Routine Lifting Plan - HEIN
Routine Lifting Plan - HEIN
Section 1 : General
Date Submited
Sub-Contractor
Project Description of Lod to be Lifted
Leg Angle 90° 80° 70° 65° 60° 55° 50° 45° 40°
Load Factor 1 1.015 1.064 1.103 1.154 1.22 1.305 1.414 1.555
※ Sling SWL = Each Sling SWL ( )tons X ( ) ea = ( )tons
※ Sling : Size …..........mm X ( )m ※ Shackle : Size ( )Inch / ( )ton
Subcontractor HEIN
Prepared by Approved By Acknowledge By Checked By
Lifting Supervisor Contruction Manager Department MGR or ENG HSE Dept
12 Capacities of sling & shackles have been checked for the load ?
Is the load less than 85 % of working load limit chart at working radius ?
13
(If the load is over 85 % of SWL, Develop the special Lifting plan)