23.12.22 24.12.22 25.12.22 26.12.22 27.12.22 28.12.22 29.12.22 30.12.22 31.12.22 01.01.23 02.01.23 03.01.23 04.01.23 05.01.23 06.01.23 07.01.23 08.01.23 09.01.23 10.01.23 11.01.23 12.01.23 13.01.23
S.n Description of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PH
1 Repalcement of both Tamping Unit
Departmantial work
2
Repalce the Tamping Unit UP/DN cylinder
seal kit 02 nos.
Departmantial work
3
Repalcement Tamping Unit adjustable
sansing pneumatic cylinder
Departmantial work
11
clarning of hydraulic cooler part no.
HY157.100/SIL
Departmantial work
13
Repalcing and fixing of wiper blades as per
sample Satyam ent.
16
Repairing/filling of N2 gas in hydraulic
accumulators Satyam ent.
17
Providing & fixing of Upper & lower side
guide rod bolts of tamping units PH Satyam ent.
20
Supply of crimped grease hoses (ID 04
mm) assembly with fittings. Satyam ent.
23
Checking & gearsing the bearing of all
axles
Departmantial work
24
Greasing the bearing of all sensing trolley
wheels
Departmantial work
25
Clearing oil hydrualic air tank & topup, if
required
Departmantial work
26
Cleaning of all panel boxes & checking of
all wire connection
Departmantial work
27
Repalcing of hydraulic hoses and
pneumatic hoses, if required
Departmantial work
29
Calibration of M/c by plasser service
engineer
34
Replacement of hydraulic valve &
pneumatic valve, if required Departmantial work
BAR CHART OF TRACK MACHINE WST-8146
23.12.22 24.12.22 25.12.22 26.12.22 27.12.22 28.12.22 29.12.22 30.12.22 31.12.22 01.01.23 02.01.23 03.01.23 04.01.23 05.01.23 06.01.23 07.01.23 08.01.23 09.01.23 10.01.23 11.01.23 12.01.23 13.01.23
S.n Description of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
37 Cleaning of machine
Departmantial work