Yjrs

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
cmanene: [PENSE | INASCON ENGIN DAMAC CRESCENT PROPERTIES DAMAC Hills Bel Air 25 Villas ~ DB54 WEP CLEARANCE REQUEST Nowe Rev.No.00 | RequestDate: 22/07/2022 Time:t1.00 AM Tnspection Date: 24/07/2022 _Timer3.00 PM Details of Inspection: MEP Clearance for First Floor Slab Cast Location of Work: Bel Air - V23-T- 4 Villas Drawing /Specification ref_| As per attached locations ‘The Following Works Require MEP Clearance: MEP Clearance for Fist Floor Slab, 1 villas, Prototypes (V-23). Vila no. (F808B). BEL AIR CLUSTER as highlighted in attached drawings, IR ruber Etec! RUOBSAFELE-21 UR) ABE IR number- Mechanical -IRDBS4MECH- 1(UA) ‘Attachments: i CZ Cheewtist [1 drawing & Specification [Related Inspection Requests L] Others. Confirmation of Cantractor’s GA/QC Inspection: Confirmation of Coordination & Compliance with Speciication, Approved drawings, Method Statement & Project Quality Plan TD Yes [No _| Ino, any deviation from specification, approved drawings, malhod statement & project ‘quality plan to be recorded, mature Mak comrooies Oe aos! oo Date 22[0F122 For Main Contractor: (PM) 2 Name: Mohammad Nafa Signature’ Date: Consultant Inspection Status War may - Rejeded, Re Date Received procees submit inspection request Work may D = Inspection not proceed subject to required compliance of ynments 2s atached important. Permission fo proceed does not conelfute acceptance or aporoval of work under inspection Goss ‘ot relieve the contractor from full compliance with contractual requirements. Consultant Signature: Date: ‘Consultant comments complied: For Sub-Contractor: For Main Contractor: Name: Name: Signature: Signature: Date: Date: Consultant verification of compliance of comments: Name. Signature Date: DZar~zaraac PELTAMR DAMAC CRESCENT PROPERTIES BNASCON Consultant Comments & Status of Compliance MEP Clearance Request No.08 Revision No.00 Date:-22-07-2022 To be Completed By S.INo, | Comments | complied Remarks by Name | Signature | Date (dateltime) Main contractor QA/QC: | hereby confirm that the above comments were incorporated/completed within the agreed time. Name: Signature: Date: VILLA TYPES TRUMP CLUSTER KEY PLAN FOR TENDER PreK Resences MLA BAMAc nae CRSCENT PROPERTIES LLC

You might also like