menghitung volume

ukuran
no sket gambar grid volume satuan
panjang p1 p2 l t
a b c d e f g h i j
1 galian
A,1-8 12 0.7 0.9 7.56 mᶾ
B,7-8 2.25 0.8 0.9 1.62 mᶾ
C,1-2,5-8 6 0.8 0.9 4.32 mᶾ
D,1-2 2 0.8 0.9 1.44 mᶾ
E,1-3,5-8 7.5 0.8 0.9 5.4 mᶾ
F,5-8 4 0.8 0.9 2.88 mᶾ
G,1-3 3.5 0.8 0.9 2.52 mᶾ
H,3-4,5-8 7 0.8 0.9 5.04 mᶾ
I,1-6 9 0.8 0.9 6.48 mᶾ
J,1-8 12 0.7 0.9 7.56 mᶾ
1,A-J 19 0.7 0.9 11.97 mᶾ
2,C-E 3.25 0.8 0.9 2.34 mᶾ
3,D-I 9.75 0.8 0.9 7.02 mᶾ
4,H-I 3 0.8 0.9 2.16 mᶾ
5,C-E,F-H 6.25 0.8 0.9 4.5 mᶾ
6,E-F,H-I 4.75 0.8 0.9 3.42 mᶾ
7,B-C 2 0.8 0.9 1.44 mᶾ
8,A-J 19 0.7 0.9 11.97 mᶾ
TOTAL 89.64 mᶾ
2 urugan tanah kembali
A,1-8 12
B,7-8 2.25
C,1-2,5-8 6
D,1-2 2
E,1-3,5-8 7.5
F,5-8 4
G,1-3 3.5
H,3-4,5-8 7
I,1-6 9
J,1-8 12
1,A-J 19
2,C-E 3.25
3,D-I 9.75
4,H-I 3
5,C-E,F-H 6.25
6,E-F,H-I 4.75
7,B-C 2
8,A-J 19
TOTAL 0 mᶾ
3 urugan pasir
A,1-8 12 0.7 0.1 0.84 mᶾ
B,7-8 2.25 0.8 0.1 0.18 mᶾ
C,1-2,5-8 6 0.8 0.1 0.48 mᶾ
D,1-2 2 0.8 0.1 0.16 mᶾ
E,1-3,5-8 7.5 0.8 0.1 0.6 mᶾ
F,5-8 4 0.8 0.1 0.32 mᶾ
G,1-3 3.5 0.8 0.1 0.28 mᶾ
H,3-4,5-8 7 0.8 0.1 0.56 mᶾ
I,1-6 9 0.8 0.1 0.72 mᶾ
J,1-8 12 0.7 0.1 0.84 mᶾ
1,A-J 19 0.7 0.1 1.33 mᶾ
2,C-E 3.25 0.8 0.1 0.26 mᶾ
3,D-I 9.75 0.8 0.1 0.78 mᶾ
4,H-I 3 0.8 0.1 0.24 mᶾ
5,C-E,F-H 6.25 0.8 0.1 0.5 mᶾ
6,E-F,H-I 4.75 0.8 0.1 0.38 mᶾ
7,B-C 2 0.8 0.1 0.16 mᶾ
8,A-J 19 0.7 0.1 1.33 mᶾ
TOTAL 9.96 mᶾ
4 pasangan batu kali
A,1-8 12 0.3 0.6 0.6 3.24 mᶾ
B,7-8 2.25 0.3 0.6 0.6 0.6075 mᶾ
C,1-2,5-8 6 0.3 0.6 0.6 1.62 mᶾ
D,1-2 2 0.3 0.6 0.6 0.54 mᶾ
E,1-3,5-8 7.5 0.3 0.6 0.6 2.025 mᶾ
F,5-8 4 0.3 0.6 0.6 1.08 mᶾ
G,1-3 3.5 0.3 0.6 0.6 0.945 mᶾ
H,3-4,5-8 7 0.3 0.6 0.6 1.89 mᶾ
I,1-6 9 0.3 0.6 0.6 2.43 mᶾ
J,1-8 12 0.3 0.6 0.6 3.24 mᶾ
1,A-J 19 0.3 0.6 0.6 5.13 mᶾ
2,C-E 3.25 0.3 0.6 0.6 0.8775 mᶾ
3,D-I 9.75 0.3 0.6 0.6 2.6325 mᶾ
4,H-I 3 0.3 0.6 0.6 0.81 mᶾ
5,C-E,F-H 6.25 0.3 0.6 0.6 1.6875 mᶾ
6,E-F,H-I 4.75 0.3 0.6 0.6 1.2825 mᶾ
7,B-C 2 0.3 0.6 0.6 0.54 mᶾ
8,A-J 19 0.3 0.6 0.6 5.13 mᶾ
TOTAL 35.7075 mᶾ
5 pasangan batu kosong
A,1-8 12 0.8 0.2 1.92 mᶾ
B,7-8 2.25 0.8 0.2 0.36 mᶾ
C,1-2,5-8 6 0.8 0.2 0.96 mᶾ
D,1-2 2 0.8 0.2 0.32 mᶾ
E,1-3,5-8 7.5 0.8 0.2 1.2 mᶾ
F,5-8 4 0.8 0.2 0.64 mᶾ
G,1-3 3.5 0.8 0.2 0.56 mᶾ
H,3-4,5-8 7 0.8 0.2 1.12 mᶾ
I,1-6 9 0.8 0.2 1.44 mᶾ
J,1-8 12 0.8 0.2 1.92 mᶾ
1,A-J 19 0.8 0.2 3.04 mᶾ
2,C-E 3.25 0.8 0.2 0.52 mᶾ
3,D-I 9.75 0.8 0.2 1.56 mᶾ
4,H-I 3 0.8 0.2 0.48 mᶾ
5,C-E,F-H 6.25 0.8 0.2 1 mᶾ
6,E-F,H-I 4.75 0.8 0.2 0.76 mᶾ
7,B-C 2 0.8 0.2 0.32 mᶾ
8,A-J 19 0.8 0.2 3.04 mᶾ
TOTAL 21.16 mᶾ
6 transram
1 pc : 3 ps A,1-8 12 0.3 3.6 m²
B,7-8 2.25 1.5 3.375 m²
C,1-2 2 1.5 3 m²
C,5-7 1.75 0.3 0.525 m²
C,7-8 2.25 1.5 3.375 m²
D,1-2 2 1.5 3 m²
E,1-3,5-8 7.5 0.3 2.25 m²
F,5-8 4 1.5 6 m²
G,1-3 3.5 0.3 1.05 m²
H,3-4,5-8 7 0.3 2.1 m²
I,1-6 9 0.3 2.7 m²
J,1-8 12 0.3 3.6 m²
1,A-C 3 0.3 0.9 m²
1,C-D 1.25 1.5 1.875 m²
1,D-J 14.75 0.3 4.425 m²
2,C-D 1.25 1.5 1.875 m²
2,D-E 2 0.3 0.6 m²
3,D-I 9.75 0.3 2.925 m²
4,H-I 3 0.3 0.9 m²
5,C-E,F-H 6.25 0.3 1.875 m²
6,E-F,H-I 4.75 0.3 1.425 m²
7,B-C 2 1.5 3 m²
8,A-J 19 0.3 5.7 m²
TOTAL 60.075 m²
7 pas bata merah 1/2 bata
1 pc : 5 ps A,1-8 12 3.7 44.4 m²
B,7-8 2.25 2.5 5.625 m²
C,1-2 2 2.5 5 m²
C,5-7 1.75 3.7 6.475 m²
C,7-8 2.25 2.5 5.625 m²
D,1-2 2 2.5 5 m²
E,1-3,5-8 7.5 3.7 27.75 m²
F,5-8 4 2.5 10 m²
G,1-3 3.5 3.7 12.95 m²
H,3-4,5-8 7 3.7 25.9 m²
I,1-6 9 3.7 33.3 m²
J,1-8 12 3.7 44.4 m²
1,A-C 3 3.7 11.1 m²
1,C-D 1.25 2.5 3.125 m²
1,D-J 14.75 3.7 54.575 m²
2,C-D 1.25 2.5 3.125 m²
2,D-E 2 3.7 7.4 m²
3,D-I 9.75 3.7 36.075 m²
4,H-I 3 3.7 11.1 m²
5,C-E,F-H 6.25 3.7 23.125 m²
6,E-F,H-I 4.75 3.7 17.575 m²
7,B-C 2 2.5 5 m²
8,A-J 19 3.7 70.3 m²
TOTAL 468.925 m²
KUSEN

NO GRID BUAH P L LUAS SAT


a b c d e f g
A,1-8 -
B,7-8 -
C,1-2,5-8 Bv2 ( 1 bh)
J4 (1 bh)
P1 (1 bh)
D,1-2 -
E,1-3,5-8 p4 (1 bh)
p5(1 bh)
j5(1bh)
p2(1 bh)
F,5-8 -
G,1-3 p(1 bh)
j6(1 bh)
H,3-4,5-8 p2(1 bh)
j3(1 bh)
I,1-6 PG(1 bh)
j1(1 bh)
p1(1 bh)
JU(1 bh)
J,1-8 -
1,A-J -
2,C-E p6(1 bh)
pj(1 bh)
3,D-I -
4,H-I -
5,C-E,F-H p2(1 bh)
6,E-F,H-I p3(1 bh)
j2(1 bh)
7,B-C bv1(1 bh)
8,A-J -
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UJI KOMPETENSI KEJURUAN
TAHUN PELAJARAN 2017/2018
LEMBAR JAWABAN

SATUAN PENDIDIKAN : SEKOLAH MENENGAH KEJURUAN


PROGRAM KEAHLIAN : TEKNIK GAMBAR BANGUNAN
KODE : 1983
JUDUL TUGAS : MERENCANAKAN RAB

HARGA SATUAN PEKERJAAN


DAPTAR HARGA BAHAN BANGUNAN WIL LOWOKWARU 2018

NO URAIAN SAT HARGA SATUAN KETERANGAN


a b c d e
I TANAH &PASIR
1 pasir urug 1 mᶾ Rp 68,400.00
2 pasir pasang 1 mᶾ Rp 93,600.00
3 pasir beton 1 mᶾ Rp 97,200.00
4 tanah urug 1 mᶾ Rp 64,800.00
5 tanah liat 1 mᶾ Rp 50,400.00
II BATU,BATA DAN BETON BLOCK
1 batu kali 1 mᶾ Rp 104,400.00
2 stenslah batu pecah mesin 2/3 cm 1 mᶾ Rp 194,400.00
3 batu bata merah 1 bh Rp 324.00
III SEMEN / KAPUR
1 portland semen (PC) (50 kg) 1 kg Rp 1,10448
IV KAYU
KAYU MERANTI
1 reng : 2/3,3/5 1 mᶾ Rp 2,808,000.00
2 usuk : 5/7 1 mᶾ Rp 2,808,000.00
3 balok 1 mᶾ Rp 2,808,000.00
4 papan (2 x 20) cm 1 mᶾ Rp 2,952,000.00
5 papan (3 x 20) cm 1 mᶾ Rp 2,952,000.00
6 papan (3 x 20) cm 1 mᶾ Rp 2,952,000.00
KAYU KHAMPER
7 reng : 2/3,3/5 1 mᶾ Rp 6,048,000.00
8 usuk : 5/7 1 mᶾ Rp 6,048,000.00
9 balok 1 mᶾ Rp 6,048,000.00
10 papan (2 x 20) cm 1 mᶾ Rp 6,480,000.00
11 papan (3 x 20) cm 1 mᶾ Rp 6,480,000.00
12 papan (3 x 20) cm 1 mᶾ Rp 6,480,000.00
13 multiplex 9.00 mm 1 lbr Rp 151,200.00
V BESI DAN ALUMINIUM
1 besi beton polos 1kg Rp 13,680.00
2 besi beugel/kawat 1kg Rp 14,400.00
3 kawat beton/bendrat RRT 1kg Rp 13,680.00
4 paku kayu segala ukuran 1kg Rp 11,520.00
VI LAIN LAIN
1 minyak begisting 1 ltr Rp 3,600.00
2 kayu dolken Ø 8-10 cm btg Rp 28,800.00
DAFTAR UPAH TENAGA KERJA WIL. LOWOKWARU 2018

NO URAIAN SAT HARGA SATUAN KETERANGAN


a b c d e
1 mandor org/hr Rp 80,000.00
2 Kepala Tukang Batu org/hr Rp 75,000.00
3 Kepala Tukang Kayu org/hr Rp 75,000.00
4 Kepala Tukang Besi org/hr Rp 75,000.00
5 Kepala Tukang Cat org/hr Rp 75,000.00
6 Kepala Tukang Listrik org/hr Rp 75,000.00
7 Tukang Gali org/hr Rp 70,000.00
8 Tukang batu org/hr Rp 70,000.00
9 Tukang kayu org/hr Rp 70,000.00
10 Tukang Besi org/hr Rp 70,000.00
11 Tukang cat org/hr Rp 70,000.00
12 Tukang plitur org/hr Rp 70,000.00
13 Tukang pipa org/hr Rp 70,000.00
14 Tukang listrik org/hr Rp 70,000.00
15 Tukang aspal org/hr Rp 70,000.00
16 Tukang kapur org/hr Rp 70,000.00
17 Pembantu tukang org/hr Rp 55,000.00
18 pekerja biasa org/hr Rp 55,000.00
19 penjaga malam org/hr Rp 55,000.00
20 sopir org/hr Rp 70,000.00
21 operator org/hr Rp 70,000.00
22 mekanik org/hr Rp 80,000.00
23 pembantu sopir org/hr Rp 65,000.00
24 pembantu operator org/hr Rp 65,000.00
25 pembantu mekanik org/hr Rp 60,000.00
26 juru ukur org/hr Rp 140,000.00
27 engineer dan crew org/hr Rp 800,000.00
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UJI KOMPETENSI KEJURUAN
TAHUN PELAJARAN 2017/2018
LEMBAR JAWABAN
SATUAN PENDIDIKAN : Sekolah Menengah Kejuruan
PROGRAM KEAHLIAN : Teknik Gambar Bangunan
KODE : 1983
JUDUL TUGAS : Merencanakan RAB
DAPTAR ANALISA HARGA SATUAN
MENURUT SNI

NO URAIAN HARGA SAT UPAH BAHAN JML HARGA


a b c d e f
A.018 1 mᶾ GALIAN TANAH BIASA SEDALAM 1.00 m
upah
0.040 oh mandor Rp 80,000.00 Rp 3,200.00 Rp 3,200.00
0.400 oh pekerja Rp 70,000.00 Rp 28,000.00 Rp 28,000.00
SUB JUMLAH Rp 31,200.00
A.026 1 mᶾ URUGAN TANAH KEMBALI
upah
0.019 oh mandor Rp 80,000.00 Rp 1,520.00 Rp 1,520.00
0.192 oh pekerja Rp 70,000.00 Rp 13,440.00 Rp 13,440.00
SUB JUMLAH Rp 14,960.00
A.028 1 mᶾ URUGAN PASIR
bahan
1.200 mᶾ pasir urug Rp 68,400.00 Rp 82,080.00 Rp 82,080.00
upah
0.010 oh mandor Rp 80,000.00 Rp 800.00 Rp 800.00
0.300 oh pekerja Rp 70,000.00 Rp 21,000.00 Rp 21,000.00
SUB JUMLAH Rp 103,880.00
A.0.37 1 mᶾ PASANGAN BATU KALI 1 PC : 4 PS
bahan
1.100 mᶾ batu kali Rp 104,400.00 Rp 114,840.00 Rp 114,840.00
163.000 kg semen pc (50 kg) Rp 180,030.00 Rp 180,030.00
0.520 mᶾ pasir pasang Rp 93,600.00 Rp 48,672.00 Rp 48,672.00
upah
0.075 oh mandor Rp 80,000.00 Rp 6,000.00 Rp 6,000.00
0.060 oh kepala tukang batu Rp 75,000.00 Rp 4,500.00 Rp 4,500.00
0.600 oh tukang batu Rp 70,000.00 Rp 42,000.00 Rp 42,000.00
1.500 oh pekerja Rp 55,000.00 Rp 82,500.00 Rp 82,500.00
SUB JUMLAH Rp 478,542.00
A.046 1 mᶾ PASANGAN BATU KOSONG (AANSTAMPING)
bahan
1.200 mᶾ batu kali Rp 104,400.00 Rp 125,280.00 Rp 125,280.00
0.300 mᶾ pasir urug Rp 68,400.00 Rp 20,520.00 Rp 20,520.00
upah
0.039 oh mandor Rp 80,000.00 Rp 3,120.00 Rp 3,120.00
0.039 oh kepala tukang batu Rp 75,000.00 Rp 2,925.00 Rp 2,925.00
0.390 oh tukang batu Rp 70,000.00 Rp 27,300.00 Rp 27,300.00
0.780 oh pekerja Rp 55,000.00 Rp 42,900.00 Rp 42,900.00
SUB JUMLAH Rp 222,045.00
A.061 1 m² PASANGAN BATA MERAH 1/2 BATA 1 PC : 4 PS
bahan
70.000 bh batu merah 5 x 11 x 22 cm Rp 324.00 Rp 22,680.00 Rp 22,680.00
11.000 kg semen pc (50 kg) Rp 12,149.00 Rp 12,149.00
0.043 mᶾ pasir pasang Rp 93,600.00 Rp 4,024.00 Rp 4,024.00
upah
0.015 oh mandor Rp 80,000.00 Rp 1,200.00 Rp 1,200.00
0.010 oh kepala tukang batu Rp 75,000.00 Rp 750.00 Rp 750.00
0.100 oh tukang batu Rp 70,000.00 Rp 7,000.00 Rp 7,000.00
0.320 oh pekerja Rp 55,000.00 Rp 17,600.00 Rp 17,600.00
SUB JUMLAH Rp 65,403.00
A.117 1 mᶾ PASANGAN KUSEN PINTU & JENDELA KAYU KHAMPER
bahan
1.200 mᶾ kayu khamper balok Rp 6,048,000.00 Rp 7,257,600.00 Rp 7,257,600.00
upah
0.300 oh mandor Rp 80,000.00 Rp 24,000.00 Rp 24,000.00
2.000 oh kepala tukang kayu Rp 75,000.00 Rp 150,000.00 Rp 150,000.00
18.000 oh tukang kayu Rp 70,000.00 Rp 1,260,000.00 Rp 1,260,000.00
6.000 oh pekerja Rp 55,000.00 Rp 330,000.00 Rp 330,000.00
SUB JUMLAH Rp 9,021,600.00
A.310 1 mᶾ SLOOOF BETON BERTULANG (200 kg besi + bekisting)
bahan
0.270 mᶾ papan maranti (2 x 20)cm Rp 2,952,000.00 Rp 797,040.00 Rp 797,040.00
2.000 kg paku segala ukuran Rp 11,520.00 Rp 23,040.00 Rp 23,040.00
0.600 ltr minyak bekisting Rp 3,600.00 Rp 2,160.00 Rp 2,160.00
200.000 kg besi beton Rp 13,680.00 Rp 2,736,000.00 Rp 2,736,000.00
3.000 kg kawat beton Rp 13,680.00 Rp 41,040.00 Rp 41,040.00
323.000 kg semen pc Rp 1,10448 Rp 356,747.04 Rp 356,747.04
0.520 mᶾ pasir beton Rp 97,200.00 Rp 50,544.00 Rp 50,544.00
0.780 mᶾ stelnslag pecah mesin 2/3 Rp 194,400.00 Rp 151,632.00 Rp 151,632.00
upah
0.170 oh mandor Rp 80,000.00 Rp 13,600.00 Rp 13,600.00
0.331 oh kepala tukang batu Rp 75,000.00 Rp 24,825.00 Rp 24,825.00
1.400 oh tukang batu Rp 70,000.00 Rp 98,000.00 Rp 98,000.00
1.560 oh tukang kayu Rp 70,000.00 Rp 109,200.00 Rp 109,200.00
0.350 oh tukang besi Rp 70,000.00 Rp 24,500.00 Rp 24,500.00
4.850 oh pekerja Rp 55,000.00 Rp 266,750.00 Rp 266,750.00
SUB JUMLAH Rp 4,695,078.00
A.311 1 mᶾ KOLOM BETON BERTULANG (150 kg besi + bekisting)
bahan
0.400 mᶾ papan maranti (2 x 20)cm Rp 2,952,000.00 Rp 1,180,800.00 Rp 1,180,800.00
4.000 kg paku segala ukuran Rp 11,520.00 Rp 46,080.00 Rp 46,080.00
2.000 ltr minyak bekisting Rp 3,600.00 Rp 7,200.00 Rp 7,200.00
0.150 mᶾ balok meranti Rp 2,808,000.00 Rp 421,200.00 Rp 421,200.00
3.500 lbr multiplex t = 9mm Rp 151,200.00 Rp 529,200.00 Rp 529,200.00
20.000 btg dolken Ø 8-10/4m Rp 28,800.00 Rp 576,000.00 Rp 576,000.00
150.000 kg besi beton Rp 13,680.00 Rp 2,052,000.00 Rp 2,052,000.00
4.000 kg kawat beton Rp 13,680.00 Rp 54,720.00 Rp 54,720.00
323.000 kg semen pc Rp 1,10448 Rp 356,747.04 Rp 356,747.04
0.520 mᶾ pasir beton Rp 97,200.00 Rp 50,544.00 Rp 50,544.00
0.780 mᶾ steinslag pecah mesin 2/3 Rp 194,400.00 Rp 194,400.00 Rp 194,400.00
upah
0.250 oh mandor Rp 80,000.00 Rp 20,000.00 Rp 20,000.00
0.570 oh kepala tukang batu Rp 75,000.00 Rp 42,750.00 Rp 42,750.00
0.350 oh tukang batu Rp 70,000.00 Rp 39,600.00 Rp 39,600.00
3.300 oh tukang kayu Rp 70,000.00 Rp 231,000.00 Rp 231,000.00
2.100 oh tukang besi Rp 70,000.00 Rp 147,000.00 Rp 147,000.00
7.300 oh pekerja Rp 55,000.00 Rp 401,500.00 Rp 401,500.00
SUB JUMLAH Rp 6,350,741.00
A.312 1 mᶾ KOLOM BETON BERTULANG (200 kg besi + bekisting)
bahan
0.320 mᶾ papan maranti (2 x 20)cm Rp 2,952,000.00 Rp 944,000.00 Rp 944,000.00
3.200 kg paku segala ukuran Rp 11,520.00 Rp 36,864.00 Rp 36,864.00
1.600 ltr minyak bekisting Rp 3,600.00 Rp 5,760.00 Rp 5,760.00
0.140 mᶾ balok meranti Rp 2,808,000.00 Rp 393,120.00 Rp 393,120.00
2.800 lbr multiplex t = 9mm Rp 151,200.00 Rp 423,360.00 Rp 423,360.00
16.000 btg dolken Ø 8-10/4m Rp 28,800.00 Rp 460,800.00 Rp 460,800.00
200.000 kg besi beton Rp 13,680.00 Rp 2,736,000.00 Rp 2,736,000.00
3.000 kg kawat beton Rp 13,680.00 Rp 41,040.00 Rp 41,040.00
323.000 kg semen pc Rp 1,10448 Rp 356,59248 Rp 356,59248
0.520 mᶾ pasir beton Rp 97,200.00 Rp 50,544.00 Rp 50,544.00
0.780 mᶾ steinslag pecah mesin 2/3 Rp 194,400.00 Rp 151,632.00 Rp 151,632.00
upah
0.208 oh mandor Rp 80,000.00 Rp 16,640.00 Rp 16,640.00
0.455 oh kepala tukang batu Rp 75,000.00 Rp 34,125.00 Rp 34,125.00
0.350 oh tukang batu Rp 70,000.00 Rp 24,500.00 Rp 24,500.00
2.800 oh tukang kayu Rp 70,000.00 Rp 196,000.00 Rp 196,000.00
1.400 oh tukang besi Rp 70,000.00 Rp 98,000.00 Rp 98,000.00
5.960 oh pekerja Rp 55,000.00 Rp 327,800.00 Rp 327,800.00
SUB JUMLAH Rp 6,296,777.00
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UJI KOMPETENSI KEJURUAN
TAHUN PELAJARAN 2017/2018
LEMBAR JAWABAN
SATUAN PENDIDIKAN : Sekolah Menengah Kejuruan
PROGRAM KEAHLIAN : Teknik Gambar Bangunan
KODE : 1983
JUDUL TUGAS : Merencanakan RAB

REKAPITULASI ANGGARAN BIAYA

HARGA SATUAN
NO JENIS PEKERJAAN SAT VOLUME
(Rp)
a b c d e
AAN

JUMLAH HARGA (Rp) %BOBOT


f g