Professional Documents
Culture Documents
Central Unit For Sustainable Cities and Renewable Energy
Central Unit For Sustainable Cities and Renewable Energy
West Unit East Unit North Upper unit South Upper Unit
Located in Borj El Arab Located in 15th May located in New Menya located in New Tiba
Goals
Efficiency Management Transport Construction
Tools
Management
Renewable Transport & tools taking into
programs
energy programs Sustainable supply consideration the
programs. opportunities different climatic
zones of Egypt
Principles
Sustainable Administration for the available sources ( Technical – financial - Human)
Using PV cells and Led Using PV on the roof tops Using Led in Lightening
lamps in the streets
Using Solar energy in the Dissemination of the energy
new cities efficiency Concept in the new
cities
Using solar heaters on the
roof tops
Current projects in Energy Efficiency field
-Developing an energy efficiency plan and using Led in all new cities
Current projects in Energy Efficiency
Number Power
Place of
for Type( LED ) م
installation importing watt
internal 3625 9 60 CM 1
21040 22684
LED under installation Led in the tendering
كشاف إضاءة ليد تم ترسيته process
كشاف إضاءة ليد جاري
طرحه
43724
كشاف إضاءة ليد
Total Led which will
be installed by end
of 2016
1- Replaced 300 sodium bulbs of 450 watt by LED bulbs
of 110 watt at El Hosaree mosque in 6 th of October city
2- Installation of 90 LED bulbs of 110 watt within the Mall of
Arabia parking
Current Projects in the field of Solar Energy in the New
Communities
دمياط
الصالحية
الجديدة
أكتوبر -طريق 6
10
النايل سات
60ك.و
رمضان
برج العرب الشروق
132ك.و
65ك.و السادات 6أكتوبر
العبور
65ك.و الشيخ زايد
السادات – مدرسة مبنى الهيئة
15ك.و الشيخ زايد 15مايو
الفيوم50ك.و
الركن الثقافي 45ك.و
12ك.و بني
سويف
أسيوط الجديدة
المنيا الجديدة 60ك.و
45ك.و
قنا الجديدة
خريطة محطات الطاقة الشمسية التابعة 60ك.و
لهيئة المجتمعات العمرانية الجديدة ()21
طيبة
تم التركيب و التشغيل ()8
90ك.و
طريق طيبة – قنا
جاري االنتهاء من إجراءات الطرح ()5 25ك.و
توشكي
قيد الدراسة بهيئه الطاقة الجديدة ()8 5ميجا
3. Project of installing solar power station with a capacity, 50
kw on the NUCA Building
205322 LE
CO2
132 ton was
reduced
Installation of solar heaters on the rooftops of buildings
in new Tiba , Sohag , Asyout & Badr
Central Solar water heater working by forced loop & opened circle using
the flat Solar Collector
Current projects in the Street Lighting using PV
3-Exchanging the Led lamps in the main Road in front of New Tiba local
authority building
انارة طريق طيبة – قنا
الصحراوى الشرقى بطول 4كم
Current projects in the Roads lighting
-power of 132 kw
-Number of lighting columns are 186 Double Column
- every bulb has power 110 watt
Pouring concrete & Laying of cable lines in Nile Sat
Preparing Shiekh Zayed to be a green sustainable city in cooperation
with ministry of environment .
2016 فبراير
Furniture
energy efficiency 2016 ترشيد كفاءة الطاقة
اإلسكا
ن
االجتما
عى
االخض
ر
www.newcities.gov.eg
hendfarouh@gmail.com