Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Project Total 2/3/2023 9:48 am

365L Equipment On Lease


crRpt365LTotals L
Customer Number 36677 Customer Name: CONSTRUCTORA INARCO PERU SAC District: EFCO de Peru
Project Number: P337310 Project Description: PASEO SAN MARTIN V

Quantity * Quantity Total Unit Total


Item # Description On Lease Unreturned Quantity Weight Weight

01988 HEF Brazo de Andamio Imp/Met 9 0 9 8.16 73.44

01993 Martillo Saca Tensor 1 0 1 7.89 7.89

01M23 HEF Angulo Exterior x 1200 1 0 1 3.05 3.05

10522 Z-Beam x 3050 1 0 1 30.39 30.39

10A24 E-Beam x 3000 1 0 1 16.96 16.96

18M24 Alineador Tubo x 1800 1 0 1 6.74 6.74

EFCO Corp
Report lists all items on lease for a project.
* Quantity Unreturned is the outstanding balance of equipment invoiced as unreturned. Page 1 of 3
Project Total 2/3/2023 9:48 am

365L Equipment On Lease


crRpt365LTotals L
Customer Number 36677 Customer Name: CONSTRUCTORA INARCO PERU SAC District: EFCO de Peru
Project Number: P337310 Project Description: PASEO SAN MARTIN V

Quantity * Quantity Total Unit Total


Item # Description On Lease Unreturned Quantity Weight Weight

10M98 Pasarela 4 0 4 14.51 58.04

23988 HEF Poste de Andamio Imp/Met 8 0 8 2.77 22.16

25523 Pro 4 Gato Largo 58 0 58 7.71 447.18

27523 Pro 4 Poste x 1525 (1 PC) 58 0 58 4.76 276.08

36523 Pro 4 Base para Gato 29 0 29 0.37 10.73

42523 Pro 4 Pasador Retenedor Gato 21 0 21 0.07 1.47

EFCO Corp
Report lists all items on lease for a project.
* Quantity Unreturned is the outstanding balance of equipment invoiced as unreturned. Page 2 of 3
Project Total 2/3/2023 9:48 am

365L Equipment On Lease


crRpt365LTotals L
Customer Number 36677 Customer Name: CONSTRUCTORA INARCO PERU SAC District: EFCO de Peru
Project Number: P337310 Project Description: PASEO SAN MARTIN V

Quantity * Quantity Total Unit Total


Item # Description On Lease Unreturned Quantity Weight Weight

45523 Pro 4 Cabezal para Z-Beam 4 0 4 3.75 15.00

Project Total Weight On Lease: 969.13

EFCO Corp
Report lists all items on lease for a project.
* Quantity Unreturned is the outstanding balance of equipment invoiced as unreturned. Page 3 of 3

You might also like