Professional Documents
Culture Documents
Takeoff Magulo
Takeoff Magulo
EXECUTIVE OFFICES
1.5x1.2
less .8x.9 4 4.32
2x.5 2 2.00
6.32
ENTRANCE
1 2.4 7.20
MAIN DOORS
2.1 1.9 3.99
2.1 0.8 1.68
5.67
SHOWER
1.8 0.57 1.03
1 0.8 0.80
1.83
CUBICLE
4.5 0.4 1.80
1.9 1.6 3.04
4.84
TOTAL AREA = 95.22
PAINT
Ceiling = 211.86
Dywall = 209.57
421.43
Flat Latex = 34.00 gal
2.13 pail
Flat Latex Interior = 3 pail
(Color Finish) Latex = 3 pail
CEILING
Total Area = 211.86
PLUMBING
Toilet Set w/ Lavatory and Accessories = 4
60000 pesos
Shower Set (Stainless 304) = 8000 pesos
Pipings & Waterline 1 lot
30000 pesos
ELECTRICAL
AREA = 316.64
142,489.80 PESOS
LOT
DRWALL
9 3 2.4 3 21.60
3.8 3.8 2.4 1 9.12
2.55 6.12
9 9 2.4 1 21.60
2.51 2.51 2.4 1 6.02
4.4 2.2 2.4 2 10.56
6.8 3.4 2.4 2 16.32
5.6 2.8 2.4 2 13.44
43.66 104.78
Metal Stud 32mm x 76mm x0.8mm = 110.00 pcs
Metal Track 32mm x 76mm x 0.8mm = 32 pcs
1/2 x 3/8 Blind Rivets = 6,300.00 pcs
3.5mm HARDILITE = 74.00 pcs
2.55
WOOD WALL CLADDING 155mm x 2.9m 17 pcs
1 1/2" Black Screw = 408 pcs
WALL TILES
2.51 2 5.02
2.2 2 4.4
1.65 2 3.3
2.9 2 5.8
3.4 2 6.8
2.8 2 5.6
74.208
FF-3
RUBBER MAT 180 sqm
RUBBER MAT TILE 500X500X25mm 720 pcs
576 per pc