Design Thinking Week 11 GROUP 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Aleffka Muhammad ar rafi

I gede bagus ecky wahyudi


Muhammad alnouval Habibi
Lanang wiratama
Akmal alfitrah
Naufal fahmi
MR.ABOX
MVP name
Mr. Abox (Skinless Sunflowerseeds)

Initial situation Plan Results


Persona Vision& Roadmap Conclusions/ next steps
Who is this MVP for? What is the product vision?
More focused on students and people in Give a simpler and neat way of eating sunflower seeds.
What are the most important
general
What does the roadmap look like? findings from all iterations?
The roadmap looks like hiking, the difficulty keeps on rising but in the
Who will test the mvp? end it goes down We should be able to compete with
Food Critics competitors
We expand the width and depth function first by making an
In here the persona is Felipe Interesting package design then promoting its advantage and so on

Top3 problems & Top3 features Learn


challenges Which top features are tested in What should be learned in
What is the focus of this MVP? this MVP? the next step?
Replacing the hype from regular -The simplicity of the packaging Promotion and advertising
sunflower seeds -The simplicity of eating it
Problems & Challenges:
-The little amount of mess it Summary of thelearnings
produces
-variations of snacks liked by students What are the learnings?
-Promotion
Mvp is a much needed tool when
-Its still a homemade product
business planning

Customer journey Build


& usecase How can these features be built and tested? Measure
-Find a good vendor
Which step of the customer -Invite a food critic How can the results be
journey or which use cases will -Invite a food critic measured?
Costs& schedule
be improved? By how many people are
What are the costs and interested in buying our product
The promotion, The customer schedule for this?
would likely come across Mr. The estimated time is 1 week
Abox from social media And the cost is 1million IDR

You might also like