Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Method statement for INSTALLATION OF CABLE

CONTAINMENTS
For

PROJECT: QATAR COOL

First floor,
WESTBAY, DOHA, QATAR

Main Contractor: SALAM TECHNOLOGY

SALAM TECHNOLOGY
P.O. Box 22658 6th Floor,
Bay Tower 2 The Gate Maysaloun
Street, West Bay
+974 40206250, +974 44077265

http://info@salamtechnology.com
INDEX
1) INSTALLATION OF CABLE CONTAINMNETS – CONDUITS, CABLE TRAY AND TRUNKING
a) Method statement
i) Scope
ii) Purpose
iii) Quality control
iv) Pre-installation works
v) References
vi) Tools and equipment’s
vii) General requirements
viii) Site material handling and storage
ix) Preparation of installation Activities
x) Installation procedure
 Normal lighting – Containment
 Small power - Containments
xi) Inspection
xii) Emergency contact
xiii) Health and safety
xiv) Employers responsibility
xv) Work place access and Egress
xvi) Work place lighting
xvii) Waste management
xviii) Supervision and resource personal
xix) Third party protection
xx) Communication
xxi) Temporary power supply
xxii)Fire emergency and accident reporting procedures.
b) Risk Assessment
2) Job Hazard Analysis for INSTALLATION OF CABLE CONTAINMNETS
3) ITP and Checklist for INSTALLATION OF CABLE CONTAINMNETS

You might also like