1. Gypsum Board Partition & Glass Partition Finishing
1.1. Metal angles to be fixed at 90 degree angles of gypsum wall.
1.2. Net to be used in between 2 pieces of gypsum wall.
1.3. After mastic and sanding, surface has to be smooth.
1.4. Gap between ceiling and wall needs to be at least 10mm.
1.5. Gap between door frame and gypsum wall to be kept at 10mm.
1.6. Skirting must be properly fixed on gypsum wall in such a way that no gap is seen.
1.7. Reinforced wood needs to be from floor to ceiling (inside gypsum wall).
1.8. Incase client requests for full partition floor to slab, mastic or silicon must be
applied to fill 100% of the gap between gypsum wall and slab.
1.9. After cutting, edge of glass needs to be properly sanded (to avoid getting hurt).
1.10. Joints between glass partitions to be kept maximum 3mm.
1.11. No bubble/air is allowed inside the silicon joints.
1.12. Full glass partition must be kept at 90 degrees (perpendicular).
2. Door (MDF & Glass) Finishing
p.1. Stoppers to be used at all costs.
2.2. Upon door installation, the gap between door and floor cannot exceed 5mm.
2.3. If solid door is used,one more hinge is to be added on the top (instead of 3,it is 4). 2.
2.4. If glass door (floor-ceiling) is used,special attention is to be given to ceiling's
accessories Sprinkler, Down light, Speaker etc.
2.5. If tempered glass is used, ensure it is perpendicularly installed and the gap in
tempered glass and either glass wall or gypsum wall is similar.
3. Ceiling (Concealed & Grid) Finishing
3.1 Concealed and drop must parallel & uniform in height.
3.
3.2 Ensure no bumps on concealed ceiling.
3.3 Ensure drop ceiling must have at least H80 net to be applied wherever there is
a joint.
3.4 Ensure uniform Grids (specially on existing).
3.5 Broken edge is not acceptable.Please change new.

4. Floor Finishing
4.1. After hacking, cement is to be used to cover and level the floor. 4.
4.2. If epoxy is used, ensure GI: A GRADE mortar is properly applied.
4.3. Floor level (toilet, bathroom) cannot be 180 degrees (to allow water to run).
4.4. Joint of ceramic tiles cannot exceed 2mm.
4.5. Joint of Granite and marble cannot exceed 2mm.
4.6. At least 3 applications of Timberex to be used on wood & ensure wood is
properly level everywhere.
4.7. Timber underlay is to be used for the entire wood floor.
4.8. Avoid using PU coat on wood unless specified.
4.9. Ensure color uniformity & no broken edge of marble/Gpanite tiles before installation.
4.10. Round stainless steel stripe is to be used in between 2 different types of materials
(e.g between carpet & tile and wood & carpet etc.).
5. M & E Finishing
5.1. Height of Power/Data/Tel/Lighting must be fixed all on the same level.
5.2. Data/tel sockets to be of similar color, unless otherwise has other requested. 5.
5.3. Fill in gap in between down light and ceiling.
5.4. PVC conduit of GI pipe to be used everywhere (conceal wall or floor or ceiling).
5.5. Wire management to be used wherever possible if budget allows.
5.6. Halogen down light is to be used in all display & cabinet items.

6. Buit-in Furniture Finishing


6.1. ELEVATION-Gap between wall & edge must be kept at 25mm (to allow better finishing).
6.2. Ensure no accessories on the ceiling are causing obstructions when opening cabinet doors.
6.3. Hanging cabinets to be installed only where there has been a reinforced partition installed
(inside wood floor to top). 6.
6.4. PLAN- Gap between low furniture & wall to be kept at 3mm.Silicon is to be applied to seal the gap 6.1
6.5. Pantry cabinet (basin gap is to sealed by silicon).
6.6. All cabinets (horizontal or perpendicular) to be kept straight & level.
6.7. All veneer cabinets or veneer wall panels should have the same wood Grain, same direction.
6.8. All cabinet doors must be of the same height & level.
6.9. All cabinets to come with locks unless specified otherwise.
6.10. All finishing works (PU, Spray) must be adequately layered and even.
6.11. All worktop/return (bottom side) must be smooth.
6.12. Joint of solid timber must be sealed with filler !
6.13. All screws & nails on solid timber must be drilled below the surface (1mm), then sealed with filler.
6.14. All joinery (MDF, veneer, panel etc.) must be reinforced by special glue.
OWNER/ REPRESENTATIVE COMPANY STAMP

DATE & SIGNATURE DATE, DESIGNATION & SIGNATURE


11400 D2 D4
200 D3-04
200 825 1600 1325 2600 3450 1200

200
D1 D5

200
825 1600 825 400 2600 400

650
100 100

2050
1600

3250 3400 2350

2950
100 100

3050

3050
2350

4150

800
5150

1300

200
LANDMARK

200

200
800
7450

7450
1150

900
72 Nguy ng 2, Qu n
4, TP.H t Nam

2900
900
100
3000

3900
300
450

350

2900
800
500 900 1790

2000
1400

1400

1000
1000
900
650
250

1200

200
200 400 2650 300 1380 2870 3000
200
100 200 100
11400

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-100
D2 D4
D3-04

D1 D5

200

650
1600

MASTER BEDROOM

3050
YARD
LIVING ROOM KITCHEN

LANDMARK

100
1000
1400 1750 200
72 Nguy ng 2, Qu n
4, TP.H t Nam
BEDROOM

2900
1100

1425

BATH 1

DINING ROOM

100
2000 500

BATH 2

1000
C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-101
D2 D4
D3-04

D1 D5

C4

TV
KITCHEN
C3
BR 1
LIVING
SO1
T2 YARD
C2

Rug

MASTER BEDROOM LANDMARK


BEDROOM

C1 72 Nguy ng 2, Qu n
4, TP.H t Nam

BATH 1
HBC BR 2
C1 C1

T1
C1 C1

BATH 2
C1
SCB

BS1

C1 HBC
C2 TVC
C3 Rug
C4 BR 1
SO1 BR 2
T1 BS1 C.TY TNHH T V N
T2 BS2 THI T K NG
T3 SCB
Wa
T&N

1 / 50

I-102
D2 D4
D3-04

D1 D5

Ho Ho
Wo2

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

Wo2 Wo2
Ho

Ho

Wo2
C.TY TNHH T V N
Ho
THI T K NG
Ho

EXT
T&N

1 / 50

I-103
D2 D4
D3-04

D1 D5

EXT EXT
D2

EXT
EXT

EXT
EXT
P2
De

LANDMARK
EXT

D2

P3 72 Nguy ng 2, Qu n
4, TP.H t Nam

EXT
D3

D1

EXT

De

P1 De
C.TY TNHH T V N
P2 D1
THI T K NG
P3

T&N
D2

EXT D3

1 / 50

I-104
D2 D4
D3-04

D1 D5

Ep1 Ep1

Ep1
Ep1

Ep1
Ep1

Wp

Ep1

LANDMARK
Ep1

72 Nguy ng 2, Qu n
4, TP.H t Nam

Wp
Ep1

Ep1

Ep1 Ep1
Ep1 Ep1
Ep1

C.TY TNHH T V N
THI T K NG

Wp T&N

1 / 50

I-105
D2 D4
D3-04

D1 D5

240
950 540
h = 350
h = 350 h = 350

1435
h = 1240

1710

1400
h = 750

E
S h = 1050

S h = 1280

450
h = 1050
h = 1280
LANDMARK
S

150
h = 360

370
1300

1200
h = 750 h = 740

72 Nguy ng 2, Qu n
S 4, TP.H t Nam
h = 1280

50

360 140
S
1600

S h = 1280

h = 1050
1070
h' = 400

h = 730

230
350

S
h = 1250 S
150

h = 1600 170
h = 1260 h = 2050

240
S

W A

C.TY TNHH T V N
AV
THI T K NG

= 2 + + A T&N
= 2 + + + A

1 / 50

I-106
D2 D4
D3-04

D1 D5

200
1100

300
1500

1100
920

LANDMARK

300
1460

72 Nguy ng 2, Qu n
4, TP.H t Nam

817
270

300
EQ
320

400

EQ
240

W
AV C.TY TNHH T V N
THI T K NG
= 2 + + A
T&N
= 2 + + +A

1 / 50

I-107
D2 D4
D3-04
200 150
800 1950 400 400 550 1500 550 700 2000

D1 D5

400 200

400 200
400
500
CC-G

2000
2300
CC-G

1500
OP
CC-G 2500 2850
3075
2500
700

550

550
900
LANDMARK

300

350
CC-G

900
OP
2500 CC-G
2850
2500 72 Nguy ng 2, Qu n
4, TP.H t Nam
600 500 1500 700

500
1500

2200
CC-G
CC-G
CC-G CC-G 2500
2300

600
2500 2500

1500
CC-G
200 125

2500

500
550

350
CC-G

600
CC-G
2500
2500

651
250
CC-G CC-G
2300 2300
CC-G
550

550
2300

900 1750 400 300 900 750 1500 700 800 350 1900 350

200

CC-G
2300 ( H=2200 )

CC-G
C.TY TNHH T V N
( H=2300 )
2500 THI T K NG
OP
2600 ( H=2600 )
T&N

1 / 50

I-108
D2 D4
D3-04

825 1525 800 1150 1150 350 550 700 200 900

D1 D5

200

200
400

200

650
500
200

800
350
2250

1500

800

800
350

600
1175
LANDMARK

1000
300 1350 300
EQ EQ 1000 1850 1000

350
200

500
72 Nguy ng 2, Qu n
4, TP.H t Nam

1200
EQ

550
412 875 475

EQ

150

1200
600
450 1150 300
675

1500
EQ
850
200

600

500
150
EQ
450

350
EQ EQ

EQ
EQ EQ 412 875 475

EQ
EQ

1000 1800

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-109
D2 D4
D3-04

D1 D5

EQ
EQ EQ

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-110
D2 D4
D3-04

D1 D5

S
S
LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

S DB

DB
C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-111
D2 D4
D3-04

D1 D5

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-112
C'
D2 D4
D3-04

D1 D5

A A' LANDMARK
B B' 72 Nguy ng 2, Qu n
4, TP.H t Nam

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-113
D2 D4
D3-04

D1 D5

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

LIVING ROOM

C.TY TNHH T V N
THI T K NG

T&N

1 / 50

I-114
D2 D4
D3-04

BRICK WALL D1 D5

MORTAR 10mm.thk

WOOD FLOOR FINISH I

UNDER LAY I
HOMOGENEOUS TILES/GRANITE TILES

LEVELING CEMENT LAYER I

FLOOR SLAB
FLOOR SLAB

LANDMARK

72 Nguy ng 2, Qu n

FLOOR DETAIL 1 FLOOR DETAIL 2 4, TP.H t Nam


SCALE:1/5
SCALE:1/5

STAINLESS STEEL
STRIPE L SHAPE I
NG
LAYER OF HOMOGENIUS TILE
GRANITE

LEVELING CEMENT LAYER I TIMBER FLOOR FINISH I


STAINLESS EMULSION WATERPROOFING
STEEL STRIPE I MEMBRANE: 2 TIMES PAINTING
EXISTING SLAB I

SLAB

C.TY TNHH T V N
THI T K NG
FLOOR DETAIL 4
FLOOR DETAIL 3
SCALE:1/5
SCALE:1/5 T&N

1AS
/ 50
SHOWN

I-115
D2 D4
D3-04

D1 D5

HANGER BOLT I THANH TREO

@1000
+2500

EXIST WALL
+2300
LANDMARK
CL1
CEILING DETAIL 1
SCALE:1/5

72 Nguy ng 2, Qu n
4, TP.H t Nam

HANGER BOLT | THANH TREO

@1000

+2500

GYPSUM BOARD 9mmTHK

C.TY TNHH T V N
+2300 THI T K NG
GYPSUM BOARD 9mmTHK

T&N
CL2 CEILING DETAIL 2
SCALE:1/5

1 AS
/ 50SHOWN

I-116
D2 D4
D3-04

D1 D5

+2850

+2850
LANDMARK
HANGER BOLT I
THANH TREO
72 Nguy ng 2, Qu n
SUSPENDED BAR
4, TP.H t Nam
TREO
LED LIGHT

HANGER BOLT
| THANH TREO
LED LIGHT
SUSPENDED BAR
+2500 @1000 | THANH

+2500
GYPSUM BOARD 9mmTHK

CL4 CEILING DETAIL 4


SCALE:1/5

+2300
GYPSUM BOARD 9mmTHK

CEILING DETAIL 3 C.TY TNHH T V N


CL3
SCALE:1/5 THI T K NG

T&N

AS SHOWN

1 / 50

I-117
D2 D4
D3-04

D1 D5

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

FFL
DOOR DETAIL D1, D3

C.TY TNHH T V N
THI T K NG

T&N

IRONMONGERY SCHEDULE IRONMONGERY SCHEDULE

1AS
/ 50
SHOWN

I-118
D2 D4
D3-04

D1 D5

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

FFL FFL

DOOR DETAIL D2

C.TY TNHH T V N
THI T K NG

T&N

1AS
/ 50SHOWN

I-119
D2 D4
D3-04

D1 D5

BATH 1

LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

EQ EQ EQ EQ 100

800 890

3090

BATH 1 - PLAN

C.TY TNHH T V N
THI T K NG

T&N

1AS
/ 50SHOWN

I - 120
D2 D4
D3-04

BATH 1
D1 D5
300

250
550

LANDMARK
750

72 Nguy ng 2, Qu n
4, TP.H t Nam
150
210
90
210
850
90
250

BATH 1 - SECTION A & SECTION B

C.TY TNHH T V N
THI T K NG

T&N

1AS
/ 50
SHOWN

I - 121
D2 D4
D3-04

D1 D5
BATH 2

1370 1850
500 870 1150 700

LANDMARK
A

500 BATH 2 D1 72 Nguy ng 2, Qu n


4, TP.H t Nam

1370
475

445 425 900 LED LIGHT

3190

BATH 2 - PLAN

C.TY TNHH T V N
THI T K NG

T&N

1 AS
/ 50SHOWN

I - 122
D2 D4
D3-04

BATH 2
D1 D5

200

210
250
LANDMARK

72 Nguy ng 2, Qu n
4, TP.H t Nam

275
145 300 1200 145 500 610 650 80

BATH 2 - SECTION A & B

C.TY TNHH T V N
THI T K NG

T&N

1 AS
/ 50 SHOWN

I - 123

You might also like