1. To inform the Project coordinator and CS Ops before start work. Negligent To obtain SIPP and related permits.

2. To identify location of work to be done. Work Area To survey the work site with the project coordinator.
Assessment To identify the hazards and to capture the hazards in daily
PTP.

3. To mobilize in the work tools and workers to the work area. To barricade In adequate/ To barricade the work area with proper related signage’s
the working area accordingly.
PRE-TASK PLANNING Insufficient
Signage’s /Info
complete with SIPP and related permits posted. To have a
full time spotter to observe safety measures at the site and to
Moving Vehicle control the traffic flow into the work area.
COMPANY VENDOR : TIALOC (M) SDN.BHD. To have a tire choke on the vehicles before
e-sipp no: starting the
333706
unloading job.
CONDUCTED BY : JAMES/HAFIZ
Bypassing Security To inform the Security Dept. when moving 'IN' the tools,
DATE CONDUCTED : Protocols materials and equipments through the
SPECIFIC LOCATION : PG7 – RETROFIT emergency doors.
JOB DESCRIPTION : WATER PROOFING Traffic Obstruction To ensure proper mobilization with spotters controlling the
AREAS OF FOCUS : traffic flow in that mobilizing area.
To communicate and micro manage with the end user about
the job intended to be done.
4.To perform
1) PPE water proofing at the toilet area.
COMPLIANCE Odor / Fume / To ensure Comply with face mask while handling chemicals /
Chemical Spill / dust form materials.
2) HOUSE KEEPING
Floor Contamination Chemical to be stored inside the double containment tray /
3) CHEMICALS seal tight to prevent spillage.
To ensure that the chemical has approved by EHS Dept.
Steps for Work Completion Area Hazards To use approved cut resistant gloves
Sharp Edges Action
when performing the
works.
Faulty Tools To ensure all the tools been inspected and tag according to
monthly color code.
To remove immediately damaged tools from site.
Ergonomic To have enough manpower while working

5.To clear all the rubbish, debris from the room and to do housekeeping works Slip/Trip/Fall/ To clear all the unwanted items at the working area after
at the area using relevant tools. Dust Accumulation completion of works.

TOOL BOX MEETING DISCUSSION ACKNOWLEDGE SIGNATURE

NO Name Signature
1. Evacuation routes- Through
emergency exits
FOREMAN
2. Do not touch / disturb any of the alarm
doors.
01.
3. Materials longer than 8 ft, 2 persons
are required to carry the load. 02.
4. Beware of the sharp edges. To wear 03.
gloves while working. 04.
05.

TIALOC (M) SDN. BHD.


5. House keeping. 06.

Signature of Supervisor :
Name:

Signature of EHS Supervisor :


Name:

Signature of Construction Manager :


Name

TIALOC (M) SDN. BHD.