CL-4 and Aeration 4 30.10.22
CL-4 and Aeration 4 30.10.22
CL-4 and Aeration 4 30.10.22
9.99
PCC
19.16
29.15
3.76
9.10
12.9
16.3
Dia in
S.No C/C Description mm
Reinforcement In Structure
RCC Footing
0.150 Longitudinal (Line)- Bottom 12
0.150 Transverse (Dot) 12
0.150 Longitudinal (Line)- Top 12
0.150 Transverse (Dot) 12
RCC Wall
0.200 Right Side- Longitudinal (Line) 12
0.200 Right Side- Transverse- (Dot) 12
0.200 Left Side- Longitudinal (Line) 12
0.200 Left Side- Transverse- (Dot) 12
Launder Wall walk Way
0.175 Longitudinal (Line) 12
0.175 Transverse (Dot) 12
Launder Wall
0.175 Longitudinal (Line) 12
0.175 Transverse (Dot) 12
Top walk Way
0.200 Longitudinal (Line) 12
0.200 Transverse (Dot) 12
Base Slab
Bottom Reinforcement
Radial 10
Radial 10
Radial 10
Radial 10
0.200 Circumferential 10
Top Reinforcement
Radial 12
Radial 12
Radial 12
Radial 12
0.175 Circumferential 12
Shaft
RCC Footing
0.125 Longitudinal (Line)- Bottom 12
0.125 Transverse (Dot) 12
0.125 Longitudinal (Line)- Top 12
0.125 Transverse (Dot) 12
Wall
0.175 Right Side- Vertical (Line) 12
0.175 Right Side- Horizontal- (Dot) 12
0.175 Left Side- Vertical (Line) 12
0.175 Left Side- Horizontal- (Dot) 12
Wall around 700 mm Dia
0.200 Right Side- Vertical (Line) 10
0.200 Right Side- Horizontal- (Dot) 10
0.200 Left Side- Vertical (Line) 10
0.200 Left Side- Horizontal- (Dot) 10
Staircase
Footing
0.200 Longitudinal (Line) 10
0.200 Transverse (Dot) 10
Plinth Beam
Bottom Reinforcement 12
Top Reinforcement 12
0.110 Stirrups 8
Columns
Straight Bars 12
0.190 Stirrups 8
Middle Landing Beam- 1
Bottom Reinforcement 12
Top Reinforcement 12
0.150 Stirrups 8
0.150 Stirrups 8
Middle Landing Beam- 2
Bottom Reinforcement 12
Top Reinforcement 12
0.150 Stirrups 8
7 Waist Slab
1st Flight
0.150 Bottom Reinf
0.150 Longitudinal 12
0.200 Transverse 8
Top reinf
0.150 Longitudinal 12
0.200 Transverse 8
2nd Flight
0.150 Bottom Reinf
0.150 Longitudinal 12
0.200 Transverse 8
Top reinf
0.150 Longitudinal 12
0.200 Transverse 8
Middle Landing Slab
0.150 Longitudinal (Line) 12
0.200 Transverse (Dot) 8
Top Landing Slab
0.150 Longitudinal (Line) 12
0.200 Transverse (Dot) 8
Steps
0.200 Longitudinal (Line) 8
Transverse (Dot) 8
1.00 1.00
DEDUCTION
1.00 1.00
22 0.59 22.79 1 x 94
21 0.59 21.59 1 x 94
18 0.59 18.59 1 x 189
12 0.59 12.59 1 x 377
70 2.50 72.21 1 x 112
- - x
3.76 0.22 (0.04) 3.94 1 x 9
1.20 0.14 (0.04) 1.30 1 x 20
- - x
3.43 0.22 (0.04) 3.60 1 x 9
1.20 0.14 (0.04) 1.30 1 x 18
L Kgs MT
418 164.84 0.16
20,982 12,929.59 12.93
53,592 47,556 47.56
- - -
- - -
60,650 60.7
CONDERY CLARIFIEAR 4
Length Width Depth Qty Remarks
151.60 1.65 0.40 100.06
151.60 4.22 0.25 159.94
81.06 22.28 0.35 632.13
155.40 0.15 0.95 22.14
147.83 0.95 0.18 24.58
145.32 0.15 0.80 17.44 RCC
14.52 0.90 13.07
12.41 0.35 1.50 6.52
2.98 0.25 6.30 4.69
2.55 0.15 0.38
1.77 0.25 0.44
TOTAL QTY 981.39
151.60 1.80 0.15 40.93
PCC
15.55 0.15 2.33
PCC
84.05 21.67 0.15 273.20
15.63 0.38 2.40 14.07
TOTAL QTY 330.53
1,766.95 1,766.95
1,907.05 1,907.05 12.00
1,766.95 1,766.95
1,907.05 1,907.05 12.00
-
3,710.45 3,710.45
3,484.52 3,484.52 12.00
3,739.90 3,739.90
3,508.01 3,508.01 12.00
- -
1,334.99 1,334.99
930.92 930.92 12.00
-
833.49 833.49
1,068.49 1,068.49 12.00
- -
950.47 950.47
1,133.33 1,133.33 12.00
-
266.57 266.57
269.40 269.40
266.57 266.57
269.40 269.40
-
150.69 150.69
117.71 117.71
179.50 179.50
146.95 146.95 1.00
96.04 96.04
86.76 86.76
130.34 130.34
121.99 121.99
13.92 13.92
13.92 13.92
3.47 3.47
3.47 3.47
12.77 12.77
-
73.44 73.44
46.82 46.82
-
7.07 7.07
7.07 7.07
9.31 9.31
9.31 9.31
-
3.47 3.47
3.47 3.47
10.48 10.48
-
34.41 34.41
25.58 25.58
24.99 24.99
18.45 18.45
-
31.48 31.48
23.40 23.40
23.04 23.04
16.99 16.99
33.07 33.07
19.75 19.75
33.07 33.07
19.75 19.75
178.00 178.00
27.38 27.38
417.98 20,981.93 53,592.48 - - - - 103.00
Total Weight (MT)
60.65
6.52
### 1.57 1.65
### 1.69 48.25
### 1.57
### 1.69 48.25
- 12.82
### 3.29
### 3.09 48.08
### 3.32
### 3.11 48.42
- 2.01
### 1.18 0.95
930.92 0.83 47.05
- 1.69
833.49 0.74 0.975
### 0.95 46.25
- 1.85
950.47 0.84 1.2
### 1.01 49.2
- 33.59
- -
### 1.32 22.200
### 1.25 21.000
### 2.17 18.000
### 2.92 12.000
### 4.98 11.1
- -
### 2.18 22.200
### 2.08 21.000
### 3.57 18.000
### 4.86 12.000
### 8.26 11.1
- 0.95
266.57 0.24 4.5
269.40 0.24 2.25
266.57 0.24
269.40 0.24 2.25
- 0.53
150.69 0.13
117.71 0.10 3.68
179.50 0.16
146.95 0.13 4.42
- 0.27
96.04 0.06
86.76 0.05 0.78
130.34 0.08
121.99 0.08 1.12
- -
- -
- -
- 0.02
13.92 0.01
13.92 0.01
- 0.01
3.47 0.00
3.47 0.00
12.77 0.01
- 0.08
73.44 0.07
46.82 0.02
- 0.02
7.07 0.01
7.07 0.01
9.31 0.00
9.31 0.00
- 0.01
3.47 0.00
3.47 0.00
10.48 0.00
- -
- 0.07
- -
34.41 0.03
25.58 0.01
- -
24.99 0.02
18.45 0.01
- 0.06
- -
31.48 0.03
23.40 0.01
-
23.04 0.02
16.99 0.01
- 0.04
33.07 0.03
19.75 0.01
- 0.04
33.07 0.03
19.75 0.01
0.08
178.00 0.07
27.38 0.01
74,992
DETAILED MBBOKS - CLF
OUTER RETAINING
11/2018-19 SC 1 1
WALL
BASE SLAB
1 1
EXCAVATION
CENTRE SHAFT 1 1
EARTH WORK
1 RA 4 5/1/2019
Excavation 700 MM DIA INLET
1 1
PIPE EXCAVATION
450 MM DIA SLUDGE
PIPE EXCAVATION 1 1
1000 MM DIA
ELECTRICAL CABLE 1 1
EXCAVATION
OUTER RETAINING
1 1
WALL
CENTRE SHAFT
1 1
BOTOOM PCC
Launder Wall
RA 6 11/22/2019 09/2018-19 SC
Slab,Launder Wall
RA 7 12/1/2019 09/2018-19 SC
RA 15 4/16/2021 29/2019-20 SC
OUTER RETAINIG
RA 4 5/24/2019 RCC 1 1
WALL RAFT
OUTER RETAINIG
WALL UPTO GRADE 1 1
SLAB
CENTRE SHAFT 1 1
SLUDGE PIT SIDE
WALL RAFT 1 1
GRADE SLAB 1 1
TOTAL
3.142/3*((24*24)+
(2.75*2.75)+(24*2.
75))*1.53 1040.87
5.5*5.
3.142/4 2.40 57.03
5
2187.03 2187.03
4.45*4
3.142/4 0.15 2.33
.45
.45 X 23.65
3.142/4 -3.77
0.45
346.98 346.9811
57.44
4.62
2.52
0.12
64.70
959.73 959.7334
STEEL
Nos L B D QTY
Blower Foundation
1 7/2/2021 AERATION 3 42/2019-20 SC 1 1
Excavation
Blower Foundation
8/2/2021 AERATION 4 42/2019-20 SC 7 1
Excavation
M20
AERATION 4 BASE
11/1/2019 Foundation PCC 10/2018-19 SC 5
RAFT
RA 6 11/21/2019 09/2018-19 SC 11 to 12
RA 7 11/30/2019 09/2018-19 SC 17 to 19
RA 7 11/30/2019 09/2018-19 SC 20 to 21
RCC
1 1
w2 wall 1st lift 1 1
w2 wall 2nd lift 1 1
w2 wall 3rd lift 1 1
w2 wall 4th lift 1 1
w2 wall rcc 2 1
w2 wall rcc 2 1
w2 wall rcc 2 1
w2 walk way rcc 2 1
w3 wall outer wallup to
2 1
launder slab rcc
w3 wall launder slab 2 1
w3 wall outer wall rcc
2 1
above launder slab
RAFT & WALL&
RA 7 12/14/2019 launder slab side wall 12/2018-19 SC 7 1.00
WalkWay
walk way slab in w3 1.00
pannel 1 raft base 1.00
RAFT & WALL& RAFT & WALL&
RA 8 12/26/2019 12/2018-19 SC 11 1
WalkWay WalkWay
deduction 1
6 2
12 2
AERATION AERATION
1/4/2022 PEDASTLA FOR UPVC PEDASTLA FOR 42/2019-20 SC 21 1
PIPES UPVC PIPES
TOTALQTY
BBOKS - AT4 - BLOWERS (STP) SHUTT
200.032 Cum
77.22 Cum
7.02 Cum
7.02 Cum
7.329 MT
2.05 MT
51.325 MT
1.73 MT
2.3 MT
2.3 MT
1.16 MT
68.194 MT 68.194
Nos L B D QTY
3 13.00 0.50 19.50
1302.84
CONCRETE DETAILS OF AERATION TANK -4
S.no Components GRADE Members Nos Length Width Depth
CONCRETE
1 Raft RCC M30 1 3.00 26.32 38.00 0.35
2 Tank Bottom PCC M20 1 3.00 26.32 38.00 0.10
GRADE
S.no Components CONCRETE Members Nos Length Width Depth
1050.21 RCC
300.06 PCC
79.80 RCC
22.80 PCC
UP TO RAFT LEVEL
Qty Remarks
4.99
36.19
35.24
5.45
33.63
1.66
7.74
4.23
1.13
5.31
5.48
141.06
ESTIMATE AS PER DEPARRTMENT - PK
ABSTRACT ESTIMATE FOR BALA
SUB COMPONENET
AMOUN AERATION TANK, SECONDA
SL
COMPONENET T IN SLN AMOUNT
NO NAME OF WORK SLN REFERE
LAKS O IN LAKS
O NCES
A BALANCE AND ADDITIONAL WORKS AT NARAVA STP
1
2
4
1 CIVIL WORKS 4528654
BALANCE WORKS 5
FOR COMPLETION
4 785.67
OF EXISITING 6
NARAVA STP 7
8
2 MECHANICAL 43719970
3 PIPING & VALUES 10058479
4 ELE. & INSTR. 20259761
5 78566864
6 785.67
1
4
ADDITIONAL 6
5 WORKS PROPOSED 393.01
IN NARAVA STP 7
2 MECHANICAL 21443383
FLOOR SLAB,
CUM 26 8205.35 213339.1
RCC M30
SIDE WALLS ,
CUM 26 9992.19 259796.94
M30
STEEL KG 45100 54.09 2439459
4528653.54
45.29 IN LAKS
4 M 30 FLOOR 730276.15
89 8205.35
5 M 30 WALLS 2298203.7
230 9992.19
G STEEL 71800 54.09 3883662
8625826.59
86.26 IN LAKS