Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BIM HARMONISATION GUIDELINES

FOR WORKS DEPARTMENTS DISTRIBUTION & RELEASE

Distribution

Copy No. Holder


1 BIM Harmonisation Steering Group (BHSG)

CEDD - PM(N)
CEDD - CE/N3
CEDD - CLS
CEDD - SE/10(N)
CEDD - SLS/BIM
CEDD - E/18(N)
ArchSD - CA/1
CIC - Senior Manager-BIM
DEVB (PLB) - H/SDO
DEVB (PLB) - H/SDO (Designate)
DEVB (WB) - Ch AS (Works) 4
DSD - CE/SP
EMSD - CE/D&T
HyD - CHE/R&D
LandsD - CLS/T
WSD - CE/D

2 AECOM Asia Company Limited (AECOM)

Prepared By:
Mr. Thomson LAI
Project Director, AECOM

Date: 28.04.2021

i-1

You might also like