GE: Newcom:
Percentage /
Month Electricity Daily electricity delivery /kWh/ Total electricity delivery (From beginning of the month)/kWh/
Power /MW/ %/
/kWh/
Difference Plan Performance Difference
Imported from
Max power /MW/ 29.73 January 3960 3,960 1.06
Grid
139,920 139,920
Exported to
Min power /MW/ 0.00 143,880 13,229,000 143,880
Grid
Production deviation
08:00-16:00 16:00-24:00 00:00-08:00 Monthly total
(-) Deviation, kWh 62,748 22,738 110,260
(Imp) Deviation, kWh 17,000 37,000
(+) Deviation, kWh -
Total 31 WTG, 110kV OHTL- 123, 124, 110kV busbar-1,2, 110kV VT-1,2, 110kV Tx-1,2, Tx-1,2 neutral point disconnectors,
In operation:
35kV busbar-1,2, Extinction Coil-2 , 35kV VT-1,2, 35kV section VCB, 35kV Service transformer-1,2, Strings-1,2,3,4
Tx tap changer: Tx-1 and Tx-2 tap changers: position=4, Extinction coil tap changer: EC-1: position=8, EC-2: position=9, KT-1,3,5-31: position=4, KT-2,4: position=5
0.69 2021.01.01 14:07-14:14 Salkhit Diesel generator Launched without load Test operation
CE New Syndicate
-Will clean road snow of site
Routine inspection was done
Date and time: 2021.01.02 10:00-18:00
GE
Repalced WECA card and wind sensor at WTG-8
New Syndicate
Melted door hinge of garage
Cleaned snow of roads which are WTG-19, WTG-25-26, WTG-18-22.
2021.01.01 0.69/0.4kV service transformer was affected at KT-1, 3, 4, 6-8, 10,12-14, 16, 17, 19, 29 (Changed (Informed OM)
phases on KT-2's Service Tx , Replaced Service Tx on KT-5,9,15,21)
2020.11.11 110kV OHTL-123 Surge arrestor had abnormal noise (Informed OM,CTO)
2021.01.01 110kV T-2 transformer's disconnector had abnormal noise (Under monitoring)
2020.09.22 110kV T-2 busbar's disconnector had abnormal noise (Under monitoring)
2020.12.22 110kV T-1 transformer's disconnector had abnormal noise (Under monitoring)
2020.04.14 110kV VT-2's surge arrestor had abnormal noise (Under monitoring)
2021.01.01 35kV busbar#2 voltmeter showed incorrect measuring (Informed OM)
2020.11.11 110kV OHTL-123 line disconnector had abnormal noise (Informed OM
2021.01.01 110kV OHTL-124 line disconnector had abnormal noise (Informed OM
2020.09.16 110kV T-1 transformer's Surge arrestor had abnormal noise (Under monitoring)
2021.01.01 Damaged B phase 690V inlet inside of KT-21 (Informed OM)
2020.07.08 Little oil leakage from Z transformer's top of radiator and N phase at Extinction coil-2 (Informed CTO)
2021.01.01 2 of 4 heaters of bore well water pipes heaters have faults. (Informed OM)
2020.10.26 GIS Busbar-2 has abnormal noise (Informed OM)
2020.10.26 Little oil leakage from Service Tx-2's LV incoming. (Informed OM)
2020.11.13 35kV EC-1 resistor box have little abnormal noise (Informed OM)
2020.11.13 Little oil leakage from Z transformer's B phase top of radiator at Extinction coil-1 (Informed CTO)
2021.01.01 1pcs the light not working at South-East Lightning arrester. (Informed CTO)
2021.01.01 Damaged main reactor's A phase outside surge arrester of SVC-1 (Informed CTO)
2021.01.01 Damaged Ext.coil-1's isolator and took outside surge arrester (Informed CTO)
GE:
2021.01.01 Motion sensor light didn't turn on at WTG- 1,2, 5,6,9,10,11,19,21,22,25,26,29,31 (Informed GE)
50.000
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Engineer: Tulgaa. B
Technician(s): Batsukh. Kh
Ninjbadgar. N
mance Hours
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Perfor
, MW
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 3.9 5.7 18.3 20.9 23.3 26.2 25.9 28.1 26.4 29.7 25.3 17.1 16.7 9.5 10.2
MW /
Plann
MET/
ed,
9.4 9.8 9.8 9.3 8.7 8.3 9.2 10.8 14.0 18.7 21.5 22.1 21.8 20.4 19.8 19.8 21.0 22.3 5.0 2.0 2.0 5.0 25.4 25.5
NRSC
2.7 1.1 2.4 2.6 0.7 0.0 3.1 4.9 7.1 13.0 9.1 11.5 16.0 11.7 9.1 4.4 1.2 3.7 2.9 3.0 3.5 3.6 7.6 5.5
m/s
Ws
3.9 4.0 3.8 3.2 3.2 2.8 2.8 5.3 4.8 4.6 5.1 8.6 9.0 10.1 9.9 9.3 9.9 9.5 10.2 9.8 8.6 8.8 8.7 8.0
ation Foreca WTGs
30 30 30 3 30 30 30 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
Temp
st,°C
-32 -31 -30 -28 -25 -24 -23 -23 -24 -26 -27 -30 -31 -31 -32 -33 -33 -33 -34 -34 -34 -34 -35 -35
plan Realtim Forecast
Precipit
Precipit
NDC ation
9 10 10 9 9 8 9 11 14 19 22 22 22 20 20 20 21 22 5 2 2 5 25 25
import
export
Grid
Percentage /
Month Electricity Daily electricity delivery /kWh/ Total electricity delivery (From beginning of the month)/kWh/
Power /MW/ %/
/kWh/
Difference Plan Performance Difference
Imported from
Max power /MW/ 28.70 January 3,960 4.53
Grid
459,030 598,950
Exported to
Min power /MW/ 5.76 459,030 13,229,000 602,910
Grid
Production deviation
08:00-16:00 16:00-24:00 00:00-08:00 Monthly total
(-) Deviation, kWh 17,967 128,227
(Imp) Deviation, kWh 42,263 49,000 128,263
(+) Deviation, kWh -
Total 22 WTG, 110kV OHTL- 123, 124, 110kV busbar-1,2, 110kV VT-1,2, 110kV Tx-1,2, Tx-1,2 neutral point disconnectors,
In operation:
35kV busbar-1,2, Extinction Coil-2 , 35kV VT-1,2, 35kV section VCB, 35kV Service transformer-1,2, Strings-1,2,3,4
Tx tap changer: Tx-1 and Tx-2 tap changers: position=4, Extinction coil tap changer: EC-1: position=8, EC-2: position=9, KT-1,3,5-31: position=4, KT-2,4: position=5
CE
Routine inspection was done
New Syndicate
Cleaned snow of site road
CE: SPARE PARTS MOVEMENT REPORT( in/out)
2021.01.02 0.69/0.4kV service transformer was affected at KT-1, 3, 4, 6-8, 10,12-14, 16, 17, 19, 29 (Changed (Informed OM)
phases on KT-2's Service Tx , Replaced Service Tx on KT-5,9,15,21)
2020.11.11 110kV OHTL-123 Surge arrestor had abnormal noise (Informed OM,CTO)
2021.01.02 110kV T-2 transformer's disconnector had abnormal noise (Under monitoring)
2020.09.22 110kV T-2 busbar's disconnector had abnormal noise (Under monitoring)
2021.01.03 110kV T-1 transformer's disconnector had abnormal noise (Under monitoring)
2020.04.14 110kV VT-2's surge arrestor had abnormal noise (Under monitoring)
2021.01.02 35kV busbar#2 voltmeter showed incorrect measuring (Informed OM)
2020.11.11 110kV OHTL-123 line disconnector had abnormal noise (Informed OM
2021.01.02 110kV OHTL-124 line disconnector had abnormal noise (Informed OM
2020.09.16 110kV T-1 transformer's Surge arrestor had abnormal noise (Under monitoring)
2021.01.02 Damaged B phase 690V inlet inside of KT-21 (Informed OM)
2020.07.08 Little oil leakage from Z transformer's top of radiator and N phase at Extinction coil-2 (Informed CTO)
2021.01.02 2 of 4 heaters of bore well water pipes heaters have faults. (Informed OM)
2020.10.26 GIS Busbar-2 has abnormal noise (Informed OM)
2020.10.26 Little oil leakage from Service Tx-2's LV incoming. (Informed OM)
2020.11.13 35kV EC-1 resistor box have little abnormal noise (Informed OM)
2020.11.13 Little oil leakage from Z transformer's B phase top of radiator at Extinction coil-1 (Informed CTO)
2021.01.02 1pcs the light not working at South-East Lightning arrester. (Informed CTO)
2021.01.02 Damaged main reactor's A phase outside surge arrester of SVC-1 (Informed CTO)
2021.01.02 Damaged Ext.coil-1's isolator and took outside surge arrester (Informed CTO)
GE:
2021.01.02 Motion sensor light didn't turn on at WTG- 1,2, 5,6,9,10,11,19,21,22,25,26,29,31 (Informed GE)
50.000
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Engineer: Enkhtur. M
Technician(s): Tumurbaatar. Kh
Gantumur. O
mance Hours
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Perfor
, MW
15.6 15.5 17.3 19.6 20.4 28.7 28.7 19.6 14.7 18.4 16.2 15.6 14.1 11.6 13.6 15.4 15.1 13.3 15.2 16.8 15.8 14.8 5.8 8.1
MW /
Plann
MET/
ed,
25.0 24.3 24.2 24.1 23.4 23.7 26.5 29.0 30.5 30.8 30.1 29.4 27.8 26.0 25.3 10.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
NRSC
3.5 1.7 3.4 3.3 1.2 0.4 3.2 4.8 7.1 13.0 9.1 11.5 16.0 11.7 9.1 4.4 0.7 0.0 0.0 0.0 1.0 1.5 5.4 5.1
m/s
Ws
7.9 7.6 8.1 7.7 8.1 10.1 10.2 8.6 7.8 10.5 10.0 9.7 8.8 7.9 7.6 7.9 7.9 7.8 8.0 8.7 8.1 8.4 7.2 8.6
ation Foreca WTGs
31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 28 29 29 29 22 16 16
Temp
st,°C
-36 -35 -34 -31 -29 -27 -26 -27 -26 -28 -29 -31 -31 -32 -32 -33 -33 -33 -33 -33 -34 -35 -35 -36
plan Realtim Forecast
Precipit
Precipit
NDC ation
25 24 24 24 23 24 27 29 31 31 30 29 28 26 25 10 5 1 1 1 1 1 1 1
import
export
Grid
Percentage /
Month Electricity Daily electricity delivery /kWh/ Total electricity delivery (From beginning of the month)/kWh/
Power /MW/ %/
/kWh/
Difference Plan Performance Difference
Imported from
Max power /MW/ 20.35 January 3,960 6.92
Grid
316,074 915,024
Exported to
Min power /MW/ 2.21 316,074 13,229,000 918,984
Grid
Production deviation
08:00-16:00 16:00-24:00 00:00-08:00 Monthly total
(-) Deviation, kWh 13,063 141,290
(Imp) Deviation, kWh 147,440 275,703
(+) Deviation, kWh -
Total 20 WTG, 110kV OHTL- 123, 124, 110kV busbar-1,2, 110kV VT-1,2, 110kV Tx-1,2, Tx-1,2 neutral point disconnectors,
In operation:
35kV busbar-1,2, Extinction Coil-2 , 35kV VT-1,2, 35kV section VCB, 35kV Service transformer-1,2, Strings-1,2,3,4
In reserve: 110kV Section ECB, SVC- 2 , WTG-10, 11, 12, 17, 22, 23, 26, 27, 29, 30, 31
In maintenance: 35kV Reserve-1, 35kV Extinction Coil-1, SVC-1,
Tx tap changer: Tx-1 and Tx-2 tap changers: position=4, Extinction coil tap changer: EC-1: position=8, EC-2: position=9, KT-1,3,5-31: position=4, KT-2,4: position=5
CE CE Khorolseren
Will do inspection of MAST-8001, 8002
Routine inspection was done
Date: 2021.01.04
New Syndicate
-Replaced 3 socket, repaired a socket, replaced a plug of heater, and sticked tape on the door of garage.
2021.01.03 0.69/0.4kV service transformer was affected at KT-1, 3, 4, 6-8, 10,12-14, 16, 17, 19, 29 (Changed (Informed OM)
phases on KT-2's Service Tx , Replaced Service Tx on KT-5,9,15,21)
2020.11.11 110kV OHTL-123 Surge arrestor had abnormal noise (Informed OM,CTO)
2021.01.03 110kV T-2 transformer's disconnector had abnormal noise (Under monitoring)
2020.09.22 110kV T-2 busbar's disconnector had abnormal noise (Under monitoring)
2021.01.03 110kV T-1 transformer's disconnector had abnormal noise (Under monitoring)
2020.04.14 110kV VT-2's surge arrestor had abnormal noise (Under monitoring)
2021.01.03 35kV busbar#2 voltmeter showed incorrect measuring (Informed OM)
2020.11.11 110kV OHTL-123 line disconnector had abnormal noise (Informed OM
2021.01.03 110kV OHTL-124 line disconnector had abnormal noise (Informed OM
2020.09.16 110kV T-1 transformer's Surge arrestor had abnormal noise (Under monitoring)
2021.01.03 Damaged B phase 690V inlet inside of KT-21 (Informed OM)
2020.07.08 Little oil leakage from Z transformer's top of radiator and N phase at Extinction coil-2 (Informed CTO)
2021.01.03 2 of 4 heaters of bore well water pipes heaters have faults. (Informed OM)
2020.10.26 GIS Busbar-2 has abnormal noise (Informed OM)
2020.10.26 Little oil leakage from Service Tx-2's LV incoming. (Informed OM)
2020.11.13 35kV EC-1 resistor box have little abnormal noise (Informed OM)
2020.11.13 Little oil leakage from Z transformer's B phase top of radiator at Extinction coil-1 (Informed CTO)
2021.01.03 1pcs the light not working at South-East Lightning arrester. (Informed CTO)
2021.01.03 Damaged main reactor's A phase outside surge arrester of SVC-1 (Informed CTO)
2021.01.03 Damaged Ext.coil-1's isolator and took outside surge arrester (Informed CTO)
GE:
2021.01.03 Motion sensor light didn't turn on at WTG- 1,2, 5,6,9,10,11,19,21,22,25,26,29,31 (Informed GE)
50.000
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Engineer: Tulgaa. B
Technician(s): Batsukh. Kh
Ninjbadgar. N
mance Hours
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Perfor
, MW
16.6 17.4 16.4 18.5 15.7 18.5 19.0 17.9 20.4 15.4 13.4 12.0 7.2 5.7 2.8 2.2 2.9 4.1 3.5 4.6 3.7 5.9 10.9 10.7
MW /
Plann
MET/
ed,
2.0 5.0 10.0 21.8 21.7 22.2 23.5 25.3 27.4 28.8 29.1 29.0 28.1 26.9 26.0 25.4 25.1 10.0 5.0 1.0 1.0 1.0 1.0 1.0
NRSC
2.8 1.3 2.7 3.4 2.7 4.7 9.6 6.7 8.2 14.0 10.8 12.4 16.7 11.9 9.1 4.5 0.7 0.0 0.0 0.0 1.0 1.5 5.4 5.4
m/s
Ws
10.5 9.0 8.3 8.9 8.1 9.3 9.2 9.1 10.2 10.9 10.2 11.2 9.9 9.5 9.1 9.9 10.0 10.8 11.3 10.9 10.3 11.5 10.7 12.0
ation Foreca WTGs
17 23 27 29 27 26 26 25 26 21 27 12 11 9 8 8 7 6 6 6 7 7 10 10
Temp
st,°C
-37 -37 -36 -33 -31 -28 -27 -26 -29 -29 -32 -33 -34 -35 -34 -34 -34 -33 -33 -32 -32 -32 -32 -33
plan Realtim Forecast
Precipit
S S S S S
Precipit
NDC ation
2 5 10 22 22 22 23 25 27 29 29 29 28 27 26 25 25 10 5 1 1 1 1 1
import
export
Grid
Percentage /
Month Electricity Daily electricity delivery /kWh/ Total electricity delivery (From beginning of the month)/kWh/
Power /MW/ %/
/kWh/
Difference Plan Performance Difference
Imported from
Max power /MW/ 30.41 January 3,960 10.38
Grid
457,842 1,372,866
Exported to
Min power /MW/ 4.12 457,842 13,229,000 1,376,826
Grid
Production deviation
08:00-16:00 16:00-24:00 00:00-08:00 Monthly total
(-) Deviation, kWh 141,290
(Imp) Deviation, kWh 39,861 315,564
(+) Deviation, kWh -
Total 7 WTG, (WTG-1,2,4,5,6,7,14), 110kV OHTL- 123, 124, 110kV busbar-1,2, 110kV VT-1,2, 110kV Tx-1,2, Tx-1,2 neutral point disconnectors,
In operation:
35kV busbar-1,2, 35kV section VCB, 35kV VT-1,2, Extinction Coil-2 , 35kV Service transformer-1,2, Strings-1,2,3,4 ,
Tx tap changer: Tx-1 and Tx-2 tap changers: position=4, Extinction coil tap changer: EC-1: position=8, EC-2: position=9, KT-1,3,5-31: position=4, KT-2,4: position=5
0.69 2021.01.04 18:00-18:36 Salkhit WTG-23 Turbine trip alarm 063_Safety chain
Power curtailment
0.69 2021.01.05 01:37-01:41 Salkhit WTGs NDC restricted
P=30-10.5 MW
Power curtailment
0.69 2021.01.05 01:41-01:48 Salkhit WTGs NDC restricted
P=30-15.5 MW
Power curtailment
0.69 2021.01.05 01:48-03:39 Salkhit WTGs NDC restricted
P=30-25.5 MW
078_Outside temperature too
0.69 2021.01.05 07:38- Salkhit WTG-11 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:45-10:30 Salkhit WTG-19 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:50-10:30 Salkhit WTG-21 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:50- Salkhit WTG-29 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:50- Salkhit WTG-9 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:51-10:31 Salkhit WTG-18 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:53-10:11 Salkhit WTG-10 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:58-10:31 Salkhit WTG-17 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 07:58-10:11 Salkhit WTG-20 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:02-10:32 Salkhit WTG-12 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:02-10:12 Salkhit WTG-8 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:05- Salkhit WTG-31 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:06-10:13 Salkhit WTG-13 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:07-10:14 Salkhit WTG-3 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:09-10:31 Salkhit WTG-30 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:10-10:31 Salkhit WTG-16 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:12-10:32 Salkhit WTG-24 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:13- Salkhit WTG-27 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:16-10:32 Salkhit WTG-22 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:17-10:32 Salkhit WTG-15 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:17-10:15 Salkhit WTG-26 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:25-10:41 Salkhit WTG-23 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 08:27-10:15 Salkhit WTG-25 Turbine trip alarm
low
078_Outside temperature too
0.69 2021.01.05 10:12-10:32 Salkhit WTG-28 Turbine trip alarm
low
CE CE Khorolseren
Will take data from MAST-8002
Routine inspection was done
Date: 2021.01.05 12:00-14:00
WTGMSE worked on site
WTGMSE inspected MAST 8001,8002. Cleaned solar panel of MAST 8002
2021.01.04 0.69/0.4kV service transformer was affected at KT-1, 3, 4, 6-8, 10,12-14, 16, 17, 19, 29 (Changed (Informed OM)
phases on KT-2's Service Tx , Replaced Service Tx on KT-5,9,15,21)
2020.11.11 110kV OHTL-123 Surge arrestor had abnormal noise (Informed OM,CTO)
2021.01.04 110kV T-2 transformer's disconnector had abnormal noise (Under monitoring)
2020.09.22 110kV T-2 busbar's disconnector had abnormal noise (Under monitoring)
2021.01.04 110kV T-1 transformer's disconnector had abnormal noise (Under monitoring)
2020.04.14 110kV VT-2's surge arrestor had abnormal noise (Under monitoring)
2021.01.04 35kV busbar#2 voltmeter showed incorrect measuring (Informed OM)
2020.11.11 110kV OHTL-123 line disconnector had abnormal noise (Informed OM
2021.01.04 110kV OHTL-124 line disconnector had abnormal noise (Informed OM
2020.09.16 110kV T-1 transformer's Surge arrestor had abnormal noise (Under monitoring)
2021.01.04 Damaged B phase 690V inlet inside of KT-21 (Informed OM)
2020.07.08 Little oil leakage from Z transformer's top of radiator and N phase at Extinction coil-2 (Informed CTO)
2021.01.04 2 of 4 heaters of bore well water pipes heaters have faults. (Informed OM)
2020.10.26 GIS Busbar-2 has abnormal noise (Informed OM)
2020.10.26 Little oil leakage from Service Tx-2's LV incoming. (Informed OM)
2020.11.13 35kV EC-1 resistor box have little abnormal noise (Informed OM)
2020.11.13 Little oil leakage from Z transformer's B phase top of radiator at Extinction coil-1 (Informed CTO)
2021.01.04 1pcs the light not working at South-East Lightning arrester. (Informed CTO)
2021.01.04 Damaged main reactor's A phase outside surge arrester of SVC-1 (Informed CTO)
2021.01.04 Damaged Ext.coil-1's isolator and took outside surge arrester (Informed CTO)
GE:
2021.01.04 Motion sensor light didn't turn on at WTG- 1,2, 5,6,9,10,11,19,21,22,25,26,29,31 (Informed GE)
50.000
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Engineer: Enkhtur. M
Technician(s): Tumurbaatar. Kh
Gantumur. O
mance Hours
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Perfor
, MW
14.6 21.2 23.3 27.3 27.8 26.4 30.1 29.8 30.4 26.4 24.2 27.3 29.2 25.0 20.0 26.4 30.2 27.3 25.5 21.3 14.4 10.8 6.5 4.1
MW /
Plann
MET/
ed,
5.0 5.0 10.0 17.5 17.7 18.3 19.4 20.9 23.1 25.6 28.2 30.6 32.5 33.4 33.5 33.4 32.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
NRSC
3.2 2.6 4.7 6.4 4.2 5.8 9.5 9.8 16.6 21.4 16.1 18.9 24.1 21.6 21.3 20.7 16.3 12.8 3.0 14.9 18.1 15.3 13.2 8.8
m/s
Ws
12.5 12.4 12.4 13.2 11.8 10.6 11.9 11.1 11.0 10.0 10.3 11.3 11.2 9.3 8.0 9.2 10.5 9.4 9.7 8.4 7.7 6.3 5.8 4.9
ation Foreca WTGs
16 24 29 28 30 30 30 30 31 31 37 28 31 31 31 31 31 31 31 31 31 31 31 31
Temp
st,°C
-32 -33 -32 -31 -29 -29 -30 -30 -31 -32 -33 -34 -34 -35 -35 -35 -35 -36 -36 -36 -36 -36 -37 -37
plan Realtim Forecast
Precipit
S S S S S S
Precipit
NDC ation
5 5 10 18 18 18 19 21 23 26 28 31 32 33 34 33 32 1 1 1 1 1 1 1
import
export
Grid
Percentage /
Month Electricity Daily electricity delivery /kWh/ Total electricity delivery (From beginning of the month)/kWh/
Power /MW/ %/
/kWh/
Difference Plan Performance Difference
Imported from
Max power /MW/ 25.68 January 3300 7,260 12.15
Grid
234,102 1,606,968
Exported to
Min power /MW/ 0.00 237,402 13,229,000 1,614,228
Grid
Production deviation
08:00-16:00 16:00-24:00 00:00-08:00 Monthly total
(-) Deviation, kWh 16,682 11,644 169,616
(Imp) Deviation, kWh 315,564
(+) Deviation, kWh -
Total 0 WTG, (WTG-1,2,4,5,6,7,14), 110kV OHTL- 123, 124, 110kV busbar-1,2, 110kV VT-1,2, 110kV Tx-1,2, Tx-1,2 neutral point disconnectors,
In operation:
35kV busbar-1,2, 35kV section VCB, 35kV VT-1,2, Extinction Coil-2 , 35kV Service transformer-1,2, Strings-1,2,3,4 ,
Tx tap changer: Tx-1 and Tx-2 tap changers: position=4, Extinction coil tap changer: EC-1: position=8, EC-2: position=9, KT-1,3,5-31: position=4, KT-2,4: position=5
0.69 2021.01.05 20:19-20:25 Salkhit Diesel generator Launched without load Test operation
CE CE RPE Ganbat
-Download data log file from String-2's REF615 relay.
Routine inspection was done
Date: 2021.01.06 12:00-15:00
WTGMSE Khorolseren took data from MAST-8002.
Sh/technicians cleaned snow of String-2 KT's foundation.
Sh/team released gas from bucholz relay at KT-13 by CTO decision.
2021.01.05 0.69/0.4kV service transformer was affected at KT-1, 3, 4, 6-8, 10,12-14, 16, 17, 19, 29 (Changed (Informed OM)
phases on KT-2's Service Tx , Replaced Service Tx on KT-5,9,15,21)
2021.01.01 110kV OHTL-123 Surge arrestor had abnormal noise (Informed OM,CTO)
2021.01.05 110kV T-2 transformer's disconnector had abnormal noise (Under monitoring)
2021.01.01 110kV T-2 busbar's disconnector had abnormal noise (Under monitoring)
2021.01.04 110kV T-1 transformer's disconnector had abnormal noise (Under monitoring)
2021.01.01 110kV VT-2's surge arrestor had abnormal noise (Under monitoring)
2021.01.05 35kV busbar#2 voltmeter showed incorrect measuring (Informed OM)
2021.01.01 110kV OHTL-123 line disconnector had abnormal noise (Informed OM
2021.01.04 110kV OHTL-124 line disconnector had abnormal noise (Informed OM
2021.01.01 110kV T-1 transformer's Surge arrestor had abnormal noise (Under monitoring)
2021.01.05 Damaged B phase 690V inlet inside of KT-21 (Informed OM)
2021.01.01 Little oil leakage from Z transformer's top of radiator and N phase at Extinction coil-2 (Informed CTO)
2021.01.05 2 of 4 heaters of bore well water pipes heaters have faults. (Informed OM)
2021.01.01 GIS Busbar-2 has abnormal noise (Informed OM)
2021.01.01 Little oil leakage from Service Tx-2's LV incoming. (Informed OM)
2021.01.01 35kV EC-1 resistor box have little abnormal noise (Informed OM)
2021.01.01 Little oil leakage from Z transformer's B phase top of radiator at Extinction coil-1 (Informed CTO)
2021.01.05 1pcs the light not working at South-East Lightning arrester. (Informed CTO)
2021.01.05 Damaged main reactor's A phase outside surge arrester of SVC-1 (Informed CTO)
2021.01.05 Damaged Ext.coil-1's isolator and took outside surge arrester (Informed CTO)
GE:
2021.01.05 Motion sensor light didn't turn on at WTG- 1,2, 5,6,9,10,11,19,21,22,25,26,29,31 (Informed GE)
50.000
45.000
40.000
35.000
30.000
Power, MW
25.000
20.000
15.000
10.000
5.000
0.000
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Engineer: Gansukh. Ts
Technician(s): Otgontuya. N
Nyamsuren. D
mance Hours
8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00
Perfor
, MW
2.2 0.0 0.2 4.5 18.9 21.3 25.7 21.0 2.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MW /
Plann
MET/
ed,
0.5 0.5 0.5 0.5 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 0.5 0.5 0.5 0.5 0.5 0.5 0.5
NRSC
5.9 10.8 13.9 13.5 9.7 13.7 44.0 50.0 47.3 22.0 17.9 19.9 25.1 24.4 18.2 13.7 15.6 9.4 9.1 8.7 16.2 16.6 22.8 25.0
m/s
Ws
6.0 6.7 7.2 6.2 7.8 7.7 8.8 9.4 12.5 12.9 12.4 13.7 17.1 20.0 20.6 16.2 19.1 17.9 15.8 15.0 16.1 15.3 16.2 16.3
ation Foreca WTGs
22 7 6 24 31 31 31 27 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Temp
st,°C
-36 -36 -34 -32 -30 -29 -28 -27 -28 -29 -29 -30 -30 -30 -30 -30 -30 -30 -30 -30 -30 -30 -30 -30
plan Realtim Forecast
Precipit
S S S S S S S S S S S S S S S S S S S S S S S S
Precipit
NDC ation
1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1
import
export
Grid
1 2016.06.10 Added Precipitation (Forecast, Realtime) into the sheet Monitoring and analysis