C-7516 00 Civil Site Works 9/7/22 9/8/22 Approved as noted
138)
"Inspection of backfilling Gravel 2nd Layer (2 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03,
6 6 KAIG3-RFI-SW-C-7517 00 Civil Site Works 9/7/22 9/8/22 Approved as noted
MH-M-04, MH-M-05 - As Highlighted (Stock Pile# 138)"

C3 3 KAIG3-RFI-SW-C-7518 00 Surface Preparation prior to start backfilling around MV Line Pit C/MV/23 at Zone-C- As Highlighted Civil Site Works 9/7/22 9/8/22 Approved as noted

Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Gravel for Non potable
K5 5 KAIG3-RFI-SW-C-7519 00 Civil Site Works 9/7/22 9/10/22 Approved as noted
water line pit POC-43 at Zone-K - As Highlighted (SP# 133)

G3 3 KAIG3-RFI-SW-C-7520 00 Surface Preparation prior to start backfilling around MV Line Pit G/MV/02 at Zone-G- As Highlighted Civil Site Works 9/7/22 9/10/22 Approved as noted

Surface Preparation prior to start backfilling for Non potable water line pit POC-29, POC-41 and POC-42 at
GK5 5 KAIG3-RFI-SW-C-7521 00 Civil Site Works 9/7/22 9/8/22 Approved as noted
zone G&K - As Highlighted
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-45 at Zone-K - as
K5 5 KAIG3-RFI-SW-C-7522 00 Civil Site Works 9/7/22 9/11/22 Approved as noted
highlighted

GK45 5 KAIG3-RFI-SW-C-7523 00 Inspection for Installation of Non-Potable Water Line Pit - POC-29, POC-41 and POC-42 - as highlighted Civil Site Works 9/7/22 9/10/22 Approved as noted

5A 5 KAIG3-RFI-EC-C-7526 00 Surface Preparation prior to start Backfilling for Energy Center 2 (as highlighted) Zone 5A Axis 12-13, A Civil Energy Center 2 9/7/22 9/13/22 Approved as noted

Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Span 12, inside Water Garden,
4B 4 KAIG3-RFI-WG-C-7527 00 Civil Water Play Garden 9/7/22 9/8/22 Approved as noted
as Highlighted area in the attached drawing's

2D 2E 6 KAIG3-RFI-RG-C-7528 00 "Surface Preparation Prior to start Backfilling at Cretaceous Garden zone 2D,2E (as highlighted) " Civil Cretaceous Garden 9/7/22 9/10/22 Approved as noted

Inspection and compaction test 6th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as
1P 6 KAIG3-RFI-MC-C-7529 00 Civil MCPE 4 9/7/22 9/11/22 Approved as noted
highlighted) ( 6th layer of 6th )

Inspection and compaction test 3rd & 4th layer for Backfilling for Isolated footing of Internal building of
2C 6 KAIG3-RFI-CO-C-7530 00 Civil Crescent 9/7/22 9/10/22 Approved as noted
Zone 2C (as highlighted) between P2 - P3 (3rd & 4th layer of 9th)

kaig-qcals 383
AS OF: February 28, 2023
Consultant : DAR Code C already Code C (not
Code D Cancelled Open Approved Approved as noted TOTAL
Main Contractor: ZHBG resubmit/approved resubmit)
0 376 65 662 14 6532 163 7812