Professional Documents
Culture Documents
Construction MODEL University Resilient Smart URS Building FINANCIAL 2
Construction MODEL University Resilient Smart URS Building FINANCIAL 2
COST COST
ITEM WORK DESCRIPTION Qty Unit TOTAL
Materials labor Materials labor
I. MOBILIZATION/DEMOBILIZATION 1.00 lot
II. SITE WORKS 1.00 lot
III. EARTHWORKS 1.00 lot
IV. CONCRETE WORKS 1.00 lot
V. REBAR WORKS 1.00 lot
VI. FORMWORKS 1.00 lot
VII. MASONRY WORKS 1.00 lot
VIII. PLASTERING 1.00 lot
IX. TOPPING WORKS 1.00 lot
X TILE WORKS 1.00 lot
XI. ROOFING FRAMING 1.00 lot
XII HANDRAIL(RAMP) 1.00 lot
XIII. TINSMITHRY 1.00 lot
XIV. CARPENTRY 1.00 lot
XV. DOORS 1.00 lot
XVI. JAMB 1.00 lot
XVII FINISHES 1.00 lot
XVIII WINDOWS 1.00 lot
XIX CATCH BASIN 1.00 lot
XX DRAINAGE LINE 1.00 lot
XXI. PAINTING 1.00 lot
XXII ELECTRICAL WORKS 1.00 lot
XXIII. PLUMBING WORKS 1.00 lot
XXIV. ELECTRONIC WORKS 1.00 lot
XXV. CONSTRUCTION SAFETY & HEALTH PROGRAM 1.00 lot
XXVI Billboard 1.00 lot
Prepared by: