Professional Documents
Culture Documents
Semhl 21 1168 - DR001
Semhl 21 1168 - DR001
PRELIMINARY
Section-4 Section-2
DIN 75%
LR1600-2
DIN 75%
LR1600-2
FURTHER ENGINEERING REQUIRED
CONFIGURATION SL10DFB CONFIGURATION SL10DFB
TRACK 8.4 m TRACK 8.4 m
COUNTERWEIGHT
MAIN BOOM
150+65 t
126 m
COUNTERWEIGHT
MAIN BOOM
150+65 t
126 m
Engineering Notes
JIB 11° 12 m JIB 11° 12 m
SL RADIUS 15 m SL RADIUS 15 m 1. All the dimensions are in mm, unless otherwise specified.
2. Equipment dimensions, weight & C.G need to be confirmed by Client.
RADIUS 20 20 20 m RADIUS 20 20 20 m 3. Final equipment placement location need to be confirmed by client.
CAPACITY 74 74 74 t CAPACITY 74 74 74 t 4. The minimum GBP required is hold.
SL-BALLAST 0 0 0 SL-BALLAST 0 0 0
t t 5. Maximum permissible Wind speed hold.
* LOAD 49.3 t * LOAD 48.1 t 6. GAD of equipment required for further study.
* HOOK BLOCK 4.5 t * HOOK BLOCK 4.5 t
* TACKLE 1.0 t * TACKLE 1.0 t
7. Client to ensure that Crane driving and slewing area to be kept free from
* TOTAL LOAD 54.8 t * TOTAL LOAD 53.6 t any obstacle.
% OF THE CAPACITY 68.2 % % OF THE CAPACITY 72.4 %
8. All components shown are indicative/Assumed, details to be
provided by client.
Lifting Drawing
LR1600-2_SL10DFB_126+12m & SANY STC 1200
Installation_Tower HH-120m
India
THIS DRAWING IS A PROPERTY OF SHETHIA ERECTORS. AND SHALL NOT BE COPIED NOR REPRODUCED - EVEN PARTIALLY - WITHOUT
OUR WRITTEN PERMISSION.
CLIENT
Nacelle
LR1600-2
DIN 75%
CONFIGURATION SL10DFB
TRACK 8.4 m
COUNTERWEIGHT 150+65 t
MAIN BOOM 126 m
JIB 11° 12 m
SL RADIUS 15 m
RADIUS 20 20 20 m
CAPACITY 110 110 110 t
SL-BALLAST 100 100 100 t
* LOAD 94.0 t
* HOOK BLOCK 1.5 t
* TACKLE 5.0 t
* TOTAL LOAD 100.5 t
% OF THE CAPACITY 91.3 %
PRELIMINARY
Engineering Notes
1. All the dimensions are in mm, unless otherwise specified.
2. Equipment dimensions, weight & C.G need to be confirmed by Client.
3. Final equipment placement location need to be confirmed by client.
4. The minimum GBP required is hold.
5. Maximum permissible Wind speed hold.
6. GAD of equipment required for further study.
7. Client to ensure that Crane driving and slewing area to be kept free from
any obstacle.
8. All components shown are indicative/Assumed, details to be
provided by client.
Lifting Drawing
LR1600-2_SL10DFB_126+12m
Installation_Tower HH-120m
India
THIS DRAWING IS A PROPERTY OF SHETHIA ERECTORS. AND SHALL NOT BE COPIED NOR REPRODUCED - EVEN PARTIALLY - WITHOUT
OUR WRITTEN PERMISSION.
CLIENT
Rotor
LR1600-2
DIN 75%
CONFIGURATION SL10DFB
TRACK 8.4 m
COUNTERWEIGHT 150+65 t
MAIN BOOM 126 m
JIB 11° 12 m
SL RADIUS 15 m
RADIUS 20 20 20 m
CAPACITY 92 92 92 t
SL-BALLAST 30 30 30 t
* LOAD 72.0 t
* HOOK BLOCK 4.5 t
* TACKLE 5.0 t
* TOTAL LOAD 81.5 t
% OF THE CAPACITY 88.5 %
PRELIMINARY
Engineering Notes
1. All the dimensions are in mm, unless otherwise specified.
2. Equipment dimensions, weight & C.G need to be confirmed by Client.
3. Final equipment placement location need to be confirmed by client.
4. The minimum GBP required is hold.
5. Maximum permissible Wind speed hold.
6. GAD of equipment required for further study.
7. Client to ensure that Crane driving and slewing area to be kept free from
any obstacle.
8. All components shown are indicative/Assumed, details to be
provided by client.
Lifting Drawing
LR1600-2_SL10DFB_126+12m
Installation_Tower HH-120m
India
THIS DRAWING IS A PROPERTY OF SHETHIA ERECTORS. AND SHALL NOT BE COPIED NOR REPRODUCED - EVEN PARTIALLY - WITHOUT
OUR WRITTEN PERMISSION.
CLIENT