MR Kelvin Ong

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Jan 20, 2022

TO: TINA J. FERIA

PROJECT: WATERPROOFING PROJECT

LOCATION: 1808 CONCEPCION ST, BRGY VALENZUELA, MAKATI CITY

SUBJECT: QUOTATION FOR LABOR AND MATERIALS

____________________________________________________________________________
We are pleased to present you our best price for the needed for the above-mentioned project:

SCOPE OF WORK

1. General Requirements

1.1 Mobilization/Demobilization

1.2 Provision of tools

1.3 Flood testing

1.4 Transportation/Food

1.5 Provision of scaffolding/ladder

8,300.00

2. Waterproofing works

2.1 Supply & application of Nervia A456 with fiber mesh reinforcement for 3x3x3m cistern
tank with provision of epoxy grouting

75,850.00

PROJECT COST Php 84,150.00


Upon signing hereof, this instrument shall become a Contract of Agreement between the Contractor

and the Client, and hereby agrees to the Terms and Conditions stated herein:

• The owner/client shall secure all any permit and licenses needed in the project

• Terms of Payment

• 50% down payment before mobilization

• 50% progress billing

• Estimated Date of Completion 7-15 days

• Water & electrical consumption should be provided by the owner/client

• The owner/client shall make the site accessible for any equipment and tools to be used on site

• Quotation is valid for 30 days

1
• We offer a full five (3) years of warranty for our waterproofing. However, damages caused by
the

force majeure such as earthquake, fire explosion, lightning, settlement, structural failure and

movement of metal work use in conjunction with waterproofing work are not covered by this

guarantee.

• Vat inclusive

Thank you Very much and we are hoping to be part of your project.

Very Truly Yours

Engr. Julius Caesar T. Batilo Jr

General Manager CONFORME:_______________

09171005350/ julsbatilo@gmail.com (Signature over Printed Name)

DATE: __________________________

2
2

You might also like