ARCHITECTURAL DESIGNER:
NOTE:
TO LUMINAIRES
UTILITY BOX
WALL
AS SPECIFIED FLEXIBLE METAL CONDUIT
NOTE:
RETAINER PLATE
CONDUIT SIZE & NUMBER OF SUPERVISION CONSULTANT:
WIRES WILL AS SHOWN ON SHOP 3915
210
d d d d d d
FFL
250
d d
340
340
525
75
944
944
SUSPENDED CEILING d d 70 170 d d
1624 1691 1701
1685 340
1000
1000
RECESSING FRAME
2080
LIGHTING FIXTURE
100
528
265
220
2447 525
200 251
1928 133
395
411
3401 d 84 d d
d CONTRACTOR:
1899 2049
DL-02-FLUSH MOUNTED
11
170
531
445
DL-01-DOWN LIGHT
545
a,b
312
354
220 a,b a,b
LIGHTING SWITCH
2167
RECESSED MOUNTED 2241
1709
OUTLET 2491 1159
2491
a,b
a,b
a,b a,b
1391
1391
183
KEY PLAN
364 100
170 2000 861 861 507 829 944
394
c 887 350 165 c
c
162 455 d 180 d d d 165
a,b a,b 315 a,b a,b a,b a,b 315 a,b a,b
1549
252
250
241
205
170
170
c,d c,d c,d c,d
131
851
181
694
518 588 FOR EF-01
354
444
384
366
b a 1R/DB-SER-2 1R/DB-SER-2 a a b
700
700
94
1024
874
874
3*2mm, Φ20 PVC CONDUIT 1033
400
400
FOR EF-01 a
3*2mm, Φ20 PVC CONDUIT
511
501
a
FOR EF-01 FOR EF-01
142 a,b a,b b b a,b a,b
1560
a,b 432 a,b 1R/DB-G4
PVC CIRCULAR BACK BOX 1860
PVC CONDUIT 3*2mm, Φ20 PVC CONDUIT
2138
b b 3330
b b
1530 1530
1R/DB-G4 1R/DB-G4
3*2mm, Φ20 PVC CONDUIT 3*2mm, Φ20 PVC CONDUIT
b b b b b b b b FOR EF-01
200
200
200
1725
1725
FOR EF-01 FOR EF-01
1665
1665
6B/DB-G4
100100
3*2mm, Φ20 PVC CONDUIT
2322
917
1447
1431
6B/DB-G4
3779
1245
3839
a a a a a
a 3*2mm, Φ20 PVC CONDUIT a a
FOR EF-01
1200 FOR EF-01 FOR EF-01 1200
6B/DB-G4 650 2480
FOR EF-01 1775
200 650 6B/DB-G4
385
a,b 3*2mm, Φ20 PVC CONDUIT a,b 474 485 a,b a,b 345
a a a 3*2mm, Φ20 PVC CONDUIT
a
NOTE: 550
1200
1200
541
a,b,c 1258 a,b,c
820
820
825
CONDUIT SIZE & NUMBER OF
718
374
1085
b b b b
WIRES WILL AS SHOWN ON SHOP
100
LIGHTING FIXTURES b 429 b b 429 b
1600
DRAWING PLANS FOLLOWING FILLING 3144
135
a,b,c a,b,c
597
101
425
RATIO PER EACH CONDUIT 101
1080 c c
c c
400
641
2750 1080
DL-06-EMBEDDED IN 2Y/DB-G4
3*2mm, Φ20 PVC CONDUIT 2Y/DB-G4
CONCRETE SLAB 2Y/DB-G4 2Y/DB-G4
3*2mm, Φ20 PVC CONDUIT
DP SWITCH-(POWER)
150
TELEPHONE/DATA OUTLET
SCREED
CONCRETE SLAB
00 JAN-2023
REV DATE ISSUED FOR DRW CHK TL PM
PROJECT:
DG-04-STANDARD
ZED EAST - PHASE 1
MOUNTAING HEIGHT OF
Filling Ratio 3*2 NEW CAIRO
ELECTRICAL
BUILDING/UNIT:
ACCESORIES
CHALET TYPE G+3A
DRAWING TITLE: