JCF-C010 - Installation of Doors - Windows Request
JCF-C010 - Installation of Doors - Windows Request
JCF-C010 - Installation of Doors - Windows Request
CONTRACT ID
CONTRACT NAME:
LOCATION:
DATE REQUESTED: RFI No.:
STRUCTURE AREA/FLOOR ACTUAL INSPECTION DATE/TIME:
LEVEL:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS.
COMPLIED ACTIONS
COMPONENTS REMARKS
DFC YES NO N/A REQUIRED
A. GENERAL
1. Materials passed the required testing or necessary
inspection (with attached test result or EC)
2. Required tools and equipment are on site
B. ALIGNMENTS
3. Vertical and horizontal alignment control
4. Squareness and plumbness of the opening
C. LOCATION AND DIMENSION
5. Openings are in correct location as per plan
6. Openings have correct dimensions to fit dimensions of
jambs/frames
D. CONSTRUCTION SAFETY REQUIREMENTS
7. Stable scaffoldings for safe access of workers on the
work area particularly on elevated areas
8. Personal Protective Equipment (PPE)
REMARKS: DFC = Dimension for Compliance