Download as pdf
Download as pdf
You are on page 1of 29
arene |petam ti] PNASCON ENGINEERING. DAMAC CRESCENT PROPERTIES DAMAC Hills Bel Air 25 Villas - DB54 MEP CLEARANCE REQUEST No.001 Rev. No00 | Request Date-0610772022 Time 10.00 AMM inspection Date:07/07/2022 __Time:10.00 AM Location of Work: Group: V-23 Villas-6Nos ‘Drawing [Specification rafi_| As per attached locations The Following Works Require MEP Clearanc MEP Clearance prior to start Tie Beam casting in Villa Type V-23 Villa Number — F804B,F805B,F806B,F807B,F808B,F809B IR number- Mechanical -01,02,03 IR number- Electrical -01,02,03,04,05,06,07,08,09,010 CA checkist C1 drawing & Specitcaton Cl Related inspection Requests CJ others Confirmation of Coorsinaion & Compliance with Specifeation, Aporoved drawings, Method Statement & Project Quality Pian TI Yes] No] fn, any devaton from specication, approved drawings, method salement projec aqualiy plan tobe recorded Signature of Main contractor's GA/QC in charge Date For Main Contractor: (PM) Name: Engr Wael Ahmed Shat Signature Date inspection Status B= WoR C- Repeted, Re] Dete Received peceed Sent mepadion request B - Work may proceed | | D - Inapection not subject tocomplance required cea | teen | attached! Important: Permission to proceed does not constitute acceptance or approval of work under inapadiion dos not telieve the contractor from full compliance with contractual requirements, Consultant Signature: Z Date: ‘Consultant comments complied: For Sub-Contractor. For Main Contractor: Name: Name: Signature: Signature: Date: Date: ‘Consultant verification of compliance of comments: Name: Signature: Date: ENGINEERING. DAMAC CRESCENT PROPERTIES MEP Clearance Request No.009 Revision No.00 | Date:05-07-2022 To be Completed By S.No. Comments | complied by = Remarks (dateltime) | Name | Signature | Date Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature: manne WMS ENASCON ‘Anf&Bintoak — DAMAC CRESCENT PROPERTIES Form No. SPWVPANIR/O03/00 DAMAC Hils Bel Air 25 Villas ~ DBS4 V-23 Type -Villa F809B,F&08B a afer ache caters Deiat _tpecin reqs ht ROTO es SU Ta We a for group V23 -FE0SE, F8086 2s per the highlighted! drawing. (Grid 1 to 3 & Grid Ato H)- Trump Bel Air-25Villa Ly Yes [Ep No | Wr, any dean Vom specicaton. approved range, Metod TASTER PORT ‘ual plan tobe recorded Sarat o oe Forse Name: Vind Syratre ne oa EBS WMS cf - sae ‘Signature of Main contractors QAIOC i charge Date _ Foran Cowacton PM) Nave Mebane AL EMARATE Deer oo DB-54 Resident eae Inspection Status er ce taped Date Receige 2 - pod som nepecion n | wrt fe Vay, | Wornay meee | [5 Trepecion rat e 2 fercatacs | soe ewei ween | Starnes ‘Tnparant-Perraain to proased does nol carstlue accenance & approval ol waTh ander Bapecion Goes Fah felleve ine eartracio tor ful eomplsnce with contac! requirements. | GEbIa phe content Se For Sub-Conracor For Name: Name wy Sinature Signatje 26 Date Date Resi jnger verfcaion of com: same aa ae Se Se ee Name Signature: ms Page tal DAMAC _ [iihipyetalt JASCO intozk DAMA CRESCENT PROPERTIES ieee pa ANAS call Form No.: SPM/PA/IR/003/00 Consultant Comments & Status of Compliance Contractor's Inspection Request No. ] See Revision No. 00 | Date: 21/06/2022 Completed By Remarks Name | Signature | Date > Inspection is for sleeves an underground drain pipe Installation highlighted area only for clearance to proceed concrete works. > Ensure all sleeves to be compatible with drainage pipe slope/invert level during construction works > Contractor shall be ensure all sleeves Location as per approved drawing and avoid Unnecessary displacement the sleeve during shuttering work. ne pele ae ul Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature’ Page 2of2 DAMAC _Dilih a YASCON OTE a aT! A sh ‘nf&Bintoak ~— DAMAC CRESCENT PROPERTIES. Form No.: SPMIPANRIOD3I00 DAMAC Hills Bel Air 25 Vilas ~ 0854 [REET Be ISR Tne TOTO AT] rapecion Do 26082922 Te DODANE ‘Details of Works: inspection request for installation of mechanical sleeves in Ground floor te beam for group V-23 -F607B, F8088 as per the highlighted drawing. (Grid 1 t0 3 & Grid A to H)- Trump Bel Ai-28Villa Wcheckist HM Drawng& Specicalon CIMEP Clearance []Ratted nspecion Requests saity Pian Ti Ye E] NO | fro. any covaion fom specication, approved ravings, RoWad Walorent§ WORE ‘ualy plan te corded ‘Signature of Sub contractars QAGCin charge. Date For Sub Contactor: PM) Name: Vinod EM Signature i Bae FES yy Slonature of Man eanvators QAOC in charges ZL ate - For Main Contractor: (PM) — SS " ‘Name: Mohammad Nata) = <= Signet SS: Date SS Reader Ergree inspection Status A WaRRG T= Rec Date Rece towed ‘eon nepaion es} 5 — et ENT Tay Bae | — [0 rapa rat aa Scones Gail Tnparant: Person proceed doos coats waxepanceo aDprovl ol wok ORT ‘tev he conrastr Fo compliance mi coun anquremente es aPaan eee NS fyeke= aes ve8 Cee gnecnt oF ‘escort Engineer Sanat = Not approval gn ‘Resident Enainger comments complied: Siiisdaecon ForsuContacor Fepbinis Contactor A ane: ane 27 JUN 2022 Snare: Signature: ate (te ee Ege ianee ED PST By sins sh SN roe] Sol Spell cele Ail ye 9) Nome: Slonature: ie Paget? DAMAC Arif@Bintoak — DAMAC CRESCENT PROPERTIES HNASCON Form No.: SPM/PANIRI003/00 Consultant Comments & Status of Compliance Contractor's Inspection Request No. IRIDBS4/MECHIO002 Revision No. 00 | Date: 27/06/2022 To be Completed By Si Conenante ‘complied Remarks. No. by Name | Signature | Date (dateltime) | Sleeves in Tie beam for Underground pipes: > Inspection is for sleeves an underground drain pipe Installation highlighted area only for clearance to proceed conerete works. > Ensure all sleeves to be compatible with drainage pipe slope/invert level during construction works > Contractor shall be ensure all sleeves Location as per approved drawing and avoid unnecessary displacement the sleeve during shuttering work. Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature: Page 20f2 LB pantec thingies ANASCON ‘etdee ~DAMAC CRESCENT PROPERTIES LLC Form No.: SPMPANFIOO3O0 DAMAC Hills BEL AIR 25 Villas (D354) ‘CONTRACTOR INSPECTION REQUEST No Rev. NO” | Rsquost Oats AS2022 Toe ODOT FRIDBSUELENOT TTSpesion Da TOSEIEE Tine OFAN ‘Deas of inspection: Thenmocs| Previn tr Cecil Cnduts | Ta no = Aiattre Leeson of Work ‘Drawing Specification rot] As pe altached oesions Details of Works: Inspection request for installation of thermocol provision for Electrical Conduits, Avila, Prototypes (V23-T) Villa No. (FBO9Q). BEL AIR CLUSTER 2s highlighted in attached drawings. es! “Asche BH Checklist [Bj Drewing & Specification [] MEP Clearance["}Related Inspection Requests [] ‘Confirmation of Convector GAIGE Inspection: | Gomtrmation of Coordination & Comptanes wih Speciation, Approved drawings, Method Satement & ProjscT Saya BIS (Ria aya an Sa ep aN HERI RIOT HO alate ened SR TF Scars NOTH a For MEP Canvas Nosy For in Contacto (Pl) Name: Vinod EM Name: = one Ate. bee Resamrengoe ; Tapa Sa (away © — Rejected, Re ay 4 proceed ‘submit nspection = “ Ser] 7] Oe \Glaefave Ee sina —- {important Permission t proceed does not const aczeplance of approval of work undeT SpoCiOn Goes Rot rebeve the contractor from full compliance with contractual requrements, Resident Ergncer Signature: Dit am unger comments complied: vad for review only Seneca farm dea 9.025, Co Sao —_ See cantant ie Date: F 3 i a i m ication fiance of = Tite Name: Page sot? AB _panenc wi 4 NASCON ‘Aui@8isiosk — DAMAC CRESCENT PROPERTIES wcities Form No.: SPHIPAMRU0GS/00 seated Works ner LOA 2th W/o eo reece decmec approve by the Engineer Aad The Conoco cen proceed ‘tht lone wor. Consultant Comments & Staius of Compliance Contractor's Inspection Request No. prbpewetenen. Revision Ko. 0 | Date: 17/06/2022 Toke Completed By Wc.| Comment | SR Tame | sgn || OM=MS (dateltime) ‘Tie beam Electrieal installations > Contractor to ensure that the conduits/slecves, thermocol provisions are not damaged during casting. > Coordinate with all other services. > Contract specification and comments on the approved shop drawing to be followed, > Contractor is fully responsible for any missing as per project requirement and damages in future. > Subject to Dewa,Btisalat/Du approval > Subject to satisfactory testing and commissioning. ¥ appornd drwing & be afinetal abmpwidy he MR —teb, — Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature: Page 202 PARA il ; COP uaF EOE ca MM ANASCON DAMAC Hills BEL AIR 25 Vilas (D854) ‘CONTRACTOR INSPECTION REQUEST Wo. Rev. Na 0 | guns Data 1702022 Te OOOANT RIDBSA/ELEIO02 spacion Date TOOSAOZ? Tene ODA ‘Detals of nepecion’ Elecircal Tor Power, Telephone ard Fre Am Location of Work ‘Drawing /Speciicaion ret | AS per attached ications Details of Works: Inspection request for installation of underground electrical pipes for Power, Teephione ae Fie sare seston, ESE NEST oT ESO highlighted in attached drawings. “Rtzchmeris WW Checkist lj Drawing & Specification [JMEP Clearance [Related Inspection Requests [] Confirmation ef Conraciors GAC Inspection Gontrmation of Coordination & Compliance with Speafcaion, Approved drawings, Method Statement & POR Quality Pan Tl Yes [J 8 | Iino, any devon fom epecticaion, approved drawngs, mefod Salamon & oie ‘uatiy plan tobe recorded. ‘Sighatae of MEP convadiors ONO H Grange For MEP Contractor (Nascon} Name: VinedEM 5 Sgratue Ai Resiionl Engineer Date Re ) simar RAE A Sonatue, Z connate Trpariank: Permission proseed does nal consti accaplance or approval of work under Fapeclon Goes Tar "aleve the contractor rom ful compliance with eertractal requirements, Resident Enginger Name: Page tof? Tsay |romee ‘em poco eT sl Ae reqs i j Ee 3 wey [B= speatan rar] |" Yet. Ecmptoce a faa hr ae DAMAC a T, ‘ AB, Barcc wie? 4 Nascon sce Werks ner 1082 2th oF ceor jection’ ore deemed epproved bythe Engines. And The Contractor con proceed ‘she lone work Consultant Comments & Status of Compliance Contractor's inspection Request No. ce Revision No.0 | Date: 17/06/2022 | Tobe Completed By Wo, Coomnentt by | Name | Sionature | Date | S™="** (detettime) Underground - Electrica installations Contractor to ensure that the conduits are not damaged during casting. Proper protection for UPVC underground conduits to be provided. Coordinate with all other services. Itis the contractor responsibilty to provide all electrical containments as per project requirements/authority's regulations, Contractor is fully responsible for any missing conduits and damages in future, Subject to ID drawing approval. Subject to satisfactory testing and commissioning. Subject to Dewa,Etisalat/Du approval BV «A chrweiry hh beat tebut along wifs AvYYY vyvy Main contractor QA/QC: | hereby confirm that the above comments were incorporatedicompleted within the agreed time. Date: Page 20f2 3 pamac pimet KNASCO Anf&Bintoak — DAMAC CRESCENT PROPERTIES Form No.: SPM/PAJIRI003/00, N DAMAC Hills Bel Air 25 Villas ~ DB54 ‘CONTRACTOR INSPECTION REQUEST No, Rev. No.0 | Rove Data 308202 Tere: 10:00 A * umeciuaeey ‘Inspection Date‘01/07/2022 Time 10.00 AM sie ground Noor ie bear V-23 Type -Villa F805B,F804B ‘Drawing /Specification ref_| AS pet attached locations: for group V-23 -F805B, F804B as per the highlighted drawing. (Grid 1 to 3 & Grid Ato H)- Trump Bel Air-25Villa, Wicrockist Ml Drawing & Specfeaton MEP Clearance — [[] Related inspection Requests OD others iplance with Specification, Approved drawings, Method Statement & Project imation of Coordi ‘Details of Works. Inspection request for installation of mechanical sleeves in Ground floor tie beam Quality Pian EL To Yes] No] Wino, any deviation fiom specication, approved drawings, method Statement & project ‘quality plan to be recorded. ‘Signature of Sub contractors QA/QC in charge: Date: For Sub C¢ MNASCON Name: Vinod E. Signature: 73 (Damac Hills - Bet Air < Papiact Code: 1026 dae CB Fave Signe olan contactors NOC wwe Lae For Main Contractor: (PM) TA Name: Mohammad Nafa eles ‘Signature: ~ Bate B-54 Resident EGET inspection Status | waay | oR Re Date Received Le Son Pepotion feavest Ga [ELRrar Reet |B speston nt Signature: oh (tf [222 | steonmenes a | + Important’ Permission to proceed does not constitute acceptance or approval of work under inspection does not i} rebeve the contactor from full compliance with conlactual requirements ga) }e*— % View only Resident Enginer Sana (garacaivos tor ronda 2 | ‘Resident Engineer comments comple: anager For Sub-Contractor FN Ste °" Name: Nano : Signature Signature: 03 JUL 2022 Date. Resident Engineer verification of compliance of comm: i od S sens at Sb Name: Signature Page tof? DAMAC DELTA linda ANASCON ‘ArfBBintoak — DAMAC CRESCENT PROPERTIES —PHIRATES lm wu! Lud! Form No: SPM/PAJIR/003/00 Consultant Comments & Status of Compliance i ‘Contractor's Inspection Request No. eect Revision No. 00 | Date: 30/06/2022 Tobe Completed By st Comments compued Remarks o. by | Name | Signature | Date (dateltime) Sleeves in Tie beam for Underground pipe: > Inspection is for sleeves an underground drain pipe Installation highlighted area only for clearance to proceed conerete works. > Ensure all sleeves to be compatible with drainage pipe slope/invert level during construction works > Contractor shall be ensure all sleeves Location as per approved drawing and avoid unnecessary displacement the sleeve during shuttering work. Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time, Name: Date: Signature: Page 2012 aamac DEAS A8 NASCON 4Jnitsinoek DAMAC CRESCENT PROPERTIES LLC DAMAC Hills BEL AIR 25 Villas (OBS4) Form No. SPM/PAIRIGO300 ‘CONTRACTOR INSPECTION REQUEST Wo, ‘Rev. No.0” | Rest Oats 1OSEE Tine Ca OANT |RIDBSAIELE/003, Trapecion Date OSTAOIE Tira TOOOR Dalal of ispecion Cearal SonarTiemocoa teeaton of Wark ‘Drang ‘Speciation ref] AS pe altachesioaions Details of Works: | Inspection request for installation of electrical sleeves & thermocol provision for electrical services in the tie beam, {Vil BELAIR CLUSTER as highlighted in attached drawings, | acne i Chechist BJ Orawing & Specification []MEP Clearance [Related Inspection Requests. C] ‘Gontamation of Conreeta’ QATOC inspection Conixmation f Coordination & Conliance wit Spaciicaion, Approved Sawing, Mahod Slaterant& PrOSS Quaity ian Yes” [Ne | Who, any dewalan Fam apicaion appraved awe, natiod Waianae ORS | ‘ual plant be corded Sgratire oF MEP contractors ONGC cage Fa can [eon does Name, Vines \ frame: OT oy Sere Date: Ale, 40 Date pm fenatafae : pete ae ee Slare teed Sn ae o a Work may D- Inspection not Derrge ve Eee |e a j= J Teen Sean ted at Sl coene accel Wr pore oT Wada PERCENT A | ~ felge cnaca te a comptance wih contactual quran oe ee | y Resident Engineer Signalure hot approval fg Page tor2 DAMAC pilthimimid A NASCON AfaBintoak ~— DAMAC CRESCENT PROPERTIES "M/#/TEsdl& ~'jLua! Form No.: SPMIPAIR003/00 Executed Works der LOA 2 Lnitoot Rs ejections ae eemed operand by the Engine. And To Cantocor on proteed wn tbe balance mar [ ___ Consultant Comments & Status of Compliance Contractor's Inspection Request No. ] ier deren | Revision No.0 | Date: 19/06/2022 c Tobe Completed By ha Comments sarered Remarks ature | Date Tie beam Electrical installations > Contractor to ensure thatthe conduits/sleeves, thermocol provisions are not | damaged during casting. > Coordinate with all other services > Contract specification and comments on the approved shop drawing to be followed. > Contractor is fully responsible for any missing as per project requirement and damages in future. > Subject to Dewa,Etisalat/Du approval. > Subject to satisfactory testing and commissioning. ¥APTAL chanting bbe affrcres along wiht IK na 10/0 Vte22 Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: ‘Signature’ Page 2012 Danane MM NSCON Ruidzincax DAMAC CRESCENT PROPERTIES LLC = Form No. SPMIPANR/002°00, DAMAC Hills BEL AIR 25 Vilas (D854) [eta etispecion Ee {oc Power, Telephone and Fre Aah ef As pe ataches toatens Details of Works: Inspection request for installation of underground electrical pipes for Power, Telephone and Fire alr systems 1Via, Prototypes (V23-(M] Vila Ho (POH). BELAIR 3s highlighted in attached drawings. Raa BH Checkist gM Orawing & Specification []MEP Clearance [Related Inspection Requests] Gentamaton of Conivede?s QA/OC tspscton= Confirmation f Coordination & Comptance win Specfcaton, Approved crawnge, Method Statement & POSS usity Pian Yes [NS | lire. ny aevation fom specteaion, approwed Grawngs, motied daizment poea ‘ualy plan ibe record ‘Sina WEP coreaCrs ONG Sa Oa Fer MEP Convector Nascon) (PM). Fora Contac (PM) Name: Vieod Em 2 Pn ‘ Sonatee ue = seer ou = \ Resa agree inspection Sais > | Waar Rasa DateRecenet | 5 Fouee [mt oman Wats D papeaion rat re /oé/ara ceed otto regina sonstire | scomcuree Teiporant Parission fo proseed does nol corse acceplancs Or approval of work Undar REpEGIGR GS6s NOP ‘releve the contractor tom fll eomplance wih contaciual equremente be ing sh hl oS Sie Page 1012 DAMAC ‘Anf8Bintoak — DAMAC CRESCENT PROPERTIES ANASCON Form No.: SPM/PA/RI003/00 executed Werks under LOA 2.without sr clear eto ore deemed approved bythe Engine. And The Contato con proceed wth tb bance werk | Consultant Comments & Status of Compliance Contractor's inspection Request No. IRIDBS4/ELE/0008 Revision No.0 | Date: 19/08/2022 | Tobe | Completed st complied sits * Ramee No. by | wame | signature | Date | (dateftime) | “8° | Sisntere | lectrical installations Contractor to ensure that the conduits are not damaged during casting. Proper protection for UPVC underground conduits to be provided. Coordinate with all other services. It is the contractor responsibility to provide all electrical containments as per project requirements/authority’s regulations. | Contractor is fully responsible for any missing conduits and damages in future. | ‘Subject to ID drawing approval. Subject to satisfactory testing and commissioning. ‘Subject to Dewa,Etisalat/Du approval. Dpprre dl abetting the Stathed a ests IR : z vy avVVY Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Date: Page 20t2 DAMAC _ Pilih Arit&Bintoak — DAMAC CRESCENT PROPERTIES SIRES, aie Ferm Nos SPM/PARF/00300 DAMAC Hils BEL AIR 25 Vilas - 0854 ‘CONTRACTOR INSPECTION REQUEST Rav hod | RO DRRUOSR TER TOORT NCIRIDESHELEGIOOS, ‘nspection Date 261062022 Time9 00 AN FOCOL PROVISION FOR ELECTRICAL CONDUNTS INTHE GROUND FLOOR TIE 7 "BEL AIR CLUSTER Contiration of rec Locaton of Work Drawing /Speciicaion ref | As per atached locations Details of Works: \nspgction request fr instalation of Thermocol Provision of Electrical Conduit, 4 Vita Prototype (V-23T) Vila no- F807. BEL AIR Cluster as Hghightod on Atached Drawings. Confirmation of Coordination & Comptiance wit Speciation, Approved Grav Pan ings, Method Statement & Project Quatiy TE ¥es [J No _| ino, any devaton em specticaton, approved drawings, method tatemant& proweek ‘quality plan tobe recocded, Signature of Sub contractors QAOC in charge For Sub Contactor. (PM) Name: Vinod Ea sxe Agu. Signature of Main contractor's QNQC in For Main Contractor: (PM) Name: Mohammad Nata stoches {imporant: Permissicn to proceed does nol consitule accepiance oF approval of werk under wspecion does ‘lieve te contractor from fll compliance with contractual requirements ‘iad Wars under (0A Zbl Wi Gear tons oe CRT ‘toe bolone wert, Poge tof AB arc withacih 4 NASCON ‘Anf@Bintoak ~— DAMAC CRESCENT PROPERTIES ee ‘xccuted Wars under LOA 2.thoot Rs clear election are deemed approved the Engine And The Contactar con proceed Wi te balnce works. Consultant Comments & Status of Compliance Contractor's Inspection Request No. npecsec cto Revision No.0 | Date: 24/06/2022 Toi i Completed By Comments antes Remarks by, | Name | Signature | Date (date/time) ‘Tie beam Electrical installations Contractor to ensure that the conduits/sleeves, thermocol provisions are not damaged during casting. Coordinate with all other services. Contract specification and comments on the approved shop drawing to be followed. Contractor is fully responsible for any missing as per project requirement and uh’ Subject to Dewa,Etisalat/Du approval Subject to satisfactory testing and commissioning. Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. v vy vyv Name: Date: Page 2012 DAMAC ‘Arf&Binioak — DAMAC CRESCENT PROPERTIES Form No.: SPMIPAMR003/00 DAMAC Hills BEL AIR 25 Villas ~ DBS4 DETAR? WN, ASCO ENGNEEY NS N ‘CONTRACTOR INSPECTION REQUEST Inspection request for installaton of Underground Electrical Pipes for Power, Telephone & Fre Alarm System. 1 Villa Prototype (V-23T) Vila no-F&D7B. BEL AIK Clustor as Highlighted on Atached Drawings, {quality plan to be recorded, DCheckist HH Grewing & Specification CI MEP Clearance [Related Inspection Requests D others Quality Pian [7s [Ne _| Hino, any deviation from specification, approved drawings, method statement & project Signature of Sub contractor's QA/QC in charge For Sub Contractor: (PI) Name: Vinod EM ‘Signature: a al. Date: ‘Signature of Main contractor's For Main Contractor: PM), ‘Name: Mohammad Nata ‘Signature: sre = ee iia ko = i catenin, , | [Skee %é/e bo aquest SUN 202 B Work may proceed D - inspection not SEES | as ise Tmportant: Permission to proceed does nol constitute acceptance or approval relieve the contractor from full compliance with contractual requirements, work under inspection does nat Page ot2 Ait 8Bintoak panne pM 4 NASCON Form No.: SPM/PA/R/O03/00. ‘Executed Works under LOA 2 without IR/s ocleor ejections are deemed approved bythe Engineer. And The Contractor can proceed ‘with ee bolonce works. Consultant Comments & Status of Compliance Contractor's Inspection Request No. RIDBS4/ELE/008 Revision No.0 | Date: 24/06/2022 To be Completed By s: ‘Comments complied Remarks No. by Name | Signature | Date {dateitime) vvvy vvvy Underground - Electrical installations Contractor to ensure that the conduits are not damaged during casting. Proper protection for UPVC underground conduits to be provided, Coordinate with all other services. It is the contractor responsibility to provide all electrical containments as per project requirements/authority’s regulations. Contractor is fully responsible for any missing conduits and damages in future. Subject to ID drawing approval. Subject to satisfactory testing and commissioning, Subject to Dewa,Btisalat/Du approval. Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature: Page 2012 eta: MUMS RNASCON ‘Asit&Bintoak — DAMAC CRESCENT PROPERTIES. Form No.: SPM/PANR/003/00 DAMAC Hills BEL AIR 25 Villas ~ D854 Inspection request fr instalation of Thermocol Provision of Electrical Condutts, 1 Vila Prototype (V-23T) Vila no- F068. BEL AIR Cluster as Highighted on Attached Drawings. TiCheckist Brawing & Speciicaton CIMEP Clearance — [] Related Ispecton Requests D otters Quality Pan [Ves] No ino, any deviation om specToatn, approved drawings, method Salamon & papa ‘tually plan tobe recorses ‘Signature of Sub contractor's QA/QC in charge: Date: =), | i NASCON | Mt 1 Neweine, ve ine | Dare | hs eg Bt UA - = Sion of an conractrs QNOCln cheng For Main Contractor: (PM). f qa Name Mobonmed Na A Saran S Date: = — Inspection Stas ria Ee oe ; cures > | are | [Sout Ly 2A pote Ewa RET ERT | Rap ss 29 JON 2022 Eseetoconsorce | /|Raued w Signature: wee |emportant: Permission to proceed does nol constitute acceptance oF approval of work under Inspection does rot Felieve the contractor from full compliance wah contractual reauirements Resident Engineor Signature: ‘Resident Engineer comments Comal: - 5 — iy cia Fr i val/Consent of For Sub-Contractor: For Main C¢ Fa not approval/G: - Name: Name: Rema the content ‘Signature: Seneture: | DE-54 Date Dt 211 jident Engineer verification of iance of whee Joos pie fi el aes had GSU A Nene Signature: | oe Saal) WWetbaSl pe 9) Ca) se) fy te ‘aeetcd Works weer 1082 Iwo UE 0 Gr Tetons ar deemed oproe Speed ‘wth he alone nts Page tot2 penance, Matt ANASCON Form No.: SPM/PAIR/003/00 a Executed Werks under LOA2 without R/O eeor ejections ae deemed approved by the Engineer. And The Contractor can proceed th the Bolonce works. Consultant Comments & Status of Compliance Contractor's Inspection Request No. (RIDBEAIELEOGT Revision No.0 —_| Date: 24/06/2022 Tobe Completed By Pi Comments complied Remarks lo. by | Name | Signature | Date (date/time) Ti > Contractor to ensure that the conduits/sleeves, thermocol provisions are not damaged during casting. Coordinate with all other services. Contract specification and comments on the approved shop drawing to be followed. Contractor is fully responsible for any missing as per project requirement and damages in future. > Subject to Dewa,Etisalat/Du approval. > Subject to satisfactory testing and commissioning vvv af Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date’ Signature! Page 20f2 ‘AriigBintosk — DAMAC CRESCENT PROPERTIES. manne piu 4 NASCON jbl Form No.: SPMIPAJIRI003/00 DAMAC Hills BEL AIR 25 Villas ~ DB54 ‘CONTRACTOR INSPECTION REQUEST NouR/DBSAELECION€ ’AS per attached locations Inspection request for instalation of Underground Electrical Pipes for Power, Telephone & Fire Alarm System. 1 Villa Prototype (V-23T) Villa no-F806B. BEL AIR Cluster as Highlighted on Attached Drawings, Grawng & specication CIME®Clearance []Restd mspecion Requests Confirmation of Coordination & Compliance with Specifcatin, Approved drawings, Method Statement & Project Quality Plan, ‘Yes [-] No] Ino, any deviation from epeciicaton, approved drawings, method statement & project {quality plan to be recorded. Signature of Sub contractors QNOC in charge: =~, | aN aScON] ee : cael For Main Contractor: (PM) = arate SX F Sarat. Date: x Ras EGRET Inspection Status oa War Ca oeeoe Du esses peed foam meron fp mam Li E-warnay weer] —]D rapeaion wat AY Beh ZO subjects complance required fa G2 &/Qe2 2 ‘of comments as a ‘Signature: attached ‘Important: Permission to proceed does nol constitute acceplance or approval of work under inspection does not relieve the contactor trom ful compliance with contractual requirements, Name: Signature ‘aecuted Woks onder 10K Fait Is or Tear eens ae deemed appeared by te Engineer Rod The Cntr con proceed tit he blonce works Page tof2 DAMAC Pith —NASCON ‘Anf&Bintoak — DAMAC CRESCENT PROPERTIES ee Form No.: SPM/PAJIR/003/00 Executed Works under LOA 21without IR/ or clear rejectons are deemed approved by the Engineer. And The Contractor con proceed ten the Botence works Consultant Comments & Status of Compliance Contractor's inspection Request No. HRIDBSAeL Eos Revision No.0 | Date: 24/06/2022 To be Completed By ie Comments compued Remarks ms Name | Signature | Date Un > Contractor to ensure that the conduits are not damaged during casting. > Proper protection for UPVC underground conduits to be provided. > Coordinate with all other services. > Itis the contractor responsibility to provide all clectrical containments as per project requirements/authority’s regulations. Contractor is fully responsible for any missing conduits and damages in future. Subject to ID drawing approval. Subject to satisfactory testing and commissioning. Subject to Dewa,Etisalat/Du approval. vyvv ae” Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: __ Date: Signature: Page 202 panec tll! | NASCON ArtaBintook DAMA CRESCENT PROPERTIES LLC fel eerste ns Form No.: SPM/PALIRU003/00 DAMAC Hills BEL AIR 25 Villas (DB54) | CONTRACTOR INSPECTION REQUEST No. Fev. No.0” | Request Gai 250872002 Tine 730A IRIDBS4ELEIO08| Tnapeaion Dat 3008/2022 Tine TOGGA ‘Location of Work: AIRC ‘Drawing /Specification ref_| AS per attached locations Details of Works: _ Inspection request for installation of electri Conti apicn steal ee PRUE Ta eT Cee ‘Confirmation of Coordination & Compliance with Specification, Approved drawings, Method Statement & Project Qualiy Pian BE Yes) Ho | fro, any devon fom spastcaion approved drawings, method statement & preject ) quality plan to be recorded. Signatur oT WEP carvators GAVGC n charge {eK Dae SS TORT | go For MEP Contractor (Nascon). Pa NASI Name: Vinod di ahs oes Damac Hills ss Resident Engines Project Code: “Tnspection Status / Tawar may” © Rejected Ae Date Received proceed fvtmt inepecton request S-Wonmay | | D- nection net BeFob fer proceed wince |, | reauied Compliance of | snature Samensas [Tmportant’ Permission fo proceed does nol consttute acceptance or approval of work under inspection does not relieve the contractor from full compliance with contractual requirements Resident Engineer Signature: Date: Resident Engineer nis complied, For Sub-Contractor: Name: Signature’ Date: ‘Resident Engineer verification of compliance of m 55 ga Bh Este oh aise Name: ‘Signatut =a ‘AciteBintoak DAMAC _PilThpiaiu ASCO DAMAC CRESCENT PROPERTIES {PATHS i w')L—ai! ne Form No.: SPM/Pi Executed Works under LOA 2. Awithout R/ or clear rejections ore deemed approved by the Engineer. And The Contractor cn proceed with te Bolonce works. Consultant Comments & Status of Compliance ] Contractor's Inspection Request No. ] ] eee oe. Revision No.0 | Date: 29/06/2022 (su No. Tobe Completed By complied | Remarks by Name | Signature | Date (date/time) Comments vvv v vy Tie beam Electrical inst ns, Contractor to ensure that the conduits/sleeves, thermocol provisions are not damaged during casting Coordinate with all other services. Contract specification and comments on the approved shop drawing to be followed. Contractor is fully responsible for any missing as per project requirement and damages in future. Subject to Dewa,Etisalat/Du approval. Subject to satisfactory testing and commissioning. Oa 1027 Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time, Name: Date: Page 20f2 panane _... Mime ANASCON ‘ArtBpintoax DAMAC CRESCENT PROPERTIES LLC Form No.: SPM/PAMR/003/00 DAMAC hills BEL AIR 25 Villas (DB54) ‘CONTRACTOR INSPECTION REQUEST No IRIDBS4/ELE/O10 Rav. No.0 | Request Oats” 75067022 Tire 03 D0ANT Taspection Date SO/062022 Tne TOCOANT provision for electrical services in the tle beam, i\ AIRICLUSTER as highlighted in attached drawings. = =r : Tare Saings Web Salament Ped ne Fea oy Re Wa, ny Senate For pean approved ang aod aad & POT | that ponte eerdos a ‘Signature of MEP contractor's QA/QC in charge: je-Qq]06)1 > ehh, ‘s ° x been [06]? a J} For MEP Contractor (Nascf £ Contractor. ¢ oo ser, ae INAS Comet ee DELTA tone, vag Eat ASC OMe | mehepere dae Damac Hill Zz 5a ResicentEngreer [Project Code: iqan™ inspection Status hay ee aa i Dae Received — ys /) f ‘ewes ey - f eras O pecian rat Jeree/r er proceed sunject fo required Ly ‘compliance of Y/ jon Signature: ‘comments a3. 4M Important” Permission fo procsed dos not constitute acceptance or approval of work under inspection does nol ‘ellave the contractor from full compliance with contractual requirements Resident Engineer Signature: —_ Date: Resident Engineer comments compl For Sub-Conttctor: For Main Contactor: aa oAy Name ceived Fo5 ESnsent ae ioace Resi 30 JUN Name. Signature Page tet? AB ‘AsitBintoak DAMAC DELTA epi ANASCON DAMAC CRESCENT PROPERTIES HHRATES Kw! Lui! Form No.: SPM/PA/IR/003/00. “Executed Wovks under LOA ?Swithout to lar rejections are Seemed approved bythe Engineer And The Contractor com proceeds sith he balance work Consultant Comments & Status of Compliance Contractor's Inspection Request No. DE OHEL ECO. Revision No.0 | Date: 29/06/2022 To be ‘Completed By No ae ee Name | Signature | Date | "°™="**| . lame | Signature (date/time) - vey ‘Tie beam Electrical installations Contractor to ensure that the conduits/sleeves, thermocol provisions are not damaged during casting. Coordinate with all other services. Contract specification and comments on the approved shop drawing to be followed. Contractor is fully responsible for any missing as per project requirement and damages in future. Subject to Dewa.Etisalat/Du approval. Subject to satisfactory testing and commissioning. chats or Ys Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Date: Signature: Page 2 of2 VILLA TYPES Zz < — a > Ww Ea [a uu Kb n 2 -_ oO a = 2 ao - FOR TENDER Sep 7, 2021

You might also like