Download as pdf or txt
Download as pdf or txt
You are on page 1of 89

Strictly comply with DEWA Regulation section 8.1.

11, during installation of


capacitor banks in the project. Ensure to limit Power Factor & Harmonics,
within DEWA approved values, at all levels of loads. Also refer DEWA
regulation section 1.11 for Harmonics and Rapid voltage changes.”

AREA: DUBAI U.A.E : AL SATWA

PROJECT: REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA PLOT NO: 3342846
DETAILS OF CONNECTED LOAD & MAXIMUM DEMAND & Kwh METERING

ECC CONNECTED LOAD (KW) PROPOSED TYPE & No. OF kWh METERS
PROTECTION RATING PHASE CABLE CONDUCTOR REMARKS
NO.CORES & 1 - PH 3- PH
PANEL REFERENCE 4P/TP MCCB ACB SIZE R.PH Y.PH B.PH TOTAL LV / HV CT (3)
COMPOSITION SIZE (1) (2)

AMPS AMPS mm2 mm2 KW KW KW KW

2500 1 NO.2400/5A CT
INCOMER TR-01/MDB-01 TP
SET@0.85
BY DEWA 2X1C:300 433.78 433.88 433.80 1301.46 40 1 INTEGRAL METER

2500 1 NO.2400/5A CT
INCOMER TR-02/MDB-02 TP
SET@0.85
BY DEWA 2X1C:300 440.85 440.70 440.99 1322.54 61 1 INTEGRAL METER

TOTAL CONNECTED LOAD(DUTY& STANDBY LOAD) 874.63 874.58 874.79 2624.00


MDB CONNECTED TO DEWA INCOMER

DEMAND FACTOR= 0.85


TOTAL DEMAND LOAD 743.44 743.39 743.57 2230.40 0 101 2
EXPECTED MAX DEMAND LOAD: 2230.40 KW
Sub Meters Sub Meters
OWNER:
LEAD DESIGN CONSULTANT:
PLOT NO: 3342846 REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL
MEP CONSULTANT:
SATWA

This approval supersedes our previous approval issued vide same Ref.
dated 13/08/20 for the same project due to modification in LV panels.
Total connected load changed to 2624.0 Kw.

2X1500 KVA TR. with LV Integral meter.


All other meters are sub meters.
E-071882 23/06/2022

Refer Guarantee letter and sectional details submitted


for the proposed Attic Slab for LV Room.
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF MDB-1 - LV ROOM
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) GROUND FLOOR
MDB/SMDB: MDB-1

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE TOTAL LV REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3)
LOAD (4)
INCOMER 4P 2500 Set @0.85 50 ˂--------------------- BY DEWA --------------------> 2X1C-300 433.78 433.88 433.80 0 40 0 1 2400/5A CT Meter
MOB. GENERATOR 4P 2500 Set @0.85 PROVISION FOR MOBILE GENERATOR
OUTGOING: PF Meter
100mA+ELS + Alarm +
FIRE FIGHTING PUMP TP 225 50 XLPE/SWA/PVC 4C-120 1C-70 36.00 36.00 36.00 108.00
Stater

SMDB-GF TP 630 50 XLPE/SWA/PVC 2X4C-240 2X1C-120 95.81 94.64 95.15 285.60

SMDB-FF1 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 73.40 73.84 73.02 220.26 10

SMDB-FF2 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 70.69 71.68 71.90 214.27 10

SMDB-SF1 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 73.40 73.84 73.02 220.26 10

SMDB-SF2 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 70.69 71.68 71.90 214.27 10

SPARE TP 80 50 13.80 12.20 12.82 38.82 FUTURE LOAD

CAP. BANK-1 TP 800 50 XLPE/SWA/PVC 2X4C-300 2X1C-150 400 KVAR CAPACITOR BANK
1000 3 240 3 120
STANDBY LOAD(FIRE PUMP) 433.78 433.88 433.80 1301.46

MDB - 1 CONNECTED TO:


0 40 0 1
DEWA INCOMER
STANDBY LOAD(FIRE PUMP) 108.00

ACTUAL CONNECTED LOAD 1193.46

MAX. DEMAND (3PH) 1106.24 kW 0.85 TOTAL DIVERSIFIED LOAD (3 PH) 1106.24 kW

Type of Meter (Rating of Incomer): (1) Up to 60 A (2) Up to 125 A (3) LV CT.... /... A / HV CT ..../..A (* 400 / 5Amps CT Metering)

PROJECT: REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA


CONSULTANT: Dubai - Al Jazeera Engineering Consultants
MDB-1 Rev.0
PLOT NO: 3342846 Al Satwa 334

Ensure to switch off some loads that TCL on TR. not exceeding
950Kw during fire mode/ test.
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF MDB-1 - LV ROOM
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) GROUND FLOOR
MDB/SMDB: MDB-2

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE TOTAL LV REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3)
LOAD (4)

INCOMER 4P 2500 Set @0.85 50 ˂--------------------- BY DEWA --------------------> 2X1C-300 440.85 440.70 440.99 0 61 1 2400/5A CT Meter
MOB. GENERATOR 4P 2500 Set @0.85 PROVISION FOR MOBILE GENERATOR
OUTGOING: 300 150 PF Meter
SMDB-RETAI-1 TP 400A 300 50 XLPE/SWA/PVC 4C-185 1C-95 58.57 58.62 58.98 176.17 17

SMDB-RETAI-2 TP 350 50 XLPE/SWA/PVC 4C-240 1C-120 55.96 55.96 55.97 167.89 14

SMDB-TF1 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 73.40 73.84 73.02 220.26 10

SMDB-TF2 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 70.69 71.68 71.90 214.27 10

SMDB-RF1 TP 400 50 XLPE/SWA/PVC 2X4C-150 2X1C-95 72.52 72.91 72.28 217.71 10

DB-SS TP 40 50 XLPE/SWA/PVC 4C-10 1C-10 0.75 0.25 2.25 3.25

ESMDB-S TP 400 50 XLPE/SWA/PVC 4C-300 1C-150 68.40 67.15 67.04 202.60


Future load subject to DEWA's prior approval and
SPARE TP 300 50 AB 
inspection as and when it is being connected. 40.56 40.29 39.55 120.40 FUTURE LOAD

CAP. BANK-2 TP 800 50 XLPE/SWA/PVC 2X4C-300 2X1C-150 400 KVAR CAPACITOR BANK
1000 3 240 3 120
TOTAL CONNECTED LOAD PER PHASE 440.85 440.70 440.99 1322.54

MDB - 1 CONNECTED TO:


0 61 1
DEWA INCOMER
STANDBY LOAD(FIRE PUMP) 0.00

ACTUAL CONNECTED LOAD 1322.54

MAX. DEMAND (3PH) 1124.16 kW 0.85 TOTAL DIVERSIFIED LOAD (3 PH) 1124.16 kW

Type of Meter (Rating of Incomer): (1) Up to 60 A (2) Up to 125 A (3) LV CT.... /... A / HV CT ..../..A (* 400 / 5Amps CT Metering)

PROJECT: REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA


CONSULTANT: Dubai - Al Jazeera Engineering Consultants
MDB-2 Rev.0
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF BASEMENT FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: ESMDB-BF

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 200 35 FIRE RATED CABLE 4C-95 1C-50 33.07 32.77 33.07 0
OUTGOING:

EDB-BF1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.40 4.10 4.40 12.90

XLPE/SWA/FIRE
MAF-B1-01 TP 63 35 4C-16 1C-10 6.67 6.67 6.67 20.00 100mA ELS+ALARM
RATED CABLE
XLPE/SWA/FIRE
MAF-B1-02 TP 63 35 4C-16 1C-10 6.67 6.67 6.67 20.00 100mA ELS+ALARM
RATED CABLE
XLPE/SWA/FIRE
SEF-B1-01 TP 63 35 4C-16 1C-10 6.67 6.67 6.67 20.00 100mA ELS+ALARM
RATED CABLE
XLPE/SWA/FIRE
SEF-B1-02 TP 63 35 4C-16 1C-10 6.67 6.67 6.67 20.00 100mA ELS+ALARM
RATED CABLE
XLPE/SWA/FIRE
JOCKY PUMP TP 20 35 4C-10 1C-10 2.00 2.00 2.00 6.00 30mA ELS+ALARM
RATED CABLE

ESMDB - BF CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 33.07 32.77 33.07 98.90 0
ESMDB-S

MAX. CONNECTED (3PH) 98.90 kW 1 TOTAL CONNECTED LOAD (3 PH) 98.90 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA ESMDB-BF Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF BASEMENT FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-BF

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH CONNEC 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CT
ISO IC mm2 mm2 kW kW kW TED (1) (2) (3) (4)

LOAD
INCOMER TP 63 35 XLPE/SWA/PVC 4C-16 1C-10 6.45 7.00 6.60 0
OUTGOING:

DB-BF1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.25 2.60 2.20 7.05

DRAINAGE PUMP TP 20 35 XLPE/SWA/PVC 4C-10 1C-10 1.60 1.70 1.70 5.00 30mA ELCB

CIRCULATION PUMP TP 20 35 XLPE/SWA/PVC 4C-6 1C-6 1.00 1.00 1.00 3.00 30mA ELCB

TRANSFER PUMP TP 20 35 XLPE/SWA/PVC 4C-6 1C-6 1.60 1.70 1.70 5.00 30mA ELCB

SMDB - BF CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 6.45 7.00 6.60 20.05 0
SMDB-GF

MAX. CONNECTED (3PH) 20.05 kW 1 TOTAL CONNECTED LOAD (3 PH) 20.05 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-BF Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF GROUND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-GF

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH CONNEC 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CT
ISO IC mm2 mm2 kW kW kW TED (1) (2) (3) (4)

LOAD
INCOMER TP 630 35 XLPE/SWA/PVC 2X4C-240 2C1C-120 95.81 94.64 95.15 0
OUTGOING:

DB-GF1 TP 100 35 XLPE/SWA/PVC 4C-35 1C-25 15.40 14.40 15.65 45.45

DB-GF2 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.11 0.89 1.50 4.50

DB-TS1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.20 5.60 5.05 15.85

SMDB-BF TP 63 35 XLPE/SWA/PVC 4C-16 1C-10 16 6.45 7.00 6.60 20.05

SMDB-RF2 TP 400 35 XLPE/SWA/PVC 2X4C-150 2X1C-95 66.65 66.75 66.35 199.75

SMDB - GF CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 95.81 94.64 95.15 285.60 0
MDB-1

MAX. CONNECTED (3PH) 257.04 kW 0.9 TOTAL CONNECTED LOAD (3 PH) 285.60 kW
Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-GF Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF TYPICAL FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-TF1(1-3)

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 73.40 73.84 73.02 10
OUTGOING:

DB-FF1 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.86 6.59 7.07 22.52 1

DB-FF2 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.99 7.38 8.22 23.59 1

DB-FF3 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.74 8.66 7.02 22.42 1

DB-FF4 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.84 6.92 9.16 22.92 1

DB-FF5 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.09 5.67 5.57 18.34 1

DB-FF6 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.99 9.41 6.82 23.22 1

DB-FF7 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.38 6.87 9.03 22.28 1

DB-FF8 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.61 7.24 6.97 22.82 1

DB-FF9 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.20 7.97 7.89 23.07 1

DB-FF10 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 6.69 7.13 5.26 19.08 1

SMDB - FF1 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 73.40 73.84 73.02 220.26 10
MDB-1

MAX. CONNECTED (3PH) 220.26 kW 1 TOTAL CONNECTED LOAD (3 PH) 220.26 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-FF1 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF TYPICAL FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-TF2(1-3)

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 70.69 71.68 71.90 10
OUTGOING:

DB-FF11 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.44 7.46 8.40 23.29 1

DB-FF12 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 9.31 7.54 6.17 23.02 1

DB-FF13 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.05 7.82 8.09 23.97 1

DB-FF14 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.52 7.43 5.33 18.28 1

DB-FF15 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.70 7.82 7.99 23.51 1

DB-FF16 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.90 7.83 7.89 23.62 1

DB-FF17 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.25 8.63 7.34 23.22 1

DB-FF18 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.62 5.63 7.89 19.14 1

DB-FF19 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.39 4.39 6.40 18.18 1

DB-FF20 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.50 7.13 6.40 18.03 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 70.69 71.68 71.90 214.27 10
MDB-1

MAX. CONNECTED (3PH) 214.27 kW 1 TOTAL CONNECTED LOAD (3 PH) 214.27 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-FF2 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF 2ND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-SF1

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 73.40 73.84 73.02 10
OUTGOING:

DB-SF1 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.86 6.59 7.07 22.52 1

DB-SF2 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.99 7.38 8.22 23.59 1

DB-SF3 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.74 8.66 7.02 22.42 1

DB-SF4 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.84 6.92 9.16 22.92 1

DB-SF5 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.09 5.67 5.57 18.34 1

DB-SF6 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.99 9.41 6.82 23.22 1

DB-SF7 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.38 6.87 9.03 22.28 1

DB-SF8 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.61 7.24 6.97 22.82 1

DB-SF9 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.20 7.97 7.89 23.07 1

DB-SF10 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 6.69 7.13 5.26 19.08 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 73.40 73.84 73.02 220.26 10
MDB-1

MAX. CONNECTED (3PH) 220.26 kW 1 TOTAL CONNECTED LOAD (3 PH) 220.26 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-SF1 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF 2ND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-SF2

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 70.69 71.68 71.90 10
OUTGOING:

DB-SF11 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.44 7.46 8.40 23.29 1

DB-SF12 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 9.31 7.54 6.17 23.02 1

DB-SF13 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.05 7.82 8.09 23.97 1

DB-SF14 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.52 7.43 5.33 18.28 1

DB-SF15 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.70 7.82 7.99 23.51 1

DB-SF16 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.90 7.83 7.89 23.62 1

DB-SF17 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.25 8.63 7.34 23.22 1

DB-SF18 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.62 5.63 7.89 19.14 1

DB-SF19 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.39 4.39 6.40 18.18 1

DB-SF20 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.50 7.13 6.40 18.03 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 70.69 71.68 71.90 214.27 10
MDB-1

MAX. CONNECTED (3PH) 214.27 kW 1 TOTAL CONNECTED LOAD (3 PH) 214.27 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-SF2 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF 3RD FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-TF1

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-

SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECT CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
ED LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 73.40 73.84 73.02 10
OUTGOING:

DB-TF1 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.86 6.59 7.07 22.52 1

DB-TF2 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.99 7.38 8.22 23.59 1

DB-TF3 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.74 8.66 7.02 22.42 1

DB-TF4 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.84 6.92 9.16 22.92 1

DB-TF5 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.09 5.67 5.57 18.34 1

DB-TF6 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.99 9.41 6.82 23.22 1

DB-TF7 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.38 6.87 9.03 22.28 1

DB-TF8 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.61 7.24 6.97 22.82 1

DB-TF9 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.20 7.97 7.89 23.07 1

DB-TF10 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 6.69 7.13 5.26 19.08 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 73.40 73.84 73.02 220.26 10
MDB-1

MAX. CONNECTED (3PH) 220.26 kW 1 TOTAL CONNECTED LOAD (3 PH) 220.26 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-TF1 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF 3RD FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-TF2

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-

SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH CONNEC 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CT
ISO IC mm2 mm2 kW kW kW TED (1) (2) (3) (4)

LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 70.69 71.68 71.90 10
OUTGOING:

DB-TF11 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.44 7.46 8.40 23.29 1

DB-TF12 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 9.31 7.54 6.17 23.02 1

DB-TF13 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.05 7.82 8.09 23.97 1

DB-TF14 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.52 7.43 5.33 18.28 1

DB-TF15 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.70 7.82 7.99 23.51 1

DB-TF16 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.90 7.83 7.89 23.62 1

DB-TF17 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.25 8.63 7.34 23.22 1

DB-TF18 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.62 5.63 7.89 19.14 1

DB-TF19 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 7.39 4.39 6.40 18.18 1

DB-TF20 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.50 7.13 6.40 18.03 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 70.69 71.68 71.90 214.27 10
MDB-1

MAX. CONNECTED (3PH) 214.27 kW 1 TOTAL CONNECTED LOAD (3 PH) 214.27 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-TF2 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF GROUND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) LV ROOM
MDB/SMDB: SMDB-RETAIL-1

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-

SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 300 35 XLPE/SWA/PVC 4C-185 1C-95 58.57 58.62 58.98 17 0
OUTGOING:
400A 300 150
DB-SH1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.02 1.84 2.58 8.44 1

DB-SH2 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.44 2.70 1.90 8.04 1

DB-SH3 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.38 2.58 3.33 8.29 1

DB-SH4 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.63 2.44 2.12 8.19 1

DB-SH5 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.47 2.62 2.74 8.83 1

DB-SH6 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.06 1.09 2.25 7.40 1

DB-SH7 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.80 3.11 2.74 8.65 1

DB-SH8 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.60 3.11 2.44 7.15 1

DB-SH9 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.50 3.11 2.39 7.00 1

DB-SH10 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.00 2.50 3.14 7.64 1

DB-SH11 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.10 2.45 3.14 7.69 1

DB-SH12 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.60 3.74 2.50 7.84 1

DB-SH13 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.85 3.74 2.45 9.04 1

DB-SH14 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.55 2.19 2.51 6.25 1

DB-SH15 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.37 2.47 3.94 8.78 1

DB-SH16 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.33 2.04 2.12 7.49 1

DB-SH17 TP 100 35 XLPE/SWA/PVC 4C-35 1C-16 15.87 16.89 16.69 49.45 1

SMDB-RETAIL-1 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 58.57 58.62 58.98 176.17 17
MDB-2

MAX. CONNECTED (3PH) 176.17 kW 1 TOTAL CONNECTED LOAD (3 PH) 176.17 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-RETAIL-1 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF GROUND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) LV ROOM
MDB/SMDB: SMDB-RETAIL-2

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-

SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECTED CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
LOAD
INCOMER TP 350 35 XLPE/SWA/PVC 4C-240 1C-120 55.96 55.96 55.97 14 0
OUTGOING:

DB-SH18 TP 100 35 XLPE/SWA/PVC 4C-35 1C-16 16.69 15.91 17.44 50.04 1

DB-SH19 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.52 2.92 2.39 8.83 1

DB-SH20 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.76 4.16 2.68 9.60 1

DB-SH21 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.83 3.11 4.16 10.10 1

DB-SH22 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.90 3.16 2.84 9.90 1

DB-SH23 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.91 4.16 2.84 9.91 1

DB-SH24 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.84 3.16 3.90 9.90 1

DB-SH25 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.91 3.21 2.83 9.95 1

DB-SH26 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.91 4.21 3.09 10.21 1

DB-SH27 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.84 3.11 4.16 10.11 1

DB-SH28 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.00 1.84 3.16 7.00 1

DB-SH29 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.51 2.79 1.85 7.15 1

DB-SH30 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.91 1.74 2.40 7.05 1

DB-SH31 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 3.43 2.48 2.23 8.14 1

SMDB-RETAIL-2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 55.96 55.96 55.97 167.89 14
MDB-2

MAX. CONNECTED (3PH) 167.89 kW 1 TOTAL CONNECTED LOAD (3 PH) 167.89 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-RETAIL-2 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF ROOF FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-RF1

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-

SP/TP
FEEDER DUTY CABLE TYPE REMARKS
F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CONNECT CT
ISO IC mm2 mm2 kW kW kW (1) (2) (3) (4)
ED LOAD
INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 72.52 72.90 72.28 10
OUTGOING:

DB-RF1 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.78 7.70 5.61 20.09 1

DB-RF2 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.19 8.60 8.35 24.14 1

DB-RF3 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.95 8.40 7.88 24.23 1

DB-RF4 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.59 7.39 5.11 19.09 1

DB-RF5 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 8.00 7.78 7.75 23.53 1

DB-RF6 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.48 8.30 7.95 23.73 1

DB-RF7 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.79 5.31 7.74 19.84 1

DB-RF8 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.56 8.22 7.75 23.53 1

DB-RF9 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 7.59 5.69 6.46 19.74 1

DB-RF10 TP 63 A 35 XLPE/SWA/PVC 4C-16 1C-16 6.59 5.51 7.69 19.79 1

SMDB - T2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 72.52 72.90 72.28 217.70 10
MDB-1

MAX. CONNECTED (3PH) 217.70 kW 1 TOTAL CONNECTED LOAD (3 PH) 217.70 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA SMDB-RF1 Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF ROOF FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: SMDB-RF2

PROPOSED TYPE & No. OF kWh


CIRCUIT/ RATING-AMPS FAULT CABLE SIZE CONNECTED LOAD - Kw
METERS
ECC SIZE-
FEEDER SP/TP F/S DUTY CABLE TYPE 2/4 X 2/3/4C X R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV REMARKS
ACB MCCB IC, mm2 CONNEC CT
DB No. ISO kA IC mm2 mm2 kW kW kW (1) (2) (3)
TED (4)

INCOMER TP 400 35 XLPE/SWA/PVC 2x4C-150 2x1C-95 66.65 66.75 66.35 LOAD 0


OUTGOING:
DB-RF TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.70 5.90 5.45 17.05

SUPPLY FAN FOR FAHU -1 TP 40 35 XLPE/SWA/PVC 4C-16 1C-16 5.00 5.00 5.00 15.00 100mA ELCB

EXTRACT FAN FOR FAHU -


TP 32 35 XLPE/SWA/PVC 4C-10 1C-10 2.50 2.50 2.50 7.50 100mA ELCB
1
HEAT RECOVERY WHEEL
TP 20 35 XLPE/SWA/PVC 4C-10 1C-10 0.12 0.12 0.12 0.37 100mA ELCB
FOR FAHU -1
CONDENSING UNIT FOR
TP 80 35 XLPE/SWA/PVC 4C-25 1C-16 10.60 10.60 10.60 31.80 100mA ELCB
FAHU -1
CONDENSING UNIT FOR
TP 125 35 XLPE/SWA/PVC 4C-50 1C-25 15.70 15.70 15.70 47.10 100mA ELCB
FAHU -1
VRF-01 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.37 4.37 4.37 13.10 100mA ELCB

VRF-01 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.37 4.37 4.37 13.10 100mA ELCB

WATER BOOSTER PUMP TP 20 35 XLPE/SWA/PVC 4C-6 1C-6 1.40 1.30 1.30 4.00 30mA ELCB

WATER FILTERATION
TP 20 35 XLPE/SWA/PVC 4C-4 1C-4 0.65 0.65 0.70 2.00 30mA ELCB
PUMP
SPARE TP 40 6.01 6.01 6.01 18.03 100mA ELCB
VRF-02 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.23 5.23 5.23 15.70 100mA ELCB

VRF-02 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 5.00 5.00 5.00 15.00 100mA ELCB

SMDB-RF- 2 CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 66.65 66.75 66.35 199.75 0
SMDB-GF

MAX. CONNECTED (3PH) 199.75 kW 1 TOTAL CONNECTED LOAD (3 PH) 199.75 kW


Type of Meter

SMDB-RF2 Rev.0
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL
PROJECT:
SATWA
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF ROOF FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) ELECTRICAL ROOM
MDB/SMDB: ESMDB-RF

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
SP/TP

FEEDER DUTY CABLE TYPE REMARKS


F/S 2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH CONNEC 1 - PH 3 - PH 3 - PH LV
DB No. ACB MCCB kA CT
ISO IC mm2 mm2 kW kW kW TED (1) (2) (3) (4)

LOAD
INCOMER TP 100 35 FIRE RATED CABLE 4C-35 1C-16 14.63 13.88 14.43 0
OUTGOING:

EDB-RF TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.30 1.55 2.10 5.95

XLPE/SWA/FIRE
GEAF-1 TP 20 35 4C-4 1C-4 0.67 0.67 0.67 2.00 100mA ELS+ALARM
RATED CABLE
XLPE/SWA/FIRE
GEF-1 TP 63 35 4C-16 1C-10 8.33 8.33 8.33 25.00 100mA ELS+ALARM
RATED CABLE

GSM TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.67 1.67 1.67 5.00 100mA ELCB

GSM TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 1.67 1.67 1.67 5.00 100mA ELCB

ESMDB -RF CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 14.63 13.88 14.43 42.95 0
ESMDB-S

MAX. CONNECTED (3PH) 42.95 kW 1 TOTALCONNECTED LOAD (3 PH) 42.95 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA ESMDB-RF Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SS LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SUBSTATION ROOM
Fed From: MDB-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

COMMERCIAL AND WATT


INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

RESIDENTIAL BUILDING

13A SSO

EXTRACT
COOKER
SHAVER
OUTLET

OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

BELL
(MERAAS PLOT AT AL

1SOL
FLEX

CCU
W/M
FAN
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
SATWA)

1 R1 10 2.5 2.5 TRANSFORMER ROOM 7 50.00 350.00


SEC-1

30mA 100m
SEC-2 40A,
ISOLATOR

40A, 4P 4P

SPACE
40A TPN

2 Y1
A

3 B1 20 SPARE 250.00 250.00


4 R2 20 4.0 4.0 TRANSFORMER ROOM 2 200.00 400.00
5 Y2 20 SPARE 250.00 250.00
6 B2 SPACE 250.00
Total connected Loads (W) 750.00 250.00 250.00 1250.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 1250.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SS REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: EDB-BF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: BASEMENT ELECTRICAL ROOM
Fed From: ESMDB-BF
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
SIZE mm2
COMMERCIAL AND
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

RESIDENTIAL BUILDING

13A DSO
13A SSO

EXTRACT
COOKER

OTHER
OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN
(MERAAS PLOT AT AL

FLEX

1SOL
SH/O

CCU
W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
SATWA)

1 R1 20 4.0 4.0 LIFT SHAFT 3 200.00 600.00


40A, 4P
SEC-1

30mA

2 Y1 20 4.0 4.0 DIESEL PUMP 1 2000.00 2000.00

3 B1 32 4.0 4.0 TELEPHONE & ELECTRICAL ROOM 3 400.00 1200.00 RING

4 R2 32 4.0 4.0 CONTROL ROOM 4 400.00 1600.00 RING


40A, 4P
SEC-2

30mA

5 Y2 20 4.0 4.0 FIRE PUMP ROOM 2 200.00 400.00

6 B2 20 4.0 4.0 FARP-CONTROL ROOM 1 500.00 500.00


7 R3 10 2.5 2.5 DRIVE WAY 4 50.00 200.00
40A TPN ISOLATOR

SEC-3 40A,
4P 100mA

8 Y3 10 2.5 2.5 DRIVE WAY 3 50.00 150.00


9 B3 10 2.5 2.5 DRIVE WAY 4 50.00 200.00
10 R4 10 2.5 2.5 LIFT LOBBY 2 50.00 100.00
11 Y4 10 2.5 2.5 RAMP AREA 4 50.00 200.00
12 B4 10 2.5 2.5 TELEPHONE & ELECTRICAL ROOM 2 50.00 100.00
13 R5 10 2.5 2.5 STAIR 12 50.00 600.00
SEC-4 40A,
4P 100mA

14 Y5 10 2.5 2.5 FIRE PUMP ROOM 4 50.00 200.00


15 B5 10 2.5 2.5 STAIR 12 50.00 600.00
16 R6 10 2.5 2.5 CONTROL ROOM 7 50.00 350.00
17 Y6 20 4.0 4.0 FIRE PUMP ROOM (GEF-B-01) 1 500.00 500.00
18 B6 SPACE
19 R7 10 2.5 2.5 LIFT SHAFT 3 50.00 150.00
SEC-5 40A,
4P 100mA

20 Y7 20 4.0 4.0 FIRE PUMP ROOM (MAF-B-01 1 500.00 500.00


21 B7 10 2.5 2.5 LIFT SHAFT 3 50.00 150.00
22 R8 10 2.5 2.5 STAIR 13 50.00 650.00
23 Y8 SPACE
24 B8 10 2.5 2.5 LIFT SHAFT 3 50.00 150.00
25 R9 20 SPARE 150.00 150.00
SEC-6

100m
40A,
4P

26 Y9 20 SPARE 150.00 150.00


A

27 B9 20 4.0 4.0 MAIN CDT RACK (CONTRL ROOM) 1 1500.00 1500.00


Total connected Loads (W) 4400.00 4100.00 4400.00 12900.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 12900.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) EDB-BF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-BF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: BASEMENT ELECTRICAL ROOM
Fed From: SMDB-BF
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
SIZE mm2
COMMERCIAL AND
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

RESIDENTIAL BUILDING

13A SSO

EXTRACT
COOKER

OTHER
OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN
(MERAAS PLOT AT AL

FLEX

1SOL
SH/O

CCU
W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
SATWA)

1 R1 20 4.0 4.0 STORAGE &PARKING 2 200.00 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 CAR PARKING 3 200.00 600.00


4P 30mA

3 B1 20 4.0 4.0 DOMESTIC PUMP ROOM 4 200.00 800.00


4 R2 20 4.0 4.0 STORAGE &PARKING 3 200.00 600.00
5 Y2 SPACE
6 B2 SPACE
40A TPN ISOLATOR

7 R3 10 2.5 2.5 CAR PARKING 14 50.00 700.00


SEC-2 40A,
4P 100mA

8 Y3 10 2.5 2.5 PARKING 11 50.00 550.00


9 B3 10 2.5 2.5 PARKING 11 50.00 550.00
10 R4 10 2.5 2.5 DRIVE WAY 5 50.00 250.00
11 Y4 10 2.5 2.5 DRIVE WAY 4 50.00 200.00
12 B4 10 2.5 2.5 DRIVE WAY 5 50.00 250.00
13 R5 10 2.5 2.5 STORAGE &PARKING 3 50.00 150.00
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 PARKING 10 50.00 500.00


15 B5 10 2.5 2.5 PARKING 7 50.00 350.00
16 R6 10 2.5 2.5 LIFT LOBBY 3 50.00 150.00
17 Y6 10 2.5 2.5 RAMP AREA 9 50.00 450.00
18 B6 10 2.5 2.5 DOMESTIC PUMP ROOM 2 50.00 100.00
19 R7 SPACE 50.00
40A, 4P
100mA
SEC-4

20 Y7 20 SPARE 300.00

21 B7 20 SPARE 150.00 150.00


Total connected Loads (W) 2250.00 2600.00 2200.00 7050.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7050.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-BF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: EDB-GF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: GROUND ELECTRICAL ROOM
Fed From: ESMDB-S
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A DSO
13A SSO

EXTRACT
COOKER

OTHER
ROOM/AREA

OUTLET
W/UNIT

TP+N+E
15A S/O
REMARKS

CHAN

1SOL
FLEX
SH/O

CCU
W/M
FCU

FAN
LTG

W/H

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 ELECTRICAL & TELEPHONE 4 50.00 200.00


SEC-1 40A,
4P 100mA

2 Y1 10 2.5 2.5 GENERATOR ROOM 6 50.00 300.00


3 B1 10 2.5 2.5 LV ROOM 6 50.00 300.00
4 R2 10 2.5 2.5 CORRIDOR 9 50.00 450.00
5 Y2 10 2.5 2.5 CORRIDOR 8 50.00 400.00
6 B2 10 2.5 2.5 CORRIDOR 7 50.00 350.00
7 R3 10 SPARE 100.00 100.00
SEC-2 40A,
4P 100mA

8 Y3 10 2.5 2.5 CORRIDOR 9 50.00 450.00


9 B3 10 2.5 2.5 CORRIDOR 7 50.00 350.00
10 R4 20 4.0 4.0 GARBAGE ROOM(GEF-G-03) 1 500.00 500.00
40A TPN ISOLATOR

11 Y4 20 4.0 4.0 GENERATOR ROOM(GEF-G-01) 1 500.00 500.00


12 B4 10 2.5 2.5 CORRIDOR 7 50.00 350.00
13 R5 32 4.0 4.0 TELEPHONE & ELECTRICAL ROOM 3 400.00 1200.00 RING
40A, 4P 40A, 4P
SEC-3

30mA

14 Y5 20 4.0 4.0 GENERATOR ROOM 2 200.00 400.00


15 B5 20 4.0 4.0 LV ROOM 2 200.00 400.00
16 R6 20 4.0 4.0 GATE BARRIER 1 500.00 500.00
100mA
SEC-4

17 Y6 20 4.0 4.0 GENERATOR ROOM 1 500.00 500.00


18 B6 20 4.0 4.0 GATE BARRIER 1 500.00 500.00

19 R7 SPACE
SEC-5 40A, 4P

20 Y7 20 4.0 4.0 RECEPTION(FACP) 1 500.00 500.00


SPARE
30mA

21 B7 20 150.00 150.00

22 R8 SPACE

23 Y8 20 SPARE 600.00 600.00

24 B8 20 SPARE 300.00 300.00


Total connected Loads (W) 2950.00 3650.00 2700.00 9300.00

CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9300.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-GF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-GF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: GROUND ELECTRICAL ROOM
Fed From: SMDB-GF
LOAD PER CIRCUIT

MCB RATING
CONNECTED LOAD / POINTS
RATING OF

RATING OF

CCT WIRE

ECC WIRE
WATT

SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
COOKER

OTHER
ROOM/AREA

OUTLET
15A S/O
W/UNIT

TP+N+E
REMARKS

CHAN

D.SO

1SOL
FLEX
SH/O

13A

CCU
W/M
FCU
LTG

FAN
W/H

32A
H/D

IND
R Y B

1 R1 32 4.0 4.0 WATCHMAN ROOM 4 400.00 1600.00 RING


SEC-1 40A,

2 Y1 20 4.0 4.0 RECEPTION 2 1 200 /400 800.00


4P 30mA

3 B1 20 4.0 4.0 GARBAGE ROOM 2 200.00 400.00


4 R2 32 4.0 4.0 CORRIDOR 7 200.00 1400.00 RING
5 Y2 32 4.0 4.0 CORRIDOR 6 200.00 1200.00 RING
6 B2 20 4.0 4.0 DISABLE TOILET FEMALE 1 1500.00 1500.00
7 R3 20 4.0 4.0 WATCH MAN BATH 1 1500.00 1500.00
40A, 4P
SEC-2

30mA

8 Y3 20 4.0 4.0 MALE TOILET 1 1500.00 1500.00


9 B3 20 4.0 4.0 FEMALE WASH 1 1500.00 1500.00
10 R4 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
40A, 4P
SEC-3

30mA

11 Y4 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
12 B4 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
13 R5 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
SEC-5 SEC-4

30mA 30mA
40A, 40A,
4P

14 Y5 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
15 B5 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
16 R6 32 6.0 6.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
100A TPN ISOLATOR

4P

17 Y6 20 4.0 4.0 FEMALE WASH 1 1500.00 1500.00


18 B6 20 4.0 4.0 CORRIDOR 1 3000 3000.00 ISO. IN FLOOR BOX FOR KIOSK
19 R7 10 2.5 2.5 WATCHMAN ROOM 3 1 50/50 200.00
SEC-6 40A,
4P 100mA

20 Y7 10 2.5 2.5 CORRIDOR 10 50.00 500.00


21 B7 10 2.5 2.5 CORRIDOR 8 50.00 400.00
22 R8 10 2.5 2.5 EXTERNAL 7 50.00 200.00
23 Y8 10 2.5 2.5 CORRIDOR 8 50.00 400.00
24 B8 10 2.5 2.5 STAIR LOBBY 11 50.00 550.00
25 R9 10 2.5 2.5 CORRIDOR 10 50.00 500.00
SEC-7 40A,
4P 100mA

26 Y9 10 2.5 2.5 EXTERNAL 7 50.00 350.00


27 B9 10 2.5 2.5 CORRIDOR 8 50.00 400.00
28 R10 10 2.5 2.5 EXTERNAL 6 50.00 300.00
29 Y10 10 2.5 2.5 WATCH MAN BATH 2 50.00 100.00
30 B10 10 2.5 2.5 FE MALE TOILET 10 50.00 500.00
31 R11 10 2.5 2.5 EXTERNAL 7 50 350.00
SEC-8 40A,
4P 100mA

32 Y11 10 2.5 2.5 MALE TOILET 11 50.00 550.00


33 B11 10 2.5 2.5 GARBAGE ROOM 14 50.00 700.00
34 R12 10 2.5 2.5 EXTERNAL 7 50 350.00
35 Y12 10 2.5 2.5 DISABLE TOILET MALE 4 50.00 200.00
36 B12 10 2.5 2.5 CORRIDOR 8 50.00 400.00
37 R13 SPACE
SEC-9 40A, 4P

38 Y13 20 4.0 4.0 GARBAGE ROOM 1 1000.00 1000.00 RAD


100mA

39 B13 SPACE

40 R14 SPACE

41 Y14 20 SPARE 300.00 300.00


42 B14 20 SPARE 300.00 300.00
Total connected Loads (W) 15400.00 14400.00 15650.00 45450.00
CABLE SIZE 4C 35mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 45450.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-GF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


For underground installations the
cables should be armored type.
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-GF2 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: GROUND ELECTRICAL ROOM
Fed From: SMDB-GF
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
COOKER

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

CCU
W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

CU-GF.32 UVR+TIMER
40A, 4P

1 R1 20 6.0 6.0 1 2110 2110.00


100mA
SEC-1

+CONTROL
2 Y1 20 4.0 4.0 FCU-GF.32 1 190.00 190.00
ISOLATOR
40A TPN

3 B1 20 SPARE 200 200.00


4 R2 SPACE
SEC-2 40A,

5 Y2 20 SPARE 250 400.00


4P 30mA

6 B2 20 4.0 4.0 DISABLE TOILET MALE 1 1500.00 1500.00


7 R3 SPACE
8 Y3 20 SPARE 300.00
9 B3 SPACE
Total connected Loads (W) 2110.00 890.00 1700.00 4700.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 4700.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-GF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-1
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET
W/UNIT

TP+N+E
15A S/O
REMARKS

CHAN

1SOL
FLEX
SH/O

W/M
FCU

FAN
LTG

W/H

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


SEC-1

100m
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


4 R2 1033.33
SEC-2

100m
40A TPN ISOLATOR

40A,

5 Y2 1033.33 UVR+TIMER+CO
4P

20 6.0 6.0 CU-GF.01 1 3100


A

NTROL
6 B2 1033.33
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,

8 Y3 20 4.0 4.0 SHOP 1 400.00 400.00


4P

9 B3 20 SPARE 250.00 250.00


10 R4 20 4.0 4.0 FCU-GF.01 1 390.00 390.00
SEC-4 40A, 4P

11 Y4 20 SPARE 1 200.00 200.00


12 B4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
100mA

13 R5 20 SPARE 300.00

14 Y5 SPACE

15 B5 SPACE
Total connected Loads (W) 4023.33 1833.33 2583.33 8440.00
4.02 1.83 2.58
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8440.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH1 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH2 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-2
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


40A, 4P
100mA
SEC-1

2 Y1 10 SPARE 250.00 250.00

3 B1 10 SPARE 500.00

4 R2 32 6.0 6.0 CU-GF.02 1 2740.00 2740.00


40A TPN ISOLATOR

40A, 4P
100mA
SEC-2

5 Y2 20 SPARE 200 200.00

6 B2 SPACE

7 R3 SPACE
SEC-3

30mA
40A,

SHOP
4P

8 Y3 32 4.0 4.0 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 FCU-GF.01 1 250 250.00


100mA

12 B4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


13 R5 20 SPARE 300.00 300.00
14 Y5 SPACE

15 B5 SPACE
Total connected Loads (W) 3440.00 2700.00 1900.00 8040.00
3.44 2.70 1.90
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8040.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH2 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH3 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-3
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
40A, SEC-1 40A,
4P 100mA

1 R1 10 SPARE 250.00 250.00

2 Y1 10 2.5 2.5 SHOP 6 50.00 300.00

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


40A TPN ISOLATOR

4 R2 1033.33
30mA 100mA
SEC-3 SEC-2

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.03 1 3100 1033.33 ONTROL


6 B2 1033.33
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
40A,
4P

8 Y3 20 SPARE 250.00
9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 4.0 4.0 FCU-GF.03 1 390.00 390.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 SPACE
13 R5 20 SPARE 300.00 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 2373.33 2583.33 3333.33 8290.00
2.37 2.58 3.33
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8290.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH3 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH4 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-4
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


30mA 100mA 100mA
SEC-3 SEC-2 SEC-1
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


4 R2 1033.33
40A TPN ISOLATOR

40A,

5 Y2 1033.33 UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.04 1 3100


ONTROL
6 B2 1033.33
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
40A,

8 Y3 20 SPARE 200.00 200.00


4P

9 B3 20 4.0 4.0 SHOP 1 400.00 400.00


10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 4.0 4.0 FCU-GF.04 1 390.00 390.00
100mA

13 R5 20 SPARE 300.00 300.00


14 Y5 SPACE

15 B5 SPACE
Total connected Loads (W) 3633.33 2433.33 2123.33 8190.00
3.63 2.43 2.12
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8190.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH4 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH5 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-5
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 SPACE
30mA 100mA 100mA
SEC-3 SEC-2 SEC-1
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 10 2.5 2.5 SHOP 8 50.00 400.00


4 R2 1220.00
40A TPN ISOLATOR

40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.05 1 3660 1220.00


ONTROL
6 B2 1220.00
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
40A,
4P

8 Y3 20 SPARE 200.00
9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.05 1 470.00 470.00


13 R5 20 SPARE 250.00 250.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 3470.00 2620.00 2490.00 8580.00
3.47 2.62 2.49
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8580.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH5 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH6 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-26
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


40A, 4P 40A, 4P
100mA 100mA
SEC-1

2 Y1 10 SPARE 250.00
3 B1 SPACE

4 R2 32 6.0 6.0 CU-GF.06 2110 2110.00


SEC-2
40A TPN ISOLATOR

UVR+TIMER+C
5 Y2 20 SPARE 250.00 250.00
ONTROL
6 B2 SPACE

7 R3 20 SPARE 250.00 250.00


40A, 4P
SEC-3

30mA

8 Y3 20 4.0 4.0 SHOP 1 400.00 400.00

9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING

10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


SEC-4 40A, 4P

11 Y4 20 4.0 4.0 FCU-GF.06 1 190 190.00


100mA

12 B4 20 SPARE 1 250.00
13 R5 20 SPARE 300 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 4060.00 1090.00 2250.00 7400.00
4.06 1.09 2.25
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7400.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH6 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH7 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-7
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 SPARE 250.00 250.00


100mA
SEC-1
40A,

2 Y1 SPACE
4P

3 B1 10 2.5 2.5 SHOP 8 50.00 400.00


40A TPN ISOLATOR

4 R2 20 SPARE 300 300


SEC-2

100m
40A,
4P

5 Y2 32 6.0 6.0 CU-GF.07 1 2110 2110.00


6 B2 20 SPARE 1500.00
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 SPACE
9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 SPARE 250.00 250.00
SEC-4 40A,
4P 100mA

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 4.0 4.0 FCU-GF.07 1 190 190.00
13 R5 SPACE
14 Y5 SPACE
15 B5 20 SPARE 250 250.00
Total connected Loads (W) 2800.00 3110.00 2740.00 8650.00
2.80 3.11 2.74
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8650.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH7 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH8 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-8
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
100mA 100mA

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


SEC-2 SEC-1
40A,
4P

2 Y1 SPACE
3 B1 SPACE
40A TPN ISOLATOR

4 R2 20 SPARE 250.00
40A,
4P

5 Y2 32 6.0 6.0 CU-GF.08 1 2110 2110.00


6 B2 20 SPARE 250.00
40A, 4P

7 R3 20 4.0 4.0 SHOP 1 400.00 400.00


SEC-3

30mA

8 Y3 SPACE
9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 SPARE 250.00 250.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.08 1 190 190.00


13 R5 20 SPARE 300 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 1600.00 3110.00 2440.00 7150.00
1.60 3.11 2.44
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7150.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH8 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH9 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-9
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


SEC-1

100m
40A,

2 Y1 SPACE
4P

3 B1 SPACE
40A TPN ISOLATOR

4 R2 20 SPARE 200 200.00


30mA 100mA
SEC-3 SEC-2
40A,
4P

5 Y2 32 6.0 6.0 CU-GF.09 1 2110 2110.00


6 B2 20 SPARE 200.00
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
40A,
4P

8 Y3 SPACE
9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 SPARE 200.00 200.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.09 1 190 190.00


13 R5 20 SPARE 300 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 1500.00 3110.00 2390.00 7000.00
1.50 3.11 2.39
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7000.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH9 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH10 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-10
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


30mA 100mA 100mA
SEC-3 SEC-2 SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


3 B1 SPACE
40A TPN ISOLATOR

4 R2 20 SPARE 200.00 200.00


40A,

UVR+TIMER+C
4P

5 Y2 SPACE
ONTROL
6 B2 32 6.0 6.0 CU-GF.10 1 2740.00 2740
7 R3 20 SPARE 200.00 200.00
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 FCU-GF.10 1 250 250.00


100mA

12 B4 SPACE
13 R5 20 SPARE 300.00 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 2000.00 2500.00 3140.00 7640.00
2.00 2.50 3.14
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7640.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH10 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH11 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-11
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


100mA
SEC-1
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 SPACE
40A TPN ISOLATOR

4 R2 20 SPARE 250.00 250.00


SEC-2

100m
40A,
4P

5 Y2 SPACE
A

6 B2 32 6.0 6.0 CU-GF.11 1 2740 2740


7 R3 20 SPARE 250.00 250.00
SEC-3

30mA
40A,

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


4P

9 B3 20 4.0 4.0 SHOP 1 400.00 400.00


10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 FCU-GF.11 1 250 250.00


100mA

12 B4 SPACE
13 R5 20 SPARE 300.00 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 2100.00 2450.00 3140.00 7690.00
2.10 2.45 3.14
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7690.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH11 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH12 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-12
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50 450.00


30mA 100mA 100mA
SEC-3 SEC-2 SEC-1
40A,
4P

2 Y1 SPACE
3 B1 10 SPARE 250 250.00
40A TPN ISOLATOR

4 R2 20 SPARE 250 250.00


40A,
4P

5 Y2 32 6.0 6.0 CU-GF.12 1 2740 2740.00


6 B2 20 4.0 4.0 FCU-GF.08 1 250 250.00
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
40A,
4P

8 Y3 SPACE
9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-4 40A, 4P

10 R4 20 SPARE 200.00
11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
100mA

12 B4 SPACE
13 R5 20 SPARE 300.00 300.00
14 Y5 SPACE
15 B5 SPACE
Total connected Loads (W) 1600.00 3740.00 2500.00 7840.00
1.60 3.74 2.50
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7840.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH12 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH13 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-13
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 SPARE 200.00
100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 SPACE
40A TPN ISOLATOR

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


4 R2 20 SPARE 250.00
40A,
4P

5 Y2 32 6.0 6.0 CU-GF.013 1 2740 2740.00


6 B2 20 SPARE 1500.00 1500.00
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 SPACE
9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
SPARE
100mA

10 R4 20 400.00 400.00
SEC-4
40A,
4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 4.0 4.0 FCU-GF.13 1 250 250.00
Total connected Loads (W) 2850.00 3740.00 2450.00 9040.00
2.85 3.74 2.45
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9040.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH13 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH14 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-14
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
40A, 4P

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


100mA
SEC-1

2 Y1 SPACE
40A TPN ISOLATOR

3 B1 SPACE
4 R2 20 SPARE 250.00 250.00
100mA
SEC-2
40A,
4P

5 Y2 20 4.0 4.0 FCU-GF.14 1 190 190.00


6 B2 32 6.0 6.0 CU-GF.14 1 2110 2110.00
7 R3 SPACE
SEC-3

30mA
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
100mA
SEC-4
40A,
4P

11 Y4 SPACE
12 B4 SPACE
Total connected Loads (W) 1550.00 2190.00 2510.00 6250.00
1.55 2.19 2.51
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 6250.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH14 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH15 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-15
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A DSO

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 10 50.00 500.00


100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 10 SPARE 250.00
40A TPN ISOLATOR

3 B1 10 SPARE 250.00
4 R2 1220.00
40A,

UVR+TIMER+
4P

5 Y2 20 6.0 6.0 CU-GF.15 1 3660 1220.00 CONTROL


6 B2 1220.00
40A, 4P

7 R3 20 4.0 4.0 SHOP 1 400.00 400.00


SEC-3

100m 30mA

8 Y3 SPACE
9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 SPARE 250.00 250.00
SEC-4
40A,
4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


A

12 B4 20 4.0 4.0 FCU-GF.15 1 470.00 470.00


Total connected Loads (W) 2370.00 2470.00 3940.00 8780.00
2.37 2.47 3.94
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8780.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH15 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH16 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-16
Fed From: SMDB-RETAIL-1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 SPACE
40A TPN ISOLATOR

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


4 R2 1033.33
40A,

5 Y2 1033.33 UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.16 1 3100


ONTROL
6 B2 1033.33
40A, 4P

7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


SEC-3

30mA

8 Y3 SPACE
9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
100mA
SEC-4
40A,
4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 4.0 4.0 FCU-GF.16 1 390.00 390.00
Total connected Loads (W) 3333.33 2033.33 2123.33 7490.00
3.33 2.03 2.12
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7490.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH16 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH17 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-17
Fed From: SMDB-RETAIL-1
CONNECTED LOAD / POINTS LOAD PER CIRCUIT
RATIN

SEC-1 RATIN

RATIN
SL.NO
ELCB

WIRE

WIRE
INCO
G OF

G OF ROOM/AR

MCB

SIZE

SIZE
ECC
G IN
CCT
CIR.
W/UNI

NO
REMARKS

DSO
13A

OUT

RAC
FCU

W/M
1SO
N+E
EXT
LTG

W/H
FLE

TP+
.

S/O
13A

15A

32A
CH
AN

H/D

OT
HE
SH/

SS
EA T R Y B

R
O

L
1 R1 10 2.5 2.5 SHOP 8 50.00 400.00
100mA 100mA 100mA 30mA 100mA 100mA
40A,
4P

2 Y1 SPACE
3 B1 10 2.5 2.5 SHOP 8 50.00 400.00
4 R2 1660.00
SEC-6 SEC-5 SEC-4 SEC-3 SEC-2
40A,

5 Y2 1660.00 UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.17 1 4980


125A TPN ISOLATOR

ONTROL
6 B2 1660.00
7 R3 SPACE
40A,

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


4P

9 B3 20 4.0 4.0 SHOP 1 400.00 400.00


10 R4 20 4.0 4.0 FCU-GF.17 1 570.00 570.00
40A,

11 Y4 SPACE
4P

12 B4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


13 R5 TP 6616.67
40A,

14 Y5 63 6616.67
4P

SPARE Future load subject to DEWA's prior approval and 1 19850.00


15 B5 A
AB 
inspection as and when it is being connected.
6616.67
16 R6 TP 6616.67
40A,

17 Y6 63 6616.67
4P

SPARE 1 19850.00
18 B6 A 6616.67
Total connected Loads (kW) 15863.33 16893.33 16693.33 49450.00
15.86 16.89 16.69
CABLE SIZE 4C 35mm2 XLPE/SWA/PVC + 1C 16 mm2 Y/G ECC TOTAL CONNECTED: 49450.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH17 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH18 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-18
Fed From: SMDB-RETAIL-2
CONNECTED LOAD / POINTS LOAD PER CIRCUIT
RATIN

40A, RATIN

RATIN
SL.NO
100m 100m ELCB

WIRE

WIRE
INCO
G OF

G OF
ROOM/AR

SIZE

SIZE
MCB

G IN

ECC
CCT
CIR.
W/UNI

NO
REMARKS

13A

DSO

OUT

RAC

W/M
FCU

N+E
1SO
LTG

W/H

EXT

TP+
32A
FLE
.

13A

15A
CH

S/O
AN
SH/

H/D

HE
OT
SS
EA T R Y B

R
O

L
1 R1 10 2.5 2.5 SHOP 8 50.00 400.00
SEC-2 SEC-1

4P
125A TPN ISOLATOR

2 Y1 10 SPARE 250.00
A

3 B1 10 2.5 2.5 SHOP 8 50.00 400.00


4 R2 1660.00
40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.18 1 4980 1660.00


A

ONTROL
6 B2 1660.00
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
SEC-3

30mA
40A,

8 Y3 20 SPARE 200.00 200.00


4P

9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4

100m
40A,

11 Y4 20 4.0 4.0 FCU-GF.18 1 570.00 570.00


4P

12 B4 20 SPARE 150.00
13 R5 TP 6616.67
100mA 100mA
SEC-6 SEC-5
40A,

14 Y5 63 6616.67
4P

SPARE 1 19850.00
15 B5 A 6616.67
Future load subject to DEWA's prior approval and
16 R6 TP AB 
inspection as and when it is being connected. 6616.67
40A,

17 Y6 63 6616.67
4P

SPARE 1 19850.00
18 B6 A 6616.67
Total connected Loads (kW) 16693.33 15913.33 17443.33 50050.00
16.69 15.91 17.44
CABLE SIZE 4C 35mm2 XLPE/SWA/PVC + 1C 16 mm2 Y/G ECC TOTAL CONNECTED: 50050.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH18 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH19 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-17
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


100mA 100mA
SEC-2 SEC-1
40A,

2 Y1 10 SPARE 250.00 250.00


4P

3 B1 10 2.5 2.5 SHOP 6 50.00 300.00


40A TPN ISOLATOR

4 R2 1220.00
40A,

UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.19 1 3660


5 Y2 1220.00 ONTROL
6 B2 1220.00
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
40A, 4P
SEC-3

30mA

8 Y3 20 SPARE 200.00 200.00


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.19 1 470.00 470.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 3520.00 2920.00 2390.00 8830.00
3.52 2.92 2.39
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8830.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH19 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH20 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-20
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A DSO

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B
100mA

1 R1 10 2.5 2.5 SHOP 6 50.00 300.00


SEC-1
40A,
4P

2 Y1 10 SPARE 200.00 200.00


3 B1 10 2.5 2.5 SHOP 6 50.00 300.00
40A TPN ISOLATOR

4 R2 1456.67
SEC-2

100m
40A,

UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.20 1 4370


A

5 Y2 1456.67 ONTROL
6 B2 1456.67
7 R3 SPACE
SEC-3

30mA
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4 40A, 4P

11 Y4 20 SPARE 250.00
100mA

12 B4 20 4.0 4.0 FCU-GF.20 1 530.00 530.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 2756.67 4156.67 2686.67 9600.00
2.76 4.16 2.69
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9600.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH20 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH21 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-21
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

13A TSSO

EXTRACT

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


SEC-1

100m
40A,
4P

2 Y1 10 SPARE 200.00 200.00


A

3 B1 10 2.5 2.5 SHOP 9 50.00 450.00


40A TPN ISOLATOR

4 R2 1456.67
SEC-2

100m
40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.21 1 4370 1456.67


A

ONTROL
6 B2 1456.67
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 200.00 200.00


9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 4.0 4.0 FCU-GF.21 1 530.00 530.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 SPARE 250.00
13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 2836.67 3106.67 4156.67 10100.00
2.84 3.11 4.16
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 10100.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH21 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH22 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-22
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


100mA 100mA
SEC-2 SEC-1
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 10 2.5 2.5 SHOP 9 50.00 450.00


40A TPN ISOLATOR

4 R2 1456.67
40A,

UVR+TIMER+
4P

5 Y2 20 6.0 6.0 CU-GF.22 1 4370 1456.67 CONTROL


6 B2 1456.67
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 250.00


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.22 1 530.00 530.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 3906.67 3156.67 2836.67 9900.00
3.91 3.16 2.84
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9900.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH22 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH23 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-23
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


30mA 100mA 100mA
SEC-3 SEC-2 SEC-1
40A,

2 Y1 10 SPARE 200.00 200.00


4P

3 B1 10 2.5 2.5 SHOP 9 50.00 450.00


40A TPN ISOLATOR

4 R2 1456.67
40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.23 1 4370 1456.67 ONTROL


6 B2 1456.67
7 R3 SPACE
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4 40A, 4P

11 Y4 20 SPARE 250.00 250.00


100mA

12 B4 20 4.0 4.0 FCU-GF.23 1 530.00 530.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 2906.67 4156.67 2836.67 9900.00
2.91 4.16 2.84
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9900.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH23 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH24 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-24
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


100mA
SEC-1
40A,
4P

2 Y1 10 SPARE 20.00 200.00


3 B1 10 2.5 2.5 SHOP 9 50.00 450.00
40A TPN ISOLATOR

4 R2 1456.67
SEC-2

100m
40A,

UVR+TIMER+C
4P

20 6.0 6.0 CU-GF.24 1 4370


A

5 Y2 1456.67 ONTROL
6 B2 1456.67
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 250.00


9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 4.0 4.0 FCU-GF.24 1 530.00 530.00
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 SPACE
13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 2836.67 3156.67 3906.67 9900.00
2.84 3.16 3.91
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9900.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH24 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH25 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-25
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


40A, 4P
100mA
SEC-1

2 Y1 10 SPARE 250.00 250.00


3 B1 10 2.5 2.5 SHOP 9 50.00 450.00
40A TPN ISOLATOR

4 R2 1456.67
100mA
SEC-2
40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.25 1 4370 1456.67


ONTROL
6 B2 1456.67
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 250.00


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
SEC-4 40A, 4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


100mA

12 B4 20 4.0 4.0 FCU-GF.25 1 530.00 530.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 SPACE
Total connected Loads (W) 3906.67 3206.67 2836.67 9950.00
3.91 3.21 2.84
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 9950.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH25 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH26 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-26
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


100mA
SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


3 B1 10 2.5 2.5 SHOP 9 50.00 450.00
40A TPN ISOLATOR

4 R2 1456.67
SEC-2

100m
40A,

UVR+TIMER+
4P

5 Y2 20 6.0 6.0 CU-GF.26 1 4370 1456.67


A

CONTROL
6 B2 1456.67
7 R3 SPACE
SEC-3

30mA
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
SEC-4 40A, 4P

11 Y4 20 SPARE 250.00 250.00


100mA

12 B4 20 4.0 4.0 FCU-GF.26 1 530.00 530.00


13 R5 SPACE
14 Y5 20 SPARE 250.00 250.00
15 B5 20 SPARE 250.00
Total connected Loads (W) 2906.67 4206.67 3086.67 10200.00
2.91 4.21 3.09
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 10200.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH26 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH27 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-27
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 9 50.00 450.00


100mA
SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


40A TPN ISOLATOR

3 B1 10 2.5 2.5 SHOP 9 50.00 450.00


4 R2 1456.67
40A, 4P
100mA
SEC-2

UVR+TIMER+
5 Y2 20 6.0 6.0 CU-GF.27 1 4370 1456.67
CONTROL
6 B2 1456.67
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 400.00


9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
10 R4 20 4.0 4.0 FCU-GF.27 1 530.00 530.00
100mA
SEC-4
40A,
4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 SPARE 250.00
Total connected Loads (W) 2836.67 3106.67 4156.67 10100.00
2.84 3.11 4.16
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 10100.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH27 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH28 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-28
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 SPACE
100mA
SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


40A TPN ISOLATOR

3 B1 10 2.5 2.5 SHOP 8 50.00 400.00


SPACE UVR+TIMER+C
4 R2
SEC-2

100m

ONTROL
40A,
4P

FCU-GF.28
A

5 Y2 20 4.0 4.0 1 190 190.00


6 B2 32 6.0 6.0 CU-GF.28 1 2110 2110.00
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 400.00


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
SPACE
40A, 4P

10 R4
100mA
SEC-4

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 SPARE 250.00
Total connected Loads (W) 2000.00 1840.00 3160.00 7000.00
2.00 1.84 3.16
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7000.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH28 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH29 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-29
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A D.SO

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


40A TPN ISOLATOR

3 B1 10 SPARE 200.00
4 R2 32 6.0 6.0 CU-GF.29 1 2110 2110.00
40A,

UVR+TIMER+C
4P

5 Y2 20 4.0 4.0 FCU-GF.29 1 190 190.00 ONTROL


6 B2 20 SPARE 250.00
7 R3 SPACE
SEC-3

30mA
40A,
4P

8 Y3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 SPACE
100mA
SEC-4
40A,
4P

11 Y4 20 SPARE 250.00 350.00


12 B4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00
Total connected Loads (W) 2510.00 2790.00 1850.00 7150.00
2.51 2.79 1.85
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7150.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH29 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH30 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-30
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A D.SO

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 10 SPARE 300.00 300.00


40A TPN ISOLATOR

3 B1 10 SPARE 200.00 200.00


4 R2 20 6.0 6.0 CU-GF.30 1 2110 2110.00
40A,

5 Y2 20 4.0 4.0 FCU-GF.30 1 190 190.00


4P

6 B2 SPACE
7 R3 20 4.0 4.0 SHOP 1 400.00 400.00
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 250.00 250.00


9 B3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SPACE
100mA

10 R4
SEC-4
40A,
4P

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 SPARE 200.00 200.00
Total connected Loads (W) 2910.00 1740.00 2400.00 7050.00
2.91 1.74 2.40
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 7050.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH30 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-SH31 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SHOP-31
Fed From: SMDB-RETAIL-2
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A D.SO

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 SHOP 8 50.00 400.00


100mA 100mA
SEC-2 SEC-1
40A,
4P

2 Y1 10 SPARE 250.00 250.00


40A TPN ISOLATOR

3 B1 10 2.5 2.5 SHOP 8 50.00 400.00


4 R2 1033.33
40A,

UVR+TIMER+C
4P

5 Y2 20 6.0 6.0 CU-GF.31 1 3100 1033.33


ONTROL
6 B2 1033.33
7 R3 32 4.0 4.0 SHOP 5 400.00 2000.00 RING
SEC-3

30mA
40A,
4P

8 Y3 20 SPARE 200.00 200.00


9 B3 20 4.0 4.0 SHOP 1 400.00 400.00
10 R4 20 SPACE
40A, 4P
100mA
SEC-4

11 Y4 20 4.0 4.0 SIGN BOARD 1 1000.00 1000.00


12 B4 20 4.0 4.0 FCU-GF.05 1 390.00 390.00
Total connected Loads (W) 3433.33 2483.33 2223.33 8140.00
3.43 2.48 2.22
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 8140.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-SH31 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
LOAD PER CIRCUIT
MCB RATING
CONNECTED LOAD / POINTS
RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT

SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD

BELL
D.SO

W/M

FCU
D/W

W/H

ISOL
H/D
13A
LTG

15A

32A

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 400.00 400.00
SEC-1 40A,

BED ROOM
4P 30mA

2 Y1 20 4.0 4.0 2 1 200 / 400 800.00


3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00
4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 32 4.0 4.0 BED ROOM 3 1 200 / 400 1000.00 RING
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 1 1 200 / 400 600.00
SEC-4 40A, 4P 40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00
11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 SPACE
63A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00


SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 SPARE 200.00 200.00
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 50/100 350.00
17 Y6 SPACE
100mA

18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 150.00


19 R7 10 2.5 2.5 CORRIDOR, WC & STORE 8 1 1 50/100/100 600.00
20 Y7 SPACE

21 B7 10 2.5 2.5 BED ROOM, MASTER BED ROOM & BATH 5 3 1 50/100 650.00

22 R8 1220.00
40A, 4P
100mA
SEC-5

UVR+TIMER+CONTRO
23 Y8 20 6.0 6.0 CU-1F.01.1 1 3660 1220.00 L
24 B8 1220.00
25 R9 32 6.0 6.0 CU-1F.01.2 2740 2740.00
100mA 1
SEC-6 40A, 4P

26 Y9 20 4.0 4.0 FCU.01 - TOILET 1 470 470.00


100mA

27 B9 20 4.0 4.0 FCU.02 - BATH 1 250 250.00


28 R10 20 SPARE 250 250.00
Typical Corrections Wherever Applicable
29 Y10 SPACE
100mA 30 B10 20 SPARE 200.00

Total connected Loads (W) 8860.00 6590.00 7070.00 22520.00

CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 22520.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF1 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF2 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION:FIRST FLOOR FLAT
Fed From: SMDB-FF1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 400.00 400.00


SEC-1 40A,

BED ROOM
4P 30mA

2 Y1 20 4.0 4.0 2 1 200 / 400 800.00


3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00
4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-4 40A, 40A, SEC-2 40A,

BATH
4P 30mA

8 Y3 20 4.0 4.0 1 1500.00 1500.00


9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00


12 B4 SPACE
13 R5 SPACE
SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
16 R6 10 2.5 2.5 SITTING AREA DINING 6 2 50/100 500.00
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 6 3 1 50/100 700.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 10 1 1 50/100/100 700.00
20 Y7 SPACE
21 B7 10 SPARE 200.00
22 R8 1456.67
SEC-5

100m
40A,
4P

23 Y8 20 6.0 6.0 CU-1F.02.1 1 4370 1456.67 UVR+TIMER+CONTROL


A

24 B8 1456.67
25 R9 32 6.0 6.0 CU-1F.02.2 1 2740 2740.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.02.1 - TOILET 1 530 530.00 UVR+TIMER+CONTROL


27 B9 20 4.0 4.0 FCU-1F.02.2 - BATH 1 250 250.00
28 R10 20 SPARE 200 200.00
29 Y10 SPACE
30 B10 20 SPARE 200 200.00
Total connected Loads (W) 7996.67 7386.67 8206.67 23590.00
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23590.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF2 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF3 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD

BELL
D.SO

D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A

IND
H/D
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00
SEC-1 40A,

BED ROOM
4P 30mA

2 Y1 20 4.0 4.0 2 1 200 / 400 800.00


3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00
4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

BATH
4P 30mA

8 Y3 20 4.0 4.0 1 1500 1500.00


9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 SPACE
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 450.00
SEC-4 40A,
4P 100mA

17 Y6 SPACE
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
22 R8 1220.00
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.03.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 20 4.0 4.0 FCU-1F.03.1 - WC 1 470 470.00
SEC-6 40A,
4P 100mA

26 Y9 32 6.0 6.0 CU-1F.03.2 1 2740 2740.00


27 B9 20 4.0 4.0 FCU-1F.03.2 - BATH 1 1 250 250.00
28 R10 20 SPARE 200 200.00
29 Y10 SPACE
30 B10 20 SPARE 200 200.00
Total connected Loads (W) 6740 8660 7020 22420
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 22420

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF3 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF4 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION:FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 200 / 400 800.00


4P 30mA

2 1
3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00
4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 SPACE
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 SPARE 200 200.00
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 550.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 SPARE 200 200.00
22 R8 1220.00
SEC-5

100m
40A,

UVR+TIMER+CO
4P

23 Y8 20 6.0 6.0 CU-1F.04.1 1 3660 1220.00


A

NTROL
24 B8 1220.00
25 R9 20 6.0 6.0 FCU-1F.04.1 - WC 1 470 470.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.04.2 - BATH 1 250 250.00


27 B9 32 6.0 6.0 CU-1F.04.2 1 2740 2740
28 R10 20 SPARE 200 200.00
29 Y10 SPACE
30 B10 20 SPARE 200 200
Total connected Loads (W) 6840 6920 9160 22920
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 22920

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF4 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF5 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 4 1 200 / 400 1200.00 RING
4 R2 20 SPARE 200.00 200.00
5 Y2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,

SPACE
4P 30mA

8 Y3
9 B3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00
40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 20 4.0 4.0 LPG SENSOR 100.00 100.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 1033.33
SEC-3

100m
40A,

UVR+TIMER+
4P

14 Y5 20 6.0 6.0 CU-1F.05.1 1 3100 1033.33


A

CONTROL
15 B5 1033.33
16 R6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 DINING & SITTING AREA 7 2 50/100 550.00


18 B6 10 SPARE 200 200.00
19 R7 10 SPARE 200.00 200.00
20 Y7 10 2.5 2.5 BED ROOM-1 6 2 1 1 50/100 600.00
21 B7 SPACE
22 R8 32 6.0 6.0 CU-1F.05.2 1 2110 2110.00
SEC-5 40A,
4P 100mA

23 Y8 20 4.0 4.0 FCU-1F.05.1 - WC 1 390 390.00


24 B8 20 4.0 4.0 FCU-1F.05.2 - BATH 1 190 190.00
25 R9 20 SPARE 250 250.00
26 Y9 SPACE
27 B9 20 SPARE 250 250.00
Total connected Loads (W) 7093.33 5673.33 5573.33 18340.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 18340.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF5 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF6 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 SPACE 100.00
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 SPARE 200.00
16 R6 10 2.5 2.5 SITTING AREA DINING 7 2 1 50/100 650.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 SPARE 200.00
22 R8 1220.00
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.06.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 20 4.0 4.0 FCU-1F.06.1 - WC 1 470 470.00
SEC-6 40A,

UVR+TIMER+
4P 100mA

26 Y9 32 6.0 6.0 CU-1F.06.2 1 2740 2740.00


CONTROL
27 B9 20 4.0 4.0 FCU-1F.06.2 - BATH 250 250.00
28 R10 20 SPARE 250 250.00
29 Y10 SPACE
30 B10 20 SPARE 250 250.00
Total connected Loads (W) 6990 9410 6820 23220
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23220

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF6 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF7 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 20 SPARE 200 200.00
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 450.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 SPARE 200.00
22 R8 1033.33
SEC-5

100m
40A,

UVR+TIMER+C
4P

23 Y8 20 6.0 6.0 CU-1F.07.1 1 3100 1033.33


A

ONTROL
24 B8 1033.33
25 R9 20 4.0 4.0 FCU-1F.07.2 - BATH 250 250.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.07.1 - WC 390 390.00


27 B9 32 6.0 6.0 CU-1F.07.2 2740 2740.00
28 R10 20 SPARE 250 250.00
29 Y10 SPACE
30 B10 20 SPARE 250 250.00
Total connected Loads (W) 6383 6873 9023 22280
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 22280

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF7 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF8 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION:FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 1 1 200 / 400 600.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 20 SPARE 200.00
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 SPARE 200 200.00
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 50/100 450.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 9 2 2 50/100 850.00
18 B6 10 2.5 2.5 KITCHEN 3 1 50/100 250.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 SPARE 200 200.00
22 R8 1220.00
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.08.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 32 6.0 6.0 CU-1F.08.2 1 2740 2740.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.08.1 - WC 470 470.00


27 B9 20 4.0 4.0 FCU-1F.08.2 - BATH 250 250.00
28 R10 SPACE
29 Y10 SPACE
30 B10 20 SPARE 250 250.00
Total connected Loads (W) 8610 7240 6970 22820
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 22820

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF8 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF9 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A DSO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

BELL
HOOD
D/W

ISOL

W/M
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 1 1 200 / 400 600.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 20 SPARE 200 200.00
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 20 SPARE 200.00
16 R6 10 2.5 2.5 SITTING AREA DINING 6 2 50/100 500.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 9 3 1 50/100 550.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 6 1 1 50/100 500.00
20 Y7 SPACE
21 B7 10 SPARE 250 250.00
22 R8 1220.00
SEC-7 SEC-6 SEC-5

100m 100m 100m


40A, 40A, 40A,

UVR+TIMER+CO
4P

23 Y8 20 6.0 6.0 CU-1F.09.1 1 3660 1220.00


A

NTROL
24 B8 1220.00
25 R9 1033.33
UVR+TIMER+CO
4P

26 Y9 20 6.0 6.0 CU-1F.09.2 1 3100 1033.33


A

NTROL
27 B9 1033.33
28 R10 20 SPARE 250 250.00
4P

29 Y10 20 4.0 4.0 FCU-1F.09.1 - WC 470 470.00


A

30 B10 20 4.0 4.0 FCU-1F.09.2 -BATH 390 390.00


Total connected Loads (W) 7203 7973 7893 23070
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23070

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF9 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF10 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD

BELL
D.SO

D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A

IND
H/D
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

KITCHEN (W/M)
4P 30mA

2 Y1 20 4.0 4.0 1 1500.00 1500.00


3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 CORRIDOR 1 1 200 / 400 600.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,

LPG SENSOR
4P 30mA

8 Y3 20 4.0 4.0 1 100.00 100.00


9 B3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00
40A TPN ISOLATOR

10 R4 20 SPARE 200 200


11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 20 4.0 4.0 KITCHEN 1 200.00 200.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 DINING & SITTING AREA 7 2 1 50/100 650.00
16 R6 10 SPARE 200.00 200.00
17 Y6 10 2.5 2.5 WC 2 50/100 100.00
18 B6 10 2.5 2.5 BED ROOM-1 & BATH 7 1 1 50/100 550.00
19 R7 1220.00
SEC-4

100m
40A,

UVR+TIMER+
4P

20 Y7 20 6.0 6.0 CU-1F.10.1 1 3660 1220.00


A

CONTROL
21 B7 1220.00
22 R8 20 4.0 4.0 FCU-1F.10.1 - WC 1 470 470.00
SEC-5 40A,
4P 100mA

23 Y8 32 6.0 6.0 CU-1F.10.2 1 2110 2110.00


24 B8 20 4.0 4.0 FCU-1F.10.2 - BATH 1 190 190.00
25 R9 SPACE
26 Y9 SPACE
27 B9 20 SPARE 250.00 250.00
Total connected Loads (W) 6690.00 7130.00 5260.00 19080.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19080.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF10 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF11 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 2 200 / 400 1000.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 SPACE
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 6 2 50/100 400.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 5 3 1 50/100 650.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 11 1 1 50/100 750.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1456.67
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.11.1 1 4370 1456.67


A

CONTROL
24 B8 1456.67
25 R9 20 4.0 4.0 FCU-1F.11.1 -WC 1 530 530.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.11.2 - BATH 1 250 250.00


27 B9 32 6.0 6.0 CU-1F.11.2 1 2990 2740.00
28 R10 20 SPARE 400 400.00
29 Y10 20 SPARE 400 400.00
30 B10 SPACE
7437 7457 8397 23290
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23290

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF11 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF12 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: MCB RATING SMDB-FF2
CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT
RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500 1500.00


12 B4 SPACE 100.00
13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00
SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 550.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1220.00
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.12.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 32 6.0 6.0 CU-1F.12.2 1 2740 2740.00
SEC-6 40A,
4P 100mA

26 Y9 20 4.0 4.0 FCU-1F.12.1 - WC 470 470.00


27 B9 20 4.0 4.0 FCU-1F.12.2 - BATH 250.00
28 R10 20 SPARE 400 400.00
29 Y10 20 SPARE 400 400.00
30 B10 SPACE
Total connected Loads (W) 9310 7540 6170 23020
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23020

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF12 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF13 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: MCB RATING SMDB-FF2
CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT
RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
11 Y4 20 4.0 4.0 BATH 1 1500 1500.00
12 B4 SPACE 100.00
63 A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00


SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 7 2 1 50/100 750.00
SEC-4 40A,
4P 100mA

17 Y6 SPACE
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
22 R8 1220.00
SEC-6 SEC-5

100m 100m
40A, 40A,

UVR+TIMER+C
4P

23 Y8 20 6.0 6.0 CU-1F.13.1 1 3660 1220.00


A

ONTROL
24 B8 1220.00
25 R9 1033.33
UVR+TIMER+C
4P

26 Y9 20 6.0 6.0 CU-1F.13.2 1 3100 1033.33


A

ONTROL
27 B9 1033.33
28 R10 20 SPARE 250 250.00
SEC-7 40A,
4P 100mA

29 Y10 20 4.0 4.0 FCU-1F.13.1 -WC 1 470 470.00


30 B10 20 4.0 4.0 FCU-1F.13.2 -BATH 1 390 390.00
31 R11 20 SPARE 400 400.00
32 Y11 20 SPARE 400 400.00
33 B11 SPACE
Total connected Loads (W) 8053 7823 8093 23970
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23970

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF13 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF14 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

D.SO

BELL
D/W

ISOL
13A

W/M

FCU
FAN
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN D/W 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 SPACE
5 Y2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,

8 Y3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

9 B3 SPACE
40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 20 4.0 4.0 LPG SENSOR 100 100.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 1033.33
SEC-3

100m
40A,

UVR+TIMER+
4P

14 Y5 20 6.0 6.0 CU-1F.14.1 1 3100 1033.33


A

CONTROL
15 B5 1033.33
16 R6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-4 40A,
4P 100mA

17 Y6 SPACE
18 B6 10 2.5 2.5 DINING & SITTING AREA 7 2 50/100 550.00
19 R7 10 SPARE 300.00 300.00
20 Y7 SPACE
21 B7 10 2.5 2.5 BED ROOM-1 7 1 1 1 50/100 650.00
22 R8 20 4.0 4.0 FCU-1F.14.1 -WC 1 390 390.00
SEC-5 40A,
4P 100mA

23 Y8 32 6.0 6.0 CU-1F.14.2 1 2100 2100.00


24 B8 20 4.0 4.0 FCU-1F.14.2 -BATH 1 190 190.00
25 R9 20 SPARE 500 500.00
26 Y9 20 SPARE 400 400.00
27 B9 SPACE
5523.33 7433.33 5323.33 18280.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 18280.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF14 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF15 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING
CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT
RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
11 Y4 20 4.0 4.0 BATH 1 1500 1500.00
12 B4 SPACE
63 A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00


SEC-3

30mA
40A,
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 350.00
SEC-4 40A,
4P 100mA

17 Y6 SPACE
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 750.00
22 R8 1220.00
SEC-6 SEC-5

100m 100m
40A, 40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.15.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 1033.33
UVR+TIMER+
4P

26 Y9 20 6.0 6.0 CU-1F.15.2 1 3100 1033.33


A

CONTROL
27 B9 1033.33
28 R10 20 SPARE 300 300.00
SEC-7 40A,
4P 100mA

29 Y10 20 4.0 4.0 FCU-1F.15.1 - WC 470 470.00


30 B10 20 4.0 4.0 FCU-1F.15.2 -BATH 390 390.00
31 R11 20 SPARE 400 400.00
32 Y11 20 SPARE 400 400.00
33 B11 SPACE
Total connected Loads (W) 7703 7823 7993 23520
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23520

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF15 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF16 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: MCB RATING SMDB-FF2
CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT
RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
11 Y4 20 4.0 4.0 BATH 1 1500 1500.00
12 B4 SPACE
63A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00


SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 5 2 1 50/100 550.00
SEC-4 40A,
4P 100mA

17 Y6 SPACE
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 10 2.5 2.5 BED ROOM & MASTER BED ROOM 7 3 1 50/100 650.00
22 R8 1220.00
SEC-6 SEC-5

100m 100m
40A, 40A,

UVR+TIMER+CO
4P

23 Y8 20 6.0 6.0 CU-1F.16.1 1 3660 1220.00


A

NTROL
24 B8 1220.00
25 R9 1033.33
UVR+TIMER+CO
4P

26 Y9 20 6.0 6.0 CU-1F.16.2 1 3100 1033.33


A

NTROL
27 B9 1033.33
28 R10 20 SPARE 300 300.00
SEC-7 40A,
4P 100mA

29 Y10 20 4.0 4.0 FCU-1F.16.1 -WC 1 470.00


30 B10 20 4.0 4.0 FCU-1F.16.2 -BATH 1 390 390.00
31 R11 20 SPARE 400 400.00
32 Y11 20 SPARE 400 400.00
33 B11 SPACE
Total connected Loads (W) 7903 7823 7893 23620
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23620

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF16 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF17 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION:FIRST FLOOR FLAT
Fed From: MCB RATING SMDB-FF2
CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT
RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL

FCU
D/W

ISOL
13A

W/M
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500 1500.00
7 R3 STORE 2 1
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 KITCHEN 1 200 200.00
11 Y4 20 4.0 4.0 BATH 1 1500 1500.00
12 B4 SPACE 100.00
63A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500 1500.00


SEC-3

30mA
4P

14 Y5 20 4.0 4.0 LPG SENSOR 100 100.00


15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 4 2 50/100 400.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 8 3 1 50/100 800.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 10 1 1 50/100 700.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1220.00
SEC-6 SEC-5

100m 100m
40A, 40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-1F.17.1 1 3660 1220.00


A

CONTROL
24 B8 1220.00
25 R9 1033.33
UVR+TIMER+
4P

26 Y9 20 6.0 6.0 CU-1F.17.2 1 3100 1033.33


A

CONTROL
27 B9 1033.33
28 R10 20 SPARE 300 300.00
SEC-7 40A,
4P 100mA

29 Y10 20 4.0 4.0 FCU-1F.17.1 - WC 1 470 470.00


30 B10 20 4.0 4.0 FCU-1F.17.2 - BATH 1 390 390.00
31 R11 20 SPARE 500 500.00
32 Y11 20 SPARE 400 400.00
33 B11 SPACE
Total connected Loads (W) 7253 8623 7343 23220
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23220

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF17 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF18 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 CORRIDOR 1 1 200 / 400 600.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 20 SPARE 300 300.00
SEC-2 40A,

8 Y3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


4P 30mA

9 B3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 20 4.0 4.0 LPG SENSOR 100.00 100.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 DINING & SITTING AREA 6 2 1 50/100 600.00
16 R6 10 SPARE 300.00 300.00
17 Y6 10 2.5 2.5 WC 2 50/100 200.00
18 B6 10 2.5 2.5 BED ROOM-1 & BATH 5 1 1 50/100 450.00
19 R7 20 4.0 4.0 FCU-1F.18.2 -BATH 1 190 190.00
SEC-4

100m
40A,
4P

20 Y7 20 4.0 4.0 FCU-1F.18.1 -WC 1 390 390.00


A

21 B7 32 6.0 6.0 CU-1F.18.2 1 2100 2110.00


22 R8 1033.33
SEC-5 40A,

UVR+TIMER+
4P 100mA

23 Y8 20 6.0 6.0 CU-1F.18.1 1 3100 1033.33


CONTROL
24 B8 1033.33
25 R9 20 SPARE 400 400.00
26 Y9 20 SPARE 400 400.00
27 B9 SPACE
Total connected Loads (W) 5623.33 5623.33 7893.33 19140.00
5.62 5.62 7.89
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19140.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF18 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF19 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 4 1 200 / 400 1200.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 LPG SENSOR 100 100.00
6 B2 SPACE
7 R3 20 SPARE 250.00 250.00
SEC-2 40A,

8 Y3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


4P 30mA

9 B3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 DINING & SITTING AREA 2 2 50/100 300.00


15 B5 SPACE
16 R6 10 SPARE 300.00 300.00
17 Y6 10 2.5 2.5 WC 2 50 100.00
18 B6 10 2.5 2.5 BED ROOM-1 5 1 1 1 50/100 550.00
19 R7 32 6.0 6.0 CU-1F.19.1 1 2740 2740.00
SEC-4

100m
40A,
4P

20 Y7 SPACE
A

21 B7 20 4.0 4.0 FCU-1F.19.1 -WC 250 250.00


22 R8 20 SPARE 1 300 300.00
SEC-5 40A,
4P 100mA

23 Y8 20 4.0 4.0 FCU-1F.19.2 - BATH 190 190.00


24 B8 32 6.0 4.0 CU-1F.19.2 2100 2100.00
25 R9 20 SPARE 400 400.00
26 Y9 20 SPARE 400 400.00
27 B9 SPACE
Total connected Loads (W) 7390.00 4390.00 6400.00 18180.00
7.39 4.39 6.40 18.18
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 18180.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF19 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-FF20 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: FIRST FLOOR FLAT
Fed From: SMDB-FF2
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO
SHAVER
OUTLET

EXHAUST
COOKER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 4 1 200 / 400 1200.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 LPG SENSOR 100 100.00
6 B2 SPACE
7 R3 20 SPARE 200.00 200.00
SEC-2 40A,

8 Y3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


4P 30mA

9 B3 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 DINING & SITTING AREA 2 2 50/100 300.00


15 B5 SPACE
16 R6 10 SPARE 200.00 200.00
17 Y6 10 2.5 2.5 WC 2 50 100.00
18 B6 10 2.5 2.5 BED ROOM-1 5 1 1 1 50/100 550.00
19 R7 SPACE
SEC-4

100m
40A,
4P

20 Y7 32 6.0 6.0 CU-1F.20.1 1 2740 2740.00


A

21 B7 20 4.0 4.0 FCU-1F.20.1 - WC 250 250.00


22 R8 20 SPARE 300.00
SEC-5 40A,
4P 100mA

23 Y8 20 4.0 4.0 FCU-1F. 20.2 -BATH 1 190 190.00


24 B8 32 6.0 6.0 CU-1F.20.2 1 2100 2100.00
25 R9 20 SPARE 400 400.00
26 Y9 20 SPARE 400 400.00
27 B9 SPACE
Total connected Loads (W) 4500.00 7130.00 6400.00 18030.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 18030.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-FF20 REV.A

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-TS1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SECOND FLOOR ELECTRICAL ROOM
Fed From: SMDB-GF
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

13A TSSO

EXTRACT

OTHER
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 1st FLOOR CORRIDOR 11 50.00 550.00


2 Y1 10 2.5 2.5 2nd FLOOR CORRIDOR 11 50.00 550.00
40A, 4P
100mA
SEC-1

3 B1 10 2.5 2.5 3rd FLOOR CORRIDOR 11 50.00 550.00


4 R2 10 2.5 2.5 1st CORRIDOR 11 50.00 550.00
5 Y2 10 2.5 2.5 2nd CORRIDOR 11 50.00 550.00
6 B2 10 2.5 2.5 3rd CORRIDOR 11 50.00 550.00
7 R3 10 2.5 2.5 1st CORRIDOR & LOBBY 6 50.00 300.00
SEC-2 40A,
4P 100mA

8 Y3 10 2.5 2.5 2nd CORRIDOR & LOBBY 6 50.00 300.00


9 B3 10 2.5 2.5 3rd CORRIDOR & LOBBY 6 50.00 300.00
10 R4 10 2.5 2.5 OPEN TO SKY 8 50.00 400.00
11 Y4 10 2.5 2.5 OPEN TO SKY 8 50.00 400.00
40A TPN ISOLATOR

12 B4 SPACE 0.00
13 R5 SPACE 0.00
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 OPEN TO SKY 8 50.00 400.00


15 B5 10 2.5 2.5 OPEN TO SKY 8 50.00 400.00
16 R6 10 2.5 2.5 SUBSTATION AREA ATTIC SLAB 8 50.00 400.00
17 Y6 10 SPARE 100.00 100.00
18 B6 SPACE 50.00 0.00
19 R7 32 4.0 4.0 1st FLOOR CORRIDOR 5 200.00 1000.00 RING
SEC-4 40A,

20 Y7 32 4.0 4.0 2nd FLOOR CORRIDOR 5 200.00 1000.00 RING


4P 30mA

21 B7 32 4.0 4.0 3rd FLOOR CORRIDOR 5 200.00 1000.00 RING


22 R8 32 4.0 4.0 1st FLOOR CORRIDOR 7 200.00 1400.00 RING
23 Y8 32 4.0 4.0 2nd FLOOR CORRIDOR 7 200.00 1400.00 RING
24 B8 32 4.0 4.0 3rd FLOOR CORRIDOR 7 200.00 1400.00 RING
25 R9 20 4.0 4.0 1st SERVICE ROOM & CORRIDOR 3 200.00 600.00
SEC-5 40A,

26 Y9 20 4.0 4.0 2nd SERVICE ROOM & CORRIDOR 3 200.00 600.00


4P 30mA

27 B9 20 4.0 4.0 3rd SERVICE ROOM & CORRIDOR 3 200.00 600.00


28 R10 50.00 0.00
29 Y10 20 SPARE 50.00 300.00
30 B10 20 SPARE 50.00 250.00
Total connected Loads (W) 5200.00 5600.00 5050.00 15850.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 15850.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-TS1 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: EDB-TS1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: SECOND FLOOR ELECTRICAL ROOM
Fed From: ESMDB-GF
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE

WATT
SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT

OTHER
13A DSO
ROOM/AREA

OUTLET

TP+N+E
W/UNIT

15A S/O
REMARKS

CHAN

FLEX

1SOL
SH/O

W/M
FCU

FAN
W/H
LTG

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 1st FLOOR CORRIDOR 12 50.00 600.00


2 Y1 10 2.5 2.5 2nd FLOOR CORRIDOR 12 50.00 600.00
40A, 4P
100mA
SEC-1

3 B1 10 2.5 2.5 3rd FLOOR CORRIDOR 12 50.00 600.00


4 R2 10 2.5 2.5 1st FLOOR CORRIDOR 12 50.00 600.00
5 Y2 10 2.5 2.5 2nd FLOOR CORRIDOR 12 50.00 600.00
6 B2 10 2.5 2.5 3rd FLOOR CORRIDOR 12 50.00 600.00
7 R3 10 2.5 2.5 1st CORRIDOR & LOBBY 7 50.00 350.00
SEC-2 40A,
4P 100mA

8 Y3 10 2.5 2.5 2nd CORRIDOR & LOBBY 7 50.00 350.00


40A TPN ISOLATOR

9 B3 10 2.5 2.5 3rd CORRIDOR & LOBBY 7 50.00 350.00


10 R4 10 2.5 2.5 1st TELE. & ELECTRICAL ROOM 4 50.00 200.00
11 Y4 10 2.5 2.5 2nd TELE. & ELECTRICAL ROOM 4 50.00 200.00
12 B4 10 2.5 2.5 3rd TELE. & ELECTRICAL ROOM 4 50.00 200.00
13 R5 10 2.5 2.5 1st SERVICE ROOM & GARBAGE 4 50.00 200.00
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 2nd SERVICE ROOM & GARBAGE 4 50.00 200.00


15 B5 10 2.5 2.5 3rd SERVICE ROOM & GARBAGE 4 50.00 200.00
16 R6 10 2.5 2.5 1st WATER METER CABINET 2 50.00 100.00
17 Y6 10 2.5 2.5 2nd WATER METER CABINET 2 50.00 100.00
18 B6 10 2.5 2.5 3rd WATER METER CABINET 2 50.00 100.00
19 R7 32 4.0 4.0 1st FLOR TELEPHONE & ELECTRICL ROOM 3 400.00 1200.00 RING
SEC-4 40A,

20 Y7 32 4.0 4.0 2nd FLOR TELEPHONE & ELECTRICL ROOM 3 400.00 1200.00 RING
4P 30mA

21 B7 32 4.0 4.0 3rd FLOR TELEPHONE & ELECTRICL ROOM 3 400.00 1200.00 RING
22 R8 20 4.0 4.0 CDT RACK FIRST FLOOR TEL ROOM 1 1500.00 1500.00
23 Y8 20 SPARE 300.00 600.00
24 B8 SPARE 300.00 600.00
Total connected Loads (W) 4750.00 3850.00 3850.00 12450.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 12450.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-TS1 REV.A
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF1 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD

BELL
D.SO

D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A

IND
H/D
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00
SEC-1 40A,

CORRIDOR (ONU)
4P 30mA

2 Y1 20 4.0 4.0 1 200 / 400 400.00


3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
6 B2 20 4.0 4.0 STORE 1 1 200 / 400 600.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,

BATH
4P 30mA

8 Y3 20 4.0 4.0 1 1500.00 1500.00


9 B3 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
40A TPN ISOLATOR

10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00


11 Y4 SPACE
12 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 BED ROOM-1 3 2 1 50/100 450.00
16 R6 SPACE
17 Y6 10 2.5 2.5 WC 2 50.00 100.00
18 B6 10 2.5 2.5 DINING & SITTING AREA 9 2 1 50/100 650.00
19 R7 1456.67
SEC-4

100m
40A,

UVR+TIMER+CO
4P

20 Y7 20 6.0 6.0 CU-RF.01.1 1 4370 1456.67


A

NTROL
21 B7 1456.67
22 R8 20 4.0 4.0 FCU-RF.01.1 530 530.00
SEC-5 40A,
4P 100mA

23 Y8 32 6.0 6.0 CU-RF.01.2 1 2740 2740.00


24 B8 20 4.0 4.0 FCU-RF.01.2 250 250.00
25 R9 SPACE
26 Y9 SPACE
27 B9 20 SPARE 300 300.00
Total connected Loads (W) 6786.67 7696.67 5606.67 20090.00
6.79 7.70 5.61
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 20090.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF1 REV.0

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF2 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING LOAD PER CIRCUIT
CONNECTED LOAD / POINTS
RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT

SIZE mm2
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

OOUTLET

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
ISOL
D /W

W/M
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR(ONU) 1 200 / 400 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 20 4.0 4.0 KITCHEN 1 200.00 200.00
63 A TPN ISOLATOR

13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00


SEC-3

30mA
40A,
4P

14 Y5 SPACE
15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 2 2 50/100 300.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 6 2 1 50/100 600.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 10 2.5 2.5 BATH 2 1 50/100 200.00
21 B7 SPACE
22 R8 1456.67
SEC-6 SEC-5

100m 100m
40A, 40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-RF.02.1 1 4370 1456.67


A

CONTROL
24 B8 1456.67
25 R9 1220.00
UVR+TIMER+
4P

26 Y9 20 6.0 6.0 CU-RF.02.2 1 3660 1220.00


A

CONTROL
27 B9 1220.00
28 R10 SPACE
SEC-7 40A,
4P 100mA

29 Y10 20 4.0 4.0 FCU-RF.02.1 530 530.00


30 B10 20 4.0 4.0 FCU-RF.02.2 470 470.00
31 R11 SPACE
32 Y11 SPACE
33 B11 20 SPARE 300.00
Total connected Loads (W) 7176.67 8606.67 8346.67 24130.00
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 24130.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF2 REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF3 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2 WATT
INCOMER

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A D.SO
13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD

BELL
D/W

ISOL

W/M

FCU
W/H
LTG

15A

32A
H/D

IND
AC
R Y B

1 R1 20 4.0 4.0 CORRIDOR 1 400.00 400.00


SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00


4 R2 20 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00


12 B4 20 4.0 4.0 KITCHEN 1 200.00 200.00
13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-3

30mA
40A,
4P

14 Y5 SPACE
15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 4 2 1 50/100 500.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 6 2 1 50/100 600.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 600.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1456.67
SEC-5

100m
40A,

UVR+TIMER+
4P

23 Y8 20 6.0 6.0 CU-RF.03.1 1 4370 1456.67


A

CONTROL
24 B8 1456.67
25 R9 1220.00
SEC-6 40A,

UVR+TIMER+
4P 100mA

26 Y9 20 6.0 6.0 CU-RF.03.2 1 1 3660 1220.00


CONTROL
27 B9 1220.00
28 R10 20 4.0 4.0 FCU-RF.02.2 470 470.00
29 Y10 20 4.0 4.0 FCU-RF.02.1 530 530.00
30 B10 20 SPARE 300
Total connected Loads (W) 7946.67 8406.67 7876.67 24230.00
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 24230.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF3 REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF4 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 SPACE
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,
40A TPN ISOLATOR

8 Y3 SPACE
4P 30mA

9 B3 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00


10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00
11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
13 R5 SPACE
SEC-3 40A,
4P 100mA

14 Y5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00


15 B5 10 2.5 2.5 DINING & SITTING AREA 6 2 50/100 500.00
16 R6 SPACE
17 Y6 SPACE
18 B6 10 2.5 2.5 BED ROOM-1 6 1 1 1 50/100 600.00
19 R7 1456.67
SEC-5 SEC-4

100m 100m
40A, 40A,

UVR+TIMER+CO
4P

20 Y7 20 6.0 6.0 CU-RF.04.1 1 4370 1456.67


A

NTROL
21 B7 1456.67
22 R8 32 6.0 6.0 CU-RF.04.2 1 2740 2740.00
UVR+TIMER+CO
4P

23 Y8 20 4.0 4.0 FCU-RF.04.1 1 530 530.00


A

NTROL
24 B8 20 4.0 4.0 FCU-RF.04.2 1 250 250.00
Total connected Loads (W) 6586.67 7396.67 5106.67 19090.00
6.59 7.40 5.11 19.09
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19090.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF4 REV.0

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF5 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE WATT
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR(ONU) 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 LPG SENSOR 100.00 100.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00


12 B4 20 4.0 4.0 KITCHEN 1
13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-3

30mA
4P

14 Y5 SPACE
15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 6 2 1 50/100 500.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 6 2 1 50/100 500.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1456.67
SEC-7 SEC-6 SEC-5

100m 100m 100m


40A, 40A, 40A,

UVR+TIMER+CO
4P

23 Y8 20 6.0 6.0 CU-RF.05.1 1 4370 1456.67


A

NTROL
24 B8 1456.67
25 R9 1220.00
UVR+TIMER+CO
4P

26 Y9 20 6.0 6.0 CU-RF.05.2 1 3660 1220.00


A

NTROL
27 B9 1220.00
28 R10 20 4.0 4.0 FCU-RF.05.1 530 530.00
4P

29 Y10 SPACE
A

30 B10 20 4.0 4.0 FCU-RF.05.2 470 470.00


Total connected Loads (W) 8006.67 7776.67 7746.67 23530.00
8.01 7.78 7.75 23.53
CABLE SIZE 4C 16 mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23530.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF5 REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF6 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR(ONU) 1 200 / 400 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00


4 R2 32 4.0 4.0 SITTING AREA DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 2 1 200 / 400 800.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 LPG SENSOR 100.00 100.00
63 A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00


12 B4 20 4.0 4.0 KITCHEN 1 200.00 200.00
13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-3

30mA
4P

14 Y5 SPACE
15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 4 2 1 50/100 500.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 6 2 1 50/100 500.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 8 1 50/100 500.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1456.67
SEC-7 SEC-6 SEC-5

100m 100m 100m


40A, 40A, 40A,

UVR+TIMER+C
4P

23 Y8 20 6.0 6.0 CU-RF.06.1 1 4370 1456.67


A

ONTROL
24 B8 1456.67
25 R9 1220.00
UVR+TIMER+C
4P

26 Y9 20 6.0 6.0 CU-RF.06.2 1 3660 1220.00


A

ONTROL
27 B9 1220.00
28 R10 SPACE
4P

29 Y10 20 4.0 4.0 FCU-RF.06.1 1 530 530.00


A

30 B10 20 4.0 4.0 FCU-RF.06.2 1 470 470.00


Total connected Loads (W) 7476.67 8306.67 7946.67 23730.00
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16mm2 Y/G ECC TOTAL CONNECTED: 23730.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF6 REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF7 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 STORE 1 1 200 / 400 600.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,
40A TPN ISOLATOR

8 Y3 SPACE
4P 30mA

9 B3 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00


10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00
11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 DINING & SITTING AREA 11 2 1 50/100 850.00
16 R6 SPACE
17 Y6 SPACE
18 B6 10 2.5 2.5 BED ROOM-1 4 1 1 50/100 400.00
19 R7 1456.67
SEC-5 SEC-4

100m 100m
40A, 40A,

UVR+TIMER+CO
4P

20 Y7 20 6.0 6.0 CU-RF.07.1 1 4370 1456.67


A

NTROL
21 B7 1456.67
22 R8 20 4.0 4.0 FCU-RF.07.1 1 530 530.00
4P

23 Y8 20 4.0 4.0 FCU-RF.07.2 250 250.00


A

24 B8 32 6.0 6.0 CU-RF.07.2 1 2740 2740.00


Total connected Loads (W) 6786.67 5306.67 7746.67 19840.00
6.79 5.31 7.75 19.84
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19840.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF7 REV.0

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF8 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
LOAD PER CIRCUIT
MCB RATING

CONNECTED LOAD / POINTS


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2 WATT

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET

TP+N+E
W/UNIT

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 CORRIDOR(ONU) 1 400.00 400.00
SEC-1 40A,

2 Y1 20 4.0 4.0 BED ROOM-1 2 1 200 / 400 800.00


4P 30mA

3 B1 20 4.0 4.0 KITCHEN (D/W) 1 1500.00 1500.00


4 R2 32 4.0 4.0 SITTING AREA & DINING 3 1 200 / 400 1000.00 RING
5 Y2 20 4.0 4.0 MASTER BED ROOM 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00
7 R3 20 4.0 4.0 STORE 1 1 200 / 400 600.00
40A, SEC-2 40A,

8 Y3 20 4.0 4.0 BATH 1 1500.00 1500.00


4P 30mA

9 B3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


10 R4 20 4.0 4.0 LPG SENSOR 100.00 100.00
63A TPN ISOLATOR

11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00


12 B4 20 4.0 4.0 KITCHEN 1
13 R5 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-3

30mA
4P

14 Y5 SPACE
15 B5 SPACE
16 R6 10 2.5 2.5 SITTING AREA DINING 3 2 50/100 350.00
SEC-4 40A,
4P 100mA

17 Y6 10 2.5 2.5 BED ROOM & MASTER BED ROOM 9 3 2 50/100 950.00
18 B6 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
19 R7 10 2.5 2.5 CORRIDOR 6 1 50/100 400.00
20 Y7 SPACE
21 B7 SPACE
22 R8 1456.67
SEC-7 SEC-6 SEC-5

100m 100m 100m


40A, 40A, 40A,

UVR+TIMER+CO
4P

23 Y8 20 6.0 6.0 CU-RF.08.1 1 4370 1456.67


A

NTROL
24 B8 1456.67
25 R9 1220.00
UVR+TIMER+CO
4P

26 Y9 20 6.0 6.0 CU-RF.08.2 1 3660 1220.00


A

NTROL
27 B9 1220.00
28 R10 20 4.0 4.0 FCU-RF.08.1 1 530 530.00
4P

29 Y10 SPACE
A

30 B10 20 4.0 4.0 FCU-RF.08.2 1 470 470.00


Total connected Loads (W) 7556.67 8226.67 7746.67 23530.00
CABLE SIZE 4C 16mm2 XLPE/SWA/PVC + 1C 16 mm2 Y/G ECC TOTAL CONNECTED: 23530.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF8 REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF9 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 STORE 1 1 200 / 400 600.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 SPACE
SEC-2 40A,
40A TPN ISOLATOR

8 Y3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING


4P 30mA

9 B3 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


10 R4 20 4.0 4.0 KITCHEN 1 200.00 200.00
11 Y4 20 4.0 4.0 LPG SENSOR 100.00 100.00
12 B4 20 4.0 4.0 BATH 1 1500.00 1500.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 DINING & SITTING AREA 5 2 1 50/100 550.00
16 R6 SPACE
17 Y6 10 2.5 2.5 WC 2 50.00 100.00
18 B6 10 2.5 2.5 BED ROOM-1 6 1 1 50/100 500.00
19 R7 1456.67
SEC-5 SEC-4

100m 100m
40A, 40A,

UVR+TIMER+CO
4P

20 Y7 20 4.0 4.0 CU-RF.09.1 1 4370 1456.67


A

NTROL
21 B7 1456.67
22 R8 32 6.0 6.0 CU-RF.09.2 1 2740 2740.00
4P

23 Y8 20 4.0 4.0 FCU-RF.09.1 1 530 530.00


A

24 B8 20 4.0 4.0 FCU-RF.09.2 1 250 250.00


Total connected Loads (W) 7596.67 5686.67 6456.67 19740.00
7.60 5.69 6.46 19.74
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19740.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF9 REV.0

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF10 LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLAT
Fed From: SMDB-RF1
MCB RATING

CONNECTED LOAD / POINTS LOAD PER CIRCUIT WATT


RATING OF

RATING OF

ECC WIRE
CCT WIRE
SIZE mm2

SIZE mm2
INCOMER

IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXHAUST
COOKER
ROOM/AREA

SHAVER
OUTLET

OUTLET
W/UNIT

TP+N+E

POINT
REMARKS

CHAN

HOOD
D.SO

BELL
D/W

ISOL
13A

W/M

FCU
LTG

W/H
15A

32A
H/D

IND
R Y B

AC
1 R1 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
SEC-1 40A,

2 Y1 20 4.0 4.0 KITCHEN (W/M) 1 1500.00 1500.00


4P 30mA

3 B1 32 4.0 4.0 DINING & SITTING AREA 3 1 200 / 400 1000.00 RING
4 R2 20 4.0 4.0 KITCHEN 1 1500.00 1500.00
5 Y2 20 4.0 4.0 STORE 2 1 200 / 400 800.00
6 B2 20 4.0 4.0 CORRIDOR (ONU) 1 200 / 400 400.00
7 R3 32 4.0 4.0 KITCHEN 1 3 200 / 400 1400.00 RING
SEC-2 40A,
40A TPN ISOLATOR

8 Y3 SPACE
4P 30mA

9 B3 20 4.0 4.0 BED ROOM 2 1 200 / 400 800.00


10 R4 20 4.0 4.0 KITCHEN 1
11 Y4 20 4.0 4.0 BATH 1 1500.00 1500.00
12 B4 20 4.0 4.0 LPG SENSOR 100.00 100.00
13 R5 10 2.5 2.5 KITCHEN 2 1 50/100 200.00
SEC-3 40A,
4P 100mA

14 Y5 SPACE
15 B5 10 2.5 2.5 DINING & SITTING AREA 5 2 50/100 450.00
16 R6 SPACE
17 Y6 SPACE
18 B6 10 2.5 2.5 BED ROOM-1 9 1 1 1 50/100 750.00
19 R7 1456.67
SEC-5 SEC-4

100m 100m
40A, 40A,

UVR+TIMER+CO
4P

20 Y7 20 6.0 6.0 CU-RF.10.1 1 4370 1456.67


A

NTROL
21 B7 1456.67
22 R8 20 4.0 4.0 FCU-RF.10.1 1 530.00 530.00
4P

23 Y8 20 4.0 4.0 FCU-RF.10.2 1 250.00 250.00


A

24 B8 32 6.0 6.0 CU-RF.10.2 1 2740.00 2740.00


Total connected Loads (W) 6586.67 5506.67 7696.67 19790.00
6.59 5.51 7.70 19.79
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 19790.00

PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF10 REV.0

Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,

*Armored cable to be used for all external services


PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: DB-RF LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLOOR ELEC ROOM
Fed From: SMDB-RF2
LOAD PER CIRCUIT

MCB RATING
CONNECTED LOAD / POINTS
RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

13A TSSO

EXTRACT

OTHER
ROOM/AREA

OUTLET
W/UNIT

TP+N+E
15A S/O
REMARKS

CHAN

1SOL
FLEX
SH/O

W/M
FCU

FAN
LTG

W/H

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 CORRIDOR 11 50.00 550.00


SEC-1 40A,
4P 100mA

2 Y1 10 2.5 2.5 CORRIDOR 13 50.00 650.00


3 B1 10 2.5 2.5 ROOF 5 50.00 250.00
4 R2 SPACE 50.00 0.00
5 Y2 10 2.5 2.5 ROOF 5 50.00 250.00
6 B2 SPACE 50.00 0.00
7 R3 10 2.5 2.5 ROOF 7 50.00 350.00
SEC-2 40A,
4P 100mA

8 Y3 10 2.5 2.5 ROOF 5 50.00 250.00


9 B3 SPACE 50.00 0.00
10 R4 10 2.5 2.5 ROOF 10 50.00 500.00
11 Y4 SPACE 50.00 0.00
12 B4 SPACE 50.00 0.00
13 R5 20 4.0 4.0 ROOF 4 200.00 800.00
SEC-3 40A,

14 Y5 32 4.0 4.0 LOBBY & CORRIDOR 7 200.00 1400.00 RING


40A TPN ISOLATOR

4P 30mA

15 B5 20 4.0 4.0 ROOF DECK 4 200.00 800.00


16 R6 20 4.0 4.0 CORRIDOR 4 200.00 800.00
17 Y6 SPACE
18 B6 20 4.0 4.0 ROOF 3 200.00 600.00
19 R7 20 SPARE 200.00 200.00
SEC-4

30mA
40A,
4P

20 Y7 20 4.0 4.0 ROOF DECK 4 200.00 800.00


21 B7 20 4.0 4.0 ROOF DECK 4 200.00 800.00
22 R8 20 SPARE 200.00 200.00
SEC-5 40A,
4P 100mA

23 Y8 20 SPARE 200.00 200.00


24 B8 20 SPARE 200.00 200.00
25 R9 10 2.5 2.5 ROOF DECK 6 50.00 300.00
26 Y9 10 2.5 2.5 ROOF DECK 7 50.00 350.00
27 B9 10 2.5 2.5 ROOF DECK 10 50.00 500.00
28 R10 1000.00
SEC-6

30mA
40A,

32A TPN SOCKET OUTLET FOR


4P

29 Y10 20 4X1CX6mm2 PVC/SC 1 3000.00 1000.00


CLEANING CRADLE
30 B10 1000.00
31 R11 1000.00
SEC-7 40A,

32A TPN SOCKET OUTLET FOR


32 Y11 20 4X1CX6mm2 PVC/SC 1 3000.00 1000.00
4P 30mA

CLEANING CRADLE
33 B11 1000.00
34 R12 SPACE
35 Y12 SPACE
36 B12 20 SPARE 300.00 300.00
Total connected Loads (W) 5700.00 5900.00 5450.00 17050.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 17.05
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) DB-RF REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
PROJECT: COMMERCIAL & RESIDENTIAL BUILDING
DB No: EDB-RF LOAD DISTRIBUTION SCHEDULE (3-PHASE) LOCATION: ROOF FLOOR ELEC ROOM
Fed From: ESMDB-RF
LOAD PER CIRCUIT

MCB RATING
CONNECTED LOAD / POINTS
RATING OF

RATING OF

ECC WIRE
CCT WIRE
WATT
INCOMER

SIZE mm2

SIZE mm2
IN AMPS
CIR. NO
SL.NO.
ELCB

13A SSO

EXTRACT
13A D.SO

OTHER
ROOM/AREA

OUTLET
W/UNIT

TP+N+E
15A S/O
REMARKS

CHAN

1SOL
FLEX
SH/O

W/M
FCU

FAN
LTG

W/H

32A
H/D

IND
R Y B

1 R1 10 2.5 2.5 CORRIDOR 12 50.00 600.00


SEC-1 40A,
4P 100mA

2 Y1 10 2.5 2.5 CORRIDOR 13 50.00 650.00


40A TPN ISOLATOR

3 B1 10 2.5 2.5 TELEPHONE & ELECTRICAL 4 50.00 200.00


4 R2 10 2.5 2.5 GSM ROOM 2 50.00 100.00
5 Y2 10 SPARE 400.00
6 B2 10 SPARE 400.00
7 R3 32 4.0 4.0 GSM ROOM 4 400.00 1600.00 RING
SEC-2 40A,

8 Y3 20 SPARE 200.00
4P 30mA

9 B3 32 4.0 4.0 TELEPHONE & ELECTRICAL 3 400.00 1200.00 RING


10 R4 SPACE
11 Y4 20 SPARE 300.00 300.00
12 B4 20 SPARE 300.00 300.00
Total connected Loads (W) 2300.00 1550.00 2100.00 5950.00
CABLE SIZE 4C 10mm2 XLPE/SWA/PVC + 1C 10mm2 Y/G ECC TOTAL CONNECTED: 5950.00
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING (MERAAS PLOT AT AL SATWA) EDB-RF REV.0
Ex. FAN = Exhaust Fan, SH.SO = Shaver Socket - outlet, W/H = Water Heater, H/D = Hand Dryer, FCU = FAN COOLING UNIT,
*Armored cable to be used for all external services
REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL SATWA
PROJECT:
LOCATION OF GROUND FLOOR
COMPLETION DATE: LOAD DISTRIBUTION SCHEDULE (3-PHASE) LV ROOM
MDB/SMDB: ESMDB-S

PROPOSED TYPE & No. OF kWh


RATING-AMPS CABLE SIZE CONNECTED LOAD - Kw METERS
CIRCUIT/ FAULT
ECC SIZE-
FEEDER SP/TP DUTY CABLE TYPE
2/4 X 2/3/4C X IC, mm2 R - PH Y - PH B - PH 1 - PH 3 - PH 3 - PH LV
REMARKS
F/S CONNEC
DB No. ACB MCCB kA CT
ISO IC mm2 mm2 kW kW kW TED (1) (2) (3) (4)

LOAD
INCOMER TP 400 35 FIRE RATED CABLE 4C-300 1C-150 68.40 67.15 67.04 0
OUTGOING:

EDF-GF1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 2.95 3.65 2.70 9.30

XLPE/SWA/FIRE
ESMDB-RF TP 100 35 4C-35 1C-16 14.63 13.88 14.43 42.95
RATED CABLE
XLPE/SWA/FIRE
LIFT-1 TP 40 35 4C-10 1C-10 3.67 3.67 3.67 11.00 300mA ELCB
RATED CABLE
XLPE/SWA/FIRE
LIFT-2 TP 40 35 4C-10 1C-10 3.67 3.67 3.67 11.00 300mA ELCB
RATED CABLE
XLPE/SWA/FIRE
LIFT-3 TP 40 35 4C-10 1C-10 3.67 3.67 3.67 11.00 300mA ELCB
RATED CABLE
XLPE/SWA/FIRE
ESMDB-BF TP 200 35 4C-95 1C-50 33.07 32.77 33.06 98.90
RATED CABLE

EDB-TS1 TP 40 35 XLPE/SWA/PVC 4C-10 1C-10 4.75 3.85 3.85 12.45

MAIN TEL ROOM TP 63 35 XLPE/SWA/PVC 4C-16 1C-16 1.00 1.00 1.00 3.00 100mA ELCB

MAIN TEL ROOM TP 63 35 XLPE/SWA/PVC 4C-16 1C-16 1.00 1.00 1.00 3.00 100mA ELCB

ESMDB -S CONNECTED TO:


TOTAL CONNECTED LOAD PER PHASE 68.40 67.15 67.04 202.60 0
MDB-2

MAX. CONNECTED (3PH) 202.60 kW 1 TOTAL CONNECTED LOAD (3 PH) 202.60 kW


Type of Meter

REESIDENTIAL & COMMERCIAL BUILDING DUBAI -AL


PROJECT:
SATWA ESMDB-S Rev.0
CONSULTANT: Dubai - Al Jazeera Engineering Consultants
PLOT NO: 3342846 Al Satwa 334