Professional Documents
Culture Documents
Survey Report - BOP Control Unit
Survey Report - BOP Control Unit
SURVEY REPORT
PREPARED FOR
------------------------
Prepared By
Reviewed By
Survey Date
Job Reference ---/SARASAE/FY16-17
CONTENTS
1. Purpose of Survey
2. Rig Particulars
3. Equipment Particulars
4. Equipment Configuration
6. Other Information
7. Documentation Available
1.Purpose of Survey
To establish equipment configuration for the purpose of verifying API 16D compliance.
Testing and inspection of BOP accumulator unit
2. Rig Particulars
3. Equipment Particulars
3.1 Equipment
3.2 Manufacturer
3.3 Rating
3.4 Serial No.
3.5 Year of manufacture
3.6 Equipment model no
3.7 Driller’s control part no
3.8 Tool pusher’s control part
no
3.9 UPS panel part no
4. Equipment Configuration
4.1 ACCUMULATORS
No of bottles
Size (Gal)
Type (top/bottom)
Port size (Inches)
4.2 ACCUMULATOR MANIFOLDS
No of manifold
Material
Type (threaded/ welded/
flanged)
Port size (Inches)
No of port in each manifold
No of manifold
Material
Type (threaded/ welded/
flanged)
Port size (Inches)
No of port in each manifold
4.4 FLUID RESERVIOR
Capacity (Gal)
Dimensions, L X B X H
(inches)
Material
4.5 PRIMARY PUMP
Make
Model
Type
Pump count
Plunger Size (inches)
4.6 SECONDARY PUMP
Make
Model
Type
Pump count
Plunger Size (inches)
4.7 ELECTRIC MOTOR
Make
Model
Type
Power (KW/HP)
Voltage
Frequency
Power factor
Ampere
RPM
Class & group
Frame
Regulated pressure
Max inlet pressure
Model no
Type
Port size (Inches)
4.9 MANIFOLD REGULATOR
Regulated pressure
Max inlet pressure
Model no
Type
Port size (Inches)
4.10 SELECTOR VALVES
Make
Description of valves
Sr. No Valve Description Size Qty
4.11 BY PASS VALVE
Make
Size (Inches)
4.12 PIPING
Material
Size (Inches)
4.13 REMOTE PANEL INTERFACE
Make
Material
Type (Electrical/ PLC)
Class & group
4.14 DRILLER'S PANEL
Make
Material
Type (Electrical/ PLC)
HMI
Serial No
Model No
Class & group
4.15 TOOL PUSHER'S PANEL
Make
Material
Type (Electrical/ PLC)
HMI
Serial No
Model No
Class & group
4.16 Valve Position Indicators
4.17 Alarms
4.18 DIVERTER PANEL
Make
Size (Inches)
Description of valves
Sr. No Valve Description Size Qty
4.19 COMMUNICATION
Wired
Wireless
Electrical
Wired & wireless
4.20 Air Receiver for backup
4.21 UPS
4.22 Relief valve calibration
certs
4.23 Pressure gauges calibra-
tion certs
4.24 Accumulators hy-
dro test certs
1. Visual Inspection :
Fitment of:- Observations
Suction/delivery lines :
Valves :
Regulators :
Lubricators :
Air Pumps: :
Electric Motor :
Triplex Pump :
Accumulators :
Fluid Reservoir :
Pre-Charge of Accumulators:
3000 PSI --
a) Manually --
Manifold Regulator
Annular Regulator
Gauges.
Relief Valves.
Accumulators/Manifolds
MPI
UT
6. Other Information
6.2 Diverter:
7. Documentation Available
Manual :
P&ID :
Certificates :
Photographs of Unit are Attached With Report
8. Signoff
Name: Name:
Designation: Designation:
Date:
Location:
Job Reference: