ukuran
no sket gambar grid volume satuan
panjang p1 p2 l t
a b c d e f g h i j
1 galian
A,1-8 12 0.7 0.9 7.56 mᶾ
B,7-8 2.25 0.8 0.9 1.62 mᶾ
C,1-2,5-8 6 0.8 0.9 4.32 mᶾ
D,1-2 2 0.8 0.9 1.44 mᶾ
E,1-3,5-8 7.5 0.8 0.9 5.4 mᶾ
F,5-8 4 0.8 0.9 2.88 mᶾ
G,1-3 3.5 0.8 0.9 2.52 mᶾ
H,3-4,5-8 7 0.8 0.9 5.04 mᶾ
I,1-6 9 0.8 0.9 6.48 mᶾ
J,1-8 12 0.7 0.9 7.56 mᶾ
1,A-J 19 0.7 0.9 11.97 mᶾ
2,C-E 3.25 0.8 0.9 2.34 mᶾ
3,D-I 9.75 0.8 0.9 7.02 mᶾ
4,H-I 3 0.8 0.9 2.16 mᶾ
5,C-E,F-H 6.25 0.8 0.9 4.5 mᶾ
6,E-F,H-I 4.75 0.8 0.9 3.42 mᶾ
7,B-C 2 0.8 0.9 1.44 mᶾ
8,A-J 19 0.7 0.9 11.97 mᶾ
TOTAL 89.64 mᶾ
2 urugan tanah kembali
A,1-8 12
B,7-8 2.25
C,1-2,5-8 6
D,1-2 2
E,1-3,5-8 7.5
F,5-8 4
G,1-3 3.5
H,3-4,5-8 7
I,1-6 9
J,1-8 12
1,A-J 19
2,C-E 3.25
3,D-I 9.75
4,H-I 3
5,C-E,F-H 6.25
6,E-F,H-I 4.75
7,B-C 2
8,A-J 19
TOTAL 0 mᶾ
3 urugan pasir
A,1-8 12 0.7 0.1 0.84 mᶾ
B,7-8 2.25 0.8 0.1 0.18 mᶾ
C,1-2,5-8 6 0.8 0.1 0.48 mᶾ
D,1-2 2 0.8 0.1 0.16 mᶾ
E,1-3,5-8 7.5 0.8 0.1 0.6 mᶾ
F,5-8 4 0.8 0.1 0.32 mᶾ
G,1-3 3.5 0.8 0.1 0.28 mᶾ
H,3-4,5-8 7 0.8 0.1 0.56 mᶾ
I,1-6 9 0.8 0.1 0.72 mᶾ
J,1-8 12 0.7 0.1 0.84 mᶾ
1,A-J 19 0.7 0.1 1.33 mᶾ
2,C-E 3.25 0.8 0.1 0.26 mᶾ
3,D-I 9.75 0.8 0.1 0.78 mᶾ
4,H-I 3 0.8 0.1 0.24 mᶾ
5,C-E,F-H 6.25 0.8 0.1 0.5 mᶾ
6,E-F,H-I 4.75 0.8 0.1 0.38 mᶾ
7,B-C 2 0.8 0.1 0.16 mᶾ
8,A-J 19 0.7 0.1 1.33 mᶾ
TOTAL 9.96 mᶾ
4 pasangan batu kali
A,1-8 12 0.3 0.6 0.6 3.24 mᶾ
B,7-8 2.25 0.3 0.6 0.6 0.6075 mᶾ
C,1-2,5-8 6 0.3 0.6 0.6 1.62 mᶾ
D,1-2 2 0.3 0.6 0.6 0.54 mᶾ
E,1-3,5-8 7.5 0.3 0.6 0.6 2.025 mᶾ
F,5-8 4 0.3 0.6 0.6 1.08 mᶾ
G,1-3 3.5 0.3 0.6 0.6 0.945 mᶾ
H,3-4,5-8 7 0.3 0.6 0.6 1.89 mᶾ
I,1-6 9 0.3 0.6 0.6 2.43 mᶾ
J,1-8 12 0.3 0.6 0.6 3.24 mᶾ
1,A-J 19 0.3 0.6 0.6 5.13 mᶾ
2,C-E 3.25 0.3 0.6 0.6 0.8775 mᶾ
3,D-I 9.75 0.3 0.6 0.6 2.6325 mᶾ
4,H-I 3 0.3 0.6 0.6 0.81 mᶾ
5,C-E,F-H 6.25 0.3 0.6 0.6 1.6875 mᶾ
6,E-F,H-I 4.75 0.3 0.6 0.6 1.2825 mᶾ
7,B-C 2 0.3 0.6 0.6 0.54 mᶾ
8,A-J 19 0.3 0.6 0.6 5.13 mᶾ
TOTAL 35.7075 mᶾ
5 pasangan batu kosong
A,1-8 12 0.8 0.2 1.92 mᶾ
B,7-8 2.25 0.8 0.2 0.36 mᶾ
C,1-2,5-8 6 0.8 0.2 0.96 mᶾ
D,1-2 2 0.8 0.2 0.32 mᶾ
E,1-3,5-8 7.5 0.8 0.2 1.2 mᶾ
F,5-8 4 0.8 0.2 0.64 mᶾ
G,1-3 3.5 0.8 0.2 0.56 mᶾ
H,3-4,5-8 7 0.8 0.2 1.12 mᶾ
I,1-6 9 0.8 0.2 1.44 mᶾ
J,1-8 12 0.8 0.2 1.92 mᶾ
1,A-J 19 0.8 0.2 3.04 mᶾ
2,C-E 3.25 0.8 0.2 0.52 mᶾ
3,D-I 9.75 0.8 0.2 1.56 mᶾ
4,H-I 3 0.8 0.2 0.48 mᶾ
5,C-E,F-H 6.25 0.8 0.2 1 mᶾ
6,E-F,H-I 4.75 0.8 0.2 0.76 mᶾ
7,B-C 2 0.8 0.2 0.32 mᶾ
8,A-J 19 0.8 0.2 3.04 mᶾ
TOTAL 21.16 mᶾ
6 transram
1 pc : 3 ps A,1-8 12 0.3 3.6 m²
B,7-8 2.25 1.5 3.375 m²
C,1-2 2 1.5 3 m²
C,5-7 1.75 0.3 0.525 m²
C,7-8 2.25 1.5 3.375 m²
D,1-2 2 1.5 3 m²
E,1-3,5-8 7.5 0.3 2.25 m²
F,5-8 4 1.5 6 m²
G,1-3 3.5 0.3 1.05 m²
H,3-4,5-8 7 0.3 2.1 m²
I,1-6 9 0.3 2.7 m²
J,1-8 12 0.3 3.6 m²
1,A-C 3 0.3 0.9 m²
1,C-D 1.25 1.5 1.875 m²
1,D-J 14.75 0.3 4.425 m²
2,C-D 1.25 1.5 1.875 m²
2,D-E 2 0.3 0.6 m²
3,D-I 9.75 0.3 2.925 m²
4,H-I 3 0.3 0.9 m²
5,C-E,F-H 6.25 0.3 1.875 m²
6,E-F,H-I 4.75 0.3 1.425 m²
7,B-C 2 1.5 3 m²
8,A-J 19 0.3 5.7 m²
TOTAL 60.075 m²
7 pas bata merah 1/2 bata
1 pc : 5 ps A,1-8 12 3.7 44.4 m²
B,7-8 2.25 2.5 5.625 m²
C,1-2 2 2.5 5 m²
C,5-7 1.75 3.7 6.475 m²
C,7-8 2.25 2.5 5.625 m²
D,1-2 2 2.5 5 m²
E,1-3,5-8 7.5 3.7 27.75 m²
F,5-8 4 2.5 10 m²
G,1-3 3.5 3.7 12.95 m²
H,3-4,5-8 7 3.7 25.9 m²
I,1-6 9 3.7 33.3 m²
J,1-8 12 3.7 44.4 m²
1,A-C 3 3.7 11.1 m²
1,C-D 1.25 2.5 3.125 m²
1,D-J 14.75 3.7 54.575 m²
2,C-D 1.25 2.5 3.125 m²
2,D-E 2 3.7 7.4 m²
3,D-I 9.75 3.7 36.075 m²
4,H-I 3 3.7 11.1 m²
5,C-E,F-H 6.25 3.7 23.125 m²
6,E-F,H-I 4.75 3.7 17.575 m²
7,B-C 2 2.5 5 m²
8,A-J 19 3.7 70.3 m²
TOTAL 468.925 m²