SAFETY CHECKLIST – CONCRETING WORKS

The following pages list the main points to consider when you are checking the safety of your site. State whether you
propose action and what priority you have given to the action. Document to be executed in the presence of Contractor
Representatives (Must)
(TO BE FILLED BEFORE STARTING THE ACTIVITY) Frequency: (each activity / day basis)

PROJECT : Syngene 1401 CHECKLIST NO:

CLIENT : Syngene International Ltd. DATE & TIME:

PMC : CBRE South Asia Pvt. Ltd.

CONTRACTOR :

LOCATION/AREA :

INSPECTION CONDUCTED BY:


CONCRETING
1 Check whether Hard barricading is completed before pouring at height / Yes No N/A
depth.

2 Check whether the vibrator hoses, pumping, concrete accessories in No Yes N/A
healthy condition and mechanically locked.

3 Check whether the pipeline in concrete pumping system is not attached Yes No N/A
to working platform as the forces and movements may affect its
integrity.
4 Check whether the safety cages & guards around moving parts / motors Yes No N/A
etc providing in concreting mixtures.

5 Check whether PPE’s like gloves, safety shoes, eye protection. Nose Yes No N/A
mask, helmets etc. are used while dealing with cements, Chemicals or
any other hazardous material.
6 Check whether the procedure of cleaning the rotating drums of concrete Yes No N/A
mixers shall be done from outside and Lockout devices are provided
where workers need to enter.
7 Check whether the position of exhaust point located away from the Yes No N/A
workers, workstation so as to eliminate their exposure to obnoxious
fumes from I.C engines.
8 Check whether sufficient focus lighting is provided for carrying out Yes No N/A
concrete work during night.

9 Check whether before & during pouring, shuttering and its supports are Yes No N/A
continuously watched for their integrity.

Remarks if any:
Contractor signature/Name/date: …………………. / ………………/………………….. Designation……………………………..

CBRE Reviewed and

Accepted □ Rejected □ Observation Incorporated & Closed □

Comments: ……………………………………………………………………………………………………………………………………………

PMC- CBRE Signature/ Name/date ………………/………………………………/………………Designation………………………

CBRE South Asia Pvt. Ltd Page 1 of 1


Format No. K008-OHS-CW-Ch-010/Rev02/Jan2016