This construction punch list contains 11 items requiring work on the interior fit-out of the proposed EDC Office. The punch list notes needed repairs and improvements to the entrance door, reception counter, work cubicles, seating area, pantry shelving, floating shelves, and a junior executive office. The general contractor is ALZA Construction and the architect is Ar. June Carlo A. Zapanta.
This construction punch list contains 11 items requiring work on the interior fit-out of the proposed EDC Office. The punch list notes needed repairs and improvements to the entrance door, reception counter, work cubicles, seating area, pantry shelving, floating shelves, and a junior executive office. The general contractor is ALZA Construction and the architect is Ar. June Carlo A. Zapanta.
This construction punch list contains 11 items requiring work on the interior fit-out of the proposed EDC Office. The punch list notes needed repairs and improvements to the entrance door, reception counter, work cubicles, seating area, pantry shelving, floating shelves, and a junior executive office. The general contractor is ALZA Construction and the architect is Ar. June Carlo A. Zapanta.
painted in Grey 4 Signage Hide LED Driver Inside Wall Behind Signage (make hole in drywall to house the LED Driver as long as the hole will be covered by EDC Signage)
5 Work Cubicles Apply Finishing Coat
Install Drawer Pulls
6 Seating Area Paint Column Face White
Column 7 Seating Area Apply Filler and Sealant in Gaps Alter Melamine Seating to Allow Operation of Awning Window @ Left Side
8 Pantry Shelving Rectify Sag with Epoxy
Rectify Delaminated Edge Banding 9 Floating Apply Silicone Sealant to all Shelves Wall to Shelf Connections Cover Exposed Screws
10 Various Clean / Retouch Paint Works
@ Edges and Along Conduits 11 Jr Executive Install Melamine Board Office Seating