Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

DG SENSING-1NO.

SPARE - 1 NO.
TR-1 MARSHALLING BOX - 1 NO.
SPARE - 1 NO.
MCC-1 PANEL - 1 NO.
SBR TURBO AIR BLOWER-1 NO.
FOR SPARE-1 NO.
TO APFC PANEL - 1
60 kVAR
A ASS
20A
20A
TO APFC PANEL - 2
60 kVAR
A ASS
SBR TURBO AIR BLOWER-1 NO.
MCC-1 PANEL - 1 NO.
BATTERY CHARGING-1 NO.
SPARE - 2 NOS.
TR-2 MARSHALLING BOX - 1 NO.
SPARE - 1 NO.
SURPLUS ACTIVATED SLUDGE
PUMP (SUBM. PUMP)- 2 NOS.
PUMP-MOTOR SAFETY
PROTECTION (PMU)
RETURN ACTIVATED SLUDGE
PUMP (SUBM. PUMP)- 2 NOS.
PUMP-MOTOR SAFETY
PROTECTION (PMU)
SBR DECANTER - 2 NOS.
(NOTE: ALL PROVISION SHALL BE AS
RECOMMENDED BY SBR
TECHNOLOGY PROVIDER.)
JB FOR SBR DECANTER
LEVEL SWITCH
GRIT GRIT CLASSIFIER - 2 NOS.
DWPE DOSING TANK AGITATOR-2 NOS.
GRIT COLLECTOR - 2 NOS.
FECL3 DOSING TANK AGITATOR - 2 NOS.
FECL3 DOSING PUMP - 2 NOS.
DWPE DOSING PUMPS-2 NOS.
ORGANIC RETURN PUMP - 2 NOS.
CENTRIFUDGE FEED PUMPS-2NOS.
CENTRIFUDGE FEED SLUDGE SUMP
BLOWER-2NOS.
TREATED SEWAGE SERVICE WATER
PUMPS- 2NOS.
PUMP-MOTOR SAFETY
PROTECTION (PMU)
FILTRATE RECYCLE PUMP- 2NOS.
CLEAR SERVICE WATER PUMP-2 NOS.
PUMP-MOTOR SAFETY
PROTECTION (PMU)
CENTRIFUGE PANEL - 2 NOS.
SPARE - 2 NOS.
MECHANICAL FINE SCREEN PANEL - 1 NO.
CHLORINATION PANEL-1 NO.
BOREWELL PUMP PANEL-1 NO.
PDB-1,2,3 & 4 AT VARIOUS PLACES-4 NOS.
SPARE-2 NOS.
LDB :1-ADMIN BUILDING G.F.-1 NO.
LDB :2-ADMIN BUILDING F.F.- 1 NO.
LDB :3-AIR BLOWER ROOM - 1 NO.
LDB:4- SLUDGE SUMP & PH- 1NO.
SPARE-1NO.
ICP - 1 NO.
SPARE - 2 NOS.
LDB-5-OUTOOR LIGHTING-1 NO.

You might also like