Republic of the Philippines

BICOL UNIVERSITY
PHYSICAL DEVELOPMENT AND MANAGEMENT OFFICE
Legazpi City

Project Title: -
###
Location: -
ABC: #NAME?
Duration: $ -

SCOPE OF WORK & TECHNICAL SPECIFICATIONS

GENERAL CONDITIONS
All works to be undertaken shall be in accordance with the plans and working drawings. It includes the furnishing
of all materials, labor and equipment with supervision necessary for the complete construction of the said project.

The plans, detailed drawings and this scope of work shall be considered as complementing with each other, so that
what is mentioned or shown on one, although not mentioned or shown in another, shall be considered as appearing in both.
In case of conflict between the two, the same should be referred to the designing Architect/Engineer.

ITEMS OF WORK INCLUDED

This program of work covers all necessary items needed for the completion of BU Polangui Campus
Computer Science and Engineering Building. Such work will cover the Ground Floor construction of additional concrete
pathway, transformer platform, & drainage line canal; complete renovation of comfort rooms; replacement of
old existing ceilings; and repainting. On the Second Floor, this program of work will cover the construction &
completion of classrooms, laboratories, storage rooms, faculty rooms/offices, corridors, and comfort rooms.

I. GENERAL REQUIREMENTS 1.00 lot

This item of work includes the provisions for Project Sign Boards, Temporary Utilities and Enclosure, and
Construction Safety and Health Programs.

II. CIVIL WORKS

A. SITE WORKS 1.00 lot

This item of work includes the cleaning and clearing of site and disposal of waste materials, before and after
construction. The contractor shall submit the waste material report prior to demobilzation.
This item of work also includes excavation, backfill, filling materials, compaction, and gravel beddings
needed for:
a. 2.0 m Concrete Pathwalk [Bounded by gridlines (5 to 6)
and (B' to F') in the Ground Floor]
Excavation 92.40 m3
Filling Materials and Compaction 83.72 m3
Gravel Bedding (Material & Labor) 14.17 m3

b. Drainage Line Canal with Steel Grating


Excavation 0.00 m3
Backfilling and Compaction 0.00 m3
Gravel Bedding (Material & Labor) 0.00 m3

c. Transformer Platform
Excavation 20.90 m3
Backfilling and Compaction 17.42 m3
Gravel Bedding (Material & Labor) 2.09 m3
This item of work also includes demolition/dismantling and disposal as follows:
a. Demolition and disposal of walls [Along gridline 2' (D to E);
B' (5 to 6); and F' (5 to 6) in the Ground Floor; Along
gridline 2' (D to E), and 1 (D to E) in the Second Floor]
Wall Area 15.16 m2

b. Dismantling and disposal of existing old ceiling in the


Ground Floor
Ceiling Area 1,223.72 m2

c. Dismantling and disposal of existing tiles in the


Ground Floor
Male, Female, and PWD Comfort Rooms 227.83 m2
Porch Damaged Tiles 10.00 m2

d. Chipping works, removal and disposal of old plumbing


fixtures and fittings in the Ground Floor
Labor & Misc. items 1.00 lot

e. Dismantling and disposal of existing foldable partitions


in the Ground Floor
Labor & Misc. items 2.00 units

f. Dismantling of existing doors in the Comfort Rooms


Electrical Room, Janitor's Room, and Storage Room
in the Ground Floor
Labor 16.00 sets

Also included in this item of work is the rental of plate compactor and hauling truck as necessary to finish
the work.

B. CONCRETE WORKS #REF! m3

This item of work includes pouring of concrete (compressive strength, fc'=25MPa) for structural members
comprising of wall footings, columns, beams, suspended slabs, transformer platform, and pathwalk.

### #NAME? m3
a. Column Footing
### 5.42 m3
b. Slanted Canopy [Along gridlines B' (3' to 6), & F' (3' to 6)] 2.28 m3
c. Wall Footing 3.36 m3
d. Transformer Platform 7.44 m3

SECOND FLOOR 193.29 m3


a. 4" Concrete Topping [Entire Second Floor] 150.38 m3
b. Columns [Bounded by gridlines (4' to 6) & (A to H)] 6.98 m3
c. Beams [Lintel beams, and beams bounded by gridlines
(4 to 6) and (A to H)] 18.25 m3
d. Concrete Gutter, and Slanted Canopy [Bounded by
gridlines (4 to 6) and (A to H)] 17.69 m3

Concrete topping at the top of the porch shall be sloped towards the drain.
This item of work also includes the rental of 1-bagger concrete mixers, concrete vibrators, plate compactor
and other equipments necessary to finish the work.
All surfaces must be plain cement finished.
All materials shall be so delivered, stored and handled as to prevent the inclusion of foreign materials
and the damage of materials by water or breakage.
Packaged materials shall be so delivered and stored in original packages until ready for use.
All materials delivered shall be of the respective qualities as specified.
Water to be used in gauging concrete shall be free of oil, acid, alkali, vegetable matter or other
deleterious substance and shall be reasonably clear and clean. The use of sea or blackish water is not allowed.
Cements shall be of any standard commercial brand in standard 40kg bag. No re-bagged cement shall
be used.
Fine aggregates used in the composition of concrete mortar, grout or plaster should consist of sand or
other inert materials with similar characteristics or a combination thereof, having clean, hard, strong, durable,
uncoated grains and free from injurious amount of dust, lumps, soft or flaky particles and shall not contain
more than 5 percent of clay. In exposed work fine aggregates shall be free from any substance, which will
discolor the concrete surface.
Coarse aggregate shall consist of crushed stones, gravel or other approved inert materials with similar
characteristics or a combination thereof, having clean, hard, strong, durable, uncoated particles, free from
injurious amount of soft, elongated and laminated pieces organic or other matter.
Coarse aggregate shall be well graded as to size, ranging from 6mm up to size which will readily pass
between all reinforcing bars and between reinforcements and forms, but not to exceed 25mm in size for
reinforced beams, floor slabs, columns, etc. and may range up to 50mm for less highly reinforced parts of
structure such as footing.
Gravel under concrete slab shall be river run gravel with a maximum size of 50mm. A minimum size
of 12.50mm.
Placing concrete- concrete shall be rapidly handled from the mixing site to forms and deposited as
early as possible in its final position without loss of ingredients. Concrete shall be spaded and worked by
hand to assure close contact to surfaces of forms and reinforcement. Concrete shall not be dropped freely
more than 1.22520mm (5ft.) for columns and not more than 920mm (3ft.) for footings and slabs.
Preparation for placing concrete- Before placing concrete, remove all sawdust, chips and other
construction debris from the places to be occupied by the concrete. Reinforcement shall be secured in
position and inspected by the authorized representative.
Curing shall be started as soon as free water has disappeared from the surface of the concrete. The
entire surface of the concrete shall be covered with canvass, straw, jute sack or other satisfactory materials
and kept moist by flushing or sprinkling water. Curing shall continue for a period of not less than 7 days after
placing the concrete.
Mixing concrete/materials shall be measured, batched and mixed in a mixer or by hand in a
watertight wooden platform at the job site.

C. STEEL WORKS 12,669.60 kgs

This item of work includes furnishing, fabrication and installation of ASTM grade 60, ASTM grade 40 and
ASTM grade 33 deformed steel bars comprising of wall footings, columns, beams, transformer platform, and pathwalk.

GROUND FLOOR 1,724.87 kgs


a. Column Footing
#REF! 210.40 kgs
b. Slanted Canopy [Along gridlines B' (3' to 6), & F' (3' to 6)] 372.69 kgs
c. Wall Footing 215.68 kgs
d. Transformer Platform 926.10 kgs

SECOND FLOOR 10,944.73 kgs


a. Columns [Bounded by gridlines (4' to 6) & (A to H)] 3,490.12 kgs
b. Beams [Lintel beams, and beams bounded by gridlines
(4 to 6) and (A to H)] 5,243.87 kgs
c. Concrete Gutter, and Slanted Canopy [Bounded by
gridlines (4 to 6) and (A to H)] 2,210.74 kgs

This item of work also includes the rental of cut-out machine and bar cutter as necessary as
possible to finish the work.
Reinforcing bars shall be standard commercial deformed type.
Use 10mmØ steel bars spaced at 1200mm on center both ways for ceiling hangers.
Tie wire shall be local standard commercial G.I. wire gauge 16.
Placing steel reinforcements – Place reinforcements securely fastened and support it to prevent
displacement before or during placing of concrete. Bars shall be bent cold. Bars shall be free from rust, scales
and oil. Splices in bars shall be made at critical points of maximum stresses.
Deformation of reinforcing bars shall conform to ASTM A615-68
Unless otherwise noted in the plans the minimum yield strength of the main reinforcing bars shall be
as follows:
10 mm fy = 230 MPa (Grade 33)
12 mm fy = 275 MPa (Grade 40)
16 mm and larger fy = 415 MPa (Grade 60)
Development length requirements (ld) shall be as tabulated in standard details.
Splice and anchorages shall follow those set from development length (ld) unless otherwise shown in
the plans or approved by the Engineer.
Standard hook for re-bars if required shall be either of the following:
Semicircular turns plus an extension of at least 4 bar diameters but not less than 65mm at free end of
the bar.
90 degree turn plus an extension of at least 12 bar diameters at free end of the bar.
Minimum diameter of bend measured on the inside of the bar be as follows:
10 mm to 25 mm - 6 bar diameter

D. MASONRY WORKS 3,549.66 m2

This item of work includes furnishing and installation of machine pressed Concrete Hollow Blocks 150mm
for exterior walls and concrete pathway; and machine pressed Concrete Hollow Blocks 100mm for the stairs and
interior partition walls, reinforced with 10 mm diameter rebars spaced at 600 mm on center bothways. Concrete
Hollow Blocks shall be filled with mortar and must be plain cement plaster finished.
This item of work also includes completion of plastering of all exterior and interior wall surfaces, columns,
beams, canopies, paraphets, and gutters.

GROUND FLOOR 299.25 m2


a. Exterior Walls [(Along gridlines A (5 to 6); and H (5 to 6)] 9.60 m2
b. Stairs 29.70 m2
c. Concrete Pathway 33.60 m2
d. Plastering [Walls along gridlines B' (3' to 6), F' (3' to 6), 226.35 m2
A (5 to 6), & H (5 to 6); Colums along gridlines B' (3' to 6),
B' (3' to 6), & F' (3' to 6); Stairs's Masonry; Canopies
along gridlines B' (4 to 6), & F' (4 to 6), and exposed
septic tank]

SECOND FLOOR 3,250.41 m2


a. Exterior Walls [Along gridlines A, B', F', & H (4 to 6) ; 174.12 m2
6 (A to H); 1 (C to F) Porch; H (1 to 2); & 1 (D to E)]
b. Interior Partition Walls [Along gridlines 4 (G to H) ; 158.88 m2
5 (A to B & G to H) ; B (4 to 5); G (4 to 5); H (1 to 2);
E (1 to 2); & 2 (D to E)]
c. Plastering [All walls, exposed beams, columns, gutters, 2,917.41 m2
paraphets, & canopies]

All masonry surfaces shall be cement plastered smooth finish ready to accept painting works.
All concrete hollow blocks for use in masonry works shall be load bearing-concrete hollow blocks
with a minimum strength of 4.85 MPa.
All masonry shall be laid true, level, plumb and neat in accordance with the plans.
Units shall be cut accurately to fit all plumbing ducts, opening, electrical works, etc. and all holes shall
be neatly patched.
Reinforcing bar shall conform to the provisions provided for the structural notes and their installation
shall be in accordance with standard details provided for. All provisions for dowels shall properly laid in place
prior to laying of masonry units. Splicing of bars shall conform to splicing standards set forth in the structural
notes.
Unless otherwise shown on the drawings, all cells shall be filled with mortar mixture consisting part
cement and three parts of sand.
All control joints shall be laid in accordance with the plans or as directed by the Engineer.
All exterior walls above grade which are not to be painted shall be waterproof with three coats of
cement sealant which is one component colorless preparation on base of Alkoxy-Silan. The sample of the
cement sealant shall be submitted to the Engineer for approval.
All masonry units shall be sound and free from cracks and other defects. Defective units shall be
subject to rejection by the Engineer and shall be removed from the project site immediately upon receipt.

E. ROOFING WORKS 392.06 m2

Area Bounded by Gridlines 3' to 6 (A to B' and F' to H)


This item of work includes the furnishing and installation of 0.6mm pre-painted long span G.I. roofing,
0.6mm pre-painted G.I. ridge roll, 0.6mm pre-painted G.I. hipped roll, tekscrew, 50mm x 150mm x 2mm C-Purlins,
75mm x 75mm x 6mm angular cleats, 75mm x 75mm x 6mm angle bar, 65mm x 65mm x 6mm angle bar, 50mm
x 50mm x 6mm angle bar, 50mm x 50mm x 4.5mm angle bar, 6mm gusset plate, 350mm x 350mm x 12mm base plate
anchored with 20mm diameter x 350mm anchor bolts. This item also uses 12mm diameter sagrods as for
added reinforcements. This item also uses 10mm thk. polyethylene double film foam as insulation.
C-purlin's connection to existing c-purlin must be welded and supported with 75mm x 75mm x 6mm thk x
350mm long angle bars with 1 leg fully welded to the purlin interior connection and bolted with 16mm Ø bolts at
its ends.
This item of work also includes rental of welding machine, cut-off machine, use of E-70 welding rod
and acetylene with oxygen, and all other equipments needed to complete welding works.
Laying should start from the opposite end direction of the prevailing monsoon wind.
Laying of long-span roofing shall conform with the manufacturer's specifications.
Apply sufficient amount of colored roof sealant to ensure leak free roofing and epoxy primer paint
on trusses, purlins, and sagrods.
All works shall be done in such a manner that will ensure a strong and lasting leak proof installation.
The purlins shall be spaced as shown on plans. Sheets shall be laid with the ends lapping as indicated
on the drawings, the minimum end lap shall be 0.30 meter.
Each course shall be started in such a manner that the vertical joints are broken. Top sheets shall be
laid with the side corrugation down, with a side lap of at least two corrugations. Each sheet laid shall be
secured to the purlins with riveted straps.
Straps shall be gauged #24, 25mm wide with corners chipped off at the riveting ends. They shall be cut
sufficiently long and punched at correct distance to fit the rivet holes and allow for bending around the required
size purlins. One strap shall be placed at each alternate corrugation at the gutter line.
The lower end of each sheet shall be riveted to the sheet beneath such rivets to alternate with rivets
engaging the straps. Side laps shall be riveted with two lines of rivets staggered and spaced as directed by
the Engineer.
The intersection of all walls with roof and wherever necessary shall be flashed with G.I. gauge #24 not
less than 200 mm high unless otherwise shown on the detail drawings or full size details, and all connections
shall be made watertight.
Please refer to the plan for the complete details.

F. FORMWORKS AND SCAFFOLDINGS 1.00 lot

This item of works includes the furnishing and installation of 1/4" thk. Marine plywood, 2"x 2" coco
lumber, 2" x 3" coco lumber, tiewire, and assorted nails.
This item of work also includes rental of GI Pipe H-frame scaffolding needed to complete the said item
in this project.
Construction of forms – Construct forms sufficiently tight to prevent leakage, securely brace and shore
forms to prevent displacement and to safely support construction loads. Forms shall not be removed until
concrete is set.

G. WATERPROOFING WORKS 193.40 m2

[Concrete Gutters bounded by gridlines 4 to 6 (A to H), and


Slab bounded by gridlines 1 (C to F)]
This item of works includes application of three (3) coats of water tite cementatious waterproofing
membranes in the surface of the gutter floors, gutter sidings up to 200 mm high, and roof slabs.
This item of work also includes integral waterproofing of concrete gutters to be constructed.
Add one pack of sahara for every bag of cement mixture.

III. ARCHITECTURAL WORKS

A. CEILING WORKS 2,647.72 m2

This item of work includes the installation of ceiling in the Ground Floor and Second Floor classrooms,
computer rooms, laboratory rooms, comfort rooms, admin office, janitor's room, electrical room, and storage
room using 3.5mm thk. fiber cement board, 1" x 2" x 0.4mm double metal furring spaced at 600mm o.c. bothways, 1"
x 2" x 0.7mm carrying channel, 25mm x 25mm x 0.5mm wall angle, blind revits, s-furring clips, hangers at 1200mm
spacing, and 50cm x 50 cm manholes with metal frames.
This item of work also includes the installation of ceiling in the Ground Floor corridors and lobby; and
Second Floor corridors, and stairs using 6.0mm thk. fiber cement board, 38mm x 38mm x 3mm angle bar ceiling joist
spaced at 600mm o.c. bothways, hangers at 1200mm spacing, 200mm x 2400mm PVC ceiling vent, epoxy primer
paint, and 50cm x 50cm manholes w/ metal frames.

GROUND FLOOR 1,223.72 m2


a. Ficem Board on Angle Bars 596.92 m2
b. Ficem Board on Metal Furring 626.80 m2

SECOND FLOOR 1,424.00 m2


a. Ficem Board on Angle Bars 503.03 m2
b. Ficem Board on Metal Furring 920.97 m2

Use bolts and/or nails for wall angles.


This item of work also includes rental of welding machine, cut-off machine, use of E-70 welding rod
and all other equipments needed to complete welding works.
Use epoxy primer paint for painting angle bars.
Use ⅝" dia x ¾" blind rivets and hangers rods, 0.4mm thk metal furring may be used as hangers rods.
It is necessary to use hacksaw blade for cuttting rods and wall angles.
Use drill tool and drill bits, tiewires, level hose, nylon, and other miscellaneous hardware items
necessary for the completion of work.
All materials shallbe of approved high quality
Please refer to the Reflected Ceiling Plan for complete details.

B. DOORS & WINDOWS 98.00 sets

This item of work includes fabrication and installation of the following doors and windows for the Ground
Floor and Second Floor of the Building
(Please refer to the plan)
GROUND FLOOR 16.00 sets
Doors
D2 - 2.5m x 0.9m Hardwood Panel Type Door 7.00 sets

D2a - 2.5m x 1.0m Hardwood Panel Type Door 1.00 set

Cubicle Door 8.00 sets

SECOND FLOOR 82.00 sets


Doors
D1 - 2.5m x 1.1m Panel Type Door w/ Clear Glass Viewing 20.00 sets
Window (Provided with Square Bar Security Grills)

D1a - 2.5m x 1.1m Aluminum Framed Powder Coated 2.00 sets


Dual Swing Type with Clear Glass Panel

D2 - 2.5m x 0.9m Hardwood Panel Type Door 6.00 sets

D2a - 2.5m x 1.0m Hardwood Panel Type Door 1.00 set

Windows
W1 - 1.2m x 2.4m Steel Casement Swing Type Window w/ 24.00 sets
1/4" Thk. Clear Glass Panel and Security Grills

W2 - 1.2m x 1.6m Steel Casement Swing Type Window w/ 2.00 sets


1/4" Thk. Clear Glass Panel and Security Grills

W3 - 0.4m x 2.4m Steel Casement Awning Type Window w/ 11.00 sets


1/4" Thk. Clear Glass Panel and Security Grills

W4 - 0.4m x 1.8m Steel Casement Awning Type Window w/ 4.00 sets


1/4" Thk. Clear Glass Panel and Security Grills

W5 - 0.4m x 1.8m Steel Casement Awning Type Window w/ 5.00 sets


1/4" Thk. Clear Glass Panel and Security Grills
W6 - 0.4m x 1.2m Steel Casement Awning Type Window w/ 4.00 sets
1/4" Thk. Clear Glass Panel and Security Grills

W7 - 1.5m x 3.0m Steel Casement Awning Type Window w/ 3.00 sets


1/4" Thk. Clear Glass Panel and Security Grills

All doors and windows shall be done as specified and shown on the detailed drawings.
Windows shall be installed without forcing or distortion so that sills and heads are level and jambs are
plumb.
Each panel of hinged door shall be hung on 88.92mm x 88.92mm (3.5" x 3.5") pin hinges. All hinges shall
be of heavy duty stainless steel.
All doors shall be duty and of approved good quality.
All locks shall be installed in door frames at the same height of 0.90 meter from finished floor line.
Please refer to the plan.

C. FLOOR AND WALL FINISHES 1,851.13 m2

This item of work includes furnishing and installation of the following tiles for the Ground Floor and
Second Floor of the building.
(Please refer to the plan)
GROUND FLOOR 354.53 m2
a. Stairs (4-Units) 116.70 m2
300mm x 300mm Ceramic Floor Tiles, Non-Skid 1,036.00 pcs
400mm x 400mm Ceramic Floor Tiles 220.00 pcs

b. Male Comfort Rooms, Female Comfort Rooms, 227.83 m2


and PWD Comfort Room
600mm x 600mm Granite Tiles 16.00 pcs
400mm x 400mm Ceramic Floor Tiles, Unglazed 319.00 pcs
400mm x 400mm Ceramic Wall Tiles, Glazed 1,214.00 pcs

c. Porch Damaged Tiles 10.00 m2


400mm x 400mm Ceramic Floor Tiles 69.00 pcs

SECOND FLOOR 1,496.60 m2


a. Corridors, Classrooms, Laboratory, Storage Rooms, 1,340.20 m2
Electrical Room, Faculty Room, Office
400mm x 400mm Ceramic Floor Tiles 9,214.00 pcs

b. Male and Female Comfort Rooms 138.40 m2


600mm x 600mm Granite Tiles 13.00 pcs
400mm x 400mm Ceramic Floor Tiles, Unglazed 189.00 pcs
400mm x 400mm Ceramic Wall Tiles, Glazed 736.00 pcs

c. Exterior Wall 18.00 m2


300mm x 600mm Outdoor Stone Tiles 110.00 pcs

Use tile adhesive for bonding, and grout for filling joints.
Use grinder and diamond blade, anti-microbial tile sealer, masking tape, spacer, sleeves, and other
consumable hardwares necessary for the completion of work.
Please refer to the Tiles Layout Plan and Perspective for complete details.

D. PAINTING WORKS 8,916.38 m2

This item of work includes the painting of exterior surfaces using concrete neutralizer, one (1) coat
elastomeric latex primer paint, two (2) coats elastomeric latex topcoat, patching compound, tinting color, and
paint thinner.
This item of work also includes the painting of ceiling and interior walls/surfaces using concrete neutralizer,
one (1) coat flat latex paint undercoat, two (2) coats semi-gloss latex paint topcoat, patching compound, tinting
color, and paint thinner.
This item of work also includes painting of installed doors and windows using one (1) coat epoxy primer,
two (2) coats quick dry enamel, and paint thinner.

GROUND FLOOR 4,028.65 m2


a. Exterior Surfaces 772.88 m2
b. Interior Surfaces 2,032.05 m2
c. Ceiling 1,223.72 m2

SECOND FLOOR 4,887.73 m2


a. Exterior Surfaces 937.60 m2
b. Interior Surfaces 2,374.75 m2
c. Ceiling 1,424.00 m2
d. Doors & Windows 151.38 m2

Also included in this item of work is grouting/patching of all cracks in the interior and exterior surfaces
of the Ground Floor using cement epoxy before application of paints.
Use only premium quality paint.
Use rollers & tray, brushes, old newspaper, sandpapers and rugs as necessary.
The painting contractor shall supply all labor, tool and equipment necessary and shall perform all
painting and finishing works as shown in the schedule of painting and other surfaces to render ready to use.
Painting materilas shall be stored in one place in the building to be kept neat and clean.
Before any painting is done all surfaces shall be cleaned, smoothed and free from dust. Dirt, grease,
mortar, rust and other foreign substances and all parts where paint remover has been used shall be washed off
with paint or laquer thinner.
All paints shall be spread evenly and carefully.
No painting shall be done on outside work extremely cold, frosty, foggy or damp weather.

E. PARTITIONS 104.40 m2

GROUND FLOOR 42.30 m2


a. Fixed Drywall Double Wall Partition [Along gridline 40.50 m2
3 (A to B), & 4 (A to B)]
Ficem board, 6.0mm Thk. 32.00 pcs
100mm x 50mm x 2.0mm channel x 6M 36.00 pcs
Epoxy Primer Paint 3.00 gals
2" Screw 96.00 pcs
Tekscrew 641.00 pcs

This item of work also includes rental of welding machine, cut-off machine, use of E-70 welding rod
and all other equipments needed to complete welding works.
(Please refer to the plan)

b. Comfort Rooms Cubicle Partitions 1.80 m2


(MADE TO ORDER) ¾" thk. Heavy duty Phenolic PCB Board urinal partition with complete accessories
(FABRICATION AND INSTALLATION INCLUDED).

SECOND FLOOR 62.10 m2


a. Foldable Social Hall Partition 40.50 m2
(MADE TO ORDER) Hollow Core Partition w/ 1/4" thk. Marine Plywood Panel on Wooden Framing w/
Heavy Duty Top Track, Roller, and Bottom Guide, 8 nos. Barrel Bolt. 3/16" x 1 1/2" x 1 1/2" Angle Bar and
Diagonal and Vertical Support w/ 5mm thk. Ficem Board Covering (2 -sets FABRICATION AND INSTALLATION
INCLUDED)

b. Comfort Rooms Cubicle Partitions 21.60 m2


(MADE TO ORDER) ¾" thk. Heavy duty Phenolic PCB Board cubicle partition and SS Accessories, adjustable
feet, wall brackets,self closing hinges,indicator lockset, coat hoak, knob handle, top rail, L bracket (FABRICATION
AND INSTALLATION INCLUDED) at ground floor.
(Please refer to the plan)
F. STAIRS, RAILINGS & ARCHITECTURAL METALS 1.00 lot

This item of work includes fabrication and installation of the following items listed below:

Brass Stair Nosing 2" 30.00 pcs


50mm Ø G.I. Pipe Handrail Schedule 40 8.00 pcs
Consumable Hardwares 1.00 lot

Please refer to the Stairs and Railings Layout Plan for complete details.

G. SPECIALTIES, TOILET ACCESSORIES, AND ACCESSORIES 1.00 lot

This item of work includes furnishing and installation of the following items listed below:

Wall Mirror, 120cm x 220cm 4.00 units


Wall Mirror, 120cm x 130cm 1.00 unit
Wall Mirror, 120cm x 100cm 2.00 units
Soap Holder, Ceramic 7.00 units
Tissue-Napkin Dispenser 3.00 units
Consumable Hardwares 1.00 lot

IV. ELECTRICAL WORKS 1.00 lot

This item of work includes the manhole size cutting at the ceiling and restoration, chipping
works if needed, and voltage test and megger testing. Also includes the supply and installation of the
following electrical materials;

GROUND FLOOR
Pinlight housing 6" dia with 15W led bulb 70.00 sets
daylight, cylindrical recessed type
15W LED Compact Bulb, Daylight 68.00 pcs
ceiling fan, 16" dia. 4.00 sets
electrical tape 10.00 rolls
Rubber tape 3.00 roll
PVC 20 mm dia conduit 25.00 pcs
3.5 sq. mm THHN wire 1.00 bx
50 sq. mm THHN wire 60.00 m
5.5 sq. mm THHN wire 2.00 bxs
5.5 sq. mm TW wire (grounding) 1.00 bxs
14.0 sq. mm TW wire (grounding) 15.00 m
PVC 50 mm dia conduit 3.00 pcs
PVC 50 mm dia elbow 2.00 pcs

SECOND FLOOR
Pinlight housing 6" dia with 22W led bulb 162.00 sets
daylight, cylindrical recessed type
duplex convenience outlet with grounding 66.00 sets
universal type, heavy duty, 16A
Duplex socket outlet FM Grounding Type 16.00 sets
Enclosed circuit breaker, 30AT, 2P, single 10.00 sets
phase in Nema 3R, metal enclosure with grounding lug(for accu)
ceiling fan, 16" dia. 26.00 sets
one gang switch 2.00 sets
two gang switch 17.00 sets
three gang switch 5.00 sets
two gang three way switch 2.00 sets
utility box, sch. 40 123.00 pcs
junction box with cover, sch. 40 193.00 pcs
pullbox 12" x 12" x 4" 1.00 pcs
electrical tape 50.00 rolls
Rubber tape 20.00 roll
Mica tube 1/4" 200.00 m
tie wire 5.00 kls
PVC solvent 3.00 can
PVC 20 mm dia conduit 886.00 pcs
3.5 sq. mm THHN wire 18.00 bxs
5.5 sq. mm THHN wire 17.00 bxs
5.5 sq. mm TW wire (grounding) 9.00 bxs
60 sq. mm THHN wire 100.00 m
22 sq. mm TW wire (grounding) 25.00 m
PVC 50 mm dia conduit 10.00 pcs
PVC 50 mm dia elbow 4.00 pcs
grounding rod with clamp 5/8" x 10' 2.00 set
other miscellaneous items 1.00 lot
and consumables such as bolts, cable tie,
terminal lugs, tagging tape, compression tap,
solderless connector etc.

Installation of 3-50kVA Transformer


Supply of 350kVa Transformer Amorphous w/ Lighting
Arrester and Fuse Cut-Out 3.00 sets
Insulator pin 12.00 pcs
Pole top pin 12.00 pcs
Bolt machine, 5/8 x 10 16.00 pcs
Bolt machine, 5/8 x 12 20.00 pcs
Washer, 2 1/4" x 2 1/4" x 3/16" x 13/16" 40.00 pcs
Spool insulator 1 3/4" dia groove 12.00 pcs
Pipe spacer 3/4" dia x 1 1/2" 5.00 pcs
Brace, 60 span 10.00 pcs
Cross arm 5.00 pcs
Guy hook J type 5.00 pcs
Locknuts 5/8" 60.00 pcs
Bolt single upset 9" 5.00 pcs
Insulator suspension 12.00 pcs
Clamp deadend 2.00 pcs
Clevis secondary swinging 8.00 pcs
Clevis secondary swinging insulated 2.00 pcs
Clamp loop deadend 10.00 pcs
Connector compression 14.00 pcs
Connector split bolt type 2.00 pcs
Clamp hotline 8.00 pcs
Ground wire # 4 AWG, 3 strand, al. 60.00 m
Bolt double upset 5/8" x 10" 8.00 pcs
Bolt single upset 5/8" x 10" 4.00 pcs
Bracket with spool 3.00 pcs
Bolt eye 5/8" x 10" 3.00 pcs
Nut eye 5/8" 3.00 pcs
Ground rod 5/8" x 10' 3.00 pcs
Ground rod clamp 3.00 pcs
Anchor log 6.00 pcs
Rod anchor, thimble eye 6.00 pcs
Anchor expanding type 3.00 pcs
Staples ground wire, 2" x 1/2" # 8 gauge 70.00 pcs
Ground wire clip 40.00 pcs
ACSR # 2/0 (Insulated) 120.00 m
35 footer concrete/steel pole 2.00 pcs
Current transformer as required 3.00 unit
Current transformer box 1.00 pc

Main Service Equipment 1.00 set


300AT/400AF/400V/3P/Enclosed Circiut Breaker/ NEMA 3R

other miscellaneous items and consumables 1.00 lot


such as cable tie, terminal lugs, tagging tape,
compression tap, etc.
Feederline and Panelboard
PP1 with main: 100AT/200AF, 1.00 unit
Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 27 branches: all bolt on type
9-15AT, 1P, 5 kaic
9-20AT, 1P, 5 kaic
9-30AT, 1P, 5 kaic
2-space

PP2 with main: 150AT/200AF, 1.00 unit


Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 30 branches: all bolt on type
9-15AT, 1P, 5 kaic
9-20AT, 1P, 5 kaic
12-30AT, 1P, 5 kaic
2-space 1P, 5 kaic

MDP with MTS: 2- 300AT/400AF 1.00 unit


Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 30 branches: all bolt on type
2-100AT,200AF,3P,10kAIC
1-150AT,200AF,3P,10kAIC
1-50AT, 100AF, 3P, 10kAIC

Other miscellaneuos labor cost


Labor for the replacement of existing compact 1.00 lot
bulb into 15W LED bulb

Dismantling of existing 3 sets of Panelboards 1.00 lot

Retermination of existing circuit homerun to 1.00 lot


new Panelboard @ GF

Mounting of 3-50kVA transformer 13.2/7.62kV, 1.00 lot


400/230V, Lighting arrester/ fuse cut-out
combination 3-current transfomer, 3-potential
transformer includes boom truck rental

Testing and energization 1.00 lot


As built plan 1.00 lot
Service entrance retermination 1.00 lot
Manhole size cutting at ceiling and 1.00 lot
restoration/ Chipping works if needed
Voltage test and megger testing 1.00 lot

For piping and wiring layout:


For lighting layout - use 2-3.5 sq. mm THHN wire in PVC 20 mm dia conduit
For convenience outlet use 2-5.5 sq. mm THHN wire + 1- 5.5 sq. mm TW in PVC 20 mm dia
For 3 tonner accu use 2-5.0 sq. mm THHN wire + 1- 5.5 sq. mm TW wire in PVC 20 mm dia
For 250AT use2 set of 3-60 sq. mm THHN wire + 1-22 sq. mm THHN wire in PVC 50 mm dia

Wiring must be color coded:


Live - red, yellow
Neutral - black or white
Grounding - green
V. PLUMBING WORKS 1.00 lot

This item of work includes furnishing and installation of the following plumbing materials and fire protection
system for the Ground Floor and Second Floor of the building.

A. Catch Basins 4.00 units

B. Fixtures & Accessories


Lavatory Countersunk w/ Faucet 15.00 sets
Lavatory w/ Faucet 1.00 set
Dual Flush Type Water Closet with Bidet 14.00 sets
Waterless Urinal 9.00 sets
Faucet, Heavy-Duty Brass 2.00 pc
4" x 4" Stainless steel floor drain 17.00 sets

C. Construction of Drainage Canal


RCPC, 200mm Ø 30.00 pcs
3"Ø x 3m PVC Pipe 27.00 pcs
3"Ø Coupling 18.00 pcs
3"Ø 45° Elbow 16.00 pcs
Brass Strainer 18.00 pcs
PVC Solvent cement 5.00 liters
Cement - bags
Sand - m3
Gravel - m3
12mmØ RSB x 6m - pcs
16mmØ RSB x 6m - pcs
50mm x 50mm x 6mm thk. Angle Bar 45.00 pcs
Welding Rod 15.00 kgs
Tie Wire #16 15.00 kls
Miscellaneous items and other consumables 1.00 lot

D. Sanitary Waste Line


4"Ø x 3m PVC Pipe 8.00 pcs
3"Ø x 3m PVC Pipe 8.00 pcs
3"Ø P-Trap 6.00 pcs
3"Ø Wye 1.00 pc
3"Ø x 2"Ø Tee Reducer 9.00 pcs
3"Ø 1/4 Bend 9.00 pcs
3"Ø 90° Elbow 5.00 pcs
4"Ø x 3"Ø Wye reducer 19.00 pcs
4"Ø Wye 4.00 pcs
4"Ø Coupling 1.00 pc
4"Ø Clean out 4.00 pcs
4"Ø 90° Elbow 6.00 pcs
PVC Solvent Cement 5.00 liters

E. Vent Line
3"Ø x 3m PVC Pipe 2.00 pcs
3"Ø Coupling 1.00 pc
4"Ø x 3"Ø Wye Reducer 1.00 pc
4"Ø x 2"Ø Wye Reducer 5.00 pcs
3"Ø 45° Elbow 1.00 pc
3"Ø x 2"Ø Coupling Reducer 9.00 pcs
2"Ø PVC Pipes 17.00 pcs
2"Ø Coupling 13.00 pcs
2"Ø 45° Elbow 20.00 pcs
PVC Solvent cement 2.00 liters

F. Clean Water Line


3/4"Ø x 4m PPR Pipes 9.00 pcs
3/4"Ø Gate Valves 2.00 pcs
3/4"Ø PPR tee 14.00 pcs
3/4"Ø PPR elbow 10.00 pcs
3/4"Ø PPR coupling 5.00 pcs
1"Ø x 3/4"Ø tee reducer 2.00 pcs
1"Ø PPR tee 1.00 pcs
1"Ø x 3/4"Ø Coupling Female 16.00 pcs
1"Ø x 3/4"Ø Coupling Male 16.00 pcs
Assorted PPR Pipe Clips 200.00 pcs

G. Fire Protection System


(see detailed plan)
Fire Hose Cabinet Complete Set 4.00 sets
Two-Way (Breeching Inlet) Siamese Connection 2.00 sets
Air Release Valve Assembly 2.00 sets
100mmØ Check Valve 2.00 pcs
Fire Extinguishers 10.00 pcs
100mmØ Wrought Iron Pipe 20.00 m
100mmØ Elbow 4.00 pcs
100mmØ x 65mmØ Tee 2.00 pcs
100mmØ x 65mmØ Bell 2.00 pcs
Miscellaneous works and other consumables 1.00 lot

This item of work also includes the rental of 1-bagger concrete mixers and other equipments necessary to
finish the work.
This item of work also includes rental of welding machine, cut-off machine, use of E-70 welding rod
and all other equipments needed to complete welding works.
Please refer to plan for details.

Prepared by: Recommending Approval:

Engr. ULYSSES R. BELLO Prof. JERRY S. BIGORNIA


Director, BU-PDMO VP for Planning and Development

Approved:

Dr. ARNULFO M. MASCARIÑAS


SUC President IV
Project Title:
Location:
Owner

BILL OF MATERIALS AND COST ESTIMATES

I. GENERAL REQUIREMENTS 1.00 lot


Project Sign Boards 1.00 lot @ 10,000.00 / lot ₱ 10,000.00
Temporary Utilities and Enclosure 1.00 lot @ 50,000.00 / lot 50,000.00
Construction Safety & Health Programs 1.00 lot @ 35,000.00 / lot 35,000.00
(A) Direct Cost ₱ 95,000.00
(B) Indirect Cost 19,000.00
Vat (5% of A & B) 5,700.00
Sub-Total Cost ₱ 119,700.00

II. CIVIL WORKS

A. SITE WORKS 1.00 lot


a. Cleaning & clearing of site before & after construction.
Labor 1.00 lot @ 20,000.00 / lot ₱ 20,000.00

b. 2.0 m Concrete Pathwalk [Bounded by gridlines (5 to 6)


and (B' to F') in the Ground Floor]
Excavation 92.40 m3 @ 200.00 / m3 18,480.00
Filling Materials and Compaction 83.72 m3 @ 680.00 / m3 56,929.60
Gravel Bedding (Material & Labor) 14.17 m3 @ 780.00 / m3 11,051.04

c. Drainage Line Canal with Steel Grating


Excavation 0.00 m3 @ 200.00 / m3 0.00
Backfilling and Compaction 0.00 m3 @ 250.00 / m3 0.00
Gravel Bedding (Material & Labor) 0.00 m3 @ 780.00 / m3 0.00

d. Transformer Platform
Excavation 20.90 m3 @ 200.00 / m3 4,180.00
Backfilling and Compaction 17.42 m3 @ 250.00 / m3 4,355.63
Gravel Bedding (Material & Labor) 2.09 m3 @ 780.00 / m3 1,630.20

e. Demolition and disposal of walls [Along gridline 2' (D to E);


B' (5 to 6); and F' (5 to 6) in the Ground Floor; Along
gridline 2' (D to E), and 1 (D to E) in the Second Floor]
Wall Area 15.16 m2 @ 200.00 / m2 3,032.00

f. Dismantling and disposal of existing old ceiling in the


Ground Floor
Ceiling Area 1,223.72 m2 @ 150.00 / m2 183,558.00

g. Dismantling and disposal of existing tiles in the


Ground Floor
Male, Female, and PWD Comfort Rooms 227.83 m2 @ 150.00 / m2 34,174.50
Porch Damaged Tiles 10.00 m2 @ 150.00 / m2 1,500.00

h. Chipping works, removal and disposal of old plumbing


fixtures and fittings in the Ground Floor
Labor & Misc. items 1.00 lot @ 15,000.00 / lot 15,000.00

j. Dismantling and disposal of existing foldable partitions


in the Ground Floor
Labor & Misc. items 2.00 units @ 2,000.00 / unit 4,000.00

k. Dismantling of existing doors in the Comfort Rooms


Electrical Room, Janitor's Room, and Storage Room
in the Ground Floor
Labor 16.00 sets @ 200.00 / set 3,200.00

l. Equipment Rental
Plate Compactor 10.00 units @ 1,000.00 / day 10,000.00
Hauling Truck 5.00 days @ 7,500.00 / day 37,500.00
(A) Direct Cost ₱ 408,590.97
(B) Indirect Cost 81,718.19
Vat (5% of A & B) 24,515.46
Sub-Total Cost ₱ 514,824.62
B. CONCRETE WORKS #REF! m3
a. Column Footing
a.1 Concrete Works 5.42 m3
Portland Cement 49.00 bags @ 260.00 / bag ₱ 12,740.00
Sand 2.80 cu. m. @ 500.00 / cu. m. 1,400.00
Gravel 5.50 cu. m. @ 600.00 / cu. m. 3,300.00

a.2 Equipment Rental


2 1-Bagger Concrete Mixers 1.00 day/s @ 1,500.00 / day 3,000.00
Material Cost ₱ 17,440.00
Labor Cost 5,232.00
Equipment 3,000.00
(A) Direct Cost ₱ 25,672.00
(B) Indirect Cost 5,134.40
VAT (5% of A and B) 1,540.32
Sub-Total Cost ₱ 32,346.72

b Column
a.1 Concrete Works 4.76 m3
Portland Cement 43.00 bags @ 260.00 / bag ₱ 11,180.00
Sand 2.40 cu. m. @ 500.00 / cu. m. 1,200.00
Gravel 4.80 cu. m. @ 600.00 / cu. m. 2,880.00

a.2 Equipment Rental


2 1-Bagger Concrete Mixers 1.00 day/s @ 1,500.00 / day 3,000.00
Material Cost ₱ 15,260.00
Labor Cost 4,578.00
Equipment 3,000.00
(A) Direct Cost ₱ 22,838.00
(B) Indirect Cost 4,567.60
VAT (5% of A and B) 1,370.28
Sub-Total Cost ₱ 28,775.88

c. Wall Footing
a.1 Concrete Works 4.76 m3
Portland Cement 43.00 bags @ 260.00 / bag ₱ 11,180.00
Sand 2.40 cu. m. @ 500.00 / cu. m. 1,200.00
Gravel 4.80 cu. m. @ 600.00 / cu. m. 2,880.00

a.2 Equipment Rental


2 1-Bagger Concrete Mixers 1.00 day/s @ 1,500.00 / day 3,000.00
Material Cost ₱ 15,260.00
Labor Cost 4,578.00
Equipment 3,000.00
(A) Direct Cost ₱ 22,838.00
(B) Indirect Cost 4,567.60
VAT (5% of A and B) 1,370.28
Sub-Total Cost ₱ 28,775.88

b. Slanted Canopy [Along gridlines B' (3' to 6), & F' (3' to 6)]
b.1 Concrete Works 2.28 m3
Portland Cement 21.00 bags @ 265.00 / bag ₱ 5,565.00
Sand 1.20 cu. m. @ 500.00 / cu. m. 600.00
Gravel 2.30 cu. m. @ 600.00 / cu. m. 1,380.00

b.2 Equuipment Rental


1-Bagger Concrete Mixer 1.00 day/s @ 1,500.00 / day 1,500.00
Material Cost ₱ 7,545.00
Labor Cost 2,263.50
Equipment 1,500.00
(A) Direct Cost ₱ 11,308.50
(B) Indirect Cost 2,261.70
VAT (5% of A and B) 678.51
Sub-Total Cost ₱ 14,248.71

c. Wall Footing
c.1 Concrete Works 3.36 m3
Portland Cement 31.00 bags @ 265.00 / bag ₱ 8,215.00
Sand 1.70 cu. m. @ 500.00 / cu. m. 850.00
Gravel 3.40 cu. m. @ 600.00 / cu. m. 2,040.00

c.2 Equuipment Rental


1-Bagger Concrete Mixer 2.00 day/s @ 1,500.00 / day 3,000.00
Material Cost ₱ 11,105.00
Labor Cost 3,331.50
Equipment 3,000.00
(A) Direct Cost ₱ 17,436.50
(B) Indirect Cost 3,487.30
VAT (5% of A and B) 1,046.19
Sub-Total Cost ₱ 21,969.99

d. Transformer Platform
d.1 Concrete Works 7.44 m3
Portland Cement 67.00 bags @ 265.00 / bag ₱ 17,755.00
Sand 3.80 cu. m. @ 500.00 / cu. m. 1,900.00
Gravel 7.50 cu. m. @ 600.00 / cu. m. 4,500.00

d.2 Equipment Rental


2 1-Bagger Concrete Mixers 2.00 day/s @ 1,500.00 / day 6,000.00
2 Concrete Vibrators 2.00 day/s @ 500.00 / day 2,000.00
Material Cost ₱ 24,155.00
Labor Cost 7,246.50
Equipment 8,000.00
(A) Direct Cost ₱ 39,401.50
(B) Indirect Cost 7,880.30
VAT (5% of A and B) 2,364.09
Sub-Total Cost ₱ 49,645.89

SECOND FLOOR 193.29 m3


a. 4" Concrete Topping [Entire Second Floor]
a.1 Concrete Works 150.38 m3
Portland Cement 1,354.00 bags @ 265.00 / bag ₱ 358,810.00
Sand 75.20 cu. m. @ 500.00 / cu. m. 37,600.00
Gravel 150.40 cu. m. @ 600.00 / cu. m. 90,240.00

a.2 Equuipment Rental


2 1-Bagger Concrete Mixers 15.00 day/s @ 1,500.00 / day 45,000.00
Material Cost ₱ 486,650.00
Labor Cost 145,995.00
Equipment 45,000.00
(A) Direct Cost ₱ 677,645.00
(B) Indirect Cost 135,529.00
VAT (5% of A and B) 40,658.70
Sub-Total Cost ₱ 853,832.70

b. Columns [Bounded by gridlines (4' to 6) & (A to H)]


b.1 Concrete Works 6.98 m3
Portland Cement 63.00 bags @ 265.00 / bag ₱ 16,695.00
Sand 3.50 cu. m. @ 500.00 / cu. m. 1,750.00
Gravel 7.00 cu. m. @ 600.00 / cu. m. 4,200.00

b.2 Equipment Rental


2 1-Bagger Concrete Mixers 2.00 day/s @ 1,500.00 / day 6,000.00
2 Concrete Vibrators 2.00 day/s @ 500.00 / day 2,000.00
Material Cost ₱ 22,645.00
Labor Cost 6,793.50
Equipment 8,000.00
(A) Direct Cost ₱ 37,438.50
(B) Indirect Cost 7,487.70
VAT (5% of A and B) 2,246.31
Sub-Total Cost ₱ 47,172.51

c. Beams [Lintel beams, and beams bounded by gridlines


(4 to 6) and (A to H)]
c.1 Concrete Works 18.25 m3
Portland Cement 165.00 bags @ 265.00 / bag ₱ 43,725.00
Sand 9.20 cu. m. @ 500.00 / cu. m. 4,600.00
Gravel 18.30 cu. m. @ 600.00 / cu. m. 10,980.00

c.2 Equipment Rental


2 1-Bagger Concrete Mixers 5.00 day/s @ 1,500.00 / day 15,000.00
2 Concrete Vibrators 5.00 day/s @ 500.00 / day 5,000.00
Material Cost ₱ 59,305.00
Labor Cost 17,791.50
Equipment 20,000.00
(A) Direct Cost ₱ 97,096.50
(B) Indirect Cost 19,419.30
VAT (5% of A and B) 5,825.79
Sub-Total Cost ₱ 122,341.59

d. Concrete Gutter, and Slanted Canopy [Bounded by


gridlines (4 to 6) and (A to H)]
d.1 Concrete Works 17.69 m3
Portland Cement 160.00 bags @ 265.00 / bag ₱ 42,400.00
Sand 8.90 cu. m. @ 500.00 / cu. m. 4,450.00
Gravel 17.70 cu. m. @ 600.00 / cu. m. 10,620.00

d.2 Equipment Rental


2 1-Bagger Concrete Mixers 5.00 day/s @ 1,500.00 / day 15,000.00
2 Concrete Vibrators 5.00 day/s @ 500.00 / day 5,000.00
Material Cost ₱ 57,470.00
Labor Cost 17,241.00
Equipment 20,000.00
(A) Direct Cost ₱ 94,711.00
(B) Indirect Cost 18,942.20
VAT (5% of A and B) 5,682.66
Sub-Total Cost ₱ 119,335.86

C. STEEL WORKS 12,669.60 kgs

GROUND FLOOR 1,724.87 kgs


a. Column Footing
#REF!
a.1 Steel Works 210.40 kgs
10 mm Ø RSB, ASTM Grade 33 x 6.0m 210.40 kgs @ 43.00 / kg ₱ 9,047.20
Tie Wire # 16 6.00 kgs @ 75.00 / kg 450.00

a.2 Equipment Rental


Bar Cutter 1.00 day/s @ 500.00 / day 500.00
Cut-Off Machine 1.00 day/s @ 1,000.00 / day 1,000.00
Material Cost ₱ 9,497.20
Labor Cost 2,849.16
Equipment 1,500.00
(A) Direct Cost ₱ 13,846.36
(B) Indirect Cost 2,769.27
VAT (5% of A and B) 830.78
Sub-Total Cost ₱ 17,446.41

b. Slanted Canopy [Along gridlines B' (3' to 6), & F' (3' to 6)]
b.1 Steel Works 372.69 kgs
12 mm Ø RSB, ASTM Grade 40 x 9.0m 247.75 kgs @ 45.00 / kg ₱ 11,148.84
10 mm Ø RSB, ASTM Grade 33 x 6.0m 124.94 kgs @ 43.00 / kg 5,372.53
Tie Wire # 16 9.00 kgs @ 75.00 / kg 675.00
b.2 Equipment Rental
Bar Cutter 1.00 day/s @ 500.00 / day 500.00
Cut-Off Machine 1.00 day/s @ 1,000.00 / day 1,000.00
Material Cost ₱ 17,196.37
Labor Cost 5,158.91
Equipment 1,500.00
(A) Direct Cost ₱ 23,855.28
(B) Indirect Cost 4,771.06
VAT (5% of A and B) 1,431.32
Sub-Total Cost ₱ 30,057.65

c. Wall Footing
c.1 Steel Works 215.68 kgs
12 mm Ø RSB, ASTM Grade 40 x 9.0m 164.10 kgs @ 45.00 / kg ₱ 7,384.41
10 mm Ø RSB, ASTM Grade 33 x 6.0m 51.58 kgs @ 43.00 / kg 2,217.94
Tie Wire # 16 1.00 kg @ 75.00 / kg 75.00

c.2 Equipment Rental


Bar Cutter 1.00 day/s @ 500.00 / day 500.00
Cut-Off Machine 1.00 day/s @ 1,000.00 / day 1,000.00
Material Cost ₱ 9,677.35
Labor Cost 2,903.21
Equipment 1,500.00
(A) Direct Cost ₱ 14,080.56
(B) Indirect Cost 2,816.11
VAT (5% of A and B) 844.83
Sub-Total Cost ₱ 17,741.50

d. Transformer Platform
d.1 Steel Works 926.10 kgs
20 mm Ø RSB, ASTM Grade 60 x 6.0m 549.10 kgs @ 47.00 / kg ₱ 25,807.70
16 mm Ø RSB, ASTM Grade 60 x 6.0m 205.21 kgs @ 47.00 / kg 9,644.87
12 mm Ø RSB, ASTM Grade 40 x 6.0m 45.87 kgs @ 45.00 / kg 2,064.15
10 mm Ø RSB, ASTM Grade 33 x 6.0m 125.92 kgs @ 43.00 / kg 5,414.56
Tie Wire # 16 10.00 kgs @ 75.00 / kg 750.00

d.2 Equipment Rental


Bar Cutter 3.00 day/s @ 500.00 / day 1,500.00
Cut-Off Machine 3.00 day/s @ 1,000.00 / day 3,000.00
Material Cost ₱ 43,681.28
Labor Cost 13,104.38
Equipment 4,500.00
(A) Direct Cost ₱ 61,285.66
(B) Indirect Cost 12,257.13
VAT (5% of A and B) 3,677.14
Sub-Total Cost ₱ 77,219.94

SECOND FLOOR 10,944.73 kgs


a. Columns [Bounded by gridlines (4' to 6) & (A to H)]
a.1 Steel Works 3,490.12 kgs
25 mm Ø RSB, ASTM Grade 60 x 6.0m 2,423.64 kgs @ 47.00 / kg ₱ 113,911.27
16 mm Ø RSB, ASTM Grade 60 x 9.0m 383.45 kgs @ 47.00 / kg 18,022.34
10 mm Ø RSB, ASTM Grade 33 x 9.0m 683.02 kgs @ 43.00 / kg 29,369.82
Tie Wire # 16 38.00 kgs @ 75.00 / kg 2,850.00

a.2 Equipment Rental


Bar Cutter 9.00 day/s @ 500.00 / day 4,500.00
Cut-Off Machine 9.00 day/s @ 1,000.00 / day 9,000.00
Material Cost ₱ 164,153.42
Labor Cost 49,246.03
Equipment 13,500.00
(A) Direct Cost ₱ 226,899.45
(B) Indirect Cost 45,379.89
VAT (5% of A and B) 13,613.97
Sub-Total Cost ₱ 285,893.31

b. Beams [Lintel beams, and beams bounded by gridlines


(4 to 6) and (A to H)]
b.1 Steel Works 5,243.87 kgs
20 mm Ø RSB, ASTM Grade 60 x 9.0m 1,813.25 kgs @ 47.00 / kg ₱ 85,222.52
20 mm Ø RSB, ASTM Grade 60 x 6.0m 2,153.69 kgs @ 47.00 / kg 101,223.48
12 mm Ø RSB, ASTM Grade 40 x 6.0m 53.28 kgs @ 45.00 / kg 2,397.60
16 mm Ø RSB, ASTM Grade 60 x 6.0m 141.15 kgs @ 47.00 / kg 6,634.05
10 mm Ø RSB, ASTM Grade 33 x 7.5m 138.83 kgs @ 43.00 / kg 5,969.48
10 mm Ø RSB, ASTM Grade 33 x 6.0m 943.68 kgs @ 43.00 / kg 40,578.24
Tie Wire # 16 79.25 kgs @ 75.00 / kg 5,943.75

b.2 Equipment Rental


Bar Cutter 15.00 day/s @ 500.00 / day 7,500.00
Cut-Off Machine 15.00 day/s @ 1,000.00 / day 15,000.00
Material Cost ₱ 247,969.11
Labor Cost 74,390.73
Equipment 22,500.00
(A) Direct Cost ₱ 344,859.84
(B) Indirect Cost 68,971.97
VAT (5% of A and B) 20,691.59
Sub-Total Cost ₱ 434,523.40
c. Concrete Gutter, and Slanted Canopy [Bounded by
gridlines (4 to 6) and (A to H)]
c.1 Steel Works 2,210.74 kgs
12 mm Ø RSB, ASTM Grade 40 x 9.0m 386.71 kgs @ 45.00 / kg ₱ 17,401.86
12 mm Ø RSB, ASTM Grade 40 x 6.0m 857.81 kgs @ 45.00 / kg 38,601.36
10 mm Ø RSB, ASTM Grade 33 x 6.0m 966.22 kgs @ 43.00 / kg 41,547.55
Tie Wire # 16 61.00 kgs @ 75.00 / kg 4,575.00

c.2 Equipment Rental


Bar Cutter 5.00 day/s @ 500.00 / day 2,500.00
Cut-Off Machine 5.00 day/s @ 1,000.00 / day 5,000.00
Material Cost ₱ 102,125.77
Labor Cost 30,637.73
Equipment 7,500.00
(A) Direct Cost ₱ 140,263.50
(B) Indirect Cost 28,052.70
VAT (5% of A and B) 8,415.81
Sub-Total Cost ₱ 176,732.00

D. MASONRY WORKS 3,549.66 m2

GROUND FLOOR 299.25 m2


a. Exterior Walls [(Along gridlines A (5 to 6); and H (5 to 6)] 9.60 m2
Concrete Hollow Blocks, 150mm 126.00 pcs @ 15.00 / pc ₱ 1,890.00
Sand 0.85 m3 @ 500.00 / m3 427.20
Cement 10.00 bags @ 265.00 / bag 2,650.00
10mm dia. X 6.0m (Grade 33 ) 7.00 pcs @ 159.1 / kg 1,113.70
Tie Wire # 16 1.00 kgs @ 75.00 / kg 75.00

b. Stairs 29.70 m2
Concrete Hollow Blocks, 100mm 390.00 pcs @ 12.00 / pc 4,680.00
Sand 1.31 m3 @ 500.00 / m3 653.40
Cement 16.00 bags @ 265.00 / bag 4,240.00
10mm dia. X 6.0m (Grade 33 ) 22.00 pcs @ 159.1 / pc 3,500.20
Tie Wire # 16 1.00 kg @ 75.00 / kg 75.00

c. Concrete Pathway 33.60 m2


Concrete Hollow Blocks, 150mm 441.00 pcs @ 15.00 / pc 6,615.00
Sand 2.99 m3 @ 500.00 / m3 1,495.20
Cement 34.00 bags @ 265.00 / bag 9,010.00
10mm dia. X 6.0m (Grade 33 ) 24.00 pcs @ 159.1 / kg 3,818.40
Tie Wire # 16 2.00 kgs @ 75.00 / kg 150.00

d. Plastering [Walls along gridlines B' (3' to 6), F' (3' to 6), 226.35 m2
A (5 to 6), & H (5 to 6); Colums along gridlines B' (3' to 6),
F' (3' to 6), & 3' (B' to F'); Exposed beams along gridlines
B' (3' to 6), & F' (3' to 6); Stairs's Masonry; Canopies
along gridlines B' (4 to 6), & F' (4 to 6), and exposed
septic tank]
Sand 3.62 m3 @ 500.00 / m3 1,810.80
Cement 44.00 bags @ 265.00 / bag 11,660.00
Material Cost ₱ 53,863.90
Labor Cost 16,159.17
(A) Direct Cost ₱ 70,023.07
(B) Indirect Cost 14,008.78
VAT (5% of A and B) 4,201.59
Sub-Total Cost ₱ 88,233.44

SECOND FLOOR 3,250.41 m2


a. Exterior Walls [Along gridlines A, B', F', & H (4 to 6) ; 174.12 m2
6 (A to H); 1 (C to F) Porch; H (1 to 2); & 1 (D to E)]
Concrete Hollow Blocks, 150mm 2,286.00 pcs @ 15.00 / pc ₱ 34,290.00
Sand 15.50 m3 @ 500.00 / m3 7,748.34
Cement 177.00 bags @ 265.00 / bag 46,905.00
10mm dia. X 6.0m (Grade 33 ) 125.00 pcs @ 159.1 / pc 19,887.50
Tie Wire # 16 6.00 kgs @ 75.00 / kg 450.00

b. Interior Partition Walls [Along gridlines 4 (G to H) ; 158.88 m2


5 (A to B & G to H) ; B (4 to 5); G (4 to 5); H (1 to 2);
E (1 to 2); & 2 (D to E)]
Concrete Hollow Blocks, 100mm 2,086.00 pcs @ 12.00 / pc 25,032.00
Sand 6.99 m3 @ 500.00 / m3 3,495.36
Cement 84.00 bags @ 265.00 / bag 22,260.00
10mm dia. X 6.0m (Grade 33 ) 114.00 pcs @ 159.1 / pc 18,137.40
Tie Wire # 16 6.00 kgs @ 75.00 / kg 450.00

c. Plastering [All walls, exposed beams, columns, gutters, 2,917.41 m2


paraphets, & canopies]
Sand 46.68 m3 @ 500.00 / m3 23,339.30
Cement 561.00 bags @ 265.00 / bag 148,665.00
Material Cost ₱ 350,659.90
Labor Cost 105,197.97
(A) Direct Cost ₱ 455,857.88
(B) Indirect Cost 91,171.58
VAT (5% of A and B) 27,351.47
Sub-Total Cost ₱ 574,380.92
E. ROOFING WORKS 392.06 m2
Area Bounded by Gridlines 3' to 6 (A to B' and F' to H)
Materials
0.6mm Pre-painted Long-span Corrugated G.I. Roofing 482.00 ln.m @ 915.00 / ln.m ₱ 441,030.00
0.6mm Pre-painted Ridge Roll 10.00 pcs @ 680.00 / pc 6,800.00
0.6mm Pre-painted Hipped Roll 15.00 pcs @ 788.00 / pc 11,820.00
Tekscrew 3,099.00 pcs @ 2.50 / pc 7,747.50
10.0mm Polyethylene Double Film Foam Roof Insulation 10.00 rolls @ 4,150.00 / roll 41,500.00
75mm x 75mm x 6mm Angle Bars x 6M 10.00 pcs @ 1,985.00 / pc 19,850.00
65mm x 65mm x 6mm Angle Bars x 6M 77.00 pcs @ 1,675.00 / pc 128,975.00
50mm x 50mm x 6mm Angle Bars x 6M 151.00 pcs @ 1,250.00 / pc 188,750.00
50mm x 50mm x 4.5mm Angle Bars x 6M 66.00 pcs @ 990.00 / pc 65,340.00
150mm x 50mm x 2.0mm C-Purlins x 6M 112.00 pcs @ 1,250.00 / pc 140,000.00
12mm Ø Sagrods x 6M 16.00 pcs @ 325.00 / pc 5,200.00
12mm x 1.2m x 2.4m MS Base Plate 1.00 pc @ 18,350.00 / pc 18,350.00
6mm x 1.2m x 2.4m MS Gusset Plate 9.00 pcs @ 16,534.00 / pc 148,806.00
20mm Ø x 350 mm Anchor Bolts w/ Nuts & Washers 176.00 pcs @ 225.00 / pc 39,600.00
16mm Ø Bolts w/ Nuts & Washers 80.00 pcs @ 100.00 / pc 8,000.00
E-70 Welding rod 95.00 kgs @ 130.00 / kg 12,350.00
Acytelene / Oxygen 5.00 sets @ 1,700.00 / set 8,500.00
Roof Sealant 4.00 gals @ 1,645.00 / gal 6,580.00
Epoxy Primer Paint 24.00 gals @ 772.00 / gal 18,528.00
Miscellaneous 1.00 lot @ 10,000.00 / lot 10,000.00

Equipment Rental
Welding Generator Set 30.00 days @ 1,500.00 / day 45,000.00
Cut-Off Machine 30.00 days @ 1,000.00 / day 30,000.00
Material Cost ₱ 1,327,726.50
Labor Cost 398,317.95
Equipment 75,000.00
(A) Direct Cost ₱ 1,801,044.45
(B) Indirect Cost 360,182.85
VAT (5% of A and B) 108,061.36
Sub-Total Cost ₱ 2,269,288.66

F. FORMWORKS AND SCAFFOLDINGS 1.00 lot


Rental GI Pipe H-frame Scaffolding 120.00 days @ 2,000.00 / day ₱ 240,000.00
Direct Cost A ₱ 240,000.00

2" × 2" Coco Lumber 2,920.00 bd.ft. @ 17.00 / bd.ft. 49,640.00


2" × 3" Coco Lumber 832.00 bd.ft. @ 17.00 / bd.ft. 14,144.00
1/4" thk. Marine Plywood 61.00 pcs @ 385.00 / pc 23,485.00
Tie Wire # 16 25.00 kgs @ 75.00 / kg 1,875.00
Assorted CW Nails 100.00 kgs @ 85.00 / kg 8,500.00
Material Cost ₱ 97,644.00
Labor Cost 29,293.20
Direct Cost B ₱ 126,937.20

(A) Total Direct Cost ₱ 366,937.20


(B) Indirect Cost 73,387.44
VAT (5% of A and B) 22,016.23
Sub-Total Cost ₱ 462,340.87

G. WATERPROOFING WORKS 193.40 m2


[Concrete Gutters bounded by gridlines 4 to 6 (A to H), and
Slab bounded by gridlines 1 (C to F)]

Materials (for Jobsite)


Water Tite Cementatious Waterproofing Membrane 97.00 gals @ 975.00 / gals ₱ 94,575.00
Sahara 148.00 bags @ 45.00 / bag 6,660.00
Cement 12.00 bags @ 265.00 / bag 3,180.00
Sand 1.00 m3 @ 500.00 / m3 500.00
Material Cost ₱ 104,915.00
Labor Cost 31,474.50
(A) Direct Cost ₱ 136,389.50
(B) Indirect Cost 27,277.90
VAT (5% of A and B) 8,183.37
Sub-Total Cost ₱ 171,850.77

SUMMARY OF CIVIL WORKS

A. SITE WORKS ₱ 514,824.62


B. CONCRETE WORKS 1,260,893.97
C. STEEL WORKS 1,039,614.21
D. MASONRY WORKS 662,614.37
E. ROOFING WORKS 2,269,288.66
F. FORMWORKS AND SCAFFOLDINGS 462,340.87
G. WATERPROOFING WORKS 171,850.77
Total Cost for Civil Works ₱ 6,381,427.46

III. ARCHITECTURAL WORKS


A. CEILING WORKS 2,647.72 m2
Materials
GROUND FLOOR 1,223.72 m2
a. Ficem Board on Angle Bars 596.92 m2
Ficem board, 6.0mm Thk. 228.00 pcs @ 685.00 / pc ₱ 156,180.00
38mm x 38mm x 3mm Angle Bar x 6M 520.00 pcs @ 503.00 / pc 261,560.00
200mm x 2400mm PVC Ceiling Vent 42.00 pcs @ 875.00 / pc 36,750.00
Hangers 478.00 pcs @ 130.00 / pc 62,140.00
E-70 Welding rod 32.00 kgs @ 130.00 / kg 4,160.00
Epoxy Primer Paint 15.00 gals @ 772.00 / gal 11,580.00
Manhole w/ Metal Frames,50x50cm 12.00 sets @ 250.00 / set 3,000.00

b. Ficem Board on Metal Furring 626.80 m2


Ficem board, 3.5mm Thk. 240.00 pcs @ 385.00 / pc 92,400.00
1"x1"x0.5mm Wall Angle x 3M 120.00 pcs @ 90.00 / pc 10,800.00
1"x2"x0.7mm Carrying Channel x 4M 171.00 pcs @ 130.00 / pc 22,230.00
1"x2"x0.4mm Double Metal Furring x 4M 682.00 pcs @ 110.00 / pc 75,020.00
Blind Rivets 12,000.00 pcs @ 2.50 / pc 30,000.00
S-furring clip 3,483.00 pcs @ 5.00 / pc 17,415.00
Hangers 502.00 pcs @ 130.00 / pc 65,260.00
Manhole w/ Metal Frames,50x50cm 16.00 sets @ 250.00 / set 4,000.00

c. Miscellaneous 1.00 lot


Tie Wire # 16 16.00 kgs @ 75.00 / kg 1,200.00
Drill Tool & Drill Bits 2.00 set @ 4,000.00 / set 8,000.00
Cutting Tool & Blade 2.00 set @ 5,000.00 / set 10,000.00
Level hose, nylon, Miscellaneous Hardware items 1.00 lot @ 5,000.00 / lot 5,000.00

SECOND FLOOR 1,424.00 m2


a. Ficem Board on Angle Bars 503.03 m2
Ficem board, 6.0mm Thk. 193.00 pcs @ 685.00 / pc 132,205.00
38mm x 38mm x 3mm Angle Bar x 6M 438.00 pcs @ 503.00 / pc 220,314.00
200mm x 2400mm PVC Ceiling Vent 40.00 pcs @ 750.00 / pc 30,000.00
Hangers 403.00 pcs @ 130.00 / pc 52,390.00
E-70 Welding rod 30.00 kgs @ 130.00 / kg 3,900.00
Epoxy Primer Paint 12.00 gals @ 772.00 / gal 9,264.00
Manhole w/ Metal Frames,50x50cm 12.00 sets @ 250.00 / set 3,000.00

b. Ficem Board on Metal Furring 920.97 m2


Ficem board, 3.5mm Thk. 352.00 pcs @ 385.00 / pc 135,520.00
1"x1"x0.5mm Wall Angle x 3M 159.00 pcs @ 90.00 / pc 14,310.00
1"x2"x0.7mm Carrying Channel x 4M 251.00 pcs @ 130.00 / pc 32,630.00
1"x2"x0.4mm Metal Furring x 4M 1,002.00 pcs @ 110.00 / pc 110,220.00
Blind Rivets 17,600.00 pcs @ 2.50 / pc 44,000.00
S-furring clip 5,117.00 pcs @ 5.00 / pc 25,585.00
Hangers 737.00 pcs @ 130.00 / pc 95,810.00
Manhole w/ Metal Frames,50x50cm 16.00 sets @ 250.00 / set 4,000.00

c. Miscellaneous 1.00 lot


Tie Wire # 16 45.00 kgs @ 75.00 / kg 3,375.00
Drill Tool & Drill Bits 2.00 set @ 4,000.00 / set 8,000.00
Cutting Tool & Blade 2.00 set @ 5,000.00 / set 10,000.00
Level hose, nylon, Miscellaneous Hardware items 1.00 lot @ 5,000.00 / lot 5,000.00

Equipment Rental
Welding Generator Set 30.00 days @ 1,500.00 / day 45,000.00
Cut-Off Machine 30.00 days @ 1,000.00 / day 30,000.00
Material Cost ₱ 1,816,218.00
Labor Cost 544,865.40
Equipment 75,000.00
(A) Direct Cost ₱ 2,436,083.40
(B) Indirect Cost 487,216.68
VAT (5% of A and B) 146,165.00
Sub-Total Cost ₱ 3,069,465.08

B. DOORS & WINDOWS 98.00 sets

GROUND FLOOR 16.00 sets


Doors
D2 - 2.5m x 0.9m Hardwood Panel Type Door 7.00 sets @ 7,875.00 / set ₱ 55,125.00

D2a - 2.5m x 1.0m Hardwood Panel Type Door 1.00 set @ 8,750.00 / set 8,750.00

Cubicle Door 8.00 sets @ 2,500.00 / set 20,000.00

SECOND FLOOR 82.00 sets


Doors
D1 - 2.5m x 1.1m Panel Type Door w/ Clear Glass Viewing 20.00 sets @ 9,625.00 / set 192,500.00
Window (Provided with Square Bar Security Grills)

D1a - 2.5m x 1.1m Aluminum Framed Powder Coated 2.00 sets @ 12,375.00 / set 24,750.00
Dual Swing Type with Clear Glass Panel

D2 - 2.5m x 0.9m Hardwood Panel Type Door 6.00 sets @ 7,875.00 / set 47,250.00

D2a - 2.5m x 1.0m Hardwood Panel Type Door 1.00 set @ 8,750.00 / set 8,750.00
Windows
W1 - 1.2m x 2.4m Steel Casement Swing Type Window w/ 24.00 sets @ 9,875.00 / set 237,000.00
1/4" Thk. Clear Glass Panel and Security Grills

W2 - 1.2m x 1.6m Steel Casement Swing Type Window w/ 2.00 sets @ 7,301.00 / set 14,602.00
1/4" Thk. Clear Glass Panel and Security Grills

W3 - 0.4m x 2.4m Steel Casement Awning Type Window w/ 11.00 sets @ 3,653.00 / set 40,183.00
1/4" Thk. Clear Glass Panel and Security Grills

W4 - 0.4m x 1.8m Steel Casement Awning Type Window w/ 4.00 sets @ 2,736.00 / set 10,944.00
1/4" Thk. Clear Glass Panel and Security Grills

W5 - 0.4m x 1.8m Steel Casement Awning Type Window w/ 5.00 sets @ 2,746.00 / set 13,730.00
1/4" Thk. Clear Glass Panel and Security Grills
W6 - 0.4m x 1.2m Steel Casement Awning Type Window w/ 4.00 sets @ 1,824.00 / set 7,296.00
1/4" Thk. Clear Glass Panel and Security Grills

W7 - 1.5m x 3.0m Steel Casement Awning Type Window w/ 3.00 sets @ 17,100.00 / set 51,300.00
1/4" Thk. Clear Glass Panel and Security Grills

Door Hole Drill Tool 5.00 sets @ 5,000.00 / set 25,000.00


Screws, Bolts, Consumable Finishing Hardwares 1.00 lot @ 5,000.00 / lot 5,000.00
Material Cost ₱ 762,180.00
Installation Cost 114,327.00
(A) Direct Cost ₱ 876,507.00
(B) Indirect Cost 175,301.40
VAT (5% of A and B) 52,590.42
Sub-Total Cost ₱ 1,104,398.82

C. FLOOR AND WALL FINISHES 1,851.13 m2

GROUND FLOOR 354.53 m2


a. Stairs (4-Units) 116.70 m2
300mm x 300mm Ceramic Floor Tiles, Non-Skid 1,036.00 pcs @ 30.00 / pc ₱ 31,080.00
400mm x 400mm Ceramic Floor Tiles 220.00 pcs @ 60.00 / pc 13,200.00
Tile Grout 17.00 packs @ 60.00 / pack 1,020.00
Tile Adhesive 24.00 bags @ 260.00 / bag 6,240.00

b. Male Comfort Rooms, Female Comfort Rooms, 227.83 m2


and PWD Comfort Room
600mm x 600mm Granite Tiles 16.00 pcs @ 165.00 / pc 2,640.00
400mm x 400mm Ceramic Floor Tiles, Unglazed 319.00 pcs @ 60.00 / pc 19,140.00
400mm x 400mm Ceramic Wall Tiles, Glazed 1,214.00 pcs @ 60.00 / pc 72,840.00
Tile Grout 33.00 packs @ 60.00 / pack 1,980.00
Tile Adhesive 46.00 bags @ 260.00 / bag 11,960.00

c. Porch Damaged Tiles 10.00 m2


400mm x 400mm Ceramic Floor Tiles 69.00 pcs @ 60.00 / pc 4,140.00
Tile Grout 2.00 packs @ 60.00 / pack 120.00
Tile Adhesive 2.00 bags @ 260.00 / bag 520.00

d. Miscellaneous 1.00 lot


Grinder & Diamond Blade 2.00 sets @ 5,000.00 / set 10,000.00
Anti Microbial Tile Sealer 5.00 lits @ 380.00 / lits 1,900.00
Masking Tape, Spacer, Sleeves, Consumable Hardwares 1.00 lot @ 5,000.00 / lot 5,000.00

SECOND FLOOR 1,496.60 m2


a. Corridors, Classrooms, Laboratory, Storage Rooms, 1,340.20 m2
Electrical Room, Faculty Room, Office
400mm x 400mm Ceramic Floor Tiles 9,214.00 pcs @ 60.00 / pc 552,840.00
Tile Grout 192.00 packs @ 60.00 / pack 11,520.00
Tile Adhesive 269.00 bags @ 260.00 / bag 69,940.00

b. Male and Female Comfort Rooms 138.40 m2


600mm x 600mm Granite Tiles 13.00 pcs @ 165.00 / pc 2,145.00
400mm x 400mm Ceramic Floor Tiles, Unglazed 189.00 pcs @ 60.00 / pc 11,340.00
400mm x 400mm Ceramic Wall Tiles, Glazed 736.00 pcs @ 60.00 / pc 44,160.00
Tile Grout 20.00 packs @ 60.00 / pack 1,200.00
Tile Adhesive 28.00 bags @ 260.00 / bag 7,280.00

c. Exterior Wall 18.00 m2


300mm x 600mm Outdoor Stone Tiles 110.00 pcs @ 85.00 / pc 9,350.00
Tile Grout 3.00 packs @ 60.00 / pack 180.00
Tile Adhesive 4.00 bags @ 260.00 / bag 1,040.00

d. Miscellaneous 1.00 lot


Grinder & Diamond Blade 4.00 sets @ 5,000.00 / set 20,000.00
Anti Microbial Tile Sealer 25.00 lits @ 380.00 / lits 9,500.00
Masking Tape, Spacer, Sleeves, Consumable Hardwares 1.00 lot @ 5,000.00 / lot 5,000.00
Material Cost ₱ 927,275.00
Labor Cost 278,182.50
(A) Direct Cost ₱ 1,205,457.50
(B) Indirect Cost 241,091.50
VAT (5% of A and B) 72,327.45
Sub-Total Cost ₱ 1,518,876.45
D. PAINTING WORKS 8,916.38 m2

GROUND FLOOR 4,028.65 m2


a. Exterior Surfaces 772.88 m2
Concrete Neutralizer 50.00 liters @ 137.65 / liter ₱ 6,882.50
Elastomeric Primer Exterior coat 8.00 pails @ 2,275.00 / pail 18,200.00
Elastomeric Topcoat, Color 16.00 pails @ 2,390.00 / pail 38,240.00
Patching Compound 13.00 gals @ 285.00 / gal 3,705.00
Acri/Tinting Colors 248.00 qrts @ 155.00 / qrt 38,440.00
Paint Thinner 24.00 gals @ 347.00 / gal 8,328.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

b. Interior Surfaces 2,032.05 m2


Concrete Neutralizer 131.00 liters @ 137.65 / liter 18,032.15
Flat Latex Undercoat, White 21.00 pails @ 1,858.50 / pail 39,028.50
Semi-Gloss Acrylic Topcoat, Color 41.00 pails @ 2,215.50 / pail 90,835.50
Patching Compound 33.00 gals @ 285.00 / gal 9,405.00
Acri/Tinting Colors 651.00 qrts @ 155.00 / qrt 100,905.00
Paint Thinner 61.00 gals @ 347.00 / gal 21,167.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

c. Ceiling 1,223.72 m2
Concrete Neutralizer 79.00 liters @ 137.65 / liter 10,874.35
Flat Latex Undercoat, White 13.00 pails @ 1,858.50 / pail 24,160.50
Semi-Gloss Acrylic Topcoat, Color 25.00 pails @ 2,215.50 / pail 55,387.50
Patching Compound 20.00 gals @ 285.00 / gal 5,700.00
Acri/Tinting Colors 392.00 qrts @ 155.00 / qrt 60,760.00
Paint Thinner 37.00 gals @ 347.00 / gal 12,839.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

d. Wall Cracks 1.00 lot


Cement Epoxy 20.00 gals @ 1,000.00 / gal 20,000.00

SECOND FLOOR 4,887.73 m2


a. Exterior Surfaces 937.60 m2
Concrete Neutralizer 61.00 liters @ 137.65 / liter 8,396.65
Elastomeric Primer Exterior coat 10.00 pails @ 2,275.00 / pail 22,750.00
Elastomeric Topcoat, Color 19.00 pails @ 2,390.00 / pail 45,410.00
Patching Compound 16.00 gals @ 285.00 / gal 4,560.00
Acri/Tinting Colors 301.00 qrts @ 155.00 / qrt 46,655.00
Paint Thinner 29.00 gals @ 347.00 / gal 10,063.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

b. Interior Surfaces 2,374.75 m2


Concrete Neutralizer 152.00 liters @ 137.65 / liter 20,922.80
Flat Latex Undercoat, White 24.00 pails @ 1,858.50 / pail 44,604.00
Semi-Gloss Acrylic Topcoat, Color 48.00 pails @ 2,215.50 / pail 106,344.00
Patching Compound 38.00 gals @ 285.00 / gal 10,830.00
Acri/Tinting Colors 760.00 qrts @ 155.00 / qrt 117,800.00
Paint Thinner 72.00 gals @ 347.00 / gal 24,984.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

c. Ceiling 1,424.00 m2
Concrete Neutralizer 92.00 liters @ 137.65 / liter 12,663.80
Flat Latex Undercoat, White 15.00 pails @ 1,858.50 / pail 27,877.50
Semi-Gloss Acrylic Topcoat, Color 29.00 pails @ 2,215.50 / pail 64,249.50
Patching Compound 23.00 gals @ 285.00 / gal 6,555.00
Acri/Tinting Colors 456.00 qrts @ 155.00 / qrt 70,680.00
Paint Thinner 43.00 gals @ 347.00 / gal 14,921.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 5,000.00 / lot 5,000.00

d. Doors & Windows 151.38 m2


Epoxy Primer Red 7.00 gals @ 875.00 / gal 6,125.00
Quick Dry Enamel Topcoat 4.00 pails @ 2,338.25 / pail 9,353.00
Paint Thinner 4.00 gals @ 347.00 / gal 1,388.00
Sandpapers, Rollers & Tray, Brushes, Rugs, & Newspapers 1.00 lot @ 2,500.00 / lot 2,500.00
Material Cost ₱ 1,292,522.25
Labor Cost 387,756.68
(A) Direct Cost ₱ 1,680,278.93
(B) Indirect Cost 336,055.79
VAT (5% of A and B) 100,816.74
Sub-Total Cost ₱ 2,117,151.45

E. PARTITIONS 104.40 m2

GROUND FLOOR 42.30 m2


a. Fixed Drywall Double Wall Partition [Along gridline 40.50 m2
3 (A to B), & 4 (A to B)]
Ficem board, 6.0mm Thk. 32.00 pcs @ 685.00 / pc ₱ 21,920.00
100mm x 50mm x 2.0mm channel x 6M 36.00 pcs @ 985.00 / pc 35,460.00
E-70 Welding rod 30.00 kgs @ 130.00 / kg 3,900.00
Epoxy Primer Paint 3.00 gals @ 772.00 / gal 2,316.00
2" Screw 96.00 pcs @ 5.00 / pc 480.00
Tekscrew 641.00 pcs @ 2.50 / pc 1,602.50

Equipment Rental
Welding Generator Set 5.00 days @ 1,500.00 / day 7,500.00
Cut-Off Machine 5.00 days @ 1,000.00 / day 5,000.00
Material Cost ₱ 65,678.50
Labor Cost 19,703.55
Equipment 12,500.00
(A) Direct Cost ₱ 97,882.05
(B) Indirect Cost 19,576.41
VAT (5% of A and B) 5,872.92
Sub-Total Cost ₱ 123,331.38

b. Comfort Rooms Cubicle Partitions 1.80 m2

(MADE TO ORDER) ¾" thk. Heavy duty Phenolic PCB Board


urinal partition with complete accessories (FABRICATION
AND INSTALLATION INCLUDED)
(MADE TO ORDER) ¾" thk. Heavy duty Phenolic PCB Board
urinal partition with complete accessories (FABRICATION
AND INSTALLATION INCLUDED)
1.80 m2 @ 7,000.00 / m2 12,600.00
(A) Direct Cost ₱ 12,600.00
(B) Indirect Cost 2,520.00
VAT (5% of A and B) 756.00
Sub-Total Cost ₱ 15,876.00

SECOND FLOOR 62.10 m2


a. Foldable Social Hall Partition 40.50 m2
(MADE TO ORDER) Hollow Core Partition w/ 1/4" thk.
Marine Plywood Panel on Wooden Framing w/ Heavy Duty
Top Track, Roller, and Bottom Guide, 8 nos. Barrel Bolt.
3/16" x 1 1/2" x 1 1/2" Angle Bar Diagonal and Vertical
Support w/ 5mm thk. Ficem Board Covering (2-Units
FABRICATION AND INSTALLATION INCLUDED) 40.50 m2 @ 4,000.00 / m2 ₱ 162,000.00

b. Comfort Rooms Cubicle Partitions 21.60 m2

(MADE TO ORDER) ¾" thk. Heavy duty Phenolic PCB Board


cubicle partition and SS Accessories, adjustable feet, wall
brackets,self closing hinges,indicator lockset, coat hoak, knob
handle, top rail, L bracket (FABRICATION AND INSTALLATION
INCLUDED)
21.60 m2 @ 7,000.00 / m2 151,200.00
(A) Direct Cost ₱ 313,200.00
(B) Indirect Cost 62,640.00
VAT (5% of A and B) 18,792.00
Sub-Total Cost ₱ 394,632.00

F. STAIRS, RAILINGS & ARCHITECTURAL METALS 1.00 lot


Materials (for Jobsite)
Brass Stair Nosing 2" 30.00 pcs @ 3,600.00 / pc ₱ 108,000.00
50mm Ø G.I. Pipe Handrail Schedule 40 8.00 pcs @ 2,413.00 / pc 19,304.00
Consumable Hardwares 1.00 lot @ 2,500.00 / lot 2,500.00
Material Cost ₱ 129,804.00
Labor Cost 38,941.20
(A) Direct Cost ₱ 168,745.20
(B) Indirect Cost 33,749.04
VAT (5% of A and B) 10,124.71
Sub-Total Cost ₱ 212,618.95

G. SPECIALTIES, TOILET ACCESSORIES, AND ACCESSORIES 1.00 lot


Materials (for Jobsite)
Wall Mirror, 120cm x 220cm 4.00 units @ 3,000.00 / unit ₱ 12,000.00
Wall Mirror, 120cm x 130cm 1.00 unit @ 1,500.00 / unit 1,500.00
Wall Mirror, 120cm x 100cm 2.00 units @ 1,350.00 / unit 2,700.00
Soap Holder, Ceramic 7.00 units @ 300.00 / unit 2,100.00
Tissue-Napkin Dispenser 3.00 units @ 1,800.00 / unit 5,400.00
Consumable Hardwares 1.00 lot @ 1,500.00 / lot 1,500.00
Material Cost ₱ 25,200.00
Labor Cost 7,560.00
(A) Direct Cost ₱ 32,760.00
(B) Indirect Cost 6,552.00
VAT (5% of A and B) 1,965.60
Sub-Total Cost ₱ 41,277.60

SUMMARY OF ARCHITECTURAL WORKS

A. CEILING WORKS ₱ 3,069,465.08


B. DOORS & WINDOWS 1,104,398.82
C. FLOOR AND WALL FINISHES 1,518,876.45
D. PAINTING WORKS 2,117,151.45
E. PARTITIONS 533,839.38
F. STAIRS, RAILINGS & ARCHITECTURAL METALS 212,618.95
G. SPECIALTIES, TOILET ACCESSORIES, AND ACCESSORIES 41,277.60
Total Cost for Architectural Works ₱ 8,597,627.73

IV. ELECTRICAL WORKS 1.00 lot

GROUND FLOOR
Pinlight housing 6" dia with 15W led bulb 70.00 sets @ 750.00 / set ₱ 52,500.00
daylight, cylindrical recessed type
15W LED Compact Bulb, Daylight 68.00 pcs @ 300.00 / set 20,400.00
ceiling fan, 16" dia. 4.00 sets @ 2,500.00 / set 10,000.00
electrical tape 10.00 rolls @ 38.00 / pc 380.00
Rubber tape 3.00 roll @ 115.00 / roll 345.00
PVC 20 mm dia conduit 25.00 pcs @ 85.00 / pc 2,125.00
3.5 sq. mm THHN wire 1.00 bx @ 3,500.00 / bx 3,500.00
50 sq. mm THHN wire 60.00 m @ 450.00 / m 27,000.00
5.5 sq. mm THHN wire 2.00 bxs @ 5,500.00 / bx 11,000.00
5.5 sq. mm TW wire (grounding) 1.00 bxs @ 5,500.00 / bx 5,500.00
14.0 sq. mm TW wire (grounding) 15.00 m @ 114.00 / m 1,710.00
PVC 50 mm dia conduit 3.00 pcs @ 207.00 / pc 621.00
PVC 50 mm dia elbow 2.00 pcs @ 72.00 / pc 144.00

SECOND FLOOR
Pinlight housing 6" dia with 22W led bulb 162.00 sets @ 750.00 / set 121,500.00
daylight, cylindrical recessed type
duplex convenience outlet with grounding 66.00 sets @ 195.00 / set 12,870.00
universal type, heavy duty, 16A
Duplex socket outlet FM Grounding Type 16.00 sets @ 620.00 / set 9,920.00
Enclosed circuit breaker, 30AT, 2P, single 10.00 sets @ 1,500.00 / set 15,000.00
phase in Nema 3R, metal enclosure with grounding lug(for accu)
ceiling fan, 16" dia. 26.00 sets @ 2,500.00 / set 65,000.00
one gang switch 2.00 sets @ 150.00 / set 300.00
two gang switch 17.00 sets @ 195.00 / set 3,315.00
three gang switch 5.00 sets @ 250.00 / set 1,250.00
two gang three way switch 2.00 sets @ 217.00 / set 434.00
utility box, sch. 40 123.00 pcs @ 35.00 / pc 4,305.00
junction box with cover, sch. 40 193.00 pcs @ 35.00 / pc 6,755.00
pullbox 12" x 12" x 4" 1.00 pcs @ 550.00 / pc 550.00
electrical tape 50.00 rolls @ 38.00 / pc 1,900.00
Rubber tape 20.00 roll @ 115.00 / roll 2,300.00
Mica tube 1/4" 200.00 m @ 20.00 / m 4,000.00
tie wire 5.00 kls @ 75.00 / kl 375.00
PVC solvent 3.00 can @ 265.00 / can 795.00
PVC 20 mm dia conduit 886.00 pcs @ 85.00 / pc 75,310.00
3.5 sq. mm THHN wire 18.00 bxs @ 3,500.00 / bx 63,000.00
5.5 sq. mm THHN wire 17.00 bxs @ 5,500.00 / bx 93,500.00
5.5 sq. mm TW wire (grounding) 9.00 bxs @ 5,500.00 / bx 49,500.00
60 sq. mm THHN wire 100.00 m @ 492.00 / m 49,200.00
22 sq. mm TW wire (grounding) 25.00 m @ 157.00 / m 3,925.00
PVC 50 mm dia conduit 10.00 pcs @ 207.00 / pc 2,070.00
PVC 50 mm dia elbow 4.00 pcs @ 72.00 / pc 288.00
grounding rod with clamp 5/8" x 10' 2.00 set @ 1,500.00 / set 3,000.00
other miscellaneous items 1.00 lot @ 10,000.00 / lot 10,000.00
and consumables such as bolts, cable tie,
terminal lugs, tagging tape, compression tap,
solderless connector etc.

Installation of 3-50kVA Transformer


Supply of 350kVa Transformer Amorphous w/ Lighting
Arrester and Fuse Cut-Out 3.00 sets @ 100,000.00 / set 300,000.00
Insulator pin 12.00 pcs @ 330.00 / pc 3,960.00
Pole top pin 12.00 pcs @ 485.00 / pc 5,820.00
Bolt machine, 5/8 x 10 16.00 pcs @ 120.00 / pc 1,920.00
Bolt machine, 5/8 x 12 20.00 pcs @ 130.00 / pc 2,600.00
Washer, 2 1/4" x 2 1/4" x 3/16" x 13/16" 40.00 pcs @ 60.00 / pc 2,400.00
Spool insulator 1 3/4" dia groove 12.00 pcs @ 60.00 / pc 720.00
Pipe spacer 3/4" dia x 1 1/2" 5.00 pcs @ 70.00 / pc 350.00
Brace, 60 span 10.00 pcs @ 1,700.00 / pc 17,000.00
Cross arm 5.00 pcs @ 1,200.00 / pc 6,000.00
Guy hook J type 5.00 pcs @ 65.00 / pc 325.00
Locknuts 5/8" 60.00 pcs @ 30.00 / pc 1,800.00
Bolt single upset 9" 5.00 pcs @ 160.00 / pc 800.00
Insulator suspension 12.00 pcs @ 860.00 / pc 10,320.00
Clamp deadend 2.00 pcs @ 880.00 / pc 1,760.00
Clevis secondary swinging 8.00 pcs @ 300.00 / pc 2,400.00
Clevis secondary swinging insulated 2.00 pcs @ 360.00 / pc 720.00
Clamp loop deadend 10.00 pcs @ 150.00 / pc 1,500.00
Connector compression 14.00 pcs @ 175.00 / pc 2,450.00
Connector split bolt type 2.00 pcs @ 1,010.00 / pc 2,020.00
Clamp hotline 8.00 pcs @ 860.00 / pc 6,880.00
Ground wire # 4 AWG, 3 strand, al. 60.00 m @ 75.00 / m 4,500.00
Bolt double upset 5/8" x 10" 8.00 pcs @ 250.00 / pc 2,000.00
Bolt single upset 5/8" x 10" 4.00 pcs @ 240.00 / pc 960.00
Bracket with spool 3.00 pcs @ 200.00 / pc 600.00
Bolt eye 5/8" x 10" 3.00 pcs @ 190.00 / pc 570.00
Nut eye 5/8" 3.00 pcs @ 975.00 / pc 2,925.00
Ground rod 5/8" x 10' 3.00 pcs @ 1,150.00 / pc 3,450.00
Ground rod clamp 3.00 pcs @ 1,190.00 / pc 3,570.00
Anchor log 6.00 pcs @ 860.00 / pc 5,160.00
Rod anchor, thimble eye 6.00 pcs @ 1,130.00 / pc 6,780.00
Anchor expanding type 3.00 pcs @ 1,190.00 / pc 3,570.00
Staples ground wire, 2" x 1/2" # 8 gauge 70.00 pcs @ 7.50 / pc 525.00
Ground wire clip 40.00 pcs @ 56.00 / pc 2,240.00
ACSR # 2/0 (Insulated) 120.00 m @ 170.00 / m 20,400.00
35 footer concrete/steel pole 2.00 pcs @ 45,000.00 / pc 90,000.00
Current transformer as required 3.00 unit @ 45,000.00 / unit 135,000.00
Current transformer box 1.00 pc @ 4,500.00 / pc 4,500.00

Main Service Equipment 1.00 set @ 22,000.00 / set 22,000.00


300AT/400AF/400V/3P/Enclosed Circiut Breaker/ NEMA 3R

other miscellaneous items and consumables 1.00 lot @ 10,000.00 / lot 10,000.00
such as cable tie, terminal lugs, tagging tape,
compression tap, etc.

Feederline and Panelboard


PP1 with main: 100AT/200AF, 1.00 unit @ 40,000.00 / unit 40,000.00
Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 27 branches: all bolt on type
9-15AT, 1P, 5 kaic
9-20AT, 1P, 5 kaic
9-30AT, 1P, 5 kaic
2-space

PP2 with main: 150AT/200AF, 1.00 unit @ 40,000.00 / unit 40,000.00


Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 30 branches: all bolt on type
9-15AT, 1P, 5 kaic
9-20AT, 1P, 5 kaic
12-30AT, 1P, 5 kaic
2-space 1P, 5 kaic

MDP with MTS: 2- 300AT/400AF 1.00 unit @ 55,000.00 / unit 55,000.00


Three phase, 3 pole + grounding terminal
10 kaic main circuit breaker, bolt on type
with 30 branches: all bolt on type
2-100AT,200AF,3P,10kAIC
1-150AT,200AF,3P,10kAIC
1-50AT, 100AF, 3P, 10kAIC
Material Cost ₱ 1,561,082.00
Labor Cost 468,324.60

Other miscellaneuos labor cost


Labor for the replacement of existing compact 1.00 lot @ 3,000.00 / lot ₱ 3,000.00
bulb into 15W LED bulb

Dismantling of existing 3 sets of Panelboards 1.00 lot @ 5,000.00 / lot 5,000.00

Retermination of existing circuit homerun to 1.00 lot @ 15,000.00 / lot 15,000.00


new Panelboard @ GF

Mounting of 3-50kVA transformer 13.2/7.62kV, 1.00 lot @ 10,000.00 / lot 10,000.00


400/230V, Lighting arrester/ fuse cut-out
combination 3-current transfomer, 3-potential
transformer includes boom truck rental

Testing and energization 1.00 lot @ 10,000.00 / lot 10,000.00


As built plan 1.00 lot @ 15,000.00 / lot 15,000.00
Service entrance retermination 1.00 lot @ 50,000.00 / lot 50,000.00
Manhole size cutting at ceiling and 1.00 lot @ 5,000.00 / lot 5,000.00
restoration/ Chipping works if needed
Voltage test and megger testing 1.00 lot @ 3,000.00 / lot 3,000.00
(A) Direct Cost ₱ 2,145,406.60
(B) Indirect Cost 429,081.32
VAT (5% of A and B) 128,724.40
Sub-Total Cost ₱ 2,703,212.32

V. PLUMBING WORKS 1.00 lot

A. Catch Basins 4.00 units


Concrete Hollow Blocks, 100mm 48.00 pcs 12.00 / pc ₱ 576.00
Cement 5.00 bags @ 265.00 / bag 1,325.00
Sand 1.00 m3 @ 500.00 / m3 500.00
Gravel 1.00 m3 @ 600.00 / m3 600.00
10mmØ RSB x 6m 17.00 pcs @ 160.00 / pc 2,720.00
12mmØ RSB x 6m 3.00 pcs @ 240.00 / pc 720.00
Tie Wire #16 3.00 kls @ 75.00 / kl 225.00
B. Fixtures & Accessories
Lavatory Countersunk w/ Faucet 15.00 sets @ 5,000.00 / set 75,000.00
Lavatory w/ Faucet 1.00 set @ 5,000.00 / set 5,000.00
Dual Flush Type Water Closet with Bidet 14.00 sets @ 6,000.00 / set 84,000.00
Waterless Urinal 9.00 sets @ 6,000.00 / set 54,000.00
Faucet, Heavy-Duty Brass 2.00 pc @ 500.00 / pc 1,000.00
4" x 4" Stainless steel floor drain 17.00 sets @ 380.00 / set 6,460.00

C. Construction of Drainage Canal


RCPC, 200mm Ø 30.00 pcs @ 550.00 / pc 16,500.00
3"Ø x 3m PVC Pipe 27.00 pcs @ 547.00 / pc 14,769.00
3"Ø Coupling 18.00 pcs @ 65.00 / pc 1,170.00
3"Ø 45° Elbow 16.00 pcs @ 60.00 / pc 960.00
Brass Strainer 18.00 pcs @ 250.00 / pc 4,500.00
PVC Solvent cement 5.00 liters @ 420.00 / pc 2,100.00
Cement - bags @ 265.00 / bag 0.00
Sand - m3 @ 500.00 / m3 0.00
Gravel - m3 @ 600.00 / m3 0.00
12mmØ RSB x 6m - pcs @ 240.00 / pc 0.00
16mmØ RSB x 6m - pcs @ 445.00 / pc 0.00
50mm x 50mm x 6mm thk. Angle Bar 45.00 pcs @ 1,250.00 / pc 56,250.00
Welding Rod 15.00 kgs @ 130.00 / kg 1,950.00
Tie Wire #16 15.00 kls @ 75.00 / kl 1,125.00
Miscellaneous items and other consumables 1.00 lot @ 5,000.00 / lot 5,000.00

D. Sanitary Waste Line


4"Ø x 3m PVC Pipe 8.00 pcs @ 714.00 / pc 5,712.00
3"Ø x 3m PVC Pipe 8.00 pcs @ 547.00 / pc 4,376.00
3"Ø P-Trap 6.00 pcs @ 162.00 / pc 972.00
3"Ø Wye 1.00 pc @ 133.00 / pc 133.00
3"Ø x 2"Ø Tee Reducer 9.00 pcs @ 40.00 / pc 360.00
3"Ø 1/4 Bend 9.00 pcs @ 53.00 / pc 477.00
3"Ø 90° Elbow 5.00 pcs @ 79.00 / pc 395.00
4"Ø x 3"Ø Wye reducer 19.00 pcs @ 190.00 / pc 3,610.00
4"Ø Wye 4.00 pcs @ 144.00 / pc 576.00
4"Ø Coupling 1.00 pc @ 59.00 / pc 59.00
4"Ø Clean out 4.00 pcs @ 70.00 / pc 280.00
4"Ø 90° Elbow 6.00 pcs @ 88.00 / pc 528.00
PVC Solvent Cement 5.00 liters @ 420.00 / pc 2,100.00

E. Vent Line
3"Ø x 3m PVC Pipe 2.00 pcs @ 547.00 / pc 1,094.00
3"Ø Coupling 1.00 pc @ 65.00 / pc 65.00
4"Ø x 3"Ø Wye Reducer 1.00 pc @ 190.00 / pc 190.00
4"Ø x 2"Ø Wye Reducer 5.00 pcs @ 119.00 / pc 595.00
3"Ø 45° Elbow 1.00 pc @ 43.00 / pc 43.00
3"Ø x 2"Ø Coupling Reducer 9.00 pcs @ 22.00 / pc 198.00
2"Ø PVC Pipes 17.00 pcs @ 255.00 / pc 4,335.00
2"Ø Coupling 13.00 pcs @ 15.50 / pc 201.50
2"Ø 45° Elbow 20.00 pcs @ 59.00 / pc 1,180.00
PVC Solvent cement 2.00 liters @ 420.00 / pc 840.00

F. Clean Water Line


3/4"Ø x 4m PPR Pipes 9.00 pcs @ 385.00 / pc 3,465.00
3/4"Ø Gate Valves 2.00 pcs @ 315.00 / pc 630.00
3/4"Ø PPR tee 14.00 pcs @ 25.00 / pc 350.00
3/4"Ø PPR elbow 10.00 pcs @ 24.00 / pc 240.00
3/4"Ø PPR coupling 5.00 pcs @ 17.00 / pc 85.00
1"Ø x 3/4"Ø tee reducer 2.00 pcs @ 35.00 / pc 70.00
1"Ø PPR tee 1.00 pcs @ 22.00 / pc 22.00
1"Ø x 3/4"Ø Coupling Female 16.00 pcs @ 92.00 / pc 1,472.00
1"Ø x 3/4"Ø Coupling Male 16.00 pcs @ 120.00 / pc 1,920.00
Assorted PPR Pipe Clips 200.00 pcs @ 2.50 / pc 500.60

G. Fire Protection System


(see detailed plan)
Fire Hose Cabinet Complete Set 4.00 sets @ 22,000.00 / set 88,000.00
Two-Way (Breeching Inlet) Siamese Connection 2.00 sets @ 12,500.00 / set 25,000.00
Air Release Valve Assembly 2.00 sets @ 2,200.00 / set 4,400.00
100mmØ Check Valve 2.00 pcs @ 15,000.00 / pc 30,000.00
Fire Extinguishers 10.00 pcs @ 2,000.00 / pc 20,000.00
100mmØ Wrought Iron Pipe 20.00 m @ 1,366.00 / m 27,320.00
100mmØ Elbow 4.00 pcs @ 540.00 / pc 2,160.00
100mmØ x 65mmØ Tee 2.00 pcs @ 1,416.00 / pc 2,832.00
100mmØ x 65mmØ Bell 2.00 pcs @ 535.00 / pc 1,070.00
Miscellaneous works and other consumables 1.00 lot @ 5,000.00 / lot 5,000.00

Equipment Rental
2 1-Bagger Concrete Mixers 5.00 day/s @ 1,500.00 / day 15,000.00
Welding Generator Set 10.00 days @ 1,500.00 / day 15,000.00
Cut-Off Machine 10.00 days @ 1,000.00 / day 10,000.00
Material Cost ₱ 579,306.10
Labor Cost 173,791.83
Equipment 40,000.00
(A) Direct Cost ₱ 793,097.93
(B) Indirect Cost 158,625.00
VAT (5% of A and B) 47,586.15
Sub-Total Cost ₱ 999,309.08

GRAND SUMMARY

I. GENERAL REQUIREMENTS ₱ 119,700.00


II. CIVIL WORKS 6,381,427.46
III. ARCHITECTURAL WORKS 8,597,627.73
IV. ELECTRICAL WORKS 2,703,212.32
V. PLUMBING WORKS 999,309.08
A. Approved Budget for Contract ₱ 18,801,276.59
B. Project Management Cost 681,911.59
TOTAL PROJECT COST ₱ 19,483,188.18

Prepared by: Recommending Approval:

Engr. ULYSSES R. BELLO Prof. JERRY S. BIGORNIA


Chief, BU-PDMO VP for Planning and Development

Approved:

Dr. ARNULFO M. MASCARIÑAS


SUC President IV
Project Title: 0
###
Location: 0

EXCAVATION, BACKFILLING, GRAVEL BEDDING, & DEMOLITION

I. Excavation = 1,026.05 m3
Summary: II. Backfill & Compaction = 968.13 m3
III. Gravel Bedding = 35.57 m3

A. SPREAD FOOTING
Designation: C4/F4
No. of Footing = 12 pcs Excavation = 206.01 m3
Length = 2.45 m Backfill = 169.46 m3
Width = 2.45 m Gravel Bed = 7.92 m3
Thickness = 0.35 m
Base depth from NGL = 2.50 m Comment/s:
Column Area = 0.16 m 2 Additional 10% volume of excavation in order to
Gravel Bed Thickness = 0.10 m accommodate the whole dimension of the footings.

B. WALL FOOTING
Designation: W1F1
Footing Length = 56 m Excavation = 17.25 m3
Footing Width = 0.40 m Backfill = 7.87 m3
Footing Thickness = 0.15 m Gravel Bed = 2.46 m3
Base depth from NGL = 0.60 m
Gravel Bed Thickness = 0.10 m Comment/s:
CHB Thickness = 0.15 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

C. SLAB ON GRADE
Overall Area = 112 m2 Excavation = 0.00 m3
Gravel Bed Thickness = 0.10 m Backfill = 0.00 m3
Gravel Bed = 11.20 m3

Comment/s: ok

D. FOOTING BEAM
Designation: FTB2
No. of Beams = 20 pcs Excavation = 59.40 m3
Length of Beam = 4.00 m Backfill = 47.40 m3
Depth = 0.40 m Gravel Bed = 2.64 m3
Base Width = 0.30 m
Base depth from NGL = 2.15 m Comment/s:
Gravel Bed Thickness = 0.10 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the beams.
E. RICE bran
Designation: rice bran
Length = 28.00 m Excavation = 743.40 m3
Width = 17.70 m Backfill = 743.40 m3
Depth = 1.50 m Gravel Bed = 0.00 m3

F. Walkway
Designation: rice hay
Length = 58.00 m Excavation = 0.00 m3
Width = 1.70 m Backfill = 0.00 m3
Depth = 0.10 m Gravel Bed = 11.34 m3

G. Demoition
G.-1
Designation: 1st Floor Line B' & F' (3'to 5)
No. of Sets = 2 sets Area of CHB = 5.20 m2
Length = 2.00 m
Height = 1.30 m Comment/s:
No. of Face(s) = 1.00

Designation: 1st Floor Line 2' (D to E)


No. of Sets = 1 sets Area of CHB = 5.20 m2
Length = 4.00 m
Height = 1.30 m Comment/s:
No. of Face(s) = 1.00
Project Title: 0
###
Location: 0

CONCRETE WORKS

Summary: Volume of Concrete = m3

A. LEAN CONCRETE
Designation: Footing C4/F4
No. of Footing = 12 pcs Volume of Concrete = 3.96 m3
Length = 2.45 m
Width = 2.45 m Comment/s: Please check the thickness of lean concrete.
Thickness of Lean = 0.05 m

Designation: Wall Footing


Footing Length = 56 m Volume of Concrete = 1.23 m3
Footing Width = 0.40 m
Thickness of Lean = 0.05 m Comment/s: Please check the thickness of lean concrete.

Designation: Slab on Grade


Overall Area = 112 m2 Volume of Concrete = 6.16 m3
Thickness of Lean = 0.05 m
Comment/s: Please check the thickness of lean concrete.

B. FOOTING
Designation: C2/F2
No. of Footing = 2 pcs Volume of Concrete = 1.24 m3
Length = 1.50 m
Width = 1.50 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: C2/F3
No. of Footing = 3 pcs Volume of Concrete = 1.29 m3
Length = 1.25 m
Width = 1.25 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: C2/F1
No. of Footing = 2 pcs Volume of Concrete = 1.12 m3
Length = 1.30 m
Width = 1.30 m Comment/s:
Thickness = 0.30 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: C2/F23A
No. of Footing = 2 pcs Volume of Concrete = 0.66 m3
Length = 1.00 m
Width = 1.20 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: 12/F3A
No. of Footing = 1 pcs Volume of Concrete = 0.33 m3
Length = 1.00 m
Width = 1.20 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: 12/F3A
No. of Footing = 1 pcs Volume of Concrete = 0.33 m3
Length = 1.00 m
Width = 1.20 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: 12/F3A
No. of Footing = 1 pcs Volume of Concrete = 0.33 m3
Length = 1.00 m
Width = 1.20 m Comment/s:
Thickness = 0.25 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

B. COLUMNS
Designation: C1
No. of Columns = 2 pcs Volume of Concrete = 0.79 m3
Length of Column = 4.20 m
Column Width1 = 0.30 m
Column Width2 = 0.30 m

Designation: C2
No. of Columns = 10 pcs Volume of Concrete = 3.97 m3
Length of Column = 4.20 m
Column Width1 = 0.30 m
Column Width2 = 0.30 m
Designation: Wall Footing
Footing Length = 56 m Volume of Concrete = 3.70 m3
Footing Width = 0.40 m
Footing Thickness = 0.15 m Comment/s:
Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

C. SLABS
Designation: Slab on Grade
Overall Area = 0 m2 Volume of Concrete = 0.00 m3
Slab Thickness = 0.100 m
Comment/s: Di pa kasama ang flooring sa labas na part.
Designation: S2 - Suspended Slab Covered Corridor / Walkway 2nd Floor
Overall Area = 0 m2 Volume of Concrete = 0.00 m3
Slab Thickness = 0.125 m
Comment/s:

Designation: S2 - Suspended Slab Roof Deck


Overall Area = 0 m2 Volume of Concrete = 0.00 m3
Slab Thickness = 0.125 m
Comment/s:
ok na pati waterproofing

Designation: Slanted Canopy - second floor only


Overall Length = 51.2 m Volume of Concrete = 3.66 m3
Cross-sectional Area = 0.068 m2

Designation: Slanted Canopy - 1st floor only


Overall Length = 32 m Volume of Concrete = 2.28 m3
Cross-sectional Area = 0.068 m2

Designation: Paraphet sa taas ng corridor


Overall Length = 0m Volume of Concrete = 0.00 m3
Cross-sectional Area = 0.060 m2

Designation: Walkway
Overall Area = 98.6 m2 Volume of Concrete = 21.69 m3
Slab Thickness = 0.200 m

Designation: 2nd Floor Concrete Topping


Overall Area = 1,409.60 m2 Volume of Concrete = 150.38 m3
Topping Thickness = 0.102 m
Comment/s:
4" toppings, 74.4 sa hagdan, 60 sa porch

D. BEAMS
Designation: FTB2 - Footing Beams
No. of Beams = 0 pcs Volume of Concrete = 0.00 m3
Length of Beam = 4.00 m
Depth = 0.40 m Comment/s:
Base Width = 0.30 m Additional 10% volume of excavation in order to
accommodate the whole dimension of the footings.

Designation: B3 - 2nd Floor


No. of Beams = 0 pcs Volume of Concrete = 0.00 m3
Length of Beam = 4.00 m
Depth = 0.45 m Comment/s:
Base Width = 0.35 m Dun palang ito sa dinagdag na building.

Designation: B4 - 2nd Floor


No. of Beams = 0 pcs Volume of Concrete = 0.00 m3
Length of Beam = 4.00 m
Depth = 0.45 m Comment/s:
Base Width = 0.30 m Dun palang ito sa dinagdag na building.

Designation: RB1A - Roof Beam


No. of Beams = 2 pcs Volume of Concrete = 0.88 m3
Length of Beam = 4.00 m
Depth = 0.35 m Comment/s:
Base Width = 0.30 m Dun palang ito sa dinagdag na building.

Designation: RB1 - Roof Beam


No. of Beams = 12 pcs Volume of Concrete = 5.29 m3
Length of Beam = 4.00 m
Depth = 0.35 m Comment/s:
Base Width = 0.30 m

Designation: RB4 - Roof Beam


No. of Beams = 8 pcs Volume of Concrete = 9.07 m3
Length of Beam = 8.00 m
Depth = 0.45 m Comment/s:
Base Width = 0.30 m

Designation: RCB1 - Roof Beams


No. of Beams = 4 pcs Volume of Concrete = 0.44 m3
Length of Beam = 0.60 m
Depth = 0.50 m Comment/s:
Base Width = 0.35 m

Designation: RCB2 - Roof Beams


No. of Beams = 18 pcs Volume of Concrete = 1.36 m3
Length of Beam = 0.60 m
Depth = 0.40 m Comment/s:
Base Width = 0.30 m

E. COLUMNS
Designation: C4 - 1st Floor
No. of Columns = 0 pcs Volume of Concrete = 0.00 m3
Length of Column = 7.70 m
Column Width1 = 0.40 m Comment/s:
Column Width2 = 0.40 m Dun palang ito sa dinagdag na building.

Designation: C4 - 2nd Floor


No. of Columns = 6 pcs Volume of Concrete = 2.55 m3
Length of Column = 3.30 m
Column Width1 = 0.35 m Comment/s:
Column Width2 = 0.35 m

Designation: C1 - 2nd Floor


No. of Columns = 8 pcs Volume of Concrete = 4.44 m3
Length of Column = 3.30 m
Column Width1 = 0.40 m Comment/s:
Column Width2 = 0.40 m
F. CONCRETE GUTTER
Linear Meter = 72.00 m Volume of Concrete = 14.03 m3
Cross-section Area = 0.19 m2

G. Lintel Beam for W7


3 sets 0.4 cu.m 1.2 cu.m

for 1 set for 3 sets


cement 3.5 bags 10.5
gravel 0.4 cum 1.2
sand 0.2 cum 0.6
main rsb 47.1 kls 141
stirrups 18.4 kls 55.2
tie wire 0.75 kls 2.25
Project Title: 0
###
Location: 0

MASONRY WORKS AND PLASTERING

Area for CHB = m2


Summary:
Area for Plastering = m2

A. EXTERIOR WALLS
Designation: 1st Floor Line 6 (B'to F')
No. of Sets = 0 sets Area of CHB = 0.00 m2
Length = 4.00 m
Height = 2.60 m Comment/s:
Height is from top of wall footing.

Designation: 1st Floor Line 5 (B'to F')


No. of Sets = 0 sets Area of CHB = 0.00 m2
Length = 4.00 m
Height = 2.60 m Comment/s:
Height is from top of wall footing.

Designation: 2nd Floor Line 6 (B to G)


No. of Sets = 0 sets Area of CHB = 0.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
Height is from top of slab.

Designation: 2nd Floor Line 5 (B'to F')


No. of Sets = 0 sets Area of CHB = 0.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
Height is from top of slab.

Designation: 2nd Floor Line (4 to 6) (B' and F')


No. of Sets = 8 sets Area of CHB = 48.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
Height is from top of slab.

Designation: 2nd Floor masonry (classrooms and hagdan exterior)


No. of Sets = 10 sets Area of CHB = 132.00 m2
Length = 4.00 m
Height = 3.30 m Comment/s:

Designation: GF (A and H (5 to 6))


No. of Sets = 2 sets Area of CHB = 9.60 m2
Length = 4.00 m
Height = 1.20 m Comment/s:

B. INTERIOR WALLS
Designation: 2nd Floor masonry (classrooms and hagdan interior)
No. of Sets = 10 sets Area of CHB = 132.00 m2
Length = 4.00 m
Height = 3.30 m Comment/s:
Add the retractible partition wall in the final estimate.

Designation: stairs
No. of Sets = 4 sets Area of CHB = 29.70 m2
Length = 9.00 m
Height = 0.83 m Comment/s:

C.. PLASTERING
C.1 - WALLS

ok Designation: GF (A and H (5 to 6))


No. of Sets = 2 sets Area of Plastering = 19.20 m2
Length = 4.00 m
Height = 1.20 m Comment/s:
No. of Face(s) = 2.00 all exterior

Designation: 1st Floor Line B' & F' (3'to 6)


No. of Sets = 8 sets Area of Plastering = 48.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 1.00 all exterior

Designation: 1st Floor Line 6 (B'to F')


No. of Sets = 0 sets Area of Plastering = 0.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 2.00 1/2 interior, 1/2 exterior

Designation: 1st Floor Line 5 (B'to F')


No. of Sets = 0 sets Area of Plastering = 0.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 2.00 1/2 interior, 1/2 exterior

Designation: 2nd Floor Line 6 (B to G)


No. of Sets = 2 sets Area of Plastering = 24.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 2.00 1/2 interior, 1/2 exterior

Designation: 2nd Floor Line 5 (B'to F')


No. of Sets = 0 sets Area of Plastering = 0.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 2.00 1/2 interior, 1/2 exterior

Designation: 2nd Floor Line (4 to 6) (B' and F')


No. of Sets = 6 sets Area of Plastering = 72.00 m2
Length = 4.00 m
Height = 1.50 m Comment/s:
No. of Face(s) = 2.00 1/2 interior, 1/2 exterior

Designation: 2nd Floor masonry (classrooms)


No. of Sets = 20 sets Area of Plastering = 458.64 m2
Length = 4.00 m
Height = 3.30 m Comment/s:
No. of Face(s) = 2.00 3/4 interior, 1/4 exterior

C.2 - COLUMNS
Designation: C4 - 1st Floor Line 5 & 6 (B'to F')
No. of Sets = 0 sets Area of Plastering = 0.00 m2
Height = 3.275 m
Column W = 0.40 m Comment/s: Check sa actual if 16 talaga.
No. of Face(s) = 4.00 1/2 interior, 1/2 exterior

Designation: C4 - 2nd floor


No. of Sets = 6 sets Area of Plastering = 26.67 m2
Height = 3.175 m
Column W = 0.35 m Comment/s:
No. of Face(s) = 4.00 1/2 interior, 1/2 exterior

Designation: C1 - 2nd floor


No. of Sets = 8 sets Area of Plastering = 40.64 m2
Height = 3.175 m
Column W = 0.40 m Comment/s:
No. of Face(s) = 4.00 5/8 interior, 3/8 exterior

C.3 - BEAMS
Designation: B3 - 2nd Floor
No. of Sets = 0 sets Area of Plastering = 0.00 m2
Beam Length = 4.000 m
Beam Depth = 0.450 m Comment/s:
Beam Width = 0.35 m all interior
Designation: B4 - 2nd Floor
No. of Sets = 0 sets Area of Plastering = 0.00 m2
Beam Length = 4.000 m
Beam Depth = 0.450 m Comment/s:
Beam Width = 0.30 m 1/2 interior, 1/2 exterior

Designation: RB1A - Roof Beam


No. of Sets = 2 sets Area of Plastering = 8.00 m2
Beam Length = 4.000 m
Beam Depth = 0.350 m Comment/s:
Beam Width = 0.30 m 15/22 interior, 7/22 exterior

Designation: RB1 - Roof Beam


No. of Sets = 12 sets Area of Plastering = 48.00 m2
Beam Length = 4.000 m
Beam Depth = 0.350 m Comment/s:
Beam Width = 0.30 m 2/3 interior, 1/3 exterior

Designation: RB4 - Roof Beam


No. of Sets = 8 sets Area of Plastering = 76.80 m2
Beam Length = 8.000 m
Beam Depth = 0.450 m Comment/s:
Beam Width = 0.30 m 3/4 interior, 1/4 exterior

Designation: RCB1 - Roof Beam


No. of Sets = 4 sets Area of Plastering = 3.24 m2
Beam Length = 0.600 m
Beam Depth = 0.500 m Comment/s:
Beam Width = 0.35 m all interior

Designation: RCB2 - Roof Beam


No. of Sets = 18 sets Area of Plastering = 11.88 m2
Beam Length = 0.600 m
Beam Depth = 0.400 m Comment/s:
Beam Width = 0.30 m all interior

C.4 - CONCRETE GUTTERS


Linear Meter = 116.00 m Area of Plastering = 342.20 m2
Plastering Line = 2.95 m all exterior

C.5 - CANOPY and PARAPHET


Designation: 2nd flr Slanted Canopy
Overall Length = 111.8 m Area of Plastering = 163.23 m2
Width = 0.680 m
Thickness = 0.100 m all exterior

Designation: 1st flr Slanted Canopy


Overall Length = 32 m Area of Plastering = 46.72 m2
Width = 0.680 m
Thickness = 0.100 m all exterior

Designation: Paraphet sa taas ng corridor


Overall Length = 0m Area of Plastering = 0.00 m2
Width = 0.600 m
Thickness = 0.100 m all exterior

C.6 - STAIRS
Designation: stairs
No. of Sets = 3 sets Area of Plastering = 44.55 m2
Length = 9.00 m
Height = 0.83 m Comment/s:
all interior

Additional Plastering sa 2nd Floor (see painting works)


SECOND FLOOR (Gridlines 1 to 4 and A to H)
Walls
Exterior
Length = 28 ln.m Reduced Area = 73.42 m2
Height = 3.3 m
Total Area = 92.4 m2

Interior
Length = 209.425 ln.m Reduced Area = 1559.365 m2
Height = 3.3 m
Total Area = 1382.205 m2

Columns
Interior
Columns = 21 pcs Total Area = 108.9 m2
Width = 0.5 m
Height = 3.3 m

Beams
Interior
Length = 296 ln.m Total Area = 355.2 m2
Depth = 0.45 m
Width = 0.3 m

Designation: 1st flr Slanted Canopy pickup sa may laboratory rooms


Overall Length = 28 m Area of Plastering = 40.88 m2
Width = 0.680 m
Thickness = 0.100 m all exterior

Designation: 2nd flr Slanted Canopy pickup sa may laboratory rooms


Overall Length = 28 m Area of Plastering = 40.88 m2
Width = 0.680 m
Thickness = 0.100 m all exterior
Project Title: 0
###
Location: 0

PAINTING WORKS

I. = m3
Summary: II. = m3
III. = m3

see plastering works


A. GROUND FLOOR

Walls Exterior Interior


1st Floor Line B' & F' (3'to 5) 0.00 m2 48.00 m2
1st Floor Line 6 (B'to F') 0 m2 0 m2
1st Floor Line 5 (B'to F') 0 m2 0 m2
1st Floor Line 3' (B'to F') 73.42 m2 0 m2

Columns
C4 - 1st Floor Line 5 & 6 (B'to F') 0 m2 0 m2
C1 & C2 - 1st Floor Line 3' (B'to F') 20.4 m2 0 m2
C4 - 1st Floor Line B' & F' (3'to 5) 10.88 m2 0 m2

Beams
B3 - 2nd Floor 0 m2 0.00 m2
B4 - 2nd Floor 0 m2 0 m2

Slanted Canopy
1st flr Slanted Canopy 46.72 m2 0 m2

Stairs
3 units stairs 0 m2 44.55 m2
151.42 m2 92.55 m2

see plastering works


B. SECOND FLOOR (Gridlines 4 to 6 and A to H)

Walls Exterior Interior


2nd Floor Line 6 (B to G) 12 m2 12 m2
2nd Floor Line 5 (B'to F') 0 m2 0 m2
2nd Floor Line (4 to 5) (B' and F') 36 m2 36 m2
2nd Floor masonry (classrooms) 114.66 m2 343.98 m2

Columns
C4 - 2nd floor 13.335 m2 13.335 m2
C1 - 2nd floor 15.24 m2 25.4 m2
Beams
RB1A - Roof Beam 2.5454545 m2 5.4545455 m2
RB1 - Roof Beam 16 m2 32 m2
RB4 - Roof Beam 19.2 m2 57.6 m2
RCB1 - Roof Beam 0 m2 3.24 m2
RCB2 - Roof Beam 0 m2 11.88 m2

Canopy and Paraphet


2nd flr Slanted Canopy 163.23 m2 0 m2
Paraphet sa taas ng corridor 0.00 m2 0 m2

Concrete Gutter
Concrete Gutter 116.00 m2 0 m2
508.21 m2 540.89 m2

C. SECOND FLOOR (Gridlines 1 to 4 and A to H)

Walls
Exterior
Length = 136 ln.m Reduced Area = 371.4 m2
Height = 3.3 m
Total Area = 448.8 m2

Interior
Length = 209.425 ln.m Reduced Area = 1559.365 m2
Height = 3.3 m
Total Area = 1382.205 m2

Columns
Exterior
Columns = 24 pcs Total Area = 39.6 m2
Width = 0.5 m
Height = 3.3 m

Interior
Columns = 21 pcs Total Area = 108.9 m2
Width = 0.5 m
Height = 3.3 m

0 m2
0 m2

Canopy
Exterior
Length = 109.75 ln.m Total Area = 160.235 m2
Perimeter = 1.46 m

Concrete Gutter & Paraphet


Exterior
Length = 136 ln.m Total Area 1 = 285.6 m2
Perimeter = 2.1 m Total Area 2 = 55.44 m2

area 2 is caculated above concrete cutter of paraphet

SUMMARY of C
Exterior Interior
912.28 m2
1,668.27 m2

D. 1st Floor Additional Repainting EXTERIOR

Walls
Exterior
Length = 128 ln.m Reduced Area = 488.72 m2
Height = 4 m
Total Area = 512 m2

W1 = 2.88 m2 7 sets 20.2 m2


W5 = 0.72 m2 3 sets 2.16 m2
W6 = 0.48 m2 2 sets 0.96 m2

Columns sa porch
Exterior
Columns = 4 pcs Total Area = 32 m2
Width = 0.5 m
Height = 4 m

Walls + Beam sa porch


Exterior
Length = 20 m Total Area = 33 m2
Height = 1.5 m

Canopy
Exterior
Length = 46.4 ln.m Total Area = 67.744 m2
Perimeter = 1.46 m

E. 1st Floor Additional Repainting INTERIOR


Walls
Interior
Length = 181.5 ln.m Reduced Area = 1672.1 m2
Height = 3.4 m
Additional = 81.6 m2
Total Area = 1804.52 m2
D1 = 2.75 m2 12 sets 66 m2
D2 = 2.25 m2 9 sets 40.5 m2
W3 = 0.96 m2 12 sets 23 m2
W4 = 0.72 m2 4 sets 2.88 m2

Columns
Interior
Inside = 13 pcs Total Area = 85 m2
Outside = 24 pcs
Width = 0.5 m
Height = 3.4 m
2nd flr computation

COLUMN FORMS
Input longer dimension: 0.4 m No. of plywoods (1.2 x 2.4):

Input shorter dimension: 0.4 m Size of Plywood Thickness


Wood 6 mm 12 mm
Input height of column: 3.3 m Frame (1/4") (1/2")
if 2" x 2" 446 305
Input number of columns: 7 if 2" x 3" 668 458

BEAM FORMS
Input depth of beam: 0.35 m No. of plywoods (1.2 x 2.4):

Input base width: 0.3 m Size of Plywood Thickness


Wood 6 mm 12 mm
Input length of beam: 4 m Frame (1/4") (1/2")
if 2" x 2" 1153 859
Input number of beams: 30 if 2" x 3" 1730 1288

SLAB FORMS
Input concrete slab area: 0 m^2 No. of plywoods (1.2 x 2.4):
COLUMN SCAFFOLDING OR STAGING
15 pcs Vertical support (2" x 3"): 162 bd.ft
Horizontal support (2" x 2"): 486 bd.ft
Brace support (2" x 2"): 271 bd.ft

bd.ft
bd.ft

BEAM SCAFFOLDING OR STAGING


46 pcs Vertical support (2" x 3"): 720 bd.ft
Horizontal support (2" x 2"): 564 bd.ft

bd.ft
bd.ft

SLAB SCAFFOLDING OR STAGING


0 pcs Support (2" x 3"): 0 bd.ft
Project Title: 0
###
Location: 0

STEEL WORKS

Summary: Kilograms of Steel = kgs

A. FOOTINGS
Designation: C4/F4 - Spread Footing
Longer Dimension: 2.45 m Shorter Dimension: 2.45 m
No. of cut bars: 12 pcs No. of cut bars: 12 pcs
No of footings: 12 No of footings: 12
Bar Length with Hook: 2.6 m Bar Length with Hook: 2.6 m
Total number of cut bars: 144 Total number of cut bars: 144

@ 6.0 m ----------> 2.3076923 pcs @ 6.0 m ----------> 2.3076923 pcs


@ 7.5 m ----------> 2.8846154 pcs @ 7.5 m ----------> 2.8846154 pcs
@ 9.0 m ----------> 3.4615385 pcs @ 9.0 m ----------> 3.4615385 pcs
ADOPT: 2 pcs ADOPT: 2 pcs
6.0 m 6.0 m
Total no. of bars: 72 pcs Total no. of bars: 72 pcs

RSB Ø kg/m kgs RSB Ø kg/m kgs


10 0.617 266.54 10 0.617 266.54
12 0.888 383.62 12 0.888 383.62
16 1.578 681.70 16 1.578 681.70
20 2.467 1,065.74 20 2.467 1,065.74
25 3.854 1,664.93 25 3.854 1,664.93

Summary: Kilograms of Steel, 20 mm = 2,131.49 kgs 6.0


Kilograms of Tiewires, 30 cm = 10 kgs 6

Comment/s: ok

Designation: W1F1 - Wall Footing


Longitudinal Dimension: 56 m Transverse Dimension: 0.4 m
Number of Rows 3 lines Spacing of Bars: 0.3 m
Splice Length: 0.3 m Total Number of Cut Bars: 188
Bar Length with Hook 0.55 m

@ 6.0 m ----------> 9.8245614 pcs @ 6.0 m ----------> 10.909091 pcs


@ 7.5 m ----------> 7.7777778 pcs @ 7.5 m ----------> 13.636364 pcs
@ 9.0 m ----------> 6.4367816 pcs @ 9.0 m ----------> 16.363636 pcs
ADOPT: 6 pcs ADOPT: 16 pcs
9.0 m 9.0 m
Total no. of bars: 18 pcs Total no. of bars: 12 pcs

RSB Ø kg/m kgs RSB Ø kg/m kgs


10 0.617 99.95 10 0.617 66.64
12 0.888 143.86 12 0.888 95.90
16 1.578 255.64 16 1.578 170.42
20 2.467 399.65 20 2.467 266.44
25 3.854 624.35 25 3.854 416.23

Summary: Kilograms of Steel, 12 mm = 143.86 kgs 9.0


Kilograms of Steel, 10 mm = 66.64 kgs 9.0
Kilograms of Tiewires, 30 cm = 4 kgs

Comment/s: ok

C. SLABS
Designation: Slab on Grade
Longitudinal Dimension: 4 m Transverse Dimension: 4 m
Spacing of Bars: 0.4 m Spacing of Bars: 0.4 m
Number of Sets: 7 sets Number of Sets: 7 sets
Hook Length: 0.2 m Hook Length: 0.2 m
Total Number of Cut Bars: 77 Total Number of Cut Bars: 77
Bar Length with Hook 4.4 m Bar Length with Hook 4.4 m

@ 6.0 m ----------> 1.3636364 pcs @ 6.0 m ----------> 1.3636364 pcs


@ 7.5 m ----------> 1.7045455 pcs @ 7.5 m ----------> 1.7045455 pcs
@ 9.0 m ----------> 2.0454545 pcs @ 9.0 m ----------> 2.0454545 pcs
ADOPT: 2 pcs ADOPT: 2 pcs
9.0 m 9.0 m
Total no. of bars: 39 pcs Total no. of bars: 39 pcs

RSB Ø kg/m kgs RSB Ø kg/m kgs


10 0.617 216.57 10 0.617 216.57
12 0.888 311.69 12 0.888 311.69
16 1.578 553.88 16 1.578 553.88
20 2.467 865.92 20 2.467 865.92
25 3.854 1,352.75 25 3.854 1,352.75

Summary: Kilograms of Steel, 12 mm = 623.38 kgs 9.0


Kilograms of Tiewires, 30 cm = 6 kgs

Comment/s: Di pa kasama ang Flooring sa labas na part.

Designation: S2 - Suspended Slab Covered Corridor / Walkway (Two-Way) 2nd Floor


Longer Dimension: 4 m Top Bar Spacing: 0.1 m
Shorter Dimension: 4 m Bottom Bar Spacing: 0.375 m
No of Slabs: 7 Temperature Bar Spacing: 0.25 m
Max. Column Dimension: 0.40 m Cut Bar Spacing: 0.3 m
Hook Length: 0.20 m
MAIN BARS:
Along Longer Dimension: Along Shorter Dimension:
# of Top Bars: = 41 pcs # of Top Bars: = 41 pcs
# of Bottom Bars: = 12 pcs # of Bottom Bars: = 12 pcs
Bot & Top Bar Length = 4.800 m Bot & Top Bar Length = 4.800 m
Total number of cuts: 371 pcs Total number of cuts: 371 pcs
@ 6.0 m ----------> 1.25 pcs @ 6.0 m ----------> 1.25 pcs
@ 7.5 m ----------> 1.5625 pcs @ 7.5 m ----------> 1.5625 pcs
@ 9.0 m ----------> 1.875 pcs @ 9.0 m ----------> 1.875 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
6.0 m 6.0 m
Total no. of bars: 371 pcs Total no. of bars: 371 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 1,373.44 10 0.617 1,373.44
12 0.888 1,976.69 12 0.888 1,976.69

# of Cut bars = 15 pcs # of Cut bars = 15 pcs


Cut Bar Length = 1.50 m Cut Bar Length = 1.50 m
Total number of cuts: 210 pcs Total number of cuts: 210 pcs
@ 6.0 m ----------> 4 pcs @ 6.0 m ----------> 4 pcs
@ 7.5 m ----------> 5 pcs @ 7.5 m ----------> 5 pcs
@ 9.0 m ----------> 6 pcs @ 9.0 m ----------> 6 pcs
ADOPT: 4 pcs ADOPT: 4 pcs
6.0 m 6.0 m
Total no. of bars: 53 pcs Total no. of bars: 53 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 196.21 10 0.617 196.21
12 0.888 282.38 12 0.888 282.38
TEMPERATURE BARS:
Along Longer Dimension: Along Shorter Dimension:
# of Temperature bars = 17 pcs # of Temperature bars = 17 pcs
Temp Bar Length = 4.80 m Temp Bar Length = 4.80 m
Total number of cuts: 119 pcs Total number of cuts: 119 pcs
@ 6.0 m ----------> 1.25 pcs @ 6.0 m ----------> 1.25 pcs
@ 7.5 m ----------> 1.5625 pcs @ 7.5 m ----------> 1.5625 pcs
@ 9.0 m ----------> 1.875 pcs @ 9.0 m ----------> 1.875 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
6.0 m 6.0 m
Total no. of bars: 119 pcs Total no. of bars: 119 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 440.54 10 0.617 440.54
12 0.888 634.03 12 0.888 634.03

Summary: Kilograms of Steel, 12 mm = 4,518.14 kgs 6.0


Kilograms of Steel, 10 mm = 881.08 kgs 6.0
Kilograms of Tiewires, 30 cm = 67 kgs
Designation: S2 - Suspended Slab (Two-Way) Roof Deck
Longer Dimension: 4 m Top Bar Spacing: 0.1 m
Shorter Dimension: 4 m Bottom Bar Spacing: 0.375 m
No of Slabs: 7 Temperature Bar Spacing: 0.25 m
Max. Column Dimension: 0.40 m Cut Bar Spacing: 0.3 m
Hook Length: 0.20 m
MAIN BARS:
Along Longer Dimension: Along Shorter Dimension:
# of Top Bars: = 41 pcs # of Top Bars: = 41 pcs
# of Bottom Bars: = 12 pcs # of Bottom Bars: = 12 pcs
Bot & Top Bar Length = 4.800 m Bot & Top Bar Length = 4.800 m
Total number of cuts: 371 pcs Total number of cuts: 371 pcs
@ 6.0 m ----------> 1.25 pcs @ 6.0 m ----------> 1.25 pcs
@ 7.5 m ----------> 1.5625 pcs @ 7.5 m ----------> 1.5625 pcs
@ 9.0 m ----------> 1.875 pcs @ 9.0 m ----------> 1.875 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
6.0 m 6.0 m
Total no. of bars: 371 pcs Total no. of bars: 371 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 1,373.44 10 0.617 1,373.44
12 0.888 1,976.69 12 0.888 1,976.69

# of Cut bars = 15 pcs # of Cut bars = 15 pcs


Cut Bar Length = 1.50 m Cut Bar Length = 1.50 m
Total number of cuts: 210 pcs Total number of cuts: 210 pcs
@ 6.0 m ----------> 4 pcs @ 6.0 m ----------> 4 pcs
@ 7.5 m ----------> 5 pcs @ 7.5 m ----------> 5 pcs
@ 9.0 m ----------> 6 pcs @ 9.0 m ----------> 6 pcs
ADOPT: 4 pcs ADOPT: 4 pcs
6.0 m 6.0 m
Total no. of bars: 53 pcs Total no. of bars: 53 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 196.21 10 0.617 196.21
12 0.888 282.38 12 0.888 282.38
TEMPERATURE BARS:
Along Longer Dimension: Along Shorter Dimension:
# of Temperature bars = 17 pcs # of Temperature bars = 17 pcs
Temp Bar Length = 4.80 m Temp Bar Length = 4.80 m
Total number of cuts: 119 pcs Total number of cuts: 119 pcs
@ 6.0 m ----------> 1.25 pcs @ 6.0 m ----------> 1.25 pcs
@ 7.5 m ----------> 1.5625 pcs @ 7.5 m ----------> 1.5625 pcs
@ 9.0 m ----------> 1.875 pcs @ 9.0 m ----------> 1.875 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
6.0 m 6.0 m
Total no. of bars: 119 pcs Total no. of bars: 119 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 440.54 10 0.617 440.54
12 0.888 634.03 12 0.888 634.03

Summary: Kilograms of Steel, 12 mm = 4,518.14 kgs 6.0


Kilograms of Steel, 10 mm = 881.08 kgs 6.0
Kilograms of Tiewires, 30 cm = 67 kgs
Designation: Slanted Canopy - 2nd Floor
Linear Meter = 51.2 m

Transverse Bars Horizontal Bars


Cut Length = 1.280 m No. of Lines = 6 lines
Bar Diameter Ø = 12 mm Bar Diameter Ø = 10 mm
Spacing of Bars = 150 mm Lap Splice Length = 0.420 m
Total Pcs of Cut = 343 pcs Total Length = 307.20 m
@ 6.0 m ----------> 4.6875 pcs @ 6.0 m ----------> 55.053763 pcs
@ 7.5 m ----------> 5.859375 pcs @ 7.5 m ----------> 43.389831 pcs
@ 9.0 m ----------> 7.03125 pcs @ 9.0 m ----------> 35.804196 pcs
ADOPT: 7 pcs ADOPT: 55 pcs
9.0 m 6.0 m
Total no. of bars: 49 pcs Total no. of bars: 55 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 272.10 10 0.617 203.61
12 0.888 391.61 12 0.888 293.04

Summary: Kilograms of Steel, 12 mm = 391.61 kgs 9.0


Kilograms of Steel, 10 mm = 203.61 kgs 6.0
Kilograms of Tiewires, 30 cm = 13 kgs

Designation: Slanted Canopy - 1st Floor


Linear Meter = 32 m

Transverse Bars Horizontal Bars


Cut Length = 1.280 m No. of Lines = 6 lines
Bar Diameter Ø = 12 mm Bar Diameter Ø = 10 mm
Spacing of Bars = 150 mm Lap Splice Length = 0.420 m
Total Pcs of Cut = 215 pcs Total Length = 192.00 m
@ 6.0 m ----------> 4.6875 pcs @ 6.0 m ----------> 34.408602 pcs
@ 7.5 m ----------> 5.859375 pcs @ 7.5 m ----------> 27.118644 pcs
@ 9.0 m ----------> 7.03125 pcs @ 9.0 m ----------> 22.377622 pcs
ADOPT: 7 pcs ADOPT: 27 pcs
9.0 m 7.5 m
Total no. of bars: 31 pcs Total no. of bars: 27 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 172.14 10 0.617 124.94
12 0.888 247.75 12 0.888 179.82

Summary: Kilograms of Steel, 12 mm = 247.75 kgs 9.0


Kilograms of Steel, 10 mm = 124.94 kgs 6.0
Kilograms of Tiewires, 30 cm = 9 kgs
Designation: WALKWAY
Linear Meter = 28 m

Transverse Bars Horizontal Bars


Cut Length = 2.000 m No. of Lines = 6 lines
Bar Diameter Ø = 12 mm Bar Diameter Ø = 12 mm
Spacing of Bars = 400 mm Lap Splice Length = 0.420 m
Total Pcs of Cut = 155 pcs Total Length = 203.00 m
@ 6.0 m ----------> 3 pcs @ 6.0 m ----------> 36.379928 pcs
@ 7.5 m ----------> 3.75 pcs @ 7.5 m ----------> 28.672316 pcs
@ 9.0 m ----------> 4.5 pcs @ 9.0 m ----------> 23.659674 pcs
ADOPT: 3 pcs ADOPT: 36 pcs
6.0 m 6.0 m
Total no. of bars: 52 pcs Total no. of bars: 36 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 192.50 10 0.617 133.27
12 0.888 277.06 12 0.888 191.81

Summary: Kilograms of Steel, 12 mm = 277.06 kgs 9.0


Kilograms of Steel, 12 mm = 191.81 kgs 6.0
Kilograms of Tiewires, 30 cm = 6 kgs

D. BEAMS
Designation: FTB2 -Footing Beams
No. of Beams: = 0 pcs At Support: TOP Bar = 4 pcs
Beam Length (CTC): = 4.0 m BOT Bar = 2 pcs
Beam Depth: = 0.4 m
Beam Width: = 0.3 m At Midspan: TOP Bar = 4 pcs
Column 1 Dimension: = 0.4 m BOT Bar = 2 pcs
Column 2 Dimension: = 0.4 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.25 m At 1 Support = 0 pcs
Clear Span (L) = 3.6 m At Midspan = 0 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 4 pcs Total No. of Main Bars = 0 pcs
BOT Bar = 2 pcs Bar Length = 1.55 m

Total Number of Cont. Bar = 0 pcs @ 6.0 m ----------> 3.8709677 pcs


Continuous Bar Length = 4.5 m @ 7.5 m ----------> 4.8387097 pcs
@ 9.0 m ----------> 5.8064516 pcs
@ 6.0 m ----------> 1.3333333 pcs ADOPT: 3 pcs
@ 7.5 m ----------> 1.6666667 pcs 6.0 m
@ 9.0 m ----------> 2 pcs Total no. of bars: 0 pcs
ADOPT: 2 pcs
9.0 m RSB Ø kg/m kgs
Total no. of bars: 0 pcs 10 0.617 0.00
12 0.888 0.00
RSB Ø kg/m kgs 16 1.578 0.00
10 0.617 0.00 20 2.467 0.00
12 0.888 0.00 25 3.854 0.00
16 1.578 0.00
20 2.467 0.00 At Midspan:
25 3.854 0.00 Total No. of Main Bars = 0 pcs
Bar Length = 2.16 m
STIRRUPS:
Length of Stirrups = 1.35 m @ 6.0 m ----------> 2.7777778 pcs
No. of Stirrups / Beam = 36 pcs @ 7.5 m ----------> 3.4722222 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 4.1666667 pcs
ADOPT: 4 pcs
@ 6.0 m ----------> 4.4444444 pcs 9.0 m
@ 7.5 m ----------> 5.5555556 pcs Total no. of bars: 0 pcs
@ 9.0 m ----------> 6.6666667 pcs
ADOPT: 4 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 0.00
Total no. of bars: 0 pcs 12 0.888 0.00
16 1.578 0.00
RSB Ø kg/m kgs 20 2.467 0.00
10 0.617 0.00 25 3.854 0.00
12 0.888 0.00

Summary: Kilograms of Steel, 20 mm = 0.00 kgs 9.0


Kilograms of Steel, 10 mm = 0.00 kgs 6.0
Kilograms of Tiewires, 30 cm = 0 kgs

Designation: B3 - 2nd Floor


No. of Beams: = 0 pcs At Support: TOP Bar = 6 pcs
Beam Length (CTC): = 4.00 m BOT Bar = 4 pcs
Beam Depth: = 0.45 m
Beam Width: = 0.35 m At Midspan: TOP Bar = 2 pcs
Column 1 Dimension: = 0.40 m BOT Bar = 4 pcs
Column 2 Dimension: = 0.40 m
Main Bar Diameter = 25.00 mm # of Non-continuous Bar:
Hook Length: = 0.48 m At 1 Support = 4 pcs
Clear Span (L) = 3.6 m At Midspan = 0 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 2 pcs Total No. of Main Bars = 0 pcs
BOT Bar = 4 pcs Bar Length = 1.78 m

Total Number of Cont. Bar = 0 pcs @ 6.0 m ----------> 3.3707865 pcs


Continuous Bar Length = 4.96 m @ 7.5 m ----------> 4.2134831 pcs
@ 9.0 m ----------> 5.0561798 pcs
@ 6.0 m ----------> 1.2096774 pcs ADOPT: 5 pcs
@ 7.5 m ----------> 1.5120968 pcs 9.0 m
@ 9.0 m ----------> 1.8145161 pcs Total no. of bars: 0 pcs
ADOPT: 1 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 0 pcs 10 0.617 0.00
12 0.888 0.00
RSB Ø kg/m kgs 16 1.578 0.00
10 0.617 0.00 20 2.467 0.00
12 0.888 0.00 25 3.854 0.00
16 1.578 0.00
20 2.467 0.00 At Midspan:
25 3.854 0.00 Total No. of Main Bars = 0 pcs
Bar Length = 2.16 m
STIRRUPS:
Length of Stirrups = 1.528 m @ 6.0 m ----------> 2.7777778 pcs
No. of Stirrups / Beam = 36 pcs @ 7.5 m ----------> 3.4722222 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 4.1666667 pcs
ADOPT: 4 pcs
@ 6.0 m ----------> 3.9267016 pcs 9.0 m
@ 7.5 m ----------> 4.908377 pcs Total no. of bars: 0 pcs
@ 9.0 m ----------> 5.8900524 pcs
ADOPT: 5 pcs RSB Ø kg/m kgs
9.0 m 10 0.617 0.00
Total no. of bars: 0 pcs 12 0.888 0.00
16 1.578 0.00
RSB Ø kg/m kgs 20 2.467 0.00
10 0.617 0.00 25 3.854 0.00
12 0.888 0.00

Summary: Kilograms of Steel, 25 mm = 0.00 kgs 6.0


Kilograms of Steel, 10 mm = 0.00 kgs 9.0
Kilograms of Tiewires, 30 cm = 0 kgs

Designation: B4 - 2nd Floor


No. of Beams: = 0 pcs At Support: TOP Bar = 3 pcs
Beam Length (CTC): = 4.00 m BOT Bar = 2 pcs
Beam Depth: = 0.45 m
Beam Width: = 0.30 m At Midspan: TOP Bar = 2 pcs
Column 1 Dimension: = 0.40 m BOT Bar = 2 pcs
Column 2 Dimension: = 0.40 m
Main Bar Diameter = 25 mm # of Non-continuous Bar:
Hook Length: = 0.48 m At 1 Support = 1 pcs
Clear Span (L) = 3.6 m At Midspan = 0 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 2 pcs Total No. of Main Bars = 0 pcs
BOT Bar = 2 pcs Bar Length = 1.78 m

Total Number of Cont. Bar = 0 pcs @ 6.0 m ----------> 3.3707865 pcs


Continuous Bar Length = 4.96 m @ 7.5 m ----------> 4.2134831 pcs
@ 9.0 m ----------> 5.0561798 pcs
@ 6.0 m ----------> 1.2096774 pcs ADOPT: 5 pcs
@ 7.5 m ----------> 1.5120968 pcs 9.0 m
@ 9.0 m ----------> 1.8145161 pcs Total no. of bars: 0 pcs
ADOPT: 1 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 0 pcs 10 0.617 0.00
12 0.888 0.00
RSB Ø kg/m kgs 16 1.578 0.00
10 0.617 0.00 20 2.467 0.00
12 0.888 0.00 25 3.854 0.00
16 1.578 0.00
20 2.467 0.00 At Midspan:
25 3.854 0.00 Total No. of Main Bars = 0 pcs
Bar Length = 2.16 m
STIRRUPS:
Length of Stirrups = 1.35 m @ 6.0 m ----------> 2.7777778 pcs
No. of Stirrups / Beam = 36 pcs @ 7.5 m ----------> 3.4722222 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 4.1666667 pcs
ADOPT: 4 pcs
@ 6.0 m ----------> 4.4444444 pcs 9.0 m
@ 7.5 m ----------> 5.5555556 pcs Total no. of bars: 0 pcs
@ 9.0 m ----------> 6.6666667 pcs
ADOPT: 4 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 0.00
Total no. of bars: 0 pcs 12 0.888 0.00
16 1.578 0.00
RSB Ø kg/m kgs 20 2.467 0.00
10 0.617 0.00 25 3.854 0.00
12 0.888 0.00

Summary: Kilograms of Steel, 25 mm = 0.00 kgs 6.0


Kilograms of Steel, 10 mm = 0.00 kgs 6.0
Kilograms of Tiewires, 30 cm = 0 kgs

Designation: RB1A - Roof Beam


No. of Beams: = 2 pcs At Support: TOP Bar = 4 pcs
Beam Length (CTC): = 4.00 m BOT Bar = 2 pcs
Beam Depth: = 0.35 m
Beam Width: = 0.30 m At Midspan: TOP Bar = 2 pcs
Column 1 Dimension: = 0.35 m BOT Bar = 4 pcs
Column 2 Dimension: = 0.35 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.4 m At 1 Support = 2 pcs
Clear Span (L) = 3.65 m At Midspan = 2 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 2 pcs Total No. of Main Bars = 8 pcs
BOT Bar = 2 pcs Bar Length = 1.6625 m

Total Number of Cont. Bar = 10 pcs @ 6.0 m ----------> 3.6090226 pcs


Continuous Bar Length = 4.8 m @ 7.5 m ----------> 4.5112782 pcs
@ 9.0 m ----------> 5.4135338 pcs
@ 6.0 m ----------> 1.25 pcs ADOPT: 5 pcs
@ 7.5 m ----------> 1.5625 pcs 9.0 m
@ 9.0 m ----------> 1.875 pcs Total no. of bars: 2 pcs
ADOPT: 1 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 10 pcs 10 0.617 11.11
12 0.888 15.98
RSB Ø kg/m kgs 16 1.578 28.40
10 0.617 37.02 20 2.467 44.41
12 0.888 53.28 25 3.854 69.37
16 1.578 94.68
20 2.467 148.02 At Midspan:
25 3.854 231.24 Total No. of Main Bars = 4 pcs
Bar Length = 2.19 m
STIRRUPS:
Length of Stirrups = 1.2 m @ 6.0 m ----------> 2.739726 pcs
No. of Stirrups / Beam = 36 pcs @ 7.5 m ----------> 3.4246575 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 4.109589 pcs
ADOPT: 4 pcs
@ 6.0 m ----------> 5 pcs 9.0 m
@ 7.5 m ----------> 6.25 pcs Total no. of bars: 1 pcs
@ 9.0 m ----------> 7.5 pcs
ADOPT: 5 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 5.55
Total no. of bars: 15 pcs 12 0.888 7.99
16 1.578 14.20
RSB Ø kg/m kgs 20 2.467 22.20
10 0.617 55.53 25 3.854 34.69
12 0.888 79.92

Summary: Kilograms of Steel, 20 mm = 214.63 kgs 6.0


Kilograms of Steel, 10 mm = 55.53 kgs 6.0
Kilograms of Tiewires, 30 cm = 4 kgs

Designation: RB1 - Roof Beam


No. of Beams: = 12 pcs At Support: TOP Bar = 3 pcs
Beam Length (CTC): = 4.00 m BOT Bar = 2 pcs
Beam Depth: = 0.35 m
Beam Width: = 0.30 m At Midspan: TOP Bar = 2 pcs
Column 1 Dimension: = 0.35 m BOT Bar = 3 pcs
Column 2 Dimension: = 0.35 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.4 m At 1 Support = 1 pcs
Clear Span (L) = 3.65 m At Midspan = 1 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 2 pcs Total No. of Main Bars = 24 pcs
BOT Bar = 2 pcs Bar Length = 1.6625 m

Total Number of Cont. Bar = 58 pcs @ 6.0 m ----------> 3.6090226 pcs


Continuous Bar Length = 4.8 m @ 7.5 m ----------> 4.5112782 pcs
@ 9.0 m ----------> 5.4135338 pcs
@ 6.0 m ----------> 1.25 pcs ADOPT: 5 pcs
@ 7.5 m ----------> 1.5625 pcs 9.0 m
@ 9.0 m ----------> 1.875 pcs Total no. of bars: 5 pcs
ADOPT: 1 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 58 pcs 10 0.617 27.77
12 0.888 39.96
RSB Ø kg/m kgs 16 1.578 71.01
10 0.617 214.72 20 2.467 111.02
12 0.888 309.02 25 3.854 173.43
16 1.578 549.14
20 2.467 858.52 At Midspan:
25 3.854 1,341.19 Total No. of Main Bars = 12 pcs
Bar Length = 2.19 m
STIRRUPS:
Length of Stirrups = 1.2 m @ 6.0 m ----------> 2.739726 pcs
No. of Stirrups / Beam = 36 pcs @ 7.5 m ----------> 3.4246575 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 4.109589 pcs
ADOPT: 4 pcs
@ 6.0 m ----------> 5 pcs 9.0 m
@ 7.5 m ----------> 6.25 pcs Total no. of bars: 3 pcs
@ 9.0 m ----------> 7.5 pcs
ADOPT: 5 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 16.66
Total no. of bars: 87 pcs 12 0.888 23.98
16 1.578 42.61
RSB Ø kg/m kgs 20 2.467 66.61
10 0.617 322.07 25 3.854 104.06
12 0.888 463.54

Summary: Kilograms of Steel, 20 mm = 1,036.14 kgs 6.0


Kilograms of Steel, 10 mm = 322.07 kgs 6.0
Kilograms of Tiewires, 30 cm = 17 kgs

Designation: RB4 - Roof Beam


No. of Beams: = 8 pcs At Support: TOP Bar = 7 pcs
Beam Length (CTC): = 8.00 m BOT Bar = 2 pcs
Beam Depth: = 0.45 m
Beam Width: = 0.30 m At Midspan: TOP Bar = 2 pcs
Column 1 Dimension: = 0.35 m BOT Bar = 5 pcs
Column 2 Dimension: = 0.35 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.4 m At 1 Support = 5 pcs
Clear Span (L) = 7.65 m At Midspan = 3 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 2 pcs Total No. of Main Bars = 80 pcs
BOT Bar = 2 pcs Bar Length = 2.6625 m

Total Number of Cont. Bar = 39 pcs @ 6.0 m ----------> 2.2535211 pcs


Continuous Bar Length = 8.8 m @ 7.5 m ----------> 2.8169014 pcs
@ 9.0 m ----------> 3.3802817 pcs
@ 6.0 m ----------> 0.6818182 pcs ADOPT: 2 pcs
@ 7.5 m ----------> 0.8522727 pcs 6.0 m
@ 9.0 m ----------> 1.0227273 pcs Total no. of bars: 40 pcs
ADOPT: 1 pcs
9.0 m RSB Ø kg/m kgs
Total no. of bars: 39 pcs 10 0.617 148.08
12 0.888 213.12
RSB Ø kg/m kgs 16 1.578 378.72
10 0.617 216.57 20 2.467 592.08
12 0.888 311.69 25 3.854 924.96
16 1.578 553.88
20 2.467 865.92 At Midspan:
25 3.854 1,352.75 Total No. of Main Bars = 24 pcs
Bar Length = 4.59 m
STIRRUPS:
Length of Stirrups = 1.35 m @ 6.0 m ----------> 1.3071895 pcs
No. of Stirrups / Beam = 69 pcs @ 7.5 m ----------> 1.6339869 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 1.9607843 pcs
ADOPT: 1 pcs
@ 6.0 m ----------> 4.4444444 pcs 6.0 m
@ 7.5 m ----------> 5.5555556 pcs Total no. of bars: 24 pcs
@ 9.0 m ----------> 6.6666667 pcs
ADOPT: 4 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 88.85
Total no. of bars: 138 pcs 12 0.888 127.87
16 1.578 227.23
RSB Ø kg/m kgs 20 2.467 355.25
10 0.617 510.88 25 3.854 554.98
12 0.888 735.26

Summary: Kilograms of Steel, 20 mm = 1,813.25 kgs 9.0


Kilograms of Steel, 10 mm = 510.88 kgs 6.0
Kilograms of Tiewires, 30 cm = 42 kgs

Designation: RCB1 - Roof Beam


No. of Beams: = 4 pcs At Support: TOP Bar = 6 pcs
Beam Length (CTC): = 0.60 m BOT Bar = 4 pcs
Beam Depth: = 0.50 m
Beam Width: = 0.35 m At Midspan: TOP Bar = 6 pcs
Column 1 Dimension: = 0.35 m BOT Bar = 4 pcs
Column 2 Dimension: = 0.35 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.4 m At 1 Support = 0 pcs
Clear Span (L) = 0.25 m At Midspan = 0 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 6 pcs Total No. of Main Bars = 0 pcs
BOT Bar = 4 pcs Bar Length = 0.8125 m

Total Number of Cont. Bar = 48 pcs @ 6.0 m ----------> 7.3846154 pcs


Continuous Bar Length = 1.4 m @ 7.5 m ----------> 9.2307692 pcs
@ 9.0 m ----------> 11.076923 pcs
@ 6.0 m ----------> 4.2857143 pcs ADOPT: 2 pcs
@ 7.5 m ----------> 5.3571429 pcs 6.0 m
@ 9.0 m ----------> 6.4285714 pcs Total no. of bars: 0 pcs
ADOPT: 4 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 12 pcs 10 0.617 0.00
12 0.888 0.00
RSB Ø kg/m kgs 16 1.578 0.00
10 0.617 44.42 20 2.467 0.00
12 0.888 63.94 25 3.854 0.00
16 1.578 113.62
20 2.467 177.62 At Midspan:
25 3.854 277.49 Total No. of Main Bars = 0 pcs
Bar Length = 0.15 m
STIRRUPS:
Length of Stirrups = 1.45 m @ 6.0 m ----------> 40 pcs
No. of Stirrups / Beam = 10 pcs @ 7.5 m ----------> 50 pcs
Diameter of Stirrups = 12 mm @ 9.0 m ----------> 60 pcs
ADOPT: 1 pcs
@ 6.0 m ----------> 4.137931 pcs 6.0 m
@ 7.5 m ----------> 5.1724138 pcs Total no. of bars: 0 pcs
@ 9.0 m ----------> 6.2068966 pcs
ADOPT: 4 pcs RSB Ø kg/m kgs
6.0 m 10 0.617 0.00
Total no. of bars: 10 pcs 12 0.888 0.00
16 1.578 0.00
RSB Ø kg/m kgs 20 2.467 0.00
10 0.617 37.02 25 3.854 0.00
12 0.888 53.28

Summary: Kilograms of Steel, 20 mm = 177.62 kgs 6.0


Kilograms of Steel, 12 mm = 53.28 kgs 6.0
Kilograms of Tiewires, 30 cm = 3 kgs

Designation: RCB2 - Roof Beam


No. of Beams: = 18 pcs At Support: TOP Bar = 6 pcs
Beam Length (CTC): = 0.60 m BOT Bar = 3 pcs
Beam Depth: = 0.40 m
Beam Width: = 0.30 m At Midspan: TOP Bar = 6 pcs
Column 1 Dimension: = 0.35 m BOT Bar = 3 pcs
Column 2 Dimension: = 0.35 m
Main Bar Diameter = 20 mm # of Non-continuous Bar:
Hook Length: = 0.4 m At 1 Support = 0 pcs
Clear Span (L) = 0.25 m At Midspan = 0 pcs

# of Main Continuous Bar: At 2-End Supports:


TOP Bar = 6 pcs Total No. of Main Bars = 0 pcs
BOT Bar = 3 pcs Bar Length = 0.8125 m

Total Number of Cont. Bar = 195 pcs @ 6.0 m ----------> 7.3846154 pcs
Continuous Bar Length = 1.4 m @ 7.5 m ----------> 9.2307692 pcs
@ 9.0 m ----------> 11.076923 pcs
@ 6.0 m ----------> 4.2857143 pcs ADOPT: 2 pcs
@ 7.5 m ----------> 5.3571429 pcs 6.0 m
@ 9.0 m ----------> 6.4285714 pcs Total no. of bars: 0 pcs
ADOPT: 4 pcs
6.0 m RSB Ø kg/m kgs
Total no. of bars: 49 pcs 10 0.617 0.00
12 0.888 0.00
RSB Ø kg/m kgs 16 1.578 0.00
10 0.617 181.40 20 2.467 0.00
12 0.888 261.07 25 3.854 0.00
16 1.578 463.93
20 2.467 725.30 At Midspan:
25 3.854 1,133.08 Total No. of Main Bars = 0 pcs
Bar Length = 0.15 m
STIRRUPS:
Length of Stirrups = 1.25 m @ 6.0 m ----------> 40 pcs
No. of Stirrups / Beam = 10 pcs @ 7.5 m ----------> 50 pcs
Diameter of Stirrups = 10 mm @ 9.0 m ----------> 60 pcs
ADOPT: 1 pcs
@ 6.0 m ----------> 4.8 pcs 6.0 m
@ 7.5 m ----------> 6 pcs Total no. of bars: 0 pcs
@ 9.0 m ----------> 7.2 pcs
ADOPT: 6 pcs RSB Ø kg/m kgs
7.5 m 10 0.617 0.00
Total no. of bars: 30 pcs 12 0.888 0.00
16 1.578 0.00
RSB Ø kg/m kgs 20 2.467 0.00
10 0.617 138.83 25 3.854 0.00
12 0.888 199.80

Summary: Kilograms of Steel, 20 mm = 725.30 kgs 6.0


Kilograms of Steel, 10 mm = 138.83 kgs 7.5
Kilograms of Tiewires, 30 cm = 11 kgs
E. COLUMNS
Designation: C4 - 1st Floor
No. of Columns = 0 pcs TIES:
Column Width1 = 0.40 m Number of Connections
Column Width2 = 0.40 m per Layer = 20 pcs
Main RSB Ø = 20 mm Total Cut Length of Ties
Ctc Length = 7.98 m per Layer = 3.45 m
Pcs of RSB = 12 pcs Number of Layers
Achorage Length = 0.68 pcs per Column = 55 pcs
Lap Splice Length = 0.8 pcs Tie Bar Ø = 10 mm
Length of Cut = 9.46 m
@ 6.0 m ----------> 0.6345849 pcs @ 6.0 m ----------> 1.7391304 pcs
@ 7.5 m ----------> 0.7932311 pcs @ 7.5 m ----------> 2.173913 pcs
@ 9.0 m ----------> 0.9518773 pcs @ 9.0 m ----------> 2.6086957 pcs
ADOPT: 1 pcs ADOPT: 2 pcs
9.5 m 7.5 m
Total no. of bars: 1 pcs Total no. of bars: 0 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 5.86 10 0.617 0.00
12 0.888 8.44 12 0.888 0.00
16 1.578 14.99
20 2.467 23.44
25 3.854 36.61
Summary: Kilograms of Steel, 20 mm = 23.44 kgs 9.0
Kilograms of Steel, 10 mm = 0.00 kgs 7.5
Kilograms of Tiewires, 30 cm = 0 kgs

Designation: C4 - 2nd Floor


No. of Columns = 6 pcs TIES:
Column Width1 = 0.35 m Number of Connections
Column Width2 = 0.35 m per Layer = 12 pcs
Main RSB Ø = 16 mm Total Cut Length of Ties
Ctc Length = 3.30 m per Layer = 2.2 m
Pcs of RSB = 8 pcs Number of Layers
Achorage Length = 0.6 pcs per Column = 34 pcs
Lap Splice Length = 0.52 pcs Tie Bar Ø = 10 mm
Length of Cut = 4 m
@ 6.0 m ----------> 1.3574661 pcs @ 6.0 m ----------> 2.7272727 pcs
@ 7.5 m ----------> 1.6968326 pcs @ 7.5 m ----------> 3.4090909 pcs
@ 9.0 m ----------> 2.0361991 pcs @ 9.0 m ----------> 4.0909091 pcs
ADOPT: 2 pcs ADOPT: 4 pcs
9.0 m 9.0 m
Total no. of bars: 27 pcs Total no. of bars: 51 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 149.93 10 0.617 283.20
12 0.888 215.78 12 0.888 407.59
16 1.578 383.45
20 2.467 599.48
25 3.854 936.52
Summary: Kilograms of Steel, 16 mm = 383.45 kgs 9.0
Kilograms of Steel, 10 mm = 283.20 kgs 9.0
Kilograms of Tiewires, 30 cm = 16 kgs
Designation: C1 - 2nd Floor
No. of Columns = 8 pcs TIES:
Column Width1 = 0.40 m Number of Connections
Column Width2 = 0.40 m per Layer = 12 pcs
Main RSB Ø = 25 mm Total Cut Length of Ties
Ctc Length = 3.30 m per Layer = 2.2 m
Pcs of RSB = 12 pcs Number of Layers
Achorage Length = 0.86 pcs per Column = 36 pcs
Lap Splice Length = 0.9 pcs Tie Bar Ø = 10 mm
Length of Cut = 5 m
@ 6.0 m ----------> 1.1857708 pcs @ 6.0 m ----------> 2.7272727 pcs
@ 7.5 m ----------> 1.4822134 pcs @ 7.5 m ----------> 3.4090909 pcs
@ 9.0 m ----------> 1.7786561 pcs @ 9.0 m ----------> 4.0909091 pcs
ADOPT: 1 pcs ADOPT: 4 pcs
6.0 m 9.0 m
Total no. of bars: 106 pcs Total no. of bars: 72 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 392.41 10 0.617 399.82
12 0.888 564.77 12 0.888 575.42
16 1.578 1,003.61
20 2.467 1,569.01
25 3.854 2,451.14
Summary: Kilograms of Steel, 25 mm = 2,451.14 kgs 6.0
Kilograms of Steel, 10 mm = 399.82 kgs 9.0
Kilograms of Tiewires, 30 cm = 22 kgs

F. CONCRETE GUTTER & PARAPHET


Designation: Concrete Gutter
Linear Meter = 72 m

Vertical & Transverse Bars Horizontal Bars


Cut Length = 1.963 m No. of Lines = 16 lines
Bar Diameter Ø = 12 mm Bar Diameter Ø = 10 mm
Spacing of Bars = 200 mm Lap Splice Length = 0.420 m
Total Pcs of Cut = 481 pcs Total Length = 1,152.00 m
@ 6.0 m ----------> 3.0573248 pcs @ 6.0 m ----------> 206.45161 pcs
@ 7.5 m ----------> 3.8216561 pcs @ 7.5 m ----------> 162.71186 pcs
@ 9.0 m ----------> 4.5859873 pcs @ 9.0 m ----------> 134.26573 pcs
ADOPT: 3 pcs ADOPT: 206 pcs
6.0 m 6.0 m
Total no. of bars: 161 pcs Total no. of bars: 206 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 596.02 10 0.617 762.61
12 0.888 857.81 12 0.888 1,097.57

Summary: Kilograms of Steel, 12 mm = 857.81 kgs 6.0


Kilograms of Steel, 10 mm = 762.61 kgs 6.0
Kilograms of Tiewires, 30 cm = 48 kgs

Designation: Paraphet top of corridor


Linear Meter = 0 m

Transverse Bars Horizontal Bars


Cut Length = 1.200 m No. of Lines = 5 lines
Bar Diameter Ø = 12 mm Bar Diameter Ø = 10 mm
Spacing of Bars = 150 mm Lap Splice Length = 0.420 m
Total Pcs of Cut = 1 pcs Total Length = 0.00 m
@ 6.0 m ----------> 5 pcs @ 6.0 m ----------> 0 pcs
@ 7.5 m ----------> 6.25 pcs @ 7.5 m ----------> 0 pcs
@ 9.0 m ----------> 7.5 pcs @ 9.0 m ----------> 0 pcs
ADOPT: 5 pcs ADOPT: 0 pcs
6.0 m 6.0 m
Total no. of bars: 1 pcs Total no. of bars: 0 pcs
RSB Ø kg/m kgs RSB Ø kg/m kgs
10 0.617 3.70 10 0.617 0.00
12 0.888 5.33 12 0.888 0.00

Summary: Kilograms of Steel, 12 mm = 5.33 kgs 6.0


Kilograms of Steel, 10 mm = 0.00 kgs 6.0
Kilograms of Tiewires, 30 cm = 1 kgs
Project Title: 0
###
Location: 0

WATERPROOFING

Summary: Waterproofing Area = 193.40 m2

A. ROOF SLAB
Designation: Area Bounded by (5 to 6) and (B'to F')
No. of Sets = 0 sets Area of Waterproofing = 0.00 m2
Length = 4.00 m
Width = 4.00 m

B. CONCRETE GUTTER
Designation: Gutter
Linear Meter = 116.00 m Area of Waterproofing = 133.40 m2
Perimeter = 1.15 m
208 ang buong building gutter line

C. SLAB DECK sa FRONT


Designation: Along Gridlines 1 (C to F)
No. of Sets = 1 sets Area of Waterproofing = 60.00 m2
Length = 20.00 m
Width = 3.00 m
Project Title: 0
###
Location: 0

CEILING WORKS

1st Floor CF2 = 112.00 m2


Summary: 2nd Floor CF1 = 921.63 m2
2nd Floor CF2 = 614.38 m2

A. 1st Floor
Designation: CF-2 Area Bounded by (5 to 6) and (B'to F')
No. of Sets = 7 sets Area of CHB = 112.00 m2
Length = 4.00 m
Width = 4.00 m Comment/s: CF2

B. 2nd Floor
B-1 . C1
Designation: CF-1 Area Bounded by (4 to 5) and (A to B and G to H)
No. of Sets = 8 sets Area of CHB = 128.00 m2
Length = 4.00 m
Width = 4.00 m Comment/s: CF1

Designation: CF-1 Area Bounded by (3 to 4) and (A to B and G to H)


No. of Sets = 8 sets Area of CHB = 128.00 m2
Length = 4.00 m
Width = 4.00 m Comment/s: CF1

Designation: CF-1 Area Bounded by (2 to 3) and (A to B and G to H)


No. of Sets = 8 sets Area of CHB = 128.00 m2
Length = 4.00 m
Width = 4.00 m Comment/s: CF1

Designation: CF-1 Area Bounded by (1 to 2) and (G to H)


No. of Sets = 2 sets Area of CHB = 32.00 m2
Length = 4.00 m
Width = 4.00 m Comment/s: CF1

Designation: CF-1 Area Bounded by (1 to 2) and (A to B)


No. of Sets = 1 sets Area of CHB = 20.00 m2
Length = 8.00 m
Width = 2.50 m Comment/s: CF1

No. of Sets = 1 sets Area of CHB = 6.23 m2


Length = 3.00 m
Width = 2.08 m Comment/s: CF1

No. of Sets = 2 sets Area of CHB = 27.40 m2


Length = 4.00 m
Width = 3.43 m Comment/s: CF1

Designation: CF-1 Area Bounded by (2' to 3') and (B' to F')


No. of Sets = 2 sets Area of CHB = 192.00 m2
Length = 12.00 m
Width = 8.00 m Comment/s: CF1

Designation: CF-1 Area Bounded by (1 to 2) and (B to G)


No. of Sets = 2 sets Area of CHB = 160.00 m2
Length = 10.00 m
Width = 8.00 m Comment/s: CF1

No. of Sets = 1 sets Area of CHB = 96.00 m2


Length = 12.00 m
Width = 8.00 m Comment/s: CF1

No. of Sets = 1 sets Area of CHB = 4.00 m2


Length = 2.00 m
Width = 2.00 m Comment/s: CF1

B-2. C2
Designation: CF-2
2nd Floor Area = 1,536.00 m2 Area of CHB = 614.38 m2
2nd Flr CF1 Area = 921.63 m2
Comment/s: CF2

CF1 permiter = 433 m


c
Project Title: 0
###
Location: 0

TILING WORKS

Summary: Tiling Area = m2

A. 2nd Floor
Designation: 2nd flr except cr
Area of Tiling = 1,452.20 m2 Area of Tiling = 1,452.20 m2

Designation: 2nd flr CR


Floor Area = 27.40 m2 Area of Tiling = 138.40 m2
Wall Area = 106.92 m2
Countertop = 4.08 m2

B. Stairs
Designation: all 4 stairs
Stairs = 84.70 m2 Area of Tiling = 116.70 m2
below 1 stair = 32.00 m2

C. 1t Floor
Designation: covered corridor
Area of Tiling = 112.00 m2 Area of Tiling = 112.00 m2

Designation: 1st flr CR


Floor Area = 46.38 m2 Area of Tiling = 227.83 m2
Wall Area = 176.44 m2
Countertop = 5.01 m2
Project Title: 0
###
Location: 0

PLUMBING WORKS

A. CATCH BASINS
No. = 31 pcs CHB Area = 44.64 m2
Width = 0.6 m Plastering Area = 100.44 m2
Height = 0.6 m Cover & Bot Slab = 4.464 m3
Thickness = 0.1 m RCPC Concrete Cover x 2 multiplier
RCPC

B. RCPC No. of Pipes


6.8 m 7 pcs
8.5 m 9 pcs
6.8 m 7 pcs
8.3 m 9 pcs
4.3 m 5 pcs
8.15 m 9 pcs
7.4 m 8 pcs
0.45 m 1 pcs
7.4 m 8 pcs
4.3 m 5 pcs
6.6 m 7 pcs
7.4 m 8 pcs
5m 5 pcs
6.6 m 7 pcs
6.6 m 7 pcs
2.6 m 3 pcs
2.6 m 3 pcs
3.4 m 4 pcs
3.4 m 4 pcs
3.4 m 4 pcs
3.4 m 4 pcs
2.6 m 3 pcs
2.6 m 3 pcs
6.6 m 7 pcs
10.6 m 11 pcs
5m 5 pcs
4.5 m 5 pcs
8.3 m 9 pcs
4.2 m 5 pcs
4.2 m 5 pcs
7.4 m 8 pcs
169 m 185 pcs
c
Project Title: 0
###
Location: 0

DOORS & WINDOWS

Summary: = m2

A. DOORS & WINDOWS


2nd Floor Unit Area Exterior Interior PAINTING AREA REDUCTION:
D1 = 2.75 m2 0 sets 22 sets Exterior = 99.4 m2
D2 = 2.25 m2 0 sets 2 sets Interior = 268 m2
D3 = 2.5 m2 0 sets 2 sets
D4 = 2.75 m2 0 sets 0 sets PAINTING AREA for D&W:
W1 = 2.88 m2 25 sets 0 sets Doors = 140 m2
W2 = 1.92 m2 2 sets 0 sets Windows = 11.4 m2
W3 = 0.96 m2 0 sets 12 sets
W4 = 0.72 m2 0 sets 4 sets Window % = 10 %
W5 = 0.72 m2 5 sets 0 sets
W6 = 0.48 m2 4 sets 0 sets
W7 = 4.5 m2 4 sets 0 sets

C. MASONRY REDUCTION
Exterior Wall
W1 4 sets x 2.88 m2 = 11.52 m2
W5 2 sets x 0.72 m2 = 1.44 m2 22 m2 Ok na naibawas na.
W7 2 sets x 4.5 m2 = 9 m2

Interior Wall
D1 4 sets x 2.75 m2 = 11 m2
W3 2 sets x 0.86 m2 = 1.72 m2 12.7 m2 Ok na naibawas na.
Project Title: 0
###
Location: 0

ROOFING

A. TRUSSES
Designation: T2
No. of Sets = 6 sets

TOP CHORDS BOTTOM CHORDS


1) Length of Cut = 5.851 m 1) Length of Cut = 5.625 m
No. of Cuts = 4 cuts No. of Cuts = 4 cuts
@ 6.0 m ---> 1.0254657 pcs @ 6.0 m ---> 1.0666667 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
Order: 24 pcs Order: 24 pcs
65mm x 65mm x 6mm Angle Bars 65mm x 65mm x 6mm Angle Bars

KING POST WEB MEMBERS


1) Length of Cut = 1.859 m 1) Total Length = 28.617 m
No. of Cuts = 2 cuts Double Angle? = 2 Angles
@ 6.0 m ---> 3.2275417 pcs Order: 63 pcs
ADOPT: 3 pcs 50mm x 50mm x 6mm Angle Bars
Order: 4 pcs
65mm x 65mm x 6mm Angle Bars CONNECTIONS = 26

Summary: 52 pcs, 65mm x 65mm x 6mm Angle Bars


63 pcs, 50mm x 50mm x 6mm Angle Bars
156 connections

Designation: HT5
No. of Sets = 4 sets

TOP CHORDS BOTTOM CHORDS


1) Length of Cut = 6.000 m 1) Length of Cut = 6.000 m
No. of Cuts = 2 cuts No. of Cuts = 2 cuts
@ 6.0 m ---> 1 pcs @ 6.0 m ---> 1 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
Order: 8 pcs Order: 8 pcs
65mm x 65mm x 6mm Angle Bars 65mm x 65mm x 6mm Angle Bars

2) Length of Cut = 2.136 m 2) Length of Cut = 1.976 m


No. of Cuts = 2 cuts No. of Cuts = 2 cuts
@ 6.0 m ---> 2.8089888 pcs @ 6.0 m ---> 3.0364372 pcs
ADOPT: 2 pcs ADOPT: 3 pcs
Order: 4 pcs Order: 3 pcs
65mm x 65mm x 6mm Angle Bars 65mm x 65mm x 6mm Angle Bars
exces: 1.728 m, 4 pcs

WEB MEMBERS
1) Total Length = 21.159 m Summary:
Double Angle? = 2 Angles 23 pcs, 65mm x 65mm x 6mm Angle Bars
Order: 32 pcs 32 pcs, 50mm x 50mm x 6mm Angle Bars
50mm x 50mm x 6mm Angle Bars 72 connections

CONNECTIONS = 18

Designation: HT6
No. of Sets = 2 sets

TOP CHORDS BOTTOM CHORDS


1) Length of Cut = 5.851 m 1) Length of Cut = 5.625 m
No. of Cuts = 2 cuts No. of Cuts = 2 cuts
@ 6.0 m ---> 1.0254657 pcs @ 6.0 m ---> 1.0666667 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
Order: 4 pcs Order: 4 pcs
50mm x 50mm x 6mm Angle Bars 50mm x 50mm x 6mm Angle Bars

WEB MEMBERS
1) Total Length = 15.238 m Summary:
Double Angle? = 2 Angles 8 pcs, 50mm x 50mm x 6mm Angle Bars
Order: 12 pcs 12 pcs, 50mm x 50mm x 4.5mm Angle Bars
50mm x 50mm x 4.5mm Angle Bars 28 connections

CONNECTIONS = 14

Designation: HT7
No. of Sets = 8 sets

TOP CHORDS BOTTOM CHORDS


1) Length of Cut = 2.758 m 1) Length of Cut = 2.650 m
No. of Cuts = 2 cuts No. of Cuts = 2 cuts
@ 6.0 m ---> 2.1754895 pcs @ 6.0 m ---> 2.2641509 pcs
ADOPT: 2 pcs ADOPT: 2 pcs
Order: 8 pcs Order: 8 pcs
50mm x 50mm x 6mm Angle Bars 50mm x 50mm x 6mm Angle Bars

WEB MEMBERS
1) Total Length = 5.361 m Summary:
Double Angle? = 2 Angles 16 pcs, 50mm x 50mm x 6mm Angle Bars
Order: 16 pcs 16 pcs, 50mm x 50mm x 4.5mm Angle Bars
50mm x 50mm x 4.5mm Angle Bars 64 connections

CONNECTIONS = 8

Designation: LB1
No. of Sets = 4 sets
TOP CHORDS BOTTOM CHORDS
1) Length of Cut = 4.000 m 1) Length of Cut = 4.000 m
No. of Cuts = 4 cuts No. of Cuts = 4 cuts
@ 6.0 m ---> 1.5 pcs @ 6.0 m ---> 1.5 pcs
ADOPT: 1 pcs ADOPT: 1 pcs
Order: 16 pcs Order: 16 pcs
50mm x 50mm x 6mm Angle Bars 50mm x 50mm x 6mm Angle Bars
exces: 2 m, 16 pcs exces: 2 m, 16 pcs

WEB MEMBERS
1) Total Length = 20.320 m Summary:
Double Angle? = 2 Angles 32 pcs, 50mm x 50mm x 6mm Angle Bars
Order: 30 pcs 30 pcs, 50mm x 50mm x 4.5mm Angle Bars
50mm x 50mm x 4.5mm Angle Bars 36 connections

CONNECTIONS = 36

Designation: LB1A
No. of Sets = 2 sets

TOP CHORDS BOTTOM CHORDS


1) Length of Cut = 2.000 m 1) Length of Cut = 2.000 m
No. of Cuts = 4 cuts No. of Cuts = 4 cuts
Comment/s: Comment/s:
The excess in LB1 can cover this part. The excess in LB1 can cover this part.

WEB MEMBERS
1) Total Length = 10.657 m Summary:
Double Angle? = 2 Angles 0 pcs, 50mm x 50mm x 6mm Angle Bars
Order: 8 pcs 8 pcs, 50mm x 50mm x 4.5mm Angle Bars
50mm x 50mm x 4.5mm Angle Bars 40 connections

CONNECTIONS = 20

B. ROOFING AREA
Designation: Roofing Comment/s:
Area of Roofing = 392.064 m2 May 200mm na extension mula sa one end ng truss
Length of Ridge = 20.000 m dahil sa papunta sa gutter na sobra.
Length of Hip = 32.544 m

Summary:
438 ln.m 0.6mm thk. Pre-painted long-span Corrugated Roofing Sheets
10 rolls Polyethylene Double Film Foam Roof Insulation ( 1.2 meters x 40 meters x 5mm)
3099 pcs, Tekscrew s
10 pcs, Pre-painted Ridge Rolls, Ga #24
15 pcs, Pre-painted Hipped Rolls, Ga #24

C. MISC.
Designation: Purlins Summary:
Total length = 640.000 m 112 pcs, 150mm x 50mm x 2.0mm C-Purlins x 6M

Designation: Angular Cleats


Number of Cleats = 220 pcs Summary:
Length of 1 Cleat = 0.150 m 6 pcs, 75mm x 75mm x 6mm Angle Bars x 6M

Designation: Sogrods
Summary:
16 pcs, 12mm Ø Sagrods x 6M

Designation: Truss top, bot, and web Connections


Total No. of Connections = 396 pcs Summary:
Area of Conection = 0.064 m2 9 pcs, 1.2m x 2.4m x 6mm MS Gusset Plate

Designation: Patungan ng Truss


Total No. of Connections = 22 pcs Summary:
Area of Base Plate = 0.123 m2 1 pcs, 1.2m x 2.4m x 12mm MS Base Plate
No. of Bolts per Connections = 8 pcs 176 pcs, 20mm Ø x 350 mm Anchor Bolts
with Nuts and Washers

You might also like