Material Submittal Register (MAT)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 21

Cancelled/

Open Code A Code B Code C Code D Total Received


Superseded

0
Consultant : DAR 0 0 0 2 0 0 2

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline : Structural

Under Review
Rundate: 28-Feb-2023 STRUCTURAL-CONCRETE
Status Code

Code A

Code B

Code C

Code D

Code E
Latest Approval Required Average Days Number of Number of Days
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By Oustanding Days Held with ZHBG
A B C D

160 KAIG3-MAT-GN-S-0145 1 L Dekguard E2000 (Anti-Carbonation Coat) Fosam Company Limited 19.07.22 02.08.22 04.08.22 16 208 C 1 1

Madeen al-Khobra Trading


161 Str KAIG3-MAT-GN-S-0146 0 L Threaded Coupler for Rebar Splice S& P Size 16, 0, 25, 32 & 40mm 23.06.22 07.07.22 29.06.22 6 244 C 1 1
Est

M.Sarfraz
Page 1
Snr. DC
Open Code A Code B

0
Consultant : DAR 0 0 0

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline : Structural

Under Review
Rundate: 28-Feb-2023 STURCTURAL STEEL

Code A

Code B

Code C

Code D

Code E
Latest Approval Required
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By

96 KAIG3-MAT-EC-SS-0090 0 L Anchor Bolt & Nut- M27x580 and 20x350-27x580 and 20x350 Masdar Technical Supplies 03.11.22 17.11.22 14.11.22 Fast Track 1 1

M.Sarfraz
Page 2
Snr. DC
Open Code A Code B

Consultant : DAR 0 0 0
Main Contractor : ZHBG
Discipline : Architectural
Rundate: 28-Feb-2023 ARCHITECTURAL

Latest Approval Required


Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By

183 KAIG3-MAT-GN-A-0146 1 L Aluminium Louver Sun Shades System Alu Systems 25.08.22 08.09.22 12.09.22

Ceramic Floor and Wall Tile Size 20x20cm-Matt & Glossy


227 KAIG3-MAT-GN-A-0173 1 L RAK Ceramics 23.10.22 06.11.22 16.11.22
Different Colors

First System Est.-Creative


229 KAIG3-MAT-GN-A-0174 1 L Precast Epoxy Terrazoe 05.10.22 19.10.22 18.10.22
Concrete

Al Gamdi Company for Sanitry


231 KAIG3-MAT-GN-A-0175 1 L Mixer & Kitchen Sinks 11.09.22 25.09.22 09.10.22
Waers Solutions

Bahjat Shaker Almobayedh


234 KAIG3-MAT-GN-A-0177 0 L Roof Access Ladders 18.08.22 01.09.22 25.08.22
Est

242 KAIG3-MAT-GN-A-0181 1 L Hardware Doors Allegion International AG 04.10.22 18.10.22 10.11.22

Aluminium Construction
243 KAIG3-MAT-TB-A-0182 0 L Aluminium Louver System at Ticket Facility Building System for Facoty (ALU 24.08.22 07.09.22 30.08.22
System)
withdraw on 031022 as per Mr.
Aluminium Construction
Moawia and Mr.
244 KAIG3-MAT-TB-A-0183 0 L Sliding Window Aluminum System System for Facoty (ALU 31.10.22 14.11.22 13.11.22
Hard/Resubmit311022 agreed with
System)
Dar

245 KAIG3-MAT-GN-A-0184 0 L Stainless Steel Handrail Metal World Co. 22.08.22 05.09.22 05.09.22

247 KAIG3-MAT-GN-A-0186 0 L Wall Partition MADA Gypsum Company Ltd 11.09.22 25.09.22 27.09.22

249 KAIG3-MAT-GN-A-0187 1 L Bullet Proof Fixed Window System Alu Systems 16.10.22 30.10.22 29.10.22

253 KAIG3-MAT-AG-A-0190 0 L Profile Aluminum Flashing (Radial Panels) Alu Systems 19.09.22 03.10.22 13.10.22

Hiltil Façade System for Stone Caldding Fixing Accessories Hilti Saudi Arabia for
254 KAIG3-MAT-GN-A-0191 0 L 02.10.22 16.10.22 13.11.22
for Ceiling and Movement Joint Area Construction

255 KAIG3-MAT-CC-A-0192 0 L Aluminum Composite Panel for Louver at Plant Screen Alu Systems 09.10.22 23.10.22 26.10.22

The Arabian Chemical


256 KAIG3-MAT-GN-A-0193 0 L Thermal Isolation for the Roofing System 16.10.22 30.10.22 27.10.22
Company

Page 3
Snr. DC
Open Code A Code B

Consultant :DAR

0
Consultant : DAR 0 0 0 Main Contractor : ZHBG

Superseded / Cancelled
Main Contractor : ZHBG Sub Contractor :

Material Submitted
Discipline : Electrical Discipline : Electrical
ELECTRICAL-POWER

Under Review
Rundate: 28-Feb-2023 Rundate:

Code A

Code B

Code C

Code D
Latest Approval

Code E
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. Required By

KAIG3-MAT-GN-E-0080 0 L Solar in Ground Lighting Alshaya Enterprises 12.09.22 26.09.22 18.09.22 1 1

93 EL KAIG3-MAT-GN-E-0081 0 L Rigid Steel, PCV Coated Rigid Steel Conduits and Fittings Saudi Electric Supply co, (SESCO) 12.09.22 26.09.22 21.09.22 1 1

M.Sarfraz
Page 4
Snr. DC
Cancelled/
Open Code A Code B Code C Code D Total Received
Superseded

Consultant : DAR

0
Consultant : DAR 0 0 0 1 0 0 1 Main Contractor : ZHBG

Superseded / Cancelled
Main Contractor : ZHBG Sub Contractor :

Material Submitted
Discipline : Electrical Discipline : Electrical

Under Review
Rundate: 28-Feb-2023 ELECTRICAL - LOW CURRENT Rundate:
Status Code

Code A

Code B

Code C

Code D

Code E
Latest Approval Average Days Number of Days Number of Days With
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. Required By Oustanding Held ZHBG
A B C D

29 LC KAIG3-MAT-GN-LC-0020 0 L CCTV System Honeywell Truki Arabi Limited 09.10.21 23.10.21 04.11.21 26 481 C 1 1

M.Sarfraz
Page 5
Snr. DC
Open Code A Code B

0
0 0 0
Consultant : DAR

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted

More than 14 days


Discipline : Mechanical

Under Review
Rundate: 28-Feb-2023

Code A

Code B

Code C

Code D

Code E
Latest Approval Required
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By

119 KAIG3-MAT-MB-M-0078 2 L Water Feature Equipment Pedrollo/New Pool Est 11.10.22 25.10.22 05.11.22 1 1 1

Jabel Nees Co for


185 KAIG3-MAT-SW-M-0120 0 L Lift Station 18.08.22 01.09.22 03.09.22 1 1 1
Trading & Contracting

KAIG3-MAT-EC-M-0122 3 L Air Handling Units Zamil Air Conditioners 31.10.22 14.11.22 15.11.22 1 1 0

192 KAIG3-MAT-ZG-M-0124 2 L Circulation Pumps for Maze Garden New Pool Est 26.10.22 09.11.22 15.11.22 1 1 0

203 KAIG3-MAT-TG-M-0131 2 L Pumps for Butterfy Garden New Pool Est 24.10.22 07.11.22 13.11.22 Fast Track 1 1 0

Fan Coil Units (Zamil)/Garden of Choices-Policene


KAIG3-MAT-GN-M-0135 3 L Zamil Air Conditioners 31.10.22 14.11.22 15.11.22 1 1 0
Garden

AMIANTIT
217 KAIG3-MAT-EC-M-0142 0 L Fuel Storage Tanks for Boilers & Generators FIBERGLASS 30.10.22 13.11.22 14.11.22 1 1 0
INDUSTRIES Ltd

M.Sarfraz
Page 6
Snr. DC
Cancelled/
Open Code A Code B Code C Code D Total Received
Superseded

0
0 0 0 1 0 0 1
Consultant : DAR

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted

More than 14 days


Discipline : Mechanical

Under Review
Rundate: 28-Feb-2023
Status Code

Code A

Code B

Code C

Code D

Code E
Latest Approval Required Average Days Number of Days Number of Days with
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By Oustanding Held ZHBG
A B C D E

Modern Times Technical


52 ME KAIG3-MAT-GN-P-0046 0 L PEX Pipes and Fittings 15.08.21 29.08.21 29.08.21 14 548 C 1 1 0
System (MTTS)

M.Sarfraz
Page 7
Snr. DC
Open Code A Code B

0
Consultant : DAR 0 0 0

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline : Earthwork

Under Review
Rundate: 28-Feb-2023

Code A

Code B

Code C

Code D

Code E
Latest Approval Received
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Remarks
Rev. Required By Date

55 Civil-Earth KAIG3-MAT-GN-C-0047 1 L Epoxy Waterproofing Paint Finish System Fosam Company 13.10.22 27.10.22 23.10.22 1 1

59 5 1 33 12 6 0 2

M.Sarfraz
Page 8
Snr. DC
Open Code A Code B Code C Code D Total Received

0
0 0 0 0 0 0
Consultant : DAR

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline :Hydrology

Under Review
Rundate: 28-Feb-2023
Status Code

Code A

Code B

Code C

Code D

Code E
Approval Required Average Days Number of
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
By Oustanding Days Held
A B C D

1 PL 44985

2 PL 44985

3 PL 44985

4 PL 44985

5 PL 44985

6 PL 44985

7 PL 44985

8 PL 44985

9 PL 44985

10 PL 44985

48 PL

49 PL

50

51

0 0 0 0 0 0 0 0

M.Sarfraz
Page 9
Snr. DC
Open Code A Code B Code C Code D Total Received

0
0 0 0 0 0 0
Consultant : DAR

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline :Transportation

Under Review
Rundate: 28-Feb-2023
Status Code

Code A

Code B

Code C

Code D

Code E
Approval Required Average Days Number of
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
By Oustanding Days Held
A B C D

1 PL 44985

2 PL 44985

3 PL 44985

4 PL 44985

5 PL 44985

6 PL 44985

7 PL 44985

8 PL 44985

9 PL 44985

10 PL 44985

48 PL

49 PL

50

51

0 0 0 0 0 0 0 0

M.Sarfraz
Page 10
Snr. DC
Open Code A Code B Code C Code D Total Received

0
0 0 0 0 0 0
Consultant : DAR

Superseded / Cancelled
Main Contractor : ZHBG

Material Submitted
Discipline :Enviromental

Under Review
Rundate: 28-Feb-2023
Status Code

Code A

Code B

Code C

Code D

Code E
Approval Required Average Days Number of
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
By Oustanding Days Held
A B C D

1 44985

2 44985

3 44985

4 44985

5 44985

6 44985

7 44985

8 44985

9 44985

10 44985

48

49

50

51

0 0 0 0 0 0 0 0

M.Sarfraz
Page 11
Snr. DC
Consultant : DAR Discipline :
Main Contractor : ZHBG Rundate :

Status C
Approval Required
Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date
By
A

1 13.01.00

2 13.01.00

Page 12 of 21 M.Sarfraz
Snr. DC
Consultant : DAR
Main Contractor : ZHBG Open Code A Code B Code C Code D 28-Feb-23

0 0 0 1 0

Latest Approval Required


Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By

Sail Anriyadah Saudi


74 KAIG3-MAT-SW-LS-0059 0 L Interlock Precast Concrete Pavers Size 240x160x80mm 16.10.22 31.10.22 23.10.22
Industries Company

Page 13 of 21 M.Sarfraz
Snr. DC
Open Code A Code B Total Received

Consultant : DAR 0 0 0 1
Main Contractor : ZHBG

28-Feb-23

Latest Approval Required


Sl No. Discipline Reference Number Rev. Description Supplier Submitted Date Received Date Remarks
Rev. By

KAIG3-MAT-GN-G-0020 2 Elvators Schindler Olyan 11.09.22 25.09.22 24.09.22

Page 14 of 21 M.Sarfraz
Snr. DC
MATERIALS CODE C SUMMARY DETAILS FROM AUGUST 1

LATEST
SN# TRANSMITTAL# REV.
REV.

1 KAIG3-MAT-EC-SS-0090 0 L

2 KAIG3-MAT-GN-A-0146 1 L

3 KAIG3-MAT-GN-A-0173 1 L

4 KAIG3-MAT-GN-A-0174 1 L

5 KAIG3-MAT-GN-A-0175 1 L

6 KAIG3-MAT-GN-A-0177 0 L

7 KAIG3-MAT-GN-A-0181 1 L

8 KAIG3-MAT-TB-A-0182 0 L

9 KAIG3-MAT-TB-A-0183 0 L

10 KAIG3-MAT-GN-A-0184 0 L

11 KAIG3-MAT-GN-A-0186 0 L

12 KAIG3-MAT-GN-A-0187 1 L

13 KAIG3-MAT-AG-A-0190 0 L

14 KAIG3-MAT-GN-A-0191 0 L

15 KAIG3-MAT-CC-A-0192 0 L

16 KAIG3-MAT-GN-A-0193 0 L
17 KAIG3-MAT-GN-E-0080 0 L

18 KAIG3-MAT-GN-E-0081 0 L

19 KAIG3-MAT-MB-M-0078 2 L

20 KAIG3-MAT-SW-M-0120 0 L

21 KAIG3-MAT-EC-M-0122 3 L

22 KAIG3-MAT-ZG-M-0124 2 L

23 KAIG3-MAT-TG-M-0131 2 L

24 KAIG3-MAT-GN-M-0135 3 L

25 KAIG3-MAT-EC-M-0142 0 L

26 KAIG3-MAT-GN-C-0047 1 L

27 KAIG3-MAT-SW-LS-0059 0 L

28 KAIG3-MAT-GN-G-0020 2 L
MATERIALS CODE C SUMMARY DETAILS FROM AUGUST 10,2022 UP TO NOVEMBER 16,2022

MATERIAL DESCRIPTION SUPPLIER

Anchor Bolt & Nut- M27x580 and 20x350-27x580 and 20x350 Masdar Technical Supplies

Aluminium Louver Sun Shades System Alu Systems

Ceramic Floor and Wall Tile Size 20x20cm-Matt & Glossy Different Colors RAK Ceramics

First System Est.-Creative


Precast Epoxy Terrazoe Concrete

Al Gamdi Company for Sanitry


Mixer & Kitchen Sinks Waers Solutions

Roof Access Ladders Bahjat Shaker Almobayedh Est

Hardware Doors Allegion International AG

Aluminium Construction System


Aluminium Louver System at Ticket Facility Building for Facoty (ALU System)

Aluminium Construction System


Sliding Window Aluminum System for Facoty (ALU System)

Stainless Steel Handrail Metal World Co.

Wall Partition MADA Gypsum Company Ltd

Bullet Proof Fixed Window System Alu Systems

Profile Aluminum Flashing (Radial Panels) Alu Systems

Hilti Saudi Arabia for


Hiltil Façade System for Stone Caldding Fixing Accessories for Ceiling and Mov Construction

Aluminum Composite Panel for Louver at Plant Screen Alu Systems

The Arabian Chemical


Thermal Isolation for the Roofing System Company
Solar in Ground Lighting Alshaya Enterprises

Saudi Electric Supply co,


Rigid Steel, PCV Coated Rigid Steel Conduits and Fittings (SESCO)

Water Feature Equipment Pedrollo/New Pool Est

Jabel Nees Co for Trading &


Lift Station Contracting

Air Handling Units Zamil Air Conditioners

Circulation Pumps for Maze Garden New Pool Est

Pumps for Butterfy Garden New Pool Est

Fan Coil Units (Zamil)/Garden of Choices-Policene Garden Zamil Air Conditioners

AMIANTIT FIBERGLASS
Fuel Storage Tanks for Boilers & Generators INDUSTRIES Ltd

Epoxy Waterproofing Paint Finish System Fosam Company

Sail Anriyadah Saudi Industries


Interlock Precast Concrete Pavers Size 240x160x80mm Company

Elvators Schindler Olyan

DISCIPLINE TOTAL

STEEL STRUCTURAL 1

ARCHITECTURAL 15

ELECTRICAL 2

MECHANICAL 7

CIVIL 1

LANDSCAPE 1

GENERAL 1

TOTAL 28
R 16,2022

REQUIRED
SUBMITTED RECEIVED
DISCIPLINE APPROVAL
DATE DATE
DATE

SS 3-Nov-22 17-Nov-22 14-Nov-22

A 25-Aug-22 8-Sep-22 12-Sep-22

A 23-Oct-22 6-Nov-22 16-Nov-22

A 5-Oct-22 19-Oct-22 18-Oct-22

A 11-Sep-22 25-Sep-22 9-Oct-22

A 18-Aug-22 1-Sep-22 25-Aug-22

A 4-Oct-22 18-Oct-22 10-Nov-22

A 24-Aug-22 7-Sep-22 30-Aug-22

A 31-Oct-22 14-Nov-22 13-Nov-22

A 22-Aug-22 5-Sep-22 5-Sep-22

A 11-Sep-22 25-Sep-22 27-Sep-22

A 16-Oct-22 30-Oct-22 29-Oct-22

A 19-Sep-22 3-Oct-22 13-Oct-22

A 2-Oct-22 16-Oct-22 13-Nov-22

A 9-Oct-22 23-Oct-22 26-Oct-22

A 16-Oct-22 30-Oct-22 27-Oct-22


E 12-Sep-22 26-Sep-22 18-Sep-22

E 12-Sep-22 26-Sep-22 21-Sep-22

M 11-Oct-22 25-Oct-22 5-Nov-22

M 18-Aug-22 1-Sep-22 3-Sep-22

M 31-Oct-22 14-Nov-22 15-Nov-22

M 26-Oct-22 9-Nov-22 15-Nov-22

M 24-Oct-22 7-Nov-22 13-Nov-22

M 31-Oct-22 14-Nov-22 15-Nov-22

M 30-Oct-22 13-Nov-22 14-Nov-22

C 13-Oct-22 27-Oct-22 23-Oct-22

LS 16-Oct-22 31-Oct-22 23-Oct-22

G 11-Sep-22 25-Sep-22 24-Sep-22


KING ABDULLAH INTERNATIONAL GARDENS PROJECT
MATERIAL SUBMITTAL SUMMARY

Run Date: 28-Feb-23

LANDSCAPE-Soft Scape

LANDSCAPE-Hardscape
Electrical-Low Current

Mechanical Plumbing
Structural-Concrete

Mechanical-HVAC
Electrical-Power
Structural-Steel

Environmental
Architectural

Mechanical

Hydrology
Earthwork

General
Total
B Material
Total No. of Planned Submittals 220 34 250 232 134 358 30 320 10 10 10 250 120 1978
No. of Materials Submitted 162 96 260 111 52 221 0 58 59 0 0 0 75 34 1128
Total No. of Materials Approved ( A & B ) 85 71 107 63 26 69 0 38 34 0 0 0 36 7 536
Materials not Approved ( C ) 33 21 93 40 18 114 0 14 12 0 0 0 17 15 377
Material Rejected ( D ) 26 3 12 1 6 6 0 0 6 0 0 0 11 2 73
Code E ( For Info & Others) 0 0 6 1 0 0 0 2 0 0 0 0 0 0 9
Under Review with DAR 1 0 9 2 0 15 0 1 2 0 0 0 4 1 35

Material Status
Code A 0 0 1 0 0 0 0 1 1 0 0 0 0 0 3
Code B 85 71 106 63 26 69 0 37 33 0 0 0 36 7 533
Code C 33 21 93 40 18 114 0 14 12 0 0 0 17 15 377
Code D 26 3 12 1 6 6 0 0 6 0 0 0 11 2 73
Code E 6 1 0 0 0 2 0 0 0 0 0 0 9
Superseded 17 1 33 4 2 17 0 3 5 0 0 0 7 9 98
Under Review with DAR 1 0 9 2 0 15 0 1 2 0 0 0 4 1 35
Total 162 96 260 111 52 221 0 58 59 0 0 0 75 34 1128
More than 14 days with consultant 65 64 173 66 29 99 0 30 40 0 0 0 44 22 610

Approved Code "A" Percentage 0.00% 0.50% 0.00% 0.00% 0.00% 0.33%
Approved Code "B" Percentage 72.03% 53.00% 61.17% 37.70% 67.92% 58.38%
Not Approved Code "C" Percentage 27.97% 46.50% 38.83% 62.30% 32.08% 41.29%

Total Approved Code "A&B" Percentage 72.03% 53.50% 61.17% 37.70% 67.92% 58.71%

Status Code:
A- Approved No Comments
B- Approved As Noted
C- Not Approved - Revise