Construction

Cost Estimate
UAP Document P-723

COURSE: BUILDING TECHNOLOGY 5 Date Submitted: JAN 31, 2023


COURSE CODE: AR165-1P
SCHOOL: MAPUA UNIVERSITY
Job No: SW-6 TO 7 Prepared By: PARAN, ERINE RAFAELLE

Material Total
Specs
Item of Work QTY Unit Cost In
Ref. No.
Amount UC Amount Pesos

Column Concrete Column


Cement 139.39 bags
Sand 6.65 cu.m.
Gravel G1 13.31 cu.m.
Water 792.00 gals
Reinforcing Bar 0.24 kgs
Tie Wire 15.84 kgs
Phenolic Board 71.05 sheets
Form Lumber 6969.60 bd.ft
Beam Concrete Beam
Cement 420.29 bags
Sand 20.06 cu.m.
Gravel G1 40.12 cu.m.
Water 2388.00 gals
Reinforcing Bar 0.72 kgs
Tie Wire 47.76 kgs
Phenolic Board 139.24 sheets
Form Lumber 14073.28 bd.ft
Footing Concrete Footing
Cement 120.81 bags
Sand 5.77 cu.m.
Gravel G1 11.53 cu.m.
Water 686.40 gals
Reinforcing Bar 0.21 kgs
Tie Wire 13.73 kgs
Construction
Cost Estimate
UAP Document P-723

COURSE: BUILDING TECHNOLOGY 5 Date Submitted: JAN 31, 2023


COURSE CODE: AR165-1P
SCHOOL: MAPUA UNIVERSITY
Job No: SW-6 TO 7 Prepared By: PARAN, ERINE RAFAELLE

Material Total
Specs
Item of Work QTY Unit Cost In
Ref. No.
Amount UC Amount Pesos

Foundation
Concrete Foundation
Cement 792.00 bags
Sand 37.80 cu.m.
Gravel G1 75.60 cu.m.
Water 4500.00 gals
Reinforcing Bar 1.35 kgs
Tie Wire 90.00 kgs
Slab Concrete Slab
Cement 325.81 bags
Sand 15.55 cu.m.
Gravel G1 31.10 cu.m.
Water 1851.18 gals
Reinforcing Bar 0.56 kgs
Tie Wire 37.02 kgs