2 Architect's Certificate of Percentage of Completion of Work (Form 1)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

l3l

{t
Flol No. I7, 4th floor,
rieg. No. : Clv87ll I
Apodrient, lchollonyo Hospttol Eulldhgl, fune Slnhgod Rood,
RohL SoXIlo
Shrimd
ll€or Nllo),om 8 d99, Porvoli, CB No, 253 A, Fhol Plo, No, 588/A. tune | 4l I 030. Padhye
\ Phono No. : 10201 24333935, 9422361389. Emoll : sh,lFodpodht€@Whoo.com
Webalio : wwworshdpodpodh\re.com

!98!4llsec ReSulatlon 3l

ARCHITECT'S CERTIFICATE

Date:20.07.2021

To

Synergy Properties
Flat No 2, BuildinB 50 & 51,
Samayadnya Co-operative Housing Society,
Opp. SPM English Medium School,
Lokmanya Nagar, Sadashiv peth, pune 411030

Subiectr Certificate of percentage of Completion of development Work Require for


LilahaRERA updation of the project pALOMA, situated on the Gat No 268 demarcated by
its boundaries (18 39'39" N 73 36,05,,8) 6at No 271. Gat No 272 _ to the North, Road And

MhaskeHouse- totheSouth, GatNo269,GatNo27O,Gat27!_ to the Eas! Gat No 272 _

to the West of Village - Adhale Budruk, Taluka - Maval, District _ pune _ 410506
admeasuring 25810.00 sq.mts. area being developed by Synergy properties.

Ref iMahaRERA Registration No p52100028735


l

Sir,

I Arch. Shripad Padhye have undertaken assagnment as Architect of certifying percentage

of Completion ofdevelopment Work ofthe plotted layout of the project PALOMA, situated

on Gat No 268 of Village - Adhale Budruk, Taluka - Maval, District, pune pin _ 410506

admeasuring 26810.00 sq.mts. area being developed by Synergy properties.


_)

Reg. No. : 4ry87n l r3l


Flot No. I 7, 4lh floor, Rohl Sokho Aporlment {Choltonyo Hospito Buidlng), Pune Slnhgod Rood,
Neor Nlloyom Brdge, Porvoll, CTS No. 253 A, Flnol Plol No. 588/4, Pune r 41 1030
Phone No. i (020124333935, 9422361389. Emoll : sh podpodhye@yohoo.com
v
$hrinad
PadhyG
Webdle r wwworshdpodpodh!€,com

1. FollowinB technical professionals are appointed by Owner / Promoter:_

i. Mr. Shripad Padhye as Architect

ii. Mr. Shishir Dhawade as Structural consultant

iii. Mr. lmran Shaikh as MEP Consultant

iv. Mr. Jitendra Borate as Project Engineer

Based on Site lnspectioh, with respect to each of the Building/Wing of the aforesaid Real
Estate Project, I certify that as on the date of this certificate, the Percentage of Work done
for each of the building/wing/Plotted Layout of the Real Estate Project as registered vide
number P52100028735 under MahaRERA is as per table A herein below. The percentage of
the work executed with respect to each of the activity of the entire phase is detailed in
Table B.

Sr.
NO

1 Excavation NA

2 number of Basement(s) and Plinth NA

3 number of Podiums NA

4 stilt Floor NA
5 of Slabs of Super Structure NA

6 lnternal wdlls, lnternal Plaster, NA


Floorings within Flats/Premises,
Doors and Windows to each ofthe Flat/Premises
-number
7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the
l Flat/Premises
l

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting NA


Staircases and Llfts, Overhead and Underground waterTanks

T
Flot No. I7, 4lh floor,
Reg. No, I Clv87ll I l3l
Rohl So$lo Aponrn€nt (Chofionyo Hospfol Eultdtngl, tun6 Stnhgod Rood,
N€or Nlloyorn Brldge, Fbrvon, CTS No. 253 A Flnol Pbt No, 588/4, tun6 | 4t I030.
Phon€ No. : 1020) 24333935, 9422361 389. Emo : shipodpodhy€@|&hoo,com
Ar.
v
Shripad
PadhTG
I Webllle : wwworshdpodpodhyo,com

9 The external plumbing and external plaster, elevation, NA


completion of terraceswith waterproofing of the
Buildin&/Win8.
10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment NA
as per cFo Noc, Electrical fittin8s to common Areas, electro,
mechanical equipment, Compliance to conditions of environment /CRZ
NOC, Finishing to entrance lobby/s, plinth protection, paving of areas
appurtenant to
Buildin&/Wing, Compound Wall and all other
requirements as may be required to Obtain Occupation /Completion
Certificate
Table A

Building /Wing Number (to be prepared separately for each Building /Wing of the
I
Project)

TABI.E-B

S.No Common areas Proposed Percentage of Details


and Facilities, (Yes/No) Work done
Amenities
1. lnternal Roads & YES 20yo
Footpaths
I 2. waterSupply YES 0v. PROVISION OF
I BOREWETL&SUPPTY
INFRASIRU CTU RE AS
l
PER CONSULTANT.
3. Sewerag€ YES 0%
(chamber.lines, AS PER CONSULTANT
Septic Tank, STP)
4. Storm Water Drains YES ovo AS PER CONST'LTANT

5. Landscaping & Tree YES 0v. AS PERCON5UITANI

Planting
6. Street Lighting YES o% AS PER CONSULTANT

.--x[,-,,t'
Reg. No. : Clv87ll l l3l
Flol No. I7, 4lh floor, Rohl Sokho Aponrnent lcholtonyo Hospttol Sulldlng), funs Slnhgod Rood,
$hfipad
Neor Nllo'/om grldge, Porvoli. CTS No. 253 A, FlnolPlol No. 588/A, funs i 411030. Padhye
Phon6 No. : 1020)24333935, 9422361389. lmolr : shripodpodhye@h/ohoo.com
Wobllle : wwwoBhripodpodhye.com

7. Community NO ov
Buildings
8. Treatment and YES oyo A5 PER CONSULTANT
d isposa I of sewage
I and sullage water
l
9. Solid Waste YE5 o%
management & AS PERCONSUTTANT

Disposal
10. YES oyr
conservation, Rain
AS PER CONSULTANT

1L. Energy NO 0v.


manaEement
12. Fire protection and NO 0%
fire safety
requirements
13. Electricalmeter YES oyo
room, sub-station, 45 PER MSEOCL

receiving station
14. Others (Option to
Add more)

Yours Faithfully

Signature & Name (tN BLOCK ofArchitect

4.. Shripad Padhye.

{Reg. No. CA"/87