Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEYMAP 1 108

2 3 109 110
K 4 5 6 111 112
OR
FW
IT O 7 8 9 10 113 114
pe LIM
f sco
ut o 11 12 13 14 115 116
-3_o
Q EZ 15 16 17 18 117 118
White Acco.

.3
WA-039

-3_3
0.52ha

Q EZ NOTES: 19 20 21 22 119 120


4CX16mm² 23 24 25 26 121 122
CU/XLPE/SWA/PVC CABLE
F-PTP-01
1. The location of private substations are 27 28 29 30 123 124
indicative only. The exact location shall be 31 32 33 34 35 36 37
Tools & Mechi.
TM-099
1.12ha

38 39 40 41 42 43 44
finalized during respective BP processing. 45 46 47 48 49 50 51 52
2. All 11kV cables are 3C-300mm2 XLPE+ FO 53 54 55 56 57 58 59
ME-130

pe
ME-129
Metals
1.05ha

sco
ME-128

f
Metals
1.05ha

ut o Cables. The 3C-300 mm2 cables are laid at a


65
ME-127

60 61 62 63 64 66
Metals
1.05ha

-3_o
Metals
1.05ha

Q EZ 3
67 68 69 70 71 72
CP0 spacing of 50cm thus reducing the current
ME-126

-3_
Metals
1.04ha

Q EZ
73 74 75 76 77
K
OR
FW
ope
LIM
IT O
carrying capacity to that of 3C240mm2. 78 79 80 81
f sc 82 83 84 85
ut o
Q EZ
-3_o 3. The location of all electrical equipment such
L2A
86 87 88 89 90
3
CP0 AD
Q EZ
-3_ RO as feeder Pillar , KWhr meter, service cabinet, 91 92 93 94 95
96 97 98 99
Mini pIllar etc, are indicative only. The exact 100 101 102 103
25 MAIN LV CABLE location will be as per the as-built drawings. 104 105 106
N1
CTIO
4CX300mm²
4. In case details/ materials on the drawings
107
JUN
CU/XLPE/SWA/PVC CABLE
contradict with KM standards and specification,
then the later shall prevail.
Metals
1.22ha

LV T-JOINT
5. Complete distribution design responsibility to
ME-124

ITH FOR
Metals
0.98ha

TW T
the infrastructure Consultant.
ME-123

UC SMEN
Metals
1.04ha

ED K
DP ENCA WOR
IT H E
S PL CRET ING N
N T
ET
6. All cost to Client. Client to appoint a KM
LV T-JOINT CO EXIS N
4CX120mm² THE TECT
O
IO
approved Contractor to execute work at site. No
CU/XLPE/SWA/PVC CABLE PR
C
cost to KM.
UT-029

/PV
C 6 F-UT-029 /PV 0236
Utilities

WA
0.01ha

WA 4/3023 E /S /S F4/3
E /S X LP
00m
X LP
m ² RO M S
F
/S F
LAR 00m
m ² RO M R
F
4C3 A BLE R PIL D
S
LA
7. Tariff metering for all QEZ 3 projects are at
4C3 A BLE R PIL D C
the LV side, except where ever else stated.
E
C E
LV F EED POSE LV F EED POSE
TO P RO T O W P RO
NE
W NE
8. All secondary substations are Indoor type
CE

-6
AN

EN

MAIN LV CABLE
TR
1 EN

4CX300mm²
2-0
00

CU/XLPE/SWA/PVC CABLE
MA

T
PLEOA1 SE

Water Front
WF-003
15.86ha
AR NDU
LA
LV T-JOINT 4CX120mm² EN
-6
CU/XLPE/SWA/PVC CABLE
LV T-JOINT F-QEZ3-FP-045
4CX120mm²
CU/XLPE/SWA/PVC CABLE
SS
CE

F-UT-049
UT-049

A AC
Utilities
0.01ha

MA AD
RS
RO
-6
EN
CE
AN

-6
TR

EN
1

2 EN
4-0

MA-094
-09

17.71ha
2-0

Marine
MA

00
MA
-6
EN
LOT
P REA1 SE
A NDU
LA
C
/PV 0236
WA
E/S /S F4/3
X LP S
m ² RO M R
-6
EN
00m F LA
4C3 A BLE R PIL D
C E
LV F EED POSE
TOW P RO
NE
MA-002
19.54ha
Marine

AD
RO
SS
CE
A AC
RS
MA
-6
EN

CE
TR AN
EN
94
00
MA
CE
AN

-6
TR

EN
3 EN
2-0
Ta

00
m² OIN T b

MA
C F
35m A/PV T-J DO
4CX E/SW ABLE LV -JOIN EN 2633
X LP VICE
C LV
T PED
AR CA ABLE
SER RP
ILL LV
C
IT
TH P reen
E AR low/G
² YelCable
-6
DE
g
1 6mm
E ar
th in IT EN
TH P reen
FEE P-046
E AR low/G
² Yel e
3 5mm in g Cabl
th
E ar
T LF
PRLEOA1 SE S
A NDU
LA
AR
ILL 2633
RP
DE
FEE
FP-P mm² VC E 13/09/2022 REVISED AS PER ADDITION OF SLFP-046 & FP-P FOR SS-30236 KA
70 A/P
4CX E/SW ABLE
C
X LP VICE D 20/12/2021 REVISED AS PER NEW MASTER PLAN CHANGES KA
S ER
MA-003

A 10/01/2018 REMOVE F.O. CABLES KA


18.63ha
Marine

2
4-0
-09
MA
SS
CE
AC
RM
AT FO
PL
NK

25m /PVC 6mm
²
T BA
4 CX /S WA 1 CX1
X LPE /E CC
TRO
L
D UC
+ PVC TO
CON
P 320
750x
FP -P PUM
M FOR
m² ² FRO L-0 1
50m /PVC 5mm P ANE 01
4 CX /S WA 1 CX2 TRO L
X LPE /E CC S ET- 0
-M.1
CON P
+ PVC FP -P TO PUM
M
FRO L-0
2 FOR
H-LV
P ANE02 EM
S ET-
, W.P
TOR
OLA -02
P IS PA
NEL
8 0A,T TROL SET-02
CON PUM P
FOR
, W.P
TOR -01
OLA
P IS NEL
6 0A,T L PA 01
TRO SET-
CON PUM P
FOR
NT
VEME
PA
BO UR
H AR
BI LE
MO
T
EN
PAVEM
TI NG
SI
EX I
KA 10-01-2018 1 : 4500
Aslam/MA HW
MM

Marine Corridor/P
64454.77 sq.m
2663E-EGI-DWG-04LV-J210

MA-097
ZONE NO:92 E 18
IN CO-OPERATION WITH ALL GIS AGENCIES

You might also like