RESOURCE PLAN SUMMARY

Subject Submission of resources quantification


Name of structures Bridges & Culverts
Project Activity Code 4.5.1
Review Activity Railings
Project Location GA-Pemathang & Khotoka

Quantity
Items Specification Unit Remarks
Total
1. Culverts (Pemathang)
Hot dipped galvanized MS Railing: The steel connections shown are schematic only.
The structural steel shall be Grade E250 (Fe410) as per IS 2062-2006. The The fabricator shall prepare shop drawings for all
weld metal shall be EX4XXX, tensile strength range 410 - 530 MPa as per IS the connections.
814. The bolts shall be minimum grade/ property class 4.6 as per IS 1367. The shop drawing shall be verified and approved
Steel Railings by the Engineer, GI or consultant.
After the approval, the fabricator shall go ahead
Drawing reference: GYAL/PEM/C-06 with the fabrication.

Rails Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 2434.69 8 Nos. 4.5 m + 8 Nos. 3.5m + 72 Nos. 2.5m
Posts Mild Steel Posts (955x200x20) kg 4078.23 136 Nos.
Base Plates Mild Steel Posts Base plates (450x225x20) kg 1080.95 68 Nos.
Bolts Bolts ( dia 16 mm, size 370 mm ) kg 173.94 272 Nos.
Nuts Nuts (inner dia 16 mm, size 24 mm) kg 5.74 272 Nos.
2. Bridge 01 (Pemathang)
Hot dipped galvanized MS Railing: The steel connections shown are schematic only.
The structural steel shall be Grade E250 (Fe410) as per IS 2062-2006. The The fabricator shall prepare shop drawings for all
weld metal shall be EX4XXX, tensile strength range 410 - 530 MPa as per IS the connections.
814. The bolts shall be minimum grade/ property class 4.6 as per IS 1367. The shop drawing shall be verified and approved
by the Engineer, GI or consultant.
Steel Railings
After the approval, the fabricator shall go ahead
Drawing reference: with the fabrication.
GI-PT-Br1-Str-04 & GI-PT-Br1-Str-15

Rails Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 2414.80 16 Nos. 5.378 m + 8 Nos. 18.398 m
Posts Mild Steel Posts (955x200x20) kg 2159.06 72 Nos.
Base Plates Mild Steel Posts Base plates (450x225x20) kg 572.27 36 Nos.
Bolts Bolts ( dia 16 mm, size 370 mm ) kg 89.45 144 Nos.
Nuts Nuts (inner dia 16 mm, size 24 mm) kg 2.95 144 Nos.
3. Bridge 02 (Pemathang)
Hot dipped galvanized MS Railing: The steel connections shown are schematic only.
The structural steel shall be Grade E250 (Fe410) as per IS 2062-2006. The The fabricator shall prepare shop drawings for all
weld metal shall be EX4XXX, tensile strength range 410 - 530 MPa as per IS the connections.
814. The bolts shall be minimum grade/ property class 4.6 as per IS 1367. The shop drawing shall be verified and approved
by the Engineer, GI or consultant.
Steel Railings After the approval, the fabricator shall go ahead
Drawing reference: with the fabrication.
GI-PT-Br2-Str-10 & GI-PT-Br2-Str-13

Rails Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 1479.456 16 Nos. 4.14 m + 8 Nos. 9.299 m
Posts Mild Steel Posts (955x200x20) kg 1439.38 48 Nos.
Base Plates Mild Steel Posts Base plates (450x225x20) kg 381.51 24 Nos.
Bolts Bolts ( dia 16 mm, size 370 mm ) kg 59.6352 96 Nos.
4. Chadrichu Bridge (Khotoka)
Hot dipped galvanized MS Railing: The steel connections shown are schematic only.
The structural steel shall be Grade E250 (Fe410) as per IS 2062-2006. The The fabricator shall prepare shop drawings for all
weld metal shall be EX4XXX, tensile strength range 410 - 530 MPa as per IS the connections.
814. The bolts shall be minimum grade/ property class 4.6 as per IS 1367. The shop drawing shall be verified and approved
Steel Railings by the Engineer, GI or consultant.
After the approval, the fabricator shall go ahead
Drawing reference: with the fabrication.
GI-Kh-CB-SD05 & GI-Kh-CB-SD14

Rails Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 1877.26528 16 Nos., 3.440 m + 8 Nos., 15.756 m
Posts Mild Steel Posts (955x200x20) kg 1799.22 60 Nos.
Base Plates Mild Steel Posts Base plates (450x225x20) kg 476.8875 30 Nos.
Bolts Bolts ( dia 16 mm, size 370 mm ) kg 74.544 120 Nos.
Nuts Nuts (inner dia 16 mm, size 24 mm) kg 2.46 120 Nos.

Reviewed by: Checked by:

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra
Submission Date 13th February, 2023
Resource Delivery Date Latest by 1st week of March 2023
RESOURCE PLAN SUMMARY
Subject Submission of resources quantification
Name of structures Bridges & Culverts
Project Activity Code 4.5.1
Review Activity Drain Spouts
Project Location GA-Pemathang & Khotoka

Quantity
Items Specification Unit Remarks
Total
1. For Culverts (Pemathang)
Galvaniszd Drain Spout
Overall size: 130mm X 130mm. The fabricator shall prepare shop drawings for all
Drain Pipe 100 mm dia, 400 mm length the connections.
Drain Spouts Specification: Grated using MS Flats Nos. 26 The shop drawing shall be verified and approved
by the Engineer, GI or consultant.
Drawing reference: GYAL/PEM/C-06 After the approval, the fabricator shall go ahead
with the fabrication.
2. For Bridges (Pemathang)
Galvanized Drain Spout
Overall size: 250mm X 250mm. The fabricator shall prepare shop drawings for all
Drain Pipe 110 mm dia, 565 mm length the connections.
Drain Spouts Specification: Grated using MS Flats. The shop drawing shall be verified and approved
by the Engineer, GI or consultant.
After the approval, the fabricator shall go ahead
with the fabrication.
Bridge 01 Drawing reference: GI-PT-Br2-Str-16 Nos. 3
Bridge 02 Drawing reference: GI-PT-Br2-Str-14 Nos. 2
3. Chadri chu Bridge (Khotoka)
Galvanized Drain Spouts:
4R00Name: Type 1, DrainBFT87TP The fabricator shall prepare shop drawings for
Overall size: 250mm X 250mm. all the connections.
Drain Spouts Drain Pipe: 865mm The shop drawing shall be verified and
Nos. 4
Type 1 Specification: Grated using MS Flats. approved by the Engineer, GI or consultant.
Drawing reference GI-Kh-CB-SD13 After the approval, the fabricator shall go ahead
with the fabrication.

Galvanized Drain Spouts:


The fabricator shall prepare shop drawings for
4R00Name: Type 1, DrainBFT87TP
all the connections.
Overall size: 250mm X 250mm.
Drain Spouts The shop drawing shall be verified and
Drain Pipe: 865mm Nos. 2
Type 2 approved by the Engineer, GI or consultant.
Specification: Grated using MS Flats.
After the approval, the fabricator shall go ahead
Drawing reference GI-Kh-CB-SD13
with the fabrication.

Reviewed by: Checke

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra
Submission Date 23/02/2023
Resource Delivery Date Latest by last week of February 2023
RESOURCE PLAN FOR CULVERTS
Name of Structure Culverts
Project Activity Code 4.5.1
Review Activity Railings & Drainage
Quantity reviewed for GA-Pemathang
Gyalsung Academy
Quantity Remarks
BSR Unit Kg Nos.
Items Specification
Code All Culvert Rest
Culvert 12
culverts 01 Culverts
Hot dipped galvanized MS Railing: The steel connections shown are
The structural steel shall be Grade E250 (Fe410) as schematic only.
per IS 2062-2006. The weld metal shall be The fabricator shall prepare shop
EX4XXX, tensile strength range 410 - 530 MPa as drawings for all the connections.
per IS 814. The bolts shall be minimum grade/ The shop drawing shall be verified and
property class 4.6 as per IS 1367. approved by the Engineer, GI .
After the approval, the fabricator shall go
Drawing reference: GYAL/PEM/C-06 ahead with the fabrication.
AR Steel Railings

8 Nos., 8 Nos., 72 Nos.,


Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 2434.69
4.5 m 3.5m 2.5m
Mild Steel Posts (955x200x20) kg 4078.23 136 Nos.
Mild Steel Posts Base plates (450x225x20) kg 1080.95 68 Nos.
Bolts ( dia 16 mm, size 370 mm ) kg 173.94 272 Nos.
Nuts (inner dia 16 mm, size 24 mm) kg 5.74 272 Nos.

The steel connections shown are


schematic only.
The fabricator shall prepare shop
Galvanized Drain Spout: drawings for all the connections.
Overall size: 130mm X 130mm. The shop drawing shall be verified and
AR Drain spouts Drain Pipe 100 mm dia, 400 mm length Nos. 26.00 approved by the Engineer, GI .
Specification: Grated using MS Flats. After the approval, the fabricator shall go
Drawing reference: GYAL/PEM/C-06 ahead with the fabrication.

Note:
 1. Drawing with dimensions of railllings & Drain Spouts is attached
2. The procurement to select the finishes, material strength, fixing mechanism and approve
3. The total quantities worked out are for Gyalsung Academy- Pemathang only

Reviewed by: Checked by:

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra

Submission Date 13/02/2023


Resource Delivery Date Latest by last week of February 2023
RAILINGS

D2-2

D2

D2.1

D2-1

D2.1
DRAIN SPOUT

110
3-5x25 MS FLAT BAR
IN EQUAL SPACE

125
8-8 mm Ø BOLTS
PVC BEND FOR

14
58
100 MM Ø PVC PIPE

3 NOS. M.S. FLAT BAR

130

100
(5X25) IN EQUAL SPACE

6 6

400
14

14
130 100 MM Ø PVC DRAIN PIPE
20X20X6 MS ANGLE FRAME
RESOURCE PLAN FOR BRIDGE # 01
Name of Bridge Bridge #01
Project Activity Code 4.5.1
Review Activity Railings & Drainage
Quantity reviewed for GA-Pemathang
Gyalsung Academy

BSR
Items Specification Unit Quantity Remarks
Code
Hot dipped galvanized MS Railing: The steel connections shown are schematic
The structural steel shall be Grade E250 (Fe410) as only.
per IS 2062-2006. The weld metal shall be The fabricator shall prepare shop drawings for
EX4XXX, tensile strength range 410 - 530 MPa as all the connections.
per IS 814. The bolts shall be minimum grade/ The shop drawing shall be verified and
property class 4.6 as per IS 1367. approved by the Engineer, GI or consultant.
After the approval, the fabricator shall go ahead
Drawing reference: with the fabrication.
AR Steel Railings GI-PT-Br1-Str-04 & GI-PT-Br1-Str-15

Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 2414.80 16 Nos., 5.378 m & 8 Nos., 18.398 m
Mild Steel Posts (955x200x20) kg 2159.06 72 Nos.
Mild Steel Posts Base plates (450x225x20) kg 572.27 36 Nos.
Bolts ( dia 16 mm, size 370 mm ) kg 89.45 144 Nos.
Nuts (inner dia 16 mm, size 24 mm) kg 2.95 144 Nos.

The steel connections shown are schematic


only.
Galvanized Drain Spout: The fabricator shall prepare shop drawings for
Overall size: 250mm X 250mm. all the connections.
Drain Pipe 110 mm dia, 565 mm length The shop drawing shall be verified and
AR Drain spouts Nos. 3.00 approved by the Engineer, GI or consultant.
Specification: Grated using MS Flats.
Drawing reference: GI-PT-Br2-Str-16 After the approval, the fabricator shall go ahead
with the fabrication.

Note:
 1. Drawing with dimensions of railllings & Drain Spouts is attached
2. The procurement to select the finishes, material strength, fixing mechanism and approve
3. The total quantities worked out are for Gyalsung Academy- Pemathang only

Reviewed by: Checked by:

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra
Submission Date 23/02/2023
Resource Delivery Date Latest by 1st week of March 2023
RAILINGS

D2-2

D2

D2.1

D2-1

D2.1
DRAIN SPOUT
RESOURCE PLAN FOR BRIDGE # 02
Name of Bridge Bridge #02
Project Activity Code 4.5.1
Review Activity Railings & Drainage Spouts
Quantity reviewed for
Gyalsung Academy GA-Pemathang

BSR
Items Specification Unit Quantity Remarks
Code
Hot dipped galvanized MS Railing: The steel connections shown are
The structural steel shall be Grade E250 (Fe410) as schematic only.
per IS 2062-2006. The weld metal shall be The fabricator shall prepare shop
EX4XXX, tensile strength range 410 - 530 MPa as drawings for all the connections.
per IS 814. The bolts shall be minimum grade/ The shop drawing shall be verified and
property class 4.6 as per IS 1367. approved by the Engineer, GI or
consultant.
Drawing reference: After the approval, the fabricator shall
GI-PT-Br2-Str-10 & GI-PT-Br2-Str-13 go ahead with the fabrication.
AR Steel Railings

Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 1479.46 16 Nos., 4.14 m 8 Nos., 9.299 m
Mild Steel Posts (955x200x20) kg 1439.38 48 Nos.
Mild Steel Posts Base plates (450x225x20) kg 381.51 24 Nos.
Bolts ( dia 16 mm, size 370 mm ) kg 59.64 96 Nos.
Nuts (inner dia 16 mm, size 24 mm) kg 1.97 96 Nos.

The steel connections shown are


schematic only.
The fabricator shall prepare shop
Galvanized Drain Spout: drawings for all the connections.
Overall size: 250mm X 250mm. The shop drawing shall be verified and
Drain Pipe 110 mm dia, 565 mm length approved by the Engineer, GI or
AR Drain spouts Nos. 2.00 consultant.
Specification: Grated using MS Flats.
Drawing reference: GI-PT-Br2-Str-14 After the approval, the fabricator shall
go ahead with the fabrication.

Note:
 1. Drawing with dimensions of railllings & Drain Spouts is attached
2. The procurement to select the finishes, material strength, fixing mechanism and approve
3. The total quantities worked out are for Gyalsung Academy- Pemathang only

Reviewed by: Checked by:

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra
Submission Date 23/02/2023
Resource Delivery Date Latest by 1st week of March 2023
RAILINGS

D2-2

D2

D2.1

D2-1

D2.1
DRAIN SPOUT
RESOURCE PLAN FOR KHOTOKA BRIDGE
Name of Bridge Chadrichu Bridge
Project Activity Code 4.5.1
Review Activity Railings & Drainage
Quantity reviewed for Gyalsung GA-Khotoka
Academy

BSR
Items Specification Unit Quantity Remarks
Code
Hot dipped galvanized MS Railing: The steel connections shown are schematic
The structural steel shall be Grade E250 (Fe410) as only.
per IS 2062-2006. The weld metal shall be The fabricator shall prepare shop drawings for
EX4XXX, tensile strength range 410 - 530 MPa as all the connections.
per IS 814. The bolts shall be minimum grade/ The shop drawing shall be verified and
property class 4.6 as per IS 1367. approved by the Engineer, GI or consultant.
After the approval, the fabricator shall go ahead
Drawing reference: with the fabrication.
AR Steel Railings GI-Kh-CB-SD05 & GI-Kh-CB-SD14

Mild Steel (Grade 250) RHS tubes (127x50x3.6) kg 1877.27 16 Nos., 3.440 m & 8 Nos., 15.756 m
Mild Steel Posts (955x200x20) kg 1799.22 60 Nos.
Mild Steel Posts Base plates (450x225x20) kg 476.89 30 Nos.
Bolts ( dia 16 mm, size 370 mm ) kg 74.54 120 Nos.
Nuts (inner dia 16 mm, size 24 mm) kg 2.46 120 Nos.

The steel connections shown are schematic


only.
Galvanized drain spouts: The fabricator shall prepare shop drawings for
4R00Name: Type 1, DrainBFT87TP all the connections.
Overall size: 250mm X 250mm. The shop drawing shall be verified and
AR Drain spouts type 1 Drain Pipe: 865mm Nos. 4.00 approved by the Engineer, GI or consultant.
Specification: Grated using MS Flats. After the approval, the fabricator shall go ahead
Drawing reference GI-Kh-CB-SD13 with the fabrication.

The steel connections shown are schematic


only.
Galvanized drain spouts: The fabricator shall prepare shop drawings for
Name: Type 1, Drain Spout all the connections.
Overall size: 250mm X 250mm. The shop drawing shall be verified and
AR Drain spouts type 2  Drain Pipe: 570mm Nos. 2.00 approved by the Engineer, GI or consultant.
Specification: Grated using MS Flats. After the approval, the fabricator shall go ahead
Drawing reference GI-Kh-CB-SD13 with the fabrication.

Note:
 1. Drawing with dimensions of railllings & Drain Spouts is attached
2. The procurement to select the finishes, material strength, fixing mechanism and approve
3. The total quantities worked out are for Gyalsung Academy- Khotokha only

Reviewed by: Checked by:

Budhiman Gurung Dorji Gyaltshen P


Dy. Executive Engineer Lead- Infra
Submission Date 13/02/2023
Resource Delivery Date Latest by last week of February 2023
RAILINGS

D2-2

D2

D2.1

D2-1

D2.1
DRAIN SPOUT
QUANTITY CALCULATION
Bridge Name: Bridge No. 02, Pemathang

Bridge type: RC. Box frame


Length Breadth Total
Sl. No. Item No.
(m) (m)
Height (m)
Quantity
Unit Remarks
1. EARTH WORK:
1.1 Jungle clearance
1 0.00 0.00 0.00 SqM
Total: 0.00 SqM
1.2 Structure excavation - qty calculated as solid volume
Bridge 1 14.31 12.37 1.00 177.01 CuM
For RT walls 1 55.62 1.95 1.00 108.46 CuM
Total: 285.47 CuM
1.3 Backfill Behind the Structures in layers not Exceeding 200mm and Compacted
1.3.1 Structure backfilling
1.3.2 Fill behind the abutments till the end of approach slab
Left bank side 1 14.61 4.25 5.00 310.46 CuM
Right bank side 1 14.61 4.25 5.00 310.46 CuM
RT walls 1 55.62 0.66 36.71 CuM
Total: 657.63 CuM
2. CONCRETE WORKS:
PCC Providing and laying blinding/leveling concrete (10MPa) below foundations of the bridge and
2.1 approch slabs.
Bridge 1 11.97 15.73 0.10 18.83 CuM
RT walls 1 55.62 1.70 0.10 9.46 CuM
Approach slab Left Bank 1 4.33 14.61 0.10 6.32 CuM
Approach slab Right Bank 1 4.33 14.61 0.10 6.32 CuM
Total: 40.92 CuM
2.2 RCC Providing and laying Structural Concrete M25 grade
2.1.1 Base slab + components
Base slab 1 11.77 15.53 0.40 73.12 CuM
Cutoff wall 2 9.00 0.35 0.60 3.78 CuM
Total: 76.90 CuM
2.2.2 Walls
Ends Walls 2 15.53 2.00 61.96 CuM
Intermediate wall 1 15.53 1.90 29.51 CuM
Return Walls 4 0.40 17.22 27.55 CuM
Corbel 2 14.61 0.18 5.38 CuM
Total: 124.40 CuM
2.2.3 Top slab and components
Top slab 1 0.40 158.32 63.33 CuM
Kerbs 1 0.35 0.30 9.46 0.99 CuM
Total: 64.32 CuM
2.2.4 Approach slabs
Approach Slab left bank side 1 4.24 14.59 0.35 21.65 CuM
Approach slab right bank side 1 4.24 14.59 0.35 21.65 CuM
Total: 43.30 CuM
Total: for substructure: 308.92

Activity Code: 4.5.1/ Bridge 02/ GA- Pemathang/ Quantity Work out Page 15 of 32
QUANTITY CALCULATION
Bridge Name: Bridge No. 02, Pemathang

Bridge type: RC. Box frame


Length Breadth Total
Sl. No. Item No.
(m) (m)
Height (m)
Quantity
Unit Remarks
3. FORM WORK
3.1 Base slab & components
Base slab
Length Face 2 11.77 0.40 9.42 SqM
Width Face 2 15.53 0.40 12.42 SqM
Cut off wall
Length Face 2 9.00 0.60 10.80 SqM
Width Face 2 0.35 0.60 0.42 SqM
Total: 33.06
3.2 Wall and Components
End walls
Front & back 4 4.10 15.53 254.69 SqM
Side 4 4.10 0.40 6.56 SqM
Intermediate wall
Front & back 4 4.04 15.53 250.96 SqM
Sides 4 4.04 0.35 5.66 SqM
Return Wall
Front & back 8 17.22 137.76 SqM
Side 4 6.51 0.40 10.42 SqM
Corbell
Front 2 14.61 0.845 24.69 SqM
sides 4 0.18 0.72 SqM
Total: 691.46 SqM
3.3 Top slab & components
Top slab
Bottom face 1 8.40 15.42 129.59 SqM
Length Face 2 8.40 0.40 6.72 SqM
Width Face 2 15.42 0.40 12.34 SqM
Kerbs
Length Face 4 9.46 0.30 11.35 SqM
Width Face 4 0.35 0.30 0.42 SqM
Total: 160.42
3.4 Approach slabs
Left Bank side
Length Face 2 4.24 0.35 2.97 SqM
Width Face 2 14.59 0.35 10.21 SqM
Right bank side
Length Face 2 4.24 0.35 2.97 SqM
Width Face 2 14.59 0.35 10.21 SqM
Total: 26.36

4. REINFORCEMENT
Providing and laying reinforcement bars High yield steel
deformed Reinforcing Bars Fe500 including bending,
binding, putting in position all complete.
4.1 Rebar for all components 1 22.70 22.70 ton
Total: 22.70 ton
5. MISCELLANEOUS WORKS
5.1 Stone Works
5.1.1 Stone soling for Bridge 1 14.31 12.37 0.20 35.40 CuM

Activity Code: 4.5.1/ Bridge 02/ GA- Pemathang/ Quantity Work out Page 16 of 32
QUANTITY CALCULATION
Bridge Name: Bridge No. 02, Pemathang

Bridge type: RC. Box frame


Length Breadth Total
Sl. No. Item No.
(m) (m)
Height (m)
Quantity
Unit Remarks
5.1.2 Stone soling fo RT Wall 1 55.62 1.95 0.15 16.27 CuM
Total: 51.67 CuM

5.1.3 RRM in CM 1:4 1 55.62 2.00 111.24 CuM

5.1.4 CRM in CM 1:4 1 55.62 0.59 32.82 CuM

5.1.4 PCC capping for RT Walls 1 55.62 0.05 2.78 CuM

5.2 Drainage and Related Works


5.2.1 Drainage Spouts 2 2 Pcs

5.2.2 Weep Holes


a) Weep holes with HDPE pipe dia. 110mm, L=400mm for 18 0.40 7.20
Mtr
bridge
b) Weep holes with HDPE pipe dia. 110mm, L=990mm 40 0.99 39.60 Mtr

5.3 Stone Filter layer


5.3.1 Graded stone filling behind the Abutments and Retaining
Walls to act as filter layer.
Bridge 2 14.61 0.60 4.75 83.28 CuM
RT wall 1 55.62 0.60 1.55 51.56 CuM
Total: 134.84 CuM
5.4 Railing
5.4.1 Steel railing as per the details shown in the drawings (18 m
long)
RHS tubes (127x50x3.6) 8 17.80 9.340 (kg/m) 1330.016 Kg
Posts (955x200x20) 48 0.955 0.20 0.02 1439.38 Kg unit weight of
Base plates (450x225x20) 24 0.450 0.225 0.020 381.51 Kg steel=7850 kg/m³
Bolts ( dia 16 mm, size 370 mm ) 96 62.120 (kg/100) 59.64 Kg
Nuts (inner dia 16 mm, size 24 mm) 96 20.500 (kg/1000) 1.97 Kg
Total: 3212.51 Kg
5.5 Surfacing
5.1 Asphalt WC for Bridge deck + Approach slab 1 134.64 134.64 SqM
Walkway surfacing 1 92.43 92.43 SqM

Activity Code: 4.5.1/ Bridge 02/ GA- Pemathang/ Quantity Work out Page 17 of 32
RESOURCE PLAN (MATERIALS)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame

Code
Sl. Length Breadth Height Total
(LMC Iitem of work No. Unit Remarks
No. (m) (m) (m) Quantity
2021)

1 RAILINGS
Materal, fabrication , supply and
1.1 SW0110 installation of steel railings (grade E
250)
Stainless steel (Grade 250) RHS tubes
1.1.1 8 18.0 1479.4560 kg
(127x50x3.6)

1.2.2 Stainless steel Posts (955x200x20) 48 1439.3760 kg

Stainless steel Posts Base plates


1.1.2 24 381.5100 kg
(450x225x20)

1.2.3 Bolts ( dia 16 mm, size 370 mm ) 96 59.6352 kg

1.1.3 Nuts (inner dia 16 mm, size 24 mm) 96 1.9680 kg

2 REINFORCEMENT STEEL
2.1 RC0083 P&L Thermo Mechanically Treated (TMT) bars of Grade Fe 500:
2.1.1 8 mm dia 18.69 kg
2.2.2 12 mm dia 15909.48 kg
2.1.2 16 mm dia 5526.19 kg
2.2.3 20 mm dia 2377.08 kg

3 DRAINAGE RELATED WORKS


3.1 Providing & fixing drainage spouts
3.1.2 2 2 Nos.
3.2 RW0143 P&L 110mm diameter HDPE pipe as weep holes
For bridge= 400 mm & For RT wall
3.2.1 46.8 m
= 990mm

4 BITUMEN WEARING COURSE


4.1 MT0260 Ashphat Wearing Course 50mm thick on the bridge deck and the approach slabs.
4.1.1 Bitumen VG - 10 1.0000 MT

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ Resource Plan (MMM) Page 1 of 32
ANALYSIS OF RATE
Bridge Name : Bridge 02
Location: Boulevard 03, GA Pemathang
Bridge Type: Reinforced Concrete Box Frame
GYALSUNG INFRA MARKET RATE BSR-2022
TOTAL
SL. CODE QUANTITY OF RESOURCE/ BSR WITH
ITEM DESCRIPTIONS UNIT UNIT RESOURCE BASIC ANALYSED BASIC ANALYSED
NO (LMC 2021) WORK UNIT WORK RATE COST
(IN NOS.) RATES RATE RATE RATE
INDEX
1000 EARTH WORK
1 EW0046 Earth work in excavation over areas by Excavator including levelling and dressing - All types of soils
LB0039 Work Supervisor (Lajab) 0.00253 day 0.65 700 1.77 700.00 1.77 632.50 1.60
256.93 Cum
MP0125 Excavator CAT 320 or equivalent 0.0035 day 0.90 13600 47.60 20,038.40 70.13 15,544.00 54.40
49.37 71.91 56.00
Add for tools & plants % 2% 0.99 1.44 1.12
Add for water charges % -
Add for over head charges % 6% 2.96 4.31 3.36
Add for OHS % 2% 0.99 1.44 1.12
cu.m Nu. 54.31 79.10 61.60

2 EW0047 Earth work in excavation over areas by Excavator including levelling and dressing - All types of rocks (blasted)
LB0039 Work Supervisor (Lajab) 0.00253 day 0.07 700 1.77 700.00 1.77 632.50 1.60
28.55 Cum
MP0125 Excavator CAT 320 or equivalent 0.0037 day 0.11 13600 50.32 20,038.40 74.14 15,544.00 57.51
52.09 75.91 59.11
Add for tools & plants % 2% 1.04 1.52 1.18
Add for water charges % -
Add for over head charges % 6% 3.13 4.55 3.55
Add for OHS % 2% 1.04 1.52 1.18
cu.m Nu. 57.30 83.50 65.02

Filling of trenches, sides of foundations etc.in layers <200 mm using


3 EW0195
selected excavated earth,ramming etc.within lead 50 m & lift 1.5 m
LB0077 Labour 657.63 Cum 0.20744 day 136.42 500 103.72 500.00 103.72 460.00 95.42
103.72 103.72 95.42
Add for tools & plants % 2% 2.07 2.07 1.91
Add for water charges % -
Add for over head charges % 6% 6.22 6.22 5.73
Add for OHS % 2% 2.07 2.07 1.91
cu.m Nu. 114.09 114.09 104.96

2000 CONCRETEretaining
WORKSwalls,+FORM WORKS
return & REINFORCEMENT
walls, walls (any thickness) including attached
4 CW0024 pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string
or lacing
LB0036 Mason courses, parapets, coping, bedblocks, anchor blocks, plain
Gd.1 0.07011 day 3.06 700 49.08 700.00 49.08 632.50 44.34
LB0039 Work Supervisor (Lajab) 0.03895 day 1.70 700 27.27 700.00 27.27 632.50 24.64
LB0051 Mason Gd.2 0.07011 day 3.06 650 45.57 650.00 45.57 575.00 40.31
LB0053 Plant Operator Gd.3 0.05453 day 2.38 600 32.72 600.00 32.72 575.00 31.35
LB0077 Labour 2.08285 day 91.03 500 1,041.43 500.00 1,041.43 460.00 958.11
MP0111 Concrete Mixer(7/5 cu.ft) 43.70 Cum 0.07000 day 3.06 1891.2 132.38 1,891.20 132.38 1,832.00 128.24
MP0112 Concrete Vibrator(M/C5) 0.07000 day 3.06 1266.4 88.65 1,266.40 88.65 1,136.00 79.52
MT0043 Sand 0.48500 cu.m 21.20 1036.13 502.52 1,388.97 673.65 473.33 229.57
MT0070 Crushed Rock - 20 mm 0.72700 cu.m 31.77 1518.53 1,103.97 1,885.98 1,371.11 967.20 703.15
MT0071 Crushed Rock - 12.5 mm - 6 mm 0.24200 cu.m 10.58 1553.84 376.03 2,129.60 515.36 963.02 233.05
MT0145 Cement (OPC / PSC) 0.22000 tonne 9.61 7522.60 1,654.97 9,191.63 2,022.16 6,627.50 1,458.05
5,054.58 5,999.37 3,930.34
Add for tools & plants % 2% 101.09 119.99 78.61
Add for water charges % -
Add for over head charges % 6% 303.27 359.96 235.82
Add for OHS % 2% 101.09 119.99 78.61
cu.m Nu. 5,560.04 6,599.31 4,323.37

P&L in position reinforced cement concrete 1:1:2 ( 1 cement : 1 sand : 2 graded crushed rock 20 mm nominal size ) work in walls ( any thickness ) including attached pilasters buttresses, piers, abutments etc. upto floor five level
5 RC0005 excluding the cost of centering, shuttering and reinforcement.

LB0036 Mason Gd.1 0.05055 day 6.29 700 35.39 700.00 35.39 632.50 31.97
LB0039 Work Supervisor (Lajab) 0.05055 day 6.29 700 35.39 700.00 35.39 632.50 31.97
LB0051 Mason Gd.2 0.05055 day 6.29 650 32.86 650.00 32.86 575.00 29.07
LB0053 Plant Operator Gd.3 0.07077 day 8.80 600 42.46 600.00 42.46 575.00 40.69
LB0077 Labour 1.25625 day 156.28 500 628.13 500.00 628.13 460.00 577.88
MP0111 Concrete Mixer(7/5 cu.ft) 124.40 Cum. 0.07 day 8.71 1891.2 132.38 1,891.20 132.38 1,832.00 128.24
MP0112 Concrete Vibrator(M/C5) 0.07 day 8.71 1266.4 88.65 1,266.40 88.65 1,136.00 79.52
MT0043 Sand 0.45 cu.m 55.98 1036.13 466.26 1,388.97 625.04 473.33 213.00
MT0070 Crushed Rock - 20mm 0.675 cu.m 83.97 1518.53 1,025.01 1,885.98 1,273.04 967.20 652.86
MT0071 Crushed Rock - 12.5mm - 6 mm 0.225 cu.m 27.99 1553.84 349.61 2,129.60 479.16 963.02 216.68
MT0145 Cement (OPC / PSC) 0.61 tonne 75.88 7522.60 4,588.79 9,191.63 5,606.89 6,627.50 4,042.78
7,424.91 8,979.37 6,044.65
Add for tools & plants % 2% 148.50 179.59 120.89
Add for water charges % -
Add for over head charges % 6% 445.49 538.76 362.68
Add for OHS % 2% 148.50 179.59 120.89
cu.m Nu. 8,167.40 9,877.31 6,649.12

Activity Code: 4.5.1/ Bridge 02/ Rate Analysis/ GA- Pemathang Page 2 of 32
ANALYSIS OF RATE
Bridge Name : Bridge 02
Location: Boulevard 03, GA Pemathang
Bridge Type: Reinforced Concrete Box Frame
GYALSUNG INFRA MARKET RATE BSR-2022
TOTAL
SL. CODE QUANTITY OF RESOURCE/ BSR WITH
ITEM DESCRIPTIONS UNIT UNIT RESOURCE BASIC ANALYSED BASIC ANALYSED
NO (LMC 2021) WORK UNIT WORK RATE COST
(IN NOS.) RATES RATE RATE RATE
INDEX
P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20mm nominal size ) work in kerbs, steps and the like upto floor five level excluding the cost of centering, shuttering and reinforcement.
6 RC0020

LB0036 Mason Gd.1 0.07077 day 9.99 700 49.54 700.00 49.54 632.50 44.76
LB0039 Work Supervisor (Lajab) 0.07077 day 9.99 700 49.54 700.00 49.54 632.50 44.76
LB0051 Mason Gd.2 0.07077 day 9.99 650 46.00 650.00 46.00 575.00 40.69
LB0053 Plant Operator Gd.3 0.07077 day 9.99 600 42.46 600.00 42.46 575.00 40.69
LB0077 Labour 1.33125 day 187.99 500 665.63 500.00 665.63 460.00 612.38
MP0111 Concrete Mixer(7/5 cu.ft) 141.22 Cum 0.07 day 9.89 1891.2 132.38 1,891.20 132.38 1,832.00 128.24
MP0112 Concrete Vibrator(M/C5) 0.07 day 9.89 1266.4 88.65 1,266.40 88.65 1,136.00 79.52
MT0043 Sand 0.45 cu.m 63.55 1036.13 466.26 1,388.97 625.04 473.33 213.00
MT0070 Crushed Rock - 20mm 0.675 cu.m 95.32 1518.53 1,025.01 1,885.98 1,273.04 967.20 652.86
MT0071 Crushed Rock - 12.5mm - 6 mm 0.225 cu.m 31.77 1553.84 349.61 2,129.60 479.16 963.02 216.68
MT0145 Cement (OPC / PSC) 0.61 tonne 86.14 7522.60 4,588.79 9,191.63 5,606.89 6,627.50 4,042.78
7,503.86 9,058.32 6,116.36
Add for tools & plants % 2% 150.08 181.17 122.33
Add for water charges % -
Add for over head charges % 6% 450.23 543.50 366.98
Add for OHS % 2% 150.08 181.17 122.33
cu.m Nu. 8,254.25 9,964.16 6,727.99

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm nominal size ) work in suspended floor, roofs having slope up to 15 degree, landings, balconies, shelves and chajjas up to floor five
7 RC0013 level excluding the cost of centering, shuttering and reinforcement.

LB0036 Mason Gd.1 0.12638 day 5.47 700 88.47 700.00 88.47 632.50 79.94
LB0039 Work Supervisor (Lajab) 0.1011 day 4.38 700 70.77 700.00 70.77 632.50 63.95
LB0051 Mason Gd.2 0.12638 day 5.47 650 82.15 650.00 82.15 575.00 72.67
LB0053 Plant Operator Gd.3 0.07077 day 3.06 600 42.46 600.00 42.46 575.00 40.69
LB0077 Labour 1.4625 day 63.33 500 731.25 500.00 731.25 460.00 672.75
MP0111 Concrete Mixer(7/5 cu.ft) 43.30 Cum 0.07 day 3.03 1891.2 132.38 1,891.20 132.38 1,832.00 128.24
MP0112 Concrete Vibrator(M/C5) 0.07 day 3.03 1266.4 88.65 1,266.40 88.65 1,136.00 79.52
MT0043 Sand 0.45 cu.m 19.49 1036.13 466.26 1,388.97 625.04 473.33 213.00
MT0070 Crushed Rock - 20mm 0.675 cu.m 29.23 1518.53 1,025.01 1,885.98 1,273.04 967.20 652.86
MT0071 Crushed Rock - 12.5mm - 6 mm 0.225 cu.m 9.74 1553.84 349.61 2,129.60 479.16 963.02 216.68
MT0145 Cement (OPC / PSC) 0.61 tonne 26.41 7522.60 4,588.79 9,191.63 5,606.89 6,627.50 4,042.78
7,665.79 9,220.25 6,263.07
Add for tools & plants % 2% 153.32 184.41 125.26
Add for water charges % -
Add for over head charges % 6% 459.95 553.22 375.78
Add for OHS % 2% 153.32 184.41 125.26
cu.m Nu. 8,432.37 10,142.28 6,889.37

8 RC0090 Providing & fixing centering and shuttering (formwork) , Including strutting, propping etc. and removal of form work - Foundation and plinth etc.
LB0033 Carpenter Gd.2 0.11965 day 650 77.77 650.00 77.77 650.00 77.77
LB0077 Labour 0.10951 day 500 54.76 500.00 54.76 500.00 54.76
33.06 Sq m
MT0325 Ballies 75 to 125mm dia 0.42 m 30.43 12.78 30.43 12.78 30.43 12.78
MT0330 Rough-sawn timber (urban rate) - Class 'B' (conifer) 0.0135 cu.m 7416.07 100.12 12,194.30 164.62 12,973.87 175.15
245.43 309.93 320.46
Add for tools & plants % 2% 4.91 6.20 6.41
Add for water charges % -
Add for over head charges % 6% 14.73 18.60 19.23
Add for OHS % 2% 4.91 6.20 6.41
sq.m Nu. 269.97 340.92 352.50

9 RC0091 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of form work-Walls, pilasters, buttresses, string course etc.
LB0033 Carpenter Gd.2 0.62641 day 433.14 650 407.17 650.00 407.17 575.00 360.19
LB0077 Labour 0.25328 day 175.13 500 126.64 500.00 126.64 460.00 116.51
691.46 Sq m
MT0325 Ballies 75 to 125mm dia 0.91 m 629.23 30.43 27.69 30.43 27.69 30.43 27.69
MT0330 Rough-sawn timber (urban rate) - Class 'B' (conifer) 0.0144 cu.m 9.96 7416.07 106.79 12,194.30 175.60 12,973.87 186.82
0.00 668.29 737.10 691.21
Add for tools & plants % 0.00 2% 13.37 14.74 13.82
Add for water charges % 0.00 -
Add for over head charges % 0.00 6% 40.10 44.23 41.47
Add for OHS % 0.00 2% 13.37 14.74 13.82
sq.m 0.00 Nu. 735.12 810.81 760.33

10 RC0095 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of form work- Suspended floor, roof, landing, shelves and their supports, balconies, chajjas, etc.
LB0033 Carpenter Gd.2 0.42952 day 94.43 650 279.19 650.00 279.19 632.50 271.67
LB0077 Labour 0.39312 day 86.43 500 196.56 500.00 196.56 460.00 180.84
219.85 Sq m
MT0325 Ballies 75 to 125mm dia 2.075 m 456.18 30.43 63.14 30.43 63.14 30.43 63.14
MT0330 Rough-sawn timber (urban rate) - Class 'B' (conifer) 0.0168 cu.m 3.69 7416.07 124.59 12,194.30 204.86 12,973.87 217.96
663.48 743.75 733.61
Add for tools & plants % 2% 13.27 14.88 14.67
Add for water charges % -
Add for over head charges % 6% 39.81 44.63 44.02
Add for OHS % 2% 13.27 14.88 14.67
sq.m Nu. 729.83 818.13 806.97

Activity Code: 4.5.1/ Bridge 02/ Rate Analysis/ GA- Pemathang Page 3 of 32
ANALYSIS OF RATE
Bridge Name : Bridge 02
Location: Boulevard 03, GA Pemathang
Bridge Type: Reinforced Concrete Box Frame
GYALSUNG INFRA MARKET RATE BSR-2022
TOTAL
SL. CODE QUANTITY OF RESOURCE/ BSR WITH
ITEM DESCRIPTIONS UNIT UNIT RESOURCE BASIC ANALYSED BASIC ANALYSED
NO (LMC 2021) WORK UNIT WORK RATE COST
(IN NOS.) RATES RATE RATE RATE
INDEX
11 RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 Mpa ) for R.C.C work including cutting, bending, binding and placing in position complete
LB0032 Blacksmith (metal-worker) 0.01142 day 0.26 700 7.99 700.00 7.99 632.50 7.22
LB0077 Labour 22.70 ton 0.01142 day 0.26 500 5.71 500.00 5.71 460.00 5.25
MT0208 Reinforcing Bars & Mesh - Thermo Mechanically Treated Bars (TMT bars 1.05 kg 23.84 70.94 74.49 74.74 78.48 51.29 53.85
8 mm dia 17.80 1.05 kg 18.69
12 mm dia 15151.89 1.05 kg 15909.48
16 mm dia 5263.04 1.05 kg 5526.19
20 mm dia 2263.88 1.05 kg 2377.08
0.00 88.19 92.18 66.33
Add for tools & plants % 0.00 2% 1.76 1.84 1.33
Add for water charges % 0.00 -
Add for over head charges % 0.00 6% 5.29 5.53 3.98
Add for OHS % 0.00 2% 1.76 1.84 1.33
kg 0.00 Nu. 97.01 101.40 72.96
1 ton 0.00 97,010.10 101,399.10 72,963.94

3000 MISCELLANEOUS WORKS


12 SM0071 Providing and laying Chisel dressed dry stone soling
LB0051 Mason Gd.2 0.63661 day 32.89 650 413.80 650.00 413.80 575.00 366.05
LB0077 Labour 51.67 ton 0.58266 day 30.11 500 291.33 500.00 291.33 460.00 268.02
MT0060 Boulder 1.1 cu.m 56.84 1046.02 1,150.62 1,440.02 1,584.02 861.81 947.99

13 SM0005 P&L Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4
LB0051 Mason Gd.2 0.6302 day 90.78 650 409.63 650.00 409.63 575.00 362.37
LB0077 Labour 3.10907 day 447.88 500 1,554.54 500.00 1,554.54 460.00 1,430.17
MT0043 Sand 144.06 Cu m 0.3531 cu.m 50.87 1036.13 365.86 1,388.97 490.45 473.33 167.13
MT0060 Boulder 1 cu.m 144.06 1046.02 1,046.02 1,440.02 1,440.02 861.81 861.81
MT0145 Cement (OPC / PSC) 0.1254 tonne 18.06 7522.60 943.33 9,191.63 1,152.63 6,627.50 831.09
4,319.38 5,047.26 3,652.57
Add for tools & plants % 2% 86.39 100.95 73.05
Add for water charges % -
Add for over head charges % 6% 259.16 302.84 219.15
Add for OHS % 2% 86.39 100.95 73.05
cu.m Nu. 4,751.31 5,551.99 4,017.83

14 SM0026 Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth - In cement mortar 1:4
LB0051 Mason Gd.2 1.0362 day 0.00 650 673.53 650.00 673.53 575.00 595.82
LB0077 Labour 3.3137 day 0.00 500 1,656.85 500.00 1,656.85 460.00 1,524.30
MT0043 Sand Cu m 0.321 cu.m 0.00 1036.13 332.60 1,388.97 445.86 473.33 151.94
MT0060 Boulder 1.1 cu.m 0.00 1046.02 1,150.62 1,440.02 1,584.02 861.81 947.99
MT0145 Cement (OPC / PSC) 0.114 tonne 0.00 7522.60 857.58 9,191.63 1,047.85 6,627.50 755.54
4,671.17 5,408.11 3,975.58
Add for tools & plants % 2% 93.42 108.16 79.51
Add for water charges % -
Add for over head charges % 6% 280.27 324.49 238.53
Add for OHS % 2% 93.42 108.16 79.51
cu.m Nu. 5,138.29 5,948.92 4,373.14

15 AR Providing & fixing drainage spouts


LB0036 Mason Gd.1 0.2301 day 0.46 700 161.07 700.00 161.07 632.50 145.54
LB0038 Plumber Gd.1 2.00 Nos. 0.2301 day 0.46 700 161.07 700.00 161.07 632.50 145.54
MT1141 Drainage Spouts 1 each 2.00 2574 2,574.00 2,574.00 2,574.00 2,574.00 2,574.00
2,896.14 2,896.14 2,865.08
Add for tools & plants % 2% 57.92 57.92 57.30
Add for water charges % -
Add for over head charges % 6% 173.77 173.77 171.90
Add for OHS % 2% 57.92 57.92 57.30
each Nu. 3,185.75 3,185.75 3,151.58

16 PO0036 P&L H.D.P.E Pipes, PN 6, including H.D.P.E fittings (excluding trenching, refilling & thrust block) - 110mm
LB0038 Plumber Gd.1 0.03666 day 1.72 700 25.66 700.00 25.66 632.50 23.19
LB0077 Labour 46.80 Mtr 0.07582 day 3.55 500 37.91 500.00 37.91 460.00 34.88
MT0836 H.D.P.E Pipes of pressure class 6kg/sq.cm - 110mm 1m 46.80 309.12 309.12 386.40 386.40 386.40 386.40

Activity Code: 4.5.1/ Bridge 02/ Rate Analysis/ GA- Pemathang Page 4 of 32
ANALYSIS OF RATE
Bridge Name : Bridge 02
Location: Boulevard 03, GA Pemathang
Bridge Type: Reinforced Concrete Box Frame
GYALSUNG INFRA MARKET RATE BSR-2022
TOTAL
SL. CODE QUANTITY OF RESOURCE/ BSR WITH
ITEM DESCRIPTIONS UNIT UNIT RESOURCE BASIC ANALYSED BASIC ANALYSED
NO (LMC 2021) WORK UNIT WORK RATE COST
(IN NOS.) RATES RATE RATE RATE
INDEX
17 AR Providing and fixing stainless steel (Gradee 250) railing made of Hollow tubes,channels,platesetc…including welding, grinding, buffing, polishing and making curvature (wherever required ) and fittings the same with necessary
LB0032 stainless
Blacksmithsteel nuts and
(metal bolts complete, i/c fixing railing with necessary accessories and stainless steel dash fasteners,stainless
worker) 0.02301 day steel bolts etc, of required size
73.92 700on the top 16.11
of the floor or700.00
the side of waist 16.11
slab with suitable arrangement14.55
632.50 as
LB0077 per approval of engineers in charge.
Labour 0.00702 day 22.55 500 3.51 500.00 3.51 460.00 3.23
LB0039 Work supervisor 3,212.51 Kg 0.0767 day 246.40 700 53.69 700.00 53.69 632.50 48.51
MT0259 Stainless steel (Grade 250) Hollow section round/square tubes 1.1 kg 3533.76 84.15 92.57 92.97 102.27 52.39 57.63
MT0260 Stainless steel bolts/square bar and plates 1 kg 3212.51 75.15 75.15 83.07 83.07 57.38 57.38
RHS tubes (127x50x3.6) 1330.016 Kg 1.1 1463.02
Posts (955x200x20) 1439.38 Kg 1 1439.38
Base plates (450x225x20) 381.51 Kg 1 381.51
Bolts ( dia 16 mm, size 370 mm ) 59.64 Kg 1 59.64
Nuts (inner dia 16 mm, size 24 mm) 1.97 Kg 1 1.97
241.02 258.64 181.30
Add for tools & plants % 2% 4.82 5.17 3.63
Add for water charges % -
Add for over head charges % 6% 14.46 15.52 10.88
Add for OHS % 2% 4.82 5.17 3.63
kg Nu. 265.12 284.51 199.44

Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job mixture design approved by the supervising engineer using asphaltplant, paver, steelroller, tyreroller etc. as per material
18 RW0143 gradation and aggregate quality specified : 50mm
LB0077 Labour 0.01001 day 1.348 500 5.01 500.00 5.01
MP0167 Tractor with trailer, Toyota 0.00007 Day 0.009 4957.67 0.35 5,063.54 0.35
MP0103 Asphalt/Bitumen Heating kettle, India make 0.00044 day 0.059 3300 1.45 3,300.00 1.45
MP0160 Spot Mix Plant, 10/16 TPH 0.00161 day 0.217 18,368 29.57 18,368.00 29.57
MP0102 Asphalt Paver 0.00014 day 0.019 8942.8 1.25 9,207.00 1.29
MP0151 Road Roller ( SV91, Sakai) 0.00045 day 0.061 11968.64 5.39 11,928.00 5.37
MP0150 Road Roller ( Pneumatic tyre), TS - 300 134.64 Sq m 0.00045 day 0.061 11,366.68 5.12 11,881.00 5.35
MP0145 Pay Loader ( CAT or Equivalent) 0.00091 day 0.123 10591.6 9.64 11,032.00 10.04
MP0165 TATA tipper 1612SE 0.0018 day 0.242 11500 20.70 14,984.00 26.97
MP0110 Compactor, plate type 0.0033 day 0.444 1575.19 5.20 1,638.00 5.41
MT0001 Bitumen VG - 10 0.00746 MT 1.004 42,027.19 313.52 42,027.19 313.52
MT0071 Crushed rock , 12.5 mm to 6mm ( preferably 10 mm) 0.02604 cu.m 3.506 1553.84 40.46 2,176.45 56.67
MT0043 sand 0.02604 cu.m 3.506 1036.13 26.98 1,442.51 37.56
0.000 464.63 498.56
Add for tools & plants % 0.000 2% 9.29 9.97
Add for water charges % 0.000 -
Add for over head charges % 0.000 6% 27.88 29.91
Add for OHS % 0.000 2% 9.29 9.97
sq.m 0.000 Nu. 511.09 548.42 599.75 758.08

Activity Code: 4.5.1/ Bridge 02/ Rate Analysis/ GA- Pemathang Page 5 of 32
RESOURCE PLAN (MEN, MATERIALS & MACHINERIES)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame
Reinforcing Bars (TMT bars) Rough-sawn
Stainless steel Stainless steel H.D.P.E Pipes Crushed
Stainless steel Bolts ( dia 16 Nuts (inner Crushed Ballies 75 timber
Code (Grade 250) Posts Base Drainage of pressure Rock - 12.5 Cement Bitumen
Sl. Quantity of RHS tubes Posts mm, size 370 dia 16 mm, Boulder Rock - 20 Sand to 125mm (urban rate)
(LMC Description of item Unit plates Spouts class 6kg/sq.cm mm - 6 (OPC / PSC) VG - 10
No work (955x200x20) mm ) size 24 mm) (8 mm) (12 mm) (16 mm) (20 mm) mm dia - Class 'B'
2021) (127x50x3.6) (450x225x20) - 110mm mm
(conifer)
( in kg) ( in kg) ( in kg) ( in kg) ( in kg) ( in kg) ( in Nos.) ( in m) ( in cu m) ( in cu m) ( in cu m) ( in cu m) ( in MT) ( in MT) (in m) (in cu m)
1 EARTH WORK
1.1 EW0046 Structure excavation - Hard soil m3 256.93
1.2 Structure excavation - Ordinary rock m3 28.55
EW0047
Backfilling for bridge (qty. for till
1.3 EW0195 the end of approach slab) + River m3 657.63
Training (RT) Wall
Total for Earth Works:
2 CONCRETE WORKS
Providing & laying lean concrete
2.1 CW0024 m3 43.70 31.7720 10.5761 21.1959 9.6146
M10

Prviding and laying M25 grade


2.2
concrete for:
End wall + intermediate wal +
2.2.1 RC0005 m3 124.40 83.9701 27.9900 55.9801 75.8841
Return Walls
2.2.2 RC0020 Top & Base slab + components m3 141.22 95.3213 31.7738 63.5475 86.1422
2.2.3 RC0013 Approach slabs m3 43.30 29.2296 9.7432 19.4864 26.4149
TOTAL= 240.2930 80.0831 160.2099 198.0559
3 FORMWORKS
3.1 RC0091 Wall & Components m2 691.46 83.9701 27.9900 55.9801 75.8841 629.2283 9.9570
Base & top slab + components+
3.2 RC0095 m2 219.85 95.3213 31.7738 63.5475 86.1422 456.1790 3.6934
approach slab
TOTAL= 179.2914 59.7638 119.5276 162.0263 1085.4073 13.6504
4 REINFORCEMENT STEEL Kg
P&L Thermo Mechanically Treated
RC0083 18.69 15909.48 5526.19 2377.08
(TMT) bars of Grade Fe 500:
5 RRM WORKS
Compacted stone soling for bridge
5.1 SM0071 m3 51.67 56.8390
and RT wall foundations
Providing and laying Random
5.2 SM0005 Rubble Masonry with CM 1:4 for RT m3 144.06 144.0558 50.8661 18.0646
Wall
TOTAL= 200.89 0.00 0.00 50.87 18.06
6 DRAINAGE RELATED WORKS
AR Drainage spouts pcs 2.00 2.00
P&L 110mm diameter HDPE pipe as
6.2 PO0036
weep holes
For bridge= 400 mm & For RT wall
mtr 46.80 46.80
= 990mm
7 RAILINGS
Materal, fabrication , supply and
SW0110 kg 3,212.51 1463.0176 1439.3760 381.5100 59.6352 1.9680
installation of steel railings
8 BITUMEN WEARING COURSE
Ashphat Wearing Course 50mm
RW0143 thick on the bridge deck and the m2 134.64 3.5060 3.5060 1.0044
approach slabs.
TOTAL RESOURCE REQUIRED 1463.02 1439.38 381.51 59.64 1.97 18.69 15909.48 5526.19 2377.08 2.00 46.80 200.89 419.58 143.35 334.11 378.15 1.00 1085.41 13.65
( in kg) ( in kg) ( in kg) ( in kg) ( in kg) ( in kg) ( in Nos.) ( in m) ( in cu m) ( in cu m) ( in cu m) ( in cu m) ( in MT) ( in MT) (in m) (in cu m)
(8 Nos. & 18 m
(48 Nos.) (24 Nos.) (96 Nos.) (96 Nos.)
long each)

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ Resource Plan (MMM) Page 1 of 32
RESOURCE PLAN (MEN, MATERIALS & MACHINERIES)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame
Asphalt/
Tractor Spot Mix Road Road Roller (
Work Plant Blacksmith Excavator Concrete Concrete Bitumen Pay Loader TATA
Code Plumber Mason Mason Carpenter with Plant, Asphalt Roller ( Pneumatic
Sl. Quantity of Supervisor Operator Labour (metal- CAT 320 or Mixer (7/5 Vibrator Heating ( CAT or tipper
(LMC Description of item Unit Gd.1 Gd 1 Gd 2 Gd.2 trailer, 10/16 Paver SV91, tyre), TS -
No work (Lajab) Gd.3 worker) equivalent cu.ft) (M/C5) kettle, India Equivalent) 1612SE
2021) Toyota TPH Sakai) 300
make
(in
(in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.)
Nos.)
1 EARTH WORK
1.1 EW0046 Structure excavation - Hard soil m3 256.93 0.6500 0.8992
1.2 Structure excavation - Ordinary rock m3 28.55 0.0722 0.1056
EW0047
Backfilling for bridge (qty. for till
1.3 EW0195 the end of approach slab) + River m3 657.63 136.4196
Training (RT) Wall
Total for Earth Works: 0.72 136.42 1.00
2 CONCRETE WORKS
Providing & laying lean concrete
2.1 CW0024 m3 43.70
M10

Prviding and laying M25 grade


2.2
concrete for:
End wall + intermediate wal +
2.2.1 RC0005 m3 124.40 6.2884 6.2884 6.2884 8.8038 156.2777 8.7080 8.7080
Return Walls
2.2.2 RC0020 Top & Base slab + components m3 141.22 9.9939 9.9939 9.9939 9.9939 187.9948 9.8852 9.8852
2.2.3 RC0013 Approach slabs m3 43.30 4.3779 5.4726 5.4726 3.0646 63.3308 3.0312 3.0312
TOTAL= 22.10 0.00 21.75 21.75 21.86 680.44 21.62 21.62
3 FORMWORKS
3.1 RC0091 Wall & Components m2 691.46 175.1329 433.1373
Base & top slab + components+
3.2 RC0095 m2 219.85 86.4256 94.4279
approach slab
TOTAL= 261.56 527.57
4 REINFORCEMENT STEEL Kg
P&L Thermo Mechanically Treated
RC0083 0.2592 0.2592
(TMT) bars of Grade Fe 500:
5 RRM WORKS
Compacted stone soling for bridge
5.1 SM0071 m3 51.67 32.8948 30.1071
and RT wall foundations
Providing and laying Random
5.2 SM0005 Rubble Masonry with CM 1:4 for RT m3 144.06 90.7840 447.8796
Wall
TOTAL= 123.68 477.99
6 DRAINAGE RELATED WORKS
AR Drainage spouts pcs 2.00 0.46 0.46
P&L 110mm diameter HDPE pipe as
6.2 PO0036
weep holes
For bridge= 400 mm & For RT wall
mtr 46.80 1.72 3.55
= 990mm
7 RAILINGS
Materal, fabrication , supply and
SW0110 kg 3,212.51 246.40 22.55 73.92
installation of steel railings
8 BITUMEN WEARING COURSE
Ashphat Wearing Course 50mm
RW0143 thick on the bridge deck and the m2 134.64 1.35 0.01 0.06 0.22 0.02 0.06 0.06 0.12 0.24
approach slabs.
TOTAL RESOURCE REQUIRED 269.23 2.18 22.22 145.43 21.86 1584.11 527.57 74.18 1.00 21.62 21.62 0.01 0.06 0.22 0.02 0.06 0.06 0.12 0.24
(in
(in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.) (in Nos.)
Nos.)

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ Resource Plan (MMM) Page 2 of 32
RESOURCE PLAN (MEN, MATERIALS & MACHINERIES)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame

Code Compactor,
Sl. Quantity of plate type
No
(LMC Description of item Unit
work
2021)

(in Nos.)
1 EARTH WORK
1.1 EW0046 Structure excavation - Hard soil m3 256.93
1.2 Structure excavation - Ordinary rock m3 28.55
EW0047
Backfilling for bridge (qty. for till
1.3 EW0195 the end of approach slab) + River m3 657.63
Training (RT) Wall
Total for Earth Works:
2 CONCRETE WORKS
Providing & laying lean concrete
2.1 CW0024 m3 43.70
M10

Prviding and laying M25 grade


2.2
concrete for:
End wall + intermediate wal +
2.2.1 RC0005 m3 124.40
Return Walls
2.2.2 RC0020 Top & Base slab + components m3 141.22
2.2.3 RC0013 Approach slabs m3 43.30
TOTAL=
3 FORMWORKS
3.1 RC0091 Wall & Components m2 691.46
Base & top slab + components+
3.2 RC0095 m2 219.85
approach slab
TOTAL=
4 REINFORCEMENT STEEL Kg
P&L Thermo Mechanically Treated
RC0083
(TMT) bars of Grade Fe 500:
5 RRM WORKS
Compacted stone soling for bridge
5.1 SM0071 m3 51.67
and RT wall foundations
Providing and laying Random
5.2 SM0005 Rubble Masonry with CM 1:4 for RT m3 144.06
Wall
TOTAL=
6 DRAINAGE RELATED WORKS
AR Drainage spouts pcs 2.00
P&L 110mm diameter HDPE pipe as
6.2 PO0036
weep holes
For bridge= 400 mm & For RT wall
mtr 46.80
= 990mm
7 RAILINGS
Materal, fabrication , supply and
SW0110 kg 3,212.51
installation of steel railings
8 BITUMEN WEARING COURSE
Ashphat Wearing Course 50mm
RW0143 thick on the bridge deck and the m2 134.64 0.44
approach slabs.
TOTAL RESOURCE REQUIRED 0.44
(in Nos.)

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ Resource Plan (MMM) Page 3 of 32
CATEGORY-INFRASTRUCTURE & SERVICES

BRIDGE 02

ACTIVITY CODE 4.5.1

COST ESTIMATE

GYALSUNG ACADEMY- PEMATHANG

GYALSUNG INFRA
DECEMBER 2022
BILL OF QUANTITIES (BoQ)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame
Rate Amount
Sl.No Code Description of item Unit Quantity
(Nu) (Nu)
1000 EARTHWORK
The quantities for earthwork are calculated
as "Solid Volume"
1 1001 Structure excavation - Hard soil m3 256.93 54.31 13,953.18
2 1002 Structure excavation - Ordinary rock m3 28.55 57.30 1,635.77
3 1003 Backfilling for bridge (qty. for till the end of
approach slab) + River Training (RT) Wall m3 657.63 114.09 75,030.80

Total for Earth Works: 90,619.75


2000 CONCRETE WORKS + FORMWORK + REBAR
Providing & laying lean concrete M10 for bridge
4 2001 foundations, RT wall and underneath of approach m3 40.92 5,560.04 227,527.25
slabs.

2002 Prviding and laying M25 grade concrete for:


2002.1 Base slab + components m3 76.90 8,254.25 634,712.48
5
2002.2 End wall + intermediate wal + Return Walls m3 124.40 8,167.40 1,016,026.42
2002.3 Top slab & Components m3 64.32 8,254.25 530,925.78
2002.4 Approach slabs m3 43.30 8,432.37 365,148.00
2003 Providing and fixing formwork for:
2003.1 Base slab + components m2 33.06 729.83 24,128.12
6 2003.2 Wall & Components m2 691.46 735.12 508,304.56
2003.3 Top slab & Components m2 160.42 729.83 117,081.44
2003.4 Approach slab m2 26.36 729.83 19,239.73
Providing and laying Thermo Mechanically
7 2004
Treated (TMT) bars of Grade Fe 500:
8 2004.1 For all component of the bridge tons 22.70 97,010.10 2,202,129.27
Total for Concrete+Formwork+Rebar: 5,645,223.05

3000 MISCELLANEOUS WORKS


Compacted stone soling for bridge and RT wall
9 3001 m3 51.67 2,041.32 105,478.73
foundations
Providing and laying Random Rubble Masonry
10 3002 m3 111.24 4,751.31 528,536.02
with CM 1:4 for RT Wall

Providing and laying Coursed Rubble Masonry


11 3003 m3 32.82 5,138.29 168,617.16
with CM 1:4 for river bank protection wall

Providing and laying PCC capping for RT walls,


12 3004 m3 2.78 5,560.04 15,462.48
concrete grade M10
Material, fabrication and installation of drainage
15 3005 pcs 2.00 3,185.75 6,371.51
spouts as per drawings
Providing and laying 110mm diameter HDPE
3006
pipe as weep holes for:
16 3006.1 For bridge - Length = 400 mm mtr 7.20 409.96 2,951.72
3006.2 For RT wall - Length= 990mm mtr 39.60 409.96 16,234.46

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ BoQ Page 1 of 32


BILL OF QUANTITIES (BoQ)
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame
Rate Amount
Sl.No Code Description of item Unit Quantity
(Nu) (Nu)
Materal, fabrication , supply and installation of
17 3007 steel railings as per the details shown in the kg 3,212.51 265.12 851,712.87
drawings
Ashphat Wearing Course 50mm thick on the
18 3008 m2 134.64 511.09 68,813.80
bridge deck and the approach slabs.
Walkway surfacing for bridge and approach slabs
19 3009 m2 92.43
(Material not yet decided)
Total for Miscellaneous Works: 1,764,178.75
Grand Total 7,500,021.56

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ BoQ Page 2 of 32


RESOURCE PLAN
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame

Sl.No Code Description of item Unit Quantity

1000 EARTHWORK
2000 CONCRETE WORKS + FORMWORK + REBAR
Providing & laying lean concrete M10 for bridge
4 CW0024 foundations, RT wall and underneath of approach m3 43.70
slabs.

5 Prviding and laying M25 grade concrete for:


RC0005 End wall + intermediate wal + Return Walls m3 124.40
RC0020 Top & Base slab + components m3 141.22
RC0013 Approach slabs m3 43.30
6 Providing and fixing formwork for:
RC0091 Wall & Components m2 691.46
RC0095 Base & top slab + components+ approach slab m2 219.85
Providing and laying Thermo Mechanically
7 RC0083
Treated (TMT) bars of Grade Fe 500:
8 For all component of the bridge tons 22.70
8 mm dia 0.018
12 mm dia
16 mm dia
20 mm dia
Total for Concrete+Formwork+Rebar:

3000 MISCELLANEOUS WORKS


Compacted stone soling for bridge and RT wall
9 SM0071 m3 51.67
foundations
Providing and laying Random Rubble Masonry
10 SM0005 m3 144.06
with CM 1:4 for RT Wall
Material, fabrication and installation of drainage
15 3005 pcs 2.00
spouts as per drawings
Providing and laying 110mm diameter HDPE
3006
16 pipe as weep holes for:
3006.1 For bridge= 400 mm & For RT wall = 990mm mtr 46.80

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ BoQ Page 1 of 32


RESOURCE PLAN
Bridge Name: Bridge 02, Boulevard 3, GA Pemathang
Bridge type: Reinforced Concrete Box Frame

Sl.No Code Description of item Unit Quantity

Materal, fabrication , supply and installation of


17 3007 steel railings as per the details shown in the kg 3,212.51
drawings
Ashphat Wearing Course 50mm thick on the
18 3008 m2 134.64
bridge deck and the approach slabs.
Total for Miscellaneous Works:

Activity Code:4.5.1/ Bridge 02/ GA- Pemathang/ BoQ Page 2 of 32


KHOTOKHA CHADRICHU BRIDGE
BILL OF QUANTITIES (BoQ)
Bridge Name: Chadrichu Bridge, GA Khotokha
Bridge type: Reinforced Concrete Rigid Frame

Rate Amount
Sl.No Code Description of item Unit Quantity
(Nu) (Nu)
1000 EARTHWORK
The quantities for earthwork are calculated
as "Solid Volume"
1 1001 Structure excavation - Hard soil m3 1,091.41 54.31 59,272.51
2 1002 Structure excavation - Ordinary rock m3 272.85 57.30 15,634.50
3 1003 Backfilling m3 1,947.86 114.09 222,235.24
Total for Earth Works: 297,142.26
2000 CONCRETE WORKS + FORMWORK + REBAR
4 2001 Providing & laying lean concrete M10 for m3 16.83 5,560.04 93,588.01
Abutment foundations, underneath of approach
slabs.
5 2002 Prviding and laying M25 grade concrete for:
2002.1 Components of the abutments - footing slab, m3 239.50 8,167.40 1,956,123.28
stem/front wall, return walls.
2002.2 Deck/top slab and kerks m3 168.61 8,254.25 1,391,715.95
2002.3 Approach slabs m3 22.05 8,432.37 185,933.80
6 2003 Providing and fixing formwork for:
2003.1 Abutment Footing slabs m2 58.00 269.97 15,658.12
2003.2 Abutment Wall and components m2 524.14 735.12 385,307.76
2003.3 Deck Slab m2 168.11 729.83 122,687.78
2003.4 kerbs m2 43.36 269.97 11,706.33
7 2004 Providing and laying Thermo Mechanically
Treated (TMT) bars of Grade Fe 500:
8 2004.1 Substructure + approach slab tons 16.80 97,010.10 1,629,769.68
9 2004.2 Deck + kerb tons 15.07 97,010.10 1,461,942.21
Total for Concrete+Formwork+Rebar: 7,254,432.91

3000 MISCELLANEOUS WORKS


10 3001 Compacted stone soling for bank protection walls m3 38.98 2,041.32 79,568.67

11 3002 Levelling concrete, Grade M10 for bank m3 17.45 5,560.04 97,015.78
protection works
12 3003 Providing and laying Random Rubble Masonry m3 508.20 4,751.31 2,414,617.08
with CM 1:4 for river bank protection wall
13 3004 Providing and laying Coursed Rubble Masonry m3 74.76 5,138.29 384,138.71
with CM 1:4 for river bank protection wall

14 3004 Providing and laying Boulder Walls for bank m3 958.50 4,751.31 4,554,133.16
protection as per the details shown in the relevant
drawings.
15 3005 Material, fabrication and installation of drainage
spouts for:
3005.1 Type 1; drain pipep length = 865mm pcs 4.00 3,185.75 12,743.02
3005.2 Type 1; drain pipep length = 570mm pcs 2.00 3,185.75 6,371.51
Page 1 of 32
KHOTOKHA CHADRICHU BRIDGE
BILL OF QUANTITIES (BoQ)
Bridge Name: Chadrichu Bridge, GA Khotokha
Bridge type: Reinforced Concrete Rigid Frame

Rate Amount
Sl.No Code Description of item Unit Quantity
(Nu) (Nu)
16 3006 Providing and laying 110mm diameter HDPE m3
pipe as weep holes for:
3005.1 For abutments - Length = 950 mm m 20.90 409.96 8,568.19
3005.2 For bank protection walls - Length= 1560mm m 346.32 409.96 141,977.76
17 3007 Materal, fabrication , supply and installation of m 45.60 265.12 12,089.66
steel railings as per the details shown in the
drawings
18 3008 Ashphat Wearing Course 50mm thick on the m2 192.45 511.09 98,360.19
bridge deck and the approach slabs.
Total for Miscellaneous Works: 7,809,583.73