1-Locations of L/Os are not compliant with the sent composite drawing .

2- Hatch marks need to be revised.


3-Put legend and keyplan.
4-Symbol of EF outlet must be different from socket symbol.
5-Columns need to be hatched . CLIENT:

6- Spaces of lighting must be accurate. PROJECT MANAGER:

ARCHITECTURAL DESIGNER:

NOTE:
TO LUMINAIRES

UNIVERSAL CONDUIT SIZE & NUMBER OF


WIRES WILL AS SHOWN ON SHOP
UPVC CONDUIT CHANNEL
DRAWING PLANS FOLLOWING FILLING
EMBEDDED IN WALL RATIO PER EACH CONDUIT
FEMALE ADAPTOR
WITH MALE BUSHING
LIGHTING SWITCH
PVC JUNCTION BOX PVC CONDUIT
DESIGN CONSULTANT:

UTILITY BOX

WALL
AS SPECIFIED FLEXIBLE METAL CONDUIT

NOTE:
RETAINER PLATE
CONDUIT SIZE & NUMBER OF SUPERVISION CONSULTANT:
WIRES WILL AS SHOWN ON SHOP 3915

DRAWING PLANS FOLLOWING FILLING 545 410 510 545


RATIO PER EACH CONDUIT REFLECTOR

210
d d d d d d
FFL

250
d d

340

340
525
75

944

944
SUSPENDED CEILING d d 70 170 d d
1624 1691 1701
1685 340

1000

1000
RECESSING FRAME

2080
LIGHTING FIXTURE

100
528
265

220
2447 525
200 251
1928 133

395

411
3401 d 84 d d
d CONTRACTOR:
1899 2049

DL-02-FLUSH MOUNTED

11
170
531

445
DL-01-DOWN LIGHT

545
a,b

312

354
220 a,b a,b

LIGHTING SWITCH

2167
RECESSED MOUNTED 2241

1709
OUTLET 2491 1159
2491

a,b
a,b
a,b a,b

FOR LIGHTING OUTLET COVE


1R/DB-G4
LIGHT PROVISION
3*2mm, Φ20 PVC CONDUIT 183

1391

1391
183
KEY PLAN
364 100
170 2000 861 861 507 829 944

394
c 887 350 165 c
c
162 455 d 180 d d d 165
a,b a,b 315 a,b a,b a,b a,b 315 a,b a,b
1549

252
250

241

205
170

170
c,d c,d c,d c,d

892 1133 1217 892


1208

131
851

181

694
518 588 FOR EF-01

354

444
384

366
b a 1R/DB-SER-2 1R/DB-SER-2 a a b

700

700

94

1024
874

874
3*2mm, Φ20 PVC CONDUIT 1033

400

400
FOR EF-01 a
3*2mm, Φ20 PVC CONDUIT

511

501
a
FOR EF-01 FOR EF-01
142 a,b a,b b b a,b a,b

1560
a,b 432 a,b 1R/DB-G4
PVC CIRCULAR BACK BOX 1860
PVC CONDUIT 3*2mm, Φ20 PVC CONDUIT

2138
b b 3330
b b
1530 1530
1R/DB-G4 1R/DB-G4
3*2mm, Φ20 PVC CONDUIT 3*2mm, Φ20 PVC CONDUIT
b b b b b b b b FOR EF-01

FOR EF-01 a,b a,b


a,b a,b

200
200

200
1725

1725
FOR EF-01 FOR EF-01

1665

1665
6B/DB-G4
100100
3*2mm, Φ20 PVC CONDUIT

2322

917

1447
1431
6B/DB-G4

3779

1245

3839
a a a a a
a 3*2mm, Φ20 PVC CONDUIT a a
FOR EF-01
1200 FOR EF-01 FOR EF-01 1200
6B/DB-G4 650 2480
FOR EF-01 1775
200 650 6B/DB-G4
385
a,b 3*2mm, Φ20 PVC CONDUIT a,b 474 485 a,b a,b 345
a a a 3*2mm, Φ20 PVC CONDUIT
a
NOTE: 550
1200
1200

541
a,b,c 1258 a,b,c

820

820
825
CONDUIT SIZE & NUMBER OF

718
374

1085
b b b b
WIRES WILL AS SHOWN ON SHOP

100
LIGHTING FIXTURES b 429 b b 429 b

1600
DRAWING PLANS FOLLOWING FILLING 3144

135
a,b,c a,b,c

597
101

425
RATIO PER EACH CONDUIT 101
1080 c c
c c

400
641

2750 1080

DL-06-EMBEDDED IN 2Y/DB-G4
3*2mm, Φ20 PVC CONDUIT 2Y/DB-G4
CONCRETE SLAB 2Y/DB-G4 2Y/DB-G4
3*2mm, Φ20 PVC CONDUIT

3*2mm, Φ20 PVC CONDUIT 3*2mm, Φ20 PVC CONDUIT

1 GROUND FLOOR PLAN


DG-02-PANEL BOARD 1 : 50

FLUSH MOUNTING DETAIL

DOOR 200 150

DP SWITCH-(POWER)

SWITCH FOR LIGHT REFERENCES LIST :


DWG. NO. DWG. TITLE
1200

150

TELEPHONE/DATA OUTLET

TWIN SOCKET OUTLET


450

FINISHED FLOOR LEVEL

SCREED

CONCRETE SLAB
00 JAN-2023
REV DATE ISSUED FOR DRW CHK TL PM

PROJECT:
DG-04-STANDARD
ZED EAST - PHASE 1
MOUNTAING HEIGHT OF
Filling Ratio 3*2 NEW CAIRO
ELECTRICAL
BUILDING/UNIT:
ACCESORIES
CHALET TYPE G+3A

DRAWING TITLE:

GROUND FLOOR PLAN

SCALE DRAWING NO. SIZE REV.


A0 00
ZE-P1C3-PKB-CPC-SHD-G+3A-L-329-00
DRAWN BY CHECKED BY APPEOVED BY DATE
M.K H.S A.E 31/01/2023

You might also like