Professional Documents
Culture Documents
Engineering Surveys Laboratory Manual
Engineering Surveys Laboratory Manual
Table of Contents
Page No.
Field Work No. 4. Lay out of Simple Curve using Total Station 8
Field Work No. 5. Lay out of Compound Curve using Total Station 10
1 Total
Equivalent =50+( ) ¿)* 100%
2 Equivalent
hours late
allowable value
13
14
1. Set the base RTK at a convenient location and determine its position.
2. Locate the location of PC and PT base on the coordinate computed.
3. Locate all full stations base on their coordinates.
4. Let your instructor investigate the reverse curve.
16