Professional Documents
Culture Documents
Significant Ships 2006
Significant Ships 2006
CONTENTS INTRODUCTION
ARCTIC VOYAGER: 143,000m3 LNG tanker for Arctic duties
3
4
BERGE NANTONG: Hyundai-built 82,000m3 LPG/NH3 tanker 8
OF 2006 BERGENSFJORD: LNG-powered Norwegian domestic ferry
BIT OKLAND: 25,000dwt twin-skeg tanker design
10
13
Compiler: BOSSCLIP TRADER: Campbell-Algoship new standard bulker 16
John Lingwood, MRINA
BRO DELIVERER: 14,700dwt tanker with Azipull propulsion 18
Editor: BW SOMBEKE: 38,000m3 gas tanker from Daewoo 21
Tim Knaggs CHARLOTTE WULFF: 4546TEU box-ship from Gdynia 24
Editorial Assistant: CLIPPER KARINA: STX-Busan-built 11,420dwt tanker 26
Clare Nicholls CLIPPER SIRA: 4000m3 chemical tanker from Volharding 29
CMA CGM SAMBHAR: CSBC's 4054TEU box ship design 31
Production Manager:
Sandy Defraine COSCO GUANGZHOU: 9500TEU container liner from Hyundai 34
CÔTE D'ALBÂTRE: Barreras-built UK/France ferry 37
Group Advertisement Manager:
Debbi Bonner
CRYSTAL DIAMOND: Ice-class chemical tanker from INP 40
DIANA J: Hegemann's 974TEU feeder design 43
Assistant Advertisement Manager: EMMA MAERSK: Largest-ever container ship 45
Matthew Clifton
ESHIPS COBIA: Hyundai Mipo's new 12,000dwt tanker design 48
Advertisement Production Manager: ETON: Daewoo-built Suezmax tanker 50
Stephen Bell, PGDip EYLUL K: Double-skin 20,000dwt bulker from Turkish yard 52
Marketing Manager: FINNSTAR: Finnlines' large ro-pax ferry from Fincantieri 54
Adelaide Proctor FREEDOM OF THE SEAS: World's largest cruise liner 57
FS CHARLOTTE: Molten sulphur/bitumen tanker 60
Publisher:
Mark J Staunton-Lambert GASCHEM SHINANO: Romanian-built 7420dwt ethylene tanker 63
GLORY ATLANTIC: 19,000dwt cement carrier from Singapore 66
Published by: GOTLANDIA II: Fincantieri-built fast ferry for Baltic service 68
The Royal Institution of Naval Architects
GRAIGLAS: Vietnamese-built bulk carrier for UK owner 70
Editorial & Advertisement Office: INDUSTRIAL DIAMOND: Heavy-lift cargo ship from ENVC 72
10 Upper Belgrave Street ITAL FESTOSA: Hyundai Mipo's first 3451TEU container ship 74
London SW1X 8BQ, UK
Telephone: +44 20 7235 4622 KRONVIKEN: Samsung-built 115,000dwt tanker 77
Telefax: +44 20 7245 6959 MAERSK KOWLOON: 6160TEU Hanjin-built box-ship 80
E-mail: editorial@rina.org.uk MAERSK QATAR: Largest LNG tanker so far? 82
advertising@rina.org.uk
MARE DI RAVENNA: Italian 51,000dwt tanker from SLS 84
MARIDA BOREAS: Fine lines for Romanian-built tanker 86
MELTEMI: Hyundai-Samho ice-class Suezmax tanker 88
MEROPE STAR: Italian-design/Turkish-built 3300m3 LPG tanker 91
MORGENSTOND I: Damen's first CF12000 Combi-Freighter 93
MYKOLA BOBROVNYKOV: Volga/Baltic trader from Ukraine 96
NAFTOCEMENT XI: Turkish-built bulk cement carrier 98
NGANHURRA: Self-propelled FPSO 100
NORILSKIY NICKEL: 'Double-acting' Arctic container ship 102
OTELLO: Daewoo's 6700car-capacity vehicle carrier design 104
© 2007. The Royal Institution of Naval Architects PAULINE: Flensburger's con-ro variant with five fixed decks 107
This publication is copyright under the Berne Convention. PROMITHEAS: Hyundai-built Aframax tanker 109
All rights reserved. No part of the publication may be
reproduced, stored in a retrieval system, or transmitted
SEATROUT: Lindenau's newest 40,000dwt 'green' tanker 112
without the prior permission of the copyright owner. SINORAIL BOHAI 1: Chinese train ferry for new route 114
Permission is not, however, required to copy abstracts or
articles on condition that a full reference to the source is SPECIALITY: Diesel-electric coastal tanker for UK trades 117
shown.
STX ACE I: STX built-and-owned 46,000dwt ice-class tanker 120
Multiple copying of the contents without permission is
always illegal. TIMCA: Szczecinska's multi-purpose con-ro design 122
Printed in Wales by Pensord Press, Tram Road,
TRANSPAPER: Forest products carrier for Baltic trades 124
Pontllfraith, Blackwood, Gwent NP12 2YA WHITONIA: Dubai-built UK bunkering tanker 126
ISBN 0 905040 30 X YM INTELLIGENT: CSBC's 1805TEU container ship 129
SIGNIFICANT SHIPS OF 2006 1
SS 06 - p3.qxd 09/02/2007 14:31 Page 3
course, overflowing order books in other Far these record breakers may have lost that information received from the shipbuilder or owner.
distinction. In a world where environmental Emergency alternators are not normally included in the
Eastern countries but hopefully these 'new' matters are becoming of paramount number of alternators. When a dash (-) has been included
countries can also increase their standing in importance, one vessel merits special against an item, this generally denotes lack of information,
the years ahead. mention - the otherwise 'ordinary'
but where it is known that features have not been included,
Add Turkey, and Balkan states such as Norwegian coastal ferry Bergensfjord
this is indicated by 'nil'. The number of sister ships
completed or on order does not include the ship presented.
Romania and Ukraine to the list, and the shift demonstrates one way into a greener future Some ships shown as 'on order' may have been delivered
away from traditional centres becomes by loading LNG to fuel its spark-ignited by the time this publication appears.
clearer. Balkan yards, of course, owe much engines. Further information on certain vessels included in
of their new-found success to the problems Perhaps, as an indication of the increasing Significant Ships of 2006 can be found in the following
of those old established European builders use of gas fuel for both domestic and marine editions of The Royal Institution of Naval Architects'
who, initially, found a way around their purposes, a significant number of ships
publication The Naval Architect:
difficulty to compete, by subcontracting transporting this commodity feature in this Bossclip Trader March 2006
construction of modules, and even complete review. Dual-fuel engines are already a Côte d'Albâtre April 2006
hulls, to yards there, often long distances up practical proposition with LNG tankers, Crystal Diamond October 2006
the river Danube. Another solution for, where boil-off gases from the cargo are used Eylul K November 2005
mainly Dutch but also Norwegian, yards has to supplement oil burnt in the steam boilers Finnstar June 2006
been to establish their own subsidiary of their turbine machinery - and now also in Freedom of the Seas July/August 2006
Gotlandia II September 2006
companies in that region, and examples of diesel engines. Marida Boreas November 2006
newbuildings built by them can be found in Reference to gas tankers leads to Arctic Merope Star March 2006
recent editions of Significant Ships. Voyager, a variant of Kawasaki's standard Norilskiy Nickel February 2006
Other Eastern European builders, such as 145,000m3 design, which is notable for the Seatrout November 2006
small Polish yards, have decided to take inclusion of features facilitating operations Sinorail Bohai I February 2005
advantage of their low labour costs to enter in Arctic conditions; such arrangements have Speciality November 2006
the world shipping market on their own become almost standard fitting in many Transpaper February 2007
account, and since many do not always have crude/products/chemical tankers now being Shorter articles, or information amongst longer articles or
adequate in-house design facilities, increased built, in preparation for an anticipated features, on the following ships have also appeared in
opportunities have arisen for design increase in the Russian oil trade. Arctic The Naval Architect:
consultancies. Mainly Scandinavian, but trading is also the reason behind the
including others locally based in Turkey, construction of Norilskiy Nickel, first of a Arctic Voyager October 2006 (Gas Carriers supplement)
Singapore and Ukraine, their names have series of 'double-acting' container ships Bergensfjord January 2005/January 2007
appeared much more frequently in specifically designed for operation in ice, Bit Okland
Bro Deliverer
February 2006
January 2006
Significant Ships of late, and their experience and which extends the principles first Clipper Karina October 2006
has been particularly influential, allowing described in our 2003 issue. Clipper Sira May 2006
many newer yards to become more than just As always, this introduction is ended with FS Charlotte June 2006
steelwork fabricators, and instead deliver thanks to everyone who has assisted with Gaschem Shinano November 2006
A
Draught Make........................................................................Shinko
RCTIC VOYAGER follows the design of the design ....................................................................11.50m Capacity........................................................8 x 1550m3/h
Kawasaki-built LNG tanker Energy Advance scantling ................................................................11.95m Cargo/ballast/machinery control systems
(Significant Ships of 2005) very closely, but with the Gross .....................................................................118,571gt Make….............................................................Kongsberg
important addition of features enabling her to operate Deadweight, design ...............................................75,000dwt Type ...................................Integrated automation system
successfully in the harsh Arctic environment Speed, service at 90% MCR.................................19.00knots Complement
surrounding the emerging Norwegian Snøhvit LNG Cargo capacity.......................................................142,700m3 Officers...........................................................................12
Bunkers
production project. Despite its similarity to the earlier heavy fuel .............................................................5850m3
Crew...............................................................................17
ship, the design of these new vessels has been prepared Spare..............................................................................11
diesel oil...................................................................450m3 Suez/Repair crew.............................................................6
by Mitsui Engineering & Shipbuilding, and that Water ballast.............................................................60,300m3 Special rudder............................……………Schilling high-lift
company has also delivered the first vessel to enter Fuel consumption, main engine .......................165.60m3/day Bow thruster
service, drawing heavily on the accumulated experience Classification .................................Det Norske Veritas, +1A1, Make ......................................Kawasaki Heavy Industries
of Det Norske Veritas relating to the structural and Tanker for Liquefied Gas, Ship Number ............................................................................1
Type 2G (Type B Independent Tanks),
human problems of operating in Arctic conditions. (-163ºC, 50kg/m3, 0.25bar),
Output ...................................................................2200kW
Arctic Voyager is the 16th Kawasaki-built LNG tanker Bridge control system
NAUTICUS, Plus-2, CSA-2, COAT-2, HMON2 Make .......................................................................Furuno
to use the Moss spherical cargo tank containment E0, F-AMC, ICS, OPP-F, COMF-V1 C(V2) One man operation ......................................................Yes
system, and is fitted with four independent tanks of High-tensile steel Fire detection system
identical size, holding a total of 142,700m3 at a filling used in construction ...........................................below 40% Make ...................................................................Autronica
ratio of 98.5% and temperature of -163oC. Like the Main engine Type ....................................................................Autrosafe
Design.........................................Kawasaki steam turbine
ship's main hull structure, the tanks, and tank skirt which Model........................................……………………UA-400
Fire extinguishing system
supports them, satisfy the 25-year fatigue life Engineroom .....................................High-expansion foam
Manufacturer ......................…Kawasaki Heavy Industries Make.........................................................................Unitor
requirements of DNV Notations Plus-2 and CSA-2, Number ............................................................................1 Radars
based on the dynamic loading of a North Atlantic wave Output ................................................................27,000kW Number ............................................................................2
environment. Gearbox
Make .......................................................................Furuno
Special consideration has been given to items such as Maker .....................................Kawasaki Heavy Industries
Types ...................FCR-2827 X-band: FAR-2837S S-band
Type.......................Double-reduction, tandem-articulated
anti-icing, de-icing, lifesaving equipment, working areas, Number ............................................................................1 Integrated bridge system
navigation systems, deck machinery and living quarters, Output speed .....................................................81rev/min Make .......................................................................Furuno
with regard to the cold operating conditions. In addition, Propeller Waste disposal plant
DNV COMF-V(1) requirements for vibration and noise Material ......................................Nickel-aluminium-bronze Incinerator
levels in the accommodation are complied with, along Designer/manufacturer ........................Mitsui Engineering Make..............................................................Sunflame
with COMF-C(2), relating to air conditioning at very low & Shipbuilding Model........................................................OSV-600SAI
Number ............................................................................1 Waste compactor
ambient temperatures. Extended, covered bridge wings Pitch ..........................................................................Fixed Make .............................................................Electrolux
are another concession to the problems of harsh Diameter ..............................................................9100mm Model ................................................................TT 100
weather. Speed.................................................................81rev/min Sewage plant
The vessel is powered by a Kawasaki UA-400 turbine, Steam-turbine driven alternators Make.....................................................................Evac
supplied with steam from two dual-fuel (HFO/boil-off Number ............................................................................2
Make/type ..................................................Shinko/RG92-2 Type.................................................................Vacuum
gas) watertube boilers and developing 27,000kW. A Type of fuel used .....................................................Steam Contract date ................................................December 2001
double-reduction, tandem-articulated, reduction gearbox Output/speed.............................2 x 3250kW/1800rev/min Launch/float-out date ...................................September 2005
is fitted in the drive to an FP propeller. Two steam Alternator make/type .............................Taiyo/HPW 65A-4 Delivery date............................................................July 2006
ARCTIC VOYAGER
B
Number ............................................................................4
ERGE NANTONG is a fully refrigerated Deadweight Grades of cargo carried..................................................2
LPG/NH3 tanker built to what has developed into design ..............................................................50,780dwt Product range ..............................................Type 2G LPG
a somewhat standard layout for this type of vessel, scantling............................................................58,899dwt Cargo pumps
featuring a single-skin, flush decked hull without Block coefficient Number ............................................................................8
design .....................................................................0.7528
forecastle, but with the upper deck given a slight sheer scantling .................................................................0.7639
Type ....................................................................Deepwell
forward, in lieu. The mooring deck aft is sunken and Speed, service (89% MCR)...................................16.75knots
Make................................................Hamworthy-Svanehøj
the flat profile is relieved only by the five-tier Cargo capacity.........................................................82,250m3
Capacity..........................................................8 x 600m3/h
superstructure aft, housing the accommodation. Bunkers Cargo control system
The cargo space, stretching forward from the heavy oil.................................................................3367m3 Make ........................................Hyundai Heavy Industries
deckhouse, is divided into four holds each having top diesel oil...................................................................280m3 Type ...............................................................Aconis 2000
Ballast control system
and bottom wing ballast tanks, and containing an Water ballast.............................................................23,600m3
Make.....................................................................Damcos
independent, free-standing, saddle-supported prismatic Fuel consumption
Type ........................................................Electro-hydraulic
cargo tank manufactured from low-temperature carbon main engine only ....................................48.55tonnes/day
auxiliaries ................................................14.56tonnes/day Complement
steel. Designed for carrying cargoes at a minimum of Officers...........................................................................16
Classification .................................Det Norske Veritas, +1A1,
-50ºC and a maximum vapour pressure of 0.25bar, the Tanker for Liquefied Gas, Ship Crew...............................................................................14
tanks are insulated with 120mm-thick polyurethane Type 2G (-50ºC, 600kg/m3, 0.25bar), E0, Suez/repair crew..............................................................6
foam clad with 0.5mm aluminium/zinc steel sheet. NAUTICUS (Newbuilding), PLUS-1, NAUT-OC, Fire detection system
Cargoes of type 2G can be loaded, including CLEAN, OPP-F, TMON, In-water Survey Make ..............................................………………Saracom
anhydrous ammonia, 1,3-butadiene, butane (both ISO Percentage of high-tensile Type .........................................................................T2000
and normal), butylenes, commercial propane, and steel used in construction .................14% HT32; 40% LT32 Fire extinguishing system
propylene, together with other products whose toxicity, Main engine Cargo tanks...............................................NK dry powder
aggressiveness, pressure, temperature, and specific Design ..............................................................MAN B&W Engineroom ...........................................................NK CO2
gravity are within the limits of the design. Cargo is Model .........................................………………6S60MC-C Integrated bridge system
handled by means of two Hamworthy-Svanehøj Manufacturer............................Hyundai Heavy Industries Make ........................................................JRC/Kongsberg
deepwell pumps in each tank (eight in total), each Number ............................................................................1 Model ...................................................................JAN-701
having a capacity of 600m3/h and capable of providing Type of fuel used........................................................HFO Waste disposal plant
a discharge time of approximately 18hours, excluding Output .............................................13,560kW/105rev/min
Incinerator
stripping. Loading is also accomplished in about Propeller
Make .....................................................HMMCO-Atlas
Material ......................................Nickel-aluminium-bronze
18hours, based on vapour return to shore. Designer/manufacturer ............Hyundai Heavy Industries
Model.........................................................Maxi 150SL
The engineering affiliate of Hyundai Heavy Number ............................................................................1 Sewage plant
Industries built the MAN B&W 6S60MC-C main Pitch ..........................................................................Fixed Make...............................................................Jonghap
engine installed in Berge Nantong. This develops Diameter ..............................................................7000mm Model..................................................JMC AEROB-18
13,560kW MCR at 105rev/min, enabling the vessel to Speed...............................................................105rev/min Contract date .............................................5 December 2003
sail at a service speed of 16.75knots at an NCR of Diesel-driven alternators Launch/float-out date ...........................................4 May 2006
12,044kW (89% MCR). The same company also Number ............................................................................3 Delivery date ......................................................27 July 2006
BERGENSFJORD: 'green-powered'
Norwegian ferry
Shipbuilder:.........A Aker Yards AS (Søviknes yard), Clean LNG is readily available from Norway's North Sea two smaller vessels in the series employ less powerful
Norway oil fields, and a coastal supply and distribution network for 1600kW Schottel propulsion units of the different
Vessel's name:...................................Bergensfjord bunkering is currently being established, since this fuel's STP1515 type to give a slower, 17knot performance on
Hull number: .....................................................1 148 use as a replacement for marine diesel forms a major part the Aarsvågen-Mortavika route.
IMO number: .........................................................-- of the government's plans for restriction of 'greenhouse'
Owner/operator: ......F Fjord 1 Nordvestlandske AS, gas emissions. This particularly follows claims that 40%
Norway of the country's NOx discharges come from its fishing TECHNICAL PARTICULARS
Designer: ...............................L LMG Marin, Norway boat, ferry and other coastal shipping sources. Length, oa.....................................................................129.80m
Norway
Flag: ...........................................................N The Bergen Diesel division of Rolls-Royce has Length, bp ....................................................................122.40m
Breadth, moulded...........................................................18.70m
Total number of sister accumulated experience of building land-based, gas-
Depth ...............................................................................4.50m
ships already completed: ................................N Nil powered engines dating back over many years, and has Draught, max ....................................................................4.60m
Total number of sister two proven designs currently available: the B35:40V Gross ..............................................................................4856gt
ships still on order:.........2 2 (plus 2 small version) developing 440kW/cylinder, and the smaller K-G4 model Speed ............................................................................21knots
of 222kW cylinder output. This latter engine is the type Bunker capacity.......................................2 x 125m3 LNG tanks
selected for the Bergensfjord series, and is the first marine Classification ....................................Det Norske Veritas, +1A1,
T HE significance of this new, five-ship class of version to be produced. R3, Car Ferry A, E0, RP,
Norwegian coastal ferry lies not so much with the The design follows that of land-based machines by GAS FUELLED [NOR]
Gas-electric system
vessel design, but with the choice of propelling adopting the Otto-cycle lean-burn combustion system, Main engines
machinery and its operation. Built to provide the claimed to have advantages over dual-fuel proposals Design.............Rolls-Royce Marine AS (Bergen Diesel)
necessary waterborne links on the major E39 road offered by some other manufacturers, which are Number/type ........................................1 x KVGS-12G4;
between Bergen and Stavanger, where they will replace understood to have problems such as mis-firing and 1 x KVGS-16G4
existing vessels operating between Halhjem/Sandvikvåg, difficult operation at low loads. In addition, the Rolls- Type of fuel used .....................................................LNG
and Aarsvågen/Mortavika, the basic design follows that Royce design is said to have speedy acceleration and a fast- Output..........................................................1 x 2650kW;
stop ability which will be advantageous when approaching 1 x 3530kW
of the many double-ended ferries working on the Alternators
Norwegian coast. Thus, they have a hull given over to terminals at relatively high speed. Design..........................................................A van Kaick
vehicle accommodation and accessed from either end, Bergensfjord's machinery installation comprises a gas- Number/type....................................1 x DSG 99 L1-6W;
surmounted by a central superstructure topped with a electric system based on two A van Kaick main 1 x DSG 114 M2-6W
navigating bridge, from which the vessel can be conned alternators, the larger of which develops 3530kW and is Output..........................................................1 x 2500kW;
in the required sailing direction, thus obviating time- driven by a Rolls-Royce KVGS-16G4 engine, with the 1 x 3400kW
second, smaller, 2650kW set connected to a KVGS-12G4 Propulsion/steering units, 360deg azimuthing
consuming turning manoeuvres.
Manufacturer............................................................Schottel
Two versions of this LMG Marin design are being built. prime mover. Power generated from these machines is Number/type..........................4 x SCD 2020, twin propeller
In each case the hulls, which are of the same dimensions, directed to the drive motors of the four azimuthing Output ................................................................4 x 2750kW
are being constructed at the Aker Tulcea shipyard in propulsion units supplied by Schottel, a long-established Mooring equipment
Romania, following which they are towed to the Aker expert in this field. Number/type ....................................................1 x windlass;
Brattvåg (Søviknes) site in Norway for fitting out. These propulsors are positioned at each 'corner' of the 1 x tugger winch
Bergensfjord is the first unit of a larger vehicle capacity, and hull, and are of the recently introduced Schottel Combi Make ...............................................................Aker Brattvåg
Lifesaving equipment
slightly faster, three-ship group carrying 212 private Drive (SCD) design. This combines the attributes of the
Type .....................................................Man-overboard boat
cars/22 trailers on two decks, with the other two vessels newer pod drives with those of the earlier, highly Manufacturer ............................................................Norsafe
loading 145 cars on a single deck. Vehicle access is by way successful mechanical Rudderpropeller models (but with Liferafts.................................................................................-
of doors/ramps and visors at each end, and passengers the electric drive motor fitted vertically in the support Vehicles
enter through side doors in the superstructure, within tube of the unit instead of within the pod). Private cars .....................................................................212
which lounge-type seating is provided for 587 persons. Bergensfjord and its two sisters are each fitted with SCD Trailers ...............................................................................22
Seven double- and four single-berth cabins are available 2020, twin-propeller versions of the Schottel units, with a Complement............................................................................18
Passengers ...........................................................................587
for crew. propeller at each end of the pod and a capability for Doors/ramps ..........................................Bow and stern access
The innovative machinery installation adopted for both azimuthing through 360deg. Each has a rating of 2750kW, Contract date .............................................................................-
alternatives of this new design is centred upon the use of which allows these three vessels to operate the Halhjem- Launch/float-out date.................................................................-
liquid natural gas as the main fuel for the propulsion plant. to-Sandvikvåg service around the clock at 21knots. The Delivery date.......................................................................2006
BERGENSFJORD
BIT OKLAND
C
Length, bp ....................................................................170.00m
LOSE to 40 years have elapsed since the then Breadth, moulded...........................................................28.00m Lifeboats............................................1 x 30-person free-fall
Canadian-based GTR Campbell consultancy Depth, moulded Make............................................................................Beihai
introduced its first standard cargo vessel - the celebrated to upper deck ...........................................................14.00m Hatch covers
Freedom Liberty-ship replacement, to the international Width of double skin Design.......................................................................Seohae
side..............................................................................1.40m Manufacturer ......................................................Shipbuilder
market. Since then, Campbell, and its Bahamian associate bottom .........................................................................1.50m Type ..........................................Hydraulic end-folding pairs
Algoship, has regularly had on offer a successful portfolio Draught Ballast control system
of series-produced, mainly Handysize bulk carrier design..........................................................................9.50m Make ......................................................Pleiger Far East Co
scantling......................................................................9.79m
designs. Some have been presented in earlier editions of Gross ...........................................................................19,918gt
Type...........................................................Electric-hydraulic
Complement
Significant Ships. Latest of these is the Trader type, a Displacement........................................................38,557tonnes Officers ................................................................................8
29,300dwt double-skin, five-hold vessel, developed in Lightweight ..............................................................7923tonnes Crew ..................................................................................13
conjunction with trading partners Clipper Group, Deadweight Spare cabins .......................................................................3
design...................................................................29,367dwt
handling chartering and operations, and Dockendale scantling...............................................................30,634dwt
Suez/repair crew .................................................................6
Shipping, looking after technical management. Bridge control system
Block coefficient (0.85% depth) .....................................0.8174
Make .......................................................................Daeyang
As with most recent Campbell/Algoship designs, the Speed, service at 85% MCR....................................14.00knots
Type.................................................................Desk console
Cargo capacity
Trader class is being built in association with an emerging grain .......................................................................40,975m3 One man operation ..........................................................No
or re-emerging Asian shipyard: in this case, the Cochin bale.........................................................................39,589m3 Fire detection system ....................................................Seaplus
Shipyard, with other contracts placed elsewhere in India Bunkers Fire extiguishing system
heavy oil ....................................................................1682m3 Cargo holds/engineroom.......................High-pressure CO2
and China, now totalling more than 20 newbuildings. Make.........................................................................Seaplus
diesel oil .................................................……………..185m3
Bossclip Trader is currently operating in the parcel bulk Water ballast ................................................................20,519m3 Radars
trades between Brazil and the US Gulf, in a partnership Fuel consumption Number................................................................................2
between Clipper and Boss, of Rio de Janeiro. main engine only ............................................23tonnes/day Make .........................................................................Furuno
auxiliaries ..........................................................2tonnes/day Models .......1 x FAR 2827 X-band; 1 x FAR 2837S S-band
She conforms with a typical bulk carrier layout having Classification ........American Bureau of Shipping +A1(E), Bulk Integrated bridge system ............................................Daeyang
1.4m wide side tanks joined within a 1.5m deep double Carrier, BC-A, +AMS, +ACCU, SH, SHCM, Waste disposal plant
bottom to provide combined side and bottom wing tanks with description 'ESP' and 'Strengthened Incinerator
for Carriage of Heavy Cargoes: holds 2 and
and a central bottom tank. The two longitudinal 4 may be empty', UWILD, TCM
Make .........................................................Hyundai Atlas
bulkheads, which form the interior of the cargo space, are Model ........................................................Maxi 100SL-1
Percentage of high-tensile steel used in construction ......65%
Waste shredder/crusher
widely spaced in accordance with Algoship fashion, Main engine
Make ...............................................................Electrolux
allowing hatches to occupy some 75% of the beam and to Design..................................................................MAN B&W
Model ..............................................................6S42MC Mk7 Model..............................................................500 Series
present minimum overhangs. Manufacturer..........................................STX Engine Co Ltd Sewage plant
Hatch covers are hydraulically-operated, end-folding Number................................................................................1 Make........................................................................RWO
Type of fuel ....................................................................HFO Model .....................................................WWT 3BIOPUR
pairs, designed by Seohae and fabricated by the Contract date ..................................................20 January 2004
Output, MCR.........................................6480kW/136rev/min
shipbuilder. Other features of the cargo space are small Propeller Launch/float-out date .......................................12 August 2005
side hoppers, square bulkhead stools, and troughed Material .........................................Nickel-aluminium-bronze Delivery date.........................................................10 April 2006
BRO DELIVERER
A
Displacement .........................................................................- Product range ......Propane, butane, mixtures of propane
LTHOUGH technical advances in the LPG world Lightweight.............................................................................- and butane, butylene, propylene,
have been nowhere near as dramatic as those in Deadweight anhydrous ammonia, VCM, and butadiene
LNG ship designs, the construction of large LPG Design...............................................................23,888dwt Coated tanks ....................................................................-
carriers continues apace; indeed, prospects for such Scantling ...........................................................29,216dwt Stainless steel...................................................................-
vessels are expected to receive a useful boost as a spin- Block coefficient.....................................................................- Cargo pumps
off from the rising level of LNG production and Speed, service, 90% MCR, 15% sea margin .......16.40knots Number .............................................................................-
Cargo capacity.........................................................38,000m3
processing. BW Sombeke is an example of a new series Bunkers
Type ..................................................................................-
from the Okpo shipyard of leading Korean builder Make .................................................................................-
Heavy oil.............................................................…2700m3 Stainless steel...................................................................-
Daewoo (DSME) ordered by Norwegian company Diesel oil ..................................................................150m3 Capacity............................................................................-
Bergesen, a well-entrenched and experienced operator Water ballast.............................................................12,000m3 Cargo control system.............................................................-
in the LPG trades. Fuel consumption Ballast control system ............................................................-
The size of this series is quite modest compared with Main engine ............................................34.60tonnes/day Complement
some of the giants now emerging from Far East yards - Classification .................................Det Norske Veritas, +1A1,
Officers...........................................................................15
Tanker for Liquefied Gas, Ship Type 2G
up to more than 80,000m3 capacity - but is still capable o
(-50 C, 700kg/m3, 0.25bar), NAUTICUS
Crew...............................................................................11
of loading a wide range of cargoes. These include (Newbuilding), PLUS-1, E0, NAUT-OC
Spare................................................................................4
propane, butane, mixtures of these two gases, as well as Percentage of high-tensile steel Suez/repair crew..............................................................4
propylene, anhydrous ammonia, vinyl chloride used in construction ................................42.70% (including Bow thruster
Number ............................................................................1
monomer, and butadiene. low-temperature steel)
Make .................................................................................-
Cargo is loaded in three independent self-supporting Main engine
Output .....................................................................850kW
prismatic cargo tanks designed for a maximumo pressure Design ..............................................................MAN B&W
Model ...............................................................6S50MC-C Bridge control system
of 0.25bar g, a minimum temperature of -50 C, and a Manufacturer.....................................................................- Make ................................................................Kongsberg
maximum cargo specific gravity of 0.70. Number ............................................................................1 Type ................................................................AutoChief-4
The tanks are located inside a hull carefully designed Type of fuel… .............................................................HFO One man operation ......................................................Yes
for a fatigue life of 20 years, based on North Atlantic Output ......................................................………..9480kW Fire detection system
Make ..................................................................Consilium
wave conditions; the tanks are also designed around this Propeller
Type...............................................................Addressable
parameter. A total of 42.70% of high-tensile steel Material ......................................Nickel-aluminium-bronze
Designer/manufacturer.........................DSME/Nakashima Fire extinguishing system ......................................................-
(including low-temperature material) is included in hull Number ............................................................................1 Radars
fabrications. Pitch ..........................................................................Fixed Number ............................................................................2
A propulsion plant for a service speed of 16.40knots Diameter ..................................................................5.80m Make .......................................................................Furuno
is centred on a MAN B&W low-speed engine of the Speed..........................................................122.60rev/min Models ...............................................................FAR-2827
Integrated bridge system
6S50MC-C type. This has an output of 9480kW and Diesel-driven alternators
Number ............................................................................3 Make .......................................................................Furuno
drives a Nakashima FP propeller of 5.80m diameter at Engine make/type.............................................................- Model .................................................................FEA-2107
122.60rev/min. Type of fuel .......................................................................- Waste disposal plant
Output ...............................................................................-
Electrical power for the cargo pumps is supplied by Alternator make/type ...........Taiyo Electric/FEAW553C-10 Incinerator.........................................................................-
three auxiliary engines driving Taiyo Electric brushless Output/speed..............................3 x 1307kVA/720rev/min Compactor ........................................................................-
alternators. The output of each set, which runs at Boilers
Number ........................2 (one oil-fired; one exhaust gas)
Shredder ...........................................................................-
720rev/min, is 1307kVA. Sewage plant
Type.....................................Vertical water tube (oil-fired); Make ..........................................................Hamworthy
Steam is generated in an Aalborg vertical watertube vertical, smoke tube with built-in steam
Model...................................................ST3A/92656-01
drum (exhaust gas)
boiler which can supply 4000kg/h. This is Manufacturer.........................................................Aalborg Contract date.....................................................25 April 2003
supplemented by an exhaust-gas smoke-tube Output.................................................4000kg/h (oil-fired); Launch/float-out date ........................................January 2006
economiser from the same company, which has an 1500kg/h at NCR main engine load (exhaust gas) Delivery date.....................................................October 2006
BW SOMBEKE
S
GDBW-1410L
IGNIFICANT SHIPS OF 2003 featured a vessel carried out at the CTO tank to improve the body lines Output/speed.............................2 x 2250kVA/720rev/min;
(Amaranta) described, when delivered, as 'Poland's of the new design. These have resulted in the fitting of 3 x 2000kVA/720rev/min
largest box ship', and Charlotte Wulff, currently sailing as a stern extension of approximately 5m to incorporate a Boilers
Maersk Diadema whilst on charter to A P Möller duck tail, aimed at improving resistance and seakeeping. Number .................................1 x oil fired/1 x exhaust gas
Types ......................1 x HDW VARIO VDR-5.8/1 x VA-549
Maersk, was originally intended to conform to that Because of the increase in reefer-box intake, the Make ....................................VKK Standardkessel Köthen
same 8234 design but was modified before building electrical loading of the 8276 design has been increased, Output....................................1 x 5800kg/h: 1 x 3500kg/h
began to include the owner's/charterer's requirements and five alternators have been installed to meet the Hatch covers
for increased reefer capacity and improved fuel demand. All are of MAN B&W/Dozamel manufacture, Design ................................................MacGregor Finland
with three having an output of 1890kW, and two Manufacturer ............................................Euroluk, Poland
economy. A particular expertise of Gdynia naval Type .............................................................Steel pontoon
architects has been to refine - to very good effect - base 1680kW. Containers
container ship concepts to meet particular owners' Lengths ....................................20ft, 40ft, 45ft (deck only)
needs. Heights ..................................8ft 6in and 9ft 6in (in holds)
These alterations have now been included by the TECHNICAL PARTICULARS Cell guides..........................................…………holds only
Total TEU capacity.....................................................4546
Gdynia shipyard into a new 8276-type container ship, Length, oa .................................................................291.66m
on deck ...............................................................2527
which retains the seven holds forward/one aft layout of Length, bp.................................................................271.20m
Breadth, moulded .......................................................32.20m in holds .................................................................2019
the earlier design but with the superstructure moved Depth, moulded
homogeneously loaded to 14tonnes ...................3085
further aft. This arrangement thereby allows one FEU to main deck ..........................................................21.80m
Reefer plugs ................................................................700
container stack to be transferred from the after deck Tiers/rows
to tweendeck .........................................................17.59m on deck (maximum) ..............................................13/7
above the small No 8 hold, to the foredeck above the Width of double skin in holds ..................................................................11/8
machinery room. side ..........................................................................2.05m Complement
A feature of the general arrangement of both the bottom ......................................................................1.95m Officers.............................................................................9
8234 and the 8276 designs is the rectangular shape of Draught Crew...............................................................................12
design ....................................................................12.00m Spare................................................................................6
the upper deck, which allows a full 13 container rows to scantling ................................................................13.20m Suez/repair crew..............................................................6
be loaded almost to the forecastle, and to stow from a Gross .......................................................................52,701gt Stern appendages/rudder ...........Duck tail; rudder with bulb
maximum seven tiers high on No 7B hatch to three at Deadweight Bow thruster
the bow. In addition, eight tiers can now be carried in design ..............................................................49,070dwt Make.............................................................ABB Zamech
the new position above the engineroom where lashing scantling............................................................58,280dwt Number ............................................................................1
bridges are fitted. Speed, service, 90% MCR ....................................24.50knots Output ...................................................................1700kW
Bunkers Bridge control system
All the deck stacks can stow TEU and FEU, except Make...................................................Raytheon Anschütz
heavy oil.................................................................6085m3
right aft where only FEU are carried. Arrangements are diesel oil...................................................................376m3 Type..................................................................Nautosteer
also included to allow 45ft boxes to be loaded in Water ballast.............................................................18,472m3 One-man operation ......................................................Yes
selected positions on deck. In the forward holds, 11 Water ballast used in loaded condition ......................8000m3 Fire detection system
rows (above the second tier) can be stowed in seven Fuel consumption Make ..................................................................Consilium
Type ......................................................................NSAC-1
tiers of 8ft 6in-high boxes, topped with one of 9ft 6in, main engine only .......................................148tonnes/day
Fire extinguishing systems
using a 40ft fixed cell-guide structure, reinforced at the auxiliaries...............................................abt 28tonnes/day
Cargo holds/engineroom ............................................CO2
Classification .....Germanischer Lloyd, +100 A5 E, Container
bottom for 20ft paired containers. Ship, IW, NAV-O, SOLAS II-2,
Make.........................................................................Unitor
Compared with 450 total on Amaranta, electrical Reg 19, + MC E, AUT
Radars
connections for 400 reefer FEU are provided on deck, Number ............................................................................2
Percentage of high-tensile steel
Make...................................................Raytheon Anschütz
and 300 in hold Nos 2 to 7, with a 4500m3/h air supply used in construction .........................................approx 33%
Models ...............................NSC34/Pathfinder Mk2 ARPA;
for all reefer boxes supplied to these holds when each is Heel control equipment ..................Hoppe Bordmesstechnik
C3425/9XU, C3430/12SU
Main engine
carrying a full load of between 30 and 60 boxes. Design ..............................................................MAN B&W Contract date.....................................................20 April 2001
Dangerous cargoes can be loaded in holds 1, 2, 3 and 4 Model ..........................................................7K98MC Mk 6 Launch/float-out date...............................22 December 2005
and on deck, except in way of the machinery space. Manufacturer ..............HSD Engine Co Ltd (now Doosan) Delivery date ................................................26 January 2006
CLIPPER KARINA
V
side .........................................................................0.90m
OLHARDING Shipyards, and its antecedents, has bottom. ........................................................0.90m>1.15m 1 x mooring winch
a long history of operation in the Dutch Draught Make ...........................................................................SEC
shipbuilding scene; however, like many of its local design ......................................................................5.40m Type .......................................................Electric-hydraulic
competitors it has, in recent times, sometimes found it scantling ..................................................................5.65m Cargo tanks
necessary to make use of overseas subcontractors in Gross ..........................................................................2700gt Number ..........................................................................10
Displacement .......................................................5607tonnes Structure .....................................................Stainless steel
order to compete for work. Fortunately, the yard was Cargo pumps
Lightweight ...........................................................1487tonnes
able to keep the contract for this series of four Deadweight Number/duty................................9 x 150m3/h; 1 x 80m3/h
chemical tankers placed by Norwegian owners, at design ..................................................................3530dwt Make ................................................................Hamworthy
home, and Clipper Sira entered service bearing the scantling...............................................................3990dwt Types.............................9 x DL100C/100; 1 x DL80C/100
builder's popular Harlingen shipyard imprint. Block coefficient, 5.65m draught .....................................0.84 stainless steel, electric deepwell
The vessel incorporates the requirements of DNV Speed, service, 100% MCR .......................................12knots Ballast/cargo control systems
Ice Class 1B notation, and is configured with a double- Cargo capacity............................................................4687m3 Make .......................................................................Ariston
hull, within which there are 10 cargo tanks, constructed Bunkers Type .....................................................................Surveyor
diesel oil...................................................................135m3 Complement
of stainless steel and divided by a centreline and four Water ballast................................................................1696m3 Officers.....................................................................5 (full)
transverse bulkheads. These are of troughed Fuel consumption Crew.........................................................................6 (full)
construction, the centreline bulkhead having vertical main engine only ........................................8.7tonnes/day Special rudder.............................................Promac flap-type
corrugations and the remainder featuring horizontal auxiliaries ....................................................1.9tonnes/day Bow thruster
troughs. With deck and side stiffening arranged outside Classification .................................Det Norske Veritas, +1A1, Make ......................................................................Verhaar
the tanks, a flat internal surface results, suitable for Tanker for Oil and Chemicals, ESP, Ice 1B, E0
Number/type .........................1 x 03100/120 3k horizontal
Heel control system ...................................side heeling tanks
cargoes with a maximum SG of 1.87tonnes/m3. Main engine
Output .....................................................................299kW
Six cargo segregations can be handled using Design ........................................................................MaK
One man operation.............................................................No
Hamworthy submerged pumps, electricically driven and Model ........................................................................6M25 Fire detection system
controlled by frequency converters. These have duties Manufacturer ............................................Caterpillar MaK Make........................................................................Eekels
Type ...........................................................................TY10
of 9 x 150m3/h and 1 x 80m3/h, and are capable of Number ............................................................................1
Fire extinguishing systems
discharging the vessel at approximately 900m3/h. The Type of fuel used.......................................................MDO
Output ...................................................................1980kW Cargo deck ...............................................................Foam
side and bottom tanks are allocated for water ballast, Gearbox Make .............................................................................MX
with an interesting inclusion in a ship of this type and Make ..............................................................Scana Volda Engine room .......................................CO2 and high foam
size, of two side tanks available for use as heeling tanks. Model...........................................................ACG 75/600K Make ................................................……………………MX
The main engine is a MaK 6M25 unit developing Number ............................................................................1 Radars
1980kW. A Scana Volda gearbox is fitted, and the same Output speed ......................................……………………- Number ............................................................................2
Propeller Make .......................................................................Furuno
company has designed and manufactured the CP, high- Designer/manufacturer..................................Scana Volda Models ..............................................Far-2117; Far 21375
skew propeller (as part of a working package agreement Number ............................................................................1 Contract date .........................................................................-
with MaK initiated a few years ago) installed in the open Pitch................................................................Controllable Launch/float-out date ..........................................6 June 2006
water sternframe. Newage Stamford supplied the Diameter ..............................................................2800mm Delivery date............................................................July 2006
CLIPPER SIRA
COSCO GUANGZHOU
T
Make..........................................................Rolls-Royce
HE Newhaven/Dieppe ferry link has endured system for use during loading and discharge. Type ...............................................................hydraulic
many problems in recent times, but now, operated Lifesaving equipment
by local-government-controlled Transmanche Ferries, TECHNICAL PARTICULARS Number/type .........................2 x 100-person lifeboats
4 x Viking 125-person vertical MES;
an attempt is being made to revive its fortunes using Length, oa .................................................................142.45m
2 x rescue craft;
Length, bp.................................................................125.00m
two new vessels, based on a successful design Breadth, moulded .......................................................24.30m
9 x self-righting liferafts
Vehicles
developed by the Vigo shipyard of H J Barreras; two Depth, moulded Number of vehicle decks ..............2 fixed: 1 hoistable
examples of this design have been described in the to main deck (No 3) ...........................................8.35m Total lane metres ..................................................1150
2004 and 2005 editions of Significant Ships. A third sister to upper deck (No 4) .......................................13.65m Vehicles ..................224 cars and 31 x 16.5m trailers,
to deck No 6.....................................................19.25m or 62 x 16.5m trailers
has now joined that earlier pair on Canary Islands Draught Doors/ramps
services (with more to follow), and, together with these design.................................................................5.70m Designer.....................................................MacGregor
French vessels, they emphasise the builder's growing scantling ............................................................6.00m Type .............................2 x stern door/ramps: 1 x bow
Gross .......................................................................18,425gt door/ramp: bow visor: 1 x hoistable
position as a leader in the construction of this type of Deadweight car deck: fixed and moveable internal ramps
ferry. design.............................................................3600dwt Complement
A full-length superstructure containing two decks scantling......................................................................- Officers .......................................................................8
Speed, service.......................................................22.00knots Crew .........................................................................36
(Nos 6 and 7) surmounts the hull, with No 8 deck Single/double rooms .............................................36/4
Bunkers
above, housing ancillary equipment. Vehicle access is by heavy oil .............................................................697m3 Passengers
way of port and starboard stern ramps/doors, each Total ........................................................................600
diesel oil ...............................................................92m3
Water ballast................................................................1545m3 Cabins ...................49 x 4-berth; 1 x 2-berth disabled
16m long x 7m, opening on to the main (No 3) deck, Bow thrusters
Fuel consumption, main engines only ..............69tonnes/day
leading directly, by means of fixed ramps, to No 4 deck. Classification.......Bureau Veritas I + Hull, + MACH, + Ro-Ro Make..........................................................Rolls-Royce
Number.......................................................................2
In a change from the Spanish ferries, a bow door/ramp Passenger Ship, Unrestricted Navigation,
Output........................................................2 x 1300kW
AUT-MS, ALP, SDS, In-Water Survey
with visor is fitted to the Transmanche vessels, Heel control system .....................................................Hoppe Bridge control system
providing additional access to No 3 deck. A hoistable Roll-stabilisation equipment...........................2 x Rolls-Royce Make ......................................................RMI/Raytheon
One-man operation..................................................No
deck (No 5) is also arranged, and fixed and moveable (Brown Bros) fin stabilisers
Fire detection system
Main engines
ramps allow internal movement of vehicles. A total of Design .............................................................Wärtsilä Make....................................................................Thorn
1150 lane metres of 3m-wide track is available to Model .................................................................9L46C Type .........................................................Addressable
accommodate 224 cars and 31 x 16.5m trailers or 62 Manufacturer ...................................................Wärtsilä Fire extinguishing system
Number.......................................................................2 Engineroom............................................................CO2
trailers. Facilities are also included for hazardous Type of fuel used..............................................….HFO Vehicle spaces...........................................Minimax drencher
cargoes to be carried on the main deck. Output.....................................2 x 9450kW/500rev/min
Cabins, public spaces................................Minimax sprinkler
Gearboxes
Deck 6 provides 49 x four-person passenger cabins, a Make ................................................................Reintjes Radars
two-berth disabled persons' cabin, and the usual array Model............................................SVA950 K41 HL/HR Number.......................................................................2
of refreshment areas, video lounges, and bars, serving a Number.......................................................................2 Make ......................................................................JRC
Output speed .............................................176rev/min Models.............1 x JMA-9922-9XA: 1 x JMA-9932-SA
total passenger complement of 600. Deck 7 is allocated Propellers Integrated bridge system ...................................................No
to facilities for a crew of 44 and an à la carte passenger Material.................................Nickel-aluminium-bronze Sewage plant .................................................................Facet
restaurant, whilst both decks also provide ample seating Designer/manufacturer ...........Rolls-Royce (Kamewa)
Number.......................................................................2 Contract date...............................................23 October 2004
for travellers. Lifesaving equipment consists of two x Pitch ..........................................................Controllable Launch/float-out date .........................................21 July 2005
100-person lifeboats carried under conventional davits, Diameter .........................................................4200mm Delivery date ..............................................12 February 2006
CÔTE D'ALBÂTRE
CRYSTAL DIAMOND
DIANA J
EMMA MAERSK
T
scantling............................................................13,100dwt
HIS five-ship order from the United Arab Number .............................................12 plus 2 slop tanks
Speed, service, 90% MCR, 15% sea margin .......13.50knots
Emirates illustrates Hyundai Mipo's versatility in Cargo capacity.........................................................14,100m3
Type ................................................Hydraulic submerged
the product/chemical tanker field, by presenting a Make ........................................................................Framo
Bunkers Stainless steel .............................................................Yes
much smaller version of this popular ship-type than heavy oil...................................................................600m3 Capacity ..................................12 x 300m3/h; 2 x 100m3/h
has previously been featured amongst the yard's diesel oil.....................................................................80m3 Complement
newbuildings, in editions of Significant Ships. Designed Water ballast................................................................5400m3 Officers.............................................................................5
to carry 13,100dwt on a scantling draught of 8.60m, Fuel consumption, main engine...................21.08tonnes/day Crew...............................................................................15
Classification ...........Det Norske Veritas, +1A1 Tanker for Oil
Eships Cobia is single decked, and has a double hull Products and Chemicals, ESP, OPP-F,
Suez crew ........................................................................6
surrounding six pairs of cargo tanks and the two slop E0, VCS-2, BIS, HL(1.45), TMON
Special rudder .........................................................Flap type
tanks positioned at the aft end of the cargo space. Also Bow thruster
Main engine
Make .....................................................................Wärtsilä
protected in this way are the fuel bunkers at the Design ........................................................................MaK
Number ............................................................................1
forward end of the engineroom. Model .....................................................................9M32C
Output .....................................................................450kW
The design follows common practice by having tank Manufacturer ............................................Caterpillar MaK
Bridge control system
divisions of corrugated construction, external Number ............................................................................1
Make ................................................................Kongsberg
longitudinal and transverse deck stiffening, and side Type of fuel .................................................................HFO
Type.............................................................AutoChief C-4
Output ................................................4500kW/600rev/min
structure within the double-hull space, thereby Gearbox
One man operation .......................................................No
providing a smooth internal surface suitable for Make ..............................................................Scana Volda Fire detection system
petroleum products and IMO Types 2 and 3 chemical Model .....................................................................SA 550 Make ...................................................................Autronica
cargoes, when coated with phenolic epoxy. Piping, and Number.................................................1 x reduction type Type.....................................................................BS-320M
the 12 Framo 300m3/h submerged cargo pumps (plus 2 Output speed ...................................................165rev/min Fire extinguishing system
x 100m3/h similar units serving the slop tanks), are Propeller Cargo deck ...............................................................Foam
constructed of stainless steel. Material ......................................Nickel-aluminium-bronze Make............................................................................Fain
Engineroom .................................................................CO2
An open-water sternframe is fitted, supporting a Designer/manufacturer..................................Scana Volda
Make............................................................................Fain
hinged-flap type rudder. Accommodation for 20 crew Number ....................................……………………………1
Integrated bridge system ..................................................Yes
and six Suez Canal personnel is arranged in a block Pitch................................................................Controllable
Waste disposal system
superstructure above the engineroom, separated from Diameter ..............................................................4200mm
Speed...............................................................165rev/min Incinerator
the funnel casing and the 26-person free-fall lifeboat Make ..........................................................G & C Tech
Main-engine driven alternator
supplied by Hyundai's 'in-house' associate. Model.............................................................GC-201R
Number ............................................................................1
The medium-speed Mak 9M32C main engine runs at Make...............................................................A van Kaick Sewage plant
600rev/min to produce a MCR output of 4500kW, and Output/speed.....................................600kW/1200rev/min Make ...............................................................Il Seung
a NCR output which is 90% of that value (4050kW). Diesel-driven alternators Model...............................................................ISS-35V
Service speed at the NCR figure, allowing a sea margin Number ............................................................................2 Contract date .........................................................................-
of 15%, when sailing at design draught, is 13.50knots. A Engine make/type..............................Yanmar/6N21AL-UV Launch/float-out date .............................................................-
CP propeller is fitted, driven at 165rev/min through a Type of fuel used........................................................HFO Delivery date ............................................24 November 2006
Hull number: ................................................5 5272 Doosan Engine Co. This develops 21,770kW at Engine make/type ................................STX-MAN 7L23/30
91rev/min, and at 78% MCR derives a service speed of Type of fuel .................................................................HFO
IMO number:..........................................9 9311610 15.50knots from the CP propeller. Operation of the Output/speed...............................3 x 1120kW/900rev/min
Owner/operator: ............S Sovcomflot Akp, Russia Alternator make/type ............................................Hyundai
main engine is monitored by means of a CoCos-EDS Output/speed.................................3 x 980kW/720rev/min
Designer:........................................D DSME, Korea computer-controlled surveillance system. Electrical Exhaust-gas economiser
Model test establishments used:...............S SSPA, requirements are satisfied from three STX- Manufacturer.......................................................KangRim
Sweden/HSVA, Germany MAN/Hyundai 980kW diesel-alternator sets, and two Type ......................................................Forced circulation
Liberia
Flag: .........................................................L 40,000kg/h oil-fired boilers are installed. Manoeuvring Output .................................................................2000kg/h
Total number of sister is assisted by a 1500kW bow thruster. Boilers
Number ............................................................................2
ships already completed:..............................N Nil Type ..........................................................Vertical oil-fired
Total number of sister
TECHNICAL PARTICULARS Make .....................................................................Aalborg
ships still on order: ..........................................3 3 Length, oa .................................................................280.50m Output ........................................................2 x 40,000kg/h
Length, bp.................................................................270.00m Cargo tanks
Breadth, moulded .......................................................50.00m Number .......................................................12 plus 2 slop
E
Grades of cargo ..............................................................3
TON is the first vessel in a series of four, Depth, moulded ..........................................................23.00m
Product range .....................................................Crude oil
Suezmax-sized, crude oil tankers building for a Width of double skin
side ..........................................................................2.50m Tank coating................................................Tar-free epoxy
Russian-based owner. The design incorporates the bottom ......................................................................2.55m Cargo pumps
requirements of a Norske Veritas 'ICE-1A' notation, Draught Number ............................................................................3
thus joining an expanding list of tankers - some design ...................................................................15.00m Type.............................Steam turbine, vertical centrifugal
included in this 2006 review, which are prepared for the scantling ................................................................16.50m Make........................................................................Shinko
anticipated expansion of the Russian oil trades. Gross .......................................................................87,146gt Capacity........................................................3 x 3700m3/h
Cargo/ballast control systems
Within a double-skin hull, the vessel has six pairs of Displacement ..................................................188,140tonnes
Make.....................................................................Damcos
cargo tanks and two slop tanks, formed by a centreline Lightweight ........................................................25,750tonnes
Type ........................................................Electro-hydraulic
and several transverse bulkheads. The structure is Deadweight
design .............................................................143,400dwt Complement
designed for a fatigue life of 40 years, with particular Officers...........................................................................16
scantling..........................................................162,390dwt
consideration given to the end-connections of Crew...............................................................................18
Block coefficient, design draught..................................0.813
longitudinal stiffeners in cargo areas to transverse webs Speed, service, 78% MCR ....................................15.50knots Spare................................................................................2
and bulkheads, in accordance with DNV Nauticus Cargo capacity.......................................................183,600m3 Suez/repair crew..............................................................6
(Newbuilding) requirements. Bunkers Bow thruster
The single upper deck is without a forecastle, and the heavy oil ................................................................4380m3 Make............................................................................KTE
hull features a raked stem above a bulbous bow diesel oil...................................................................290m3 Number ............................................................................1
forward, and a transom with open-water stern frame Water ballast.............................................................57,300m3 Output ...................................................................1500kW
incorporating an ice knife, a semi-balanced rudder and Segregated ballast.........................................................100% Bridge control system
a CP propeller, at the stern. Side and bottom tanks Fuel consumption, main engine.....................66.4tonnes/day Make ....................................Yokogawa Denshikiki Co Ltd
One man operation .......................................................No
within the double-hull space are given over to water Classification .................................Det Norske Veritas, +1A1,
Fire detection system
ballast. Tanker for Oil, ESP, E0,
Make ..................................................................Consilium
Eton's construction has been based on an ambient air NAUTICUS (Newbuilding), DAT (-30), Type...............................................................Addressable
temperature of -30ºC for hull structure and equipment, ICE-1A, VCS-2, SPM, TMON Fire extinguishing systems
with special attention given to working in ice with Percentage of high-tensile Cargo deck .....................................High-expansion foam
regard to heating for hydraulic equipment, and the use steel used in construction .............................................53% Make .............................................................................NK
of electrical equipment on deck instead of air motors. Main engine Radars
Design ..............................................................MAN B&W Number ............................................................................3
Of note is the fact that the hull form was tested for Make..................................................Japan Radio Co Ltd
Model .....................................………………….7S70ME-C
open-sea performance at the SSPA tank in Sweden, Models................................JMA-9933-SA/JMA-9923-7XA
Manufacturer ......................…………..Doosan Engine Co
with separate tests carried out in Hamburg to ascertain Integrated bridge system ...................................................No
Number ............................................................................1
performance in ice. Type of fuel .................................................................HFO
Incinerator
Three vertical, centrifugal, Shinko steam turbine Output/speed....................................21,770kW/91rev/min
Make.....................................................................Teamtec
pumps, each having a duty of 3700m3/h, are installed. Propeller
Model ...............................................................KEI-99SDA
Operating independently, with separate suction and Sewage plant
Material .......................................................Stainless steel Make ..........................................................................Evac
discharge lines in tanks and on deck, these are capable Designer/manufacturer ..............................DSME/Wärtsilä Model...................................................................SRP 40C
of handling three grades of oil simultaneously. Cargo Number ............................................................................1 Contract date ...........................................17 December 2003
and ballast systems are controlled from a conventional Pitch................................................................Controllable Launch/float-out date ......................................February 2006
central console in the cargo control room. Diameter ..............................................................8600mm Delivery date...........................................................April 2006
ETON ETON
T HIS new NG-BULK20 bulk carrier design, which Rolls-Royce bow thruster with CP propeller, developing Speed...............................................................173rev/min
600kW at 437rev/min. Electrical requirements are Diesel-driven alternators
has been produced by the Istanbul-based Delta
Number ............................................................................3
Marine consultancy, is understood to offer a more fulfilled by three alternators driven by Hyundai Engine make/type ...................Hyundai HiMSEN/5H17/28
flexible loading capability, lower fuel consumption, HiMSEN engines, each of 575kW output, with a Type of fuel ................................................................MDO
higher speed, improved environmental qualities, and KangRim 2500kg/h boiler covering the steam loading. Alternator make/type ........................................................-
better long-term maintenance properties than many Output ............................................3 x 575kW/900rev/min
available similar designs. It is constructed with a double Boiler
hull containing four equally dimensioned holds (28.2m TECHNICAL PARTICULARS Number ............................................................................1
Length, oa .................................................................157.90m Type...................................................................MA040IP3
x 21.0m) separated by double-skin transverse
Length, bp.................................................................151.50m Make ...................................................................KangRim
bulkheads built on stools, with the space between these Breadth, moulded .......................................................23.20m Output .................................................................2500kg/h
used as water ballast tanks, and also to contain hold Depth, moulded Cargo cranes
access trunks. to main deck ..........................................................12.50m Number ............................................................................3
This arrangement allows stiffening to be placed inside to upper deck ........................................................15.50m Make...........................................................................NMF
these tanks, and in the double-hull space, so that the Width of double skin Type .................................................................DKV 30028
holds are unobstructed for easy cleaning and side ..........................................................................1.10m Performance.............................24tonnes/4-28m outreach
maintenance. All hatch covers open to the full size of bottom ......................................................................1.63m Mooring equipment
the hold and are of the totally-enclosed, folding-pair, Draught Number .................................2 x mooring winch/windlass
end-stowing type. Tanktop structure complies with a design ......................................................................8.60m 3 x mooring winch
Heavy Cargoes notation, with a maximum loading of scantling ..................................................................9.00m Make ...........................................................................SEC
Gross .......................................................................14,000gt Type ....................................................................Hydraulic
18tonnes/m2. Two rows of steel coils can be loaded and Hatch covers
grab discharge is catered for. Deadweight
design ...............................................................20,000dwt Design .............................................................MacGregor
Because of the hull-girder design, the vessel is Type ...............................................Folding pair, enclosed
scantling............................................................21,000dwt
claimed to sustain 20% higher moment values than Complement
Block coefficient.............................................................0.846
those recommended by the classification society for Officers ....................................................................11 + 1
Speed, service, 85% MCR .........................................14knots
calm sea hogging/sagging conditions, and permits Cargo capacity
Crew.................................................................................9
alternate hold loading with numbers 1 and 4 empty and grain/bale ...........................................................26,631m3 Bow thruster
2 and 3 loaded, or sailing with one hold empty. All holds Bunkers Make ...............................................................Rolls-Royce
are mechanically ventilated and can carry dangerous heavy oil...................................................................753m3 Number ............................................................................1
cargoes. diesel oil...................................................................112m3 Output .....................................................................600kW
Cargo handling is accomplished by three NMF Water ballast................................................................8163m3 One-man bridge operation................................................Yes
24tonne SWL x 28m-outreach electric deck cranes Fuel consumption, main engine only ................21tonnes/day Contract date ..................................................................2005
positioned between holds 1 and 2, 2 and 3, and 3 and 4. Classification ......Bureau Veritas, +1 Hull, + Machinery, Bulk Launch/float-out date .............................................................-
The upper deck has been kept clear of obstructions Carrier, ESP, Unrestricted Navigation, Delivery date .....................................................January 2007
EYLUL K EYLUL K
FINNSTAR
T HE design of this new, Royal Caribbean 'Freedom' outboard pair comprising ABB Azipods capable of Manufacturer............................................Kone Marine
class of cruise liner has been largely based on the 360deg operation in a pulling mode, and the centreline Ballast control system (part of integrated machinery
company's earlier 'Voyager' (originally designated 'fixipod' operating as a fixed, pushing unit. All three are automation system)
'Eagle') class, described in Significant Ships of 1999, fitted with FP propellers. Complementing this Make ..........................L-3 Communications Valmarine AS
arrangement are four Rolls-Royce (Kamewa) 3400kW Type .............................................................Damatic DNA
however, Freedom of the Seas not only presents a 15% Complement
increase in size compared with that earlier series, but bow thrusters, and enhancing passenger comfort is a Officers.........................................................................133
offers many new and intriguing features - including pair of Blohm & Voss 18m2 stabilisers. Crew...........................................................................1817
what is claimed to be the first full-size boxing ring to be Cabins..........................................................................763
Passengers
fitted in a cruise ship! Of much more significance to Total............................................................................4375
the operation of this 'Freedom', however, is the TECHNICAL PARTICULARS
Length, oa .................................................................338.80m Number of cabins ......................................................1817
Scanship advanced waste treatment systems, notably a Length, bp.................................................................303.20m Number outboard ......................................................1256
state-of-the-art water purification plant which converts Breadth, moulded .......................................................38.60m Bow thrusters
all of the vessel's grey and black waste water back into Depth, moulded Manufacturer .........Rolls-Royce Marine AS (ABB motors)
to main deck (No 4)...............................................11.70m Number ......................................................4 x tunnel type
virtually pure drinking water, thereby supplementing to upper deck (No 12)...........................................21.30m Output .............................................................4 x 3400kW
the output from two 900tonne/24h Alfa Laval fresh- Draught Bridge control system
water generators. design .....................................................................8.50m Make ..........................................................Sperry Marine
Sludge generated in these processes is incinerated scantling ..................................................................8.80m Type ............................................................................VMS
Gross .....................................................................154,000gt One man operation? ....................Yes (without certificate)
along with other combustible items, with the remainder Deadweight Fire detection system
of the solid waste sorted for recycling and disposal on design ..............................................................10,600dwt Make ..............................Autronica Fire and Detection AS
shore, as part of the comprehensive overall Speed, service at 78% MCR.................................21.60knots Type.......................................................BS-100 AutroSafe
Bunkers
environmental considerations of the design. Benefitting heavy oil.................................................................3700m3
Fire extinguishing systems
greatly from the water purification system are the leisure Engineroom, cabins, public spaces
diesel oil...................................................................250m3
Water fog ...........................................................Marioff
facilities, concentrated in a top-deck 'aqua- Water ballast................................................................3800m3
Engineroom, CO2 total flood ............................Unitor ASA
environment', which includes three massive pool areas, Classification ......Det Norske Veritas +1A1, Passenger Ship,
E0, RP, LCS-DC, BIS, TMON Radars
an interactive water park, a 'flow rider' surfing simulator, Roll stabilisation equipment ..............2 x 18m Blohm & Voss
2 Number ............................................................................4
jacuzzis, cantilevered whirlpools described as the most retractable fins Make ...........................................................Sperry Marine
dramatic afloat, and a sports pool, all of which can now Diesel-electric power system Model ..........................................................Bridge Master
Main engines Integrated bridge system
operate on fresh, rather than sea, water. In addition, Design .............................................................Wärtsilä Make ...........................................................Sperry Marine
Freedom of the Seas features what is claimed to be the Model...............................................................12V46C Model..................................Voyage Management System
largest fitness centre yet installed afloat. Manufacturer .......................................Wärtsilä (Turku) Waste treatment plant
The 18 decks of the hull and superstructure contain Number.......................................................................6 Systems.................................Scanship Environmental AS
Type of fuel ...........................................................HFO Incinerator
all the features required by the clientele of today's Output..................................6 x 12,600kW/514rev/min Make ...............................................…………Scanship
mega-cruise ships, including the Royal Caribbean 'trade- Alternators Model ..............................................................SE 1600
mark' lounge built into the fore part of the funnel, Manufacturer .................................………………..ABB Waste compactor
whilst the famed Royal Promenade of the 'Voyager' Number/type ........................6 x AMG 1600UU14 LSE Make .............................................................Bramidan
Output ................................6 x 17,600kVA/514rev/min Model ...............................4-0F (type PDK) bale press
class, with its shops and inboard-facing cabins, is also Propulsion motors Waste shredders/crushers
retained and extended to a length of 160m. A massive Manufacturer .........................................................ABB Make.............................................................St Andrea
double-occupancy grand total of 4375 passengers (500 Number.......................................................................3 Main unit .........................................................G30/860
Output ..............................3 x 14,000kW/0-140rev/min
more than the earlier vessels) can be carried in 1817 Auxiliary unit ...................................................G15/600
Propulsion units Sewage plant......................................................Scanship
mostly prefabricated cabins, available in 11 sizes and Manufacturer .........................................................ABB Contract date ..........................................18 September 2003
said to be amongst the most spacious ever fitted on a Number .................2 x 360deg azimuthing FP Azipod Launch/float-out date ....................................19 August 2005
cruise ship, with the highlight being a 14-person, 113m2 1 x fixed FP 'fixipod' Delivery date......................................................24 April 2006
FS CHARLOTTE
Gross ..........................................................................5945gt
Deadweight
'ethylene' draught ...................................…..……5059dwt
scantling/design draught.....................................7420dwt
Speed, service 78% MCR
ballast condition ....................................................17knots
'ethylene' draught .................................................16knots
Cargo capacity
tank 1 .....................................................................1970m3
tank 2 .....................................................................4490m3
total ........................................................................6460m3
Bunkers
heavy oil… ...............................................................799m3
diesel oil...................................................................174m3
Water ballast................................................................1738m3
Fuel consumption
main engine only (including shaft
alternator)...................................................18tonnes/day
auxiliaries (in harbour) ................................1.7tonnes/day
Classification ........................Germanischer Lloyd, + 100 A5,
Liquefied Gas Tanker, Type 2G, NAV-O,
BWM, + MC, AUT, INERT
Percentage of high-tensile
steel used in construction.................................................Nil
Main engine
Design ........................................................................MaK
Model .....................................................................9M32C
Manufacturer ............................................Caterpillar MaK
Number ............................................................................1
Type of fuel .................................................................HFO
Output ................................................4500kW/600rev/min
Gearbox
Make ..........................................................................Renk
Model .................................................................RSVL-800
Number ............................................................................1
Output speed................................................138.5rev/min
Propeller
Material ......................................Nickel-aluminium-bronze
Designer/manufacturer ..........................MAN B&W Alpha
mak
e bla Roche
• Providing up-to-date technical information on commercial ship ck ms
clea and gre ystems MAY
n in
the y water 200
design, construction and equipment extr
eme 6
• Regular reports on centres of shipbuilding activity worldwide
• Comprehensive, technical descriptions of the latest newbuildings FC.qxd 28/03/2006 12:08 Page 1
2007 Subscription
BLA HEM
W AT C K A
ER ND
TRE GRE
AT Y
ww ME
NT
w.ro
www.rina.org.uk/omt
ww
w.rin
a .org
.uk/t
na
1
Page
8
11:5
04
5/20
05/0
&
qxd
cover.
/
MAY
E
JUN
4
200
Published 6 times a year
.rin
a.or
g.uk
/s&
industry figures
ww
w
Fron
t co
ve r.qx
d
05/0
9/20
06
SHIPREP
12:2
5
Page
1
2007 Subscription
UK £84 EUR £89 OVS £100 Ref: J7
AI
R
AN
D CON
VER
SIO
N TEC
HN
OLO
GY
Visit
Hall u
3, b s at
ooth
430
3rd Q
UAR
TER
200
6
Published quarterly
We
c
why are tha
we t's
• In depth coverage of all aspects of shiprepair and conversion work try
har
der
2007 Subscription
site: tu
www. rboned
turb .nl
oned
.nl
Tel: +44 (0) 20 7235 4622 Fax: +44 (0) 20 7259 5912
Email: subscriptions@rina.org.uk
Hull number: ................................................T T134 the tanktop throughout each hold, and by blowing air Number ............................................................................1
through this material, the cement is fluidised and flows Pitch................................................................Controllable
IMO number:..........................................9 9326342 towards the lowest point of the hold; here, it is collected Diameter ..............................................................4500mm
Owner/operator: ..................B Belden Shipholding, by vertical screw conveyors and transported to the deck Speed............................................................144.7rev/min
Norway/Belden Shipholding for discharge. Pneumatic unloading can be effected Main-engine driven alternators
Pte Ltd, Singapore using up to four pipelines, whilst mechanical unloading Number ............................................................................2
Make..............................................................Leroy Somer
Designer:................S Shiptech Pte Ltd, Singapore is carried out through on-deck connections arranged to
Output/speed.............................2 x 2200kW/1200rev/min
Model test establishment used:...S Shanghai Ship transfer the cargo to tanker trucks ashore, or into Diesel-driven alternator
& Shipping Research Institute (SSSRI), smaller vessels berthed alongside, Number ............................................................................1
The gearbox is fitted with two power take-offs, each
People's Republic of China driving 2200kW alternators which, when operating in
Engine make/type ....................................Caterpillar 3412
Singapore
Flag: ....................................................S Type of fuel used.......................................................MDO
parallel, provide power for the cement discharge Output/speed.....................................500kW/1800rev/min
Total number of sister processors. A 500kW diesel-alternator set is also Exhaust gas scrubbing ...............................can be retrofitted
ships already completed:..............................N Nil provided, and space is available in the funnel for future Boiler
Total number of sister fitting of a catalytic emission converter. Number ............................................................................1
ships still on order: ..........................................22 Type.............................................................V4-0-TFO-005
Make ................................................Aalborg Mission TFO
TECHNICAL PARTICULARS Output .....................................................................500kW
S
Length, oa .................................................................145.00m Mooring equipment
INGAPORE-based consultancy Shiptech Pte Ltd, Length, bp.................................................................136.00m Number/type .........................2 x mooring winch/windlass
with a reference list of 16 newbuilding bulk cement Breadth, moulded .......................................................25.50m 2 x mooring winch
carriers, plus many conversions, in its portfolio, brings Depth, moulded ..........................................................12.00m Make ...........................................................................Thor
more than 30 years' experience into the design of this Draught Type .......................................................Electric-hydraulic
first newbuilding in the 14-strong Belden fleet. For the design ......................................................................9.00m Complement ........................................................................27
first three years of its life, this vessel will be operating scantling ..................................................................9.05m Bow thruster
on charter in the Caribbean/East Coast USA area. Gross .......................................................................11,979gt Make...................................................................Kawasaki
The ship is laid out with a single deck, and poop and Displacement ....................................................25,369tonnes Number ............................................................................1
Lightweight ...........................................................5736tonnes Output .........................................................10tonne thrust
forecastle erections. The engineroom, containing two Deadweight
Wärtsilä 8L26A main engines, each developing 2640kW Bridge control system
design ...............................................................19,489dwt One man operation ......................................................Yes
and driving a CP propeller through a twin-input/single- scantling............................................................19,633dwt Fire detection system
output gearbox, is positioned behind four pairs of Block coefficient, 9.05m draught...................................0.746 Make.........................................................................Unitor
cargo holds equipped to handle two grades of ordinary Speed, service, 85% MCR ....................................13.50knots Type ....................................Conventional Model SIP 20-1
Portland cement of specific density up to Cargo capacity Fire extinguishing system
1.2tonnes/m3. The general arrangement is completed bulk .....................................................................17,444m3 Engineroom ..............................................................Unitor
by a bulbous bow with cut-away forefoot, and an open- Bunkers Cabins ......................................................................Unitor
water sternframe with bulb, allowing optimum wake heavy oil...................................................................689m3
Radars
field, and an accommodation block above the diesel..........................................................................89m3
Number ............................................................................3
engineroom arranged with modular single cabins and Water ballast................................................................7235m3
Make ........................................................................Codar
toilet blocks for 27 personnel. Classification ............Lloyd's Register of Shipping. + 100A1,
Models..............................JMA 9932 SA: JMA 9922-6 XA
Glory Atlantic is equipped with a Nordström cement +LMC, UMS, IWS, TCM
Main engines Integrated bridge system ...................................................No
handling system, developed by MacGregor Bulk AB Design...................................................................Wärtsilä Waste disposal plant
(formerly BMH Marine), which allows mechanical Model.......................................................................8L26A Incinerator
loading at 1000tonnes/hour using shore-chutes and a Manufacturer.........................................................Wärtsilä Make.....................................................................Atlas
single point receiving system each side of the vessel. Number ............................................................................2 Model ..............................................................200 5LP
When loading pneumatically, an installed dust collector Type of fuel used........................................................HFO Sewage plant
allows loading rates up to 800tonnes/hour from two Output .............................................................2 x 2640kW Make............................................................Taiko Kikai
lines. Discharge rates up to 1200tonnes/hour are Gearbox Model ........................................................SBT-40MEN
possible using a bulk discharge boom conveyor on deck, Make .....................................................................Wärtsilä Contract date ..................................……………14 June 2005
and four sets of Nordström pneumatic blow-pump Model .................TCH250-2P53 twin-output/single-output Launch/float-out date ...................................2 February 2006
systems installed in a pump room amidships, located Number ............................................................................1 Delivery date ......................................................31 May 2006
F
Depth, moulded
INCANTIERI'S reputation as a builder of large main deck ................................................................4.85m
Make .........................................Liferaft Systems Australia
fast ferries (both conventional and lightweight), Draught
Type.............................................................Sloping slides
and, in particular its association with Scandinavian Vehicles
design .....................................................................3.20m
Number of decks .............................................................2
owners, is further enhanced by the delivery, in just 14 scantling ..................................................................3.30m
Total cars ....................................................160 x 5m long
months from keel laying to completion, of the Gross ..........................................................................6400gt
Total buses.......................................................................8
monohull Gotlandia II. Hull construction was carried Displacement, full load.........................................2300tonnes
Doors, ramps
out at the builder's Riva Trigoso shipyard, with Deadweight .................................................................580dwt
Number/type............................................2 x stern ramps;
Block coefficient, design draught ....................................0.45
outfitting undertaken at Muggiano, following which the 2 x internal ramps to upper car deck;
Speed, service, 85% MCR ....................................35.00knots
vessel entered service on Destination Gotland's Baltic Bunkers, diesel oil .........................................................219m3
2 x bunker station ramps; 2 x catering ramps
routes. Water ballast....................................................................40m3
Designer ......................................................................STA
Designed and built in accordance with IMO code Classification ................................Lloyd's Register, + 100A1,
Complement
HSC 2000 and classed by Lloyd's Register, Gotlandia II Officers.............................................................................5
SSC Passenger (B)
Crew...............................................................................14
has a high-tensile steel hull and light-alloy Mono, HSC, LDC, G3, + LMC, UMS
Passengers
superstructure. In addition, she complies with the Percentage of high-tensile
Total..............................................................................780
stringent requirements of the Swedish Maritime steel used in hull construction.....................................100%
Bow thrusters
Authority with regard to environmental impact. The Percentage of aluminium used
in superstructure..........................................................100% Make..................................................................Fincantieri
design is based around a vehicle capacity of 160 cars or Roll stabilisation equipment .....................Maritime Dynamics Number ............................................................................2
eight buses, carried on two decks, and a day passenger Main engines Output ...............................................................2 x 350kW
complement of 780, occupying mainly aircraft-type Design........................................................................MAN Bridge control system
seating in lounges laid out on two decks. Model .....................................................................RK 280 Make ..............................................Kongsberg-Norcontrol
Vehicle access is on to the main car deck over two Manufacturer ..................................................MAN Diesel Type .............................................DataBridge SM 11 S 23
stern ramps, thence by two internal ramps to the upper Number ............................................................................4 One man operation.......................................NAV notation
Fire detection system
car deck. Without a forward entry, a turning circle is Type of fuel.......................................................WRD/MDO
Output ........................................4 x 9000kW/1000rev/min Make...........................................................................Tyco
provided at the fore end of each deck, to enable Type ...................................................................MX/T2000
Gearboxes
vehicles to be returned aft for exit. Beneath the main Fire extinguishing system
Make ..............................................................................ZF
deck there is an arrangement of void spaces, a bow Model .................................................................6000NRH Enginerooms ...............................................Marioff Hi-Fog
thruster room, and two main machinery spaces near the Number ............................................................................4 Vehicle spaces .................................Fincantieri sprinklers
stern. Output speed ...................................................450rev/min Public spaces...................................Fincantieri sprinklers
Four MAN B&W RK280 main engines (formerly Reversing/steering water jets Radars
Ruston models) are installed in pairs, in each of the two Designer/manufacturer ........………Rolls-Royce Kamewa Number ............................................................................2
separate enginerooms. The shaft lines from the forward Number.......................................……………….…………4 Make........................................................................Decca
Diameter .......................................................each 140mm Models ...............................1 x ARPA-X-band high-speed
pair of engines pass through the aft engineroom, and 1 x ARPA S-band
Speed...............................................................450rev/min
between the aft pair of engines. A ZF reduction Special adaptations ..............................Ice strengthening Sewage plant
gearbox is fitted in the transmission from each engine to Diesel-driven alternators Make ..........................................................................Evac
the Rolls-Royce Kamewa steering/reversing water jets Number ............................................................................3 Contract date ....................................................14 June 2004
installed under the flat transom stern. This system is Engine make /type.............................MAN/D2842 LE 301 Launch/float-out date...............................30 December 2005
designed to give Gotlandia II a service speed of 35knots, Type of fuel ................................................................MDO Delivery date......................................................29 April 2006
GOTLANDIA II GOTLANDIA II
T WO years ago Significant Ships introduced readers manoeuvrability and directional stability. Output, each set .....................................................770kW
Electrical requirements are served from three 680kW Alternator make....................................................Siemens
to a new standard bulk carrier design, marketed as Output/speed.................................3 x 680kW/720rev/min
the Diamond 53, by featuring Spar Lyra amongst its diesel alternators. The machinery installation is arranged Boilers
reviews. Not only did this Norwegian-owned, for low-sulphur fuel operation and is NOx compliant. A Number ............................................................................1
53,000dwt vessel mark an extension of the remote and automatic control system serves the Type ..................................K/KD-2.0 + 1.1/7 Combination
propulsion system with integrated alarm and Make ......................................................................Saacke
newbuilding partnership formed between the Danish Output .................2000kg/h (oil): 1100kg/h (exhaust gas)
consultancy Carl Bro and Welsh owner Graig (begun monitoring, including power management. All fuel is Cargo cranes
nearly 10 years earlier with the Confidence class of circa carried in deep tanks in the engineroom, surrounded by Number ............................................................................4
9000dwt multi-purpose cargo ships, Clipper Confidence, cofferdams as protection against rupture. Make…..............................................................Wuhan-IHI
Type ...........................................................H360200-280B
Significant Ships of 1997), but it also consolidated their Performance ...............................................36tonnes/28m
use of Chinese shipbuilders to construct the vessels Mooring equipment
originating in their offices. Now, the expanding TECHNICAL PARTICULARS Number ............................................................................4
shipyards of Vietnam have been added to the list of Length, oa .................................................................190.00m Make ...............................................................Rolls-Royce
Length, bp.................................................................183.05m Type...............................................low-pressure hydraulic
those working with the designers; added interest is Breadth, moulded .......................................................32.26m Hatch covers
provided by Graig marking a return to shipowning and Depth, moulded ..........................................................17.50m Design .............................................................MacGregor
taking delivery of that country's first Diamond 53, Width of double skin Manufacturer.........................................MacGregor China
side .........................................................................1.20m Type...................hydraulic folding with double cross-joint
Graiglas, into its own fleet. sealing and sliding resting pads
bottom .....................................................................1.80m
The Diamond 53 is a geared, Handymax bulk carrier Draught Ballast control system
with five wide hatch openings (one at 19.2m wide x design ....................................................................11.10m Make .......................................................................Pleiger
Type .......................................................Electric-hydraulic
20.8m and four at 21.6m wide x 22.4m), all closed by scantling ...............................................................12.62m
Complement
Gross .......................................................................32,474gt
end-folding, hydraulically operated, double-skin covers. Lightweight ........................................................11,000tonnes Officers ......................................…………………………10
The large holds, in conjunction with a structure-free, Deadweight Crew...............................................................................15
Stern appendages ................stern bulb; deadwood on keel;
double hull configuration, allow easy discharging. design ...............................................................44,500dwt extended sole plate on rudder
Cleaning is also facilitated, with special holding tanks scantling............................................................54,000dwt Bridge control system
provided to contain dirty water produced in the process. Speed, service at 75% MCR......................................14knots Make .........................................................Lyngsø Marine
Cargo capacity Fire detection system
Top and bottom wing ballast tanks are included, with bale/grain............................................................65,900m3 Make...........................................................................Tyco
service pipes and cables carried in ducts incorporated in Bunkers Fire extinguishing system
the former. These are also available as passageways, heavy oil.................................................................2000m3 Cargo holds/engineroom .........................................Unitor
Radars
giving protected crew access to the fore deck. Ballast diesel oil .............................................………………230m3 Number ............................................................................2
Water ballast
piping and valves are run in a duct keel, and wing and excluding floodable hold ...................................18,100m3
Make...........................................................Kelvin Hughes
Waste disposal plant
double-bottom tanks are separated to facilitate water including floodable hold.....................................31,750m3 Incinerator
ballast exchange, with sequential exchange feasible. Fuel consumption Make ...............................................................Teamtec
Model.............................................................CGS-200
Flow-through exchange is available to serve No 3 main engine only ....................................30.40tonnes/day
Sewage plant
hold in heavy weather, with overflow arranged auxiliaries ..................................................2.50tonnes/day Make ..........................................................Hamworthy
Classification ..............Det Norske Veritas +1A1 Bulk Carrier, Model ...................................................................ST3A
overboard through permanent steel piping P&S; ESP, BC-A (Holds 2 and 4 empty), Contract date ...............................................29 January 2004
however, under normal circumstances use of this Nauticus (Newbuilding), DK (+), HA (+), Launch/float-out date ........................................13 June 2006
compartment for ballasting is considered unnecessary. IB (+), EO, TMON, BIS Delivery date .................................................December 2006
GRAIGLAS GRAIGLAS
I NDUSTRIAL DIAMOND is the first of six ships to main deck ...........................................................8.38m Type.............................................................VA-0-TFO-005
to upper deck ........................................................11.30m Make .....................................................................Aalborg
ordered from ENVC by German owner Jungerhans, Output .....................................................................500kW
Width of double skin
and designed for worldwide trading carrying bulk side ..........................................................................2.10m Cargo cranes
cargoes, containers, and heavy lifts. Two TTS electro- bottom ......................................................................1.30m Number ............................................................................2
hydraulic cranes, of open-girder jib type, have been Draught Make/type...............................................................TTS/KL
installed on the port side of the vessel: No 1 between design .....................................................................6.70m Duties.......................................2 x 250/200/185/60tonnes
holds 1 and 2, and No 2 between 2 and 3 holds. scantling ..................................................................7.70m Mooring equipment ....................................................Hatlapa
Each crane has a main hoist capable of lifting Gross ..........................................................................7223gt Hatch covers
250tonnes at 14m outreach/185tonnes at 20m, and an Displacement ....................................................12,372tonnes Design/manufacturer ...................................................TTS
auxiliary hoist which, for No 1 crane, can lift 60tonnes Lightweight ...........................................................4404tonnes Type ......................................................................Pontoon
Deadweight Containers
at 24.6m outreach, and for No 2 crane, 60tonnes at 30m design .................................................................6038dwt Total capacity........................................................516TEU
outreach. Using a spreader, the two cranes can be linked scantling...............................................................7968dwt in holds ............................................................214TEU
to lift 400tonnes from a position 5m beyond the ship's Block coefficient.............................................................0.662 on deck............................................................302TEU
port side and place it to starboard in No 2 hold, 5m Speed, service, 85% MCR ....................................16.00knots Reefer plugs ..................................................................80
beyond the centreline. Cargo capacity, grain...............................................11,326m3 Tiers/rows (maximum)
The design features a double-skin hull surrounding Bunkers on deck....................................................................3/8
three box-shaped cargo holds arranged with a heavy oil...................................................................800m3 in holds ....................................................................4/6
tweendeck, which in No 2 hold may be positioned at diesel oil.....................................................................85m3 Ballast control system
Water ballast................................................................3984m3 Make .......................................................................Hoppe
three different levels. A half-height forecastle protected Water ballast carried in container Type ....................................................................Hydraulic
by a whaleback structure is fitted. loaded condition ................................................2000tonnes Complement ........................................................................19
Permissable loadings are 15tonnes/m2 on the tanktop, Classification........................Germanischer Lloyd, GL + 100, Bow thruster
2.5tonnes/m2 on the weather deck and 3.5tonnes/m2 Equipped for carriage of containers Make .....................................................................Schottel
on the tweendeck. Weather-deck and tweendeck hatch (SOLAS II-2, REG 54) Number ............................................................................1
covers are of the pontoon type, fitted with recessed Percentage of high-tensile steel used in construction ......9% Output .....................................................................450kW
container fittings and suitable for stack loadings of Heel control equipment fitted ............................................Yes Bridge control system
60/80tonnes for TEU/FEU on the weather deck and Main engine Make.........................................................................ENVC
One man operation ......................................................Yes
50/60tonnes, on the tweendecks. A mechanical Design .....................................……………………..…MaK
Fire detection system
ventilation system for the holds provides six air changes Model .....................................................................6M43C
Manufacturer ............................................Caterpillar MaK Make.........................................................................Unitor
hourly, and 12kW waterproof sockets for 80 Type.....................................Servo Master C8E CL motor
Number ............................................................................1
refrigerated containers are located in the transverse Type of fuel used........................................................HFO
Fire extinguishing system
hatch coamings. Output ................................................5400kW/500rev/min
Holds and engineroom................................................CO2
Total container intake is 214TEU in the holds and Gearbox
Sewage plant
Make ........................................………………………Facet
302TEU, stacked a maximum of three tiers high, on Make......................................................................Reintjes Model ....................................................................STO 1.5
deck and hatch covers. Alternatively, capacity is Model.........................................................SVA 850 P K41 Contract date................................................4 February 2005
104FEU plus 6TEU, and 143FEU plus 16TEU, in holds Number ............................................................................1 Launch/float-out date......................................18 March 2006
and on deck, respectively. Water ballast is carried in the Output ...............................................................................- Delivery date ......................................................28 July 2006
H
on deck .................................................................7/13
AMBURG-based Rickmers Reederei is another of Bunkers in holds ..................................................................7/11
the many German shipowners who have found heavy oil.................................................................4450m3 Hold refrigeration system ..............mechanical ventilation
excellent employment for their fleets in the container- diesel oil...................................................................500m3 Ballast control system
ship charter market, with Hyundai Mipo, likewise, one Water ballast.............................................................12,300m3 Make...........................................................................SAM
of the shipbuilders who have met the resulting demand Fuel consumption Type........................................................Gearmar 120 ISL
main engine only ....................................116.9tonnes/day
for tonnage by developing a collection of standard auxiliaries ....................................................6.0tonnes/day
(integrated monitoring and control system)
designs of varying capacities, especially for this sector. Classification ..........................Germanischer Lloyd, +100A5,
Complement
An example of this output is Ital Festosa, rated as a Officers...........................................................................13
Container Ship, +MC, AUT, Crew...............................................................................15
3500TEU container ship (actual loading 3451TEU), RSD, IW, SOLAS Ch II-2 Reg 19, Suez/repair crew..............................................................0
which is a size which fits into the trading patterns of RCP 550/20, BWM, C2P60
Bow thruster
many of the principal lines requiring chartered Heel control equipment..............................Anti-heeling tanks
Make .................................................................................-
tonnage. Main engine
Number ............................................................................1
Design ..............................................................MAN B&W
This vessel is configured in the popular five-holds- Model ...............................................................7K90MC-C
Output ...................................................................1200kW
forward of the superstructure, one-aft, layout adopted Manufacturer............................Hyundai Heavy Industries Bridge control system
by many builders of ships of this class. Each hold is Number ............................................................................1 Make...........................................................................SAM
closed by steel pontoon covers designed to load two Type of fuel used........................................................HFO Type ..................................DMS2100i/DPS2100/EGS2000
TEU stacks. In addition space is provided aft, between Output .............................................31,990kW/104rev/min One man operation .......................................................No
the superstructure and No 6 hold, for an FEU stack Propeller Fire detection system
stowed directly on deck, with similar FEU stowage Material ......................................Nickel-aluminium-bronze Make ..................................................................Consilium
arranged right-aft over the mooring deck. Designer/manufacturer ............Hyundai Heavy Industries Type..................................................................CS4000/3L
A maximum 11 rows of boxes can be stacked in the Number ............................................................................1 Fire extinguishing system
Pitch ..........................................................................Fixed Cargo holds/engineroom ............................................CO2
holds to a height of 6 x 8ft 6in units, topped off with a
Diameter ..............................................................7600mm Make....................................................…………………NK
single tier of 9ft 6in boxes. On deck and hatch covers, Speed...............................................................104rev/min Radars
the maximum loadings are 7 x 8ft 6in tiers high and 13 Diesel-driven alternators Number ............................................................................2
rows. For stability calculation purposes, it is considered Number ............................................................................4 Make .......................................................................Furuno
that 2370TEU, loaded to 14tonnes each, can be carried. Engine make/type.........2 x Hyundai-MAN B&W/6L27/38; Models ............................................FAR-2837S/FAR-2827
Refrigerated containers in the holds are cooled by 2 x Hyundai-MAN B&W/7L27/38 Integrated bridge system ...................................................No
mechanical ventilation, and 550 electrical connections Type of fuel used........................................................HFO Waste disposal plant
are also provided. Cell guides are fitted throughout, and Output/speed..............................2 x 1800kW/720rev/min; Incinerator .......................................KangRim KIN-70SDA
there is provision for 45ft containers to be loaded. 2 x 2050kW/720rev/min
Sewage plant
Ital Festosa is fitted with a MAN B&W 7K90MC-C Alternator make/type.......2 x Hyundai/HFC5 714-14K-01;
Make...............................................................Jonghap
2 x Hyundai/HFC5 710-14K-01
main engine, manufactured by Hyundai Heavy Output/speed..............................2 x 1700kW/720rev/min; Model .............................................Bio-Aerob Type 12
Industries and developing 31,990kW at 104rev/min. 2 x 1950kW/720rev/min Contract date .........................................................................-
Service speed at the design draught of 10.8m, with the Boiler Launch/float-out date .............................................................-
engine producing 90% MCR and allowing 15% sea Number ............................................................................1 Delivery date......................................................13 April 2006
ITAL FESTOSA
D
Scantling ...................................................................14.90m
ESPITE several similarities with another Gross .......................................................................61,653gt Type ......Vertical, single-stage, centrifugal, double-suction
Samsung-built Aframax-class tanker, British Displacement .........................................................................- Make...........................................................................Shinko
Cormorant, presented in last year's edition of Significant Lightweight.............................................................................- Capacity...........................................................3 x 3800m3/h
Ships, this new completion does offer some innovations Deadweight Cargo control system
and changes. Notably, the owner has chosen to include Design.................................................................................- Make ......................................................................Samsung
a 1500kW Brunvoll bow thruster to aid manoeuvring, Scantling ...........................................................114,500dwt Type ......................................................................SSAS-Pro
while the class society reflects the owner's Scandinavian Block coefficient.....................................................................- Ballast control system
Speed, service.......................................................14.60knots Make ......................................................................Samsung
base. Cargo capacity.......................................................130,000m3 Type ......................................................................SSAS-Pro
Kronviken is a further example of quite a large number Bunkers Complement
of new tankers that have been specified (or even Heavy oil ...................................................................3000m3 Officers ..............................................................................14
modified after contract signing) with ice strengthening, Diesel oil...............................................................................- Crew ....................................................................................9
to reflect perceived opportunities in exporting Russian Water ballast.............................................................39,000m3 Supernumaries/spare..........................................................1
oil from Baltic terminals such as Primorsk and others in Percentage of segregated ballast .................................100% Suez/repair crew .................................................................4
the Russian Far East. With this in mind, the hull has Fuel consumption...................................................................-
Bow thruster
Classification ...................Det Norske Veritas, +1A1, ICE-1A,
been reinforced to meet Det Norske Veritas ICE-1A Tanker for Oil, ESP, E0, PLUS-2,
Number ...............................................................................1
standards and the equivalent Finnish/Swedish NAUTICUS (Newbuilding) Make.........................................................................Brunvoll
requirements. Percentage of high-tensile steel Output ......................................................................1500kW
The ship is only designed to load crude oil, albeit in used in construction .......................................................63% Bridge control system
Make..............................................................Lyngsø Marine
three grades. Cargo is transported in six pairs of tanks, Main engine
One-man operation ..................................................……Yes
while two slop tanks and six pairs of wing and double- Design..................................................................MAN B&W
Model.......................................................................7S60MC Fire detection system
bottom tanks, plus peak tanks, are also included in the Manufacturer ..........................................Doosan Engine Co Make .......................................................................Saracom
hull structure for segregated water ballast. All fuel Number ...............................................................................1 Fire extinguishing systems
tanks, mainly grouped around the machinery space, are Type of fuel ....................................................................HFO Cargo tanks (deck) ......................................................Foam
protected by double skins and void spaces. All Output/speed .....................................14,520kW/105rev/min Make ...........................................................................NK Co
transverse and longitudinal bulkheads below the upper Propeller Engineroom ........................................High-expansion foam
deck are of plain construction. Once again, an ice knife Material .........................................Nickel-aluminium-bronze Make ........................................................................Kashiwa
is included above the rudder to protect against ice Designer/manufacturer ...................…Samsung/Nakashima Cabins ....................................................................Hydrants
damage. Number ...............................................................................1 Radars
Pitch .............................................................................Fixed
A specially refined hull form means that, considering Diameter..................................................................7350mm
Number ...............................................................................2
the planned ice navigation areas, it has been possible to Speed ..................................................................105rev/min
Make...............................................................................JRC
install a MAN B&W 7S60MC main engine of Diesel-driven alternators Models..................................JMA-9933-SA; JMA-9923-7XA
14,520kW; by comparison, British Cormorant featured an Number ...............................................................................3 Integrated bridge system
MC-C version of the same engine with an output of Engine make/type ........................................MAN/5L28/32H Make...............................................................................JRC
15,820kW. The new ship's engine turns a Nakashima Type of fuel ....................................................................HFO Model.............................................JAN-701; JAN-701-CON
FP propeller of slightly smaller diameter (7350mm) at Output/speed ..................................3 x 1050kW/720rev/min Waste disposal plant
Alternator make/type..........................................Nishishiba/- Incinerator
105rev/min to yield a service speed of 14.60knots Output/speed ....................................3 x 980kW/720rev/min Make.........................................................................Hunco
(15.42knots for British Cormorant). Boilers Model.......................................................Maxi 100SL-1WS
Cargo discharge is handled by three Shinko 3800m3/h Number ...............................................................................2 Sewage treatment plant
vertical single-stage pumps, and both cargo and ballast Type ......................................................................MAC-35B Make ...........................................................................Evac
system controls are based on Samsung SSAS-Pro Make .....................................................................Mitsubishi Contract date ....................................................3 March 2004
equipment. Steam is generated in a pair of Mitsubishi Output ...........................................................2 x 35,000kg/h Launch/float-out date .............................................................-
boilers, each with an output of 35,000kg/h. An electro- Cranes Delivery date ...........................................14 September 2006
KRONVIKEN
T
side ..........................................................................2.53m Number ............................................................................1
HE diversity of the Möller-Maersk Group is bottom ......................................................................3.10m Engine make/type .............................STX-MAN/8L32/40H
difficult to measure, but some idea of its extent is Draught Type of fuel ................................................................MDO
demonstrated in this edition of Significant Ships where design ....................................................................11.40m Output/speed.....................................3664kW/720rev/min
four of this leading owner's newbuildings are featured, summer ..................................................................12.00m Alternator type ..................................................Nishishiba
including the largest container ship in the world, scantling ................................................................12.40m Output/speed.....................................3450kW/720rev/min
together with this vessel - one of the largest LNG Gross .......................................................................96,508gt Cargo tanks
tankers in service, alongside two 'baby-size' box ships. Displacement (design)....................................102,000tonnes Number...................................4 x IMO Type 2 membrane
Lightweight ........................................................30,740tonnes (GTT Mk 3 system)
Equally, Samsung can point to its own varied output, Deadweight Cargo pumps
and a rise to becoming a world leader in LNG carrier design ..............................................................71,450dwt Number ............................................................................8
design in just seven years since delivering the first ship summer .............................................................77,450dwt Type....................................................submerged electric
of this type. scantling............................................................81,450dwt Make.........................................................................Ebara
Maersk Qatar is a development of Samsung's standard Block coefficient (design) ..............................................0.745 Capacity........................................................8 x 1700m3/h
design, which conforms closely to what has become an Speed, service, 85% MCR, design draught .........20.60knots Custody transfer system .............................Saab Rosemount
industry 'norm', offering around 140,000m3 capacity. In Cargo capacity.......................................................145,600m3 Integrated automation system ...............Kongsberg Maritime
Bunkers Complement...........................................41 plus 6 Suez crew
fact, Maersk Qatar, with some slight 'tweaking' of length
heavy oil.................................................................7490m3 Bow thruster
and beam over earlier ships, will load nearly 6000m3 diesel oil...................................................................440m3 Make ......................................Kawasaki Heavy Industries
more than that, in its operations on the RasGas project. Water ballast.............................................................57,000m3 Number ............................................................................1
The design features a double-skin hull with side Fuel consumption, main engine..................171.7/tonnes/day Output ...................................................................2500kW
spaces joined with top and bottom wing tanks arranged Classification .............American Bureau of Shipping, +A1, E, Bridge control system
to carry water ballast. These enclose four individual Liquefied Gas Carrier, Ship Type Make...................................................................Kawasaki
cargo tanks, separated by cofferdams, and constructed 2G (Membrane Tank, max pressure 25kPaG, Type .................................part of main turbine installation
in accordance with the Gaz Transport and Technigas min temp -163ºC, SG 500kg/m3), Fire detection system
SH, SH-DLA, SHCM, SFA (40) +AMS, +ACCU, Make ......................................................Consilium Marine
(GTT) Mk 3 containment system for the carriage of Type .....................................................................CS 3000
o UWILD, PMS including CMS, NIBS,
LNG cargoes at cryogenic temperatures (-163 C). HM3+R with Descriptive Note: 'Slam Warning, Fire extinguishing system
These tanks extend above the upper deck and are Hull Girder Stress, Full VDM' Engineroom .........................................High-pressure CO2
enclosed in a trunk which also provides access passages Percentage of high-tensile Make ...............................................…………………Unitor
forward and aft. The containment system, which is steel used in construction ................…………..approx 13%
Radars
designed to limit the daily boil-off rate to 0.15% cargo Main engine
Number ............................................................................2
volume, is complemented by three Ebara 1700m3/h Make ................................................................Kongsberg
Design ..............................direct reversible steam turbine Model ...................................................................DB 1028
electric submersible pumps, capable of discharging Model.....................................................................UA-400 Integrated bridge system
cargo in 12 hours, following pre-cooling by LNG spray. Manufacturer..........................Kawasaki Heavy Industries Make ................................................................Kongsberg
Despite the fact that its does hold contracts for both Number ............................................................................1 Model .........................................................SEAMAP 1021
low-speed diesel and diesel-electric-powered LNG Output ................................................................29,050kW Contract date...............................................29 October 2003
tankers, Samsung has retained the 'traditional' steam Main boilers Launch/float-out date ...........................................9 July 2005
turbine propulsion system for Maersk Qatar. This makes Number ............................................................................2 Delivery date......................................................15 April 2006
U
Engine make/type .............................STX-MAN 6L23/30H
NTIL recently the SLS shipbuilding company 11,060kW at 127rev/min to give a 15knot service speed Type of fuel used........................................................HFO
traded as ShinA from a modest (by Korean at 90% MCR. Output/speed.................................4 x 780kW/720rev/min
standards) shipyard on the country's south coast, A 1000kW hydraulically-driven bow thruster is fitted, Alternator make/type .................................................Taiyo
Output/speed.................................4 x 740kW/720rev/min
boasting only two adjacent building berths, originally and to enhance redundancy cover, a fourth diesel Boiler
sized for vessels of around 12,000dwt. As the new alternator set has been installed. With an output of Number ............................................................................1
Type........................................................................oil fired
century dawned, work was already in progress to 740kW, these machines are some 70kW larger than Make .....................................................................Aalborg
convert one of these berths into a slipway suitable for those previously fitted. An integrated alarm, monitoring Output ..............................................................18,000kg/h
37,000dwt vessels - later further increased to and control system is installed, and a power Cargo tanks
Number .........................................………………………12
accommodate today's maximum-size designs of management programme is fitted. Grades of cargo carried ..........................6 x IMO Type III
around 51,000dwt. Tank coating ..................................Sigma phenolic epoxy
Stainless steel...............................................pipes, valves
Although not exclusively so, the yard has tended to Cargo pumps
specialise in the construction of product/chemical TECHNICAL PARTICULARS Number ..........................................................................12
tankers in recent years. In so doing, the company has Length, oa .................................................................183.00m Type................................................hydraulic, submerged
Length, bp.................................................................174.00m Make ........................................................................Framo
built up a successful association with a number of Stainless steel ..............................................................Yes
Breadth, moulded .......................................................32.20m
Italian owners, using its own efficient design Depth, moulded ..........................................................19.10m
Duty...............................................................12 x 600m3/h
department to develop means of adding more Width of double skin
Cargo/ballast monitoring system....................................Saab
Complement
deadweight or cubic capacity into successive vessels, side .........................................................................2.00m Officers...........................................................................17
within more or less fixed dimensions. bottom ......................................................................2.15m Crew...............................................................................11
Mare di Ravenna features a single, cambered upper Draught Suez/repair crew..............................................................6
Bow thruster
deck, with a slight sheer forward leading to a short design ....................................................................11.00m Make...................................................................Kawasaki
forecastle. The cargo space, within a double hull format, scantling ................................................................13.20m Number ............................................................................1
Gross .......................................................................29,900gt Output ...................................................................1000kW
is divided into six pairs of cargo tanks and two slop Displacement........................................approx 61,600tonnes Bridge control system
tanks by a centreline and transverse bulkheads of Lightweight ........................................................10,260tonnes Make ..........................................................Lyngsø Marine
troughed construction. Side and bottom spaces in the Deadweight Type .............................Integrated control and monitoring
double hull are joined to form 'L-shaped' tanks, divided Fire detection system
design...................................................approx 40,000dwt Make ............................................................Saraco-Thorn
at the centreline, and designated for water ballast. Cargo scantling ...............................................approx 51,000dwt Fire extinguishing systems
tank internals are smooth and coated with 300microns Speed, service, 90% MCR .........................................15knots Cargo tanks/engineroom ........................Namyang-Kidde
Cargo capacity.........................................................55,400m3 Radars
of Sigma phenolic epoxy, suitable for IMO Type III Number ............................................................................2
Bunkers
cargoes, chemicals, and oil products. heavy oil.................................................................1600m3
Make......................................................................Telemar
Unlike some other SLS/ShinA tanker designs, Mare di diesel oil...................................................................220m3
Model...................................................................ARPA 25
Waste disposal system
Ravenna uses Framo hydraulic, submerged pumps in Water ballast ................................................approx 23,000m3 Incinerator
each tank (total 12 x 600m3/h) instead of three steam Fuel consumption, main engine...................41.36tonnes/day Make ......................................................Hyundai-Atlas
turbine-driven pumps in a separate pump room, to Classification ........................Registro Italiano Navale (RINa), Model ................................................MAX250SL-1 WS
C*Oil Tanker-ChemicalTanker, ESP, Sewage plant
handle cargo. These are driven by four power packs and Make ..........................................................Hamworthy
IMO III, CLEAN-SEA, *AUT-UMS,
can deal with six grades of cargo at one time, working *STAR-HULL-NB, *AUT-PORT, IV, IWS, MON-SHAFT,
Model ...................................................................ST2A
Contract date ............................................5 September 2003
through two cargo manifolds on deck. All cargo piping CARGOCONTROL, VCS-MIDSHIP, SPM, Launch/float-out date ...........................................2 May 2006
and valves, and the cargo pumps, are of ANS1316L Unrestricted Navigation, Ice Class 1B Delivery date .....................................................29 June 2006
M
Length, bp.................................................................139.25m Number.........................................................14 + 2 x slop
ARIDA BOREAS is the first of six vessels Breadth, moulded .......................................................22.00m Grades of cargo carried ..........................................IMO II
ordered by a Cyprus-based owner from the Aker Depth, moulded ..........................................................12.95m Product range .......................................oil and chemicals
Braila yard. The hull was constructed in two halves, Width of double skin Tank coating............................................Jotun Tankguard
side ...............................................................1.25m/1.40m Cargo pumps
each of which was launched sideways, and towed bottom (sloping) .........................................2.084m/1.86m Number ..........................................................................16
further down the Danube river system to the associated Draught Type ................................................Hydraulic submerged
Aker Yards Tulcea, where they were placed on a design ......................................................................8.50m Make ...............................................................Frank Mohn
hoistable platform for assembly. scantling (ice class).................................................8.70m Capacity ..........14 x SD150/350m3/h: 2 x SD100/100m3/h
Gross .......................................................................10,350gt Cargo/ballast control system
Known as the Aker TP150 type, the design is heavily Displacement ....................................................20,050tonnes Make
ice-strengthened to Det Norske Veritas 1A standards Lightweight ...........................................................5050tonnes monitoring ....................................Krohne Skarpenord
and is equipped for the carriage of IMO Type II Deadweight actuator ............................................................Lyngsø
cargoes up to 1.3tonnes/m3 specific gravity, in seven design ...............................................................15,000dwt control.........................................................Kongsberg
scantling............................................................15,540dwt Complement ........................................................................20
pairs of cargo tanks and two slop spaces, contained Block coefficient, design draught..................................0.748 Bow thruster
within a double-skin hull. With all stiffening arranged Speed, service, 90% MCR, 5% sea margin .........15.50knots Make ...............................................................Rolls-Royce
outside the tanks, and divisional bulkheads of vertically Cargo capacity.........................................................18,000m3 Number ............................................................................1
Bunkers
(centreline), or horizontally (transverse) troughed heavy oil...................................................................736m3
Output ................................................750kW/1770rev/min
construction, the resulting smooth internal surface is Bridge control system
diesel oil.....................................................................63m3 Make.....................................................Aker Yards Elektro
protected by 300microns of Jotun Special Tankguard Water ballast................................................................8945m3
One man operation ......................................................Yes
coating. Considerable effort was expended by Aker Segregated ballast.........................................................100%
Fire detection system
Fuel consumption
Brevik Engineering to perfect an excellent set of hull main engine only ........................................9.9tonnes/day Make .................................Aker Yards Elektro/Kongsberg
lines, and according to Marintek, the ship revealed some auxiliaries ....................................................1.4tonnes/day Fire extinguishing system
of the best model performance results ever witnessed Classification...........................Det Norske Veritas, +1A1, E0, Cargo tanks.................................................Minimax foam
Tanker for Oil ESP, Tanker for Chemicals, ICE-1A Engineroom..................................Minimax CO2/Watermist
by that facility for a ship of this type. Radars
Main engine
Eight grades of cargo can be handled simultaneously Design........................................................................MAN Number ............................................................................2
by means of Frank Mohn hydraulic, submerged pumps Model ....................................................................8L40/54 Make .......................................................................Furuno
of 350m3/h capacity. A central power pack is fitted, Manufacturer ..................................................MAN Diesel Models............................................X-band FAR-21177BB
Number ...........................................………………………1 S-band FAR-2137SBB
sized to allow four of the pumps to work at one time, Type of fuel .................................................................HFO Waste disposal plant
with 10% spare capacity, and, in addition serve the two Output ................................................5700kW/550rev/min Incinerator ......................................Teamtec AS OG 200C
500m3/h ballast pumps and two 100m3/h slop tank Gearbox Sewage plant .........................DVZ Services DVZ-SKA-20
Make .........................................................Reintjes Marine Biomaster
pumps. Cargo can be heated up to 60oC by deck- Model .............................................................SVAL 1120A Contract date ...........................................10 December 2003
mounted heat exchangers supplied from a thermal oil Number ............................................................................1 Launch/float-out date .............................................................-
boiler, and radar-type depth gauges are fitted. Tank Output speed ...................................................106rev/min Delivery date.....................................................October 2006
MELTEMI
T RIESTE-BASED consultancy MES has more than Length, oa ...................................................................82.50m Output....................................................800kg/h: 600kg/h
Breadth, moulded .......................................................15.00m Mooring equipment
20 years experience in the chemical and gas tanker Depth, moulded Number ............................................................................4
sectors, and examples of its designs have been featured main deck ................................................................7.80m Make......................................................................Hatlapa
in Significant Ships since 1993, when we presented canopy deck..........................................................11.10m Type ....................................................................Hydraulic
Vallesina. Many of its most recent projects, including Draught Cargo tanks
Ottomana (2005), have involved Turkish shipbuilders, design ......................................................................5.50m Number ............................................................................2
and this four-ship series, led by Merope Star, continues scantling ..................................................................6.50m Grades of cargo carried..................................................2
the link (another four sisters will be built in Ukraine). Gross ..........................................................................3395gt Coated tanks..................................................................no
Displacement .......................................................6100tonnes Stainless steel...................................Structure and piping
The tanker is believed to be the first semi- Lightweight ...........................................................2300tonnes Cargo pumps
pressurised/fully refrigerated gas carrier to be built in Deadweight Number ............................................................................2
Turkey. design ..................................................................2600dwt Type........................................................electric deepwell
The double-skin hull is single-decked, with a trunk or scantling...............................................................3800dwt Make ................................................Hamworthy Svanehøj
'canopy' deck above, covering the tops of the two self- Block coefficient, scantling draught ..............................0.730 Stainless steel ......................................................AISI 304
supporting IMO Type C cylindrical tanks, installed in Speed, service (85% MCR; 15% sea margin)...........14knots Capacity...............................................………2 x 200m3/h
Cargo capacity
the cargo space. These were fabricated in Italy by Gas & refrigerated ............................................................3300m3
Cargo/ballast control
Heat (G & H), an associate both of the designers and of Bunkers
Make ..........................................................Lyngsø Marine
the owning company, and delivered, pre-insulated and Complement
heavy oil...................................................................350m3 Officers...........................................................................16
in modular form, to the shipyard by heavy-lift ship, diesel oil.....................................................................95m3 Special rudder .........................................Gurdesan flap type
along with the canopy deck and cargo handling plant. Water ballast................................................................1700m3 Bow thruster
The gas-handling plant comprises one redundant Segregated ballast.........................................................100% Make ...............................................................Rolls-Royce
reliquefaction plant with two compressors and Classification....................................Registro Italiano Navale, Number ............................................................................1
Liquefied Gas Carrier, AUT-UMS,
condensers. This can handle two different products Output .....................................................................410kW
AUT-PORT, AUT-CCS, AUT-IMS, AVM-APS-NS,
simultaneously, one being refrigerated. Two separate CargoControl, GreenStar, InwaterSurvey, Manovr, Mon
Bridge control system
main control systems are installed, one of which uses Make ..............................................................Polar Marine
Shaft, PMS, Star-Hull-NB, SYS-IBS, One man operation ......................................................Yes
programmable logic controls; the other is hardwired for Unrestricted Navigation also American Bureau Fire detection system
critical sequences and emergency shutdown. The of Shipping +A1, +ACCU, +AMS(E), Make .........................................................Minerva Marine
systems can deal with acetaldehyde, anhydrous Liquefied Gas Carrier, ES, NIBS, PORT, R1 Type .........................................................................T1016
ammonia, butadiene, butanes, butylenes, Percentage of high-tensile Fire extinguishing system
butane/propane mixtures, commercial propane, steel in construction.......................................................30% Engineroom ..............................................................Unitor
Main engine
propylene, and VCM cargoes at fully refrigerated Design ..............................................................MAN B&W
Radars
o
temperatures of -48 C, and a maximum operating Model ....................................................................6L27/38
Number ............................................................................2
pressure of 9.97bar g. Make............................................................................JRC
Manufacturer..........................................MAN B&W Alpha Models ...............................................................JMA 5300
Merope Star can be loaded from refrigerated shore Number ............................................................................1 Integrated bridge system
tanks in five hours, assuming vapour return is available, Type of fuel .................................................................HFO Make ..........................................................Lyngsø Marine
with discharge taking about eight hours by means of Output ................................................2040kW/800rev/min Waste disposal plant
Gearbox
two electric deepwell pumps supplied by Hamworthy- Make.......................................................MAN B&W Alpha
Incinerator
Svanehøj operating simultaneously, and using duplicate Model .........................................56VO28EV AMG 28E/EV
Make .............................................................Detegasa
crossovers and separate lines for liquids and vapours. A Number ............................................................................1 Model .......................................................Delta IRL-10
Sewage plant
booster pump and cargo heater are also available. Output speed ...................................................130rev/min
Make ............................................................Acquamar
Propeller
A MAN B&W machinery package includes an Alpha Material ......................................Nickel-aluminium-bronze Contract date ..................................................................2005
6L27/38 main engine developing 2040kW at Designer/manufacturer ..........................MAN B&W Alpha Launch/float-out date ......................................February 2006
800rev/min, a reduction gearbox, and the CP propeller Number ............................................................................1 Delivery date ..........................................................June 2006
MEROPE STAR
MORGENSTOND I
T
Propeller
HE Combi-Freighter (CF) series from enterprising A resiliently-mounted MAN B&W 9L21/31 main Number ............................................................................1
Dutch builder Damen Shipyards' cargo vessels engine developing 1935kW at 1000rev/min is installed; Designer/manufacturer.....................................................-
division is long established, and an example of its new this drives a CP propeller operating in a nozzle at Pitch................................................................Controllable
Diameter ..............................................................2500mm
CF12000 variant is described in this 2006 review. Hull 231rev/min, through a reduction gearbox, for a service Speed...............................................................231rev/min
construction of that vessel was subcontracted to the speed of 11.70knots. A fishtail-type rudder, turned by a Special adaptations ................................................nozzle
company's Ukrainian subsidiary Okean Shipyard, which Rolls-Royce rotary-vane steering gear operates behind Main-engine driven alternator
Number ............................................................................1
now features in its own right as builder of this first the propeller, and a 200kW Veth bow thruster is fitted. Make/type .........................................................................-
Damen CF6300V river/sea cargo container vessel. Electrical supply comes from a 390kVA shaft-driven Output ....................................................................390kVA
The initial design challenge for consultant alternator and two 295kVA sets with Scania prime Diesel-driven alternators
Number ............................................................................2
Chernomorsudoproject was to develop a vessel suitable movers. Accommodation is arranged aft for nine crew Make/type .........................................................................-
for trading in the Baltic, and on the Volga river and plus a pilot and two supercargoes, in quarters separated Output ..............................................................2 x 295kVA
linked canals, where beam and draught restrictions of from machinery spaces and funnel casing to provide Mooring equipment
Number/type .........................2 x mooring winch/windlass
16.6m/3.6m respectively, apply. A second important extra comfort. A free-fall lifeboat operates over the Make .................................................................................-
consideration related to the method for calculating fees stern. Hatch covers
on the Volga system. These are not based, in the usual Type ...............................................hydraulic folding pairs
Containers
way, on gross tonnage, but on a length x beam x depth Lengths ..............................................................TEU, FEU
calculation, and by building the CF6300V with a low TECHNICAL PARTICULARS Total capacity........................................................331TEU
depth, this value has been reduced. The effect of this Length, oa .................................................................127.30m on deck ..................................................................138
Length, bp.................................................................122.40m in holds ...................................................................193
low depth on cubic and deadweight capacity is Breadth, moulded .......................................................16.60m Complement
compensated for by introducing high hatch coamings Depth, moulded to main deck ......................................6.70m Crew.................................................................................9
and a 2m-high trunk deck, and, since these are classed as Width of double skin Pilot ..................................................................................1
side ..........................................................................1.80m
superstructures, freeboard is reduced and a relatively bottom ......................................................................1.00m
Spare................................................................................2
deep draught is still assigned. Draught Special rudder.....................................................'fishtail' type
Bow thruster
The characteristic low profile of a Russian river/sea river ..........................................................................3.60m
Number ............................................................................1
seawater ..................................................................4.86m
vessel is a feature of the design, with the trunk deck and Deadweight Make ...........................................................................Veth
hatch coamings linking the poop to a forecastle fitted river ......................................................................3800dwt Output .....................................................................200kW
seawater...............................................................6300dwt Fire extinguishing systems ...............................................CO2
with a breakwater for protection of deck cargo. Three Contract date .........................................................................-
Gross ..........................................................................5166gt
virtually box-shaped holds are provided in the double- Speed, service 100% MCR ...................................11.70knots Launch/float-out date .............................................................-
skin hull, and these have an almost full-size, open access Cargo capacity............................................................9980m3 Delivery date ............................................18 November 2005
MYKOLA BOBROVNYKOV
Total number of sister domestic outlets, and a Brunvoll 450kW bow thruster. Boilers
One oil-fired, and one exhaust-gas boiler satisfy steam Number........................................…………………………2
ships still on order:...........................................1 1 requirements. Type .....................................1 x oil-fired: 1 x exhaust-gas
Make .............................Pesci S-Man (Garaioni Naval Srl)
NAFTOCEMENT XI NAFTOCEMENT XI
Hull number: ...........................................H HN1535 field development concept involves the use of sub-sea Material ......................................Nickel-aluminium-bronze
wells and flowlines to support the single floating Designer/manufacturer....................................Nakashima
IMO number:..........................................9 9297424 production, storage and offloading facility provided by Number ............................................................................1
Owner/operator: ........W Woodside Energy Pty Ltd, Nganhurra to receive reservoir fluids (oil, water, and gas). Pitch ..........................................................................Fixed
Australia The vessel is moored in a water depth range of Diameter.........................................................7100rev/min
Designer:.....S Samsung Heavy Industries Co Ltd, 350m/700m using a disconnectable single-point Speed...............................................................105rev/min
Diesel-driven alternators
Korea mooring system, positioned over the bow, which can be
Number ............................................................................2
Model test establishment used ..........................-- released if a very strong cyclone is expected. Engine make/type.......................STX-MAN B&W 6L27/38
Australia
Flag: ......................................................A The topside processing facilities produce extracted Type of fuel used.......................................................MDO
fluids into oil, gas and water streams, with the stabilised
Total number of sister crude oil passed into 12 cargo storage tanks before
Output/speed.............................2 x 2040kW/1000rev/min
ships already completed:..............................N Nil Cargo offloading crane
offloading, by means of a stern floating hose reel and Number ............................................................................1
Total number of sister flexible hose system, into tandem-moored tankers. Make .............................................................Hydramarine
ships still on order: ........................................N Nil Residual water is given further treatment using hydro- Type .........................................................................API2C
cyclones, before disposal overboard. Performance .....................................7.5tonne/20m radius
Mooring equipment
NGANHURRA NGANHURRA
OTELLO
PAULINE
PROMITHEAS
S UCCESIVE examples of Lindenau's 'Safety Tanker' towing facility is also fitted at bow and stern. Output ........................................3 x 1200kW/1000rev/min
Boilers
series have featured in editions of Significant Ships
Number ............................................................................2
ever since its introduction in 1990. Whilst the Types....................................1 x oil fired: 1 x exhaust gas
characteristics of the designs have remained the same, TECHNICAL PARTICULARS Make ........................................................Aalborg Mission
almost every variant of the first 23,400dwt vessel has Length, oa .................................................................188.33m Output .........................................15tonnes/h; 1.5tonnes/h
demonstrated some evolutionary solution to Length, bp.................................................................179.50m Mooring equipment
Breadth, moulded .......................................................32.30m
environmental conditions. Seatrout is the first of the Depth, moulded ..........................................................17.05m
Number/type ........................2 x mooring winch/windlass;
'Safety Class 2010' type, the latest in this progression of Width of double skin
6 x mooring winch
Make.............................Brattvaag low-pressure hydraulic
designs and is offered with 40,600dwt. side ..........................................................................2.00m Cargo tanks
It follows the basic configuration of the concept by bottom ......................................................................2.15m Number ....................................................10 plus 3 x slop
having a double hull surrounding not only an Draught Grades of cargo ......................................oil and products
arrangement of five pairs of cargo and three slop tanks, design ....................................................................10.00m Product range......................................up to 1.1tonnes/m3
but of the fuel tanks in the engineroom. The tank scantling ................................................................11.00m Coating........................................................EPICON T800
Gross .......................................................................26,548gt
divisions are formed from volume (double-skin) Deadweight
Stainless steel ......................................piping StSt 1.4435
transverse and longitudinal bulkheads offering a design ...............................................................35,400dwt
Cargo pumps
Number/type ..............................10 x CKL200; 2 x DL125
smooth tank surface protected by an Epicon T800 scantling............................................................40,600dwt Make.......................................Svanehøj electric deepwell
coating. Speed, trial, design draught, 8200kW ..................15.50knots Stainless steel ..............................................................Yes
All cargo pipes, fittings, valves, together with the 10 Cargo capacity.........................................................47,372m3 Capacity ........10 x 600m3/h; 2 x 250m3/h; 2 x screw type
Svanehøj 600m3/h submerged cargo pumps, and the Bunkers Cargo/ballast control system.....................................Damcos
heating coils provided in tanks 6 and 7, are made of heavy oil.................................................................1493m3 Complement
diesel oil...................................................................472m3
stainless steel. Gaining an extra 3000dwt has meant an Water ballast.............................................................21,440m3
Officers..........................................………………………11
increase in dimensions for the Seatrout class over earlier Percentage segregated ballast .....................................100%
Crew...............................................................................18
Suez/repair crew..............................................................6
'Safety Tanker' designs, and beam has now reached Fuel consumption Special rudder ..............................................Becker flap type
Panamax size. It has also been necessary to add two main engine only ....................................38.80tonnes/day Bow thruster
cylinders to the MAN B&W L58/64 type main engine Classification .........................................Germanischer Lloyd, Make..............................................................Lips/Wärtsilä
which has been used in all previous variants, in order to +100A5 E3 Oil/Products Tanker, ESP, Number ............................................................................1
achieve a comparable ship speed; the increased ERS, VEC, COLL 3, Suitable for the Output ...................................................................1250kW
Transport of Oil Products
11,200kW output from the 8L58/64 unit drives through Percentage of high-tensile
Bridge control system .....................................SAM/Raytheon
a Renk gearbox and Vulkan coupling, meeting a steel used in construction .............................................30%
Fire detection system
Make .....................................................SAM/Servoteknikk
contract speed of 16.50knots (15.50knots on sea trials Main engine Type ..............................................................Servo Master
at 8200kW). Design ..............................................................MAN B&W Fire extinguishing systems
To maintain performance in an economic and Model ....................................................................8L58/64 Cargo deck ...............................................................Foam
environmental friendly way, Lindenau has employed Manufacturer ....................................................MAN B&W Make.........................................................................Unitor
extensive CFD (computational fluid dynamics) studies Number ............................................................................1 Integrated bridge system................................SAM Raytheon
Type of fuel .................................................................HFO
on the hull form, and paid particular attention to the Output .............................................11,200kW/428rev/min
Sewage plant
fore-end lines with regard to structural stresses, loss of Make............................................................................DvZ
Gearbox Type......................................................SKA-30 Biomaster
speed in a seaway, fuel economy, and deck wetness. Make....................................................................Renk AG Contract date ...........................................22 November 2004
Operations at high speed in ice, and good icebreaking Number ............................................................................1 Launch/float-out date ...................................4 February 2006
capabilities, have also been addressed. Output speed................................................115.7rev/min Delivery date .......................................................3 June 2006
SEATROUT SEATROUT
C under the stern each side of a central skeg. Two 710kW Number ............................................................................1
HINA is one of the few countries in the world still
Type ..........................................................Vertical oil-fired
operating train ferries within its railway system, and bow thrusters are fitted and, with the Azipods, provide
Make...................................Qingdao Marine Boiler Works
it is currently extending the network still further by a manoeuvring system which allows the ferry to turn in Output ................................................................3tonnes/h
establishing a new link between the north east of the its own length, and to move sideways. Mooring equipment ...........................................Navalimpianti
country and the Yangtze River Delta, by way of the Lifesaving equipment
Bohai Strait. The new route condenses a long, circular Type ..............................................2 x Viking vertical MES
journey around Bo Hai into an approximately 100-mile TECHNICAL PARTICULARS Capacity ..................................................2 x 227 persons
Type................................................................2 x lifeboats
crossing of the strait between Yantai in Shandong Length, oa .................................................................182.60m
Capacity ....................................................2 x 82 persons
Province, and Dalian, directly opposite, in Liaoning Length, bp.................................................................164.60m
Train capacity
Breadth, moulded .......................................................24.80m
Province. Number of train decks.....................................................1
Depth, moulded
Sinorail Bohai 1 is the first of four new ferries custom- to main deck ............................................................9.00m
Total track length ...............................5 tracks, total 735m
designed for the service, which will perform a to upper deck ........................................................15.00m
Total rail trucks....................................................50 x 14m
multipurpose function, with the main deck providing Road vehicles
Width of double skin Number of vehicle decks ................................................1
five flush rail tracks with a total lane length of 735m; side .........................................................................3.60m Total lane length........................................................486m
this space will be capable of accommodating 50 x 14m bottom ......................................................................1.48m Total cars........................................................................25
cargo wagons carrying 4000tonnes of freight, including Draught Total freight units...................................................50 x 7m
design ......................................................................5.80m
dangerous goods of IMO classes 2-9, loaded over a Doors, ramps
scantling ..................................................................6.00m Number................................1 x stern door: 1 x side door
shore linkspan, through a top-hinged stern door. The Gross .......................................................................24,975gt Designer.......................................................Navalimpianti
upper deck is arranged for road vehicles and is accessed Deadweight Complement ........................................................................63
by way of a door/ramp in the starboard, aft quarter of design .................................................................6466dwt Passengers........................................................................480
the superstructure. With no bow entry, space is scantling...............................................................7218dwt Cabins............................................................................98
provided at the fore end of the deck as a turning circle. Speed, service, 25% sea margin............................18.0knots Bow thrusters
Total vehicle lane length is 486m, equivalent to 50 x 7m Bunkers Make ......................................................Wuhan-Kawasaki
Number ............................................................................2
trucks and 25 cars. heavy oil...................................................................368m3
Output ...............................................................2 x 710kW
Despite the relatively short duration of the voyage, diesel oil.....................................................................52m3
Fire extinguishing systems
Water ballast................................................................4498m3
the 480 passengers carried are well catered for, with 98 Vehicle spaces ............................................................CO2
Fuel consumption .............................................38tonnes/day
cabins available on A and B decks and 1000m2 of public Make ................................................................NK (Korea)
Classification .............................China Classification Society, Radars
spaces, including supermarket, sightseeing lounge, * CSA, Train Ro-Ro Passenger Ship, Number ............................................................................2
cinema, multi-function bar, and restaurants provided. In Ice Class B, Greater Coastal Make................................................………Kelvin Hughes
addition, a four-deck high entrance hall forms a central Service, Yantai-Dalian Service, *CSM, MCC, BRC Contract date .........................................................................-
feature. A complement of 63 is carried to operate the Percentage of high-tensile Launch/float-out date .....................................8 January 2006
vessel, and lifesaving equipment includes two 82-person steel used in construction .............................................18% Delivery date................................................12 October 2006
SINORAIL BOHAI 1
SPECIALITY
TIMCA TIMCA
TRANSPAPER TRANSPAPER
Hull number: ...............................................N NB41 vessels by the original owner is one which Whitaker was Designer/manufacturer .................................HRP Holland
already familiar with, following the company's Number ............................................................................2
IMO number:..........................................9 9342607 experience operating a number of dry cargo coasters Pitch ..........................................................................Fixed
Owner/operator: ........................JJohn H Whitaker built for UK short-sea trading, and fitted with a similar Diesel-driven alternators
(Tankers) Ltd, United Kingdom system. This is based upon twin azimuthing propulsion Number ............................................................................3
Designer: ..................................D Dubai Drydocks, units fitted under the stern, either side of a central skeg. Engine/alternator make .....................................Caterpillar
United Arab Emirates Supplied by Dutch manufacturer HRP, each is driven by Output/speed............2 x 500kW: 1 x 245kW/1000rev/min
a Yanmar 736kW diesel engine, and is fitted with an FP Hose-handling crane
Model test establishment used: .......IIIT, Madras, Number ............................................................................1
India propeller.
A 400kW bow thruster is also installed, and the entire Make ....................................................NorCrane & Winch
Flag: ...................................................IIsle of Man propulsion system can be controlled by joystick, as well Type ........................................................Electro-hydraulic
Total number of sister as by conventional means, to facilitate bunkering Duty....................................................3tonnes/16m radius
ships already completed:..............................N Nil operations. Three Caterpillar diesel-alternator sets Cargo tanks
Total number of sister satisfy electrical requirements, two supplying 500kW Number............................................................10 + 2 slop
and one rated at 245kW. The mooring equipment on Grades of cargo ...............................................HFO/MDO
ships still on order: ..........................................3 3
deck is operated hydraulically from independent power Coated tanks.........................................................partially
Cargo pumps
packs, with a similar unit supplying the hose-handling
Number ............................................................................3
crane installed amidships, with a duty of 3tonnes at
D UBAI Drydocks (as its name might imply) is a
company not normally associated with
shipbuilding, nor is a UK domestic operator such as
16m outreach. Make .................................................................................-
Type ..............................................vertical, electric, screw
Capacity ....................................2 x 500m3/h; 1 x 150m3/h
Whitaker, the first likely to be named as a purchaser of Cargo and ballast control
a newbuilding designed and constructed by the UAE TECHNICAL PARTICULARS Make................................................................MacGregor
Length, oa .................................................................101.10m
concern. Circumstances have nevertheless prevailed to Length, bp...................................................................95.20m
Type.....................................................................hydraulic
bring the two companies together in an unexpected Complement
Breadth, moulded .......................................................18.00m
way. Originally ordered by a Middle East owner who Officers.............................................................................7
Depth, moulded ............................................................8.80m
Crew...............................................................................16
later withdrew from the contract, this group of four Width of double skin
Bow thruster
ships was offered for sale on the open market, with the side ..........................................................................1.20m
Make..............................................................HRP Holland
first unit purchased by Whitaker and given the name bottom ......................................................................1.25m
Draught Number ............................................................................1
Whitonia, with a planned deployment as a bunkering design ......................................................................5.95m Output .....................................................................400kW
tanker at one of the major UK ports served by the scantling ..................................................................6.70m Bridge control system
company. Gross ..........................................................................4292gt Make ..............................................................Yanmar/HRP
The basic design was developed 'in house' and tank- Deadweight Type .......................................................................Electric
tested in India to optimise the hard-chine hull form. design ..................................................................6370dwt One man operation .......................................................No
This features a double-skin structure surrounding an scantling...............................................................7600dwt Fire detection system
arrangement of 10 cargo tanks and a slop tank. The Speed, service, 85% MCR ......................................8.00knots Make...........................................................................Tyco
tanks are segregated for two types of cargo (HFO and Cargo capacity............................................................6800m3 Fire extinguishing systems
MDO), with three vertical, electrically-driven screw Bunkers Engineroom .................................................................CO2
pumps installed in a room, forward of the machinery diesel oil...................................................................176m3 Make .............................................................................NK
space, available for cargo handling at the rate of Water ballast................................................................3000m3
Radars
1000m3/h. Two pumps of 500m3/h capacity serve the Percentage segregated ballast .....................................100%
Number ............................................................................2
HFO requirements and one of 150m3/h is available to Classification ........... Lloyd's Register of Shipping, + 100A1,
Make........................................................................Koden
Double Hull Oil Tanker, + LMC,
work with MDO. One stripping pump connected to all LI (Arabian Gulf Coastal Service) for Models............................................................MDC 1810P
tanks is also installed. Carriage of Bunker Fuel with Flashpoint above 60ºC Sewage plant
A cargo control room is located on the poop deck Main engines Make ................................................................Hamworthy
with a view of on-deck operations, and contains the Design....................................................................Yanmar Model.........................................................................ST2A
hydraulic controls for cargo and ballast valves. Gas Model ..............................................................6RY17P-GV Contract date ................................................December 2004
detection, a deck foam firefighting system, high-level Manufacturer ............................Yanmar Diesel Engine Co Launch/float-out date .............................................................-
alarms, and tank gauging equipment are all installed in Number ..........................................……………………….2 Delivery date .................................................November 2006
WHITONIA
scantling .................................................................9.50m
Gross .......................................................................16,488gt
Deadweight
design ...............................................................18,158dwt
scantling............................................................22,027dwt
Speed, service at 90% MCR, 15% sea margin ....20.20knots
Bunkers
heavy oil.................................................................1850m3
diesel oil...................................................................160m3
Water ballast ..............................................................6615m3
Fuel consumption
main engine only ......................................59.7tonnes/day
Classification............American Bureau of Shipping, +A1 (E),
Container Carrier, + AMS, +ACCU, UWILD,
SH, SHCM
Percentage of high-tensile
steel used in construction .................................approx 15%
Heel control equipment .....anti-heel control system; 300m3/h
Main engine
Design ..............................................................MAN B&W
Model ...............................................................7S60MC-C
Manufacturer ............................................................Mitsui
Number ............................................................................1
Type of fuel used........................................................HFO
Output .............................................15,820kW/105rev/min
Propeller
Material.......................................nickel-aluminium-bronze
Designer/manufacturer .........................CSBC/Nakashima
Number ............................................................................1
Pitch ..........................................................................Fixed
Diameter ..............................................................6500mm
Speed...............................................................105rev/min
Diesel-driven alternators
Number ............................................................................3
Engine make/type ..................................Daihatsu/8DK-20
Type of fuel used........................................................HFO
Output/speed......................................3 x 1280kW/900kW
Alternator make.................................................Nishishiba
Output/speed...............................3 x 1200kW/900rev/min
Boilers
YM INTELLIGENT: CSBC
Number ............................................................................1
Type ........................................MC093, vertical composite
Make ...................................................................KangRim
Output ..................................exhaust-gas side, 1200kg/h;
YM INTELLIGENT
^ SPECIAL
SAVINGS
THE ESSENTIAL GUIDE TO THE VERY BEST
IN SHIP DESIGN AND SHIPBUILDING
AND INVALUABLE TECHNICAL REFERENCE SOURCE
Name:
Company:
Address:
Post/Zipcode:
Country:
Telephone:
Fax:
Email: Membership/Subscription No:
Payment Instructions: Payment must be in pounds sterling to RINA by bank transfer (bank details on request), credit card we accept Visa, Mastercard, Amex or sterling cheque
drawn on a UK bank.
I enclose a cheque for £
Please charge £ to my credit card Visa/Mastercard/Amex
Post to the Marketing Department, RINA, 10 Upper Belgrave Street, London SW1X 8BQ, UK or
Fax: +44 (0) 20 7259 5912 E-mail: publications@rina.org.uk
significant
ships of 2007
A publication of The Royal Institution of Naval Architects
The eighteenth edition of our annual Significant Ships series, Significant Ships
of 2007, will be published in February 2008. As in previous editions we shall be
including approximately 50 of the most innovative and interesting commercial
ship designs (of mostly 100m length and above) which will be delivered during the
forthcoming year.
The Editor invites shipbuilders, designers and owners to submit details of vessels
for possible inclusion in Significant Ships of 2007. Presentation will follow on
the established two-page format, with a colour photograph, descriptive text and
tabular details (including major equipment suppliers) on the first page, followed
by a full page of technical general arrangement plans. Initial potential entries
should comprise a short technical description (100 words) of the proposed vessel
highlighting the special features and the delivery date.