Download as pdf
Download as pdf
You are on page 1of 10
I ‘SARA SAE PRIVATE LIMITED é Sara Sae SURVEY REPORT-BOP CONTROLS SSF-33-005 REVISION: 0 ISSUE: A DATE : 04.09.17 PAGE :10F 10 SURVEY REPORT BOP CONTROL SYSTEM FOR OFFSHORE BOP STACK ON Ric# 68! PREPARED FOR | Prepared By Monars: Aesune » Pp | Reviewed By Survey Date 1-22 [Job Reference /SARASAE/FY22-23 Sata Sae Private Limited | 7/2, Pritam Road | Dehradun | india ‘Tel: +91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae com | www.sarasae.com | ‘SARA SAE PRIVATE LIMITED ‘SSF-33-005, 4 SURVEY REPORT-BOP CONTROLS —— (Sara Sae Pace :20r0" re Saami CONTENTS 1. Purpose of Survey 2. Rig Particulars 3. Equipment Particulars 4, Equipment Configuration 5. Visual and Functional Observations 6. Other Information 7. Documentation Available Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | india Tel: +91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www sarasae.com ‘SARA SAE PRIVATE LIMITED ‘SSF-33-005 SURVEY REPORT-BOP CONTROLS __RéVsion: 0 ISSUE: A, Sara Sae DATE: 04.09.17 PAGE: 30F 10 1.Purpose of Survey {To establish equipment configuration for the purpose of verifying API 16D compliance. * Testing and inspection of BOP accumulator unit 2. Rig Particulars [2a Rig Owner ADE Ss 2.2 | Rig Name ADM 68) [2.3 | Rig Type 24 | Location Asey HP yheD. 3. Equipment Particulars 3.1_| Equipment BoP lonteot Unf 3.2 | Manufacturer Came zon. 3.3 _| Rating Sooo fs | 3.4 | Serial No. Yat 4a F 3.5 _[ Year of manufacture 1 |2ey 3.6_| Equipment model no ASSY we: 21E6 20 — 4%. Reyv—ol. 3.7 | Driller’s control part no 2186 20% —4Ge evn 3.8 | Tool pusher’s control part no. 2186 204-95 Revo, [3.9] UPS panel part no 4. Equipment Configuration 4.1 | ACCUMULATORS No of bottles bo +36 Size (Gal) 15 Type (top/battom) “Te? Leaping ie Port size (Inches) IMy = fora huo bea ~fianne = PE: Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | India ‘Tel: +81 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www.sarasae.com ‘SARA SAE PRIVATE LIMITED Sara Sae SURVEY REPORT-BOP CONTROLS ‘SSF-33-005 REVISION: 0 ISSUE: A DATE: 04.09.17 PAGE: 40F 10 | 4.2 | ACCUMULATOR MANIFOLDS No of manifoid Tr Material Ms Type (threaded/ 5 welded/flanged) IEA — “Twesereo , Lem ~ Planned Port size (inches) IVa" -Geea pao hea =Flanae “type No of portin each manifold |, put a, te nfo, 1 Pek te ty 43 | VALVE MANIFOLD No of manifold z | Material i Type (threaded/ welded/flanged) aise Port size (Inches) No of port in each manifold tote] —b Uy tn uy eld) 4.4 | FLUID RESERVIOR Capacity (Gal) oS 6 - Gus Dimensions, LXBX H (inches) Ite 499 £99. Material Ms. 45 | PRIMARY PUMP Make Nov. | Bes B54 Model BEA | Type Beac™ Punwex PunP- Pump count 2 Plunger Size (inches) rbs Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | india Tel: +91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www. sarasae.com ‘SARA SAE PRIVATE LIMITED & Gara Sae 4.6 | SECONDARY PUMP ‘SSF-33-005 SURVEY REPORT-BOP CONTROLS DATE : 04.09.17 PAGE:5 OF 10 Make Alo Model AP= 31332 Type Pump count z Pump size (inches) Bly 4.7 | ELECTRIC MOTOR Make eee Model OFS 1S KP 32 9 300) Type [Power (KW/HP) Siew Voltage Liev Frequency [Power factor “Ampere Su RPM Class & group 2505 yn Frame I ae 4.8 | ANNULAR REGULATOR | Regulated pressure on ‘Max inlet pressure a Model no a Type NA Conmete7 Port size (Inches) 4.9 | MANIFOLD REGULATOR Port size (Inches) | Regulated pressure A Maxinlet pressure | 1a Model no NA Type No (er type) Y Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | India Tel: +91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www.sarasae.com — ‘SARA SAE PRIVATE LIMITED SURVEY REPORT-BOP CONTROLS Sara Sae DATE : 04.09.17 PAGE :60F 10 L aes 4.10 [ SELECTOR VALVES Make I Description of valves Sr. No Valve Description Size Qty —__Na Pnoule y Jats J no Bhna Shae. r U Spore ~) © 1 pa Nv Lower pire gan is ! I rn Lprer Pee erm 5 1 | Yee Pie req | 1 Ash Patuer. ” 1 I 4.41 | BY PASS VALVE Make NA Size (Inches) be 4.12 | PIPING Material MS. Size (Inches) Das Veaeie Serene 7 4.13 | REMOTE PANEL INTERFACE Make Can Aen. Material M. Type (Electrical/ PLC) ee teees Le aay | Class & group mi 4.14 | DRILLER’S PANEL Make CARNE RAS Material SS ‘Type (Electrical/ PLC) Ph HMI Serial No —}-2i8§ 203-95 eva) Model No Class & group 4.15 | TOOL PUSHER’S PANEL Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | india Tel: 491135, 2672395 | Fax: +91 135 2673108 | ssae@sarasae.com | www sarasae.com SARA SAE PRIVATE LIMITED ‘SSF-33-005, 4 SURVEY REPORT-BOP CONTROLS me ° DATE : 04.09.17 (Sara Sae PAGE: 7 0F 10 Make Com enon). Material 65- | ‘Type (Electrical/ PLC) Pee HMI Serial No 2isk 209 95 peso) Model No Class & group 4.16 | Valve Position indicators _ 4.17 | Alarms = 4.18 | DIVERTER PANEL — Make S$ Size (Inches) Ste Description of valves ie Sr.No Valve Description Size Qty An. ale ba 4.19 [ COMMUNICATION Wired Wireless aa Electrical Elecre at. ed & wireless | 4.20 | Air Receiver for backup Dea 4.21 | ups 1EA- 4.22 | Relief valve calibration ora NA- Dev. 4.23 | Pressure gauges Nea, fe tibente Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | India Tel: +91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www sarasae. com |__| calibration certs ee eee =ae| ‘SARA SAE PRIVATE LIMITED | SSF-33-005 SURVEY REPORT-BOP CONTROLS _fevision: 0 A ISSUE: A (Sara Sae Pace eors 4.24 | Accumulators hydro test certs isual and Functional Observations Msual and Functional Observations 1. Visual Inspection : itment of: Observations > Suction/delivery lines: Faure Pus > Valves founa Push Bion > Regulators Found pusl- Mery. > Lubricators F Necd"Te Peptoee - > Air Pumps: RUE ped To meplen . > Electric Motor Nee Te Unt wb normal Role. > Triplex Pump Fo werd Te onde plete * Accumulators Nett ty Baredt'fy eras > Fluid Reservoir 2 pieodap — own, ee » Pre-Charge of Accumulators: NHL op them leds. ton ten, Functional Tests Carried Out Observations 2. Hydraulic Testing of Unit carried out at 3000 PSI Dew) - Westra Positnen, 3. Combination of both the Electrical and Pneumatic pump system achieved 0-300 PSI in ~ Na. Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | India Tel: 491 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www.sarasae.com SARA SAE PRIVATE LIMITED ‘SSF-33-005 SURVEY REPORT-BOP CONTROLS _ | Revision: 0 ISSUE: A & Sara Sae | | ace igerra 6. Setting of pressure switches a) Electrical Pump 1- cut-off a......psi, restart at psi — A b) Electrical Pump 2- cut-off 7. Function of control valves, Unit & Diverter 2) Manually ~ ow, Newt Plast ) Through both the remote panel ~ ou, Net Pkte 8. Function of regulators: Unit & Manifold Regulator ~ OK preed Ale Annular Regulator ~ 6K, Ned Aiere. Gauges. Calibration Date Calibration due Date = pag y Relief Valves. Calibration Date Calibration due Date ~ exprien, Accumulators/Manifolds ‘MPI Calibration Date eee a uT Wed Reertifotion , Calibration Date— Hydro test certificate with charts, Calibration Date ~ Sara Sae Private Limited | 7/1, Pritam Road | Dehradun | india Tel: #91 135 2672395 | Fax: +91 135 2673109 | ssae@sarasae.com | www sarasae,com SARA SAE PRIVATE LIMITED i) ( ( \Sara Sae | 6. Other Information SURVEY REPORT-BOP CONTROLS SSF-33-005 DATE: 04.09.17 PAGE: 10 OF 10 Sara Sae Private Limited Tel: +91 135 2672395 | Fax: 491135, 6.1 BOP stack PRESSURE | VERTICAL BORE =| . P S.NO | BOP STACKNAME | MaKe RATING (Psi) | SizeANeHEs av | ps {eee ofs) IAx 51g L 6.2 Visual Observations 7. Documentation Available * Manual MR = PaID + Certificates > NA 8. Signoft Sara Sae Representative Customer Representative Hane: Marien Pato A tame: 5. (MEE Designation: $+ ENGINEER Designation: Date: V2 E 681 Location: gay yneo N Al Job Reference: Flag: LIBERIA | IMO: 9623893 17/1, Pritam Road | Dehradun | Indi ; 2673108 | ssae@sarasae.com | www sSralbSiQh: SLFAS

You might also like