1.AKAR IMPEX PVT LTD - Civil BOQ - THDC-WTP QTY-CS - (NEW QUANTITY)
1.AKAR IMPEX PVT LTD - Civil BOQ - THDC-WTP QTY-CS - (NEW QUANTITY)
I pile works
Providing RC bored cast in situ piles and R.C. pile caps as per design carried out
Pile 600mm DIA and depth of termination approximately 26m deep Grade of
1 concrete M25 for piles, initial pile load tests,routine load test of piles, High Strain Nos 0 -
Dynamic Load Test, Pile Integrity Tests and methodology for installation of working
piles(including boring,concreting,steel and pile cutoff,testing of piles)
II Excavation Works -
Earth work excavation in all kinds of soil, soft rock and disposal of surplus
excavated material to a distance of 4Km as showned by Engineer and lift including
dressing the all sides and bottom, levelling, bailing out of water if required,
2 shoring/Sheet piling if required, strutting, barricading, embankement, danger -
lighting and spreading/levelling of disposal materials etc., complete as per the
specification and Engineer instructions for the following depths from the ground
level.
2A 0 to 1.5m Cum 25956 218.3 5,666,195
2B 1.5m to 3.0m Cum 7139 241.9 1,726,924
2C 3.0m to 4.5m Cum 645 265.5 171,248
III Filling Works 0.0 -
Refilling(Backfilling) the excavated good soil from where it dumped in all the
footings and foundations laying in the layers of 15cm in thick to atleast 90% of its
3A Cum 23615 330.4 7,802,396
maximum dry density, inclusive of all leads and lifts, ramming, well compaction and
consolidation charges.
Supply and filling of Stone with morrum in trenches, sides and bottom of
foundations and basement with all transporting leads and lifts, loading and
unloading, spreading in layers not exceeding 15 cm thick to atleast 90% of its
3B Cum 2978 566.4 1,686,456
maximum dry density, consolidating each deposited layer by watering and
compaction by manuual and Machine etc., complete as per the specification and
Engineer instructions.
Supply and filling of Sand in trenches, sides and bottom of foundations and
basement with all trasporting leads and lifts, loading and unloading, spreading in
layers not exceeding 15 cm thick, to atleast 90% of its maximum dry density,
3C Cum 32 2950 94,990
consolidating each deposited layer by watering and compaction by manuual and
Machine etc., complete as per the specification and Engineer instructions.
IV Concrete Works -
Providing and laying of Cement concrete M7.5 Grade using 20 mm and down size
jelly and well compacted including machine mixing, admixtures if required, curing
4A Cum 2219 4366 9,688,154
etc. complete as per specifications and Engineer instructions.
Plastering with Ceiling 6 mm thick 1:4 Cement mortar including cost of all
8C materials, labour charges, hacking and preparation of surface, curing, Scaffoldings, sqm 2707 684.4 1,852,671
etc., complete as per specifications and Engineer instructions.
IX Painting Works 0.0 -
Acrylic smooth exterior paint with silicon additives over sutiable primer of Cement
based water proof paint of approve brand, given shade and manfacture in two
9A coats applying over a one coat of suitable primer including cost of all materials, Sqm 19109 324.5 6,200,871
labour charges, Preparing the base surface, applied by roller, Scaffoldings etc.,
complete and as directed by Engineers instructions
Epoxy phenolic coating shall be applied on internal surfaces of the RCC water
retaining
9B structures with two component transparent polyamide cured epoxy sealer coating Sqm 11925 885 10,553,625
of minimum 50 micron DFT.Sealer coat shall be followed with the application of
epoxy phenolic coating of minimum 400 micron DFT. including cost of all materials,
labour charges, Preparing the base surface, applied by roller, Scaffoldings etc.,
interior
completePainting Works-two
and as directed coat of Acrylic
by Engineers emulision paint over the base coat
instructions
9C primer including cost of all materials, labour charges, Preparing the base surface, sqm 3963 413 1,636,719
applied by roller, Scaffoldings etc., complete and as directed by Engineers
instructions
Celing Painting Works-two coat of Acrylic distamper over the base coat primer
9C including cost of all materials, labour charges, Preparing the base surface, applied sqm 1593 295 469,935
by roller, Scaffoldings etc., complete and as directed by Engineers instructions
x Structural steel -
Supply,delivery, trasporatation, fabrication and erection of all kinds structural
steel (grade designation E250)painting for the steel surface to be applied with
painting shall be thoroughly cleaned before applying painting by brushing, shot
blasting, etc.including Priming coatOne (1) Coat of red oxide primer of thickness 30
to 35 microns followed up with two (2) coats synthetic enamel paint, with 25
10 microns as thickness of each coat shall be applied,includes all materials, labour cost, KG 35288 212.4 7,495,256
at all the levels, welding, complete as per manufactures instructions and complete in
all respect as per drawings and specifications and Engineer instructions(SAIL, JSW
Steel Ltd, Jindal Steel & Power, Tata steel Ltd.) Painting Spec as per clause no-
7.04.00 or else followed spec clause no-7.03.00(external surface)
All buildings shall be provided with minimum 750 mm wide plinth protection all
around. The plinth protection shall consist 100mm average thick PCC (M-15)
11B Sqm 1024 649 664,576
including cost of all materials, labour charges, etc.complete as per the
specifications.
Supply and fixing of Doors shall have aluminium Glazed door with glazing. The
aluminium section shall have minimum 2 mm thickness. The aluminium frame shall be
11C electro colour dyed (anodised with 15 micron coating thickness). glazing minimum 6 sqm 155 4130 640,877
mm thick toughened glass conforming to IS: 5437. door closer,fittings including
cost of all materials, labour charges, etc.
Supply and fixing of windows and ventilators shall have aluminium Glazed door with
glazing. The aluminium section shall have minimum 2 mm thickness. The aluminium
11D frame shall be electro colour dyed (anodised with 15 micron coating thickness). sqm 305 3304 1,006,161
glazing minimum 6 mm thick toughened glass conforming to IS: 5437. door
closer,fittings including cost of all materials, labour charges, etc.
All doors of toilet areas shall be of steel framed solid core flush shutter.including
11E sqm 14 3894 53,893
cost of all materials, labour charges, etc.
11F Supply and fixing of MS Rolling shutter shall conform to IS: 6248. sqm 247 3304 816,696
XII Flooring 0 -
Supply and providing for 50mm thk Cement concrete with Metallic hardener
flooring The floor shall be laid on an already laid and matured concrete base. The
underbed for floors and similar horizontal surfaces shall consist of cement
concrete M20 grade. Stone chips shall be 12.5 mm down well graded & proper filling
shall be done with brick bats/cinders. Flooring like Tiles/ Stones shall be laid with
12A sqm 1823 2714 4,948,898
1:4 cement sand mortar and Tile/ Stone Cladding on wall shall be laid with 1:3
cement sand mortar.Metallic hardener topping -with ordinary grey cement shall be-
12 mm thick (insitu) or finishing the concrete / mortar surfaces topping shall be
furnished with neat cement slurry (with ordinary grey cement) including base
coarse materials cost of all materials, labour charges etc.
Supply and fixing of Mirror polished Digitally glazed vitrified & Matt Finish
Digitally glazed Vitrified ceramic tiles (minimum 9.0mm thick) with 3mm groove
joints as per approved pattern pointed neatly with 3x4mm stainless epoxy grout
mix of 0.70kg of organic coated filter of desired shade (0.10kg of hardener and
12B 0.20kg of resin per kg) with sizes of the tiles shall be as under: a) Size of tile 250 2124 531,000
600x600/605x605 of Premium Series Kajaria/ Royale Series Somany/ OMA00025
Series Johnson or equivalent (or) b) Size of tile 800x800 of Polished and Lapatto
Series Kajaria/Diamond Series Somany/ Polished and Lapatto Series Johnson or
equivalent
Supply and including base
fixing Roof coarse
water materials
proofing roofcost of proofing
water all materials, labourusing
treatment charges
highetc.
solid content liquid applied elastomeric water proofing membrane with separate
wearing course as per ASTM - C-836 & 898. Thickness of the membrane shall be
1.5mm (min.). This treatment shall include application of polymerised mastic over
the roof to achieve smooth surface and primer coat.Wearing course on the top of
membrane shall consist of 25mm thick PCC (1:2:4) cast in panels of maximum 1.2 x
12C sqm 2473 2714 6,711,114
1.2m size and reinforced with 0.56mm dia galvanised chicken wire mesh and sealing
of joints using sealing compound/elastomeric water proofing membrane.
However, chequered concrete tile flooring 22 mm (min.) thick of approved colour
and shade
conforming to IS: 13801,including materials cost of all materials, labour charges
etc.
DPC 50 mm thick DPC in Cement concrete (1:1.5:3) with water proofing compound
12D followed by two layers of bitumen coating 85/25 grade as per IS: 702 @ 1.7 sqm 183 1416 259,128
kg./sq.m. shall be provided at plinth level before starting the masonry work.
Supply & providing of screed or concrete screed concrete 1:2:4 (using 12.5 mm
13F coarse aggregate) and/or cement mortar (1:4). However, minimum 25 mm thick Sqm 5809 377.6 2,193,352
cement mortar (1:4) shall be provided on top to achieve smooth surface. incliding
materials and labour etc.
Supply and fixing of false ceiling of 15 mm thick mineral fibre board, in tile form of
size 600mm x 600mm, along with galvanised light gauge rolled form supporting
system in double web construction prepainted with steel capping, of approved shade
13G and colour, to give grid of maximum size of 1200x600. as per manufacturers details Sqm 76 2124 161,466
including supporting grid system, expansion fasteners for suspension arrangement
from RCC, providing openings for AC ducts, return air grills, light fixtures, etc., all
complete.
13H GI Ladder 500mm width nos 5 -
10I HUME PIPE-600mm dia (as per IS-458) rm 45 3894 175,230
10 J HYDRO TESTING lit 4727835 0 -
Supply and fixing of 12mm thk acid resistant tile on horizontal and vertical
surfaces, at all levels for all type of works shall include one coat of bitumen primer
followed by 12 mm thick bituminastic layer, 6 mmthick under-bed by potassium
10K sqm 1618 3186 5,154,948
silicate mortar conforming to IS:4832 (Part-I), pointing of joints of tiles with
acid/alkali resistant epoxy/furane mortar conforming to IS:4832 (Part-I), up to a
depth of 20 mm and bituminastic end sealing inculding cost of all materials, labour
charges, etc.
Providing and fixing in position of UPVC rain water pipes for with suitable
bellmouth and grating at top shall be provided for a minimum dia of 110mm dia,
including The pipes shall be provided complete with necessary clamps, connections,
10L Rm 536 2124 1,138,464
bends, Tees, other accessories 10mm gap for thermal expansion, including required
special, MS / GI clamps, etc complete, all as directed .
Anti - termite treatment shall be done with insecticide emulsion at the rate of 5
11 SQM 2207 330.4 729,193
liters/m2 as per IS: 6313 (Part – II) 1981 for all structures.
Grating covers shall be electroforged types. Minimum thickness of the grating shall
be 40 mm for indoor installation and 32 mm for outdoor installation. The opening
size shall not be more than 30mmx100mm. The minimum thickness of the main
12 bearing bar shall be 5 mm or as per design requirement whichever is higher. All SQM 85 3,304 280,840
gratings shall be hot dip galvanised at the rate of 610 g. per sq.m. after surface
preparation by means of shot blasting or cleaned by acid pickling. incliding materials
and labour etc.
Supply,fabrication and fixing of foundation bolts shall conform to IS 5624. Mild
steel bars used for the fabrication of bolt assembly shall conform to grade 1of IS
13 Kg 500 212.4 106,200
432 and/ or grade A of IS 2062. Hexagonal nuts and lock nuts shall conform to IS:
1363 & IS 1364 up to M36 diameter. complete as per the specification and
Engineer instructions
Anti-corrosive layer shall consist of screened coarse sand, mixed with 80/100
bitumen or equivalent 8% to 10% by volume. Bitumen shall be heated to a
temperature 1750 C to 1900 C, with 3% kerosene, if required. Sand shall be
thoroughly mixed with it in a mixing drum to obtain uniform mixture and shall be
14 laid over the compacted surface, laid in line, grade and levelled, Bitumen shall not sqm 1450 -
be heated beyond the temperature limits given above.The premix carpet shall be
laid in two layers of 3 cm and 2 cm respectively. After compacting and laying the
first layer of 3cm, a tack coat of hot bitumen at the rate of 1 Kg. per Sq.m.shall be
uniformly applied to the surface, by means of Sprayer and the Second layer of 2cm
thick shall be laid, tamped and compacted to the satisfaction of the Engineer. Sand
shall be spread on the final surface at the rate of 0.5 Cu. m per 100Sq.m.
The concrete pavement for roads shall be minimum 250 mm thick slab.The road
construction including its shoulders, base, sub base and concrete pavement shall be
as per IRC standards. IRC 58 shall be followed for the pavement design and
MORTH specification (latest) shall be followed for the construction of the
concrete pavement road.The mix design for concrete compacted by screeds, needle
vibrator and hand tampers shall be carried out as per IRC 44.
15 SQm 2250 4,130 9,292,500
The road base shall be with minimum 150 mm thick over granular sub base. Concrete
shall be laid by a mechanical paver or semi-mechanized construction technique as
per IRC 15 may be adopted for concrete laying and road construction. Concrete
pavement slab shall be minimum M35 grade concrete pavement shall be provided
with 125 micron polythene sheet below it concrete pavement shall also be provided
with contraction and expansion joint with MS dowel bars as per Ministry of Road
Transport and Highways specification.
Total 445,270,395
BOQ WORKSHEET
JOB No. SHEET
PROJECT #REF!
DATE
Doc. No.6 TENDER PURPOSE
A 07.08.15
CALCULATED CHECKED
PARTICULARS #REF! #REF!
MB MKV
Dimensions Numbers Total 1
Sl. No. Description of Work Height / Contents or
No Length Breadth area
Depth
I Excavation
Total 1006.7 m3
II Back filling
IV PCC M 10
V RCC (M30)
Staircase 1 5.00
Pump P1 0.00
VII Shuttering
0.0 0.0 m3
VIII Plastering
Walkways
Staircase 0
360.6 360.6 m2
IX Painting
0.0
Ventilators
Rolling shutter 0
RS1 0 0 0 m2
Bitumen coating external surface of under 0 0.00 0.00 0.0 0.00 Sqm
I Excavation
Total 163.2 m3
II Back filling
Total 7 7 m3
IV PCC M 10
V RCC (M30)
Staircase 1 4.00
Pump P1 0.00
VII Shuttering
0.0 0.0 m3
VIII Plastering
IX Painting
Ventilators
Rolling shutter 0
RS1 0 0 0 m2
Bitumen coating external surface of under 0 0.00 0.00 0.0 0.00 Sqm
I Excavation
Total 77.0 m3
II Back filling
IV PCC M 10
V RCC (M30)
Ramp 0 0.00
Pump P1 0.00
VII Shuttering
0.0 0.0 m3
VIII Plastering
70.2 70 m2
IX Painting
0.0 70.2 m2
Ventilators
Rolling shutter 0
RS1 0 0 0 m2
Bitumen coating external surface of under 0 0.00 0.00 0.0 0.00 Sqm
I Excavation
Total 61.2 m3
II Back filling
IV PCC M 10
V RCC (M30)
Ramp 0 0.00
Pump P1 0.00
VII Shuttering
0.0 0.0 m3
VIII Plastering
56.5 57 m2
IX Painting
0.0 56.5 m2
Ventilators
Rolling shutter 0
RS1 0 0 0 m2
Bitumen coating external surface of under 0 0.00 0.00 0.0 0.00 Sqm