PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
Contents
1.0 Preamble ..................................................................................................................................... 3
2.0 Geographical Area....................................................................................................................... 3
3.0 Scope of Work ............................................................................................................................. 4
4.0 Field Work ................................................................................................................................... 4
4.1 Equipment & Survey Specifications ............................................................................................ 5
4.2 Preparation of Maps & Drawings ................................................................................................ 5
5.0 Meeting & Site Visit .................................................................................................................... 7
6.0 Review Meeting .......................................................................................................................... 7
7.0 Schedule of Work ........................................................................................................................ 7
8.0 Service Fees & Payment Terms ................................................................................................... 7
8.1 Taxes & Duties ............................................................................................................................ 7
8.2 Out of Pocket Expenses .............................................................................................................. 7
9.0 Deliverables................................................................................................................................. 8
10.0 Change order management ........................................................................................................ 8
11.0 Confidentiality ............................................................................................................................. 8
12.0 Terms & Conditions..................................................................................................................... 8
13.0 Safety & Quality .......................................................................................................................... 9
14.0 Schedule I .................................................................................................................................... 9
14.1 Alignment Survey ........................................................................................................................ 9
14.2 Topography Survey ..................................................................................................................... 9
14.3 Base Map Digitalization ............................................................... Error! Bookmark not defined.
14.4 Fixation of BMs / PBMS............................................................................................................. 10
15.0 Schedule II ................................................................................................................................. 10
16.0 Schedule III ................................................................................................................................ 12
2|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
1.0 Preamble
M/s KPTL has been awarded on the Turnkey basis contract for “PAKUR AND DUMKA DISTRICT
MEGA WATER SUPPLY SCHEME, UNDER D.W & S. DIVISION SAHIBGANJ, JHARKHAND”, with a design
built duration of 30 months.
3|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
I. Survey near proposed intake point of the project, giving details for accessibility to it, bank
conditions required for planning of the RCC Intake Structure and RCC gangway.
II. Net levels at maximum 3.0-meter grid for sites of Intake cum Jack well location, Raw Water
Sump location and any other sites provided in the tender BOQ to be provided.
III. Generation of contour overlay at 0.5-meter interval for all the sites like Intake Well, RCC
Gangway, Raw Water Sumps etc.
IV. Longitudinal survey along proposed pipeline routes with spot levels taken at maximum
30 m intervals and at every changes of road alignment, road junction etc. Also conducting
the crossectional survey of major rivers and nallahs coming in the way of proposed pipe
alignment.
V. RL of each node (pipe junction; road junction; peak/ valley crest along the pipe route etc.)
above MSL.
VI. Road width (hard crust / side berm); any culvert / bridge; stream / Nallah crossing; trees/
poles etc. that may obstruct the pipe alignment.
VII. Prominent structures along the proposed route viz. Educational Institute, Govt. / Semi
Govt. Offices, Hospitals, Religious Institute etc. with their respective DGPS data.
4|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
VIII. Individual dwelling houses, available water body etc. with their respective DGPS data.
Establishing temporary bench marks (TBM) at different locations of the project area on
permanent structures viz., parapet of culvert / bridge; at plinth of old monument / Govt.
offices/ structures of existing water supply scheme (if any), with respect to Geodetic
Triangulation Station bench mark (GTS BM), including co relating the TBM with DGPS data.
IX. Total no. of concrete PBM to be fixed along the pipeline alignment and at location of each
proposed structure Intake Well and RCC Gangway etc. Size of concrete PBM should not
be less than 150 (L) x 150 (W) x 500 (H) mm.
X. PBM at any location should be verified by Survey Team- KPTL prior to its fixing. After
installation of every PBM, signature of Surveyor- KPTL/D.W.S must be taken on a finalized
checklist and that should be attached in the Final Survey Report.
2. Accuracy (rms) with Post Processing as Static (phase) with long observations
for Horizontal: 3 mm + 0.1 ppm (rms) and for Vertical: 3.5 mm + 0.4 ppm (rms).
Total Station: Equipment to be mobilized at site should be of a reputed make like Leica,
Trimble, Robust etc. and well calibrated. Machines mobilized should be equipped with:
1. A laser plummet.
2. Built-in easy to use alphanumerical keyboard for fast entry of numbers, special
characters.
3. Distance measurement accuracy on prism as 1.0 mm + 1.5 ppm.
5|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
Note: -
i. Key Map / Index map for longitudinal section along pipeline route made to a scale
matching to A0 size paper.
ii. Cross sections of river crossing alignment routes for a scale of 1:200 plotted to A3 size
paper to be produced.
iii. Key Map / Index map for Road network to a scale matching to A0 size paper.
iv. Final Survey Report along with the drawings to be submitted. Final survey report
should contain the following:
• List of equipment mobilized along with its calibration certificates including the
list of staffs involved in the process.
• Methodology adopted for carrying out survey.
• Details of the plot area surveyed for permanent structures. This should
contain the Plot Sizes, Location (with co-ordinates), respective Village name,
Block name & GP name.
• Details of the type of roads surveyed while carrying out alignment survey.
This should include the detailed breakup of different types of Road
encountered with total length. Roads should be categorized as follows:
1. Village roads,
2. Major district roads,
3. State Highway,
4. National Highway,
5. Kucha road,
6. CC / BT / BOE roads,
7. Paver Block roads etc.
6|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
7|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
9.0 Deliverables
Final Report shall be furnished and submitted to the owner within 10 working days after the
completion of survey works at site.
11.0 Confidentiality
• The Data/ Report/ any other relevant information related to the project shall not be used by
the executing Agency elsewhere without any prior consent of KPTL.
• The Data/ Report/ any other relevant information related to the project shall not be shared
to any other Contractor / Agency / Government Client / any other body except KPTL.
8|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
14.0 Schedule I
The scope of Ground Survey works are as follows:
Structures
SN. Description Remarks
(Nos.)
Bathymetry Survey of 0.5 km x
1 Intake Well and RCC Gangway 01
0.5 km grid.
Raw Water Sump and Pump house at
2 1
Pokharia Village
Bathymetry Survey of 0.2 km x
3 Floating Jetty at Malpahari Mines. 1
0.2 km grid.
River and Nallah crossing detailed
survey along 10 m strip and obtaining 2 River Crossing and 4 Nallah
4 06
the cross section of River/Nallah along Crossing.
the Raw Water Rising main alignment
9|Page
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
15.0 Schedule II
The payment Terms shall be as follows:
Please note that, the payment terms mentioned above are final and abiding to all. Request for any
alteration / changes in the payment terms shall not be entertained by KPTL.
10 | P a g e
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
The Price Bid Form shall be strictly as per the below mentioned format only & the same must be
duly filled & signed by the agency in their respective letter head.
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY SCHEME, D.W &
KPTL
S SAHIBGANJ DIVISION
Estimate
Sl. Total
UOM Rates/ Unit Total Rate
No. Cost Estimate Quantity
1 Raw Water Rising Mains 85 KM To be filled ₹0.00
(10m Both side.)
Intake well and Raw Water Sump
2 01 Nos. To be filled ₹0.00
(Bathymetry Survey)
3 Raw Water Sump and Pump House 01 Nos. To be filled ₹0.00
4 Floating Jetty Location ( Bathymetry Survey) 01 Nos. To be filled ₹0.00
River and Nallah Crossing Crossection survey
5 and survey along 10 m strip across the river 06 Nos. To be filled ₹0.00
or nallah.
6 Concrete Pillar Benchmark 17 Nos. To be filled ₹0.00
(150 (L) x 150 (W) x 500 (H) mm)
7 Survey Report 1 LS To be filled ₹0.00
11 | P a g e
PAKUR AND DUMKA DISTRICT MEGA RURAL WATER SUPPLY Doc. No.
SCHEME, D.W & S SAHIBGANJ DIVISION, 32301-ToR-001
Terms of Reference for TOPOGRAPHY SURVEY
KPTL
8 Total No. of Existing ESRs. ___________________ Total No. of Existing ESRs Surveyed. _____________
If Yes,
1. River _______________ Nos.
2. Nallah _______________ Nos.
3. Culvert _______________ Nos.
4. Railway _______________ Nos.
12 | P a g e