AGENDA

A. GENERAL

1 Mobilization of Supervision Engineers for respective packages


Mobilization of 30 engineers for TG, Refractory, Insulation,
2 Electrical and C&I
3 Discussion on Piping BOQ Procurement
4 Discussion on Insulation Quantity and Turbine Jacket
5 HVAC Procurement?
6

B. TURBINE

Final P&ID's for Turbine and Final BOQ prepared accordingly,


1 since material at site is not matching list from Barbil
TG Instruments programming in PLC according to which P&ID,
2 Philosophy and BOQ
3 Instrument Hookup drawings for TG Instruments BOQ
4 Instrumentation Spares list and BOQ?
5 Discussion on Piping Dismantled from Barbil
Non-availability of packing list for instruments received from
6 Hyderabad for TG giveb to 3rd Party
7 EOT Crane Refurbishment and Test Reports?
8 TG Area instrument air piping from Air Compresser details
9 TG Warm up line silencers procurement?
10 Steam Blowing Pipe drawings and details
11 Steam Blowing Target Plate Arrangement and Routing

C. Material Handling
1 LHS Confirmed Civil Drawing release status?
2 Complete BOQ not provided
3 Instrument GA Drawings not provided

D. WTP
1 Location of Raw Water Pump and Fire Water Pump

2 Erection
Intermittent tank details
Drawings for RawGA
and detailed Water Pump to counter
of equipment NPSH
missing with
3 internals
4 Details of Chemicals Required for plant operation?
E. Electrical
1 Earthing Calculations
2 Instrument and Signal Cables Schedule
3 Cable Trays Support Mild Steel BOQ Required
Checkered Plates Status for MCC & Control Room, Rubber Plate
4 etc
5 Dispatch details and BOQ for all panels
6 Power Plant Illumination