Download as pdf
Download as pdf
You are on page 1of 10
TeLNo.22875794, 22872801 wbeys weodoaed sefed Fa:080-22374092 Gnedredioseen geval smead teed -mail ~sebglkpwd@gmail.com orikedd ag, eloridedd ae Gnedredioiaen geval Ee Bao] 2021-2aNe med ddagrivy geet serie ewaa® Towohs ddrivay | 2022-26 de mud mye ¥gsinae wadady sogoxa ar} Booed ucled Boas : Keg 51 VO*.B.as* 2019 GwooF 18-03-2022 | . Be seeO wes Wo. 8629 Anv0e 01-04-2022 . Be seed again aly Oavo¥ : 27-12-2022 Raed BY Toaly : Roe G6 UO*.A.ag* 2022 Bros OS-01-2023 . MRPL erie HINCOL dad ddrie aeg . 01-01-2023 Bosego, Aeeg Deer} Jorived oad BY Vo. 4612 6. GO-12-2022 whege spodbosde, deeg ayy gedaed dad ay w0.5503 8.03-01-2023 |. Heys wpobhosdH, Keegy ay augd dad ay wo. 3547 8.04-01-2023 whegs wpobosdw, Keegy ayy aorided dad By 6.04-01-2023 eogen ©O9NDOFON= ganas: Boat-pede med Keekeedioineh ger, doaies-12 adap ad cdaigre weatrery tyes Rony: 70 good achout, yeor adey eenaoriy adgs dorivay, sudod Rageddey geuddeabed. | “The prevailing market rates of cement & steel will be assessed and the basic rates shall be | approved by the Superintending Engineer PWD & published quarterly te, 1° April, 1st July, 1st | October & 1st January whenever the variation in price is more/less than 10% over the previously approved rates”. Rates are to be calculated and issued for OPC, PPC, PSC, TMT Bars, Mild Steel and | Structural Steel and Bitumen etc,, The Superintending Engineer shall issue office memorandum | with wide publicity and obtain rate from GST registered vendors. S wogen-()d Teoedd wdedaly Ressdsaod, wglew (2)0g avocbadseohada 2022-23 de mud ddagrivy moyde ¥ytvtd wahodg aside ddrivay andaladen Keen avgd, gedaed serie aorided agriv ddrv amasabmy, Reden evglem (3) dy deedeidsed. aocbada, evgen (4)3 amoedd agdg maids waed Mosh : 7 way, ve dUMwos TOgUeIrlows wceddeNdyd. “The prevailing market rates of Bitumen, Cement & Steel will be assessed and the basic rates shall be approved by the Superintending Engineer PWD Bangalore Circle in consultation with Dharwad Circle, Bellary Circle & Mangalore Circle and publish quarterly ie, 1% April, 1st July, 1st October & 1st January mandatorily. sheen wOzjdeabos serie wgen (5) Cod (9) dada amasivay weds Jeor morin aden? ddrive, dUMaos Tog™oren seaine overs. a | Material Component | Unit Rate w.e.f from 04-01-2023 (Market Rate in Rs, All Inclusive of Taxes) 1, | Steel- TMT Fe 550 t = 7300.00 2. Structural Steel kg 76.00 = a Mild Steel kg 68.00 4, | Cement (OPC/PPC/PSC) Bag | 400.00 | x (Basic Rate in Rs, Excluding GST) 5, VG-40 t 5111800 = 6 VG-30 t 48384.00 7. VG-10 t 48818.00 8._| Bitumen Emulsion SS1 t 48393.00 ‘9._| Bitumen Emulsion RS1 t 4446.00 edd Woslyan*ged:seoweWdaeg:2022-23 : BOS9 Hawod : 04-01-2023 Bhevds Oadrodos Boys yeor wearin wendor® ov0HS Borwvah, doagadgga Ge OS avo Poalpriadroeoah Wad avs 04-01-2023 bod sedobydsos ands adesdadr aod} Sdeehd serie gays sodobgdd acbow® deriva, snodddds arson geexoond. : =~ webege waadbosdad Greg dorded ayy Bsabayy 1 ®evedd goed mobewserie, Aeekreaioineh qed, Dzew xP, aorivedd dad aa arash aged. 2, Beda moobedserivd, deekeetaieeN gues, Qzet vA, elorided dad ad arash syed. 3, Reeds mobeddcriv, aovodago quel, Seow APG, sored dad ga amesreh deeds. 4 Beordd wmoabedderied, weg Nevadd quod, aed aq, dorked dad ga ames syed 2|Poge KARNATAKA PUBLIC WORKS DEPARTMENT 5s. Beoeds smoobewserie, Hosmads’ oas* gosvobOHor® geval, sorided dad da Brbsreh Vey03. 6 alway wepodowdd, agos, alorilac dad gd alsa Apgabey. era cferaberaley emreteea® aoaen Roeod. 7, soay wpadosdds, Zosée sbey eyurivy (Ggr, ovgd, cemexy ads) deog) cddnv’ ga dross aged. a alway wHODOBTd, exo Beoy veked eloriviac dad ainwart pac. 9, ainay wpadosdd, rameromayQ gee. Sordeds dad amar weeds. 10, adeedech, a-dgeacrabow, azbabalare 8a, elorided dad amar aeyact 11, Jord Rbosdd, aZs dorided abadrid aed, Joridedd ddd dnaat Reged 12, aay weOdoTTH, aorived waahQ xBosod. dorisvedd dad dnwart zeae. ehege wmodowdd, ceeg aby, cyte, meas, aborted, aupd, seghe. dur. Gada abs dairy dalcbriv aeasrmn g-ahew* aoarosd sede. 14, OBeYE EHodoTddd, PaermoaaQ aerdi, eloriked dad amaareh @-aeor anan0dd eebmod. 15, deed JS fe. oer Soridech ays a RATES FOR STEEL RELATED ITEMS Finished Item Rates Excluding GST in Rs. Rateas per 2021- Rate 7 Rate | res 22 Ske considered | Rateconsidered | considered | Ratewef No} Ng | Unit | 18-03-2022 & between oropgozeto | ._ between from continued till | 07-04-2022 to 09-11-2022 to | 04-01-2023 06-04-2022 | 96-07-2022 | 08-11-2022 | 43. 91-2023 VOL2 | 1 i11 [ie 91.00 113.00 102.00 ‘91.00 97.00 2 [112 [kg 95.00 115.00 104.00 95.00 101.00 3 [11254 | kg 97.00 115.00 106.00 97.00 103.00 4 [11.252 | kg 108.00 133.00 122.00 108.00 120.00 S| 1132 | kg 88.00 106.00 96.00 83.00 92.00 6 | 1133 [kg | 83.00 100.00 90.00 78.00 86.00 7 [11348 | kg | 131.00 159.00 147.00 131.00 145.00, [11348 | kg 143.00 171.00 159.00__| 143.00 157.00 | VOL.3 | ] 1 [93 [| 7637600 94295.00 84066.00 7168400 | 80297.00 2 [422 | t [11235900 138200.00 125279.00 112359.00 | 120110.00 3 [1235 [mi | 51544.00 '53332.00 51689.00 5045400 | $1313.00 4 [1237 | t | 10261500 | _127281.00 114948.00 102615.00_,| 110013.00 S| 1251 | m 8381.00 10321.00 9351.00 8381.00 | 8963.00 6 | 1253 | m 9507.00 | 11692.00 710600.00, 9507.00 | 10163.00 7 [1255 | 64383.00 | 103931.00 91980.00 | 7847200 | 87869.00 8 | 1256] t 73392.00 96884.00 4345.00 72600.00 | 81996.00 9 [Tiga “[E 83780.00 103329.00 92170.00 7866200 | 88059.00 10 [132 [t 72790.00 96272.00 4535.00 72790.00 | 82186.00 a1 | 13.as | t | 143457.00 170071.00 156765.00 143457.00 | 151441.00 w2] 14a [tt 3997.00 10351800 92360.00 7885100 | 88249.00 13 | 1412 [m! | 28556.00 30351.00 29678.00 27602.00 | 2919.00 a4 [1424 | t [14632300 | 173454.00 159890.00 146323.00 | 154462.00 RATES FOR CEMENT RELATED ITEMS Finished Item Rates Excluding GST in Rs. Rate as per 2021-22SR | Rate considered | Rate w.e. from si ihe unit | Wet 18-03-2022 & between 04-01-2023 No. 7 continued till 07-07-2022 to 06-07-2022 03-01-2023 | VOLA af 211 m 4976.00, 4859.00 4859.00, 2] 212 m3 5364.00 5206.00 5206.00 3 | 21.3 m? 5752.00 5554.00 5554.00 4 | 21.4 m? 5926.00 5728.00 5728.00 5 2211 m 6231.00, 5943.00 5943.00 6 EAW) m3 6161.00 5873.00 5873.00 7 2.2.24 m_| 6285.00 5979.00 5979.00 8 22.2.2 _m 6211.00 5905.00 5905.00 9 2.2.31 mi 6633.00, 6309.00 6309.00 10 2.2.32 m 6559.00 Deleted Deleted a1 | 2244 me 6917.00 6565.00 (6565.00 4iPage KARNATAKA PUBLIC WORKS DEPARTMENT i2 mi 6842.00 Deleted Deleted 13 me 7200.00 6822.00 | 6822.00 4 me 7126.00 Deleted, Deleted 15 im 6256.00 5968.00 5968.00 16 més 6288.00 5982.00 5982.00 7 m 6714.00 6389.00 6389.00 18 m 7117.00 6766.00 6766.00 19 mi 7408.00 7030.00 7030.00 20 m 6096.00 5880.00 5880.00 21 m 6256.00 5968.00 5968.00 22 ms 6299.00 5992.00 5992.00 23 m 6819.00 6494.00 6494.00 24 ms 7176.00 6825.00 6825.00 25 m 7423.00 7044.00 7044.00 26 m 6934.00 6547.00 6547.00 27 m 7297.00 6891.00 6891.00 28 im 7297.00 (6891.00 6891.00 29 me 6471.00 6182.00 6182.00 30. m 6492.00 6186.00 6186.00 31 mi 7022.00 6697.00 6697.00 32 m 7305.00 6954.00 6954.00 33 m 7608.00 7229.00 7229.00 34 ms 7122.00 6717.00 6717.00 35 ms 7122.00 6717.00 6717.00 36 _| m? 7874.00 7603.00 7603.00 37 m 8803.00 8058.00 8058.00 38 mi 6766.00 6270.00 6270.00 39 m3 5750.00 5377.00 5377.00 40 ms 4842.00 4565.00 4565.00 41 m 4354.00 4127.00 4127.00 42 m 3935.00 3752.00 3752.00 43 m= 6766.00 6270.00 6270.00 44 | x ‘m3 5750.00 5377.00 5377.00 45 39 mi 4842.00 4565.00 4565.00 46 3.10 mi 4354.00 4127.00 4127.00 47 3.11 m 3935.00 3752.00 3752.00 48 3.12 me 6741.00 6244.00 6244.00 VOL2 i 43 m 286.00 283.00 283.00 2 5.11 mi 4824.00 4750.00 4750.00 3 52 mm 5611.00 3543.00 5543.00 4 53. mi 5266.00 5198.00 5198.00 5 54 mi 5422.00 5352.00 5352.00 6 61 m 7043.00 6955.00 6955.00 z. 62 ms (6754.00 6696.00 6696.00 8 63 m? 7718.00 7640.00 7640.00 9 64 m 7464.00 7413.00 7413.00 10 65 m 8918.00 8860.00 8860.00 a 65 im 9608.00 9557.00 9557.00 qz 67 m3 7036.00 6948.00 6948.00 13 68 ms 6748.00 6690.00 6690.00 5|Page KARNATAKA PUB 14 6:10 297.00 294.00 294.00 15 6.11 (657.00 649.00 649.00 16 6.12 864.00 851.00 851.00 17 6.13 832.00 822.00 822.00 18 6.14 908.00 894.00 894.00 19 6.15 875.00 866.00 866.00 20 6.17 1801.00 1660.00 1660.00 21 618 1339.00 1246.00 11246.00 22 6.19 102.00 15009.00 15009.00 23, 6.20 723.00 1630.00 1630.00 24 6.21 711.00 704.00 704.00 25 6.22 6217.00, 6129.00 6129.00 26 623 5929.00 5871.00 5871.00 27 6.24 5990.00 5913.00 5913.00 28 6.25 5737.00 5685.00 5685.00 29 6.26 4867.00 4832.00 4832.00 30 6.29 771.00 757.00 787.00 31 6.30 738.00 728.00 728.00 32 6.32 1202.00 1196.00 1196.00 33 6.33 1067.00 1061.00 1061.00 34 634 946.00 940.00 240.00 35 635 5634.00 5594.00 5594.00 36 6.36 5691.00 5650.00 5650.00 37 637 5945.00 5903.00 5903.00 38 6.38 2989.00 2949.00 2949.00 39 6.39 3253.00 3211.00 3211.00 40 585.00 578.00 578.00 ‘41 507.00 506.00 506.00 42 806.00 806.00 806.00 43 673.00 668.00 668.00 44 699.00 697.00, 697.00 45 746 1095.00 1087.00 1087.00 46 eit 218.00 213.00 213.00 47. 8.12 202.00 198.00 198.00 48 B21 253.00 248.00 248.00 49. 822 234.00 230.00 230.00 30 83.1 307.00 299.00 299.00 51 83.2 281.00 276.00 276.00 52 84.1 282.00 274.00 274.00 53 84.2 268.00 262.00 262.00 54 85.1 321.00 311.00 311.00 55 85.2 301.00 294.00 294.00 56 86.1 282.00 274.00 274.00 57 8.6.2 380.00 [368.00 368.00 58 87 321.00 | 311.00 311.00 59 88 313.00 [307.00 307.00 60 a 329.00 [322.00 322.00 61 8.10 176.00 173.00 173.00 62. 8.11 51.00 49.00 49.00 63 8.171 138.00 136.00 136.00 64 | 8.17.2 224.00 I 221.00 221.00 6[Page KARNATAKA PUBLIC WORKS DEPARTMENT 6 8.18 m 790.00 188.00 188.00 66 8.19.1 m2 200.00 199.00 199.00 7 8.19.2 m 363.00 361.00 361.00 68 8.20 m 113.00 112.00 112.00 69 8.83 m 1202.00 1175.00 1175.00 70 94 m 415.00 400.00 400.00 71 92. m 724.00 705.00 705.00 72 93.1 m 422.00 409.00 409.00 73 93.2 m 394.00 383.00 383.00 74 9.6.1 me 757.00 629.00 629.00 75 9.6.2 me 662.00 590.00 590.00 76 3.6.3 me 585.00 569.00 569.00 77 9.6.4 m 696.00 680.00 680.00 78 971 m? 1060.00 1053.00 1053.00 79 97.2 m 1100.00 1095.00 1095.00 80 39 m 616.00 605.00 605.00 81 9.10 m= 629.00 620.00 620.00 82 9.11 m= 773.00 762.00 762.00 83 9121 mé 1023.00 1012.00 1012.00 84 9.122 m2 | 1098.00 1087.00 1087.00 85, 9.123 m_| 1399.00 1388.00 1388.00 86 9.12.4 m2 1775.00 1764.00 1764.00 87 9.125 m? 1837.00 1826.00 1826.00 88. 9.13 im? 397.00 386.00 386.00 89 9.15 im 577.00 568.00 568.00 90 9171 ‘m= 1036.00 1027.00, 1027.00 91 9.172 m 1111.00 1102.00 1102.00 92 9.173 m? 1412.00 1403.00 1403.00 93 9.17.4 m 1788.00 1778.00 1778.00 94 9.175 im 1850.00 1841.00 1841.00 95 9.23 m 1899.00 1888.00 1888.00 96 9.24 m 2881.00 2870.00 2870.00 97 9.26 m2 928.00 925.00 925.00 98 9.27 m 969.00 957.00 957.00 99 9.28 m? 2372.00 2364.00, 2364.00 100) 9.29 im 2391.00 2383.00 2383.00 101 9.30 m2 2401.00 2395.00 2395.00 102 9.34 m? 1204.00 1192.00 1192.00 103 9.35 me 1324.00 [1312.00 1312.00 104 9.36 mi 1246.00 1234.00 1234.00 105) 9.37 me 639.00 633.00 633.00 106 9.38 m2 983.00 974.00 974.00 107, 9.39 mé 1045.00 1037.00 1037.00 108 9.40 me 1139.00 1133.00 1133.00 109) ALT im? 3175.00 3163.00 3163.00 110 9412 im 5686.00, 5673.00 5673.00 111 10.1.4 m? 3452.00 3444.00 3444.00 112 10.12 m? 3458.00 3450.00 3450.00 113, 10.3 m 246.00 245.00 245.00 114 10.7 m2 1886.00 1877.00 | _ 1877.00 115, 10.8 m 1666.00 1612.00 | 1612.00 T[Page KARNATAKA PUBLIC WORKS DEPARTMENT 116 1014 mm 974.00 964.00 964.00 117 10.18) m ~ 3073.00 3065.00, 3065.00 11s] 10.19 m= 3512.00 3498.00 3498.00 [19] 10.20 im 1854.00 1848.00 1848.00 120 | 10.21 m? 1982.00 1976.00 1976.00 [aaa 10.22, m= 1836.00 1831.00 1831.00 [az2T 10.23 im 1487.00 1462.00 1482.00 [123 | 12.51 |_Nos. 1485.00 | 1481.00 1481.00 [aq 12.52 (Nos. 1010.00 | 1007.00 1007.00 125, 16.72 [me 1061.00 [1057.00 1057.00 126 16.73, m2 1127.00 1123.00 1123.00 127 2044.1 each 2790.00 2744.00 2744.00 128 20.442 each 3557.00 3512.00 3512.00 129 20.45 each 167.00 165.00 165.00 130 20.82 mi 705.00 695.00 695.00 131 20.97 m 432.00 431.00 431.00 132 20.98 m 216.00 214.00 214.00 VOL.3 1 47 m 771.00 740.00 740.00 2 48 _| 824.00 792.00 792.00 3 49 m 774.00 742.00 ¢ 742.00 4 413 ms 775.00 748.00 748.00 5 414 ms 724.00 697.00 697.00 6 4.16 mé 1123.00 1061.00 1061.00, bs 4.17 () im 2782.00 2710.00 2710.00 8 4.17 (ii) ‘m 2799.00 2727.00 2727.00 9 4.19 (i) me 2851.00 2804.00 2804.00 10 4.19 (ii) me 2877.00 2830.00 2830.00 a1 4.20 (i) m 2974.00 2928.00 2928.00 12 4.20 (ii) m_| 2974.00 2928.00 2928.00 13 4.32 im | 787.00 776.00 776.00 14 61 m 4196.00 4025.00 4025.00 15 62 (PQC) me 9348.00 ‘8965.00 8965.00 16 63 (POC) m_| 8738.00 8565.00 8565.00 e a ni Gees 3691.00 3691.00 ry i 9076.00 8694.00 8694.00 19 | 66 (Thin WT with GGBS)_|~m? 8467.00 7826.00 7826.00 20_| 67 (Thin WT with FlyAsh) |_m? 8499.00 8173.00 8173.00 21 12:38 m_| 8468.00 8291.00 8291.00 22 12.39 m_ | 11376.00 11063.00 11063.00 23 12.40 ‘m_| 15060.00 14609.00 14609.00 24 12.41 m_| 21204.00 20499.00 2049.00 25 12.42 m 6883.00 6714.00 6714.00 26 12.43 m 10695.00 10394.00 10394.00 27 | 12.44 m 15681.00 1524700 15247.00 28 12.45, m 3980.00 3904.00 3904.00 29 12.46 m 6165.00 5994.00 5994.00 30 12.47 m 9520.00 9216.00 9216.00 8|Page KARNATAKA PUBLIC WORKS DEPARTMENT 31 12.48 m 3155.00 3120.00 3120.00 32, 12.49 m 4669.00 4573.00 4573.00 33. 12.50 m 7750.00 7532.00 7532.00 34 149 m | 6651.00 6415.00 6415.00 35, 20.15 (RCCP) m 7047.00, 6766.00 6766.00 36 20.28 (M20) m3 6442.00 6152.00 6152.00 37, 20.29 (M30) m3 6837.00 6512.00 6512.00 RATES FOR BITUMEN RELATED ITEMS Finished Item Rates Excluding GST in Rs. Rate considered S|] tonsa. | unt | “wer Seas-zozza™ | — ,,berween | Ratewethom No. continuedtit 06-07-2022 | 07-07-2022 to 04-01-2023 03-01-2023 VOL.3 1 5.1 m? 44.00 42.00 42,00 zZ 5.2 m? 56.00 53.00 53.00 3 5.3 m? 12.00 12.00 12.00 4 5.4 m 15.00 14.00. 14.00 5 5.5 m 18.00 17.00 17.00 6 5.68 m 7487.00, 6963.00 7116.00 7 5.6B m? 7405.00, 6882.00 7034.00 8 5.6C m 7508.00, 6984.00 7137.00 9 5.78 m3 7773.00, 7149.00 7356.00 10 5.7B m 7691.00 7067.00 7274.00 1 5.7 m3 7794.00, 7170.00 7377.00 12 5.8A, m 7886.00 7346.00 7503.00 13 5.8B m 7804.00 7265.00 7422.00 14 5.8C m3 7907.00, 7368.00 7525.00 15 5.9, ms 8180.00 7537.00 7751.00 16 5.9B m 8098.00 7456.00 7670.00 17 5.9C m? 8201.00 7559.00 7773.00 18 5.10A m? 9132.00 8465.00 8660.00 19 5.10B m? 9046.00 8379.00 8574.00 20 5.10 m3 9154.00 8487.00 8682.00 21 S.11A m* 9496.00 8701.00 8965.00 z S.11B m 9410.00, 8616.00 8880.00 23 5.11C m 9518.00 8724.00 8982.00 24 512A m 9867.00, 9117.00 9335.00 25 5.12B m 9781.00 9031.00 9249.00. 26 5.12C m3 9889.00 9139.00 9357.00 27 5.13A_ m 10276.00 | 9382.00 9679.00 28 5.13B ms 10190.00 | 9296.00. 9593.00 29 5.13C m? 10298.00 | 9404.00 9701.00 30 5.144, m3 11162.00 10277.00 10535.00_ 31 5.14B m3 11075.00 10189.00 10446.00 32 5.14C ms 11185.00 10299.00 10556.00 33 = 5.154 m 11646.00 10590.00 10940.00 34 5.15B m3 11558.00 10503.00_ 10852.00 35 $.15C m3 11668.00 10613.00 10962.00 36 5.168. m 11508.00 10588.00 10856.00 KARNATAKA PUBLIC WORKS DEPARTMENT 37 5.16B nm 11420.00 10500.00 10768.00 38 5.16C im 1531.00 10611.00, 10879.00 39 5.17A im 2010.00 10914.00 11278.00 40 5.17B ms 1922.00 | 10826.00 1190.00 41 S.17C m 12032.00 10937.00 11301.00 42 5.18 (i) m2 108.00 99.00 101.00 43. 5.18 (ii) im 86.00 79.00 79.00 44 5.19 me 151.00 141.00 143.00 45 5.20 (A) im, 198.00 182.00 186.00 46 5.20 (B) m 179.00 165.00, 168.00 47 5.21 (i) me 82.00 75.00 77.00 48. 5.21 (ii) me 57.00 52.00 53.00 49. 5.22 im 676.00 625.00 642.00 50 5.23 (H) m 51.00 46.00 47.00 SI 5.23 (ii) m 81.00 73.00 75.00 52 5.23 (iii) im 100.00 90.00 93.00 53 5.24 AG) ms 7073.00 6591.00 6731.00 54 5.24 A(il) ms 7182.00 (6688.00 6832.00 55 5.24 BG) m? 7952.00 7368.00 7538.00 56 5.24 Bi) m 8629.00 7972.00 8163.00 57 5.24 C(i) m 9499.00 8740.00 8961.00 | 58. 5.24 C(ii) im 9761.00 8972.00 9202.00 59 5.25 im 49.00 | 44.00 45.00 60 5.26 (i) m3 13975.00 13446.00 13552.00 61 5.26 (ii) m 13974.00 13446.00 13551.00 62 5.27 m 10595.00 ‘9803.00 1034.00 63 5.298 m 10344.00 9529.00 9766.00 64 5.298 ms 10673.00 9827.00 1074.00 oS 530A m 4053.00 3672.00 3783.00 66 5.30B. ms 4114.00 3726.00 3839.00 67 21-A(1) m 10579.00 9746.00 ‘9990.00 68. 21-A3) m 13.00 12.00 13.00 69. 21-A(4) m 16.00 15.00 16.00 70 21-A(5) m 19.00 18.00 19.00 m1 10.4 me 158.00 | 148.00 151.00 72 10.54 m 426.00 404.00 414.00 B 10.5B m? 433.00 409.00 [419.00 nding Engin [Page Be Bengaluru Cire! PARTMENT

You might also like