Scheduling/Leveling Report - 2022-11-16 13:49:12 - PM.

EXE
=========================================================

Default Project..................................................5
Use scheduling options from......................................5

Projects:
5............................................................DAVAO BULK
WATER SUPPLY PROJECT 08-11-22

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Total Float
Number of paths to calculate.....................................10

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................5321
# Not Started....................................................4291
# In Progress....................................................519
# Completed......................................................511
# Relationships..................................................5972
# Activities with Constraint.....................................1479
Project: 5 Activity: A18430 Fit-up and full welding of
riser pipe
Project: 5 Activity: A1CS1010 Removal of Sheet Pile
Project: 5 Activity: A1CS1050 Pipe Support
Project: 5 Activity: A1CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A2C1550 Fabrication of forms
Project: 5 Activity: A2C2430 Trench excavation
Project: 5 Activity: A2C2450 Pouring of lean concrete
pouring
Project: 5 Activity: A2CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A3C1000 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1160 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1170 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1500 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C2670 Trench excavation
Project: 5 Activity: A3C2730 Trench excavation
Project: 5 Activity: A3CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A4AC1000 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1080 Installation of rebar for
slab and wall
Project: 5 Activity: A4ACS1000 250mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: AL1.1000 Riser Pipes & Other
Appurtenances
Project: 5 Activity: AL1.1010 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1050 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1240 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1C1030 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 0+115
Project: 5 Activity: AL2.1000 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1010 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1020 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1040 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1050 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1140 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1170 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1180 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL3.1010 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1020 Clearing and Dewatering
Project: 5 Activity: AL3.1040 Clearing and Dewatering
Project: 5 Activity: AL3.1050 Clearing and Dewatering
Project: 5 Activity: AL3.1060 Clearing and Dewatering
Project: 5 Activity: AL3.1070 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1090 Clearing and Dewatering
Project: 5 Activity: AL3.1100 Clearing and Dewatering
Project: 5 Activity: AL3.1110 Clearing and Dewatering
Project: 5 Activity: AL3.1170 Clearing and Dewatering
Project: 5 Activity: AL3.1230 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.1440 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1550 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1560 NDT and painting works
Project: 5 Activity: AL3.1570 NDT and painting works
Project: 5 Activity: AL3.1580 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1590 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1600 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1610 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1620 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1640 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1650 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1660 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL4a.1000 Cutting, Fit-up, and Welding
of Ring Flange
Project: 5 Activity: AL4a.1030 Butterfly Valve and
Dismantling Joint Installation
Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1020 FIRST POWER USING DLPC LINE
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1050 FULL MLD
Project: 5 Activity: KMSTX1070 GUARANTEE RUN
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION
Project: 5 Activity: MCONX1110 Chembond Mobilization @ WTP
Project: 5 Activity: MCONX1120 Sta. Clara Mobilization @ RWF
Project: 5 Activity: MCONX1130 Sta. Clara Mobilization @ WTP
Project: 5 Activity: MCONX1140 Prime Builders Mobilization @
WTP
Project: 5 Activity: OCABC1000 Perimeter Fence and Gates
Project: 5 Activity: OCABE1000 Service Entrance
Project: 5 Activity: OCABE1010 Installation of radio antenna
tower
Project: 5 Activity: OCABM1000 Yard Piping Works
Project: 5 Activity: OCABS1000 Building Structural Concrete
Project: 5 Activity: OCALI1000 Fabrication & Installation of
instruments supports
Project: 5 Activity: OCALM1000 Fabrication & Install
Chlorine Package System Pipe Supports
Project: 5 Activity: OCALM1010 Install ACU -condensate drain
remaining
Project: 5 Activity: OCALM1050 Disinfection of Pipe System
Project: 5 Activity: ODUMS1000 Building Structural Concrete
Project: 5 Activity: ODUMS1010 Construction of Concrete
Chambers
Project: 5 Activity: OINDA1000 Ceiling Works (Gypsum Board)
Project: 5 Activity: OINDA1010 Exterior Painting
Project: 5 Activity: OINDA1040 Install PVC Door
Project: 5 Activity: OINDA1050 Waterproofing Works
Project: 5 Activity: OINDS1000 Construction of Concrete
Chambers
Project: 5 Activity: OMANA1000 Screeding & Waterproofing
Works
Project: 5 Activity: OMANA1010 Exterior Painting
Project: 5 Activity: OMANA1020 Install Tiles
Project: 5 Activity: OMANA1030 Install PVC Door
Project: 5 Activity: OMANC1000 Perimeter Fence and Gates
Project: 5 Activity: OMANM1000 Install Chlorine Package
System
Project: 5 Activity: OMANM1010 AC & Ventillation Works
Project: 5 Activity: OMANM1020 Yard Piping Works
Project: 5 Activity: OMANS1000 Construction of Chamber
Covers
Project: 5 Activity: OPANM1000 Yard Piping Works
Project: 5 Activity: OPANS1000 Building Structural Concrete
Project: 5 Activity: OTALI1000 Installation of instruments
supports
Project: 5 Activity: OTALM1000 Install Ducting
Project: 5 Activity: OTALM1020 Install Chlorine Package
System
Project: 5 Activity: OTALM1030 Install ACCU
Project: 5 Activity: OTALM1050 Disinfection of Pipe System
Project: 5 Activity: OTP11000 Installation of Louvers, L01;
2200mm W x 1000mm & L02; 1600mm W x 1100mm
Project: 5 Activity: OTP11005 Installation of D01; 700mm W
x 2100mm H PVC moulded door; single leaf; including PVC frame
Project: 5 Activity: OTP11050 Perimeter Fence (Rebars,
Forms, Concreting & Paintings Works along this area)
Project: 5 Activity: OTP11070 Fabrication of concrete
covers (Rebars, Forms , Concreting Works)
Project: 5 Activity: OTP11080 Surface rectification works
inside the chambers
Project: 5 Activity: OTP1M1000 Electromagnetic Flowmeter
DN250
Project: 5 Activity: OTP2C1000 Concrete covers (Rebars,
Forms , Concreting Works)
Project: 5 Activity: OTP2C1110 Concrete surface
rectification works inside the chambers
Project: 5 Activity: OTP2M1000 Installation Flow Control
Valve DN200
Project: 5 Activity: OTP6C1000 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1060 Ramp and Floor Slab (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1080 Installation of Comfort Room/
Janitors Closet (Tiles, Fixtures, PVC door and remaining concreting works along
this area)
Project: 5 Activity: OTP6M1090 Installation Electromagnetic
Flow Meter
Project: 5 Activity: OTP6M1100 Installation Flow Control
Valve DN500
Project: 5 Activity: OTUGE1000 Installation of cable tray
Project: 5 Activity: OTUGE1010 Installation of radio antenna
- after completing all activities
Project: 5 Activity: OTUGM1000 AC & Ventillation Works - Not
part of vcci
Project: 5 Activity: OTUGM1010 Install Chlorine Package
System - REMAINING WORKS
Project: 5 Activity: OTUGM1040 HVAC & Ventillation Works
Project: 5 Activity: OTUGM1050 Installation of Exhaust Fan
Project: 5 Activity: OTUGM1060 WIR Inspection for
Installation of Exhaust Fan
Project: 5 Activity: OTUGM1070 Fabrication of Exhaust fan
Supports
Project: 5 Activity: OTUGM1090 Installation of Exhaust fan
Supports
Project: 5 Activity: OTUGM1100 WIR INspection for
Installation of Exhaust fan Supports
Project: 5 Activity: OTUGM1110 Fabrication of Exhaust fan
Duct
Project: 5 Activity: OTUGM1120 Installation of Exhaust fan
Duct
Project: 5 Activity: OTUGM1130 WIR INspection for
Installation of Exhaust fan Duct
Project: 5 Activity: OTUGM1140 Installation of Scaffolding
prior for installation of Motorized Dampers
Project: 5 Activity: OTUGM1150 Installation of Motorized
Dampers
Project: 5 Activity: OTUGM1160 WIR Inspection for
Installation of Motorized Dampers
Project: 5 Activity: OTUGM1170 Procurement of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1180 Fabrication of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1190 Installation of Gravity
Damper and Bird Screen
Project: 5 Activity: OTUGM1200 WIR Inspection for
Installation of Gravity damper and Bird Screen
Project: 5 Activity: OTUGM1210 Fabrication of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1220 Installation of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1230 WIR Inspection for
Installation of Exhaust Air grill - Chlorination Room
Project: 5 Activity: OTUGM1240 Installation of Exhaust Fan
at Genset Room with Support
Project: 5 Activity: OTUGM1250 WIR Inspection for
Installation of Exhaust Fan at Genset Room
Project: 5 Activity: OTUGM1260 Installation of Outside Air
louver 2.2m x 1m
Project: 5 Activity: OTUGM1270 WIR Inspection for
Installation of Outside Air louver 2.2m x 1m
Project: 5 Activity: OTUGM1280 Hydrotest test prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1290 Hydrotest test for chlorine
package system
Project: 5 Activity: OTUGM1300 PIpe reinstatement for
chlorine package system
Project: 5 Activity: OTUGM1310 WIR Inspection for chlorine
package system
Project: 5 Activity: OTUGM1320 Nitrogen Test for chlorine
package system
Project: 5 Activity: OTUGM1330 Nitrogen Tes prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1340 Nitrogen Tes for chlorine
package system
Project: 5 Activity: OTUGM1350 PIpe reinstatement for
chlorine package system - Nitrogen Tes
Project: 5 Activity: OTUGM1360 WIR Inspection for chlorine
package system - Nitrogen Tes
Project: 5 Activity: RCDSC1000 Air vents guy support and
screen cover (Fabrication)
Project: 5 Activity: RCDSC1010 Backfilling Works
Project: 5 Activity: RCDSC1040 Air vents guy support and
screen cover (Installation of Scaffolding)
Project: 5 Activity: RCDSC1050 Air vents guy support and
screen cover (Installation)
Project: 5 Activity: RCDSC1060 Air vents guy support and
screen cover (Painting Works)
Project: 5 Activity: RCDSC1070 Air vents guy support and
screen cover (WIR Inspection)
Project: 5 Activity: RCDSC1080 Air vents guy support and
screen cover (Procurement)
Project: 5 Activity: RCDSM1020 Internal paint repair/touch-
up works (identified during walkdown)
Project: 5 Activity: RCDSM1060 Excavation for Drain Pipes
(10, 50, & 30 mts)
Project: 5 Activity: RCDSM1070 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1
Project: 5 Activity: RCDSM1100 Design for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1 to 3
Project: 5 Activity: RCDSM1110 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 2
Project: 5 Activity: RCDSM1120 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 3
Project: 5 Activity: RCDSM1130 Procurement for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1 to 3
Project: 5 Activity: RCDSM1140 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1
Project: 5 Activity: RCDSM1150 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 2
Project: 5 Activity: RCDSM1160 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 3
Project: 5 Activity: RCDSM1230 WIR Inspection for
Installation for Drain Valve protection wrap, PVC pipe sleeve and valve box - 1 to
3
Project: 5 Activity: RCDSS1020 Slope Protection Works
(Cut/Down Slope)
Project: 5 Activity: RCWDM1020 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RDESA1020 Staff gauge installation
Project: 5 Activity: RDESA1030 Remaining roofing and
cladding (including genset enclosure)
Project: 5 Activity: RDESA1040 Install Windows & Louvers
Project: 5 Activity: RDESC1010 Backfilling works - Desander
Project: 5 Activity: RDESE1000 Underground cable
installation - Service Entrance to ECB
Project: 5 Activity: RDESE1020 Installation of CCTV System
Project: 5 Activity: RDESI1000 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RDESI1010 Wiring of flowmeter to
transmitter
Project: 5 Activity: RDESI1020 Installation of additional
turbidity sensor @ Desander
Project: 5 Activity: RDESM1000 Ladder rung and cage to
outlet chamber and bypass valve chamber
Project: 5 Activity: RDESM1010 Install Exhaust Fan
Project: 5 Activity: RDESM1020 Bolt torquing for Bypass
Valve and Drain Valve
Project: 5 Activity: RDESM1030 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RDESM1050 Fabrication of stainless
sheet cover for pillow block for A
Project: 5 Activity: RDESM1070 Installation of stainless
sheet cover for pillow block For A
Project: 5 Activity: RDESM1080 WIR Inspection of stainless
sheet cover for pillow block for A
Project: 5 Activity: RDESM1100 Design of stainless sheet
cover for pillow block (new) - To be provided by AAII
Project: 5 Activity: RDESM1110 Procurement of stainless
sheet cover for pillow block (new) - VCCI/AAII SI
Project: 5 Activity: RDESM1120 Fabrication of stainless
sheet cover for pillow block for B
Project: 5 Activity: RDESM1130 Installation of stainless
sheet cover for pillow block for B
Project: 5 Activity: RDESM1140 WIR Inspection of stainless
sheet cover for pillow block for B
Project: 5 Activity: RHFAA1000 Ceiling Works - HEPP FA
Project: 5 Activity: RHFAA1010 Install Louver Doors - HEPP
FA
Project: 5 Activity: RHFAA1020 Install Metal Doors - LEC
Steel - HEPP FA
Project: 5 Activity: RHFAE1010 Installation of lighting
fixtures - HEPP FA
Project: 5 Activity: RHFAE1030 Installation of FDAS - HEPP
FA
Project: 5 Activity: RHMBA1000 Fabrication of Louvers - DONE
Project: 5 Activity: RHMBA1040 Installation of Louvers -
DONE
Project: 5 Activity: RHMBA1050 Painting of Louvers (On the
welded portion)
Project: 5 Activity: RHMBA1060 WIR Inspection of Louvers
Project: 5 Activity: RHMBA1070 Installation of Scaffolding
of Louvers - DONE
Project: 5 Activity: RHMBA1090 Scaffolding installation
Prior for installation of Exhaust Fan
Project: 5 Activity: RHMBA1100 Installation of Exhaust Fan -
5 units
Project: 5 Activity: RHMBA1110 WIR Inspection of Exhaust Fan
- 5 units
Project: 5 Activity: RHMBA1120 Design of ladder rung -
access to sump pumps
Project: 5 Activity: RHMBA1260 Dismantling of Scaffolding of
Louvers
Project: 5 Activity: RHMBE1000 Install Electrical Equipment
- INGOS
Project: 5 Activity: RHMBM1030 Leveling and prealignment of
Turbine and Generator
Project: 5 Activity: RHMBM1050 Dismantling of Scaffolding
prior for the Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1060 Install aeration pipework -
Painting Works
Project: 5 Activity: RHMBM1210 Reinstallation of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1220 Lifting of Bypass Inlet Valve
DN800
Project: 5 Activity: RHMBM1230 Bolt torquing of Bypass Inlet
Valve DN800
Project: 5 Activity: RHMBM1240 WIR Inspection of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1250 Piping Alignment of Turbine
and Generator
Project: 5 Activity: RHMBM1260 Piping and Turbine and
Generator Alignment
Project: 5 Activity: RHMBM1270 Dismantling of Pipe
conncetion for Turbine and Generator
Project: 5 Activity: RHMBM1280 Final Alignment for Piping
and Turbine and Generator
Project: 5 Activity: RHMBM1290 1st stage grouting of Turbine
and Generator
Project: 5 Activity: RHMBM1300 2nd Stage grouting for Piping
and Turbine and Generator
Project: 5 Activity: RHMBM1310 Fabrication of temporaty
blinds for Pipe conncetion in draft Tube
Project: 5 Activity: RHMBM1320 Installation of temporaty
blinds for Pipe conncetion in draft Tube
Project: 5 Activity: RHMBM1330 Inspection as found status of
Turbines and Generator
Project: 5 Activity: RHMBM1340 Inspection prior for grouting
of Turbine and Generator
Project: 5 Activity: RHMBM1350 WIR Final inspection of
Turbine and Generator
Project: 5 Activity: RHMBM1360 Connection to Cooling Water
Sytem - Turbine and Generator
Project: 5 Activity: RHMBM1370 WIR Inspection Bolt torquing
of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1380 WIR Inspection prior for the
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1390 WIR Inspection for
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RPPLC1000 Design for CAVs protection
cage - AAII
Project: 5 Activity: RPPLC1010 Installation of Manhole
chamber ladder rung
Project: 5 Activity: RPPLC1020 Restoration - Backfilling &
Compaction
Project: 5 Activity: RPPLC1030 Procuremnet for CAVs
protection cage
Project: 5 Activity: RPPLC1040 Fabrication for CAVs
protection cage
Project: 5 Activity: RPPLC1050 Installation for CAVs
protection cage
Project: 5 Activity: RPPLC1060 Painting Works for CAVs
protection cage
Project: 5 Activity: RPPLC1070 WIR Inspection for CAVs
protection cage
Project: 5 Activity: RPPLC1080 Procurement of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1090 Fabrication of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1100 Painting of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1110 WIR Inspection for Manhole
chamber ladder rung
Project: 5 Activity: RPPLM1040 Manhole seal inspection -
Installation of O-Ring and manhole closing (34 MH)
Project: 5 Activity: RPPLM1050 Installation of Flow Meter -
(EESI to provide power supply)
Project: 5 Activity: RPPLS1000 Construction of Access Way to
Penstock Flume Bridge
Project: 5 Activity: RSTFC1000 Backfilling Works
Project: 5 Activity: RSWPA1030 Floor Finishes
Project: 5 Activity: RTWTM1000 Fixing of Gates - TWT and
Trial Operations (Draft tube)
Project: 5 Activity: RTWTM1020 Shafting Installation at
Bypass
Project: 5 Activity: RTWTM1030 Hydraulic tubing including
supports connection to Hydraulic Cyclinder - Draft Tube
Project: 5 Activity: RTWTM1040 WIR Inspection for Hydraulic
tubing connection to Hydraulic Cyclinder
Project: 5 Activity: RTWTM1050 Shafting Installation at
Draft tube
Project: 5 Activity: RTWTM1060 Installation of Hydraulic
Cylinder for Draft tube
Project: 5 Activity: RTWTM1070 Installation of Hydraulic
Cyinder for Bypass
Project: 5 Activity: RTWTM1080 Hydraulic tubing including
supports connection to Hydraulic Cyclinder - Bypass
Project: 5 Activity: RTWTM1090 Fixing of Gates - TWT and
Trial Operations (Bypass)
Project: 5 Activity: RTWTM1100 Procurement of 2 pins for
Draft tube and Bypass
Project: 5 Activity: RTWTM1110 Fabrication of 2 pins for
Draft tube and Bypass
Project: 5 Activity: RWEIA1040 Install Steel Wall Cladding -
remaining
Project: 5 Activity: RWEIA1060 Safety Railings
Project: 5 Activity: RWEIA1070 Architectural and Structural
Coating touch-ups/rectification
Project: 5 Activity: RWEIC1020 INITIAL Re-diversion Works of
the River through Steel Pipe
Project: 5 Activity: RWEIM1060 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RWEIM1070 Bolt Torquing for
Environmental Valves
Project: 5 Activity: RWEIM1080 Flow Regulating valve
(Spindle/Shafting fabrication and installation) at Environmental Gate
Project: 5 Activity: RWEIM1090 Install Room Exhaust Fan
Project: 5 Activity: RWEIM1100 Install ladder rung guard
Project: 5 Activity: RWEIM1110 Relocation of turbidity
sensor, DO and Temp @ Weir
Project: 5 Activity: RWEIM1130 Installation of Stitched
Sheet Piles
Project: 5 Activity: RWEIM1140 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RWEIM1150 Gate Seals Rectification and
testing(Bypass)
Project: 5 Activity: RWEIM1180 Installation of grounding pit
(EE Design issue - pending)
Project: 5 Activity: RWEIM1190 Gate Seals Rectification and
testing(Maintenance)
Project: 5 Activity: RWEIM1200 Gate Seals Rectification and
testing(flushing)
Project: 5 Activity: RWEIM1210 Gate Seals Rectification and
testing(Intake)
Project: 5 Activity: RWEIM1220 Weir to Desander Piping
(Paint rectification)
Project: 5 Activity: RWEIM1230 Weir to Desander Piping
(Paint rectification) - Joint Final Inspection with Witco and T&C
Project: 5 Activity: RWEIM1320 Gate Seals Rectification
(Inlet Gates A)
Project: 5 Activity: RWEIM1330 Gate Seals Rectification
(Flushing Gates A)
Project: 5 Activity: RWEIM1340 Gate Seals Rectification
Outlet Gate A)
Project: 5 Activity: RWEIM1350 Gate Seals Rectification
(Inlet Gates B)
Project: 5 Activity: RWEIM1360 Gate Seals Rectification
(Flushing Gates B)
Project: 5 Activity: RWEIM1370 Gate Seals Rectification
Outlet Gate B)
Project: 5 Activity: RWEIM1380 Gate Seals Rectification
(Inlet Gates Inspection for A and B)
Project: 5 Activity: RWEIM1390 Gate Seals Rectification
(Flushing Gates Ins[ppection for A and B)
Project: 5 Activity: RWEIM1400 Gate Seals Rectification
Outlet Gate Inspecttion for A and B)
Project: 5 Activity: RWEIM1420 Air vent screen cover -
Procurement of Materials
Project: 5 Activity: RWEIS1010 Install Weir Pedestrian
Bridge - Remaining works
Project: 5 Activity: TAL1C2000 Gully Bridge: Construction of
Scouring Protection
Project: 5 Activity: TAL1C2860 Permanent Road Restoration
Sta 2+862 to 3+406
Project: 5 Activity: TAL1M2000 Install Expansion Joint at
Gully Bridge Pipe - WELDING REMAINING WORKS
Project: 5 Activity: TAL2C1840 Permanent Road Restoration
Sta 1+842 to 2+028
Project: 5 Activity: TAL2C2030 Permanent Road Restoration
Sta 2+031 to 2+107
Project: 5 Activity: TAL2C2110 Permanent Road Restoration
Sta 2+112 to 2+285
Project: 5 Activity: TAL2C3280 Permanent Road Restoration
Sta 2+286 to 2+641
Project: 5 Activity: TAL2C3340 Permanent Road Restoration
Sta 3+342 to 3+900
Project: 5 Activity: TAL2C4460 Permanent Road Restoration
Sta 4+463 to 5+113
Project: 5 Activity: TAL2Cn0010 Permanent Road Restoration
Sta 0+000 to 0+114
Project: 5 Activity: TAL3C2380 Permanent Road Restoration
Sta 2+382 to 2+869
Project: 5 Activity: TAL3C2880 Permanent Road Restoration
Sta 2+885 to 3+559
Project: 5 Activity: TAL3C3560 Permanent Road Restoration
Sta 3+568 to 4+285
Project: 5 Activity: TAL3C4280 Permanent Road Restoration
Sta 4+288 to 4+310
Project: 5 Activity: TAL3C6370 Permanent Road Restoration
Sta 6+377 to 6+700
Project: 5 Activity: TAL3C8300 Permanent Road Restoration
Sta 8+306 to 8+947
Project: 5 Activity: TAL3C8950 Permanent Road Restoration
Sta 8+950 to 9+972
Project: 5 Activity: TAL3Cn0070 Permanent Road Restoration
Sta 0+076 to 0+871
Project: 5 Activity: TAL3M1000 BOV & CAV Installation
including Appurtenances (TOTAL 53)
Project: 5 Activity: TAL4C14630 Permanent Road Restoration
Sta 14+637 to 14+910, 0+015 (AL5), 0+018 (AL6)
Project: 5 Activity: TAL4C2410 Permanent Road Restoration
Sta 2+418 to 3+235
Project: 5 Activity: TAL4Cn0020 Permanent Road Restoration
Sta 0+028 to 0+718
Project: 5 Activity: TAL4M1700 Hydrotesting Segment-3 -
Alignment 4A
Project: 5 Activity: TAL4M1800 Isolation Chamber remaining
(4) - Walls (2), Covers (4), Backfilling - Alignment 4A
Project: 5 Activity: TAL4M1900 Hydrotesting Segment-8 -
Alignment 4A
Project: 5 Activity: TAL4M2000 Hydrotesting Segment-9 -
Alignment 4A
Project: 5 Activity: TAL4M2400 Pipelaying Alignment 4B
Project: 5 Activity: TAL5C7140 Permanent Road Restoration
Sta 7+144 to 7+991
Project: 5 Activity: TAL5Cn0020 Permanent Road Restoration
Sta 0+020 to 1+020
Project: 5 Activity: TAL5M1000 Pipelaying & Welding Works
Project: 5 Activity: TAL6C1030 Permanent Road Restoration
Sta 1+032 to 1+997
Project: 5 Activity: TAL6M1000 Isolation Chambers
Installation - Alignment 6
Project: 5 Activity: TAL6M2000 Pipelaying at Sta. 0+002-
673.40 (7 segments) - Alignment 6
Project: 5 Activity: TAL6M4000 Hydrotesting at sta. 4+068-
427 - Alignment 6
Project: 5 Activity: TAL6M7000 BOV (7), CAV (10), IV (2)
Installation Including Appurtenances - Alignment 6
Project: 5 Activity: TAL7C2520 Permanent Road Restoration
Sta 2+523 to 4+046
Project: 5 Activity: TAL7Cn0700 Permanent Road Restoration
Sta 0+706 to 1+070
Project: 5 Activity: TAL7M1000 BOV & CAV Installation
Project: 5 Activity: TAL7M2000 Pipelaying & Welding Works
Project: 5 Activity: TAL7M4000 Isolation Chamber
Installation
Project: 5 Activity: TAL8Cn0000 Permanent Road Restoration
Sta 0+000 to 1+482
Project: 5 Activity: TDRBS1000 Concreting Works
Project: 5 Activity: TDRBS1010 Steel Bridge Fabrication &
Delivery
Project: 5 Activity: WABRA1000 Install Doors
Project: 5 Activity: WABRA1010 Construct Concrete Stairs
Project: 5 Activity: WABRA1030 Ceiling & Wall Finishes -
Rockwool ????
Project: 5 Activity: WABRA1050 Install Louvers
Project: 5 Activity: WABRA1090 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1100 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1110 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1120 Installation of Fire Dampers
Project: 5 Activity: WABRA1130 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1140 Installation of Opposed Back
Drop (OBD) for Exhaust Blowers - 2 Units
Project: 5 Activity: WABRA1150 WIR Inspection for
Installation of Opposed Back Drop (OBD) for Exhaust Blowers - 2 Units
Project: 5 Activity: WABRA1170 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1180 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1240 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1260 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1270 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1280 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRM1000 Exhaust Fan
Project: 5 Activity: WACSS1000 Concrete Works
Project: 5 Activity: WACSS1010 Install Primary Structural
Steel
Project: 5 Activity: WADBA1010 Roof Deck Water Proofing &
Testing
Project: 5 Activity: WADBA1020 Ceiling Works 2nd Priority
Project: 5 Activity: WADBA1030 Install Doors 1st Priority -
HDF & PVC remaining
Project: 5 Activity: WADBA1040 Joinery Works
Project: 5 Activity: WADBA1070 Install Doors 2nd Priority
Project: 5 Activity: WADBA1080 Install Louver Door at EE
room
Project: 5 Activity: WADBA1090 Delivery of Exhaust Air
Louver at EE room
Project: 5 Activity: WADBA1140 Install Exhaust Air Louver at
EE room
Project: 5 Activity: WADBA1150 WIR Inspection of Install
Exhaust Air Louver at EE room
Project: 5 Activity: WADBA1160 Installation of Scaffolding
prior for Installation of Fire Dampers - - EE Room
Project: 5 Activity: WADBA1170 Installation of Fire Dampers
- - EE Room
Project: 5 Activity: WADBA1180 Installation of Exhaust Fan
Enclosure - - EE Room
Project: 5 Activity: WADBA1190 WIR Inspection for Fire
Dampers - EE Room
Project: 5 Activity: WADBE1000 Installation of lightning
protection system - done
Project: 5 Activity: WADBE1010 Termination works - remaining
ACS & comm. cables
Project: 5 Activity: WADBE1020 Firestop Sealant for Conduit
penetrations for Ceiling
Project: 5 Activity: WADBE1030 Installation of work stations
& Console table
Project: 5 Activity: WADBM1000 Ducting Works
Project: 5 Activity: WADBM1010 Install Laboratory
Instruments
Project: 5 Activity: WADBM1020 Installation of Blowers
(Niagara fan) - 1 unit
Project: 5 Activity: WADBM1030 Installation of of High Flume
Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1040 Design of support for High
Flume Exhaust Fan - 5 Units - AAII/ VCCI
Project: 5 Activity: WADBM1050 Fabrication of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1060 Painting of support for High
Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1070 Installation of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1080 WIR Installation prior for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1090 Installation of Energy
Recovery Ventilation (ERV) - 2 units
Project: 5 Activity: WADBM1100 Fabrication of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1110 Paiting of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1120 Installation of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1130 WIR Inspection prior for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1140 Installation of Flexible Duct
Connection
Project: 5 Activity: WADBM1150 WIR Inspection for
Installation of Flexible Duct Connection
Project: 5 Activity: WADBM1160 WIR Inspection for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1170 Cleaning of Outside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1180 Cleaning of Inside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1190 Balancing for Ducting prior
for testing - T&C
Project: 5 Activity: WADBM1200 Sealant Application in the
Duct passing through the wall - Ground to Roof Deck
Project: 5 Activity: WADBM1210 WIR Inspection for Sealant
Application in the Duct passing through the wall
Project: 5 Activity: WADBM1220 Installation of ACCU (28
units) - Roof Deck
Project: 5 Activity: WADBM1230 WIR Inspection for
Installation of ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1240 Installation of refregerant
Piping from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1250 Cleaning of refregerant
Piping using R11 from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1260 Flushing and Cleaning of
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1270 Fabrication of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1280 Painting of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1290 Lay-out of support for
refregerant Pipie from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1300 WIR Inspection prior for
install of support for refregerant pipe from dog house to ACCU (28 units) - Roof
Deck
Project: 5 Activity: WADBM1310 Installation of support for
refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1320 Installation of Aluminum
Cladding for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1330 Initial charging of freon
(R32) for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1340 Procurement of thermostat
control with wiring (Honeywell or johnson&Johnson) - 7 Pieces AAII/VCCI
Project: 5 Activity: WADBM1350 Installation of thermostat
control with wiring - 7 Pieces
Project: 5 Activity: WADBM1360 WIR Inspectkion for
Installation of thermostat control with wiring - 7 Pieces
Project: 5 Activity: WADBU1010 Install Sanitary Fixtures
Project: 5 Activity: WAPBA1010 Masonry Works
Project: 5 Activity: WAPBA1020 Acid Resistant Painting
Equipment Area
Project: 5 Activity: WAPBA1030 Ceiling Finishes
Project: 5 Activity: WAPBA1050 Install RUD
Project: 5 Activity: WAPBA1060 Install Stair & Steel
Platform
Project: 5 Activity: WAPBA1080 Install Sunshade Louver (3)
Project: 5 Activity: WAPBI1000 Installation of instruments -
EESI to check (JESCO supply) - completion to depend on Mixing tank to install
Project: 5 Activity: WAPBM1000 Overhead crane load testing
Project: 5 Activity: WAPBM1020 Installation of Alum Dosing
Pumps - 2 Units
Project: 5 Activity: WAPBM1030 Installation of Alum Sulphate
Prep Unit
Project: 5 Activity: WAPBM1040 Installation of Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM1570 WIR Inspection for Pump
Alignment of Alum Dosing Pumps Prior for Installation- 2 Units
Project: 5 Activity: WAPBM1580 Final Grouting for Alum
Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM1590 WIR Inspection for Final
Grouting of Alum Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM1980 Installation of Mixer for
Alum Sulphate Prep Unit 1
Project: 5 Activity: WAPBM1990 Installation of Mixer for
Alum Sulphate Prep Unit 2
Project: 5 Activity: WAPBM2020 WIR Inspection prior for
Installation of Mixer for Alum Sulphate Prep Tank 1
Project: 5 Activity: WAPBM2030 WIR Inspection prior for
Installation of Mixer for Alum Sulphate Prep Tank 2
Project: 5 Activity: WAPBM2160 Procurement of Exhaust Blower
or Fan Units - 4 units - AAII
Project: 5 Activity: WAPBM2170 Installation of Supply Blower
or Fan Units - 2 units (DONE)
Project: 5 Activity: WAPBM2180 Installation of flexible
joint for Supply Blower or Fan Units - 2 units
Project: 5 Activity: WAPBM2190 Installation of flexible
joint for Exhaust Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2200 WIR Inspection for Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2210 WIR Inspection for Supply
Blower or Fan Units - 2 units (Done)
Project: 5 Activity: WAPBM2220 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2230 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2350 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2360 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2390 Installation of Flexible
Joints (DONE)
Project: 5 Activity: WAPBM2470 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2480 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2490 Installation of Flexible
Joints
Project: 5 Activity: WAPBM2500 Installation of Exhaust Fan -
1 unit
Project: 5 Activity: WAPBM2510 WIR Inspection for
Installation of Exhaust Fan - 1 unit
Project: 5 Activity: WAPBM2520 Installation of Fire Dampers
- 3 units
Project: 5 Activity: WAPBM2530 Installation of Motorized
Fire Dampers - 3 units
Project: 5 Activity: WAPBM2540 Installation of Scaffolding
prior for Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2550 Installation of Scaffolding
prior for Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2560 WIR Inspection for
Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2570 WIR Inspection for
Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2650 Pump Alignment for Alum
Dosing Pumps - 2 Units
Project: 5 Activity: WAPBU1000 Construct Septic Tank - done
Project: 5 Activity: WAPBU1010 Install Water Piping
Project: 5 Activity: WAPBU1020 Install Bathroom Fixtures
Project: 5 Activity: WAPBU1030 Procurement of the materials
of Water Piping
Project: 5 Activity: WAPBU1040 WIR Inspection for Water
Piping
Project: 5 Activity: WAPBU1050 Hydrotest for Water Piping
Project: 5 Activity: WAPBU1060 Installation of Down Spout
Project: 5 Activity: WAPBU1070 WIR Inspection of Down Spout
Project: 5 Activity: WAPLC1000 Alum & Polymer Chemical
Trench - Back of Alum Bldg. - damp proof remaining
Project: 5 Activity: WAPLM1000 Alum & Polymer Chemical Line
- Alum bldg to IWCM
Project: 5 Activity: WBLBI1000 Install Instrument Junction
Boxes
Project: 5 Activity: WBLBM1000 MH FWTA - Install Valves
DN1600
Project: 5 Activity: WBLBM1010 DMF MH - Install Isolation
Valves
Project: 5 Activity: WBPHA1000 Concrete hollow blocks
(concrete stiffeners, lintel beams, upstands, and design joints; 150mm thick)
Project: 5 Activity: WBPHA1070 Install Louvers (5 units)
Project: 5 Activity: WBPHA1140 WIR Inspection for Louvers (5
units)
Project: 5 Activity: WBPHA1290 Installation of Plenum Box
(1.8m X 1.8m) for Install Louvers
Project: 5 Activity: WBPHE1010 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WBPHM1040 Install Overhead Crane -
DEMAG
Project: 5 Activity: WBPHM1050 Outside Air Duct Works
connection to Blowers
Project: 5 Activity: WBPHM1590 WIR Inspection for Outside
Air Duct Works connection to Blowers
Project: 5 Activity: WBPHM1600 WIR Inspection for Outside
Air Duct Works
Project: 5 Activity: WBPHM1610 Clearing for Outside Air Duct
with temp. blowers
Project: 5 Activity: WBPHM1630 Clearing for Internal Air
Duct with temp. blowers
Project: 5 Activity: WBPHM1680 Installation of flexible
connection for Duct connection to blowers - 4 units
Project: 5 Activity: WBPHM1720 Installation of Fire Dampers
- 4 Units
Project: 5 Activity: WBPHM1730 WIR Inspection for
Installation of Fire Dampers - 4 Units
Project: 5 Activity: WBPHS1010 Construct Pipe Support
including pedestal - Suctions, Discharge, & Elbow
Project: 5 Activity: WCCLC1020 Chlorine Chemical Trench -
MH6 to CLB - waiting for Genset to remove
Project: 5 Activity: WCLBA1010 Masonry Works
Project: 5 Activity: WCLBA1020 Install Handrails & Ladders
Project: 5 Activity: WCLBA1030 Install Doors (8 units)
Project: 5 Activity: WCLBA1040 Delivery of Louver - (Done)
Project: 5 Activity: WCLBA1070 Roof Deck Finishes
Project: 5 Activity: WCLBA1080 Ceiling Finishes
Project: 5 Activity: WCLBA1100 WIR Inspection for Install
Louver
Project: 5 Activity: WCLBA1110 Install Louver
Project: 5 Activity: WCLBC1000 Construct Septic Tank
Project: 5 Activity: WCLBE1000 Cable pulling
Project: 5 Activity: WCLBE1010 Installation of grounding
system
Project: 5 Activity: WCLBM1100 Installation of FRP pipe
support at chemical trenches
Project: 5 Activity: WCLBM1110 Outside Air Duct Works
Project: 5 Activity: WCLBM1120 Installation of FRP Air
Blower Units - 2 Units - 2 Units (DONE)
Project: 5 Activity: WCLBM1140 Install Fire Dampers
Project: 5 Activity: WCLBM1150 Installation of Chlorine and
S02 ton container with dip trays
Project: 5 Activity: WCLBM1180 Installation of Flanges for
Vacuum Regulator
Project: 5 Activity: WCLBM1220 Supply - Outside Air Blowers
- 3 units (2 units installed)
Project: 5 Activity: WCLBM1230 Rectification for Spring
Mounting of Outside Air Blowers - 1 piece
Project: 5 Activity: WCLBM1240 WIR Inspection of Outside Air
Blowers - 1 piece
Project: 5 Activity: WCLBM1250 Installation of Exhaust Fans
- 4 Units (DONE) Wall Mounted
Project: 5 Activity: WCLBM1260 WIR Inspection for
Installation of Exhaust Fans - 4 Units Wall Mounted
Project: 5 Activity: WCLBM1280 Install of Scaffolding prior
fo Installation of Fire Dampers
Project: 5 Activity: WCLBM1290 Install Motorize Fire Dampers
Project: 5 Activity: WCLBM1300 Installation of Mobile
Scaffolding prior for Install Fire Dampers and Motorized Fire Dampers
Project: 5 Activity: WCLBM1320 WIR Inspection of Install
Fire Dampers
Project: 5 Activity: WCLBM1330 WIR Inspection of Install
Motorize Fire Dampers
Project: 5 Activity: WCLBM1340 Installation of Fire Dampers
Project: 5 Activity: WCLBM1350 WIR Inspection of FRP Air
Blower Units - 2 Units
Project: 5 Activity: WCLBM1690 Procurement for Chlorine and
S02 ton container with dip trays - AAII
Project: 5 Activity: WCLBM1700 WIR Inspection for
Installation of Chlorine and S02 ton container with dip trays
Project: 5 Activity: WELBA1000 Install Doors (3) - ELB
Project: 5 Activity: WELBA1010 Install Louvers (2) - ELB
Project: 5 Activity: WELBA1040 Wall Finishes (External) -
ELB
Project: 5 Activity: WELBF1000 Install FM200 - ELB
Project: 5 Activity: WELBF1010 Install FDAS - ELB
Project: 5 Activity: WELBM1010 Install Fire Damper - ELB
Project: 5 Activity: WELBM1020 Install ACCU unit - Inside
(Done)
Project: 5 Activity: WELBM1030 Install ACCU unit - Out door
- 6 units
Project: 5 Activity: WELBM1040 Fabrication of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1050 Painting of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1060 Installation of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1070 WIR Inspection for
Installation of ACCU Supports/Steel Flat Forms
Project: 5 Activity: WELBM1080 Installation of Copper Tube
Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELBM1090 WIR Inspection for
Installation of Copper Tube Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELNE1000 Duct Bank MH05 to MCC-6
Project: 5 Activity: WELNE1010 Duct Bank MH13 to Stub-out
Project: 5 Activity: WELNE1020 Duct Bank Valve Chamber to
EHH1
Project: 5 Activity: WELNE1030 Duct Bank MH12 to EHH11
Project: 5 Activity: WELNE1040 Duct Bank MH06 to MH10
Project: 5 Activity: WELNE1110 Duct Bank PB1-ACC TO MCC-7
Project: 5 Activity: WELNE1230 Cable Pulling MSB to MCC-6
Project: 5 Activity: WELNS1000 MH10
Project: 5 Activity: WELNS1010 MH09
Project: 5 Activity: WELNS1030 MH07
Project: 5 Activity: WFITA1030 Mid Painting of Guardrails -
First Priority
Project: 5 Activity: WFITA1050 Install Louvers at Air Vents
( 6 nos.) - South Side
Project: 5 Activity: WFITA1170 Install Doors Control Room 2
Project: 5 Activity: WFITA1250 Waterproofing Works Stair 1
Project: 5 Activity: WFITA1340 Install Doors Stair 2
Project: 5 Activity: WFITA1450 Mid Painting of Guardrails -
2nd Priority
Project: 5 Activity: WFITA1470 Install Louvers at Air Vents
( 6 nos.) - North Side (Done)
Project: 5 Activity: WFITA1480 WIR Inspection for Install
Louvers at Air Vents ( 6 nos.) - North Side (Done)
Project: 5 Activity: WFITA1490 WIR Inspection for Install
Louvers at Air Vents ( 6 nos.) - South Side
Project: 5 Activity: WFITA2130 Procurement of Steel gratings
at the Trench of Pipe gallery
Project: 5 Activity: WFITE1000 Installation of grounding
system
Project: 5 Activity: WFITE1020 Termination works Tanks 11,
13, 15, 17 - remaining Instruments
Project: 5 Activity: WFITE1060 Cable pulling Tanks 10, 12,
14, 16, 18
Project: 5 Activity: WFITE1070 Termination works Tanks 10,
12, 14, 16, 18 - remaining Instruments
Project: 5 Activity: WFITI1000 Installation of instrument
Support Tanks 11, 13, 15, 17 (At Pipe Gallery remaining)
Project: 5 Activity: WFITM10000 Underdrain DMF18 - Air Header
pipe survey
Project: 5 Activity: WFITM10010 Underdrain DMF18 - Anchor rod
installation
Project: 5 Activity: WFITM10020 Underdrain DMF18 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM10030 Underdrain DMF18 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM10040 Underdrain DMF18 -
Installation of FRP Plates
Project: 5 Activity: WFITM10050 Underdrain DMF18 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM10060 Underdrain DMF18 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM10070 Underdrain DMF18 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM10080 Underdrain DMF18 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM10090 Underdrain DMF18 - Protection
covers of the underdrains
Project: 5 Activity: WFITM1010 Pipe Support Installation
Project: 5 Activity: WFITM10100 Underdrain DMF18 - WIR
Inspection
Project: 5 Activity: WFITM10110 LAUNSDERS DMF18 - Chipping
for Launders of
Project: 5 Activity: WFITM10120 LAUNSDERS DMF18 - Install
scaffolding
Project: 5 Activity: WFITM10130 LAUNSDERS DMF18 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM10140 LAUNSDERS DMF16 - Placement
of Launders
Project: 5 Activity: WFITM10150 LAUNSDERS DMF18 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM10160 LAUNSDERS DMF18 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM10170 LAUNSDERS DMF18 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM10180 LAUNSDERS DMF18 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM10190 LAUNSDERS DMF18 - Formworks &
Grouting
Project: 5 Activity: WFITM1030 Installation of Jet Fan
Project: 5 Activity: WFITM1050 Monorail Crane @ Stair 1 load
testing - DEMAG/VCCI
Project: 5 Activity: WFITM15460 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM2720 WIR Inspection for the 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2730 Design of the Plugs for 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2740 Fabrication of the Plugs for
9 units of Sluice Gates in Main Channel - South Side
Project: 5 Activity: WFITM2750 Fabrication of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM2760 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - South Side
Project: 5 Activity: WFITM2770 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM3130 Installation of Flowmeter at
South Side (DONE) - 9 units
Project: 5 Activity: WFITM3140 Bolt torquing for the
Flowmeter at South Side - 9 units
Project: 5 Activity: WFITM3150 Installation of Flowmeter at
North Side - 9 units
Project: 5 Activity: WFITM3160 Bolt torquing for the
Flowmeter at North Side - 9 units
Project: 5 Activity: WFITM3170 Installation of Sampling
point at South Side - 9 units
Project: 5 Activity: WFITM3180 WIR Inspection for the
Flowmeter at South Side - 9 units
Project: 5 Activity: WFITM3190 WIR Inspection for the
Flowmeter at North Side - 9 units
Project: 5 Activity: WFITM3200 Installation of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM3210 WIR Inspection of Sampling
point at South Side - 9 units
Project: 5 Activity: WFITM3220 WIR Inspection of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM3900 Underdrain DMF2 - Install
scaffold roof
Project: 5 Activity: WFITM3910 Underdrain DMF2 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM3920 Underdrain DMF2 - Modify
scaffold access
Project: 5 Activity: WFITM3930 Underdrain DMF2 - Clearing
works
Project: 5 Activity: WFITM3940 Underdrain DMF2 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM3950 Underdrain DMF2 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM3960 Underdrain DMF2 - Air header
pipe installation.
Project: 5 Activity: WFITM3970 Underdrain DMF2 - Air Header
pipe survey
Project: 5 Activity: WFITM3980 Underdrain DMF2 - Anchor rod
installation
Project: 5 Activity: WFITM3990 Underdrain DMF2 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4000 Underdrain DMF2 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4010 Underdrain DMF2 -
Installation of FRP Plates
Project: 5 Activity: WFITM4020 Underdrain DMF2 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4030 Underdrain DMF2 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4040 Underdrain DMF2 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4050 Underdrain DMF2 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4060 Underdrain DMF2 - Protection
covers of the underdrains
Project: 5 Activity: WFITM4070 Underdrain DMF2 - WIR
Inspection
Project: 5 Activity: WFITM4080 LAUNSDERS DMF2 - Chipping for
Launders of
Project: 5 Activity: WFITM4090 LAUNSDERS DMF2 - Install
scaffolding
Project: 5 Activity: WFITM4100 LAUNSDERS DMF2 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM4110 LAUNSDERS DMF2 - Placement of
Launders
Project: 5 Activity: WFITM4120 LAUNSDERS DMF2 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM4130 LAUNSDERS DMF2 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM4140 LAUNSDERS DMF2 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM4150 LAUNSDERS DMF2 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM4160 LAUNSDERS DMF2 - Formworks &
Grouting
Project: 5 Activity: WFITM4490 Underdrain DMF4 - Install
scaffold roof
Project: 5 Activity: WFITM4500 Underdrain DMF4 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM4510 Underdrain DMF4 - Modify
scaffold access
Project: 5 Activity: WFITM4520 Underdrain DMF4 - Clearing
works
Project: 5 Activity: WFITM4530 Underdrain DMF4 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM4540 Underdrain DMF4 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM4550 Underdrain DMF4 - Air header
pipe installation.
Project: 5 Activity: WFITM4560 Underdrain DMF4 - Air Header
pipe survey
Project: 5 Activity: WFITM4570 Underdrain DMF4 - Anchor rod
installation
Project: 5 Activity: WFITM4580 Underdrain DMF4 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4590 Underdrain DMF4 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4600 Underdrain DMF4 -
Installation of FRP Plates
Project: 5 Activity: WFITM4610 Underdrain DMF4 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4620 Underdrain DMF4 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4630 Underdrain DMF4 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4640 Underdrain DMF4 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4650 Underdrain DMF4 - Protection
covers of the underdrains
Project: 5 Activity: WFITM4660 Underdrain DMF4 - WIR
Inspection
Project: 5 Activity: WFITM4670 LAUNSDERS DMF4 - Chipping for
Launders of
Project: 5 Activity: WFITM4680 LAUNSDERS DMF4 - Install
scaffolding
Project: 5 Activity: WFITM4690 LAUNSDERS DMF4 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM4700 LAUNSDERS DMF4 - Placement of
Launders
Project: 5 Activity: WFITM4710 LAUNSDERS DMF4 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM4720 LAUNSDERS DMF4 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM4730 LAUNSDERS DMF4 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM4740 LAUNSDERS DMF4 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM4750 LAUNSDERS DMF4 - Formworks &
Grouting
Project: 5 Activity: WFITM4830 Underdrain DMF6 - Install
scaffold roof
Project: 5 Activity: WFITM4840 Underdrain DMF6 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM4850 Underdrain DMF6 - Modify
scaffold access
Project: 5 Activity: WFITM4860 Underdrain DMF6 - Clearing
works
Project: 5 Activity: WFITM4870 Underdrain DMF6 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM4880 Underdrain DMF6 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM4890 Underdrain DMF6 - Air header
pipe installation.
Project: 5 Activity: WFITM4900 Underdrain DMF6 - Air Header
pipe survey
Project: 5 Activity: WFITM4910 Underdrain DMF6 - Anchor rod
installation
Project: 5 Activity: WFITM4920 Underdrain DMF6 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4930 Underdrain DMF6 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4940 Underdrain DMF6 -
Installation of FRP Plates
Project: 5 Activity: WFITM4950 Underdrain DMF6 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4960 Underdrain DMF6 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4970 Underdrain DMF6 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4980 Underdrain DMF6 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4990 Underdrain DMF6 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5000 Underdrain DMF6 - WIR
Inspection
Project: 5 Activity: WFITM5010 LAUNSDERS DMF6 - Chipping for
Launders of
Project: 5 Activity: WFITM5020 LAUNSDERS DMF6 - Install
scaffolding
Project: 5 Activity: WFITM5030 LAUNSDERS DMF6 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5040 LAUNSDERS DMF6 - Placement of
Launders
Project: 5 Activity: WFITM5050 LAUNSDERS DMF6 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5060 LAUNSDERS DMF6 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5070 LAUNSDERS DMF6 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5080 LAUNSDERS DMF6 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5090 LAUNSDERS DMF6 - Formworks &
Grouting
Project: 5 Activity: WFITM5100 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5110 Underdrain DMF8 - Pull-off
Test
Project: 5 Activity: WFITM5120 Underdrain DMF8 - Flume
Handover
Project: 5 Activity: WFITM5130 Underdrain DMF8 - Scour air
piping flushing
Project: 5 Activity: WFITM5140 Underdrain DMF8 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5150 Underdrain DMF8 - Hydrotest
DN900
Project: 5 Activity: WFITM5160 Underdrain DMF8 - Scour air
piping pressure test
Project: 5 Activity: WFITM5170 Underdrain DMF8 - Install
scaffold roof
Project: 5 Activity: WFITM5180 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5190 Underdrain DMF8 - Modify
scaffold access
Project: 5 Activity: WFITM5200 Underdrain DMF8 - Clearing
works
Project: 5 Activity: WFITM5210 Underdrain DMF8 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5220 Underdrain DMF8 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5230 Underdrain DMF8 - Air header
pipe installation.
Project: 5 Activity: WFITM5240 Underdrain DMF8 - Air Header
pipe survey
Project: 5 Activity: WFITM5250 Underdrain DMF8 - Anchor rod
installation
Project: 5 Activity: WFITM5260 Underdrain DMF8 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5270 Underdrain DMF8 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5280 Underdrain DMF8 -
Installation of FRP Plates
Project: 5 Activity: WFITM5290 Underdrain DMF8 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5300 Underdrain DMF8 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5310 Underdrain DMF8 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5320 Underdrain DMF8 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5330 Underdrain DMF8 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5340 Underdrain DMF8 - WIR
Inspection
Project: 5 Activity: WFITM5350 LAUNSDERS DMF8 - Chipping for
Launders of
Project: 5 Activity: WFITM5360 LAUNSDERS DMF8 - Install
scaffolding
Project: 5 Activity: WFITM5370 LAUNSDERS DMF8 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5380 LAUNSDERS DMF8 - Placement of
Launders
Project: 5 Activity: WFITM5390 LAUNSDERS DMF8 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5400 LAUNSDERS DMF8 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5410 LAUNSDERS DMF8 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5420 LAUNSDERS DMF8 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5430 LAUNSDERS DMF8 - Formworks &
Grouting
Project: 5 Activity: WFITM5440 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5450 Underdrain DMF1 - Pull-off
Test
Project: 5 Activity: WFITM5460 Underdrain DMF1 - Flume
Handover
Project: 5 Activity: WFITM5470 Underdrain DMF1 - Scour air
piping flushing
Project: 5 Activity: WFITM5480 Underdrain DMF1 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5490 Underdrain DMF1 - Hydrotest
DN900
Project: 5 Activity: WFITM5500 Underdrain DMF1 - Scour air
piping pressure test
Project: 5 Activity: WFITM5510 Underdrain DMF1 - Install
scaffold roof
Project: 5 Activity: WFITM5520 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5530 Underdrain DMF1 - Modify
scaffold access
Project: 5 Activity: WFITM5540 Underdrain DMF1 - Clearing
works
Project: 5 Activity: WFITM5550 Underdrain DMF1 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5560 Underdrain DMF1 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5570 Underdrain DMF1 - Air header
pipe installation.
Project: 5 Activity: WFITM5580 Underdrain DMF1 - Air Header
pipe survey
Project: 5 Activity: WFITM5590 Underdrain DMF1 - Anchor rod
installation
Project: 5 Activity: WFITM5600 Underdrain DMF1 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5610 Underdrain DMF1 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5620 Underdrain DMF1 -
Installation of FRP Plates
Project: 5 Activity: WFITM5630 Underdrain DMF1 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5640 Underdrain DMF1 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5650 Underdrain DMF1 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5660 Underdrain DMF1 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5670 Underdrain DMF1 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5680 Underdrain DMF1 - WIR
Inspection
Project: 5 Activity: WFITM5690 LAUNSDERS DMF1 - Chipping for
Launders of
Project: 5 Activity: WFITM5700 LAUNSDERS DMF1 - Install
scaffolding
Project: 5 Activity: WFITM5710 LAUNSDERS DMF1 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5720 LAUNSDERS DMF1 - Placement of
Launders
Project: 5 Activity: WFITM5730 LAUNSDERS DMF1 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5740 LAUNSDERS DMF1 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5750 LAUNSDERS DMF1 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5760 LAUNSDERS DMF1 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5770 LAUNSDERS DMF1 - Formworks &
Grouting
Project: 5 Activity: WFITM5780 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5790 Underdrain DMF3 - Pull-off
Test
Project: 5 Activity: WFITM5800 Underdrain DMF3 - Flume
Handover
Project: 5 Activity: WFITM5810 Underdrain DMF3 - Scour air
piping flushing
Project: 5 Activity: WFITM5820 Underdrain DMF3 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5830 Underdrain DMF3 - Hydrotest
DN900
Project: 5 Activity: WFITM5840 Underdrain DMF3 - Scour air
piping pressure test
Project: 5 Activity: WFITM5850 Underdrain DMF3 - Install
scaffold roof
Project: 5 Activity: WFITM5860 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5870 Underdrain DMF3 - Modify
scaffold access
Project: 5 Activity: WFITM5880 Underdrain DMF3 - Clearing
works
Project: 5 Activity: WFITM5890 Underdrain DMF3 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5900 Underdrain DMF3 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5910 Underdrain DMF3 - Air header
pipe installation.
Project: 5 Activity: WFITM5920 Underdrain DMF3 - Air Header
pipe survey
Project: 5 Activity: WFITM5930 Underdrain DMF3 - Anchor rod
installation
Project: 5 Activity: WFITM5940 Underdrain DMF3 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5950 Underdrain DMF3 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5960 Underdrain DMF3 -
Installation of FRP Plates
Project: 5 Activity: WFITM5970 Underdrain DMF3 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5980 Underdrain DMF3 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5990 Underdrain DMF3 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6000 Underdrain DMF3 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6010 Underdrain DMF3 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6020 Underdrain DMF3 - WIR
Inspection
Project: 5 Activity: WFITM6030 LAUNSDERS DMF3 - Chipping for
Launders of
Project: 5 Activity: WFITM6040 LAUNSDERS DMF3 - Install
scaffolding
Project: 5 Activity: WFITM6050 LAUNSDERS DMF3 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6060 LAUNSDERS DMF3 - Placement of
Launders
Project: 5 Activity: WFITM6070 LAUNSDERS DMF3 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6080 LAUNSDERS DMF3 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6090 LAUNSDERS DMF3 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6100 LAUNSDERS DMF3 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6110 LAUNSDERS DMF3 - Formworks &
Grouting
Project: 5 Activity: WFITM6120 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6130 Underdrain DMF5 - Pull-off
Test
Project: 5 Activity: WFITM6140 Underdrain DMF5 - Flume
Handover
Project: 5 Activity: WFITM6150 Underdrain DMF5 - Scour air
piping flushing
Project: 5 Activity: WFITM6160 Underdrain DMF5 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM6170 Underdrain DMF5 - Hydrotest
DN900
Project: 5 Activity: WFITM6180 Underdrain DMF5 - Scour air
piping pressure test
Project: 5 Activity: WFITM6190 Underdrain DMF5 - Install
scaffold roof
Project: 5 Activity: WFITM6200 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6210 Underdrain DMF5 - Modify
scaffold access
Project: 5 Activity: WFITM6220 Underdrain DMF5 - Clearing
works
Project: 5 Activity: WFITM6230 Underdrain DMF5 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6240 Underdrain DMF5 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6250 Underdrain DMF5 - Air header
pipe installation.
Project: 5 Activity: WFITM6260 Underdrain DMF5 - Air Header
pipe survey
Project: 5 Activity: WFITM6270 Underdrain DMF5 - Anchor rod
installation
Project: 5 Activity: WFITM6280 Underdrain DMF5 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6290 Underdrain DMF5 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6300 Underdrain DMF5 -
Installation of FRP Plates
Project: 5 Activity: WFITM6310 Underdrain DMF5 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6320 Underdrain DMF5 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6330 Underdrain DMF5 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6340 Underdrain DMF5 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6350 Underdrain DMF5 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6360 Underdrain DMF5 - WIR
Inspection
Project: 5 Activity: WFITM6370 LAUNSDERS DMF5 - Chipping for
Launders of
Project: 5 Activity: WFITM6380 LAUNSDERS DMF5 - Install
scaffolding
Project: 5 Activity: WFITM6390 LAUNSDERS DMF5 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6400 LAUNSDERS DMF5 - Placement of
Launders
Project: 5 Activity: WFITM6410 LAUNSDERS DMF5 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6420 LAUNSDERS DMF5 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6430 LAUNSDERS DMF5 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6440 LAUNSDERS DMF5 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6450 LAUNSDERS DMF5 - Formworks &
Grouting
Project: 5 Activity: WFITM6530 Underdrain DMF7 - Install
scaffold roof
Project: 5 Activity: WFITM6540 Underdrain DMF7 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6550 Underdrain DMF7 - Modify
scaffold access
Project: 5 Activity: WFITM6560 Underdrain DMF7 - Clearing
works
Project: 5 Activity: WFITM6570 Underdrain DMF7 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6580 Underdrain DMF7 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6590 Underdrain DMF7 - Air header
pipe installation.
Project: 5 Activity: WFITM6600 Underdrain DMF7 - Air Header
pipe survey
Project: 5 Activity: WFITM6610 Underdrain DMF7 - Anchor rod
installation
Project: 5 Activity: WFITM6620 Underdrain DMF7 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6630 Underdrain DMF7 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6640 Underdrain DMF7 -
Installation of FRP Plates
Project: 5 Activity: WFITM6650 Underdrain DMF7 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6660 Underdrain DMF7 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6670 Underdrain DMF7 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6680 Underdrain DMF7 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6690 Underdrain DMF7 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6700 Underdrain DMF7 - WIR
Inspection
Project: 5 Activity: WFITM6710 LAUNSDERS DMF7 - Chipping for
Launders of
Project: 5 Activity: WFITM6720 LAUNSDERS DMF7 - Install
scaffolding
Project: 5 Activity: WFITM6730 LAUNSDERS DMF7 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6740 LAUNSDERS DMF7 - Placement of
Launders
Project: 5 Activity: WFITM6750 LAUNSDERS DMF7 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6760 LAUNSDERS DMF7 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6770 LAUNSDERS DMF7 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6780 LAUNSDERS DMF7 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6790 LAUNSDERS DMF7 - Formworks &
Grouting
Project: 5 Activity: WFITM6870 Underdrain DMF9 - Install
scaffold roof
Project: 5 Activity: WFITM6880 Underdrain DMF9 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6890 Underdrain DMF9 - Modify
scaffold access
Project: 5 Activity: WFITM6900 Underdrain DMF9 - Clearing
works
Project: 5 Activity: WFITM6910 Underdrain DMF9 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6920 Underdrain DMF9 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6930 Underdrain DMF9 - Air header
pipe installation.
Project: 5 Activity: WFITM6940 Underdrain DMF9 - Air Header
pipe survey
Project: 5 Activity: WFITM6950 Underdrain DMF9 - Anchor rod
installation
Project: 5 Activity: WFITM6960 Underdrain DMF9 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6970 Underdrain DMF9 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6980 Underdrain DMF9 -
Installation of FRP Plates
Project: 5 Activity: WFITM6990 Underdrain DMF9 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7000 Underdrain DMF9 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM7010 Underdrain DMF9 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7020 Underdrain DMF9 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM7030 Underdrain DMF9 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7040 Underdrain DMF9 - WIR
Inspection
Project: 5 Activity: WFITM7050 LAUNSDERS DMF9 - Chipping for
Launders of
Project: 5 Activity: WFITM7060 LAUNSDERS DMF9 - Install
scaffolding
Project: 5 Activity: WFITM7070 LAUNSDERS DMF9 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7080 LAUNSDERS DMF9 - Placement of
Launders
Project: 5 Activity: WFITM7090 LAUNSDERS DMF9 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7100 LAUNSDERS DMF9 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7110 LAUNSDERS DMF9 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7120 LAUNSDERS DMF9 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7130 LAUNSDERS DMF9 - Formworks &
Grouting
Project: 5 Activity: WFITM7210 Underdrain DMF17 - Install
scaffold roof
Project: 5 Activity: WFITM7220 Underdrain DMF17 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7230 Underdrain DMF17 - Modify
scaffold access
Project: 5 Activity: WFITM7240 Underdrain DMF17 - Clearing
works
Project: 5 Activity: WFITM7250 Underdrain DMF17 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM7260 Underdrain DMF17 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7270 Underdrain DMF17 - Air header
pipe installation.
Project: 5 Activity: WFITM7280 Underdrain DMF17 - Air Header
pipe survey
Project: 5 Activity: WFITM7290 Underdrain DMF17 - Anchor rod
installation
Project: 5 Activity: WFITM7300 Underdrain DMF17 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7310 Underdrain DMF17 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM7320 Underdrain DMF17 -
Installation of FRP Plates
Project: 5 Activity: WFITM7330 Underdrain DMF17 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7340 Underdrain DMF17 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM7350 Underdrain DMF17 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7360 Underdrain DMF17 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM7370 Underdrain DMF17 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7380 Underdrain DMF17 - WIR
Inspection
Project: 5 Activity: WFITM7390 LAUNSDERS DMF17 - Chipping
for Launders of
Project: 5 Activity: WFITM7400 LAUNSDERS DMF17 - Install
scaffolding
Project: 5 Activity: WFITM7410 LAUNSDERS DMF17 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7420 LAUNSDERS DMF17 - Placement
of Launders
Project: 5 Activity: WFITM7430 LAUNSDERS DMF17 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7440 LAUNSDERS DMF17 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7450 LAUNSDERS DMF17 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7460 LAUNSDERS DMF17 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7470 LAUNSDERS DMF17 - Formworks &
Grouting
Project: 5 Activity: WFITM7550 Underdrain DMF13 - Install
scaffold roof
Project: 5 Activity: WFITM7560 Underdrain DMF13 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7570 Underdrain DMF13 - Modify
scaffold access
Project: 5 Activity: WFITM7580 Underdrain DMF13 - Clearing
works
Project: 5 Activity: WFITM7590 Underdrain DMF13 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM7600 Underdrain DMF13 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7610 Underdrain DMF13 - Air header
pipe installation.
Project: 5 Activity: WFITM7620 Underdrain DMF13 - Air Header
pipe survey
Project: 5 Activity: WFITM7630 Underdrain DMF13 - Anchor rod
installation
Project: 5 Activity: WFITM7640 Underdrain DMF13 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7650 Underdrain DMF13 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM7660 Underdrain DMF13 -
Installation of FRP Plates
Project: 5 Activity: WFITM7670 Underdrain DMF13 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7680 Underdrain DMF13 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM7690 Underdrain DMF13 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7700 Underdrain DMF13 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM7710 Underdrain DMF13 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7720 Underdrain DMF13 - WIR
Inspection
Project: 5 Activity: WFITM7730 LAUNSDERS DMF13 - Chipping
for Launders of
Project: 5 Activity: WFITM7740 LAUNSDERS DMF13 - Install
scaffolding
Project: 5 Activity: WFITM7750 LAUNSDERS DMF13 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7760 LAUNSDERS DMF13 - Placement
of Launders
Project: 5 Activity: WFITM7770 LAUNSDERS DMF13 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7780 LAUNSDERS DMF13 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7790 LAUNSDERS DMF13 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7800 LAUNSDERS DMF13 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7810 LAUNSDERS DMF13 - Formworks &
Grouting
Project: 5 Activity: WFITM7890 Underdrain DMF15 - Install
scaffold roof
Project: 5 Activity: WFITM7900 Underdrain DMF15 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7910 Underdrain DMF15 - Modify
scaffold access
Project: 5 Activity: WFITM7920 Underdrain DMF15 - Clearing
works
Project: 5 Activity: WFITM7930 Underdrain DMF15 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM7940 Underdrain DMF15 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7950 Underdrain DMF15 - Air header
pipe installation.
Project: 5 Activity: WFITM7960 Underdrain DMF15 - Air Header
pipe survey
Project: 5 Activity: WFITM7970 Underdrain DMF15 - Anchor rod
installation
Project: 5 Activity: WFITM7980 Underdrain DMF15 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7990 Underdrain DMF15 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8000 Underdrain DMF15 -
Installation of FRP Plates
Project: 5 Activity: WFITM8010 Underdrain DMF15 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8020 Underdrain DMF15 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8030 Underdrain DMF15 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8040 Underdrain DMF15 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8050 Underdrain DMF15 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8060 Underdrain DMF15 - WIR
Inspection
Project: 5 Activity: WFITM8070 LAUNSDERS DMF15 - Chipping
for Launders of
Project: 5 Activity: WFITM8080 LAUNSDERS DMF15 - Install
scaffolding
Project: 5 Activity: WFITM8090 LAUNSDERS DMF15 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8100 LAUNSDERS DMF15 - Placement
of Launders
Project: 5 Activity: WFITM8110 LAUNSDERS DMF15 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8120 LAUNSDERS DMF15 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8130 LAUNSDERS DMF15 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8140 LAUNSDERS DMF15 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8150 LAUNSDERS DMF15 - Formworks &
Grouting
Project: 5 Activity: WFITM8160 Underdrain DMF11 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8170 Underdrain DMF11 - Pull-off
Test
Project: 5 Activity: WFITM8180 Underdrain DMF11 - Flume
Handover
Project: 5 Activity: WFITM8190 Underdrain DMF11 - Scour air
piping flushing
Project: 5 Activity: WFITM8200 Underdrain DMF11 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8210 Underdrain DMF11 - Hydrotest
DN900
Project: 5 Activity: WFITM8220 Underdrain DMF11 - Scour air
piping pressure test
Project: 5 Activity: WFITM8230 Underdrain DMF11 - Install
scaffold roof
Project: 5 Activity: WFITM8240 Underdrain DMF11 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8250 Underdrain DMF11 - Modify
scaffold access
Project: 5 Activity: WFITM8260 Underdrain DMF11 - Clearing
works
Project: 5 Activity: WFITM8270 Underdrain DMF11 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM8280 Underdrain DMF11 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8290 Underdrain DMF11 - Air header
pipe installation.
Project: 5 Activity: WFITM8300 Underdrain DMF11 - Air Header
pipe survey
Project: 5 Activity: WFITM8310 Underdrain DMF11 - Anchor rod
installation
Project: 5 Activity: WFITM8320 Underdrain DMF11 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM8330 Underdrain DMF11 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8340 Underdrain DMF11 -
Installation of FRP Plates
Project: 5 Activity: WFITM8350 Underdrain DMF11 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8360 Underdrain DMF11 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8370 Underdrain DMF11 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8380 Underdrain DMF11 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8390 Underdrain DMF11 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8400 Underdrain DMF11 - WIR
Inspection
Project: 5 Activity: WFITM8410 LAUNSDERS DMF11 - Chipping
for Launders
Project: 5 Activity: WFITM8420 LAUNSDERS DMF11 - Install
scaffolding
Project: 5 Activity: WFITM8430 LAUNSDERS DMF11 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8440 LAUNSDERS DMF11 - Placement
of Launders
Project: 5 Activity: WFITM8450 LAUNSDERS DMF11 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8460 LAUNSDERS DMF11 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8470 LAUNSDERS DMF11 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8480 LAUNSDERS DMF11 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8490 LAUNSDERS DMF11 - Formworks &
Grouting
Project: 5 Activity: WFITM8500 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8510 Underdrain DMF10 - Pull-off
Test
Project: 5 Activity: WFITM8520 Underdrain DMF10 - Flume
Handover
Project: 5 Activity: WFITM8530 Underdrain DMF10 - Scour air
piping flushing
Project: 5 Activity: WFITM8540 Underdrain DMF10 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8550 Underdrain DMF10 - Hydrotest
DN900
Project: 5 Activity: WFITM8560 Underdrain DMF10 - Scour air
piping pressure test
Project: 5 Activity: WFITM8570 Underdrain DMF10 - Install
scaffold roof
Project: 5 Activity: WFITM8580 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8590 Underdrain DMF10 - Modify
scaffold access
Project: 5 Activity: WFITM8600 Underdrain DMF10 - Clearing
works
Project: 5 Activity: WFITM8610 Underdrain DMF10 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8620 Underdrain DMF10 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8630 Underdrain DMF10 - Air header
pipe installation.
Project: 5 Activity: WFITM8640 Underdrain DMF10 - Air Header
pipe survey
Project: 5 Activity: WFITM8650 Underdrain DMF10 - Anchor rod
installation
Project: 5 Activity: WFITM8660 Underdrain DMF10 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM8670 Underdrain DMF10 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8680 Underdrain DMF10 -
Installation of FRP Plates
Project: 5 Activity: WFITM8690 Underdrain DMF10 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8700 Underdrain DMF10 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8710 Underdrain DMF10 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8720 Underdrain DMF10 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8730 Underdrain DMF10 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8740 Underdrain DMF10 - WIR
Inspection
Project: 5 Activity: WFITM8750 LAUNSDERS DMF10 - Chipping
for Launders of
Project: 5 Activity: WFITM8760 LAUNSDERS DMF10 - Install
scaffolding
Project: 5 Activity: WFITM8770 LAUNSDERS DMF10 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8780 LAUNSDERS DMF10 - Placement
of Launders
Project: 5 Activity: WFITM8790 LAUNSDERS DMF10 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8800 LAUNSDERS DMF10 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8810 LAUNSDERS DMF10 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8820 LAUNSDERS DMF10 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8830 LAUNSDERS DMF10 - Formworks &
Grouting
Project: 5 Activity: WFITM8840 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8850 Underdrain DMF12 - Pull-off
Test
Project: 5 Activity: WFITM8860 Underdrain DMF12 - Flume
Handover
Project: 5 Activity: WFITM8870 Underdrain DMF12 - Scour air
piping flushing
Project: 5 Activity: WFITM8880 Underdrain DMF12 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8890 Underdrain DMF12 - Hydrotest
DN900
Project: 5 Activity: WFITM8900 Underdrain DMF12 - Scour air
piping pressure test
Project: 5 Activity: WFITM8910 Underdrain DMF12 - Install
scaffold roof
Project: 5 Activity: WFITM8920 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8930 Underdrain DMF12 - Modify
scaffold access
Project: 5 Activity: WFITM8940 Underdrain DMF12 - Clearing
works
Project: 5 Activity: WFITM8950 Underdrain DMF12 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8960 Underdrain DMF12 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8970 Underdrain DMF12 - Air header
pipe installation.
Project: 5 Activity: WFITM8980 Underdrain DMF12 - Air Header
pipe survey
Project: 5 Activity: WFITM8990 Underdrain DMF12 - Anchor rod
installation
Project: 5 Activity: WFITM9000 Underdrain DMF12 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9010 Underdrain DMF12 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9020 Underdrain DMF12 -
Installation of FRP Plates
Project: 5 Activity: WFITM9030 Underdrain DMF12 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9040 Underdrain DMF12 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9050 Underdrain DMF12 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9060 Underdrain DMF12 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9070 Underdrain DMF12 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9080 Underdrain DMF12 - WIR
Inspection
Project: 5 Activity: WFITM9090 LAUNSDERS DMF12 - Chipping
for Launders of
Project: 5 Activity: WFITM9100 LAUNSDERS DMF12 - Install
scaffolding
Project: 5 Activity: WFITM9110 LAUNSDERS DMF12 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9120 LAUNSDERS DMF12 - Placement
of Launders
Project: 5 Activity: WFITM9130 LAUNSDERS DMF12 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9140 LAUNSDERS DMF12 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9150 LAUNSDERS DMF12 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9160 LAUNSDERS DMF12 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9170 LAUNSDERS DMF12 - Formworks &
Grouting
Project: 5 Activity: WFITM9270 Underdrain DMF14 - Modify
scaffold access
Project: 5 Activity: WFITM9280 Underdrain DMF14 - Clearing
works
Project: 5 Activity: WFITM9290 Underdrain DMF14 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9300 Underdrain DMF14 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9310 Underdrain DMF14 - Air header
pipe installation.
Project: 5 Activity: WFITM9320 Underdrain DMF14 - Air Header
pipe survey
Project: 5 Activity: WFITM9330 Underdrain DMF14 - Anchor rod
installation
Project: 5 Activity: WFITM9340 Underdrain DMF14 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9350 Underdrain DMF14 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9360 Underdrain DMF14 -
Installation of FRP Plates
Project: 5 Activity: WFITM9370 Underdrain DMF14 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9380 Underdrain DMF14 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9390 Underdrain DMF14 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9400 Underdrain DMF14 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9410 Underdrain DMF14 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9420 Underdrain DMF14 - WIR
Inspection
Project: 5 Activity: WFITM9430 LAUNSDERS DMF14 - Chipping
for Launders of
Project: 5 Activity: WFITM9440 LAUNSDERS DMF14 - Install
scaffolding
Project: 5 Activity: WFITM9450 LAUNSDERS DMF14 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9460 LAUNSDERS DMF14 - Placement
of Launders
Project: 5 Activity: WFITM9470 LAUNSDERS DMF14 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9480 LAUNSDERS DMF14 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9490 LAUNSDERS DMF14 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9500 LAUNSDERS DMF14 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9510 LAUNSDERS DMF14 - Formworks &
Grouting
Project: 5 Activity: WFITM9590 Underdrain DMF16 - Install
scaffold roof
Project: 5 Activity: WFITM9600 Underdrain DMF16 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9610 Underdrain DMF16 - Modify
scaffold access
Project: 5 Activity: WFITM9620 Underdrain DMF16 - Clearing
works
Project: 5 Activity: WFITM9630 Underdrain DMF16 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9650 Underdrain DMF16 - Air header
pipe installation.
Project: 5 Activity: WFITM9660 Underdrain DMF16 - Air Header
pipe survey
Project: 5 Activity: WFITM9670 Underdrain DMF16 - Anchor rod
installation
Project: 5 Activity: WFITM9680 Underdrain DMF16 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9690 Underdrain DMF16 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9700 Underdrain DMF16 -
Installation of FRP Plates
Project: 5 Activity: WFITM9710 Underdrain DMF16 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9720 Underdrain DMF16 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9730 Underdrain DMF16 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9740 Underdrain DMF16 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9750 Underdrain DMF16 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9760 Underdrain DMF16 - WIR
Inspection
Project: 5 Activity: WFITM9770 LAUNSDERS DMF16 - Chipping
for Launders of
Project: 5 Activity: WFITM9780 LAUNSDERS DMF16 - Install
scaffolding
Project: 5 Activity: WFITM9790 LAUNSDERS DMF16 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9800 LAUNSDERS DMF16 - Placement
of Launders
Project: 5 Activity: WFITM9810 LAUNSDERS DMF16 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9820 LAUNSDERS DMF16 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9830 LAUNSDERS DMF16 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9840 LAUNSDERS DMF16 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9850 LAUNSDERS DMF16 - Formworks &
Grouting
Project: 5 Activity: WFITM9930 Underdrain DMF18 - Install
scaffold roof
Project: 5 Activity: WFITM9940 Underdrain DMF18 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9950 Underdrain DMF18 - Modify
scaffold access
Project: 5 Activity: WFITM9960 Underdrain DMF18 - Clearing
works
Project: 5 Activity: WFITM9970 Underdrain DMF18 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9980 Underdrain DMF18 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9990 Underdrain DMF18 - Air header
pipe installation.
Project: 5 Activity: WFITS1200 Wall Tank Lining Tank2
Project: 5 Activity: WFITS1330 Leak Repair Tanks 9 - ongoing
Project: 5 Activity: WFLTA1020 Epoxy Floor Coating on
platforms - under first drop priority areas
Project: 5 Activity: WFLTM1010 PressureTesting - Chemical
Piping - Done
Project: 5 Activity: WFLTM4050 1st Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFLTM4270 2nd Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFPLM1010 Excavation Works
Project: 5 Activity: WFSTS1000 Excavation & Lean Concrete
Project: 5 Activity: WFSTS1030 Water Filling
Project: 5 Activity: WIWCA1000 Install Guardrails - Rem.
bolts for Kick plates
Project: 5 Activity: WIWCA1010 Installation of Self Closing
gates - 3 units
Project: 5 Activity: WIWCA1020 Installation of portable
ladders
Project: 5 Activity: WIWCA1030 Fabrication of Cage at IW
Project: 5 Activity: WIWCA1040 WIR Inspection of Self
Closing gates - 3 units
Project: 5 Activity: WIWCA1050 Procurements of Railing
materials inc portable ladders and cage
Project: 5 Activity: WIWCA1060 Installation of Support for
portable ladders
Project: 5 Activity: WIWCA1070 Painting of Cage at IW
Project: 5 Activity: WIWCA1080 Installation of Cage at IW
Project: 5 Activity: WIWCA1090 WIR Inspection of Cage at IW
Project: 5 Activity: WIWCA1100 Fabrication of Portable
Supports
Project: 5 Activity: WIWCA1110 Painting of Portable Supports
Project: 5 Activity: WIWCA1120 WIR Inspection of Portable
Ladder Supports
Project: 5 Activity: WIWCA1130 Installation of Scaffolding
Supports for Cage at IW
Project: 5 Activity: WIWCE1000 Junction Box Installation
Project: 5 Activity: WIWCM1170 Procurement of Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCS1000 Tank Lining Inlet
Distribution Chamber at Overflow
Project: 5 Activity: WMCCA1010 Install Doors - by LEC Steel
- MCC1
Project: 5 Activity: WMCCA1020 Install Steel Grating - MCC1
(drawing dependent)
Project: 5 Activity: WMCCA1030 Install Louvers - MCC1
Project: 5 Activity: WMCCA1050 Ceiling Finishes - MCC1
Project: 5 Activity: WMCCA1070 Interior Painting - MCC1
Project: 5 Activity: WMCCE1050 Cable pulling - MCC1
Project: 5 Activity: WMCCM1000 Install Exhaust Fan - MCC1
Project: 5 Activity: WMGHS1000 Concrete Works
Project: 5 Activity: WMVTA1000 Finished Painting
Project: 5 Activity: WMVTE1000 Oil Separator Box (design
dependent)
Project: 5 Activity: WMVTE1010 Termination Works (waiting
for approval XLPE cables)
Project: 5 Activity: WSDBA1000 Masonry Works
Project: 5 Activity: WSDBE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WSDBE1010 Installation of grounding
system
Project: 5 Activity: WSDBM1000 FCCU Non Roof Deck
Project: 5 Activity: WSDBS1000 Structural Concrete Works
Project: 5 Activity: WSDBS1010 HVAC Miscellaneous Foundation
at Roof Deck
Project: 5 Activity: WSDLC1000 Backfilling MH3-1A to MH B-1
Project: 5 Activity: WSDLC1010 Slope Protection between MH3-
1A and MH B-1 (design dependent)
Project: 5 Activity: WSDLS1010 CSDN1000 MH B-1 to MH001
Project: 5 Activity: WSDLS1020 MH001
Project: 5 Activity: WSETA1010 Installation of Self Closing
gate- 1st Priority 4, 5, 6
Project: 5 Activity: WSETA1020 Floor Coating at Concrete
Platform - 1st Priority
Project: 5 Activity: WSETA1050 Installation of Self Closing
gate- 2nd Priority 1, 2,3
Project: 5 Activity: WSETE1080 Termination works Tank 4
Project: 5 Activity: WSETE1090 Termination works Tank 1
Project: 5 Activity: WSETI1000 Installation of instrument
support Train 6
Project: 5 Activity: WSETI1010 Installation of instrument
support Train 5
Project: 5 Activity: WSETI1020 Installation of instrument
support Train 4
Project: 5 Activity: WSETI1030 Installation of instrument
support Train 3
Project: 5 Activity: WSETI1040 Installation of instrument
support Train 2
Project: 5 Activity: WSETI1050 Installation of instrument
support Train 1
Project: 5 Activity: WSETI1060 Instrumentation NTU Train 6 &
Common Channel (Waiting housing)
Project: 5 Activity: WSETM2880 Procurement of Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2980 Installation of Sludge
Extraction Unit Tank 4
Project: 5 Activity: WSETM3220 Installation of Scaffolding
Supports for Lamella Support Tank 3
Project: 5 Activity: WSETM3230 Hauling of Lamella Support
Installation Tank 3
Project: 5 Activity: WSETM3240 WIR Inspection for Lamella
Support Tank 3
Project: 5 Activity: WSETM3250 Layout for Lamella Support
Tank 3
Project: 5 Activity: WSETM3260 WIR Inspection of Layout for
Lamella Support Tank 3
Project: 5 Activity: WSETM3550 Hauling of Lamella Support
Installation Tank 2
Project: 5 Activity: WSETM3560 Installation of Scaffolding
Supports Lamella Support Installation Tank 2
Project: 5 Activity: WSETM3570 Layout for Lamella Support
Installation Tank 2
Project: 5 Activity: WSETM3580 WIR Inspection for Layout of
Lamella Support Installation Tank 2
Project: 5 Activity: WSETM3590 Installation of Lamella
Support Installation Tank 2
Project: 5 Activity: WSETM3760 Installation of Sludge
Extraction Unit Tank 2
Project: 5 Activity: WSETM4070 WIR Inspection of Lamella
Support Installation Tank 2
Project: 5 Activity: WSETM4080 Installation for Lamella
Support Tank 3
Project: 5 Activity: WSIDC3500 Protection of Chemical
Trenches (Alum & Chlorination) at Road crossings
Project: 5 Activity: WSIDC4200 Sand backfilling -
Thickener/Slop Backfilling A1
Project: 5 Activity: WSIDC6000 Soil backfilling - Road6
Project: 5 Activity: WSIDC9200 Roads & Paving
Project: 5 Activity: WSLLE1010 Cable pulling
Project: 5 Activity: WSLLS1000 Application of Sealant for
Construction Joints (WAITING Sika primer)
Project: 5 Activity: WSLLS1010 Design for Chamber Covers - 4
units AAII, VCCI
Project: 5 Activity: WSLLS1020 Install Railings
Project: 5 Activity: WSLLS1030 Procurement of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1040 Fabrication of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1050 Painting of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1060 Installation of Chamber
Covers - 4 Units
Project: 5 Activity: WSLLS1070 WIR Inspection for
Installation of Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1080 Install Gates
Project: 5 Activity: WSLPS1000 Excavation & Lean Concrete
Project: 5 Activity: WSPPC1030 Construction of TB-02A (from
TWR to Drain) - done
Project: 5 Activity: WSPPC1040 MH4 - done
Project: 5 Activity: WSPPC1130 Rectification works of
Process pipe from MH3 to MH5
Project: 5 Activity: WSPPC1140 Concrete Encasement MH7 &
MH800
Project: 5 Activity: WSPPM1000 Install Sluice Gate - MH804A
& MH806A
Project: 5 Activity: WSPPM1010 Install Sluice Gate - MH806
Project: 5 Activity: WSTFM1000 Thickener Feed Tank Inlet
Sluice Gate
Project: 5 Activity: WSTFM1020 DN350 PIPE Installation
including Butterfly and check valves
Project: 5 Activity: WSTFM1040 Pipe Reducer - Remove from
p6 program
Project: 5 Activity: WSTFM1130 WIR Inspection for Thickener
Feed Tank Inlet Sluice Gate
Project: 5 Activity: WSTFM1150 Design for Thickener Feed
Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1160 Design for Thickener Feed
Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1170 Procurement of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1180 Procurement of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1190 Fabrication of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1200 Fabrication of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1210 Hydro Prep, Filling and
Flushing for DN350 PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1220 Hydrotest for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1230 Pipe Reinstatement for DN350
PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1240 WIR Inspection for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFS1010 Leak Repair Feed Tank 1 & 2
Project: 5 Activity: WSTFS1020 Tank Lining Feed Tank 1 & 2
Project: 5 Activity: WSTFS1030 Install Miscellaneous Steel
(Manhole Covers, Handrails, etc.)
Project: 5 Activity: WSTTA1000 Install Miscellaneous Steel
(Handrails)
Project: 5 Activity: WSTTM1000 Install Monorail @ Pump Room
Project: 5 Activity: WSTTM1010 Install Exhaust Air Louvers &
Outside Air Louvers @ Pump Room
Project: 5 Activity: WSWLM1020 Procurement
Project: 5 Activity: WSWLM1040 Service Water line
Project: 5 Activity: WSWLM1060 Procurement of the Pipe
Materials including delivery
Project: 5 Activity: WSWLM1080 Excavation for Pipes -
Section 1 CIVIL TEAM
Project: 5 Activity: WSWLM1110 Installation of Pipes
Project: 5 Activity: WSWLM1160 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1170 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1200 Excavation for Pipes -
Section 2 CIVIL TEAM
Project: 5 Activity: WSWLM1210 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1220 Installation of Pipes
Project: 5 Activity: WSWLM1230 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1320 Excavation for Pipes -
Section 3 CIVIL TEAM
Project: 5 Activity: WSWLM1330 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1340 Installation of Pipes
Project: 5 Activity: WSWLM1360 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1430 Excavation for Pipes -
Section 4 CIVIL TEAM
Project: 5 Activity: WSWLM1440 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1450 Installation of Pipes
Project: 5 Activity: WSWLM1470 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1540 Excavation for Pipes -
Section 5 CIVIL TEAM
Project: 5 Activity: WSWLM1550 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1560 Installation of Pipes
Project: 5 Activity: WSWLM1580 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1650 Excavation for Pipes -
Section 6 CIVIL TEAM
Project: 5 Activity: WSWLM1660 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1670 Installation of Pipes
Project: 5 Activity: WSWLM1690 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1760 Excavation for Pipes -
Section 7 CIVIL TEAM
Project: 5 Activity: WSWLM1770 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1780 Installation of Pipes
Project: 5 Activity: WSWLM1800 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1870 Excavation for Pipes -
Section 8 CIVIL TEAM
Project: 5 Activity: WSWLM1880 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1890 Installation of Pipes
Project: 5 Activity: WSWLM1910 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWPA1000 Install Handrails
Project: 5 Activity: WSWPA1010 Ceiling Finishes
Project: 5 Activity: WSWPA1020 Interior Wall Finishes
Project: 5 Activity: WSWPA1040 Install Steel Grating
Project: 5 Activity: WSWPE1010 Cable pulling
Project: 5 Activity: WSWPE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSWPE1030 Installation of grounding
system
Project: 5 Activity: WSWPM1000 Install Exhaust Fans
Project: 5 Activity: WSWPM1010 Install Monorail Crane -
DEMAG
Project: 5 Activity: WSWPM1020 Install Fire Dampers
Project: 5 Activity: WSWPM1030 Install Outside Air Louvers
(2)
Project: 5 Activity: WSWPM1040 Piping Works - REMOVE FROM P6
PROGRAM
Project: 5 Activity: WSWPM1050 Installation of Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1060 Installation of Service Water
Pump Skid
Project: 5 Activity: WSWPM1070 Installation of Motive Pump
Skid
Project: 5 Activity: WSWPM1110 Waiting for AAII DRR for
Motive Pump Skid
Project: 5 Activity: WSWPM1120 Fixing and alignment for
Motive Pump Skid
Project: 5 Activity: WSWPM1130 WIR Inspection for Fixing and
alignment for Motive Pump Skid
Project: 5 Activity: WSWPM1140 Grouting for Motive Pump Skid
Project: 5 Activity: WSWPM1150 WIR Inspection for Grouting
of Motive Pump Skid
Project: 5 Activity: WSWPM1170 Fabrication of Pipe Supports
for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1180 Painting of Pipe Supports for
Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1190 Installation of Pipe Supports
for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1200 WIR Inspection for
Installation of Pipe Supports for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1210 Piping installation for
Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1220 Hydrotest for pipes of
Suction Line of Motive Pump Skid including the HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1230 WIR Inspection for Hydrotest
for pipes of Suction Line of Motive Pump Skid including the HDPE Pipe connecting
to TWR
Project: 5 Activity: WSWPM1240 Fabrication of Pipe Supports
for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1250 Painting of Pipe Supports for
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1260 Installation of Pipe Supports
for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1270 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1280 Piping installation for
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1290 Hydrotest for pipes of
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1300 WIR Inspection for Hydrotest
for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1310 Pipe reinstatement for pipes
of Suction Line of MPS including the HDPE Pipe connecting to TWR after the
hydrotest
Project: 5 Activity: WSWPM1320 Pipe reinstatement for pipes
of Discharge Line of Motive Pump Skid after hydrotest
Project: 5 Activity: WSWPM1330 Procurement HDPE Pipe,
Valves, flange and 20mm plate connecting to TWR
Project: 5 Activity: WSWPM1340 Fabrication of HDPE Suction
Pipe connecting to TWR
Project: 5 Activity: WSWPM1350 Installation HDPE Pipe
connecting to TWR
Project: 5 Activity: WSWPM1360 WIR Inspection for
Installation HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1370 Fabrication of Pipe Supports
for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1380 Painting of Pipe Supports for
HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1390 Installation of Pipe Supports
for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1400 WIR Inspection of Pipe
Supports for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1410 Fabrication of 20mm thk TWR
Outlet Header End plate for HDPE Pipe Suction Connection
Project: 5 Activity: WSWPM1420 Installation of 20mm thk TWR
Outlet Header End plate for HDPE Pipe Suction Connection
Project: 5 Activity: WSWPM1430 WIR Inspection for
Installation of 20mm thk TWR Outlet Header End plate for HDPE Pipe Suction
Connection
Project: 5 Activity: WSWPM1440 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of MPS including the HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1450 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1470 Installation of Nozzles for
SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1480 Paingting of Nozzles for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1490 WIR Inspection and NDT for
Installation of Nozzles for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1510 Installation of Valves for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1520 WIR Inspection for
Installation of Valves for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1530 Fixing and alignment for Fire
Fighting pump Skid - 2 units
Project: 5 Activity: WSWPM1540 WIR Inspection for Fixing and
alignment for Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1550 Grouting for Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1560 WIR Inspection for Grouting
of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1570 Fabrication of Pipe Supports
for Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1580 Painting of Pipe Supports for
Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1590 Installation of Pipe Supports
for Suction Line of Fire Fighting Pump Skid -2 units
Project: 5 Activity: WSWPM1600 WIR Inspection for
Installation of Pipe Supports for Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1610 Piping installation for
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1620 Hydrotest for pipes of
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1630 WIR Inspection for Hydrotest
for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1640 Fabrication of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1650 Painting of Pipe Supports for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1660 Installation of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1670 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1680 Piping installation for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1690 Hydrotest for pipes of
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1700 WIR Inspection for Hydrotest
for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1710 Pipe reinstatement for pipes
of Suction Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1720 Pipe reinstatement for pipes
of Discharge Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1730 Fire Pump Shaft alignment for
Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1740 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1750 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1760 Fixing and alignment for
Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1770 WIR Inspection for Fixing and
alignment for Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1780 Grouting for Service Water
Pump Skid - 2 units
Project: 5 Activity: WSWPM1790 WIR Inspection for Grouting
of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1800 Fabrication of Pipe Supports
for Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1810 Painting of Pipe Supports for
Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1820 Installation of Pipe Supports
for Suction Line of Service Water Pump Skid -2 units
Project: 5 Activity: WSWPM1830 WIR Inspection for
Installation of Pipe Supports for Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1840 Piping installation for
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1850 Hydrotest for pipes of
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1860 WIR Inspection for Hydrotest
for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1870 Fabrication of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1880 Painting of Pipe Supports for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1890 Installation of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1900 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1910 Piping installation for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1920 Hydrotest for pipes of
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1930 WIR Inspection for Hydrotest
for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1940 Pipe reinstatement for pipes
of Suction Line of Service Water Pump Skid after the hydrotest
Project: 5 Activity: WSWPM1950 Pipe reinstatement for pipes
of Discharge Line of Service Water Pump Skid after hydrotest
Project: 5 Activity: WSWPM1970 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1980 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1990 Installation of Jockey Pump -
1 unit
Project: 5 Activity: WSWPM2000 WIR Inspection for
Installation of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2010 Fixing and Alignment of
Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2020 WIR Inspection for Fixing and
Alignment of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2040 Fabrication of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2050 Painting of Pipe Supports for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2060 Installation of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2070 WIR Inspection for
Installation of Pipe Supports for Suction Line and Discharge Line of Jockey Pump -
1 Unit
Project: 5 Activity: WSWPM2080 Piping installation for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2090 Hydrotest for pipes of
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2100 WIR Inspection for Hydrotest
for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2190 Pipe reinstatement for pipes
of Suction Line and Discharge Line of Jockey Pump - Including check valves
Project: 5 Activity: WSWPM2200 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2320 WIR Inspection for Install
Exhaust Fans
Project: 5 Activity: WSWPM2330 WIR Inspection for Install
Fire Dampers
Project: 5 Activity: WSWPM2340 WIR Inspection for Install
Outside Air Louvers (2)
Project: 5 Activity: WTA1M1000 Hydrotesting
Project: 5 Activity: WTA1M1010 Reinstatement of Piping after
Hydrotest & Installation of Valves and Flowmeter - Not included in Schedule
Project: 5 Activity: WTA1M1020 Modification of Fire Suction
Line
Project: 5 Activity: WTA1M1030 Fit-up Installation of Steel
Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1040 Painting works for Steel Pipe
from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1050 WIR Inspection for Painting
for Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1060 Modification of Service Water
Suction Line
Project: 5 Activity: WTA1M1070 Design Issue for the
Elevation of Pipes from Chamber 19 to AL-1 - AAII
Project: 5 Activity: WTA1M1080 UT Inspection for Steel Pipe
from Chamber 19 to AL-1 prior for Painting
Project: 5 Activity: WTA1M1100 WIR Inspection Fire and
Servicw Water Sunction Line
Project: 5 Activity: WTA1M1110 Installation of Scaffolding
Supports for Steel Pipes from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1120 WIR Inspection for Steel Pipe
from Chamber 19 to AL-1 prior for Painting
Project: 5 Activity: WTA1M1130 WIR Inspection for fit-up
Installation of Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1140 Full Welding Installation of
Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1150 WIR Inspection for Full
Welding Installation of Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1160 Hydrotest of Fire Suction
Line
Project: 5 Activity: WTA1M1170 Hydrotest of Service Water
Suction Line
Project: 5 Activity: WTA1M1180 Installation of Pipes for
Drain Line DN80
Project: 5 Activity: WTA1M1190 Fit-up Installation of Drain
Line
Project: 5 Activity: WTA1M1200 WIR Inspection for Fit-up
Installation of Drain Line
Project: 5 Activity: WTA1M1210 Full Welding Installation of
Drain Line
Project: 5 Activity: WTA1M1220 WIR Inspection for Full
welding Installation of Drain Line
Project: 5 Activity: WTA1M1230 UT Inspection of Drain Line
Project: 5 Activity: WTA1M1240 WIR Inspection of Drain Line
prior for Painting Works
Project: 5 Activity: WTA1M1250 Painting Works for Drain Line
Project: 5 Activity: WTA1M1260 WIR Inspection of Painting
Works for Drain Line
Project: 5 Activity: WTA1M1270 Installation of Valves for
Drain Line - 2 units
Project: 5 Activity: WTA1M1280 Fit-up Installation of Valve
for Drain Line -2 unirts
Project: 5 Activity: WTA1M1290 WIR Inspection for Fit-up
Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1300 Full Welding Installation of
Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1310 WIR Inspection for Full
welding Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1320 UT Inspection of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1330 WIR Inspection of Valve for
Drain Line prior for Painting Works - 2 units
Project: 5 Activity: WTA1M1340 Painting Works of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1350 WIR Inspection of Painting
Works of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1360 Installation of Threadolet
and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1370 WIR Inspection for
Installation of Threadolet and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1380 NDT Inspection for
Installation of Drain line and Sampling Line - AAII, VCCI, Witco
Project: 5 Activity: WTA1M1390 Painting works for Threadolet
and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1400 WIR Inspection of Painting
works for Threadolet and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1420 Installation of flanges for
Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1430 Painting of flanges for
Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1440 WIR Inspection of Painting of
flanges for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1450 Bolt Torquing for Valves
DN1400 of Chamber 16
Project: 5 Activity: WTA1M1460 WIR Inspection for Valves
DN1400 of Chamber 16
Project: 5 Activity: WTA1M1470 WIR Inspection for
Installation of flanges for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1480 UT Inspection for
Installation of flanges for Valves DN1400 of Chamber 16 - Prior for Painting
Project: 5 Activity: WTA1M1490 Installation of Valves DN1400
of Chamber 16
Project: 5 Activity: WTA1M1500 Installation of Scaffolding
for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1510 WIR Inspection prior for
installation of Valves DN1400 of Chamber 16 - AAII & VCCI
Project: 5 Activity: WTA1M1520 Installation of Scaffolding
Supports prior for installation of Valve for DN900
Project: 5 Activity: WTA1M1530 Installation of Valve for
DN900
Project: 5 Activity: WTA1M1540 Botl torquing of valve for
DN900
Project: 5 Activity: WTA1M1550 WIR Inspection for
Installation of Valve for DN900
Project: 5 Activity: WTA1M1560 WIR Inspection prior for the
Installation of valve for DN900
Project: 5 Activity: WTA1M1570 Procurement for Remaining
Bolts for DN1400 and DN900
Project: 5 Activity: WTA1M1580 Painting works for valve of
DN900
Project: 5 Activity: WTA1M1590 WIR Inspection Painting works
for valve of DN900
Project: 5 Activity: WTA1M1600 Procurement of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1610 Fabrication of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1620 Painting of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1630 Installation of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1640 WIR Inspection for the
Installation of materials for Chamber Covers - 5 units
Project: 5 Activity: WTA1M1650 Removal of Temporary blinds
inside of Tank 3 - 6 Units
Project: 5 Activity: WTA1M1660 Rectification works including
painting for pipes
Project: 5 Activity: WTA1M1670 WIR Final Joint Inspection -
Rectification works including painting for pipes -AAII, VCCI, WITCO
Project: 5 Activity: WTA1S1000 Backfilling Works part 1 -
for Hydrotesting
Project: 5 Activity: WTELS1010 Civil Works - 30M TOWER
Project: 5 Activity: WTIPC1000 Backfilling & Compaction -
Chamber15 to 13
Project: 5 Activity: WTIPC1010 Backfilling & Compaction -
Chamber 11 to 13
Project: 5 Activity: WTIPE1010 Duct bank Substation to MH14
- remaining backfill
Project: 5 Activity: WTIPI1000 At Header Tank: Install of
instrument junction box (300-GB-010)
Project: 5 Activity: WTIPM1010 Procurement for setting bolts
Project: 5 Activity: WTWRA1000 Procurement of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1010 Procurement of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1090 Painting of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1100 Fabrication of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1110 Install Railings at Perimeter
Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1120 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1130 Fabrication of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1140 Painting of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1150 Install Access Hatch Cover (3
units) - TWR Tank1&3
Project: 5 Activity: WTWRA1160 WIR Inspection Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1170 Fabrication of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1180 Painting of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1190 Install Access Hatch Cover (3
units) - TWR Tank 2
Project: 5 Activity: WTWRA1200 WIR Inspection of Access
Hatch Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1210 Painting of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1220 Fabrication of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1230 Install Railings at Perimeter
Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1240 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRC1000 Damp Proofing Works at
Exterior Walls
Project: 5 Activity: WTWRE1000 Termination works - Tank1&3
Project: 5 Activity: WTWRI1010 Installation of instruments -
Tank1&3
Project: 5 Activity: WTWRM1010 Installation of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1030 Procurement of Materials for
Chlorine Chemical Piping and Supports - TWR
Project: 5 Activity: WTWRM1040 Fabrication of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1050 Installation of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1060 Walkdown prior for
Hydrotesting of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1070 Hydrotesting of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1080 WIR Inspection of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1090 Design of Rectification Plan
for Sluice Gates Tank 1&2, Inlet and Outlet, Common - AAII
Project: 5 Activity: WTWRM1100 Procurement of materials for
Rectification Plan for Sluice Gates - AAII
Project: 5 Activity: WTWRM1110 Rectification of Sluice Gates
- Inlet Tank 1 (1 unit)
Project: 5 Activity: WTWRM1120 Rectification of Sluice Gates
- Outlet Tank 1 (4 units)
Project: 5 Activity: WTWRM1130 Rectification of Sluice Gates
- Drain Tank 1 (1 unit)
Project: 5 Activity: WTWRM1140 Rectification of Sluice Gates
- Common Sluice gates at FWT (2 units)
Project: 5 Activity: WTWRM1150 Rectification of Sluice Gates
- Inlet Tank 2 (1 unit)
Project: 5 Activity: WTWRM1160 Rectification of Sluice Gates
- Outlet Tank 2 (4 units)
Project: 5 Activity: WTWRM1170 Rectification of Sluice Gates
- Drain Tank 2 (1 unit)
Project: 5 Activity: WTWRM1190 WIR Inspection of Chlorine
Chemical Piping Supports - TWR
Project: 5 Activity: WTWRM1200 Hydrotesting prep, Filling
and Flushing of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1210 Pipe Reinstatement after
Hydrotesting of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRS1000 Formworks - TWR Tank2
Project: 5 Activity: WTWRS1070 Tank Lining TWR Tank 3
Project: 5 Activity: WTWRS1080 Tank Lining TWR Tank 1
Project: 5 Activity: WTWRS1110 Crack Repair of Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRS1150 Tank Lining Backwash Tank 2

Errors:
-------
Warnings:
---------
Activities without predecessors..................................1092
Project: 5 Activity: A1CS1010 Removal of Sheet Pile
Project: 5 Activity: A1CS1050 Pipe Support
Project: 5 Activity: A1CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A2C2430 Trench excavation
Project: 5 Activity: A2CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A3C1000 Fabrication of angle bar for
edging
Project: 5 Activity: A3C2730 Trench excavation
Project: 5 Activity: A4AC1000 Fabrication of angle bar for
edging
Project: 5 Activity: A4ACS1160 Blow Off Valve (BOV) at
Sta.0+035 Excavation
Project: 5 Activity: A4ACS1260 Blow Off Valve (BOV) at
Sta.3+588 Excavation
Project: 5 Activity: A4ACS1330 Blow Off Valve (BOV) at
Sta.4+422 Excavation
Project: 5 Activity: A4ACS1470 Blow Off Valve (BOV) at
Sta.7+136 Excavation
Project: 5 Activity: A4ACS1640 Combination Air Valve (CAV)
at Sta.9+835 Excavation
Project: 5 Activity: A4ACS1810 CAV Excavation at Sta. 3 +
373
Project: 5 Activity: AL1.1000 Riser Pipes & Other
Appurtenances
Project: 5 Activity: AL1.1030 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1240 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1C1030 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 0+115
Project: 5 Activity: AL2.1000 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL3.1020 Clearing and Dewatering
Project: 5 Activity: AL3.1110 Clearing and Dewatering
Project: 5 Activity: AL4a.1000 Cutting, Fit-up, and Welding
of Ring Flange
Project: 5 Activity: MCONX1090 VCCI Mobilization @ WTP
Project: 5 Activity: MCONX1100 EESI Mobilization @ WTP
Project: 5 Activity: MCONX1110 Chembond Mobilization @ WTP
Project: 5 Activity: MCONX1120 Sta. Clara Mobilization @ RWF
Project: 5 Activity: MCONX1130 Sta. Clara Mobilization @ WTP
Project: 5 Activity: MCONX1140 Prime Builders Mobilization @
WTP
Project: 5 Activity: OCABE1000 Service Entrance
Project: 5 Activity: OCABM1000 Yard Piping Works
Project: 5 Activity: OCABS1000 Building Structural Concrete
Project: 5 Activity: OCALI1000 Fabrication & Installation of
instruments supports
Project: 5 Activity: OCALM1000 Fabrication & Install
Chlorine Package System Pipe Supports
Project: 5 Activity: OCALM1010 Install ACU -condensate drain
remaining
Project: 5 Activity: ODUMS1000 Building Structural Concrete
Project: 5 Activity: OINDA1000 Ceiling Works (Gypsum Board)
Project: 5 Activity: OINDA1010 Exterior Painting
Project: 5 Activity: OINDS1000 Construction of Concrete
Chambers
Project: 5 Activity: OMANA1000 Screeding & Waterproofing
Works
Project: 5 Activity: OMANA1010 Exterior Painting
Project: 5 Activity: OMANA1020 Install Tiles
Project: 5 Activity: OMANA1030 Install PVC Door
Project: 5 Activity: OMANC1000 Perimeter Fence and Gates
Project: 5 Activity: OMANM1000 Install Chlorine Package
System
Project: 5 Activity: OMANM1010 AC & Ventillation Works
Project: 5 Activity: OMANM1020 Yard Piping Works
Project: 5 Activity: OMANS1000 Construction of Chamber
Covers
Project: 5 Activity: OPANS1000 Building Structural Concrete
Project: 5 Activity: OTALI1000 Installation of instruments
supports
Project: 5 Activity: OTALM1000 Install Ducting
Project: 5 Activity: OTALM1020 Install Chlorine Package
System
Project: 5 Activity: OTP11000 Installation of Louvers, L01;
2200mm W x 1000mm & L02; 1600mm W x 1100mm
Project: 5 Activity: OTP1M1000 Electromagnetic Flowmeter
DN250
Project: 5 Activity: OTP2C1000 Concrete covers (Rebars,
Forms , Concreting Works)
Project: 5 Activity: OTP2M1000 Installation Flow Control
Valve DN200
Project: 5 Activity: OTP6C1000 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6M1050 Installation of Exhaust Fan;
EF-01 Chlorination Room & EF-02 Gnset Room
Project: 5 Activity: OTUGE1000 Installation of cable tray
Project: 5 Activity: OTUGE1010 Installation of radio antenna
- after completing all activities
Project: 5 Activity: OTUGM1000 AC & Ventillation Works - Not
part of vcci
Project: 5 Activity: OTUGM1010 Install Chlorine Package
System - REMAINING WORKS
Project: 5 Activity: OTUGM1020 Install Valves
Project: 5 Activity: OTUGM1040 HVAC & Ventillation Works
Project: 5 Activity: OTUGM1050 Installation of Exhaust Fan
Project: 5 Activity: OTUGM1060 WIR Inspection for
Installation of Exhaust Fan
Project: 5 Activity: OTUGM1070 Fabrication of Exhaust fan
Supports
Project: 5 Activity: OTUGM1090 Installation of Exhaust fan
Supports
Project: 5 Activity: OTUGM1100 WIR INspection for
Installation of Exhaust fan Supports
Project: 5 Activity: OTUGM1110 Fabrication of Exhaust fan
Duct
Project: 5 Activity: OTUGM1120 Installation of Exhaust fan
Duct
Project: 5 Activity: OTUGM1130 WIR INspection for
Installation of Exhaust fan Duct
Project: 5 Activity: OTUGM1140 Installation of Scaffolding
prior for installation of Motorized Dampers
Project: 5 Activity: OTUGM1150 Installation of Motorized
Dampers
Project: 5 Activity: OTUGM1160 WIR Inspection for
Installation of Motorized Dampers
Project: 5 Activity: OTUGM1170 Procurement of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1180 Fabrication of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1190 Installation of Gravity
Damper and Bird Screen
Project: 5 Activity: OTUGM1200 WIR Inspection for
Installation of Gravity damper and Bird Screen
Project: 5 Activity: OTUGM1210 Fabrication of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1220 Installation of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1230 WIR Inspection for
Installation of Exhaust Air grill - Chlorination Room
Project: 5 Activity: OTUGM1240 Installation of Exhaust Fan
at Genset Room with Support
Project: 5 Activity: OTUGM1250 WIR Inspection for
Installation of Exhaust Fan at Genset Room
Project: 5 Activity: OTUGM1260 Installation of Outside Air
louver 2.2m x 1m
Project: 5 Activity: OTUGM1270 WIR Inspection for
Installation of Outside Air louver 2.2m x 1m
Project: 5 Activity: OTUGM1280 Hydrotest test prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1290 Hydrotest test for chlorine
package system
Project: 5 Activity: OTUGM1300 PIpe reinstatement for
chlorine package system
Project: 5 Activity: OTUGM1310 WIR Inspection for chlorine
package system
Project: 5 Activity: OTUGM1320 Nitrogen Test for chlorine
package system
Project: 5 Activity: OTUGM1330 Nitrogen Tes prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1340 Nitrogen Tes for chlorine
package system
Project: 5 Activity: OTUGM1350 PIpe reinstatement for
chlorine package system - Nitrogen Tes
Project: 5 Activity: OTUGM1360 WIR Inspection for chlorine
package system - Nitrogen Tes
Project: 5 Activity: RCDSC1080 Air vents guy support and
screen cover (Procurement)
Project: 5 Activity: RCDSM1010 Complete weld rectification
of Segment 4 closure at TB66 (including coating)
Project: 5 Activity: RCDSM1020 Internal paint repair/touch-
up works (identified during walkdown)
Project: 5 Activity: RCDSM1060 Excavation for Drain Pipes
(10, 50, & 30 mts)
Project: 5 Activity: RCDSM1100 Design for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1 to 3
Project: 5 Activity: RCWDC1000 Transition Box Leak
Rectification
Project: 5 Activity: RCWDC1010 Clean up inside conveyance
pipeline
Project: 5 Activity: RCWDM1000 Internal painting of pipe
joints at TB-1 bend and closure
Project: 5 Activity: RCWDM1110 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 1 MH
Project: 5 Activity: RCWDM1120 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RCWDM1250 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RDESA1000 Concrete surface
rectification - external portion
Project: 5 Activity: RDESA1010 Desander leak rectification
Project: 5 Activity: RDESA1020 Staff gauge installation
Project: 5 Activity: RDESA1030 Remaining roofing and
cladding (including genset enclosure)
Project: 5 Activity: RDESE1000 Underground cable
installation - Service Entrance to ECB
Project: 5 Activity: RDESE1010 Testing for all electrical
installation
Project: 5 Activity: RDESE1020 Installation of CCTV System
Project: 5 Activity: RDESI1000 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RDESI1010 Wiring of flowmeter to
transmitter
Project: 5 Activity: RDESI1020 Installation of additional
turbidity sensor @ Desander
Project: 5 Activity: RDESM1000 Ladder rung and cage to
outlet chamber and bypass valve chamber
Project: 5 Activity: RDESM1010 Install Exhaust Fan
Project: 5 Activity: RDESM1020 Bolt torquing for Bypass
Valve and Drain Valve
Project: 5 Activity: RDESM1100 Design of stainless sheet
cover for pillow block (new) - To be provided by AAII
Project: 5 Activity: RDRSS1000 PE Sta 0+451 - 0+477 (TB11 -
dissipator) - done
Project: 5 Activity: RHFAA1010 Install Louver Doors - HEPP
FA
Project: 5 Activity: RHFAU1000 Septic Tank - DONE
Project: 5 Activity: RHMBA1020 Install Doors
Project: 5 Activity: RHMBA1090 Scaffolding installation
Prior for installation of Exhaust Fan
Project: 5 Activity: RHMBA1120 Design of ladder rung -
access to sump pumps
Project: 5 Activity: RHMBA1180 Fabrication of sump pumps
gratings
Project: 5 Activity: RHMBA1220 Fabrication of gratings
Project: 5 Activity: RHMBA1300 Design of Louvers for Exhaust
Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1350 Fabrication of Exhaust
ducting and Supports at Genset room
Project: 5 Activity: RHMBE1000 Install Electrical Equipment
- INGOS
Project: 5 Activity: RHMBM1000 Install aeration pipework -
Installation
Project: 5 Activity: RHMBM1050 Dismantling of Scaffolding
prior for the Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1120 Fabrication of Flanges for
Sump Pumps
Project: 5 Activity: RHMBM1200 Design for Sump Pumps - AAII
Project: 5 Activity: RHMBM1240 WIR Inspection of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1310 Fabrication of temporaty
blinds for Pipe conncetion in draft Tube
Project: 5 Activity: RHMBM1330 Inspection as found status of
Turbines and Generator
Project: 5 Activity: RPPLC1000 Design for CAVs protection
cage - AAII
Project: 5 Activity: RPPLC1080 Procurement of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLM1000 CAVs = 5 and Drain Valve = 1
bolt torqueing
Project: 5 Activity: RPPLM1010 Fabrication of manhole cover
for TB-15
Project: 5 Activity: RPPLM1020 Bolt torqueing of anchor
bolts of flume bridge = 8 x 4
Project: 5 Activity: RPPLM1030 Gasket verifcation at site
(part of bolt torqueing) Air Vents
Project: 5 Activity: RSTFC1000 Backfilling Works
Project: 5 Activity: RTWTM1090 Fixing of Gates - TWT and
Trial Operations (Bypass)
Project: 5 Activity: RTWTM1100 Procurement of 2 pins for
Draft tube and Bypass
Project: 5 Activity: RTWTM1120 Fabrication of ladder rung
and cage
Project: 5 Activity: RWEIA1030 Additional Handrails and
Cantilever Platform at Weir House Perimeter
Project: 5 Activity: RWEIA1060 Safety Railings
Project: 5 Activity: RWEIA1070 Architectural and Structural
Coating touch-ups/rectification
Project: 5 Activity: RWEIC1010 Clearing works at the Weir
Intake Channel/Chamber
Project: 5 Activity: RWEIE1000 Wiring of temporary gensets
to the main panels
Project: 5 Activity: RWEIE1010 Rectification of electrical
works
Project: 5 Activity: RWEIE1020 Testing for all electrical
installation
Project: 5 Activity: RWEIM1010 Preparation of platform and
additional soundproofing enclosure on Weir for the portable genset
Project: 5 Activity: RWEIM1020 Hauling of 2 units portable
gensets from WTP to RWF. Mounting on platforms
Project: 5 Activity: RWEIM1030 Install Valve for
Environmental Pipe
Project: 5 Activity: RWEIM1040 Temp flap gate to be
fabricated and installed sketch and info required
Project: 5 Activity: RWEIM1050 Stitch welding of sheet piles
- sketch/info required
Project: 5 Activity: RWEIM1060 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RWEIM1070 Bolt Torquing for
Environmental Valves
Project: 5 Activity: RWEIM1080 Flow Regulating valve
(Spindle/Shafting fabrication and installation) at Environmental Gate
Project: 5 Activity: RWEIM1090 Install Room Exhaust Fan
Project: 5 Activity: RWEIM1130 Installation of Stitched
Sheet Piles
Project: 5 Activity: RWEIM1180 Installation of grounding pit
(EE Design issue - pending)
Project: 5 Activity: RWEIM1220 Weir to Desander Piping
(Paint rectification)
Project: 5 Activity: RWEIM1420 Air vent screen cover -
Procurement of Materials
Project: 5 Activity: RWEIS1000 Vertical grooving at Weir
side wall for the relocation of turbidity & DO
Project: 5 Activity: TAL1C2000 Gully Bridge: Construction of
Scouring Protection
Project: 5 Activity: TAL1C2860 Permanent Road Restoration
Sta 2+862 to 3+406
Project: 5 Activity: TAL1M2000 Install Expansion Joint at
Gully Bridge Pipe - WELDING REMAINING WORKS
Project: 5 Activity: TAL2C1840 Permanent Road Restoration
Sta 1+842 to 2+028
Project: 5 Activity: TAL2C3340 Permanent Road Restoration
Sta 3+342 to 3+900
Project: 5 Activity: TAL2M3000 Install Temporary Access
Manholes
Project: 5 Activity: TAL3C2380 Permanent Road Restoration
Sta 2+382 to 2+869
Project: 5 Activity: TAL3C2880 Permanent Road Restoration
Sta 2+885 to 3+559
Project: 5 Activity: TAL3C6370 Permanent Road Restoration
Sta 6+377 to 6+700
Project: 5 Activity: TAL3C8300 Permanent Road Restoration
Sta 8+306 to 8+947
Project: 5 Activity: TAL3C8950 Permanent Road Restoration
Sta 8+950 to 9+972
Project: 5 Activity: TAL3Cn0070 Permanent Road Restoration
Sta 0+076 to 0+871
Project: 5 Activity: TAL3M1000 BOV & CAV Installation
including Appurtenances (TOTAL 53)
Project: 5 Activity: TAL4C14630 Permanent Road Restoration
Sta 14+637 to 14+910, 0+015 (AL5), 0+018 (AL6)
Project: 5 Activity: TAL4C2410 Permanent Road Restoration
Sta 2+418 to 3+235
Project: 5 Activity: TAL4Cn0020 Permanent Road Restoration
Sta 0+028 to 0+718
Project: 5 Activity: TAL4M1500 Install/Sealing of Temporary
Access Manholes Alignment 4A
Project: 5 Activity: TAL4M1700 Hydrotesting Segment-3 -
Alignment 4A
Project: 5 Activity: TAL4M1900 Hydrotesting Segment-8 -
Alignment 4A
Project: 5 Activity: TAL4M2400 Pipelaying Alignment 4B
Project: 5 Activity: TAL5C7140 Permanent Road Restoration
Sta 7+144 to 7+991
Project: 5 Activity: TAL5M1000 Pipelaying & Welding Works
Project: 5 Activity: TAL6C1030 Permanent Road Restoration
Sta 1+032 to 1+997
Project: 5 Activity: TAL6M2000 Pipelaying at Sta. 0+002-
673.40 (7 segments) - Alignment 6
Project: 5 Activity: TAL6M4000 Hydrotesting at sta. 4+068-
427 - Alignment 6
Project: 5 Activity: TAL7C2520 Permanent Road Restoration
Sta 2+523 to 4+046
Project: 5 Activity: TAL7Cn0700 Permanent Road Restoration
Sta 0+706 to 1+070
Project: 5 Activity: TAL7M2000 Pipelaying & Welding Works
Project: 5 Activity: TAL8Cn0000 Permanent Road Restoration
Sta 0+000 to 1+482
Project: 5 Activity: TDRBS1000 Concreting Works
Project: 5 Activity: TDRBS1010 Steel Bridge Fabrication &
Delivery
Project: 5 Activity: WABRA1000 Install Doors
Project: 5 Activity: WABRA1010 Construct Concrete Stairs
Project: 5 Activity: WABRA1030 Ceiling & Wall Finishes -
Rockwool ????
Project: 5 Activity: WABRA1070 Exterior Wall Finishes
Project: 5 Activity: WABRA1090 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1110 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1170 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1240 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1270 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRM1000 Exhaust Fan
Project: 5 Activity: WACSM1270 Installation of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1280 Procurement of Outside Blower
or Fan Units - 2 Units
Project: 5 Activity: WACSM1290 Installation of Exhaust Fan
Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1300 WIR Inspection of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1310 WIR Inspection of Inside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1320 WIR Inspection of
Installation of Exhaust Fan Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1330 WIR Inspection of
Installation of Emergency Eye Shower
Project: 5 Activity: WACSS1000 Concrete Works
Project: 5 Activity: WADBA1000 Install Windows 2nd Priority
- done
Project: 5 Activity: WADBA1010 Roof Deck Water Proofing &
Testing
Project: 5 Activity: WADBA1020 Ceiling Works 2nd Priority
Project: 5 Activity: WADBA1030 Install Doors 1st Priority -
HDF & PVC remaining
Project: 5 Activity: WADBA1040 Joinery Works
Project: 5 Activity: WADBA1080 Install Louver Door at EE
room
Project: 5 Activity: WADBA1090 Delivery of Exhaust Air
Louver at EE room
Project: 5 Activity: WADBA1160 Installation of Scaffolding
prior for Installation of Fire Dampers - - EE Room
Project: 5 Activity: WADBE1000 Installation of lightning
protection system - done
Project: 5 Activity: WADBE1010 Termination works - remaining
ACS & comm. cables
Project: 5 Activity: WADBE1020 Firestop Sealant for Conduit
penetrations for Ceiling
Project: 5 Activity: WADBM1000 Ducting Works
Project: 5 Activity: WADBM1030 Installation of of High Flume
Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1040 Design of support for High
Flume Exhaust Fan - 5 Units - AAII/ VCCI
Project: 5 Activity: WADBM1050 Fabrication of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1060 Painting of support for High
Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1070 Installation of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1080 WIR Installation prior for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1100 Fabrication of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1110 Paiting of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1120 Installation of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1130 WIR Inspection prior for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1150 WIR Inspection for
Installation of Flexible Duct Connection
Project: 5 Activity: WADBM1160 WIR Inspection for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1170 Cleaning of Outside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1180 Cleaning of Inside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1190 Balancing for Ducting prior
for testing - T&C
Project: 5 Activity: WADBM1200 Sealant Application in the
Duct passing through the wall - Ground to Roof Deck
Project: 5 Activity: WADBM1210 WIR Inspection for Sealant
Application in the Duct passing through the wall
Project: 5 Activity: WADBM1220 Installation of ACCU (28
units) - Roof Deck
Project: 5 Activity: WADBM1230 WIR Inspection for
Installation of ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1240 Installation of refregerant
Piping from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1250 Cleaning of refregerant
Piping using R11 from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1260 Flushing and Cleaning of
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1270 Fabrication of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1280 Painting of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1290 Lay-out of support for
refregerant Pipie from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1300 WIR Inspection prior for
install of support for refregerant pipe from dog house to ACCU (28 units) - Roof
Deck
Project: 5 Activity: WADBM1310 Installation of support for
refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1320 Installation of Aluminum
Cladding for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1330 Initial charging of freon
(R32) for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1340 Procurement of thermostat
control with wiring (Honeywell or johnson&Johnson) - 7 Pieces AAII/VCCI
Project: 5 Activity: WADBM1350 Installation of thermostat
control with wiring - 7 Pieces
Project: 5 Activity: WADBM1360 WIR Inspectkion for
Installation of thermostat control with wiring - 7 Pieces
Project: 5 Activity: WADBU1000 Construct Septic Tank - done
Project: 5 Activity: WADBU1060 Hydrotest for Water Piping
Line
Project: 5 Activity: WADBU1070 WIR for Hydrotest of Water
Piping Line
Project: 5 Activity: WADBU1080 Dis-infection for Water
Piping Line - T&C
Project: 5 Activity: WADBU1090 WIR Inspection for Dis-
infection for Water Piping Line - T&C
Project: 5 Activity: WADBU1100 Installation of Pipe
connecting to Rainwater Tanks
Project: 5 Activity: WADBU1110 Installation of C-Clamp
Supports for Pipe connecting to Rainwater Tanks
Project: 5 Activity: WADBU1120 Installation of Pipes from
Water Pump to Water Tank
Project: 5 Activity: WADBU1130 WIR Inspection for
Installation of Pipes from Water Pump to Water Tank
Project: 5 Activity: WADBU1140 WIR Inspection for Install
Water Pump - 2 units
Project: 5 Activity: WADBU1150 WIR Inspection for Install
Rainwater Tanks
Project: 5 Activity: WADBU1160 WIR Inspection for Install
Water Tank
Project: 5 Activity: WAPBA1000 Install Windows (16 units) -
done
Project: 5 Activity: WAPBA1010 Masonry Works
Project: 5 Activity: WAPBA1060 Install Stair & Steel
Platform
Project: 5 Activity: WAPBE1000 Installation of Cable tray -
done
Project: 5 Activity: WAPBM1000 Overhead crane load testing
Project: 5 Activity: WAPBM1060 Delivery of Alum Sulphate
Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM1370 Installation of Discharge
Lines of Polymer Dosing Pumps - 12 units
Project: 5 Activity: WAPBM1460 Procurement of U-Bolts for
Discharge Line of polymer dosing pumps
Project: 5 Activity: WAPBM1650 Installation of Supports for
Connection Line of Alum Dosing pumps and transfer Pumps Prior for Hydrotesting
Project: 5 Activity: WAPBM1720 Additional Unions for Suction
Lines for Alum Dosing Pumps -
Project: 5 Activity: WAPBM1780 New Activity
Project: 5 Activity: WAPBM1790 Installation of Discharge
Lines of Alum Dosing Pumps - 2 units
Project: 5 Activity: WAPBM1850 Additional Unions for Suction
Lines for Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1910 Installation of Discharge
Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM2160 Procurement of Exhaust Blower
or Fan Units - 4 units - AAII
Project: 5 Activity: WAPBM2170 Installation of Supply Blower
or Fan Units - 2 units (DONE)
Project: 5 Activity: WAPBM2180 Installation of flexible
joint for Supply Blower or Fan Units - 2 units
Project: 5 Activity: WAPBM2190 Installation of flexible
joint for Exhaust Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2200 WIR Inspection for Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2210 WIR Inspection for Supply
Blower or Fan Units - 2 units (Done)
Project: 5 Activity: WAPBM2220 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2230 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2240 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2300 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2310 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2320 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2330 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2340 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2350 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2360 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2370 Installation of ACCU - 2
units (DONE)
Project: 5 Activity: WAPBM2380 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2390 Installation of Flexible
Joints (DONE)
Project: 5 Activity: WAPBM2400 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2410 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2420 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2430 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2440 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2450 Installation of ACCU - 2
units
Project: 5 Activity: WAPBM2460 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2470 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2480 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2490 Installation of Flexible
Joints
Project: 5 Activity: WAPBM2500 Installation of Exhaust Fan -
1 unit
Project: 5 Activity: WAPBM2510 WIR Inspection for
Installation of Exhaust Fan - 1 unit
Project: 5 Activity: WAPBM2520 Installation of Fire Dampers
- 3 units
Project: 5 Activity: WAPBM2530 Installation of Motorized
Fire Dampers - 3 units
Project: 5 Activity: WAPBM2540 Installation of Scaffolding
prior for Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2550 Installation of Scaffolding
prior for Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2560 WIR Inspection for
Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2570 WIR Inspection for
Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2600 Procurement of Pulsation
Dampener - Polymer
Project: 5 Activity: WAPBM2610 Installation of Polymer
Suction Lines - 12 units
Project: 5 Activity: WAPBM2650 Pump Alignment for Alum
Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM2660 Pump Alignment of Transfer
Pumps 1&2
Project: 5 Activity: WAPBU1000 Construct Septic Tank - done
Project: 5 Activity: WAPBU1030 Procurement of the materials
of Water Piping
Project: 5 Activity: WAPBU1060 Installation of Down Spout
Project: 5 Activity: WAPBU1070 WIR Inspection of Down Spout
Project: 5 Activity: WAPLC1000 Alum & Polymer Chemical
Trench - Back of Alum Bldg. - damp proof remaining
Project: 5 Activity: WAPLM1000 Alum & Polymer Chemical Line
- Alum bldg to IWCM
Project: 5 Activity: WBLBI1000 Install Instrument Junction
Boxes
Project: 5 Activity: WBPHA1000 Concrete hollow blocks
(concrete stiffeners, lintel beams, upstands, and design joints; 150mm thick)
Project: 5 Activity: WBPHA1140 WIR Inspection for Louvers (5
units)
Project: 5 Activity: WBPHA1150 Procurement of the Materials
for Handrails
Project: 5 Activity: WBPHA1290 Installation of Plenum Box
(1.8m X 1.8m) for Install Louvers
Project: 5 Activity: WBPHE1000 Cable pulling - done
Project: 5 Activity: WBPHE1010 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WBPHI1010 Installation of instruments
valves (pressure switch & gauges)
Project: 5 Activity: WBPHM1010 Curing period for the second
stage Grouting
Project: 5 Activity: WBPHM1120 Procurement of Remaining
Setting Bolts for Valves
Project: 5 Activity: WBPHM1280 Procurement of Blower or Fan
Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1300 Procurement of Sump Pumps - 2
units
Project: 5 Activity: WBPHM1400 Fabrication of Piping
Supports for Sump Pumps
Project: 5 Activity: WBPHM1440 Painting of combination air
valve - 1 unit
Project: 5 Activity: WBPHM1460 Procurement for Storm drain
Installation - Riser
Project: 5 Activity: WBPHM1540 Temporary Removal of Blind
Flange
Project: 5 Activity: WBPHM1600 WIR Inspection for Outside
Air Duct Works
Project: 5 Activity: WBPHM1690 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1700 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1710 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1860 Fabrication of Pipe Supports
for Discharge Line DONE
Project: 5 Activity: WBPHS1010 Construct Pipe Support
including pedestal - Suctions, Discharge, & Elbow
Project: 5 Activity: WBPHS1020 Painting works for Steel
Columns, Beams, & Frames - on the Welded Part
Project: 5 Activity: WBPHS1030 WIR Inspection for Steel
Columns, Beams, & Frames
Project: 5 Activity: WCCLC1000 Chlorine Chemical Trench -
MH1A to MH3A
Project: 5 Activity: WCLBA1000 Install Windows (5 units) -
done
Project: 5 Activity: WCLBA1010 Masonry Works
Project: 5 Activity: WCLBA1020 Install Handrails & Ladders
Project: 5 Activity: WCLBA1070 Roof Deck Finishes
Project: 5 Activity: WCLBA1080 Ceiling Finishes
Project: 5 Activity: WCLBE1000 Cable pulling
Project: 5 Activity: WCLBE1010 Installation of grounding
system
Project: 5 Activity: WCLBI1010 Installation of instruments
Project: 5 Activity: WCLBM1000 Install Overhead Crane - done
Project: 5 Activity: WCLBM1040 Chlorinator
Project: 5 Activity: WCLBM1070 Installation of Chlorine
Ejector Unit
Project: 5 Activity: WCLBM1100 Installation of FRP pipe
support at chemical trenches
Project: 5 Activity: WCLBM1110 Outside Air Duct Works
Project: 5 Activity: WCLBM1220 Supply - Outside Air Blowers
- 3 units (2 units installed)
Project: 5 Activity: WCLBM1230 Rectification for Spring
Mounting of Outside Air Blowers - 1 piece
Project: 5 Activity: WCLBM1240 WIR Inspection of Outside Air
Blowers - 1 piece
Project: 5 Activity: WCLBM1250 Installation of Exhaust Fans
- 4 Units (DONE) Wall Mounted
Project: 5 Activity: WCLBM1260 WIR Inspection for
Installation of Exhaust Fans - 4 Units Wall Mounted
Project: 5 Activity: WCLBM1270 WIR Inspection for
Installation of Emergency Eye Shower - 5 Units
Project: 5 Activity: WCLBM1280 Install of Scaffolding prior
fo Installation of Fire Dampers
Project: 5 Activity: WCLBM1300 Installation of Mobile
Scaffolding prior for Install Fire Dampers and Motorized Fire Dampers
Project: 5 Activity: WCLBM1340 Installation of Fire Dampers
Project: 5 Activity: WCLBM1390 WIR Inspection Prior for
Installation of Equipment and conncetion Line for chlorine tank for Auto Change
Over Unit
Project: 5 Activity: WCLBM1660 Installation of Chlorine
Chemical Pipes connecting to TWR
Project: 5 Activity: WCLBM1670 Design for the new Sampling
Point
Project: 5 Activity: WCLBM1680 Installation for the new
Sampling Point
Project: 5 Activity: WCLBM1690 Procurement for Chlorine and
S02 ton container with dip trays - AAII
Project: 5 Activity: WCLBM1700 WIR Inspection for
Installation of Chlorine and S02 ton container with dip trays
Project: 5 Activity: WELBA1000 Install Doors (3) - ELB
Project: 5 Activity: WELBA1040 Wall Finishes (External) -
ELB
Project: 5 Activity: WELBF1000 Install FM200 - ELB
Project: 5 Activity: WELBF1010 Install FDAS - ELB
Project: 5 Activity: WELBM1020 Install ACCU unit - Inside
(Done)
Project: 5 Activity: WELBM1040 Fabrication of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1080 Installation of Copper Tube
Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELBM1090 WIR Inspection for
Installation of Copper Tube Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELNE1000 Duct Bank MH05 to MCC-6
Project: 5 Activity: WELNE1010 Duct Bank MH13 to Stub-out
Project: 5 Activity: WELNE1020 Duct Bank Valve Chamber to
EHH1
Project: 5 Activity: WELNE1030 Duct Bank MH12 to EHH11
Project: 5 Activity: WELNE1110 Duct Bank PB1-ACC TO MCC-7
Project: 5 Activity: WELNS1000 MH10
Project: 5 Activity: WELNS1030 MH07
Project: 5 Activity: WFITA1020 Fabrication & Arrival of
Louvers from Cebu
Project: 5 Activity: WFITA1140 Exterior Painting Control
Room 2
Project: 5 Activity: WFITA1150 Internal Painting Control
Room 2
Project: 5 Activity: WFITA1170 Install Doors Control Room 2
Project: 5 Activity: WFITA1210 Internal Painting Control
Room 3
Project: 5 Activity: WFITA1250 Waterproofing Works Stair 1
Project: 5 Activity: WFITA1430 Fabrication of Guardrails Top
of Tanks - South Side
Project: 5 Activity: WFITA1500 Procurement of Steel Stairs,
Platforms - SOUTH and NORTH SIDE PIPE GALLERY - (Gratings and handrails by
WEBFORGE)
Project: 5 Activity: WFITA1510 Installation of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1540 Installation of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1550 Fabrication of Railings Stair
1
Project: 5 Activity: WFITA1700 Design of Access hatch - 3
Units - AAII/ VCCI SI
Project: 5 Activity: WFITA1760 Procurement of Steel Gratings
for Trench of Control Room 1
Project: 5 Activity: WFITA2130 Procurement of Steel gratings
at the Trench of Pipe gallery
Project: 5 Activity: WFITA2260 Storm Drain at Control Room 1
Project: 5 Activity: WFITA2320 Installation of Pipes for
Sump Pumps
Project: 5 Activity: WFITA2330 Procurement of Portable Pump
- 1 unit
Project: 5 Activity: WFITA2360 WIR Inspection of Steel
Stairs, Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2370 WIR Inspection of Steel
Stairs, Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2380 Painting of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2390 Painting of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2420 Install ACCU Control Room 2
(Done)
Project: 5 Activity: WFITA2430 Procurement of Steel Gratings
for Trench of Control Room 2
Project: 5 Activity: WFITA2440 Storm Drain at Control Room 2
Project: 5 Activity: WFITA2550 Install ACCU Control Room 3
(Done)
Project: 5 Activity: WFITA2560 Procurement of Steel Gratings
for Trench of Control Room 3
Project: 5 Activity: WFITA2580 Storm Drain at Control Room 3
Project: 5 Activity: WFITE1000 Installation of grounding
system
Project: 5 Activity: WFITE1020 Termination works Tanks 11,
13, 15, 17 - remaining Instruments
Project: 5 Activity: WFITE1060 Cable pulling Tanks 10, 12,
14, 16, 18
Project: 5 Activity: WFITI1000 Installation of instrument
Support Tanks 11, 13, 15, 17 (At Pipe Gallery remaining)
Project: 5 Activity: WFITM10000 Underdrain DMF18 - Air Header
pipe survey
Project: 5 Activity: WFITM10010 Underdrain DMF18 - Anchor rod
installation
Project: 5 Activity: WFITM10020 Underdrain DMF18 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM10030 Underdrain DMF18 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM10040 Underdrain DMF18 -
Installation of FRP Plates
Project: 5 Activity: WFITM10050 Underdrain DMF18 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM10060 Underdrain DMF18 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM10070 Underdrain DMF18 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM10080 Underdrain DMF18 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM10090 Underdrain DMF18 - Protection
covers of the underdrains
Project: 5 Activity: WFITM1010 Pipe Support Installation
Project: 5 Activity: WFITM10100 Underdrain DMF18 - WIR
Inspection
Project: 5 Activity: WFITM10110 LAUNSDERS DMF18 - Chipping
for Launders of
Project: 5 Activity: WFITM1030 Installation of Jet Fan
Project: 5 Activity: WFITM1040 Install Monorail Crane @
Access Area Stair1 - DEMAG
Project: 5 Activity: WFITM11610 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11750 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM15390 Procurement of Bolts for
valve of DN1000, DN900, DN500- 9 units North Side
Project: 5 Activity: WFITM15420 Installation of Flange
Adaptor for Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15480 Installation of Bolts for
Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15490 Bolt torquing for Valves of
DN500 - 36 units units North Side
Project: 5 Activity: WFITM15500 WIR Inspection for bolt
torquing of Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM16510 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16710 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM17050 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17330 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17610 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17890 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM18030 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18310 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18590 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18870 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM19150 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM19570 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19850 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20130 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20410 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20690 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20930 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM20940 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21130 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21230 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21530 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21730 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21830 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22330 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22340 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22430 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22440 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22530 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22540 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22630 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22640 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22730 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22740 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22830 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22840 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22930 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22940 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM23030 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM23770 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM2720 WIR Inspection for the 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2730 Design of the Plugs for 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2780 Design for the Insulation of
SS Pipes (DN200) - AAII/VCCI SI
Project: 5 Activity: WFITM2920 Design of Air Relive Valves
of DN900 at Filter Tank 1 & 10 - AAII/VCCI SI
Project: 5 Activity: WFITM3070 Installation of Scaffolding
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3130 Installation of Flowmeter at
South Side (DONE) - 9 units
Project: 5 Activity: WFITM3150 Installation of Flowmeter at
North Side - 9 units
Project: 5 Activity: WFITM3170 Installation of Sampling
point at South Side - 9 units
Project: 5 Activity: WFITM3200 Installation of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM3900 Underdrain DMF2 - Install
scaffold roof
Project: 5 Activity: WFITM4080 LAUNSDERS DMF2 - Chipping for
Launders of
Project: 5 Activity: WFITM4490 Underdrain DMF4 - Install
scaffold roof
Project: 5 Activity: WFITM4670 LAUNSDERS DMF4 - Chipping for
Launders of
Project: 5 Activity: WFITM4830 Underdrain DMF6 - Install
scaffold roof
Project: 5 Activity: WFITM5010 LAUNSDERS DMF6 - Chipping for
Launders of
Project: 5 Activity: WFITM5100 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5350 LAUNSDERS DMF8 - Chipping for
Launders of
Project: 5 Activity: WFITM5440 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5450 Underdrain DMF1 - Pull-off
Test
Project: 5 Activity: WFITM5460 Underdrain DMF1 - Flume
Handover
Project: 5 Activity: WFITM5470 Underdrain DMF1 - Scour air
piping flushing
Project: 5 Activity: WFITM5480 Underdrain DMF1 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5490 Underdrain DMF1 - Hydrotest
DN900
Project: 5 Activity: WFITM5500 Underdrain DMF1 - Scour air
piping pressure test
Project: 5 Activity: WFITM5510 Underdrain DMF1 - Install
scaffold roof
Project: 5 Activity: WFITM5520 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5530 Underdrain DMF1 - Modify
scaffold access
Project: 5 Activity: WFITM5540 Underdrain DMF1 - Clearing
works
Project: 5 Activity: WFITM5550 Underdrain DMF1 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5560 Underdrain DMF1 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5570 Underdrain DMF1 - Air header
pipe installation.
Project: 5 Activity: WFITM5580 Underdrain DMF1 - Air Header
pipe survey
Project: 5 Activity: WFITM5590 Underdrain DMF1 - Anchor rod
installation
Project: 5 Activity: WFITM5600 Underdrain DMF1 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5610 Underdrain DMF1 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5620 Underdrain DMF1 -
Installation of FRP Plates
Project: 5 Activity: WFITM5630 Underdrain DMF1 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5640 Underdrain DMF1 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5650 Underdrain DMF1 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5660 Underdrain DMF1 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5670 Underdrain DMF1 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5680 Underdrain DMF1 - WIR
Inspection
Project: 5 Activity: WFITM5690 LAUNSDERS DMF1 - Chipping for
Launders of
Project: 5 Activity: WFITM5700 LAUNSDERS DMF1 - Install
scaffolding
Project: 5 Activity: WFITM5710 LAUNSDERS DMF1 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5720 LAUNSDERS DMF1 - Placement of
Launders
Project: 5 Activity: WFITM5730 LAUNSDERS DMF1 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5740 LAUNSDERS DMF1 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5750 LAUNSDERS DMF1 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5760 LAUNSDERS DMF1 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5770 LAUNSDERS DMF1 - Formworks &
Grouting
Project: 5 Activity: WFITM5780 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5790 Underdrain DMF3 - Pull-off
Test
Project: 5 Activity: WFITM5800 Underdrain DMF3 - Flume
Handover
Project: 5 Activity: WFITM5810 Underdrain DMF3 - Scour air
piping flushing
Project: 5 Activity: WFITM5820 Underdrain DMF3 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5830 Underdrain DMF3 - Hydrotest
DN900
Project: 5 Activity: WFITM5840 Underdrain DMF3 - Scour air
piping pressure test
Project: 5 Activity: WFITM5850 Underdrain DMF3 - Install
scaffold roof
Project: 5 Activity: WFITM5860 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5870 Underdrain DMF3 - Modify
scaffold access
Project: 5 Activity: WFITM5880 Underdrain DMF3 - Clearing
works
Project: 5 Activity: WFITM5890 Underdrain DMF3 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5900 Underdrain DMF3 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5910 Underdrain DMF3 - Air header
pipe installation.
Project: 5 Activity: WFITM5920 Underdrain DMF3 - Air Header
pipe survey
Project: 5 Activity: WFITM5930 Underdrain DMF3 - Anchor rod
installation
Project: 5 Activity: WFITM5940 Underdrain DMF3 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5950 Underdrain DMF3 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5960 Underdrain DMF3 -
Installation of FRP Plates
Project: 5 Activity: WFITM5970 Underdrain DMF3 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5980 Underdrain DMF3 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5990 Underdrain DMF3 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6000 Underdrain DMF3 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6010 Underdrain DMF3 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6020 Underdrain DMF3 - WIR
Inspection
Project: 5 Activity: WFITM6030 LAUNSDERS DMF3 - Chipping for
Launders of
Project: 5 Activity: WFITM6040 LAUNSDERS DMF3 - Install
scaffolding
Project: 5 Activity: WFITM6050 LAUNSDERS DMF3 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6060 LAUNSDERS DMF3 - Placement of
Launders
Project: 5 Activity: WFITM6070 LAUNSDERS DMF3 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6080 LAUNSDERS DMF3 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6090 LAUNSDERS DMF3 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6100 LAUNSDERS DMF3 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6110 LAUNSDERS DMF3 - Formworks &
Grouting
Project: 5 Activity: WFITM6120 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6130 Underdrain DMF5 - Pull-off
Test
Project: 5 Activity: WFITM6140 Underdrain DMF5 - Flume
Handover
Project: 5 Activity: WFITM6150 Underdrain DMF5 - Scour air
piping flushing
Project: 5 Activity: WFITM6160 Underdrain DMF5 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM6170 Underdrain DMF5 - Hydrotest
DN900
Project: 5 Activity: WFITM6180 Underdrain DMF5 - Scour air
piping pressure test
Project: 5 Activity: WFITM6190 Underdrain DMF5 - Install
scaffold roof
Project: 5 Activity: WFITM6200 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6210 Underdrain DMF5 - Modify
scaffold access
Project: 5 Activity: WFITM6220 Underdrain DMF5 - Clearing
works
Project: 5 Activity: WFITM6230 Underdrain DMF5 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6240 Underdrain DMF5 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6250 Underdrain DMF5 - Air header
pipe installation.
Project: 5 Activity: WFITM6260 Underdrain DMF5 - Air Header
pipe survey
Project: 5 Activity: WFITM6270 Underdrain DMF5 - Anchor rod
installation
Project: 5 Activity: WFITM6280 Underdrain DMF5 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6290 Underdrain DMF5 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6300 Underdrain DMF5 -
Installation of FRP Plates
Project: 5 Activity: WFITM6310 Underdrain DMF5 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6320 Underdrain DMF5 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6330 Underdrain DMF5 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6340 Underdrain DMF5 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6350 Underdrain DMF5 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6360 Underdrain DMF5 - WIR
Inspection
Project: 5 Activity: WFITM6370 LAUNSDERS DMF5 - Chipping for
Launders of
Project: 5 Activity: WFITM6380 LAUNSDERS DMF5 - Install
scaffolding
Project: 5 Activity: WFITM6390 LAUNSDERS DMF5 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6400 LAUNSDERS DMF5 - Placement of
Launders
Project: 5 Activity: WFITM6410 LAUNSDERS DMF5 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6420 LAUNSDERS DMF5 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6430 LAUNSDERS DMF5 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6440 LAUNSDERS DMF5 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6450 LAUNSDERS DMF5 - Formworks &
Grouting
Project: 5 Activity: WFITM6530 Underdrain DMF7 - Install
scaffold roof
Project: 5 Activity: WFITM6540 Underdrain DMF7 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6550 Underdrain DMF7 - Modify
scaffold access
Project: 5 Activity: WFITM6560 Underdrain DMF7 - Clearing
works
Project: 5 Activity: WFITM6570 Underdrain DMF7 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6580 Underdrain DMF7 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6590 Underdrain DMF7 - Air header
pipe installation.
Project: 5 Activity: WFITM6600 Underdrain DMF7 - Air Header
pipe survey
Project: 5 Activity: WFITM6610 Underdrain DMF7 - Anchor rod
installation
Project: 5 Activity: WFITM6620 Underdrain DMF7 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6630 Underdrain DMF7 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6640 Underdrain DMF7 -
Installation of FRP Plates
Project: 5 Activity: WFITM6650 Underdrain DMF7 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6660 Underdrain DMF7 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6670 Underdrain DMF7 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6680 Underdrain DMF7 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6690 Underdrain DMF7 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6700 Underdrain DMF7 - WIR
Inspection
Project: 5 Activity: WFITM6710 LAUNSDERS DMF7 - Chipping for
Launders of
Project: 5 Activity: WFITM6720 LAUNSDERS DMF7 - Install
scaffolding
Project: 5 Activity: WFITM6730 LAUNSDERS DMF7 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6740 LAUNSDERS DMF7 - Placement of
Launders
Project: 5 Activity: WFITM6750 LAUNSDERS DMF7 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6760 LAUNSDERS DMF7 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6770 LAUNSDERS DMF7 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6780 LAUNSDERS DMF7 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6790 LAUNSDERS DMF7 - Formworks &
Grouting
Project: 5 Activity: WFITM6870 Underdrain DMF9 - Install
scaffold roof
Project: 5 Activity: WFITM6880 Underdrain DMF9 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6890 Underdrain DMF9 - Modify
scaffold access
Project: 5 Activity: WFITM6900 Underdrain DMF9 - Clearing
works
Project: 5 Activity: WFITM6910 Underdrain DMF9 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6920 Underdrain DMF9 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6930 Underdrain DMF9 - Air header
pipe installation.
Project: 5 Activity: WFITM6940 Underdrain DMF9 - Air Header
pipe survey
Project: 5 Activity: WFITM6950 Underdrain DMF9 - Anchor rod
installation
Project: 5 Activity: WFITM6960 Underdrain DMF9 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6970 Underdrain DMF9 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6980 Underdrain DMF9 -
Installation of FRP Plates
Project: 5 Activity: WFITM6990 Underdrain DMF9 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7000 Underdrain DMF9 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM7010 Underdrain DMF9 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7020 Underdrain DMF9 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM7030 Underdrain DMF9 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7040 Underdrain DMF9 - WIR
Inspection
Project: 5 Activity: WFITM7050 LAUNSDERS DMF9 - Chipping for
Launders of
Project: 5 Activity: WFITM7060 LAUNSDERS DMF9 - Install
scaffolding
Project: 5 Activity: WFITM7070 LAUNSDERS DMF9 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7080 LAUNSDERS DMF9 - Placement of
Launders
Project: 5 Activity: WFITM7090 LAUNSDERS DMF9 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7100 LAUNSDERS DMF9 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7110 LAUNSDERS DMF9 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7120 LAUNSDERS DMF9 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7130 LAUNSDERS DMF9 - Formworks &
Grouting
Project: 5 Activity: WFITM7210 Underdrain DMF17 - Install
scaffold roof
Project: 5 Activity: WFITM7390 LAUNSDERS DMF17 - Chipping
for Launders of
Project: 5 Activity: WFITM7550 Underdrain DMF13 - Install
scaffold roof
Project: 5 Activity: WFITM7730 LAUNSDERS DMF13 - Chipping
for Launders of
Project: 5 Activity: WFITM7890 Underdrain DMF15 - Install
scaffold roof
Project: 5 Activity: WFITM8070 LAUNSDERS DMF15 - Chipping
for Launders of
Project: 5 Activity: WFITM8160 Underdrain DMF11 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8410 LAUNSDERS DMF11 - Chipping
for Launders
Project: 5 Activity: WFITM8500 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8750 LAUNSDERS DMF10 - Chipping
for Launders of
Project: 5 Activity: WFITM8840 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9090 LAUNSDERS DMF12 - Chipping
for Launders of
Project: 5 Activity: WFITM9270 Underdrain DMF14 - Modify
scaffold access
Project: 5 Activity: WFITM9430 LAUNSDERS DMF14 - Chipping
for Launders of
Project: 5 Activity: WFITM9590 Underdrain DMF16 - Install
scaffold roof
Project: 5 Activity: WFITM9770 LAUNSDERS DMF16 - Chipping
for Launders of
Project: 5 Activity: WFITM9930 Underdrain DMF18 - Install
scaffold roof
Project: 5 Activity: WFITM9940 Underdrain DMF18 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9950 Underdrain DMF18 - Modify
scaffold access
Project: 5 Activity: WFITM9960 Underdrain DMF18 - Clearing
works
Project: 5 Activity: WFITM9970 Underdrain DMF18 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9980 Underdrain DMF18 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9990 Underdrain DMF18 - Air header
pipe installation.
Project: 5 Activity: WFITS1000 Wall Tank Lining DMF11 - done
Project: 5 Activity: WFITS1010 Wall Tank Lining DMF13 - done
Project: 5 Activity: WFITS1020 Wall Tank Lining DMF15 - done
Project: 5 Activity: WFITS1030 Wall Tank Lining DMF17 - done
Project: 5 Activity: WFITS1050 Wall Tank Lining at grouted
Launders DMF11
Project: 5 Activity: WFITS1080 Wall Tank Lining at grouted
Launders DMF17
Project: 5 Activity: WFITS1110 Wall Tank Lining at grouted
Launders DMF10
Project: 5 Activity: WFITS1120 Wall Tank Lining at grouted
Launders DMF12
Project: 5 Activity: WFITS1130 Wall Tank Lining at grouted
Launders DMF14
Project: 5 Activity: WFITS1140 Wall Tank Lining at grouted
Launders DMF16
Project: 5 Activity: WFITS1150 Wall Tank Lining at grouted
Launders DMF18
Project: 5 Activity: WFITS1160 Water Filling Tanks 2, 4, 6,
8 - done
Project: 5 Activity: WFITS1180 Wall Tank Lining Tank4
Project: 5 Activity: WFITS1260 Wall Tank Lining at grouted
Launders DMF2
Project: 5 Activity: WFITS1300 Water Filling Tanks1, 3, 5, 7
- done
Project: 5 Activity: WFITS1310 Water Filling Tank9 - done
Project: 5 Activity: WFITS1350 Wall Tank Lining at grouted
Launders DMF1, 3, 5, 7, 9
Project: 5 Activity: WFLTA1020 Epoxy Floor Coating on
platforms - under first drop priority areas
Project: 5 Activity: WFLTA1050 Procurement for Portable
Ladders & Support -12 units
Project: 5 Activity: WFLTA1060 Installation of Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1080 Painting works for Self-
closing Gates - 12 uints
Project: 5 Activity: WFLTA1090 WIR Inspection for Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1100 Fabrication of Support for
portable ladders -12 units
Project: 5 Activity: WFLTA1110 WIR Inspection for Self-
closing Gates - 12 units
Project: 5 Activity: WFLTA1120 Fabrication and Installation
of Flatform for Chemical Lines
Project: 5 Activity: WFLTA1130 Painting of Flatform for
Chemical Lines
Project: 5 Activity: WFLTA1140 WIR Inspection of Flatform
for Chemical Lines
Project: 5 Activity: WFLTA1160 Procurement for Portable
Ladders & Support -
Project: 5 Activity: WFLTA1170 Installation of Portable
Ladders & Support - 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1180 Painting works for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1190 WIR Inspection for Portable
Ladders & Support 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1200 Fabrication of Support for
portable ladders
Project: 5 Activity: WFLTA1210 WIR Inspection for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1220 Installation of Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1230 Painting works for Self-
closing Gates - 2nd priority 1, 2, 3
Project: 5 Activity: WFLTA1240 WIR Inspection for Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1250 WIR Inspection for Self-
closing Gates - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTM1040 Internal Testing - Equipment
FLT6
Project: 5 Activity: WFLTM1100 Internal Testing - Equipment
FLT5
Project: 5 Activity: WFLTM1130 Internal Testing - Equipment
FLT3
Project: 5 Activity: WFLTM1160 Internal Testing - Equipment
FLT2
Project: 5 Activity: WFLTM1190 Internal Testing - Equipment
FLT1
Project: 5 Activity: WFLTM1310 Sludge Valve Installation
DN100 Tank 2
Project: 5 Activity: WFLTM1320 Sludge Valve Installation
DN100 Tank 3
Project: 5 Activity: WFLTM1330 Sludge Valve Installation
DN100 Tank 4
Project: 5 Activity: WFLTM1340 Sludge Valve Installation
DN100 Tank 5
Project: 5 Activity: WFLTM1350 Sludge Valve Installation
DN100 Tank 6
Project: 5 Activity: WFLTM1360 Inspection for the Sluice
gates outlet at Settling Tank 1-6
Project: 5 Activity: WFLTM3850 1st Stage Floc Mixer 6-
Install scaffolding
Project: 5 Activity: WFLTM4060 2nd Stage Floc Mixer 6 -
Install scaffolding
Project: 5 Activity: WFLTM4280 1st Stage Floc Mixer 4
Install scaffolding
Project: 5 Activity: WFLTM4480 2nd Stage Floc Mixer 4-
Install scaffolding
Project: 5 Activity: WFLTM4700 1st Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM4900 2nd Stage Floc Mixer 3-
Install scaffolding
Project: 5 Activity: WFLTM5120 1st Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM5320 2nd Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM5540 1st Stage Floc Mixer 2 -
Install scaffolding
Project: 5 Activity: WFLTM5740 2nd Stage Floc Mixer 2-
Install scaffolding
Project: 5 Activity: WFLTM6000 1st Stage Floc Mixer 1 -
Install scaffolding
Project: 5 Activity: WFLTM6210 2nd Stage Floc Mixer 1-
Install scaffolding
Project: 5 Activity: WFLTS1030 Tank Lining Tanks 2A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1040 Tank Lining Tanks 2B
Project: 5 Activity: WFLTS1050 Tank Lining Tanks 1A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1060 Tank Lining Tanks 1B
Project: 5 Activity: WFPLM1010 Excavation Works
Project: 5 Activity: WFPLM1050 Installation for Pipe
Project: 5 Activity: WFSTS1000 Excavation & Lean Concrete
Project: 5 Activity: WFSTS1030 Water Filling
Project: 5 Activity: WIWCA1010 Installation of Self Closing
gates - 3 units
Project: 5 Activity: WIWCA1050 Procurements of Railing
materials inc portable ladders and cage
Project: 5 Activity: WIWCE1000 Junction Box Installation
Project: 5 Activity: WIWCM1000 Installation of Chemical
Lines - ALUM (done)
Project: 5 Activity: WIWCM1010 Procurement of Chemical
Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1070 Fabrication and Painting of
Pipe Support - ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1160 Inspection for Closing and
Opening of the Sluice gates prior for Handover to T&C - AAII and VCCI (6 Units)
Project: 5 Activity: WIWCS1000 Tank Lining Inlet
Distribution Chamber at Overflow
Project: 5 Activity: WMCCA1000 Waterproofing of Trench -
MCC1 - done
Project: 5 Activity: WMCCA1010 Install Doors - by LEC Steel
- MCC1
Project: 5 Activity: WMCCA1020 Install Steel Grating - MCC1
(drawing dependent)
Project: 5 Activity: WMCCA1050 Ceiling Finishes - MCC1
Project: 5 Activity: WMCCA1060 Exterior Painting - MCC1
Project: 5 Activity: WMCCA1070 Interior Painting - MCC1
Project: 5 Activity: WMCCE1030 Handhole Installation - MCC1
- done
Project: 5 Activity: WMGHS1000 Concrete Works
Project: 5 Activity: WMVTA1000 Finished Painting
Project: 5 Activity: WMVTE1010 Termination Works (waiting
for approval XLPE cables)
Project: 5 Activity: WSDBE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WSDBS1000 Structural Concrete Works
Project: 5 Activity: WSDLC1000 Backfilling MH3-1A to MH B-1
Project: 5 Activity: WSDLC1010 Slope Protection between MH3-
1A and MH B-1 (design dependent)
Project: 5 Activity: WSDLM1000 Install Air Vent and Manhole
Sta260 - 0+477 (3 nos by GHD) - done
Project: 5 Activity: WSDLS1000 PS 1 to 3 - done
Project: 5 Activity: WSDLS1010 CSDN1000 MH B-1 to MH001
Project: 5 Activity: WSDLS1020 MH001
Project: 5 Activity: WSETA1020 Floor Coating at Concrete
Platform - 1st Priority
Project: 5 Activity: WSETA1070 Fabrication of Chamber Cover
for tank 1-6
Project: 5 Activity: WSETE1000 Cable pulling Tank 6 - done
Project: 5 Activity: WSETE1020 Cable pulling Tank 4 - done
Project: 5 Activity: WSETI1000 Installation of instrument
support Train 6
Project: 5 Activity: WSETI1010 Installation of instrument
support Train 5
Project: 5 Activity: WSETI1020 Installation of instrument
support Train 4
Project: 5 Activity: WSETM2200 Bolt Torquing for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2210 WIR Inspection for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2220 Bolt Torquing for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2230 WIR Inspection for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2240 Bolt Torquing for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2250 WIR Inspection for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2280 Bolt Torquing for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2290 WIR Inspection for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2320 Sludge Valve DN400
Installation Tank 1
Project: 5 Activity: WSETM2330 Sludge Valve DN400
Installation Tank 2
Project: 5 Activity: WSETM2340 Sludge Valve DN400
Installation Tank 3
Project: 5 Activity: WSETM2360 Sludge Valve DN400
Installation Tank 5
Project: 5 Activity: WSETM2390 Bolt Torquing for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2400 WIR Inspection for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2410 Bolt Torquing for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2420 WIR Inspection for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2430 Bolt Torquing for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2440 WIR Inspection for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2470 Bolt Torquing for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2480 WIR Inspection for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2510 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2750 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 1
Project: 5 Activity: WSETM2760 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 2
Project: 5 Activity: WSETM2770 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 3
Project: 5 Activity: WSETM2780 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 4
Project: 5 Activity: WSETM2790 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 5
Project: 5 Activity: WSETM2800 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 6
Project: 5 Activity: WSETM2810 Installation of Bolts for
Sludge Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2820 Installation of Bolts for
Sludge Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2830 Installation of Bolts for
Sludge Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2850 Installation of Bolts for
Sludge Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2950 Rectification of the
Plumbness of Wall Laces at Settling Tank 6
Project: 5 Activity: WSETM3030 Rectification of the
Plumbness of Wall Laces at Settling Tank 4
Project: 5 Activity: WSETM3150 Rectification of the
Plumbness of Wall Laces at Settling Tank 5
Project: 5 Activity: WSETM3230 Hauling of Lamella Support
Installation Tank 3
Project: 5 Activity: WSETM3360 Hauling of Launders Supports
Tank 3
Project: 5 Activity: WSETM3420 Rectification of the
Plumbness of Wall Laces at Settling Tank 3 - CIVIL TEAM
Project: 5 Activity: WSETM3480 Fabrication of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3550 Hauling of Lamella Support
Installation Tank 2
Project: 5 Activity: WSETM3640 Hauling of Launders Tank 2
Project: 5 Activity: WSETM3650 Installation of Launder
Supports Tank 2
Project: 5 Activity: WSETM3660 WIR Inspection of Launder
Supports Tank 2
Project: 5 Activity: WSETM3670 WIR Inspection for the
Alignment of Launder Tank 2
Project: 5 Activity: WSETM3690 Rectification of Alignment
for launder tank 2
Project: 5 Activity: WSETM3700 Launder Installation Tank 2
Project: 5 Activity: WSETM3710 Hauling of Laces and
SupportsTank 2
Project: 5 Activity: WSETM3720 Installation of Laces
SupportsTank 2
Project: 5 Activity: WSETM3730 WIR Inspection of Laces
Supports Installation Tank 2
Project: 5 Activity: WSETM3740 WIR Inspection of Laces
Installation Tank 2
Project: 5 Activity: WSETM3750 Laces Installation Tank 2
Project: 5 Activity: WSETM3760 Installation of Sludge
Extraction Unit Tank 2
Project: 5 Activity: WSETM3770 Procurement of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3780 Installation of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3790 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3800 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3810 Final Fixing of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3820 Installation of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3830 WIR Inspection for
Installation of Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3840 Lamella Support Installation
Tank 1
Project: 5 Activity: WSETM3850 Lamella Tube Settler
Installation Tank 1
Project: 5 Activity: WSETM3860 Launder Installation Tank 1
Project: 5 Activity: WSETM3870 Final Fixing of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3880 WIR Inspection of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3890 Laces Installation Tank 1
Project: 5 Activity: WSETM3900 WIR Inspection of the
Alignment of Launders at Settling Tank 1
Project: 5 Activity: WSETM3910 Rectification of Alignment
for Launders at Settling Tank 1
Project: 5 Activity: WSETM3950 Installation of Lamella
Support at Settling Tank 6
Project: 5 Activity: WSETM3980 Installation of Lamella
Support at Settling Tank 4
Project: 5 Activity: WSETM4010 Installation of Lamella
Support at Settling Tank 5
Project: 5 Activity: WSETM4050 Fabrication of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM4090 Sludge Valve DN100
Installation Tank 4
Project: 5 Activity: WSETM4100 Sludge Valve DN100
Installation Tank 6
Project: 5 Activity: WSETM4110 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4160 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4210 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4260 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4310 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSIDC3100 Sand backfilling - MCC5 Room
Project: 5 Activity: WSIDC3500 Protection of Chemical
Trenches (Alum & Chlorination) at Road crossings
Project: 5 Activity: WSIDC6000 Soil backfilling - Road6
Project: 5 Activity: WSIDC6200 Sand backfilling - CLB
Project: 5 Activity: WSIDC7000 Sand backfilling - Road7
Project: 5 Activity: WSLLE1010 Cable pulling
Project: 5 Activity: WSLLS1000 Application of Sealant for
Construction Joints (WAITING Sika primer)
Project: 5 Activity: WSLLS1020 Install Railings
Project: 5 Activity: WSLLS1030 Procurement of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1040 Fabrication of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1050 Painting of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1060 Installation of Chamber
Covers - 4 Units
Project: 5 Activity: WSLLS1070 WIR Inspection for
Installation of Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1080 Install Gates
Project: 5 Activity: WSPPC1000 Welding Works 2nd Priority -
done
Project: 5 Activity: WSPPC1030 Construction of TB-02A (from
TWR to Drain) - done
Project: 5 Activity: WSPPC1040 MH4 - done
Project: 5 Activity: WSPPC1080 Construction of TB-B4 and TB-
B5 At Overflow line to from Filtration to Y - done
Project: 5 Activity: WSPPC1120 Backfilling of Overflow Line
from Filtration to Y - done
Project: 5 Activity: WSPPC1130 Rectification works of
Process pipe from MH3 to MH5
Project: 5 Activity: WSPPC1140 Concrete Encasement MH7 &
MH800
Project: 5 Activity: WSPPC1160 MH5 Structural works
Project: 5 Activity: WSPPC1170 Backfilling MH804B to MH800
Project: 5 Activity: WSPPC1180 Backfilling from MH805-4 to
MH3-1
Project: 5 Activity: WSPPM1000 Install Sluice Gate - MH804A
& MH806A
Project: 5 Activity: WSTFM1000 Thickener Feed Tank Inlet
Sluice Gate
Project: 5 Activity: WSTFM1130 WIR Inspection for Thickener
Feed Tank Inlet Sluice Gate
Project: 5 Activity: WSTFM1140 WIR Inspection for Thickener
Feed Tank Connecting Sluice Gate
Project: 5 Activity: WSTFM1150 Design for Thickener Feed
Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1160 Design for Thickener Feed
Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1170 Procurement of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1180 Procurement of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1190 Fabrication of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1200 Fabrication of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1210 Hydro Prep, Filling and
Flushing for DN350 PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1220 Hydrotest for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1230 Pipe Reinstatement for DN350
PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1240 WIR Inspection for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1250 WIR Inspection for
Installation of Submerge Sludge Mixers
Project: 5 Activity: WSTFM1260 WIR Inspection for
Installation of Submerge Sludge Pumps
Project: 5 Activity: WSTFS1000 Water Filling Feed Tank 1 & 2
- done
Project: 5 Activity: WSTTS1000 Concrete Works Thickener 1 &
2
Project: 5 Activity: WSWLM1020 Procurement
Project: 5 Activity: WSWLM1040 Service Water line
Project: 5 Activity: WSWLM1060 Procurement of the Pipe
Materials including delivery
Project: 5 Activity: WSWLM1080 Excavation for Pipes -
Section 1 CIVIL TEAM
Project: 5 Activity: WSWPA1000 Install Handrails
Project: 5 Activity: WSWPA1010 Ceiling Finishes
Project: 5 Activity: WSWPA1020 Interior Wall Finishes
Project: 5 Activity: WSWPE1010 Cable pulling
Project: 5 Activity: WSWPE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSWPE1030 Installation of grounding
system
Project: 5 Activity: WSWPM1000 Install Exhaust Fans
Project: 5 Activity: WSWPM1010 Install Monorail Crane -
DEMAG
Project: 5 Activity: WSWPM1170 Fabrication of Pipe Supports
for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1240 Fabrication of Pipe Supports
for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1330 Procurement HDPE Pipe,
Valves, flange and 20mm plate connecting to TWR
Project: 5 Activity: WSWPM1450 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1470 Installation of Nozzles for
SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1480 Paingting of Nozzles for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1490 WIR Inspection and NDT for
Installation of Nozzles for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1510 Installation of Valves for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1520 WIR Inspection for
Installation of Valves for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1530 Fixing and alignment for Fire
Fighting pump Skid - 2 units
Project: 5 Activity: WSWPM1540 WIR Inspection for Fixing and
alignment for Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1550 Grouting for Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1560 WIR Inspection for Grouting
of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1570 Fabrication of Pipe Supports
for Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1580 Painting of Pipe Supports for
Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1590 Installation of Pipe Supports
for Suction Line of Fire Fighting Pump Skid -2 units
Project: 5 Activity: WSWPM1600 WIR Inspection for
Installation of Pipe Supports for Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1610 Piping installation for
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1620 Hydrotest for pipes of
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1630 WIR Inspection for Hydrotest
for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1640 Fabrication of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1650 Painting of Pipe Supports for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1660 Installation of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1670 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1680 Piping installation for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1690 Hydrotest for pipes of
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1700 WIR Inspection for Hydrotest
for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1710 Pipe reinstatement for pipes
of Suction Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1720 Pipe reinstatement for pipes
of Discharge Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1730 Fire Pump Shaft alignment for
Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1740 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1750 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1760 Fixing and alignment for
Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1770 WIR Inspection for Fixing and
alignment for Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1780 Grouting for Service Water
Pump Skid - 2 units
Project: 5 Activity: WSWPM1790 WIR Inspection for Grouting
of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1800 Fabrication of Pipe Supports
for Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1810 Painting of Pipe Supports for
Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1820 Installation of Pipe Supports
for Suction Line of Service Water Pump Skid -2 units
Project: 5 Activity: WSWPM1830 WIR Inspection for
Installation of Pipe Supports for Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1840 Piping installation for
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1850 Hydrotest for pipes of
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1860 WIR Inspection for Hydrotest
for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1870 Fabrication of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1880 Painting of Pipe Supports for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1890 Installation of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1900 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1910 Piping installation for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1920 Hydrotest for pipes of
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1930 WIR Inspection for Hydrotest
for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1940 Pipe reinstatement for pipes
of Suction Line of Service Water Pump Skid after the hydrotest
Project: 5 Activity: WSWPM1950 Pipe reinstatement for pipes
of Discharge Line of Service Water Pump Skid after hydrotest
Project: 5 Activity: WSWPM1970 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1980 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1990 Installation of Jockey Pump -
1 unit
Project: 5 Activity: WSWPM2000 WIR Inspection for
Installation of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2010 Fixing and Alignment of
Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2020 WIR Inspection for Fixing and
Alignment of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2040 Fabrication of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2050 Painting of Pipe Supports for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2060 Installation of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2070 WIR Inspection for
Installation of Pipe Supports for Suction Line and Discharge Line of Jockey Pump -
1 Unit
Project: 5 Activity: WSWPM2080 Piping installation for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2090 Hydrotest for pipes of
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2100 WIR Inspection for Hydrotest
for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2190 Pipe reinstatement for pipes
of Suction Line and Discharge Line of Jockey Pump - Including check valves
Project: 5 Activity: WSWPM2200 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2210 Procurement for Sump Pumps -
2 units
Project: 5 Activity: WSWPM2220 WIR Inspection for
Installation of Sump Pump - 2 units
Project: 5 Activity: WSWPM2230 Fabrication of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2240 Painting of Pipe Supports for
Sump Pumps
Project: 5 Activity: WSWPM2250 Installation of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2260 WIR Inspection for
Installation of Pipe Supports for Sump Pumps
Project: 5 Activity: WSWPM2270 WIR inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2280 Hydrotest for Piping
Installation for Sump Pumps
Project: 5 Activity: WSWPM2290 Pipe Reistatement for Piping
Installation for Sump Pumps including check valves
Project: 5 Activity: WSWPM2300 WIR Inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2310 Hydrotest Prep, Filling and
Flushing for Piping Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2320 WIR Inspection for Install
Exhaust Fans
Project: 5 Activity: WSWPM2330 WIR Inspection for Install
Fire Dampers
Project: 5 Activity: WSWPM2340 WIR Inspection for Install
Outside Air Louvers (2)
Project: 5 Activity: WTA1M1020 Modification of Fire Suction
Line
Project: 5 Activity: WTA1M1060 Modification of Service Water
Suction Line
Project: 5 Activity: WTA1M1070 Design Issue for the
Elevation of Pipes from Chamber 19 to AL-1 - AAII
Project: 5 Activity: WTA1M1100 WIR Inspection Fire and
Servicw Water Sunction Line
Project: 5 Activity: WTA1M1160 Hydrotest of Fire Suction
Line
Project: 5 Activity: WTA1M1170 Hydrotest of Service Water
Suction Line
Project: 5 Activity: WTA1M1180 Installation of Pipes for
Drain Line DN80
Project: 5 Activity: WTA1M1190 Fit-up Installation of Drain
Line
Project: 5 Activity: WTA1M1200 WIR Inspection for Fit-up
Installation of Drain Line
Project: 5 Activity: WTA1M1210 Full Welding Installation of
Drain Line
Project: 5 Activity: WTA1M1220 WIR Inspection for Full
welding Installation of Drain Line
Project: 5 Activity: WTA1M1230 UT Inspection of Drain Line
Project: 5 Activity: WTA1M1240 WIR Inspection of Drain Line
prior for Painting Works
Project: 5 Activity: WTA1M1250 Painting Works for Drain Line
Project: 5 Activity: WTA1M1260 WIR Inspection of Painting
Works for Drain Line
Project: 5 Activity: WTA1M1270 Installation of Valves for
Drain Line - 2 units
Project: 5 Activity: WTA1M1280 Fit-up Installation of Valve
for Drain Line -2 unirts
Project: 5 Activity: WTA1M1290 WIR Inspection for Fit-up
Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1300 Full Welding Installation of
Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1310 WIR Inspection for Full
welding Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1320 UT Inspection of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1330 WIR Inspection of Valve for
Drain Line prior for Painting Works - 2 units
Project: 5 Activity: WTA1M1340 Painting Works of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1350 WIR Inspection of Painting
Works of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1360 Installation of Threadolet
and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1370 WIR Inspection for
Installation of Threadolet and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1380 NDT Inspection for
Installation of Drain line and Sampling Line - AAII, VCCI, Witco
Project: 5 Activity: WTA1M1390 Painting works for Threadolet
and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1400 WIR Inspection of Painting
works for Threadolet and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1420 Installation of flanges for
Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1510 WIR Inspection prior for
installation of Valves DN1400 of Chamber 16 - AAII & VCCI
Project: 5 Activity: WTA1M1520 Installation of Scaffolding
Supports prior for installation of Valve for DN900
Project: 5 Activity: WTA1M1530 Installation of Valve for
DN900
Project: 5 Activity: WTA1M1540 Botl torquing of valve for
DN900
Project: 5 Activity: WTA1M1550 WIR Inspection for
Installation of Valve for DN900
Project: 5 Activity: WTA1M1560 WIR Inspection prior for the
Installation of valve for DN900
Project: 5 Activity: WTA1M1570 Procurement for Remaining
Bolts for DN1400 and DN900
Project: 5 Activity: WTA1M1580 Painting works for valve of
DN900
Project: 5 Activity: WTA1M1590 WIR Inspection Painting works
for valve of DN900
Project: 5 Activity: WTA1M1600 Procurement of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1610 Fabrication of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1620 Painting of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1630 Installation of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1640 WIR Inspection for the
Installation of materials for Chamber Covers - 5 units
Project: 5 Activity: WTA1M1650 Removal of Temporary blinds
inside of Tank 3 - 6 Units
Project: 5 Activity: WTA1M1660 Rectification works including
painting for pipes
Project: 5 Activity: WTA1M1670 WIR Final Joint Inspection -
Rectification works including painting for pipes -AAII, VCCI, WITCO
Project: 5 Activity: WTELS1000 Fabrication of Tower - 30M
TOWER - done
Project: 5 Activity: WTELS1010 Civil Works - 30M TOWER
Project: 5 Activity: WTIPC1000 Backfilling & Compaction -
Chamber15 to 13
Project: 5 Activity: WTIPI1000 At Header Tank: Install of
instrument junction box (300-GB-010)
Project: 5 Activity: WTIPM1070 Internal Inspection inside
the Pipes
Project: 5 Activity: WTIPM1150 Fabrication and Installation
of Chemical Injection at Chamber 15
Project: 5 Activity: WTIPM1210 Fabrication and Installation
of Drain line at Chamber 14
Project: 5 Activity: WTIPM1220 Installation of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1230 WIR Inspection of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1300 WIR Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1310 Fabrication and Installation
of tredolet for sampling point at Chamber 11
Project: 5 Activity: WTIPS1000 Construction of TB (1 unit
remaining) - done
Project: 5 Activity: WTWRA1000 Procurement of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1010 Procurement of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1090 Painting of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1100 Fabrication of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1110 Install Railings at Perimeter
Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1120 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1130 Fabrication of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1140 Painting of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1150 Install Access Hatch Cover (3
units) - TWR Tank1&3
Project: 5 Activity: WTWRA1160 WIR Inspection Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1170 Fabrication of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1180 Painting of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1190 Install Access Hatch Cover (3
units) - TWR Tank 2
Project: 5 Activity: WTWRA1200 WIR Inspection of Access
Hatch Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1210 Painting of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1220 Fabrication of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1230 Install Railings at Perimeter
Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1240 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRC1000 Damp Proofing Works at
Exterior Walls
Project: 5 Activity: WTWRE1000 Termination works - Tank1&3
Project: 5 Activity: WTWRE1030 Installation of roughing ins,
Blockout/Openings/Sleeves Provision 2nd priority
Project: 5 Activity: WTWRI1000 Installation of instruments
supports - Tank1&3
Project: 5 Activity: WTWRM1030 Procurement of Materials for
Chlorine Chemical Piping and Supports - TWR
Project: 5 Activity: WTWRM1090 Design of Rectification Plan
for Sluice Gates Tank 1&2, Inlet and Outlet, Common - AAII
Project: 5 Activity: WTWRS1000 Formworks - TWR Tank2
Project: 5 Activity: WTWRS1070 Tank Lining TWR Tank 3
Project: 5 Activity: WTWRS1080 Tank Lining TWR Tank 1
Project: 5 Activity: WTWRS1110 Crack Repair of Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRS1140 Leak Test & Dewatering of TWR
Tank 2 - done
Project: 5 Activity: WTWRS1150 Tank Lining Backwash Tank 2
Activities without successors....................................904
Project: 5 Activity: A1CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A1CS1080 Sheet Pile Removal
Project: 5 Activity: A1CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A4ACS1220 ISOLATION CHAMBER at Sta.
2+015 Concreting of Pipe Support
Project: 5 Activity: AL3.2040 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION
Project: 5 Activity: ODUMD1000 Dry Testing
Project: 5 Activity: OINDA1010 Exterior Painting
Project: 5 Activity: OPANA1010 Exterior Painting
Project: 5 Activity: OPANA1060 Install Doors
Project: 5 Activity: OTUGM1040 HVAC & Ventillation Works
Project: 5 Activity: OTUGM1050 Installation of Exhaust Fan
Project: 5 Activity: OTUGM1060 WIR Inspection for
Installation of Exhaust Fan
Project: 5 Activity: OTUGM1070 Fabrication of Exhaust fan
Supports
Project: 5 Activity: OTUGM1090 Installation of Exhaust fan
Supports
Project: 5 Activity: OTUGM1100 WIR INspection for
Installation of Exhaust fan Supports
Project: 5 Activity: OTUGM1110 Fabrication of Exhaust fan
Duct
Project: 5 Activity: OTUGM1120 Installation of Exhaust fan
Duct
Project: 5 Activity: OTUGM1130 WIR INspection for
Installation of Exhaust fan Duct
Project: 5 Activity: OTUGM1140 Installation of Scaffolding
prior for installation of Motorized Dampers
Project: 5 Activity: OTUGM1150 Installation of Motorized
Dampers
Project: 5 Activity: OTUGM1160 WIR Inspection for
Installation of Motorized Dampers
Project: 5 Activity: OTUGM1170 Procurement of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1180 Fabrication of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1190 Installation of Gravity
Damper and Bird Screen
Project: 5 Activity: OTUGM1200 WIR Inspection for
Installation of Gravity damper and Bird Screen
Project: 5 Activity: OTUGM1210 Fabrication of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1220 Installation of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1230 WIR Inspection for
Installation of Exhaust Air grill - Chlorination Room
Project: 5 Activity: OTUGM1240 Installation of Exhaust Fan
at Genset Room with Support
Project: 5 Activity: OTUGM1250 WIR Inspection for
Installation of Exhaust Fan at Genset Room
Project: 5 Activity: OTUGM1260 Installation of Outside Air
louver 2.2m x 1m
Project: 5 Activity: OTUGM1270 WIR Inspection for
Installation of Outside Air louver 2.2m x 1m
Project: 5 Activity: OTUGM1280 Hydrotest test prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1290 Hydrotest test for chlorine
package system
Project: 5 Activity: OTUGM1300 PIpe reinstatement for
chlorine package system
Project: 5 Activity: OTUGM1310 WIR Inspection for chlorine
package system
Project: 5 Activity: OTUGM1320 Nitrogen Test for chlorine
package system
Project: 5 Activity: OTUGM1330 Nitrogen Tes prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1340 Nitrogen Tes for chlorine
package system
Project: 5 Activity: OTUGM1350 PIpe reinstatement for
chlorine package system - Nitrogen Tes
Project: 5 Activity: OTUGM1360 WIR Inspection for chlorine
package system - Nitrogen Tes
Project: 5 Activity: RACRC4000 AR4 (Desander to Surge Tank)
- surface reshaping and side ditches
Project: 5 Activity: RCDSC1070 Air vents guy support and
screen cover (WIR Inspection)
Project: 5 Activity: RCDSM1010 Complete weld rectification
of Segment 4 closure at TB66 (including coating)
Project: 5 Activity: RCDSM1220 WIR Inspection for Drain
Pipes - Riser 1-3
Project: 5 Activity: RCDSM1230 WIR Inspection for
Installation for Drain Valve protection wrap, PVC pipe sleeve and valve box - 1 to
3
Project: 5 Activity: RCWDC1010 Clean up inside conveyance
pipeline
Project: 5 Activity: RDESE1000 Underground cable
installation - Service Entrance to ECB
Project: 5 Activity: RDESM1090 Gate Seals Rectification
(Flap Gates Inspection for A and B)
Project: 5 Activity: RDRSS1010 PE Sta 0+260 - 0+451(TB10 -
TB11) - Remaining 4m PE
Project: 5 Activity: RHMBA1030 Floor Finishes
Project: 5 Activity: RHMBA1210 WIR Inspection of sump pumps
gratings
Project: 5 Activity: RHMBA1250 WIR Inspection gratings
Project: 5 Activity: RHMBA1260 Dismantling of Scaffolding of
Louvers
Project: 5 Activity: RHMBA1290 WIR Inspection for
Installation of Exhaust fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1340 Installation of Louvers for
Exhaust Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBM1090 Pipe Connection DN1000 - WIR
Inspection
Project: 5 Activity: RHMBM1100 Re-installation of Sump Pumps
- 2 units
Project: 5 Activity: RHMBM1130 Installation of Flanges for
Sump Pumps
Project: 5 Activity: RHMBM1150 Installation of Gate valves
for Sump Pumps - 2 units
Project: 5 Activity: RHMBM1180 Painting Works of Pipes for
Sump Pumps - WIR Inspection
Project: 5 Activity: RHMBM1240 WIR Inspection of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1290 1st stage grouting of Turbine
and Generator
Project: 5 Activity: RHMBM1300 2nd Stage grouting for Piping
and Turbine and Generator
Project: 5 Activity: RHMBM1360 Connection to Cooling Water
Sytem - Turbine and Generator
Project: 5 Activity: RHMBM1370 WIR Inspection Bolt torquing
of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBS1020 2nd Stage Concrete Pouring
Project: 5 Activity: RTWTM1040 WIR Inspection for Hydraulic
tubing connection to Hydraulic Cyclinder
Project: 5 Activity: RTWTM1050 Shafting Installation at
Draft tube
Project: 5 Activity: RTWTM1060 Installation of Hydraulic
Cylinder for Draft tube
Project: 5 Activity: RTWTM1070 Installation of Hydraulic
Cyinder for Bypass
Project: 5 Activity: RTWTM1090 Fixing of Gates - TWT and
Trial Operations (Bypass)
Project: 5 Activity: RWEIC1010 Clearing works at the Weir
Intake Channel/Chamber
Project: 5 Activity: RWEIE1000 Wiring of temporary gensets
to the main panels
Project: 5 Activity: RWEIE1010 Rectification of electrical
works
Project: 5 Activity: RWEIM1010 Preparation of platform and
additional soundproofing enclosure on Weir for the portable genset
Project: 5 Activity: RWEIM1020 Hauling of 2 units portable
gensets from WTP to RWF. Mounting on platforms
Project: 5 Activity: RWEIM1060 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RWEIM1070 Bolt Torquing for
Environmental Valves
Project: 5 Activity: RWEIM1230 Weir to Desander Piping
(Paint rectification) - Joint Final Inspection with Witco and T&C
Project: 5 Activity: RWEIM1380 Gate Seals Rectification
(Inlet Gates Inspection for A and B)
Project: 5 Activity: RWEIM1390 Gate Seals Rectification
(Flushing Gates Ins[ppection for A and B)
Project: 5 Activity: RWEIM1400 Gate Seals Rectification
Outlet Gate Inspecttion for A and B)
Project: 5 Activity: TAL2C3120 Permanent Road Restoration
Sta 3+129 to 3+339
Project: 5 Activity: TAL2C4320 Permanent Road Restoration
Sta 4+327 to 4+463
Project: 5 Activity: TAL2C6270 Permanent Road Restoration
Sta 6+279 to 6+820, 0+073 (AL3), 0+025 (AL 4)
Project: 5 Activity: TAL4C13530 Permanent Road Restoration
Sta 13+530 to 14+585
Project: 5 Activity: TAL4C14630 Permanent Road Restoration
Sta 14+637 to 14+910, 0+015 (AL5), 0+018 (AL6)
Project: 5 Activity: TAL4C2410 Permanent Road Restoration
Sta 2+418 to 3+235
Project: 5 Activity: TAL4M1700 Hydrotesting Segment-3 -
Alignment 4A
Project: 5 Activity: TAL7C5650 Permanent Road Restoration
Sta 5+658 to 5+680
Project: 5 Activity: TDRBC1010 Site Restoration
Project: 5 Activity: WABRA1100 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1130 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1150 WIR Inspection for
Installation of Opposed Back Drop (OBD) for Exhaust Blowers - 2 Units
Project: 5 Activity: WABRA1180 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1260 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1280 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WACSM1270 Installation of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1280 Procurement of Outside Blower
or Fan Units - 2 Units
Project: 5 Activity: WACSM1290 Installation of Exhaust Fan
Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1300 WIR Inspection of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1310 WIR Inspection of Inside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1320 WIR Inspection of
Installation of Exhaust Fan Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1330 WIR Inspection of
Installation of Emergency Eye Shower
Project: 5 Activity: WADBA1050 Install Cyclone Fence
Project: 5 Activity: WADBA1060 Install Railings
Project: 5 Activity: WADBA1070 Install Doors 2nd Priority
Project: 5 Activity: WADBA1100 Install Glazings
Project: 5 Activity: WADBA1150 WIR Inspection of Install
Exhaust Air Louver at EE room
Project: 5 Activity: WADBA1180 Installation of Exhaust Fan
Enclosure - - EE Room
Project: 5 Activity: WADBM1030 Installation of of High Flume
Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1040 Design of support for High
Flume Exhaust Fan - 5 Units - AAII/ VCCI
Project: 5 Activity: WADBM1050 Fabrication of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1060 Painting of support for High
Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1070 Installation of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1080 WIR Installation prior for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1100 Fabrication of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1110 Paiting of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1120 Installation of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1130 WIR Inspection prior for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1140 Installation of Flexible Duct
Connection
Project: 5 Activity: WADBM1150 WIR Inspection for
Installation of Flexible Duct Connection
Project: 5 Activity: WADBM1160 WIR Inspection for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1170 Cleaning of Outside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1180 Cleaning of Inside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1190 Balancing for Ducting prior
for testing - T&C
Project: 5 Activity: WADBM1200 Sealant Application in the
Duct passing through the wall - Ground to Roof Deck
Project: 5 Activity: WADBM1210 WIR Inspection for Sealant
Application in the Duct passing through the wall
Project: 5 Activity: WADBM1220 Installation of ACCU (28
units) - Roof Deck
Project: 5 Activity: WADBM1230 WIR Inspection for
Installation of ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1240 Installation of refregerant
Piping from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1250 Cleaning of refregerant
Piping using R11 from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1260 Flushing and Cleaning of
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1270 Fabrication of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1280 Painting of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1290 Lay-out of support for
refregerant Pipie from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1300 WIR Inspection prior for
install of support for refregerant pipe from dog house to ACCU (28 units) - Roof
Deck
Project: 5 Activity: WADBM1310 Installation of support for
refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1320 Installation of Aluminum
Cladding for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1330 Initial charging of freon
(R32) for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1340 Procurement of thermostat
control with wiring (Honeywell or johnson&Johnson) - 7 Pieces AAII/VCCI
Project: 5 Activity: WADBM1350 Installation of thermostat
control with wiring - 7 Pieces
Project: 5 Activity: WADBM1360 WIR Inspectkion for
Installation of thermostat control with wiring - 7 Pieces
Project: 5 Activity: WADBU1060 Hydrotest for Water Piping
Line
Project: 5 Activity: WADBU1070 WIR for Hydrotest of Water
Piping Line
Project: 5 Activity: WADBU1080 Dis-infection for Water
Piping Line - T&C
Project: 5 Activity: WADBU1090 WIR Inspection for Dis-
infection for Water Piping Line - T&C
Project: 5 Activity: WADBU1100 Installation of Pipe
connecting to Rainwater Tanks
Project: 5 Activity: WADBU1110 Installation of C-Clamp
Supports for Pipe connecting to Rainwater Tanks
Project: 5 Activity: WADBU1120 Installation of Pipes from
Water Pump to Water Tank
Project: 5 Activity: WADBU1130 WIR Inspection for
Installation of Pipes from Water Pump to Water Tank
Project: 5 Activity: WADBU1140 WIR Inspection for Install
Water Pump - 2 units
Project: 5 Activity: WADBU1150 WIR Inspection for Install
Rainwater Tanks
Project: 5 Activity: WADBU1160 WIR Inspection for Install
Water Tank
Project: 5 Activity: WAPBE1020 Termination works
Project: 5 Activity: WAPBM1000 Overhead crane load testing
Project: 5 Activity: WAPBM1010 Outside Air Duct Works
Project: 5 Activity: WAPBM1070 Installation of Alum
Pulsation Dampener
Project: 5 Activity: WAPBM1220 WIR Inspection for final
Grouting for Polymer Dosing Pumps - 12 Units
Project: 5 Activity: WAPBM1300 WIR Final Inspection for
Suction Pipe Reinstatement - 12 units AAII, VCCI
Project: 5 Activity: WAPBM1360 WIR Inspection Installation
for additional supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1420 WIR Final Inspection for
Suction Pipe Reinstatement - 12 units AAII, VCCI
Project: 5 Activity: WAPBM1430 Installation of Fittings
connected to instrument for PVC Ball Valve 1-1/2" 546 Pro (FKM) ASTM NPT
Project: 5 Activity: WAPBM1500 WIR Inspection of Pulsation
Dampener - Polymer
Project: 5 Activity: WAPBM1590 WIR Inspection for Final
Grouting of Alum Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM1620 WIR Inspection for Final
Grouting of Transfer Pumps - 2 Units
Project: 5 Activity: WAPBM1640 Hydrotest for Connection
lines of Alum Dosing Pump to Transfer Pumps
Project: 5 Activity: WAPBM1710 WIR Inspection for additional
supports and End Cap for Alum Calibration Column
Project: 5 Activity: WAPBM1770 Final Inspection for Suction
Pipe Reinstatement of Alum Dosing Pumps - AAII, VCCI
Project: 5 Activity: WAPBM1780 New Activity
Project: 5 Activity: WAPBM1840 Final Inspection for
Discharge Pipe Reinstatement of Alum Dosing Pumps- 2 units AAII, VCCI
Project: 5 Activity: WAPBM1900 Final Inspection for Suction
Pipe Reinstatement of Transfer Pumps - AAII, VCCI
Project: 5 Activity: WAPBM1960 Final Inspection for
Discharge Pipe Reinstatement of Transfer Pumps- 2 units AAII, VCCI
Project: 5 Activity: WAPBM1990 Installation of Mixer for
Alum Sulphate Prep Unit 2
Project: 5 Activity: WAPBM2040 WIR Inspection for Assembly
of Bulk Bag Loader Screw Feeder with Chute for Alum Sulphate Prep Tank 1
Project: 5 Activity: WAPBM2050 WIR Inspection for Assembly
of Bulk Bag Loader Screw Feeder with Chute for Alum Sulphate Prep Tank 2
Project: 5 Activity: WAPBM2070 Installation of Mixer of Alum
Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2150 Coating of Grouted base plate
supports for Alum Sulphate Storage Tank (18 cu.m) - 2 units - CIVIL TEAM
Project: 5 Activity: WAPBM2160 Procurement of Exhaust Blower
or Fan Units - 4 units - AAII
Project: 5 Activity: WAPBM2170 Installation of Supply Blower
or Fan Units - 2 units (DONE)
Project: 5 Activity: WAPBM2180 Installation of flexible
joint for Supply Blower or Fan Units - 2 units
Project: 5 Activity: WAPBM2190 Installation of flexible
joint for Exhaust Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2200 WIR Inspection for Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2210 WIR Inspection for Supply
Blower or Fan Units - 2 units (Done)
Project: 5 Activity: WAPBM2220 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2230 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2290 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2300 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2310 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2320 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2330 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2340 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2350 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2360 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2370 Installation of ACCU - 2
units (DONE)
Project: 5 Activity: WAPBM2380 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2390 Installation of Flexible
Joints (DONE)
Project: 5 Activity: WAPBM2400 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2410 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2420 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2430 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2440 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2450 Installation of ACCU - 2
units
Project: 5 Activity: WAPBM2460 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2470 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2480 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2490 Installation of Flexible
Joints
Project: 5 Activity: WAPBM2500 Installation of Exhaust Fan -
1 unit
Project: 5 Activity: WAPBM2510 WIR Inspection for
Installation of Exhaust Fan - 1 unit
Project: 5 Activity: WAPBM2520 Installation of Fire Dampers
- 3 units
Project: 5 Activity: WAPBM2530 Installation of Motorized
Fire Dampers - 3 units
Project: 5 Activity: WAPBM2540 Installation of Scaffolding
prior for Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2550 Installation of Scaffolding
prior for Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2560 WIR Inspection for
Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2570 WIR Inspection for
Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2580 Initial charge of Freon (R32)
Project: 5 Activity: WAPBM2640 WIR Inspection for Anionic
Polymer Prep Unit - Tank 2
Project: 5 Activity: WAPBU1000 Construct Septic Tank - done
Project: 5 Activity: WAPBU1020 Install Bathroom Fixtures
Project: 5 Activity: WAPBU1040 WIR Inspection for Water
Piping
Project: 5 Activity: WAPBU1060 Installation of Down Spout
Project: 5 Activity: WAPBU1070 WIR Inspection of Down Spout
Project: 5 Activity: WBPHA1140 WIR Inspection for Louvers (5
units)
Project: 5 Activity: WBPHM1010 Curing period for the second
stage Grouting
Project: 5 Activity: WBPHM1060 Overhead Crane load testing -
DEMAG
Project: 5 Activity: WBPHM1470 Installation of nipple and
valve for pressure gauges and switches - LP 1 - 4 Units
Project: 5 Activity: WBPHM1480 Installation of nipple and
valve for pressure gauges and switches - LP 2 - 4 Units
Project: 5 Activity: WBPHM1490 Installation of nipple and
valve for pressure gauges and switches - HP 1 - 4 Units
Project: 5 Activity: WBPHM1500 Installation of nipple and
valve for pressure gauges and switches - HP 2 - 4 Units
Project: 5 Activity: WBPHM1620 WIR Inspection of
Installation of Blower or Fan Units - Wall mounted (Done)
Project: 5 Activity: WBPHM1690 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1700 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1710 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHS1010 Construct Pipe Support
including pedestal - Suctions, Discharge, & Elbow
Project: 5 Activity: WBPHS1020 Painting works for Steel
Columns, Beams, & Frames - on the Welded Part
Project: 5 Activity: WBPHS1030 WIR Inspection for Steel
Columns, Beams, & Frames
Project: 5 Activity: WCLBA1060 Interior Wall Finishes -
remaining
Project: 5 Activity: WCLBA1100 WIR Inspection for Install
Louver
Project: 5 Activity: WCLBE1010 Installation of grounding
system
Project: 5 Activity: WCLBM1020 Overhead crane load testing -
done
Project: 5 Activity: WCLBM1090 Chlorine piping works and
supports inside the building - DONE
Project: 5 Activity: WCLBM1100 Installation of FRP pipe
support at chemical trenches
Project: 5 Activity: WCLBM1220 Supply - Outside Air Blowers
- 3 units (2 units installed)
Project: 5 Activity: WCLBM1230 Rectification for Spring
Mounting of Outside Air Blowers - 1 piece
Project: 5 Activity: WCLBM1240 WIR Inspection of Outside Air
Blowers - 1 piece
Project: 5 Activity: WCLBM1250 Installation of Exhaust Fans
- 4 Units (DONE) Wall Mounted
Project: 5 Activity: WCLBM1260 WIR Inspection for
Installation of Exhaust Fans - 4 Units Wall Mounted
Project: 5 Activity: WCLBM1270 WIR Inspection for
Installation of Emergency Eye Shower - 5 Units
Project: 5 Activity: WCLBM1280 Install of Scaffolding prior
fo Installation of Fire Dampers
Project: 5 Activity: WCLBM1320 WIR Inspection of Install
Fire Dampers
Project: 5 Activity: WCLBM1330 WIR Inspection of Install
Motorize Fire Dampers
Project: 5 Activity: WCLBM1340 Installation of Fire Dampers
Project: 5 Activity: WCLBM1350 WIR Inspection of FRP Air
Blower Units - 2 Units
Project: 5 Activity: WCLBM1380 Delivery of chlorine tank for
Auto Change Over Unit - 4 Units
Project: 5 Activity: WCLBM1430 WIR Inspection prior for
installation of Chlorine Ejector Unit
Project: 5 Activity: WCLBM1500 WIR Inspection of Barcol,
Smoke, and Nitrogen Testing Testing of FRP pipes
Project: 5 Activity: WCLBM1600 Final WIR Inspection of
Chlorine Scrubber System Lines - AAII Acceptance
Project: 5 Activity: WCLBM1630 Final WIR Inspection for
Nitrogen Leak test for Vacuum Regulator, Auto Change Over Unit and Evaporator
System
Project: 5 Activity: WCLBM1650 Final WIR Inspection for
Chlorine Ejector Unit
Project: 5 Activity: WCLBM1660 Installation of Chlorine
Chemical Pipes connecting to TWR
Project: 5 Activity: WCLBM1670 Design for the new Sampling
Point
Project: 5 Activity: WCLBM1680 Installation for the new
Sampling Point
Project: 5 Activity: WCLBM1690 Procurement for Chlorine and
S02 ton container with dip trays - AAII
Project: 5 Activity: WCLBM1700 WIR Inspection for
Installation of Chlorine and S02 ton container with dip trays
Project: 5 Activity: WCLBU1030 Reinstatement after the
Hydrotest for Install Water Piping
Project: 5 Activity: WCLBU1050 Leak Test for Install
Sanitary Plumbing - Rem. Perimeter lines
Project: 5 Activity: WELBM1030 Install ACCU unit - Out door
- 6 units
Project: 5 Activity: WELBM1070 WIR Inspection for
Installation of ACCU Supports/Steel Flat Forms
Project: 5 Activity: WELBM1080 Installation of Copper Tube
Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELBM1090 WIR Inspection for
Installation of Copper Tube Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELNE1020 Duct Bank Valve Chamber to
EHH1
Project: 5 Activity: WELNE1250 FOC Cable Pulling
Project: 5 Activity: WFITA1070 Install Steel Stairs,
Platforms, and Handrails - NORTH SIDE GALLERY
Project: 5 Activity: WFITA1500 Procurement of Steel Stairs,
Platforms - SOUTH and NORTH SIDE PIPE GALLERY - (Gratings and handrails by
WEBFORGE)
Project: 5 Activity: WFITA1510 Installation of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1540 Installation of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1670 WIR Inspection of Installed
Louvers Stair 3
Project: 5 Activity: WFITA2360 WIR Inspection of Steel
Stairs, Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2370 WIR Inspection of Steel
Stairs, Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2380 Painting of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2390 Painting of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITE1000 Installation of grounding
system
Project: 5 Activity: WFITE1010 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WFITE1070 Termination works Tanks 10,
12, 14, 16, 18 - remaining Instruments
Project: 5 Activity: WFITE1080 SAT/program Simulation Tanks
10, 12, 14, 16, 18
Project: 5 Activity: WFITE1100 Termination works Tanks 1, 3,
5, 9 - remaining Instruments
Project: 5 Activity: WFITE1110 SAT/program Simulation Tanks
1, 3, 5, 9
Project: 5 Activity: WFITM10000 Underdrain DMF18 - Air Header
pipe survey
Project: 5 Activity: WFITM10010 Underdrain DMF18 - Anchor rod
installation
Project: 5 Activity: WFITM10020 Underdrain DMF18 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM10030 Underdrain DMF18 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM10040 Underdrain DMF18 -
Installation of FRP Plates
Project: 5 Activity: WFITM10050 Underdrain DMF18 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM10060 Underdrain DMF18 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM10070 Underdrain DMF18 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM10080 Underdrain DMF18 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM10090 Underdrain DMF18 - Protection
covers of the underdrains
Project: 5 Activity: WFITM10100 Underdrain DMF18 - WIR
Inspection
Project: 5 Activity: WFITM10190 LAUNSDERS DMF18 - Formworks &
Grouting
Project: 5 Activity: WFITM15410 WIR Inspection for bolt
torquing of Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM15470 WIR Inspection for Painting
for Flange Adaptor for Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15480 Installation of Bolts for
Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15490 Bolt torquing for Valves of
DN500 - 36 units units North Side
Project: 5 Activity: WFITM15500 WIR Inspection for bolt
torquing of Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM18160 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM18440 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM18720 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM19000 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM19280 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM19700 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19980 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20260 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20540 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2070 Filter to Rinse Tank 10
Project: 5 Activity: WFITM20820 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20940 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2140 Filter to Rinse Tank 12
Project: 5 Activity: WFITM21820 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM21920 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM2210 Filter to Rinse Tank 14
Project: 5 Activity: WFITM22340 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22420 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22440 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22520 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22540 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22620 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22640 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22720 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22740 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2280 Filter to Rinse Tank 16
Project: 5 Activity: WFITM22820 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22840 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22920 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM22940 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM23020 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM23120 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM2350 Filter to Rinse Tank 18
Project: 5 Activity: WFITM2420 Filter to Rinse Tank 1
Project: 5 Activity: WFITM2490 Filter to Rinse Tank 3
Project: 5 Activity: WFITM2560 Filter to Rinse Tank 5
Project: 5 Activity: WFITM2630 Filter to Rinse Tank 7
Project: 5 Activity: WFITM2700 Filter to Rinse Tank 9
Project: 5 Activity: WFITM2720 WIR Inspection for the 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2770 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM2830 WIR Inspection and
Reinstatement for SS Pipes (DN200)
Project: 5 Activity: WFITM2950 WIR Inspection of Air Relive
Valves of at Filter Tank 1 & 10
Project: 5 Activity: WFITM3190 WIR Inspection for the
Flowmeter at North Side - 9 units
Project: 5 Activity: WFITM3220 WIR Inspection of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM4070 Underdrain DMF2 - WIR
Inspection
Project: 5 Activity: WFITM4160 LAUNSDERS DMF2 - Formworks &
Grouting
Project: 5 Activity: WFITM4660 Underdrain DMF4 - WIR
Inspection
Project: 5 Activity: WFITM4750 LAUNSDERS DMF4 - Formworks &
Grouting
Project: 5 Activity: WFITM5000 Underdrain DMF6 - WIR
Inspection
Project: 5 Activity: WFITM5090 LAUNSDERS DMF6 - Formworks &
Grouting
Project: 5 Activity: WFITM5340 Underdrain DMF8 - WIR
Inspection
Project: 5 Activity: WFITM5430 LAUNSDERS DMF8 - Formworks &
Grouting
Project: 5 Activity: WFITM5440 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5450 Underdrain DMF1 - Pull-off
Test
Project: 5 Activity: WFITM5460 Underdrain DMF1 - Flume
Handover
Project: 5 Activity: WFITM5470 Underdrain DMF1 - Scour air
piping flushing
Project: 5 Activity: WFITM5480 Underdrain DMF1 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5490 Underdrain DMF1 - Hydrotest
DN900
Project: 5 Activity: WFITM5500 Underdrain DMF1 - Scour air
piping pressure test
Project: 5 Activity: WFITM5510 Underdrain DMF1 - Install
scaffold roof
Project: 5 Activity: WFITM5520 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5530 Underdrain DMF1 - Modify
scaffold access
Project: 5 Activity: WFITM5540 Underdrain DMF1 - Clearing
works
Project: 5 Activity: WFITM5550 Underdrain DMF1 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5560 Underdrain DMF1 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5570 Underdrain DMF1 - Air header
pipe installation.
Project: 5 Activity: WFITM5580 Underdrain DMF1 - Air Header
pipe survey
Project: 5 Activity: WFITM5590 Underdrain DMF1 - Anchor rod
installation
Project: 5 Activity: WFITM5600 Underdrain DMF1 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5610 Underdrain DMF1 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5620 Underdrain DMF1 -
Installation of FRP Plates
Project: 5 Activity: WFITM5630 Underdrain DMF1 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5640 Underdrain DMF1 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5650 Underdrain DMF1 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5660 Underdrain DMF1 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5670 Underdrain DMF1 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5680 Underdrain DMF1 - WIR
Inspection
Project: 5 Activity: WFITM5690 LAUNSDERS DMF1 - Chipping for
Launders of
Project: 5 Activity: WFITM5700 LAUNSDERS DMF1 - Install
scaffolding
Project: 5 Activity: WFITM5710 LAUNSDERS DMF1 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5720 LAUNSDERS DMF1 - Placement of
Launders
Project: 5 Activity: WFITM5730 LAUNSDERS DMF1 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5740 LAUNSDERS DMF1 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5750 LAUNSDERS DMF1 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5760 LAUNSDERS DMF1 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5770 LAUNSDERS DMF1 - Formworks &
Grouting
Project: 5 Activity: WFITM5780 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5790 Underdrain DMF3 - Pull-off
Test
Project: 5 Activity: WFITM5800 Underdrain DMF3 - Flume
Handover
Project: 5 Activity: WFITM5810 Underdrain DMF3 - Scour air
piping flushing
Project: 5 Activity: WFITM5820 Underdrain DMF3 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5830 Underdrain DMF3 - Hydrotest
DN900
Project: 5 Activity: WFITM5840 Underdrain DMF3 - Scour air
piping pressure test
Project: 5 Activity: WFITM5850 Underdrain DMF3 - Install
scaffold roof
Project: 5 Activity: WFITM5860 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5870 Underdrain DMF3 - Modify
scaffold access
Project: 5 Activity: WFITM5880 Underdrain DMF3 - Clearing
works
Project: 5 Activity: WFITM5890 Underdrain DMF3 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5900 Underdrain DMF3 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5910 Underdrain DMF3 - Air header
pipe installation.
Project: 5 Activity: WFITM5920 Underdrain DMF3 - Air Header
pipe survey
Project: 5 Activity: WFITM5930 Underdrain DMF3 - Anchor rod
installation
Project: 5 Activity: WFITM5940 Underdrain DMF3 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5950 Underdrain DMF3 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5960 Underdrain DMF3 -
Installation of FRP Plates
Project: 5 Activity: WFITM5970 Underdrain DMF3 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5980 Underdrain DMF3 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5990 Underdrain DMF3 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6000 Underdrain DMF3 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6010 Underdrain DMF3 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6020 Underdrain DMF3 - WIR
Inspection
Project: 5 Activity: WFITM6030 LAUNSDERS DMF3 - Chipping for
Launders of
Project: 5 Activity: WFITM6040 LAUNSDERS DMF3 - Install
scaffolding
Project: 5 Activity: WFITM6050 LAUNSDERS DMF3 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6060 LAUNSDERS DMF3 - Placement of
Launders
Project: 5 Activity: WFITM6070 LAUNSDERS DMF3 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6080 LAUNSDERS DMF3 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6090 LAUNSDERS DMF3 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6100 LAUNSDERS DMF3 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6110 LAUNSDERS DMF3 - Formworks &
Grouting
Project: 5 Activity: WFITM6120 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6130 Underdrain DMF5 - Pull-off
Test
Project: 5 Activity: WFITM6140 Underdrain DMF5 - Flume
Handover
Project: 5 Activity: WFITM6150 Underdrain DMF5 - Scour air
piping flushing
Project: 5 Activity: WFITM6160 Underdrain DMF5 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM6170 Underdrain DMF5 - Hydrotest
DN900
Project: 5 Activity: WFITM6180 Underdrain DMF5 - Scour air
piping pressure test
Project: 5 Activity: WFITM6190 Underdrain DMF5 - Install
scaffold roof
Project: 5 Activity: WFITM6200 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6210 Underdrain DMF5 - Modify
scaffold access
Project: 5 Activity: WFITM6220 Underdrain DMF5 - Clearing
works
Project: 5 Activity: WFITM6230 Underdrain DMF5 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6240 Underdrain DMF5 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6250 Underdrain DMF5 - Air header
pipe installation.
Project: 5 Activity: WFITM6260 Underdrain DMF5 - Air Header
pipe survey
Project: 5 Activity: WFITM6270 Underdrain DMF5 - Anchor rod
installation
Project: 5 Activity: WFITM6280 Underdrain DMF5 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6290 Underdrain DMF5 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6300 Underdrain DMF5 -
Installation of FRP Plates
Project: 5 Activity: WFITM6310 Underdrain DMF5 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6320 Underdrain DMF5 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6330 Underdrain DMF5 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6340 Underdrain DMF5 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6350 Underdrain DMF5 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6360 Underdrain DMF5 - WIR
Inspection
Project: 5 Activity: WFITM6370 LAUNSDERS DMF5 - Chipping for
Launders of
Project: 5 Activity: WFITM6380 LAUNSDERS DMF5 - Install
scaffolding
Project: 5 Activity: WFITM6390 LAUNSDERS DMF5 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6400 LAUNSDERS DMF5 - Placement of
Launders
Project: 5 Activity: WFITM6410 LAUNSDERS DMF5 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6420 LAUNSDERS DMF5 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6430 LAUNSDERS DMF5 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6440 LAUNSDERS DMF5 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6450 LAUNSDERS DMF5 - Formworks &
Grouting
Project: 5 Activity: WFITM6530 Underdrain DMF7 - Install
scaffold roof
Project: 5 Activity: WFITM6540 Underdrain DMF7 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6550 Underdrain DMF7 - Modify
scaffold access
Project: 5 Activity: WFITM6560 Underdrain DMF7 - Clearing
works
Project: 5 Activity: WFITM6570 Underdrain DMF7 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6580 Underdrain DMF7 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6590 Underdrain DMF7 - Air header
pipe installation.
Project: 5 Activity: WFITM6600 Underdrain DMF7 - Air Header
pipe survey
Project: 5 Activity: WFITM6610 Underdrain DMF7 - Anchor rod
installation
Project: 5 Activity: WFITM6620 Underdrain DMF7 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6630 Underdrain DMF7 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6640 Underdrain DMF7 -
Installation of FRP Plates
Project: 5 Activity: WFITM6650 Underdrain DMF7 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6660 Underdrain DMF7 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6670 Underdrain DMF7 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6680 Underdrain DMF7 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6690 Underdrain DMF7 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6700 Underdrain DMF7 - WIR
Inspection
Project: 5 Activity: WFITM6710 LAUNSDERS DMF7 - Chipping for
Launders of
Project: 5 Activity: WFITM6720 LAUNSDERS DMF7 - Install
scaffolding
Project: 5 Activity: WFITM6730 LAUNSDERS DMF7 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6740 LAUNSDERS DMF7 - Placement of
Launders
Project: 5 Activity: WFITM6750 LAUNSDERS DMF7 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6760 LAUNSDERS DMF7 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6770 LAUNSDERS DMF7 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6780 LAUNSDERS DMF7 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6790 LAUNSDERS DMF7 - Formworks &
Grouting
Project: 5 Activity: WFITM6870 Underdrain DMF9 - Install
scaffold roof
Project: 5 Activity: WFITM6880 Underdrain DMF9 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6890 Underdrain DMF9 - Modify
scaffold access
Project: 5 Activity: WFITM6900 Underdrain DMF9 - Clearing
works
Project: 5 Activity: WFITM6910 Underdrain DMF9 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6920 Underdrain DMF9 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6930 Underdrain DMF9 - Air header
pipe installation.
Project: 5 Activity: WFITM6940 Underdrain DMF9 - Air Header
pipe survey
Project: 5 Activity: WFITM6950 Underdrain DMF9 - Anchor rod
installation
Project: 5 Activity: WFITM6960 Underdrain DMF9 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6970 Underdrain DMF9 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6980 Underdrain DMF9 -
Installation of FRP Plates
Project: 5 Activity: WFITM6990 Underdrain DMF9 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7000 Underdrain DMF9 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM7010 Underdrain DMF9 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7020 Underdrain DMF9 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM7030 Underdrain DMF9 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7040 Underdrain DMF9 - WIR
Inspection
Project: 5 Activity: WFITM7050 LAUNSDERS DMF9 - Chipping for
Launders of
Project: 5 Activity: WFITM7060 LAUNSDERS DMF9 - Install
scaffolding
Project: 5 Activity: WFITM7070 LAUNSDERS DMF9 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7080 LAUNSDERS DMF9 - Placement of
Launders
Project: 5 Activity: WFITM7090 LAUNSDERS DMF9 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7100 LAUNSDERS DMF9 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7110 LAUNSDERS DMF9 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7120 LAUNSDERS DMF9 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7130 LAUNSDERS DMF9 - Formworks &
Grouting
Project: 5 Activity: WFITM7380 Underdrain DMF17 - WIR
Inspection
Project: 5 Activity: WFITM7720 Underdrain DMF13 - WIR
Inspection
Project: 5 Activity: WFITM7810 LAUNSDERS DMF13 - Formworks &
Grouting
Project: 5 Activity: WFITM8150 LAUNSDERS DMF15 - Formworks &
Grouting
Project: 5 Activity: WFITM8490 LAUNSDERS DMF11 - Formworks &
Grouting
Project: 5 Activity: WFITM8740 Underdrain DMF10 - WIR
Inspection
Project: 5 Activity: WFITM8830 LAUNSDERS DMF10 - Formworks &
Grouting
Project: 5 Activity: WFITM9080 Underdrain DMF12 - WIR
Inspection
Project: 5 Activity: WFITM9170 LAUNSDERS DMF12 - Formworks &
Grouting
Project: 5 Activity: WFITM9420 Underdrain DMF14 - WIR
Inspection
Project: 5 Activity: WFITM9510 LAUNSDERS DMF14 - Formworks &
Grouting
Project: 5 Activity: WFITM9690 Underdrain DMF16 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9760 Underdrain DMF16 - WIR
Inspection
Project: 5 Activity: WFITM9850 LAUNSDERS DMF16 - Formworks &
Grouting
Project: 5 Activity: WFITM9930 Underdrain DMF18 - Install
scaffold roof
Project: 5 Activity: WFITM9940 Underdrain DMF18 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9950 Underdrain DMF18 - Modify
scaffold access
Project: 5 Activity: WFITM9960 Underdrain DMF18 - Clearing
works
Project: 5 Activity: WFITM9970 Underdrain DMF18 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9980 Underdrain DMF18 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9990 Underdrain DMF18 - Air header
pipe installation.
Project: 5 Activity: WFITS1090 Under drain Tank Lining Tank
10 to 17 - done
Project: 5 Activity: WFITS1100 Wall Tank Lining Tank 10, 12,
14, 16, 18
Project: 5 Activity: WFITS1110 Wall Tank Lining at grouted
Launders DMF10
Project: 5 Activity: WFITS1120 Wall Tank Lining at grouted
Launders DMF12
Project: 5 Activity: WFITS1130 Wall Tank Lining at grouted
Launders DMF14
Project: 5 Activity: WFITS1140 Wall Tank Lining at grouted
Launders DMF16
Project: 5 Activity: WFITS1150 Wall Tank Lining at grouted
Launders DMF18
Project: 5 Activity: WFITS1250 Under drain Tank Lining Tank8
Project: 5 Activity: WFITS1340 Under drain Tank Lining
Tank1, 3, 5, 7, 9
Project: 5 Activity: WFITS1350 Wall Tank Lining at grouted
Launders DMF1, 3, 5, 7, 9
Project: 5 Activity: WFLTA1050 Procurement for Portable
Ladders & Support -12 units
Project: 5 Activity: WFLTA1060 Installation of Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1080 Painting works for Self-
closing Gates - 12 uints
Project: 5 Activity: WFLTA1090 WIR Inspection for Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1100 Fabrication of Support for
portable ladders -12 units
Project: 5 Activity: WFLTA1110 WIR Inspection for Self-
closing Gates - 12 units
Project: 5 Activity: WFLTA1120 Fabrication and Installation
of Flatform for Chemical Lines
Project: 5 Activity: WFLTA1130 Painting of Flatform for
Chemical Lines
Project: 5 Activity: WFLTA1140 WIR Inspection of Flatform
for Chemical Lines
Project: 5 Activity: WFLTA1160 Procurement for Portable
Ladders & Support -
Project: 5 Activity: WFLTA1170 Installation of Portable
Ladders & Support - 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1180 Painting works for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1190 WIR Inspection for Portable
Ladders & Support 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1200 Fabrication of Support for
portable ladders
Project: 5 Activity: WFLTA1210 WIR Inspection for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1220 Installation of Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1230 Painting works for Self-
closing Gates - 2nd priority 1, 2, 3
Project: 5 Activity: WFLTA1240 WIR Inspection for Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1250 WIR Inspection for Self-
closing Gates - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTM1310 Sludge Valve Installation
DN100 Tank 2
Project: 5 Activity: WFLTM1320 Sludge Valve Installation
DN100 Tank 3
Project: 5 Activity: WFLTM1330 Sludge Valve Installation
DN100 Tank 4
Project: 5 Activity: WFLTM1340 Sludge Valve Installation
DN100 Tank 5
Project: 5 Activity: WFLTM1350 Sludge Valve Installation
DN100 Tank 6
Project: 5 Activity: WFLTM1360 Inspection for the Sluice
gates outlet at Settling Tank 1-6
Project: 5 Activity: WFLTM4050 1st Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFLTM4270 2nd Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFLTM4690 2nd Stage Flocculation Mixer
FLT4 - Prepare for mock up test
Project: 5 Activity: WFLTM5110 2nd Stage Flocculation Mixer
FLT3 - Prepare for mock up test
Project: 5 Activity: WFLTM5530 2nd Stage Flocculation Mixer
FLT5 - Prepare for mock up test
Project: 5 Activity: WFLTM5950 2nd Stage Flocculation Mixer
FLT2 - Prepare for mock up test
Project: 5 Activity: WFLTM5960 1ST Stage Flocculation Mixer
FLT3 - Prepare for mock up test
Project: 5 Activity: WFLTM5970 1ST Stage Flocculation Mixer
FLT5 - Prepare for mock up test
Project: 5 Activity: WFLTM5980 1ST Stage Flocculation Mixer
FLT4 - Prepare for mock up test
Project: 5 Activity: WFLTM5990 1ST Stage Flocculation Mixer
FLT2 - Prepare for mock up test
Project: 5 Activity: WFLTM6200 1st Stage Flocculation Mixer
FLT1 - Prepare for mock up test
Project: 5 Activity: WFLTM6420 2nd Stage Flocculation Mixer
FLT1 - Prepare for mock up test
Project: 5 Activity: WFLTS1000 Tank Lining Tanks 5B
Project: 5 Activity: WFLTS1010 Tank Lining Tanks 3A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1020 Tank Lining Tanks 3B
Project: 5 Activity: WFLTS1030 Tank Lining Tanks 2A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1040 Tank Lining Tanks 2B
Project: 5 Activity: WFLTS1050 Tank Lining Tanks 1A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1060 Tank Lining Tanks 1B
Project: 5 Activity: WFLTW1060 Automation Testing Train 05
Project: 5 Activity: WFLTW1080 Automation Testing Train 03
Project: 5 Activity: WFLTW1100 Automation Testing Train 02
Project: 5 Activity: WFLTW1120 Automation Testing Train 01
Project: 5 Activity: WFPLM1070 Pipe Test
Project: 5 Activity: WIWCM1160 Inspection for Closing and
Opening of the Sluice gates prior for Handover to T&C - AAII and VCCI (6 Units)
Project: 5 Activity: WIWCM1210 WIR Inspection for Hydrotest
of Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1240 WIR Inspection for Pipe
Reinstatement after the Hydrotesting of double containment Chemical Piping - ACID &
CAUSTIC SODA
Project: 5 Activity: WIWCM1290 WIR Final Inspection after
Pipe reinstaement of Chemical Lines- ALUM
Project: 5 Activity: WMCCA1020 Install Steel Grating - MCC1
(drawing dependent)
Project: 5 Activity: WMCCA1050 Ceiling Finishes - MCC1
Project: 5 Activity: WMCCA1070 Interior Painting - MCC1
Project: 5 Activity: WMGHA1030 Install Handrails & Stairs
Project: 5 Activity: WMGHA1070 Signages & Markers
Project: 5 Activity: WMGHA1090 Install Doors
Project: 5 Activity: WMGHE1010 Installation of Panel
Project: 5 Activity: WSDBA1030 Install Doors (9 units)
Project: 5 Activity: WSDBA1040 Install Miscellaneous Steel
Project: 5 Activity: WSDBA1050 Exterior Wall Finishes
Project: 5 Activity: WSDBU1010 Install Rainwater Tank
Project: 5 Activity: WSDLC1010 Slope Protection between MH3-
1A and MH B-1 (design dependent)
Project: 5 Activity: WSETA1060 Top Coat for Railings - 2nd
Priority 1, 2, 3
Project: 5 Activity: WSETA1150 WIR Inspection for the
Installation of Chamber Cover Tank 1-6
Project: 5 Activity: WSETI1010 Installation of instrument
support Train 5
Project: 5 Activity: WSETI1020 Installation of instrument
support Train 4
Project: 5 Activity: WSETI1030 Installation of instrument
support Train 3
Project: 5 Activity: WSETI1040 Installation of instrument
support Train 2
Project: 5 Activity: WSETI1050 Installation of instrument
support Train 1
Project: 5 Activity: WSETM1010 Sludge Valve DN100
Installation Tank 1
Project: 5 Activity: WSETM2200 Bolt Torquing for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2210 WIR Inspection for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2220 Bolt Torquing for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2230 WIR Inspection for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2240 Bolt Torquing for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2250 WIR Inspection for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2270 WIR Inspection for Sludge
Valve DN100 Installation Tank 4
Project: 5 Activity: WSETM2280 Bolt Torquing for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2290 WIR Inspection for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2310 WIR Inspection for Sludge
Valve DN100 Installation Tank 6
Project: 5 Activity: WSETM2320 Sludge Valve DN400
Installation Tank 1
Project: 5 Activity: WSETM2330 Sludge Valve DN400
Installation Tank 2
Project: 5 Activity: WSETM2340 Sludge Valve DN400
Installation Tank 3
Project: 5 Activity: WSETM2360 Sludge Valve DN400
Installation Tank 5
Project: 5 Activity: WSETM2390 Bolt Torquing for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2400 WIR Inspection for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2410 Bolt Torquing for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2420 WIR Inspection for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2430 Bolt Torquing for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2440 WIR Inspection for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2460 WIR Inspection for Sludge
Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2470 Bolt Torquing for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2480 WIR Inspection for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2500 WIR Inspection for Sludge
Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2540 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2750 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 1
Project: 5 Activity: WSETM2760 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 2
Project: 5 Activity: WSETM2770 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 3
Project: 5 Activity: WSETM2790 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 5
Project: 5 Activity: WSETM2810 Installation of Bolts for
Sludge Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2820 Installation of Bolts for
Sludge Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2830 Installation of Bolts for
Sludge Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2850 Installation of Bolts for
Sludge Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2910 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2940 WIR Inspection of Laces at
Settling Tank 6
Project: 5 Activity: WSETM2970 WIR Inspection of the
Alignment of Launders at Settling Tank 6
Project: 5 Activity: WSETM3020 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 4
Project: 5 Activity: WSETM3060 WIR Inspection of Laces at
Settling Tank 4
Project: 5 Activity: WSETM3090 WIR Inspection of the
Alignment of Launders at Settling Tank 4
Project: 5 Activity: WSETM3140 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 5
Project: 5 Activity: WSETM3180 WIR Inspection of Laces at
Settling Tank 5
Project: 5 Activity: WSETM3210 WIR Inspection of the
Alignment of Launders at Settling Tank 5
Project: 5 Activity: WSETM3310 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 3
Project: 5 Activity: WSETM3350 WIR Inspection for the
Alignment of Launder Tank 3
Project: 5 Activity: WSETM3460 WIR Inspection of Laces
Installation Tank 3
Project: 5 Activity: WSETM3510 WIR Inspection of Lamella
Tube Settler Installation Tank 3
Project: 5 Activity: WSETM3630 WIR Inspection of Lamella
Tube Settler Installation Tank 2
Project: 5 Activity: WSETM3640 Hauling of Launders Tank 2
Project: 5 Activity: WSETM3650 Installation of Launder
Supports Tank 2
Project: 5 Activity: WSETM3660 WIR Inspection of Launder
Supports Tank 2
Project: 5 Activity: WSETM3670 WIR Inspection for the
Alignment of Launder Tank 2
Project: 5 Activity: WSETM3690 Rectification of Alignment
for launder tank 2
Project: 5 Activity: WSETM3700 Launder Installation Tank 2
Project: 5 Activity: WSETM3710 Hauling of Laces and
SupportsTank 2
Project: 5 Activity: WSETM3720 Installation of Laces
SupportsTank 2
Project: 5 Activity: WSETM3730 WIR Inspection of Laces
Supports Installation Tank 2
Project: 5 Activity: WSETM3740 WIR Inspection of Laces
Installation Tank 2
Project: 5 Activity: WSETM3750 Laces Installation Tank 2
Project: 5 Activity: WSETM3760 Installation of Sludge
Extraction Unit Tank 2
Project: 5 Activity: WSETM3770 Procurement of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3780 Installation of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3790 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3800 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3810 Final Fixing of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3820 Installation of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3830 WIR Inspection for
Installation of Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3840 Lamella Support Installation
Tank 1
Project: 5 Activity: WSETM3850 Lamella Tube Settler
Installation Tank 1
Project: 5 Activity: WSETM3860 Launder Installation Tank 1
Project: 5 Activity: WSETM3870 Final Fixing of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3880 WIR Inspection of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3890 Laces Installation Tank 1
Project: 5 Activity: WSETM3900 WIR Inspection of the
Alignment of Launders at Settling Tank 1
Project: 5 Activity: WSETM3910 Rectification of Alignment
for Launders at Settling Tank 1
Project: 5 Activity: WSETM4070 WIR Inspection of Lamella
Support Installation Tank 2
Project: 5 Activity: WSETM4150 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4200 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4250 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4300 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4350 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETW1050 Automation Testing Train 5
Project: 5 Activity: WSETW1070 Automation Testing Train 3
Project: 5 Activity: WSETW1090 Automation Testing Train 2
Project: 5 Activity: WSETW1110 Automation Testing Train 1
Project: 5 Activity: WSIDC3700 Backfilling Works along FLT,
SET and FIT
Project: 5 Activity: WSIDC4010 Levelling, trimming, and
compacting of sand - Road4
Project: 5 Activity: WSIDC4310 Levelling, trimming, and
compacting of sand - Thickener/Slop Backfilling A2
Project: 5 Activity: WSLLS1030 Procurement of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1040 Fabrication of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1050 Painting of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1060 Installation of Chamber
Covers - 4 Units
Project: 5 Activity: WSLLS1070 WIR Inspection for
Installation of Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1080 Install Gates
Project: 5 Activity: WSOPA1020 Exterior Painting
Project: 5 Activity: WSOPA1060 Install Doors
Project: 5 Activity: WSPPC1080 Construction of TB-B4 and TB-
B5 At Overflow line to from Filtration to Y - done
Project: 5 Activity: WSTFM1130 WIR Inspection for Thickener
Feed Tank Inlet Sluice Gate
Project: 5 Activity: WSTFM1140 WIR Inspection for Thickener
Feed Tank Connecting Sluice Gate
Project: 5 Activity: WSTFM1150 Design for Thickener Feed
Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1160 Design for Thickener Feed
Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1170 Procurement of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1180 Procurement of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1190 Fabrication of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1200 Fabrication of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1210 Hydro Prep, Filling and
Flushing for DN350 PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1220 Hydrotest for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1230 Pipe Reinstatement for DN350
PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1240 WIR Inspection for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1250 WIR Inspection for
Installation of Submerge Sludge Mixers
Project: 5 Activity: WSTFM1260 WIR Inspection for
Installation of Submerge Sludge Pumps
Project: 5 Activity: WSTTA1050 Floor Finishes @ Pump Room
Project: 5 Activity: WSWLM1030 Motive Pump line
Project: 5 Activity: WSWLM1050 Pipelaying Works
Project: 5 Activity: WSWLM1150 Final Backfilling Works -
Section 1 CIVIL TEAM
Project: 5 Activity: WSWLM1290 Final Backfilling Works -
Section 2 CIVIL TEAM
Project: 5 Activity: WSWLM1420 Final Backfilling Works -
Section 3 CIVIL TEAM
Project: 5 Activity: WSWLM1530 Final Backfilling Works -
Section 4 CIVIL TEAM
Project: 5 Activity: WSWLM1640 Final Backfilling Works -
Section 5 CIVIL TEAM
Project: 5 Activity: WSWLM1750 Final Backfilling Works -
Section 6 CIVIL TEAM
Project: 5 Activity: WSWLM1860 Final Backfilling Works -
Section 7 CIVIL TEAM
Project: 5 Activity: WSWLM1970 Final Backfilling Works -
Section 8 CIVIL TEAM
Project: 5 Activity: WSWPM1030 Install Outside Air Louvers
(2)
Project: 5 Activity: WSWPM1090 Piping Installation for Sump
Pumps
Project: 5 Activity: WSWPM1110 Waiting for AAII DRR for
Motive Pump Skid
Project: 5 Activity: WSWPM1150 WIR Inspection for Grouting
of Motive Pump Skid
Project: 5 Activity: WSWPM1200 WIR Inspection for
Installation of Pipe Supports for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1230 WIR Inspection for Hydrotest
for pipes of Suction Line of Motive Pump Skid including the HDPE Pipe connecting
to TWR
Project: 5 Activity: WSWPM1270 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1280 Piping installation for
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1300 WIR Inspection for Hydrotest
for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1400 WIR Inspection of Pipe
Supports for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1470 Installation of Nozzles for
SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1480 Paingting of Nozzles for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1490 WIR Inspection and NDT for
Installation of Nozzles for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1510 Installation of Valves for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1520 WIR Inspection for
Installation of Valves for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1530 Fixing and alignment for Fire
Fighting pump Skid - 2 units
Project: 5 Activity: WSWPM1540 WIR Inspection for Fixing and
alignment for Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1550 Grouting for Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1560 WIR Inspection for Grouting
of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1570 Fabrication of Pipe Supports
for Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1580 Painting of Pipe Supports for
Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1590 Installation of Pipe Supports
for Suction Line of Fire Fighting Pump Skid -2 units
Project: 5 Activity: WSWPM1600 WIR Inspection for
Installation of Pipe Supports for Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1610 Piping installation for
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1620 Hydrotest for pipes of
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1630 WIR Inspection for Hydrotest
for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1640 Fabrication of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1650 Painting of Pipe Supports for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1660 Installation of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1670 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1680 Piping installation for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1690 Hydrotest for pipes of
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1700 WIR Inspection for Hydrotest
for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1710 Pipe reinstatement for pipes
of Suction Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1720 Pipe reinstatement for pipes
of Discharge Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1730 Fire Pump Shaft alignment for
Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1740 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1750 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1760 Fixing and alignment for
Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1770 WIR Inspection for Fixing and
alignment for Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1780 Grouting for Service Water
Pump Skid - 2 units
Project: 5 Activity: WSWPM1790 WIR Inspection for Grouting
of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1800 Fabrication of Pipe Supports
for Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1810 Painting of Pipe Supports for
Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1820 Installation of Pipe Supports
for Suction Line of Service Water Pump Skid -2 units
Project: 5 Activity: WSWPM1830 WIR Inspection for
Installation of Pipe Supports for Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1840 Piping installation for
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1850 Hydrotest for pipes of
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1860 WIR Inspection for Hydrotest
for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1870 Fabrication of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1880 Painting of Pipe Supports for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1890 Installation of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1900 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1910 Piping installation for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1920 Hydrotest for pipes of
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1930 WIR Inspection for Hydrotest
for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1940 Pipe reinstatement for pipes
of Suction Line of Service Water Pump Skid after the hydrotest
Project: 5 Activity: WSWPM1950 Pipe reinstatement for pipes
of Discharge Line of Service Water Pump Skid after hydrotest
Project: 5 Activity: WSWPM1970 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1980 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1990 Installation of Jockey Pump -
1 unit
Project: 5 Activity: WSWPM2000 WIR Inspection for
Installation of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2010 Fixing and Alignment of
Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2020 WIR Inspection for Fixing and
Alignment of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2040 Fabrication of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2050 Painting of Pipe Supports for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2060 Installation of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2070 WIR Inspection for
Installation of Pipe Supports for Suction Line and Discharge Line of Jockey Pump -
1 Unit
Project: 5 Activity: WSWPM2080 Piping installation for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2090 Hydrotest for pipes of
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2100 WIR Inspection for Hydrotest
for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2190 Pipe reinstatement for pipes
of Suction Line and Discharge Line of Jockey Pump - Including check valves
Project: 5 Activity: WSWPM2200 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2210 Procurement for Sump Pumps -
2 units
Project: 5 Activity: WSWPM2220 WIR Inspection for
Installation of Sump Pump - 2 units
Project: 5 Activity: WSWPM2230 Fabrication of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2240 Painting of Pipe Supports for
Sump Pumps
Project: 5 Activity: WSWPM2250 Installation of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2260 WIR Inspection for
Installation of Pipe Supports for Sump Pumps
Project: 5 Activity: WSWPM2270 WIR inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2280 Hydrotest for Piping
Installation for Sump Pumps
Project: 5 Activity: WSWPM2290 Pipe Reistatement for Piping
Installation for Sump Pumps including check valves
Project: 5 Activity: WSWPM2300 WIR Inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2310 Hydrotest Prep, Filling and
Flushing for Piping Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2320 WIR Inspection for Install
Exhaust Fans
Project: 5 Activity: WSWPM2330 WIR Inspection for Install
Fire Dampers
Project: 5 Activity: WSWPM2340 WIR Inspection for Install
Outside Air Louvers (2)
Project: 5 Activity: WTA1M1050 WIR Inspection for Painting
for Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1060 Modification of Service Water
Suction Line
Project: 5 Activity: WTA1M1100 WIR Inspection Fire and
Servicw Water Sunction Line
Project: 5 Activity: WTA1M1160 Hydrotest of Fire Suction
Line
Project: 5 Activity: WTA1M1170 Hydrotest of Service Water
Suction Line
Project: 5 Activity: WTA1M1180 Installation of Pipes for
Drain Line DN80
Project: 5 Activity: WTA1M1190 Fit-up Installation of Drain
Line
Project: 5 Activity: WTA1M1200 WIR Inspection for Fit-up
Installation of Drain Line
Project: 5 Activity: WTA1M1210 Full Welding Installation of
Drain Line
Project: 5 Activity: WTA1M1220 WIR Inspection for Full
welding Installation of Drain Line
Project: 5 Activity: WTA1M1230 UT Inspection of Drain Line
Project: 5 Activity: WTA1M1240 WIR Inspection of Drain Line
prior for Painting Works
Project: 5 Activity: WTA1M1250 Painting Works for Drain Line
Project: 5 Activity: WTA1M1260 WIR Inspection of Painting
Works for Drain Line
Project: 5 Activity: WTA1M1270 Installation of Valves for
Drain Line - 2 units
Project: 5 Activity: WTA1M1280 Fit-up Installation of Valve
for Drain Line -2 unirts
Project: 5 Activity: WTA1M1290 WIR Inspection for Fit-up
Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1300 Full Welding Installation of
Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1310 WIR Inspection for Full
welding Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1320 UT Inspection of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1330 WIR Inspection of Valve for
Drain Line prior for Painting Works - 2 units
Project: 5 Activity: WTA1M1340 Painting Works of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1350 WIR Inspection of Painting
Works of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1360 Installation of Threadolet
and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1370 WIR Inspection for
Installation of Threadolet and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1380 NDT Inspection for
Installation of Drain line and Sampling Line - AAII, VCCI, Witco
Project: 5 Activity: WTA1M1390 Painting works for Threadolet
and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1400 WIR Inspection of Painting
works for Threadolet and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1460 WIR Inspection for Valves
DN1400 of Chamber 16
Project: 5 Activity: WTA1M1510 WIR Inspection prior for
installation of Valves DN1400 of Chamber 16 - AAII & VCCI
Project: 5 Activity: WTA1M1520 Installation of Scaffolding
Supports prior for installation of Valve for DN900
Project: 5 Activity: WTA1M1530 Installation of Valve for
DN900
Project: 5 Activity: WTA1M1540 Botl torquing of valve for
DN900
Project: 5 Activity: WTA1M1550 WIR Inspection for
Installation of Valve for DN900
Project: 5 Activity: WTA1M1560 WIR Inspection prior for the
Installation of valve for DN900
Project: 5 Activity: WTA1M1570 Procurement for Remaining
Bolts for DN1400 and DN900
Project: 5 Activity: WTA1M1580 Painting works for valve of
DN900
Project: 5 Activity: WTA1M1590 WIR Inspection Painting works
for valve of DN900
Project: 5 Activity: WTA1M1600 Procurement of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1610 Fabrication of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1620 Painting of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1630 Installation of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1640 WIR Inspection for the
Installation of materials for Chamber Covers - 5 units
Project: 5 Activity: WTA1M1650 Removal of Temporary blinds
inside of Tank 3 - 6 Units
Project: 5 Activity: WTA1M1660 Rectification works including
painting for pipes
Project: 5 Activity: WTA1M1670 WIR Final Joint Inspection -
Rectification works including painting for pipes -AAII, VCCI, WITCO
Project: 5 Activity: WTIPM1200 External Painting of the
Pipes at Chamber 15- Rectification
Project: 5 Activity: WTIPM1220 Installation of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1230 WIR Inspection of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1250 WIR Inspection of Drain line
at Chamber 14
Project: 5 Activity: WTIPM1260 WIR Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1300 WIR Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1340 WIR Inspection of tredolet
for sampling point at Chamber 11
Project: 5 Activity: WTIPS1010 Construction of Pipe Supports
at Valve Chambers
Project: 5 Activity: WTWRA1090 Painting of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1100 Fabrication of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1110 Install Railings at Perimeter
Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1120 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1130 Fabrication of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1140 Painting of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1150 Install Access Hatch Cover (3
units) - TWR Tank1&3
Project: 5 Activity: WTWRA1160 WIR Inspection Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1170 Fabrication of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1180 Painting of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1190 Install Access Hatch Cover (3
units) - TWR Tank 2
Project: 5 Activity: WTWRA1200 WIR Inspection of Access
Hatch Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1210 Painting of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1220 Fabrication of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1230 Install Railings at Perimeter
Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1240 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRM1150 Rectification of Sluice Gates
- Inlet Tank 2 (1 unit)
Project: 5 Activity: WTWRM1180 WIR Inspection for all Sluice
Gates
Project: 5 Activity: WTWRM1210 Pipe Reinstatement after
Hydrotesting of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRW1030 Water Refilling to Filtered
Water Tank A & TWR Tank 1 from DMF 11, 13
Project: 5 Activity: WTWRW1040 Water Refilling to Filtered
Water Tank A & TWR Tank 1 from DMF 11, 13, 15
Project: 5 Activity: WWTOA1010 Ceiling Finishes

Out-of-sequence activities.......................................42
Project: 5 Activity: RDESM1040 Gate Seals Rectification
(Flap Gates B)
Project: 5 Activity: WAPBI1000 Installation of instruments -
EESI to check (JESCO supply) - completion to depend on Mixing tank to install
Project: 5 Activity: WAPBM1080 Anionic Polymer Prep Unit -
DONE
Project: 5 Activity: WAPBM1130 Pressure Relief Valve -
Polymer 12 Units (Done)
Project: 5 Activity: WAPBM1140 PVC Ball Valve 1-1/2" 546 Pro
(FKM) ASTM NPT (Done)
Project: 5 Activity: WAPBM1180 Installation of Polymer
Dosing Pumps
Project: 5 Activity: WAPBU1010 Install Water Piping
Project: 5 Activity: WAPLM1010 Alum & Polymer Chemical Line
- Back of Alum bldg
Project: 5 Activity: WBPHE1030 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WBPHM1030 Installation of Blower or Fan
Units - Wall mounted (Done)
Project: 5 Activity: WCCLM1010 Chlorine Chemical Pipe - MH1A
to MH3A
Project: 5 Activity: WCLBI1000 Cable pulling
Project: 5 Activity: WELBM1000 Install HVAC Equipment - ELB
Project: 5 Activity: WFITA1120 Install ACCU Control Room 1
(Done)
Project: 5 Activity: WFITA1470 Install Louvers at Air Vents
( 6 nos.) - North Side (Done)
Project: 5 Activity: WFLTM1010 PressureTesting - Chemical
Piping - Done
Project: 5 Activity: WIWCA1000 Install Guardrails - Rem.
bolts for Kick plates
Project: 5 Activity: WMCCM1000 Install Exhaust Fan - MCC1
Project: 5 Activity: WSDBM1020 Install Overhead Crane &
Monorail
Project: 5 Activity: WSETA1030 Top Coat for Railings - 1st
Priority 4, 5, 6
Project: 5 Activity: WSETA1060 Top Coat for Railings - 2nd
Priority 1, 2, 3
Project: 5 Activity: WSETE1100 Termination works Tank 2
Project: 5 Activity: WSETM2260 Bolt Torquing for Sludge
Valve DN100 Installation Tank 4
Project: 5 Activity: WSETM2270 WIR Inspection for Sludge
Valve DN100 Installation Tank 4
Project: 5 Activity: WSETM2300 Bolt Torquing for Sludge
Valve DN100 Installation Tank 6
Project: 5 Activity: WSETM2310 WIR Inspection for Sludge
Valve DN100 Installation Tank 6
Project: 5 Activity: WSETM2350 Sludge Valve DN400
Installation Tank 4
Project: 5 Activity: WSETM2370 Sludge Valve DN400
Installation Tank 6
Project: 5 Activity: WSETM2450 Bolt Torquing for Sludge
Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2460 WIR Inspection for Sludge
Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2490 Bolt Torquing for Sludge
Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2500 WIR Inspection for Sludge
Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2840 Installation of Bolts for
Sludge Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2860 Installation of Bolts for
Sludge Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM3070 Laces Installation Tank 4
Project: 5 Activity: WSETM3100 Installation of Sludge
Extraction Unit Tank 5
Project: 5 Activity: WSETM3190 Laces Installation Tank 5
Project: 5 Activity: WSETM3940 Installation of Laces at
Settling Tank 6
Project: 5 Activity: WSPPM1010 Install Sluice Gate - MH806
Project: 5 Activity: WSTFM1080 DN350 90* Elbow - Remove
from p6 program
Project: 5 Activity: WTIPE1000 Duct bank Chamber 13 to MH1 -
remaining backfill
Project: 5 Activity: WTIPE1020 Duct bank Chamber 15 to MH1 -
remaining backfill

Activities with Actual Dates > Data Date.........................21


Project: 5 Activity: WBPHM1690 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1700 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1710 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WFITM3130 Installation of Flowmeter at
South Side (DONE) - 9 units
Project: 5 Activity: WFITM9270 Underdrain DMF14 - Modify
scaffold access
Project: 5 Activity: WFITM9280 Underdrain DMF14 - Clearing
works
Project: 5 Activity: WFITM9290 Underdrain DMF14 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9300 Underdrain DMF14 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9310 Underdrain DMF14 - Air header
pipe installation.
Project: 5 Activity: WFITM9320 Underdrain DMF14 - Air Header
pipe survey
Project: 5 Activity: WFITM9330 Underdrain DMF14 - Anchor rod
installation
Project: 5 Activity: WFITM9340 Underdrain DMF14 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9350 Underdrain DMF14 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFLTM1000 Installation of Chemical Line
- POLYMER - Done
Project: 5 Activity: WFLTM3860 1st Stage Floc Mixer 6-
Conduct actual survey
Project: 5 Activity: WFLTM3870 1st Stage Floc Mixer 6-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM3880 1st Stage Floc Mixer 6-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM3890 1st Stage Floc Mixer 6-
Unbolt impeller blades
Project: 5 Activity: WFLTM3900 1st Stage Floc Mixer 6- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM3910 1st Stage Floc Mixer 6 -
Uncouple the shaft and drive unit
Project: 5 Activity: WIWCA1010 Installation of Self Closing
gates - 3 units

Milestone Activities with invalid relationships..................1


Project: 5 Activity: KMSTX1020 FIRST POWER USING DLPC LINE

Finish milestone and predecessors have different calendars.......15


Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................5321
# Relationships with other projects..............................0
Data Date........................................................12-Nov-22
Earliest Early Start Date........................................12-Nov-22
Latest Early Finish Date.........................................19-Jul-23
Number of float paths............................................10
Exceptions:
-----------
Critical Activities..............................................1615
Project: 5 Activity: A13530 Snagging & Cleaning
Project: 5 Activity: A18430 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18460 NDT and painting works
Project: 5 Activity: A18470 Installation of Gate Valve
and STC
Project: 5 Activity: A18480 Clearing and Dewatering
Project: 5 Activity: A18484 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18488 NDT and painting works
Project: 5 Activity: A18510 Installation of Gate Valve
and STC
Project: 5 Activity: A18520 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18570 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18620 Installation of Gate Valve
and STC
Project: 5 Activity: A18630 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18660 NDT and painting works
Project: 5 Activity: A18670 Installation of Gate Valve
and STC
Project: 5 Activity: A18680 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18710 NDT and painting works
Project: 5 Activity: A18715 Installation of Gate Valve
and STC
Project: 5 Activity: A18720 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21480 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A2C1550 Fabrication of forms
Project: 5 Activity: A2C1560 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1570 Pouring of concrete saddle
support
Project: 5 Activity: A2C1580 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1590 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1600 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1610 Fabrication of forms
Project: 5 Activity: A2C1620 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1630 Pouring of concrete saddle
support
Project: 5 Activity: A2C1640 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1650 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1660 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1670 Fabrication of forms
Project: 5 Activity: A2C1680 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1690 Pouring of concrete saddle
support
Project: 5 Activity: A2C1700 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1710 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1720 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1730 Fabrication of forms
Project: 5 Activity: A2C1740 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1750 Pouring of concrete saddle
support
Project: 5 Activity: A2C1760 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1770 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1780 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1790 Fabrication of forms
Project: 5 Activity: A2C1800 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1810 Pouring of concrete saddle
support
Project: 5 Activity: A2C1820 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A2CS1010 Installation Sheet Pile
Project: 5 Activity: A2CS1020 Excavation
Project: 5 Activity: A2CS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A2CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A2CS1050 Pipe Support
Project: 5 Activity: A2CS1060 Concrete Cover
Project: 5 Activity: A2CS1070 Backfilling
Project: 5 Activity: A2CS1080 Sheet Pile Removal
Project: 5 Activity: A2CS1090 Riser Pipes
Project: 5 Activity: A2CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A2CS1110 Disposal of Excess Materials
Project: 5 Activity: A2CS1120 Scaffolding Works
Project: 5 Activity: A2CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A2CS1140 Complete remaining hydro
testing
Project: 5 Activity: A3CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A3CS1010 Installation Sheet Pile
Project: 5 Activity: A3CS1020 Excavation
Project: 5 Activity: A3CS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A3CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A3CS1050 Pipe Support
Project: 5 Activity: A3CS1060 Concrete Cover
Project: 5 Activity: A3CS1070 Backfilling
Project: 5 Activity: A3CS1080 Sheet Pile Removal
Project: 5 Activity: A3CS1090 Riser Pipes
Project: 5 Activity: A3CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A3CS1110 Disposal of Excess Materials
Project: 5 Activity: A3CS1120 Scaffolding Works
Project: 5 Activity: A3CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A3CS1140 Complete remaining hydro
testing
Project: 5 Activity: A4AC1000 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1080 Installation of rebar for
slab and wall
Project: 5 Activity: A4AC1090 Concrete pouring of slab
Project: 5 Activity: A4AC1100 Installation of forms and
supports
Project: 5 Activity: A4AC1110 Concrete pouring for walls
Project: 5 Activity: A4AC1120 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1130 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A4AC1140 Fabrication of forms
Project: 5 Activity: A4AC1150 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1160 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1170 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4AC1180 Completion of rebar
installation for wall
Project: 5 Activity: A4AC1190 Installation of forms and
supports
Project: 5 Activity: A4AC1200 Concrete pouring for walls
Project: 5 Activity: A4AC1210 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1220 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1230 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1240 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4ACS1000 250mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A4ACS1010 Installation Sheet Pile
Project: 5 Activity: A4ACS1020 Excavation
Project: 5 Activity: A4ACS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A4ACS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A4ACS1050 Pipe Support
Project: 5 Activity: A4ACS1060 Concrete Cover
Project: 5 Activity: A4ACS1070 Backfilling
Project: 5 Activity: A4ACS1080 Sheet Pile Removal
Project: 5 Activity: A4ACS1090 Riser Pipes
Project: 5 Activity: A4ACS1100 Sandfilling @ Pipezone
Project: 5 Activity: A4ACS1110 Disposal of Excess Materials
Project: 5 Activity: A4ACS1120 Scaffolding Works
Project: 5 Activity: A4ACS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A4ACS1140 Complete remaining hydro
testing
Project: 5 Activity: A4ACS1690 JUNCTION CHAMBER at Sta.
0+015 Concreting of Pipe support
Project: 5 Activity: A4ACS1700 Blow Off Valve (BOV) at
Sta.0+015 Excavation
Project: 5 Activity: A4ACS1710 Combination Air Valve (CAV)
at Sta.0+015 Excavation
Project: 5 Activity: A4ACS1740 Cable Hole Excavation at
Sta. 4 + 080
Project: 5 Activity: A4ACS1750 BOV Excavation at Sta. 6 +
670
Project: 5 Activity: A4ACS1760 BOV Excavation at Sta. 6 +
258
Project: 5 Activity: A4ACS1770 BOVExcavation at Sta. 5 +
807
Project: 5 Activity: A4ACS1780 BOV Excavation at Sta. 5 +
616
Project: 5 Activity: AL1.1000 Riser Pipes & Other
Appurtenances
Project: 5 Activity: AL1.1040 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1050 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1060 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1070 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1080 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1090 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1100 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1110 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1120 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1130 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1140 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1150 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1160 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1170 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1180 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1190 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1200 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1210 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1220 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1230 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1240 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1250 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1260 Touch-up paint on weldment
Project: 5 Activity: AL1.1270 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1280 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1290 Touch-up paint on weldment
Project: 5 Activity: AL1.1300 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1310 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1320 Touch-up paint on weldment
Project: 5 Activity: AL1.1330 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1340 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1350 Touch-up paint on weldment
Project: 5 Activity: AL2.1000 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1060 Installation of Pipe Spool,
Dismantling joint, Butterfly valve
Project: 5 Activity: AL2.1130 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1140 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1160 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1170 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1180 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1190 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1200 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1210 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1220 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1230 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1240 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1250 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1260 Installation of Pressure
reducing valve, and Combination air valve
Project: 5 Activity: AL2.1270 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1280 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1290 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1300 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1310 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1320 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1330 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1340 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1350 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1360 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1370 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1380 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1390 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1400 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1410 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1420 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1430 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1440 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1450 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1460 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1470 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1480 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1490 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1500 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1510 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1520 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1530 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1540 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1550 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1560 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1570 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1580 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1590 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1600 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1610 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1620 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1630 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1640 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1650 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1660 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1670 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1680 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1690 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1700 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1710 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1720 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1730 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1740 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1750 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1760 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1770 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1780 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1790 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1800 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1810 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1820 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1830 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1840 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL3.1580 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1590 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1600 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1610 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1620 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1680 Clearing and Dewatering
Project: 5 Activity: AL3.1710 Clearing and Dewatering
Project: 5 Activity: AL3.1720 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1730 Installation of riser pipes,
flange & Valve Subject for Non Destructive Test (NDT)
Project: 5 Activity: AL3.1740 Clearing and Dewatering
Project: 5 Activity: AL3.1820 NDT and painting works
Project: 5 Activity: AL3.1830 Installation of
Petrowrap/latum
Project: 5 Activity: AL3.1860 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1890 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1900 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1910 Installation of Dismantling
joint (STC)
Project: 5 Activity: AL3.1920 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1950 NDT and painting works
Project: 5 Activity: AL3.1970 NDT and painting works
Project: 5 Activity: AL3.1980 Application of anti seize
compund/lubrication & Bolt torquing
Project: 5 Activity: AL3.1990 NDT and painting works
Project: 5 Activity: AL3.2030 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2050 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2070 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2080 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2110 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2130 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2140 Application of protective
coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2150 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2170 Clearing and Dewatering
Project: 5 Activity: AL3.2180 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2190 Clearing and Dewatering
Project: 5 Activity: AL3.2210 Clearing and Dewatering
Project: 5 Activity: AL3.2220 Clearing and Dewatering
Project: 5 Activity: AL3.2260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2270 NDT and painting works
Project: 5 Activity: AL3.2310 NDT and painting works
Project: 5 Activity: AL3.2320 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2330 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2350 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.2360 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2390 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2400 NDT and painting works
Project: 5 Activity: AL3.2410 NDT and painting works
Project: 5 Activity: AL3.2420 NDT and painting works
Project: 5 Activity: AL3.2440 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2470 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2480 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2490 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2500 Installation of Dismantling
Joint and Butterfly Valve
Project: 5 Activity: AL3.2510 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2560 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2570 NDT and painting works
Project: 5 Activity: AL3.2580 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2590 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2620 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2630 Clearing and Dewatering
Project: 5 Activity: AL3.2640 Clearing and Dewatering
Project: 5 Activity: AL3.2650 Clearing and Dewatering
Project: 5 Activity: AL3.2660 Clearing and Dewatering
Project: 5 Activity: AL3.2730 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2770 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2790 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2800 NDT and painting works
Project: 5 Activity: AL3.2810 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2820 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2830 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2900 NDT and painting works
Project: 5 Activity: AL3.2910 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2920 NDT and painting works
Project: 5 Activity: AL3.2930 NDT and painting works
Project: 5 Activity: AL3.2940 NDT and painting works
Project: 5 Activity: AL3.3000 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.3010 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3020 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3030 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3040 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3090 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3100 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3110 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3120 Clearing and Dewatering
Project: 5 Activity: AL3.3150 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3180 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.3190 Clearing and Dewatering
Project: 5 Activity: AL3.3200 Clearing and Dewatering
Project: 5 Activity: AL3.3210 Clearing and Dewatering
Project: 5 Activity: AL3.3220 NDT and painting works
Project: 5 Activity: AL3.3230 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3240 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.3250 NDT and painting works
Project: 5 Activity: AL3.3260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3270 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3280 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3290 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3300 NDT and painting works
Project: 5 Activity: AL3.3310 NDT and painting works
Project: 5 Activity: AL3.3320 NDT and painting works
Project: 5 Activity: AL3.3330 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3340 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3350 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3360 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3370 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3380 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3390 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3400 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL4a.1030 Butterfly Valve and
Dismantling Joint Installation
Project: 5 Activity: AL4a.1040 Torquing of bolts
Project: 5 Activity: AL4a.1050 Installation of flow control
valve and dismantling joint
Project: 5 Activity: AL4a.1060 Closure gap for existing DCWD
pipe
Project: 5 Activity: AL4a.1120 Clearing and Dewatering
Project: 5 Activity: AL4a.1170 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL4a.1180 NDT and painting works
Project: 5 Activity: AL4a.1200 Installation of Gate Valve
and STC
Project: 5 Activity: AL4a.1220 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: KMSTX1000 WATER RE-DIVERTED TO WEIR
Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1020 FIRST POWER USING DLPC LINE
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1050 FULL MLD
Project: 5 Activity: KMSTX1060 PROCESS COMMISSIONING
Project: 5 Activity: KMSTX1070 GUARANTEE RUN
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION
Project: 5 Activity: MCONX1090 VCCI Mobilization @ WTP
Project: 5 Activity: MCONX1110 Chembond Mobilization @ WTP
Project: 5 Activity: MCONX1130 Sta. Clara Mobilization @ WTP
Project: 5 Activity: MCONX1140 Prime Builders Mobilization @
WTP
Project: 5 Activity: OCABA1020 Waterproofing Works
Project: 5 Activity: OCABA1030 Ceiling Works (Gypsum Board)
Project: 5 Activity: OCABA1040 Floor Finishes
Project: 5 Activity: OCABA1050 Install Windows
Project: 5 Activity: OCABA1060 Install Doors
Project: 5 Activity: OCABD1000 Dry Testing - Cabantian
Project: 5 Activity: OCABE1010 Installation of radio antenna
tower
Project: 5 Activity: OCABE1020 Installation of roughing ins,
Blockout/Openings/Sleeves Provision and Telemetry Tower
Project: 5 Activity: OCABE1040 Cable pulling and termination
works
Project: 5 Activity: OCABH1000 Walkthrough - Cabantian
Project: 5 Activity: OCABH1010 PUNCHLIST CLOSEOUT -
Cabantian
Project: 5 Activity: OCABH1020 Construction Handover -
Cabantian
Project: 5 Activity: OCABI1000 Installation of instruments
Project: 5 Activity: OCABM1020 Install Chlorine Package
System
Project: 5 Activity: OCABM1030 AC & Ventillation Works
Project: 5 Activity: OCABM1040 Disinfection of Pipe System
Project: 5 Activity: OCABM1050 Install Genset
Project: 5 Activity: OCABS1000 Building Structural Concrete
Project: 5 Activity: OCABW1000 Wet Testing - Cabantian
Project: 5 Activity: OCABW1010 Automation Testing -
Cabantian
Project: 5 Activity: OCABW1020 Disinfection Alignment 6 & 8
Project: 5 Activity: ODUMC1000 Perimeter Fence and Gates
Project: 5 Activity: ODUMC1010 Roads, Paving, & Drainage
Project: 5 Activity: ODUMS1000 Building Structural Concrete
Project: 5 Activity: ODUMW1000 Wet Testing - DUMOY
Project: 5 Activity: ODUMW1010 Automation Testing - DUMOY
Project: 5 Activity: ODUMW1020 Disinfection Alignment 5, 7
Project: 5 Activity: OINDA1050 Waterproofing Works
Project: 5 Activity: OINDC1000 Perimeter Fence and Gates
Project: 5 Activity: OINDC1010 Roads, Paving, & Drainage
Project: 5 Activity: OINDD1000 Dry Testing
Project: 5 Activity: OINDE1010 Installation of radio antenna
Project: 5 Activity: OINDH1000 Walkthrough
Project: 5 Activity: OINDH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: OINDH1020 Construction Handover
Project: 5 Activity: OINDI1000 Installation of instruments
Project: 5 Activity: OINDM1000 Yard Piping Works
Project: 5 Activity: OINDM1020 AC & Ventillation Works
Project: 5 Activity: OINDM1030 Install Chlorine Package
System
Project: 5 Activity: OINDM1040 Disinfection of Pipe System
Project: 5 Activity: OINDM1050 Install Genset
Project: 5 Activity: OINDS1000 Construction of Concrete
Chambers
Project: 5 Activity: OINDW1000 Wett Testing - INDANGAN
Project: 5 Activity: OINDW1010 Automation Testing
Project: 5 Activity: OINDW1020 Process Commissioning OTP
Indangan
Project: 5 Activity: OMANW1000 Wet Testing - Mandug
Project: 5 Activity: OMANW1010 Automation Testing - Mandug
Project: 5 Activity: OMANW1020 Disinfection Alignment 4A/4B
- Mandug
Project: 5 Activity: OPANA1020 Waterproofing Works
Project: 5 Activity: OPANA1030 Ceiling Works (Gypsum Board)
Project: 5 Activity: OPANA1040 Floor Finishes
Project: 5 Activity: OPANC1000 Perimeter Fence and Gates
Project: 5 Activity: OPANC1010 Roads, Paving, & Drainage
Project: 5 Activity: OPAND1000 Dry Testing
Project: 5 Activity: OPANE1020 Installation of radio antenna
tower
Project: 5 Activity: OPANE1030 Cable pulling and termination
works
Project: 5 Activity: OPANE1040 Installation of PLC Panels
Project: 5 Activity: OPANH1000 Walkthrough
Project: 5 Activity: OPANH1010 PUNCHLISTCLOSEOUT
Project: 5 Activity: OPANH1020 Construction Handover
Project: 5 Activity: OPANM1020 AC & Ventillation Works
Project: 5 Activity: OPANM1030 Install Chlorine Package
System
Project: 5 Activity: OPANM1040 Disinfection of Pipe System
Project: 5 Activity: OPANM1050 Install Genset
Project: 5 Activity: OPANS1000 Building Structural Concrete
Project: 5 Activity: OPANW1000 Wett Testing - PANACAN
Project: 5 Activity: OPANW1010 Automation Testing
Project: 5 Activity: OPANW1020 Process Commissioning OTP
Panacan
Project: 5 Activity: OTP6C1000 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1010 Installation Pipe Support
Project: 5 Activity: OTP6C1020 Concrete surface
rectification works inside the chambers
Project: 5 Activity: OTP6C1025 Concrete surface
rectification along the door panels
Project: 5 Activity: OTP6C1030 Construction and fabrication
of concrete covers (Rebars, Forms , Concreting Works)
Project: 5 Activity: OTP6C1040 Installation of Remaining and
Uninstalled Ladder Rung
Project: 5 Activity: OTP6C1050 Backfilling of Open trench
along the Chambers at the yard pipe.
Project: 5 Activity: OTP6C1060 Ramp and Floor Slab (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1070 Perimeter Fence (Rebars,
Forms, Concreting & Paintings Works along this area)
Project: 5 Activity: OTP6C1090 Application of Concrete
Masonry Paint (Exterior and Interior)
Project: 5 Activity: OTP6C1100 Installation of Louvers
Project: 5 Activity: OTP6C1110 Installation of Emergency
Shower/Eye Wash
Project: 5 Activity: OTP6C1120 Installation of Door; D01;
700mm W x 2100mm & D05; 700mm W x 1700mm PVC moulded door
Project: 5 Activity: OTP6C1125 Installation of Door; D03;
1500mm W x 2400mm H metal door
Project: 5 Activity: OTP6C1127 Painting of Steel Doors
Project: 5 Activity: OTP6C1130 Wall Finishes: Tile edging
Project: 5 Activity: OTP6C1133 Floor Finishes; F05; Sealed
concrete finish with 15mm W x 5mm H groove
Project: 5 Activity: OTP6C1135 Floor Finishes; F06;
300x300mm unglazed homogeneous floor tiles
Project: 5 Activity: OTP6C1137 Floor Finishes; Concrete
topping; 50mm thick
Project: 5 Activity: OTP6C1139 Floor Finishes; Waterproofing
works
Project: 5 Activity: OTP6C1159 Misc Civil Items; Stair
Nosing, Roof Ladder Bracket, Basecourse at open areas, Etc.
Project: 5 Activity: OTP6M1000 Installation Butterfly valve
DN500
Project: 5 Activity: OTP6M1010 Installation Dismantling
Joint DN500
Project: 5 Activity: OTP6M1020 Installation Gate Valve DN100
Project: 5 Activity: OTP6M1030 Installation Gate Valve DN150
Project: 5 Activity: OTP6M1040 Tapping Point to DCWD,
406.4mm Ø ASTM A139
Project: 5 Activity: OTP6M1100 Installation Flow Control
Valve DN500
Project: 5 Activity: OTP6M1105 DN500 Dismantling Joint
Project: 5 Activity: OTP6M1107 Touch up paint on weldments
Project: 5 Activity: OTUGD1000 Dry Testing - Tugbok
Project: 5 Activity: OTUGH1000 Walkthrough - Tugbok
Project: 5 Activity: OTUGH1010 PUNCHLIST CLOSEOUT - Tugbok
Project: 5 Activity: OTUGH1020 Construction Handover -
Tugbok
Project: 5 Activity: OTUGM1000 AC & Ventillation Works - Not
part of vcci
Project: 5 Activity: OTUGM1010 Install Chlorine Package
System - REMAINING WORKS
Project: 5 Activity: OTUGM1020 Install Valves
Project: 5 Activity: OTUGM1030 Disinfection of Pipe System
Project: 5 Activity: OTUGW1000 Wet Testing - TUGBOK
Project: 5 Activity: OTUGW1010 Automation Testing - Tugbok
Project: 5 Activity: OTUGW1020 Dis-infection of Align 1, 2,
3
Project: 5 Activity: RACSA1110 Floor Finishes
Project: 5 Activity: RCDSD1000 Dry Testing Conveyance Line
Project: 5 Activity: RCDSH1000 Walkthrough Conveyance Line
Project: 5 Activity: RCDSH1010 PUNCHLIST CLOSEOUT Conveyance
Line
Project: 5 Activity: RCDSH1020 Construction Handover
Conveyance Line
Project: 5 Activity: RCDSM1020 Internal paint repair/touch-
up works (identified during walkdown)
Project: 5 Activity: RCDSM1050 Manhole seal inspection -
Installation of O-Ring and manhole closing (30-33 MH)
Project: 5 Activity: RCDSW1000 Flush / Drain Conveyance Line
Project: 5 Activity: RCWDH1000 Walkthrough - Weir to
Desander
Project: 5 Activity: RCWDH1010 Punchlist Close-out - Weir to
Desander
Project: 5 Activity: RCWDH1020 Construction Handover to
Commissioning - Weir to Desander
Project: 5 Activity: RCWDM1020 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RCWDM1030 Manhole seal inspection -
Installation of O-Ring and manhole closing (1 MH)
Project: 5 Activity: RCWDM1120 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RCWDM1130 Manhole seal inspection -
Installation of O-Ring and manhole closing (1-7 MH)
Project: 5 Activity: RCWDM1140 Manhole seal inspection -
Installation of O-Ring and manhole closing (8-14 MH)
Project: 5 Activity: RCWDM1150 Manhole seal inspection -
Installation of O-Ring and manhole closing (15-21 MH)
Project: 5 Activity: RCWDM1160 Manhole seal inspection -
Installation of O-Ring and manhole closing (22-29 MH)
Project: 5 Activity: RCWDM1170 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 8-14 MH
Project: 5 Activity: RCWDM1180 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 15-21 MH
Project: 5 Activity: RCWDM1190 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 22-29 MH
Project: 5 Activity: RCWDM1210 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 30-33 MH
Project: 5 Activity: RCWDM1220 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 1-7 MH
Project: 5 Activity: RCWDM1240 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 34 MH
Project: 5 Activity: RCWDM1250 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RDESD1000 Dry Testing Inlet Gate
Desander Chamber 1
Project: 5 Activity: RDESD1010 Dry Testing Flushing Gate
Desander Chamber 1
Project: 5 Activity: RDESD1020 Dry Testing Flap Gate
Desander Chamber 1
Project: 5 Activity: RDESD1030 Dry Testing Inlet Gate
Desander Chamber 2
Project: 5 Activity: RDESD1040 Dry Testing Flushing Gate
Desander Chamber 2
Project: 5 Activity: RDESD1050 Dry Testing Flap Gate
Desander Chamber 2
Project: 5 Activity: RDESD1060 Dry Testing Desander Common
Outlet Chamber
Project: 5 Activity: RDESH1000 Walkthrough Desander Inlet
Chamber 1
Project: 5 Activity: RDESH1010 Punchlist Closeout Desander
Inlet Chamber 1
Project: 5 Activity: RDESH1020 Construction Handover
Desander Inlet Chamber 1
Project: 5 Activity: RDESH1030 Walkthrough Desander Inlet
Chamber 2
Project: 5 Activity: RDESH1040 Punchlist Closeout Desander
Inlet Chamber 2
Project: 5 Activity: RDESH1050 Construction Handover
Desander Inlet Chamber 2
Project: 5 Activity: RDESH1060 Walkthrough Desander Common
Outlet Chamber
Project: 5 Activity: RDESH1070 PUNCHLIST CLOSEOUT Desander
Common Outlet Chamber
Project: 5 Activity: RDESH1080 Construction Handover
Desander Common Outlet Chamber
Project: 5 Activity: RDESM1030 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RDESW1000 Wet Testing Inlet Gate
Desander Chamber 1
Project: 5 Activity: RDESW1010 Wet Testing Flushing Gate
Desander Chamber 1
Project: 5 Activity: RDESW1020 Wet Testing Flap Gate
Desander Chamber 1
Project: 5 Activity: RDESW1030 Wet Testing Inlet Gate
Desander Chamber 2
Project: 5 Activity: RDESW1040 Wet Testing Flushing Gate
Desander Chamber 2
Project: 5 Activity: RDESW1050 Wet Testing Flap Gate
Desander Chamber 2
Project: 5 Activity: RDESW1060 Wet Testing Desander Common
Outlet Chamber Gate
Project: 5 Activity: RDESW1070 Wet Testing Desander Common
Outlet Chamber LIT
Project: 5 Activity: RDRSD1000 Dry Testing Inlet Sampling
System
Project: 5 Activity: RDRSH1000 Walkthrough HEPP Drain Line
Project: 5 Activity: RDRSH1010 PUNCHLIST CLOSEOUT HEPP Drain
Line
Project: 5 Activity: RDRSH1020 Construction Handover HEPP
Drain Line
Project: 5 Activity: RDRSH1030 Walkthrough Inlet Sampling
System
Project: 5 Activity: RDRSH1040 PUNCHLIST CLOSEOUT Inlet
Sampling System
Project: 5 Activity: RDRSH1050 Construction Handover Inlet
Sampling System
Project: 5 Activity: RDRSW1000 Wet Testing Inlet Sampling
System
Project: 5 Activity: RHFAE1000 Installation of ACCU - HEPP
FA
Project: 5 Activity: RHMBA1020 Install Doors
Project: 5 Activity: RHMBA1050 Painting of Louvers (On the
welded portion)
Project: 5 Activity: RHMBA1060 WIR Inspection of Louvers
Project: 5 Activity: RHMBA1090 Scaffolding installation
Prior for installation of Exhaust Fan
Project: 5 Activity: RHMBA1100 Installation of Exhaust Fan -
5 units
Project: 5 Activity: RHMBA1110 WIR Inspection of Exhaust Fan
- 5 units
Project: 5 Activity: RHMBD1000 Dry Testing Turbine & Bypass
Inlet Valve
Project: 5 Activity: RHMBD1010 Dry Testing Turbine Line &
Bypass Line
Project: 5 Activity: RHMBH1000 Walkthrough Bifurcation Line
Project: 5 Activity: RHMBH1010 PUNCHLIST CLOSEOUT
Bifurcation Line
Project: 5 Activity: RHMBH1020 Construction Handover
Bifurcation Line
Project: 5 Activity: RHMBH1030 Walkthrough Turbine & Bypass
Inlet Valve
Project: 5 Activity: RHMBH1040 PUNCHLIST CLOSEOUT Turbine &
Bypass Inlet Valve
Project: 5 Activity: RHMBH1050 Construction Handover Turbine
& Bypass Inlet Valve
Project: 5 Activity: RHMBH1060 Walkthrough Turbine Line &
Bypass Line & Bypass Line
Project: 5 Activity: RHMBH1070 PUNCHLIST CLOSEOUT Turbine
Line & Bypass Line
Project: 5 Activity: RHMBH1080 Construction Handover Turbine
Line & Bypass Line
Project: 5 Activity: RHMBM1010 Pipe Connection DN1000 - Full
Welding Works
Project: 5 Activity: RHMBM1050 Dismantling of Scaffolding
prior for the Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1060 Install aeration pipework -
Painting Works
Project: 5 Activity: RHMBM1070 Install aeration pipework -
WIR Inspection
Project: 5 Activity: RHMBM1210 Reinstallation of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1220 Lifting of Bypass Inlet Valve
DN800
Project: 5 Activity: RHMBM1230 Bolt torquing of Bypass Inlet
Valve DN800
Project: 5 Activity: RHMBM1380 WIR Inspection prior for the
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1390 WIR Inspection for
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBS1000 Formworks & Rebar
Installation Turbine Tube
Project: 5 Activity: RHMBS1010 Concrete Pouring Turbine Tube
Project: 5 Activity: RHMBW1000 Wet Testing Turbine & Bypass
Inlet Valve
Project: 5 Activity: RHMBW1010 Wet Testing Turbine Line &
Bypass Line & Bypass Line
Project: 5 Activity: RPPLD1000 Dry Testing Penstock Line
Project: 5 Activity: RPPLH1000 Walkthrough Penstock Line
Project: 5 Activity: RPPLH1010 PUNCHLIST CLOSEOUT Penstock
Line
Project: 5 Activity: RPPLH1020 Construction Handover
Penstock Line
Project: 5 Activity: RPPLM1040 Manhole seal inspection -
Installation of O-Ring and manhole closing (34 MH)
Project: 5 Activity: RPPLW1000 Flush / Drain Penstock Line
Project: 5 Activity: RSTFC1000 Backfilling Works
Project: 5 Activity: RSWPA1030 Floor Finishes
Project: 5 Activity: RTWTD1000 Dry Testing Bypass Inlet
Valve
Project: 5 Activity: RTWTD1010 Dry Testing Water Head Tank
Spillway Box
Project: 5 Activity: RTWTD1020 Dry Testing Water Head Tank
Project: 5 Activity: RTWTH1000 Walkthrough Bypass Chamber
Drain Line
Project: 5 Activity: RTWTH1010 PUNCHLIST CLOSEOUT Bypass
Chamber Drain Line
Project: 5 Activity: RTWTH1020 Construction Handover Bypass
Chamber Drain Line
Project: 5 Activity: RTWTH1030 Walkthrough Bypass Inlet
Valve
Project: 5 Activity: RTWTH1040 PUNCHLIST CLOSEOUT Bypass
Inlet Valve
Project: 5 Activity: RTWTH1050 Construction Handover Bypass
Inlet Valve
Project: 5 Activity: RTWTH1060 Walkthrough Water Head Tank
Spillway Box
Project: 5 Activity: RTWTH1070 PUNCHLIST CLOSEOUT Water Head
Tank Spillway Box
Project: 5 Activity: RTWTH1080 Construction Handover Water
Head Tank Spillway Box
Project: 5 Activity: RTWTH1090 Walkthrough Water Head Tank
Project: 5 Activity: RTWTH1100 PUNCHLIST CLOSEOUT Water Head
Tank
Project: 5 Activity: RTWTH1110 Construction Handover Water
Head Tank
Project: 5 Activity: RTWTM1010 Install Hydraulic Piping -
TWT
Project: 5 Activity: RTWTM1120 Fabrication of ladder rung
and cage
Project: 5 Activity: RTWTM1130 Painting works ladder rung
and cage
Project: 5 Activity: RTWTM1140 Installation of ladder rung
and cage
Project: 5 Activity: RTWTM1290 WIR Inspection ladder rung
and cage
Project: 5 Activity: RTWTW1000 Wet Testing Bypass Inlet
Valve
Project: 5 Activity: RTWTW1010 Wet Testing Water Head Tank
Spillway Box
Project: 5 Activity: RTWTW1020 Wet Testing Water Head Tank
Project: 5 Activity: RWEIC1020 INITIAL Re-diversion Works of
the River through Steel Pipe
Project: 5 Activity: RWEIC1040 Drilling & Rockbolting -
Slope Protection
Project: 5 Activity: RWEIC1050 Wiremesh pinning - Slope
Protection
Project: 5 Activity: RWEIC1060 Shotcreting / Grouted Riprap
- Slope Protection
Project: 5 Activity: RWEIC1130 Concreting Works - Flushing
Box P1-A1
Project: 5 Activity: RWEIC1140 Backfill and Compaction -
Flushing Box P1-A1
Project: 5 Activity: RWEIC1150 Water Diversion ( to Coffer
Dam Area 1) - Flushing Box P1-A1
Project: 5 Activity: RWEIC1260 Dewatering Works - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1270 Excavation works - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1280 Backfilling works - Right
Dike Abutment 1st Half
Project: 5 Activity: RWEIC1290 Levelling, trimming, and
compacting of soil - Right Dike Abutment 1st Half
Project: 5 Activity: RWEIC1300 Cyclopean concrete - Right
Dike Abutment 1st Half
Project: 5 Activity: RWEIC1310 300mmthk Grouted Boulders -
Right Dike Abutment 1st Half
Project: 5 Activity: RWEIC1320 Rockfill - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1330 Rebar & Froms - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1340 Concrete - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1440 Cyclopean Concrete
Project: 5 Activity: RWEIC1450 Forms
Project: 5 Activity: RWEIC1460 Water Diversion (to Weir) -
5-Barrel RCBC with Dike
Project: 5 Activity: RWEIC1470 Excavation works - 5-Barrel
RCBC with Dike
Project: 5 Activity: RWEIC1480 Levelling, trimming, and
compacting of soil - 5-Barrel RCBC with Dike
Project: 5 Activity: RWEIC1490 Formworks - 5-Barrel RCBC
with Dike
Project: 5 Activity: RWEIC1500 Reinforcement - 5-Barrel RCBC
with Dike
Project: 5 Activity: RWEIC1510 Concrete - 5-Barrel RCBC with
Dike
Project: 5 Activity: RWEID1000 Dry Testing - Weir Intake
Inlet Gate (Include initial tests of the gates) - WEIR
Project: 5 Activity: RWEID1010 Dry Testing - Weir Intake
Inlet Line - WEIR
Project: 5 Activity: RWEID1020 Dry Testing - Weir Intake
Inlet Stoplog - WEIR
Project: 5 Activity: RWEID1030 Dry Testing - Bypass Line -
WEIR
Project: 5 Activity: RWEID1040 Dry Testing - Environmental
Line - WEIR
Project: 5 Activity: RWEID1050 Dry Testing - Intake Box
Flushing Line - WEIR
Project: 5 Activity: RWEIH1000 Walkthrough - WEIR
Project: 5 Activity: RWEIH1010 Punchlist Close-out - WEIR
Project: 5 Activity: RWEIH1020 Construction Handover to
Commissioning - WEIR
Project: 5 Activity: RWEII1020 Cable pulling for FOC
Project: 5 Activity: RWEII1030 Installation of CCTV System
Project: 5 Activity: RWEIM1140 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RWEIM1150 Gate Seals Rectification and
testing(Bypass)
Project: 5 Activity: RWEIM1190 Gate Seals Rectification and
testing(Maintenance)
Project: 5 Activity: RWEIM1200 Gate Seals Rectification and
testing(flushing)
Project: 5 Activity: RWEIM1210 Gate Seals Rectification and
testing(Intake)
Project: 5 Activity: RWEIM1320 Gate Seals Rectification
(Inlet Gates A)
Project: 5 Activity: RWEIM1330 Gate Seals Rectification
(Flushing Gates A)
Project: 5 Activity: RWEIM1340 Gate Seals Rectification
Outlet Gate A)
Project: 5 Activity: RWEIM1350 Gate Seals Rectification
(Inlet Gates B)
Project: 5 Activity: RWEIM1360 Gate Seals Rectification
(Flushing Gates B)
Project: 5 Activity: RWEIM1370 Gate Seals Rectification
Outlet Gate B)
Project: 5 Activity: RWEIW1000 Wet Testing Weir Intake Inlet
Gate - WEIR
Project: 5 Activity: RWEIW1010 Wet Testing Weir Intake Inlet
Line - WEIR
Project: 5 Activity: RWEIW1020 Wet Testing Weir Intake Inlet
Stoplog - WEIR
Project: 5 Activity: RWEIW1030 Wet Testing Bypass Line -
WEIR
Project: 5 Activity: RWEIW1040 Wet Testing Environmental
Line - WEIR
Project: 5 Activity: RWEIW1050 Wet Testing Intake Box
Flushing Line - WEIR
Project: 5 Activity: RWEIW1060 Flushing & Cleaning - WEIR
Project: 5 Activity: TAL1D1000 Dry Testing ( Close/Open
valves - 20) - Alignment 1
Project: 5 Activity: TAL1H1000 Walkthrough - Alignment 1
Project: 5 Activity: TAL1H1010 Construction Handover -
Alignment 1
Project: 5 Activity: TAL1H1020 PUNCHLIST CLOSEOUT -
Alignment 1
Project: 5 Activity: TAL1M2000 Install Expansion Joint at
Gully Bridge Pipe - WELDING REMAINING WORKS
Project: 5 Activity: TAL1M3000 Steel Bridge Painting
Remaining works
Project: 5 Activity: TAL1M4000 Removal of Debris Inside the
Pipe / Clean-up - Align1
Project: 5 Activity: TAL1M4010 Painting - Align1
Project: 5 Activity: TAL1M4020 Closing of Temporary Manhole
- Welding - Align1
Project: 5 Activity: TAL1M4030 Closing of Temporary Manhole
- Painting - Align1
Project: 5 Activity: TAL1W1000 Flushing & Cleaning -
Alignment 1
Project: 5 Activity: TAL2D1000 Dry Testing (Close/Open
Valves - 88)
Project: 5 Activity: TAL2H1000 Walkthrough
Project: 5 Activity: TAL2H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL2H1020 Construction Handover
Project: 5 Activity: TAL2M3000 Install Temporary Access
Manholes
Project: 5 Activity: TAL2M7000 Removal of Debris Inside the
Pipe / Clean-up - Align2
Project: 5 Activity: TAL2M7010 Clearing with the NCR / Weld
Repair - Align2
Project: 5 Activity: TAL2M7020 Painting - Align2
Project: 5 Activity: TAL2M7030 Closing of Temporary Manhole
- Welding - Align2
Project: 5 Activity: TAL2M7040 Closing of Temporary Manhole
- Painting - Align2
Project: 5 Activity: TAL2W1000 Flushing & Cleaning -
Alignment 2
Project: 5 Activity: TAL3D1000 Dry Testing ( Close/Open
valves - 121) - Alignment 3
Project: 5 Activity: TAL3H1000 Walkthrough
Project: 5 Activity: TAL3H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL3H1020 Construction Handover
Project: 5 Activity: TAL3M1000 BOV & CAV Installation
including Appurtenances (TOTAL 53)
Project: 5 Activity: TAL3M4000 Removal of temporary
restraint from installed expansion joints at Angalan fabricated bridges 1,2 & 3
Project: 5 Activity: TAL3W1000 Flushing & Cleaning -
Alignment 3
Project: 5 Activity: TAL4D1000 Dry Testing ( Close/Open
valves - 131) - Alignment 4 (To Mandug)
Project: 5 Activity: TAL4H1000 Walkthrough - Alignment 4 (To
Mandug)
Project: 5 Activity: TAL4H1010 PUNCHLIST CLOSEOUT -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL4H1020 Construction Handover -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL4M1500 Install/Sealing of Temporary
Access Manholes Alignment 4A
Project: 5 Activity: TAL4M1600 BOV(20), CAV (GV+AV=52), PRV
(2) Including Appurtenances Alignment 4A
Project: 5 Activity: TAL4M1800 Isolation Chamber remaining
(4) - Walls (2), Covers (4), Backfilling - Alignment 4A
Project: 5 Activity: TAL4M1900 Hydrotesting Segment-8 -
Alignment 4A
Project: 5 Activity: TAL4M2000 Hydrotesting Segment-9 -
Alignment 4A
Project: 5 Activity: TAL4M2200 Hydrotesting Segment-10 -
Alignment 4A
Project: 5 Activity: TAL4M2300 Hydrotesting Segment-11 -
Alignment 4A
Project: 5 Activity: TAL4M2400 Pipelaying Alignment 4B
Project: 5 Activity: TAL4M2500 Hydrotest - Sta. 10+675-780
Alignment 4B
Project: 5 Activity: TAL4M2600 Thrust Blocks & Backfilling -
Alignment 4B
Project: 5 Activity: TAL4M2700 Welding Alignment 4B
Project: 5 Activity: TAL4M2800 Closing of Gaps Alignment 4B
Project: 5 Activity: TAL4M2900 Hydrotest - Sta. 10+788-
11+064 Alignment 4B
Project: 5 Activity: TAL4M3100 Isolation Chamber remaining
(2) - Concrete covers, Saddle supports & Backfilling - Alignment 4B
Project: 5 Activity: TAL4M3200 Hydrotest - Sta. 11+067-617
Alignment 4B
Project: 5 Activity: TAL4M3300 Hydrotest - Sta. 11+620-
12+602 Alignment 4B
Project: 5 Activity: TAL4M3400 BOV(12), CAV (GV+AV=22), PRV
(4) Including Appurtenances Alignment-4B
Project: 5 Activity: TAL4M3500 Hydrotest - Sta. 12+607-
13+526 Alignment 4B
Project: 5 Activity: TAL4M3600 Hydrotest - Sta. 13+530-
14+906 Alignment 4B
Project: 5 Activity: TAL4M3700 Hydrotest - Sta. 10+430-671
Alignment 4B
Project: 5 Activity: TAL4M4000 Removal of Debris Inside the
Pipe / Clean-up - Align4
Project: 5 Activity: TAL4M4010 Clearing with the NCR / Weld
Repair - Align4
Project: 5 Activity: TAL4M4020 Painting - Align4
Project: 5 Activity: TAL4M4030 Closing of Temporary Manhole
- Welding - Align4
Project: 5 Activity: TAL4M4040 Closing of Temporary Manhole
- Painting - Align4
Project: 5 Activity: TAL4W1000 Flushing & Cleaning -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL5C1020 Permanent Road Restoration
Sta 1+025 to 2+020
Project: 5 Activity: TAL5C2020 Permanent Road Restoration
Sta 2+025 to 3+020
Project: 5 Activity: TAL5C3020 Permanent Road Restoration
Sta 3+025 to 4+020
Project: 5 Activity: TAL5C4020 Permanent Road Restoration
Sta 4+025 to 5+020
Project: 5 Activity: TAL5C5020 Permanent Road Restoration
Sta 5+025 to 6+200
Project: 5 Activity: TAL5C6200 Permanent Road Restoration
Sta 6+205 to 7+140
Project: 5 Activity: TAL5C7140 Permanent Road Restoration
Sta 7+144 to 7+991
Project: 5 Activity: TAL5Cn0020 Permanent Road Restoration
Sta 0+020 to 1+020
Project: 5 Activity: TAL5D1000 Dry Testing
Project: 5 Activity: TAL5H1000 Walkthrough
Project: 5 Activity: TAL5H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL5H1020 Construction Handover
Project: 5 Activity: TAL5M1000 Pipelaying & Welding Works
Project: 5 Activity: TAL5M2000 Hydrotesting
Project: 5 Activity: TAL5M3000 Closing of Gaps
Project: 5 Activity: TAL5M5000 Isolation Chambers
Installation
Project: 5 Activity: TAL5M6000 Removal of Debris Inside the
Pipe / Clean-up - Align5
Project: 5 Activity: TAL5M6100 Clearing with the NCR / Weld
Repair - Align5
Project: 5 Activity: TAL5M6200 Painting - Align5
Project: 5 Activity: TAL5M6300 Closing of Temporary Manhole
- Welding - Align5
Project: 5 Activity: TAL5M6400 Closing of Temporary Manhole
- Painting - Align5
Project: 5 Activity: TAL6C1030 Permanent Road Restoration
Sta 1+032 to 1+997
Project: 5 Activity: TAL6C2010 Permanent Road Restoration
Sta 2+014 to 3+065
Project: 5 Activity: TAL6C3060 Permanent Road Restoration
Sta 3+068 to 4+045
Project: 5 Activity: TAL6C4060 Permanent Road Restoration
Sta 4+068 to 4+432, 0+005 (AL7)
Project: 5 Activity: TAL6Cn0020 Permanent Road Restoration
Sta 0+023 to 1+020
Project: 5 Activity: TAL6M7000 BOV (7), CAV (10), IV (2)
Installation Including Appurtenances - Alignment 6
Project: 5 Activity: TAL6W1000 Flushing & Cleaning -
Alignment 6
Project: 5 Activity: TAL8D1000 Dry Testing ( Close/Open
valves - 29) - Alignment 8
Project: 5 Activity: TAL8H1000 Walkthrough - Alignment 8
Project: 5 Activity: TAL8H1010 PUNCHLIST CLOSEOUT -
Alignment 8
Project: 5 Activity: TAL8H1020 Construction Handover -
Alignment 8
Project: 5 Activity: TAL8M4000 BOV (7), CAV (20), IV (2)
Installation - Alignment 8
Project: 5 Activity: TAL8W1000 Flushing & Cleaning -
Alignment 8
Project: 5 Activity: TDRBM1000 Pipeline Works
Project: 5 Activity: TDRBS1000 Concreting Works
Project: 5 Activity: TDRBS1010 Steel Bridge Fabrication &
Delivery
Project: 5 Activity: TDRBS1020 Steel Bridge Installation
Project: 5 Activity: WABRA1010 Construct Concrete Stairs
Project: 5 Activity: WABRA1030 Ceiling & Wall Finishes -
Rockwool ????
Project: 5 Activity: WABRA1050 Install Louvers
Project: 5 Activity: WABRA1080 Floor Finishes
Project: 5 Activity: WABRA1090 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1170 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1240 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1270 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRD1000 Dry Testing
Project: 5 Activity: WABRH1000 Walkthrough
Project: 5 Activity: WABRH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WABRH1020 Construction Handover
Project: 5 Activity: WABRW1000 Wet Testing - ABR
Project: 5 Activity: WABRW1010 Automation Testing
Project: 5 Activity: WABRW1020 Process Commissioning Air
Blower Room
Project: 5 Activity: WACSA1000 Masonry Works
Project: 5 Activity: WACSA1060 Install Handrails, Ladders,
Cages
Project: 5 Activity: WACSA1070 Waterproofing Works
Project: 5 Activity: WACSA1100 Ceiling Finishes @ Pump Room
Project: 5 Activity: WACSD1000 Dry Testing
Project: 5 Activity: WACSD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WACSE1040 Installation of Cable tray
Project: 5 Activity: WACSE1050 Cable pulling
Project: 5 Activity: WACSE1060 Termination works
Project: 5 Activity: WACSE1070 Installation of MCC-7 Panel
Project: 5 Activity: WACSE1080 Installation of PLC Panels
Project: 5 Activity: WACSH1000 Walkthrough
Project: 5 Activity: WACSH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WACSH1020 Construction Handover
Project: 5 Activity: WACSM1000 Install Acid Tanks
Project: 5 Activity: WACSM1010 Install Soda Tanks
Project: 5 Activity: WACSM1020 Acid Un-loading Pump
Project: 5 Activity: WACSM1030 Dosing Pump ( Sulphuric )
Project: 5 Activity: WACSM1040 Installation of Emergency Eye
Shower
Project: 5 Activity: WACSM1050 Calibration Column
Project: 5 Activity: WACSM1060 Outside Air Duct Works
Project: 5 Activity: WACSM1070 Pulsation Damper
Project: 5 Activity: WACSM1080 Pressure Relief Valve
Project: 5 Activity: WACSM1090 PVC Plain End Pipe (1/2") x
20ft, S 80, ASTM, (include double containment)
Project: 5 Activity: WACSM1100 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1110 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1120 Soda storage Tank (D=4m ,
H=5m, V=63 cu.m.)
Project: 5 Activity: WACSM1130 Un-loading Pumps
Project: 5 Activity: WACSM1140 Dosing Pump ( Caustic Soda )
Project: 5 Activity: WACSM1150 Calibration Column
Project: 5 Activity: WACSM1160 Pulsation Damper
Project: 5 Activity: WACSM1170 Pressure Relief Valve
Project: 5 Activity: WACSM1180 PVC Plain End Pipe (1") x
20ft, S 80, ASTM inlude (double Containment)
Project: 5 Activity: WACSM1190 Exhaust Air Duct Works
Project: 5 Activity: WACSM1200 Containment Coupling -
Standard, Split (S x S) 3" CLEAR PVC
Project: 5 Activity: WACSM1210 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1220 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1230 Centralizer (Contain-It x
IPS) 3"x 1"
Project: 5 Activity: WACSM1240 Installation of Inside Blower
or Fan Units - 2 Units
Project: 5 Activity: WACSM1250 PVC Ball Valve 1" 546 Pro
(FKM) ASTM NPT
Project: 5 Activity: WACSM1260 PVC Pressure Retaining Valve
1" (FKM) Union, ASTM, w/o manometer,
Project: 5 Activity: WACSS1000 Concrete Works
Project: 5 Activity: WACSS1010 Install Primary Structural
Steel
Project: 5 Activity: WACSW1000 Wett Testing - ACSB
Project: 5 Activity: WACSW1010 Automation Testing
Project: 5 Activity: WACSW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WACSW1030 Process Commissioning Acid &
Caustic Soda Building
Project: 5 Activity: WADBA1010 Roof Deck Water Proofing &
Testing
Project: 5 Activity: WADBA1030 Install Doors 1st Priority -
HDF & PVC remaining
Project: 5 Activity: WADBA1040 Joinery Works
Project: 5 Activity: WADBD1000 Dry Testing
Project: 5 Activity: WADBE1010 Termination works - remaining
ACS & comm. cables
Project: 5 Activity: WADBE1030 Installation of work stations
& Console table
Project: 5 Activity: WADBH1000 Walkthrough
Project: 5 Activity: WADBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WADBH1020 Construction Handover
Project: 5 Activity: WADBM1010 Install Laboratory
Instruments
Project: 5 Activity: WADBM1020 Installation of Blowers
(Niagara fan) - 1 unit
Project: 5 Activity: WADBW1000 Wet Testing - ADB
Project: 5 Activity: WADBW1010 Automation Testing
Project: 5 Activity: WADBW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WAPBA1010 Masonry Works
Project: 5 Activity: WAPBA1020 Acid Resistant Painting
Equipment Area
Project: 5 Activity: WAPBA1030 Ceiling Finishes
Project: 5 Activity: WAPBA1060 Install Stair & Steel
Platform
Project: 5 Activity: WAPBA1070 Install Handrails & Ladders
Project: 5 Activity: WAPBD1000 Dry Testing
Project: 5 Activity: WAPBD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WAPBH1000 Walkthrough
Project: 5 Activity: WAPBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WAPBH1020 Construction Handover
Project: 5 Activity: WAPBW1000 Wet Testing - ASPB
Project: 5 Activity: WAPBW1010 Automation Testing
Project: 5 Activity: WAPBW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WAPBW1030 Process Commissioning Alum
Sulfate
Project: 5 Activity: WAPLC1000 Alum & Polymer Chemical
Trench - Back of Alum Bldg. - damp proof remaining
Project: 5 Activity: WAPLM1010 Alum & Polymer Chemical Line
- Back of Alum bldg
Project: 5 Activity: WBLBD1000 Dry Testing - BWDL
Project: 5 Activity: WBLBH1000 Walkthrough - BWDL
Project: 5 Activity: WBLBH1010 PUNCHLIST CLOSEOUT - BWDL
Project: 5 Activity: WBLBH1020 Construction Handover - BWDL
Project: 5 Activity: WBLBI1010 MH FWTA - Install Supports &
Instruments
Project: 5 Activity: WBLBI1020 MH FWTB - Install Supports &
Instruments
Project: 5 Activity: WBLBM1000 MH FWTA - Install Valves
DN1600
Project: 5 Activity: WBLBM1010 DMF MH - Install Isolation
Valves
Project: 5 Activity: WBLBM1020 MH FWTB - Install Valves
DN1600
Project: 5 Activity: WBLBM1030 TWR Drain Chamber - Install
Valves DN1400
Project: 5 Activity: WBLBW1000 Wett Testing - BWDL
Project: 5 Activity: WBLBW1010 Automation Testing - BWDL
Project: 5 Activity: WBPHA1040 Roofing Works with
Insulation- remaining 1-sheet
Project: 5 Activity: WBPHD1000 Dry Testing - BWPH
Project: 5 Activity: WBPHE1010 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WBPHE1020 FAT/program Simulation
Project: 5 Activity: WBPHE1030 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WBPHE1040 Installation of grounding
system
Project: 5 Activity: WBPHE1050 Termination works -remaining
feeder line
Project: 5 Activity: WBPHH1000 Walkthrough - BWPH
Project: 5 Activity: WBPHH1010 PUNCHLIST CLOSEOUT - BWPH
Project: 5 Activity: WBPHH1020 Construction Handover - BWPH
Project: 5 Activity: WBPHI1000 Installation of instruments -
Flow Meter & Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHI1010 Installation of instruments
valves (pressure switch & gauges)
Project: 5 Activity: WBPHI1020 Bolt torquing - Flow Meter &
Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHI1030 WIR Inspection - Flow Meter &
Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHM1000 Pump to Pipe alignment - HP1
Project: 5 Activity: WBPHM1050 Outside Air Duct Works
connection to Blowers
Project: 5 Activity: WBPHM1080 Pump to Pipe alignment - HP2
Project: 5 Activity: WBPHM1090 Pump to Pipe alignment - LP1
Project: 5 Activity: WBPHM1100 Pump to Pipe alignment - LP2
Project: 5 Activity: WBPHM1110 Painting for Suction pipes -
HP1&2, LP1&2
Project: 5 Activity: WBPHM1120 Procurement of Remaining
Setting Bolts for Valves
Project: 5 Activity: WBPHM1130 Installation of Remaining
Setting Bolts for Valves - HP1
Project: 5 Activity: WBPHM1150 Motor Solo Run for HP1- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1160 Motor Solo Run for HP2- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1170 Motor Solo Run for LP1- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1180 Motor Solo Run for LP2- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1200 Final Pump Shaft alignment
including inspection- HP1
Project: 5 Activity: WBPHM1210 Final Pump Shaft alignment
including inspection- HP2
Project: 5 Activity: WBPHM1220 Final Pump Shaft alignment
including inspection- LP1
Project: 5 Activity: WBPHM1230 Final Pump Shaft alignment
including inspection- LP2
Project: 5 Activity: WBPHM1240 Coupling guard Installation -
HP1
Project: 5 Activity: WBPHM1250 Coupling guard Installation-
HP2
Project: 5 Activity: WBPHM1260 Coupling guard Installation-
LP1
Project: 5 Activity: WBPHM1270 Coupling guard Installation-
LP2
Project: 5 Activity: WBPHM1280 Procurement of Blower or Fan
Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1300 Procurement of Sump Pumps - 2
units
Project: 5 Activity: WBPHM1310 Installation of Sump Pumps -
2 units
Project: 5 Activity: WBPHM1320 Installation of Piping for
Sump Pumps
Project: 5 Activity: WBPHM1330 Hydrotest Prep, Filling and
Flushing of Piping for Sump Pumps
Project: 5 Activity: WBPHM1340 WIR Inspection of Piping for
Sump Pumps
Project: 5 Activity: WBPHM1350 WIR Inspection of Sump Pumps
- 2 units
Project: 5 Activity: WBPHM1400 Fabrication of Piping
Supports for Sump Pumps
Project: 5 Activity: WBPHM1410 Painting of Piping Supports
for Sump Pumps
Project: 5 Activity: WBPHM1430 Installation of combination
air valve - 1 unit
Project: 5 Activity: WBPHM1440 Painting of combination air
valve - 1 unit
Project: 5 Activity: WBPHM1450 WIR Inspection of combination
air valve - 1 unit
Project: 5 Activity: WBPHM1510 Painting for Discharge pipes
- HP1&2, LP1&2
Project: 5 Activity: WBPHM1540 Temporary Removal of Blind
Flange
Project: 5 Activity: WBPHM1550 Reinstallation and Bolt
torquing of Blind Flange
Project: 5 Activity: WBPHM1560 WIR Inspection for Bolt
torquing of Blind Flange
Project: 5 Activity: WBPHM1570 Installation Blower or Fan
Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1580 WIR Inspection for Blower or
Fan Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1590 WIR Inspection for Outside
Air Duct Works connection to Blowers
Project: 5 Activity: WBPHM1600 WIR Inspection for Outside
Air Duct Works
Project: 5 Activity: WBPHM1610 Clearing for Outside Air Duct
with temp. blowers
Project: 5 Activity: WBPHM1630 Clearing for Internal Air
Duct with temp. blowers
Project: 5 Activity: WBPHM1640 Balancing of Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1680 Installation of flexible
connection for Duct connection to blowers - 4 units
Project: 5 Activity: WBPHM1720 Installation of Fire Dampers
- 4 Units
Project: 5 Activity: WBPHM1730 WIR Inspection for
Installation of Fire Dampers - 4 Units
Project: 5 Activity: WBPHM1740 WIR Inspection for Pump to
Pipe alignment - HP1
Project: 5 Activity: WBPHM1750 WIR Inspection for Pump to
Pipe alignment - HP2
Project: 5 Activity: WBPHM1760 WIR Inspection for Pump to
Pipe alignment - LP1
Project: 5 Activity: WBPHM1770 WIR Inspection for Pump to
Pipe alignment - LP2
Project: 5 Activity: WBPHM1780 Coupling Installation - HP1
Project: 5 Activity: WBPHM1790 Coupling Installation- HP2
Project: 5 Activity: WBPHM1800 Coupling Installation- LP1
Project: 5 Activity: WBPHM1810 Coupling Installation- LP2
Project: 5 Activity: WBPHM1820 Installation of Piping
Supports for Sump Pumps
Project: 5 Activity: WBPHM1830 WIR Inspection for
Installation of Piping Supports for Sump Pumps
Project: 5 Activity: WBPHM1840 Hydrotest of Piping for Sump
Pumps
Project: 5 Activity: WBPHM1850 Pipe Reinstatement after
Hydrotest of Piping for Sump Pumps
Project: 5 Activity: WBPHM1870 Procurement of 1 1/2 in Tie
Rod for Discharge Valves
Project: 5 Activity: WBPHM1880 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - HP1
Project: 5 Activity: WBPHM1890 Installation of Remaining
Setting Bolts for Valves - HP2
Project: 5 Activity: WBPHM1900 Installation of Remaining
Setting Bolts for Valves - LP1
Project: 5 Activity: WBPHM1910 Installation of Remaining
Setting Bolts for Valves - LP2
Project: 5 Activity: WBPHM1920 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - HP2
Project: 5 Activity: WBPHM1930 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - LP1
Project: 5 Activity: WBPHM1940 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - LP2
Project: 5 Activity: WBPHM1950 Installation for Suction
pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1960 Installation for Discharge
pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1970 WIR Inspection for Painting
of Suction pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1990 WIR Inspection for Painting
of Discharge pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM2000 Grouting for Pump to Pipe
alignment - HP2
Project: 5 Activity: WBPHM2010 Grouting for Pump to Pipe
alignment - HP1
Project: 5 Activity: WBPHM2020 WIR Inspection for Grouting
for Pump to Pipe alignment - HP1 and HP2
Project: 5 Activity: WBPHM2030 Grouting for Pump to Pipe
alignment - LP2
Project: 5 Activity: WBPHM2040 Grouting for Pump to Pipe
alignment - LP1
Project: 5 Activity: WBPHM2050 WIR Inspection for Grouting
for Pump to Pipe alignment - LP1 and LP2
Project: 5 Activity: WBPHM2060 Request to remove Gaurd and
Coupling
Project: 5 Activity: WBPHM2070 Reinstatement for Gaurd and
Coupling
Project: 5 Activity: WBPHM2080 WIR Inspection for
Reinstatement for Gaurd and Coupling
Project: 5 Activity: WBPHS1000 Install Steel Columns, Beams,
& Frames - (Remaining Beam only)
Project: 5 Activity: WBPHW1000 Wett Testing - BWPH
Project: 5 Activity: WBPHW1010 Automation Testing - BWPH
Project: 5 Activity: WBPHW1020 Process Commissioning
Backwash Pump - BWPH
Project: 5 Activity: WCCLC1000 Chlorine Chemical Trench -
MH1A to MH3A
Project: 5 Activity: WCCLC1010 Chlorine Chemical Trench -
MH3A to MH6
Project: 5 Activity: WCCLC1020 Chlorine Chemical Trench -
MH6 to CLB - waiting for Genset to remove
Project: 5 Activity: WCCLC1030 Chlorine Chemical Trench-
MH14 to Chamber15
Project: 5 Activity: WCCLC1040 Chlorine Chemical Trench -
CLB to ACSB
Project: 5 Activity: WCCLC1050 Chlorine Chemical Trench -
APPLICATION OF ACID RESISTANT
Project: 5 Activity: WCCLM1000 Chlorine Chemical Pipe - MH3A
to MH6
Project: 5 Activity: WCCLM1010 Chlorine Chemical Pipe - MH1A
to MH3A
Project: 5 Activity: WCCLM1020 Chlorine Chemical Pipe - CLB
to ACSB
Project: 5 Activity: WCCLM1030 Chlorine Chemical Pipe - MH6
to CLB
Project: 5 Activity: WCCLM1040 Chlorine Chemical Pipe - MH14
to Chamber15
Project: 5 Activity: WCLBA1020 Install Handrails & Ladders
Project: 5 Activity: WCLBA1080 Ceiling Finishes
Project: 5 Activity: WCLBA1090 Floor Finishes Acid
Resistance
Project: 5 Activity: WCLBD1000 Dry Testing
Project: 5 Activity: WCLBH1000 Walkthrough
Project: 5 Activity: WCLBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WCLBH1020 Construction Handover
Project: 5 Activity: WCLBI1000 Cable pulling
Project: 5 Activity: WCLBI1010 Installation of instruments
Project: 5 Activity: WCLBI1020 Terminations
Project: 5 Activity: WCLBM1070 Installation of Chlorine
Ejector Unit
Project: 5 Activity: WCLBM1120 Installation of FRP Air
Blower Units - 2 Units - 2 Units (DONE)
Project: 5 Activity: WCLBM1140 Install Fire Dampers
Project: 5 Activity: WCLBM1150 Installation of Chlorine and
S02 ton container with dip trays
Project: 5 Activity: WCLBM1160 Installation of Emergency Eye
Shower - 5 Units
Project: 5 Activity: WCLBM1170 Internal Hydrotest
Chlorination
Project: 5 Activity: WCLBM1300 Installation of Mobile
Scaffolding prior for Install Fire Dampers and Motorized Fire Dampers
Project: 5 Activity: WCLBW1000 Wet Testing - CLB
Project: 5 Activity: WCLBW1010 Automation TEsting
Project: 5 Activity: WCLBW1020 Process Commissioning
Chlorination Building
Project: 5 Activity: WELBA1010 Install Louvers (2) - ELB
Project: 5 Activity: WELBA1020 Install Longspan Roofing -
ELB
Project: 5 Activity: WELBA1030 Install Cyclone Wire Fence -
ELB
Project: 5 Activity: WELBA1040 Wall Finishes (External) -
ELB
Project: 5 Activity: WELBD1000 Dry Testing - ELB
Project: 5 Activity: WELBE1000 Termination works - ELB -
link to backwash
Project: 5 Activity: WELBH1000 Walkthrough - ELB
Project: 5 Activity: WELBH1010 PUNCHLIST CLOSEOUT - ELB
Project: 5 Activity: WELBH1020 Construction Handover - ELB
Project: 5 Activity: WELBM1010 Install Fire Damper - ELB
Project: 5 Activity: WELBM1020 Install ACCU unit - Inside
(Done)
Project: 5 Activity: WELBW1000 Wett Testing - ELB
Project: 5 Activity: WELBW1010 Automation Testing - ELB
Project: 5 Activity: WELNE1040 Duct Bank MH06 to MH10
Project: 5 Activity: WELNE1050 Duct Bank MH06 to MCC-5
Project: 5 Activity: WELNE1060 Duct Bank MH10 to MH09
Project: 5 Activity: WELNE1070 Duct Bank EHH10 to EHH11
Project: 5 Activity: WELNE1080 Duct Bank EHH11 to EHH12
Project: 5 Activity: WELNE1090 Duct Bank Stubout to EHH7
Project: 5 Activity: WELNE1100 Duct Bank Stubout to EHH8
Project: 5 Activity: WELNE1120 Duct Bank Stubout to EHH9
Project: 5 Activity: WELNE1130 Duct Bank EHH6 to EHH7
Project: 5 Activity: WELNE1180 Duct Bank EHH7 to EHH8
Project: 5 Activity: WELNE1190 Duct Bank EHH8 to EHH9
Project: 5 Activity: WELNE1200 Duct Bank EHH8 to Chamber16
Project: 5 Activity: WELNE1210 Duct Bank EHH9 to Chamber19
Project: 5 Activity: WELNE1220 Cable Pulling MSB to MCC-5
Project: 5 Activity: WELNE1240 Cable Pulling MSB to MCC-8
Project: 5 Activity: WELNS1020 EHH10, EHH11, EHH12
Project: 5 Activity: WELNS1050 EHH 7
Project: 5 Activity: WELNS1060 EHH 6
Project: 5 Activity: WELNS1070 EHH 8
Project: 5 Activity: WELNS1080 EHH 9
Project: 5 Activity: WFITA1010 Fabrication of Steel Stairs,
Platforms - SOUTH and NORTH SIDE PIPE GALLERY - (Gratings and handrails by
WEBFORGE)
Project: 5 Activity: WFITA1060 Floor Coating - First
Priority
Project: 5 Activity: WFITA1080 Top Coating of Guard Rails -
First Priority
Project: 5 Activity: WFITA1130 Floor Finishes Control Room 1
Project: 5 Activity: WFITA1460 Top Coating of Guard Rails -
2nd Priority
Project: 5 Activity: WFITA1880 Installation of Condensate
Tubing Control Room 1
Project: 5 Activity: WFITA1890 Testing of Condensate Tubing
Control Room 1
Project: 5 Activity: WFITA1900 Refregerant charging of
Condensate Tubing Control Room 1
Project: 5 Activity: WFITA1910 Inspection of Condensate
Tubing Control Room 1
Project: 5 Activity: WFITA1960 Installation of Tubing
insulation for Condensate Tubing Control Room 1
Project: 5 Activity: WFITA1970 Procurement of Tubing
insulation for Condensate Tubing Control Room 1
Project: 5 Activity: WFITA2450 Installation of Condensate
Tubing Control Room 2
Project: 5 Activity: WFITA2470 Inspection of Condensate
Tubing Control Room 2
Project: 5 Activity: WFITA2480 Testing of Condensate Tubing
Control Room 2
Project: 5 Activity: WFITA2500 Refregerant charging of
Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2510 Procurement of Tubing
insulation for Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2540 Installation of Tubing
insulation for Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2570 Installation of Condensate
Tubing Control Room 3
Project: 5 Activity: WFITA2590 Inspection of Condensate
Tubing Control Room 3
Project: 5 Activity: WFITA2600 Testing of Condensate Tubing
Control Room 3
Project: 5 Activity: WFITA2610 Refregerant charging of
Condensate Tubing Control Room 3
Project: 5 Activity: WFITA2620 Procurement of Tubing
insulation for Condensate Tubing Control Room 3
Project: 5 Activity: WFITA2650 Installation of Tubing
insulation for Condensate Tubing Control Room 3
Project: 5 Activity: WFITD1000 Dry Testing DMF Common Inlet
Project: 5 Activity: WFITD1010 Dry Testing DMF Common
Channel
Project: 5 Activity: WFITD1020 Dry Testing Train 11 (Trough,
Flow Meter, Instrumentaion, Gauge & Gate)
Project: 5 Activity: WFITD1030 Dry Testing DMF13 (Gates-
Close/Open)
Project: 5 Activity: WFITD1040 Dry Testing DMF15
Project: 5 Activity: WFITD1050 Dry Testing DMF17
Project: 5 Activity: WFITD1100 Dry testing Filtered Water
Tank A
Project: 5 Activity: WFITE1020 Termination works Tanks 11,
13, 15, 17 - remaining Instruments
Project: 5 Activity: WFITE1030 SAT/program Simulation Tanks
11, 13, 15, 17
Project: 5 Activity: WFITH1000 Walkthrough DMF Common Inlet
Project: 5 Activity: WFITH1010 PUNCHLIST CLOSEOUT DMF Common
Inlet
Project: 5 Activity: WFITH1020 Construction Handover DMF
Common Inlet
Project: 5 Activity: WFITH1030 Walkthrough DMF Common
Channel
Project: 5 Activity: WFITH1040 PUNCHLIST CLOSEOUT DMF Common
Channel
Project: 5 Activity: WFITH1050 Construction Handover DMF
Common Channel
Project: 5 Activity: WFITH1060 Walkthrough Overflow Lines
Project: 5 Activity: WFITH1070 PUNCHLIST CLOSEOUT Overflow
Lines
Project: 5 Activity: WFITH1080 Construction Handover
Overflow Lines
Project: 5 Activity: WFITH1090 Walkthrough DMF11
Project: 5 Activity: WFITH1100 PUNCHLIST CLOSEOUT DMF11
Project: 5 Activity: WFITH1110 Construction Handover DMF11
Project: 5 Activity: WFITH1120 Walkthrough DMF13 (Gates,
Under drain, Air Header & Instruments)
Project: 5 Activity: WFITH1130 PUNCHLIST CLOSEOUT DMF13
Project: 5 Activity: WFITH1140 Construction Handover DMF13
Project: 5 Activity: WFITH1150 Walkthrough DMF15 (Gates,
Under drain, Air Header & Instruments)
Project: 5 Activity: WFITH1160 PUNCHLIST CLOSEOUT DMF15
Project: 5 Activity: WFITH1170 Construction Handover DMF15
Project: 5 Activity: WFITH1180 Walkthrough DMF17
Project: 5 Activity: WFITH1190 PUNCHLIST CLOSEOUT DMF17
Project: 5 Activity: WFITH1200 Construction Handover DMF17
Project: 5 Activity: WFITH1330 Walkthrough Filtered Water
Tank A
Project: 5 Activity: WFITH1340 PUNCHLIST CLOSEOUT Filtered
Water Tank A
Project: 5 Activity: WFITH1350 Construction Handover
Filtered Water Tank A
Project: 5 Activity: WFITI1000 Installation of instrument
Support Tanks 11, 13, 15, 17 (At Pipe Gallery remaining)
Project: 5 Activity: WFITI1010 Installation of Xylem
instrument Tanks 11, 13, 15, 17
Project: 5 Activity: WFITM10630 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM10640 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM10650 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM10660 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM10670 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM10680 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM10690 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM10700 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM10710 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM10720 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM10730 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM10740 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM10750 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM10760 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM11610 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11620 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM11630 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11640 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11650 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11660 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11670 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM11680 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11690 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM11700 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM11710 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11720 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM11730 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11740 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM11750 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11760 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM11770 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11780 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11790 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11800 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11810 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM11820 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11830 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM11840 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM11850 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11860 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM11870 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11880 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1450 Water Filling & Bubble Test
Filter Tank 11
Project: 5 Activity: WFITM1460 Sand Media Installation Tank
11
Project: 5 Activity: WFITM1470 Water Filling & Backwashing
of Sand Media Filter Tank 11
Project: 5 Activity: WFITM1480 Anthracite Installation Tank
11
Project: 5 Activity: WFITM1490 Water Filling & Backwashing
of Anthracite Filter Tank 11
Project: 5 Activity: WFITM1500 Disinfection of Media Filters
Tank 11
Project: 5 Activity: WFITM1510 Filter to Rinse Tank 11
Project: 5 Activity: WFITM1520 Water Filling & Bubble Test
Filter Tank 13
Project: 5 Activity: WFITM1530 Sand Media Installation Tank
13
Project: 5 Activity: WFITM1540 Water Filling & Backwashing
of Sand Media Filter Tank 13 (2 cycles)
Project: 5 Activity: WFITM15400 Installation for Valves of
DN500 - 27 units South Side
Project: 5 Activity: WFITM1550 Anthracite Installation Tank
13
Project: 5 Activity: WFITM1560 Water Filling & Backwashing
of Anthracite Filter Tank 13 (6 cycles)
Project: 5 Activity: WFITM1570 Disinfection of Media Filters
Tank 13
Project: 5 Activity: WFITM1580 Filter to Rinse Tank 13
Project: 5 Activity: WFITM1590 Water Filling & Bubble Test
Filter Tank 15
Project: 5 Activity: WFITM1600 Sand Media Installation Tank
15
Project: 5 Activity: WFITM1610 Water Filling & Backwashing
of Sand Media Filter Tank 15 (2 Cycles)
Project: 5 Activity: WFITM16160 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16170 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16180 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16190 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM1620 Anthracite Installation Tank
15
Project: 5 Activity: WFITM16200 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM1630 Water Filling & Backwashing
of Anthracite Filter Tank 15 (6 Cycles)
Project: 5 Activity: WFITM16310 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16330 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16340 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16350 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16360 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16370 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16380 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16390 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM1640 Disinfection of Media Filters
Tank 15
Project: 5 Activity: WFITM16400 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM1650 Filter to Rinse Tank 15
Project: 5 Activity: WFITM16510 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16530 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16540 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16550 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16560 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16570 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16580 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16590 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM1660 Water Filling & Bubble Test
Filter Tank 17
Project: 5 Activity: WFITM16600 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM1670 Sand Media Installation Tank
17
Project: 5 Activity: WFITM16710 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16730 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16740 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16750 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16760 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16770 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16780 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16790 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM1680 Water Filling & Backwashing
of Sand Media Filter Tank 17 (2 Cycles)
Project: 5 Activity: WFITM16800 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM1690 Anthracite Installation Tank
17
Project: 5 Activity: WFITM1700 Water Filling & Backwashing
of Anthracite Filter Tank 17 (6 Cycles)
Project: 5 Activity: WFITM1710 Disinfection of Media Filters
Tank 17
Project: 5 Activity: WFITM1720 Filter to Rinse Tank 17
Project: 5 Activity: WFITM1730 Water Filling & Bubble Test
Filter Tank 2
Project: 5 Activity: WFITM1740 Sand Media Installation Tank
2
Project: 5 Activity: WFITM1750 Water Filling & Backwashing
of Sand Media Filter Tank 2 (2 Cycles)
Project: 5 Activity: WFITM1760 Anthracite Installation Tank
2
Project: 5 Activity: WFITM1770 Water Filling & Backwashing
of Anthracite Filter Tank 2 (6 Cycles)
Project: 5 Activity: WFITM1780 Disinfection of Media Filters
Tank 2
Project: 5 Activity: WFITM1800 Water Filling & Bubble Test
Filter Tank 4
Project: 5 Activity: WFITM1810 Sand Media Installation Tank
4
Project: 5 Activity: WFITM1820 Water Filling & Backwashing
of Sand Media Filter Tank 4 (2 Cycles)
Project: 5 Activity: WFITM1830 Anthracite Installation Tank
4
Project: 5 Activity: WFITM1840 Water Filling & Backwashing
of Anthracite Filter Tank 4 (6 Cycles)
Project: 5 Activity: WFITM1850 Disinfection of Media Filters
Tank 4
Project: 5 Activity: WFITM1870 Water Filling & Bubble Test
Filter Tank 6
Project: 5 Activity: WFITM1880 Sand Media Installation Tank
6
Project: 5 Activity: WFITM1890 Water Filling & Backwashing
of Sand Media Filter Tank 6 (2 Cycles)
Project: 5 Activity: WFITM1900 Anthracite Installation Tank
6
Project: 5 Activity: WFITM1910 Water Filling & Backwashing
of Anthracite Filter Tank 6 (6 Cycles)
Project: 5 Activity: WFITM1920 Disinfection of Media Filters
Tank 6
Project: 5 Activity: WFITM1930 Filter to Rinse Tank 6
Project: 5 Activity: WFITM1940 Water Filling & Bubble Test
Filter Tank 8
Project: 5 Activity: WFITM1950 Sand Media Installation Tank
8
Project: 5 Activity: WFITM1960 Water Filling & Backwashing
of Sand Media Filter Tank 8 (2 Cycles)
Project: 5 Activity: WFITM1970 Anthracite Installation Tank
8
Project: 5 Activity: WFITM1980 Water Filling & Backwashing
of Anthracite Filter Tank 8 (6 Cycles)
Project: 5 Activity: WFITM1990 Disinfection of Media Filters
Tank 8
Project: 5 Activity: WFITM2000 Filter to Rinse Tank 8
Project: 5 Activity: WFITM23770 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM23780 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM23790 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM23800 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM23810 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM23820 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM23830 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM23840 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM23850 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM23860 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM23870 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM23880 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM23890 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM23900 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM3020 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3030 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3040 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM3050 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3070 Installation of Scaffolding
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3080 Installation of Flange
Adaptor for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3100 Painting for Flange Adaptor
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3120 Procurement of Bolts for
valve of DN1000, DN900, DN500- 9 units South Side
Project: 5 Activity: WFITM3230 WIR Inspection for Painting
for Flange Adaptor for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM5100 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5110 Underdrain DMF8 - Pull-off
Test
Project: 5 Activity: WFITM5120 Underdrain DMF8 - Flume
Handover
Project: 5 Activity: WFITM5130 Underdrain DMF8 - Scour air
piping flushing
Project: 5 Activity: WFITM5140 Underdrain DMF8 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5150 Underdrain DMF8 - Hydrotest
DN900
Project: 5 Activity: WFITM5160 Underdrain DMF8 - Scour air
piping pressure test
Project: 5 Activity: WFITM5170 Underdrain DMF8 - Install
scaffold roof
Project: 5 Activity: WFITM5180 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5190 Underdrain DMF8 - Modify
scaffold access
Project: 5 Activity: WFITM5200 Underdrain DMF8 - Clearing
works
Project: 5 Activity: WFITM5210 Underdrain DMF8 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5220 Underdrain DMF8 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5230 Underdrain DMF8 - Air header
pipe installation.
Project: 5 Activity: WFITM5240 Underdrain DMF8 - Air Header
pipe survey
Project: 5 Activity: WFITM5250 Underdrain DMF8 - Anchor rod
installation
Project: 5 Activity: WFITM5260 Underdrain DMF8 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5270 Underdrain DMF8 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5280 Underdrain DMF8 -
Installation of FRP Plates
Project: 5 Activity: WFITM5290 Underdrain DMF8 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5300 Underdrain DMF8 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5310 Underdrain DMF8 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5320 Underdrain DMF8 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5330 Underdrain DMF8 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5340 Underdrain DMF8 - WIR
Inspection
Project: 5 Activity: WFITM8500 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8510 Underdrain DMF10 - Pull-off
Test
Project: 5 Activity: WFITM8520 Underdrain DMF10 - Flume
Handover
Project: 5 Activity: WFITM8530 Underdrain DMF10 - Scour air
piping flushing
Project: 5 Activity: WFITM8540 Underdrain DMF10 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8550 Underdrain DMF10 - Hydrotest
DN900
Project: 5 Activity: WFITM8560 Underdrain DMF10 - Scour air
piping pressure test
Project: 5 Activity: WFITM8570 Underdrain DMF10 - Install
scaffold roof
Project: 5 Activity: WFITM8580 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8590 Underdrain DMF10 - Modify
scaffold access
Project: 5 Activity: WFITM8600 Underdrain DMF10 - Clearing
works
Project: 5 Activity: WFITM8610 Underdrain DMF10 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8620 Underdrain DMF10 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8630 Underdrain DMF10 - Air header
pipe installation.
Project: 5 Activity: WFITM8640 Underdrain DMF10 - Air Header
pipe survey
Project: 5 Activity: WFITM8650 Underdrain DMF10 - Anchor rod
installation
Project: 5 Activity: WFITM8660 Underdrain DMF10 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM8670 Underdrain DMF10 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8680 Underdrain DMF10 -
Installation of FRP Plates
Project: 5 Activity: WFITM8690 Underdrain DMF10 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8700 Underdrain DMF10 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8710 Underdrain DMF10 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8720 Underdrain DMF10 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8730 Underdrain DMF10 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8740 Underdrain DMF10 - WIR
Inspection
Project: 5 Activity: WFITM8840 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8850 Underdrain DMF12 - Pull-off
Test
Project: 5 Activity: WFITM8860 Underdrain DMF12 - Flume
Handover
Project: 5 Activity: WFITM8870 Underdrain DMF12 - Scour air
piping flushing
Project: 5 Activity: WFITM8880 Underdrain DMF12 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8890 Underdrain DMF12 - Hydrotest
DN900
Project: 5 Activity: WFITM8900 Underdrain DMF12 - Scour air
piping pressure test
Project: 5 Activity: WFITM8910 Underdrain DMF12 - Install
scaffold roof
Project: 5 Activity: WFITM8920 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8930 Underdrain DMF12 - Modify
scaffold access
Project: 5 Activity: WFITM8940 Underdrain DMF12 - Clearing
works
Project: 5 Activity: WFITM8950 Underdrain DMF12 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8960 Underdrain DMF12 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8970 Underdrain DMF12 - Air header
pipe installation.
Project: 5 Activity: WFITM8980 Underdrain DMF12 - Air Header
pipe survey
Project: 5 Activity: WFITM8990 Underdrain DMF12 - Anchor rod
installation
Project: 5 Activity: WFITM9000 Underdrain DMF12 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9010 Underdrain DMF12 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9020 Underdrain DMF12 -
Installation of FRP Plates
Project: 5 Activity: WFITM9030 Underdrain DMF12 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9040 Underdrain DMF12 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9050 Underdrain DMF12 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9060 Underdrain DMF12 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9070 Underdrain DMF12 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9080 Underdrain DMF12 - WIR
Inspection
Project: 5 Activity: WFITS1050 Wall Tank Lining at grouted
Launders DMF11
Project: 5 Activity: WFITW1000 Wet Testing DMF Common
Channel
Project: 5 Activity: WFITW1010 Wet Testing DMF11
Project: 5 Activity: WFITW1020 Automation Testing DMF11
Project: 5 Activity: WFITW1030 Flushing & Cleaning - DMF11
Project: 5 Activity: WFITW1040 Filtration Trial Run to Waste
Project: 5 Activity: WFITW1050 Wet Testing DMF13
Project: 5 Activity: WFITW1060 Automation Testing DMF13
Project: 5 Activity: WFITW1070 Process Commissioning for DMF
13
Project: 5 Activity: WFITW1080 Wet Testing DMF15
Project: 5 Activity: WFITW1090 Automation Testing DMF15
Project: 5 Activity: WFITW1100 Process Commissioning for DMF
15
Project: 5 Activity: WFITW1110 Wet Testing DMF17
Project: 5 Activity: WFITW1120 Automation Testing DMF17
Project: 5 Activity: WFITW1130 Process Commissioning for
Sand Filter 17
Project: 5 Activity: WFITW1140 Wet Testing DMF2
Project: 5 Activity: WFITW1150 Automation Testing DMF2
Project: 5 Activity: WFITW1160 Process Commissioning for
Sand Filter 2
Project: 5 Activity: WFITW1170 Wet Testing DMF4
Project: 5 Activity: WFITW1180 Automation Testing DMF4
Project: 5 Activity: WFITW1190 Process Commissioning for
Sand Filter 4
Project: 5 Activity: WFITW1200 Wet Testing DMF6
Project: 5 Activity: WFITW1210 Automation Testing DMF6
Project: 5 Activity: WFITW1220 Process Commissioning for
Sand Filter 6
Project: 5 Activity: WFITW1230 Wet Testing DMF8
Project: 5 Activity: WFITW1240 Automation Testing DMF8
Project: 5 Activity: WFITW1250 Process Commissioning for
Sand Filter 8
Project: 5 Activity: WFITW1260 Wet Testing Filtered Water
Tank A
Project: 5 Activity: WFITW1270 Flushing & Cleaning Filtered
Water Tank A
Project: 5 Activity: WFITW1280 Water Refilling to Filtered
Water Tank A
Project: 5 Activity: WFLTA1020 Epoxy Floor Coating on
platforms - under first drop priority areas
Project: 5 Activity: WFLTA1040 Epoxy Floor Coating on
platforms - Balance areas
Project: 5 Activity: WFLTD1000 Dry Testing Flocculation Sed
Train 6 Sludge Line
Project: 5 Activity: WFLTD1010 Dry Testing Flocculation
Train 6
Project: 5 Activity: WFLTH1000 Walkthrough Flocculation Sed
Train 6 Sludge Line
Project: 5 Activity: WFLTH1010 PUNCHLIST CLOSEOUT
Flocculation Sed Train 6 Sludge Line
Project: 5 Activity: WFLTH1020 Construction Handover
Flocculation Sed Train 6 Sludge Line
Project: 5 Activity: WFLTH1030 Walkthrough Flocculation
Train 6
Project: 5 Activity: WFLTH1040 PUNCHLIST CLOSEOUT
Flocculation Train 6
Project: 5 Activity: WFLTH1050 Construction Handover
Flocculation Train 6
Project: 5 Activity: WFLTW1000 Wet Testing Flocculation Sed
Train 6 Sludge Line
Project: 5 Activity: WFLTW1010 Wet Testing Flocculation
Train 6
Project: 5 Activity: WFLTW1020 Automation Testing
Flocculation Train 6
Project: 5 Activity: WFLTW1030 Wet Testing Flocculation
Train 4
Project: 5 Activity: WFLTW1040 Automation Testing
Flocculation Train 4
Project: 5 Activity: WFPLM1010 Excavation Works
Project: 5 Activity: WFPLM1020 Installation for Pipe -
removed from p6
Project: 5 Activity: WFPLM1030 Welding Works - removed from
p6
Project: 5 Activity: WFPLM1040 Pipe Test - removed from p6
Project: 5 Activity: WIWCA1000 Install Guardrails - Rem.
bolts for Kick plates
Project: 5 Activity: WIWCA1020 Installation of portable
ladders
Project: 5 Activity: WIWCA1030 Fabrication of Cage at IW
Project: 5 Activity: WIWCA1050 Procurements of Railing
materials inc portable ladders and cage
Project: 5 Activity: WIWCA1060 Installation of Support for
portable ladders
Project: 5 Activity: WIWCA1070 Painting of Cage at IW
Project: 5 Activity: WIWCA1080 Installation of Cage at IW
Project: 5 Activity: WIWCA1090 WIR Inspection of Cage at IW
Project: 5 Activity: WIWCA1100 Fabrication of Portable
Supports
Project: 5 Activity: WIWCA1110 Painting of Portable Supports
Project: 5 Activity: WIWCA1120 WIR Inspection of Portable
Ladder Supports
Project: 5 Activity: WIWCA1130 Installation of Scaffolding
Supports for Cage at IW
Project: 5 Activity: WIWCD1000 Dry Testing Inlet Well Drain
Line
Project: 5 Activity: WIWCD1010 Dry Testing Inlet Well &
Cascade Mixer
Project: 5 Activity: WIWCD1020 Dry Testing Flocculation Tank
Distribution Chamber
Project: 5 Activity: WIWCE1020 Termination works
Project: 5 Activity: WIWCE1050 Termination works
Project: 5 Activity: WIWCH1000 Walkthrough Flocculation Tank
Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1010 PUNCHLIST CLOSEOUT
Flocculation Tank Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1020 Construction Handover
Flocculation Tank Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1030 Walkthrough Inlet Well Drain
Line
Project: 5 Activity: WIWCH1040 PUNCHLIST CLOSEOUT Inlet
Well Drain Line
Project: 5 Activity: WIWCH1050 Construction Handover Inlet
Well Drain Line
Project: 5 Activity: WIWCH1060 Walkthrough Inlet Well &
Cascade Mixer
Project: 5 Activity: WIWCH1070 PUNCHLIST CLOSEOUT Inlet Well
& Cascade Mixer
Project: 5 Activity: WIWCH1080 Construction Handover Inlet
Well & Cascade Mixer
Project: 5 Activity: WIWCH1090 Walkthrough Flocculation Tank
Distribution Chamber
Project: 5 Activity: WIWCH1100 PUNCHLIST CLOSEOUT
Flocculation Tank Distribution Chamber
Project: 5 Activity: WIWCH1110 Construction Handover
Flocculation Tank Distribution Chamber
Project: 5 Activity: WIWCI1010 Installation of Instruments -
Chlorine Analyzer (Immersion type)
Project: 5 Activity: WIWCM1000 Installation of Chemical
Lines - ALUM (done)
Project: 5 Activity: WIWCM1010 Procurement of Chemical
Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1020 The drilling of perforated
holes for Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1030 Installation for Chemical
Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1040 WIR Inspection for
Installation of Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1050 Hydrotest Prep, Filling and
Flushing of Chemical Lines- ALUM
Project: 5 Activity: WIWCM1120 Walkthrough prior for
hydrotesting (ALUM) - AAII and VCCI
Project: 5 Activity: WIWCM1170 Procurement of Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1180 The drilling of perforated
holes for Chemical Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1190 Installation for Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1200 WIR Inspection for Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1270 Hydrotest of Chemical Lines-
ALUM
Project: 5 Activity: WIWCM1280 Pipe Reinstatement after
Hydrotest of Chemical Lines- ALUM
Project: 5 Activity: WIWCW1000 Wet Testing Inlet Well Drain
Line
Project: 5 Activity: WIWCW1010 Wet Testing Inlet Well &
Cascade Mixer
Project: 5 Activity: WIWCW1020 Wet Testing Flocculation Tank
Distribution Chamber
Project: 5 Activity: WMCCA1010 Install Doors - by LEC Steel
- MCC1
Project: 5 Activity: WMCCA1030 Install Louvers - MCC1
Project: 5 Activity: WMCCD1000 Dry Testing - MCC1
Project: 5 Activity: WMCCE1040 Termination works - MCC1
(awaiting Panel Board for Lightings and small power))
Project: 5 Activity: WMCCH1000 Walkthrough - MCC1
Project: 5 Activity: WMCCH1010 PUNCHLIST CLOSEOUT - MCC1
Project: 5 Activity: WMCCH1020 Construction Handover - MCC1
Project: 5 Activity: WMCCW1000 AutomationTesting - MCC1
Project: 5 Activity: WMVTE1000 Oil Separator Box (design
dependent)
Project: 5 Activity: WMVTE1010 Termination Works (waiting
for approval XLPE cables)
Project: 5 Activity: WSDBA1000 Masonry Works
Project: 5 Activity: WSDBA1060 Interior Wall Finishes
Project: 5 Activity: WSDBD1000 Dry Testing
Project: 5 Activity: WSDBD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WSDBE1010 Installation of grounding
system
Project: 5 Activity: WSDBE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSDBE1030 Cable pulling
Project: 5 Activity: WSDBE1070 Termination works
Project: 5 Activity: WSDBH1000 Walkthrough
Project: 5 Activity: WSDBH1010 PUCNHLIST CLOSEOUT
Project: 5 Activity: WSDBH1020 Construction Handover
Project: 5 Activity: WSDBI1000 Installation of instruments
Project: 5 Activity: WSDBM1050 Dewatered Sludge Screw Pump
Project: 5 Activity: WSDBM1070 Sludge Hopper
Project: 5 Activity: WSDBM1080 Hopper Sluice Gates (600x600)
Project: 5 Activity: WSDBM1090 Cationic Plymer Prep Unit
Project: 5 Activity: WSDBM1100 Dosing Pumps
Project: 5 Activity: WSDBM1110 Calibration Column
Project: 5 Activity: WSDBM1120 Pulsation Damper
Project: 5 Activity: WSDBM1130 Pressure Relief Valve
Project: 5 Activity: WSDBS1000 Structural Concrete Works
Project: 5 Activity: WSDBW1000 Wett Testing - SDB
Project: 5 Activity: WSDBW1010 Client Approval for Process
Commissioning
Project: 5 Activity: WSDBW1020 Process Commissioning Sludge
Dewatering System
Project: 5 Activity: WSDLC1000 Backfilling MH3-1A to MH B-1
Project: 5 Activity: WSDLD1000 Dry Testing - SLL to Drain
Line
Project: 5 Activity: WSDLH1000 Walkthrough - SLL to Drain
Line
Project: 5 Activity: WSDLH1010 Punchlist Close-out - SLL to
Drain Line
Project: 5 Activity: WSDLH1020 Construction Handover - SLL
to Drain Line
Project: 5 Activity: WSDLS1010 CSDN1000 MH B-1 to MH001
Project: 5 Activity: WSDLS1020 MH001
Project: 5 Activity: WSDLS1030 MH B-1
Project: 5 Activity: WSDLS1040 RCP to MH-B-1
Project: 5 Activity: WSETA1010 Installation of Self Closing
gate- 1st Priority 4, 5, 6
Project: 5 Activity: WSETA1020 Floor Coating at Concrete
Platform - 1st Priority
Project: 5 Activity: WSETA1030 Top Coat for Railings - 1st
Priority 4, 5, 6
Project: 5 Activity: WSETD1000 Dry Testing Settling Train 6
Project: 5 Activity: WSETE1010 Termination works Tank 6
Project: 5 Activity: WSETH1000 Walkthrough Settling Train 6
Project: 5 Activity: WSETH1010 PUNCHLIST CLOSEOUT Settling
Train 6
Project: 5 Activity: WSETH1020 Construction Handover
Settling Train 6
Project: 5 Activity: WSETI1060 Instrumentation NTU Train 6 &
Common Channel (Waiting housing)
Project: 5 Activity: WSETM2870 Installation of Sludge
Extraction Unit Tank 6
Project: 5 Activity: WSETM2880 Procurement of Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2890 Installation of Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2900 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2960 Installation of the Launders
at Settling Tank 6
Project: 5 Activity: WSETM3920 Final Fixing of Sludge
Extraction Unit Tank 6
Project: 5 Activity: WSETW1000 Wet Testing Settling Train 6
Project: 5 Activity: WSETW1010 Automation Testing Settling
Train 6
Project: 5 Activity: WSETW1020 Wet Testing Settling Train 4
Project: 5 Activity: WSETW1030 Automation Testing Settling
Train 4
Project: 5 Activity: WSIDC5100 Soil backfilling - Telemetry
Project: 5 Activity: WSIDC5110 Levelling, trimming, and
compacting of Soil - Telemetry
Project: 5 Activity: WSIDC5510 Levelling, trimming, and
compacting - Between TWR & DMF
Project: 5 Activity: WSIDC8000 Sand backfilling - Between
TWR & Pond2
Project: 5 Activity: WSIDC8100 Levelling, trimming, and
compacting of sand - Between TWR & Pond2
Project: 5 Activity: WSIDC9000 Site Drainage Works
Project: 5 Activity: WSIDC9200 Roads & Paving
Project: 5 Activity: WSLLD1000 Dry Testing Sludge Lagoon
Project: 5 Activity: WSLLE1010 Cable pulling
Project: 5 Activity: WSLLE1020 Termination works
Project: 5 Activity: WSLLH1000 Walkthrough Sludge Lagoon
Project: 5 Activity: WSLLH1010 PUNCHLIST CLOSEOUT Sludge
Lagoon
Project: 5 Activity: WSLLH1020 Construction Handover Sludge
Lagoon
Project: 5 Activity: WSLLS1000 Application of Sealant for
Construction Joints (WAITING Sika primer)
Project: 5 Activity: WSLLS1020 Install Railings
Project: 5 Activity: WSLPD1000 Dry Testing
Project: 5 Activity: WSLPH1000 Walkthrough
Project: 5 Activity: WSLPH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WSLPH1020 Construction Handover
Project: 5 Activity: WSLPM1000 Sludge Pit Inlet Sluice Gate
Project: 5 Activity: WSLPM1010 DN250 PIPE
Project: 5 Activity: WSLPM1020 Sludge Pit Connecting Sluice
Gate
Project: 5 Activity: WSLPM1030 Submerge Sludge Pumps
Project: 5 Activity: WSLPM1040 DN250 X 100 Ecc Red.
Project: 5 Activity: WSLPM1050 Sludge Pit Submersible Mixers
Project: 5 Activity: WSLPM1060 DN250 90° Elbow
Project: 5 Activity: WSLPM1070 DN250 NRV
Project: 5 Activity: WSLPM1080 DN250 Valve
Project: 5 Activity: WSLPS1000 Excavation & Lean Concrete
Project: 5 Activity: WSLPS1010 Concrete Works
Project: 5 Activity: WSLPS1020 Install Miscellaneous Steel
(MH Cover, Railings, etc)
Project: 5 Activity: WSLPW1000 Wett Testing - SLP
Project: 5 Activity: WSLPW1010 Process Commissioning Sludge
PIt A/B
Project: 5 Activity: WSPPC1170 Backfilling MH804B to MH800
Project: 5 Activity: WSPPD1000 Dry Testing MOV (2) ,
Motorized Gates (2) Sludge Line
Project: 5 Activity: WSPPH1000 Walkthrough Sludge Line
Project: 5 Activity: WSPPH1010 Construction Handover Sludge
Line
Project: 5 Activity: WSPPH1020 PUNCHLIST CLOSEOUT Sludge
Line
Project: 5 Activity: WSPPM1000 Install Sluice Gate - MH804A
& MH806A
Project: 5 Activity: WSPPM1010 Install Sluice Gate - MH806
Project: 5 Activity: WSPPW1000 Wet Testing Sludge Line
Project: 5 Activity: WSTFD1000 Dry Testing - STT
Project: 5 Activity: WSTFH1000 Walkthrough - STT
Project: 5 Activity: WSTFH1010 PUNCHLIST CLOSEOUT - STT
Project: 5 Activity: WSTFH1020 Construction Handover - STT
Project: 5 Activity: WSTFM1000 Thickener Feed Tank Inlet
Sluice Gate
Project: 5 Activity: WSTFM1010 Thickener Feed Tank
Connecting Sluice Gate
Project: 5 Activity: WSTFM1020 DN350 PIPE Installation
including Butterfly and check valves
Project: 5 Activity: WSTFM1030 Installation of Submerge
Sludge Pumps
Project: 5 Activity: WSTFM1040 Pipe Reducer - Remove from
p6 program
Project: 5 Activity: WSTFM1050 DN350 Equal Tee - - Remove
from p6 program
Project: 5 Activity: WSTFM1060 Installation of Submerge
Sludge Mixers
Project: 5 Activity: WSTFM1070 Installation for Geo Tubes -
AAII to advise
Project: 5 Activity: WSTFM1080 DN350 90* Elbow - Remove
from p6 program
Project: 5 Activity: WSTFM1090 DN350 45*Elbow - Remove from
p6 program
Project: 5 Activity: WSTFM1100 DN350 Butterfly Valve -
Remove from p6 program
Project: 5 Activity: WSTFM1110 DN350 Check Valve - Remove
from p6 program
Project: 5 Activity: WSTFM1120 Internal Testing - Remove
from p6 program
Project: 5 Activity: WSTFS1020 Tank Lining Feed Tank 1 & 2
Project: 5 Activity: WSTFS1030 Install Miscellaneous Steel
(Manhole Covers, Handrails, etc.)
Project: 5 Activity: WSTFW1000 Wet Testing - STT
Project: 5 Activity: WSUBD1000 Dry Testing - SUBST
Project: 5 Activity: WSUBH1000 Walkthrough - SUBST
Project: 5 Activity: WSUBH1010 Punchlist Close-out - SUBST
Project: 5 Activity: WSUBH1020 Construction Handover - SUBST
Project: 5 Activity: WSUBW1000 AutomationTesting - SUBST
Project: 5 Activity: WSWLM1060 Procurement of the Pipe
Materials including delivery
Project: 5 Activity: WSWLM1090 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1110 Installation of Pipes
Project: 5 Activity: WSWLM1120 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1170 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1200 Excavation for Pipes -
Section 2 CIVIL TEAM
Project: 5 Activity: WSWLM1210 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1220 Installation of Pipes
Project: 5 Activity: WSWLM1230 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1240 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1250 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1320 Excavation for Pipes -
Section 3 CIVIL TEAM
Project: 5 Activity: WSWLM1330 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1340 Installation of Pipes
Project: 5 Activity: WSWLM1350 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1360 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1370 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1430 Excavation for Pipes -
Section 4 CIVIL TEAM
Project: 5 Activity: WSWLM1440 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1450 Installation of Pipes
Project: 5 Activity: WSWLM1460 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1470 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1480 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1490 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1500 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1510 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1520 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWPA1010 Ceiling Finishes
Project: 5 Activity: WSWPA1020 Interior Wall Finishes
Project: 5 Activity: WSWPD1000 Dry Testing - SWPR
Project: 5 Activity: WSWPE1000 Installation of MCC-8 Panel
Project: 5 Activity: WSWPE1010 Cable pulling
Project: 5 Activity: WSWPE1040 Installation of PLC Panels
Project: 5 Activity: WSWPH1000 Walkthrough - SWPR
Project: 5 Activity: WSWPH1010 PUNCHLIST CLOSEOUT - SWPR
Project: 5 Activity: WSWPH1020 Construction Handover - SWPR
Project: 5 Activity: WSWPI1000 Installation of instruments
Project: 5 Activity: WSWPI1010 Install CCTV
Project: 5 Activity: WSWPI1020 Install FDAS
Project: 5 Activity: WSWPM1000 Install Exhaust Fans
Project: 5 Activity: WSWPM1010 Install Monorail Crane -
DEMAG
Project: 5 Activity: WSWPM1020 Install Fire Dampers
Project: 5 Activity: WSWPM1040 Piping Works - REMOVE FROM P6
PROGRAM
Project: 5 Activity: WSWPM1050 Installation of Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPW1000 WetTesting - SWPR
Project: 5 Activity: WTA1D1000 Dry Testing
Project: 5 Activity: WTA1H1000 Walkthrough - TWR to
Alignment 1
Project: 5 Activity: WTA1H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WTA1H1020 Construction Handover
Project: 5 Activity: WTA1I1000 Installation of Junction Box
Project: 5 Activity: WTA1I1010 Installation of Instruments
Project: 5 Activity: WTA1I1020 Cable Pullling at EHH Lines
and Terminations
Project: 5 Activity: WTA1M1010 Reinstatement of Piping after
Hydrotest & Installation of Valves and Flowmeter - Not included in Schedule
Project: 5 Activity: WTA1M1020 Modification of Fire Suction
Line
Project: 5 Activity: WTA1S1010 Backfilling Works part 2 -
TWR to drain (Portion of sand; The rest are soil)
Project: 5 Activity: WTA1W1000 Flushing & Cleaning - TWR to
Alignment 1
Project: 5 Activity: WTELD1000 Dry Testing - 30M TOWER
Project: 5 Activity: WTELD1010 Client Approval for Equipment
Commissioning - 30M TOWER
Project: 5 Activity: WTELE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision and Telemetry Tower - 30M TOWER
Project: 5 Activity: WTELE1010 Installation of grounding
system - 30M TOWER
Project: 5 Activity: WTELE1020 Installation of Panel - 30M
TOWER
Project: 5 Activity: WTELE1030 Installation of radio antenna
- 30M TOWER
Project: 5 Activity: WTELE1040 Cable pulling and termination
works - 30M TOWER
Project: 5 Activity: WTELH1000 Walkthrough - 30M TOWER
Project: 5 Activity: WTELH1010 PUNCHLIST CLOSEOUT - 30M
TOWER
Project: 5 Activity: WTELH1020 Construction Handover - 30M
TOWER
Project: 5 Activity: WTELS1020 Tower erection - 30M TOWER
Project: 5 Activity: WTELW1000 Wett Testing - 30M TOWER
Project: 5 Activity: WTELW1010 Automation Testing - 30M
TOWER
Project: 5 Activity: WTIPC1010 Backfilling & Compaction -
Chamber 11 to 13
Project: 5 Activity: WTIPD1000 Dry Testing Inlet Pipe
Assembly
Project: 5 Activity: WTIPH1000 Walkthrough Inlet Pipe
Assembly
Project: 5 Activity: WTIPH1010 PUNCHLIST CLOSEOUT Inlet Pipe
Assembly
Project: 5 Activity: WTIPH1020 Construction Handover Inlet
Pipe Assembly
Project: 5 Activity: WTIPI1000 At Header Tank: Install of
instrument junction box (300-GB-010)
Project: 5 Activity: WTIPI1010 At Header Tank: Installation
of Instruments at Chamber11
Project: 5 Activity: WTIPM1000 Installation of Valves and DJ
(DN1600; DN1400) (Chamber 11,12,13,14,15)
Project: 5 Activity: WTIPM1010 Procurement for setting bolts
Project: 5 Activity: WTIPM1020 Installation for setting
bolts at Chamber 11
Project: 5 Activity: WTIPM1030 Installation for setting
bolts at Chamber 12
Project: 5 Activity: WTIPM1040 Installation for setting
bolts at Chamber 13
Project: 5 Activity: WTIPM1050 Installation for setting
bolts at Chamber 14
Project: 5 Activity: WTIPM1060 Installation for setting
bolts at Chamber 15
Project: 5 Activity: WTIPM1070 Internal Inspection inside
the Pipes
Project: 5 Activity: WTIPM1080 Internal Painting of the
Pipes - Rectification
Project: 5 Activity: WTIPM1090 Final Inspection inside the
Pipes - WITCO, AAII & VCCI
Project: 5 Activity: WTIPM1100 Bolt torquing at Chamber 11
Project: 5 Activity: WTIPM1110 Bolt torquing at Chamber 12
Project: 5 Activity: WTIPM1120 Bolt torquing at Chamber 13
Project: 5 Activity: WTIPM1130 Bolt torquing at Chamber 14
Project: 5 Activity: WTIPM1140 Bolt torquing at Chamber 15
Project: 5 Activity: WTIPM1350 WIR Inspection for Bolt
torquing at Chamber 11 to 15
Project: 5 Activity: WTIPW1000 Wet Testing Inlet Pipe
Assembly
Project: 5 Activity: WTWRA1000 Procurement of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRD1000 Dry testing Tanks 1 & 3
Project: 5 Activity: WTWRE1000 Termination works - Tank1&3
Project: 5 Activity: WTWRH1000 Walkthrough Tanks 1 & 3
Project: 5 Activity: WTWRH1010 PUNCHLIST CLOSEOUT Tanks 1 &
3
Project: 5 Activity: WTWRH1020 Construction Handover Tanks 1
& 3
Project: 5 Activity: WTWRI1010 Installation of instruments -
Tank1&3
Project: 5 Activity: WTWRM1010 Installation of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1030 Procurement of Materials for
Chlorine Chemical Piping and Supports - TWR
Project: 5 Activity: WTWRM1040 Fabrication of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1050 Installation of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1190 WIR Inspection of Chlorine
Chemical Piping Supports - TWR
Project: 5 Activity: WTWRS1070 Tank Lining TWR Tank 3
Project: 5 Activity: WTWRS1080 Tank Lining TWR Tank 1
Project: 5 Activity: WTWRS1100 Curing and Pull-off test at
Backwash Tank 1 and 2 (Filtered Water Tank A/B)
Project: 5 Activity: WTWRS1110 Crack Repair of Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRS1120 Disinfection TWR Tank1&3
Project: 5 Activity: WTWRS1130 Floor Coating at Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRW1000 Wet Testing Tanks 1 & 3
Project: 5 Activity: WTWRW1020 Flushing & Cleaning Tank 1 &
3 TWR

Activities with unsatisfied constraints..........................27


Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1020 FIRST POWER USING DLPC LINE
Project: 5 Activity: KMSTX1030 1ST DROP AT TUGBOK OTP
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1050 FULL MLD
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION
Project: 5 Activity: OTALM1020 Install Chlorine Package
System
Project: 5 Activity: WADBA1020 Ceiling Works 2nd Priority
Project: 5 Activity: WADBE1010 Termination works - remaining
ACS & comm. cables
Project: 5 Activity: WADBE1020 Firestop Sealant for Conduit
penetrations for Ceiling
Project: 5 Activity: WELBA1040 Wall Finishes (External) -
ELB
Project: 5 Activity: WELBM1020 Install ACCU unit - Inside
(Done)
Project: 5 Activity: WFITE1070 Termination works Tanks 10,
12, 14, 16, 18 - remaining Instruments
Project: 5 Activity: WSDLS1010 CSDN1000 MH B-1 to MH001
Project: 5 Activity: WSETM3550 Hauling of Lamella Support
Installation Tank 2
Project: 5 Activity: WSLLS1020 Install Railings
Project: 5 Activity: WSLLS1080 Install Gates
Project: 5 Activity: WTWRA1000 Procurement of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1090 Painting of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1100 Fabrication of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1110 Install Railings at Perimeter
Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1120 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1210 Painting of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1220 Fabrication of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1230 Install Railings at Perimeter
Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1240 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRI1010 Installation of instruments -
Tank1&3

Activities with unsatisfied relationships........................0

Activities with external dates...................................5


Project: 5 Activity: KMSTX1000 WATER RE-DIVERTED TO WEIR
Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1050 FULL MLD
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION

Activities that are not on any float paths.......................5245


Project: 5 Activity: A10820 Snagging & Cleaning
Project: 5 Activity: A13490 Snagging & Cleaning
Project: 5 Activity: A13530 Snagging & Cleaning
Project: 5 Activity: A18430 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18460 NDT and painting works
Project: 5 Activity: A18470 Installation of Gate Valve
and STC
Project: 5 Activity: A18480 Clearing and Dewatering
Project: 5 Activity: A18484 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18488 NDT and painting works
Project: 5 Activity: A18510 Installation of Gate Valve
and STC
Project: 5 Activity: A18520 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18530 Clearing and Dewatering
Project: 5 Activity: A18540 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18550 NDT and painting works
Project: 5 Activity: A18560 Installation of Gate Valve
and STC
Project: 5 Activity: A18570 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18580 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18610 NDT and painting works
Project: 5 Activity: A18620 Installation of Gate Valve
and STC
Project: 5 Activity: A18630 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18660 NDT and painting works
Project: 5 Activity: A18670 Installation of Gate Valve
and STC
Project: 5 Activity: A18680 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18710 NDT and painting works
Project: 5 Activity: A18715 Installation of Gate Valve
and STC
Project: 5 Activity: A18720 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18730 Clearing and Dewatering
Project: 5 Activity: A18740 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18750 NDT and painting works
Project: 5 Activity: A18760 Installation of Gate Valve
and STC
Project: 5 Activity: A18770 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18780 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18810 NDT and painting works
Project: 5 Activity: A18820 Installation of Gate Valve
and STC
Project: 5 Activity: A18830 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18860 NDT and painting works
Project: 5 Activity: A18870 Installation of Gate Valve
and STC
Project: 5 Activity: A18880 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18910 NDT and painting works
Project: 5 Activity: A18915 Installation of Gate Valve
and STC
Project: 5 Activity: A18920 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18930 Clearing and Dewatering
Project: 5 Activity: A18940 Fit-up and full welding of
riser pipe
Project: 5 Activity: A18950 NDT and painting works
Project: 5 Activity: A18960 Installation of Gate Valve
and STC
Project: 5 Activity: A18970 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A18980 Fit-up and full welding of
riser pipe
Project: 5 Activity: A19010 NDT and painting works
Project: 5 Activity: A19020 NDT and painting works
Project: 5 Activity: A19030 Clearing and Dewatering
Project: 5 Activity: A19040 Fit-up and full welding of
riser pipe
Project: 5 Activity: A19050 NDT and painting works
Project: 5 Activity: A19060 Installation of Gate Valve
and STC
Project: 5 Activity: A19070 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A1CS1010 Removal of Sheet Pile
Project: 5 Activity: A1CS1020 Excavation
Project: 5 Activity: A1CS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A1CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A1CS1050 Pipe Support
Project: 5 Activity: A1CS1060 Concrete Cover
Project: 5 Activity: A1CS1070 Backfilling
Project: 5 Activity: A1CS1080 Sheet Pile Removal
Project: 5 Activity: A1CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A1CS1110 Disposal of Excess Materials
Project: 5 Activity: A1CS1120 Scaffolding Works
Project: 5 Activity: A1CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A21480 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21485 Clearing and Dewatering
Project: 5 Activity: A21490 Fit-up and full welding of
riser pipe
Project: 5 Activity: A21500 NDT and painting works
Project: 5 Activity: A21510 Installation of Gate Valve
and STC
Project: 5 Activity: A21520 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21530 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21540 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21550 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21560 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A21570 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: A2C1530 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1540 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1550 Fabrication of forms
Project: 5 Activity: A2C1560 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1570 Pouring of concrete saddle
support
Project: 5 Activity: A2C1580 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1590 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1600 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1610 Fabrication of forms
Project: 5 Activity: A2C1620 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1630 Pouring of concrete saddle
support
Project: 5 Activity: A2C1640 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1650 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1660 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1670 Fabrication of forms
Project: 5 Activity: A2C1680 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1690 Pouring of concrete saddle
support
Project: 5 Activity: A2C1700 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1710 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1720 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1730 Fabrication of forms
Project: 5 Activity: A2C1740 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1750 Pouring of concrete saddle
support
Project: 5 Activity: A2C1760 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C1770 Fabrication of angle bar for
edging
Project: 5 Activity: A2C1780 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A2C1790 Fabrication of forms
Project: 5 Activity: A2C1800 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A2C1810 Pouring of concrete saddle
support
Project: 5 Activity: A2C1820 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A2C2310 Trench excavation
Project: 5 Activity: A2C2320 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A2C2330 Pouring of lean concrete
pouring
Project: 5 Activity: A2C2340 Installation of reinforcing
bars
Project: 5 Activity: A2C2350 Installation of forms
Project: 5 Activity: A2C2360 Concrete pouring
Project: 5 Activity: A2C2430 Trench excavation
Project: 5 Activity: A2C2440 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A2C2450 Pouring of lean concrete
pouring
Project: 5 Activity: A2C2460 Installation of reinforcing
bars
Project: 5 Activity: A2C2470 Installation of forms
Project: 5 Activity: A2C2480 Concrete pouring
Project: 5 Activity: A2CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A2CS1010 Installation Sheet Pile
Project: 5 Activity: A2CS1020 Excavation
Project: 5 Activity: A2CS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A2CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A2CS1050 Pipe Support
Project: 5 Activity: A2CS1060 Concrete Cover
Project: 5 Activity: A2CS1070 Backfilling
Project: 5 Activity: A2CS1080 Sheet Pile Removal
Project: 5 Activity: A2CS1090 Riser Pipes
Project: 5 Activity: A2CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A2CS1110 Disposal of Excess Materials
Project: 5 Activity: A2CS1120 Scaffolding Works
Project: 5 Activity: A2CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A2CS1140 Complete remaining hydro
testing
Project: 5 Activity: A3C1000 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1010 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1020 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1030 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A3C1040 Pouring of last lift chamber
wall
Project: 5 Activity: A3C1050 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1060 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1070 Fabrication of forms
Project: 5 Activity: A3C1080 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C1090 Pouring of concrete saddle
support
Project: 5 Activity: A3C1100 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A3C1110 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1120 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1130 Fabrication of forms
Project: 5 Activity: A3C1140 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C1150 Pouring of concrete saddle
support
Project: 5 Activity: A3C1160 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1170 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1180 Fabrication of forms
Project: 5 Activity: A3C1190 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C1200 Fabrication of angle bar for
edging
Project: 5 Activity: A3C1210 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1220 Fabrication of forms
Project: 5 Activity: A3C1230 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C1240 Pouring of concrete saddle
support
Project: 5 Activity: A3C1250 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A3C1260 Clearing of surface
Project: 5 Activity: A3C1270 Installation of masonry
riprap
Project: 5 Activity: A3C1280 Installation of weep holes
Project: 5 Activity: A3C1290 Riprap surface plastering
works
Project: 5 Activity: A3C1480 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A3C1490 Fabrication of forms
Project: 5 Activity: A3C1500 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A3C1510 Pouring of concrete saddle
support
Project: 5 Activity: A3C1520 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A3C1890 Trench excavation
Project: 5 Activity: A3C1900 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A3C1910 Pouring of lean concrete
pouring
Project: 5 Activity: A3C1920 Installation of reinforcing
bars
Project: 5 Activity: A3C1930 Installation of forms
Project: 5 Activity: A3C1940 Concrete pouring
Project: 5 Activity: A3C1950 Trench excavation
Project: 5 Activity: A3C1960 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A3C1970 Pouring of lean concrete
pouring
Project: 5 Activity: A3C1980 Installation of reinforcing
bars
Project: 5 Activity: A3C1990 Installation of forms
Project: 5 Activity: A3C2000 Concrete pouring
Project: 5 Activity: A3C2670 Trench excavation
Project: 5 Activity: A3C2680 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A3C2690 Pouring of lean concrete
pouring
Project: 5 Activity: A3C2700 Installation of reinforcing
bars
Project: 5 Activity: A3C2710 Installation of forms
Project: 5 Activity: A3C2720 Concrete pouring
Project: 5 Activity: A3C2730 Trench excavation
Project: 5 Activity: A3C2740 Compaction of base in
preparation for lean concrete pouring
Project: 5 Activity: A3C2750 Pouring of lean concrete
pouring
Project: 5 Activity: A3C2760 Installation of reinforcing
bars
Project: 5 Activity: A3C2770 Installation of forms
Project: 5 Activity: A3C2780 Concrete pouring
Project: 5 Activity: A3CS1000 25mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A3CS1010 Installation Sheet Pile
Project: 5 Activity: A3CS1020 Excavation
Project: 5 Activity: A3CS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A3CS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A3CS1050 Pipe Support
Project: 5 Activity: A3CS1060 Concrete Cover
Project: 5 Activity: A3CS1070 Backfilling
Project: 5 Activity: A3CS1080 Sheet Pile Removal
Project: 5 Activity: A3CS1090 Riser Pipes
Project: 5 Activity: A3CS1100 Sandfilling @ Pipezone
Project: 5 Activity: A3CS1110 Disposal of Excess Materials
Project: 5 Activity: A3CS1120 Scaffolding Works
Project: 5 Activity: A3CS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A3CS1140 Complete remaining hydro
testing
Project: 5 Activity: A4AC1000 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1010 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1020 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A4AC1030 Fabrication of forms
Project: 5 Activity: A4AC1040 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1050 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1060 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4AC1070 Lean concrete pouring
Project: 5 Activity: A4AC1080 Installation of rebar for
slab and wall
Project: 5 Activity: A4AC1090 Concrete pouring of slab
Project: 5 Activity: A4AC1100 Installation of forms and
supports
Project: 5 Activity: A4AC1110 Concrete pouring for walls
Project: 5 Activity: A4AC1120 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1130 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A4AC1140 Fabrication of forms
Project: 5 Activity: A4AC1150 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1160 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1170 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4AC1180 Completion of rebar
installation for wall
Project: 5 Activity: A4AC1190 Installation of forms and
supports
Project: 5 Activity: A4AC1200 Concrete pouring for walls
Project: 5 Activity: A4AC1210 Fabrication of angle bar for
edging
Project: 5 Activity: A4AC1220 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1230 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1240 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4AC1260 Completion of rebar
Installation.
Project: 5 Activity: A4AC1270 Installation of forms and
support
Project: 5 Activity: A4AC1280 Concrete pouring
Project: 5 Activity: A4AC1290 Backfilling works
Project: 5 Activity: A4AC1300 Installation of reinforcing
bars for concrete cover
Project: 5 Activity: A4AC1310 Fabrication of forms
Project: 5 Activity: A4AC1320 Pouring of concrete cover
(4000psi)
Project: 5 Activity: A4AC1330 Pouring of concrete saddle
support
Project: 5 Activity: A4AC1340 Backfilling works on open
trench around the isolation chamber
Project: 5 Activity: A4ACS1000 250mmthk Concrete Pavement /
Breaking Concrete
Project: 5 Activity: A4ACS1010 Installation Sheet Pile
Project: 5 Activity: A4ACS1020 Excavation
Project: 5 Activity: A4ACS1030 Clearing/Disposal of Excess
Materials
Project: 5 Activity: A4ACS1040 Sandfilling Works on Pipe
Zone
Project: 5 Activity: A4ACS1050 Pipe Support
Project: 5 Activity: A4ACS1060 Concrete Cover
Project: 5 Activity: A4ACS1070 Backfilling
Project: 5 Activity: A4ACS1080 Sheet Pile Removal
Project: 5 Activity: A4ACS1090 Riser Pipes
Project: 5 Activity: A4ACS1100 Sandfilling @ Pipezone
Project: 5 Activity: A4ACS1110 Disposal of Excess Materials
Project: 5 Activity: A4ACS1120 Scaffolding Works
Project: 5 Activity: A4ACS1130 Allow for the dewatering of
work areas
Project: 5 Activity: A4ACS1140 Complete remaining hydro
testing
Project: 5 Activity: A4ACS1150 JUNCTIOM CHAMBER at Sta.
0+035 Concreting of Pipe Support
Project: 5 Activity: A4ACS1160 Blow Off Valve (BOV) at
Sta.0+035 Excavation
Project: 5 Activity: A4ACS1180 Combination Air Valve (CAV)
at Sta.0+035 Excavation
Project: 5 Activity: A4ACS1190 Blow Off Valve (BOV) at
Sta.0+059 Excavation
Project: 5 Activity: A4ACS1200 Combination Air Valve (CAV)
at Sta.0+065 Excavation
Project: 5 Activity: A4ACS1210 Blow Off Valve (BOV) at
Sta.1+987 Excavation
Project: 5 Activity: A4ACS1220 ISOLATION CHAMBER at Sta.
2+015 Concreting of Pipe Support
Project: 5 Activity: A4ACS1230 Blow Off Valve (BOV) at
Sta.2+397 Excavation
Project: 5 Activity: A4ACS1240 Blow Off Valve (BOV) at
Sta.2+699 Excavation
Project: 5 Activity: A4ACS1250 Blow Off Valve (BOV) at
Sta.2+850 Excavation
Project: 5 Activity: A4ACS1260 Blow Off Valve (BOV) at
Sta.3+588 Excavation
Project: 5 Activity: A4ACS1270 Blow Off Valve (BOV) at
Sta.3+954 Excavation
Project: 5 Activity: A4ACS1280 ISOLATION CHAMBER at Sta.
4+015 Concreting of Pipe Support
Project: 5 Activity: A4ACS1290 Combination Air Valve (CAV)
at Sta.4+015 Excavation
Project: 5 Activity: A4ACS1300 Blow Off Valve (BOV) at
Sta.4+015 Excavation
Project: 5 Activity: A4ACS1310 Blow Off Valve (BOV) at
Sta.4+220 Excavation
Project: 5 Activity: A4ACS1320 Combination Air Valve (CAV)
at Sta.4+225 Excavation
Project: 5 Activity: A4ACS1330 Blow Off Valve (BOV) at
Sta.4+422 Excavation
Project: 5 Activity: A4ACS1340 Blow Off Valve (BOV) at
Sta.4+804 Excavation
Project: 5 Activity: A4ACS1350 Blow Off Valve (BOV) at
Sta.5+106 Excavation
Project: 5 Activity: A4ACS1360 Combination Air Valve (CAV)
at Sta.5+208 Excavation
Project: 5 Activity: A4ACS1370 Blow Off Valve (BOV) at
Sta.5+828 Excavation
Project: 5 Activity: A4ACS1380 Combination Air Valve (CAV)
at Sta.5+835 Excavation
Project: 5 Activity: A4ACS1390 ISOLATION CHAMBER at Sta.
6+015 Concreting of Pipe Support
Project: 5 Activity: A4ACS1400 Combination Air Valve (CAV)
at Sta.6+015 Excavation
Project: 5 Activity: A4ACS1410 Blow Off Valve (BOV) at
Sta.6+236 Excavation
Project: 5 Activity: A4ACS1420 Combination Air Valve (CAV)
at Sta.6+244 Excavation
Project: 5 Activity: A4ACS1430 Blow Off Valve (BOV) at
Sta.6+428 Excavation
Project: 5 Activity: A4ACS1440 Combination Air Valve (CAV)
at Sta.6+430 Excavation
Project: 5 Activity: A4ACS1450 Blow Off Valve (BOV) at
Sta.6+739 Excavation
Project: 5 Activity: A4ACS1460 Combination Air Valve (CAV)
at Sta.6+765 Excavation
Project: 5 Activity: A4ACS1470 Blow Off Valve (BOV) at
Sta.7+136 Excavation
Project: 5 Activity: A4ACS1480 Combination Air Valve (CAV)
at Sta.7+144 Excavation
Project: 5 Activity: A4ACS1490 Blow Off Valve (BOV) at
Sta.7+259 Excavation
Project: 5 Activity: A4ACS1500 Combination Air Valve (CAV)
at Sta.7+260 Excavation
Project: 5 Activity: A4ACS1510 Blow Off Valve (BOV) at
Sta.7+475 Excavation
Project: 5 Activity: A4ACS1520 Blow Off Valve (BOV) at
Sta.7+815 Excavation
Project: 5 Activity: A4ACS1530 ISOLATION CHAMBER at Sta.
8+015 Concreting of Pipe
Project: 5 Activity: A4ACS1540 Combination Air Valve (CAV)
at Sta.8+015 Excavation
Project: 5 Activity: A4ACS1550 Blow Off Valve (BOV) at
Sta.8+015 Excavation
Project: 5 Activity: A4ACS1560 Blow Off Valve (BOV) at
Sta.8+280 Excavation
Project: 5 Activity: A4ACS1570 Combination Air Valve (CAV)
at Sta.8+272 Excavation
Project: 5 Activity: A4ACS1580 Blow Off Valve (BOV) at
Sta.8+966 Excavation
Project: 5 Activity: A4ACS1590 Combination Air Valve (CAV)
at Sta.8+990 Excavation
Project: 5 Activity: A4ACS1600 Blow Off Valve (BOV) at
Sta.9+030 Excavation
Project: 5 Activity: A4ACS1610 Combination Air Valve (CAV)
at Sta.9+132 Excavation
Project: 5 Activity: A4ACS1620 Combination Air Valve (CAV)
at Sta.9+524 Excavation
Project: 5 Activity: A4ACS1630 Blow Off Valve (BOV) at
Sta.9+840 Excavation
Project: 5 Activity: A4ACS1640 Combination Air Valve (CAV)
at Sta.9+835 Excavation
Project: 5 Activity: A4ACS1650 Combination Air Valve (CAV)
at Sta.9+933 Excavation
Project: 5 Activity: A4ACS1660 ISOLATION CHAMBER at Sta.
9+935 Concreting of Pipe
Project: 5 Activity: A4ACS1670 Combination Air Valve (CAV)
at Sta.9+950 Excavation
Project: 5 Activity: A4ACS1680 Blow Off Valve (BOV) at
Sta.9+950 Excavation
Project: 5 Activity: A4ACS1690 JUNCTION CHAMBER at Sta.
0+015 Concreting of Pipe support
Project: 5 Activity: A4ACS1700 Blow Off Valve (BOV) at
Sta.0+015 Excavation
Project: 5 Activity: A4ACS1710 Combination Air Valve (CAV)
at Sta.0+015 Excavation
Project: 5 Activity: A4ACS1740 Cable Hole Excavation at
Sta. 4 + 080
Project: 5 Activity: A4ACS1750 BOV Excavation at Sta. 6 +
670
Project: 5 Activity: A4ACS1760 BOV Excavation at Sta. 6 +
258
Project: 5 Activity: A4ACS1770 BOVExcavation at Sta. 5 +
807
Project: 5 Activity: A4ACS1780 BOV Excavation at Sta. 5 +
616
Project: 5 Activity: A4ACS1790 BOV Excavation at Sta. 4 +
273
Project: 5 Activity: A4ACS1800 BOV Excavation at Sta. 3 +
736
Project: 5 Activity: A4ACS1810 CAV Excavation at Sta. 3 +
373
Project: 5 Activity: AL1.1000 Riser Pipes & Other
Appurtenances
Project: 5 Activity: AL1.1010 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1020 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1030 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1040 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1050 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1060 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1070 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1080 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1090 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1100 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1110 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1120 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1130 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1140 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1150 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1160 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1170 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1180 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1190 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1200 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1210 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1220 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL1.1230 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL1.1240 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1250 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1260 Touch-up paint on weldment
Project: 5 Activity: AL1.1270 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1280 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1290 Touch-up paint on weldment
Project: 5 Activity: AL1.1300 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1310 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1320 Touch-up paint on weldment
Project: 5 Activity: AL1.1330 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL1.1340 Fit-up and Full Welding and
UT
Project: 5 Activity: AL1.1350 Touch-up paint on weldment
Project: 5 Activity: AL1C1030 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 0+115
Project: 5 Activity: AL1C1040 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 0+775
Project: 5 Activity: AL1C1050 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 0+889
Project: 5 Activity: AL1C1060 Backfilling/ Area restoration
for Ampon Property Sta. 1+100 to 1+150.
Project: 5 Activity: AL1C1070 Backfilling/ Area restoration
for Narte Property Sta. 1+150 to 1+240.
Project: 5 Activity: AL1C1080 Backfilling Works for Pipes
Exposed along the Isolation Valve Chamber at Sta. 1+976.
Project: 5 Activity: AL1C1090 Backfilling of pipe zone
along the pipe prior to common backfilling at Sta. 1+240
Project: 5 Activity: AL1C1100 Backfilling Works for Hydro
Gap with open manhole at Sta. 1+394.
Project: 5 Activity: AL1C1110 Backfilling works for BOV
opening at Sta. 2+197.
Project: 5 Activity: AL1C1120 Backfilling works for pipe
zone and Manhole opening at Sta. 2+441
Project: 5 Activity: AL1C1130 Backfilling works for pipe
zoneand Manhole opening at Sta. 3+425
Project: 5 Activity: AL1C1133 Excavation works for Dirt
Canal along at Sta. 1+550 to 1+850.
Project: 5 Activity: AL1C1136 Excavation works for Dirt
Canal along at Sta. 2+384 to 2+523.
Project: 5 Activity: AL1C1139 Excavation works for Dirt
Canal along at Sta. 3+180 to 3+402.
Project: 5 Activity: AL1C1140 Concrete pipe support for
Isolation Valve Chamber at Sta. 1+976.
Project: 5 Activity: AL1C1150 Concrete Cover for Isolation
Valve Chamber at Sta. 1+976
Project: 5 Activity: AL1C1160 Installation of rcpc and
restoration of driveway along at Sta. 2+384 to 2+523.
Project: 5 Activity: AL1C1170 Installation of rcpc and
restoration works for driveway along at Sta. 3+000 to 3+050.
Project: 5 Activity: AL1C1180 Restoration works for lined
canal along at Sta. 3+080 to 3+180.
Project: 5 Activity: AL2.1000 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1010 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1020 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1030 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1040 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1050 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1060 Installation of Pipe Spool,
Dismantling joint, Butterfly valve
Project: 5 Activity: AL2.1070 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1080 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1090 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1100 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1110 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1120 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1130 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1140 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1150 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1160 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1170 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1180 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1190 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1200 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1210 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1220 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1230 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1240 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1250 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1260 Installation of Pressure
reducing valve, and Combination air valve
Project: 5 Activity: AL2.1270 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1280 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1290 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1300 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1310 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1320 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1330 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1340 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1350 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1360 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1370 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1380 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1390 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1400 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1410 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1420 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1430 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1440 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1450 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1460 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1470 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1480 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1490 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1500 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1510 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1520 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1530 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1540 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1550 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1560 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1570 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1580 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1590 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1600 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1610 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1620 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1630 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1640 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1650 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1660 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1670 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1680 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1690 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1700 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1710 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1720 Dewatering, Scaffolding and
Manual Excavation
Project: 5 Activity: AL2.1730 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1740 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1750 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1760 Installation of Gate valve
Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1770 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1780 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1790 Installation of CAV, Gate
valve Inc. valve box assembly w/ centering rings
Project: 5 Activity: AL2.1800 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1810 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1820 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1830 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL2.1840 Touch-up paint on weldment
and Wrapping (Petrolatum)
Project: 5 Activity: AL3.1000 Clearing and Dewatering
Project: 5 Activity: AL3.1010 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1020 Clearing and Dewatering
Project: 5 Activity: AL3.1030 Clearing and Dewatering
Project: 5 Activity: AL3.1040 Clearing and Dewatering
Project: 5 Activity: AL3.1050 Clearing and Dewatering
Project: 5 Activity: AL3.1060 Clearing and Dewatering
Project: 5 Activity: AL3.1070 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1080 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1090 Clearing and Dewatering
Project: 5 Activity: AL3.1100 Clearing and Dewatering
Project: 5 Activity: AL3.1110 Clearing and Dewatering
Project: 5 Activity: AL3.1120 NDT and painting works
Project: 5 Activity: AL3.1130 NDT and painting works
Project: 5 Activity: AL3.1140 NDT and painting works
Project: 5 Activity: AL3.1150 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1160 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1170 Clearing and Dewatering
Project: 5 Activity: AL3.1180 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1190 Fit-up and full welding of
riser pipe and ring flange
Project: 5 Activity: AL3.1200 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1210 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1220 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1230 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.1240 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1250 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1270 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.1280 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.1290 NDT and painting works
Project: 5 Activity: AL3.1300 NDT and painting works
Project: 5 Activity: AL3.1310 NDT and painting works
Project: 5 Activity: AL3.1320 NDT and painting works
Project: 5 Activity: AL3.1330 NDT and painting works
Project: 5 Activity: AL3.1340 NDT and painting works
Project: 5 Activity: AL3.1350 NDT and painting works
Project: 5 Activity: AL3.1360 NDT and painting works
Project: 5 Activity: AL3.1370 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1380 NDT and painting works
Project: 5 Activity: AL3.1390 NDT and painting works
Project: 5 Activity: AL3.1400 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1410 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1420 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1430 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1440 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1450 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1460 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1470 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1480 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1490 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1500 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1510 Clearing and Dewatering
Project: 5 Activity: AL3.1520 Installation of Dismantling
Joint and Butterfly Valve
Project: 5 Activity: AL3.1530 Installation of Dismantling
Joint and Butterfly Valve
Project: 5 Activity: AL3.1540 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1550 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1560 NDT and painting works
Project: 5 Activity: AL3.1570 NDT and painting works
Project: 5 Activity: AL3.1580 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1590 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1600 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1610 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1620 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1630 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1640 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1650 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1660 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1670 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.1680 Clearing and Dewatering
Project: 5 Activity: AL3.1690 Fit up and full welding of
riser pipe and ring flange
Project: 5 Activity: AL3.1700 Clearing and Dewatering
Project: 5 Activity: AL3.1710 Clearing and Dewatering
Project: 5 Activity: AL3.1720 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.1730 Installation of riser pipes,
flange & Valve Subject for Non Destructive Test (NDT)
Project: 5 Activity: AL3.1740 Clearing and Dewatering
Project: 5 Activity: AL3.1750 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.1760 Ring Flange, Installation of
Butterfly valve, Combination Air Valve
Project: 5 Activity: AL3.1770 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1780 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.1790 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1800 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.1810 NDT and painting works
Project: 5 Activity: AL3.1820 NDT and painting works
Project: 5 Activity: AL3.1830 Installation of
Petrowrap/latum
Project: 5 Activity: AL3.1840 NDT and painting works
Project: 5 Activity: AL3.1850 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1860 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1870 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1880 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1890 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1900 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1910 Installation of Dismantling
joint (STC)
Project: 5 Activity: AL3.1920 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.1930 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.1940 NDT and painting works
Project: 5 Activity: AL3.1950 NDT and painting works
Project: 5 Activity: AL3.1960 NDT and painting works
Project: 5 Activity: AL3.1970 NDT and painting works
Project: 5 Activity: AL3.1980 Application of anti seize
compund/lubrication & Bolt torquing
Project: 5 Activity: AL3.1990 NDT and painting works
Project: 5 Activity: AL3.2000 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2010 NDT and painting works
Project: 5 Activity: AL3.2020 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2030 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2040 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2050 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2060 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2070 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2080 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2090 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2100 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2110 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2120 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2130 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2140 Application of protective
coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2150 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2160 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2170 Clearing and Dewatering
Project: 5 Activity: AL3.2180 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2190 Clearing and Dewatering
Project: 5 Activity: AL3.2200 Clearing and Dewatering
Project: 5 Activity: AL3.2210 Clearing and Dewatering
Project: 5 Activity: AL3.2220 Clearing and Dewatering
Project: 5 Activity: AL3.2230 NDT and painting works
Project: 5 Activity: AL3.2240 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2250 Installation of Butterfly
valve, Combination Air Valve
Project: 5 Activity: AL3.2260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2270 NDT and painting works
Project: 5 Activity: AL3.2280 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.2290 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2300 NDT and painting works
Project: 5 Activity: AL3.2310 NDT and painting works
Project: 5 Activity: AL3.2320 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2330 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2340 NDT and painting works
Project: 5 Activity: AL3.2350 Fit-up and full welding of
ring flange
Project: 5 Activity: AL3.2360 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2370 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2380 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2390 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2400 NDT and painting works
Project: 5 Activity: AL3.2410 NDT and painting works
Project: 5 Activity: AL3.2420 NDT and painting works
Project: 5 Activity: AL3.2430 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2440 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2450 Installation of Dismantling
Joint and Butterfly Valve
Project: 5 Activity: AL3.2460 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2470 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2480 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2490 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2500 Installation of Dismantling
Joint and Butterfly Valve
Project: 5 Activity: AL3.2510 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2520 NDT and painting works
Project: 5 Activity: AL3.2530 Clearing and Dewatering
Project: 5 Activity: AL3.2540 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2550 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2560 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2570 NDT and painting works
Project: 5 Activity: AL3.2580 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2590 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2600 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2610 NDT and painting works
Project: 5 Activity: AL3.2620 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2630 Clearing and Dewatering
Project: 5 Activity: AL3.2640 Clearing and Dewatering
Project: 5 Activity: AL3.2650 Clearing and Dewatering
Project: 5 Activity: AL3.2660 Clearing and Dewatering
Project: 5 Activity: AL3.2670 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.2680 Clearing and Dewatering
Project: 5 Activity: AL3.2690 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2700 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2710 Clearing and Dewatering
Project: 5 Activity: AL3.2720 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2730 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2740 NDT and painting works
Project: 5 Activity: AL3.2750 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2760 NDT and painting works
Project: 5 Activity: AL3.2770 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2780 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2790 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2800 NDT and painting works
Project: 5 Activity: AL3.2810 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2820 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2830 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2840 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2850 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2860 NDT and painting works
Project: 5 Activity: AL3.2870 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2880 Fit up and Full welding of
ring flange and riser pipe
Project: 5 Activity: AL3.2890 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.2900 NDT and painting works
Project: 5 Activity: AL3.2910 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.2920 NDT and painting works
Project: 5 Activity: AL3.2930 NDT and painting works
Project: 5 Activity: AL3.2940 NDT and painting works
Project: 5 Activity: AL3.2950 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.2960 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.2970 NDT and painting works
Project: 5 Activity: AL3.2980 NDT and painting works
Project: 5 Activity: AL3.2990 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3000 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.3010 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3020 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3030 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3040 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3050 NDT and painting works
Project: 5 Activity: AL3.3060 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.3070 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3080 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3090 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3100 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3110 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3120 Clearing and Dewatering
Project: 5 Activity: AL3.3130 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3140 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3150 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3160 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3170 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3180 Fit up and Full welding of
ring flange
Project: 5 Activity: AL3.3190 Clearing and Dewatering
Project: 5 Activity: AL3.3200 Clearing and Dewatering
Project: 5 Activity: AL3.3210 Clearing and Dewatering
Project: 5 Activity: AL3.3220 NDT and painting works
Project: 5 Activity: AL3.3230 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3240 Installation of Gate Valve
and Air Valve
Project: 5 Activity: AL3.3250 NDT and painting works
Project: 5 Activity: AL3.3260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3270 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3280 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL3.3290 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3300 NDT and painting works
Project: 5 Activity: AL3.3310 NDT and painting works
Project: 5 Activity: AL3.3320 NDT and painting works
Project: 5 Activity: AL3.3330 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3340 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3350 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3360 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3370 Installation of Gate Valve
and STC
Project: 5 Activity: AL3.3380 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3390 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL3.3400 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL4a.1000 Cutting, Fit-up, and Welding
of Ring Flange
Project: 5 Activity: AL4a.1010 NDT and painting works
Project: 5 Activity: AL4a.1020 Installation of
Electromagnetic flow meter valve and dismantling joint
Project: 5 Activity: AL4a.1030 Butterfly Valve and
Dismantling Joint Installation
Project: 5 Activity: AL4a.1040 Torquing of bolts
Project: 5 Activity: AL4a.1050 Installation of flow control
valve and dismantling joint
Project: 5 Activity: AL4a.1060 Closure gap for existing DCWD
pipe
Project: 5 Activity: AL4a.1070 Fit up and beveling
Project: 5 Activity: AL4a.1080 Full Welding
Project: 5 Activity: AL4a.1090 NDT
Project: 5 Activity: AL4a.1100 Painting works
Project: 5 Activity: AL4a.1110 Fit up and beveling
Project: 5 Activity: AL4a.1120 Clearing and Dewatering
Project: 5 Activity: AL4a.1130 Full Welding
Project: 5 Activity: AL4a.1140 NDT
Project: 5 Activity: AL4a.1150 Painting works
Project: 5 Activity: AL4a.1160 Fit up and beveling
Project: 5 Activity: AL4a.1170 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL4a.1180 NDT and painting works
Project: 5 Activity: AL4a.1190 Full Welding
Project: 5 Activity: AL4a.1200 Installation of Gate Valve
and STC
Project: 5 Activity: AL4a.1210 NDT
Project: 5 Activity: AL4a.1220 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL4a.1230 Painting works
Project: 5 Activity: AL4a.1240 Clearing and Dewatering
Project: 5 Activity: AL4a.1250 Clearing and Dewatering
Project: 5 Activity: AL4a.1260 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL4a.1270 Fit-up and full welding of
riser pipe
Project: 5 Activity: AL4a.1280 NDT and painting works
Project: 5 Activity: AL4a.1290 NDT and painting works
Project: 5 Activity: AL4a.1300 Installation of Gate Valve
and STC
Project: 5 Activity: AL4a.1310 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: AL4a.1320 Installation of Gate Valve
and STC
Project: 5 Activity: AL4a.1330 Torquing of Bolts and Petro
Wrapping, Application of protective coatings & Installation of Valve cover/casing
Project: 5 Activity: KMSTX1000 WATER RE-DIVERTED TO WEIR
Project: 5 Activity: KMSTX1010 WATER REACHED HEPP AND
DIVERTED TO DAVAO RIVER
Project: 5 Activity: KMSTX1020 FIRST POWER USING DLPC LINE
Project: 5 Activity: KMSTX1040 2ND DROP AT MANDUG &
CABANTIAN OTP
Project: 5 Activity: KMSTX1050 FULL MLD
Project: 5 Activity: KMSTX1060 PROCESS COMMISSIONING
Project: 5 Activity: KMSTX1070 GUARANTEE RUN
Project: 5 Activity: KMSTX1080 OVERALL PROJECT COMPLETION
Project: 5 Activity: MCONX1090 VCCI Mobilization @ WTP
Project: 5 Activity: MCONX1100 EESI Mobilization @ WTP
Project: 5 Activity: MCONX1110 Chembond Mobilization @ WTP
Project: 5 Activity: MCONX1120 Sta. Clara Mobilization @ RWF
Project: 5 Activity: MCONX1130 Sta. Clara Mobilization @ WTP
Project: 5 Activity: MCONX1140 Prime Builders Mobilization @
WTP
Project: 5 Activity: OCABA1000 Interior Painting
Project: 5 Activity: OCABA1010 Exterior Painting
Project: 5 Activity: OCABA1020 Waterproofing Works
Project: 5 Activity: OCABA1030 Ceiling Works (Gypsum Board)
Project: 5 Activity: OCABA1040 Floor Finishes
Project: 5 Activity: OCABA1050 Install Windows
Project: 5 Activity: OCABA1060 Install Doors
Project: 5 Activity: OCABC1000 Perimeter Fence and Gates
Project: 5 Activity: OCABC1010 Roads, Paving, & Drainage
Project: 5 Activity: OCABD1000 Dry Testing - Cabantian
Project: 5 Activity: OCABE1000 Service Entrance
Project: 5 Activity: OCABE1010 Installation of radio antenna
tower
Project: 5 Activity: OCABE1020 Installation of roughing ins,
Blockout/Openings/Sleeves Provision and Telemetry Tower
Project: 5 Activity: OCABE1030 Installation of PLC Panels
Project: 5 Activity: OCABE1040 Cable pulling and termination
works
Project: 5 Activity: OCABH1000 Walkthrough - Cabantian
Project: 5 Activity: OCABH1010 PUNCHLIST CLOSEOUT -
Cabantian
Project: 5 Activity: OCABH1020 Construction Handover -
Cabantian
Project: 5 Activity: OCABI1000 Installation of instruments
Project: 5 Activity: OCABM1000 Yard Piping Works
Project: 5 Activity: OCABM1010 Install Valves
Project: 5 Activity: OCABM1020 Install Chlorine Package
System
Project: 5 Activity: OCABM1030 AC & Ventillation Works
Project: 5 Activity: OCABM1040 Disinfection of Pipe System
Project: 5 Activity: OCABM1050 Install Genset
Project: 5 Activity: OCABS1000 Building Structural Concrete
Project: 5 Activity: OCABS1010 Construction of Chamber
Covers
Project: 5 Activity: OCABW1000 Wet Testing - Cabantian
Project: 5 Activity: OCABW1010 Automation Testing -
Cabantian
Project: 5 Activity: OCABW1020 Disinfection Alignment 6 & 8
Project: 5 Activity: OCALD1030 Dry Testing
Project: 5 Activity: OCALD1040 Client Approval for Equipment
Commissioning
Project: 5 Activity: OCALE1000 Installation of Cable Tray
Project: 5 Activity: OCALE1010 Cable pulling and termination
works
Project: 5 Activity: OCALH1000 Walkthrough
Project: 5 Activity: OCALH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: OCALH1020 Construction Handover
Project: 5 Activity: OCALI1000 Fabrication & Installation of
instruments supports
Project: 5 Activity: OCALI1010 Installation of instruments
Project: 5 Activity: OCALM1000 Fabrication & Install
Chlorine Package System Pipe Supports
Project: 5 Activity: OCALM1010 Install ACU -condensate drain
remaining
Project: 5 Activity: OCALM1030 Install Chlorine Package
System
Project: 5 Activity: OCALM1040 Install Ducting
Project: 5 Activity: OCALM1050 Disinfection of Pipe System
Project: 5 Activity: OCALW1050 Wett Testing - CALINAN
Project: 5 Activity: OCALW1060 Auotomation Testing
Project: 5 Activity: OCALW1070 Process Commissioning OTP
Calinan
Project: 5 Activity: ODUMA1000 Interior Painting
Project: 5 Activity: ODUMA1010 Exterior Painting
Project: 5 Activity: ODUMA1020 Waterproofing Works
Project: 5 Activity: ODUMA1030 Ceiling Works (Gypsum Board)
Project: 5 Activity: ODUMA1040 Floor Finishes
Project: 5 Activity: ODUMA1050 Install Windows
Project: 5 Activity: ODUMA1060 Install Doors
Project: 5 Activity: ODUMC1000 Perimeter Fence and Gates
Project: 5 Activity: ODUMC1010 Roads, Paving, & Drainage
Project: 5 Activity: ODUMD1000 Dry Testing
Project: 5 Activity: ODUME1000 Installation of roughing ins,
Blockout/Openings/Sleeves
Project: 5 Activity: ODUME1010 Installation of radio antenna
Project: 5 Activity: ODUME1020 Installation of PLC Panels
Project: 5 Activity: ODUME1030 Cable pulling and termination
works
Project: 5 Activity: ODUMH1000 Walkthrough
Project: 5 Activity: ODUMH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: ODUMH1020 Construction Handover
Project: 5 Activity: ODUMI1000 Installation of instruments
Project: 5 Activity: ODUMM1000 Yard Piping Works
Project: 5 Activity: ODUMM1010 Install Crane
Project: 5 Activity: ODUMM1020 Install Valves
Project: 5 Activity: ODUMM1030 Install Chlorine Package
System
Project: 5 Activity: ODUMM1040 Install Scrubber Package
Project: 5 Activity: ODUMM1050 AC & Ventillation Works
Project: 5 Activity: ODUMM1060 Disinfection of Pipe System
Project: 5 Activity: ODUMM1070 Install Genset
Project: 5 Activity: ODUMS1000 Building Structural Concrete
Project: 5 Activity: ODUMS1010 Construction of Concrete
Chambers
Project: 5 Activity: ODUMS1020 Install Steel Frames &
Roofing
Project: 5 Activity: ODUMW1000 Wet Testing - DUMOY
Project: 5 Activity: ODUMW1010 Automation Testing - DUMOY
Project: 5 Activity: ODUMW1020 Disinfection Alignment 5, 7
Project: 5 Activity: OINDA1000 Ceiling Works (Gypsum Board)
Project: 5 Activity: OINDA1010 Exterior Painting
Project: 5 Activity: OINDA1030 Install Steel Doors
Project: 5 Activity: OINDA1040 Install PVC Door
Project: 5 Activity: OINDA1050 Waterproofing Works
Project: 5 Activity: OINDC1000 Perimeter Fence and Gates
Project: 5 Activity: OINDC1010 Roads, Paving, & Drainage
Project: 5 Activity: OINDD1000 Dry Testing
Project: 5 Activity: OINDE1000 Installation of PLC Panels
Project: 5 Activity: OINDE1010 Installation of radio antenna
Project: 5 Activity: OINDE1020 Cable pulling and termination
works
Project: 5 Activity: OINDH1000 Walkthrough
Project: 5 Activity: OINDH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: OINDH1020 Construction Handover
Project: 5 Activity: OINDI1000 Installation of instruments
Project: 5 Activity: OINDM1000 Yard Piping Works
Project: 5 Activity: OINDM1010 Install Valves
Project: 5 Activity: OINDM1020 AC & Ventillation Works
Project: 5 Activity: OINDM1030 Install Chlorine Package
System
Project: 5 Activity: OINDM1040 Disinfection of Pipe System
Project: 5 Activity: OINDM1050 Install Genset
Project: 5 Activity: OINDS1000 Construction of Concrete
Chambers
Project: 5 Activity: OINDW1000 Wett Testing - INDANGAN
Project: 5 Activity: OINDW1010 Automation Testing
Project: 5 Activity: OINDW1020 Process Commissioning OTP
Indangan
Project: 5 Activity: OMANA1000 Screeding & Waterproofing
Works
Project: 5 Activity: OMANA1010 Exterior Painting
Project: 5 Activity: OMANA1020 Install Tiles
Project: 5 Activity: OMANA1030 Install PVC Door
Project: 5 Activity: OMANC1000 Perimeter Fence and Gates
Project: 5 Activity: OMANC1010 Roads, Paving, & Drainage
Project: 5 Activity: OMAND1000 Dry Testing - Mandug
Project: 5 Activity: OMANE1000 Cable pulling and termination
works
Project: 5 Activity: OMANH1000 Walkthrough - Mandug
Project: 5 Activity: OMANH1010 PUNCHSLIST CLOSEOUT - Mandug
Project: 5 Activity: OMANH1020 Construction Handover -
Mandug
Project: 5 Activity: OMANI1000 Installation of instruments
Project: 5 Activity: OMANM1000 Install Chlorine Package
System
Project: 5 Activity: OMANM1010 AC & Ventillation Works
Project: 5 Activity: OMANM1020 Yard Piping Works
Project: 5 Activity: OMANM1030 Install Valves
Project: 5 Activity: OMANM1040 Disinfection of Pipe System
Project: 5 Activity: OMANS1000 Construction of Chamber
Covers
Project: 5 Activity: OMANW1000 Wet Testing - Mandug
Project: 5 Activity: OMANW1010 Automation Testing - Mandug
Project: 5 Activity: OMANW1020 Disinfection Alignment 4A/4B
- Mandug
Project: 5 Activity: OPANA1000 Interior Painting
Project: 5 Activity: OPANA1010 Exterior Painting
Project: 5 Activity: OPANA1020 Waterproofing Works
Project: 5 Activity: OPANA1030 Ceiling Works (Gypsum Board)
Project: 5 Activity: OPANA1040 Floor Finishes
Project: 5 Activity: OPANA1050 Install Windows
Project: 5 Activity: OPANA1060 Install Doors
Project: 5 Activity: OPANC1000 Perimeter Fence and Gates
Project: 5 Activity: OPANC1010 Roads, Paving, & Drainage
Project: 5 Activity: OPAND1000 Dry Testing
Project: 5 Activity: OPANE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision and Telemetry Tower
Project: 5 Activity: OPANE1010 Installation of grounding
system
Project: 5 Activity: OPANE1020 Installation of radio antenna
tower
Project: 5 Activity: OPANE1030 Cable pulling and termination
works
Project: 5 Activity: OPANE1040 Installation of PLC Panels
Project: 5 Activity: OPANH1000 Walkthrough
Project: 5 Activity: OPANH1010 PUNCHLISTCLOSEOUT
Project: 5 Activity: OPANH1020 Construction Handover
Project: 5 Activity: OPANI1000 Installation of instruments
Project: 5 Activity: OPANM1000 Yard Piping Works
Project: 5 Activity: OPANM1010 Install Valves
Project: 5 Activity: OPANM1020 AC & Ventillation Works
Project: 5 Activity: OPANM1030 Install Chlorine Package
System
Project: 5 Activity: OPANM1040 Disinfection of Pipe System
Project: 5 Activity: OPANM1050 Install Genset
Project: 5 Activity: OPANS1000 Building Structural Concrete
Project: 5 Activity: OPANS1010 Construction of Concrete
Chambers
Project: 5 Activity: OPANW1000 Wett Testing - PANACAN
Project: 5 Activity: OPANW1010 Automation Testing
Project: 5 Activity: OPANW1020 Process Commissioning OTP
Panacan
Project: 5 Activity: OTALD1000 Dry Testing
Project: 5 Activity: OTALD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: OTALE1000 Cable pulling and termination
works
Project: 5 Activity: OTALH1000 Walkthrough
Project: 5 Activity: OTALH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: OTALH1020 Construction Handover
Project: 5 Activity: OTALI1000 Installation of instruments
supports
Project: 5 Activity: OTALI1010 Installation of instruments
Project: 5 Activity: OTALM1000 Install Ducting
Project: 5 Activity: OTALM1020 Install Chlorine Package
System
Project: 5 Activity: OTALM1030 Install ACCU
Project: 5 Activity: OTALM1050 Disinfection of Pipe System
Project: 5 Activity: OTALW1000 WettTesting - TALANDANG
Project: 5 Activity: OTALW1010 Automation Testing
Project: 5 Activity: OTALW1020 Process Commissioning OTP
Talandang
Project: 5 Activity: OTP11000 Installation of Louvers, L01;
2200mm W x 1000mm & L02; 1600mm W x 1100mm
Project: 5 Activity: OTP11005 Installation of D01; 700mm W
x 2100mm H PVC moulded door; single leaf; including PVC frame
Project: 5 Activity: OTP11010 Application of Concrete
Masonry Paint (Exterior and Interior)
Project: 5 Activity: OTP11015 Concrete surface
rectification along the door panels
Project: 5 Activity: OTP11018 Painting of Steel Doors
Project: 5 Activity: OTP11020 Installation of Comfort Room/
Janitors Closet (Tiles, Fixtures, PVC door and remaining concreting works along
this area)
Project: 5 Activity: OTP11030 Masonry, Installation Pipe
Saddle Support
Project: 5 Activity: OTP11040 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP11050 Perimeter Fence (Rebars,
Forms, Concreting & Paintings Works along this area)
Project: 5 Activity: OTP11060 Ramp and Floor Slab (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP11070 Fabrication of concrete
covers (Rebars, Forms , Concreting Works)
Project: 5 Activity: OTP11080 Surface rectification works
inside the chambers
Project: 5 Activity: OTP11085 Wall Finishes; Tile edging
Project: 5 Activity: OTP11090 Backfilling of Open trench
along the Chambers at the yard pipe.
Project: 5 Activity: OTP11100 IWF1; fairface cement plaster
painted elastomeric semi-gloss latex finish
Project: 5 Activity: OTP11110 IWF2; 300x300mm ceramic wall
tiles
Project: 5 Activity: OTP11120 Plaster and render; 25mm
thick
Project: 5 Activity: OTP11130 F05; Sealed concrete finish
with 15mm W x 5mm H groove
Project: 5 Activity: OTP11140 F06; 300x300mm unglazed
homogeneous floor tiles
Project: 5 Activity: OTP11150 Concrete topping; 50mm thick
Project: 5 Activity: OTP11155 Wall Finishes; Tile edging
Project: 5 Activity: OTP11160 Waterproofing works
Project: 5 Activity: OTP1M1000 Electromagnetic Flowmeter
DN250
Project: 5 Activity: OTP1M1010 Flow Control Valve DN250
Project: 5 Activity: OTP1M1020 Installation of Emergency
Shower/Eye Wash
Project: 5 Activity: OTP1M1030 Installation of Exhaust Fan,
EF-01 Chlorination Room & EF-02 Gnset Room
Project: 5 Activity: OTP1M1040 ASTM Cement Lined 406mmØ Pipe
Project: 5 Activity: OTP1M1050 Concentric Reducer 406.4mmØ x
273.1mmØ Cement lined
Project: 5 Activity: OTP1M1060 Pressure Relief Valve DN65
Project: 5 Activity: OTP1M1070 Gate Valve
Project: 5 Activity: OTP1M1080 Stub out/on with reinforcing
saddle/collar plate
Project: 5 Activity: OTP1M1090 Ventilation Pipe (Stainless
Steel) DN150
Project: 5 Activity: OTP1M1100 Portable Ultrasonic Flowmeter
(Clamp On)
Project: 5 Activity: OTP1M1105 Plumbing Fixtures; Shower set
at emergency shower and eyewash area
Project: 5 Activity: OTP1M1108 Plumbing works; Roof drain75
mm diameter
Project: 5 Activity: OTP1M1110 Dismantling Joint DN250
Project: 5 Activity: OTP1M1120 Plumbing Fixtures; Shower set
at emergency shower and eyewash area
Project: 5 Activity: OTP1M1130 Plumbing Fixtures; Hose Bibb
& Floor Drain
Project: 5 Activity: OTP2C1000 Concrete covers (Rebars,
Forms , Concreting Works)
Project: 5 Activity: OTP2C1010 Concrete pouring of Thrust
Block along the Yard Pipe Bend
Project: 5 Activity: OTP2C1020 Installation of Comfort Room/
Janitors Closet (Tiles, Fixtures, PVC door and remaining concreting works along
this area)
Project: 5 Activity: OTP2C1030 Application of Concrete
Masonry Paint (Exterior and Interior)
Project: 5 Activity: OTP2C1040 Installation of Louvers; L01;
2200mm W x 1000mm & L02; 1600mm W x 1000mm
Project: 5 Activity: OTP2C1045 Installation of Doors; D01;
700mm W x 2100mm & D05; 700mm W x 1700mm
Project: 5 Activity: OTP2C1050 Installation of Ladder Rung
Project: 5 Activity: OTP2C1060 Verification and inspection
of fit-up, welding & restoration of disturbed cement mortar lined
Project: 5 Activity: OTP2C1070 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP2C1080 Perimeter Fence (Rebars,
Forms, Concreting & Paintings Works along this area)
Project: 5 Activity: OTP2C1090 Ramp and Floor Slab (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP2C1100 Backfilling of Open trench
along the Chambers at the yard pipe.
Project: 5 Activity: OTP2C1110 Concrete surface
rectification works inside the chambers
Project: 5 Activity: OTP2C1113 Wall Finishes: Tile edging
Project: 5 Activity: OTP2C1115 Wall Finishes: IWF1; fairface
cement plaster painted elastomeric semi-gloss latex finish
Project: 5 Activity: OTP2C1117 Wall Finishes: IWF2;
300x300mm ceramic wall tiles
Project: 5 Activity: OTP2C1119 Wall Finishes: Plaster and
render; 25mm thick
Project: 5 Activity: OTP2C1120 Construction and fabrication
of thrust block (Rebars, Forms , Concreting Works)
Project: 5 Activity: OTP2M1000 Installation Flow Control
Valve DN200
Project: 5 Activity: OTP2M1010 Installation Butterfly Valve
DN200
Project: 5 Activity: OTP2M1020 Installation of Emergency
Shower/Eye Wash
Project: 5 Activity: OTP2M1030 Installation of Exhaust Fan;
EF-01 Chlorination Room & EF-02 Gnset Room
Project: 5 Activity: OTP2M1040 Installation Stub-on with
saddle plate
Project: 5 Activity: OTP2M1050 508mmØ Cement line miter
bend, Tapping point to DCWD
Project: 5 Activity: OTP2M1060 Installation Crotch Plates
Project: 5 Activity: OTP2M1070 Hydrostatic/Pressure Test
Test Package
Project: 5 Activity: OTP2M1080 Installation Gate Valve DN50
Project: 5 Activity: OTP2M1090 Installation Gate Valve DN65
Project: 5 Activity: OTP2M1100 Installation Dismantling
Joint DN200
Project: 5 Activity: OTP2M1110 Installation Ventilation Pipe
DN150 (Stainless)
Project: 5 Activity: OTP2M1120 Installation Pressure Relief
Valve DN65
Project: 5 Activity: OTP2M1130 Installation Ultrasonic
flowmeter Clamp On
Project: 5 Activity: OTP2M1140 Installation Electromagnetic
Flowmeter DN200
Project: 5 Activity: OTP2M1150 Installation Combination Air
Valve
Project: 5 Activity: OTP2M1160 Plumbing works; Installation
Roof drain75 mm diameter
Project: 5 Activity: OTP2M1165 Plumbing Fixtures; Shower set
at emergency shower and eyewash area
Project: 5 Activity: OTP2M1170 Installation of Hose Bibb &
Floor Drain
Project: 5 Activity: OTP2M1180 Drainage;V-Drain Channel and
Concrete Channel with Steel Grating
Project: 5 Activity: OTP6C1000 Road and Drainage (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1010 Installation Pipe Support
Project: 5 Activity: OTP6C1020 Concrete surface
rectification works inside the chambers
Project: 5 Activity: OTP6C1025 Concrete surface
rectification along the door panels
Project: 5 Activity: OTP6C1030 Construction and fabrication
of concrete covers (Rebars, Forms , Concreting Works)
Project: 5 Activity: OTP6C1040 Installation of Remaining and
Uninstalled Ladder Rung
Project: 5 Activity: OTP6C1050 Backfilling of Open trench
along the Chambers at the yard pipe.
Project: 5 Activity: OTP6C1060 Ramp and Floor Slab (Rebars,
Forms, Concreting Works along this area)
Project: 5 Activity: OTP6C1070 Perimeter Fence (Rebars,
Forms, Concreting & Paintings Works along this area)
Project: 5 Activity: OTP6C1080 Installation of Comfort Room/
Janitors Closet (Tiles, Fixtures, PVC door and remaining concreting works along
this area)
Project: 5 Activity: OTP6C1090 Application of Concrete
Masonry Paint (Exterior and Interior)
Project: 5 Activity: OTP6C1100 Installation of Louvers
Project: 5 Activity: OTP6C1110 Installation of Emergency
Shower/Eye Wash
Project: 5 Activity: OTP6C1120 Installation of Door; D01;
700mm W x 2100mm & D05; 700mm W x 1700mm PVC moulded door
Project: 5 Activity: OTP6C1125 Installation of Door; D03;
1500mm W x 2400mm H metal door
Project: 5 Activity: OTP6C1127 Painting of Steel Doors
Project: 5 Activity: OTP6C1130 Wall Finishes: Tile edging
Project: 5 Activity: OTP6C1133 Floor Finishes; F05; Sealed
concrete finish with 15mm W x 5mm H groove
Project: 5 Activity: OTP6C1135 Floor Finishes; F06;
300x300mm unglazed homogeneous floor tiles
Project: 5 Activity: OTP6C1137 Floor Finishes; Concrete
topping; 50mm thick
Project: 5 Activity: OTP6C1139 Floor Finishes; Waterproofing
works
Project: 5 Activity: OTP6C1159 Misc Civil Items; Stair
Nosing, Roof Ladder Bracket, Basecourse at open areas, Etc.
Project: 5 Activity: OTP6M1000 Installation Butterfly valve
DN500
Project: 5 Activity: OTP6M1010 Installation Dismantling
Joint DN500
Project: 5 Activity: OTP6M1020 Installation Gate Valve DN100
Project: 5 Activity: OTP6M1030 Installation Gate Valve DN150
Project: 5 Activity: OTP6M1040 Tapping Point to DCWD,
406.4mm Ø ASTM A139
Project: 5 Activity: OTP6M1050 Installation of Exhaust Fan;
EF-01 Chlorination Room & EF-02 Gnset Room
Project: 5 Activity: OTP6M1055 Supply and installation of
aluminum exhaust louver & intake louver
Project: 5 Activity: OTP6M1060 Installation Portable
Ultrasonic Flow Meter (Clamp On) (Others Subcon)
Project: 5 Activity: OTP6M1070 Installation Stub out/on with
reinforcing collar/saddle plate
Project: 5 Activity: OTP6M1080 Installation Pressure Relief
Valve DN100 (Others Subcon)
Project: 5 Activity: OTP6M1090 Installation Electromagnetic
Flow Meter
Project: 5 Activity: OTP6M1100 Installation Flow Control
Valve DN500
Project: 5 Activity: OTP6M1105 DN500 Dismantling Joint
Project: 5 Activity: OTP6M1107 Touch up paint on weldments
Project: 5 Activity: OTP6M1110 Plumbing works; Installation
Roof drain75 mm diameter
Project: 5 Activity: OTP6M1120 Plumbing Fixtures; Shower set
at emergency shower and eyewash area
Project: 5 Activity: OTP6M1130 Plumbing Fixtures; Hose Bibb
& Floor Drain
Project: 5 Activity: OTP6M1140 Drainage; V-Drain Channel and
Concrete Channel with Steel Grating
Project: 5 Activity: OTUGD1000 Dry Testing - Tugbok
Project: 5 Activity: OTUGE1000 Installation of cable tray
Project: 5 Activity: OTUGE1010 Installation of radio antenna
- after completing all activities
Project: 5 Activity: OTUGH1000 Walkthrough - Tugbok
Project: 5 Activity: OTUGH1010 PUNCHLIST CLOSEOUT - Tugbok
Project: 5 Activity: OTUGH1020 Construction Handover -
Tugbok
Project: 5 Activity: OTUGI1000 Installation of instrument
Project: 5 Activity: OTUGM1000 AC & Ventillation Works - Not
part of vcci
Project: 5 Activity: OTUGM1010 Install Chlorine Package
System - REMAINING WORKS
Project: 5 Activity: OTUGM1020 Install Valves
Project: 5 Activity: OTUGM1030 Disinfection of Pipe System
Project: 5 Activity: OTUGM1040 HVAC & Ventillation Works
Project: 5 Activity: OTUGM1050 Installation of Exhaust Fan
Project: 5 Activity: OTUGM1060 WIR Inspection for
Installation of Exhaust Fan
Project: 5 Activity: OTUGM1070 Fabrication of Exhaust fan
Supports
Project: 5 Activity: OTUGM1090 Installation of Exhaust fan
Supports
Project: 5 Activity: OTUGM1100 WIR INspection for
Installation of Exhaust fan Supports
Project: 5 Activity: OTUGM1110 Fabrication of Exhaust fan
Duct
Project: 5 Activity: OTUGM1120 Installation of Exhaust fan
Duct
Project: 5 Activity: OTUGM1130 WIR INspection for
Installation of Exhaust fan Duct
Project: 5 Activity: OTUGM1140 Installation of Scaffolding
prior for installation of Motorized Dampers
Project: 5 Activity: OTUGM1150 Installation of Motorized
Dampers
Project: 5 Activity: OTUGM1160 WIR Inspection for
Installation of Motorized Dampers
Project: 5 Activity: OTUGM1170 Procurement of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1180 Fabrication of Gravity Damper
and Bird Screen
Project: 5 Activity: OTUGM1190 Installation of Gravity
Damper and Bird Screen
Project: 5 Activity: OTUGM1200 WIR Inspection for
Installation of Gravity damper and Bird Screen
Project: 5 Activity: OTUGM1210 Fabrication of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1220 Installation of Exhaust Air
grill - Chlorination Room
Project: 5 Activity: OTUGM1230 WIR Inspection for
Installation of Exhaust Air grill - Chlorination Room
Project: 5 Activity: OTUGM1240 Installation of Exhaust Fan
at Genset Room with Support
Project: 5 Activity: OTUGM1250 WIR Inspection for
Installation of Exhaust Fan at Genset Room
Project: 5 Activity: OTUGM1260 Installation of Outside Air
louver 2.2m x 1m
Project: 5 Activity: OTUGM1270 WIR Inspection for
Installation of Outside Air louver 2.2m x 1m
Project: 5 Activity: OTUGM1280 Hydrotest test prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1290 Hydrotest test for chlorine
package system
Project: 5 Activity: OTUGM1300 PIpe reinstatement for
chlorine package system
Project: 5 Activity: OTUGM1310 WIR Inspection for chlorine
package system
Project: 5 Activity: OTUGM1320 Nitrogen Test for chlorine
package system
Project: 5 Activity: OTUGM1330 Nitrogen Tes prep, filling
and flushing for chlorine package system
Project: 5 Activity: OTUGM1340 Nitrogen Tes for chlorine
package system
Project: 5 Activity: OTUGM1350 PIpe reinstatement for
chlorine package system - Nitrogen Tes
Project: 5 Activity: OTUGM1360 WIR Inspection for chlorine
package system - Nitrogen Tes
Project: 5 Activity: RACRC1000 AR1 (from existing road going
to Intake Weir) - surface reshaping and side ditches
Project: 5 Activity: RACRC1500 AR1a (Intake Weir to
Desander) - surface reshaping and side ditches
Project: 5 Activity: RACRC2000 AR2 (temporary access road at
Matas/Mabida area) - surface reshaping and side ditches
Project: 5 Activity: RACRC3000 AR3 (temporary access road at
Dulaugon area) - surface reshaping and side ditches
Project: 5 Activity: RACRC4000 AR4 (Desander to Surge Tank)
- surface reshaping and side ditches
Project: 5 Activity: RACRC5000 AR5 (along Penstock) -
surface reshaping and side ditches
Project: 5 Activity: RACRC6000 AR6 (along Penstock) -
surface reshaping and side ditches
Project: 5 Activity: RACSA1110 Floor Finishes
Project: 5 Activity: RCDSC1000 Air vents guy support and
screen cover (Fabrication)
Project: 5 Activity: RCDSC1010 Backfilling Works
Project: 5 Activity: RCDSC1020 Lined canals and outfall
interceptor canals
Project: 5 Activity: RCDSC1040 Air vents guy support and
screen cover (Installation of Scaffolding)
Project: 5 Activity: RCDSC1050 Air vents guy support and
screen cover (Installation)
Project: 5 Activity: RCDSC1060 Air vents guy support and
screen cover (Painting Works)
Project: 5 Activity: RCDSC1070 Air vents guy support and
screen cover (WIR Inspection)
Project: 5 Activity: RCDSC1080 Air vents guy support and
screen cover (Procurement)
Project: 5 Activity: RCDSH1000 Walkthrough Conveyance Line
Project: 5 Activity: RCDSH1010 PUNCHLIST CLOSEOUT Conveyance
Line
Project: 5 Activity: RCDSM1000 Install Pipe Drain Valves -
Torquing Only
Project: 5 Activity: RCDSM1010 Complete weld rectification
of Segment 4 closure at TB66 (including coating)
Project: 5 Activity: RCDSM1020 Internal paint repair/touch-
up works (identified during walkdown)
Project: 5 Activity: RCDSM1030 Closure of Pipes - NDT, UT
Project: 5 Activity: RCDSM1040 Install Air Valves - Torquing
Only
Project: 5 Activity: RCDSM1060 Excavation for Drain Pipes
(10, 50, & 30 mts)
Project: 5 Activity: RCDSM1070 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1
Project: 5 Activity: RCDSM1080 Install Drain Pipes - Riser 1
Project: 5 Activity: RCDSM1090 Backfilling of Installed
Drain Pipes (10, 50, & 30 mts)
Project: 5 Activity: RCDSM1100 Design for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1 to 3
Project: 5 Activity: RCDSM1110 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 2
Project: 5 Activity: RCDSM1120 Fabrication for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 3
Project: 5 Activity: RCDSM1130 Procurement for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1 to 3
Project: 5 Activity: RCDSM1140 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 1
Project: 5 Activity: RCDSM1150 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 2
Project: 5 Activity: RCDSM1160 Installation for Drain Valve
protection wrap, PVC pipe sleeve and valve box - 3
Project: 5 Activity: RCDSM1170 Install Drain Pipes - Riser 2
Project: 5 Activity: RCDSM1180 Install Drain Pipes - Riser 3
Project: 5 Activity: RCDSM1190 Painting Drain Pipes - Riser
1
Project: 5 Activity: RCDSM1200 Painting Drain Pipes - Riser
2
Project: 5 Activity: RCDSM1210 Painting Drain Pipes - Riser
3
Project: 5 Activity: RCDSM1220 WIR Inspection for Drain
Pipes - Riser 1-3
Project: 5 Activity: RCDSM1230 WIR Inspection for
Installation for Drain Valve protection wrap, PVC pipe sleeve and valve box - 1 to
3
Project: 5 Activity: RCDSS1000 Pipe Encasement Pouring 2
Project: 5 Activity: RCDSS1010 Construction of Cross Drains
and Drainage
Project: 5 Activity: RCDSS1020 Slope Protection Works
(Cut/Down Slope)
Project: 5 Activity: RCDSS1030 Thrust blocks and encasement
concrete repair
Project: 5 Activity: RCDSS1040 Construction of Pedestrian
Crossings
Project: 5 Activity: RCWDC1000 Transition Box Leak
Rectification
Project: 5 Activity: RCWDC1010 Clean up inside conveyance
pipeline
Project: 5 Activity: RCWDH1000 Walkthrough - Weir to
Desander
Project: 5 Activity: RCWDH1010 Punchlist Close-out - Weir to
Desander
Project: 5 Activity: RCWDH1020 Construction Handover to
Commissioning - Weir to Desander
Project: 5 Activity: RCWDM1000 Internal painting of pipe
joints at TB-1 bend and closure
Project: 5 Activity: RCWDM1020 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RCWDM1030 Manhole seal inspection -
Installation of O-Ring and manhole closing (1 MH)
Project: 5 Activity: RCWDM1110 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 1 MH
Project: 5 Activity: RCWDM1240 Manhole seal inspection -
(Joint Inspection with VCCI, AAII, WITCO and T&C) 34 MH
Project: 5 Activity: RCWDM1250 Manhole seal inspection -
Procurement of O-Ring materials (AAII)
Project: 5 Activity: RDESA1000 Concrete surface
rectification - external portion
Project: 5 Activity: RDESA1010 Desander leak rectification
Project: 5 Activity: RDESA1020 Staff gauge installation
Project: 5 Activity: RDESA1030 Remaining roofing and
cladding (including genset enclosure)
Project: 5 Activity: RDESA1040 Install Windows & Louvers
Project: 5 Activity: RDESA1050 Architectural and Structural
Coating touch-ups/rectification
Project: 5 Activity: RDESA1060 Safety Railings (final
coating)
Project: 5 Activity: RDESA1070 Install Doors
Project: 5 Activity: RDESA1080 Floor Finishes (Smooth finish
and grinding only)
Project: 5 Activity: RDESA1090 Restoration works for
excavation along flushing channel
Project: 5 Activity: RDESA1100 Install Ladders
Project: 5 Activity: RDESA1110 Install Perimeter Fence &
Gates
Project: 5 Activity: RDESC1000 Dewatering of work area -
Desander
Project: 5 Activity: RDESC1010 Backfilling works - Desander
Project: 5 Activity: RDESC1020 Levelling, trimming, and
compacting of soil - Desander
Project: 5 Activity: RDESC1060 Backfilling works - Desander
Project: 5 Activity: RDESD1000 Dry Testing Inlet Gate
Desander Chamber 1
Project: 5 Activity: RDESD1010 Dry Testing Flushing Gate
Desander Chamber 1
Project: 5 Activity: RDESD1020 Dry Testing Flap Gate
Desander Chamber 1
Project: 5 Activity: RDESD1030 Dry Testing Inlet Gate
Desander Chamber 2
Project: 5 Activity: RDESD1040 Dry Testing Flushing Gate
Desander Chamber 2
Project: 5 Activity: RDESD1050 Dry Testing Flap Gate
Desander Chamber 2
Project: 5 Activity: RDESD1060 Dry Testing Desander Common
Outlet Chamber
Project: 5 Activity: RDESE1000 Underground cable
installation - Service Entrance to ECB
Project: 5 Activity: RDESE1010 Testing for all electrical
installation
Project: 5 Activity: RDESE1020 Installation of CCTV System
Project: 5 Activity: RDESE1030 Install PLC
Project: 5 Activity: RDESH1000 Walkthrough Desander Inlet
Chamber 1
Project: 5 Activity: RDESH1010 Punchlist Closeout Desander
Inlet Chamber 1
Project: 5 Activity: RDESH1020 Construction Handover
Desander Inlet Chamber 1
Project: 5 Activity: RDESH1030 Walkthrough Desander Inlet
Chamber 2
Project: 5 Activity: RDESH1040 Punchlist Closeout Desander
Inlet Chamber 2
Project: 5 Activity: RDESH1050 Construction Handover
Desander Inlet Chamber 2
Project: 5 Activity: RDESH1060 Walkthrough Desander Common
Outlet Chamber
Project: 5 Activity: RDESH1070 PUNCHLIST CLOSEOUT Desander
Common Outlet Chamber
Project: 5 Activity: RDESH1080 Construction Handover
Desander Common Outlet Chamber
Project: 5 Activity: RDESI1000 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RDESI1010 Wiring of flowmeter to
transmitter
Project: 5 Activity: RDESI1020 Installation of additional
turbidity sensor @ Desander
Project: 5 Activity: RDESI1030 Installation of pressure
based level sensor @ Desander
Project: 5 Activity: RDESI1040 Mounting & wiring of PLC and
HMI in HPU control panel
Project: 5 Activity: RDESI1050 Relocation of ultrasonic
level sensor, inlet box.
Project: 5 Activity: RDESM1000 Ladder rung and cage to
outlet chamber and bypass valve chamber
Project: 5 Activity: RDESM1010 Install Exhaust Fan
Project: 5 Activity: RDESM1020 Bolt torquing for Bypass
Valve and Drain Valve
Project: 5 Activity: RDESM1030 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RDESM1040 Gate Seals Rectification
(Flap Gates B)
Project: 5 Activity: RDESM1050 Fabrication of stainless
sheet cover for pillow block for A
Project: 5 Activity: RDESM1060 Gate Seals Rectification
(Flap Gates A)
Project: 5 Activity: RDESM1070 Installation of stainless
sheet cover for pillow block For A
Project: 5 Activity: RDESM1080 WIR Inspection of stainless
sheet cover for pillow block for A
Project: 5 Activity: RDESM1090 Gate Seals Rectification
(Flap Gates Inspection for A and B)
Project: 5 Activity: RDESM1100 Design of stainless sheet
cover for pillow block (new) - To be provided by AAII
Project: 5 Activity: RDESM1110 Procurement of stainless
sheet cover for pillow block (new) - VCCI/AAII SI
Project: 5 Activity: RDESM1120 Fabrication of stainless
sheet cover for pillow block for B
Project: 5 Activity: RDESM1130 Installation of stainless
sheet cover for pillow block for B
Project: 5 Activity: RDESM1140 WIR Inspection of stainless
sheet cover for pillow block for B
Project: 5 Activity: RDESS1000 Construct Stair 2 - Desander
Project: 5 Activity: RDESS1010 Excavation works - Desander
Project: 5 Activity: RDESS1020 100mm thick gravel bedding -
Desander
Project: 5 Activity: RDESS1030 Formworks - Desander
Project: 5 Activity: RDESS1040 Reinforcement - Desander
Project: 5 Activity: RDESS1050 Concrete / PVC Waterstop
W=0.2 - Desander
Project: 5 Activity: RDESW1000 Wet Testing Inlet Gate
Desander Chamber 1
Project: 5 Activity: RDESW1010 Wet Testing Flushing Gate
Desander Chamber 1
Project: 5 Activity: RDESW1020 Wet Testing Flap Gate
Desander Chamber 1
Project: 5 Activity: RDESW1030 Wet Testing Inlet Gate
Desander Chamber 2
Project: 5 Activity: RDESW1040 Wet Testing Flushing Gate
Desander Chamber 2
Project: 5 Activity: RDESW1050 Wet Testing Flap Gate
Desander Chamber 2
Project: 5 Activity: RDESW1060 Wet Testing Desander Common
Outlet Chamber Gate
Project: 5 Activity: RDESW1070 Wet Testing Desander Common
Outlet Chamber LIT
Project: 5 Activity: RDRSC1000 Perimter Fence at Baffle
Apron Dissipator
Project: 5 Activity: RDRSD1000 Dry Testing Inlet Sampling
System
Project: 5 Activity: RDRSH1000 Walkthrough HEPP Drain Line
Project: 5 Activity: RDRSH1010 PUNCHLIST CLOSEOUT HEPP Drain
Line
Project: 5 Activity: RDRSH1020 Construction Handover HEPP
Drain Line
Project: 5 Activity: RDRSH1030 Walkthrough Inlet Sampling
System
Project: 5 Activity: RDRSH1040 PUNCHLIST CLOSEOUT Inlet
Sampling System
Project: 5 Activity: RDRSH1050 Construction Handover Inlet
Sampling System
Project: 5 Activity: RDRSS1000 PE Sta 0+451 - 0+477 (TB11 -
dissipator) - done
Project: 5 Activity: RDRSS1010 PE Sta 0+260 - 0+451(TB10 -
TB11) - Remaining 4m PE
Project: 5 Activity: RHFAA1000 Ceiling Works - HEPP FA
Project: 5 Activity: RHFAA1010 Install Louver Doors - HEPP
FA
Project: 5 Activity: RHFAA1020 Install Metal Doors - LEC
Steel - HEPP FA
Project: 5 Activity: RHFAA1030 Install Architectural Doors -
HEPP FA
Project: 5 Activity: RHFAA1040 Interior Painting - HEPP FA
Project: 5 Activity: RHFAA1050 Exterior Painting - HEPP FA
Project: 5 Activity: RHFAE1000 Installation of ACCU - HEPP
FA
Project: 5 Activity: RHFAE1010 Installation of lighting
fixtures - HEPP FA
Project: 5 Activity: RHFAE1020 Installation of LVSG - HEPP
FA
Project: 5 Activity: RHFAE1030 Installation of FDAS - HEPP
FA
Project: 5 Activity: RHFAE1040 Installation of data com -
HEPP FA
Project: 5 Activity: RHFAE1050 Installation of Panel Boards
- HEPP FA
Project: 5 Activity: RHFAE1060 Termination works - HEPP FA
Project: 5 Activity: RHFAE1070 Installation of CCTV System -
HEPP FA
Project: 5 Activity: RHFAU1000 Septic Tank - DONE
Project: 5 Activity: RHFAU1010 Catch Basins - HEPP FA
Project: 5 Activity: RHFAU1020 Sewer & Drain Pipe - HEPP FA
Project: 5 Activity: RHMBA1000 Fabrication of Louvers - DONE
Project: 5 Activity: RHMBA1010 Exterior Painting
Project: 5 Activity: RHMBA1020 Install Doors
Project: 5 Activity: RHMBA1030 Floor Finishes
Project: 5 Activity: RHMBA1040 Installation of Louvers -
DONE
Project: 5 Activity: RHMBA1050 Painting of Louvers (On the
welded portion)
Project: 5 Activity: RHMBA1060 WIR Inspection of Louvers
Project: 5 Activity: RHMBA1070 Installation of Scaffolding
of Louvers - DONE
Project: 5 Activity: RHMBA1090 Scaffolding installation
Prior for installation of Exhaust Fan
Project: 5 Activity: RHMBA1100 Installation of Exhaust Fan -
5 units
Project: 5 Activity: RHMBA1110 WIR Inspection of Exhaust Fan
- 5 units
Project: 5 Activity: RHMBA1120 Design of ladder rung -
access to sump pumps
Project: 5 Activity: RHMBA1130 Procurement of ladder rung -
access to sump pumps
Project: 5 Activity: RHMBA1140 Fabrication of ladder rung
and cage - access to sump pumps
Project: 5 Activity: RHMBA1150 Installation of ladder rung
and cage - access to sump pumps
Project: 5 Activity: RHMBA1160 Painting of ladder rung and
cage - access to sump pumps
Project: 5 Activity: RHMBA1170 WIR Inspection of ladder rung
and cage - access to sump pumps
Project: 5 Activity: RHMBA1180 Fabrication of sump pumps
gratings
Project: 5 Activity: RHMBA1190 Painting works of sump pumps
gratings
Project: 5 Activity: RHMBA1200 Installation of sump pumps
gratings
Project: 5 Activity: RHMBA1210 WIR Inspection of sump pumps
gratings
Project: 5 Activity: RHMBA1220 Fabrication of gratings
Project: 5 Activity: RHMBA1230 Painting works gratings
Project: 5 Activity: RHMBA1240 Installation of gratings
Project: 5 Activity: RHMBA1250 WIR Inspection gratings
Project: 5 Activity: RHMBA1260 Dismantling of Scaffolding of
Louvers
Project: 5 Activity: RHMBA1270 Installation of Scaffolding
for ladder rung and cage - access to sump pumps
Project: 5 Activity: RHMBA1280 Installation of Exhaust fan -
Ceiling caset type 4 units
Project: 5 Activity: RHMBA1290 WIR Inspection for
Installation of Exhaust fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1300 Design of Louvers for Exhaust
Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1310 Procurement of Louvers for
Exhaust Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1320 Fabrication of Louvers for
Exhaust Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1330 Painting of Louvers for
Exhaust Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1340 Installation of Louvers for
Exhaust Fan - Ceiling caset type 4 units
Project: 5 Activity: RHMBA1350 Fabrication of Exhaust
ducting and Supports at Genset room
Project: 5 Activity: RHMBA1360 Installation of Exhaust
ducting and Supports at Genset room
Project: 5 Activity: RHMBA1370 WIR Inspection for
Installation of Exhaust ducting and Supports at Genset room
Project: 5 Activity: RHMBD1000 Dry Testing Turbine & Bypass
Inlet Valve
Project: 5 Activity: RHMBD1010 Dry Testing Turbine Line &
Bypass Line
Project: 5 Activity: RHMBD1020 Dry Testing -Turbine &
Switchgear
Project: 5 Activity: RHMBE1000 Install Electrical Equipment
- INGOS
Project: 5 Activity: RHMBE1010 Install Cable Tray - INGOS
Project: 5 Activity: RHMBE1020 Cable Pulling - INGOS
Project: 5 Activity: RHMBE1030 Termination Works - INGOS
Project: 5 Activity: RHMBH1000 Walkthrough Bifurcation Line
Project: 5 Activity: RHMBH1010 PUNCHLIST CLOSEOUT
Bifurcation Line
Project: 5 Activity: RHMBH1020 Construction Handover
Bifurcation Line
Project: 5 Activity: RHMBH1030 Walkthrough Turbine & Bypass
Inlet Valve
Project: 5 Activity: RHMBH1040 PUNCHLIST CLOSEOUT Turbine &
Bypass Inlet Valve
Project: 5 Activity: RHMBH1050 Construction Handover Turbine
& Bypass Inlet Valve
Project: 5 Activity: RHMBH1060 Walkthrough Turbine Line &
Bypass Line & Bypass Line
Project: 5 Activity: RHMBH1070 PUNCHLIST CLOSEOUT Turbine
Line & Bypass Line
Project: 5 Activity: RHMBH1080 Construction Handover Turbine
Line & Bypass Line
Project: 5 Activity: RHMBH1090 Walkthrough -Turbine &
Switchgear
Project: 5 Activity: RHMBH1100 PUNCHLIST CLOSEOUT -Turbine &
Switchgear
Project: 5 Activity: RHMBH1110 Construction Handover -
Turbine & Switchgear
Project: 5 Activity: RHMBM1000 Install aeration pipework -
Installation
Project: 5 Activity: RHMBM1010 Pipe Connection DN1000 - Full
Welding Works
Project: 5 Activity: RHMBM1020 Install Cooling Water System
& HYDROTESTING
Project: 5 Activity: RHMBM1030 Leveling and prealignment of
Turbine and Generator
Project: 5 Activity: RHMBM1040 Installation of Pipes for
Sump Pumps
Project: 5 Activity: RHMBM1050 Dismantling of Scaffolding
prior for the Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1060 Install aeration pipework -
Painting Works
Project: 5 Activity: RHMBM1070 Install aeration pipework -
WIR Inspection
Project: 5 Activity: RHMBM1080 Pipe Connection DN1000 -
Painting Works
Project: 5 Activity: RHMBM1090 Pipe Connection DN1000 - WIR
Inspection
Project: 5 Activity: RHMBM1100 Re-installation of Sump Pumps
- 2 units
Project: 5 Activity: RHMBM1110 Hydrotest of Pipes for Sump
Pumps
Project: 5 Activity: RHMBM1120 Fabrication of Flanges for
Sump Pumps
Project: 5 Activity: RHMBM1130 Installation of Flanges for
Sump Pumps
Project: 5 Activity: RHMBM1140 Installation of Check valves
for Sump Pumps - 2 units
Project: 5 Activity: RHMBM1150 Installation of Gate valves
for Sump Pumps - 2 units
Project: 5 Activity: RHMBM1160 Hydrotest of Pipes for Sump
Pumps - WIR Inspection
Project: 5 Activity: RHMBM1170 Painting Works of Pipes for
Sump Pumps
Project: 5 Activity: RHMBM1180 Painting Works of Pipes for
Sump Pumps - WIR Inspection
Project: 5 Activity: RHMBM1190 Procurement for Sump Pumps -
AAII/VCCI SI
Project: 5 Activity: RHMBM1200 Design for Sump Pumps - AAII
Project: 5 Activity: RHMBM1210 Reinstallation of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1220 Lifting of Bypass Inlet Valve
DN800
Project: 5 Activity: RHMBM1230 Bolt torquing of Bypass Inlet
Valve DN800
Project: 5 Activity: RHMBM1240 WIR Inspection of Bypass
Inlet Valve DN800
Project: 5 Activity: RHMBM1250 Piping Alignment of Turbine
and Generator
Project: 5 Activity: RHMBM1260 Piping and Turbine and
Generator Alignment
Project: 5 Activity: RHMBM1270 Dismantling of Pipe
conncetion for Turbine and Generator
Project: 5 Activity: RHMBM1280 Final Alignment for Piping
and Turbine and Generator
Project: 5 Activity: RHMBM1290 1st stage grouting of Turbine
and Generator
Project: 5 Activity: RHMBM1300 2nd Stage grouting for Piping
and Turbine and Generator
Project: 5 Activity: RHMBM1310 Fabrication of temporaty
blinds for Pipe conncetion in draft Tube
Project: 5 Activity: RHMBM1320 Installation of temporaty
blinds for Pipe conncetion in draft Tube
Project: 5 Activity: RHMBM1330 Inspection as found status of
Turbines and Generator
Project: 5 Activity: RHMBM1340 Inspection prior for grouting
of Turbine and Generator
Project: 5 Activity: RHMBM1350 WIR Final inspection of
Turbine and Generator
Project: 5 Activity: RHMBM1360 Connection to Cooling Water
Sytem - Turbine and Generator
Project: 5 Activity: RHMBM1370 WIR Inspection Bolt torquing
of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1380 WIR Inspection prior for the
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBM1390 WIR Inspection for
Reinstallation of Bypass Inlet Valve DN800
Project: 5 Activity: RHMBS1000 Formworks & Rebar
Installation Turbine Tube
Project: 5 Activity: RHMBS1010 Concrete Pouring Turbine Tube
Project: 5 Activity: RHMBS1020 2nd Stage Concrete Pouring
Project: 5 Activity: RHMBW1020 Wet Testing -Turbine &
Switchgear
Project: 5 Activity: RINDA1020 Floor Finishes
Project: 5 Activity: RMGHM1030 Install Exhaust Fan
Project: 5 Activity: RPPLC1000 Design for CAVs protection
cage - AAII
Project: 5 Activity: RPPLC1010 Installation of Manhole
chamber ladder rung
Project: 5 Activity: RPPLC1020 Restoration - Backfilling &
Compaction
Project: 5 Activity: RPPLC1030 Procuremnet for CAVs
protection cage
Project: 5 Activity: RPPLC1040 Fabrication for CAVs
protection cage
Project: 5 Activity: RPPLC1050 Installation for CAVs
protection cage
Project: 5 Activity: RPPLC1060 Painting Works for CAVs
protection cage
Project: 5 Activity: RPPLC1070 WIR Inspection for CAVs
protection cage
Project: 5 Activity: RPPLC1080 Procurement of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1090 Fabrication of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1100 Painting of materials for
Manhole chamber ladder rung
Project: 5 Activity: RPPLC1110 WIR Inspection for Manhole
chamber ladder rung
Project: 5 Activity: RPPLD1000 Dry Testing Penstock Line
Project: 5 Activity: RPPLH1000 Walkthrough Penstock Line
Project: 5 Activity: RPPLH1010 PUNCHLIST CLOSEOUT Penstock
Line
Project: 5 Activity: RPPLH1020 Construction Handover
Penstock Line
Project: 5 Activity: RPPLM1000 CAVs = 5 and Drain Valve = 1
bolt torqueing
Project: 5 Activity: RPPLM1010 Fabrication of manhole cover
for TB-15
Project: 5 Activity: RPPLM1020 Bolt torqueing of anchor
bolts of flume bridge = 8 x 4
Project: 5 Activity: RPPLM1030 Gasket verifcation at site
(part of bolt torqueing) Air Vents
Project: 5 Activity: RPPLM1040 Manhole seal inspection -
Installation of O-Ring and manhole closing (34 MH)
Project: 5 Activity: RPPLM1050 Installation of Flow Meter -
(EESI to provide power supply)
Project: 5 Activity: RPPLS1000 Construction of Access Way to
Penstock Flume Bridge
Project: 5 Activity: RSDBA1080 Floor Finishes
Project: 5 Activity: RSTFC1000 Backfilling Works
Project: 5 Activity: RSWPA1030 Floor Finishes
Project: 5 Activity: RTWTA1000 Finish Painting for Exterior
Walls - TWT
Project: 5 Activity: RTWTC1000 Backfilling works - Remaining
- TWT
Project: 5 Activity: RTWTD1000 Dry Testing Bypass Inlet
Valve
Project: 5 Activity: RTWTD1010 Dry Testing Water Head Tank
Spillway Box
Project: 5 Activity: RTWTD1020 Dry Testing Water Head Tank
Project: 5 Activity: RTWTH1000 Walkthrough Bypass Chamber
Drain Line
Project: 5 Activity: RTWTH1010 PUNCHLIST CLOSEOUT Bypass
Chamber Drain Line
Project: 5 Activity: RTWTH1020 Construction Handover Bypass
Chamber Drain Line
Project: 5 Activity: RTWTH1030 Walkthrough Bypass Inlet
Valve
Project: 5 Activity: RTWTH1040 PUNCHLIST CLOSEOUT Bypass
Inlet Valve
Project: 5 Activity: RTWTH1050 Construction Handover Bypass
Inlet Valve
Project: 5 Activity: RTWTH1060 Walkthrough Water Head Tank
Spillway Box
Project: 5 Activity: RTWTH1070 PUNCHLIST CLOSEOUT Water Head
Tank Spillway Box
Project: 5 Activity: RTWTH1080 Construction Handover Water
Head Tank Spillway Box
Project: 5 Activity: RTWTH1090 Walkthrough Water Head Tank
Project: 5 Activity: RTWTH1100 PUNCHLIST CLOSEOUT Water Head
Tank
Project: 5 Activity: RTWTH1110 Construction Handover Water
Head Tank
Project: 5 Activity: RTWTM1000 Fixing of Gates - TWT and
Trial Operations (Draft tube)
Project: 5 Activity: RTWTM1010 Install Hydraulic Piping -
TWT
Project: 5 Activity: RTWTM1020 Shafting Installation at
Bypass
Project: 5 Activity: RTWTM1030 Hydraulic tubing including
supports connection to Hydraulic Cyclinder - Draft Tube
Project: 5 Activity: RTWTM1040 WIR Inspection for Hydraulic
tubing connection to Hydraulic Cyclinder
Project: 5 Activity: RTWTM1050 Shafting Installation at
Draft tube
Project: 5 Activity: RTWTM1060 Installation of Hydraulic
Cylinder for Draft tube
Project: 5 Activity: RTWTM1070 Installation of Hydraulic
Cyinder for Bypass
Project: 5 Activity: RTWTM1080 Hydraulic tubing including
supports connection to Hydraulic Cyclinder - Bypass
Project: 5 Activity: RTWTM1090 Fixing of Gates - TWT and
Trial Operations (Bypass)
Project: 5 Activity: RTWTM1100 Procurement of 2 pins for
Draft tube and Bypass
Project: 5 Activity: RTWTM1110 Fabrication of 2 pins for
Draft tube and Bypass
Project: 5 Activity: RTWTM1120 Fabrication of ladder rung
and cage
Project: 5 Activity: RTWTM1130 Painting works ladder rung
and cage
Project: 5 Activity: RTWTM1140 Installation of ladder rung
and cage
Project: 5 Activity: RTWTM1290 WIR Inspection ladder rung
and cage
Project: 5 Activity: RTWTS1000 Staircase Construction:
Excavation - TWT
Project: 5 Activity: RTWTS1010 Staircase Construction:
Foundation Works - TWT
Project: 5 Activity: RTWTS1020 Staircase Construction:
Backfilling - TWT
Project: 5 Activity: RTWTS1030 Staircase Construction: Steel
Stair case - TWT
Project: 5 Activity: RWEIA1010 Install Ladder Rungs
Project: 5 Activity: RWEIA1020 Install Gate Covers at Intake
Tower
Project: 5 Activity: RWEIA1030 Additional Handrails and
Cantilever Platform at Weir House Perimeter
Project: 5 Activity: RWEIA1050 Install Windows
Project: 5 Activity: RWEIA1060 Safety Railings
Project: 5 Activity: RWEIA1070 Architectural and Structural
Coating touch-ups/rectification
Project: 5 Activity: RWEIA1080 Install Doors
Project: 5 Activity: RWEIC1000 Trash Rack Repair
Project: 5 Activity: RWEIC1010 Clearing works at the Weir
Intake Channel/Chamber
Project: 5 Activity: RWEIC1020 INITIAL Re-diversion Works of
the River through Steel Pipe
Project: 5 Activity: RWEIC1030 Scaffolding - Slope
Protection
Project: 5 Activity: RWEIC1040 Drilling & Rockbolting -
Slope Protection
Project: 5 Activity: RWEIC1050 Wiremesh pinning - Slope
Protection
Project: 5 Activity: RWEIC1060 Shotcreting / Grouted Riprap
- Slope Protection
Project: 5 Activity: RWEIC1070 Scaffolding - Slope
Protection
Project: 5 Activity: RWEIC1080 Drilling & Rockbolting -
Slope Protection
Project: 5 Activity: RWEIC1090 Wiremesh pinning - Slope
Protection
Project: 5 Activity: RWEIC1100 Shotcreting / Grouted Riprap
- Slope Protection
Project: 5 Activity: RWEIC1110 Temporary Coffer Dam/Care of
Water - Flushing Box P1-A1
Project: 5 Activity: RWEIC1120 Excavation Works/Base
preparation - Flushing Box P1-A1
Project: 5 Activity: RWEIC1130 Concreting Works - Flushing
Box P1-A1
Project: 5 Activity: RWEIC1140 Backfill and Compaction -
Flushing Box P1-A1
Project: 5 Activity: RWEIC1150 Water Diversion ( to Coffer
Dam Area 1) - Flushing Box P1-A1
Project: 5 Activity: RWEIC1160 Temporary Coffer Dam/Care of
Water - Flushing Box P1-A2
Project: 5 Activity: RWEIC1170 Excavation Works/Base
preparation - Flushing Box P1-A2
Project: 5 Activity: RWEIC1180 Concreting Works - Flushing
Box P1-A2
Project: 5 Activity: RWEIC1190 Backfill and Compaction -
Flushing Box P1-A2
Project: 5 Activity: RWEIC1200 Temporary Coffer Dam/Care of
Water - Flushing Box P2
Project: 5 Activity: RWEIC1210 Excavation Works/Base
preparation/backfilling - Flushing Box P2
Project: 5 Activity: RWEIC1220 Concreting Works - Flushing
Box P2
Project: 5 Activity: RWEIC1230 Backfill and Compaction -
Flushing Box P2
Project: 5 Activity: RWEIC1240
Excavation/Hauling/Restoration - Weir River Channel
Project: 5 Activity: RWEIC1250 Levelling, trimming, and
compacting of soil
Project: 5 Activity: RWEIC1260 Dewatering Works - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1270 Excavation works - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1280 Backfilling works - Right
Dike Abutment 1st Half
Project: 5 Activity: RWEIC1290 Levelling, trimming, and
compacting of soil - Right Dike Abutment 1st Half
Project: 5 Activity: RWEIC1300 Cyclopean concrete - Right
Dike Abutment 1st Half
Project: 5 Activity: RWEIC1310 300mmthk Grouted Boulders -
Right Dike Abutment 1st Half
Project: 5 Activity: RWEIC1320 Rockfill - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1330 Rebar & Froms - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1340 Concrete - Right Dike
Abutment 1st Half
Project: 5 Activity: RWEIC1350 Dewatering Works - Right Dike
Abutment 2nd Half
Project: 5 Activity: RWEIC1360 Excavation works - Right Dike
Abutment 2nd Half
Project: 5 Activity: RWEIC1370 Backfilling works - Right
Dike Abutment 2nd Half
Project: 5 Activity: RWEIC1380 Levelling, trimming, and
compacting of soil - Right Dike Abutment 2nd Half
Project: 5 Activity: RWEIC1390 Cyclopean concrete - Right
Dike Abutment 2nd Half
Project: 5 Activity: RWEIC1400 300mmthk Grouted Boulders -
Right Dike Abutment 2nd Half
Project: 5 Activity: RWEIC1410 Rockfill - Right Dike
Abutment 2nd Half
Project: 5 Activity: RWEIC1420 Rebar & Froms - Right Dike
Abutment 2nd Half
Project: 5 Activity: RWEIC1430 Concrete - Right Dike
Abutment 2nd Half
Project: 5 Activity: RWEIC1440 Cyclopean Concrete
Project: 5 Activity: RWEIC1450 Forms
Project: 5 Activity: RWEIC1460 Water Diversion (to Weir) -
5-Barrel RCBC with Dike
Project: 5 Activity: RWEIC1470 Excavation works - 5-Barrel
RCBC with Dike
Project: 5 Activity: RWEIC1480 Levelling, trimming, and
compacting of soil - 5-Barrel RCBC with Dike
Project: 5 Activity: RWEIC1490 Formworks - 5-Barrel RCBC
with Dike
Project: 5 Activity: RWEIC1500 Reinforcement - 5-Barrel RCBC
with Dike
Project: 5 Activity: RWEIC1510 Concrete - 5-Barrel RCBC with
Dike
Project: 5 Activity: RWEID1000 Dry Testing - Weir Intake
Inlet Gate (Include initial tests of the gates) - WEIR
Project: 5 Activity: RWEID1010 Dry Testing - Weir Intake
Inlet Line - WEIR
Project: 5 Activity: RWEID1020 Dry Testing - Weir Intake
Inlet Stoplog - WEIR
Project: 5 Activity: RWEID1030 Dry Testing - Bypass Line -
WEIR
Project: 5 Activity: RWEID1040 Dry Testing - Environmental
Line - WEIR
Project: 5 Activity: RWEID1050 Dry Testing - Intake Box
Flushing Line - WEIR
Project: 5 Activity: RWEIE1000 Wiring of temporary gensets
to the main panels
Project: 5 Activity: RWEIE1010 Rectification of electrical
works
Project: 5 Activity: RWEIE1020 Testing for all electrical
installation
Project: 5 Activity: RWEIE1030 Normal power connection
(DLPC)
Project: 5 Activity: RWEIE1040 Install Permanent Service
Entrance & Handhole
Project: 5 Activity: RWEIE1050 Remaining grounding system
Project: 5 Activity: RWEIH1000 Walkthrough - WEIR
Project: 5 Activity: RWEIH1010 Punchlist Close-out - WEIR
Project: 5 Activity: RWEIH1020 Construction Handover to
Commissioning - WEIR
Project: 5 Activity: RWEII1000 Install PLC
Project: 5 Activity: RWEII1010 Installation of remaining
instruments
Project: 5 Activity: RWEII1020 Cable pulling for FOC
Project: 5 Activity: RWEII1030 Installation of CCTV System
Project: 5 Activity: RWEIM1000 Install Hydraulic Piping
Project: 5 Activity: RWEIM1010 Preparation of platform and
additional soundproofing enclosure on Weir for the portable genset
Project: 5 Activity: RWEIM1020 Hauling of 2 units portable
gensets from WTP to RWF. Mounting on platforms
Project: 5 Activity: RWEIM1030 Install Valve for
Environmental Pipe
Project: 5 Activity: RWEIM1040 Temp flap gate to be
fabricated and installed sketch and info required
Project: 5 Activity: RWEIM1050 Stitch welding of sheet piles
- sketch/info required
Project: 5 Activity: RWEIM1060 Modification works on HPU
control panel, including control wiring to HPU
Project: 5 Activity: RWEIM1070 Bolt Torquing for
Environmental Valves
Project: 5 Activity: RWEIM1080 Flow Regulating valve
(Spindle/Shafting fabrication and installation) at Environmental Gate
Project: 5 Activity: RWEIM1090 Install Room Exhaust Fan
Project: 5 Activity: RWEIM1100 Install ladder rung guard
Project: 5 Activity: RWEIM1110 Relocation of turbidity
sensor, DO and Temp @ Weir
Project: 5 Activity: RWEIM1120 Permanent Access Ladder -
Fabrication
Project: 5 Activity: RWEIM1130 Installation of Stitched
Sheet Piles
Project: 5 Activity: RWEIM1140 SAT of HPU (Joint Inspection
w/ EESI, VCCI, T&C, Hydrotechnic)
Project: 5 Activity: RWEIM1150 Gate Seals Rectification and
testing(Bypass)
Project: 5 Activity: RWEIM1160 Air vent screen cover -
Fabrication
Project: 5 Activity: RWEIM1170 Relocate maintenance platform
for water monitoring instruments
Project: 5 Activity: RWEIM1180 Installation of grounding pit
(EE Design issue - pending)
Project: 5 Activity: RWEIM1190 Gate Seals Rectification and
testing(Maintenance)
Project: 5 Activity: RWEIM1200 Gate Seals Rectification and
testing(flushing)
Project: 5 Activity: RWEIM1210 Gate Seals Rectification and
testing(Intake)
Project: 5 Activity: RWEIM1220 Weir to Desander Piping
(Paint rectification)
Project: 5 Activity: RWEIM1230 Weir to Desander Piping
(Paint rectification) - Joint Final Inspection with Witco and T&C
Project: 5 Activity: RWEIM1240 Air vent screen cover -
Installation (Welding Works)
Project: 5 Activity: RWEIM1250 Permanent Access Ladder -
Installation (Welding Works)
Project: 5 Activity: RWEIM1260 Permanent Access Ladder -
Installation of Scaffoldings prior for installation
Project: 5 Activity: RWEIM1270 Air vent screen cover -
Installation of Scaffoldings prior for installation
Project: 5 Activity: RWEIM1280 Air vent screen cover -
Painting Works
Project: 5 Activity: RWEIM1290 Permanent Access Ladder -
Painting Works
Project: 5 Activity: RWEIM1300 Air vent screen cover - WIR
Inspection
Project: 5 Activity: RWEIM1310 Permanent Access Ladder - WIR
Inspection
Project: 5 Activity: RWEIM1320 Gate Seals Rectification
(Inlet Gates A)
Project: 5 Activity: RWEIM1330 Gate Seals Rectification
(Flushing Gates A)
Project: 5 Activity: RWEIM1340 Gate Seals Rectification
Outlet Gate A)
Project: 5 Activity: RWEIM1350 Gate Seals Rectification
(Inlet Gates B)
Project: 5 Activity: RWEIM1360 Gate Seals Rectification
(Flushing Gates B)
Project: 5 Activity: RWEIM1370 Gate Seals Rectification
Outlet Gate B)
Project: 5 Activity: RWEIM1380 Gate Seals Rectification
(Inlet Gates Inspection for A and B)
Project: 5 Activity: RWEIM1390 Gate Seals Rectification
(Flushing Gates Ins[ppection for A and B)
Project: 5 Activity: RWEIM1400 Gate Seals Rectification
Outlet Gate Inspecttion for A and B)
Project: 5 Activity: RWEIM1420 Air vent screen cover -
Procurement of Materials
Project: 5 Activity: RWEIM1430 Permanent Access Ladder-
Procurement of Materials
Project: 5 Activity: RWEIS1000 Vertical grooving at Weir
side wall for the relocation of turbidity & DO
Project: 5 Activity: RWEIS1010 Install Weir Pedestrian
Bridge - Remaining works
Project: 5 Activity: RWEIW1000 Wet Testing Weir Intake Inlet
Gate - WEIR
Project: 5 Activity: RWEIW1010 Wet Testing Weir Intake Inlet
Line - WEIR
Project: 5 Activity: RWEIW1020 Wet Testing Weir Intake Inlet
Stoplog - WEIR
Project: 5 Activity: RWEIW1030 Wet Testing Bypass Line -
WEIR
Project: 5 Activity: RWEIW1040 Wet Testing Environmental
Line - WEIR
Project: 5 Activity: RWEIW1050 Wet Testing Intake Box
Flushing Line - WEIR
Project: 5 Activity: RWEIW1060 Flushing & Cleaning - WEIR
Project: 5 Activity: TAL1C2000 Gully Bridge: Construction of
Scouring Protection
Project: 5 Activity: TAL1C2070 Permanent Road Restoration
Sta 2+078 to 2+140
Project: 5 Activity: TAL1C2380 Permanent Road Restoration
Sta 2+384 to 2+443
Project: 5 Activity: TAL1C2440 Permanent Road Restoration
Sta 2+446 to 2+520
Project: 5 Activity: TAL1C2860 Permanent Road Restoration
Sta 2+862 to 3+406
Project: 5 Activity: TAL1C7000 Gully Bridge: Site
Restoration
Project: 5 Activity: TAL1D1000 Dry Testing ( Close/Open
valves - 20) - Alignment 1
Project: 5 Activity: TAL1H1000 Walkthrough - Alignment 1
Project: 5 Activity: TAL1H1010 Construction Handover -
Alignment 1
Project: 5 Activity: TAL1H1020 PUNCHLIST CLOSEOUT -
Alignment 1
Project: 5 Activity: TAL1M2000 Install Expansion Joint at
Gully Bridge Pipe - WELDING REMAINING WORKS
Project: 5 Activity: TAL1M3000 Steel Bridge Painting
Remaining works
Project: 5 Activity: TAL1M4000 Removal of Debris Inside the
Pipe / Clean-up - Align1
Project: 5 Activity: TAL1M4010 Painting - Align1
Project: 5 Activity: TAL1M4020 Closing of Temporary Manhole
- Welding - Align1
Project: 5 Activity: TAL1M4030 Closing of Temporary Manhole
- Painting - Align1
Project: 5 Activity: TAL2C1610 Permanent Road Restoration
Sta 1+610 to 1+652
Project: 5 Activity: TAL2C1650 Permanent Road Restoration
Sta 1+654 to 1+840
Project: 5 Activity: TAL2C1840 Permanent Road Restoration
Sta 1+842 to 2+028
Project: 5 Activity: TAL2C2030 Permanent Road Restoration
Sta 2+031 to 2+107
Project: 5 Activity: TAL2C2110 Permanent Road Restoration
Sta 2+112 to 2+285
Project: 5 Activity: TAL2C2640 Permanent Road Restoration
Sta 2+645 to 3+035
Project: 5 Activity: TAL2C3030 Permanent Road Restoration
Sta 3+038 to 3+125
Project: 5 Activity: TAL2C3120 Permanent Road Restoration
Sta 3+129 to 3+339
Project: 5 Activity: TAL2C3280 Permanent Road Restoration
Sta 2+286 to 2+641
Project: 5 Activity: TAL2C3340 Permanent Road Restoration
Sta 3+342 to 3+900
Project: 5 Activity: TAL2C3900 Permanent Road Restoration
Sta 3+900 to 4+278
Project: 5 Activity: TAL2C4280 Permanent Road Restoration
Sta 4+280 to 4+324
Project: 5 Activity: TAL2C4320 Permanent Road Restoration
Sta 4+327 to 4+463
Project: 5 Activity: TAL2C4460 Permanent Road Restoration
Sta 4+463 to 5+113
Project: 5 Activity: TAL2C5110 Permanent Road Restoration
Sta 5+115 to 5+195
Project: 5 Activity: TAL2C5200 Permanent Road Restoration
Sta 5+200 to 6+275
Project: 5 Activity: TAL2C6270 Permanent Road Restoration
Sta 6+279 to 6+820, 0+073 (AL3), 0+025 (AL 4)
Project: 5 Activity: TAL2Cn0010 Permanent Road Restoration
Sta 0+000 to 0+114
Project: 5 Activity: TAL2Cn0120 Permanent Road Restoration
Sta 0+120 to 0+954
Project: 5 Activity: TAL2Cn0950 Permanent Road Restoration
Sta 0+957 to 1+602
Project: 5 Activity: TAL2D1000 Dry Testing (Close/Open
Valves - 88)
Project: 5 Activity: TAL2H1000 Walkthrough
Project: 5 Activity: TAL2H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL2H1020 Construction Handover
Project: 5 Activity: TAL2M3000 Install Temporary Access
Manholes
Project: 5 Activity: TAL2M7000 Removal of Debris Inside the
Pipe / Clean-up - Align2
Project: 5 Activity: TAL2M7010 Clearing with the NCR / Weld
Repair - Align2
Project: 5 Activity: TAL2M7020 Painting - Align2
Project: 5 Activity: TAL2M7030 Closing of Temporary Manhole
- Welding - Align2
Project: 5 Activity: TAL2M7040 Closing of Temporary Manhole
- Painting - Align2
Project: 5 Activity: TAL3C1970 Permanent Road Restoration
Sta 1+977 to 1+989
Project: 5 Activity: TAL3C1990 Permanent Road Restoration
Sta 1+991 to 2+371
Project: 5 Activity: TAL3C2380 Permanent Road Restoration
Sta 2+382 to 2+869
Project: 5 Activity: TAL3C2880 Permanent Road Restoration
Sta 2+885 to 3+559
Project: 5 Activity: TAL3C3560 Permanent Road Restoration
Sta 3+568 to 4+285
Project: 5 Activity: TAL3C4280 Permanent Road Restoration
Sta 4+288 to 4+310
Project: 5 Activity: TAL3C4310 Permanent Road Restoration
Sta 4+313 to 5+137
Project: 5 Activity: TAL3C5140 Permanent Road Restoration
Sta 5+147 to 5+307
Project: 5 Activity: TAL3C5310 Permanent Road Restoration
Sta 5+310 to 6+374
Project: 5 Activity: TAL3C6370 Permanent Road Restoration
Sta 6+377 to 6+700
Project: 5 Activity: TAL3C8020 Permanent Road Restoration
Sta 8+020 to 8+303
Project: 5 Activity: TAL3C8300 Permanent Road Restoration
Sta 8+306 to 8+947
Project: 5 Activity: TAL3C8950 Permanent Road Restoration
Sta 8+950 to 9+972
Project: 5 Activity: TAL3Cn0070 Permanent Road Restoration
Sta 0+076 to 0+871
Project: 5 Activity: TAL3Cn0870 Permanent Road Restoration
Sta 0+874 to 1+975
Project: 5 Activity: TAL3D1000 Dry Testing ( Close/Open
valves - 121) - Alignment 3
Project: 5 Activity: TAL3H1000 Walkthrough
Project: 5 Activity: TAL3H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL3H1020 Construction Handover
Project: 5 Activity: TAL3M1000 BOV & CAV Installation
including Appurtenances (TOTAL 53)
Project: 5 Activity: TAL3M4000 Removal of temporary
restraint from installed expansion joints at Angalan fabricated bridges 1,2 & 3
Project: 5 Activity: TAL4C10300 Permanent Road Restoration
Sta 10+300 to 10+425
Project: 5 Activity: TAL4C10430 Permanent Road Restoration
Sta 10+430 to 10+460
Project: 5 Activity: TAL4C11140 Permanent Road Restoration
Sta 11+145 to 11+616
Project: 5 Activity: TAL4C11620 Permanent Road Restoration
Sta 11+620 to 12+602
Project: 5 Activity: TAL4C12600 Permanent Road Restoration
Sta 12+607 to 13+526
Project: 5 Activity: TAL4C13530 Permanent Road Restoration
Sta 13+530 to 14+585
Project: 5 Activity: TAL4C14630 Permanent Road Restoration
Sta 14+637 to 14+910, 0+015 (AL5), 0+018 (AL6)
Project: 5 Activity: TAL4C1520 Permanent Road Restoration
Sta 1+525 to 2+415
Project: 5 Activity: TAL4C2410 Permanent Road Restoration
Sta 2+418 to 3+235
Project: 5 Activity: TAL4C3230 Permanent Road Restoration
Sta 3+238 to 3+989
Project: 5 Activity: TAL4C4000 Permanent Road Restoration
Sta 4+007 to 4+420
Project: 5 Activity: TAL4C5480 Permanent Road Restoration
Sta 5+484 to 5+711
Project: 5 Activity: TAL4C5710 Permanent Road Restoration
Sta 5+715 to 6+350
Project: 5 Activity: TAL4C8200 Permanent Road Restoration
Sta 8+200 to 8+360
Project: 5 Activity: TAL4C8710 Permanent Road Restoration
Sta 8+710 to 8+970
Project: 5 Activity: TAL4C9740 Permanent Road Restoration
Sta 9+740 to 9+933
Project: 5 Activity: TAL4C9930 Permanent Road Restoration
Sta 9+935 to 10+200
Project: 5 Activity: TAL4Cn0020 Permanent Road Restoration
Sta 0+028 to 0+718
Project: 5 Activity: TAL4Cn0723 Permanent Road Restoration
Sta 0+723 to 1+520
Project: 5 Activity: TAL4D1000 Dry Testing ( Close/Open
valves - 131) - Alignment 4 (To Mandug)
Project: 5 Activity: TAL4H1000 Walkthrough - Alignment 4 (To
Mandug)
Project: 5 Activity: TAL4H1010 PUNCHLIST CLOSEOUT -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL4H1020 Construction Handover -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL4M1500 Install/Sealing of Temporary
Access Manholes Alignment 4A
Project: 5 Activity: TAL4M1600 BOV(20), CAV (GV+AV=52), PRV
(2) Including Appurtenances Alignment 4A
Project: 5 Activity: TAL4M1700 Hydrotesting Segment-3 -
Alignment 4A
Project: 5 Activity: TAL4M1800 Isolation Chamber remaining
(4) - Walls (2), Covers (4), Backfilling - Alignment 4A
Project: 5 Activity: TAL4M1900 Hydrotesting Segment-8 -
Alignment 4A
Project: 5 Activity: TAL4M2000 Hydrotesting Segment-9 -
Alignment 4A
Project: 5 Activity: TAL4M2100 Closing of Gaps - Golden
Joints Alignment 4A (37 mts)
Project: 5 Activity: TAL4M2200 Hydrotesting Segment-10 -
Alignment 4A
Project: 5 Activity: TAL4M2300 Hydrotesting Segment-11 -
Alignment 4A
Project: 5 Activity: TAL4M2400 Pipelaying Alignment 4B
Project: 5 Activity: TAL4M2500 Hydrotest - Sta. 10+675-780
Alignment 4B
Project: 5 Activity: TAL4M2600 Thrust Blocks & Backfilling -
Alignment 4B
Project: 5 Activity: TAL4M2700 Welding Alignment 4B
Project: 5 Activity: TAL4M2800 Closing of Gaps Alignment 4B
Project: 5 Activity: TAL4M2900 Hydrotest - Sta. 10+788-
11+064 Alignment 4B
Project: 5 Activity: TAL4M3000 Install Stub-outs for
Draining (8 sets) - Alignment 4A/4B
Project: 5 Activity: TAL4M3100 Isolation Chamber remaining
(2) - Concrete covers, Saddle supports & Backfilling - Alignment 4B
Project: 5 Activity: TAL4M3200 Hydrotest - Sta. 11+067-617
Alignment 4B
Project: 5 Activity: TAL4M3300 Hydrotest - Sta. 11+620-
12+602 Alignment 4B
Project: 5 Activity: TAL4M3400 BOV(12), CAV (GV+AV=22), PRV
(4) Including Appurtenances Alignment-4B
Project: 5 Activity: TAL4M3500 Hydrotest - Sta. 12+607-
13+526 Alignment 4B
Project: 5 Activity: TAL4M3600 Hydrotest - Sta. 13+530-
14+906 Alignment 4B
Project: 5 Activity: TAL4M3700 Hydrotest - Sta. 10+430-671
Alignment 4B
Project: 5 Activity: TAL4M4000 Removal of Debris Inside the
Pipe / Clean-up - Align4
Project: 5 Activity: TAL4M4010 Clearing with the NCR / Weld
Repair - Align4
Project: 5 Activity: TAL4M4020 Painting - Align4
Project: 5 Activity: TAL4M4030 Closing of Temporary Manhole
- Welding - Align4
Project: 5 Activity: TAL4M4040 Closing of Temporary Manhole
- Painting - Align4
Project: 5 Activity: TAL4W1000 Flushing & Cleaning -
Alignment 4 (To Mandug)
Project: 5 Activity: TAL5C1020 Permanent Road Restoration
Sta 1+025 to 2+020
Project: 5 Activity: TAL5C2020 Permanent Road Restoration
Sta 2+025 to 3+020
Project: 5 Activity: TAL5C3020 Permanent Road Restoration
Sta 3+025 to 4+020
Project: 5 Activity: TAL5C4020 Permanent Road Restoration
Sta 4+025 to 5+020
Project: 5 Activity: TAL5C5020 Permanent Road Restoration
Sta 5+025 to 6+200
Project: 5 Activity: TAL5C6200 Permanent Road Restoration
Sta 6+205 to 7+140
Project: 5 Activity: TAL5C7140 Permanent Road Restoration
Sta 7+144 to 7+991
Project: 5 Activity: TAL5Cn0020 Permanent Road Restoration
Sta 0+020 to 1+020
Project: 5 Activity: TAL5D1000 Dry Testing
Project: 5 Activity: TAL5H1000 Walkthrough
Project: 5 Activity: TAL5H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL5H1020 Construction Handover
Project: 5 Activity: TAL5M1000 Pipelaying & Welding Works
Project: 5 Activity: TAL5M2000 Hydrotesting
Project: 5 Activity: TAL5M3000 Closing of Gaps
Project: 5 Activity: TAL5M4000 BOV & CAV Installation
Project: 5 Activity: TAL5M5000 Isolation Chambers
Installation
Project: 5 Activity: TAL5M6000 Removal of Debris Inside the
Pipe / Clean-up - Align5
Project: 5 Activity: TAL5M6100 Clearing with the NCR / Weld
Repair - Align5
Project: 5 Activity: TAL5M6200 Painting - Align5
Project: 5 Activity: TAL5M6300 Closing of Temporary Manhole
- Welding - Align5
Project: 5 Activity: TAL5M6400 Closing of Temporary Manhole
- Painting - Align5
Project: 5 Activity: TAL6C1030 Permanent Road Restoration
Sta 1+032 to 1+997
Project: 5 Activity: TAL6C2010 Permanent Road Restoration
Sta 2+014 to 3+065
Project: 5 Activity: TAL6C3060 Permanent Road Restoration
Sta 3+068 to 4+045
Project: 5 Activity: TAL6C4040 Permanent Road Restoration
Sta 4+049 to 4+064
Project: 5 Activity: TAL6C4060 Permanent Road Restoration
Sta 4+068 to 4+432, 0+005 (AL7)
Project: 5 Activity: TAL6Cn0020 Permanent Road Restoration
Sta 0+023 to 1+020
Project: 5 Activity: TAL6D1000 Dry Testing ( Close/Open
valves - 19) - Alignment 6
Project: 5 Activity: TAL6H1000 Walkthrough
Project: 5 Activity: TAL6H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL6H1020 Construction Handover
Project: 5 Activity: TAL6M1000 Isolation Chambers
Installation - Alignment 6
Project: 5 Activity: TAL6M2000 Pipelaying at Sta. 0+002-
673.40 (7 segments) - Alignment 6
Project: 5 Activity: TAL6M3000 Welding at Sta. 0+002-673.40
- Alignment 6
Project: 5 Activity: TAL6M4000 Hydrotesting at sta. 4+068-
427 - Alignment 6
Project: 5 Activity: TAL6M5000 Hydrotesting at sta. 0+023-
1+020 - Alignment 6
Project: 5 Activity: TAL6M6000 Closing of Gaps ( 9.33 mts) &
Backfilling - Alignment 6
Project: 5 Activity: TAL6M7000 BOV (7), CAV (10), IV (2)
Installation Including Appurtenances - Alignment 6
Project: 5 Activity: TAL6M8000 Install Stub-outs for
Draining (3 sets) - Alignment 6
Project: 5 Activity: TAL6M9000 Thrust Block Installation &
Backfilling - Alignment 6
Project: 5 Activity: TAL6W1000 Flushing & Cleaning -
Alignment 6
Project: 5 Activity: TAL7C1070 Permanent Road Restoration
Sta 1+072 to 1+326
Project: 5 Activity: TAL7C1330 Permanent Road Restoration
Sta 1+338 to 1+490
Project: 5 Activity: TAL7C1490 Permanent Road Restoration
Sta 1+492 to 1+660
Project: 5 Activity: TAL7C1660 Permanent Road Restoration
Sta 1+664 to 1+684
Project: 5 Activity: TAL7C1680 Permanent Road Restoration
Sta 1+686 to 2+487
Project: 5 Activity: TAL7C2480 Permanent Road Restoration
Sta 2+489 to 2+521
Project: 5 Activity: TAL7C2520 Permanent Road Restoration
Sta 2+523 to 4+046
Project: 5 Activity: TAL7C4040 Permanent Road Restoration
Sta 4+048 to 4+061
Project: 5 Activity: TAL7C4060 Permanent Road Restoration
Sta 4+063 to 4+800
Project: 5 Activity: TAL7C4800 Permanent Road Restoration
Sta 4+802 to 4+815
Project: 5 Activity: TAL7C4810 Permanent Road Restoration
Sta 4+817 to 5+656
Project: 5 Activity: TAL7C5650 Permanent Road Restoration
Sta 5+658 to 5+680
Project: 5 Activity: TAL7Cn0010 Permanent Road Restoration
Sta 0+010 to 0+703
Project: 5 Activity: TAL7Cn0700 Permanent Road Restoration
Sta 0+706 to 1+070
Project: 5 Activity: TAL7D1000 Dry Testing
Project: 5 Activity: TAL7H1000 Walkthrough
Project: 5 Activity: TAL7H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: TAL7H1020 Construction Handover
Project: 5 Activity: TAL7M1000 BOV & CAV Installation
Project: 5 Activity: TAL7M2000 Pipelaying & Welding Works
Project: 5 Activity: TAL7M3000 Hydrotesting
Project: 5 Activity: TAL7M4000 Isolation Chamber
Installation
Project: 5 Activity: TAL7M5000 Closing of Gaps
Project: 5 Activity: TAL8C1480 Permanent Road Restoration
Sta 1+486 to 2+827
Project: 5 Activity: TAL8C2820 Permanent Road Restoration
Sta 2+829 to 2+850
Project: 5 Activity: TAL8Cn0000 Permanent Road Restoration
Sta 0+000 to 1+482
Project: 5 Activity: TAL8D1000 Dry Testing ( Close/Open
valves - 29) - Alignment 8
Project: 5 Activity: TAL8H1000 Walkthrough - Alignment 8
Project: 5 Activity: TAL8H1010 PUNCHLIST CLOSEOUT -
Alignment 8
Project: 5 Activity: TAL8H1020 Construction Handover -
Alignment 8
Project: 5 Activity: TAL8M1000 Isolation Chamber
Installation - Concrete walls, Covers, saddle support, & Backfilling - Alignment 8
Project: 5 Activity: TAL8M2000 Closing of Gaps (4.33 mts) -
Alignment 8
Project: 5 Activity: TAL8M3000 Install Stub-outs for
Draining (1 set) - Alignment 8
Project: 5 Activity: TAL8M4000 BOV (7), CAV (20), IV (2)
Installation - Alignment 8
Project: 5 Activity: TAL8W1000 Flushing & Cleaning -
Alignment 8
Project: 5 Activity: TDRBC1000 Construction of Scouring
Protection
Project: 5 Activity: TDRBC1010 Site Restoration
Project: 5 Activity: TDRBM1000 Pipeline Works
Project: 5 Activity: TDRBS1000 Concreting Works
Project: 5 Activity: TDRBS1010 Steel Bridge Fabrication &
Delivery
Project: 5 Activity: TDRBS1020 Steel Bridge Installation
Project: 5 Activity: WABRA1000 Install Doors
Project: 5 Activity: WABRA1010 Construct Concrete Stairs
Project: 5 Activity: WABRA1020 Install Steel Grating
Project: 5 Activity: WABRA1030 Ceiling & Wall Finishes -
Rockwool ????
Project: 5 Activity: WABRA1040 Install Handrails
Project: 5 Activity: WABRA1050 Install Louvers
Project: 5 Activity: WABRA1060 Signages & Markers
Project: 5 Activity: WABRA1070 Exterior Wall Finishes
Project: 5 Activity: WABRA1080 Floor Finishes
Project: 5 Activity: WABRA1090 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1100 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1110 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1120 Installation of Fire Dampers
Project: 5 Activity: WABRA1130 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1140 Installation of Opposed Back
Drop (OBD) for Exhaust Blowers - 2 Units
Project: 5 Activity: WABRA1150 WIR Inspection for
Installation of Opposed Back Drop (OBD) for Exhaust Blowers - 2 Units
Project: 5 Activity: WABRA1170 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1180 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRA1240 Installation of Scaffolding
prior for installation of Fire Dampers
Project: 5 Activity: WABRA1260 WIR INspection for
Installation of Fire Dampers
Project: 5 Activity: WABRA1270 Delivery of Louvers for
Install Louvers
Project: 5 Activity: WABRA1280 WIR Inspection of Louvers for
Install Louvers
Project: 5 Activity: WABRD1000 Dry Testing
Project: 5 Activity: WABRH1000 Walkthrough
Project: 5 Activity: WABRH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WABRH1020 Construction Handover
Project: 5 Activity: WABRM1000 Exhaust Fan
Project: 5 Activity: WABRW1000 Wet Testing - ABR
Project: 5 Activity: WABRW1010 Automation Testing
Project: 5 Activity: WABRW1020 Process Commissioning Air
Blower Room
Project: 5 Activity: WACLC1000 Acid Caustic & Soda Chemical
Trench
Project: 5 Activity: WACLM1000 Acid Caustic & Soda Chemical
Line
Project: 5 Activity: WACSA1000 Masonry Works
Project: 5 Activity: WACSA1010 Install Roofing @ Caustic
Soda & Acid Soda Storage
Project: 5 Activity: WACSA1020 Install Windows (7 units)
Project: 5 Activity: WACSA1030 Install Gratings @ Pump Room
Project: 5 Activity: WACSA1040 Interior Wall Finishes
Project: 5 Activity: WACSA1050 Ceiling Finishes @ Caustic
Soda
Project: 5 Activity: WACSA1060 Install Handrails, Ladders,
Cages
Project: 5 Activity: WACSA1070 Waterproofing Works
Project: 5 Activity: WACSA1080 Ceiling Finishes @ Acid Soda
Storage
Project: 5 Activity: WACSA1090 Install Doors (3 units)
Project: 5 Activity: WACSA1100 Ceiling Finishes @ Pump Room
Project: 5 Activity: WACSD1000 Dry Testing
Project: 5 Activity: WACSD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WACSE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WACSE1010 Installation of 225 KVA Dry
Type Transformer
Project: 5 Activity: WACSE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WACSE1030 Installation of Fire Alarm
Project: 5 Activity: WACSE1040 Installation of Cable tray
Project: 5 Activity: WACSE1050 Cable pulling
Project: 5 Activity: WACSE1060 Termination works
Project: 5 Activity: WACSE1070 Installation of MCC-7 Panel
Project: 5 Activity: WACSE1080 Installation of PLC Panels
Project: 5 Activity: WACSH1000 Walkthrough
Project: 5 Activity: WACSH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WACSH1020 Construction Handover
Project: 5 Activity: WACSI1000 Installation of instruments
supports
Project: 5 Activity: WACSM1000 Install Acid Tanks
Project: 5 Activity: WACSM1010 Install Soda Tanks
Project: 5 Activity: WACSM1020 Acid Un-loading Pump
Project: 5 Activity: WACSM1030 Dosing Pump ( Sulphuric )
Project: 5 Activity: WACSM1040 Installation of Emergency Eye
Shower
Project: 5 Activity: WACSM1050 Calibration Column
Project: 5 Activity: WACSM1060 Outside Air Duct Works
Project: 5 Activity: WACSM1070 Pulsation Damper
Project: 5 Activity: WACSM1080 Pressure Relief Valve
Project: 5 Activity: WACSM1090 PVC Plain End Pipe (1/2") x
20ft, S 80, ASTM, (include double containment)
Project: 5 Activity: WACSM1100 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1110 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1120 Soda storage Tank (D=4m ,
H=5m, V=63 cu.m.)
Project: 5 Activity: WACSM1130 Un-loading Pumps
Project: 5 Activity: WACSM1140 Dosing Pump ( Caustic Soda )
Project: 5 Activity: WACSM1150 Calibration Column
Project: 5 Activity: WACSM1160 Pulsation Damper
Project: 5 Activity: WACSM1170 Pressure Relief Valve
Project: 5 Activity: WACSM1180 PVC Plain End Pipe (1") x
20ft, S 80, ASTM inlude (double Containment)
Project: 5 Activity: WACSM1190 Exhaust Air Duct Works
Project: 5 Activity: WACSM1200 Containment Coupling -
Standard, Split (S x S) 3" CLEAR PVC
Project: 5 Activity: WACSM1210 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1220 Valve Box 3" 150 991 104 Not
Pressure Rated.
Project: 5 Activity: WACSM1230 Centralizer (Contain-It x
IPS) 3"x 1"
Project: 5 Activity: WACSM1240 Installation of Inside Blower
or Fan Units - 2 Units
Project: 5 Activity: WACSM1250 PVC Ball Valve 1" 546 Pro
(FKM) ASTM NPT
Project: 5 Activity: WACSM1260 PVC Pressure Retaining Valve
1" (FKM) Union, ASTM, w/o manometer,
Project: 5 Activity: WACSM1270 Installation of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1280 Procurement of Outside Blower
or Fan Units - 2 Units
Project: 5 Activity: WACSM1290 Installation of Exhaust Fan
Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1300 WIR Inspection of Outside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1310 WIR Inspection of Inside
Blower or Fan Units - 2 Units
Project: 5 Activity: WACSM1320 WIR Inspection of
Installation of Exhaust Fan Units - 1 Unit Toilet Area
Project: 5 Activity: WACSM1330 WIR Inspection of
Installation of Emergency Eye Shower
Project: 5 Activity: WACSS1000 Concrete Works
Project: 5 Activity: WACSS1010 Install Primary Structural
Steel
Project: 5 Activity: WACSS1020 Install Steel Framing
Project: 5 Activity: WACSU1000 Construct Septic Tank
Project: 5 Activity: WACSW1000 Wett Testing - ACSB
Project: 5 Activity: WACSW1010 Automation Testing
Project: 5 Activity: WACSW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WACSW1030 Process Commissioning Acid &
Caustic Soda Building
Project: 5 Activity: WADBA1000 Install Windows 2nd Priority
- done
Project: 5 Activity: WADBA1010 Roof Deck Water Proofing &
Testing
Project: 5 Activity: WADBA1020 Ceiling Works 2nd Priority
Project: 5 Activity: WADBA1030 Install Doors 1st Priority -
HDF & PVC remaining
Project: 5 Activity: WADBA1040 Joinery Works
Project: 5 Activity: WADBA1050 Install Cyclone Fence
Project: 5 Activity: WADBA1060 Install Railings
Project: 5 Activity: WADBA1070 Install Doors 2nd Priority
Project: 5 Activity: WADBA1080 Install Louver Door at EE
room
Project: 5 Activity: WADBA1090 Delivery of Exhaust Air
Louver at EE room
Project: 5 Activity: WADBA1100 Install Glazings
Project: 5 Activity: WADBA1110 Floor Finishes 2nd Priority
Project: 5 Activity: WADBA1120 Wall Finishes (Internal)
Project: 5 Activity: WADBA1130 Wall Finishes (External)
Project: 5 Activity: WADBA1140 Install Exhaust Air Louver at
EE room
Project: 5 Activity: WADBA1150 WIR Inspection of Install
Exhaust Air Louver at EE room
Project: 5 Activity: WADBA1160 Installation of Scaffolding
prior for Installation of Fire Dampers - - EE Room
Project: 5 Activity: WADBA1170 Installation of Fire Dampers
- - EE Room
Project: 5 Activity: WADBA1180 Installation of Exhaust Fan
Enclosure - - EE Room
Project: 5 Activity: WADBA1190 WIR Inspection for Fire
Dampers - EE Room
Project: 5 Activity: WADBD1000 Dry Testing
Project: 5 Activity: WADBE1000 Installation of lightning
protection system - done
Project: 5 Activity: WADBE1010 Termination works - remaining
ACS & comm. cables
Project: 5 Activity: WADBE1020 Firestop Sealant for Conduit
penetrations for Ceiling
Project: 5 Activity: WADBE1030 Installation of work stations
& Console table
Project: 5 Activity: WADBH1000 Walkthrough
Project: 5 Activity: WADBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WADBH1020 Construction Handover
Project: 5 Activity: WADBM1000 Ducting Works
Project: 5 Activity: WADBM1010 Install Laboratory
Instruments
Project: 5 Activity: WADBM1020 Installation of Blowers
(Niagara fan) - 1 unit
Project: 5 Activity: WADBM1030 Installation of of High Flume
Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1040 Design of support for High
Flume Exhaust Fan - 5 Units - AAII/ VCCI
Project: 5 Activity: WADBM1050 Fabrication of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1060 Painting of support for High
Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1070 Installation of support for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1080 WIR Installation prior for
High Flume Exhaust Fan - 5 Units
Project: 5 Activity: WADBM1090 Installation of Energy
Recovery Ventilation (ERV) - 2 units
Project: 5 Activity: WADBM1100 Fabrication of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1110 Paiting of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1120 Installation of Supports for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1130 WIR Inspection prior for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1140 Installation of Flexible Duct
Connection
Project: 5 Activity: WADBM1150 WIR Inspection for
Installation of Flexible Duct Connection
Project: 5 Activity: WADBM1160 WIR Inspection for
Installation of Blowers (Niagara fan) - 1 unit
Project: 5 Activity: WADBM1170 Cleaning of Outside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1180 Cleaning of Inside Air Duct
with Temp. Blowers
Project: 5 Activity: WADBM1190 Balancing for Ducting prior
for testing - T&C
Project: 5 Activity: WADBM1200 Sealant Application in the
Duct passing through the wall - Ground to Roof Deck
Project: 5 Activity: WADBM1210 WIR Inspection for Sealant
Application in the Duct passing through the wall
Project: 5 Activity: WADBM1220 Installation of ACCU (28
units) - Roof Deck
Project: 5 Activity: WADBM1230 WIR Inspection for
Installation of ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1240 Installation of refregerant
Piping from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1250 Cleaning of refregerant
Piping using R11 from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1260 Flushing and Cleaning of
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1270 Fabrication of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1280 Painting of support for
refregerant Pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1290 Lay-out of support for
refregerant Pipie from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1300 WIR Inspection prior for
install of support for refregerant pipe from dog house to ACCU (28 units) - Roof
Deck
Project: 5 Activity: WADBM1310 Installation of support for
refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1320 Installation of Aluminum
Cladding for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1330 Initial charging of freon
(R32) for refregerant pipe from dog house to ACCU (28 units) - Roof Deck
Project: 5 Activity: WADBM1340 Procurement of thermostat
control with wiring (Honeywell or johnson&Johnson) - 7 Pieces AAII/VCCI
Project: 5 Activity: WADBM1350 Installation of thermostat
control with wiring - 7 Pieces
Project: 5 Activity: WADBM1360 WIR Inspectkion for
Installation of thermostat control with wiring - 7 Pieces
Project: 5 Activity: WADBU1000 Construct Septic Tank - done
Project: 5 Activity: WADBU1010 Install Sanitary Fixtures
Project: 5 Activity: WADBU1020 Installation of Water Piping
Line
Project: 5 Activity: WADBU1030 Install Rainwater Tanks
Project: 5 Activity: WADBU1040 Install Water Pump - 2 units
Project: 5 Activity: WADBU1050 Install Water Tank
Project: 5 Activity: WADBU1060 Hydrotest for Water Piping
Line
Project: 5 Activity: WADBU1070 WIR for Hydrotest of Water
Piping Line
Project: 5 Activity: WADBU1080 Dis-infection for Water
Piping Line - T&C
Project: 5 Activity: WADBU1090 WIR Inspection for Dis-
infection for Water Piping Line - T&C
Project: 5 Activity: WADBU1100 Installation of Pipe
connecting to Rainwater Tanks
Project: 5 Activity: WADBU1110 Installation of C-Clamp
Supports for Pipe connecting to Rainwater Tanks
Project: 5 Activity: WADBU1120 Installation of Pipes from
Water Pump to Water Tank
Project: 5 Activity: WADBU1130 WIR Inspection for
Installation of Pipes from Water Pump to Water Tank
Project: 5 Activity: WADBU1140 WIR Inspection for Install
Water Pump - 2 units
Project: 5 Activity: WADBU1150 WIR Inspection for Install
Rainwater Tanks
Project: 5 Activity: WADBU1160 WIR Inspection for Install
Water Tank
Project: 5 Activity: WADBW1000 Wet Testing - ADB
Project: 5 Activity: WADBW1010 Automation Testing
Project: 5 Activity: WADBW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WAPBA1000 Install Windows (16 units) -
done
Project: 5 Activity: WAPBA1010 Masonry Works
Project: 5 Activity: WAPBA1020 Acid Resistant Painting
Equipment Area
Project: 5 Activity: WAPBA1030 Ceiling Finishes
Project: 5 Activity: WAPBA1040 Interior Wall Finishes
Project: 5 Activity: WAPBA1050 Install RUD
Project: 5 Activity: WAPBA1060 Install Stair & Steel
Platform
Project: 5 Activity: WAPBA1070 Install Handrails & Ladders
Project: 5 Activity: WAPBA1080 Install Sunshade Louver (3)
Project: 5 Activity: WAPBA1090 Signage & Markers
Project: 5 Activity: WAPBD1000 Dry Testing
Project: 5 Activity: WAPBD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WAPBE1000 Installation of Cable tray -
done
Project: 5 Activity: WAPBE1010 Cable pulling
Project: 5 Activity: WAPBE1020 Termination works
Project: 5 Activity: WAPBH1000 Walkthrough
Project: 5 Activity: WAPBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WAPBH1020 Construction Handover
Project: 5 Activity: WAPBI1000 Installation of instruments -
EESI to check (JESCO supply) - completion to depend on Mixing tank to install
Project: 5 Activity: WAPBM1000 Overhead crane load testing
Project: 5 Activity: WAPBM1010 Outside Air Duct Works
Project: 5 Activity: WAPBM1020 Installation of Alum Dosing
Pumps - 2 Units
Project: 5 Activity: WAPBM1030 Installation of Alum Sulphate
Prep Unit
Project: 5 Activity: WAPBM1040 Installation of Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM1050 Assembly of Bulk Bag Loader
Screw Feeder with Chute for Alum Sulphate Prep Tank 1
Project: 5 Activity: WAPBM1060 Delivery of Alum Sulphate
Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM1070 Installation of Alum
Pulsation Dampener
Project: 5 Activity: WAPBM1080 Anionic Polymer Prep Unit -
DONE
Project: 5 Activity: WAPBM1090 Installation of Alum
Calibration Column
Project: 5 Activity: WAPBM1100 Installation of Alum Pressure
Relief Valve
Project: 5 Activity: WAPBM1110 Installation of Pulsation
Dampener
Project: 5 Activity: WAPBM1120 Installation of Polymer
Calibration Column
Project: 5 Activity: WAPBM1130 Pressure Relief Valve -
Polymer 12 Units (Done)
Project: 5 Activity: WAPBM1140 PVC Ball Valve 1-1/2" 546 Pro
(FKM) ASTM NPT (Done)
Project: 5 Activity: WAPBM1150 Installation of Transfer
Pumps 1&2
Project: 5 Activity: WAPBM1180 Installation of Polymer
Dosing Pumps
Project: 5 Activity: WAPBM1190 PVC Ball Valve 2" 546 Pro
(FKM) ASTM NPT, 161 546 357
Project: 5 Activity: WAPBM1210 Final Grouting for Polymer
Dosing Pumps - 12 Units
Project: 5 Activity: WAPBM1220 WIR Inspection for final
Grouting for Polymer Dosing Pumps - 12 Units
Project: 5 Activity: WAPBM1230 Anchor Bolts tightening for
Polymer Dosing Pumps - 12 Units
Project: 5 Activity: WAPBM1240 WIR Inspection for Anchor
Bolts tightening for Polymer Dosing Pumps - 12 Units
Project: 5 Activity: WAPBM1250 Additional Unions for Suction
Lines for Maintenance purposes - 12 units
Project: 5 Activity: WAPBM1260 Hydrotest for Suction Lines
of Polymer Dosing pumps - 12 units
Project: 5 Activity: WAPBM1270 Test package for Suction
Lines - 12 units
Project: 5 Activity: WAPBM1280 WIR Inpection for Suction
Lines Prior for Hydrotest - 12 units
Project: 5 Activity: WAPBM1290 Suction Pipe of Polymer
Dosing Pumps Reinstatement - 12 units
Project: 5 Activity: WAPBM1300 WIR Final Inspection for
Suction Pipe Reinstatement - 12 units AAII, VCCI
Project: 5 Activity: WAPBM1310 Design for additional
supports and End Cap for Polymer Calibration Column - JESCO
Project: 5 Activity: WAPBM1320 Procurement for additional
supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1330 Fabrication for additional
supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1340 Painting for additional
supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1350 Installation for additional
supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1360 WIR Inspection Installation
for additional supports and End Cap for Polymer Calibration Column
Project: 5 Activity: WAPBM1370 Installation of Discharge
Lines of Polymer Dosing Pumps - 12 units
Project: 5 Activity: WAPBM1380 Stage 1 Hydrotest for
Discharge Lines of Polymer Dosing pumps - 12 units
Project: 5 Activity: WAPBM1390 Test package for Discharge
Lines of Polymer Dosing Pumps- 12 units
Project: 5 Activity: WAPBM1400 WIR Inpection for Discharge
Lines of Polymer Dosing Pumps Prior for Hydrotest - 12 units
Project: 5 Activity: WAPBM1410 Discharge Pipe of Polymer
Dosing Pumps Reinstatement - 12 units
Project: 5 Activity: WAPBM1420 WIR Final Inspection for
Suction Pipe Reinstatement - 12 units AAII, VCCI
Project: 5 Activity: WAPBM1430 Installation of Fittings
connected to instrument for PVC Ball Valve 1-1/2" 546 Pro (FKM) ASTM NPT
Project: 5 Activity: WAPBM1440 Stage 2 Hydrotest From valves
to monifold (Polymer Dosing Pumps)- 12 units
Project: 5 Activity: WAPBM1450 Procurement of Fittings
connected to instrument for PVC Ball Valve 1-1/2" 546 Pro (FKM) ASTM NPT
Project: 5 Activity: WAPBM1460 Procurement of U-Bolts for
Discharge Line of polymer dosing pumps
Project: 5 Activity: WAPBM1470 Installation of U-Bolts for
Discharge Line of polymer dosing pumps
Project: 5 Activity: WAPBM1480 Delivery of Pulsation
Dampener - Polymer
Project: 5 Activity: WAPBM1500 WIR Inspection of Pulsation
Dampener - Polymer
Project: 5 Activity: WAPBM1510 Installation of Mixer 1 for
Anionic Polymer Prep Unit - Tank 1
Project: 5 Activity: WAPBM1520 Installation of Mixer 2 for
Anionic Polymer Prep Unit - Tank 1
Project: 5 Activity: WAPBM1530 Installation of Mixer 3 for
Anionic Polymer Prep Unit - Tank 1
Project: 5 Activity: WAPBM1540 Installation of Mixer 1 for
Anionic Polymer Prep Unit - Tank 2
Project: 5 Activity: WAPBM1550 Installation of Mixer 2 for
Anionic Polymer Prep Unit - Tank 2
Project: 5 Activity: WAPBM1560 Installation of Mixer 3 for
Anionic Polymer Prep Unit - Tank 2
Project: 5 Activity: WAPBM1570 WIR Inspection for Pump
Alignment of Alum Dosing Pumps Prior for Installation- 2 Units
Project: 5 Activity: WAPBM1580 Final Grouting for Alum
Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM1590 WIR Inspection for Final
Grouting of Alum Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM1600 WIR Inspection for Pump
Alignment of Transfer Pumps Prior for Installation- 2 Units
Project: 5 Activity: WAPBM1610 Final Grouting for Transfer
Pumps - 2 Units
Project: 5 Activity: WAPBM1620 WIR Inspection for Final
Grouting of Transfer Pumps - 2 Units
Project: 5 Activity: WAPBM1630 WIR Inspection for Connection
lines of Alum Dosing Pump to Transfer Pumps prior for Hydrotest
Project: 5 Activity: WAPBM1640 Hydrotest for Connection
lines of Alum Dosing Pump to Transfer Pumps
Project: 5 Activity: WAPBM1650 Installation of Supports for
Connection Line of Alum Dosing pumps and transfer Pumps Prior for Hydrotesting
Project: 5 Activity: WAPBM1660 Design for additional
supports and End Cap for Alum Calibration Column - JESCO
Project: 5 Activity: WAPBM1670 Procurement for additional
supports and End Cap for Alum Calibration Column -
Project: 5 Activity: WAPBM1680 Fabrication for additional
supports and End Cap for Alum Calibration Column -
Project: 5 Activity: WAPBM1690 Painting for additional
supports and End Cap for Alum Calibration Column -
Project: 5 Activity: WAPBM1700 Installation for additional
supports and End Cap for Alum Calibration Column
Project: 5 Activity: WAPBM1710 WIR Inspection for additional
supports and End Cap for Alum Calibration Column
Project: 5 Activity: WAPBM1720 Additional Unions for Suction
Lines for Alum Dosing Pumps -
Project: 5 Activity: WAPBM1730 Hydrotest for Suction Lines
of Alum Dosing pumps -
Project: 5 Activity: WAPBM1740 Test package for Suction
Lines of Alum Dosing Pumps-
Project: 5 Activity: WAPBM1750 WIR Inpection for Suction
Lines of Alum Dosing Pumps for Hydrotest
Project: 5 Activity: WAPBM1760 Suction Pipe of Alum Dosing
Pumps Reinstatement -2 units
Project: 5 Activity: WAPBM1770 Final Inspection for Suction
Pipe Reinstatement of Alum Dosing Pumps - AAII, VCCI
Project: 5 Activity: WAPBM1780 New Activity
Project: 5 Activity: WAPBM1790 Installation of Discharge
Lines of Alum Dosing Pumps - 2 units
Project: 5 Activity: WAPBM1800 Stage 1 Hydrotest for
Discharge Lines of Alum Dosing pumps - 2 units
Project: 5 Activity: WAPBM1810 Test package for Discharge
Lines of Alum Dosing Pumps- 2 units
Project: 5 Activity: WAPBM1820 WIR Inpection for Discharge
Lines of Alum Dosing Pumps for Hydrotest - 2 units
Project: 5 Activity: WAPBM1830 Discharge Pipe of Alum Dosing
Pumps Reinstatement - 2 units
Project: 5 Activity: WAPBM1840 Final Inspection for
Discharge Pipe Reinstatement of Alum Dosing Pumps- 2 units AAII, VCCI
Project: 5 Activity: WAPBM1850 Additional Unions for Suction
Lines for Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1860 Hydrotest for Suction Lines
of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1870 Test package for Suction
Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1880 WIR Inpection for Suction
Lines of Transfer Pumps - 2 units for Hydrotest
Project: 5 Activity: WAPBM1890 Suction Pipe of Transfer
Pumps Reinstatement -2 units
Project: 5 Activity: WAPBM1900 Final Inspection for Suction
Pipe Reinstatement of Transfer Pumps - AAII, VCCI
Project: 5 Activity: WAPBM1910 Installation of Discharge
Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1920 Stage 1 Hydrotest for
Discharge Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1930 Test package for Discharge
Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM1940 WIR Inpection for Discharge
Lines of Transfer Pumps for Hydrotest - 2 units
Project: 5 Activity: WAPBM1950 Discharge Pipe of Transfer
Pumps Reinstatement - 2 units
Project: 5 Activity: WAPBM1960 Final Inspection for
Discharge Pipe Reinstatement of Transfer Pumps- 2 units AAII, VCCI
Project: 5 Activity: WAPBM1980 Installation of Mixer for
Alum Sulphate Prep Unit 1
Project: 5 Activity: WAPBM1990 Installation of Mixer for
Alum Sulphate Prep Unit 2
Project: 5 Activity: WAPBM2000 Assembly of Bulk Bag Loader
Screw Feeder with Chute for Alum Sulphate Prep Tank 2
Project: 5 Activity: WAPBM2010 Installation of Alum Sulphate
Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2020 WIR Inspection prior for
Installation of Mixer for Alum Sulphate Prep Tank 1
Project: 5 Activity: WAPBM2030 WIR Inspection prior for
Installation of Mixer for Alum Sulphate Prep Tank 2
Project: 5 Activity: WAPBM2040 WIR Inspection for Assembly
of Bulk Bag Loader Screw Feeder with Chute for Alum Sulphate Prep Tank 1
Project: 5 Activity: WAPBM2050 WIR Inspection for Assembly
of Bulk Bag Loader Screw Feeder with Chute for Alum Sulphate Prep Tank 2
Project: 5 Activity: WAPBM2060 WIR Inspection prior for
installation of Alum Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2070 Installation of Mixer of Alum
Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2080 Walkdown with civil team for
ground checking prior for installation of Alum Sulphate Storage Tank (18 cu.m) - 2
units
Project: 5 Activity: WAPBM2090 Crane Mobilization and
preparation prior for lifting of Alum Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2100 Lifting of Alum Sulphate
Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2120 Grouting of base plate
supports for Alum Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2130 WIR Inspection for Grouting
of base plate supports for Alum Sulphate Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2140 Alignment of Alum Sulphate
Storage Tank (18 cu.m) - 2 units
Project: 5 Activity: WAPBM2150 Coating of Grouted base plate
supports for Alum Sulphate Storage Tank (18 cu.m) - 2 units - CIVIL TEAM
Project: 5 Activity: WAPBM2160 Procurement of Exhaust Blower
or Fan Units - 4 units - AAII
Project: 5 Activity: WAPBM2170 Installation of Supply Blower
or Fan Units - 2 units (DONE)
Project: 5 Activity: WAPBM2180 Installation of flexible
joint for Supply Blower or Fan Units - 2 units
Project: 5 Activity: WAPBM2190 Installation of flexible
joint for Exhaust Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2200 WIR Inspection for Exhaust
Blower or Fan Units - 4 units
Project: 5 Activity: WAPBM2210 WIR Inspection for Supply
Blower or Fan Units - 2 units (Done)
Project: 5 Activity: WAPBM2220 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2230 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2240 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2250 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2260 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2280 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2290 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2300 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2310 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2320 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2330 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2340 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2350 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2360 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2370 Installation of ACCU - 2
units (DONE)
Project: 5 Activity: WAPBM2380 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2390 Installation of Flexible
Joints (DONE)
Project: 5 Activity: WAPBM2400 ACCU Refregerant Connection
Toping Point
Project: 5 Activity: WAPBM2410 WIR Inspection of ACCU
Refregerant Connection Toping Point
Project: 5 Activity: WAPBM2420 Installation of FCU
Condensate Drain
Project: 5 Activity: WAPBM2430 Flushing and Leak Testing of
FCU and ACCU Refregerant Pipe
Project: 5 Activity: WAPBM2440 Installation of Electrical
Wiring Control from FCU to ACCU
Project: 5 Activity: WAPBM2450 Installation of ACCU - 2
units
Project: 5 Activity: WAPBM2460 Installation of FCU - 2 units
Project: 5 Activity: WAPBM2470 Cleaning of Outside Air Duct
with temp blowers
Project: 5 Activity: WAPBM2480 Cleaning of Internal Air Duct
with temp blowers
Project: 5 Activity: WAPBM2490 Installation of Flexible
Joints
Project: 5 Activity: WAPBM2500 Installation of Exhaust Fan -
1 unit
Project: 5 Activity: WAPBM2510 WIR Inspection for
Installation of Exhaust Fan - 1 unit
Project: 5 Activity: WAPBM2520 Installation of Fire Dampers
- 3 units
Project: 5 Activity: WAPBM2530 Installation of Motorized
Fire Dampers - 3 units
Project: 5 Activity: WAPBM2540 Installation of Scaffolding
prior for Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2550 Installation of Scaffolding
prior for Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2560 WIR Inspection for
Installation of Fire Dampers - 3 units
Project: 5 Activity: WAPBM2570 WIR Inspection for
Installation of Motorized Fire Dampers - 3 units
Project: 5 Activity: WAPBM2580 Initial charge of Freon (R32)
Project: 5 Activity: WAPBM2590 WIR Inspection for
Installation of Polymer Dosing Pumps
Project: 5 Activity: WAPBM2600 Procurement of Pulsation
Dampener - Polymer
Project: 5 Activity: WAPBM2610 Installation of Polymer
Suction Lines - 12 units
Project: 5 Activity: WAPBM2620 Hydrotest prep, filling and
Flushing for Suction Lines Prior for Hydrotest - 12 units
Project: 5 Activity: WAPBM2630 Hydrotest prep, filling and
Flushing for Discharge Lines Prior for Hydrotest - 12 units
Project: 5 Activity: WAPBM2640 WIR Inspection for Anionic
Polymer Prep Unit - Tank 2
Project: 5 Activity: WAPBM2650 Pump Alignment for Alum
Dosing Pumps - 2 Units
Project: 5 Activity: WAPBM2660 Pump Alignment of Transfer
Pumps 1&2
Project: 5 Activity: WAPBM2670 Hydrotest Prep, Filling and
Flushing for Suction Lines of Alum Dosing pumps -
Project: 5 Activity: WAPBM2680 Hydrotest Prep, Filling and
Flushing for Suction Lines ofTransfer pumps -
Project: 5 Activity: WAPBM2690 Stage 1 Hydrotest Prep,
Filling and Flushing for Discharge Lines of Transfer Pumps - 2 units
Project: 5 Activity: WAPBM2700 Stage 1 Hydrotest Prep,
Filling and Flushing for Discharge Lines of Alum Dosing Pumps - 2 units
Project: 5 Activity: WAPBU1000 Construct Septic Tank - done
Project: 5 Activity: WAPBU1010 Install Water Piping
Project: 5 Activity: WAPBU1020 Install Bathroom Fixtures
Project: 5 Activity: WAPBU1030 Procurement of the materials
of Water Piping
Project: 5 Activity: WAPBU1040 WIR Inspection for Water
Piping
Project: 5 Activity: WAPBU1050 Hydrotest for Water Piping
Project: 5 Activity: WAPBU1060 Installation of Down Spout
Project: 5 Activity: WAPBU1070 WIR Inspection of Down Spout
Project: 5 Activity: WAPBW1000 Wet Testing - ASPB
Project: 5 Activity: WAPBW1010 Automation Testing
Project: 5 Activity: WAPBW1020 Client Approval for Process
Commissioning
Project: 5 Activity: WAPBW1030 Process Commissioning Alum
Sulfate
Project: 5 Activity: WAPLC1000 Alum & Polymer Chemical
Trench - Back of Alum Bldg. - damp proof remaining
Project: 5 Activity: WAPLM1000 Alum & Polymer Chemical Line
- Alum bldg to IWCM
Project: 5 Activity: WAPLM1010 Alum & Polymer Chemical Line
- Back of Alum bldg
Project: 5 Activity: WBLBD1000 Dry Testing - BWDL
Project: 5 Activity: WBLBH1000 Walkthrough - BWDL
Project: 5 Activity: WBLBH1010 PUNCHLIST CLOSEOUT - BWDL
Project: 5 Activity: WBLBH1020 Construction Handover - BWDL
Project: 5 Activity: WBLBI1000 Install Instrument Junction
Boxes
Project: 5 Activity: WBLBI1010 MH FWTA - Install Supports &
Instruments
Project: 5 Activity: WBLBI1020 MH FWTB - Install Supports &
Instruments
Project: 5 Activity: WBLBM1000 MH FWTA - Install Valves
DN1600
Project: 5 Activity: WBLBM1010 DMF MH - Install Isolation
Valves
Project: 5 Activity: WBLBM1020 MH FWTB - Install Valves
DN1600
Project: 5 Activity: WBLBM1030 TWR Drain Chamber - Install
Valves DN1400
Project: 5 Activity: WBLBW1000 Wett Testing - BWDL
Project: 5 Activity: WBLBW1010 Automation Testing - BWDL
Project: 5 Activity: WBPHA1000 Concrete hollow blocks
(concrete stiffeners, lintel beams, upstands, and design joints; 150mm thick)
Project: 5 Activity: WBPHA1010 Masonry Works
Project: 5 Activity: WBPHA1020 Installation of Handrails
Project: 5 Activity: WBPHA1030 Install Portable Ladder
Project: 5 Activity: WBPHA1040 Roofing Works with
Insulation- remaining 1-sheet
Project: 5 Activity: WBPHA1050 Install Doors (3 units) -
materials arrived
Project: 5 Activity: WBPHA1060 Install Windows(9 units)
Project: 5 Activity: WBPHA1070 Install Louvers (5 units)
Project: 5 Activity: WBPHA1080 Plaster and render; 25mm
thick
Project: 5 Activity: WBPHA1090 Concrete topping/screed; 50mm
thick
Project: 5 Activity: WBPHA1100 Liquid Applied Polyurethane
Membrane Waterproofing
Project: 5 Activity: WBPHA1110 25mmW x 25mmD Grooves for
Exterior Wall
Project: 5 Activity: WBPHA1120 Painting Works (Interior &
Exterior Wall)
Project: 5 Activity: WBPHA1130 Wall Finishes
Project: 5 Activity: WBPHA1140 WIR Inspection for Louvers (5
units)
Project: 5 Activity: WBPHA1150 Procurement of the Materials
for Handrails
Project: 5 Activity: WBPHA1160 Fabrication of the Materials
for Handrails
Project: 5 Activity: WBPHA1170 Painting of the Materials for
Handrails
Project: 5 Activity: WBPHA1180 WIR Inspection for Handrails
Project: 5 Activity: WBPHA1190 Procurement of Gates,
Portable Ladder and Supports
Project: 5 Activity: WBPHA1200 Fabrication of Portable
Ladder Supports
Project: 5 Activity: WBPHA1210 Installation of Portable
Ladder Supports
Project: 5 Activity: WBPHA1220 Painting of Portable Ladder
Supports
Project: 5 Activity: WBPHA1230 WIR Inspection of Portable
Ladder and Supports
Project: 5 Activity: WBPHA1250 Fabrication of Gates
Project: 5 Activity: WBPHA1260 Installation of Gates
Project: 5 Activity: WBPHA1270 Painting of Gates
Project: 5 Activity: WBPHA1280 WIR Inspection of Gates
Project: 5 Activity: WBPHA1290 Installation of Plenum Box
(1.8m X 1.8m) for Install Louvers
Project: 5 Activity: WBPHD1000 Dry Testing - BWPH
Project: 5 Activity: WBPHE1000 Cable pulling - done
Project: 5 Activity: WBPHE1010 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WBPHE1020 FAT/program Simulation
Project: 5 Activity: WBPHE1030 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WBPHE1040 Installation of grounding
system
Project: 5 Activity: WBPHE1050 Termination works -remaining
feeder line
Project: 5 Activity: WBPHH1000 Walkthrough - BWPH
Project: 5 Activity: WBPHH1010 PUNCHLIST CLOSEOUT - BWPH
Project: 5 Activity: WBPHH1020 Construction Handover - BWPH
Project: 5 Activity: WBPHI1000 Installation of instruments -
Flow Meter & Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHI1010 Installation of instruments
valves (pressure switch & gauges)
Project: 5 Activity: WBPHI1020 Bolt torquing - Flow Meter &
Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHI1030 WIR Inspection - Flow Meter &
Transmitter (VCCI & EESI)
Project: 5 Activity: WBPHM1000 Pump to Pipe alignment - HP1
Project: 5 Activity: WBPHM1010 Curing period for the second
stage Grouting
Project: 5 Activity: WBPHM1030 Installation of Blower or Fan
Units - Wall mounted (Done)
Project: 5 Activity: WBPHM1040 Install Overhead Crane -
DEMAG
Project: 5 Activity: WBPHM1050 Outside Air Duct Works
connection to Blowers
Project: 5 Activity: WBPHM1060 Overhead Crane load testing -
DEMAG
Project: 5 Activity: WBPHM1080 Pump to Pipe alignment - HP2
Project: 5 Activity: WBPHM1090 Pump to Pipe alignment - LP1
Project: 5 Activity: WBPHM1100 Pump to Pipe alignment - LP2
Project: 5 Activity: WBPHM1110 Painting for Suction pipes -
HP1&2, LP1&2
Project: 5 Activity: WBPHM1120 Procurement of Remaining
Setting Bolts for Valves
Project: 5 Activity: WBPHM1130 Installation of Remaining
Setting Bolts for Valves - HP1
Project: 5 Activity: WBPHM1150 Motor Solo Run for HP1- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1160 Motor Solo Run for HP2- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1170 Motor Solo Run for LP1- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1180 Motor Solo Run for LP2- EESI,
VCCI, AAII
Project: 5 Activity: WBPHM1200 Final Pump Shaft alignment
including inspection- HP1
Project: 5 Activity: WBPHM1210 Final Pump Shaft alignment
including inspection- HP2
Project: 5 Activity: WBPHM1220 Final Pump Shaft alignment
including inspection- LP1
Project: 5 Activity: WBPHM1230 Final Pump Shaft alignment
including inspection- LP2
Project: 5 Activity: WBPHM1240 Coupling guard Installation -
HP1
Project: 5 Activity: WBPHM1250 Coupling guard Installation-
HP2
Project: 5 Activity: WBPHM1260 Coupling guard Installation-
LP1
Project: 5 Activity: WBPHM1270 Coupling guard Installation-
LP2
Project: 5 Activity: WBPHM1280 Procurement of Blower or Fan
Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1290 Installation of Instrument
connection (Stub out) including Installation of Drain Valves for HP
Project: 5 Activity: WBPHM1300 Procurement of Sump Pumps - 2
units
Project: 5 Activity: WBPHM1310 Installation of Sump Pumps -
2 units
Project: 5 Activity: WBPHM1320 Installation of Piping for
Sump Pumps
Project: 5 Activity: WBPHM1330 Hydrotest Prep, Filling and
Flushing of Piping for Sump Pumps
Project: 5 Activity: WBPHM1340 WIR Inspection of Piping for
Sump Pumps
Project: 5 Activity: WBPHM1350 WIR Inspection of Sump Pumps
- 2 units
Project: 5 Activity: WBPHM1360 Installation of Pipe Supports
for Suction Line DONE
Project: 5 Activity: WBPHM1370 Painting of Pipe Supports for
Discharge Line
Project: 5 Activity: WBPHM1380 Inspection of Pipe Supports
for Discharge Line
Project: 5 Activity: WBPHM1400 Fabrication of Piping
Supports for Sump Pumps
Project: 5 Activity: WBPHM1410 Painting of Piping Supports
for Sump Pumps
Project: 5 Activity: WBPHM1420 Installation of Instrument
connection (Stub out) including Installation of Drain Valves for LP
Project: 5 Activity: WBPHM1430 Installation of combination
air valve - 1 unit
Project: 5 Activity: WBPHM1440 Painting of combination air
valve - 1 unit
Project: 5 Activity: WBPHM1450 WIR Inspection of combination
air valve - 1 unit
Project: 5 Activity: WBPHM1460 Procurement for Storm drain
Installation - Riser
Project: 5 Activity: WBPHM1470 Installation of nipple and
valve for pressure gauges and switches - LP 1 - 4 Units
Project: 5 Activity: WBPHM1480 Installation of nipple and
valve for pressure gauges and switches - LP 2 - 4 Units
Project: 5 Activity: WBPHM1490 Installation of nipple and
valve for pressure gauges and switches - HP 1 - 4 Units
Project: 5 Activity: WBPHM1500 Installation of nipple and
valve for pressure gauges and switches - HP 2 - 4 Units
Project: 5 Activity: WBPHM1510 Painting for Discharge pipes
- HP1&2, LP1&2
Project: 5 Activity: WBPHM1540 Temporary Removal of Blind
Flange
Project: 5 Activity: WBPHM1550 Reinstallation and Bolt
torquing of Blind Flange
Project: 5 Activity: WBPHM1560 WIR Inspection for Bolt
torquing of Blind Flange
Project: 5 Activity: WBPHM1570 Installation Blower or Fan
Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1580 WIR Inspection for Blower or
Fan Units - 2 units under purchasing from AAII
Project: 5 Activity: WBPHM1590 WIR Inspection for Outside
Air Duct Works connection to Blowers
Project: 5 Activity: WBPHM1600 WIR Inspection for Outside
Air Duct Works
Project: 5 Activity: WBPHM1610 Clearing for Outside Air Duct
with temp. blowers
Project: 5 Activity: WBPHM1620 WIR Inspection of
Installation of Blower or Fan Units - Wall mounted (Done)
Project: 5 Activity: WBPHM1630 Clearing for Internal Air
Duct with temp. blowers
Project: 5 Activity: WBPHM1640 Balancing of Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1650 Installation of Storm drain
Installation - Riser
Project: 5 Activity: WBPHM1660 Leak Test of Storm drain
Installation - Riser
Project: 5 Activity: WBPHM1670 WIR Inspection of Storm
drain Installation - Riser
Project: 5 Activity: WBPHM1680 Installation of flexible
connection for Duct connection to blowers - 4 units
Project: 5 Activity: WBPHM1690 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1700 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1710 Balancing for Ducting prior
for testing (T&C)
Project: 5 Activity: WBPHM1720 Installation of Fire Dampers
- 4 Units
Project: 5 Activity: WBPHM1730 WIR Inspection for
Installation of Fire Dampers - 4 Units
Project: 5 Activity: WBPHM1740 WIR Inspection for Pump to
Pipe alignment - HP1
Project: 5 Activity: WBPHM1750 WIR Inspection for Pump to
Pipe alignment - HP2
Project: 5 Activity: WBPHM1760 WIR Inspection for Pump to
Pipe alignment - LP1
Project: 5 Activity: WBPHM1770 WIR Inspection for Pump to
Pipe alignment - LP2
Project: 5 Activity: WBPHM1780 Coupling Installation - HP1
Project: 5 Activity: WBPHM1790 Coupling Installation- HP2
Project: 5 Activity: WBPHM1800 Coupling Installation- LP1
Project: 5 Activity: WBPHM1810 Coupling Installation- LP2
Project: 5 Activity: WBPHM1820 Installation of Piping
Supports for Sump Pumps
Project: 5 Activity: WBPHM1830 WIR Inspection for
Installation of Piping Supports for Sump Pumps
Project: 5 Activity: WBPHM1840 Hydrotest of Piping for Sump
Pumps
Project: 5 Activity: WBPHM1850 Pipe Reinstatement after
Hydrotest of Piping for Sump Pumps
Project: 5 Activity: WBPHM1860 Fabrication of Pipe Supports
for Discharge Line DONE
Project: 5 Activity: WBPHM1870 Procurement of 1 1/2 in Tie
Rod for Discharge Valves
Project: 5 Activity: WBPHM1880 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - HP1
Project: 5 Activity: WBPHM1890 Installation of Remaining
Setting Bolts for Valves - HP2
Project: 5 Activity: WBPHM1900 Installation of Remaining
Setting Bolts for Valves - LP1
Project: 5 Activity: WBPHM1910 Installation of Remaining
Setting Bolts for Valves - LP2
Project: 5 Activity: WBPHM1920 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - HP2
Project: 5 Activity: WBPHM1930 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - LP1
Project: 5 Activity: WBPHM1940 Installation of 1 1/2 in Tie
rod Bolts for Discharge Valves - LP2
Project: 5 Activity: WBPHM1950 Installation for Suction
pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1960 Installation for Discharge
pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1970 WIR Inspection for Painting
of Suction pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM1990 WIR Inspection for Painting
of Discharge pipes - HP1&2, LP1&2
Project: 5 Activity: WBPHM2000 Grouting for Pump to Pipe
alignment - HP2
Project: 5 Activity: WBPHM2010 Grouting for Pump to Pipe
alignment - HP1
Project: 5 Activity: WBPHM2020 WIR Inspection for Grouting
for Pump to Pipe alignment - HP1 and HP2
Project: 5 Activity: WBPHM2030 Grouting for Pump to Pipe
alignment - LP2
Project: 5 Activity: WBPHM2040 Grouting for Pump to Pipe
alignment - LP1
Project: 5 Activity: WBPHM2050 WIR Inspection for Grouting
for Pump to Pipe alignment - LP1 and LP2
Project: 5 Activity: WBPHM2060 Request to remove Gaurd and
Coupling
Project: 5 Activity: WBPHM2070 Reinstatement for Gaurd and
Coupling
Project: 5 Activity: WBPHM2080 WIR Inspection for
Reinstatement for Gaurd and Coupling
Project: 5 Activity: WBPHS1000 Install Steel Columns, Beams,
& Frames - (Remaining Beam only)
Project: 5 Activity: WBPHS1010 Construct Pipe Support
including pedestal - Suctions, Discharge, & Elbow
Project: 5 Activity: WBPHS1020 Painting works for Steel
Columns, Beams, & Frames - on the Welded Part
Project: 5 Activity: WBPHS1030 WIR Inspection for Steel
Columns, Beams, & Frames
Project: 5 Activity: WBPHW1000 Wett Testing - BWPH
Project: 5 Activity: WBPHW1010 Automation Testing - BWPH
Project: 5 Activity: WBPHW1020 Process Commissioning
Backwash Pump - BWPH
Project: 5 Activity: WCCLC1000 Chlorine Chemical Trench -
MH1A to MH3A
Project: 5 Activity: WCCLC1010 Chlorine Chemical Trench -
MH3A to MH6
Project: 5 Activity: WCCLC1020 Chlorine Chemical Trench -
MH6 to CLB - waiting for Genset to remove
Project: 5 Activity: WCCLC1030 Chlorine Chemical Trench-
MH14 to Chamber15
Project: 5 Activity: WCCLC1040 Chlorine Chemical Trench -
CLB to ACSB
Project: 5 Activity: WCCLC1050 Chlorine Chemical Trench -
APPLICATION OF ACID RESISTANT
Project: 5 Activity: WCCLM1000 Chlorine Chemical Pipe - MH3A
to MH6
Project: 5 Activity: WCCLM1010 Chlorine Chemical Pipe - MH1A
to MH3A
Project: 5 Activity: WCCLM1020 Chlorine Chemical Pipe - CLB
to ACSB
Project: 5 Activity: WCCLM1030 Chlorine Chemical Pipe - MH6
to CLB
Project: 5 Activity: WCCLM1040 Chlorine Chemical Pipe - MH14
to Chamber15
Project: 5 Activity: WCLBA1000 Install Windows (5 units) -
done
Project: 5 Activity: WCLBA1010 Masonry Works
Project: 5 Activity: WCLBA1020 Install Handrails & Ladders
Project: 5 Activity: WCLBA1030 Install Doors (8 units)
Project: 5 Activity: WCLBA1040 Delivery of Louver - (Done)
Project: 5 Activity: WCLBA1050 Signage & Markers
Project: 5 Activity: WCLBA1060 Interior Wall Finishes -
remaining
Project: 5 Activity: WCLBA1070 Roof Deck Finishes
Project: 5 Activity: WCLBA1080 Ceiling Finishes
Project: 5 Activity: WCLBA1090 Floor Finishes Acid
Resistance
Project: 5 Activity: WCLBA1100 WIR Inspection for Install
Louver
Project: 5 Activity: WCLBA1110 Install Louver
Project: 5 Activity: WCLBC1000 Construct Septic Tank
Project: 5 Activity: WCLBD1000 Dry Testing
Project: 5 Activity: WCLBE1000 Cable pulling
Project: 5 Activity: WCLBE1010 Installation of grounding
system
Project: 5 Activity: WCLBE1020 Termination works
Project: 5 Activity: WCLBH1000 Walkthrough
Project: 5 Activity: WCLBH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WCLBH1020 Construction Handover
Project: 5 Activity: WCLBI1000 Cable pulling
Project: 5 Activity: WCLBI1010 Installation of instruments
Project: 5 Activity: WCLBI1020 Terminations
Project: 5 Activity: WCLBM1000 Install Overhead Crane - done
Project: 5 Activity: WCLBM1010 Certification of steel basket
- done
Project: 5 Activity: WCLBM1020 Overhead crane load testing -
done
Project: 5 Activity: WCLBM1030 Installation of Vacuum
Regulator - DONE
Project: 5 Activity: WCLBM1040 Chlorinator
Project: 5 Activity: WCLBM1050 Evaporator System
Project: 5 Activity: WCLBM1060 Chlorine Scrubber Sytem -
DONE
Project: 5 Activity: WCLBM1070 Installation of Chlorine
Ejector Unit
Project: 5 Activity: WCLBM1080 Auto Change Over Unit - DONE
Project: 5 Activity: WCLBM1090 Chlorine piping works and
supports inside the building - DONE
Project: 5 Activity: WCLBM1100 Installation of FRP pipe
support at chemical trenches
Project: 5 Activity: WCLBM1110 Outside Air Duct Works
Project: 5 Activity: WCLBM1120 Installation of FRP Air
Blower Units - 2 Units - 2 Units (DONE)
Project: 5 Activity: WCLBM1130 Installation of FRP pipes
Project: 5 Activity: WCLBM1140 Install Fire Dampers
Project: 5 Activity: WCLBM1150 Installation of Chlorine and
S02 ton container with dip trays
Project: 5 Activity: WCLBM1160 Installation of Emergency Eye
Shower - 5 Units
Project: 5 Activity: WCLBM1170 Internal Hydrotest
Chlorination
Project: 5 Activity: WCLBM1180 Installation of Flanges for
Vacuum Regulator
Project: 5 Activity: WCLBM1200 Nitrogen Leak test for Vacuum
Regulator, Auto Change Over Unit and Evaporator System
Project: 5 Activity: WCLBM1210 WIR Inspection prior for
Pressure testing of Vacuum Regulator System
Project: 5 Activity: WCLBM1220 Supply - Outside Air Blowers
- 3 units (2 units installed)
Project: 5 Activity: WCLBM1230 Rectification for Spring
Mounting of Outside Air Blowers - 1 piece
Project: 5 Activity: WCLBM1240 WIR Inspection of Outside Air
Blowers - 1 piece
Project: 5 Activity: WCLBM1250 Installation of Exhaust Fans
- 4 Units (DONE) Wall Mounted
Project: 5 Activity: WCLBM1260 WIR Inspection for
Installation of Exhaust Fans - 4 Units Wall Mounted
Project: 5 Activity: WCLBM1270 WIR Inspection for
Installation of Emergency Eye Shower - 5 Units
Project: 5 Activity: WCLBM1280 Install of Scaffolding prior
fo Installation of Fire Dampers
Project: 5 Activity: WCLBM1290 Install Motorize Fire Dampers
Project: 5 Activity: WCLBM1300 Installation of Mobile
Scaffolding prior for Install Fire Dampers and Motorized Fire Dampers
Project: 5 Activity: WCLBM1320 WIR Inspection of Install
Fire Dampers
Project: 5 Activity: WCLBM1330 WIR Inspection of Install
Motorize Fire Dampers
Project: 5 Activity: WCLBM1340 Installation of Fire Dampers
Project: 5 Activity: WCLBM1350 WIR Inspection of FRP Air
Blower Units - 2 Units
Project: 5 Activity: WCLBM1360 Installation of Flanges for
Evaporator System
Project: 5 Activity: WCLBM1370 Test Package prior for
Nitrogen Leak test for Vacuum Regulator, Auto Change Over Unit and Evaporator
System
Project: 5 Activity: WCLBM1380 Delivery of chlorine tank for
Auto Change Over Unit - 4 Units
Project: 5 Activity: WCLBM1390 WIR Inspection Prior for
Installation of Equipment and conncetion Line for chlorine tank for Auto Change
Over Unit
Project: 5 Activity: WCLBM1400 Installation of chlorine tank
and connection lines to Auto Change Over Unit - 4 units
Project: 5 Activity: WCLBM1410 WIR Inspection for
Installation of chlorine tank and connection lines to Auto Change Over Unit - 4
units
Project: 5 Activity: WCLBM1420 Delivery for 3 inch Flange
for Chlorine Ejector Unit - 8 units 5th batch JESCO delivery
Project: 5 Activity: WCLBM1430 WIR Inspection prior for
installation of Chlorine Ejector Unit
Project: 5 Activity: WCLBM1440 Preparation for Test Package
of Chlorine Ejector Unit
Project: 5 Activity: WCLBM1450 Nitrogen Leak test for
Chlorine Ejector Unit
Project: 5 Activity: WCLBM1460 Installation for 3 inch
Flange for Chlorine Ejector Unit - 8 units 5th batch JESCO delivery
Project: 5 Activity: WCLBM1470 WIR Inspection for
Installation of FRP pipes
Project: 5 Activity: WCLBM1480 Preparation for testing of
FRP pipes
Project: 5 Activity: WCLBM1490 Barcol, Smoke, and Nitrogen
Testing of FRP pipes
Project: 5 Activity: WCLBM1500 WIR Inspection of Barcol,
Smoke, and Nitrogen Testing Testing of FRP pipes
Project: 5 Activity: WCLBM1520 Delivery of flange reducer
for Chlorine Scrubber System included in 5th batch JESCO Delivery
Project: 5 Activity: WCLBM1530 Installation of flange
reducer for for Chlorine Scrubber System included in 5th batch JESCO Delivery
Project: 5 Activity: WCLBM1540 WIR Inspection for Chlorine
Scrubber System Lines Prior for Pressure Testing
Project: 5 Activity: WCLBM1550 Preparation for Test package
of Chlorine Scrubber System Lines
Project: 5 Activity: WCLBM1570 Pressure Testing of Chlorine
Scrubber System Lines
Project: 5 Activity: WCLBM1590 Pipe Reinstatement of
Chlorine Scrubber System Lines
Project: 5 Activity: WCLBM1600 Final WIR Inspection of
Chlorine Scrubber System Lines - AAII Acceptance
Project: 5 Activity: WCLBM1610 Chlorine Scrubber Piping
Connection - On-going installation
Project: 5 Activity: WCLBM1620 Pipe Reinstatement for
Nitrogen Leak test for Vacuum Regulator, Auto Change Over Unit and Evaporator
System
Project: 5 Activity: WCLBM1630 Final WIR Inspection for
Nitrogen Leak test for Vacuum Regulator, Auto Change Over Unit and Evaporator
System
Project: 5 Activity: WCLBM1640 Pipe Reinstatement for
Chlorine Ejector Unit
Project: 5 Activity: WCLBM1650 Final WIR Inspection for
Chlorine Ejector Unit
Project: 5 Activity: WCLBM1660 Installation of Chlorine
Chemical Pipes connecting to TWR
Project: 5 Activity: WCLBM1670 Design for the new Sampling
Point
Project: 5 Activity: WCLBM1680 Installation for the new
Sampling Point
Project: 5 Activity: WCLBM1690 Procurement for Chlorine and
S02 ton container with dip trays - AAII
Project: 5 Activity: WCLBM1700 WIR Inspection for
Installation of Chlorine and S02 ton container with dip trays
Project: 5 Activity: WCLBU1000 Install Water Piping
Project: 5 Activity: WCLBU1010 Install Sanitary Plumbing
Project: 5 Activity: WCLBU1020 Install Bathroom Fixtures -
to be verify
Project: 5 Activity: WCLBU1030 Reinstatement after the
Hydrotest for Install Water Piping
Project: 5 Activity: WCLBU1040 WIR Inspection for Install
Water Piping
Project: 5 Activity: WCLBU1050 Leak Test for Install
Sanitary Plumbing - Rem. Perimeter lines
Project: 5 Activity: WCLBU1060 WIR Inspection for Install
Sanitary Plumbing
Project: 5 Activity: WCLBU1070 Hydrotest for Install Water
Piping
Project: 5 Activity: WCLBW1000 Wet Testing - CLB
Project: 5 Activity: WCLBW1010 Automation TEsting
Project: 5 Activity: WCLBW1020 Process Commissioning
Chlorination Building
Project: 5 Activity: WELBA1000 Install Doors (3) - ELB
Project: 5 Activity: WELBA1010 Install Louvers (2) - ELB
Project: 5 Activity: WELBA1020 Install Longspan Roofing -
ELB
Project: 5 Activity: WELBA1030 Install Cyclone Wire Fence -
ELB
Project: 5 Activity: WELBA1040 Wall Finishes (External) -
ELB
Project: 5 Activity: WELBD1000 Dry Testing - ELB
Project: 5 Activity: WELBE1000 Termination works - ELB -
link to backwash
Project: 5 Activity: WELBF1000 Install FM200 - ELB
Project: 5 Activity: WELBF1010 Install FDAS - ELB
Project: 5 Activity: WELBH1000 Walkthrough - ELB
Project: 5 Activity: WELBH1010 PUNCHLIST CLOSEOUT - ELB
Project: 5 Activity: WELBH1020 Construction Handover - ELB
Project: 5 Activity: WELBM1000 Install HVAC Equipment - ELB
Project: 5 Activity: WELBM1010 Install Fire Damper - ELB
Project: 5 Activity: WELBM1020 Install ACCU unit - Inside
(Done)
Project: 5 Activity: WELBM1030 Install ACCU unit - Out door
- 6 units
Project: 5 Activity: WELBM1040 Fabrication of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1050 Painting of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1060 Installation of ACCU
Supports/Steel Flat Forms
Project: 5 Activity: WELBM1070 WIR Inspection for
Installation of ACCU Supports/Steel Flat Forms
Project: 5 Activity: WELBM1080 Installation of Copper Tube
Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELBM1090 WIR Inspection for
Installation of Copper Tube Pipe from FCU to ACCU outdoor connection
Project: 5 Activity: WELBW1000 Wett Testing - ELB
Project: 5 Activity: WELBW1010 Automation Testing - ELB
Project: 5 Activity: WELNE1000 Duct Bank MH05 to MCC-6
Project: 5 Activity: WELNE1010 Duct Bank MH13 to Stub-out
Project: 5 Activity: WELNE1020 Duct Bank Valve Chamber to
EHH1
Project: 5 Activity: WELNE1030 Duct Bank MH12 to EHH11
Project: 5 Activity: WELNE1040 Duct Bank MH06 to MH10
Project: 5 Activity: WELNE1050 Duct Bank MH06 to MCC-5
Project: 5 Activity: WELNE1060 Duct Bank MH10 to MH09
Project: 5 Activity: WELNE1070 Duct Bank EHH10 to EHH11
Project: 5 Activity: WELNE1080 Duct Bank EHH11 to EHH12
Project: 5 Activity: WELNE1090 Duct Bank Stubout to EHH7
Project: 5 Activity: WELNE1100 Duct Bank Stubout to EHH8
Project: 5 Activity: WELNE1110 Duct Bank PB1-ACC TO MCC-7
Project: 5 Activity: WELNE1120 Duct Bank Stubout to EHH9
Project: 5 Activity: WELNE1130 Duct Bank EHH6 to EHH7
Project: 5 Activity: WELNE1140 Duct Bank MH05 to MH07
Project: 5 Activity: WELNE1150 Duct Bank MH07 to PB1-AC
Project: 5 Activity: WELNE1160 Duct Bank MH07 to MH08
Project: 5 Activity: WELNE1170 Duct Bank MH8 to MCC9
Project: 5 Activity: WELNE1180 Duct Bank EHH7 to EHH8
Project: 5 Activity: WELNE1190 Duct Bank EHH8 to EHH9
Project: 5 Activity: WELNE1200 Duct Bank EHH8 to Chamber16
Project: 5 Activity: WELNE1210 Duct Bank EHH9 to Chamber19
Project: 5 Activity: WELNE1220 Cable Pulling MSB to MCC-5
Project: 5 Activity: WELNE1230 Cable Pulling MSB to MCC-6
Project: 5 Activity: WELNE1240 Cable Pulling MSB to MCC-8
Project: 5 Activity: WELNE1250 FOC Cable Pulling
Project: 5 Activity: WELNE1260 Cable Pulling MSB to MCC-7
Project: 5 Activity: WELNE1270 Cable Pulling MSB to MCC-9
Project: 5 Activity: WELNS1000 MH10
Project: 5 Activity: WELNS1010 MH09
Project: 5 Activity: WELNS1020 EHH10, EHH11, EHH12
Project: 5 Activity: WELNS1030 MH07
Project: 5 Activity: WELNS1040 MH08
Project: 5 Activity: WELNS1050 EHH 7
Project: 5 Activity: WELNS1060 EHH 6
Project: 5 Activity: WELNS1070 EHH 8
Project: 5 Activity: WELNS1080 EHH 9
Project: 5 Activity: WFITA1000 Install Guardrails Top of
Tanks - South Side
Project: 5 Activity: WFITA1010 Fabrication of Steel Stairs,
Platforms - SOUTH and NORTH SIDE PIPE GALLERY - (Gratings and handrails by
WEBFORGE)
Project: 5 Activity: WFITA1020 Fabrication & Arrival of
Louvers from Cebu
Project: 5 Activity: WFITA1030 Mid Painting of Guardrails -
First Priority
Project: 5 Activity: WFITA1040 External Wall Painting
Project: 5 Activity: WFITA1050 Install Louvers at Air Vents
( 6 nos.) - South Side
Project: 5 Activity: WFITA1060 Floor Coating - First
Priority
Project: 5 Activity: WFITA1070 Install Steel Stairs,
Platforms, and Handrails - NORTH SIDE GALLERY
Project: 5 Activity: WFITA1080 Top Coating of Guard Rails -
First Priority
Project: 5 Activity: WFITA1100 Internal Painting Control
Room 1
Project: 5 Activity: WFITA1110 Exterior Painting Control
Room 1
Project: 5 Activity: WFITA1120 Install ACCU Control Room 1
(Done)
Project: 5 Activity: WFITA1130 Floor Finishes Control Room 1
Project: 5 Activity: WFITA1140 Exterior Painting Control
Room 2
Project: 5 Activity: WFITA1150 Internal Painting Control
Room 2
Project: 5 Activity: WFITA1170 Install Doors Control Room 2
Project: 5 Activity: WFITA1180 Floor Finishes Control Room 2
Project: 5 Activity: WFITA1200 Masonry Works Stair 3
Project: 5 Activity: WFITA1210 Internal Painting Control
Room 3
Project: 5 Activity: WFITA1220 Exterior Painting Control
Room 3
Project: 5 Activity: WFITA1230 Install Doors Control Room 3
Project: 5 Activity: WFITA1240 Floor Finishes Control Room 3
Project: 5 Activity: WFITA1250 Waterproofing Works Stair 1
Project: 5 Activity: WFITA1260 Interior Painting Stair 1
Project: 5 Activity: WFITA1270 Install Railings Stair 1
Project: 5 Activity: WFITA1280 Exterior Painting Stair 1
Project: 5 Activity: WFITA1290 Masonry Works Stair 2
Project: 5 Activity: WFITA1300 Interior Painting Stair 2
Project: 5 Activity: WFITA1310 Waterproofing Works Stair 2
Project: 5 Activity: WFITA1320 Install Louvers Stair 2
Project: 5 Activity: WFITA1330 Install Railings Stair 2
Project: 5 Activity: WFITA1340 Install Doors Stair 2
Project: 5 Activity: WFITA1350 Exterior Painting Stair 2
Project: 5 Activity: WFITA1360 Interior Painting Stair 3
Project: 5 Activity: WFITA1370 Waterproofing Works Stair 3
Project: 5 Activity: WFITA1380 Install Louvers Stair 3
Project: 5 Activity: WFITA1390 Install Railings Stair 3
Project: 5 Activity: WFITA1400 Install Doors Stair 3
Project: 5 Activity: WFITA1410 Exterior Painting Stair 3
Project: 5 Activity: WFITA1420 Install Guardrails Top of
Tanks - North Side
Project: 5 Activity: WFITA1430 Fabrication of Guardrails Top
of Tanks - South Side
Project: 5 Activity: WFITA1440 Fabrication of Guardrails Top
of Tanks - North Side
Project: 5 Activity: WFITA1450 Mid Painting of Guardrails -
2nd Priority
Project: 5 Activity: WFITA1460 Top Coating of Guard Rails -
2nd Priority
Project: 5 Activity: WFITA1470 Install Louvers at Air Vents
( 6 nos.) - North Side (Done)
Project: 5 Activity: WFITA1480 WIR Inspection for Install
Louvers at Air Vents ( 6 nos.) - North Side (Done)
Project: 5 Activity: WFITA1490 WIR Inspection for Install
Louvers at Air Vents ( 6 nos.) - South Side
Project: 5 Activity: WFITA1500 Procurement of Steel Stairs,
Platforms - SOUTH and NORTH SIDE PIPE GALLERY - (Gratings and handrails by
WEBFORGE)
Project: 5 Activity: WFITA1510 Installation of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1540 Installation of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA1550 Fabrication of Railings Stair
1
Project: 5 Activity: WFITA1560 Painting of Railings Stair 1
Project: 5 Activity: WFITA1570 WIR Inspection of Railings
Stair 1
Project: 5 Activity: WFITA1580 Fabrication of Railings Stair
2
Project: 5 Activity: WFITA1590 Painting of Railings Stair 2
Project: 5 Activity: WFITA1600 WIR Inspection of Railings
Stair 2
Project: 5 Activity: WFITA1610 Installation Steel Gratings
for Trench of Control Room 1
Project: 5 Activity: WFITA1640 Fabrication of Railings Stair
3
Project: 5 Activity: WFITA1650 Painting of Railings Stair 3
Project: 5 Activity: WFITA1660 WIR Inspection of Railings
Stair 3
Project: 5 Activity: WFITA1670 WIR Inspection of Installed
Louvers Stair 3
Project: 5 Activity: WFITA1700 Design of Access hatch - 3
Units - AAII/ VCCI SI
Project: 5 Activity: WFITA1710 Procurement of the Materials
for Access Hatch - 3 Units
Project: 5 Activity: WFITA1720 Fabrication of the Materials
for Access Hatch - 3 Units
Project: 5 Activity: WFITA1730 Painting of the Materials for
Access Hatch - 3 Units
Project: 5 Activity: WFITA1740 Installation of the Materials
for Access Hatch - 3 Units
Project: 5 Activity: WFITA1750 WIR Inspection of the
Materials for Access Hatch - 3 Units
Project: 5 Activity: WFITA1760 Procurement of Steel Gratings
for Trench of Control Room 1
Project: 5 Activity: WFITA1770 Fabrication of Steel Gratings
for Trench of Control Room 1
Project: 5 Activity: WFITA1780 Painting of Steel Gratings
for Trench of Control Room 1
Project: 5 Activity: WFITA1790 WIR Inspection of Steel
Gratings for Trench of Control Room 1
Project: 5 Activity: WFITA1880 Installation of Condensate
Tubing Control Room 1
Project: 5 Activity: WFITA1890 Testing of Condensate Tubing
Control Room 1
Project: 5 Activity: WFITA1900 Refregerant charging of
Condensate Tubing Control Room 1
Project: 5 Activity: WFITA1910 Inspection of Condensate
Tubing Control Room 1
Project: 5 Activity: WFITA1960 Installation of Tubing
insulation for Condensate Tubing Control Room 1
Project: 5 Activity: WFITA1970 Procurement of Tubing
insulation for Condensate Tubing Control Room 1
Project: 5 Activity: WFITA2060 WIR Inspection of Installed
Louvers Stair 2
Project: 5 Activity: WFITA2070 Desing for the Maintenance
Gates - AAII/VCCI SI
Project: 5 Activity: WFITA2080 Procurement for the
Maintenance Gates
Project: 5 Activity: WFITA2090 Fabrication for the
Maintenance Gates
Project: 5 Activity: WFITA2100 Installation for the
Maintenance Gates
Project: 5 Activity: WFITA2110 Painting for the Maintenance
Gates
Project: 5 Activity: WFITA2120 WIR Inspection for the
Maintenance Gates
Project: 5 Activity: WFITA2130 Procurement of Steel gratings
at the Trench of Pipe gallery
Project: 5 Activity: WFITA2140 Fabrication of Steel gratings
at the Trench of South Side Pipe gallery
Project: 5 Activity: WFITA2150 Painting of Steel gratings at
the Trench of South Side Pipe gallery
Project: 5 Activity: WFITA2160 Installation of Steel
gratings at the Trench of South Side Pipe gallery
Project: 5 Activity: WFITA2170 WIR Inspection of Steel
gratings at the Trench of South Side Pipe gallery
Project: 5 Activity: WFITA2190 Fabrication of Steel gratings
at the Trench of North Side Pipe gallery
Project: 5 Activity: WFITA2200 Painting of Steel gratings at
the Trench of North Side Pipe gallery
Project: 5 Activity: WFITA2210 Installation of Steel
gratings at the Trench of North Side Pipe gallery
Project: 5 Activity: WFITA2220 WIR Inspection of Steel
gratings at the Trench of North Side Pipe gallery
Project: 5 Activity: WFITA2230 Installation Sump Pumps - 4
units
Project: 5 Activity: WFITA2240 WIR Inspection for the
installed Sump Pumps - 4 units
Project: 5 Activity: WFITA2260 Storm Drain at Control Room 1
Project: 5 Activity: WFITA2290 Storm Drain at Stair 1
Project: 5 Activity: WFITA2300 Storm Drain at Stair 1
Project: 5 Activity: WFITA2310 Storm Drain at Stair 3
Project: 5 Activity: WFITA2320 Installation of Pipes for
Sump Pumps
Project: 5 Activity: WFITA2330 Procurement of Portable Pump
- 1 unit
Project: 5 Activity: WFITA2340 Hydrotest Prep, Filling and
Flushing of Pipes for Sump Pumps
Project: 5 Activity: WFITA2350 WIR Inspection of Pipes for
Sump Pumps
Project: 5 Activity: WFITA2360 WIR Inspection of Steel
Stairs, Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2370 WIR Inspection of Steel
Stairs, Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2380 Painting of Steel Stairs,
Platforms - SOUTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2390 Painting of Steel Stairs,
Platforms - NORTH SIDE PIPE GALLERY - (Gratings and handrails by WEBFORGE)
Project: 5 Activity: WFITA2400 Hydrotesting of Pipes for
Sump Pumps
Project: 5 Activity: WFITA2410 Pipe REinstatement after
Hydrotesting of Pipes for Sump Pumps
Project: 5 Activity: WFITA2420 Install ACCU Control Room 2
(Done)
Project: 5 Activity: WFITA2430 Procurement of Steel Gratings
for Trench of Control Room 2
Project: 5 Activity: WFITA2440 Storm Drain at Control Room 2
Project: 5 Activity: WFITA2450 Installation of Condensate
Tubing Control Room 2
Project: 5 Activity: WFITA2460 Fabrication of Steel Gratings
for Trench of Control Room 2
Project: 5 Activity: WFITA2470 Inspection of Condensate
Tubing Control Room 2
Project: 5 Activity: WFITA2480 Testing of Condensate Tubing
Control Room 2
Project: 5 Activity: WFITA2490 Painting of Steel Gratings
for Trench of Control Room 2
Project: 5 Activity: WFITA2500 Refregerant charging of
Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2510 Procurement of Tubing
insulation for Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2520 Installation Steel Gratings
for Trench of Control Room 2
Project: 5 Activity: WFITA2530 WIR Inspection of Steel
Gratings for Trench of Control Room 2
Project: 5 Activity: WFITA2540 Installation of Tubing
insulation for Condensate Tubing Control Room 2
Project: 5 Activity: WFITA2550 Install ACCU Control Room 3
(Done)
Project: 5 Activity: WFITA2560 Procurement of Steel Gratings
for Trench of Control Room 3
Project: 5 Activity: WFITA2570 Installation of Condensate
Tubing Control Room 3
Project: 5 Activity: WFITA2580 Storm Drain at Control Room 3
Project: 5 Activity: WFITA2590 Inspection of Condensate
Tubing Control Room 3
Project: 5 Activity: WFITA2600 Testing of Condensate Tubing
Control Room 3
Project: 5 Activity: WFITA2610 Refregerant charging of
Condensate Tubing Control Room 3
Project: 5 Activity: WFITA2620 Procurement of Tubing
insulation for Condensate Tubing Control Room 3
Project: 5 Activity: WFITA2630 Fabrication of Steel Gratings
for Trench of Control Room 3
Project: 5 Activity: WFITA2640 Painting of Steel Gratings
for Trench of Control Room 3
Project: 5 Activity: WFITA2650 Installation of Tubing
insulation for Condensate Tubing Control Room 3
Project: 5 Activity: WFITA2660 Installation Steel Gratings
for Trench of Control Room 3
Project: 5 Activity: WFITA2670 WIR Inspection of Steel
Gratings for Trench of Control Room 3
Project: 5 Activity: WFITD1000 Dry Testing DMF Common Inlet
Project: 5 Activity: WFITD1010 Dry Testing DMF Common
Channel
Project: 5 Activity: WFITD1020 Dry Testing Train 11 (Trough,
Flow Meter, Instrumentaion, Gauge & Gate)
Project: 5 Activity: WFITD1030 Dry Testing DMF13 (Gates-
Close/Open)
Project: 5 Activity: WFITD1040 Dry Testing DMF15
Project: 5 Activity: WFITD1050 Dry Testing DMF17
Project: 5 Activity: WFITD1060 Dry Testing DMF2
Project: 5 Activity: WFITD1070 Dry Testing DMF4
Project: 5 Activity: WFITD1080 Dry Testing DMF6
Project: 5 Activity: WFITD1090 Dry Testing DMF8
Project: 5 Activity: WFITD1100 Dry testing Filtered Water
Tank A
Project: 5 Activity: WFITE1000 Installation of grounding
system
Project: 5 Activity: WFITE1010 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WFITE1020 Termination works Tanks 11,
13, 15, 17 - remaining Instruments
Project: 5 Activity: WFITE1030 SAT/program Simulation Tanks
11, 13, 15, 17
Project: 5 Activity: WFITE1040 Termination works Tanks 2, 4,
6, 8 - remaining Instruments
Project: 5 Activity: WFITE1050 SAT/program Simulation Tanks
2, 4, 6, 8
Project: 5 Activity: WFITE1060 Cable pulling Tanks 10, 12,
14, 16, 18
Project: 5 Activity: WFITE1070 Termination works Tanks 10,
12, 14, 16, 18 - remaining Instruments
Project: 5 Activity: WFITE1080 SAT/program Simulation Tanks
10, 12, 14, 16, 18
Project: 5 Activity: WFITE1090 Cable pulling Tanks 01-09
Project: 5 Activity: WFITE1100 Termination works Tanks 1, 3,
5, 9 - remaining Instruments
Project: 5 Activity: WFITE1110 SAT/program Simulation Tanks
1, 3, 5, 9
Project: 5 Activity: WFITH1000 Walkthrough DMF Common Inlet
Project: 5 Activity: WFITH1010 PUNCHLIST CLOSEOUT DMF Common
Inlet
Project: 5 Activity: WFITH1020 Construction Handover DMF
Common Inlet
Project: 5 Activity: WFITH1030 Walkthrough DMF Common
Channel
Project: 5 Activity: WFITH1040 PUNCHLIST CLOSEOUT DMF Common
Channel
Project: 5 Activity: WFITH1050 Construction Handover DMF
Common Channel
Project: 5 Activity: WFITH1060 Walkthrough Overflow Lines
Project: 5 Activity: WFITH1070 PUNCHLIST CLOSEOUT Overflow
Lines
Project: 5 Activity: WFITH1080 Construction Handover
Overflow Lines
Project: 5 Activity: WFITH1090 Walkthrough DMF11
Project: 5 Activity: WFITH1100 PUNCHLIST CLOSEOUT DMF11
Project: 5 Activity: WFITH1110 Construction Handover DMF11
Project: 5 Activity: WFITH1120 Walkthrough DMF13 (Gates,
Under drain, Air Header & Instruments)
Project: 5 Activity: WFITH1130 PUNCHLIST CLOSEOUT DMF13
Project: 5 Activity: WFITH1140 Construction Handover DMF13
Project: 5 Activity: WFITH1150 Walkthrough DMF15 (Gates,
Under drain, Air Header & Instruments)
Project: 5 Activity: WFITH1160 PUNCHLIST CLOSEOUT DMF15
Project: 5 Activity: WFITH1170 Construction Handover DMF15
Project: 5 Activity: WFITH1180 Walkthrough DMF17
Project: 5 Activity: WFITH1190 PUNCHLIST CLOSEOUT DMF17
Project: 5 Activity: WFITH1200 Construction Handover DMF17
Project: 5 Activity: WFITH1210 Walkthrough DMF2
Project: 5 Activity: WFITH1220 PUNCHLIST CLOSEOUT DMF2
Project: 5 Activity: WFITH1230 Construction Handover DMF2
Project: 5 Activity: WFITH1240 Walkthrough DMF4
Project: 5 Activity: WFITH1250 PUNCHLIST CLOSEOUT DMF4
Project: 5 Activity: WFITH1260 Construction Handover DMF4
Project: 5 Activity: WFITH1270 Walkthrough DMF6
Project: 5 Activity: WFITH1280 PUNCHLIST CLOSEOUT DMF6
Project: 5 Activity: WFITH1290 Construction Handover DMF6
Project: 5 Activity: WFITH1300 Walkthrough DMF8
Project: 5 Activity: WFITH1310 PUNCHLIST CLOSEOUT DMF8
Project: 5 Activity: WFITH1320 Construction Handover DMF8
Project: 5 Activity: WFITH1330 Walkthrough Filtered Water
Tank A
Project: 5 Activity: WFITH1340 PUNCHLIST CLOSEOUT Filtered
Water Tank A
Project: 5 Activity: WFITH1350 Construction Handover
Filtered Water Tank A
Project: 5 Activity: WFITI1000 Installation of instrument
Support Tanks 11, 13, 15, 17 (At Pipe Gallery remaining)
Project: 5 Activity: WFITI1010 Installation of Xylem
instrument Tanks 11, 13, 15, 17
Project: 5 Activity: WFITI1020 Installation of instruments
Tanks 2, 4, 6, 8
Project: 5 Activity: WFITI1030 Installation of instruments
Tanks 10, 12, 14, 16, 18
Project: 5 Activity: WFITI1040 Installation of instruments
Tanks 1, 3, 5, 9
Project: 5 Activity: WFITM1000 Installation of Insulation of
SS Pipes (DN200)
Project: 5 Activity: WFITM10000 Underdrain DMF18 - Air Header
pipe survey
Project: 5 Activity: WFITM10010 Underdrain DMF18 - Anchor rod
installation
Project: 5 Activity: WFITM10020 Underdrain DMF18 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM10030 Underdrain DMF18 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM10040 Underdrain DMF18 -
Installation of FRP Plates
Project: 5 Activity: WFITM10050 Underdrain DMF18 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM10060 Underdrain DMF18 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM10070 Underdrain DMF18 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM10080 Underdrain DMF18 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM10090 Underdrain DMF18 - Protection
covers of the underdrains
Project: 5 Activity: WFITM1010 Pipe Support Installation
Project: 5 Activity: WFITM10100 Underdrain DMF18 - WIR
Inspection
Project: 5 Activity: WFITM10110 LAUNSDERS DMF18 - Chipping
for Launders of
Project: 5 Activity: WFITM10120 LAUNSDERS DMF18 - Install
scaffolding
Project: 5 Activity: WFITM10130 LAUNSDERS DMF18 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM10140 LAUNSDERS DMF16 - Placement
of Launders
Project: 5 Activity: WFITM10150 LAUNSDERS DMF18 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM10160 LAUNSDERS DMF18 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM10170 LAUNSDERS DMF18 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM10180 LAUNSDERS DMF18 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM10190 LAUNSDERS DMF18 - Formworks &
Grouting
Project: 5 Activity: WFITM1030 Installation of Jet Fan
Project: 5 Activity: WFITM1040 Install Monorail Crane @
Access Area Stair1 - DEMAG
Project: 5 Activity: WFITM1050 Monorail Crane @ Stair 1 load
testing - DEMAG/VCCI
Project: 5 Activity: WFITM10630 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM10640 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM10650 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM10660 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM10670 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM10680 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM10690 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM10700 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM10710 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM10720 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM10730 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM10740 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM10750 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM10760 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM11610 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11620 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM11630 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11640 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11650 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11660 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11670 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM11680 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11690 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM11700 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM11710 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11720 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM11730 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11740 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM11750 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11760 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM11770 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM11780 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11790 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM11800 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11810 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM11820 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM11830 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM11840 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM11850 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11860 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM11870 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM11880 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1450 Water Filling & Bubble Test
Filter Tank 11
Project: 5 Activity: WFITM1460 Sand Media Installation Tank
11
Project: 5 Activity: WFITM1470 Water Filling & Backwashing
of Sand Media Filter Tank 11
Project: 5 Activity: WFITM1520 Water Filling & Bubble Test
Filter Tank 13
Project: 5 Activity: WFITM1530 Sand Media Installation Tank
13
Project: 5 Activity: WFITM15390 Procurement of Bolts for
valve of DN1000, DN900, DN500- 9 units North Side
Project: 5 Activity: WFITM15400 Installation for Valves of
DN500 - 27 units South Side
Project: 5 Activity: WFITM15410 WIR Inspection for bolt
torquing of Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM15420 Installation of Flange
Adaptor for Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15450 Painting for Flange Adaptor
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM15460 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM15470 WIR Inspection for Painting
for Flange Adaptor for Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15480 Installation of Bolts for
Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM15490 Bolt torquing for Valves of
DN500 - 36 units units North Side
Project: 5 Activity: WFITM15500 WIR Inspection for bolt
torquing of Valves of DN500 - 27 units North Side
Project: 5 Activity: WFITM1590 Water Filling & Bubble Test
Filter Tank 15
Project: 5 Activity: WFITM1600 Sand Media Installation Tank
15
Project: 5 Activity: WFITM16160 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16170 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16180 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16190 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16200 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16310 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16330 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16340 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16350 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16360 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16370 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16380 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16390 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16400 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16510 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16530 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16540 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16550 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16560 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16570 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16580 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16590 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16600 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16710 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16730 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16740 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16750 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM16760 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16770 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16780 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM16790 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM16800 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM17050 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17060 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17070 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17080 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17090 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM17100 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17110 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17120 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17130 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM17140 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM17150 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17160 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17170 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17180 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM1730 Water Filling & Bubble Test
Filter Tank 2
Project: 5 Activity: WFITM17330 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17340 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17350 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17360 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17370 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM17380 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17390 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM1740 Sand Media Installation Tank
2
Project: 5 Activity: WFITM17400 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17410 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM17420 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM17430 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17440 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17450 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17460 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM1750 Water Filling & Backwashing
of Sand Media Filter Tank 2 (2 Cycles)
Project: 5 Activity: WFITM1760 Anthracite Installation Tank
2
Project: 5 Activity: WFITM17610 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17620 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17630 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17640 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17650 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM17660 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17670 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17680 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17690 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM1770 Water Filling & Backwashing
of Anthracite Filter Tank 2 (6 Cycles)
Project: 5 Activity: WFITM17700 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM17710 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17720 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17730 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM17740 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM1780 Disinfection of Media Filters
Tank 2
Project: 5 Activity: WFITM17890 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM1790 Filter to Rinse Tank 2
Project: 5 Activity: WFITM17900 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17910 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17920 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM17930 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM17940 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17950 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17960 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM17970 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM17980 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM17990 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM1800 Water Filling & Bubble Test
Filter Tank 4
Project: 5 Activity: WFITM18000 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM18010 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM18020 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM18030 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18040 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM18050 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18060 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18070 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18080 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18090 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM1810 Sand Media Installation Tank
4
Project: 5 Activity: WFITM18100 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18110 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM18120 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM18130 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18140 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM18150 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18160 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1820 Water Filling & Backwashing
of Sand Media Filter Tank 4 (2 Cycles)
Project: 5 Activity: WFITM1830 Anthracite Installation Tank
4
Project: 5 Activity: WFITM18310 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18320 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM18330 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18340 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18350 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18360 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18370 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM18380 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18390 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM1840 Water Filling & Backwashing
of Anthracite Filter Tank 4 (6 Cycles)
Project: 5 Activity: WFITM18400 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM18410 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18420 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM18430 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18440 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1850 Disinfection of Media Filters
Tank 4
Project: 5 Activity: WFITM18590 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM1860 Filter to Rinse Tank 4
Project: 5 Activity: WFITM18600 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM18610 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18620 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18630 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18640 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18650 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM18660 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18670 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM18680 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM18690 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM1870 Water Filling & Bubble Test
Filter Tank 6
Project: 5 Activity: WFITM18700 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM18710 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18720 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1880 Sand Media Installation Tank
6
Project: 5 Activity: WFITM18870 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM18880 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM18890 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM1890 Water Filling & Backwashing
of Sand Media Filter Tank 6 (2 Cycles)
Project: 5 Activity: WFITM18900 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18910 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM18920 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18930 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM18940 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM18950 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM18960 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM18970 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM18980 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM18990 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM1900 Anthracite Installation Tank
6
Project: 5 Activity: WFITM19000 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1910 Water Filling & Backwashing
of Anthracite Filter Tank 6 (6 Cycles)
Project: 5 Activity: WFITM19150 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM19160 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM19170 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM19180 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM19190 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM1920 Disinfection of Media Filters
Tank 6
Project: 5 Activity: WFITM19200 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM19210 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM19220 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM19230 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM19240 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM19250 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM19260 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM19270 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM19280 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM1930 Filter to Rinse Tank 6
Project: 5 Activity: WFITM1940 Water Filling & Bubble Test
Filter Tank 8
Project: 5 Activity: WFITM1950 Sand Media Installation Tank
8
Project: 5 Activity: WFITM19570 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19580 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19590 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM1960 Water Filling & Backwashing
of Sand Media Filter Tank 8 (2 Cycles)
Project: 5 Activity: WFITM19600 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19610 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM19620 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19630 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19640 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19650 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM19660 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM19670 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM19680 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19690 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM1970 Anthracite Installation Tank
8
Project: 5 Activity: WFITM19700 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM1980 Water Filling & Backwashing
of Anthracite Filter Tank 8 (6 Cycles)
Project: 5 Activity: WFITM19850 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19860 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19870 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19880 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM19890 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM1990 Disinfection of Media Filters
Tank 8
Project: 5 Activity: WFITM19900 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19910 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19920 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19930 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM19940 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM19950 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM19960 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM19970 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM19980 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2000 Filter to Rinse Tank 8
Project: 5 Activity: WFITM2010 Water Filling & Bubble Test
Filter Tank 10
Project: 5 Activity: WFITM20130 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20140 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20150 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20160 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20170 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM20180 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20190 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2020 Sand Media Installation Tank
10
Project: 5 Activity: WFITM20200 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20210 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM20220 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM20230 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM20240 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20250 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM20260 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2030 Water Filling & Backwashing
of Sand Media Filter Tank 10 (2 Cycles)
Project: 5 Activity: WFITM2040 Anthracite Installation Tank
10
Project: 5 Activity: WFITM20410 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20420 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20430 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20440 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20450 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM20460 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20470 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20480 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20490 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM2050 Water Filling & Backwashing
of Anthracite Filter Tank 10 (6 Cycles)
Project: 5 Activity: WFITM20500 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM20510 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM20520 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20530 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM20540 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2060 Disinfection of Media Filters
Tank 10
Project: 5 Activity: WFITM20690 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM2070 Filter to Rinse Tank 10
Project: 5 Activity: WFITM20700 Additional Installation of
Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20710 Inspection of Additional
Installation of Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20720 Painting for Additional
Installed Pipe for DN900 - NORTH SIDE
Project: 5 Activity: WFITM20730 Inspection of Painting for
Additional Installed Pipe for DN900 -NORTH SIDE
Project: 5 Activity: WFITM20740 Installation of Scaffolding
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20750 Installation of Flange
Adaptor for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20760 Painting for Flange Adaptor
for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20770 Painting Inspection for
Valves of DN900 - NORTH SIDE AAII, VCCI, WITCO
Project: 5 Activity: WFITM20780 Installation of Valves for
DN900 & Appurtenances - NORTH SIDE
Project: 5 Activity: WFITM20790 WIR Inspection for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM2080 Water Filling & Bubble Test
Filter Tank 12
Project: 5 Activity: WFITM20800 Installation of Bolts for
Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM20810 Bolt torquing for Valves of
DN900 - NORTH SIDE
Project: 5 Activity: WFITM20820 WIR Inspection of Bolt
torquing for Valves of DN900 - NORTH SIDE
Project: 5 Activity: WFITM2090 Sand Media Installation Tank
12
Project: 5 Activity: WFITM20930 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM20940 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM20950 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM20960 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM20970 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM20980 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM20990 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2100 Water Filling & Backwashing
of Sand Media Filter Tank 12 (2 Cycles)
Project: 5 Activity: WFITM21000 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM21010 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21020 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM2110 Anthracite Installation Tank
12
Project: 5 Activity: WFITM21130 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21150 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21160 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21170 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21180 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21190 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2120 Water Filling & Backwashing
of Anthracite Filter Tank 12 (6 Cycles)
Project: 5 Activity: WFITM21200 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM21210 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21220 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM21230 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21250 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21260 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21270 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21280 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21290 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2130 Disinfection of Media Filters
Tank 12
Project: 5 Activity: WFITM21300 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM21310 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21320 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM2140 Filter to Rinse Tank 12
Project: 5 Activity: WFITM2150 Water Filling & Bubble Test
Filter Tank 14
Project: 5 Activity: WFITM21530 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21550 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21560 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21570 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM21580 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21590 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2160 Sand Media Installation Tank
14
Project: 5 Activity: WFITM21600 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM21610 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM21620 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM2170 Water Filling & Backwashing
of Sand Media Filter Tank 14 (2 Cycles)
Project: 5 Activity: WFITM21730 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21750 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21760 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21770 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21780 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM21790 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM2180 Anthracite Installation Tank
14
Project: 5 Activity: WFITM21800 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM21810 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM21820 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM21830 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21850 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21860 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21870 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM21880 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM21890 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM2190 Water Filling & Backwashing
of Anthracite Filter Tank 14 (6 Cycles)
Project: 5 Activity: WFITM21900 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM21910 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM21920 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM2200 Disinfection of Media Filters
Tank 14
Project: 5 Activity: WFITM2210 Filter to Rinse Tank 14
Project: 5 Activity: WFITM2220 Water Filling & Bubble Test
Filter Tank 16
Project: 5 Activity: WFITM2230 Sand Media Installation Tank
16
Project: 5 Activity: WFITM22330 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22340 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22350 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22360 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22370 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22380 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22390 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2240 Water Filling & Backwashing
of Sand Media Filter Tank 16 (2 Cycles)
Project: 5 Activity: WFITM22400 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22410 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22420 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22430 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22440 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22450 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22460 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22470 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22480 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22490 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2250 Anthracite Installation Tank
16
Project: 5 Activity: WFITM22500 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22510 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22520 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22530 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22540 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22550 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22560 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22570 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22580 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22590 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2260 Water Filling & Backwashing
of Anthracite Filter Tank 16 (6 Cycles)
Project: 5 Activity: WFITM22600 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22610 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22620 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22630 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22640 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22650 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22660 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22670 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22680 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22690 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2270 Disinfection of Media Filters
Tank 16
Project: 5 Activity: WFITM22700 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22710 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22720 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22730 Installation of Scaffolding
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22740 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22750 Installation of Flange
Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22760 Painting for Flange Adaptor
for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22770 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - North Side
Project: 5 Activity: WFITM22780 Installation of Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22790 WIR Inspection for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM2280 Filter to Rinse Tank 16
Project: 5 Activity: WFITM22800 Installation of Bolts for
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22810 Bolt torquing for Valves of
DN1000 - North Side
Project: 5 Activity: WFITM22820 WIR Inspection for Bolts of
Valves of DN1000 - North Side
Project: 5 Activity: WFITM22830 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22840 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22850 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22860 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22870 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22880 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22890 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM2290 Water Filling & Bubble Test
Filter Tank 18
Project: 5 Activity: WFITM22900 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM22910 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22920 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM22930 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22940 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22950 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22960 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22970 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM22980 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM22990 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM2300 Sand Media Installation Tank
18
Project: 5 Activity: WFITM23000 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM23010 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM23020 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM23030 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM23050 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM23060 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM23070 WIR Inspection for Painting
of Flange Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM23080 Installation of Valves of
DN1000 - South Side
Project: 5 Activity: WFITM23090 WIR Inspection for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM2310 Water Filling & Backwashing
of Sand Media Filter Tank 18 (2 Cycles)
Project: 5 Activity: WFITM23100 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM23110 Bolt torquing for Valves of
DN1000 - South Side
Project: 5 Activity: WFITM23120 WIR Inspection for Bolts of
Valves of DN1000 - South Side
Project: 5 Activity: WFITM2320 Anthracite Installation Tank
18
Project: 5 Activity: WFITM2330 Water Filling & Backwashing
of Anthracite Filter Tank 18 (6 Cycles)
Project: 5 Activity: WFITM2340 Disinfection of Media Filters
Tank 18
Project: 5 Activity: WFITM2350 Filter to Rinse Tank 18
Project: 5 Activity: WFITM2360 Water Filling & Bubble Test
Filter Tank 1
Project: 5 Activity: WFITM2370 Sand Media Installation Tank
1
Project: 5 Activity: WFITM23770 Installation of Scaffoldings
for Additional Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM23780 Additional Installation of
Pipe for DN900 - South Side
Project: 5 Activity: WFITM23790 Inspection of Additional
Installation of Pipe for DN900 - South Side
Project: 5 Activity: WFITM2380 Water Filling & Backwashing
of Sand Media Filter Tank 1 (2 Cycles)
Project: 5 Activity: WFITM23800 Painting for Additional
Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM23810 Inspection of Painting for
Additional Installed Pipe for DN900 - South Side
Project: 5 Activity: WFITM23820 Installation of Scaffolding
for Valves of DN900 - South Side
Project: 5 Activity: WFITM23830 Installation of Flange
Adaptor for Valves of DN900 - South Side
Project: 5 Activity: WFITM23840 Painting for Flange Adaptor
for Valves of DN900 - South Side
Project: 5 Activity: WFITM23850 Painting Inspection for
flange adaptor of DN900 - South Side AAII, VCCI, WITCO
Project: 5 Activity: WFITM23860 Installation of Valves for
DN900 & Appurtenances - South Side
Project: 5 Activity: WFITM23870 WIR Inspection for Valves of
DN900 - South Side
Project: 5 Activity: WFITM23880 Installation of Bolts for
Valves of DN900 - South Side
Project: 5 Activity: WFITM23890 Bolt torquing for Valves of
DN900 - South Side
Project: 5 Activity: WFITM2390 Anthracite Installation Tank
1
Project: 5 Activity: WFITM23900 WIR Inspection for Bolts of
Valves of DN900 - South Side
Project: 5 Activity: WFITM2400 Water Filling & Backwashing
of Anthracite Filter Tank 1 (6 Cycles)
Project: 5 Activity: WFITM2410 Disinfection of Media Filters
Tank 1
Project: 5 Activity: WFITM2420 Filter to Rinse Tank 1
Project: 5 Activity: WFITM2430 Water Filling & Bubble Test
Filter Tank 3
Project: 5 Activity: WFITM2440 Sand Media Installation Tank
3
Project: 5 Activity: WFITM2450 Water Filling & Backwashing
of Sand Media Filter Tank 3 (2 Cycles)
Project: 5 Activity: WFITM2460 Anthracite Installation Tank
3
Project: 5 Activity: WFITM2470 Water Filling & Backwashing
of Anthracite Filter Tank 3 (6 Cycles)
Project: 5 Activity: WFITM2480 Disinfection of Media Filters
Tank 3
Project: 5 Activity: WFITM2490 Filter to Rinse Tank 3
Project: 5 Activity: WFITM2500 Water Filling & Bubble Test
Filter Tank 5
Project: 5 Activity: WFITM2510 Sand Media Installation Tank
5
Project: 5 Activity: WFITM2520 Water Filling & Backwashing
of Sand Media Filter Tank 5 (2 Cycles)
Project: 5 Activity: WFITM2530 Anthracite Installation Tank
5
Project: 5 Activity: WFITM2540 Water Filling & Backwashing
of Anthracite Filter Tank 5 (6 Cycles)
Project: 5 Activity: WFITM2550 Disinfection of Media Filters
Tank 5
Project: 5 Activity: WFITM2560 Filter to Rinse Tank 5
Project: 5 Activity: WFITM2570 Water Filling & Bubble Test
Filter Tank 7
Project: 5 Activity: WFITM2580 Sand Media Installation Tank
7
Project: 5 Activity: WFITM2590 Water Filling & Backwashing
of Sand Media Filter Tank 7 (2 Cycles)
Project: 5 Activity: WFITM2600 Anthracite Installation Tank
7
Project: 5 Activity: WFITM2610 Water Filling & Backwashing
of Anthracite Filter Tank 7 (6 Cycles)
Project: 5 Activity: WFITM2620 Disinfection of Media Filters
Tank 7
Project: 5 Activity: WFITM2630 Filter to Rinse Tank 7
Project: 5 Activity: WFITM2640 Water Filling & Bubble Test
Filter Tank 9
Project: 5 Activity: WFITM2650 Sand Media Installation Tank
9
Project: 5 Activity: WFITM2660 Water Filling & Backwashing
of Sand Media Filter Tank 9 (2 Cycles)
Project: 5 Activity: WFITM2670 Anthracite Installation Tank
9
Project: 5 Activity: WFITM2680 Water Filling & Backwashing
of Anthracite Filter Tank 9 (6 Cycles)
Project: 5 Activity: WFITM2690 Disinfection of Media Filters
Tank 9
Project: 5 Activity: WFITM2700 Filter to Rinse Tank 9
Project: 5 Activity: WFITM2720 WIR Inspection for the 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2730 Design of the Plugs for 18
units of Sluice Gates in Main Channel
Project: 5 Activity: WFITM2740 Fabrication of the Plugs for
9 units of Sluice Gates in Main Channel - South Side
Project: 5 Activity: WFITM2750 Fabrication of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM2760 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - South Side
Project: 5 Activity: WFITM2770 Installation of the Plugs for
9 units of Sluice Gates in Main Channel - North Side
Project: 5 Activity: WFITM2780 Design for the Insulation of
SS Pipes (DN200) - AAII/VCCI SI
Project: 5 Activity: WFITM2790 Procurement for the
Insulation of SS Pipes (DN200)
Project: 5 Activity: WFITM2800 Fabrication for the
Insulation of SS Pipes (DN200)
Project: 5 Activity: WFITM2810 Pnematic testing for SS Pipes
(DN200)
Project: 5 Activity: WFITM2820 Walkdown prior for Pnematic
testing for SS Pipes (DN200)
Project: 5 Activity: WFITM2830 WIR Inspection and
Reinstatement for SS Pipes (DN200)
Project: 5 Activity: WFITM2840 WIR Inspection for the
Insulation of SS Pipes (DN200)
Project: 5 Activity: WFITM2920 Design of Air Relive Valves
of DN900 at Filter Tank 1 & 10 - AAII/VCCI SI
Project: 5 Activity: WFITM2930 Procurement of Air Relive
Valves of at Filter Tank 1 & 10
Project: 5 Activity: WFITM2940 Installation of Air Relive
Valves of at Filter Tank 1 & 10
Project: 5 Activity: WFITM2950 WIR Inspection of Air Relive
Valves of at Filter Tank 1 & 10
Project: 5 Activity: WFITM3020 Installation of Scaffolding
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3030 Installation of Flange
Adaptor for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3040 Installation of Bolts for
Valves of DN1000 - South Side
Project: 5 Activity: WFITM3050 Painting for Flange Adaptor
for Valves of DN1000 - South Side
Project: 5 Activity: WFITM3070 Installation of Scaffolding
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3080 Installation of Flange
Adaptor for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3090 Installation of Bolts for
Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3100 Painting for Flange Adaptor
for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3110 Bolt torquing for Valves of
DN500 - 36 units units South Side
Project: 5 Activity: WFITM3120 Procurement of Bolts for
valve of DN1000, DN900, DN500- 9 units South Side
Project: 5 Activity: WFITM3130 Installation of Flowmeter at
South Side (DONE) - 9 units
Project: 5 Activity: WFITM3140 Bolt torquing for the
Flowmeter at South Side - 9 units
Project: 5 Activity: WFITM3150 Installation of Flowmeter at
North Side - 9 units
Project: 5 Activity: WFITM3160 Bolt torquing for the
Flowmeter at North Side - 9 units
Project: 5 Activity: WFITM3170 Installation of Sampling
point at South Side - 9 units
Project: 5 Activity: WFITM3180 WIR Inspection for the
Flowmeter at South Side - 9 units
Project: 5 Activity: WFITM3190 WIR Inspection for the
Flowmeter at North Side - 9 units
Project: 5 Activity: WFITM3200 Installation of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM3210 WIR Inspection of Sampling
point at South Side - 9 units
Project: 5 Activity: WFITM3220 WIR Inspection of Sampling
point at North Side - 9 units
Project: 5 Activity: WFITM3230 WIR Inspection for Painting
for Flange Adaptor for Valves of DN500 - 27 units South Side
Project: 5 Activity: WFITM3900 Underdrain DMF2 - Install
scaffold roof
Project: 5 Activity: WFITM3910 Underdrain DMF2 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM3920 Underdrain DMF2 - Modify
scaffold access
Project: 5 Activity: WFITM3930 Underdrain DMF2 - Clearing
works
Project: 5 Activity: WFITM3940 Underdrain DMF2 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM3950 Underdrain DMF2 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM3960 Underdrain DMF2 - Air header
pipe installation.
Project: 5 Activity: WFITM3970 Underdrain DMF2 - Air Header
pipe survey
Project: 5 Activity: WFITM3980 Underdrain DMF2 - Anchor rod
installation
Project: 5 Activity: WFITM3990 Underdrain DMF2 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4000 Underdrain DMF2 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4010 Underdrain DMF2 -
Installation of FRP Plates
Project: 5 Activity: WFITM4020 Underdrain DMF2 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4030 Underdrain DMF2 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4040 Underdrain DMF2 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4050 Underdrain DMF2 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4060 Underdrain DMF2 - Protection
covers of the underdrains
Project: 5 Activity: WFITM4070 Underdrain DMF2 - WIR
Inspection
Project: 5 Activity: WFITM4080 LAUNSDERS DMF2 - Chipping for
Launders of
Project: 5 Activity: WFITM4090 LAUNSDERS DMF2 - Install
scaffolding
Project: 5 Activity: WFITM4100 LAUNSDERS DMF2 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM4110 LAUNSDERS DMF2 - Placement of
Launders
Project: 5 Activity: WFITM4120 LAUNSDERS DMF2 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM4130 LAUNSDERS DMF2 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM4140 LAUNSDERS DMF2 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM4150 LAUNSDERS DMF2 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM4160 LAUNSDERS DMF2 - Formworks &
Grouting
Project: 5 Activity: WFITM4490 Underdrain DMF4 - Install
scaffold roof
Project: 5 Activity: WFITM4500 Underdrain DMF4 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM4510 Underdrain DMF4 - Modify
scaffold access
Project: 5 Activity: WFITM4520 Underdrain DMF4 - Clearing
works
Project: 5 Activity: WFITM4530 Underdrain DMF4 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM4540 Underdrain DMF4 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM4550 Underdrain DMF4 - Air header
pipe installation.
Project: 5 Activity: WFITM4560 Underdrain DMF4 - Air Header
pipe survey
Project: 5 Activity: WFITM4570 Underdrain DMF4 - Anchor rod
installation
Project: 5 Activity: WFITM4580 Underdrain DMF4 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4590 Underdrain DMF4 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4600 Underdrain DMF4 -
Installation of FRP Plates
Project: 5 Activity: WFITM4610 Underdrain DMF4 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4620 Underdrain DMF4 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4630 Underdrain DMF4 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4640 Underdrain DMF4 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4650 Underdrain DMF4 - Protection
covers of the underdrains
Project: 5 Activity: WFITM4660 Underdrain DMF4 - WIR
Inspection
Project: 5 Activity: WFITM4670 LAUNSDERS DMF4 - Chipping for
Launders of
Project: 5 Activity: WFITM4680 LAUNSDERS DMF4 - Install
scaffolding
Project: 5 Activity: WFITM4690 LAUNSDERS DMF4 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM4700 LAUNSDERS DMF4 - Placement of
Launders
Project: 5 Activity: WFITM4710 LAUNSDERS DMF4 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM4720 LAUNSDERS DMF4 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM4730 LAUNSDERS DMF4 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM4740 LAUNSDERS DMF4 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM4750 LAUNSDERS DMF4 - Formworks &
Grouting
Project: 5 Activity: WFITM4830 Underdrain DMF6 - Install
scaffold roof
Project: 5 Activity: WFITM4840 Underdrain DMF6 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM4850 Underdrain DMF6 - Modify
scaffold access
Project: 5 Activity: WFITM4860 Underdrain DMF6 - Clearing
works
Project: 5 Activity: WFITM4870 Underdrain DMF6 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM4880 Underdrain DMF6 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM4890 Underdrain DMF6 - Air header
pipe installation.
Project: 5 Activity: WFITM4900 Underdrain DMF6 - Air Header
pipe survey
Project: 5 Activity: WFITM4910 Underdrain DMF6 - Anchor rod
installation
Project: 5 Activity: WFITM4920 Underdrain DMF6 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM4930 Underdrain DMF6 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM4940 Underdrain DMF6 -
Installation of FRP Plates
Project: 5 Activity: WFITM4950 Underdrain DMF6 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM4960 Underdrain DMF6 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM4970 Underdrain DMF6 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM4980 Underdrain DMF6 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM4990 Underdrain DMF6 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5000 Underdrain DMF6 - WIR
Inspection
Project: 5 Activity: WFITM5010 LAUNSDERS DMF6 - Chipping for
Launders of
Project: 5 Activity: WFITM5020 LAUNSDERS DMF6 - Install
scaffolding
Project: 5 Activity: WFITM5030 LAUNSDERS DMF6 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5040 LAUNSDERS DMF6 - Placement of
Launders
Project: 5 Activity: WFITM5050 LAUNSDERS DMF6 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5060 LAUNSDERS DMF6 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5070 LAUNSDERS DMF6 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5080 LAUNSDERS DMF6 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5090 LAUNSDERS DMF6 - Formworks &
Grouting
Project: 5 Activity: WFITM5100 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5110 Underdrain DMF8 - Pull-off
Test
Project: 5 Activity: WFITM5120 Underdrain DMF8 - Flume
Handover
Project: 5 Activity: WFITM5130 Underdrain DMF8 - Scour air
piping flushing
Project: 5 Activity: WFITM5140 Underdrain DMF8 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5150 Underdrain DMF8 - Hydrotest
DN900
Project: 5 Activity: WFITM5160 Underdrain DMF8 - Scour air
piping pressure test
Project: 5 Activity: WFITM5170 Underdrain DMF8 - Install
scaffold roof
Project: 5 Activity: WFITM5180 Underdrain DMF8 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5190 Underdrain DMF8 - Modify
scaffold access
Project: 5 Activity: WFITM5200 Underdrain DMF8 - Clearing
works
Project: 5 Activity: WFITM5210 Underdrain DMF8 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5220 Underdrain DMF8 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5230 Underdrain DMF8 - Air header
pipe installation.
Project: 5 Activity: WFITM5240 Underdrain DMF8 - Air Header
pipe survey
Project: 5 Activity: WFITM5250 Underdrain DMF8 - Anchor rod
installation
Project: 5 Activity: WFITM5260 Underdrain DMF8 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5270 Underdrain DMF8 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5280 Underdrain DMF8 -
Installation of FRP Plates
Project: 5 Activity: WFITM5290 Underdrain DMF8 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5300 Underdrain DMF8 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5310 Underdrain DMF8 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5320 Underdrain DMF8 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5330 Underdrain DMF8 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5340 Underdrain DMF8 - WIR
Inspection
Project: 5 Activity: WFITM5350 LAUNSDERS DMF8 - Chipping for
Launders of
Project: 5 Activity: WFITM5360 LAUNSDERS DMF8 - Install
scaffolding
Project: 5 Activity: WFITM5370 LAUNSDERS DMF8 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5380 LAUNSDERS DMF8 - Placement of
Launders
Project: 5 Activity: WFITM5390 LAUNSDERS DMF8 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5400 LAUNSDERS DMF8 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5410 LAUNSDERS DMF8 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5420 LAUNSDERS DMF8 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5430 LAUNSDERS DMF8 - Formworks &
Grouting
Project: 5 Activity: WFITM5440 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5450 Underdrain DMF1 - Pull-off
Test
Project: 5 Activity: WFITM5460 Underdrain DMF1 - Flume
Handover
Project: 5 Activity: WFITM5470 Underdrain DMF1 - Scour air
piping flushing
Project: 5 Activity: WFITM5480 Underdrain DMF1 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5490 Underdrain DMF1 - Hydrotest
DN900
Project: 5 Activity: WFITM5500 Underdrain DMF1 - Scour air
piping pressure test
Project: 5 Activity: WFITM5510 Underdrain DMF1 - Install
scaffold roof
Project: 5 Activity: WFITM5520 Underdrain DMF1 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5530 Underdrain DMF1 - Modify
scaffold access
Project: 5 Activity: WFITM5540 Underdrain DMF1 - Clearing
works
Project: 5 Activity: WFITM5550 Underdrain DMF1 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5560 Underdrain DMF1 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5570 Underdrain DMF1 - Air header
pipe installation.
Project: 5 Activity: WFITM5580 Underdrain DMF1 - Air Header
pipe survey
Project: 5 Activity: WFITM5590 Underdrain DMF1 - Anchor rod
installation
Project: 5 Activity: WFITM5600 Underdrain DMF1 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5610 Underdrain DMF1 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5620 Underdrain DMF1 -
Installation of FRP Plates
Project: 5 Activity: WFITM5630 Underdrain DMF1 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5640 Underdrain DMF1 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5650 Underdrain DMF1 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM5660 Underdrain DMF1 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM5670 Underdrain DMF1 - Protection
covers of the underdrains
Project: 5 Activity: WFITM5680 Underdrain DMF1 - WIR
Inspection
Project: 5 Activity: WFITM5690 LAUNSDERS DMF1 - Chipping for
Launders of
Project: 5 Activity: WFITM5700 LAUNSDERS DMF1 - Install
scaffolding
Project: 5 Activity: WFITM5710 LAUNSDERS DMF1 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM5720 LAUNSDERS DMF1 - Placement of
Launders
Project: 5 Activity: WFITM5730 LAUNSDERS DMF1 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM5740 LAUNSDERS DMF1 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM5750 LAUNSDERS DMF1 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM5760 LAUNSDERS DMF1 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM5770 LAUNSDERS DMF1 - Formworks &
Grouting
Project: 5 Activity: WFITM5780 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5790 Underdrain DMF3 - Pull-off
Test
Project: 5 Activity: WFITM5800 Underdrain DMF3 - Flume
Handover
Project: 5 Activity: WFITM5810 Underdrain DMF3 - Scour air
piping flushing
Project: 5 Activity: WFITM5820 Underdrain DMF3 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM5830 Underdrain DMF3 - Hydrotest
DN900
Project: 5 Activity: WFITM5840 Underdrain DMF3 - Scour air
piping pressure test
Project: 5 Activity: WFITM5850 Underdrain DMF3 - Install
scaffold roof
Project: 5 Activity: WFITM5860 Underdrain DMF3 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM5870 Underdrain DMF3 - Modify
scaffold access
Project: 5 Activity: WFITM5880 Underdrain DMF3 - Clearing
works
Project: 5 Activity: WFITM5890 Underdrain DMF3 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM5900 Underdrain DMF3 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM5910 Underdrain DMF3 - Air header
pipe installation.
Project: 5 Activity: WFITM5920 Underdrain DMF3 - Air Header
pipe survey
Project: 5 Activity: WFITM5930 Underdrain DMF3 - Anchor rod
installation
Project: 5 Activity: WFITM5940 Underdrain DMF3 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM5950 Underdrain DMF3 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM5960 Underdrain DMF3 -
Installation of FRP Plates
Project: 5 Activity: WFITM5970 Underdrain DMF3 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM5980 Underdrain DMF3 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM5990 Underdrain DMF3 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6000 Underdrain DMF3 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6010 Underdrain DMF3 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6020 Underdrain DMF3 - WIR
Inspection
Project: 5 Activity: WFITM6030 LAUNSDERS DMF3 - Chipping for
Launders of
Project: 5 Activity: WFITM6040 LAUNSDERS DMF3 - Install
scaffolding
Project: 5 Activity: WFITM6050 LAUNSDERS DMF3 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6060 LAUNSDERS DMF3 - Placement of
Launders
Project: 5 Activity: WFITM6070 LAUNSDERS DMF3 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6080 LAUNSDERS DMF3 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6090 LAUNSDERS DMF3 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6100 LAUNSDERS DMF3 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6110 LAUNSDERS DMF3 - Formworks &
Grouting
Project: 5 Activity: WFITM6120 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6130 Underdrain DMF5 - Pull-off
Test
Project: 5 Activity: WFITM6140 Underdrain DMF5 - Flume
Handover
Project: 5 Activity: WFITM6150 Underdrain DMF5 - Scour air
piping flushing
Project: 5 Activity: WFITM6160 Underdrain DMF5 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM6170 Underdrain DMF5 - Hydrotest
DN900
Project: 5 Activity: WFITM6180 Underdrain DMF5 - Scour air
piping pressure test
Project: 5 Activity: WFITM6190 Underdrain DMF5 - Install
scaffold roof
Project: 5 Activity: WFITM6200 Underdrain DMF5 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6210 Underdrain DMF5 - Modify
scaffold access
Project: 5 Activity: WFITM6220 Underdrain DMF5 - Clearing
works
Project: 5 Activity: WFITM6230 Underdrain DMF5 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6240 Underdrain DMF5 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6250 Underdrain DMF5 - Air header
pipe installation.
Project: 5 Activity: WFITM6260 Underdrain DMF5 - Air Header
pipe survey
Project: 5 Activity: WFITM6270 Underdrain DMF5 - Anchor rod
installation
Project: 5 Activity: WFITM6280 Underdrain DMF5 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6290 Underdrain DMF5 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6300 Underdrain DMF5 -
Installation of FRP Plates
Project: 5 Activity: WFITM6310 Underdrain DMF5 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6320 Underdrain DMF5 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6330 Underdrain DMF5 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6340 Underdrain DMF5 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6350 Underdrain DMF5 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6360 Underdrain DMF5 - WIR
Inspection
Project: 5 Activity: WFITM6370 LAUNSDERS DMF5 - Chipping for
Launders of
Project: 5 Activity: WFITM6380 LAUNSDERS DMF5 - Install
scaffolding
Project: 5 Activity: WFITM6390 LAUNSDERS DMF5 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6400 LAUNSDERS DMF5 - Placement of
Launders
Project: 5 Activity: WFITM6410 LAUNSDERS DMF5 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6420 LAUNSDERS DMF5 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6430 LAUNSDERS DMF5 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6440 LAUNSDERS DMF5 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6450 LAUNSDERS DMF5 - Formworks &
Grouting
Project: 5 Activity: WFITM6530 Underdrain DMF7 - Install
scaffold roof
Project: 5 Activity: WFITM6540 Underdrain DMF7 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6550 Underdrain DMF7 - Modify
scaffold access
Project: 5 Activity: WFITM6560 Underdrain DMF7 - Clearing
works
Project: 5 Activity: WFITM6570 Underdrain DMF7 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6580 Underdrain DMF7 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6590 Underdrain DMF7 - Air header
pipe installation.
Project: 5 Activity: WFITM6600 Underdrain DMF7 - Air Header
pipe survey
Project: 5 Activity: WFITM6610 Underdrain DMF7 - Anchor rod
installation
Project: 5 Activity: WFITM6620 Underdrain DMF7 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6630 Underdrain DMF7 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6640 Underdrain DMF7 -
Installation of FRP Plates
Project: 5 Activity: WFITM6650 Underdrain DMF7 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM6660 Underdrain DMF7 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM6670 Underdrain DMF7 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM6680 Underdrain DMF7 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM6690 Underdrain DMF7 - Protection
covers of the underdrains
Project: 5 Activity: WFITM6700 Underdrain DMF7 - WIR
Inspection
Project: 5 Activity: WFITM6710 LAUNSDERS DMF7 - Chipping for
Launders of
Project: 5 Activity: WFITM6720 LAUNSDERS DMF7 - Install
scaffolding
Project: 5 Activity: WFITM6730 LAUNSDERS DMF7 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM6740 LAUNSDERS DMF7 - Placement of
Launders
Project: 5 Activity: WFITM6750 LAUNSDERS DMF7 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM6760 LAUNSDERS DMF7 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM6770 LAUNSDERS DMF7 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM6780 LAUNSDERS DMF7 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM6790 LAUNSDERS DMF7 - Formworks &
Grouting
Project: 5 Activity: WFITM6870 Underdrain DMF9 - Install
scaffold roof
Project: 5 Activity: WFITM6880 Underdrain DMF9 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM6890 Underdrain DMF9 - Modify
scaffold access
Project: 5 Activity: WFITM6900 Underdrain DMF9 - Clearing
works
Project: 5 Activity: WFITM6910 Underdrain DMF9 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM6920 Underdrain DMF9 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM6930 Underdrain DMF9 - Air header
pipe installation.
Project: 5 Activity: WFITM6940 Underdrain DMF9 - Air Header
pipe survey
Project: 5 Activity: WFITM6950 Underdrain DMF9 - Anchor rod
installation
Project: 5 Activity: WFITM6960 Underdrain DMF9 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM6970 Underdrain DMF9 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM6980 Underdrain DMF9 -
Installation of FRP Plates
Project: 5 Activity: WFITM6990 Underdrain DMF9 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7000 Underdrain DMF9 - Setting and
Installation of Underdrains
Project: 5 Activity: WFITM7010 Underdrain DMF9 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7020 Underdrain DMF9 - Chamferring
both ends of the Filter Underdrain
Project: 5 Activity: WFITM7030 Underdrain DMF9 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7040 Underdrain DMF9 - WIR
Inspection
Project: 5 Activity: WFITM7050 LAUNSDERS DMF9 - Chipping for
Launders of
Project: 5 Activity: WFITM7060 LAUNSDERS DMF9 - Install
scaffolding
Project: 5 Activity: WFITM7070 LAUNSDERS DMF9 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7080 LAUNSDERS DMF9 - Placement of
Launders
Project: 5 Activity: WFITM7090 LAUNSDERS DMF9 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7100 LAUNSDERS DMF9 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7110 LAUNSDERS DMF9 - Placement of
the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7120 LAUNSDERS DMF9 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7130 LAUNSDERS DMF9 - Formworks &
Grouting
Project: 5 Activity: WFITM7210 Underdrain DMF17 - Install
scaffold roof
Project: 5 Activity: WFITM7220 Underdrain DMF17 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7230 Underdrain DMF17 - Modify
scaffold access
Project: 5 Activity: WFITM7240 Underdrain DMF17 - Clearing
works
Project: 5 Activity: WFITM7250 Underdrain DMF17 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM7260 Underdrain DMF17 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7270 Underdrain DMF17 - Air header
pipe installation.
Project: 5 Activity: WFITM7280 Underdrain DMF17 - Air Header
pipe survey
Project: 5 Activity: WFITM7290 Underdrain DMF17 - Anchor rod
installation
Project: 5 Activity: WFITM7300 Underdrain DMF17 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7310 Underdrain DMF17 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM7320 Underdrain DMF17 -
Installation of FRP Plates
Project: 5 Activity: WFITM7330 Underdrain DMF17 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7340 Underdrain DMF17 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM7350 Underdrain DMF17 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7360 Underdrain DMF17 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM7370 Underdrain DMF17 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7380 Underdrain DMF17 - WIR
Inspection
Project: 5 Activity: WFITM7390 LAUNSDERS DMF17 - Chipping
for Launders of
Project: 5 Activity: WFITM7400 LAUNSDERS DMF17 - Install
scaffolding
Project: 5 Activity: WFITM7410 LAUNSDERS DMF17 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7420 LAUNSDERS DMF17 - Placement
of Launders
Project: 5 Activity: WFITM7430 LAUNSDERS DMF17 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7440 LAUNSDERS DMF17 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7450 LAUNSDERS DMF17 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7460 LAUNSDERS DMF17 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7470 LAUNSDERS DMF17 - Formworks &
Grouting
Project: 5 Activity: WFITM7550 Underdrain DMF13 - Install
scaffold roof
Project: 5 Activity: WFITM7560 Underdrain DMF13 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7570 Underdrain DMF13 - Modify
scaffold access
Project: 5 Activity: WFITM7580 Underdrain DMF13 - Clearing
works
Project: 5 Activity: WFITM7590 Underdrain DMF13 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM7600 Underdrain DMF13 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7610 Underdrain DMF13 - Air header
pipe installation.
Project: 5 Activity: WFITM7620 Underdrain DMF13 - Air Header
pipe survey
Project: 5 Activity: WFITM7630 Underdrain DMF13 - Anchor rod
installation
Project: 5 Activity: WFITM7640 Underdrain DMF13 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7650 Underdrain DMF13 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM7660 Underdrain DMF13 -
Installation of FRP Plates
Project: 5 Activity: WFITM7670 Underdrain DMF13 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM7680 Underdrain DMF13 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM7690 Underdrain DMF13 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM7700 Underdrain DMF13 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM7710 Underdrain DMF13 - Protection
covers of the underdrains
Project: 5 Activity: WFITM7720 Underdrain DMF13 - WIR
Inspection
Project: 5 Activity: WFITM7730 LAUNSDERS DMF13 - Chipping
for Launders of
Project: 5 Activity: WFITM7740 LAUNSDERS DMF13 - Install
scaffolding
Project: 5 Activity: WFITM7750 LAUNSDERS DMF13 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM7760 LAUNSDERS DMF13 - Placement
of Launders
Project: 5 Activity: WFITM7770 LAUNSDERS DMF13 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM7780 LAUNSDERS DMF13 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM7790 LAUNSDERS DMF13 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM7800 LAUNSDERS DMF13 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM7810 LAUNSDERS DMF13 - Formworks &
Grouting
Project: 5 Activity: WFITM7890 Underdrain DMF15 - Install
scaffold roof
Project: 5 Activity: WFITM7900 Underdrain DMF15 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM7910 Underdrain DMF15 - Modify
scaffold access
Project: 5 Activity: WFITM7920 Underdrain DMF15 - Clearing
works
Project: 5 Activity: WFITM7930 Underdrain DMF15 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM7940 Underdrain DMF15 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM7950 Underdrain DMF15 - Air header
pipe installation.
Project: 5 Activity: WFITM7960 Underdrain DMF15 - Air Header
pipe survey
Project: 5 Activity: WFITM7970 Underdrain DMF15 - Anchor rod
installation
Project: 5 Activity: WFITM7980 Underdrain DMF15 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM7990 Underdrain DMF15 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8000 Underdrain DMF15 -
Installation of FRP Plates
Project: 5 Activity: WFITM8010 Underdrain DMF15 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8020 Underdrain DMF15 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8030 Underdrain DMF15 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8040 Underdrain DMF15 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8050 Underdrain DMF15 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8060 Underdrain DMF15 - WIR
Inspection
Project: 5 Activity: WFITM8070 LAUNSDERS DMF15 - Chipping
for Launders of
Project: 5 Activity: WFITM8080 LAUNSDERS DMF15 - Install
scaffolding
Project: 5 Activity: WFITM8090 LAUNSDERS DMF15 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8100 LAUNSDERS DMF15 - Placement
of Launders
Project: 5 Activity: WFITM8110 LAUNSDERS DMF15 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8120 LAUNSDERS DMF15 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8130 LAUNSDERS DMF15 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8140 LAUNSDERS DMF15 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8150 LAUNSDERS DMF15 - Formworks &
Grouting
Project: 5 Activity: WFITM8160 Underdrain DMF11 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8170 Underdrain DMF11 - Pull-off
Test
Project: 5 Activity: WFITM8180 Underdrain DMF11 - Flume
Handover
Project: 5 Activity: WFITM8190 Underdrain DMF11 - Scour air
piping flushing
Project: 5 Activity: WFITM8200 Underdrain DMF11 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8210 Underdrain DMF11 - Hydrotest
DN900
Project: 5 Activity: WFITM8220 Underdrain DMF11 - Scour air
piping pressure test
Project: 5 Activity: WFITM8230 Underdrain DMF11 - Install
scaffold roof
Project: 5 Activity: WFITM8240 Underdrain DMF11 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8250 Underdrain DMF11 - Modify
scaffold access
Project: 5 Activity: WFITM8260 Underdrain DMF11 - Clearing
works
Project: 5 Activity: WFITM8270 Underdrain DMF11 - Layout of
anchor rod locations will be with xylem assistance.
Project: 5 Activity: WFITM8280 Underdrain DMF11 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8290 Underdrain DMF11 - Air header
pipe installation.
Project: 5 Activity: WFITM8300 Underdrain DMF11 - Air Header
pipe survey
Project: 5 Activity: WFITM8310 Underdrain DMF11 - Anchor rod
installation
Project: 5 Activity: WFITM8320 Underdrain DMF11 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM8330 Underdrain DMF11 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8340 Underdrain DMF11 -
Installation of FRP Plates
Project: 5 Activity: WFITM8350 Underdrain DMF11 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8360 Underdrain DMF11 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8370 Underdrain DMF11 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8380 Underdrain DMF11 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8390 Underdrain DMF11 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8400 Underdrain DMF11 - WIR
Inspection
Project: 5 Activity: WFITM8410 LAUNSDERS DMF11 - Chipping
for Launders
Project: 5 Activity: WFITM8420 LAUNSDERS DMF11 - Install
scaffolding
Project: 5 Activity: WFITM8430 LAUNSDERS DMF11 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8440 LAUNSDERS DMF11 - Placement
of Launders
Project: 5 Activity: WFITM8450 LAUNSDERS DMF11 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8460 LAUNSDERS DMF11 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8470 LAUNSDERS DMF11 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8480 LAUNSDERS DMF11 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8490 LAUNSDERS DMF11 - Formworks &
Grouting
Project: 5 Activity: WFITM8500 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8510 Underdrain DMF10 - Pull-off
Test
Project: 5 Activity: WFITM8520 Underdrain DMF10 - Flume
Handover
Project: 5 Activity: WFITM8530 Underdrain DMF10 - Scour air
piping flushing
Project: 5 Activity: WFITM8540 Underdrain DMF10 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8550 Underdrain DMF10 - Hydrotest
DN900
Project: 5 Activity: WFITM8560 Underdrain DMF10 - Scour air
piping pressure test
Project: 5 Activity: WFITM8570 Underdrain DMF10 - Install
scaffold roof
Project: 5 Activity: WFITM8580 Underdrain DMF10 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8590 Underdrain DMF10 - Modify
scaffold access
Project: 5 Activity: WFITM8600 Underdrain DMF10 - Clearing
works
Project: 5 Activity: WFITM8610 Underdrain DMF10 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8620 Underdrain DMF10 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8630 Underdrain DMF10 - Air header
pipe installation.
Project: 5 Activity: WFITM8640 Underdrain DMF10 - Air Header
pipe survey
Project: 5 Activity: WFITM8650 Underdrain DMF10 - Anchor rod
installation
Project: 5 Activity: WFITM8660 Underdrain DMF10 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM8670 Underdrain DMF10 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM8680 Underdrain DMF10 -
Installation of FRP Plates
Project: 5 Activity: WFITM8690 Underdrain DMF10 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM8700 Underdrain DMF10 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM8710 Underdrain DMF10 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM8720 Underdrain DMF10 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM8730 Underdrain DMF10 - Protection
covers of the underdrains
Project: 5 Activity: WFITM8740 Underdrain DMF10 - WIR
Inspection
Project: 5 Activity: WFITM8750 LAUNSDERS DMF10 - Chipping
for Launders of
Project: 5 Activity: WFITM8760 LAUNSDERS DMF10 - Install
scaffolding
Project: 5 Activity: WFITM8770 LAUNSDERS DMF10 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM8780 LAUNSDERS DMF10 - Placement
of Launders
Project: 5 Activity: WFITM8790 LAUNSDERS DMF10 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM8800 LAUNSDERS DMF10 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM8810 LAUNSDERS DMF10 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM8820 LAUNSDERS DMF10 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM8830 LAUNSDERS DMF10 - Formworks &
Grouting
Project: 5 Activity: WFITM8840 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8850 Underdrain DMF12 - Pull-off
Test
Project: 5 Activity: WFITM8860 Underdrain DMF12 - Flume
Handover
Project: 5 Activity: WFITM8870 Underdrain DMF12 - Scour air
piping flushing
Project: 5 Activity: WFITM8880 Underdrain DMF12 - Manual
Cleaning of DN900
Project: 5 Activity: WFITM8890 Underdrain DMF12 - Hydrotest
DN900
Project: 5 Activity: WFITM8900 Underdrain DMF12 - Scour air
piping pressure test
Project: 5 Activity: WFITM8910 Underdrain DMF12 - Install
scaffold roof
Project: 5 Activity: WFITM8920 Underdrain DMF12 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM8930 Underdrain DMF12 - Modify
scaffold access
Project: 5 Activity: WFITM8940 Underdrain DMF12 - Clearing
works
Project: 5 Activity: WFITM8950 Underdrain DMF12 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM8960 Underdrain DMF12 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM8970 Underdrain DMF12 - Air header
pipe installation.
Project: 5 Activity: WFITM8980 Underdrain DMF12 - Air Header
pipe survey
Project: 5 Activity: WFITM8990 Underdrain DMF12 - Anchor rod
installation
Project: 5 Activity: WFITM9000 Underdrain DMF12 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9010 Underdrain DMF12 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9020 Underdrain DMF12 -
Installation of FRP Plates
Project: 5 Activity: WFITM9030 Underdrain DMF12 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9040 Underdrain DMF12 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9050 Underdrain DMF12 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9060 Underdrain DMF12 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9070 Underdrain DMF12 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9080 Underdrain DMF12 - WIR
Inspection
Project: 5 Activity: WFITM9090 LAUNSDERS DMF12 - Chipping
for Launders of
Project: 5 Activity: WFITM9100 LAUNSDERS DMF12 - Install
scaffolding
Project: 5 Activity: WFITM9110 LAUNSDERS DMF12 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9120 LAUNSDERS DMF12 - Placement
of Launders
Project: 5 Activity: WFITM9130 LAUNSDERS DMF12 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9140 LAUNSDERS DMF12 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9150 LAUNSDERS DMF12 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9160 LAUNSDERS DMF12 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9170 LAUNSDERS DMF12 - Formworks &
Grouting
Project: 5 Activity: WFITM9270 Underdrain DMF14 - Modify
scaffold access
Project: 5 Activity: WFITM9280 Underdrain DMF14 - Clearing
works
Project: 5 Activity: WFITM9290 Underdrain DMF14 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9300 Underdrain DMF14 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9310 Underdrain DMF14 - Air header
pipe installation.
Project: 5 Activity: WFITM9320 Underdrain DMF14 - Air Header
pipe survey
Project: 5 Activity: WFITM9330 Underdrain DMF14 - Anchor rod
installation
Project: 5 Activity: WFITM9340 Underdrain DMF14 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9350 Underdrain DMF14 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9360 Underdrain DMF14 -
Installation of FRP Plates
Project: 5 Activity: WFITM9370 Underdrain DMF14 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9380 Underdrain DMF14 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9390 Underdrain DMF14 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9400 Underdrain DMF14 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9410 Underdrain DMF14 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9420 Underdrain DMF14 - WIR
Inspection
Project: 5 Activity: WFITM9430 LAUNSDERS DMF14 - Chipping
for Launders of
Project: 5 Activity: WFITM9440 LAUNSDERS DMF14 - Install
scaffolding
Project: 5 Activity: WFITM9450 LAUNSDERS DMF14 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9460 LAUNSDERS DMF14 - Placement
of Launders
Project: 5 Activity: WFITM9470 LAUNSDERS DMF14 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9480 LAUNSDERS DMF14 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9490 LAUNSDERS DMF14 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9500 LAUNSDERS DMF14 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9510 LAUNSDERS DMF14 - Formworks &
Grouting
Project: 5 Activity: WFITM9590 Underdrain DMF16 - Install
scaffold roof
Project: 5 Activity: WFITM9600 Underdrain DMF16 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9610 Underdrain DMF16 - Modify
scaffold access
Project: 5 Activity: WFITM9620 Underdrain DMF16 - Clearing
works
Project: 5 Activity: WFITM9630 Underdrain DMF16 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9650 Underdrain DMF16 - Air header
pipe installation.
Project: 5 Activity: WFITM9660 Underdrain DMF16 - Air Header
pipe survey
Project: 5 Activity: WFITM9670 Underdrain DMF16 - Anchor rod
installation
Project: 5 Activity: WFITM9680 Underdrain DMF16 - Anchor rod
epoxy curing
Project: 5 Activity: WFITM9690 Underdrain DMF16 - Non-
destructive vertical pull test on 100% anchors
Project: 5 Activity: WFITM9700 Underdrain DMF16 -
Installation of FRP Plates
Project: 5 Activity: WFITM9710 Underdrain DMF16 - Sealing of
Gaps of FRP Plates
Project: 5 Activity: WFITM9720 Underdrain DMF16 - Setting
and Installation of Underdrains
Project: 5 Activity: WFITM9730 Underdrain DMF16 - Fill
Grouting of Under Drains
Project: 5 Activity: WFITM9740 Underdrain DMF16 -
Chamferring both ends of the Filter Underdrain
Project: 5 Activity: WFITM9750 Underdrain DMF16 - Protection
covers of the underdrains
Project: 5 Activity: WFITM9760 Underdrain DMF16 - WIR
Inspection
Project: 5 Activity: WFITM9770 LAUNSDERS DMF16 - Chipping
for Launders of
Project: 5 Activity: WFITM9780 LAUNSDERS DMF16 - Install
scaffolding
Project: 5 Activity: WFITM9790 LAUNSDERS DMF16 - Survey and
Elevations to be marked on the filter walls
Project: 5 Activity: WFITM9800 LAUNSDERS DMF16 - Placement
of Launders
Project: 5 Activity: WFITM9810 LAUNSDERS DMF16 - Any time
field trimming or additional hole drilling is required, fiberglass sealing of the
cut
Project: 5 Activity: WFITM9820 LAUNSDERS DMF16 - Locate the
centerline of each trough to be installed on the filter side walls
Project: 5 Activity: WFITM9830 LAUNSDERS DMF16 - Placement
of the anchor units for the trough end hanger on the filter side wall and install
Project: 5 Activity: WFITM9840 LAUNSDERS DMF16 - Attach the
wall mounting bracket to the trough bracket using the hardware furnised
Project: 5 Activity: WFITM9850 LAUNSDERS DMF16 - Formworks &
Grouting
Project: 5 Activity: WFITM9930 Underdrain DMF18 - Install
scaffold roof
Project: 5 Activity: WFITM9940 Underdrain DMF18 - Prepare
grouting area on site with scaffold roofing
Project: 5 Activity: WFITM9950 Underdrain DMF18 - Modify
scaffold access
Project: 5 Activity: WFITM9960 Underdrain DMF18 - Clearing
works
Project: 5 Activity: WFITM9970 Underdrain DMF18 - Layout of
anchor rod locations will be with xylem assistance
Project: 5 Activity: WFITM9980 Underdrain DMF18 - Make-up
block cutting pending tank measurements.
Project: 5 Activity: WFITM9990 Underdrain DMF18 - Air header
pipe installation.
Project: 5 Activity: WFITS1000 Wall Tank Lining DMF11 - done
Project: 5 Activity: WFITS1010 Wall Tank Lining DMF13 - done
Project: 5 Activity: WFITS1020 Wall Tank Lining DMF15 - done
Project: 5 Activity: WFITS1030 Wall Tank Lining DMF17 - done
Project: 5 Activity: WFITS1040 Tank Lining Main Channel -
done
Project: 5 Activity: WFITS1050 Wall Tank Lining at grouted
Launders DMF11
Project: 5 Activity: WFITS1060 Wall Tank Lining at grouted
Launders DMF15
Project: 5 Activity: WFITS1070 Wall Tank Lining at grouted
Launders DMF13
Project: 5 Activity: WFITS1080 Wall Tank Lining at grouted
Launders DMF17
Project: 5 Activity: WFITS1090 Under drain Tank Lining Tank
10 to 17 - done
Project: 5 Activity: WFITS1100 Wall Tank Lining Tank 10, 12,
14, 16, 18
Project: 5 Activity: WFITS1110 Wall Tank Lining at grouted
Launders DMF10
Project: 5 Activity: WFITS1120 Wall Tank Lining at grouted
Launders DMF12
Project: 5 Activity: WFITS1130 Wall Tank Lining at grouted
Launders DMF14
Project: 5 Activity: WFITS1140 Wall Tank Lining at grouted
Launders DMF16
Project: 5 Activity: WFITS1150 Wall Tank Lining at grouted
Launders DMF18
Project: 5 Activity: WFITS1160 Water Filling Tanks 2, 4, 6,
8 - done
Project: 5 Activity: WFITS1170 Leak Repair Tanks 2, 4, 6, 8
- done
Project: 5 Activity: WFITS1180 Wall Tank Lining Tank4
Project: 5 Activity: WFITS1190 Wall Tank Lining Tank6
Project: 5 Activity: WFITS1200 Wall Tank Lining Tank2
Project: 5 Activity: WFITS1210 Under drain Tank Lining Tank2
Project: 5 Activity: WFITS1220 Wall Tank Lining Tank8
Project: 5 Activity: WFITS1230 Under drain Tank Lining Tank4
Project: 5 Activity: WFITS1240 Under drain Tank Lining Tank6
Project: 5 Activity: WFITS1250 Under drain Tank Lining Tank8
Project: 5 Activity: WFITS1260 Wall Tank Lining at grouted
Launders DMF2
Project: 5 Activity: WFITS1270 Wall Tank Lining at grouted
Launders DMF4
Project: 5 Activity: WFITS1280 Wall Tank Lining at grouted
Launders DMF6
Project: 5 Activity: WFITS1290 Wall Tank Lining at grouted
Launders DMF8
Project: 5 Activity: WFITS1300 Water Filling Tanks1, 3, 5, 7
- done
Project: 5 Activity: WFITS1310 Water Filling Tank9 - done
Project: 5 Activity: WFITS1320 Wall Tank Lining Tank1, 3, 5,
7 - ongoing 1&3
Project: 5 Activity: WFITS1330 Leak Repair Tanks 9 - ongoing
Project: 5 Activity: WFITS1340 Under drain Tank Lining
Tank1, 3, 5, 7, 9
Project: 5 Activity: WFITS1350 Wall Tank Lining at grouted
Launders DMF1, 3, 5, 7, 9
Project: 5 Activity: WFITS1360 Wall Tank Lining Tank9
Project: 5 Activity: WFITW1060 Automation Testing DMF13
Project: 5 Activity: WFITW1070 Process Commissioning for DMF
13
Project: 5 Activity: WFITW1140 Wet Testing DMF2
Project: 5 Activity: WFITW1150 Automation Testing DMF2
Project: 5 Activity: WFITW1160 Process Commissioning for
Sand Filter 2
Project: 5 Activity: WFITW1170 Wet Testing DMF4
Project: 5 Activity: WFITW1180 Automation Testing DMF4
Project: 5 Activity: WFITW1190 Process Commissioning for
Sand Filter 4
Project: 5 Activity: WFITW1200 Wet Testing DMF6
Project: 5 Activity: WFITW1210 Automation Testing DMF6
Project: 5 Activity: WFITW1220 Process Commissioning for
Sand Filter 6
Project: 5 Activity: WFITW1230 Wet Testing DMF8
Project: 5 Activity: WFITW1240 Automation Testing DMF8
Project: 5 Activity: WFITW1250 Process Commissioning for
Sand Filter 8
Project: 5 Activity: WFITW1260 Wet Testing Filtered Water
Tank A
Project: 5 Activity: WFITW1270 Flushing & Cleaning Filtered
Water Tank A
Project: 5 Activity: WFLTA1000 Install Guardrails - Painting
Works
Project: 5 Activity: WFLTA1010 Install Self- closing Gates -
12 units
Project: 5 Activity: WFLTA1020 Epoxy Floor Coating on
platforms - under first drop priority areas
Project: 5 Activity: WFLTA1030 Exterior Painting at Walls
Project: 5 Activity: WFLTA1040 Epoxy Floor Coating on
platforms - Balance areas
Project: 5 Activity: WFLTA1050 Procurement for Portable
Ladders & Support -12 units
Project: 5 Activity: WFLTA1060 Installation of Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1080 Painting works for Self-
closing Gates - 12 uints
Project: 5 Activity: WFLTA1090 WIR Inspection for Portable
Ladders & Support - 12 units
Project: 5 Activity: WFLTA1100 Fabrication of Support for
portable ladders -12 units
Project: 5 Activity: WFLTA1110 WIR Inspection for Self-
closing Gates - 12 units
Project: 5 Activity: WFLTA1120 Fabrication and Installation
of Flatform for Chemical Lines
Project: 5 Activity: WFLTA1130 Painting of Flatform for
Chemical Lines
Project: 5 Activity: WFLTA1140 WIR Inspection of Flatform
for Chemical Lines
Project: 5 Activity: WFLTA1160 Procurement for Portable
Ladders & Support -
Project: 5 Activity: WFLTA1170 Installation of Portable
Ladders & Support - 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1180 Painting works for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1190 WIR Inspection for Portable
Ladders & Support 1st Priority 4, 5, 6
Project: 5 Activity: WFLTA1200 Fabrication of Support for
portable ladders
Project: 5 Activity: WFLTA1210 WIR Inspection for Self-
closing Gates - 1st priority 4, 5, 6
Project: 5 Activity: WFLTA1220 Installation of Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1230 Painting works for Self-
closing Gates - 2nd priority 1, 2, 3
Project: 5 Activity: WFLTA1240 WIR Inspection for Portable
Ladders & Support - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTA1250 WIR Inspection for Self-
closing Gates - 2nd Priority 1, 2, 3
Project: 5 Activity: WFLTD1000 Dry Testing Flocculation Sed
Train 6 Sludge Line
Project: 5 Activity: WFLTD1010 Dry Testing Flocculation
Train 6
Project: 5 Activity: WFLTD1020 Dry Testing Flocculation
Train 4
Project: 5 Activity: WFLTD1030 Dry Testing Train 05
Project: 5 Activity: WFLTD1040 Dry Testing Train 03
Project: 5 Activity: WFLTD1050 Dry Testing Train 02
Project: 5 Activity: WFLTD1060 Dry Testing Train 01
Project: 5 Activity: WFLTE1000 Termination works FLT6&4
Project: 5 Activity: WFLTE1010 Termination works FLT5
Project: 5 Activity: WFLTE1020 Termination works FLT3
Project: 5 Activity: WFLTE1030 Termination works FLT2
Project: 5 Activity: WFLTE1040 Termination works FLT1
Project: 5 Activity: WFLTH1000 Walkthrough Flocculation Sed
Train 6 Sludge Line
Project: 5 Activity: WFLTH1010 PUNCHLIST CLOSEOUT
Flocculation Sed Train 6 Sludge Line
Project: 5 Activity: WFLTH1020 Construction Handover
Flocculation Sed Train 6 Sludge Line
Project: 5 Activity: WFLTH1030 Walkthrough Flocculation
Train 6
Project: 5 Activity: WFLTH1040 PUNCHLIST CLOSEOUT
Flocculation Train 6
Project: 5 Activity: WFLTH1050 Construction Handover
Flocculation Train 6
Project: 5 Activity: WFLTH1060 Walkthrough Flocculation
Train 4
Project: 5 Activity: WFLTH1070 PUNCHLIST CLOSEOUT
Flocculation Train 4
Project: 5 Activity: WFLTH1080 Construction Handover
Flocculation Train 4
Project: 5 Activity: WFLTH1090 Walkthrough Train 05
Project: 5 Activity: WFLTH1100 PUNCHLIST CLOSEOUT Train 05
Project: 5 Activity: WFLTH1110 Construction Handover Train
05
Project: 5 Activity: WFLTH1120 Walkthrough Train 03
Project: 5 Activity: WFLTH1130 PUNCHLIST CLOSEOUT Train 03
Project: 5 Activity: WFLTH1140 Construction Handover Train
03
Project: 5 Activity: WFLTH1150 Walkthrough Train 02
Project: 5 Activity: WFLTH1160 PUNCHLIST CLOSEOUT Train 02
Project: 5 Activity: WFLTH1170 Construction Handover Train
02
Project: 5 Activity: WFLTH1180 Walkthrough Train 01
Project: 5 Activity: WFLTH1190 PUNCHLIST CLOSEOUT Train 01
Project: 5 Activity: WFLTH1200 Construction Handover Train
01
Project: 5 Activity: WFLTM1000 Installation of Chemical Line
- POLYMER - Done
Project: 5 Activity: WFLTM1010 PressureTesting - Chemical
Piping - Done
Project: 5 Activity: WFLTM1040 Internal Testing - Equipment
FLT6
Project: 5 Activity: WFLTM1070 Internal Testing - Equipment
FLT4
Project: 5 Activity: WFLTM1100 Internal Testing - Equipment
FLT5
Project: 5 Activity: WFLTM1130 Internal Testing - Equipment
FLT3
Project: 5 Activity: WFLTM1160 Internal Testing - Equipment
FLT2
Project: 5 Activity: WFLTM1190 Internal Testing - Equipment
FLT1
Project: 5 Activity: WFLTM1310 Sludge Valve Installation
DN100 Tank 2
Project: 5 Activity: WFLTM1320 Sludge Valve Installation
DN100 Tank 3
Project: 5 Activity: WFLTM1330 Sludge Valve Installation
DN100 Tank 4
Project: 5 Activity: WFLTM1340 Sludge Valve Installation
DN100 Tank 5
Project: 5 Activity: WFLTM1350 Sludge Valve Installation
DN100 Tank 6
Project: 5 Activity: WFLTM1360 Inspection for the Sluice
gates outlet at Settling Tank 1-6
Project: 5 Activity: WFLTM3850 1st Stage Floc Mixer 6-
Install scaffolding
Project: 5 Activity: WFLTM3860 1st Stage Floc Mixer 6-
Conduct actual survey
Project: 5 Activity: WFLTM3870 1st Stage Floc Mixer 6-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM3880 1st Stage Floc Mixer 6-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM3890 1st Stage Floc Mixer 6-
Unbolt impeller blades
Project: 5 Activity: WFLTM3900 1st Stage Floc Mixer 6- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM3910 1st Stage Floc Mixer 6 -
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM3920 1st Stage Floc Mixer 6 -
Lower the shaft
Project: 5 Activity: WFLTM3930 1st Stage Floc Mixer 6 -
Conduct and record shaft run out test
Project: 5 Activity: WFLTM3940 1st Stage Floc Mixer 6 -
Weld additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM3950 1st Stage Floc Mixer 6 -
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM3960 1st Stage Floc Mixer 6 -
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM3970 1st Stage Floc Mixer 6 -
Delivery of new couplings
Project: 5 Activity: WFLTM3980 1st Stage Floc Mixer 6-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM3990 1st Stage Floc Mixer 6 - Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM4000 1st Stage Floc Mixer 6 - Re-
install the shaft
Project: 5 Activity: WFLTM4010 1st Stage Floc Mixer 6 - Re-
install the drive unit
Project: 5 Activity: WFLTM4020 1st Stage Floc Mixer 6 -
Install new coupling
Project: 5 Activity: WFLTM4030 1st Stage Floc Mixer 6 -
Final alignment verification
Project: 5 Activity: WFLTM4040 1st Stage Floc Mixer 6 -
Remove scaffold
Project: 5 Activity: WFLTM4050 1st Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFLTM4060 2nd Stage Floc Mixer 6 -
Install scaffolding
Project: 5 Activity: WFLTM4070 2nd Stage Floc Mixer 6 -
Conduct actual survey
Project: 5 Activity: WFLTM4080 2nd Stage Floc Mixer 6 -
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM4090 2nd Stage Floc Mixer 6 -
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM4100 2nd Stage Floc Mixer 6 -
Unbolt impeller blades
Project: 5 Activity: WFLTM4110 2nd Stage Floc Mixer 6- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM4120 2nd Stage Floc Mixer 6 -
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM4130 2nd Stage Floc Mixer 6 -
Lower the shaft
Project: 5 Activity: WFLTM4140 2nd Stage Floc Mixer 6 -
Conduct and record shaft run out test
Project: 5 Activity: WFLTM4150 2nd Stage Floc Mixer 6 -
Weld additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM4160 2nd Stage Floc Mixer 6 -
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM4170 2nd Stage Floc Mixer 6 -
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM4180 2nd Stage Floc Mixer 6 -
Delivery of new couplings
Project: 5 Activity: WFLTM4190 2nd Stage Floc Mixer 6-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM4200 2nd Stage Floc Mixer 6 - Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM4210 2nd Stage Floc Mixer 6 - Re-
install the shaft
Project: 5 Activity: WFLTM4220 2nd Stage Floc Mixer 6 - Re-
install the drive unit
Project: 5 Activity: WFLTM4230 2nd Stage Floc Mixer 6 -
Install new coupling
Project: 5 Activity: WFLTM4240 2nd Stage Floc Mixer 6 -
Final alignment verification
Project: 5 Activity: WFLTM4250 2nd Stage Floc Mixer 6 -
Remove scaffold
Project: 5 Activity: WFLTM4270 2nd Stage Floc Mixer 6 -
Prepare for mock up test
Project: 5 Activity: WFLTM4280 1st Stage Floc Mixer 4
Install scaffolding
Project: 5 Activity: WFLTM4290 1st Stage Floc Mixer 4-
Conduct actual survey
Project: 5 Activity: WFLTM4300 1st Stage Floc Mixer 4-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM4310 1st Stage Floc Mixer 4-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM4320 1st Stage Floc Mixer 4-
Unbolt impeller blades
Project: 5 Activity: WFLTM4330 1st Stage Floc Mixer 4- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM4340 1st Stage Floc Mixer 4-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM4350 1st Stage Floc Mixer 4-
Lower the shaft
Project: 5 Activity: WFLTM4360 1st Stage Floc Mixer 4-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM4370 1st Stage Floc Mixer 4- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM4380 1st Stage Floc Mixer 4-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM4390 1st Stage Floc Mixer 4-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM4400 1st Stage Floc Mixer 4-
Delivery of new couplings
Project: 5 Activity: WFLTM4410 1st Stage Floc Mixer 4-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM4420 1st Stage Floc Mixer 4- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM4430 1st Stage Floc Mixer 4- Re-
install the shaft
Project: 5 Activity: WFLTM4440 1st Stage Floc Mixer 4- Re-
install the drive unit
Project: 5 Activity: WFLTM4450 1st Stage Floc Mixer 4-
Install new coupling
Project: 5 Activity: WFLTM4460 1st Stage Floc Mixer 4- Final
alignment verification
Project: 5 Activity: WFLTM4470 1st Stage Floc Mixer 4-
Remove scaffold
Project: 5 Activity: WFLTM4480 2nd Stage Floc Mixer 4-
Install scaffolding
Project: 5 Activity: WFLTM4490 2nd Stage Floc Mixer 4-
Conduct actual survey
Project: 5 Activity: WFLTM4500 2nd Stage Floc Mixer 4-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM4510 2nd Stage Floc Mixer 4-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM4520 2nd Stage Floc Mixer 4-
Unbolt impeller blades
Project: 5 Activity: WFLTM4530 2nd Stage Floc Mixer 4- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM4540 2nd Stage Floc Mixer 4-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM4550 2nd Stage Floc Mixer 4-
Lower the shaft
Project: 5 Activity: WFLTM4560 2nd Stage Floc Mixer 4-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM4570 2nd Stage Floc Mixer 4- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM4580 2nd Stage Floc Mixer 4-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM4590 2nd Stage Floc Mixer 4-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM4600 2nd Stage Floc Mixer 4-
Delivery of new couplings
Project: 5 Activity: WFLTM4610 2nd Stage Floc Mixer 4-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM4620 2nd Stage Floc Mixer 4- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM4630 2nd Stage Floc Mixer 4- Re-
install the shaft
Project: 5 Activity: WFLTM4640 2nd Stage Floc Mixer 4- Re-
install the drive unit
Project: 5 Activity: WFLTM4650 2nd Stage Floc Mixer 4-
Install new coupling
Project: 5 Activity: WFLTM4660 2nd Stage Floc Mixer 4- Final
alignment verification
Project: 5 Activity: WFLTM4670 2nd Stage Floc Mixer 4-
Remove scaffold
Project: 5 Activity: WFLTM4690 2nd Stage Flocculation Mixer
FLT4 - Prepare for mock up test
Project: 5 Activity: WFLTM4700 1st Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM4710 1st Stage Floc Mixer 5-
Conduct actual survey
Project: 5 Activity: WFLTM4720 1st Stage Floc Mixer 5-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM4730 1st Stage Floc Mixer 5-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM4740 1st Stage Floc Mixer 5-
Unbolt impeller blades
Project: 5 Activity: WFLTM4750 1st Stage Floc Mixer 5- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM4760 1st Stage Floc Mixer 5-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM4770 1st Stage Floc Mixer 5-
Lower the shaft
Project: 5 Activity: WFLTM4780 1st Stage Floc Mixer 5-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM4790 1st Stage Floc Mixer 5- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM4800 1st Stage Floc Mixer 5-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM4810 1st Stage Floc Mixer 5-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM4820 1st Stage Floc Mixer 5-
Delivery of new couplings
Project: 5 Activity: WFLTM4830 1st Stage Floc Mixer 5-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM4840 1st Stage Floc Mixer 5- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM4850 1st Stage Floc Mixer 5- Re-
install the shaft
Project: 5 Activity: WFLTM4860 1st Stage Floc Mixer 5- Re-
install the drive unit
Project: 5 Activity: WFLTM4870 1st Stage Floc Mixer 5-
Install new coupling
Project: 5 Activity: WFLTM4880 1st Stage Floc Mixer 5- Final
alignment verification
Project: 5 Activity: WFLTM4890 1st Stage Floc Mixer 5-
Remove scaffold
Project: 5 Activity: WFLTM4900 2nd Stage Floc Mixer 3-
Install scaffolding
Project: 5 Activity: WFLTM4910 2nd Stage Floc Mixer 3-
Conduct actual survey
Project: 5 Activity: WFLTM4920 2nd Stage Floc Mixer 3-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM4930 2nd Stage Floc Mixer 3-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM4940 2nd Stage Floc Mixer 3-
Unbolt impeller blades
Project: 5 Activity: WFLTM4950 2nd Stage Floc Mixer 3- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM4960 2nd Stage Floc Mixer 3-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM4970 2nd Stage Floc Mixer 3-
Lower the shaft
Project: 5 Activity: WFLTM4980 2nd Stage Floc Mixer 3-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM4990 2nd Stage Floc Mixer 3- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM5000 2nd Stage Floc Mixer 3-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM5010 2nd Stage Floc Mixer 3-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM5020 2nd Stage Floc Mixer 3-
Delivery of new couplings
Project: 5 Activity: WFLTM5030 2nd Stage Floc Mixer 3-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM5040 2nd Stage Floc Mixer 3- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM5050 2nd Stage Floc Mixer 3- Re-
install the shaft
Project: 5 Activity: WFLTM5060 2nd Stage Floc Mixer 3- Re-
install the drive unit
Project: 5 Activity: WFLTM5070 2nd Stage Floc Mixer 3-
Install new coupling
Project: 5 Activity: WFLTM5080 2nd Stage Floc Mixer 3- Final
alignment verification
Project: 5 Activity: WFLTM5090 2nd Stage Floc Mixer 3-
Remove scaffold
Project: 5 Activity: WFLTM5110 2nd Stage Flocculation Mixer
FLT3 - Prepare for mock up test
Project: 5 Activity: WFLTM5120 1st Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM5130 1st Stage Floc Mixer 5-
Conduct actual survey
Project: 5 Activity: WFLTM5140 1st Stage Floc Mixer 5-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM5150 1st Stage Floc Mixer 5-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM5160 1st Stage Floc Mixer 5-
Unbolt impeller blades
Project: 5 Activity: WFLTM5170 1st Stage Floc Mixer 5- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM5180 1st Stage Floc Mixer 5-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM5190 1st Stage Floc Mixer 5-
Lower the shaft
Project: 5 Activity: WFLTM5200 1st Stage Floc Mixer 5-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM5210 1st Stage Floc Mixer 5- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM5220 1st Stage Floc Mixer 5-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM5230 1st Stage Floc Mixer 5-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM5240 1st Stage Floc Mixer 5-
Delivery of new couplings
Project: 5 Activity: WFLTM5250 1st Stage Floc Mixer 5-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM5260 1st Stage Floc Mixer 5- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM5270 1st Stage Floc Mixer 5- Re-
install the shaft
Project: 5 Activity: WFLTM5280 1st Stage Floc Mixer 5- Re-
install the drive unit
Project: 5 Activity: WFLTM5290 1st Stage Floc Mixer 5-
Install new coupling
Project: 5 Activity: WFLTM5300 1st Stage Floc Mixer 5- Final
alignment verification
Project: 5 Activity: WFLTM5310 1st Stage Floc Mixer 5-
Remove scaffold
Project: 5 Activity: WFLTM5320 2nd Stage Floc Mixer 5-
Install scaffolding
Project: 5 Activity: WFLTM5330 2nd Stage Floc Mixer 5-
Conduct actual survey
Project: 5 Activity: WFLTM5340 2nd Stage Floc Mixer 5-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM5350 2nd Stage Floc Mixer 5-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM5360 2nd Stage Floc Mixer 5-
Unbolt impeller blades
Project: 5 Activity: WFLTM5370 2nd Stage Floc Mixer 5- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM5380 2nd Stage Floc Mixer 5-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM5390 2nd Stage Floc Mixer 5-
Lower the shaft
Project: 5 Activity: WFLTM5400 2nd Stage Floc Mixer 5-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM5410 2nd Stage Floc Mixer 5- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM5420 2nd Stage Floc Mixer 5-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM5430 2nd Stage Floc Mixer 5-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM5440 2nd Stage Floc Mixer 5-
Delivery of new couplings
Project: 5 Activity: WFLTM5450 2nd Stage Floc Mixer 5-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM5460 2nd Stage Floc Mixer 5- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM5470 2nd Stage Floc Mixer 5- Re-
install the shaft
Project: 5 Activity: WFLTM5480 2nd Stage Floc Mixer 5- Re-
install the drive unit
Project: 5 Activity: WFLTM5490 2nd Stage Floc Mixer 5-
Install new coupling
Project: 5 Activity: WFLTM5500 2nd Stage Floc Mixer 5- Final
alignment verification
Project: 5 Activity: WFLTM5510 2nd Stage Floc Mixer 5-
Remove scaffold
Project: 5 Activity: WFLTM5530 2nd Stage Flocculation Mixer
FLT5 - Prepare for mock up test
Project: 5 Activity: WFLTM5540 1st Stage Floc Mixer 2 -
Install scaffolding
Project: 5 Activity: WFLTM5550 1st Stage Floc Mixer 2-
Conduct actual survey
Project: 5 Activity: WFLTM5560 1st Stage Floc Mixer 2-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM5570 1st Stage Floc Mixer 2-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM5580 1st Stage Floc Mixer 2-
Unbolt impeller blades
Project: 5 Activity: WFLTM5590 1st Stage Floc Mixer 2- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM5600 1st Stage Floc Mixer 2-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM5610 1st Stage Floc Mixer 2-
Lower the shaft
Project: 5 Activity: WFLTM5620 1st Stage Floc Mixer 2-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM5630 1st Stage Floc Mixer 2- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM5640 1st Stage Floc Mixer 2-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM5650 1st Stage Floc Mixer 2-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM5660 1st Stage Floc Mixer 2-
Delivery of new couplings
Project: 5 Activity: WFLTM5670 1st Stage Floc Mixer 2-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM5680 1st Stage Floc Mixer 2- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM5690 1st Stage Floc Mixer 2- Re-
install the shaft
Project: 5 Activity: WFLTM5700 1st Stage Floc Mixer 2- Re-
install the drive unit
Project: 5 Activity: WFLTM5710 1st Stage Floc Mixer 2-
Install new coupling
Project: 5 Activity: WFLTM5720 1st Stage Floc Mixer 2- Final
alignment verification
Project: 5 Activity: WFLTM5730 1st Stage Floc Mixer 2-
Remove scaffold
Project: 5 Activity: WFLTM5740 2nd Stage Floc Mixer 2-
Install scaffolding
Project: 5 Activity: WFLTM5750 2nd Stage Floc Mixer 2-
Conduct actual survey
Project: 5 Activity: WFLTM5760 2nd Stage Floc Mixer 2-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM5770 2nd Stage Floc Mixer 2-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM5780 2nd Stage Floc Mixer 2-
Unbolt impeller blades
Project: 5 Activity: WFLTM5790 2nd Stage Floc Mixer 2- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM5800 2nd Stage Floc Mixer 2-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM5810 2nd Stage Floc Mixer 2-
Lower the shaft
Project: 5 Activity: WFLTM5820 2nd Stage Floc Mixer 2-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM5830 2nd Stage Floc Mixer 2- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM5840 2nd Stage Floc Mixer 2-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM5850 2nd Stage Floc Mixer 2-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM5860 2nd Stage Floc Mixer 3-
Delivery of new couplings
Project: 5 Activity: WFLTM5870 2nd Stage Floc Mixer 2-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM5880 2nd Stage Floc Mixer 2- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM5890 2nd Stage Floc Mixer 2- Re-
install the shaft
Project: 5 Activity: WFLTM5900 2nd Stage Floc Mixer 2- Re-
install the drive unit
Project: 5 Activity: WFLTM5910 2nd Stage Floc Mixer 2-
Install new coupling
Project: 5 Activity: WFLTM5920 2nd Stage Floc Mixer 2- Final
alignment verification
Project: 5 Activity: WFLTM5930 2nd Stage Floc Mixer 2-
Remove scaffold
Project: 5 Activity: WFLTM5950 2nd Stage Flocculation Mixer
FLT2 - Prepare for mock up test
Project: 5 Activity: WFLTM5960 1ST Stage Flocculation Mixer
FLT3 - Prepare for mock up test
Project: 5 Activity: WFLTM5970 1ST Stage Flocculation Mixer
FLT5 - Prepare for mock up test
Project: 5 Activity: WFLTM5980 1ST Stage Flocculation Mixer
FLT4 - Prepare for mock up test
Project: 5 Activity: WFLTM5990 1ST Stage Flocculation Mixer
FLT2 - Prepare for mock up test
Project: 5 Activity: WFLTM6000 1st Stage Floc Mixer 1 -
Install scaffolding
Project: 5 Activity: WFLTM6010 1st Stage Floc Mixer 1-
Conduct actual survey
Project: 5 Activity: WFLTM6020 1st Stage Floc Mixer 1-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM6030 1st Stage Floc Mixer 1-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM6040 1st Stage Floc Mixer 1-
Unbolt impeller blades
Project: 5 Activity: WFLTM6050 1st Stage Floc Mixer 1- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM6060 1st Stage Floc Mixer 1-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM6070 1st Stage Floc Mixer 1-
Lower the shaft
Project: 5 Activity: WFLTM6080 1st Stage Floc Mixer 1-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM6090 1st Stage Floc Mixer 1- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM6100 1st Stage Floc Mixer 1-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM6110 1st Stage Floc Mixer 1-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM6120 1st Stage Floc Mixer 1-
Delivery of new couplings
Project: 5 Activity: WFLTM6130 1st Stage Floc Mixer 1-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM6140 1st Stage Floc Mixer 1- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM6150 1st Stage Floc Mixer 1- Re-
install the shaft
Project: 5 Activity: WFLTM6160 1st Stage Floc Mixer 1- Re-
install the drive unit
Project: 5 Activity: WFLTM6170 1st Stage Floc Mixer 1-
Install new coupling
Project: 5 Activity: WFLTM6180 1st Stage Floc Mixer 1- Final
alignment verification
Project: 5 Activity: WFLTM6190 1st Stage Floc Mixer 1-
Remove scaffold
Project: 5 Activity: WFLTM6200 1st Stage Flocculation Mixer
FLT1 - Prepare for mock up test
Project: 5 Activity: WFLTM6210 2nd Stage Floc Mixer 1-
Install scaffolding
Project: 5 Activity: WFLTM6220 2nd Stage Floc Mixer 1-
Conduct actual survey
Project: 5 Activity: WFLTM6230 2nd Stage Floc Mixer 1-
Prepare and set up rigging blocks and slings for lowering the shaft
Project: 5 Activity: WFLTM6240 2nd Stage Floc Mixer 1-
Prepare shaft run out measuring equipment and test criteria
Project: 5 Activity: WFLTM6250 2nd Stage Floc Mixer 1-
Unbolt impeller blades
Project: 5 Activity: WFLTM6260 2nd Stage Floc Mixer 1- Weigh
blades for balance check and / or make jig for static balance check of assembled
impellor.
Project: 5 Activity: WFLTM6270 2nd Stage Floc Mixer 1-
Uncouple the shaft and drive unit
Project: 5 Activity: WFLTM6280 2nd Stage Floc Mixer 1-
Lower the shaft
Project: 5 Activity: WFLTM6290 2nd Stage Floc Mixer 1-
Conduct and record shaft run out test
Project: 5 Activity: WFLTM6300 2nd Stage Floc Mixer 1- Weld
additional flat bar onto the drive unit support
Project: 5 Activity: WFLTM6310 2nd Stage Floc Mixer 1-
Drive unit support to be machined of site in accordance with NORDS requirements
Project: 5 Activity: WFLTM6320 2nd Stage Floc Mixer 1-
Machine/Purchase new couplings (JESCO - Malaysia machine shop)
Project: 5 Activity: WFLTM6330 2nd Stage Floc Mixer 1-
Delivery of new couplings
Project: 5 Activity: WFLTM6340 2nd Stage Floc Mixer 1-Take
final measurements of the shaft and drive unit and machine the coupling (Davao
machine shop)
Project: 5 Activity: WFLTM6350 2nd Stage Floc Mixer 1- Re-
install and align the drive unit support (Grout)
Project: 5 Activity: WFLTM6360 2nd Stage Floc Mixer 1- Re-
install the shaft
Project: 5 Activity: WFLTM6370 2nd Stage Floc Mixer 1- Re-
install the drive unit
Project: 5 Activity: WFLTM6380 2nd Stage Floc Mixer 1-
Install new coupling
Project: 5 Activity: WFLTM6390 2nd Stage Floc Mixer 1- Final
alignment verification
Project: 5 Activity: WFLTM6400 2nd Stage Floc Mixer 1-
Remove scaffold
Project: 5 Activity: WFLTM6420 2nd Stage Flocculation Mixer
FLT1 - Prepare for mock up test
Project: 5 Activity: WFLTS1000 Tank Lining Tanks 5B
Project: 5 Activity: WFLTS1010 Tank Lining Tanks 3A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1020 Tank Lining Tanks 3B
Project: 5 Activity: WFLTS1030 Tank Lining Tanks 2A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1040 Tank Lining Tanks 2B
Project: 5 Activity: WFLTS1050 Tank Lining Tanks 1A (Incl.
Surface preparation)
Project: 5 Activity: WFLTS1060 Tank Lining Tanks 1B
Project: 5 Activity: WFLTW1030 Wet Testing Flocculation
Train 4
Project: 5 Activity: WFLTW1040 Automation Testing
Flocculation Train 4
Project: 5 Activity: WFLTW1050 Wet Testing Train 05
Project: 5 Activity: WFLTW1060 Automation Testing Train 05
Project: 5 Activity: WFLTW1070 Wet Testing Train 03
Project: 5 Activity: WFLTW1080 Automation Testing Train 03
Project: 5 Activity: WFLTW1090 Wet Testing Train 02
Project: 5 Activity: WFLTW1100 Automation Testing Train 02
Project: 5 Activity: WFLTW1110 Wet Testing Train 01
Project: 5 Activity: WFLTW1120 Automation Testing Train 01
Project: 5 Activity: WFPLM1010 Excavation Works
Project: 5 Activity: WFPLM1020 Installation for Pipe -
removed from p6
Project: 5 Activity: WFPLM1030 Welding Works - removed from
p6
Project: 5 Activity: WFPLM1040 Pipe Test - removed from p6
Project: 5 Activity: WFPLM1050 Installation for Pipe
Project: 5 Activity: WFPLM1060 Welding Works
Project: 5 Activity: WFPLM1070 Pipe Test
Project: 5 Activity: WFSTA1000 Construct Air Vents
Project: 5 Activity: WFSTA1010 Install Handrails
Project: 5 Activity: WFSTA1020 Exterior Wall Painting
Project: 5 Activity: WFSTA1030 Ceiling Finishes
Project: 5 Activity: WFSTA1040 Signages & Markers
Project: 5 Activity: WFSTS1000 Excavation & Lean Concrete
Project: 5 Activity: WFSTS1010 Structural Concrete Works
Project: 5 Activity: WFSTS1030 Water Filling
Project: 5 Activity: WFSTS1040 Leak Repair
Project: 5 Activity: WFSTS1050 Joints Coating
Project: 5 Activity: WFSTS1060 Tank Lining
Project: 5 Activity: WIWCA1000 Install Guardrails - Rem.
bolts for Kick plates
Project: 5 Activity: WIWCA1010 Installation of Self Closing
gates - 3 units
Project: 5 Activity: WIWCA1020 Installation of portable
ladders
Project: 5 Activity: WIWCA1030 Fabrication of Cage at IW
Project: 5 Activity: WIWCA1040 WIR Inspection of Self
Closing gates - 3 units
Project: 5 Activity: WIWCA1050 Procurements of Railing
materials inc portable ladders and cage
Project: 5 Activity: WIWCA1060 Installation of Support for
portable ladders
Project: 5 Activity: WIWCA1070 Painting of Cage at IW
Project: 5 Activity: WIWCA1080 Installation of Cage at IW
Project: 5 Activity: WIWCA1090 WIR Inspection of Cage at IW
Project: 5 Activity: WIWCA1100 Fabrication of Portable
Supports
Project: 5 Activity: WIWCA1110 Painting of Portable Supports
Project: 5 Activity: WIWCA1120 WIR Inspection of Portable
Ladder Supports
Project: 5 Activity: WIWCA1130 Installation of Scaffolding
Supports for Cage at IW
Project: 5 Activity: WIWCC1000 Damp Proofing & Backfilling
Project: 5 Activity: WIWCD1000 Dry Testing Inlet Well Drain
Line
Project: 5 Activity: WIWCD1010 Dry Testing Inlet Well &
Cascade Mixer
Project: 5 Activity: WIWCD1020 Dry Testing Flocculation Tank
Distribution Chamber
Project: 5 Activity: WIWCE1000 Junction Box Installation
Project: 5 Activity: WIWCE1010 Cable pulling
Project: 5 Activity: WIWCE1020 Termination works
Project: 5 Activity: WIWCE1050 Termination works
Project: 5 Activity: WIWCH1000 Walkthrough Flocculation Tank
Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1010 PUNCHLIST CLOSEOUT
Flocculation Tank Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1020 Construction Handover
Flocculation Tank Distribution Chamber Overflow Line
Project: 5 Activity: WIWCH1030 Walkthrough Inlet Well Drain
Line
Project: 5 Activity: WIWCH1040 PUNCHLIST CLOSEOUT Inlet
Well Drain Line
Project: 5 Activity: WIWCH1050 Construction Handover Inlet
Well Drain Line
Project: 5 Activity: WIWCH1060 Walkthrough Inlet Well &
Cascade Mixer
Project: 5 Activity: WIWCH1070 PUNCHLIST CLOSEOUT Inlet Well
& Cascade Mixer
Project: 5 Activity: WIWCH1080 Construction Handover Inlet
Well & Cascade Mixer
Project: 5 Activity: WIWCH1090 Walkthrough Flocculation Tank
Distribution Chamber
Project: 5 Activity: WIWCH1100 PUNCHLIST CLOSEOUT
Flocculation Tank Distribution Chamber
Project: 5 Activity: WIWCH1110 Construction Handover
Flocculation Tank Distribution Chamber
Project: 5 Activity: WIWCI1000 Installation of Instruments
Supports
Project: 5 Activity: WIWCI1010 Installation of Instruments -
Chlorine Analyzer (Immersion type)
Project: 5 Activity: WIWCM1000 Installation of Chemical
Lines - ALUM (done)
Project: 5 Activity: WIWCM1010 Procurement of Chemical
Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1020 The drilling of perforated
holes for Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1030 Installation for Chemical
Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1040 WIR Inspection for
Installation of Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1050 Hydrotest Prep, Filling and
Flushing of Chemical Lines- ALUM
Project: 5 Activity: WIWCM1060 Procurement of Chemical
adhessive - ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1070 Fabrication and Painting of
Pipe Support - ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1080 Installation of Pipe Supports
- ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1090 Hydrotesting of double
containment Chemical Piping - CAUSTIC SODA
Project: 5 Activity: WIWCM1100 Installation of double
containment Chemical Piping - ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1110 WIR Inspection of double
containment Chemical Piping - ACID AND CAUSTIC SODA
Project: 5 Activity: WIWCM1120 Walkthrough prior for
hydrotesting (ALUM) - AAII and VCCI
Project: 5 Activity: WIWCM1130 Walkthrough prior for
hydrotesting (ACID) - AAII and VCCI
Project: 5 Activity: WIWCM1140 Walkthrough prior for
hydrotesting (CAUSTIC SODA) - AAII and VCCI
Project: 5 Activity: WIWCM1150 Hydrotesting of double
containment Chemical Piping - ACID
Project: 5 Activity: WIWCM1160 Inspection for Closing and
Opening of the Sluice gates prior for Handover to T&C - AAII and VCCI (6 Units)
Project: 5 Activity: WIWCM1170 Procurement of Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1180 The drilling of perforated
holes for Chemical Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1190 Installation for Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1200 WIR Inspection for Chemical
Diffuser pipes - POLYMER
Project: 5 Activity: WIWCM1210 WIR Inspection for Hydrotest
of Chemical Diffuser pipes - ALUM
Project: 5 Activity: WIWCM1220 Pipe Reinstatement after the
Hydrotesting of double containment Chemical Piping - ACID
Project: 5 Activity: WIWCM1230 Pipe Reinstatement after the
Hydrotesting of double containment Chemical Piping - CAUSTIC SODA
Project: 5 Activity: WIWCM1240 WIR Inspection for Pipe
Reinstatement after the Hydrotesting of double containment Chemical Piping - ACID &
CAUSTIC SODA
Project: 5 Activity: WIWCM1250 Hydrotest Prep, Filling and
Flushing of double containment Chemical Piping - CAUSTIC SODA
Project: 5 Activity: WIWCM1260 Hydrotest Prep, Filling and
Flushing of double containment Chemical Piping - ACID
Project: 5 Activity: WIWCM1270 Hydrotest of Chemical Lines-
ALUM
Project: 5 Activity: WIWCM1280 Pipe Reinstatement after
Hydrotest of Chemical Lines- ALUM
Project: 5 Activity: WIWCM1290 WIR Final Inspection after
Pipe reinstaement of Chemical Lines- ALUM
Project: 5 Activity: WIWCS1000 Tank Lining Inlet
Distribution Chamber at Overflow
Project: 5 Activity: WMCCA1000 Waterproofing of Trench -
MCC1 - done
Project: 5 Activity: WMCCA1010 Install Doors - by LEC Steel
- MCC1
Project: 5 Activity: WMCCA1020 Install Steel Grating - MCC1
(drawing dependent)
Project: 5 Activity: WMCCA1030 Install Louvers - MCC1
Project: 5 Activity: WMCCA1040 Signages & Markers - MCC1
Project: 5 Activity: WMCCA1050 Ceiling Finishes - MCC1
Project: 5 Activity: WMCCA1060 Exterior Painting - MCC1
Project: 5 Activity: WMCCA1070 Interior Painting - MCC1
Project: 5 Activity: WMCCD1000 Dry Testing - MCC1
Project: 5 Activity: WMCCE1000 Installation of MCC-1 Panel -
done
Project: 5 Activity: WMCCE1010 Installation of 112.5 KVA Dry
Type Transformer - MCC1 - done
Project: 5 Activity: WMCCE1020 Installation of PLC Panels -
MCC1 - done
Project: 5 Activity: WMCCE1030 Handhole Installation - MCC1
- done
Project: 5 Activity: WMCCE1040 Termination works - MCC1
(awaiting Panel Board for Lightings and small power))
Project: 5 Activity: WMCCE1050 Cable pulling - MCC1
Project: 5 Activity: WMCCH1000 Walkthrough - MCC1
Project: 5 Activity: WMCCH1010 PUNCHLIST CLOSEOUT - MCC1
Project: 5 Activity: WMCCH1020 Construction Handover - MCC1
Project: 5 Activity: WMCCM1000 Install Exhaust Fan - MCC1
Project: 5 Activity: WMCCW1000 AutomationTesting - MCC1
Project: 5 Activity: WMGHA1000 Masonry Works
Project: 5 Activity: WMGHA1010 Interior Painting
Project: 5 Activity: WMGHA1020 Exterior Painting
Project: 5 Activity: WMGHA1030 Install Handrails & Stairs
Project: 5 Activity: WMGHA1040 Roof Deck Finishes
Project: 5 Activity: WMGHA1050 Ceiling Finishes
Project: 5 Activity: WMGHA1060 Floor Finishes
Project: 5 Activity: WMGHA1070 Signages & Markers
Project: 5 Activity: WMGHA1080 Install Windows
Project: 5 Activity: WMGHA1090 Install Doors
Project: 5 Activity: WMGHE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WMGHE1010 Installation of Panel
Project: 5 Activity: WMGHE1020 Cable pulling
Project: 5 Activity: WMGHE1030 Termination works
Project: 5 Activity: WMGHE1040 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WMGHS1000 Concrete Works
Project: 5 Activity: WMGHS1010 Install Structural Steel
Columns & Roof Frames
Project: 5 Activity: WMVTA1000 Finished Painting
Project: 5 Activity: WMVTE1000 Oil Separator Box (design
dependent)
Project: 5 Activity: WMVTE1010 Termination Works (waiting
for approval XLPE cables)
Project: 5 Activity: WPELE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WPELE1010 Cable pulling
Project: 5 Activity: WPELE1020 Termination works
Project: 5 Activity: WPELE1030 Installation of lighting
fixtures
Project: 5 Activity: WSDBA1000 Masonry Works
Project: 5 Activity: WSDBA1010 Waterproofing Works
Project: 5 Activity: WSDBA1020 Install Window Louvers (19
units)
Project: 5 Activity: WSDBA1030 Install Doors (9 units)
Project: 5 Activity: WSDBA1040 Install Miscellaneous Steel
Project: 5 Activity: WSDBA1050 Exterior Wall Finishes
Project: 5 Activity: WSDBA1060 Interior Wall Finishes
Project: 5 Activity: WSDBA1070 Ceiling Finishes
Project: 5 Activity: WSDBD1000 Dry Testing
Project: 5 Activity: WSDBD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WSDBE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WSDBE1010 Installation of grounding
system
Project: 5 Activity: WSDBE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSDBE1030 Cable pulling
Project: 5 Activity: WSDBE1040 Installation of MCC-9 Panel
Project: 5 Activity: WSDBE1050 Installation of PLC Panels
Project: 5 Activity: WSDBE1060 Installation of 112.5 KVA Dry
Type Transformer
Project: 5 Activity: WSDBE1070 Termination works
Project: 5 Activity: WSDBH1000 Walkthrough
Project: 5 Activity: WSDBH1010 PUCNHLIST CLOSEOUT
Project: 5 Activity: WSDBH1020 Construction Handover
Project: 5 Activity: WSDBI1000 Installation of instruments
Project: 5 Activity: WSDBM1000 FCCU Non Roof Deck
Project: 5 Activity: WSDBM1010 Exhaust Air Duct Works In
building
Project: 5 Activity: WSDBM1020 Install Overhead Crane &
Monorail
Project: 5 Activity: WSDBM1030 Exhaust Fans & ACCU @ Roof
Deck
Project: 5 Activity: WSDBM1040 Exhaust Air Duct Works at
Roof Deck
Project: 5 Activity: WSDBM1050 Dewatered Sludge Screw Pump
Project: 5 Activity: WSDBM1060 Overhead Crane & Monorail
load testing
Project: 5 Activity: WSDBM1070 Sludge Hopper
Project: 5 Activity: WSDBM1080 Hopper Sluice Gates (600x600)
Project: 5 Activity: WSDBM1090 Cationic Plymer Prep Unit
Project: 5 Activity: WSDBM1100 Dosing Pumps
Project: 5 Activity: WSDBM1110 Calibration Column
Project: 5 Activity: WSDBM1120 Pulsation Damper
Project: 5 Activity: WSDBM1130 Pressure Relief Valve
Project: 5 Activity: WSDBM1140 Emergency Safety Shower
Project: 5 Activity: WSDBM1150 Internal Testing
Project: 5 Activity: WSDBS1000 Structural Concrete Works
Project: 5 Activity: WSDBS1010 HVAC Miscellaneous Foundation
at Roof Deck
Project: 5 Activity: WSDBU1000 Construct Septic Tank
Project: 5 Activity: WSDBU1010 Install Rainwater Tank
Project: 5 Activity: WSDBW1000 Wett Testing - SDB
Project: 5 Activity: WSDBW1010 Client Approval for Process
Commissioning
Project: 5 Activity: WSDBW1020 Process Commissioning Sludge
Dewatering System
Project: 5 Activity: WSDLC1000 Backfilling MH3-1A to MH B-1
Project: 5 Activity: WSDLC1010 Slope Protection between MH3-
1A and MH B-1 (design dependent)
Project: 5 Activity: WSDLD1000 Dry Testing - SLL to Drain
Line
Project: 5 Activity: WSDLH1000 Walkthrough - SLL to Drain
Line
Project: 5 Activity: WSDLH1010 Punchlist Close-out - SLL to
Drain Line
Project: 5 Activity: WSDLH1020 Construction Handover - SLL
to Drain Line
Project: 5 Activity: WSDLM1000 Install Air Vent and Manhole
Sta260 - 0+477 (3 nos by GHD) - done
Project: 5 Activity: WSDLS1000 PS 1 to 3 - done
Project: 5 Activity: WSDLS1010 CSDN1000 MH B-1 to MH001
Project: 5 Activity: WSDLS1020 MH001
Project: 5 Activity: WSDLS1030 MH B-1
Project: 5 Activity: WSDLS1040 RCP to MH-B-1
Project: 5 Activity: WSETA1000 Install Guardrails (425M)
Project: 5 Activity: WSETA1010 Installation of Self Closing
gate- 1st Priority 4, 5, 6
Project: 5 Activity: WSETA1020 Floor Coating at Concrete
Platform - 1st Priority
Project: 5 Activity: WSETA1030 Top Coat for Railings - 1st
Priority 4, 5, 6
Project: 5 Activity: WSETA1040 Wall Finishes
Project: 5 Activity: WSETA1050 Installation of Self Closing
gate- 2nd Priority 1, 2,3
Project: 5 Activity: WSETA1060 Top Coat for Railings - 2nd
Priority 1, 2, 3
Project: 5 Activity: WSETA1070 Fabrication of Chamber Cover
for tank 1-6
Project: 5 Activity: WSETA1080 Painting of Chamber Cover for
Tank 1-6
Project: 5 Activity: WSETA1090 Installation of Chamber Cover
Tank 1
Project: 5 Activity: WSETA1100 Installation of Chamber Cover
Tank 2
Project: 5 Activity: WSETA1110 Installation of Chamber Cover
Tank 3
Project: 5 Activity: WSETA1120 Installation of Chamber Cover
Tank 4
Project: 5 Activity: WSETA1130 Installation of Chamber Cover
Tank 5
Project: 5 Activity: WSETA1140 Installation of Chamber Cover
Tank 6
Project: 5 Activity: WSETA1150 WIR Inspection for the
Installation of Chamber Cover Tank 1-6
Project: 5 Activity: WSETD1000 Dry Testing Settling Train 6
Project: 5 Activity: WSETD1010 Dry Testing Settling Train 4
Project: 5 Activity: WSETD1020 Dry Testing Train 5
Project: 5 Activity: WSETD1030 Dry Testing Train 3
Project: 5 Activity: WSETD1040 Dry Testing Train 2
Project: 5 Activity: WSETD1050 Dry Testing Train 1
Project: 5 Activity: WSETE1000 Cable pulling Tank 6 - done
Project: 5 Activity: WSETE1010 Termination works Tank 6
Project: 5 Activity: WSETE1020 Cable pulling Tank 4 - done
Project: 5 Activity: WSETE1030 Termination works Tank 3
Project: 5 Activity: WSETE1040 Cable pulling Tank 5 - done
Project: 5 Activity: WSETE1050 Cable pulling Tank 3 - done
Project: 5 Activity: WSETE1060 Cable pulling Tank 2 - done
Project: 5 Activity: WSETE1070 Cable pulling Tank 1 - done
Project: 5 Activity: WSETE1080 Termination works Tank 4
Project: 5 Activity: WSETE1090 Termination works Tank 1
Project: 5 Activity: WSETE1100 Termination works Tank 2
Project: 5 Activity: WSETE1110 Termination works Tank 5
Project: 5 Activity: WSETH1000 Walkthrough Settling Train 6
Project: 5 Activity: WSETH1010 PUNCHLIST CLOSEOUT Settling
Train 6
Project: 5 Activity: WSETH1020 Construction Handover
Settling Train 6
Project: 5 Activity: WSETH1030 Walkthrough Settling Train 4
Project: 5 Activity: WSETH1040 PUNCHLIST CLOSEOUT Settling
Train 4
Project: 5 Activity: WSETH1050 Construction Handover
Settling Train 4
Project: 5 Activity: WSETH1060 Walkthrough Train 5
Project: 5 Activity: WSETH1070 PUNCHLIST CLOSEOUT Train 5
Project: 5 Activity: WSETH1080 Construction Handover Train 5
Project: 5 Activity: WSETH1090 Walkthrough Train 3
Project: 5 Activity: WSETH1100 PUNCHLIST CLOSEOUT Train 3
Project: 5 Activity: WSETH1110 Construction Handover Train 3
Project: 5 Activity: WSETH1120 Walkthrough Train 2
Project: 5 Activity: WSETH1130 PUNCHLIST CLOSEOUT Train 2
Project: 5 Activity: WSETH1140 Construction Handover Train 2
Project: 5 Activity: WSETH1150 Walkthrough Train 1
Project: 5 Activity: WSETH1160 PUNCHLIST CLOSEOUT Train 1
Project: 5 Activity: WSETH1170 Construction Handover Train 1
Project: 5 Activity: WSETI1000 Installation of instrument
support Train 6
Project: 5 Activity: WSETI1010 Installation of instrument
support Train 5
Project: 5 Activity: WSETI1020 Installation of instrument
support Train 4
Project: 5 Activity: WSETI1030 Installation of instrument
support Train 3
Project: 5 Activity: WSETI1040 Installation of instrument
support Train 2
Project: 5 Activity: WSETI1050 Installation of instrument
support Train 1
Project: 5 Activity: WSETI1060 Instrumentation NTU Train 6 &
Common Channel (Waiting housing)
Project: 5 Activity: WSETM1000 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM1010 Sludge Valve DN100
Installation Tank 1
Project: 5 Activity: WSETM2200 Bolt Torquing for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2210 WIR Inspection for Sludge
Valve DN100 Installation Tank 1
Project: 5 Activity: WSETM2220 Bolt Torquing for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2230 WIR Inspection for Sludge
Valve DN100 Installation Tank 2
Project: 5 Activity: WSETM2240 Bolt Torquing for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2250 WIR Inspection for Sludge
Valve DN100 Installation Tank 3
Project: 5 Activity: WSETM2260 Bolt Torquing for Sludge
Valve DN100 Installation Tank 4
Project: 5 Activity: WSETM2270 WIR Inspection for Sludge
Valve DN100 Installation Tank 4
Project: 5 Activity: WSETM2280 Bolt Torquing for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2290 WIR Inspection for Sludge
Valve DN100 Installation Tank 5
Project: 5 Activity: WSETM2300 Bolt Torquing for Sludge
Valve DN100 Installation Tank 6
Project: 5 Activity: WSETM2310 WIR Inspection for Sludge
Valve DN100 Installation Tank 6
Project: 5 Activity: WSETM2320 Sludge Valve DN400
Installation Tank 1
Project: 5 Activity: WSETM2330 Sludge Valve DN400
Installation Tank 2
Project: 5 Activity: WSETM2340 Sludge Valve DN400
Installation Tank 3
Project: 5 Activity: WSETM2350 Sludge Valve DN400
Installation Tank 4
Project: 5 Activity: WSETM2360 Sludge Valve DN400
Installation Tank 5
Project: 5 Activity: WSETM2370 Sludge Valve DN400
Installation Tank 6
Project: 5 Activity: WSETM2390 Bolt Torquing for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2400 WIR Inspection for Sludge
Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2410 Bolt Torquing for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2420 WIR Inspection for Sludge
Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2430 Bolt Torquing for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2440 WIR Inspection for Sludge
Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2450 Bolt Torquing for Sludge
Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2460 WIR Inspection for Sludge
Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2470 Bolt Torquing for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2480 WIR Inspection for Sludge
Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2490 Bolt Torquing for Sludge
Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2500 WIR Inspection for Sludge
Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2510 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2520 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2530 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2540 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 1
Project: 5 Activity: WSETM2750 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 1
Project: 5 Activity: WSETM2760 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 2
Project: 5 Activity: WSETM2770 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 3
Project: 5 Activity: WSETM2780 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 4
Project: 5 Activity: WSETM2790 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 5
Project: 5 Activity: WSETM2800 Installation of Sludge Valve
Flange Adaptor DN400 Installation Tank 6
Project: 5 Activity: WSETM2810 Installation of Bolts for
Sludge Valve DN400 Installation Tank 1
Project: 5 Activity: WSETM2820 Installation of Bolts for
Sludge Valve DN400 Installation Tank 2
Project: 5 Activity: WSETM2830 Installation of Bolts for
Sludge Valve DN400 Installation Tank 3
Project: 5 Activity: WSETM2840 Installation of Bolts for
Sludge Valve DN400 Installation Tank 4
Project: 5 Activity: WSETM2850 Installation of Bolts for
Sludge Valve DN400 Installation Tank 5
Project: 5 Activity: WSETM2860 Installation of Bolts for
Sludge Valve DN400 Installation Tank 6
Project: 5 Activity: WSETM2870 Installation of Sludge
Extraction Unit Tank 6
Project: 5 Activity: WSETM2880 Procurement of Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2890 Installation of Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2900 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2910 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 6
Project: 5 Activity: WSETM2920 Final Fixing of Laces at
Settling Tank 6
Project: 5 Activity: WSETM2940 WIR Inspection of Laces at
Settling Tank 6
Project: 5 Activity: WSETM2950 Rectification of the
Plumbness of Wall Laces at Settling Tank 6
Project: 5 Activity: WSETM2960 Installation of the Launders
at Settling Tank 6
Project: 5 Activity: WSETM2970 WIR Inspection of the
Alignment of Launders at Settling Tank 6
Project: 5 Activity: WSETM2980 Installation of Sludge
Extraction Unit Tank 4
Project: 5 Activity: WSETM2990 Procurement of Setting Bolts
Sludge Extraction Unit Tank 4
Project: 5 Activity: WSETM3000 Installation of Setting Bolts
Sludge Extraction Unit Tank 4
Project: 5 Activity: WSETM3010 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 4
Project: 5 Activity: WSETM3020 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 4
Project: 5 Activity: WSETM3030 Rectification of the
Plumbness of Wall Laces at Settling Tank 4
Project: 5 Activity: WSETM3040 Final Fixing of Laces at
Settling Tank 4
Project: 5 Activity: WSETM3060 WIR Inspection of Laces at
Settling Tank 4
Project: 5 Activity: WSETM3070 Laces Installation Tank 4
Project: 5 Activity: WSETM3080 Rectification of the Launders
at Settling Tank 4
Project: 5 Activity: WSETM3090 WIR Inspection of the
Alignment of Launders at Settling Tank 4
Project: 5 Activity: WSETM3100 Installation of Sludge
Extraction Unit Tank 5
Project: 5 Activity: WSETM3110 Procurement of Setting Bolts
Sludge Extraction Unit Tank 5
Project: 5 Activity: WSETM3120 Installation of Setting Bolts
Sludge Extraction Unit Tank 5
Project: 5 Activity: WSETM3130 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 5
Project: 5 Activity: WSETM3140 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 5
Project: 5 Activity: WSETM3150 Rectification of the
Plumbness of Wall Laces at Settling Tank 5
Project: 5 Activity: WSETM3160 Final Fixing of Laces at
Settling Tank 5
Project: 5 Activity: WSETM3180 WIR Inspection of Laces at
Settling Tank 5
Project: 5 Activity: WSETM3190 Laces Installation Tank 5
Project: 5 Activity: WSETM3200 Rectification of the Launders
at Settling Tank 5
Project: 5 Activity: WSETM3210 WIR Inspection of the
Alignment of Launders at Settling Tank 5
Project: 5 Activity: WSETM3220 Installation of Scaffolding
Supports for Lamella Support Tank 3
Project: 5 Activity: WSETM3230 Hauling of Lamella Support
Installation Tank 3
Project: 5 Activity: WSETM3240 WIR Inspection for Lamella
Support Tank 3
Project: 5 Activity: WSETM3250 Layout for Lamella Support
Tank 3
Project: 5 Activity: WSETM3260 WIR Inspection of Layout for
Lamella Support Tank 3
Project: 5 Activity: WSETM3270 Final Fixing of Sludge
Extraction Unit Tank 3
Project: 5 Activity: WSETM3280 Procurement of Setting Bolts
Sludge Extraction Unit Tank 3
Project: 5 Activity: WSETM3290 Installation of Setting Bolts
Sludge Extraction Unit Tank 3
Project: 5 Activity: WSETM3300 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 3
Project: 5 Activity: WSETM3310 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 3
Project: 5 Activity: WSETM3320 Hauling of Launders Tank 3
Project: 5 Activity: WSETM3330 Installation of Launder
Supports Tank 3
Project: 5 Activity: WSETM3340 WIR Inspection of Launder
Supports Tank 3
Project: 5 Activity: WSETM3350 WIR Inspection for the
Alignment of Launder Tank 3
Project: 5 Activity: WSETM3360 Hauling of Launders Supports
Tank 3
Project: 5 Activity: WSETM3380 Rectification of Alignment
for launder tank 3
Project: 5 Activity: WSETM3390 Installation of Launder Tank
3
Project: 5 Activity: WSETM3400 Final Fixing of Laces at
Settling Tank 3
Project: 5 Activity: WSETM3420 Rectification of the
Plumbness of Wall Laces at Settling Tank 3 - CIVIL TEAM
Project: 5 Activity: WSETM3430 Hauling of Laces and
SupportsTank 3
Project: 5 Activity: WSETM3440 Installation of Laces
SupportsTank 3
Project: 5 Activity: WSETM3450 WIR Inspection of Laces
Supports Installation Tank 3
Project: 5 Activity: WSETM3460 WIR Inspection of Laces
Installation Tank 3
Project: 5 Activity: WSETM3470 Laces Installation Tank 3
Project: 5 Activity: WSETM3480 Fabrication of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3490 Assembly of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3500 Hauling of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3510 WIR Inspection of Lamella
Tube Settler Installation Tank 3
Project: 5 Activity: WSETM3520 Lamella Tube Settler
Installation Tank 3
Project: 5 Activity: WSETM3530 Installation of Sludge
Extraction Unit Tank 3
Project: 5 Activity: WSETM3550 Hauling of Lamella Support
Installation Tank 2
Project: 5 Activity: WSETM3560 Installation of Scaffolding
Supports Lamella Support Installation Tank 2
Project: 5 Activity: WSETM3570 Layout for Lamella Support
Installation Tank 2
Project: 5 Activity: WSETM3580 WIR Inspection for Layout of
Lamella Support Installation Tank 2
Project: 5 Activity: WSETM3590 Installation of Lamella
Support Installation Tank 2
Project: 5 Activity: WSETM3610 Assembly of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3620 Hauling of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM3630 WIR Inspection of Lamella
Tube Settler Installation Tank 2
Project: 5 Activity: WSETM3640 Hauling of Launders Tank 2
Project: 5 Activity: WSETM3650 Installation of Launder
Supports Tank 2
Project: 5 Activity: WSETM3660 WIR Inspection of Launder
Supports Tank 2
Project: 5 Activity: WSETM3670 WIR Inspection for the
Alignment of Launder Tank 2
Project: 5 Activity: WSETM3690 Rectification of Alignment
for launder tank 2
Project: 5 Activity: WSETM3700 Launder Installation Tank 2
Project: 5 Activity: WSETM3710 Hauling of Laces and
SupportsTank 2
Project: 5 Activity: WSETM3720 Installation of Laces
SupportsTank 2
Project: 5 Activity: WSETM3730 WIR Inspection of Laces
Supports Installation Tank 2
Project: 5 Activity: WSETM3740 WIR Inspection of Laces
Installation Tank 2
Project: 5 Activity: WSETM3750 Laces Installation Tank 2
Project: 5 Activity: WSETM3760 Installation of Sludge
Extraction Unit Tank 2
Project: 5 Activity: WSETM3770 Procurement of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3780 Installation of Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3790 Bolt torquing of Setting
Bolts Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3800 WIR Inspection Setting Bolts
Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3810 Final Fixing of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3820 Installation of Sludge
Extraction Unit Tank 1
Project: 5 Activity: WSETM3830 WIR Inspection for
Installation of Sludge Extraction Unit Tank 1
Project: 5 Activity: WSETM3840 Lamella Support Installation
Tank 1
Project: 5 Activity: WSETM3850 Lamella Tube Settler
Installation Tank 1
Project: 5 Activity: WSETM3860 Launder Installation Tank 1
Project: 5 Activity: WSETM3870 Final Fixing of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3880 WIR Inspection of Laces at
Settling Tank 1
Project: 5 Activity: WSETM3890 Laces Installation Tank 1
Project: 5 Activity: WSETM3900 WIR Inspection of the
Alignment of Launders at Settling Tank 1
Project: 5 Activity: WSETM3910 Rectification of Alignment
for Launders at Settling Tank 1
Project: 5 Activity: WSETM3920 Final Fixing of Sludge
Extraction Unit Tank 6
Project: 5 Activity: WSETM3930 Final Fixing of Sludge
Extraction Unit Tank 4
Project: 5 Activity: WSETM3940 Installation of Laces at
Settling Tank 6
Project: 5 Activity: WSETM3950 Installation of Lamella
Support at Settling Tank 6
Project: 5 Activity: WSETM3960 Installation of Lamella Tube
Settlers at Settling Tank 6
Project: 5 Activity: WSETM3970 Rectification of the Launders
at Settling Tank 6
Project: 5 Activity: WSETM3980 Installation of Lamella
Support at Settling Tank 4
Project: 5 Activity: WSETM3990 Installation of Lamella Tube
Settlers at Settling Tank 4
Project: 5 Activity: WSETM4000 Installation of the Launders
at Settling Tank 4
Project: 5 Activity: WSETM4010 Installation of Lamella
Support at Settling Tank 5
Project: 5 Activity: WSETM4020 Installation of Lamella Tube
Settlers at Settling Tank 5
Project: 5 Activity: WSETM4030 Installation of the Launders
at Settling Tank 5
Project: 5 Activity: WSETM4040 Final Fixing of Sludge
Extraction Unit Tank 5
Project: 5 Activity: WSETM4050 Fabrication of Lamella Tube
Settler Installation Tank 3
Project: 5 Activity: WSETM4060 Installation of Lamella Tube
Settler Installation Tank 2
Project: 5 Activity: WSETM4070 WIR Inspection of Lamella
Support Installation Tank 2
Project: 5 Activity: WSETM4080 Installation for Lamella
Support Tank 3
Project: 5 Activity: WSETM4090 Sludge Valve DN100
Installation Tank 4
Project: 5 Activity: WSETM4100 Sludge Valve DN100
Installation Tank 6
Project: 5 Activity: WSETM4110 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4120 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4130 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4140 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4150 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 2
Project: 5 Activity: WSETM4160 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4170 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4180 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4190 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4200 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 3
Project: 5 Activity: WSETM4210 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4220 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4230 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4240 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4250 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 4
Project: 5 Activity: WSETM4260 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4270 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4280 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4290 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4300 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 5
Project: 5 Activity: WSETM4310 Fabrication of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETM4320 Installation of Supports of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETM4330 Installation of Sludge Drain
Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETM4340 Pickling and Passination of
Sludge Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETM4350 WIR Inspection of Sludge
Drain Pipe (DN100) SS Pipe - Tanks 6
Project: 5 Activity: WSETS1000 Tank Lining Tank 3
Project: 5 Activity: WSETS1010 Construct Concrete Stairs -
done
Project: 5 Activity: WSETW1020 Wet Testing Settling Train 4
Project: 5 Activity: WSETW1030 Automation Testing Settling
Train 4
Project: 5 Activity: WSETW1040 Wet Testing Settling Train 5
Project: 5 Activity: WSETW1050 Automation Testing Train 5
Project: 5 Activity: WSETW1060 Wet Testing Settling Train 3
Project: 5 Activity: WSETW1070 Automation Testing Train 3
Project: 5 Activity: WSETW1080 Wet Testing Settling Train 2
Project: 5 Activity: WSETW1090 Automation Testing Train 2
Project: 5 Activity: WSETW1100 Wet Testing Settling Train 1
Project: 5 Activity: WSETW1110 Automation Testing Train 1
Project: 5 Activity: WSIDC3000 Backfilling Works between
IWCM & FLT
Project: 5 Activity: WSIDC3100 Sand backfilling - MCC5 Room
Project: 5 Activity: WSIDC3110 Levelling, trimming, and
compacting of sand - MCC5 Room
Project: 5 Activity: WSIDC3500 Protection of Chemical
Trenches (Alum & Chlorination) at Road crossings
Project: 5 Activity: WSIDC3600 Backfilling Works at IWCM
Perimeter (Sides and Back)
Project: 5 Activity: WSIDC3700 Backfilling Works along FLT,
SET and FIT
Project: 5 Activity: WSIDC4000 Sand backfilling - Road4
Project: 5 Activity: WSIDC4010 Levelling, trimming, and
compacting of sand - Road4
Project: 5 Activity: WSIDC4200 Sand backfilling -
Thickener/Slop Backfilling A1
Project: 5 Activity: WSIDC4210 Levelling, trimming, and
compacting of sand - Thickener/Slop Backfilling A1
Project: 5 Activity: WSIDC4300 Sand backfilling -
Thickener/Slop Backfilling A2
Project: 5 Activity: WSIDC4310 Levelling, trimming, and
compacting of sand - Thickener/Slop Backfilling A2
Project: 5 Activity: WSIDC5100 Soil backfilling - Telemetry
Project: 5 Activity: WSIDC5110 Levelling, trimming, and
compacting of Soil - Telemetry
Project: 5 Activity: WSIDC5500 Sand backfilling - Between
TWR & DMF
Project: 5 Activity: WSIDC5510 Levelling, trimming, and
compacting - Between TWR & DMF
Project: 5 Activity: WSIDC6000 Soil backfilling - Road6
Project: 5 Activity: WSIDC6100 Levelling, trimming, and
compacting of Soil- Road6
Project: 5 Activity: WSIDC6200 Sand backfilling - CLB
Project: 5 Activity: WSIDC6210 Levelling, trimming, and
compacting of sand - CLB
Project: 5 Activity: WSIDC7000 Sand backfilling - Road7
Project: 5 Activity: WSIDC7100 Levelling, trimming, and
compacting of sand - Road7
Project: 5 Activity: WSIDC8000 Sand backfilling - Between
TWR & Pond2
Project: 5 Activity: WSIDC8100 Levelling, trimming, and
compacting of sand - Between TWR & Pond2
Project: 5 Activity: WSIDC9000 Site Drainage Works
Project: 5 Activity: WSIDC9100 Perimeter Fence & Gate
Project: 5 Activity: WSIDC9200 Roads & Paving
Project: 5 Activity: WSLLD1000 Dry Testing Sludge Lagoon
Project: 5 Activity: WSLLE1010 Cable pulling
Project: 5 Activity: WSLLE1020 Termination works
Project: 5 Activity: WSLLH1000 Walkthrough Sludge Lagoon
Project: 5 Activity: WSLLH1010 PUNCHLIST CLOSEOUT Sludge
Lagoon
Project: 5 Activity: WSLLH1020 Construction Handover Sludge
Lagoon
Project: 5 Activity: WSLLS1000 Application of Sealant for
Construction Joints (WAITING Sika primer)
Project: 5 Activity: WSLLS1010 Design for Chamber Covers - 4
units AAII, VCCI
Project: 5 Activity: WSLLS1020 Install Railings
Project: 5 Activity: WSLLS1030 Procurement of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1040 Fabrication of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1050 Painting of materials for
Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1060 Installation of Chamber
Covers - 4 Units
Project: 5 Activity: WSLLS1070 WIR Inspection for
Installation of Chamber Covers - 4 Units
Project: 5 Activity: WSLLS1080 Install Gates
Project: 5 Activity: WSLPD1000 Dry Testing
Project: 5 Activity: WSLPH1000 Walkthrough
Project: 5 Activity: WSLPH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WSLPH1020 Construction Handover
Project: 5 Activity: WSLPM1000 Sludge Pit Inlet Sluice Gate
Project: 5 Activity: WSLPM1010 DN250 PIPE
Project: 5 Activity: WSLPM1020 Sludge Pit Connecting Sluice
Gate
Project: 5 Activity: WSLPM1030 Submerge Sludge Pumps
Project: 5 Activity: WSLPM1040 DN250 X 100 Ecc Red.
Project: 5 Activity: WSLPM1050 Sludge Pit Submersible Mixers
Project: 5 Activity: WSLPM1060 DN250 90° Elbow
Project: 5 Activity: WSLPM1070 DN250 NRV
Project: 5 Activity: WSLPM1080 DN250 Valve
Project: 5 Activity: WSLPS1000 Excavation & Lean Concrete
Project: 5 Activity: WSLPS1010 Concrete Works
Project: 5 Activity: WSLPS1020 Install Miscellaneous Steel
(MH Cover, Railings, etc)
Project: 5 Activity: WSLPW1000 Wett Testing - SLP
Project: 5 Activity: WSLPW1010 Process Commissioning Sludge
PIt A/B
Project: 5 Activity: WSOPA1000 Masonry Works
Project: 5 Activity: WSOPA1010 Interior Painting
Project: 5 Activity: WSOPA1020 Exterior Painting
Project: 5 Activity: WSOPA1030 Ceiling Finishes
Project: 5 Activity: WSOPA1040 Floor Finishes
Project: 5 Activity: WSOPA1050 Install Windows
Project: 5 Activity: WSOPA1060 Install Doors
Project: 5 Activity: WSOPE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WSOPE1010 Cable pulling
Project: 5 Activity: WSOPE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSOPE1030 Termination works
Project: 5 Activity: WSOPS1000 Concrete Works
Project: 5 Activity: WSPPC1000 Welding Works 2nd Priority -
done
Project: 5 Activity: WSPPC1010 Backfilling @RCPC between TWR
& Chlorination (elev Storm Drainage)
Project: 5 Activity: WSPPC1020 Backfilling SLudge Line MH
800 to Y part 1
Project: 5 Activity: WSPPC1030 Construction of TB-02A (from
TWR to Drain) - done
Project: 5 Activity: WSPPC1040 MH4 - done
Project: 5 Activity: WSPPC1050 MH805-4 - done
Project: 5 Activity: WSPPC1060 MH805-5 & MH3-1 - done
Project: 5 Activity: WSPPC1070 Flow Meter chamber - North of
Sludge Lagoon - done
Project: 5 Activity: WSPPC1080 Construction of TB-B4 and TB-
B5 At Overflow line to from Filtration to Y - done
Project: 5 Activity: WSPPC1090 SLudge Line Y to MH 4 part 2
- done
Project: 5 Activity: WSPPC1100 SLudge Line Y to MH 5 part 2
- done
Project: 5 Activity: WSPPC1110 Backfilling Sludge Line Y to
MH5/MH4 part 2
Project: 5 Activity: WSPPC1120 Backfilling of Overflow Line
from Filtration to Y - done
Project: 5 Activity: WSPPC1130 Rectification works of
Process pipe from MH3 to MH5
Project: 5 Activity: WSPPC1140 Concrete Encasement MH7 &
MH800
Project: 5 Activity: WSPPC1150 Backfilling works of Process
pipe from MH3 to MH5
Project: 5 Activity: WSPPC1160 MH5 Structural works
Project: 5 Activity: WSPPC1170 Backfilling MH804B to MH800
Project: 5 Activity: WSPPC1180 Backfilling from MH805-4 to
MH3-1
Project: 5 Activity: WSPPD1000 Dry Testing MOV (2) ,
Motorized Gates (2) Sludge Line
Project: 5 Activity: WSPPH1000 Walkthrough Sludge Line
Project: 5 Activity: WSPPH1010 Construction Handover Sludge
Line
Project: 5 Activity: WSPPH1020 PUNCHLIST CLOSEOUT Sludge
Line
Project: 5 Activity: WSPPM1000 Install Sluice Gate - MH804A
& MH806A
Project: 5 Activity: WSPPM1010 Install Sluice Gate - MH806
Project: 5 Activity: WSTFD1000 Dry Testing - STT
Project: 5 Activity: WSTFH1000 Walkthrough - STT
Project: 5 Activity: WSTFH1010 PUNCHLIST CLOSEOUT - STT
Project: 5 Activity: WSTFH1020 Construction Handover - STT
Project: 5 Activity: WSTFM1000 Thickener Feed Tank Inlet
Sluice Gate
Project: 5 Activity: WSTFM1010 Thickener Feed Tank
Connecting Sluice Gate
Project: 5 Activity: WSTFM1020 DN350 PIPE Installation
including Butterfly and check valves
Project: 5 Activity: WSTFM1030 Installation of Submerge
Sludge Pumps
Project: 5 Activity: WSTFM1040 Pipe Reducer - Remove from
p6 program
Project: 5 Activity: WSTFM1050 DN350 Equal Tee - - Remove
from p6 program
Project: 5 Activity: WSTFM1060 Installation of Submerge
Sludge Mixers
Project: 5 Activity: WSTFM1070 Installation for Geo Tubes -
AAII to advise
Project: 5 Activity: WSTFM1080 DN350 90* Elbow - Remove
from p6 program
Project: 5 Activity: WSTFM1090 DN350 45*Elbow - Remove from
p6 program
Project: 5 Activity: WSTFM1100 DN350 Butterfly Valve -
Remove from p6 program
Project: 5 Activity: WSTFM1110 DN350 Check Valve - Remove
from p6 program
Project: 5 Activity: WSTFM1120 Internal Testing - Remove
from p6 program
Project: 5 Activity: WSTFM1130 WIR Inspection for Thickener
Feed Tank Inlet Sluice Gate
Project: 5 Activity: WSTFM1140 WIR Inspection for Thickener
Feed Tank Connecting Sluice Gate
Project: 5 Activity: WSTFM1150 Design for Thickener Feed
Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1160 Design for Thickener Feed
Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1170 Procurement of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1180 Procurement of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1190 Fabrication of Shafting for
Thickener Feed Tank Connecting Sluice Gate - AAII
Project: 5 Activity: WSTFM1200 Fabrication of Shafting for
Thickener Feed Tank Inlet Sluice Gate - AAII
Project: 5 Activity: WSTFM1210 Hydro Prep, Filling and
Flushing for DN350 PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1220 Hydrotest for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1230 Pipe Reinstatement for DN350
PIPE Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1240 WIR Inspection for DN350 PIPE
Installation including Butterfly and check valves
Project: 5 Activity: WSTFM1250 WIR Inspection for
Installation of Submerge Sludge Mixers
Project: 5 Activity: WSTFM1260 WIR Inspection for
Installation of Submerge Sludge Pumps
Project: 5 Activity: WSTFS1000 Water Filling Feed Tank 1 & 2
- done
Project: 5 Activity: WSTFS1010 Leak Repair Feed Tank 1 & 2
Project: 5 Activity: WSTFS1020 Tank Lining Feed Tank 1 & 2
Project: 5 Activity: WSTFS1030 Install Miscellaneous Steel
(Manhole Covers, Handrails, etc.)
Project: 5 Activity: WSTFW1000 Wet Testing - STT
Project: 5 Activity: WSTTA1000 Install Miscellaneous Steel
(Handrails)
Project: 5 Activity: WSTTA1010 Masonry Works at Pumproom
Project: 5 Activity: WSTTA1020 Roof Deck Finishes (including
Waterproofing) @ Pumproom
Project: 5 Activity: WSTTA1030 Interior Painting @ Pumproom
Project: 5 Activity: WSTTA1040 Ceiling Finishes at Pumproom
Project: 5 Activity: WSTTA1050 Floor Finishes @ Pump Room
Project: 5 Activity: WSTTA1060 External Painting @ Pumproom
Project: 5 Activity: WSTTA1070 Tank Finishes
Project: 5 Activity: WSTTA1080 Install Windows @ Pumproom
Project: 5 Activity: WSTTA1090 Install Doors @ Pumproom
Project: 5 Activity: WSTTD1000 Dry Testing
Project: 5 Activity: WSTTD1010 Client Approval for Equipment
Commissioning
Project: 5 Activity: WSTTH1000 Walkthrough
Project: 5 Activity: WSTTH1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WSTTH1020 Construction Handover
Project: 5 Activity: WSTTM1000 Install Monorail @ Pump Room
Project: 5 Activity: WSTTM1010 Install Exhaust Air Louvers &
Outside Air Louvers @ Pump Room
Project: 5 Activity: WSTTM1020 Thickener Tank Mixer
Project: 5 Activity: WSTTM1030 Thickened Sludge Pump @ Pump
Room
Project: 5 Activity: WSTTM1040 DN300 Pipe SS Pipe
Project: 5 Activity: WSTTM1050 DN300 Puddle SS Pipe
Project: 5 Activity: WSTTM1060 DN300 90 Elbow SS
Project: 5 Activity: WSTTM1070 DN50 Pipe
Project: 5 Activity: WSTTM1080 DN50 90 Elbow
Project: 5 Activity: WSTTM1090 DN50 Tee
Project: 5 Activity: WSTTM1100 Internal Testing
Project: 5 Activity: WSTTS1000 Concrete Works Thickener 1 &
2
Project: 5 Activity: WSTTS1010 Concrete Works Pump Room
Project: 5 Activity: WSTTS1020 Concrete Works Walkway
Project: 5 Activity: WSTTS1030 Apply SCP Thickener 1 & 2
Project: 5 Activity: WSTTS1040 Water Filling Thickener 1 & 2
Project: 5 Activity: WSTTS1050 Leak Repair Thickener 1 & 2
Project: 5 Activity: WSTTS1060 Construct Concrete Stair 1
Project: 5 Activity: WSTTS1070 Construct Concrete Stair 2
Project: 5 Activity: WSTTS1080 Joint Repair Thickener 1 & 2
Project: 5 Activity: WSTTS1090 Concrete Works Chamber
Project: 5 Activity: WSTTS1100 Tank Lining Thickener 1 & 2
Project: 5 Activity: WSTTU1000 Install Catch Basins (3
units)
Project: 5 Activity: WSTTW1000 Wett Testing - STT
Project: 5 Activity: WSTTW1010 Client Approval for Process
Commissioning
Project: 5 Activity: WSUBD1000 Dry Testing - SUBST
Project: 5 Activity: WSUBH1000 Walkthrough - SUBST
Project: 5 Activity: WSUBH1010 Punchlist Close-out - SUBST
Project: 5 Activity: WSUBH1020 Construction Handover - SUBST
Project: 5 Activity: WSUBW1000 AutomationTesting - SUBST
Project: 5 Activity: WSWLM1020 Procurement
Project: 5 Activity: WSWLM1030 Motive Pump line
Project: 5 Activity: WSWLM1040 Service Water line
Project: 5 Activity: WSWLM1050 Pipelaying Works
Project: 5 Activity: WSWLM1060 Procurement of the Pipe
Materials including delivery
Project: 5 Activity: WSWLM1080 Excavation for Pipes -
Section 1 CIVIL TEAM
Project: 5 Activity: WSWLM1090 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1110 Installation of Pipes
Project: 5 Activity: WSWLM1120 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1130 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1150 Final Backfilling Works -
Section 1 CIVIL TEAM
Project: 5 Activity: WSWLM1160 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1170 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1180 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1190 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1200 Excavation for Pipes -
Section 2 CIVIL TEAM
Project: 5 Activity: WSWLM1210 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1220 Installation of Pipes
Project: 5 Activity: WSWLM1230 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1240 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1250 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1260 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1270 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1280 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1290 Final Backfilling Works -
Section 2 CIVIL TEAM
Project: 5 Activity: WSWLM1300 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1310 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1320 Excavation for Pipes -
Section 3 CIVIL TEAM
Project: 5 Activity: WSWLM1330 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1340 Installation of Pipes
Project: 5 Activity: WSWLM1350 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1360 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1370 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1380 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1390 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1400 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1410 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1420 Final Backfilling Works -
Section 3 CIVIL TEAM
Project: 5 Activity: WSWLM1430 Excavation for Pipes -
Section 4 CIVIL TEAM
Project: 5 Activity: WSWLM1440 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1450 Installation of Pipes
Project: 5 Activity: WSWLM1460 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1470 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1480 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1490 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1500 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1510 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1520 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1530 Final Backfilling Works -
Section 4 CIVIL TEAM
Project: 5 Activity: WSWLM1540 Excavation for Pipes -
Section 5 CIVIL TEAM
Project: 5 Activity: WSWLM1550 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1560 Installation of Pipes
Project: 5 Activity: WSWLM1570 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1580 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1590 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1600 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1610 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1620 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1630 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1640 Final Backfilling Works -
Section 5 CIVIL TEAM
Project: 5 Activity: WSWLM1650 Excavation for Pipes -
Section 6 CIVIL TEAM
Project: 5 Activity: WSWLM1660 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1670 Installation of Pipes
Project: 5 Activity: WSWLM1680 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1690 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1700 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1710 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1720 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1730 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1740 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1750 Final Backfilling Works -
Section 6 CIVIL TEAM
Project: 5 Activity: WSWLM1760 Excavation for Pipes -
Section 7 CIVIL TEAM
Project: 5 Activity: WSWLM1770 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1780 Installation of Pipes
Project: 5 Activity: WSWLM1790 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1800 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1810 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1820 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1830 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1840 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1850 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1860 Final Backfilling Works -
Section 7 CIVIL TEAM
Project: 5 Activity: WSWLM1870 Excavation for Pipes -
Section 8 CIVIL TEAM
Project: 5 Activity: WSWLM1880 WIR Inspection for Elevation
- CIVIL and MECHANICAL TEAM
Project: 5 Activity: WSWLM1890 Installation of Pipes
Project: 5 Activity: WSWLM1900 WIR Inspection for the
Installation of Pipes
Project: 5 Activity: WSWLM1910 Random Inspection for the
HDPE Welds - AAII, VCCI
Project: 5 Activity: WSWLM1920 Hydroprep, Fiiling and
Flushing for the Installed Pipes
Project: 5 Activity: WSWLM1930 Partial Backfilling prior for
hydrotest of Installed Pipes - CIVIL TEAM
Project: 5 Activity: WSWLM1940 Hydrotest for the Installed
Pipes
Project: 5 Activity: WSWLM1950 WIR Inspection for Hydrotest
for the Installed Pipes
Project: 5 Activity: WSWLM1960 Pipe Reinstatement after the
Hydrotest for the Installed Pipes
Project: 5 Activity: WSWLM1970 Final Backfilling Works -
Section 8 CIVIL TEAM
Project: 5 Activity: WSWPA1000 Install Handrails
Project: 5 Activity: WSWPA1010 Ceiling Finishes
Project: 5 Activity: WSWPA1020 Interior Wall Finishes
Project: 5 Activity: WSWPA1040 Install Steel Grating
Project: 5 Activity: WSWPA1050 Install Windows - done
Project: 5 Activity: WSWPA1060 Exterior Wall Finishes
Project: 5 Activity: WSWPA1070 Install Doors (6 units)
Project: 5 Activity: WSWPA1080 Signages & Markers
Project: 5 Activity: WSWPD1000 Dry Testing - SWPR
Project: 5 Activity: WSWPE1000 Installation of MCC-8 Panel
Project: 5 Activity: WSWPE1010 Cable pulling
Project: 5 Activity: WSWPE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WSWPE1030 Installation of grounding
system
Project: 5 Activity: WSWPE1040 Installation of PLC Panels
Project: 5 Activity: WSWPH1000 Walkthrough - SWPR
Project: 5 Activity: WSWPH1010 PUNCHLIST CLOSEOUT - SWPR
Project: 5 Activity: WSWPH1020 Construction Handover - SWPR
Project: 5 Activity: WSWPI1000 Installation of instruments
Project: 5 Activity: WSWPI1010 Install CCTV
Project: 5 Activity: WSWPI1020 Install FDAS
Project: 5 Activity: WSWPM1000 Install Exhaust Fans
Project: 5 Activity: WSWPM1010 Install Monorail Crane -
DEMAG
Project: 5 Activity: WSWPM1020 Install Fire Dampers
Project: 5 Activity: WSWPM1030 Install Outside Air Louvers
(2)
Project: 5 Activity: WSWPM1040 Piping Works - REMOVE FROM P6
PROGRAM
Project: 5 Activity: WSWPM1050 Installation of Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1060 Installation of Service Water
Pump Skid
Project: 5 Activity: WSWPM1070 Installation of Motive Pump
Skid
Project: 5 Activity: WSWPM1080 Installation of Sump Pump - 2
units
Project: 5 Activity: WSWPM1090 Piping Installation for Sump
Pumps
Project: 5 Activity: WSWPM1110 Waiting for AAII DRR for
Motive Pump Skid
Project: 5 Activity: WSWPM1120 Fixing and alignment for
Motive Pump Skid
Project: 5 Activity: WSWPM1130 WIR Inspection for Fixing and
alignment for Motive Pump Skid
Project: 5 Activity: WSWPM1140 Grouting for Motive Pump Skid
Project: 5 Activity: WSWPM1150 WIR Inspection for Grouting
of Motive Pump Skid
Project: 5 Activity: WSWPM1170 Fabrication of Pipe Supports
for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1180 Painting of Pipe Supports for
Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1190 Installation of Pipe Supports
for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1200 WIR Inspection for
Installation of Pipe Supports for Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1210 Piping installation for
Suction Line of Motive Pump Skid
Project: 5 Activity: WSWPM1220 Hydrotest for pipes of
Suction Line of Motive Pump Skid including the HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1230 WIR Inspection for Hydrotest
for pipes of Suction Line of Motive Pump Skid including the HDPE Pipe connecting
to TWR
Project: 5 Activity: WSWPM1240 Fabrication of Pipe Supports
for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1250 Painting of Pipe Supports for
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1260 Installation of Pipe Supports
for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1270 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1280 Piping installation for
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1290 Hydrotest for pipes of
Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1300 WIR Inspection for Hydrotest
for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1310 Pipe reinstatement for pipes
of Suction Line of MPS including the HDPE Pipe connecting to TWR after the
hydrotest
Project: 5 Activity: WSWPM1320 Pipe reinstatement for pipes
of Discharge Line of Motive Pump Skid after hydrotest
Project: 5 Activity: WSWPM1330 Procurement HDPE Pipe,
Valves, flange and 20mm plate connecting to TWR
Project: 5 Activity: WSWPM1340 Fabrication of HDPE Suction
Pipe connecting to TWR
Project: 5 Activity: WSWPM1350 Installation HDPE Pipe
connecting to TWR
Project: 5 Activity: WSWPM1360 WIR Inspection for
Installation HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1370 Fabrication of Pipe Supports
for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1380 Painting of Pipe Supports for
HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1390 Installation of Pipe Supports
for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1400 WIR Inspection of Pipe
Supports for HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1410 Fabrication of 20mm thk TWR
Outlet Header End plate for HDPE Pipe Suction Connection
Project: 5 Activity: WSWPM1420 Installation of 20mm thk TWR
Outlet Header End plate for HDPE Pipe Suction Connection
Project: 5 Activity: WSWPM1430 WIR Inspection for
Installation of 20mm thk TWR Outlet Header End plate for HDPE Pipe Suction
Connection
Project: 5 Activity: WSWPM1440 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of MPS including the HDPE Pipe connecting to TWR
Project: 5 Activity: WSWPM1450 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Motive Pump Skid
Project: 5 Activity: WSWPM1470 Installation of Nozzles for
SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1480 Paingting of Nozzles for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1490 WIR Inspection and NDT for
Installation of Nozzles for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1510 Installation of Valves for SW
and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1520 WIR Inspection for
Installation of Valves for SW and FW for DN300 HDPE Pipe
Project: 5 Activity: WSWPM1530 Fixing and alignment for Fire
Fighting pump Skid - 2 units
Project: 5 Activity: WSWPM1540 WIR Inspection for Fixing and
alignment for Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1550 Grouting for Fire Fighting
Pump Skid - 2 units
Project: 5 Activity: WSWPM1560 WIR Inspection for Grouting
of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1570 Fabrication of Pipe Supports
for Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1580 Painting of Pipe Supports for
Suction Line of Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1590 Installation of Pipe Supports
for Suction Line of Fire Fighting Pump Skid -2 units
Project: 5 Activity: WSWPM1600 WIR Inspection for
Installation of Pipe Supports for Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1610 Piping installation for
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1620 Hydrotest for pipes of
Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1630 WIR Inspection for Hydrotest
for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1640 Fabrication of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1650 Painting of Pipe Supports for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1660 Installation of Pipe Supports
for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1670 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1680 Piping installation for
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1690 Hydrotest for pipes of
Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1700 WIR Inspection for Hydrotest
for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1710 Pipe reinstatement for pipes
of Suction Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1720 Pipe reinstatement for pipes
of Discharge Line of Fire Fighting Pump Skid after hydrotest
Project: 5 Activity: WSWPM1730 Fire Pump Shaft alignment for
Fire Fighting Pump Skid - 2 units
Project: 5 Activity: WSWPM1740 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1750 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Fire Fighting Pump Skid
Project: 5 Activity: WSWPM1760 Fixing and alignment for
Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1770 WIR Inspection for Fixing and
alignment for Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1780 Grouting for Service Water
Pump Skid - 2 units
Project: 5 Activity: WSWPM1790 WIR Inspection for Grouting
of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1800 Fabrication of Pipe Supports
for Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1810 Painting of Pipe Supports for
Suction Line of Service Water Pump Skid - 2 units
Project: 5 Activity: WSWPM1820 Installation of Pipe Supports
for Suction Line of Service Water Pump Skid -2 units
Project: 5 Activity: WSWPM1830 WIR Inspection for
Installation of Pipe Supports for Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1840 Piping installation for
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1850 Hydrotest for pipes of
Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1860 WIR Inspection for Hydrotest
for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1870 Fabrication of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1880 Painting of Pipe Supports for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1890 Installation of Pipe Supports
for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1900 WIR Inspection for
Installation of Pipe Supports for Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1910 Piping installation for
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1920 Hydrotest for pipes of
Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1930 WIR Inspection for Hydrotest
for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1940 Pipe reinstatement for pipes
of Suction Line of Service Water Pump Skid after the hydrotest
Project: 5 Activity: WSWPM1950 Pipe reinstatement for pipes
of Discharge Line of Service Water Pump Skid after hydrotest
Project: 5 Activity: WSWPM1970 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1980 Hydrotest Prep, Filling and
Flushing for pipes of Discharge Line of Service Water Pump Skid
Project: 5 Activity: WSWPM1990 Installation of Jockey Pump -
1 unit
Project: 5 Activity: WSWPM2000 WIR Inspection for
Installation of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2010 Fixing and Alignment of
Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2020 WIR Inspection for Fixing and
Alignment of Jockey Pump - 1 unit
Project: 5 Activity: WSWPM2040 Fabrication of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2050 Painting of Pipe Supports for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2060 Installation of Pipe Supports
for Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2070 WIR Inspection for
Installation of Pipe Supports for Suction Line and Discharge Line of Jockey Pump -
1 Unit
Project: 5 Activity: WSWPM2080 Piping installation for
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2090 Hydrotest for pipes of
Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2100 WIR Inspection for Hydrotest
for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2190 Pipe reinstatement for pipes
of Suction Line and Discharge Line of Jockey Pump - Including check valves
Project: 5 Activity: WSWPM2200 Hydrotest Prep, Filling and
Flushing for pipes of Suction Line and Discharge Line of Jockey Pump - 1 Unit
Project: 5 Activity: WSWPM2210 Procurement for Sump Pumps -
2 units
Project: 5 Activity: WSWPM2220 WIR Inspection for
Installation of Sump Pump - 2 units
Project: 5 Activity: WSWPM2230 Fabrication of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2240 Painting of Pipe Supports for
Sump Pumps
Project: 5 Activity: WSWPM2250 Installation of Pipe Supports
for Sump Pumps
Project: 5 Activity: WSWPM2260 WIR Inspection for
Installation of Pipe Supports for Sump Pumps
Project: 5 Activity: WSWPM2270 WIR inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2280 Hydrotest for Piping
Installation for Sump Pumps
Project: 5 Activity: WSWPM2290 Pipe Reistatement for Piping
Installation for Sump Pumps including check valves
Project: 5 Activity: WSWPM2300 WIR Inspection for Piping
Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2310 Hydrotest Prep, Filling and
Flushing for Piping Installation for Sump Pumps prior for Hydrotest
Project: 5 Activity: WSWPM2320 WIR Inspection for Install
Exhaust Fans
Project: 5 Activity: WSWPM2330 WIR Inspection for Install
Fire Dampers
Project: 5 Activity: WSWPM2340 WIR Inspection for Install
Outside Air Louvers (2)
Project: 5 Activity: WSWPW1000 WetTesting - SWPR
Project: 5 Activity: WSWPW1010 Automation Testing
Project: 5 Activity: WSWPW1020 Process Commissioning Service
Water Pumphouse
Project: 5 Activity: WTA1D1000 Dry Testing
Project: 5 Activity: WTA1H1000 Walkthrough - TWR to
Alignment 1
Project: 5 Activity: WTA1H1010 PUNCHLIST CLOSEOUT
Project: 5 Activity: WTA1H1020 Construction Handover
Project: 5 Activity: WTA1I1000 Installation of Junction Box
Project: 5 Activity: WTA1I1010 Installation of Instruments
Project: 5 Activity: WTA1I1020 Cable Pullling at EHH Lines
and Terminations
Project: 5 Activity: WTA1M1000 Hydrotesting
Project: 5 Activity: WTA1M1010 Reinstatement of Piping after
Hydrotest & Installation of Valves and Flowmeter - Not included in Schedule
Project: 5 Activity: WTA1M1020 Modification of Fire Suction
Line
Project: 5 Activity: WTA1M1030 Fit-up Installation of Steel
Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1040 Painting works for Steel Pipe
from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1050 WIR Inspection for Painting
for Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1060 Modification of Service Water
Suction Line
Project: 5 Activity: WTA1M1070 Design Issue for the
Elevation of Pipes from Chamber 19 to AL-1 - AAII
Project: 5 Activity: WTA1M1080 UT Inspection for Steel Pipe
from Chamber 19 to AL-1 prior for Painting
Project: 5 Activity: WTA1M1100 WIR Inspection Fire and
Servicw Water Sunction Line
Project: 5 Activity: WTA1M1110 Installation of Scaffolding
Supports for Steel Pipes from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1120 WIR Inspection for Steel Pipe
from Chamber 19 to AL-1 prior for Painting
Project: 5 Activity: WTA1M1130 WIR Inspection for fit-up
Installation of Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1140 Full Welding Installation of
Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1150 WIR Inspection for Full
Welding Installation of Steel Pipe from Chamber 19 to AL-1
Project: 5 Activity: WTA1M1160 Hydrotest of Fire Suction
Line
Project: 5 Activity: WTA1M1170 Hydrotest of Service Water
Suction Line
Project: 5 Activity: WTA1M1180 Installation of Pipes for
Drain Line DN80
Project: 5 Activity: WTA1M1190 Fit-up Installation of Drain
Line
Project: 5 Activity: WTA1M1200 WIR Inspection for Fit-up
Installation of Drain Line
Project: 5 Activity: WTA1M1210 Full Welding Installation of
Drain Line
Project: 5 Activity: WTA1M1220 WIR Inspection for Full
welding Installation of Drain Line
Project: 5 Activity: WTA1M1230 UT Inspection of Drain Line
Project: 5 Activity: WTA1M1240 WIR Inspection of Drain Line
prior for Painting Works
Project: 5 Activity: WTA1M1250 Painting Works for Drain Line
Project: 5 Activity: WTA1M1260 WIR Inspection of Painting
Works for Drain Line
Project: 5 Activity: WTA1M1270 Installation of Valves for
Drain Line - 2 units
Project: 5 Activity: WTA1M1280 Fit-up Installation of Valve
for Drain Line -2 unirts
Project: 5 Activity: WTA1M1290 WIR Inspection for Fit-up
Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1300 Full Welding Installation of
Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1310 WIR Inspection for Full
welding Installation of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1320 UT Inspection of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1330 WIR Inspection of Valve for
Drain Line prior for Painting Works - 2 units
Project: 5 Activity: WTA1M1340 Painting Works of Valve for
Drain Line - 2 units
Project: 5 Activity: WTA1M1350 WIR Inspection of Painting
Works of Valve for Drain Line - 2 units
Project: 5 Activity: WTA1M1360 Installation of Threadolet
and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1370 WIR Inspection for
Installation of Threadolet and Sampling Valve for Sampling Line - 1 unit
Project: 5 Activity: WTA1M1380 NDT Inspection for
Installation of Drain line and Sampling Line - AAII, VCCI, Witco
Project: 5 Activity: WTA1M1390 Painting works for Threadolet
and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1400 WIR Inspection of Painting
works for Threadolet and Sampling Valve for Sampling Line
Project: 5 Activity: WTA1M1420 Installation of flanges for
Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1430 Painting of flanges for
Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1440 WIR Inspection of Painting of
flanges for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1450 Bolt Torquing for Valves
DN1400 of Chamber 16
Project: 5 Activity: WTA1M1460 WIR Inspection for Valves
DN1400 of Chamber 16
Project: 5 Activity: WTA1M1470 WIR Inspection for
Installation of flanges for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1480 UT Inspection for
Installation of flanges for Valves DN1400 of Chamber 16 - Prior for Painting
Project: 5 Activity: WTA1M1490 Installation of Valves DN1400
of Chamber 16
Project: 5 Activity: WTA1M1500 Installation of Scaffolding
for Valves DN1400 of Chamber 16
Project: 5 Activity: WTA1M1510 WIR Inspection prior for
installation of Valves DN1400 of Chamber 16 - AAII & VCCI
Project: 5 Activity: WTA1M1520 Installation of Scaffolding
Supports prior for installation of Valve for DN900
Project: 5 Activity: WTA1M1530 Installation of Valve for
DN900
Project: 5 Activity: WTA1M1540 Botl torquing of valve for
DN900
Project: 5 Activity: WTA1M1550 WIR Inspection for
Installation of Valve for DN900
Project: 5 Activity: WTA1M1560 WIR Inspection prior for the
Installation of valve for DN900
Project: 5 Activity: WTA1M1570 Procurement for Remaining
Bolts for DN1400 and DN900
Project: 5 Activity: WTA1M1580 Painting works for valve of
DN900
Project: 5 Activity: WTA1M1590 WIR Inspection Painting works
for valve of DN900
Project: 5 Activity: WTA1M1600 Procurement of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1610 Fabrication of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1620 Painting of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1630 Installation of materials for
Chamber Covers - 5 units
Project: 5 Activity: WTA1M1640 WIR Inspection for the
Installation of materials for Chamber Covers - 5 units
Project: 5 Activity: WTA1M1650 Removal of Temporary blinds
inside of Tank 3 - 6 Units
Project: 5 Activity: WTA1M1660 Rectification works including
painting for pipes
Project: 5 Activity: WTA1M1670 WIR Final Joint Inspection -
Rectification works including painting for pipes -AAII, VCCI, WITCO
Project: 5 Activity: WTA1S1000 Backfilling Works part 1 -
for Hydrotesting
Project: 5 Activity: WTA1S1010 Backfilling Works part 2 -
TWR to drain (Portion of sand; The rest are soil)
Project: 5 Activity: WTELD1000 Dry Testing - 30M TOWER
Project: 5 Activity: WTELD1010 Client Approval for Equipment
Commissioning - 30M TOWER
Project: 5 Activity: WTELE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision and Telemetry Tower - 30M TOWER
Project: 5 Activity: WTELE1010 Installation of grounding
system - 30M TOWER
Project: 5 Activity: WTELE1020 Installation of Panel - 30M
TOWER
Project: 5 Activity: WTELE1030 Installation of radio antenna
- 30M TOWER
Project: 5 Activity: WTELE1040 Cable pulling and termination
works - 30M TOWER
Project: 5 Activity: WTELH1000 Walkthrough - 30M TOWER
Project: 5 Activity: WTELH1010 PUNCHLIST CLOSEOUT - 30M
TOWER
Project: 5 Activity: WTELH1020 Construction Handover - 30M
TOWER
Project: 5 Activity: WTELS1000 Fabrication of Tower - 30M
TOWER - done
Project: 5 Activity: WTELS1010 Civil Works - 30M TOWER
Project: 5 Activity: WTELS1020 Tower erection - 30M TOWER
Project: 5 Activity: WTELW1000 Wett Testing - 30M TOWER
Project: 5 Activity: WTELW1010 Automation Testing - 30M
TOWER
Project: 5 Activity: WTIPC1000 Backfilling & Compaction -
Chamber15 to 13
Project: 5 Activity: WTIPC1010 Backfilling & Compaction -
Chamber 11 to 13
Project: 5 Activity: WTIPD1000 Dry Testing Inlet Pipe
Assembly
Project: 5 Activity: WTIPE1000 Duct bank Chamber 13 to MH1 -
remaining backfill
Project: 5 Activity: WTIPE1010 Duct bank Substation to MH14
- remaining backfill
Project: 5 Activity: WTIPE1020 Duct bank Chamber 15 to MH1 -
remaining backfill
Project: 5 Activity: WTIPH1000 Walkthrough Inlet Pipe
Assembly
Project: 5 Activity: WTIPH1010 PUNCHLIST CLOSEOUT Inlet Pipe
Assembly
Project: 5 Activity: WTIPH1020 Construction Handover Inlet
Pipe Assembly
Project: 5 Activity: WTIPI1000 At Header Tank: Install of
instrument junction box (300-GB-010)
Project: 5 Activity: WTIPI1010 At Header Tank: Installation
of Instruments at Chamber11
Project: 5 Activity: WTIPM1000 Installation of Valves and DJ
(DN1600; DN1400) (Chamber 11,12,13,14,15)
Project: 5 Activity: WTIPM1010 Procurement for setting bolts
Project: 5 Activity: WTIPM1020 Installation for setting
bolts at Chamber 11
Project: 5 Activity: WTIPM1030 Installation for setting
bolts at Chamber 12
Project: 5 Activity: WTIPM1040 Installation for setting
bolts at Chamber 13
Project: 5 Activity: WTIPM1050 Installation for setting
bolts at Chamber 14
Project: 5 Activity: WTIPM1060 Installation for setting
bolts at Chamber 15
Project: 5 Activity: WTIPM1070 Internal Inspection inside
the Pipes
Project: 5 Activity: WTIPM1080 Internal Painting of the
Pipes - Rectification
Project: 5 Activity: WTIPM1090 Final Inspection inside the
Pipes - WITCO, AAII & VCCI
Project: 5 Activity: WTIPM1100 Bolt torquing at Chamber 11
Project: 5 Activity: WTIPM1110 Bolt torquing at Chamber 12
Project: 5 Activity: WTIPM1120 Bolt torquing at Chamber 13
Project: 5 Activity: WTIPM1130 Bolt torquing at Chamber 14
Project: 5 Activity: WTIPM1140 Bolt torquing at Chamber 15
Project: 5 Activity: WTIPM1150 Fabrication and Installation
of Chemical Injection at Chamber 15
Project: 5 Activity: WTIPM1160 External Painting of the
Pipes at Chamber 11- Rectification
Project: 5 Activity: WTIPM1170 External Painting of the
Pipes at Chamber 12- Rectification
Project: 5 Activity: WTIPM1180 External Painting of the
Pipes at Chamber 13- Rectification
Project: 5 Activity: WTIPM1190 External Painting of the
Pipes at Chamber 14- Rectification
Project: 5 Activity: WTIPM1200 External Painting of the
Pipes at Chamber 15- Rectification
Project: 5 Activity: WTIPM1210 Fabrication and Installation
of Drain line at Chamber 14
Project: 5 Activity: WTIPM1220 Installation of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1230 WIR Inspection of Drain Valve
at Chamber 14 - 2 units
Project: 5 Activity: WTIPM1240 Painting works of Drain line
at Chamber 14
Project: 5 Activity: WTIPM1250 WIR Inspection of Drain line
at Chamber 14
Project: 5 Activity: WTIPM1260 WIR Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1270 NDT Inspection of Drain line
at Chamber 14
Project: 5 Activity: WTIPM1280 NDT Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1290 Painting of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1300 WIR Inspection of Chemical
Injection at Chamber 15
Project: 5 Activity: WTIPM1310 Fabrication and Installation
of tredolet for sampling point at Chamber 11
Project: 5 Activity: WTIPM1320 NDT inspection of tredolet
for sampling point at Chamber 11
Project: 5 Activity: WTIPM1330 Painting works of tredolet
for sampling point at Chamber 11
Project: 5 Activity: WTIPM1340 WIR Inspection of tredolet
for sampling point at Chamber 11
Project: 5 Activity: WTIPM1350 WIR Inspection for Bolt
torquing at Chamber 11 to 15
Project: 5 Activity: WTIPS1000 Construction of TB (1 unit
remaining) - done
Project: 5 Activity: WTIPS1010 Construction of Pipe Supports
at Valve Chambers
Project: 5 Activity: WTWRA1000 Procurement of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1010 Procurement of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1020 Install Aluminum Powder
Coated Louver (11 units) - TWR Tank1,2&3
Project: 5 Activity: WTWRA1030 Procurement of Railings at
Perimeter Top SLab - TWR Tank2
Project: 5 Activity: WTWRA1040 Roof Vents - TWR Tank2
Project: 5 Activity: WTWRA1050 Access Hatch, Safety Access
Handrail - TWR Tank1,2&3
Project: 5 Activity: WTWRA1060 Install Aluminum Powder
Coated Louver (14 units) - TWR Tank1,2&3
Project: 5 Activity: WTWRA1070 Procurement of Access Hatch
Cover (7 units) - TWR Tank2
Project: 5 Activity: WTWRA1080 Fairface Cement Plaster
Finish & Painted
Project: 5 Activity: WTWRA1090 Painting of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1100 Fabrication of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1110 Install Railings at Perimeter
Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1120 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank1&3
Project: 5 Activity: WTWRA1130 Fabrication of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1140 Painting of Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1150 Install Access Hatch Cover (3
units) - TWR Tank1&3
Project: 5 Activity: WTWRA1160 WIR Inspection Access Hatch
Cover (3 units) - TWR Tank1&3
Project: 5 Activity: WTWRA1170 Fabrication of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1180 Painting of Access Hatch
Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1190 Install Access Hatch Cover (3
units) - TWR Tank 2
Project: 5 Activity: WTWRA1200 WIR Inspection of Access
Hatch Cover (3 units) - TWR Tank 2
Project: 5 Activity: WTWRA1210 Painting of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1220 Fabrication of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1230 Install Railings at Perimeter
Top SLab - TWR Tank 2
Project: 5 Activity: WTWRA1240 WIR Inspection of Railings at
Perimeter Top SLab - TWR Tank 2
Project: 5 Activity: WTWRC1000 Damp Proofing Works at
Exterior Walls
Project: 5 Activity: WTWRC1010 Backfilling & Compaction
Project: 5 Activity: WTWRD1000 Dry testing Tanks 1 & 3
Project: 5 Activity: WTWRD1010 Dry testing Tank 2
Project: 5 Activity: WTWRE1000 Termination works - Tank1&3
Project: 5 Activity: WTWRE1020 Cable pulling 2nd Priority
Project: 5 Activity: WTWRE1030 Installation of roughing ins,
Blockout/Openings/Sleeves Provision 2nd priority
Project: 5 Activity: WTWRE1040 Termination works - Tank2
(civil/structural dependent)
Project: 5 Activity: WTWRH1000 Walkthrough Tanks 1 & 3
Project: 5 Activity: WTWRH1010 PUNCHLIST CLOSEOUT Tanks 1 &
3
Project: 5 Activity: WTWRH1020 Construction Handover Tanks 1
& 3
Project: 5 Activity: WTWRH1030 Walkthrough Tank 2
Project: 5 Activity: WTWRH1040 PUNCHLIST CLOSEOUT Tank 2
Project: 5 Activity: WTWRH1050 Construction Handover Tanks 2
Project: 5 Activity: WTWRI1000 Installation of instruments
supports - Tank1&3
Project: 5 Activity: WTWRI1010 Installation of instruments -
Tank1&3
Project: 5 Activity: WTWRI1020 Installation of instruments
supports - Tank2
Project: 5 Activity: WTWRI1030 Installation of instruments -
Tank2
Project: 5 Activity: WTWRM1010 Installation of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1030 Procurement of Materials for
Chlorine Chemical Piping and Supports - TWR
Project: 5 Activity: WTWRM1040 Fabrication of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1050 Installation of Supports for
Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1060 Walkdown prior for
Hydrotesting of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1070 Hydrotesting of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1080 WIR Inspection of Chlorine
Chemical Piping - TWR
Project: 5 Activity: WTWRM1090 Design of Rectification Plan
for Sluice Gates Tank 1&2, Inlet and Outlet, Common - AAII
Project: 5 Activity: WTWRM1100 Procurement of materials for
Rectification Plan for Sluice Gates - AAII
Project: 5 Activity: WTWRM1110 Rectification of Sluice Gates
- Inlet Tank 1 (1 unit)
Project: 5 Activity: WTWRM1120 Rectification of Sluice Gates
- Outlet Tank 1 (4 units)
Project: 5 Activity: WTWRM1130 Rectification of Sluice Gates
- Drain Tank 1 (1 unit)
Project: 5 Activity: WTWRM1140 Rectification of Sluice Gates
- Common Sluice gates at FWT (2 units)
Project: 5 Activity: WTWRM1150 Rectification of Sluice Gates
- Inlet Tank 2 (1 unit)
Project: 5 Activity: WTWRM1160 Rectification of Sluice Gates
- Outlet Tank 2 (4 units)
Project: 5 Activity: WTWRM1170 Rectification of Sluice Gates
- Drain Tank 2 (1 unit)
Project: 5 Activity: WTWRM1180 WIR Inspection for all Sluice
Gates
Project: 5 Activity: WTWRM1190 WIR Inspection of Chlorine
Chemical Piping Supports - TWR
Project: 5 Activity: WTWRM1200 Hydrotesting prep, Filling
and Flushing of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRM1210 Pipe Reinstatement after
Hydrotesting of Chlorine Chemical Piping - TWR
Project: 5 Activity: WTWRS1000 Formworks - TWR Tank2
Project: 5 Activity: WTWRS1010 Reinforcement - TWR Tank2
Project: 5 Activity: WTWRS1020 Concrete - TWR Tank2
Project: 5 Activity: WTWRS1030 Curing - TWR Tank2
Project: 5 Activity: WTWRS1040 Removal of Forms/Scaffoldings
- TWR Tank2
Project: 5 Activity: WTWRS1050 Cutting of Tie Rods - TWR
Tank2
Project: 5 Activity: WTWRS1060 Concrete topping/screed;
500mm thick - TWR Tank2
Project: 5 Activity: WTWRS1070 Tank Lining TWR Tank 3
Project: 5 Activity: WTWRS1080 Tank Lining TWR Tank 1
Project: 5 Activity: WTWRS1090 Tank Lining Backwash Tank 1
Project: 5 Activity: WTWRS1100 Curing and Pull-off test at
Backwash Tank 1 and 2 (Filtered Water Tank A/B)
Project: 5 Activity: WTWRS1110 Crack Repair of Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRS1120 Disinfection TWR Tank1&3
Project: 5 Activity: WTWRS1130 Floor Coating at Top Slab -
TWR Tank1&3
Project: 5 Activity: WTWRS1140 Leak Test & Dewatering of TWR
Tank 2 - done
Project: 5 Activity: WTWRS1150 Tank Lining Backwash Tank 2
Project: 5 Activity: WTWRS1160 Floor Coating at Top Slab -
TWR Tank2
Project: 5 Activity: WTWRS1170 Tank Lining TWR Tank 2
Project: 5 Activity: WTWRS1180 Disinfection TWR Tank 2
Project: 5 Activity: WTWRW1010 Automation Testing Tanks 1 &
3
Project: 5 Activity: WTWRW1030 Water Refilling to Filtered
Water Tank A & TWR Tank 1 from DMF 11, 13
Project: 5 Activity: WTWRW1040 Water Refilling to Filtered
Water Tank A & TWR Tank 1 from DMF 11, 13, 15
Project: 5 Activity: WTWRW1050 Wet Testing Tank 2
Project: 5 Activity: WTWRW1060 Automation Testing Tank 2
Project: 5 Activity: WWTOA1000 Roofing Works
Project: 5 Activity: WWTOA1010 Ceiling Finishes
Project: 5 Activity: WWTOE1000 Installation of roughing ins,
Blockout/Openings/Sleeves Provision
Project: 5 Activity: WWTOE1010 Cable pulling
Project: 5 Activity: WWTOE1020 Installation of wiring
devices and lighting fixtures
Project: 5 Activity: WWTOE1030 Termination works
Project: 5 Activity: WWTOS1000 Concrete Works
Project: 5 Activity: WWTOS1010 Install Structural Steel
(including Stairs)