PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL LOCATION MAP
BRGY. TALEB, BANTAY, ILOCOS SUR LOT AREA & TECHNICAL DESCRIPTIONS
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
177 4
17

1
174

17

168
171

LOT AREA = 5.00 HECTARES


168

165
165
162 14 13 12
162
159 159
156
156
153
153
11

150 8 7 6
4 3

147 9
5

15

10
144 16
17

18 21
141 LEGENDS:
19

150
1 GUARD HOUSE 12 CELL 1 20

2 WEIGHBRIDGE 13 CELL 2
144 147
3 PUBLIC RESTROOM 14 CELL 3

4 ADMIN OFFICE 15 SLUDGE DRYING 141


BED
5 MRF
16 PUMP HOUSE
6 ROTARY COMPOSTER
& BIO SHREDDER 17 ABR
18 REED BED SITE DEVELOPMENT PLAN
scale 1:1300 mts
7 SORTING AREA
8 VERMI BEDS 19 DISINFECTION

9 MOTORPOOL 20 LEACHATE/
SEDIMENTATION POND
10 AREA FOR SOIL COVER
21 STORM POND
11 WASHBAY
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL SITE DEVELOPMENT PLAN
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
80.00

CELL 3 CELL 2 CELL 1


Area = 10,640 sq. m. Area = 10,640 sq. m.
133.00

Area = 10,640 sq. m.

cell plan
scale 1:900 mts

GAS VENTS
80.00 M
PERIMETER DRAIN GAS VENTS

HDPE LINER
LEACHATE COLLECTION PIPE

7.00 M
RETAINING WALL NGL

7.00 M
RETAINING WALL

7.00 M
133.00 M

LANDFILL LONGITUDINAL SECTION LANDFILL TRANSVERSE SECTION (CELL 1)


1:900 mts
scale scale 1:900 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL CELL PLAN AND CROSS-SECTION
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
VEGETATION
6" (0.15M) TOP SOIL
1.5mm HDPE MEMBRANE 30" (0.76M) PROTECTION
PEBBLES / GRAVELS PERMEABILITY ≤ 1X10^-6 COVER SOIL
50-150mmØ GEOCOMPOSITE DRAINAGE NET
& 40MIL LLDPE GEOMEMBRANE

250 250 250 300


12" (0.30M) WORKING
SURFACE MATERIAL

WASTES
COMPACTED CLAY LINER

NATURAL SUBGRADE
(CLAY SOIL)
LINER SYSTEM SECTION
SCALE 1:60 M

FINAL COVER SYSTEM


NOT TO SCALE

MAIN LEACHATE COLLECTION PIPE


(600mmØ PERFORATED HUME PIPE)

PEBBLES / GRAVELS WASTE FILLING AREA


50-150mmØ 2500

1.5mm HDPE MEMBRANE


PERFORATED PVC PIPE
PERMEABILITY ≤ 1X10^-6
160mmØ
4 - 12mmØ BARS
1:1 1:1
FOR FUTURE EXTENSION SLOT

250 250 250 300


4% 4%

COMPACTED CLAY LINER


CYLINDRICAL GABION
500mmØ
NATURAL SUBGRADE
500
REINFORCED CONCRETE (CLAY SOIL)
2500 200mm THK.
MAIN LEACHATE COLLECTION PIPE
PEBBLES / GRAVELS 1600 300mm THK. STONE MASONRY SCALE 1:60 M

50-150mmØ WITH 20mm THK. PLASTER INSIDE

CONCRETE BENCHING
PEBBLES / GRAVELS
1 1
50-150mmØ 1 1
BRANCH LEACHATE COLLECTION PIPE
(200mmØ PERFORATED HDPE PIPE)
250 250 250 300

4% 1:4 4% WASTE FILLING AREA


1:4

PEBBLES / GRAVELS
100150

50-150mmØ

1.5mm HDPE MEMBRANE


4698.77 PERMEABILITY ≤ 1X10^-6
150mm THK. REINFORCED CONCRETE
COMPACTED CRUSHER RUN
NATURAL SUBGRADE OVER 50mm LEAN CONCRETE 1:1 1:1

300
100 mm THK.
(CLAY SOIL)

250 250 250 300


4% 4%
GAS VENT AND MAIN LEACHATE COLLECTION PIPE LAYOUT
SCALE 1:60 M

COMPACTED CLAY LINER

NATURAL SUBGRADE
(CLAY SOIL)
BRANCH LEACHATE COLLECTION PIPE
SCALE 1:60 M

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU LINER SYSTEM
PROPOSED CATEGORY II SANITARY LANDFILL FINAL COVER SYSTEM
BRGY. TALEB, BANTAY, ILOCOS SUR LEACHATE COLLECTION SYSTEM
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
MAIN LEACHATE COLLECTION PIPE
(600mmØ PERFORATED PVC PIPE)

BRANCH LEACHATE COLLECTION PIPE


(200mmØ PERFORATED HDPE PIPE)
50.00 M

GAS VENT
200

LEACHATE SPRINKLER SYSTEM

BRANCH LEACHATE COLLECTION PIPE


(200mmØ PERFORATED HDPE PIPE)

200
GAS VENT SPACING
GAS VENT AND LEACHATE PIPE SYSTEM NOT TO SCALE

SCALE 1:60 M

320 VERTICAL SPACING


25mmØ HOLES
250 125
3
36

0
161

161

25
PERFORATED PVC PIPE
80

55 36
° 5 160mmØ
173

3
507

12
363

346

346
1520

253

30mmØ HOLE

PIPE PERFORATION FOR LEACHATE PIPE PIPE PERFORATION FOR GAS VENT PIPE
NOT TO SCALE SCALE 1:60 M

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL GAS VENT AND LEACHATE PIPE SYSTEM
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
0.65m

0.15m

0.15m 13-12mm∅ HORIZONTAL


BARS SPACED AS SHOWN

16mm∅ VERTICAL BARS


SPACED @ 0.20M O.C.

0.20m
100 mm thk. gravel fill
DRAINAGE B
DRAINAGE B DRAINAGE B
22

DRAINAGE A

DRAINAGE B
0.85m
DRAINAGE A

0.15m

0.15m 13-12mm∅ HORIZONTAL


BARS SPACED AS SHOWN

14 13 12 16mm∅ VERTICAL BARS


22
SPACED @ 0.20M O.C.

LOT AREA = 5.00 HECTARES

0.20m
DRAINAGE B
DRAINAGE A

100 mm thk. gravel fill

11
DRAINAGE B
8 7 6 4 3
1

2
DRAINAGE C
DRAINAGE C DRAINAGE C

5
9

15 1.00m
10
0.15m
16
17
0.15m
LEGENDS: 18 21
19 13-12mm∅ HORIZONTAL
BARS SPACED AS SHOWN
1 GUARD HOUSE 12 CELL 1 20
22

16mm∅ VERTICAL BARS


2 WEIGHBRIDGE 13 CELL 2 SPACED @ 0.20M O.C.

0.20m
3 PUBLIC RESTROOM 14 CELL 3

4 ADMIN OFFICE 15 SLUDGE DRYING


BED
5 MRF
16 PUMP HOUSE
6 ROTARY COMPOSTER SITE DEVELOPMENT PLAN 100 mm thk. gravel fill
17 ABR
& BIO SHREDDER NOT DRAWN TO SCALE
DRAINAGE C
18 REED BED
7 SORTING AREA
8 VERMI BEDS 19 DISINFECTION CROSS-SECTIONAL AREA (DRAINAGE)
TO SCALE
NOT DRAWN

9 MOTORPOOL 20 LEACHATE/
SEDIMENTATION POND
10 AREA FOR SOIL COVER 21 STORM POND
11 WASHBAY 22 GROUNDWATER MONITORING WELLS

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL DRAINAGE SYSTEM
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
22

DRAINAGE B DRAINAGE B
DRAINAGE B

TOP COVER PVC PROTECTIVE SURFACE CASING

PVC PIPE
100mmØ

DRAINAGE B
STEEL WELL CASING
ANNULAR SEAL
DRAINAGE A

(CEMENT GROUT, CONCRETE,


BENTONITE OR CLAY SLURRY)
SAND

14 13 12
22 SAND

DRAINAGE B
DRAINAGE A

CLAY

SAND

CLAY (SEALING MATERIAL)


11 PERFORATED PVC PIPE
100mmØ
8 7 6 4 3

DRAINAGE C
2 BOTTOM COVER (PVC TS CAP)
DRAINAGE C DRAINAGE C

5
9

15

10
16
17

18 21
GROUNDWATER MONITORING WELL
LEGENDS: 19
NOT DRAWN TO SCALE
20
22

1 GUARD HOUSE 12 CELL 1

2 WEIGHBRIDGE 13 CELL 2
LOT AREA = 5.00 HECTARES
3 PUBLIC RESTROOM 14 CELL 3

4 ADMIN OFFICE 15 SLUDGE DRYING


BED
5 MRF
16 PUMP HOUSE SITE DEVELOPMENT PLAN
6 ROTARY COMPOSTER DRAWN TO SCALE
NOT

& BIO SHREDDER 17 ABR


18 REED BED
7 SORTING AREA
8 VERMI BEDS 19 DISINFECTION

9 MOTORPOOL 20 LEACHATE/
SEDIMENTATION POND
10 AREA FOR SOIL COVER 21 STORM POND
11 WASHBAY
22 GROUNDWATER MONITORING WELLS

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL GROUNDWATER MONITORING WELL
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
INNER FACE VERTICAL
BAR @ 0.21M O.C. 300MM
OUTER FACE HORIZONTAL
BAR @ 0.15M O.C.

INNER FACE HORIZONTAL


BAR @ 0.21M O.C.
INNER FACE VERTICAL
BAR @ 0.21M O.C.
OUTER FACE VERTICAL OUTER HORIZONTAL
BAR @ 0.30M O.C. TEMPERATURE BAR @
0.15M O.C.
16 MM DIA. J-BARS
SPACED STAGGERED
AS SHOWN @0.21M O.C.

CONSTRUCTION JOINT

H=8.00M

H=8.00M
FOOTING TOP BARS
@ 0.23M O.C.
WASTE
FOOTING TOP
TEMPERATURE BARS
@ 0.17M O.C.

16 MM DIA. J-BARS
SPACED STAGGERED
AS SHOWN @0.21M O.C.
1.5mm HDPE MEMBRANE
PERMEABILITY ≤ 1X10^-6
FOOTING BOTTOM
TEMPERATURE BARS
@ 0.17M O.C.
2-16 MM DIA REINFORCING
BARS @ 0.21M O.C.
FOOTING BOTTOM
BARS @ 0.23M O.C.

0.76M
0.76M

100MM THICK LEAN CONCRETE


(CONCRETE CLASS "B")

VARIES
1.20M
1.90M 1.90M
5.00M

TYPICAL DETAIL OF RETAINING WALL FRONT ELEVATION OF RETAINING WALL


1:50 mts
scale 1:50 mts
scale

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL RETAINING WALL
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
50 X 50 HORIZONTAL
50 X 50 HORIZONTAL
COCO LUMBER
COCO LUMBER
2.50m

1.00m 1.20m
DISPLAY AREA

1.2 m 1.0 m
(1200 X 2400 X 12
DISPLAY AREA
MARINE PYLWOOD)

2.00m
2.00m
50 X 75 VERTICAL 50 X 75 VERTICAL
COCO LUMBER COCO LUMBER

50 X 50 WOODEN STAKE GROUND LEVEL


0.65m

0.65m
0.73m
1.0 m 0.50 m 2.40m 0.50m

GROUND LEVEL

typical frame elevation front elevation (option 1) 0.28m

sign board details perimeter fence details


not drawn to scale scale 1:60 mts

0.20m
0.05m

0.70m
0.32m 1.00m
3.00m

1.00m
1.02m

0.08m 0.10m 2.00m 1.27m


1.27m 0.40m
0.52m

front elevation plan side elevation plan


top view rear elevation plan

guard house
scale 1:60 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL
GUARD HOUSE
PERIMETER FENCE
BRGY. TALEB, BANTAY, ILOCOS SUR
SIGN BOARD
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
D

PLAIN DOWEL BAR

300
36mm Ø x 600 @ 300
C
O.C. (280mm) LANE SHOWING TRANSVERSE

300
CONSTRUCTION JOINT AT LOCATION
DEFORMED TIE BAR OF WEAKENED PLANE JOINT

300
16mm Ø x 600 @ 600

WIDTH AS SHOWN IN PLANS


A
O.C. (230mm)

300
300
TRANSVERSE CONSTRUCTION JOINT

600
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600

600
300 300 300 300

LANE SHOWING TRANSVERSE

600
CONSTRUCTION JOINT AT MIDDLE
THIRD OF NORMAL JOINT INTERVAL

600
B

4500 4500 1500 (MIN.)

TYPICAL PLAN OF TWO LANE PAVEMENT(280mm)


NOT TO SCALE

PLAIN DOWEL BAR


DEFORMED TIE BAR 36mm Ø x 600 @ 300
FORMED GROOVE WITH KEYWAYS
16mm Ø X 600 @ 600 O.C. DEFORMED TIE BAR
FILL WITH POURED JOINT FILLER
16mm Ø x 1000 @ 600 O.C.
12
FORMED GROOVE WITH
5
1/3T 1/3T 1/3T

POURED JOINT FILLER LONGITUDINAL JOINT


12mm

5mm

25mm
T

FIRST SLAB

DETAIL "A" FIRST SLAB


SCALE 1:10 M

DETAIL "D"
SCALE 1:10 M

DEFORMED TIE BAR


16mm Ø X 600 SAWED GROOVE WITH POURED
@ 600 O.C. JOINT FILLER
6.0mm
5mm

50mm

(minimum) b b
T/2

PLAIN DOWEL BAR b b


FORMED GROOVE WITH KEYWAYS a a
36mm Ø X 600
@ 300 FILL WITH POURED JOINT FILLER
TRANSVERSE CONTACT JOINT
T/2

12
OF WEAKENED PLANE JOINT

25

1/3T
DETAIL "B" 1/3T 1/3T DETAIL OF BAR SPACING

T
SCALE 1:10 M
ALONG CURVES
FIRST SLAB
SAWED GROOVE WITH POURED 25
JOINT FILLER (@ 4.5m INTERVAL OR 300(200mm) 300(200mm)
6mm AS DIRECTED BY THE ENGINEER)
5mm

50mm

(minimum) S E C T I O N "E"
SCALE 1:10 M
KEYED TRANSVERSE CONSTRUCTION ON CONTACT JOINT (TO BE
PLACED ONLY IN MIDDLE THIRD OF NORMAL JOINT INTERVAL)

DETAIL "C"
SCALE 1:10 M

SCALE: 1:60

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL ACCESS ROAD
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
LEGENDS:

STEEL PLATFORM
LOAD CELL
CONCRETE FOUNDATION

9.00m
1.95m

R0.15m
0.50m

3.00m
0.50m

2.00m
5.00m

floor plan (weighbridge)


scale 1:100 mts

0.25m

0.20m

cross-sectional area (weighbridge)


scale 1:100 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL WEIGHBRIDGE
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
0.80m

0.56m
2.10m
0.75m

elevation plan
left1:100 right elevation plan
scale mts
1:100 mts
scale

1.20m

1.20m

front elevation plan rear elevation plan


1:100 mts
scale 1:100 mts
scale

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL ADMIN OFFICE
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
3.00m 3.10m 2.95m

4376.60

497340
9.05m

floor plan(ADMIN OFFICE) FOUNDATION plan (AdmIN OFFICE)


scale 1:80 mts scale 1:80 mts

3.80m

0.60m 2.00m

2188070
1.80m 1.80m

public comfort room


scale 1:80 mts ROOF BEAM LAYOUT (ADMN. BLDG)
scale 1:80 mts
SCALE: 1:80

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL ADMIN OFFICE ROOF BEAM LAYOUT,
FLOOR & FOUNDATION PLAN
BRGY. TALEB, BANTAY, ILOCOS SUR
PUBLIC COMFORT ROOM FLOOR PLAN CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
LC L
1.80m 0.75 LC
L/4 L/4

EQ.

EQ.
TOP BARS AT
CANTILEVER'S TOP BARS TOP BARS
DISCONTINUOUS AT SUPPORT AT MIDSPAN
END

d
1.80m
EQ.
2d 2d
BOTTOM BARS BOTTOM BARS
AT SUPPORT AT MIDSPAN NO SPLICE

BOTTOM BARS BOTTOM BARS SHALL BE


AT CANTILEVER'S AT SUPPORT
DISCONTINUOUS
END
EQ. ALLOWED 2d

FROM THE
0.165 L1

SUPPORT
50mm
AT MAX.
FACE OF THE

SUPPORT

PLAN DISCONTINUOUS
FREE END
CONTINUOUS END
"A" OR "B"
(SEE REMARKS)
CONTINUOUS END
"A" OR "B"
(SEE REMARKS)

SECTION

0.40mm PRE-PAINTED RIDGE ROLL

TYP. BEAM DETAIL 2 12" X 2 12" X 41" TC/ BT


0.40mm PRE-PAINTED RIB TYPE
1:100 mts
scale ROOFING (VERIFY COLOR)

2" X 4" C-PURLIN WITH ANGLE CLEAT

0.30m
0.40mm PRE-PAINTED
BOX GUTTER
0.30m C1 DETAIL

STRAINER

0.30m 2"x10" C-PURLINS

3"Ø PVC
2" X 2" X 14" WM DOWNSPOUT
0.20m 1.23m 2.05m 2.05m 1.23m 0.20m
1.43m 5.00m 1.43m
VERIFY

01
S-6
10MM Ø BENT BARS @ 14 FROM SUPPORT
10MM Ø TOP AND BOTTOM BARS SPACED
@ 150MM B.W.
(L)
(L/4) (L/4)

120MM. THK. SLAB TRUSS DETAIL


scale 1:100 mts

0.35m SECTION

SLAB DETAIL
1:100 mts
scale

footing detail
1:100 mts
scale

STRUCTURAL DETAIL of admin office


scale 1:80 mts

SCALE: 1:80

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL STRUCTURAL DETAIL OF ADMIN OFFICE
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
rear elevation plan left elevation plan
scale 1:120 mts scale 1:120 mts

front elevation plan right elevation plan


scale 1:120 mts scale 1:120 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL MATERIALS RECOVERY FACILITY
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
11.05m 3.95m
5.425m 5.425m

RECYCLABLE HAZARDOUS WASTE/

2.70m
(PLASTICS, CARTONS, DRY PAPERS, CANS, STYROFOAMS, GLASS
MIRRORS,GLASS BOTTLES) E-WASTE
(PAINTS,TV'S, COMPUTER'S PARTS, WIRES )

1.30m
1.00m

1000.0000
1000.0000

10.00m

10.00m
2.00m

DROPPING

2000.0000
2.00m POINT

2000.0000

2000.0000
4.00m

PLASTIC SHREDDER/ GLASS SHREDDER/


PLASTIC DENSIFIER PULVIRIZER
(FOR HOLLOW BLOCKS, BRICKS)
(WITH PLASTIC MOULDER - FOR PLANT BOX, BRICKS)

5.425m
15.00m
FOUNDATION PLAN (MRF)
scale 1:200 mts

floor plan(MRF)
scale 1:200 mts

10.00m
ROOF BEAM LAYOUT (MRF)
scale 1:200 mts
SCALE: 1:120

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL
MRF ROOF BEAM LAYOUT,
FLOOR AND FOUNDATION PLAN
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
1.80m

1.80m LC
0.75 LC
L/4
L
L/4

EQ.

EQ.
TOP BARS AT

PLAN CANTILEVER'S
DISCONTINUOUS
END
TOP BARS
AT SUPPORT
TOP BARS
AT MIDSPAN

d
EQ.
2d 2d
BOTTOM BARS BOTTOM BARS
AT SUPPORT AT MIDSPAN NO SPLICE

BOTTOM BARS BOTTOM BARS SHALL BE


AT CANTILEVER'S AT SUPPORT
DISCONTINUOUS
END
EQ. ALLOWED 2d

FROM THE
0.165 L1

SUPPORT
50mm
AT MAX.
0.30m FACE OF THE

SUPPORT

DISCONTINUOUS CONTINUOUS END CONTINUOUS END


0.40mm PRE-PAINTED RIDGE ROLL
FREE END "A" OR "B" "A" OR "B"

0.30m C1 DETAIL
(SEE REMARKS) (SEE REMARKS)
2 21" X 2 12" X 41" TC/ BT
SECTION 0.40mm PRE-PAINTED RIB TYPE
ROOFING (VERIFY COLOR)

2" X 4" C-PURLIN WITH ANGLE CLEAT

TYP. BEAM DETAIL 0.40mm PRE-PAINTED


0.30m BOX GUTTER

STRAINER

2"x10" C-PURLINS
VERIFY

3"Ø PVC
1
2" X 2" X 4" WM DOWNSPOUT
0.20m 1.23m 2.05m 2.05m 1.23m 0.20m
10MM Ø BENT BARS @ 14 FROM SUPPORT 1.43m 5.00m 1.43m
10MM Ø TOP AND BOTTOM BARS SPACED
@ 150MM B.W. 01
(L)
(L/4) (L/4) S-6

120MM. THK. SLAB

0.35m SECTION
TRUSS DETAIL

SLAB DETAIL
footing detail

STRUCTURAL DETAIL of mrf


scale 1:80 mts

SCALE: 1:60

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL STRUCTURAL DETAIL OF MRF
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
1.00m

1.50m 2.00m 1.50m

left elevation plan


scale 1:120 mts
front elevation plan
scale 1:120 mts

1.50m 2.00m 1.50m

rear elevation plan


right elevation plan scale 1:120 mts
1:120 mts
scale

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL MOTORPOOL
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
20.00m
5.00m 5.00m 5.00m 5.00m

C1F1 C1F1 C1F1 C1F1 C1F1


B1 B1 B1 B1

20.00m

5.00m
B1 B1 B1 B1 B1
5.00m 5.00m 5.00m 5.00m

C1F1 C1F1 C1F1 C1F1 C1F1

10.00m
ENTRANCE ENTRANCE ENTRANCE

B1 B1 B1 B1 B1

5.00m
C1F1 C1F1 C1F1 C1F1 C1F1

2.00m
BAY 1 BAY 2 BAY 3 1.00m
1.00m
B1 B1 B1 B1

1.00m
Storage for:
-Used Oil
-Car Batteries
-Used Tires
tion Plan
Foundamts
2.00m

5.00m
Heavy Heavy Heavy
Storage Equipment Equipment Equipment
Area Area Area
scale 1:150
Room

10.00m
Storage for:
-Tools
-Other Equipments
Storage Heavy Heavy Heavy
2.00m

5.00m
Equipment Equipment Equipment
Room 1.00m Area Area Area

BAY 6 BAY 5 BAY 4


2.00m

ENTRANCE ENTRANCE ENTRANCE

floor plan
scale 1:150 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL MOTORPOOL FLOOR PLAN
BRGY. TALEB, BANTAY, ILOCOS SUR MOTORPOOL FOUNDATION PLAN
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
1.80m

LC L
1.80m

L/4 L/4
0.75 LC
EQ.

EQ.
TOP BARS AT
CANTILEVER'S TOP BARS TOP BARS
DISCONTINUOUS AT SUPPORT AT MIDSPAN
END

d
EQ.
2d
PLAN BOTTOM BARS
AT SUPPORT
2d BOTTOM BARS
AT MIDSPAN NO SPLICE
0.40mm PRE-PAINTED RIDGE ROLL

2 21" X 2 21" X 14" TC/ BT


BOTTOM BARS BOTTOM BARS SHALL BE


1509.69
AT CANTILEVER'S AT SUPPORT
DISCONTINUOUS EQ. ALLOWED 2d 0.40mm PRE-PAINTED RIB TYPE

1510.12
END
FROM THE ROOFING (VERIFY COLOR)
0.165 L1

SUPPORT
50mm
AT MAX.
FACE OF THE
2" X 4" C-PURLIN WITH ANGLE CLEAT
SUPPORT 02
DISCONTINUOUS
FREE END
CONTINUOUS END
"A" OR "B"
(SEE REMARKS)
CONTINUOUS END
"A" OR "B"
(SEE REMARKS)

198.98
S-6
03
S-6 198.98
0.30m SECTION

0.30m C1 DETAIL 0.40mm PRE-PAINTED


BOX GUTTER
TYP. BEAM DETAIL
STRAINER

1
2"x10" C-PURLINS
2" X 2" X 4" WM
0.30m 3"Ø PVC
DOWNSPOUT

1311.15 4999.78 5000.22 1310.71


01
VERIFY

10MM Ø BENT BARS @ 14 FROM SUPPORT S-6


10MM Ø TOP AND BOTTOM BARS SPACED

(L/4)
(L)
@ 150MM B.W.

(L/4) 10000.00
120MM. THK. SLAB

0.35m SECTION
SLAB DETAIL TRUSS DETAIL

footing detail

STRUCTURAL DETAIL of mOTORPOOL


scale 1:80 mts

SCALE: 1:80

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL STRUCTURAL DETAIL OF MOTORPOOL
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
front elevation plan
1:120 mts
scale right elevation plan
scale 1:120 mts

rear elevation plan


1:120 mts
scale elevation plan
left1:120
scale mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL WASH BAY
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
6 6
2 4
1 High Pressure Hose To
1 1
3 5
Ceiling Boom

3.00m 3.00m 3.00m 3.00m 3.00m


A Wash Pad
A
0.80m
C1F1 C1F1 C1F1 C1F1 C1F1 C1F1
EXIT ENTRANCE
1 1 1

4.00m
6.00m

wash bay plan

1.00m
to scale
drawn not

C1F1 C1F1 C1F1 C1F1 C1F1 C1F1


1.00m
15.00m

1 2 1 1
4

foundation plan 6 High Pressure Hose To


mts
scale 1:120 Ceiling Boom
6

5
Wash Pad

cross- section a-a


not to scale
drawn

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL WASH BAY PLAN AND FOUNDATION PLAN
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
1.80m
1.80m

LC L
L/4 L/4
0.75 LC
PLAN EQ.

EQ.
TOP BARS AT
CANTILEVER'S TOP BARS TOP BARS
DISCONTINUOUS AT SUPPORT AT MIDSPAN
END

295.42 1946.08

d
EQ. 0.40mm PRE-PAINTED RIDGE ROLL
2d 2d
BOTTOM BARS BOTTOM BARS
AT SUPPORT AT MIDSPAN 2 12" X 2 12" X 41" TC/ BT

256.42
NO SPLICE

0.40mm PRE-PAINTED RIB TYPE

256.42
BOTTOM BARS BOTTOM BARS SHALL BE
AT CANTILEVER'S AT SUPPORT
DISCONTINUOUS EQ. ALLOWED 2d ROOFING (VERIFY COLOR)
0.30m END
FROM THE
0.165 L1

SUPPORT
50mm
AT MAX.
2" X 4" C-PURLIN WITH ANGLE CLEAT
FACE OF THE

SUPPORT

0.30m C1 DETAIL
DISCONTINUOUS CONTINUOUS END CONTINUOUS END
FREE END "A" OR "B" "A" OR "B"
(SEE REMARKS) (SEE REMARKS)

SECTION
0.40mm PRE-PAINTED
BOX GUTTER

0.30m TYP. BEAM DETAIL STRAINER

2"x10" C-PURLINS
1
2" X 2" X 4" WM
3"Ø PVC
DOWNSPOUT

1689.66 340.92 2999.93 1689.66


VERIFY

01
S-6

(L)
10MM Ø BENT BARS @ 14 FROM SUPPORT
10MM Ø TOP AND BOTTOM BARS SPACED
@ 150MM B.W.
6000.00
(L/4) (L/4)

0.35m SECTION 120MM. THK. SLAB

footing detail SLAB DETAIL

STRUCTURAL DETAIL of WASH BAY


scale 1:80 mts

SCALE: 1:80

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL
BRGY. TALEB, BANTAY, ILOCOS SUR STRUCTURAL DETAIL OF WASH BAY
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
1.00m 5000.00

SORTING AREA FACILITY

1.90m
1.00m BIODEGRADABLE

SORTING AREA

2.00m
6.00m
RECYCLABLE/HAZ. WASTE/SPECIAL WASTE
1.00m

1.90m
1.00m RESIDUALS

1.90m 3.00m

sorting facility
scale 1:60 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL SORTING FACILITY
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
6.00m
Manhole
1.20m

0.97m
FIRST HOLDING CHAMBER
FILTER CHAMBER

Natural

230.0000
Ground

264.2630
Inlet

4.24m
Sludge Filter Media
FIRST HOLDING CHAMBER

Outlet
3° SECOND HOLDING
CHAMBER

Baffle
1000.00
2000.00 1500.001500.00

1.00m 2.00m 1.50m 1.50m

3000.00
1000.00

SEPTIC tank
scale 1:60 mts

SCALE: 1:60

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL SEPTIC TANK
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
3.00m

3.00m

0.50m

4.00m
3.00m

Natural
0.50m Ground

1.50m 1.50m

SEPTIC VAULT (HAZARDOUS/


MEDICAL/INFECTED/SPECIAL WASTE
scale 1:600 mts

SCALE: 1:60

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL SEPTIV VAULT
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
4.00m
3.00m

1.20m

2.00m
3.00m

1.20m
0.90m 1.20m

floor plan
scale 1:100 mts
rear elevation plan
1:100 mts
scale

0.30m

0.90m

side eleva tion plan


front elevation plan mts
scale 1:100
1:100 mts
scale

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL PUMP HOUSE
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
60.00 M

41.00 M

LEACHATE/ SEDIMENTATION POND (PLAN VIEW)


scale 1:400 mts

FENCE
60.00 M
FENCE
1.5mm HDPE MEMBRANE
41.00 M PERMEABILITY ≤ 1X10^-6

1.5mm HDPE MEMBRANE FENCE


PERMEABILITY ≤ 1X10^-6
FENCE LEACHATE
COLLECTION

3.50 M
PIPE
3.50 M

LONGITUDIN AL SECTION
1:400 mts
scale
TRANSVERS E SECTION
scale 1:400 mts

SCALE: 1:300

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL LEACHATE/SEDIMENTATION POND
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
8.00m

1.50m 0.75m 0.75m 0.75m

5 - 3"Ø Perforated
1.50m

Manhole PVC Pipe and Ball


Valve

4.50m
From ABR

3.75m

top view plan (abr)


scale 1:50 mts

top view plan (reed bed)


scale 1:50 mts

1.50m 0.75m 0.75m 0.75m From ABR


Vetiver Plant
Manhole
6"Ø HDPE Inlet Pipe
RCC Wall Coarse Aggregate
0.375m Baffled
6"Ø HDPE Outlet Pipe
Soil (Loam)
1.50m

Gravel
Sand

5 - 3"Ø Perforated
PVC Pipe and Ball
Valve

Clay
3.75m
7.00m
cross-se ctional area (abr)
scale 1:50 mts cross-sec tional area (reed bed)
scale 1:50 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL ABR AND REED BED
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
From Reed Bed

1.00m

0.16m

2.00m 2.00m 2.00m


0.16m

A A
0.16m 6.00m

To be disinfected

2.50m
10.00m

10.00m

cross-sectional area (disinfection)


scale 1:100 mts

10.00m

floor plan (disinfection)


scale 1:100 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL DISINFECTION
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
24.00m

8.00m 8.00m 8.00m

4.00m 7.84m 7.84m 3.84m

A A
6.00m

12.00m
6.00m

floor plan (sludge drying bed)


scale 1:150 mts

Screen
Leachate collection pipe

0.30m


2.00m

8.00m 8.00m 8.00m

Sludge

cross-sectional area (sludge drying bed)


scale 1:150 mts

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL SLUDGE DRYING BED
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
41.00 M

27.00 M

STORM POND (PLAN VIEW)


scale 1:300 mts

27.00 M 41.00 M
FENCE FENCE FENCE FENCE

NGL NGL
4.00 M

4.00 M
TRANSVE RSE SECTION LONGITU DINAL SECTION
1:300 mts
scale 1:300 mts
scale

SCALE: 1:300

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU PROPOSED CATEGORY II SANITARY LANDFILL STORM POND
BRGY. TALEB, BANTAY, ILOCOS SUR
CIVIL ENGINEER ENVIRONMENTAL CHIEF, ECOLOGICAL SOLID WASTE CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION
SCALE: 1:80

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED: SUBMITTED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
ENVIRONMENTAL MANAGEMENT BUREAU
REGIONAL OFFICE NO. 1 ENGR. RHEMELYN L. CALAOAGAN ENGR. MELECIO Q. LLANES, JR. ENGR. RYANNE N. NARVAEZ ENGR. MARIA DORICA NAZ-HIPE, CESE
DENR BLDG., GOVERNMENT CENTER, SEVILLA, CITY OF SAN FERNANDO, LA UNION
CIVIL ENGINEER ENVIRONMENTAL OIC - CHIEF, ECOLOGICAL SOLID WASTE OIC - CHIEF, ENVIRONMENTAL MONITORING AND REGIONAL DIRECTOR
MONITORING OFFICER MANAGEMENT SECTION